Loading...
HomeMy WebLinkAboutReports - Drainage - 07/02/2025FINAL DRAINAGE REPORT FOR LIBERTY COMMON JUNIOR HIGH Lots 4, 5, 8 & 9, Prospect Industrial Park FORT COLLINS, CO Prepared for: NEENAN ARCHISTRUCTION 3325 S. Timberline Road, Suite 100 Fort Collins, CO 80525 Contact: Shelby Hinchliff Phone: 970.218.9607 Prepared by: ELEVATION CONSULTING GROUP, LTD. P.O. Box 280869 Lakewood, CO 80226 Contact: Lincoln Thomas, P.E. Phone: 303.204.5065 JN: 2024020 July 2, 2025 Final Drainage Report Liberty Common Junior High Fort Collins, Colorado Elevation Consulting 2 ENGINNER’S CERTIFICATION I hereby attest that this report for the final drainage design for the Liberty Common Junior High was prepared by me or under my direct supervision, in accordance with the provisions of the Fort Collins Stormwater Criteria Manual. I understand that the City of Fort Collins does not and will not assume liability for drainage facilities designed by others. _______________________________________ Lincoln J. Thomas, PE State of Colorado No. 42350 For and on behalf of Elevation Consulting 7/02/25 Final Drainage Report Liberty Common Junior High Fort Collins, Colorado Elevation Consulting 3 TABLE OF CONTENTS 1 General Location and Existing Site Information ........................................................ 4 2 Master Drainage Basin Information ............................................................................ 7 3 Project Description...................................................................................................... 8 4 Drainage Design Criteria ............................................................................................ 9 4.1 Regulations ......................................................................................................... 9 4.2 Four-Step Process ............................................................................................... 9 4.3 Hydrologic Criteria ........................................................................................... 10 4.4 Hydraulic Criteria ............................................................................................. 10 4.5 Low Impact Development................................................................................. 10 5 Variance Requests ..................................................................................................... 11 6 Erosion Control ......................................................................................................... 11 7 Conclusions ............................................................................................................... 11 8 References ................................................................................................................. 12 Appendices ........................................................................................................................ 13 APPENDIX A – Hydrologic Computations APPENDIX B – Hydraulic Computations APPENDIX C – Referenced Information APPENDIX D – Drainage Map Final Drainage Report Liberty Common Junior High Fort Collins, Colorado Elevation Consulting 4 1 General Location and Existing Site Information Liberty Common Junior High (Site) is located within Section 20, Township 7 North, Range 68 West of the 6th P.M. The following public roadways bound the Site, Sharp Point Drive to the northeast, March Court to the northwest and Canton Court to the southeast. Riverbend Court a former public right-of-way bisecting the Site has be vacated per Ordinance No. 004, 2025 and is now part of the Site. Liberty Common Elementary School is located to the northwest and southwest of the Site; 2601 Riverbend Court, 2609 Riverbend Court and 2600 Canton Court, existing commercial buildings, are also located to the southwest of the Site; Merganser Pond is located to the northeast of the Site; 2619 Canton Court, and existing multi-tenant building is located to the southeast of the Site, see vicinity map below. Figure 1-1 Vicinity Map The Site is located within the Cache La Poudre Master Basin per Figure 2.0-1 of the Fort Collins Stormwater Criteria Manual (FCSCM). Final Drainage Report Liberty Common Junior High Fort Collins, Colorado Elevation Consulting 5 There are no major drainageways through the Site. Per Flood Insurance Rate Map (FIRM) Map No. 08069C0984H and 08069C0992G, the Site is located in Zone X and not within a regulatory floodplain of Cache La Poudre River. There are no major irrigation facilities within or adjacent to the Site. Per the NRCS Soils Map in Appendix C, soils for this drainage study consist of Loveland clay loam, Caruso clay loam and Table Mountain loam. NRCS hydrologic soils group C has been used for the hydrology calculations for this drainage study. The Site is 4.05 acres, including the vacated right-of-way for Riverbend Court. Current improvements within the Site consist of 1825 Sharp Point Drive, an existing multi-tenant office building and parking lot; Riverbend Court, an existing cul-de-sac; and 1901 Sharp Point Drive, an existing multi-tenant office building and parking lot. A drainage area of 8.95 acres has been analyzed for the existing condition in this Drainage Report and is divided into 19 existing sub-basins. Basin EX1 (0.73 ac) is located behind the 1825 Sharp Point Drive building. The basin consists of hardscape and landscaping. Runoff sheet flows to three area inlets within the parking lot and conveyed via (3) 12-inch storm sewer pipes under the building to an inlet (Design Point 3) on the front side of the building which outfalls to Merganser Pond. (Q2=1.8 cfs, Q100=7.3 cfs). In the event the inlets becomes plugged, emergency overflow path is at the southwest corner of the 1825 Sharp Point Drive building and into Basin EX3. Basin EX2 (0.44 ac) is located to the north of Basin EX1. The basin consists of the 1825 Sharp Point Drive building roof. Runoff is collected and routed through internal drains to the (3) 12-inch storm sewer pipes under the building and routed to an inlet (Design Point 3) on the front side of the building which outfalls to Merganser Pond. (Q2=1.2 cfs, Q100=4.4 cfs). Basin EX3 (0.09 ac) is located to the west of the 1825 Sharp Point Drive building. The basin consists of hardscape and landscaping. Runoff sheet flows to a swale and drainage channel and is conveyed to the parking lot on the front side of the building, collected in an inlet (Design Point 3) and conveyed to Merganser Pond. (Q2=0.1 cfs, Q100=0.4 cfs). Basin EX4 (0.54 ac) is located in front of the 1825 Sharp Point Drive building. The basin consists of hardscape and landscaping. Runoff sheet flows to an inlet (Design Point 3) and conveyed to Merganser Pond. (Q2=1.1 cfs, Q100=4.9 cfs). In the event the inlet becomes plugged, emergency overflow path is to the north and into Sharp Point Drive. Basin EX5 (0.58 ac) is located to the east of 1825 Sharp Point Drive. The basin consists of hardscape and landscaping. Runoff sheet flows to the vacated Riverbend Court curb and gutter and is conveyed to Sharp Point Drive right-of-way, collected by a sump curb inlet which outfalls to Merganser Pond. (Q2=1.0 cfs, Q100=4.9 cfs). Final Drainage Report Liberty Common Junior High Fort Collins, Colorado Elevation Consulting 6 Basin EX6 (0.28 ac) is located behind the 1901 Sharp Point Drive building. The basin consists of hardscape and landscaping. Runoff sheet flows to an area inlet (Design Point 5) within the parking lot and conveyed via a 12-inch storm sewer pipe under the building to an inlet (Design Point 8) on the front side of the building which outfalls to Merganser Pond. (Q2=0.7 cfs, Q100=2.8 cfs). In the event the inlet becomes plugged, emergency overflow path is at the southeast corner of the 1901 Sharp Point Drive building and into Basin EX9. Basin EX7 (0.33 ac) is located behind the 1901 Sharp Point Drive building. The basin consists of hardscape and landscaping. Runoff sheet flows to an area inlet (Design Point 4) within the parking lot and conveyed via a 12-inch storm sewer pipe under the building to an inlet (Design Point 8) on the front side of the building which outfalls to Merganser Pond. (Q2=0.9 cfs, Q100=3.3 cfs). In the event the inlet becomes plugged, emergency overflow path is at the southeast corner of the 1901 Sharp Point Drive building and into Basin EX9. Basin EX8 (0.23 ac) is located to the north of Basin EX6. The basin consists of a portion of the 1901 Sharp Point Drive building roof. Runoff is collected and routed through internal drains to an external drain on the east side of the building where a concrete drainage channel conveys flows to the parking lot on the front side of the building. Flows are collected via parking lot inlet (Design Point 8) and conveyed to Merganser Pond. (Q2=0.6 cfs, Q100=2.3 cfs). Basin EX9 (0.04 ac) is located to the east of Basin EX8. The basin consists of hardscape and landscaping. Runoff sheet flows to drainage channels and is conveyed to the parking lot on the front side of the building. Flows are collected via parking lot inlet (Design Point 8) and conveyed to Merganser Pond. (Q2=0.0 cfs, Q100=0.1 cfs). Basin EX10 (0.56 ac) is located in front of the 1901 Sharp Point Drive building. The basin consists of hardscape and landscaping. Runoff sheet flows to an inlet (Design Point 8) and conveyed to Merganser Pond. (Q2=1.1 cfs, Q100=4.9 cfs). In the event the inlet becomes plugged, emergency overflow path is to the north and into Sharp Point Drive. Basin EX11 (0.23 ac) is located to the north of Basin EX7. The basin consists of a portion of the 1901 Sharp Point Drive building roof. Runoff is collected and routed through internal drains to an external drain on the west side of the building where it discharges to the vacated Riverbend Court curb and gutter and is conveyed to Sharp Point Drive right-of-way, collected by a sump curb inlet which outfalls to Merganser Pond. (Q2=0.6 cfs, Q100=2.3 cfs). Basin OS1 (1.61 ac) is an offsite basin located to the south of Basin EX1 and consists of a portion of the Liberty Common Elementary school track and field. Land uses are hardscape, gravel and landscaping. Runoff is collected via trench drain or underdrains and routed to a junction structure in the eastern portion of the field where it discharges to the vacated Riverbend Court curb and gutter and is conveyed to Sharp Point Drive right- Final Drainage Report Liberty Common Junior High Fort Collins, Colorado Elevation Consulting 7 of-way, collected by a sump curb inlet which outfalls to Merganser Pond. (Q2=1.6 cfs, Q100=6.9 cfs). Basin OS2 (1.45 ac) is an offsite basin located adjacent to OS1 and consists of the remaining portion of the Liberty Common Elementary school track and field. Land uses are hardscape, gravel and landscaping. Runoff is collected via trench drain or underdrains and routed to a junction structure in the eastern portion of the field where it discharges to the vacated Riverbend Court curb and gutter and is conveyed to Sharp Point Drive right-of-way, collected by a sump curb inlet which outfalls to Merganser Pond. (Q2=1.3 cfs, Q100=5.9 cfs). Basin OS3 (1.24 ac) is an offsite basin located to the south of Basin EX7. Land uses are industrial. Runoff sheet flows to a concrete drainage channel within the basin and is conveyed to the area inlet within Basin EX7 (Design Point 4) and onto Merganser Pond via the 1901 Sharp Point Drive storm sewer system. (Q2=3.0 cfs, Q100=11.2 cfs). Basin OS4 (0.54 ac) is an offsite basin located to the south of Basin EX6. Land uses are industrial. Runoff sheet flows to a concrete drainage channel within the basin and is conveyed to the area inlet within Basin EX6 (Design Point 5) and onto Merganser Pond via the 1901 Sharp Point Drive storm sewer system. (Q2=1.3 cfs, Q100=5.4 cfs). Basin OS5 (0.01 ac) is an offsite basin located to the east of Basin EX6. Land uses are landscape. Runoff sheet flows to the area inlet within Basin EX6 (Design Point 5) and onto Merganser Pond via the 1901 Sharp Point Drive storm sewer system. (Q2=0.0 cfs, Q100=0.0 cfs). Basin OS6 (0.01 ac) is an offsite basin located to the north of Basin EX10. Land uses are landscape. Runoff sheet flows to the area inlet within Basin EX10 (Design Point 8) and onto Merganser Pond via the 1901 Sharp Point Drive storm sewer system. (Q2=0.0 cfs, Q100=0.0 cfs). Basin OS7 (0.02 ac) is an offsite basin located to the west of Basin EX1. Land uses are hardscape and landscape. Runoff sheet flows to the area inlet within Basin EX1 and onto Merganser Pond via the 1825 Sharp Point Drive storm sewer system. (Q2=0.0 cfs, Q100=0.1 cfs). Basin OS8 (0.02 ac) is an offsite basin located to the north of Basin EX4. Land uses are landscape. Runoff sheet flows to the area inlet within Basin EX4 (Design Point 3) and onto Merganser Pond via the 1825 Sharp Point Drive storm sewer system. (Q2=0.0 cfs, Q100=0.1 cfs). 2 Master Drainage Basin Information Final Drainage Report Liberty Common Junior High Fort Collins, Colorado Elevation Consulting 8 The Site is located within the Cache La Poudre River watershed. Per the City’s website, the Master Plan update for the watershed is currently underway. Site is not identified on the Cache La Poudre River Problem Identification Map or Flooding Solution Map. 3 Project Description The majority of the existing improvements are to remain. Construction includes minor parking lot improvements, utility services, landscaping and 17,240 s.f. building addition between 1825 and 1901 Sharp Point Drive buildings. The proposed construction activities associated with this report are grading, paving, utility, storm drainage improvements and vertical construction with the total area of these proposed grading activities being 1.33 acres. The existing grades are flat to steep ranging from less than 1% to 24%. The overall drainage area of 8.95 acres did not change with the post development analysis, 2 new sub-basins were created as well as modifications to 8 existing sub-basins. Basin C2 ( 0.90 ac) is located in between 1825 and 1901 Sharp Point Drive buildings. Land uses are rooftop, landscape and hardscape. Surface runoff will be conveyed overland to Rain Garden #1 and routed through the Site storm sewer system to Merganser Pond. Building runoff will be piped via the Site storm sewer system to the Rain Garden #1 and routed through the Site storm sewer system to Merganser Pond. (Q2=1.6 cfs, Q100=6.9 cfs). Basin C3 ( 0.07 ac) is located to the north of Basin C2. Land uses are landscape and hardscape. Runoff sheet flows to Sharp Point Drive right-of-way, collected by a sump curb inlet which outfalls to Merganser Pond. (Q2=0.0 cfs, Q100=0.2 cfs). Basin EX1-A (0.96 ac) Land uses are not being changed, but basin area and composite imperviousness are being modified with Site improvements. Runoff will continue to sheet flow to three existing area inlets within the parking lot and conveyed via (3) 12- inch storm sewer pipes under the building to an inlet (Design Point 3) on the front side of the building which outfalls to Merganser Pond. (Q2=2.2 cfs, Q100=9.6 cfs). Emergency overflow path will not change and continue to be into Basin EX3. Basin EX2-A (0.44 ac) is located to the north of Basin EX1-A. The basin area and land use have not been changed. Runoff will now be collected and routed through internal drains to (2) new external roof drains on the March Court side of the building. Runoff sheet flows to a swale and drainage channel within Basin EX-3 and is conveyed to the parking lot on the front side of the building, collected in the existing inlet (Design Point 3) and conveyed to Merganser Pond. (Q2=1.2 cfs, Q100=4.4 cfs). Basin EX4-A (0.48 ac) Land uses are not being changed, but basin area and composite imperviousness are being modified with Site improvements. Runoff will continue to sheet flow to an existing inlet within the parking lot (Design Point 3) and be conveyed to Final Drainage Report Liberty Common Junior High Fort Collins, Colorado Elevation Consulting 9 Merganser Pond. (Q2=1.0 cfs, Q100=4.5 cfs). Emergency overflow path will not change and continue to be into Sharp Point Drive. Basin EX7-A (0.33 ac) Site improvements do not modify the Basin area or land uses, but there is a change in composite imperviousness. Runoff will continue to sheet flow to an area inlet (Design Point 4) within the parking lot and conveyed via a 12-inch storm sewer pipe under the building to an inlet (Design Point 8) on the north side of the building which outfalls to Merganser Pond. (Q2=0.8 cfs, Q100=3.3 cfs). Emergency overflow path will not change and continue to be into Basin EX9. Basin EX10-A (0.23 ac) ) Land uses are not being changed, but basin area and composite imperviousness are being modified with Site improvements. Runoff will now be conveyed overland to Rain Garden #2 and routed through the Site storm sewer system to Merganser Pond. (Q2=0.1 cfs, Q100=1.0 cfs). Emergency overflow path will not change and continue to be into Sharp Point Drive. Basin OS1-A (1.61 ac) Land uses, basin area and composite imperviousness are not being modified with Site improvements. Runoff will now discharge to the March Court curb and gutter, conveyed to Sharp Point Drive right-of-way, collected by a sump curb inlet which outfalls to Merganser Pond. (Q2=1.6 cfs, Q100=6.9 cfs). Basin OS2-A (1.44 ac) Land uses, basin area and composite imperviousness are not being modified with Site improvements. Runoff will now discharge to the March Court curb and gutter, conveyed to Sharp Point Drive right-of-way, collected by a sump curb inlet which outfalls to Merganser Pond. (Q2=1.3 cfs, Q100=5.9 cfs). Basin OS7-A (0.02 ac) Land uses, basin area and composite imperviousness are not being modified with Site improvements. Runoff will now discharge to the March Court curb and gutter, conveyed to Sharp Point Drive right-of-way, collected by a sump curb inlet which outfalls to Merganser Pond. (Q2=0.0 cfs, Q100=0.1 cfs). 4 Drainage Design Criteria 4.1 Regulations This drainage report was prepared in accordance with the Fort Collins Stormwater Citeria Manual (FCSCM). 4.2 Four-Step Process Site complies with the City’s four step process to minimize adverse impacts of urbanization. Step 1 – Employing runoff reduction practices; new Site imperviousness, 73%, will not exceed existing conditions, 80%, therefore reducing runoff volume. Step 2 – Implementing best management practice (BMPs) that provide a water quality capture volume with slow release and/or infiltration; new rain gardens will be constructed as part of the project to provide WQCV for modified areas of the Site. Step 3 – Stabilizing streams; there are no drainageways on or adjacent to the Site, therefore Step 3 is not Final Drainage Report Liberty Common Junior High Fort Collins, Colorado Elevation Consulting 10 applicable to this project. Step 4 – Implementing site specific and other source control BMPs; Site use of a school facility will minimize risk for illicit discharges from material storage, vehicle maintenance and manufacturing as these site activities are not generally associated with a school facility. Good housekeeping practices will be implemented to control the potential for illicit discharges from the Site. 4.3 Hydrologic Criteria The minor storm was calculated for the 2-year recurrence interval and the major storm was calculated at the 100-year recurrence interval. The Rational Method was used for determining peak runoff rate. Runoff coefficients were calculated for each sub basin using values from the FCSCM Tables 3.2-1, 3.2-2 and 3.2-3. The developed time of concentration for the basins were calculated using FCSCM Equation 5-3. The initial overland flow time was calculated using FCSCM Equation 3.3- 2. Channelized flow time was calculated using Manning’s Equation for velocity and FCSCM Equation 5-5. The maximum total time of concentration for the most upstream basins were calculated using FCSCM Equation 3.3-5. The project design rainfall intensities were determined using FCSCM Table 3.4-1. Rain Garden Water Quality Capture Volume (WQCV) was calculated using FCSCM Equation 7-1 and 7-2 with a drain time of 12 hours. Additional 20% storage volume listed in equation 7-2 was removed for Low Impact Development (LID) systems. Complete calculations are included in Appendix A. 4.4 Hydraulic Criteria All new Site storm sewers will be private and sized to convey the 100-year storm event. Inlets were sized to capture runoff using the software from Mile High Flood District (MHFD). StormCAD and Flowmaster, software programs developed by Bentley Systems, were used to determine storm sewer hydraulic gradelines, velocities and capacities as well as roadway Pipe hydraulic calculations show the existing 1825 Sharp Point storm system has capacity for the increased runoff from basin EX1-A, pipe HGL and EGL are still contained within the pipes. Open channel flow calculations for March Court show the street has conveyance capacity for the redirected runoff from the Liberty Common Elementary school track and field without overtopping curb. 4.5 Low Impact Development Proposed improvements will modify 1.33 acres of the Site. 917 cubic feet of WQCV is needed for this disturbed area in order to meet City’s Low Impact Development requirements. Rain Gardens 1 & 2 will provide 1,292 cubic feet of WQCV, therefore exceeding the minimum requirements. Refer to Stormwater Quality Exhibit in Appendix A. Final Drainage Report Liberty Common Junior High Fort Collins, Colorado Elevation Consulting 11 5 Variance Requests No variances associated with drainage are being requested. 6 Erosion Control Erosion Control Plan and Erosion Control Report in compliance with the Fort Collins Stormwater Criteria Manual will be submitted as part of the permitting for this project. 7 Conclusions The Site is designed in compliance with the Fort Collins Stormwater Criteria Manual. Site runoff to the existing 1901 Sharp Point Drive storm sewer system has been reduced. Site runoff to the existing 1825 Sharp Point Drive storm sewer system has been slightly increased, but existing system has capacity for the increased flows. Stormwater runoff being conveyed underneath either of the existing buildings has not been increased with the proposed improvements. Total runoff from the Site to Merganser Pond has been reduced per Design Flow Comparison below, therefore proposed Site improvements should not negatively impact downstream properties. Design Flow Comparison Table Pre Development Post Development Design Point Q2 (cfs) Q100 (cfs) Design Point Q2 (cfs) Q100 (cfs) 3 3.8 17.1 3 4.2 18.8 8 7.1 28.0 8 7.1 27.3 9 4.2 18.2 9 3.0 13.0 TOTAL 15.1 63.3 14.3 59.1 Final Drainage Report Liberty Common Junior High Fort Collins, Colorado Elevation Consulting 12 8 References 1 Fort Collins Stormwater Criteria Manual; City of Fort Collins; December 2018. 2 Mile High Flood District Storm Drainage Criteria Manual Volumes 1, 2 & 3; Mile High Flood District; November 2010. Final Drainage Report Liberty Common Junior High Fort Collins, Colorado Elevation Consulting 13 Appendices APPENDIX A – Hydrologic Analyses APPENDIX B – Hydraulic Analyses APPENDIX C – Referenced Information APPENDIX D – Drainage Map Final Drainage Report Liberty Common Junior High Fort Collins, Colorado Elevation Consulting 14 APPENDIX A HYDROLOGIC COMPUTATIONS % Impervious1 C2 2-YR 100% 0.95 100-YR 90% 0.95 Gravel 40% 0.50 2% 0.20 2% 0.25 2% 0.35 90% 0.95 Area (acres) % Area (acres) % Area (acres) % Area (acres) % Area (acres) % Area (acres) % Area (acres) % EX1 0.73 0.63 86.3% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.10 13.7% 0.00 0.0% 0 0.0% 100.00% 87% 0.85 0.85 1.00 EX2 0.44 0.00 0.0% 0.44 100.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0 0.0% 100.00% 90% 0.95 0.95 1.00 EX3 0.09 0.01 11.1% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.08 88.9% 0.00 0.0% 0.00 0.0% 100.00% 13% 0.33 0.33 0.41 EX4 0.54 0.37 68.5% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.17 31.5% 0.00 0.0% 0.00 0.0% 100.00% 69% 0.73 0.73 0.91 EX5 0.58 0.45 77.6% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.13 22.4% 0.00 0.0% 0.00 0.0% 100.00% 78% 0.79 0.79 0.99 EX6 0.28 0.27 96.4% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.01 3.6% 0.00 0.0% 0.00 0.0% 100.00% 97% 0.93 0.93 1.00 EX7 0.33 0.32 97.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.01 3.0% 0.00 0.0% 0.00 0.0% 100.00% 97% 0.93 0.93 1.00 EX8 0.23 0.00 0.0% 0.23 100.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 100.00% 90% 0.95 0.95 1.00 EX9 0.04 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.04 100.0% 0.00 0.0% 0.00 0.0% 100.00% 2% 0.25 0.25 0.31 EX10 0.56 0.36 64.3% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.20 35.7% 0.00 0.0% 0.00 0.0% 100.00% 65% 0.70 0.70 0.88 EX11 0.23 0.00 0.0% 0.23 100.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 100.00% 90% 0.95 0.95 1.00 Subtotal 4.05 2.41 59.5%0.90 22.2%0.00 0.0%0.00 0.0%0.74 18.3%0.00 0.0%0.00 0.0%100.00%80%0.82 0.82 1.00 OS1 1.61 0.54 33.5% 0.00 0.0% 0.26 16.1% 0.81 50.3% 0.00 0.0% 0.00 0.0% 0.00 0.0% 100.00% 41% 0.50 0.50 0.63 OS2 1.45 0.46 31.7% 0.00 0.0% 0.18 12.4% 0.81 55.9% 0.00 0.0% 0.00 0.0% 0.00 0.0% 100.00% 38% 0.48 0.48 0.59 OS3 1.24 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 1.24 100.0% 100.00% 90% 0.95 0.95 1.00 OS4 0.54 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.54 100.0% 100.00% 90% 0.95 0.95 1.00 OS5 0.01 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.01 100.0% 0.00 0.0% 0.00 0.0% 100.00% 2% 0.25 0.25 0.31 OS6 0.01 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.01 100.0% 0.00 0.0% 0.00 0.0% 100.00% 2% 0.25 0.25 0.31 OS7 0.02 0.01 50.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.01 50.0% 0.00 0.0% 0.00 0.0% 100.00% 51% 0.60 0.60 0.75 OS8 0.02 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.02 100.0% 0.00 0.0% 0.00 0.0% 100.00% 2% 0.25 0.25 0.31 Subotal 4.90 1.01 20.6%0.00 0.0%0.44 9.0%1.62 33.1%0.05 1.0%0.00 0.0%1.78 36.3%100.00%58%0.65 0.65 0.82 Total 8.95 3.42 38.2%0.90 10.1%0.44 4.9%1.62 18.1%0.79 8.8%0.00 0.0%1.78 19.9%100.00%68%0.73 0.73 0.91 1. From Tables 4.1-2 and 4.1-3 in the Fort Collins Stormwater Criteria Manual 2. From Tables 3.2-1 and 3.2-2 in the Fort Collins Stormwater Criteria Manual 3. From Table 3.2-3 in the Fort Collins Stormwater Criteria Manual 4. From Equation 5-2 in the Fort Collins Stormwater Criteria Manual Industrial Land Use % Check Land Use Area per Sub-Basin Lawns, Clayey Soil, Steep Slope >7% Lawns, Clayey Soil, Avg Slope 2-7% 1.00 1.25 Asphalt, Concrete Rooftop Gravel Global Parameters Composite C Coefficient4 Industrial Land Use Rooftop Asphalt, Concrete Lawns, Clayey Soil, Avg Slope 2-7% Subbasin Total Area (acres)Composite Imperviousness Lawns, Clayey Soil, Steep Slope >7% Frequency Adjustment Factors (C F)3 2-YR 100-YR Lawns, Clayey Soil, Flat Slope <2% Pre-Development C Value Calculations Liberty Common Junior High Fort Collins, Colorado Land Use Lawns, Clayey Soil, Flat Slope <2% C*CF (1.00 MAX) Tc Check 6 Su b - B a s i n Ar e a Cx C F (2 - Y R ) Cx C F (1 0 0 - Y R ) Le n g t h (2 0 0 ' m a x ) Sl o p e ti ( 2 - Y R ) ti ( 1 0 0 - Y R ) Le n g t h Sl o p e Ve l o c i t y 3 Tt=L / V x 6 0 To t a l Le n g t h Tc = T i+T t (2 - Y R ) Tc = T i+T t (1 0 0 - Y R ) Tc = (L / 1 8 0 ) +1 0 Fi n a l T c (2 - Y R ) Fi n a l T c (1 0 0 - Y R ) acres ft % min. min. ft % fps Tc min min min min min min EX1 0.73 0.85 1.00 110 2.7% 3.5 1.4 110 3.5 1.4 10.6 5.0 5.0 EX2 0.44 0.95 1.00 5.0 5.0 EX3 0.09 0.33 0.41 13 10.0% 2.4 2.2 215 1.4% 1.3 2.8 228 5.2 4.9 11.3 5.2 5.0 EX4 0.54 0.73 0.91 10 10.0% 1.0 0.5 265 1.1% 1.1 3.9 275 4.9 4.4 11.5 5.0 5.0 EX5 0.58 0.79 0.99 42 3.0% 2.6 0.9 287 0.4% 0.7 6.9 329 9.5 7.9 11.8 9.5 7.9 EX6 0.28 0.93 1.00 73 2.8% 2.0 1.1 47 1.3% 1.2 0.6 120 2.6 1.8 10.7 5.0 5.0 EX7 0.33 0.93 1.00 61 4.1% 1.6 0.9 59 1.6% 1.4 0.7 120 2.3 1.6 10.7 5.0 5.0 EX8 0.23 0.95 1.00 5.0 5.0 EX9 0.04 0.25 0.31 5.0 5.0 EX10 0.56 0.70 0.88 28 6.6% 2.1 1.2 102 2.3% 1.7 1.0 130 3.1 2.2 10.7 5.0 5.0 EX11 0.23 0.95 1.00 5.0 5.0 OS1 1.61 0.50 0.63 88 1.0% 10.5 8.3 535 0.5% 0.2 44.3 623 54.8 52.6 13.5 13.5 13.5 OS2 1.45 0.48 0.59 95 1.0% 11.4 9.2 535 0.5% 0.2 44.3 630 55.7 53.5 13.5 13.5 13.5 OS3 1.24 0.95 1.00 22 2.0% 1.0 0.7 387 1.0% 1.1 5.9 409 7.0 6.6 12.3 7.0 6.6 OS4 0.54 0.95 1.00 22 2.0% 1.0 0.7 391 1.0% 1.1 6.0 413 7.0 6.7 12.3 7.0 6.7 OS5 0.01 0.25 0.31 5.0 5.0 OS6 0.01 0.25 0.31 5.0 5.0 OS7 0.02 0.60 0.75 5.0 5.0 OS8 0.02 0.25 0.31 5.0 5.0 Notes: 2. Ti =[1.87(1.1-CxCF)L0.5]/S1/3. C=Runoff Coefficient Cf=Frequency Adjustment Factor L=Length of Overland Flow, feet S=Slope, percent 3. V=(1.49/n)R2/3S1/2 V=velocity Land Use n 4' pan 0.04 n=Roughness Coefficient Pervious Surface 0.25 field underdrain 0.33 R=Hydraulic Radius, feet Impervious Surface 0.016 S=Longitudinal Slope, feet/feet 4. Tt=L/(Vx60) 5. Tc =Ti+Tt 6. Tc=(L/180)+10 7. From Table 4.1-1 in the Fort Collins Stormwater Criteria Manual Travel Time (t t)4 STANDARD FORM SF-2 TIME OF CONCENTRATION Date: Development: Total Time of Concentration (T C)5 2/22/2025 Liberty Common Junior High Subbasin Data Initial/Overland Time (t i)2 Calculated By: Time of Concentration, T c LJT Final T c (4) 4-inch pipes assuming full Tc is the lesser of the values of equations 5. and 6., min Tc = 5.0 minutes 1. Flows calculated using the rational method, based on the methods provided in Chapter 5 (Hydrology Standards) of the Fort Collins Stormwater Criteria Manual Hydraulic Radius, R assuming full pan Roughness Coefficients 7 Calculated By: LJT Job #: 2024020 Date: 2/22/2025 Project: Liberty Common Junior High Design Storm:2-Year Storm Area Area Coeff Tc C*A I Q Tc Sum C*A I Q Slope Street Q Design Q Slope PIPE L VEL Tt Q add'l Q tot Design (ac)C (min)(ac)(cfs)(min)(ac)in/hr cfs %cfs cfs %SIZE ft ft/sec min 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 OS1 1.61 0.50 13.5 0.81 1.95 1.6 OS2 1.45 0.48 13.5 0.69 1.95 1.3 1 13.5 1.49 1.95 2.9 OS7 0.02 0.60 5.0 0.01 2.85 0.0 EX1 0.73 0.85 5.0 0.62 2.85 1.8 EX2 0.44 0.95 5.0 0.42 2.85 1.2 2 5.0 1.05 2.61 2.7 EX3 0.09 0.33 5.2 0.03 2.81 0.1 EX4 0.54 0.73 5.0 0.39 2.85 1.1 OS8 0.02 0.25 5.0 0.01 2.85 0.0 3 5.2 1.48 2.59 3.8 OS3 1.24 0.95 7.0 1.18 2.52 3.0 EX7 0.33 0.93 5.0 0.31 2.85 0.9 4 7.0 1.48 2.45 3.6 OS4 0.54 0.95 7.0 0.51 2.49 1.3 OS5 0.01 0.25 5.0 0.00 2.85 0.0 EX6 0.28 0.93 5.0 0.26 2.85 0.7 5 7.0 0.77 2.45 1.9 6 7.0 2.26 2.45 5.5 EX8 0.23 0.95 5.0 0.22 2.85 0.6 EX9 0.04 0.25 5.0 0.01 2.85 0.0 7 5.0 0.23 2.61 0.6 EX10 0.56 0.70 5.0 0.39 2.85 1.1 OS6 0.01 0.25 5.0 0.00 2.85 0.0 8 7.0 2.88 2.45 7.1 EX5 0.58 0.79 9.5 0.46 2.25 1.0 EX11 0.23 0.95 5.0 0.22 2.85 0.6 9 13.5 2.17 1.95 4.2 Standard Form SF-3 Storm Drainage System Design (Rational Method Procedure) STREET DESIGN POINT DIRECT RUNOFF TOTAL RUNOFF STREET PIPE TRAVEL TIME Calculated By: LJT Job #: 2024020 Date: 2/22/2025 Project: Liberty Common Junior High Design Storm:100-Year Storm Area Area Coeff Tc C*A I Q Tc Sum C*A I Q Slope Street Q Design Q Slope PIPE L VEL Tt Q add'l Q tot Design (ac)C (min)(ac)(cfs)(min)(ac)in/hr cfs %cfs cfs %SIZE ft ft/sec min 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 OS1 1.61 0.63 13.5 1.01 6.82 6.9 OS2 1.45 0.59 13.5 0.86 6.82 5.9 1 13.5 1.87 6.82 12.7 OS7 0.02 0.75 5.0 0.02 9.95 0.1 EX1 0.73 1.00 5.0 0.73 9.95 7.3 EX2 0.44 1.00 5.0 0.44 9.95 4.4 2 5.0 1.19 9.95 11.8 EX3 0.09 0.41 5.0 0.04 9.95 0.4 EX4 0.54 0.91 5.0 0.49 9.95 4.9 OS8 0.02 0.31 5.0 0.01 9.95 0.1 3 5.0 1.72 9.95 17.1 OS3 1.24 1.00 6.6 1.24 8.99 11.2 EX7 0.33 1.00 5.0 0.33 9.95 3.3 4 6.6 1.57 8.99 14.1 OS4 0.54 1.00 6.7 0.54 9.95 5.4 OS5 0.01 0.31 5.0 0.00 9.95 0.0 EX6 0.28 1.00 5.0 0.28 9.95 2.8 5 6.7 0.82 9.95 8.2 6 6.7 2.39 8.96 21.5 EX8 0.23 1.00 5.0 0.23 9.95 2.3 EX9 0.04 0.31 5.0 0.01 9.95 0.1 7 5.0 0.24 9.95 2.4 EX10 0.56 0.88 5.0 0.49 9.95 4.9 OS6 0.01 0.31 5.0 0.00 9.95 0.0 8 6.7 3.13 8.96 28.0 EX5 0.58 0.99 7.9 0.58 8.44 4.9 EX11 0.23 1.00 5.0 0.23 9.95 2.3 9 13.5 2.67 6.82 18.2 Standard Form SF-3 Storm Drainage System Design (Rational Method Procedure) STREET DESIGN POINT DIRECT RUNOFF TOTAL RUNOFF STREET PIPE TRAVEL TIME % Impervious1 C2 2-YR 100% 0.95 100-YR 90% 0.95 Gravel 40% 0.50 2% 0.20 2% 0.25 2% 0.35 90% 0.95 Area (acres) % Area (acres) % Area (acres) % Area (acres) % Area (acres) % Area (acres) % Area (acres) % C2 0.9 0.05 5.6% 0.62 68.9% 0.00 0.0% 0.00 0.0% 0.23 25.6% 0.00 0.0% 0.00 0.0% 100.00% 68% 0.77 0.77 0.96 C3 0.07 0 0.0% 0 0.0% 0.00 0.0% 0.00 0.0% 0.07 100.0% 0.00 0.0% 0.00 0.0% 100.00% 2% 0.25 0.25 0.31 EX1-A 0.96 0.76 79.2% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.20 20.8% 0.00 0.0% 0.00 0.0% 100.00% 80% 0.80 0.80 1.00 EX2-A 0.44 0.00 0.0% 0.44 100.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 100.00% 90% 0.95 0.95 1.00 EX3 0.09 0.01 11.1% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.08 88.9% 0.00 0.0% 0.00 0.0% 100.00% 13% 0.33 0.33 0.41 EX4-A 0.48 0.34 70.8% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.14 29.2% 0.00 0.0% 0.00 0.0% 100.00% 71% 0.75 0.75 0.93 EX6 0.28 0.27 96.4% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.01 3.6% 0.00 0.0% 0.00 0.0% 100.00% 97% 0.93 0.93 1.00 EX7-A 0.33 0.30 90.9% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.03 9.1% 0.00 0.0% 0.00 0.0% 100.00% 91% 0.89 0.89 1.00 EX8 0.23 0.00 0.0% 0.23 100.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 100.00% 90% 0.95 0.95 1.00 EX9 0.04 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.04 100.0% 0.00 0.0% 0.00 0.0% 100.00% 2% 0.25 0.25 0.31 EX10-A 0.23 0.03 13.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.20 87.0% 0.00 0.0% 0.00 0.0% 100.00% 15% 0.34 0.34 0.43 Subtotal 4.05 1.76 43.5%1.29 31.9%0.00 0.0%0.00 0.0%1.00 24.7%0.00 0.0%0.00 0.0%100.00%73%0.78 0.78 0.97 OS1-A 1.61 0.54 33.5% 0.00 0.0% 0.26 16.1% 0.81 50.3% 0.00 0.0% 0.00 0.0% 0.00 0.0% 100.00% 41% 0.50 0.50 0.63 OS2-A 1.45 0.46 31.7% 0.00 0.0% 0.18 12.4% 0.81 55.9% 0.00 0.0% 0.00 0.0% 0.00 0.0% 100.00% 38% 0.48 0.48 0.59 OS3 1.24 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 1.24 100.0% 100.00% 90% 0.95 0.95 1.00 OS4 0.54 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.54 100.0% 100.00% 90% 0.95 0.95 1.00 OS5 0.01 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.01 100.0% 0.00 0.0% 0.00 0.0% 100.00% 2% 0.25 0.25 0.31 OS6 0.01 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.01 100.0% 0.00 0.0% 0.00 0.0% 100.00% 2% 0.25 0.25 0.31 OS7-A 0.02 0.01 50.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.01 50.0% 0.00 0.0% 0.00 0.0% 100.00% 51% 0.60 0.60 0.75 OS8 0.02 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.02 100.0% 0.00 0.0% 0.00 0.0% 100.00% 2% 0.25 0.25 0.31 Subotal 4.90 1.01 20.6%0.00 0.0%0.44 9.0%1.62 33.1%0.05 1.0%0.00 0.0%1.78 36.3%100.00%58%0.65 0.65 0.82 Total 8.95 2.77 30.9%1.29 14.4%0.44 4.9%1.62 18.1%1.05 11.7%0.00 0.0%1.78 19.9%100.00%64%0.71 0.71 0.89 1. From Tables 4.1-2 and 4.1-3 in the Fort Collins Stormwater Criteria Manual 2. From Tables 3.2-1 and 3.2-2 in the Fort Collins Stormwater Criteria Manual 3. From Table 3.2-3 in the Fort Collins Stormwater Criteria Manual 4. From Equation 5-2 in the Fort Collins Stormwater Criteria Manual Frequency Adjustment Factors (C F)3 2-YR 100-YR Lawns, Clayey Soil, Flat Slope <2% Post-Development C Value Calculations Liberty Common Junior High Fort Collins, Colorado Land Use Lawns, Clayey Soil, Flat Slope <2% C*CF (1.00 MAX) Global Parameters Composite C Coefficient4 Industrial Land Use Rooftop Asphalt, Concrete Lawns, Clayey Soil, Avg Slope 2-7% Subbasin Total Area (acres)Composite Imperviousness Lawns, Clayey Soil, Steep Slope >7% Industrial Land Use % Check Land Use Area per Sub-Basin Lawns, Clayey Soil, Steep Slope >7% Lawns, Clayey Soil, Avg Slope 2-7% 1.00 1.25 Asphalt, Concrete Rooftop Gravel Tc Check6 Su b - B a s i n Ar e a Cx C F (2 - Y R ) Cx C F (1 0 0 - Y R ) Le n g t h (2 0 0 ' m a x ) Sl o p e ti ( 2 - Y R ) ti ( 1 0 0 - Y R ) Le n g t h Sl o p e Ve l o c i t y 3 Tt=L / V x 6 0 To t a l Le n g t h Tc = T i+T t (2 - Y R ) Tc = T i+T t (1 0 0 - Y R ) Tc = (L / 1 8 0 ) +1 0 Fi n a l T c (2 - Y R ) Fi n a l T c (1 0 0 - Y R ) acres ft % min. min. ft % fps Tc min min min min min min C2 0.90 0.77 0.96 186 1.0% 8.4 3.5 44 4.4% 0.6 1.2 230 9.6 4.7 11.3 9.6 5.0 C3 0.07 0.25 0.31 5.0 5.0 EX1-A 0.96 0.80 1.00 71 2.3% 3.5 1.2 166 1.0% 1.1 2.5 237 6.1 3.7 11.3 6.1 5.0 EX2-A 0.44 0.95 1.00 5.0 5.0 EX3 0.09 0.33 0.41 13 10.0% 2.4 2.2 215 1.4% 1.3 2.8 228 5.2 4.9 11.3 5.2 5.0 EX4-A 0.48 0.75 0.93 10 10.0% 1.0 0.5 265 1.1% 1.1 3.9 275 4.8 4.3 11.5 5.0 5.0 EX6 0.28 0.93 1.00 73 2.8% 2.0 1.1 47 1.3% 1.2 0.6 120 2.6 1.8 10.7 5.0 5.0 EX7-A 0.33 0.89 1.00 61 4.1% 1.9 0.9 59 1.6% 1.4 0.7 120 2.7 1.6 10.7 5.0 5.0 EX8 0.23 0.95 1.00 5.0 5.0 EX9 0.04 0.25 0.31 5.0 5.0 EX10-A 0.23 0.34 0.43 85 2.0% 10.4 9.2 85 10.4 9.2 10.5 10.4 9.2 OS1-A 1.61 0.50 0.63 88 1.0% 10.5 8.3 535 0.5% 0.2 44.3 623 54.8 52.6 13.5 13.5 13.5 OS2-A 1.45 0.48 0.59 95 1.0% 11.4 9.2 535 0.5% 0.2 44.3 630 55.7 53.5 13.5 13.5 13.5 OS3 1.24 0.95 1.00 22 2.0% 1.0 0.7 387 1.0% 1.1 5.9 409 7.0 6.6 12.3 7.0 6.6 OS4 0.54 0.95 1.00 22 2.0% 1.0 0.7 391 1.0% 1.1 6.0 413 7.0 6.7 12.3 7.0 6.7 OS5 0.01 0.25 0.31 5.0 5.0 OS6 0.01 0.25 0.31 5.0 5.0 OS7-A 0.02 0.60 0.75 5.0 5.0 OS8 0.02 0.25 0.31 5.0 5.0 Notes: 2. Ti =[1.87(1.1-CxCF)L0.5]/S1/3. C=Runoff Coefficient Cf=Frequency Adjustment Factor L=Length of Overland Flow, feet S=Slope, percent 3. V=(1.49/n)R2/3S1/2 V=velocity Land Use n 4' pan 0.04 n=Roughness Coefficient Pervious Surface 0.25 field underdrain 0.33 R=Hydraulic Radius, feet Impervious Surface 0.016 S=Longitudinal Slope, feet/feet 4. Tt=L/(Vx60) 5. Tc =Ti+Tt 6. Tc=(L/180)+10 7. From Table 4.1-1 in the Fort Collins Stormwater Criteria Manual Tc is the lesser of the values of equations 5. and 6., min Tc = 5.0 minutes 1. Flows calculated using the rational method, based on the methods provided in Chapter 5 (Hydrology Standards) of the Fort Collins Stormwater Criteria Manual STANDARD FORM SF-2 TIME OF CONCENTRATION Date: Development: Initial/Overland Time (ti)2 Time of Concentration, Tc Liberty Common Junior High Subbasin Data Calculated By: Total Time of Concentration (TC)5 3/6/2025 Travel Time (tt)4 Final Tc LJT Hydraulic Radius, R assuming full pan Roughness Coefficients7 (4) 4-inch pipes assuming full Calculated By: LJT Job #: 2024020 Date: 3/6/2025 Project: Liberty Common Junior High Design Storm:2-Year Storm Area Area Coeff Tc C*A I Q Tc Sum C*A I Q Slope Street Q Design Q Slope PIPE L VEL Tt Q add'l Q tot Design (ac)C (min)(ac)(cfs)(min)(ac)in/hr cfs %cfs cfs %SIZE ft ft/sec min 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 OS1-A 1.61 0.50 13.5 0.81 1.95 1.6 OS2-A 1.45 0.48 13.5 0.69 1.95 1.3 OS7-A 0.02 0.60 5.0 0.01 2.85 0.0 1 13.5 1.51 1.95 2.9 EX1-A 0.96 0.80 6.1 0.77 2.66 2.1 EX2-A 0.44 0.95 5.0 0.42 2.85 1.2 EX3 0.09 0.33 5.2 0.03 2.81 0.1 EX4-A 0.48 0.75 5.0 0.36 2.85 1.0 OS8 0.02 0.25 5.0 0.01 2.85 0.0 3 6.1 1.58 2.66 4.2 OS3 1.24 0.95 7.0 1.18 2.52 3.0 EX7-A 0.33 0.89 5.0 0.29 2.85 0.8 4 7.0 1.47 2.52 3.7 OS4 0.54 0.95 7.0 0.51 2.52 1.3 OS5 0.01 0.25 5.0 0.00 2.85 0.0 EX6 0.28 0.93 5.0 0.26 2.85 0.7 5 7.0 0.77 2.52 2.0 6 7.0 2.25 2.52 5.7 EX8 0.23 0.95 5.0 0.22 2.85 0.6 EX9 0.04 0.25 5.0 0.01 2.85 0.0 7 5.0 0.23 2.85 0.7 C2 0.90 0.77 9.6 0.69 2.24 1.6 EX10-A 0.23 0.34 10.4 0.08 2.18 0.2 OS6 0.01 0.25 5.0 0.00 2.85 0.0 8 10.4 3.25 2.18 7.1 C3 0.07 0.25 5.0 0.02 2.85 0.0 9 13.5 1.52 1.95 3.0 Standard Form SF-3 Storm Drainage System Design (Rational Method Procedure) STREET DESIGN POINT DIRECT RUNOFF TOTAL RUNOFF STREET PIPE TRAVEL TIME Calculated By: LJT Job #: 2024020 Date: 3/6/2025 Project: Liberty Common Junior High Design Storm:100-Year Storm Area Area Coeff Tc C*A I Q Tc Sum C*A I Q Slope Street Q Design Q Slope PIPE L VEL Tt Q add'l Q tot Design (ac)C (min)(ac)(cfs)(min)(ac)in/hr cfs %cfs cfs %SIZE ft ft/sec min 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 OS1-A 1.61 0.63 13.5 1.01 6.82 6.9 OS2-A 1.45 0.59 13.5 0.86 6.82 5.9 OS7-A 0.02 0.75 5.0 0.02 9.95 0.1 1 13.5 1.88 6.82 12.8 EX1-A 0.96 1.00 5.0 0.96 9.95 9.6 EX2-A 0.44 1.00 5.0 0.44 9.95 4.4 EX3 0.09 0.41 5.0 0.04 9.95 0.4 EX4-A 0.48 0.93 5.0 0.45 9.95 4.5 OS8 0.02 0.31 5.0 0.01 9.95 0.1 3 5.0 1.89 9.95 18.8 OS3 1.24 1.00 6.6 1.24 8.99 11.2 EX7-A 0.33 1.00 5.0 0.33 9.95 3.3 4 6.6 1.57 8.99 14.1 OS4 0.54 1.00 6.7 0.54 8.96 4.8 OS5 0.01 0.31 5.0 0.00 9.95 0.0 EX6 0.28 1.00 5.0 0.28 9.95 2.8 5 6.7 0.82 8.96 7.4 6 6.7 2.39 8.96 21.5 EX8 0.23 1.00 5.0 0.23 9.95 2.3 EX9 0.04 0.31 5.0 0.01 9.95 0.1 7 5.0 0.24 9.95 2.4 C2 0.90 0.77 5.0 0.69 9.95 6.9 EX10-A 0.23 0.43 9.2 0.10 7.96 0.8 OS6 0.01 0.31 5.0 0.00 9.95 0.0 8 9.2 3.43 7.96 27.3 C3 0.07 0.31 5.0 0.02 9.95 0.2 9 13.5 1.90 6.82 13.0 Standard Form SF-3 Storm Drainage System Design (Rational Method Procedure) STREET DESIGN POINT DIRECT RUNOFF TOTAL RUNOFF STREET PIPE TRAVEL TIME JOB #:2024020 DATE:4/22/2025 PROJECT: Liberty Common Junior High SUBJECT: Rain Garden #1 Drainage Area=0.90 acres 719 cf Available Volume =990 SEDIMENT BASIN VOLUME SUMMARY Contour Total Area H Volume Cumulative Cumulative Elev Volume Volume (ft)(ft2)(ft)(ft3)(ft3)ac-ft 4892.5 603 0 1.0 990 4893.5 1436 990 0.023 Required WQCV= JOB #:2024020 DATE:4/22/2025 PROJECT: Liberty Common Junior High SUBJECT: Rain Garden #2 Drainage Area=0.51 acres 297 cf Available Volume =302 SEDIMENT BASIN VOLUME SUMMARY Contour Total Area H Volume Cumulative Cumulative Elev Volume Volume (ft)(ft2)(ft)(ft3)(ft3)ac-ft 4892.5 175 0 1.0 302 4893.5 450 302 0.007 Required WQCV= Final Drainage Report Liberty Common Junior High Fort Collins, Colorado Elevation Consulting 15 APPENDIX B HYDRAULIC COMPUTATIONS Worksheet for March Court DP1 flow Project Description Manning FormulaFriction Method Normal DepthSolve For Input Data ft/ft0.008Channel Slope cfs12.80Discharge Section Definitions Elevation (ft) Station (ft) 4,897.950+00.0 4,897.880+04.0 4,897.410+04.5 4,897.530+06.5 4,897.920+22.5 4,897.290+38.5 4,897.150+40.5 4,897.620+41.0 4,897.720+44.0 Roughness Segment Definitions Roughness CoefficientEnding StationStart Station 0.016(0+44.0, 4,897.72)(0+00.0, 4,897.95) Options Pavlovskii's Method Current Roughness Weighted Method Pavlovskii's Method Open Channel Weighting Method Pavlovskii's Method Closed Channel Weighting Method Results in6.8Normal Depth 0.016Roughness Coefficient ft4,897.71Elevation 4,897.15 to 4,897.95 ftElevation Range ft²4.8Flow Area ft26.25Wetted Perimeter in2.2Hydraulic Radius ft25.92Top Width in6.8Normal Depth in6.9Critical Depth ft/ft0.007Critical Slope ft/s2.67Velocity Page 1 of 227 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 3/3/2025 FlowMaster [10.03.00.03] Bentley Systems, Inc. Haestad Methods Solution CenterUntitled1.fm8 Worksheet for March Court DP1 flow Results ft0.11Velocity Head ft0.67Specific Energy 1.096Froude Number SupercriticalFlow Type GVF Input Data in0.0Downstream Depth ft0.00Length 0Number Of Steps GVF Output Data in0.0Upstream Depth N/AProfile Description ft0.00Profile Headloss ft/sInfinityDownstream Velocity ft/sInfinityUpstream Velocity in6.8Normal Depth in6.9Critical Depth ft/ft0.008Channel Slope ft/ft0.007Critical Slope Page 2 of 227 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 3/3/2025 FlowMaster [10.03.00.03] Bentley Systems, Inc. Haestad Methods Solution CenterUntitled1.fm8 Cross Section for March Court DP1 flow Project Description Manning FormulaFriction Method Normal DepthSolve For Input Data ft/ft0.008Channel Slope in6.8Normal Depth cfs12.80Discharge Page 1 of 127 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 3/3/2025 FlowMaster [10.03.00.03] Bentley Systems, Inc. Haestad Methods Solution CenterUntitled1.fm8 Project: Basin ID: Design Information (Input): Circular Opening:Diameter Dia. =ft. OR Rectangular Opening:Width W =2.00 ft. Length L =2.00 ft. Percentage of Open Area After Trash Rack Reduction % open =50.00 % Orifice Coefficient Co =0.67 Weir Coefficient Cw =3.00 Orifice Elevation Eo =4894.88 ft. Calculation of Collection Capacity: Net Opening Area (after Trash Rack Reduction)Ao =2.00 sq. ft. Perimeter as Weir Length Lw =8.00 ft. Enter water surface elevations in ascending order. Water Weir Orifice Collection Surface Flow Flow Capacity Elevation cfs cfs cfs ft (input) (output) (output) (output) start 4895.00 1.00 3.73 1.00 4895.10 2.48 5.04 2.48 4895.20 4.34 6.08 4.34 Collection Capacity of Horizontal Orifice (Inlet Control) Liberty Common Junior High 1825 Sharp Point Inlet (south parking lot) 3/3/2025, 1:18 PMInlet Capacity Calc.xls, Existing 3 inlets=13.02 cfs > 9.6 cfs for Basin EX1-A Project: Basin ID: Design Information (Input): Circular Opening:Diameter Dia. =ft. OR Rectangular Opening:Width W =1.35 ft. Length L =1.98 ft. Percentage of Open Area After Trash Rack Reduction % open =50.00 % Orifice Coefficient Co =0.67 Weir Coefficient Cw =3.00 Orifice Elevation Eo =4894.63 ft. Calculation of Collection Capacity: Net Opening Area (after Trash Rack Reduction)Ao =1.34 sq. ft. Perimeter as Weir Length Lw =6.66 ft. Enter water surface elevations in ascending order. Water Weir Orifice Collection Surface Flow Flow Capacity Elevation cfs cfs cfs ft (input) (output) (output) (output) start 4894.70 0.37 1.90 0.37 4894.80 1.40 2.96 1.40 4894.90 2.80 3.73 2.80 Collection Capacity of Horizontal Orifice (Inlet Control) Liberty Common Junior High Design Point 7 Area Inlet 3/3/2025, 1:23 PMInlet Capacity Calc.xls, Existing > DP7 Q100 = 2.4 cfs 2 year storm: Conduit Table Energy Grade Line (Out) (ft) Energy Grade Line (In) (ft) Hydraulic Grade Line (Out) (ft) Hydraulic Grade Line (In) (ft) Flow / Capacity (Design) (%) Capacity (Full Flow) (cfs) Depth (Out) (ft) Velocity (ft/s) Flow (cfs) Manning's nDiameter (in) Section Type Slope (Calculated) (ft/ft) Length (Scaled) (ft) Invert (Stop) (ft) Stop Node Invert (Start) (ft) Start Node Label 4,891.224,893.244,891.194,893.1117.54.280.624.090.750.01112.0Circle0.010211.34,890.57CB-44,892.75CB-1CO-1 4,891.224,893.054,891.194,892.9217.44.120.623.940.720.01112.0Circle0.010208.44,890.57CB-44,892.57CB-2CO-2 4,891.224,893.264,891.194,893.1317.44.290.624.100.750.01112.0Circle0.010212.04,890.57CB-44,892.77CB-3CO-3 4,890.714,891.464,890.274,891.1920.021.430.615.334.290.01324.0Circle0.00989.14,889.66O-14,890.46CB-4CO-4 Page 1 of 176 Watertown Road, Suite 2D Thomaston, CT 06787 USA +1-203-755-16663/3/2025 StormCAD [10.03.04.53]Bentley Systems, Inc. Haestad Methods Solution Center2024020 - PROPOSED STORM MODEL 5 year.stsw 1825 SHARP POINT STORM Profile Report Engineering Profile - Profile - 1 (2024020 - PROPOSED STORM MODEL 2 year.stsw) 4,885.00 4,890.00 4,895.00 -0+50 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 Station (ft) El e v a t i o n ( f t ) Element ID\Label Length (Unified) (ft) Rise (Unified) (ft)\Material Flow (cfs) Slope (Calculated) (ft/ft) Element ID\Label Elevation (Ground) (ft) Elevation (Invert) (ft) Station (ft) 57\CO-1 58\CO-4 211.3 89.1 1.00\ 2.00\ 0.75 4.29 0.010 0.009 54\CB-1 55\CB-4 56\O-1 4,894.88 4,894.38 4,889.66 4,892.75 4,890.46 4,889.66 0+00 2+11 3+00 CB-1 Rim: 4,894.88 ft Invert: 4,892.75 ft CB-4 Rim: 4,894.38 ft Invert: 4,890.46 ft O-1 Rim: 4,889.66 ft Invert: 4,889.66 ft CO-4: 89.1 ft @ 0.009 ft/ftCircle - 24.0 in CO-1: 211.3 ft @ 0.010 ft/ftCircle - 12.0 in Page 1 of 176 Watertown Road, Suite 2D Thomaston, CT 06787 USA +1-203-755-1666 3/3/2025 StormCAD [10.03.04.53] Bentley Systems, Inc. Haestad Methods Solution Center 2024020 - PROPOSED STORM MODEL 5 year.stsw 1825 SHARP POINT STORM Profile Report Engineering Profile - Profile - 2 (2024020 - PROPOSED STORM MODEL 2 year.stsw) 4,885.00 4,890.00 4,895.00 -0+50 0+00 0+50 1+00 1+50 2+00 2+50 3+00 Station (ft) El e v a t i o n ( f t ) Element ID\Label Length (Unified) (ft) Rise (Unified) (ft)\Material Flow (cfs) Slope (Calculated) (ft/ft) Element ID\Label Elevation (Ground) (ft) Elevation (Invert) (ft) Station (ft) 62\CO-2 58\CO-4 208.4 89.1 1.00\ 2.00\ 0.72 4.29 0.010 0.009 61\CB-2 55\CB-4 56\O-1 4,894.81 4,894.38 4,889.66 4,892.57 4,890.46 4,889.66 0+00 2+08 2+98 CB-4 Rim: 4,894.38 ft Invert: 4,890.46 ft CB-2 Rim: 4,894.81 ft Invert: 4,892.57 ft O-1 Rim: 4,889.66 ft Invert: 4,889.66 ft CO-2: 208.4 ft @ 0.010 ft/ftCircle - 12.0 in CO-4: 89.1 ft @ 0.009 ft/ftCircle - 24.0 in Page 1 of 176 Watertown Road, Suite 2D Thomaston, CT 06787 USA +1-203-755-1666 3/3/2025 StormCAD [10.03.04.53] Bentley Systems, Inc. Haestad Methods Solution Center 2024020 - PROPOSED STORM MODEL 5 year.stsw 1825 SHARP POINT STORM Profile Report Engineering Profile - Profile - 3 (2024020 - PROPOSED STORM MODEL 2 year.stsw) 4,885.00 4,890.00 4,895.00 -0+50 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 Station (ft) El e v a t i o n ( f t ) Element ID\Label Length (Unified) (ft) Rise (Unified) (ft)\Material Flow (cfs) Slope (Calculated) (ft/ft) Element ID\Label Elevation (Ground) (ft) Elevation (Invert) (ft) Station (ft) 60\CO-3 58\CO-4 212.0 89.1 1.00\ 2.00\ 0.75 4.29 0.010 0.009 59\CB-3 55\CB-4 56\O-1 4,894.80 4,894.38 4,889.66 4,892.77 4,890.46 4,889.66 0+00 2+12 3+01 CB-3 Rim: 4,894.80 ft Invert: 4,892.77 ft CB-4 Rim: 4,894.38 ft Invert: 4,890.46 ft O-1 Rim: 4,889.66 ft Invert: 4,889.66 ft CO-4: 89.1 ft @ 0.009 ft/ftCircle - 24.0 in CO-3: 212.0 ft @ 0.010 ft/ftCircle - 12.0 in Page 1 of 176 Watertown Road, Suite 2D Thomaston, CT 06787 USA +1-203-755-1666 3/3/2025 StormCAD [10.03.04.53] Bentley Systems, Inc. Haestad Methods Solution Center 2024020 - PROPOSED STORM MODEL 5 year.stsw 1825 SHARP POINT STORM 100 year storm: Conduit Table Energy Grade Line (Out) (ft) Energy Grade Line (In) (ft) Hydraulic Grade Line (Out) (ft) Hydraulic Grade Line (In) (ft) Flow / Capacity (Design) (%) Capacity (Full Flow) (cfs) Depth (Out) (ft) Velocity (ft/s) Flow (cfs) Manning's nDiameter (in) Section Type Slope (Calculated) (ft/ft) Length (Scaled) (ft) Invert (Stop) (ft) Stop Node Invert (Start) (ft) Start Node Label 4,892.264,893.904,892.004,893.5275.04.281.435.973.210.01112.0Circle0.010211.34,890.57CB-44,892.75CB-1CO-1 4,892.264,893.724,892.004,893.3477.84.121.435.803.210.01112.0Circle0.010208.44,890.57CB-44,892.57CB-2CO-2 4,892.264,893.924,892.004,893.5474.84.291.435.993.210.01112.0Circle0.010212.04,890.57CB-44,892.77CB-3CO-3 4,891.994,892.774,891.084,892.0085.021.431.427.6618.230.01324.0Circle0.00989.14,889.66O-14,890.46CB-4CO-4 Page 1 of 176 Watertown Road, Suite 2D Thomaston, CT 06787 USA +1-203-755-16663/3/2025 StormCAD [10.03.04.53]Bentley Systems, Inc. Haestad Methods Solution Center2024020 - PROPOSED STORM MODEL.stsw 1825 SHARP POINT STORM Profile Report Engineering Profile - Profile - 1 (2024020 - PROPOSED STORM MODEL.stsw) 4,885.00 4,890.00 4,895.00 -0+50 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 Station (ft) El e v a t i o n ( f t ) Element ID\Label Length (Unified) (ft) Rise (Unified) (ft)\Material Flow (cfs) Slope (Calculated) (ft/ft) Element ID\Label Elevation (Ground) (ft) Elevation (Invert) (ft) Station (ft) 57\CO-1 58\CO-4 211.3 89.1 1.00\ 2.00\ 3.21 18.23 0.010 0.009 54\CB-1 55\CB-4 56\O-1 4,894.88 4,894.38 4,889.66 4,892.75 4,890.46 4,889.66 0+00 2+11 3+00 CB-1 Rim: 4,894.88 ft Invert: 4,892.75 ft CB-4 Rim: 4,894.38 ft Invert: 4,890.46 ft O-1 Rim: 4,889.66 ft Invert: 4,889.66 ft CO-4: 89.1 ft @ 0.009 ft/ftCircle - 24.0 in CO-1: 211.3 ft @ 0.010 ft/ftCircle - 12.0 in Page 1 of 176 Watertown Road, Suite 2D Thomaston, CT 06787 USA +1-203-755-1666 3/3/2025 StormCAD [10.03.04.53] Bentley Systems, Inc. Haestad Methods Solution Center2024020 - PROPOSED STORM MODEL.stsw 1825 SHARP POINT STORM Profile Report Engineering Profile - Profile - 2 (2024020 - PROPOSED STORM MODEL.stsw) 4,885.00 4,890.00 4,895.00 -0+50 0+00 0+50 1+00 1+50 2+00 2+50 3+00 Station (ft) El e v a t i o n ( f t ) Element ID\Label Length (Unified) (ft) Rise (Unified) (ft)\Material Flow (cfs) Slope (Calculated) (ft/ft) Element ID\Label Elevation (Ground) (ft) Elevation (Invert) (ft) Station (ft) 62\CO-2 58\CO-4 208.4 89.1 1.00\ 2.00\ 3.21 18.23 0.010 0.009 61\CB-2 55\CB-4 56\O-1 4,894.81 4,894.38 4,889.66 4,892.57 4,890.46 4,889.66 0+00 2+08 2+98 CB-4 Rim: 4,894.38 ft Invert: 4,890.46 ft CB-2 Rim: 4,894.81 ft Invert: 4,892.57 ft O-1 Rim: 4,889.66 ft Invert: 4,889.66 ft CO-2: 208.4 ft @ 0.010 ft/ftCircle - 12.0 in CO-4: 89.1 ft @ 0.009 ft/ftCircle - 24.0 in Page 1 of 176 Watertown Road, Suite 2D Thomaston, CT 06787 USA +1-203-755-1666 3/3/2025 StormCAD [10.03.04.53] Bentley Systems, Inc. Haestad Methods Solution Center2024020 - PROPOSED STORM MODEL.stsw 1825 SHARP POINT STORM Profile Report Engineering Profile - Profile - 3 (2024020 - PROPOSED STORM MODEL.stsw) 4,885.00 4,890.00 4,895.00 -0+50 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 Station (ft) El e v a t i o n ( f t ) Element ID\Label Length (Unified) (ft) Rise (Unified) (ft)\Material Flow (cfs) Slope (Calculated) (ft/ft) Element ID\Label Elevation (Ground) (ft) Elevation (Invert) (ft) Station (ft) 60\CO-3 58\CO-4 212.0 89.1 1.00\ 2.00\ 3.21 18.23 0.010 0.009 59\CB-3 55\CB-4 56\O-1 4,894.80 4,894.38 4,889.66 4,892.77 4,890.46 4,889.66 0+00 2+12 3+01 CB-3 Rim: 4,894.80 ft Invert: 4,892.77 ft CB-4 Rim: 4,894.38 ft Invert: 4,890.46 ft O-1 Rim: 4,889.66 ft Invert: 4,889.66 ft CO-4: 89.1 ft @ 0.009 ft/ftCircle - 24.0 in CO-3: 212.0 ft @ 0.010 ft/ftCircle - 12.0 in Page 1 of 176 Watertown Road, Suite 2D Thomaston, CT 06787 USA +1-203-755-1666 3/3/2025 StormCAD [10.03.04.53] Bentley Systems, Inc. Haestad Methods Solution Center2024020 - PROPOSED STORM MODEL.stsw 1825 SHARP POINT STORM New Addition roof drain Project Description Manning FormulaFriction Method Normal DepthSolve For Input Data 0.011Roughness Coefficient ft/ft0.010Channel Slope in12.0Diameter cfs2.61Discharge Results in6.8Normal Depth ft²0.5Flow Area ft1.7Wetted Perimeter in3.2Hydraulic Radius ft0.99Top Width in8.3Critical Depth %57.0Percent Full ft/ft0.006Critical Slope ft/s5.65Velocity ft0.50Velocity Head ft1.07Specific Energy 1.457Froude Number cfs4.53Maximum Discharge cfs4.21Discharge Full ft/ft0.004Slope Full SupercriticalFlow Type GVF Input Data in0.0Downstream Depth ft0.0Length 0Number Of Steps GVF Output Data in0.0Upstream Depth N/AProfile Description ft0.00Profile Headloss %0.0Average End Depth Over Rise %57.0Normal Depth Over Rise ft/sInfinityDownstream Velocity ft/sInfinityUpstream Velocity in6.8Normal Depth in8.3Critical Depth ft/ft0.010Channel Slope ft/ft0.006Critical Slope Page 1 of 127 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 4/22/2025 FlowMaster [10.03.00.03] Bentley Systems, Inc. Haestad Methods Solution Centerpipe capacities.fm8 Design Point 7 outfall pipe Project Description Manning FormulaFriction Method Normal DepthSolve For Input Data 0.011Roughness Coefficient ft/ft0.005Channel Slope in12.0Diameter cfs2.40Discharge Results in8.2Normal Depth ft²0.6Flow Area ft1.9Wetted Perimeter in3.5Hydraulic Radius ft0.93Top Width in8.0Critical Depth %68.0Percent Full ft/ft0.005Critical Slope ft/s4.22Velocity ft0.28Velocity Head ft0.96Specific Energy 0.952Froude Number cfs3.20Maximum Discharge cfs2.98Discharge Full ft/ft0.003Slope Full SubcriticalFlow Type GVF Input Data in0.0Downstream Depth ft0.0Length 0Number Of Steps GVF Output Data in0.0Upstream Depth N/AProfile Description ft0.00Profile Headloss %0.0Average End Depth Over Rise %54.1Normal Depth Over Rise ft/sInfinityDownstream Velocity ft/sInfinityUpstream Velocity in8.2Normal Depth in8.0Critical Depth ft/ft0.005Channel Slope ft/ft0.005Critical Slope Page 1 of 127 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 3/3/2025 FlowMaster [10.03.00.03] Bentley Systems, Inc. Haestad Methods Solution Centerpipe capacities.fm8 Final Drainage Report Liberty Common Junior High Fort Collins, Colorado Elevation Consulting 16 APPENDIX C REFERENCED INFORMATION FORT COLLINS STORMWATER CRITERIA MANUAL Preface 2.0 Purpose 2.0 Purpose Page 2 In addition, this Manual recognizes the various Master Drainage Plans that have been developed for all the major drainage basins within and around Fort Collins. Each Master Drainage Plan provides detailed analysis and selected plan improvement guidance for major stormwater infrastructure needs throughout Fort Collins and its GMA, see Figure 2.0-1 below. This Manual directs users to apply allowable release rates for storm drainage that have been established by the various Master Drainage Plans and to incorporate any selected plan improvements (where appropriate) into their design. This Manual does not provide direction or requirements for Master Drainage Plan updates. Figure 2.0-1. Master Drainage Basin Map with City Limits and GMA National Flood Hazard Layer FIRMette 0 500 1,000 1,500 2,000250 Feet Ü SEE FIS REPORT FOR DETAILED LEGEND AND INDEX MAP FOR FIRM PANEL LAYOUT SPECIAL FLOOD HAZARD AREAS Without Base Flood Elevation (BFE) Zone A, V, A99 With BFE or Depth Zone AE, AO, AH, VE, AR Regulatory Floodway 0.2% Annual Chance Flood Hazard, Areas of 1% annual chance flood with average depth less than one foot or with drainage areas of less than one square mile Zone X Future Conditions 1% Annual Chance Flood Hazard Zone X Area with Reduced Flood Risk due to Levee. See Notes.Zone X Area with Flood Risk due to Levee Zone D NO SCREEN Area of Minimal Flood Hazard Zone X Area of Undetermined Flood Hazard Zone D Channel, Culvert, or Storm Sewer Levee, Dike, or Floodwall Cross Sections with 1% Annual Chance 17.5 Water Surface Elevation Coastal Transect Coastal Transect Baseline Profile Baseline Hydrographic Feature Base Flood Elevation Line (BFE) Effective LOMRs Limit of Study Jurisdiction Boundary Digital Data Available No Digital Data Available Unmapped This map complies with FEMA's standards for the use of digital flood maps if it is not void as described below. The basemap shown complies with FEMA's basemap accuracy standards The flood hazard information is derived directly from the authoritative NFHL web services provided by FEMA. This map was exported on 10/28/2024 at 9:00 PM and does not reflect changes or amendments subsequent to this date and time. The NFHL and effective information may change or become superseded by new data over time. This map image is void if the one or more of the following map elements do not appear: basemap imagery, flood zone labels, legend, scale bar, map creation date, community identifiers, FIRM panel number, and FIRM effective date. Map images for unmapped and unmodernized areas cannot be used for regulatory purposes. Legend OTHER AREAS OF FLOOD HAZARD OTHER AREAS GENERAL STRUCTURES OTHER FEATURES MAP PANELS 8 B 20.2 The pin displayed on the map is an approximate point selected by the user and does not represent an authoritative property location. 1:6,000 105°2'1"W 40°33'58"N 105°1'23"W 40°33'31"N Basemap Imagery Source: USGS National Map 2023 SITE Hydrologic Soil Group—Larimer County Area, Colorado Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 3/2/2025 Page 1 of 4 44 9 0 0 5 0 44 9 0 0 9 0 44 9 0 1 3 0 44 9 0 1 7 0 44 9 0 2 1 0 44 9 0 2 5 0 44 9 0 2 9 0 44 9 0 0 5 0 44 9 0 0 9 0 44 9 0 1 3 0 44 9 0 1 7 0 44 9 0 2 1 0 44 9 0 2 5 0 44 9 0 2 9 0 497350 497390 497430 497470 497510 497550 497590 497630 497670 497710 497350 497390 497430 497470 497510 497550 497590 497630 497670 497710 40° 33' 48'' N 10 5 ° 1 ' 5 3 ' ' W 40° 33' 48'' N 10 5 ° 1 ' 3 6 ' ' W 40° 33' 40'' N 10 5 ° 1 ' 5 3 ' ' W 40° 33' 40'' N 10 5 ° 1 ' 3 6 ' ' W N Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 13N WGS84 0 50 100 200 300 Feet 0 25 50 100 150 Meters Map Scale: 1:1,760 if printed on A landscape (11" x 8.5") sheet. Soil Map may not be valid at this scale. MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Rating Polygons A A/D B B/D C C/D D Not rated or not available Soil Rating Lines A A/D B B/D C C/D D Not rated or not available Soil Rating Points A A/D B B/D C C/D D Not rated or not available Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Larimer County Area, Colorado Survey Area Data: Version 19, Aug 29, 2024 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Jul 2, 2021—Aug 25, 2021 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Hydrologic Soil Group—Larimer County Area, Colorado Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 3/2/2025 Page 2 of 4 Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI 22 Caruso clay loam, 0 to 1 percent slope D 2.4 31.5% 64 Loveland clay loam, 0 to 1 percent slopes C 5.0 64.2% 105 Table Mountain loam, 0 to 1 percent slopes B 0.3 4.3% Totals for Area of Interest 7.8 100.0% Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Hydrologic Soil Group—Larimer County Area, Colorado Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 3/2/2025 Page 3 of 4 Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff: None Specified Tie-break Rule: Higher Hydrologic Soil Group—Larimer County Area, Colorado Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 3/2/2025 Page 4 of 4 SITE SITE Final Drainage Report Liberty Common Junior High Fort Collins, Colorado Elevation Consulting 17 APPENDIX D DRAINAGE MAP LOT 1 VIPONT AT PROSPECT PARK EAST LOT 3 PROSPECT INDUSTRIAL PARK LOT 11 PROSPECT INDUSTRIAL PARK LOT 12 PROSPECT INDUSTRIAL PARK LOT 6 PROSPECT INDUSTRIAL PARK LOT 2 PROSPECT INDUSTRIAL PARK LOT 10 PROSPECT INDUSTRIAL PARK LOT 7 PROSPECT INDUSTRIAL PARK LOT 3 PROSPECT INDUSTRIAL PARK LOT 6 PROSPECT INDUSTRIAL PARK LOT 2 PROSPECT INDUSTRIAL PARK LOT 1 VIPONT AT PROSPECT PARK EAST LOT 7 PROSPECT INDUSTRIAL PARK LOT 17 PROSPECT INDUSTRIAL PARK LOT 18 PROSPECT INDUSTRIAL PARK LOT 19 PROSPECT INDUSTRIAL PARK LOT 20 PROSPECT INDUSTRIAL PARK LOT 21 PROSPECT INDUSTRIAL PARK LOT 22 PROSPECT INDUSTRIAL PARK LOT 1 VIPONT AT PROSPECT PARK EAST LOT 3 PROSPECT INDUSTRIAL PARK LOT 11 PROSPECT INDUSTRIAL PARK LOT 12 PROSPECT INDUSTRIAL PARK LOT 6 PROSPECT INDUSTRIAL PARK LOT 2 PROSPECT INDUSTRIAL PARK LOT 10 PROSPECT INDUSTRIAL PARK LOT 7 PROSPECT INDUSTRIAL PARK LOT 1 VIPONT AT PROSPECT PARK EAST LOT 3 PROSPECT INDUSTRIAL PARK LOT 11 PROSPECT INDUSTRIAL PARK LOT 12 PROSPECT INDUSTRIAL PARK LOT 6 PROSPECT INDUSTRIAL PARK LOT 2 PROSPECT INDUSTRIAL PARK LOT 10 PROSPECT INDUSTRIAL PARK LOT 7 PROSPECT INDUSTRIAL PARK LOT 3 PROSPECT INDUSTRIAL PARK LOT 6 PROSPECT INDUSTRIAL PARK LOT 2 PROSPECT INDUSTRIAL PARK LOT 1 VIPONT AT PROSPECT PARK EAST LOT 3 PROSPECT INDUSTRIAL PARK LOT 6 PROSPECT INDUSTRIAL PARK LOT 2 PROSPECT INDUSTRIAL PARK LOT 1 VIPONT AT PROSPECT PARK EAST LOT 17 PROSPECT INDUSTRIAL PARK LOT 18 PROSPECT INDUSTRIAL PARK LOT 19 PROSPECT INDUSTRIAL PARK LOT 20 PROSPECT INDUSTRIAL PARK LOT 21 PROSPECT INDUSTRIAL PARK LOT 22 PROSPECT INDUSTRIAL PARK LOT 7 PROSPECT INDUSTRIAL PARK