HomeMy WebLinkAboutAT&T WCF - 2602 S Timberline Road - BDR250014 - SUBMITTAL DOCUMENTS - ROUND 1 - Project Narrative
Powder River Development Services, LLC
1660 S Albion St
Suite 317
Denver, CO 80222
303.478.2835
Steve.kelly@powderriverdev.com
June 10, 2025
City of Ft. Collins
Community Development
281 North College Ave.
Ft. Collins, CO 80522
Narrative Description
Wireless Communications Facility
WCF Drake Zeigler
Attachment to Application
Project Title: WCF Drake Zeigler
Previous Meeting Date: Conceptual Design Review (CDR) – March 13, 2025
Applicant: AT&T Mobility
Representative as Agent for AT&T Mobility:
Powder River Development
Stephan Kelly
1660 S Albion St.
Suite 317
Denver, CO 80222
303.478.2835
Steve.kelly@powderriverdev.com
Project Address: 2602 S. Timberline
Parcel ID: 8729270001
Property Owner: Dillon Companies LLC, DBA King Soopers
Existing Zoning: N-C (Neighborhood Commercial)
Project Plan and Purpose:
PLAN:
AT&T Mobility requests approval of this application to place fully screened rooftop antenna mounts
in each of the four corners, and associated radio equipment cabinets on the ground at rear of the
King Soopers store on the east end. Equipment cabinets will have a solid CMU security wall around
them. The wall will be of similar texture and color as the existing store and be attached to the
exterior store wall. The rooftop locations are planned as square enclosures to hide the antenna
arrays from view yet be of a material that allows radio frequency transmission. Each rooftop corner
location will be approximately 190 square feet for a total of approximately 720 square feet. The
corners are ideal as transmission locations because the roof is more structurally sound. Placing
them further back from the building parapets would require them to be taller to achieve coverage
objectives and would impact the structural integrity of the roof. Applicant acknowledges the
Powder River Development Services, LLC
1660 S Albion St
Suite 317
Denver, CO 80222
303.478.2835
Steve.kelly@powderriverdev.com
allowable rooftop height to be 15 feet above the roof deck, which provides clearance for coverage
objectives. The screen boxes are planned to be of a texture and color to match and blend with the
existing building. The associated radio equipment cabinets will be placed in a designated lease
area at the base of the easterly rear wall of the store. The planned equipment enclosure is
approximately 260 square feet. This area will have a secure wall and gate. All equipment installed
will be owned, maintained and managed by AT&T.
The attachment of this equipment does not substantially change the physical dimensions or use of
the main host structure. The site will be unmanned and will operate 24/7/365. The site will not
generate vehicle traffic except for periodic maintenance visits and requires no parking spaces.
There is no impact on ground water or existing landscaping. No hazardous materials are involved
with this project.
PURPOSE:
The purpose of the installation at this location is to serve the FirstNet Nationwide Safety Public
Broadband Network (‘FirstNet network”) and to provide upgraded and enhanced coverage to AT&T
customers along S. Timberline, E. Drake Rd. and the general neighborhood vicinity.
Excerpt from FirstNet information office:
The proposed project will include facilities to serve the FirstNet 1 Nationwide Safety Public Broadband
Network (“FirstNet network”) as well as AT&T’s commercial customers. The FirstNet network will
provide first responders with priority access to wireless communications services on a single
nationwide network, enabling increased coordination among first responder agencies and decre ased
response times.
The FirstNet Network: All 50 states have opted in to the FirstNet Nationwide Public Safety
Broadband Network. The federal First Responder Network Authority, through a public -private
partnership with AT&T, will provide the nation’s first-ever high-speed nationwide wireless broadband
network dedicated to federal, state and local first responders. Various public safety agencies
including the United States Forest Service will be able to communicate on the FirstNet network,
allowing greater coordination and faster response times.
In its partnership with the First Responder Network Authority, AT&T is responsible for building,
maintaining, and upgrading the FirstNet network for the next 25 years. In order to support FirstNet,
AT&T will be upgrading its existing wireless sites and building new wireless facilities throughout
Colorado. AT&T’s upgrades include deployment of the new frequency band (“Band 14”) supporting
the FirstNet network. In 2012, the U.S. Congress set aside Band 14 for use by first responders.
FirstNet Built with AT&T is designed to be reliable, functional, safe, and secure, and it will provide
optimal levels of operational capacity at all times.
1 The First Responder Network Authority (FirstNet) is an independent authority within the U.S. Department of
Commerce. Chartered in 2012, its mission is to ensure the building, deployment, and operation of the
nationwide, broadband network that equips first responders to save lives and protect U.S. communities.
FirstNet grew out of and addresses a 9/11 Commission recommendation calling for improved
communications for all U.S. first responders. Learn more at FirstNet.gov/mediakit.
Powder River Development Services, LLC
1660 S Albion St
Suite 317
Denver, CO 80222
303.478.2835
Steve.kelly@powderriverdev.com
ADDITIONAL INFORMATION:
• Application fees have been paid and receipt acknowledged by Development Review
Coordinator.
• Attached to, submitted with and made a part of this application are required documents:
o Project Narrative
o Preliminary Development Review comments letter with applicant responses
o Development Review checklist
o Development Review application
o Project plan set containing title page with project information, site plan, elevations,
general notes
o Project photo simulations of proposed installation
o RF Emissions letter
o RF Non-interference letter
o Water Adequacy Determination – provided but N/A as no water source necessary for
telecommunication sites
o Other items on the checklist are either waived or deferred by departments at this
time including Owner Authorization and the power design which will be part of the
building permit process and CD’s. The applicant understands and acknowledges no
Development Review permit will be granted until the Authorization is provided.
• When Development Review is complete and approved applicant plans to submit for
building permit and commence the installation. Typically, rooftop projects take
approximately four (4) weeks from start to completion, barring delays for weather or
materials supply chain issues. No phasing is required.
• Kroger (King Soopers) has approved the AT&T proposed wireless site on the store and a
lease is in negotiation at this time.
Thank you for your consideration
Stephan Kelly, on behalf of AT&T mobility
Respectfully Submitted June 10, 2025