Complete Submittal Checklist:
Wireless Communication Facilities
Project Name:
Applicant Name:
This checklist is for the review of Wireless Communication Facility (WCF) development projects, ensuring
compliance with relevant codes and regulations. It outlines essential requirements for submittals, including site
assessments and compliance checks, to ensure that WCF projects adhere to local regulations. Use this
checklist to facilitate efficient review processes and support the deployment of reliable wireless services.
All checklist items are required unless city staff indicates an item is (W)aived, (D)eferred, (N/A) Not
Applicable or already (R)eceived. If the staff code is blank, then the item is required.
This checklist must be reviewed, completed and accepted by staff prior to project routing. Additional
information may be requested from the applicant during the review process, if necessary, to address specific
issues that arise. Please note that all application materials, once submitted, become a matter of public
record.
Checklist, Submittal Forms and Fees:
Staff
Code
Applicant
Validation Item Description Submittal Requirement
Resources
One copy of this checklist, completed and signed by applicant Development Review
Coordination
DRCoord@fcgov.com
970-221-6689
One signed copy of Development Application Form
Payment for the above application form
Payments can be made by check, debit /credit card or eCheck.
Check: Make payable to City of Fort Collins.
Mail to the Development Review Center, 281 N College Ave, Fort Collins,
CO 80524, OR place in the blue drop box located at the west side of the building. Card or eCheck: Would be processed at fcgov.com/CitizenAccess.
• Debit/Credit card payments include a convenience fee of 2% + $0.25 added to all
payments under $2,500.00, and 2.75% added to all payments over $2,500.00.
• ECheck payments include a convenience fee of $0.50 added to all payments
between $0.00 - $99,999.99.
10/3/2024 3 Wireless Communication Facilities Submittal Checklist
Electronic Copies*
All copies must be provided per City file naming standards and submitted electronically. All copies must be
prepared per city PDF formatting standards.
See: Submittal Requirements Section M – File Naming Standards & PDF formatting standards
*Paper copies of plans and reports are not required during development review. See Submittal Requirements,
Section D for drawing format guidelines. All plan elements shall be clearly drawn and labelled. A scale bar must
be provided on all scaled drawings. Paper copies of plan sheets may be requested complete a timely review,
including instances when the drawing scale is not accurately depicted.
1)General Information:
Staff
Code
Applicant
Validation Item Description Submittal Requirement
Resources
A comment response letter from the project's Conceptual
Review or Preliminary Development Review staff meeting;
for 1st round FDP include response from the last round
PDP; or for resubmittals include a comment response letter
from the prior round of review. To receive a final copy of
the staff comment letter, contact your Development Review
Coordinator
Section C
Development Review
Coordination
DRCoord@fcgov.com
970-221-6689
Project Information & Design Narrative:
Specifically detailing the rational for the proposed
location
Letter of Authorization, from the landowner:
Deferred per email 6/6/25
If the applicant is not the owner of the property
or structure to which the WCF is to be attached.
LUC 4.3.5.H.6b(II)
2)Planning Submittal Package:
Staff
Code
Applicant
Validation Item Description Submittal Requirement
Resources
Title Block information on all plan sheets
Section D Cover Page, including:
Title Block
Land Use Table Section E Requirements
Sheet Index
Section D Signature Blocks
Site Plan Notes Standard Notes
(also available in Word
format at the Submittal
Requirements web page)
10/3/2024 4 Wireless Communication Facilities Submittal Checklist
Site Location Map
Section D Legal Description
Final Site Plan Sheet(s) (and related hardscape design
detail sheets, See Section I for Requirements) Section F
Final Architectural Elevation Sheet(s), Materials and other
Detail Sheets (color elevations recommended)
Section G
Final Landscape Plan Sheet(s)
Standard city landscape notes, and related planting detail
sheets (See Section I for planting detail requirements)
Section H and I
Standard Notes
(also available in Word
format at the Submittal
Requirements web page)
Preliminary Irrigation Plan,
Separate PDF, do not combine with other Plan Set sheets
Section H
Water Conservation
Final Lighting Plan, Photometric Plan and Lighting Detail
Sheets
Section I
Final Trash and Recycling Enclosure Details (include these
details with the site plan sheets or elevation sheets)
Confirmation that all Sheets provided incorporate City
drafting and format standards Section D
Staff Comments:
10/3/2024 5 Wireless Communication Facilities Submittal Checklist
3) Final Subdivision Plat:
Staff
Code
Applicant
Validation Item Description Submittal Requirement
Resources
A final subdivision plat of the site. This plat must conform to
Section J
LUC Division 5.4
Engineering Standards
City Contact(s):
• Technical Services –
Jeff County,
JCounty@fgov.com
• Surveying –
John Von Nieda
JVonNieda@fcgov.com
elevations if required and all other public rights-of-way.
will be provided by your Development Review Coordinator.
Monument Records
Closure Report
10/3/2024 6 Wireless Communication Facilities Submittal Checklist
4) Final Utility Plans (Civil Construction Plans):
Staff
Code
Applicant
Validation Item Description Submittal Requirement
Resources
Cover Sheet
Utility Plans Checklist.pdf
City Contact: Engineering
Development Review
EngDevRev@fcgov.com
970-221-6605
Standard Notes Sheet
Existing Conditions and/or Demolition Plan
Overall Grading Plan
Detailed Grading Plan Sheets
Overall Utility Plan Sheet
Detailed Utility Plan Sheets
Sanitary Sewer Plan and Profile Sheets
Storm Sewer Plan and Profile Sheets
Water Plan and Profile Sheets
Street Plan and Profile Sheets
Street Cross-sections
City of Fort Collins Standard Construction Details
10/3/2024 7 Wireless Communication Facilities Submittal Checklist
5) Final Drainage and Erosion Control Report:
Staff
Code
Applicant
Validation Item Description
Final Drainage and Erosion Control Report may include
the following:
Items from the PDP Checklist:
Detention Requirements and Calculations
Offsite Flows
Floodplain Zone -- Contact Floodplain
Administration staff at 970-416-2632 for questions
Hydraulic Calculations
Detention Basin Calculations
Standard Water Quality and LID Calculations
Include Drainage Plan or Exhibit in the report
Additional Final Items:
Hydraulic Calculations
Four Step Process
SDI Data Spreadsheet (if required)
Erosion Control Materials
Note: All items shown above are components that may
be necessary with a drainage report analysis. Not all
components may be necessary. The drainage report
analysis must be prepared by a professional engineer.
Stormwater Criteria Manual
Resource Page
Stormwater Criteria Manual
Appendices:
A. Required Submittal
Content
B. Stormwater Facilities
Landscape Standards
C. LID Implementation
D. Erosion Control
Guidance
E. Erosion Control
Construction Measures
Fact Sheets
F. Erosion Control
Construction Measures
Standard Notes
City Utilities:
Development Forms,
Guidelines & Regulations
For Stormwater or
Floodplain questions,
contact:
waterutilitieseng@
fcgov.com
970-221-6689
Erosion Control Information:
www.fcgov.com/erosion
10/3/2024 8 Wireless Communication Facilities Submittal Checklist
6) Final Reports and Supporting Documents:
Staff
Code
Applicant
Validation Item Description Submittal Requirement
Resources
Meeting
Date:
(mm/dd/yy)
Building Services Presubmittal Meeting:
Confirmation of completed Pre-Submittal Code Feasibility
Meeting with Building Services.
New Commercial Projects require a pre-submittal meeting for
building code feasibility. This typically takes place when
drawings are 50% complete and in the mid phases of the
Development Review Process, and prior to Building Permit
Submittal.
Applicants are encouraged to review building requirements as
early as possible in the process. For questions or to schedule
this meeting contact your Development Review Coordinator.
Please Note:
Building Permits will not be
reviewed until Development
Plan review process is
completed and recorded.
Building Codes & Standards
Building Permit Fees
Planning Services:
Perspective views of the Building Exterior
Section G
Electronic Building Material Sample Board
(Physical board maybe required upon request)
Neighborhood Context Plan
(Overall site plan diagram indicating surrounding
neighborhood features, to be incorporated into Site
Plan sheets or cover page)
Section C
Land Use Code Modification and Alternative Compliance
Requests; staff review, and approval required prior to
Development Review Completion
(If Modifications are proposed)
LUC Division 6.8
City Contact: Planning
Services
planning@fcgov.com
970-416-4311
Parking Alternative Compliance Studies
Guidelines for these studies are held by the Director
Parking Impact Study Guidelines
LUC Section 5.9.1(K)
City Contact: Planning
Services
planning@fcgov.com
970-416-4311
Certification of Notice to Mineral Owner(s)
If provided with PDP please submit that copy
Certification of Mineral Estate
Owner Notification
C.R.S.A § 24-65.5-103
Water Adequacy Determination & Demand
Summary Worksheet
LUC Section 5.17
FCMC §26-148 to -150
Contact: Planning
Services
planning@fcgov.com
970-416-4311
New Structures: Any request for new vertical
structures associated with a WCF need to
demonstrate that other alternative site options,
including collocations, are not feasible.
LUC Section 4.3.5(H)(6)(d)
Contact: Planning
Services
planning@fcgov.com
970-416-4311
10/3/2024 9 Wireless Communication Facilities Submittal Checklist
Staff
Code
Applicant
Validation Item Description Submittal Requirement
Resources
Development Review Engineering:
Soils Report
In conformance with the Larimer County Urban Area
Street Standards
Larimer County Urban Area
Street Standards
Subsurface Hydrologic Study
Report or Certification; showing the site will be
in full compliance with Federal radio-frequency
emission standards for WCFs LUC 4.3.5.H.6b(II)
Signal Interference Certification; With the seal
and signature of a Colorado professional engineer,
certifying that all WCFs in the application will comply
with federal signal interference requirements
Development Agreement Information Form
Recorded Statement of Authority (§38-30-172, C.R.S.) for
Developer and/or Owner [whoever will be signing the
Development Agreement]
City Contact: Engineering
Development Review
EngDevRev@fcgov.com
970-221-6605
Final legal descriptions for accompanying deeds of
dedication by separate document
Easement and Right-of-Way
Dedication Process
Final legal descriptions for accompanying easement
vacation request by separate document
Vacation of Easements
Process
Closure Report for any Easements and/or Right of
Ways submitted for review.
Approved and Signed Engineering or Utility Variance
Requests
Larimer County Urban Area
Street Standards
Traffic Operations: Resource Page
City Contact:
Traffic Operations
Transportation Impact Study (TIS) OR waiver
indicated from Traffic Operations staff
(Waiver indication to be provided with initial submittal)
Utilities – Environmental Engineering:
Erosion Control Cost Estimate
City Utilities: Development
Forms, Guidelines &
Regulations
Utilities – Electric Systems Engineering:
Electric Utility Service C-1 Form
City Utilities: Development
Forms, Guidelines &
Regulations
Utilities – Water Development Fees:
Water Fee Form
City Utilities: Water
development fees page
10/3/2024 10 Wireless Communication Facilities Submittal Checklist
Staff
Code
Applicant
Validation Item Description Submittal Requirement
Resources
Environmental Planning:
Ecological Characterization Study (ECS)
If an ECS is required, this must be submitted at least ten
days prior to the development review application. A copy
shall also be submitted at the time of the application with
this checklist.
Section J
Section H
LUC Section 5.6.1
City Contact:
Environmental Planning
970-416-4311
Phase 1 Environmental Site Assessment
Needed IF there have been previous uses on the site
that could cause contamination. i.e., mechanic shops,
manufacturing, gas stations or anything with fuel storage
(above or below ground), dry cleaners, etc.
To be provided by qualified
third-party consultant
City Forestry:
Existing Tree Inventory Plan
Prior to the review submittal, the applicant must
schedule an on- site meeting with City Forestry to
obtain tree inventory information for all existing trees
within the development area. The meeting is also
intended to discuss any proposed tree removal.
PLEASE NOTE THAT EXISTING TREES SHOULD
NOT BE REMOVED OR DAMAGED PRIOR TO
SUBMITTAL, REVIEW AND APPROVAL OF THE
PROPOSED DEVELOPMENT.
See Submittal Requirements
Sections H and L for more
information regarding
documentation of existing and
proposed trees on landscape
plans
City Contact:
City Forestry
forestry@fcgov.com
970.221.6660
City Forestry Resources:
www.fcgov.com/forestry
Land Use Code Section:
5.10.1(F) Tree Preservation
and Mitigation
Replacement
Existing Tree Removal Feasibility Request
Provide a letter to City Forestry outlining the justification
for the removal of any existing trees, if proposed.
Existing Tree Mitigation Plan
At your site meeting, City Forestry will determine the
characteristics and mitigation requirements for all
existing trees within the project's proposed Limits of
Disturbance.
(If tree removal is proposed).
10/3/2024 11 Wireless Communication Facilities Submittal Checklist
Other information and data as required for the full
and complete consideration of the development to
access compliance (to be completed by City staff):
Hazardous Materials Impact Analysis.
Any special wildlife, wetland, natural habitats and
features, ecological or environmental study or mapping
pursuant to Section 5.4 and 5.6 of the Land Use Code
as requested by the Director.
Other items required:
City Contact: Development
Review Coordination
DRCoord@fcgov.com
970-221-6689
Applicant Acknowledgement:
I have reviewed the Development Application Submittal Requirements, Sections A – M. All documents submitted
are complete, and the requirements have been incorporated into the plans (See Development Application
Submittal Requirements for detailed descriptions). All documents have been compared, and consistent design
information is shown on all plan sheets and reports. I understand that if the City identifies missing information, the
review period will be paused until I submit the required documents, potentially prolonging the review process.
Applicant Signature: ______________________________________________________ Date: ______________________________
Phone: ______________________________________ Email: ________________________________________________________
(See Development Application Submittal Requirements for detailed description of requirements)