Re: Uplift Self‐Storage at Rudolph Farm
Final Development Plan
Response to PDR Comments issued 11/18/2022
Department: Development Review Coordinator
Contact: Brandy Bethurem Harras bbethuremharras@fcgov.com 970-416-2744
Topic: General
Comment Number: 5
02/18/2025: FDP SUBMITTAL:
Submittals are accepted any day of the week, with Wednesday at noon being the cut-off for routing the
same week. Upon initial submittal, your project will be subject to a Completeness Review. Staff has
until noon that Friday to determine if the project contains all required checklist items and is sufficient for
a round of review. If complete, a formal Letter of Acceptance will be emailed to you and the project
would be officially routed with its initial round of review, followed by a formal meeting.
As you are preparing to submit your formal plans, please notify me with an anticipated submittal date.
Applications and plans are submitted electronically to me by email or secured file sharing applications.
We will be returning revised submittals in a timely manner.
Comment Number: 11
02/21/2025: FDP FEES:
Payments can be made by check, debit/credit card or eCheck.
If paying by check, make payable to “City of Fort Collins”. This is accepted at the Development Review
Center, 281 N College Ave, Fort Collins, CO 80524, by mail or can be placed in the blue drop box
located at the northwest side of the building. Please mark it to the attention of your Development
Review Coordinator and reference the project it is associated with.
If paying by debit/credit card or eCheck, please go to fcgov.com/CitizenAccess, select
Planning/Development Review and search by inputting your project's information*.
• Debit/Credit card payments include a convenience fee of 2% + $0.25
4032 De foe St., Strasburg, CO 8013 6 Phone 303.317.3 000 aaron@aperiopc.com
Uplift Self Storage at Rudolph Farm
Final Development Plan
Response to PDR Comments_Rd4
April 18, 2025
2
added to all payments under $2,500.00, and 2.75% added to all payments over $2,500.00.
• ECheck payments include a convenience fee of $0.50 added to all payments between $0.00 -
$99,999.99.
*Please advise your Development Review Coordinator as to which payment method will be used. If
choosing to pay online, your Development Review Coordinator will provide you with the project
information when the fees are available to be paid.
Department: Engineering Development Review
Contact: Sophie Buckingham sbuckingham@fcgov.com
Topic: General
Comment Number: 7
01/08/2024: FOR FINAL PLAN:
I will leave this comment active as a reminder for the first round of FDP.
11/14/2023: FOR FINAL PLAN:
You will need to dedicate one emergency access easement and two sight distance easements with this
project. These easements will need to be prepared by a Colorado licensed Professional Land Surveyor
and submitted with the first round of FDP. Information about easement dedications, including fees,
process guidelines, and deed templates, is available at
https://www.fcgov.com/engineering/devrev.php#cb-38308-6601.
The sight distance triangles are fully contained in the ROW for Carriage Parkway and
therefore do not require an easement. We have submitted the legal description and
closure calculations for the EAE and utility easement for the electrical service to the site.
Department: Traffic Operation
Contact: Steve Gilchrist, 970-224-6175, sgilchrist@fcgov.com
Topic: Traffic Impact Study
Comment Number: 1
11/12/2022: A Traffic Impact Study or memo will be required with the submittal of this project to
determine if this proposal is consistent with the overall development plan. Please contact Traffic
Operations to scope the study.
A TIS memo is included with the application materials, in conformance with the overall
development TIS.
Department: Erosion Control
Contact: Andrew Crecca, , acrecca@fcgov.com
Topic: Erosion Control
Comment Number: 3
Uplift Self Storage at Rudolph Farm
Final Development Plan
Response to PDR Comments_Rd4
April 18, 2025
3
01/02/2024: FOR FINAL PLAN:
Referring to comment responses during PDP round 2 we acknowledge Erosion Control Materials will
be summitted with Final Development Plans. Please refer to the Fort Collins Stormwater Criteria
Manual Chapter 2 Section 6 for requirements.
An Erosion Control Report and Plan is included with the Final Utility Plan submittal.
Department: Stormwater Engineering
Contact: Dan Mogen, 970-305-5989, dmogen@fcgov.com
Topic: General
Comment Number: 4
02/18/2025: FOR FINAL PLAN:
Please ensure proposed grading aligns with grading to be completed with Rudolph Farm Infrastructure
and include spot elevations at lot lines/tie in points to show alignment.
The grading background has been updated.
Comment Number: 5
02/18/2025: FOR FINAL PLAN:
Please review landscape separations and ensure landscape separations are met around existing and
proposed storm sewer. See redlines for more detail.
The tree locations have been adjusted for clearance to storm sewer.
Department: Light And Power
Contact: Cody Snowdon, 970-416-2306, csnowdon@fcgov.com
Topic: General
Comment Number: 6
01/09/2024: FOR FINAL PLAN:
Please dedicate a Utility Easement around all proposed electric facilities within the property.
09/26/2023: INFORMATION:
Any existing and/or proposed Light and Power electric facilities that are within the limits of the project
must be located within a utility easement or public right-of-way.
The legal description and exhibit for the utility easement is included in the FDP application
materials.
Comment Number: 10
09/26/2023: FOR FINAL PLAN:
Please coordinate meter locations with Light and Power and show on the utility plans during Final
Design. These locations will need to comply with our electric metering standards. Electric meter
locations will need to be coordinated with Light and Power Engineering. Reference Section 8 of our
Uplift Self Storage at Rudolph Farm
Final Development Plan
Response to PDR Comments_Rd4
April 18, 2025
4
Electric Service Standards for electric metering standards. A link has been provided below.
https://www.fcgov.com/utilities/img/site_specific/uploads/ElectricServiceStandards_FINAL_18Novembe
r2016_Amendment.pdf
Please refer to the included electrical plan.
Comment Number: 11
09/26/2023: FOR FINAL PLAN:
A Customer Owned Service Information Form (C-1 Form) and a one-line diagram for all commercial
meters will need to be completed and submitted to Light & Power Engineering for review prior to Final
Plan. A link to the C-1 Form is below:
https://www.fcgov.com/utilities/img/site_specific/uploads/c-1_form.pdf?1597677310
The C-1 Form is included with the FDP application materials.
Comment Number: 12
09/26/2023: FOR FINAL PLAN:
On the one-line diagram, please show the main disconnect size and meter sequencing.
A copy of our meter sequencing can be found in our electric policies practices and procedures below.
http://www.fcgov.com/utilities/business/builders-and-developers/development-forms-guidelines-regulati
ons
The one-line diagram is included with the FDP application materials.
Department: Environmental Planning
Contact: Kristie Raymond kraymond@fcgov.com
Topic: General
Comment Number: 7
02/18/2025: FOR FINAL PLAN:
Please include a water budget chart and hydrozone diagram with the next submittal that identifies all
hydrozones and total annual water use on the site per LUC section 3.2.1(E)(3). Total annual water use
should not exceed 15 gallons/square foot over the site, including all hydrozones used on the landscape
plan.
Where are the different hydrozones located? Please show this visually.
The different zones have been added to the plan. The overall budget is on the plan, totaling
7.73 gal/sf/yr.
Comment Number: 11
02/18/2025: FOR FINAL PLAN:
Please ensure plantings next to the NHBZ are intentional, and are native species to provide a good
transition from the NHBZ to development. Please refer to the City of Fort Collins Vegetation database
Uplift Self Storage at Rudolph Farm
Final Development Plan
Response to PDR Comments_Rd4
April 18, 2025
5
(https://www.fcgov.com/vegetation/), and the Rudolph Farm infrastructure plan for approved seed lists
and plantings that would compliment this project. For example, please replace Shumard Oak with a
native species
The tree and seeding for the NHBZ have been updated.
Department: Forestry
Contact: Christine Holtz choltz@fcgov.com
Topic: General
Comment Number: 4
02/04/2025: FOR FINAL PLAN:
01/04/2024: FOR HEARING:
Scotch pine have high mortality rates in Fort Collins due mainly to pine wilt nematode,and it is not on
our recommended species list. Please see the other conifer options below:
Arizona cypress
Utah juniper
Rocky mountain Juniper
Engelmann spruce
Swiss stone pine
Vanderwolf pine
Bald cypress
Bosnian pine
The Scotch Pines have been substituted.
Comment Number: 5
02/04/2025: FOR FINAL PLAN:
01/10/2024: FOR HEARING:
There is at least one separation issue with a proposed tree and a storm water utility. Please see
forestry redlines.
Please see revised plan.
Comment Number: 6
02/04/2025: FOR FINAL PLAN:
01/10/2024: FOR HEARING:
There is an opportunity to put shade trees along the walk on the south side of the property--this would
increase shade for the sidewalk, but ponderosa pines would do fine there as well
The Hackberry and Autumn Blaze Maple trees are a shade tree.
Department: PFA
Uplift Self Storage at Rudolph Farm
Final Development Plan
Response to PDR Comments_Rd4
April 18, 2025
6
Contact: Marcus Glasgow marcus.glasgow@poudre-fire.org 970-416-2869
Topic: General
Comment Number: 2
11/14/2023: FOR FINAL PLAN - UNRESOLVED:
09/25/2023: FOR FINAL PLAN:
FIRE LANE LOADING - IFC Appendix D102.1 amendment
Fire lanes shall be designed as a flat, hard, all-weather driving surface capable of supporting 80,000
pounds. Private drives used for fire lanes shall provide information confirming the design can handle
fire truck loading. A note shall be added to the civil plans indicating all areas dedicated as EAE are
capable of supporting 80,000 pounds.
The requested pavement design note has been included on the Final Utility Plans and will be
designed accordingly by the geotechnical engineer.
Comment Number: 3
11/14/2023: FOR FINAL PLAN - UPDATED:
Fire lane signage is missing in the fire lane on the the East side of the building.
Additional signage or striping will be required in this area.
09/25/2023: FOR FINAL PLAN - FIRE LANE SIGNS:
The limits of the fire lane shall be fully defined and fire lane sign locations should be indicated on future
plan sets. Refer to LCUASS detail #1418 & #1419 for sign type, placement, and spacing. Appropriate
directional arrows required on all signs. Posting of additional fire lane signage may be determined at
time of fire inspection. Code language provided below.
- IFC D103.6: Where required by the fire code official, fire apparatus access roads shall be marked with
permanent NO PARKING - FIRE LANE signs complying with Figure D103.6. Signs shall have a
minimum dimension of 12 inches wide by 18 inches high and have red letters on a white reflective
background. Signs shall be posted on one or both sides of the fire apparatus road as required by
Section D103.6.1 or D103.6.2.
SIGN PLACEMENT
- IFC D103.6.1; ROADS 20 TO 26 FEET IN WIDTH: Fire lane signs as specified in Section D103.6
shall be posted on both sides of fire apparatus access roads that are 20 to 26 feet wide.
- IFC D103.6.1; ROADS MORE THAN 26 FEET IN WIDTH: Fire lane signs as specified in Section
D103.6 shall be posted on one side of fire apparatus access roads more than 26 feet wide and less
than 32 feet wide.
An additional fire lane – no parking sign has been added on the east side of the site for Phase 1.
Comment Number: 4
11/14/2023: FOR FINAL PLAN -UPDATED:
Please include generic address to scale on Building Elevations and update note 17 on the site plan to
show 8 inch.
Addressing on the building is shown on the elevations.
Uplift Self Storage at Rudolph Farm
Final Development Plan
Response to PDR Comments_Rd4
April 18, 2025
7
09/25/2023: FOR FINAL PLAN:
PREMISE IDENTIFICATION: ADDRESS POSTING & WAYFINDING – IFC section 505.1.1
amendment
Where possible, the naming of private drives is usually recommended to aid in wayfinding. New and
existing buildings shall be provided with approved address identification. The address identification
shall be legible and placed in a position that is visible from the street or road fronting the property.
Address identification characters shall contrast with their background. Address numbers shall be arabic
numbers or alphabetical letters. Numbers shall not be spelled out. The address numerals for any
commercial or industrial buildings shall be placed at a height to be clearly visible from the street. They
shall be a minimum of 8 inches in height unless distance from the street or other factors dictate
larger numbers. Refer to Table 505.1.3 of the 2021 IFC as amended. If bronze or brass numerals are
used, they shall only be posted on a black background for visibility. Monument signs may be used in
lieu of address numerals on the building as approved by the fire code official. Buildings, either
individually or part of a multi- building complex, that have emergency access lanes on sides other than
on the addressed street side, shall have the address numbers and street name on each side that fronts
the fire lane.
Addressing on the building is shown on the elevations. Further detailed refinement can be
made if necessary prior to building permit.
Comment Number: 10
11/14/2023: FOR FINAL PLAN - FIRE LANE:
The fire lane shown on the plan will need to be dedicated as an Emergency Access Easement.
The EAE legal description and exhibit have been submitted for dedication.
Comment Number: 11
01/04/2024: FOR FINAL PLAN - UPDATED:
The provided turning exhibit appears to show turning movements for a Tiller. Please update the exhibit
to show the correct aerial apparatus. Any areas of overhang will not be approved.
The “tiller” plan was for a semi-truck turning template for traffic review, the last submittal for
the PDP prior to hearing included the fire apparatus exhibit. It is also included with the FDP
submittal.
Department: Water Conservation
Contact: Emma Pett epett@fcgov.com
Topic: General
Comment Number: 1
09/19/2023: FOR FINAL PLAN:
Preliminary irrigation plans are due at FDP should include a landscape plan, a water budget and
Uplift Self Storage at Rudolph Farm
Final Development Plan
Response to PDR Comments_Rd4
April 18, 2025
8
hydrozone map. Your water budget must be under 15 gallons/square foot for the property annually.
Final irrigation plans are due at building permit application, but we encourage you to submit them
earlier in case changes need to be made. Detailed irrigation submittal requirements can be found here:
https://www.fcgov.com/utilities//img/site_specific/uploads/irrigation-plan-submittal-reqs.pdf?164926026
7
The landscape plans with the hydrozone information, water budget and preliminary irrigation
plan are included.
If you should have any questions, or need any additional information, please don’t hesitate
to call me at 303‐317‐300 or email me at Aaron@aperiopc.com .
Sincerely,
Aaron Thompson
Aperio Property Consultants, LLC
Cc: Tony Ollila, Uplift Development Group, LLC
Chris Aronson, VFLA Architecture
Greg Kelly, Kelly Development Services, LLC