May 7, 2025
Luke Kamtz 1908 HARMONY DR
Fort Collins, CO 80525
RE: Harmony Drive Minor Subdivision, BDR250004, Round Number 1 Please see the following summary of comments from City staff and outside reviewing agencies for your
submittal of Harmony Drive Minor Subdivision. If you have questions about any comments, you may contact
the individual commenter or direct your questions through your Development Review Coordinator, Todd
Sullivan via phone at 970-221-6695 or via email at tsullivan@fcgov.com.
Comment Summary:
Department: Development Review Coordinator
Contact: Todd Sullivan tsullivan@fcgov.com 970-221-6695
Topic: General
Comment Number: 1
INFORMATION:
I will be your primary point of contact throughout the development review and permitting process. If
you have any questions, need additional meetings with the project reviewers, or need assistance
throughout the process, please let me know and I can assist you and your team. Please include
me in all email correspondence with other reviewers and keep me informed of any phone
conversations. Thank you!
Noted. Thank you
Comment Number: 2
SUBMITTAL:
As part of your submittal, a response to the comments provided in this letter and a response to
plan markups is required. The final letter is provided to you in Microsoft Word format. Please use
this letter to insert responses to each comment for your submittal, using a different font color.
Please use the markups to insert responses to each comment on plans. Please do not flatten
markup responses.
Provide a detailed response for any comment asking a question or requiring an action. Any
comment requesting a response or requiring action by you with a response of noted,
Page 2 of 6
acknowledged etc. will be considered not addressed. You will need to provide references to
specific project plans, pages, reports, or explanations of why comments have not been addressed
[when applicable].
Noted. Thank you.
Comment Number: 3
SUBMITTAL:
Correct file naming is required as part of a complete submittal. Please follow the Electronic
Submittal Requirements and File Naming Standards found here:
https://www.fcgov.com/developmentreview/files/electronic-submittal-requirements-and-file-naming-
standards_v1_8-1-19.pdf?1703783275
File names should have the corresponding number, followed by the file type prefix, project
information, and round number. For example: 1_SITE PLAN_Project Name_FDP_Rd1. A list of
numbers and prefixes for each file can be found at the link above.
Intermill Land Surveying agrees to the file naming convention requested.
Comment Number: 4
SUBMITTAL:
All plans should be saved as optimized/flattened PDFs to reduce file size and remove layers. Per
the Electronic Submittal Requirements AutoCAD SHX attributes need to be removed from the
PDF’s.
AutoCAD turns drawing text into comments that appear in the PDF plan set, and these must be
removed prior to submittal as they can cause issues with the PDF file. The default setting is "1"
("on") in AutoCAD. To change the setting and remove this feature, type "EPDFSHX" (version
2016.1) or “PDFSHX (version 2017 and newer) in the command line and enter "0".
Read this article at Autodesk.com for more on this topic:
https://knowledge.autodesk.com/support/autocad/troubleshooting/caas/sfdcarticles/sfdcarticles/Dra
wing-text-appears-as-Comments-in-a-PDF-created-by-AutoCAD.html
Thank you for this reminder.
Comment Number: 5
SUBMITTAL:
Resubmittals are accepted any day of the week, with Wednesday at noon being the cut-off for
routing the same week. When you are preparing to resubmit your plans, please notify me with an
expected submittal date with as much advanced notice as possible.
Acknowledged. Sent email 2025.05.07 with target submittal of 2025.05.08.
Comment Number: 6
INFORMATION:
Please resubmit within 180 days, approximately 6 months, to avoid the expiration of your project.
180-day window is 2025.09.10. Target submittal date is 2025.05.08 well within the 180-day
requirement.
Comment Number: 7
INFORMATION:
ANY project that requires four or more rounds of review would be subject to an additional fee of
$3,000.00.
Noted.
Page 3 of 6
Comment Number: 8
NOTICE:
A Development Review sign will be posted on the property. This sign will be posted through the
final decision and appeal process. A request for the removal of signs will be made by your
Development Review Coordinator at the appropriate time.
Acknowledged. Thank you.
Comment Number: 9
FOR APPROVAL – PLAT:
Could you please update the City signature blocks on the Plat? Instead of using "this _______ day
of ______A.D., 20____," could you opt for "on this day, ____________" for the date? This
alternative format facilitates smoother date input with digital signatures.
Additionally, kindly ensure there is sufficient space between the signature line and the title line to
accommodate the digital signature.
Updated signature block – Hope this is what you were looking for.
Comment Number: 10
FOR APPROVAL:
All comments requiring action from the applicant team shall be addressed and resolved prior to the
Director issuing a written decision. Please communicate with each department and copy me with
all the correspondence you have regarding any questions about any active comments and if they
require any action prior to your project's decision being issued.
Intermill Land Surveying will comply with this comment and include our Development Review
Coordinator with any and all communications regarding this project.
Comment Number: 11
FOR APPROVAL AND RECORDING:
The Director shall issue a written decision to approve, approve with conditions, or deny the
development application based on compliance with the standards referenced in Step 8 of the
Common Development Review Procedures (Section 6.3.8).
The written decision shall be mailed to the applicant, to any person who provided comments during
the comment period and to the abutting property owners, and shall also be posted on the City's
website at fcgov.com/developmentreview/proposals.
There is a two-week appeal period from the date of the signed written decision. The project is not
able to be recorded until it is confirmed there are no appeals.
Noted.
Department: Planning Services
Contact: Kayla Redd kredd@fcgov.com 970-224-6086
Topic: General
Comment Number: 1
03/12/2025: FOR APPROVAL
Please work with and consider recommendations from Planning Staff to strengthen the language
in the Modification of Standard requests.
Intermill Land Surveying welcomes all feedback and welcomes any from the Planning Staff.
Department: Historic Preservation
Contact: Jim Bertolini jbertolini@fcgov.com 970-416-4250
Topic: General
Page 4 of 6
Comment Number: 1
02/20/2025: NO HISTORIC REVIEW REQUIRED:
This proposal does not require historic review because there are no designated historic resources
on the site and the nature of the project does not impact any historic resources that may lie on the
development site or within 200 feet of the site.
Acknowledged.
Department: Engineering Development Review
Contact: Tim Dinger tdinger@fcgov.com
Topic: General
Comment Number: 1
02/21/2025: FOR APPROVAL:
Permanent structures are not permitted to encroach into a utility easement if they exceed 120
square feet, exceed 8 ft in height, or have a constructed footing/foundation. Either the utility
easement must be vacated, or the structure must be removed/relocated out of the easement. If
you seek vacation of the easement, additional discussion may be needed internally to see if there
are any conflicts with the vacation. If the structures located in the ROW and easements are not
permanent structures, then this comment can be ignored.
Noted – question out to property owner regarding his greenhouse.
Comment Number: 2
02/21/2025: INFORMATION:
The existing fence can remain in the utility easement, but please be aware that the fence may
need to be removed if utility maintenance/installation is needed within the easement. The company
or agency doing the utility work has the right to remove the fence, and they are not required to
reinstall the fence. This applies to "temporary" structures as well (any structure under 8 ft height
and 120 SF footprint).
Acknowledged.
Department: Technical Services
Contact: Jeff County jcounty@fcgov.com 970-221-6588
Topic: Plat
Comment Number: 1
03/12/2025: FOR FINAL APPROVAL:
Please make changes as marked in the Technical Services (TS) markup PDF. If changes are not
made or you disagree with comments, please provide written response of why corrections were
not made. Please provide any responses on redlined sheets and/or in response letter. If you have
any specific questions about the markups, please contact John Von Nieda at 970-221-6565 or
jvonnieda@fcgov.com
Acknowledged and comments will be on redlines.
Department: Stormwater Engineering
Contact: Derek Lutz dlutz@fcgov.com 970-221-6339
Topic: General
Comment Number: 1
02/21/2025: INFORMATION:
There are no concerns with the subdivision from a stormwater perspective; however, this
subdivision approval does not include any approval of actual development or building on the
created lots. Prior to any development or issuance of any building permits, a detailed grading plan
and drainage memorandum prepared by a professional engineer licensed in the state of Colorado
Page 5 of 6
will be required.
Acknowledged.
Department: Water-Wastewater Engineering
Contact: Derek Lutz dlutz@fcgov.com 970-221-6339
Topic: General
Comment Number: 1
02/21/2025: FOR APPROVAL:
The Existing Conditions Map shows several encroachments into the 10-FT wide Utility Easement
along the north property line. There is an existing city water main located north of this property line.
Due to these encroachments and the proximity to the city water main, we cannot approve this
subdivision without verifying the distance between the water main and the various encroachments.
Water line was located and is now shown on the existing conditions map for reference.
Please contact Colorado 811 to have underground utilities marked located.
https://www.colorado811.org. Please note private utilities including wastewater service and private
portions of the water service (downstream of the curb stop) must be located privately. Once the
water main has been surveyed and the distances to the encroachments have been identified, then
we can consider appropriate measures to rectify the situation.
Department: Erosion Control
Contact: Andrew Crecca acrecca@fcgov.com
Topic: Erosion Control
Comment Number: 1
02/24/2025: Information Only:
This project is located within the City's MS4 boundaries and is subject to the erosion control
requirements located in the Fort Collins Stormwater Criteria Manual (FCSCM), Chapter 2, Section
6.0. A copy of those requirements can be found at www.fcgov.com/erosion
Based upon this project type, Lot lines and replat alone do not trigger erosion control requirements.
Please be aware that future submittals or planned work will be evaluated based upon the submittal
requirements of FCSCM and may require Erosion Control Materials including Plans, Reports,
Escrow Calculations and Inspection Fees.
Noted. At this time, there are no plans for any construction on this site.
Department: Light And Power
Contact: Daniel Paluzzi dpaluzzi@fcgov.com
Topic: General
Comment Number: 1
02/26/2025: FOR APPROVAL:
The service wire that feeds 1900 Harmony Dr will need to be located within a utility easement.
Please have that service wire located and obtain a 6ft utility easement and show the easement on
the plat.
Telecommunications service line was located and a 6-foot utility easement has been added to
protect this line.
Comment Number: 2
02/26/2025: INFORMATION:
Please note that no permanent structures may be placed over our electrical service lines.
Acknowledged. Thank you.
Page 6 of 6
Comment Number: 3
02/26/2025: INFORMATION:
Please be aware that the existing vault is not able to be driven over. Please be cautious when
maneuvering around it. Please be aware that any damage to the vault as a result of driving over it
will be at the property owner’s expense.
Noted. Thank you.
Department: Traffic Operation
Contact: Steve Gilchrist sgilchrist@fcgov.com 970-224-6175
Topic: General
Comment Number: 1
03/06/2025: INFORMATION:
TIS waived during conceptual review as a replat to reconfigure lots lines would not create
additional traffic/trips to the site. TIS waived.
Thank you
Department: Environmental Planning
Contact: Clint Anders canders@fcgov.com
Topic: General
Comment Number: 1
02/27/2025: INFORMATION:
No Comments on the lot line adjustments. Understand that if the site is developed further, plans
must be designed pursuant to LUC Article 5.6.1, buffering adjacent habitat features.
Noted and acknowledged. Thank you.
Department: Forestry
Contact: Christine Holtz choltz@fcgov.com
Topic: General
Comment Number: 1
03/11/2025: FOR INFORMATION:
Forestry has no comments.
Thank you.
Department: PFA
Contact: Marcus Glasgow marcus.glasgow@poudre-fire.org 970-416-2869
Topic: General
Comment Number: 1
02/28/2025:
PFA has no comments on the minor subdivision.
Thank you.
Department: Internal Services
Contact: Russell Hovland rhovland@fcgov.com 970-416-2341
Topic: Building Insp Plan Review
Comment Number: 1
03/05/2025:
All new property lines must be located a min of 5ft from existing structures for fire separation
distance.
All property lines are a minimum of 5 feet from existing structures.