April 2, 2025
Brandy Bethuram Harras
Community Development and Neighborhood Services
City of Fort Collins
281 North College Avenue, PO Box 580
Fort Collins, CO 80522
RE: Case Number: FDP250003
Title: Bloom Filing 3
Engineering/Survey:
Engineer Contact:
Applicant: Vignette Studios LLC – Terence Hoaglund
Parcel Number(s):
Boxelder Sanitation District (BSD) has reviewed the proposed project identified as:
Proposed 360 multi-family dwelling units
The District hereby advises as follows:
There is no objection to this proposal.
Responses required to comments below.
The District will respond at the hearing date of ______________.
Comments:
1) Standalone easement will be required for all sewers that are not located in the public
R.O.W. The easements are necessary to address access and maintenance issues
that are not included on the plat. Standard easement width for Boxelder is 30-feet.
The alleys are only 26 feet so the easement width will need to be addressed before
standalone easements are filed. See attached example of perpetual easement
agreement.
2) Show curb distances and distances of sewer easements for proposed sanitary sewer
on utility plan.
3) Applicant shall provide drawings and specifications describing how pool drains and
mechanical systems connect to the sewer. It will be necessary to incorporate a
sampling manhole for future sampling of pool discharge. The District will not own the
manhole and it does not need to be in a defined District easement. A possible
alternative will be to provide a design that utilizes an air gap for sampling. Regardless
of the sampling method, future access will be required for sampling as needed. If the
Applicant has any proposed substitutes or modifications, the District will review them.
4) Provide information on kitchen and bathroom facilities for the community building.
5) Sanitary sewer service lines shall be perpendicular to sanitary sewer mains.
We look forward to reviewing future submittals on this project. Please feel free to contact