Loading...
HomeMy WebLinkAboutReports - Drainage - 04/07/2025FINAL DRAINAGE REPORT FOR PICKLEBALL FACILITY AT 4400 INNOVATION DRIVE Prepared For: OLD TOWN DESIGN BUILD INC. 210 E. OAK STREET, SUITE B FORT COLLINS, COLORADO 80524 Karen Ramsey (970) 666-0016 April 7th 2025 Project No. 39838.00 Prepared By: JR Engineering, LLC 2900 South College Avenue, Suite 1A Fort Collins, CO 80525 1 Pickleball Facility at 4400 Innovation Drive Final Drainage Report ii TABLE OF CONTENTS TABLE OF CONTENTS ......................................................................................................................... ii APPENDIX ..................................................................................................................................... iii Engineer’s Certification Block ........................................................................................................... iv GENERAL DESCRIPTION AND LOCATION .......................................................................................... 18 LOCATION ................................................................................................................................... 18 DESCRIPTION OF PROPERTY ........................................................................................................ 18 MASTER DRAINAGE BASIN DESCRIPTION ..................................................................................... 18 FLOODPLAIN SUBMITTAL REQUIREMENTS ................................................................................... 18 DRAINAGE BASINS AND SUB-BASINS ............................................................................................... 19 MAJOR BASINS AND SUB-BASINS ................................................................................................. 19 EXISTING SUB-BASIN DESCRIPTION .............................................................................................. 19 EXISTING OFFSITE DRAINAGE BASINS .......................................................................................... 19 PROPOSED SUB-BASINS DESCRIPTIONS ....................................................................................... 20 PROJECT DESCRIPTION .................................................................................................................... 21 PROJECT DESCRIPTION ................................................................................................................ 21 PROPOSED DRAINAGE FACILITIES .................................................................................................... 21 GENERAL CONCEPT ..................................................................................................................... 21 WATER QUALITY/ DETENTION FACILITIES .................................................................................... 22 LOW IMPACT DEVELOPMENT ...................................................................................................... 22 DRAINAGE DESIGN CRITERIA ........................................................................................................... 22 REGULATIONS ............................................................................................................................. 22 FOUR-STEP PROCESS TO PROTECT RECEIVING WATERS ............................................................... 22 DEVELOPMENT CRITERIA REFERENCE AND CONSTRAINTS ........................................................... 24 HYDROLOGIC CRITERIA ................................................................................................................ 24 HYDRAULIC CRITERIA ................................................................................................................... 24 FLOODPLAIN REGULATIONS COMPLIANCE ................................................................................... 24 MODIFICATIONS OF CRITERIA ...................................................................................................... 24 EROSION CONTROL ..................................................................................................................... 25 CONCLUSIONS ................................................................................................................................. 25 COMPLIANCE WITH STANDARDS ................................................................................................. 25 DRAINAGE CONCEPT ................................................................................................................... 25 Pickleball Facility at 4400 Innovation Drive Final Drainage Report iii APPENDIX Appendix A – Figures Appendix B – Hydrologic Calculations Appendix C – Hydraulic Calculations Appendix D – Water Quality Calculations Appendix E – Reference Appendix F – Maps Appendix G – LID Exhibit Pickleball Facility at 4400 Innovation Drive Final Drainage Report iv Engineer’s Certification Block I hereby attest that this report for the final drainage design for the Pickleball Facility at 4400 Innovation Drive was prepared by me or under my direct supervision, in accordance with the provisions of the Fort Collins Stormwater Criteria Manual. I understand that the City of Fort Collins does not and will not assume liability for drainage facilities designed by others. Joseph M. Frank, PE Registered Professional Engineer State of Colorado No. 53399 Pickleball Facility at 4400 Innovation Drive Final Drainage Report 18 GENERAL DESCRIPTION AND LOCATION LOCATION The site is located in The South ½ Section 31, Township 7 North, Range 68 West of the 6th P.M. in the City of Fort Collins, Larimer County, Colorado. More specifically, the site is a 4.37 acre property that is currently developed as a warehouse with a parking lot. The site borders the Union Pacific Railroad to the east and Colorado Early Colleges Fort Collins High School to the south. To the west, the site borders Kruse Elementary School. To the north, the site borders the Golden Meadows detention and water quality Pond. DESCRIPTION OF PROPERTY The site generally drains east to west at a 0.5% to 1.5% slope. The site is part of the Golden Meadows Business Park, and contains an existing parking lot and a warehouse. The site drains to the Golden Meadows Pond. The site contains Nunn clay loam soils with slopes ranging from 1-3% (wet conditions) to 3-5%. These soils are moderately well to somewhat poorly drained, with a clay loam texture that retains moisture but has slower permeability. For additional information, refer to the NRCS soil map within Appendix A of this report. MASTER DRAINAGE BASIN DESCRIPTION The site is located in the Fox Meadows Basin; Runoff from the site currently drains into the Golden Meadows Pond. FLOODPLAIN SUBMITTAL REQUIREMENTS The site is on FEMA FIRM panel 08069C1000F. The flood map for this location has a status of "not printed". This means that the entire area of the panel is in a single flood zone, so FEMA chose to economize and not create a printable image for this location. The site lies within FEMA Zone X, areas which are determined to be outside the 0.2% annual chance floodplain. The site is not located within a FEMA regulated floodplain, as shown in Appendix A in the FEMA attachments. The site is also not located in the City of Fort Collins Floodplain. Pickleball Facility at 4400 Innovation Drive Final Drainage Report 19 DRAINAGE BASINS AND SUB-BASINS MAJOR BASINS AND SUB-BASINS The Pickleball Facility is 4.37 acres; the existing site parking lot will be resurfaced, have new parking islands and will be developed to have pickleball courts. Storm and water quality ADS isolator rows will be proposed to treat the new impervious area for water quality. EXISTING SUB-BASIN DESCRIPTION The existing site drains into the Golden Meadows water quality/detention pond. The drainage pattern for the individual existing sub-basins are described below. Basin EA1, 1.57 acres and 81% impervious, is composed primarily of paved parking areas, walks, landscaped area, and grass open. The runoff from this basin is conveyed to the storm drainage system at design point 1a where it drains to an existing 12” culvert and overtops the culvert in large storm events. Basin EB1, 0.68 acres and 70% impervious, is composed of paved drive aisles, parking stalls, and small landscaped area. The runoff from this basin is conveyed to the storm drainage system at design point 1b where it drains to an existing curb cut drain. Basin EC1, 0.59 acres and 100% impervious, is composed entirely of adjacent paved surfaces. The runoff from this basin will be conveyed to the open channel and 30” existing culvert at design point 1c. Basin EC2, 0.22 acres and 86.5% impervious, is comprised of concrete and gravel and sheet drain to the east of the site and then drains into a drainage ditch towards the pond. EXISTING OFFSITE DRAINAGE BASINS The site currently receives off site runoff from the parking lot and the Colorado Early College – Fort Collins High School building. This runoff drains onto the onsite parking lot into a swale and then directly into the Golden Meadows detention/water quality pond, directly north of the site. Runoff from Kruse Elementary school travels along the western border of the site directly into a swale and then continues on to the Golden Meadows Pond. Pickleball Facility at 4400 Innovation Drive Final Drainage Report 20 Basin OS1, 6.27 acres and 26% impervious, is composed predominantly of grassy open space with minimal paved surfaces and is comprised of a portion of Kruse elementary School. The runoff from this basin will be conveyed to the storm drainage system at design point OS1a. Basin OS2, 3.50 acres and 76% impervious, is composed of a mix of lawn areas and paved pathways or small paved features. The runoff from this basin drains to the onsite parking lot and confluences with flow from design point 1a. Basin OS3, 0.57 acres and 74% impervious, is composed of a small open area with some paved surfaces, and pedestrian paths. The runoff from this basin will be conveyed to the storm drainage system at design point 3o with upstream runoff from basin EB1. PROPOSED SUB-BASINS DESCRIPTIONS Basin A1, 1.17 acres and 89.3% impervious, is composed primarily of re-paved parking areas, walks, landscaped area, and grass open. The runoff from this basin is conveyed to the storm drainage system at design point 1a where it drains to an existing 12” culvert and overtops the culvert in large storm events. Basin A2, 0.33 acres and 83.9% impervious, is composed of two outside pickleball courts. Runoff from this basin will drain to localized sump inlets, runoff will be captured and treated in the 2 year and water quality event and will then be treated in the underground ADS isolator rows. Basin A3, 0.12 acres and 90.9% impervious, is composed of one outdoor pickleball courts. Runoff from this basin will drain to localized sump inlets, runoff will be captured and treated in the 2 year and water quality event and will then be treated in the underground ADS isolator rows. Basin B1, 0.58 acres and 72.6% impervious, is composed of re-paved parking areas and will drain to design point 1b. Pickleball Facility at 4400 Innovation Drive Final Drainage Report 21 Basin C1, 0.59 acres and 92.9% impervious, is composed of existing and re-paved parking areas. Runoff from this basin will drain into an existing drainage channel and will then be conveyed to the Golden Meadows detention / water quality pond. Basin C2, 0.22 acres and 83.2% impervious is composed of the eastern portion of the site. Runoff from this portion of the site sheet drains into a pan and then drains into the Golden Meadows Pond. PROJECT DESCRIPTION PROJECT DESCRIPTION The Pickleball Facility at 4400 Innovation Drive will consist of a pickleball facility, updated and re- paved parking and landscape islands, ADA accessible ramps, walks and outdoor pickleball courts. The site will be developed in two phases (s) - Phase 1 consists of improvements to the parking lot and the pickleball courts, and Phase 2 consists of repurposing the eastern portion of the building for future industrial use and upgrading the parking lot. The phasing for the site is shown within the LID exhibit in Appendix G of this Report. PROPOSED DRAINAGE FACILITIES GENERAL CONCEPT The proposed improvements to the Pickleball Facility at 4400 Innovation Drive will result in the developed condition being treated for water quality and detained. Low-impact development best management practices are proposed to improve the quality of runoff and aid in reducing peak flows. Specifically, ADS isolator rows are proposed near the end of the site to treat and provide water quality for the majority of the development. The area of the Golden Meadows Pond is 3.36 acres - the resulting runoff from the pickleball facility will not adversely affect the pond, the detention from the less than half an acre of impervious area from the pickleball facility will result in a rise of 0.02 ft or .2 inches in the Golden Meadows Pond area as shown in Appendix C in the FFA calculation sheet. Pickleball Facility at 4400 Innovation Drive Final Drainage Report 22 Runoff from the site is captured in inlets for the new pickleball courts. The runoff from the new pickleball courts will be conveyed by a series of ADS Nyloplastic inlets to isolator rows and will be treated for water quality. In larger storms the runoff will not be treated, will overflow, and sheet drain onto the parking lot and it will then drain directly into the Golden Meadows Pond. WATER QUALITY/ DETENTION FACILITIES The majority of the new impervious area for the water quality is treated within the onsite ADS isolator rows. LOW IMPACT DEVELOPMENT A minimum of 75 percent of the new impervious surface area is treated by a Low-Impact Development (LID) best management practice (BMP) in accordance with City criteria. An illustrative LID/ Surface Map is provided in Appendix G, and the sizing calculations of the LID method is provided in Appendix D. DRAINAGE DESIGN CRITERIA REGULATIONS This report was prepared to meet or exceed the City of Fort Collins stormwater criteria. The City of Fort Collins Stormwater Criteria Manual (dated 2018)(FCSCM) and the Urban Drainage Flood Control District’s (UDFCD) Drainage Criteria Manual (USDCM) Volumes 1, 2 and 3 were referenced as guidelines for this design. FOUR-STEP PROCESS TO PROTECT RECEIVING WATERS The City of Fort Collins requires the Four Step Process to protect receiving waters. The four- step process incorporates reducing runoff volume, treating water quality capture volume, stabilizing streams, and implementing long-term source controls. Volume reduction is an important part of the four-step process and is fundamental to effective stormwater management. Per City criteria, a minimum of 75 percent of the new impervious surface area must be treated by a Low-Impact Development (LID) best management practice (BMP). The site incorporates underground ADS isolator rows, and a water quality pond designed to capture and treat at least 75% of the site’s water quality capture volume. The isolator rows need to be properly cleaned Pickleball Facility at 4400 Innovation Drive Final Drainage Report 23 and maintained to allow for long-term protection of the receiving waters. The proposed LID BMPs will have the effect of slowing runoff through the site and increase infiltration and rainfall interception by encouraging infiltration via the careful selection of vegetative cover. The improvements will decrease the runoff coefficient from the site and are expected to have no adverse impact on the timing, quantity, or quality of stormwater runoff. The majority of the new impervious area is treated by the proposed isolator rows in the southern portion of the site. The remainder of the site is treated within water quality pond, as illustrated in the LID/Surface Map provided in Appendix G. Step 1 – Employ Runoff Reduction Practices As part of this retrofit project—originally developed as an HP warehouse site in the early 1980s—the design now incorporates additional landscape islands to help reduce surface runoff. These landscape islands serve multiple functions: they provide opportunities for infiltration and evapotranspiration, enhance soil moisture retention, and ultimately reduce the total volume of stormwater leaving the site. By introducing more pervious areas and vegetation into a previously impervious setting, the project effectively employs runoff reduction practices, resulting in improved on-site stormwater management. Step 2 – Implement BMPS that Provide a Water Quality Capture Volume This project integrates Advanced Drainage Systems (ADS) isolator rows to enhance water quality treatment of runoff. The ADS isolator row units provide a sedimentation chamber that effectively captures sediment and associated pollutants before stormwater enters the detention system, thus improving overall water quality. Step 3 –Stabilize Drainageways The newly paved parking lot aids in stabilizing the drainageway by providing a more durable, long-lasting surface. Utilizing an improved asphalt mix with enhanced longevity and performance qualities ensures a stable surface that withstands weathering and flow velocities. Step 4 – Implement site-specific and other source-control BMPs Additionally, proposed storm inlets are strategically placed and designed to treat runoff from newly modified and added impervious areas. These inlets incorporate source-control features such as sump pits and/or sediment collection devices to reduce the pollutant load entering the storm conveyance system. Pickleball Facility at 4400 Innovation Drive Final Drainage Report 24 Together, the ADS isolator rows and the specialized storm inlets ensure that runoff from the project area meets or exceeds the City of Fort Collins’ water quality treatment standards. DEVELOPMENT CRITERIA REFERENCE AND CONSTRAINTS This project’s stormwater management strategy meets the City of Fort Collins requirement for on-site Low Impact Development (LID) treatment, with a minimum of 75% of the site’s runoff receiving water quality treatment through LID practices. The remaining portion of the site’s runoff is treated within the Golden Meadows detention/water quality facility, ensuring compliance with all applicable City of Fort Collins standards and criteria. HYDROLOGIC CRITERIA Weighted percent imperviousness was calculated for each basin using the Fort Collins Stormwater Criteria Manual Table 3.2-2 for each basin. The City of Fort Collins area has rainfall depths associated with the table below, as shown in Chapter 5 of the Fort Collins Stormwater Criteria Manual. HYDRAULIC CRITERIA The private Nyloplastic area inlet storm drains were sized to capture the 2-year storm. In the 100 Year event a portion of the runoff will spill into the parking lot and sheet flow. FLOODPLAIN REGULATIONS COMPLIANCE As previously stated, the site lies within FEMA Zone X, areas which are determined to be outside the 0.2% annual chance floodplain. The site is not located within a FEMA regulated floodplain, as shown in Appendix A in the FEMA attachments. The site is also not located in the City of Fort Collins Floodplain, as shown in Appendix A in the City of Fort Collins Flood map. MODIFICATIONS OF CRITERIA The site does not treat 100% of modified/ added impervious areas with traditional BMPs. 100% of added onsite impervious area associated with the Pickleball courts is treated for water quality. The small portion of runoff that is untreated, but will not have a significant impact on water quality. With the exception of the resurfacing of the parking lot, which is not considered modified impervious area, there will be some additional improvement to the site that is considered new/modified impervious area. The new concrete walk/pan that replaces the gravel on the eastern side of the site, which will be built in phase 2, will add impervious area. In addition, an offsite walk to the Colorado Early Colleges - Fort Collins High School will add additional impervious area. However, the proposed landscape islands within the site will result in a net increase in the previous area, resulting in a net lowering of the site's total Pickleball Facility at 4400 Innovation Drive Final Drainage Report 25 percent impervious value and runoff coefficient. For additional information on the LID treatment methods and impervious areas, please refer to Appendix G - for the LID exhibit. EROSION CONTROL This project’s design and construction operations will be conducted in full accordance with the City of Fort Collins Erosion Control Criteria. All measures implemented will be selected, installed, and maintained to prevent and minimize soil erosion, sediment transport, and related water quality impacts during and after construction activities. CONCLUSIONS COMPLIANCE WITH STANDARDS The hydrologic and water quality calculations were performed using the required methods as outlined in the City of Fort Collins Stormwater Criteria Manual. The proposed drainage and water quality improvements, including LID BMPs and ADS isolator rows, will adequately treat stormwater runoff, reduce runoff volumes, and comply with City regulations. The project will not adversely impact flooding conditions and will enhance long-term site and receiving water quality. DRAINAGE CONCEPT The drainage concept for the Pickleball Facility at 4400 Innovation Drive focuses on capturing, treating, and safely conveying stormwater runoff to the existing Golden Meadows detention/water quality pond while minimizing impacts on receiving waters. The project repaves and reconfigures the parking areas and adds pickleball courts, incorporating Low-Impact Development (LID) practices to address runoff from new impervious surfaces. Key measures include strategically placed inlets, ADS isolator rows for water quality treatment, and enhanced landscaped islands to reduce runoff volumes and promote infiltration. Together, these improvements ensure the majority of new and modified impervious surfaces are treated for water quality, comply with local stormwater criteria, and effectively manage flows to protect downstream waterways. Pickleball Facility at 4400 Innovation Drive Final Drainage Report 26 REFERENCES Fort Collins Stormwater Criteria Manual; City of Fort Collins, Colorado, December 2018. Urban Storm Drainage Criteria Manual (Volumes 1, 2, and 3); Urban Drainage and Flood Control District, June 2001. Fox Meadows Basin Drainage Master Plan Update; ICON Engineering, Inc., prepared for City of Fort Collins, Colorado, April 2008. Pickleball Facility at 4400 Innovation Drive Final Drainage Report APPENDIX A – FIGURES A Westrian Company E. HARMONY ROAD S. T I M B E R L I N E R O A D DIX O N C A N Y O N L A T E R A L MC M U R R Y A V E UN I O N P A C I F I C R A I L R O A D SITE Hydrologic Soil Group—Larimer County Area, Colorado Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 12/17/2024 Page 1 of 4 44 8 6 0 9 0 44 8 6 1 3 0 44 8 6 1 7 0 44 8 6 2 1 0 44 8 6 2 5 0 44 8 6 2 9 0 44 8 6 3 3 0 44 8 6 0 9 0 44 8 6 1 3 0 44 8 6 1 7 0 44 8 6 2 1 0 44 8 6 2 5 0 44 8 6 2 9 0 44 8 6 3 3 0 496020 496060 496100 496140 496180 496220 496260 496300 496340 496380 496020 496060 496100 496140 496180 496220 496260 496300 496340 496380 40° 31' 40'' N 10 5 ° 2 ' 4 9 ' ' W 40° 31' 40'' N 10 5 ° 2 ' 3 3 ' ' W 40° 31' 31'' N 10 5 ° 2 ' 4 9 ' ' W 40° 31' 31'' N 10 5 ° 2 ' 3 3 ' ' W N Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 13N WGS84 0 50 100 200 300 Feet 0 25 50 100 150 Meters Map Scale: 1:1,790 if printed on A landscape (11" x 8.5") sheet. Soil Map may not be valid at this scale. MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Rating Polygons A A/D B B/D C C/D D Not rated or not available Soil Rating Lines A A/D B B/D C C/D D Not rated or not available Soil Rating Points A A/D B B/D C C/D D Not rated or not available Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Larimer County Area, Colorado Survey Area Data: Version 19, Aug 29, 2024 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Jul 2, 2021—Aug 25, 2021 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Hydrologic Soil Group—Larimer County Area, Colorado Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 12/17/2024 Page 2 of 4 Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI 74 Nunn clay loam, 1 to 3 percent slopes C 6.0 38.5% 75 Nunn clay loam, 3 to 5 percent slopes C 4.8 31.1% 76 Nunn clay loam, wet, 1 to 3 percent slopes C 4.7 30.4% Totals for Area of Interest 15.6 100.0% Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Hydrologic Soil Group—Larimer County Area, Colorado Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 12/17/2024 Page 3 of 4 Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff: None Specified Tie-break Rule: Higher Hydrologic Soil Group—Larimer County Area, Colorado Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 12/17/2024 Page 4 of 4 National Flood Hazard Layer FIRMette 0 500 1,000 1,500 2,000250 Feet Ü SEE FIS REPORT FOR DETAILED LEGEND AND INDEX MAP FOR FIRM PANEL LAYOUT SPECIAL FLOOD HAZARD AREAS Without Base Flood Elevation (BFE) Zone A, V, A99 With BFE or Depth Zone AE, AO, AH, VE, AR Regulatory Floodway 0.2% Annual Chance Flood Hazard, Areas of 1% annual chance flood with average depth less than one foot or with drainage areas of less than one square mile Zone X Future Conditions 1% Annual Chance Flood Hazard Zone X Area with Reduced Flood Risk due to Levee. See Notes.Zone X Area with Flood Risk due to Levee Zone D NO SCREEN Area of Minimal Flood Hazard Zone X Area of Undetermined Flood Hazard Zone D Channel, Culvert, or Storm Sewer Levee, Dike, or Floodwall Cross Sections with 1% Annual Chance 17.5 Water Surface Elevation Coastal Transect Coastal Transect Baseline Profile Baseline Hydrographic Feature Base Flood Elevation Line (BFE) Effective LOMRs Limit of Study Jurisdiction Boundary Digital Data Available No Digital Data Available Unmapped This map complies with FEMA's standards for the use of digital flood maps if it is not void as described below. The basemap shown complies with FEMA's basemap accuracy standards The flood hazard information is derived directly from the authoritative NFHL web services provided by FEMA. This map was exported on 12/17/2024 at 7:17 PM and does not reflect changes or amendments subsequent to this date and time. The NFHL and effective information may change or become superseded by new data over time. This map image is void if the one or more of the following map elements do not appear: basemap imagery, flood zone labels, legend, scale bar, map creation date, community identifiers, FIRM panel number, and FIRM effective date. Map images for unmapped and unmodernized areas cannot be used for regulatory purposes. Legend OTHER AREAS OF FLOOD HAZARD OTHER AREAS GENERAL STRUCTURES OTHER FEATURES MAP PANELS 8 B 20.2 The pin displayed on the map is an approximate point selected by the user and does not represent an authoritative property location. 1:6,000 105°2'59"W 40°31'50"N 105°2'21"W 40°31'23"N Basemap Imagery Source: USGS National Map 2023 Pickleball Facility at 4400 Innovation Drive Final Drainage Report APPENDIX B – HYDROLOGIC CALCULATIONS Subdivision:GOLDEN MEADOWS BUSINESS PARK Project Name:PICKLEBALL FACILITY AT 4400 INNOVATION DRIVE Location:Fort Collins Project No.: Calculated By:ARJ Checked By:0 Date:4/7/25 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 EA1 1.57 100%1.26 80.2%40%0.00 0.0%90%0.00 0.0%2%0.31 0.4%80.6% EB1 0.68 100%0.46 67.9%40%0.00 0.0%90%0.01 1.2%2%0.21 0.6%69.6% EC2 0.22 100%0.17 76.7%40%0.05 9.3%90%0.00 0.0%2%0.05 0.5%86.5% OS1 6.27 100%0.79 12.5%40%0.31 2.0%90%0.68 9.7%2%4.50 1.4%25.6% OS2 3.50 100%1.98 56.4%40%0.00 0.0%90%0.74 19.1%2%0.78 0.4%76.0% OS3 0.57 100%0.05 9.3%40%0.00 0.0%90%0.40 64.0%2%0.11 0.4%73.7% 39838.00 Weighted % Imp. Basins Total Weighted % Imp.Basin ID Total Area (ac)% Imp. Area (ac) Lawns % Imp. Area (ac)Weighted % Imp. Paved Roads and Walks Roofs Imp. HISTORIC - COMPOSITE % IMPERVIOUS CALCULATIONS % Imp.Area (ac) Gravel % Imp.Area (ac)Imp. X:\3980000.all\3983800\Excel\Drainage\3983800 Ex Drainage_Calcs_Template_v2.07.xlsm Page 1 of 1 4/8/2025 Subdivision:GOLDEN MEADOWS BUSINESS PARK Project Name:PICKLEBALL FACILITY AT 4400 INNOVATION DRIVE Location:Fort Collins Project No.: Calculated By:ARJ Checked By:0 Date:4/7/25 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 11.0 12.0 13.0 14.0 15.0 16.0 17.0 18.0 19.0 20.0 21.0 Hydrologic Soils Group EA1 1.57 C 0.95 1.26 0.76 0.95 0.95 0.00 0.00 0.00 0.50 0.00 0.00 0.00 0.20 0.31 0.04 0.05 0.80 1.00 EB1 0.68 C 0.95 0.46 0.64 0.81 0.95 0.01 0.01 0.02 0.50 0.00 0.00 0.00 0.20 0.21 0.06 0.08 0.72 0.90 EC1 0.59 C 0.95 0.59 0.95 1.00 0.95 0.00 0.00 0.00 0.50 0.00 0.00 0.00 0.20 0.00 0.00 0.00 0.95 1.00 EC2 0.22 C 0.95 0.17 0.73 0.91 0.95 0.00 0.00 0.00 0.50 0.05 0.12 0.15 0.20 0.05 0.05 0.06 0.78 1.00 OS1 6.27 C 0.95 0.79 0.12 0.15 0.95 0.68 0.10 0.13 0.50 0.31 0.02 0.03 0.20 4.50 0.14 0.18 0.37 0.46 OS2 3.50 C 0.95 1.98 0.54 0.67 0.95 0.74 0.20 0.25 0.50 0.00 0.00 0.00 0.20 0.78 0.04 0.06 0.78 0.98 OS3 0.57 C 0.95 0.05 0.09 0.11 0.95 0.40 0.68 0.84 0.50 0.00 0.00 0.00 0.20 0.11 0.04 0.05 0.80 1.00 COMP.13.39 0.59 0.73 Basins Total Weighted 100 YEAR CRunoff Coefficient Area (ac)2 - YEAR C 100 - YEAR C Paved Roads/Ashphalt/Concrete Roofs Lawns Basins Total Weighted 2 YEAR C100 - YEAR C 39838.00 Total Area (ac)Runoff Coefficient HISTORIC - COMPOSITE RUNOFF COEFFICIENT CALCULATIONS Basin ID Area (ac) 2 - YEAR C 100 - YEAR C Runoff Coefficient Area (ac)2 - YEAR C 100 - YEAR C Gravel Runoff Coefficient Area (ac)2 - YEAR C X:\3980000.all\3983800\Excel\Drainage\3983800 Ex Drainage_Calcs_Template_v2.07.xlsm Page 1 of 1 4/8/2025 Subdivision:GOLDEN MEADOWS BUSINESS PARK Project Name:PICKLEBALL FACILITY AT 4400 INNOVATION DRIVE Location:Fort Collins Project No.: Calculated By:ARJ Checked By:0 Date:4/7/25 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 11.0 12.0 13.0 14.0 15.0 16.0 17.0 18.0 19.0 20.0 21.0 BASIN D.A. Hydrologic Impervious C2 C100 L S o t i - 2Year t i - 100 Year L t S t K VEL.t t COMP.t c-2 Year COMP.t c 100 - Year TOTAL Urbanized t c t c-2 Year t c-100 Year ID (ac) Soils Group (%)(ft)(%)(min)(min)(ft)(%)(ft/s)(min)(min)(min)LENGTH (ft)(min)(min)(min) EA1 1.57 C 81%0.80 1.00 10 2.0%6.4 2.2 280 1.2%15.0 1.6 2.8 9.3 5.0 290.0 11.6 9.3 5.0 EB1 0.68 C 70%0.72 0.90 40 2.0%16.4 8.7 70 1.3%20.0 2.3 0.5 16.9 9.2 110.0 10.6 10.6 9.2 EC1 0.59 C 100%0.95 1.00 15 2.0%4.0 2.6 105 0.3%20.0 1.1 1.6 5.5 4.2 120.0 10.7 5.5 5.0 EC2 0.22 C 87%0.78 1.00 5 2.0%4.9 1.5 30 0.7%20.0 1.7 0.3 5.2 1.8 35.0 10.2 5.2 5.0 OS1 6.27 C 26%0.37 0.46 10 2.0%15.8 13.8 438 1.4%15.0 1.8 4.2 20.0 18.0 448.0 12.5 12.5 12.5 OS2 3.50 C 76%0.78 0.98 10 2.0%6.8 2.6 208 1.7%20.0 2.6 1.3 8.2 3.9 218.0 11.2 8.2 5.0 OS3 0.57 C 74%0.80 1.00 5 2.0%4.5 1.5 15 2.0%20.0 2.8 0.1 4.6 1.6 20.0 10.1 5.0 5.0 NOTES: HISTORIC - STANDARD FORM SF-2 TIME OF CONCENTRATION SUB-BASIN Time of Concentration -Check 39838.00 FINAL(Tc)DATA INITIAL/OVERLAND (Ti) TRAVEL TIME (Tt) X:\3980000.all\3983800\Excel\Drainage\3983800 Ex Drainage_Calcs_Template_v2.07.xlsm Page 1 of 1 4/8/2025 Project Name:PICKLEBALL FACILITY AT 4400 INNOVATION DRIVE Subdivision:GOLDEN MEADOWS BUSINESS PARK Project No.: Location:Fort Collins Calculated By:ARJ Design Storm:Checked By:0 Date: TRAVEL TIME STREET De s i g n P o i n t Ba s i n I D Ar e a ( A c ) Ru n o f f C o e f f . tc ( m i n ) C* A ( A c ) I ( i n / h r ) Q ( c f s ) tc ( m i n ) C* A ( a c ) I ( i n / h r ) Q ( c f s ) Qst r e e t ( c f s ) C* A ( a c ) Sl o p e ( % ) Qpi p e ( c f s ) C* A ( a c ) Sl o p e ( % ) Pi p e S i z e ( i n c h e s ) Le n g t h ( f t ) Ve l o c i t y ( f p s ) tt ( m i n ) REMARKS Runoff from the the Colorado Early Colleges Site o2 OS2 3.50 0.78 8.2 2.74 2.38 6.5 Runoff from the onsite parking lot and site 1a EA1 1.57 0.80 9.3 1.26 2.28 2.9 9.3 4.00 2.28 9.1 Runoff from Kruse Elementry School o1 OS1 6.27 0.37 12.5 2.29 2.02 4.6 Runoff from the site frontage 1b EB1 0.68 0.72 10.6 0.49 2.16 1.1 Runoff goes into drain and is pipes offsite 3b OS3 0.57 0.80 5.0 0.45 2.85 1.3 10.6 0.94 2.16 2.0 Runoff drains off site 1c EC1 0.59 0.95 5.5 0.56 2.75 1.5 Runoff drains off site 2c EC2 0.22 0.78 5.2 0.17 2.81 0.5 Notes: Street and Pipe C*A values are determined by Q/i using the catchment's intensity value. DIRECT RUNOFF TOTAL RUNOFF STREET PIPE HISTORIC - STANDARD FORM SF-3 STORM DRAINAGE SYSTEM DESIGN (RATIONAL METHOD PROCEDURE) X:\3980000.all\3983800\Excel\Drainage\3983800 Ex Drainage_Calcs_Template_v2.07.xlsm Page 1 of 1 4/8/2025 Project Name:PICKLEBALL FACILITY AT 4400 INNOVATION DRIVE Subdivision:GOLDEN MEADOWS BUSINESS PARK Project No.: Location:Fort Collins Calculated By:ARJ Design Storm:Checked By:0 Date: TRAVEL TIME STREET De s i g n P o i n t Ba s i n I D Ar e a ( a c ) Ru n o f f C o e f f . tc ( m i n ) C* A ( a c ) I ( i n / h r ) Q ( c f s ) tc ( m i n ) C* A ( a c ) I ( i n / h r ) Q ( c f s ) Qst r e e t ( c f s ) C* A ( a c ) Sl o p e ( % ) Qpi p e ( c f s ) C* A ( a c ) Sl o p e ( % ) Pi p e S i z e ( i n c h e s ) Le n g t h ( f t ) Ve l o c i t y ( f p s ) tt ( m i n ) REMARKS Runoff from the the Colorado Early Colleges Site o2 OS2 3.50 0.98 5.0 3.43 9.95 34.1 Runoff from the onsite parking lot and site 1a EA1 1.57 1.00 5.0 1.57 9.95 15.6 5.0 5.00 9.95 49.8 Runoff from Kruse Elementry School o1 OS1 6.27 0.46 12.5 2.86 7.04 20.1 Runoff from the site frontage 1b EB1 0.68 0.90 9.2 0.61 7.97 4.9 Runoff goes into drain and is pipes offsite 3b OS3 0.57 1.00 5.0 0.57 9.95 5.7 9.2 1.18 7.97 9.4 Runoff drains off site 1c EC1 0.59 1.00 5.0 0.59 9.95 5.9 Runoff drains off site 2c EC2 0.22 1.00 5.0 0.22 9.95 2.2 Notes: Street and Pipe C*A values are determined by Q/i using the catchment's intensity value. STORM DRAINAGE SYSTEM DESIGN HISTORIC - STANDARD FORM SF-3 (RATIONAL METHOD PROCEDURE) PIPE 100-Year DIRECT RUNOFF TOTAL RUNOFF 4/7/25 STREET X:\3980000.all\3983800\Excel\Drainage\3983800 Ex Drainage_Calcs_Template_v2.07.xlsm Page 1 of 1 4/8/2025 Subdivision:GOLDEN MEADOWS BUSINESS PARK Project Name:PICKLEBALL FACILITY Location:Fort Collins Project No.: Calculated By:ARJ Checked By:0 Date:4/7/25 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 A1 1.17 100%1.04 89.0%40%0.00 0.0%90%0.00 0.0%2%0.13 0.2%89.3% A2 0.33 100%0.28 83.6%40%0.00 0.0%90%0.00 0.0%2%0.05 0.3%83.9% A3 0.12 100%0.11 90.7%40%0.00 0.0%90%0.00 0.0%2%0.01 0.2%90.9% B1 0.58 100%0.41 70.7%40%0.00 0.0%90%0.01 1.4%2%0.16 0.6%72.6% C1 0.59 100%0.54 92.8%40%0.00 0.0%90%0.00 0.0%2%0.04 0.1%92.9% C2 0.22 100%0.18 82.8%40%0.00 0.0%90%0.00 0.0%2%0.04 0.3%83.2% OS1 6.27 100%0.79 12.5%40%0.31 2.0%90%0.68 9.7%2%4.81 1.5%25.7% OS2 3.50 100%1.98 56.4%40%0.00 0.0%90%0.74 19.1%2%0.78 0.4%76.0% OS3 0.57 100%0.05 9.3%40%0.00 0.0%90%0.40 64.0%2%0.11 0.4%73.7% 39838.00 Weighted % Imp. Basins Total Weighted % Imp.% Imp. Area (ac)Weighted % Imp. Paved Roads and Walks Roofs Imp. COMPOSITE % IMPERVIOUS CALCULATIONS % Imp.Area (ac) Gravel % Imp.Area (ac)Imp.Basin ID Total Area (ac)% Imp. Area (ac) Lawns X:\3980000.all\3983800\Excel\Drainage\3983800 Drainage_Calcs_Template_v2.07.xlsm Page 1 of 1 4/8/2025 Subdivision:GOLDEN MEADOWS BUSINESS PARK Project Name:PICKLEBALL FACILITY Location:Fort Collins Project No.: Calculated By:ARJ Checked By:0 Date:4/7/25 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 11.0 12.0 13.0 14.0 15.0 16.0 17.0 18.0 19.0 20.0 21.0 Hydrologic Soils Group A1 1.17 C 0.95 1.04 0.85 1.00 0.95 0.00 0.00 0.00 0.50 0.00 0.00 0.00 0.20 0.13 0.02 0.03 0.87 1.00 A2 0.33 C 0.95 0.28 0.79 0.99 0.95 0.00 0.00 0.00 0.50 0.00 0.00 0.00 0.20 0.05 0.03 0.04 0.83 1.00 A3 0.12 C 0.95 0.11 0.86 1.00 0.95 0.00 0.00 0.00 0.50 0.00 0.00 0.00 0.20 0.01 0.02 0.02 0.88 1.00 B1 0.58 C 0.95 0.41 0.67 0.84 0.95 0.01 0.01 0.02 0.50 0.00 0.00 0.00 0.20 0.16 0.06 0.07 0.74 0.93 C1 0.59 C 0.95 0.54 0.88 1.00 0.95 0.00 0.00 0.00 0.50 0.00 0.00 0.00 0.20 0.04 0.01 0.02 0.90 1.00 C2 0.22 C 0.95 0.18 0.79 0.98 0.95 0.00 0.00 0.00 0.50 0.00 0.00 0.00 0.20 0.04 0.03 0.04 0.82 1.00 OS1 6.27 C 0.95 0.79 0.12 0.15 0.95 0.68 0.10 0.13 0.50 0.31 0.02 0.03 0.20 4.81 0.15 0.19 0.37 0.47 OS2 3.50 C 0.95 1.98 0.54 0.67 0.95 0.74 0.20 0.25 0.50 0.00 0.00 0.00 0.20 0.78 0.04 0.06 0.78 0.98 OS3 0.57 C 0.95 0.05 0.09 0.11 0.95 0.40 0.68 0.84 0.50 0.00 0.00 0.00 0.20 0.11 0.04 0.05 0.80 1.00 COMP.13.35 0.61 0.74 Basins Total Weighted 100 YEAR CRunoff Coefficient Area (ac)2 - YEAR C 100 - YEAR C Paved Roads/Ashphalt/Concrete Roofs Lawns Basins Total Weighted 2 YEAR C100 - YEAR C 39838.00 Total Area (ac)Runoff Coefficient COMPOSITE RUNOFF COEFFICIENT CALCULATIONS Basin ID Area (ac)2 - YEAR C 100 - YEAR C Runoff Coefficient Area (ac)2 - YEAR C 100 - YEAR C Gravel Runoff Coefficient Area (ac)2 - YEAR C X:\3980000.all\3983800\Excel\Drainage\3983800 Drainage_Calcs_Template_v2.07.xlsm Page 1 of 1 4/8/2025 Subdivision:GOLDEN MEADOWS BUSINESS PARK Project Name:PICKLEBALL FACILITY Location:Fort Collins Project No.: Calculated By:ARJ Checked By:0 Date:4/7/25 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 11.0 12.0 13.0 14.0 15.0 16.0 17.0 18.0 19.0 20.0 21.0 BASIN D.A. Hydrologic Impervious C2 C100 L S o t i - 2Year t i - 100 Year L t S t K VEL.t t COMP.t c-2 Year COMP.t c 100 - Year TOTAL Urbanized t c t c-2 Year t c-100 Year ID (ac) Soils Group (%)(ft)(%)(min)(min)(ft)(%)(ft/s)(min)(min)(min)LENGTH (ft)(min)(min)(min) A1 1.17 C 89%0.87 1.00 5 2.0%3.5 1.5 280 1.2%15.0 1.6 2.8 6.4 4.4 285.0 11.6 6.4 5.0 A2 0.33 C 84%0.83 1.00 5 2.0%4.2 1.5 64 0.5%20.0 1.4 0.8 4.9 2.3 69.0 10.4 5.0 5.0 A3 0.12 C 91%0.88 1.00 5 2.0%3.3 1.5 64 0.5%20.0 1.4 0.8 4.1 2.3 69.0 10.4 5.0 5.0 B1 0.58 C 73%0.74 0.93 5 2.0%5.5 2.6 70 1.3%20.0 2.2 0.5 6.0 3.2 75.0 10.4 6.0 5.0 C1 0.59 C 93%0.90 1.00 5 2.0%3.1 1.5 100 0.3%20.0 1.1 1.5 4.6 3.0 105.0 10.6 5.0 5.0 C2 0.22 C 83%0.82 1.00 30 0.7%14.7 5.3 189 0.5%20.0 1.4 2.2 16.9 7.5 219.0 11.2 11.2 7.5 OS1 6.27 C 26%0.37 0.47 10 2.0%15.6 13.6 438 1.4%15.0 1.8 4.2 19.8 17.7 448.0 12.5 12.5 12.5 OS2 3.50 C 76%0.78 0.98 10 2.0%6.8 2.6 208 1.7%20.0 2.6 1.3 8.2 3.9 218.0 11.2 8.2 5.0 OS3 0.57 C 74%0.80 1.00 5 2.0%4.5 1.5 15 2.0%20.0 2.8 0.1 4.6 1.6 20.0 10.1 5.0 5.0 NOTES: STANDARD FORM SF-2 TIME OF CONCENTRATION SUB-BASIN Time of Concentration -Check 39838.00 FINAL(Tc)DATA INITIAL/OVERLAND (Ti) TRAVEL TIME (Tt) X:\3980000.all\3983800\Excel\Drainage\3983800 Drainage_Calcs_Template_v2.07.xlsm Page 1 of 1 4/8/2025 Project Name:PICKLEBALL FACILITY Subdivision:GOLDEN MEADOWS BUSINESS PARK Project No.: Location:Fort Collins Calculated By:ARJ Design Storm:Checked By:0 Date: TRAVEL TIME STREET De s i g n P o i n t Ba s i n I D Ar e a ( A c ) Ru n o f f C o e f f . tc ( m i n ) C* A ( A c ) I ( i n / h r ) Q ( c f s ) tc ( m i n ) C* A ( a c ) I ( i n / h r ) Q ( c f s ) Qst r e e t ( c f s ) C* A ( a c ) Sl o p e ( % ) Qpi p e ( c f s ) C* A ( a c ) Sl o p e ( % ) Pi p e S i z e ( i n c h e s ) Le n g t h ( f t ) Ve l o c i t y ( f p s ) tt ( m i n ) REMARKS 1o OS1 6.27 0.37 12.5 2.35 2.02 4.7 Runoff from the the Colorado Early Colleges Site 2o OS2 3.50 0.78 8.2 2.74 2.38 6.5 Runoff into chase goes onto Street 1a A1 1.17 0.87 6.4 1.01 2.62 2.6 8.2 3.75 2.38 8.9 Runoff from the Pickleball courts - Drains to nyloplastic inlets 3a A3 0.12 0.88 5.0 0.11 2.85 0.3 Runoff from the Pickleball courts - Drains to nyloplastic inlets 2a A2 0.33 0.83 5.0 0.28 2.85 0.8 Total runoff in Nyloplastic inlets 1.1 5.0 0.39 2.85 1.1 Ruoff from site. Drains to ex pipe. 1b B1 0.58 0.74 6.0 0.43 2.67 1.2 3o OS3 0.57 0.80 5.0 0.45 2.85 1.3 6.0 0.88 2.67 2.4 Drains to channel - east of the site 1c C1 0.59 0.90 5.0 0.53 2.85 1.5 Drain North of the site into Golden Meadows pond 2c C2 0.22 0.82 11.2 0.18 2.11 0.4 Notes: Street and Pipe C*A values are determined by Q/i using the catchment's intensity value. DIRECT RUNOFF TOTAL RUNOFF STREET PIPE STANDARD FORM SF-3 STORM DRAINAGE SYSTEM DESIGN (RATIONAL METHOD PROCEDURE) X:\3980000.all\3983800\Excel\Drainage\3983800 Drainage_Calcs_Template_v2.07.xlsm Page 1 of 1 4/8/2025 Project Name:PICKLEBALL FACILITY Subdivision:GOLDEN MEADOWS BUSINESS PARK Project No.: Location:Fort Collins Calculated By:ARJ Design Storm:Checked By:0 Date: TRAVEL TIME STREET De s i g n P o i n t Ba s i n I D Ar e a ( a c ) Ru n o f f C o e f f . tc ( m i n ) C* A ( a c ) I ( i n / h r ) Q ( c f s ) tc ( m i n ) C* A ( a c ) I ( i n / h r ) Q ( c f s ) Qst r e e t ( c f s ) C* A ( a c ) Sl o p e ( % ) Qpi p e ( c f s ) C* A ( a c ) Sl o p e ( % ) Pi p e S i z e ( i n c h e s ) Le n g t h ( f t ) Ve l o c i t y ( f p s ) tt ( m i n ) REMARKS Runoff from Kruse Elementary School on the west side of the site 1o OS1 6.27 0.47 12.5 2.94 7.04 20.7 Runoff from the the Colorado Early Colleges Site 2o OS2 3.50 0.98 5.0 3.43 9.95 34.1 STORM DRAINAGE SYSTEM DESIGN STANDARD FORM SF-3 (RATIONAL METHOD PROCEDURE) PIPE 100-Year DIRECT RUNOFF TOTAL RUNOFF 4/7/25 STREET X:\3980000.all\3983800\Excel\Drainage\3983800 Drainage_Calcs_Template_v2.07.xlsm Page 1 of 1 4/8/2025 Pickleball Facility at 4400 Innovation Drive Final Drainage Report APPENDIX C – HYDRAULIC CALCULATIONS Project Name:PIKLEBALL FACILITY Subdivision:GOLDEN MEADOWS BUSINESS PARK Project No.: Location:Fort Collins Calculated By:ARJ Checked By:0 Date: Q2 Q100 Total (CFS)Total (CFS)Slope (ft/ft)Min D ft Min D inches Min D ft Min D inches Min D Provided 1.1 1.1 4.5 0.005 0.74 8.83 1.24 14.89 12 2a 0.8 3.3 0.005 0.65 7.80 1.10 13.26 12 3a 0.3 1.2 0.005 0.46 5.49 0.76 9.07 8 * Sized for 2 year DESIGN POINT SUMMARY DP 2 year 100 year 39838.00 4/7/25 X:\3980000.all\3983800\Excel\Drainage\3983800 Drainage_Calcs_Template_v2.07.xlsm Page 1 of 1 4/7/2025 Subdivision:PIKLEBALL FACILITY AT 4400 INNOVATION DRIVE Project Name:PIKLEBALL FACILITY AT 4400 INNOVATION DRIVE Location:Fort Collins Project No.: Design Storm:100-Year Calculated By:ARJ Checked By: Date:Jan-25 Input Type of Grate 12" Standard Head (ft)0.11 Properties Orifice Flow Area (in)60.62 Orifice Flow Area (ft)0.42 Weir Flow Perimeter (in)43.75 Weir Flow Perimeter (ft)3.65 Solution Capacity (cfs)0.44 Capacity (gpm)198.78 Design Point 2 YR (cfs)3a 1.2 No of inlets 3 Total Cap. (cfs)1.33 FS 1.11 uses the lesser of these two equations REV 2.1.21 39838.00 DISCLAIMER: SAFETY FACTORS ARE NOT INCLUDED IN THESE CALCULATIONS. ACTUAL CALCULATIONS SHOULD BE CARRIED OUT AND VERIFIED BY THE DESIGN ENGINEER TAKING INTO ACCOUNT ALL LOCAL CONDITIONS. NYLOPLAST RECOMMENDS USING A MINIMUM SAFETY FACTOR OF 1.25 FOR PAVED AREAS AND 2.0 FOR TURF AREAS. ADS/NYLOPLAST IS NOT RESPONSIBLE FOR MISUSE OF THIS TOOL. Subdivision:PIKLEBALL FACILITY AT 4400 INNOVATION DRIVE Project Name:PIKLEBALL FACILITY AT 4400 INNOVATION DRIVE Location:Fort Collins Project No.: Design Storm:100-Year Calculated By:ARJ Checked By: Date:Jan-25 Input Type of Grate 12" Standard Head (ft)0.11 Properties Orifice Flow Area (in)60.62 Orifice Flow Area (ft)0.42 Weir Flow Perimeter (in)43.75 Weir Flow Perimeter (ft)3.65 Solution Capacity (cfs)0.44 Capacity (gpm)198.78 Design Point 100 YR (cfs)3a 0.3 No of inlets 3 Total Cap. (cfs)1.33 FS 4.24 uses the lesser of these two equations REV 2.1.21 39838.00 DISCLAIMER: SAFETY FACTORS ARE NOT INCLUDED IN THESE CALCULATIONS. ACTUAL CALCULATIONS SHOULD BE CARRIED OUT AND VERIFIED BY THE DESIGN ENGINEER TAKING INTO ACCOUNT ALL LOCAL CONDITIONS. NYLOPLAST RECOMMENDS USING A MINIMUM SAFETY FACTOR OF 1.25 FOR PAVED AREAS AND 2.0 FOR TURF AREAS. ADS/NYLOPLAST IS NOT RESPONSIBLE FOR MISUSE OF THIS TOOL. Subdivision:PIKLEBALL FACILITY AT 4400 INNOVATION DRIVE Project Name:PIKLEBALL FACILITY AT 4400 INNOVATION DRIVE Location:Fort Collins Project No.: Design Storm:100-Year Calculated By:ARJ Checked By: Date:Jan-25 Input Type of Grate 12" Standard Head (ft)0.15 Properties Orifice Flow Area (in)60.62 Orifice Flow Area (ft)0.42 Weir Flow Perimeter (in)43.75 Weir Flow Perimeter (ft)3.65 Solution Capacity (cfs)0.71 Capacity (gpm)316.54 Design Point 2 YR (cfs)2a 3.3 No of inlets 5 Total Cap. (cfs)3.53 FS 1.07 uses the lesser of these two equations REV 2.1.21 39838.00 DISCLAIMER: SAFETY FACTORS ARE NOT INCLUDED IN THESE CALCULATIONS. ACTUAL CALCULATIONS SHOULD BE CARRIED OUT AND VERIFIED BY THE DESIGN ENGINEER TAKING INTO ACCOUNT ALL LOCAL CONDITIONS. NYLOPLAST RECOMMENDS USING A MINIMUM SAFETY FACTOR OF 1.25 FOR PAVED AREAS AND 2.0 FOR TURF AREAS. ADS/NYLOPLAST IS NOT RESPONSIBLE FOR MISUSE OF THIS TOOL. Subdivision:PIKLEBALL FACILITY AT 4400 INNOVATION DRIVE Project Name:PIKLEBALL FACILITY AT 4400 INNOVATION DRIVE Location:Fort Collins Project No.: Design Storm:100-Year Calculated By:ARJ Checked By: Date:Jan-25 Input Type of Grate 12" Standard Head (ft)0.15 Properties Orifice Flow Area (in)60.62 Orifice Flow Area (ft)0.42 Weir Flow Perimeter (in)43.75 Weir Flow Perimeter (ft)3.65 Solution Capacity (cfs)0.71 Capacity (gpm)316.54 Design Point 100 YR (cfs)2a 0.8 No of inlets 5 Total Cap. (cfs)3.53 FS 4.42 uses the lesser of these two equations REV 2.1.21 39838.00 DISCLAIMER: SAFETY FACTORS ARE NOT INCLUDED IN THESE CALCULATIONS. ACTUAL CALCULATIONS SHOULD BE CARRIED OUT AND VERIFIED BY THE DESIGN ENGINEER TAKING INTO ACCOUNT ALL LOCAL CONDITIONS. NYLOPLAST RECOMMENDS USING A MINIMUM SAFETY FACTOR OF 1.25 FOR PAVED AREAS AND 2.0 FOR TURF AREAS. ADS/NYLOPLAST IS NOT RESPONSIBLE FOR MISUSE OF THIS TOOL. A Westrian Company Subdivision:GOLDEN MEADOWS BUSINESS PARK Project Name:PIKLEBALL FACILITY Location:Fort Collins Project No.:39838.00 Calculated By:ARJ Checked By: Date:4/3/25 Area (acres)0.46 Area of Catchment tributary to storage facility (Acres) 2yr Runoff Coefficient 'C'0.84 the runoff coefficient 100yr Runoff Coefficinent 'Cfc'1.00 *with Frequency Adjustment Factor (100-yr = 1.25) Release Rate (cfs)1.10 the allowable maximum release rate from the detention facility Time of Concentration (min)5 ft3 acre-ft. 2748.6 0.063 Time (min) C * A 100-Yr Intensity (in/hr) Inflow Rate (cfs) Volume (ft3) Adjustmen t factor (m) Average Outflow Rate (cfs) Volume (ft3)(ft3) Detentio (acre-ft) 5 0.46 9.95 4.55 1364.34 0.61 0.67 201.30 1163.04 0.0267 10 0.46 7.72 3.53 2117.12 0.56 0.61 366.30 1750.82 0.0402 15 0.46 6.52 2.98 2682.05 0.54 0.59 531.30 2150.75 0.0494 Golden Meadows Pond Area 20 0.46 5.60 2.56 3071.47 0.53 0.58 696.30 2375.17 0.0545 146383.04 Ft^2 25 0.46 4.98 2.28 3414.27 0.52 0.57 861.30 2552.97 0.0586 3.36 Acre-Ft 30 0.46 4.52 2.07 3718.67 0.52 0.57 1026.30 2692.37 0.0618 35 0.46 4.08 1.86 3916.12 0.52 0.57 1191.30 2724.82 0.0626 Detention in 100 YR 40 0.46 3.74 1.71 4102.60 0.51 0.57 1356.30 2746.30 0.0630 2776.02 Ft^3 45 0.46 3.46 1.58 4269.89 0.51 0.56 1521.30 2748.59 0.0631 50 0.46 3.23 1.48 4428.95 0.51 0.56 1686.30 2742.65 0.0630 Depth in Pond 55 0.46 3.03 1.38 4570.18 0.51 0.56 1851.30 2718.88 0.0624 0.02 Ft 60 0.46 2.86 1.31 4705.93 0.51 0.56 2016.30 2689.63 0.0617 0.23 Inches 65 0.46 2.71 1.24 4830.71 0.51 0.56 2181.30 2649.41 0.0608 70 0.46 2.59 1.18 4971.94 0.51 0.56 2346.30 2625.64 0.0603 75 0.46 2.48 1.13 5100.83 0.51 0.56 2511.30 2589.53 0.0594 80 0.46 2.38 1.09 5221.50 0.51 0.56 2676.30 2545.20 0.0584 85 0.46 2.29 1.05 5338.05 0.51 0.56 2841.30 2496.75 0.0573 90 0.46 2.21 1.01 5454.60 0.51 0.56 3006.30 2448.30 0.0562 95 0.46 2.13 0.97 5549.21 0.51 0.56 3171.30 2377.91 0.0546 100 0.46 2.06 0.94 5649.31 0.51 0.56 3336.30 2313.01 0.0531 Required detention Detention Pond Sizing FAA Methoud Page 1 105 0.46 2.00 0.91 5759.00 0.51 0.56 3501.30 2257.70 0.0518 110 0.46 1.94 0.89 5852.25 0.51 0.56 3666.30 2185.95 0.0502 115 0.46 1.88 0.86 5929.03 0.50 0.56 3831.30 2097.73 0.0482 120 0.46 1.84 0.84 6055.18 0.50 0.56 3996.30 2058.88 0.0473 Page 2 Pickleball Facility at 4400 Innovation Drive Final Drainage Report APPENDIX D – WATER QUALITY CALCULATIONS Subdivision:GOLDEN MEADOWS BUSINESS PARK Project Name:PIKLEBALL FACILITY Location:Fort Collins Project No.:39838.00 Calculated By:ARJ Checked By:0 Date:4/7/25 Basin (ac)Value % Imp. A2 0.33 0.83 83.9% A3 0.12 0.88 90.9% Total 0.46 0.84 85.8% WQCV Drain Time (hr):12 Coefficient, a (Figure 3.2):0.8 WQCV (in):0.29 WQCV (ac-ft):0.011 WQ Pond Tributary Areas ADS Isolator Rows X:\3980000.all\3983800\Excel\Drainage\3983800 Drainage_Calcs_Template_v2.07.xlsm Page 1 of 2 4/7/2025 X:\3980000.all\3983800\Excel\Drainage\3983800 Drainage_Calcs_Template_v2.07.xlsm Page 2 of 2 4/7/2025 A B C D E F G H I J K L M N VAULT ID TOTAL REQUIRED WQCV (CF) WQ FLOW (CFS)CHAMBER TYPE RELEASE RATE/ CHAMBER (CFS) CHAMBER VOLUME (CF) CHAMBER VOLUME + AGGREGATE (CF) NUMBER OF CHAMBERS RELEASE RATE WQCV METHOD (CFS) REQUIRED STORAGE VOLUME (CF) NUMBER OF CHAMBERS (FAA) VOLUME (CHAMBERS ONLY) (CF) RELEASE RATE FAA METHOD (CFS) TOTAL NUMBER OF CHAMBERS REQUIRED TOTAL SYSTEM VOLUME (CF) WQ A 488.45 0.55 MC-3500 0.036 109.9 175.0 3 0.11 252 3 330 0.11 CONFIRM CONFIRM A MHFD Extended Detention Basin Spreadsheet WQCV B 1/2 of the 2-year developed flow rate for the basin being sized C Chamber type based on site constraints D Flow rate thru the bottom of the isolator row chamber which is equal to the area of the bottom of the chamber multiplied by the flow rate per unit area (see calculations below) E Volume within chamber only, not accounting for void spaces in surrounding aggregate (standard spec) F Volume includes chamber and void space (40%) in surrounding aggregate , per chamber unit. (standard spec) G Number of chambers required to provide full WQCV within total installed system, include aggregate = A / F H Release rate per chamber times number of chambers = D * G I FAA calc based on Flow, WQ and Total Release Rate J Number of chambers required to provide required FAA staorage volume stored within the chamber only (no aggregate stone) = I / E K Volume provided in chambers only (no aggregate storage). This must meet or exceed the required FAA storage volume. Greater of G or J * E L Release rate per chamber times number of chambers = D * J M Total number of chambers (Greater of J or G) N Total system volume. Includes number of chambers plus aggregate. This must meet or exceed required WQCV MC-3500 60.0 60.0 45.0 30.0 16.0 12.0 HEIGHT ft 3.75 100.0 100.0 77.0 51.0 34.0 25.0 WIDTH ft 6.4166667 79.1 48.3 86.0 85.4 85.4 85.4 INSTALLED LENGTH ft 7.1666667 54.9 33.5 46.0 30.2 20.2 14.8 FLOOR AREA (SF)46.0 175.9 106.5 109.9 45.9 14.7 6.9 CHAMBER VOLUME (CF)109.9 267.3 162.6 175.0 74.9 31.0 15.0 CHAMBER/AGGREGATE VOLUME (CF)175.0 CHAMBER FLOW RATE CONVERSION (GPM/SF TO CFS) 0.35 GPM/SF 1 CF =7.48052 GAL 1 GALLON =0.133681 CF 1 GPM =0.002228 CFS *FLOW RATE BASED ON 1/2 OF NOV 07 QMAX IN FIGURE 17 OF UNH TESTING REPORT MC-7200 MC-4500 MC-3500 SC-740 SC-310 SC-160LP 0.043 0.026 0.036 0.024 0.016 0.012 (COLUMN D)FLOW RATE / CHAMBER (CFS) STORMTECH CHAMBER VOLUME AND RELEASE RATE CALCULATIONS FLOOR AREA (SF) CHAMBER VOLUME (CF) CHAMBER/AGGREGATE VOLUME (CF) FLOW RATE* CHAMBER FLOW RATE WIDTH (IN) INSTALLED LENGTH (IN) HEIGHT (IN) STORMTECH CHAMBER DATA Subdivision:GOLDEN MEADOWS BUSINESS PARK Project Name:PIKLEBALL FACILITY AT 4400 INNOVATION DRIVE Location:Fort Collins Project No.:39838.00 Calculated By:ARJ Checked By:0 Date:4/12/25 WQ Storm Composite 'C'0.84 ft3 acre-ft. Area 0.46 Modified Modified 251.9 0.006 Release Rate 0.11 M. FATER D. JUDISH C. Li May-95 Apr-98 Nov-98 DETENTION POND SIZING TIME TIME INTENSITY Q 2 Runoff Release Required Required cum 1/2 of 2 year Volume Cum total Detention Detention (mins)(secs)(in/hr)(cfs)(ft^3)(ft^3)(ft^3)(ac-ft) 0 0 0 0.00 0 0.0 0.0 0.0000 5 300 1.425 0.55 164.3929 33.0 131.4 0.0030 10 600 1.105 0.42 254.9532 66.0 189.0 0.0043 15 900 0.935 0.36 323.5945 99.0 224.6 0.0052 20 1200 0.805 0.31 371.4703 132.0 239.5 0.0055 25 1500 0.715 0.27 412.4243 165.0 247.4 0.0057 30 1800 0.650 0.25 449.9174 198.0 251.9 0.0058 35 2100 0.585 0.22 472.4133 231.0 241.4 0.0055 40 2400 0.535 0.21 493.7556 264.0 229.8 0.0053 45 2700 0.495 0.19 513.9442 297.0 216.9 0.0050 50 3000 0.460 0.18 530.6719 330.0 200.7 0.0046 55 3300 0.435 0.17 552.0141 363.0 189.0 0.0043 60 3600 0.410 0.16 567.5882 396.0 171.6 0.0039 65 3900 0.385 0.15 577.3941 429.0 148.4 0.0034 70 4200 0.365 0.14 589.5072 462.0 127.5 0.0029 75 4500 0.345 0.13 597.0058 495.0 102.0 0.0023 80 4800 0.330 0.13 609.119 528.0 81.1 0.0019 85 5100 0.315 0.12 617.7713 561.0 56.8 0.0013 90 5400 0.305 0.12 633.3453 594.0 39.3 0.0009 95 5700 0.290 0.11 635.6526 627.0 8.7 0.0002 100 6000 0.280 0.11 646.0353 660.0 -14.0 -0.0003 105 6300 0.270 0.10 654.1107 693.0 -38.9 -0.0009 110 6600 0.260 0.10 659.8789 726.0 -66.1 -0.0015 115 6900 0.255 0.10 676.6066 759.0 -82.4 -0.0019 120 7200 0.245 0.09 678.3371 792.0 -113.7 -0.0026 Required detention WQ Pond Tributary Areas Pickleball Facility at 4400 Innovation Drive Final Drainage Report APPENDIX E – REFERENCES !( !( !( !( !( !( !( !( E HARMONY RD ZI E G L E R R D E HORSETOOTH RD S T I M B E R L I N E R D S L E M A Y A V E CO RD 40 UN I O N P A C I F I C R A I L R O A D Golden Meadow Pond• Retrofit Existing Pond to accommodate Water Quality Volume Fox Meadows Pond• Retrofit Existing Pond to accommodate Water Quality Volume FCRID Pond• New Pond to accommodate Water Quality Volume Sunstone Village Regional Pond• Retrofit Existing Pond to accommodate Water Quality Volume Hewlitt-Packard Ponds• Retrofit Existing Pond to accommodate Water Quality Volume Woodland Park Pond• Retrofit Existing Pond to accommodate Water Quality Volume Fos s i l C r e e k R e s e r v o i r I n l e t D i t c h ( F C R I D ) Collindale Golf Course• Source Control BMP's (see report text)Alternate Locations Evaluated Stone Ridge Pond• Alternative to FCRID location (EDBD) K I F C B A H Fox Meadows BasinSelected Plan - Water Quality Improvements .1 inch = 500 feet 0 500 1,000 1,500 2,000Feet Fox Meadows Basin Proposed BMP Basin Type Flood Control Only Water Quality Only Flood Control and Water Quality Proposed Improvements Proposed Selected PlanWater Quality AlternativesProposed Pickleball Facility at 4400 Innovation Drive Final Drainage Report APPENDIX F – MAPS A W e s t r i a n C o m p a n y Know what's below. before you dig.Call R A W e s t r i a n C o m p a n y Know what's below. before you dig.Call R Pickleball Facility at 4400 Innovation Drive Final Drainage Report APPENDIX G –LID EXHIBIT A W e s t r i a n C o m p a n y