HomeMy WebLinkAboutDocument Markups - Site Plan - 01/22/2025A
W
e
s
t
r
i
a
n
C
o
m
p
a
n
y
A PERMIT MUST BE OBTAINED FROM THE CITY FORESTER BEFORE ANY TREES OR
SHRUBS AS NOTED ON THIS PLAN ARE PLANTED, PRUNED OR REMOVED IN THE PUBLIC
RIGHT-OF-WAY. THIS INCLUDES ZONES BETWEEN THE SIDEWALK AND CURB, MEDIANS
AND OTHER CITY PROPERTY. THIS PERMIT SHALL APPROVE THE LOCATION AND SPECIES
TO BE PLANTED. FAILURE TO OBTAIN THIS PERMIT IS A VIOLATION OF THE CITY OF FORT
COLLINS CODE SUBJECT TO CITATION (SECTION 27-31) AND MAY ALSO RESULT IN
REPLACING OR RELOCATING TREES AND A HOLD ON CERTIFICATE OF OCCUPANCY.
STREET TREE NOTE
30'-0"
Dead End Fire
Access Roads
exceeding 150 feet
require an approved
turnaround
300'-3/4"
19'
-
6
1
/
2
"
3'-4
"
72'-7 1/4"
5'-2"199'-4 3/4"
300'-1/4"
28
5
'
-
8
"
2'-8
3
/
4
"
11'-7 1/2"
Area of building
outside of apparatus
access
What is this?
Is this a
walkway?
Will this include a
gathering and rest
space with
pedestrian amenities
(i.e., benches,
tables)?
How will pedestrians
safely move through
this site from and to
the trail? This could
look similar to the
west portion of the
site and have a
walkway through
landscape islands.
Please demonstrate
site connectivity and
an internal pedestrian
system per LUC
Section 5.9.1 and the
supplemental plans
of the HC District
(i.e., Harmony
Corridor Standards
and Guidelines and
Harmony Corridor
Plan).
Why aren't all
proposed
trees/landscaping
included on the site
plan?
Is this proposing
multiple phases or
is this portion of
the site included in
the development
plan? Please
clarify.
Where is the
pedestrian
connectivity? This
walkway should
continue along the
front to meet the
walkway south of the
site.
Will there be
shared parking
with the southern
site?
If this is not a phased
project (i.e., ODP),
this portion of the site
will need to be
brought into
conformance (i.e.,
landscape and
parking)
JR Response: Yes,
concrete hatch added
to clarify walks
JR Response: no
shared parking with
south property, all
spots accounted for
on site
JR Response: adding landscaping
to the site plan made it busy and
hard to understand so all land-
scaping is shown on the next page
JR Response: bike
path to eastern prop-
erty boundary added
with striping and
curbed refuge area.
Phase II Sidewalk im-
provements also help
increase connectivity
for the Eastern por-
tion of building.
JR Response: phase
descriptions added to
site as well as a
phasing plan. East
building use part of
phase II.
JR Response: to
contain tables, notes
updated
JR Response:
landscape area,
notes updatedJR Response: walk-
way on the east side
of courts for building
access and spectator
viewing. There is con-
nectivity east and
west across the site
and north-south
across the site.
JR Response: see
PFA Hose Exhibit.
Based on emergency
access easement
changes and parking
lot revisions, hose
length can now be
met.
JR Response: phase
descriptions added to
site as well as a
phasing plan. East
building use part of
phase II. Eastern por-
tion brought to con-
formance with land-
scaping and parking
standards.
JR Response: See
emergency access
easement and PFA
Turning Exhibit. Ham-
merhead turnaround
added.