Loading...
HomeMy WebLinkAboutPlans - Electrical Plan - 03/31/2025T F N G 1200A KRP-C 1200/3 M (NEW) FT. COLLINS POWER 500 KVA, 120/208V, 3PH, 4W (NEW) FT. COLLINS POWER METER NEW 3 SETS[(4-#600 KCMIL CU)3-1/2"PVC.] (#3/0G) (#6G) CWP BLDG. STEEL GND ROD 4 SETS[(4-#500 KCMIL AL, 1-#3/0 CU GND)3-1/2"PVC.] (NEW) (RELOCATED) 1200A BUSSED GUTTER 120/208V, 3P, 4W 600/3 600A FRN-R PANEL "M1" 400/3 400A FRN-R PANEL "M2" (NEW) MM 2 SETS (4-#500 KCMIL AL, 1-#2/0 AL GND)3"C. 2 SETS (4-#500 KCMIL AL, 1-#250 AL GND)3"C. (NEW)(NEW) 2 SETS (4-#250 KCMIL AL, 1-#250 AL GND)2-1/2"C. 2 SETS (4-#250 KCMIL AL, 1-#1 AL GND)2-1/2"C. EGAUGE METER FOR ENERGY MONITORING IECC 405.12 EGAUGE METER FOR ENERGY MONITORING IECC 405.12 42 POLE (MECHANICAL EQUIP) 60 POLE (MECHANICAL EQUIP) 400/3 400A FRN-R PANEL "L" (NEW) M (NEW) 2 SETS (4-#250 KCMIL AL, 1-#250 AL GND)2-1/2"C. 2 SETS (4-#250 KCMIL AL, 1-#1 AL GND)2-1/2"C. EGAUGE METER FOR ENERGY MONITORING IECC 405.12 120 POLE (GENERAL PWR, LIGHTING, EQUIPMENT) (SECTION 1) PANEL "L" (NEW) (SECTION 2) TEMPORARY POWER SERVICE ONE-LINE DIAGRAM SCALE: NONE M (RELOCATED) MAIN DISCONNECT 1"GRC. Isc-1 X Isc-2 X Isc-3 X Isc-4 X Isc-5 X Isc-7 X RECONNECT EXISTING GROUNDING ELECTRODES, FIELD VERIFY. C T NEW 1200A CT CABINET NEW 4 SETS[(4-#500 KCMIL AL, 1#250 KCMIL AL SSBJ)3-1/2"PVC.] Isc-2B X TEMPORARY CONSTRUCTION POWER N G 400A FRN-R 400/3 M (NEW) FT. COLLINS POWER METER (#1/0G) GND ROD GND ROD 1"GRC.Isc-11 X C T NEW 400A CT CABINET PANEL "TEMP" TEMPORARY CONSTRUCTION POWER (4-#500 KCMIL CU, 1-#3 CU GND)3"C. Isc-11A X (4-#500 KCMIL CU )3-1/2" PVC. (4-#500 KCMIL CU, 1-#1/0 CU SSBJ)3"C. (8) EMPTY 3-1/2"C FOR FUTURE PHASE 2 ELECTRICAL SERVICE. f =[1.732 X length X Isc(prev)]/[# runs X wire factor X voltage] f = 1.732 X 5 X 20,656 / 1 X 22,185 X 208 f = 0.039 M = 1/(1+f) M = 0.963 Isc = Isc(prev) x M Isc = 19,885 M = 0.996 Isc = Isc(prev) x M Isc = 34,603 Point #4 - At PANEL "M1" f = [1.732 X length X Isc(prev)] / [# runs X wire factor X voltage] f = 1.732 X 100 X 34,603 / 2 X 18,755 X 208 f = 0.768 M = 1/(1+f) M = 0.566 Isc = Isc(prev) x M Isc = 19,570 Point #5 - At PANEL "M2" f = [1.732 X length X Isc(prev)] / [# runs X wire factor X voltage] f = 1.732 X 1 X 34,871 / 4 X 18,755 X 208 f = 0.004 M = 1/(1+f) M = 0.996 Isc = Isc(prev) x M Isc = 34,736 Point #3 - At the BUSSED GUTTER f = [1.732 X length X Isc(prev)] / [# runs X wire factor X voltage] f = 1.732 X 1 X 34,736 / 4 X 18,755 X 208 f = 0.004 M = 1/(1+f) M = 0.433 Isc = Isc(prev) x M Isc = 14,997 Point #8 - At EXISTING RTU-1 f = [1.732 X length X Isc(prev)] / [# runs X wire factor X voltage] f = 1.732 X 105 X 19,570 / 1 X 10,755 X 208 f = 1.591 M = 1/(1+f) M = 0.386 Isc = Isc(prev) x M Isc = 7,553 Point #9 - At EXISTING RTU-2 M = 0.687 Isc = Isc(prev) x M Isc = 13,454 Point #11 - At Temp Power CT Cabinet f = [1.732 X length X Isc(prev)] / [# runs X wire factor X voltage] f = 1.732 X 75 X 49,355 / 1 X 22,185 X 208 f = 1.389 M = 1/(1+f) M = 0.419 Isc = Isc(prev) x M Isc = 20,656 Point #11A - At TEMP PANEL f = [1.732 X length X Isc(prev)] / [# runs X wire factor X voltage] f = 1.732 X 105 X 34,603 / 2 X 12,122 X 208 f = 1.248 M = 1/(1+f) M = 0.445 Isc = Isc(prev) x M Isc = 15,393 Point #7 - At PANEL "L" f = [1.732 X length X Isc(prev)] / [# runs X wire factor X voltage] f = 1.732 X 110 X 34,603 / 2 X 12,122 X 208 f = 1.307 M = 1/(1+f) f = [1.732 X length X Isc(prev)] / [# runs X wire factor X voltage] f = 1.732 X 65 X 19,570 / 1 X 10,755 X 208 f = 0.985 M = 1/(1+f) M = 0.504 Isc = Isc(prev) x M Isc = 9,860 Point #10 - At EXISTING RTU-3 f = [1.732 X length X Isc(prev)] / [# runs X wire factor X voltage] f = 1.732 X 30 X 19,570 / 1 X 10,755 X 208 f = 0.455 M = 1/(1+f) TEMP POWER Isc CALCULATION - 3 PHASE Point #1 - At The Utility Transformer, 500 kVA Isc = 49,355 Point #2 - At the CT Cabinet f = [1.732 X length X Isc(prev)] / [# runs X wire factor X voltage] f = 1.732 X 85 X 49,355 / 3 X 28,033 X 208 f = 0.415 M = 1/(1+f) M = 0.707 Isc = Isc(prev) x M Isc = 34,871 Point #2B - At the 1200A MAIN DISCONNECT SPACE 41 0 0 42 SPACE SPACE 43 0 0 44 SPACE 24000 24000 24000 LOAD TYPE CONNECTED KVA TOTAL FACTOR DEMAND KVA TOTAL AФ BФ CФ ALL Ф'S AФ BФ CФ ALL Ф'S LOAD TYPE L = LIGHTING R = RECEPTACLE M = HVAC / MOTOR K = KITCHEN G = MISCELLANEOUSLEGEND PANEL "TEMP" VOLTAGE 120 / 208 V 3 Ф 4 W FLUSH EXTG MAIN MLO X SURFACE X NEW X BUS 400A FEED THRU AIC 22,000A LOAD DESCRIPTION BKR CIR LOAD (VA/Ф) CIR BKR DESCRIPTION LOAD TYPE AФ BФ CФ TYPE G CONSTRUCTION TRAILER 100/3 1 9500 4500 2 50/3 CONTRUCTION POWER LR G 3 9500 4500 4 LR G 5 9500 4500 6 LR G TEMP HEAT 50/3 7 5000 0 8 SPACE G 9 5000 0 10 SPACE G 11 5000 0 12 SPACE G TEMP HEAT 50/3 13 5000 0 14 SPACE G 15 5000 0 16 SPACE G 17 5000 0 18 SPACE SPACE 19 0 0 20 SPACE SPACE 21 0 0 22 SPACE SPACE 23 0 0 24 SPACE SPACE 25 0 0 26 SPACE SPACE 27 0 0 28 SPACE SPACE 29 0 0 30 SPACE SPACE 31 0 0 32 SPACE SPACE 33 0 0 34 SPACE SPACE 35 0 0 36 SPACE SPACE 37 0 0 38 SPACE SPACE 39 0 0 40 SPACE LIGHTING/CONTINUOUS 1.5 1.5 1.5 4.5 125% 1.9 1.9 1.9 5.6 RECEPTACLE (10KVA OR LESS) 3.0 3.0 3.0 9.0 100% 3.0 3.0 3.0 9.0 RECEPTACLE (OVER 10KVA) 0.0 0.0 0.0 0.0 100% 0.0 0.0 0.0 0.0 HVAC/MOTOR 0.0 0.0 0.0 0.0 100% 0.0 0.0 0.0 0.0 MOTOR(LARGEST) 0.0 0.0 0.0 0.0 125% 0.0 0.0 0.0 0.0 KITCHEN EQUIPMENT 0.0 0.0 0.0 0.0 100% 0.0 0.0 0.0 0.0 MISCELLANEOUS 19.5 19.5 19.5 58.5 100% 19.5 19.5 19.5 58.5 TOTAL KVA 24.0 24.0 24.0 72.0 TOTAL KVA 24.4 24.4 24.4 73.1 TOTAL AMPS 203.1 203.1 203.1 203.1 33 2 5 S . T i m b e r l i n e R o a d , S u i t e 1 0 0 Fo r t C o l l i n s , C o l o r a d o 8 0 5 2 5 (9 7 0 ) 4 9 3 - 8 7 4 7 Fa x : ( 9 7 0 ) 4 9 3 - 5 8 6 9 ® Issued For SD: Plot Date Issued For DD: Issued For Permit: Issued For 90% CD: 10/01/24 11/22/24 11/27/24 01/24/25 Issued For Construction:02/28/25 3/31/2025 3:31:29 PM E0.05A Te m p o r a r y Po w e r O n e - l i n e Di a g r a m LI B E R T Y C O M M O N LI B E R T Y C O M M O N J U N I O R H I G H - P H 1 18 2 5 S H A R P P O I N T D R . F O R T C O L L I N S , C O 8 0 5 2 5 3493 Revision Number Revision Date 03.31.25