Loading...
HomeMy WebLinkAboutSupporting Documentation - Response to Comments - 04/23/2025Markup Summary_Prospect Plaza_FDP_Rd1 Subject: Length Measurement Page Label: [6] PLAN-PROSPECT PLAZA-LAND-SPAR-LP-101 Author: FS - Christine Holtz Measurement: 1.6090 ft' in" File Name: 2_LANDSCAPE_Prospect Plaza Redevelopment_FDP_Rd1.pdf 1'-7 1/4" 2_LANDSCAPE_Prospect Plaza Redevelopment_FDP_Rd1.pdf (7) Measurement: 0.0000 ft' in" Subject: Callout Page Label: [6] PLAN-PROSPECT PLAZA-LAND-SPAR-LP-101 Author: FS - Christine Holtz Measurement: 1 Count File Name: 2_LANDSCAPE_Prospect Plaza Redevelopment_FDP_Rd1.pdf Please shift tree northwest away from sanitary line Subject: Length Measurement Page Label: [7] PLAN-PROSPECT PLAZA-LAND-SPAR-LP-102 Author: FS - Christine Holtz Measurement: 6.3686 ft' in" File Name: 2_LANDSCAPE_Prospect Plaza Redevelopment_FDP_Rd1.pdf 6'-4 1/2" Subject: Callout Page Label: [7] PLAN-PROSPECT PLAZA-LAND-SPAR-LP-102 Author: FS - Christine Holtz Measurement: 1 Count File Name: 2_LANDSCAPE_Prospect Plaza Redevelopment_FDP_Rd1.pdf Shift tree to ten feet from stormwater pipe Subject: Length Measurement Page Label: [7] PLAN-PROSPECT PLAZA-LAND-SPAR-LP-102 Author: FS - Christine Holtz Measurement: 10.0168 ft' in" File Name: 2_LANDSCAPE_Prospect Plaza Redevelopment_FDP_Rd1.pdf 10'-1/4" 1'-7 1/4" M M03 Please shift tree northwest away from sanitary line 6'-4 1 / 2 " Shift tree to ten feet from stormwater pipe M 10'-1/4" Subject: Length Measurement Page Label: [7] PLAN-PROSPECT PLAZA-LAND-SPAR-LP-102 Author: FS - Christine Holtz Measurement: 4.3825 ft' in" File Name: 2_LANDSCAPE_Prospect Plaza Redevelopment_FDP_Rd1.pdf 4'-4 1/2" Subject: Callout Page Label: [7] PLAN-PROSPECT PLAZA-LAND-SPAR-LP-102 Author: FS - Christine Holtz Measurement: 1 Count File Name: 2_LANDSCAPE_Prospect Plaza Redevelopment_FDP_Rd1.pdf Can shift to meet separation requirements without removing tree Subject: Cloud+ Page Label: [2] 2 SHEET (2) Author: ENG - Sophie Buckingham Measurement: 1 Count File Name: 3_PLAT_Prospect Plaza Redevelopment_FDP_Rd1.pdf vacated? 3_PLAT_Prospect Plaza Redevelopment_FDP_Rd1.pdf (9) Measurement: 9 Count Subject: Cloud+ Page Label: [2] 2 SHEET (2) Author: ENG - Sophie Buckingham Measurement: 1 Count File Name: 3_PLAT_Prospect Plaza Redevelopment_FDP_Rd1.pdf vacated? Subject: Cloud+ Page Label: [2] 2 SHEET (2) Author: ENG - Sophie Buckingham Measurement: 1 Count File Name: 3_PLAT_Prospect Plaza Redevelopment_FDP_Rd1.pdf vacated? 4'-4 1/2" (3) PR AM M (1) PY CA M-01 P-02 S-06 Can shift to meet separation requirements without removing tree PROPERTY LINE TO BE VACETED BY THIS PLA vacated? PROPERTY LINE TO BE VACETED BY THIS PLA vacated? PEDESTRIAN INGRESS PROPERTY LINE TO BE VACETED BY THIS PLA vacated? Subject: Callout Page Label: [2] 2 SHEET (2) Author: SW - Derek Lutz Measurement: 1 Count File Name: 3_PLAT_Prospect Plaza Redevelopment_FDP_Rd1.pdf UTILITY PLANS SHOW THIS EASEMENT TO REMAIN. PLEASE CLARIFY. Subject: Cloud+ Page Label: [3] 3 SHEET (3) Author: ENG - Sophie Buckingham Measurement: 1 Count File Name: 3_PLAT_Prospect Plaza Redevelopment_FDP_Rd1.pdf vacated? Subject: Cloud+ Page Label: [3] 3 SHEET (3) Author: ENG - Sophie Buckingham Measurement: 1 Count File Name: 3_PLAT_Prospect Plaza Redevelopment_FDP_Rd1.pdf vacated? Subject: Cloud+ Page Label: [3] 3 SHEET (3) Author: ENG - Sophie Buckingham Measurement: 1 Count File Name: 3_PLAT_Prospect Plaza Redevelopment_FDP_Rd1.pdf vacated? Subject: Callout Page Label: [3] 3 SHEET (3) Author: SW - Derek Lutz Measurement: 1 Count File Name: 3_PLAT_Prospect Plaza Redevelopment_FDP_Rd1.pdf UTILITY PLANS SHOW THIS EASEMENT TO REMAIN. PLEASE CLARIFY. 88. 1 5 ' 20' DU C T B A N K E A S E M E N T CIT Y O F F O R T C O L L I N S (R E C E P T I O N N O . 2 0 1 6 0 0 2 5 3 9 3 ) TO B E V A C A T E D B Y T H I S P L A T FOUND #4 REBAR AR I Z O N A | C O L O R A D O ep s g r o u p i n c . c o m 97 0 . 2 2 1 . 4 1 5 8 UTILITY PLANS SHOW THIS EASEMENT TO REMAIN. PLEASE CLARIFY. PROPERTY LIN TO BE VACETED BY THIS PLA vacated? PROPERTY LIN TO BE VACETED BY THIS PLA vacated? PEDESTRIAN INGRESS PROPERTY LINE TO BE VACETED BY THIS PLA vacated? 443 . 5 1 ' 20' DU C T B A N K E A S E M E N T CIT Y O F F O R T C O L L I N S RE C E P T I O N N O . 2 0 1 6 0 0 2 5 3 9 3 TO B E V A C A T E D B Y T H I S P L A T S0 0 ° 2 2 ' 5 7 " W UTILITY PLANS SHOW THIS EASEMENT TO REMAIN.PLEASE CLARIFY. Subject: Callout Page Label: [5] 5 SHEET 5 Author: PFA-Marcus Glasgow Measurement: 1 Count File Name: 3_PLAT_Prospect Plaza Redevelopment_FDP_Rd1.pdf Also needs to be Emergency Access Easement Subject: Text Box Page Label: [1] C0.0 COVER SHEET Author: DPaluzzi Measurement: 1 Count File Name: 4_UTILITY PLANS_Prospect Plaza Redevelopment_FDP_Rd1.pdf Light and Power Comments By Daniel Paluzzi 4_UTILITY PLANS_Prospect Plaza Redevelopment_FDP_Rd1.pdf (81) Measurement: 10 Count Subject: Callout Page Label: [1] C0.0 COVER SHEET Author: ENG - Sophie Buckingham Measurement: 1 Count File Name: 4_UTILITY PLANS_Prospect Plaza Redevelopment_FDP_Rd1.pdf Engineering Comments by Sophie Buckingham Subject: Callout Page Label: [1] C0.0 COVER SHEET Author: SW - Derek Lutz Measurement: 1 Count File Name: 4_UTILITY PLANS_Prospect Plaza Redevelopment_FDP_Rd1.pdf WATER UTILITIES COMMENTS BY DEREK LUTZ Subject: Cloud+ Page Label: [1] C0.0 COVER SHEET Author: TECHNICAL SERVICES-JEFF COUNTY Measurement: 1 Count File Name: 4_UTILITY PLANS_Prospect Plaza Redevelopment_FDP_Rd1.pdf Please revise to match required format as shown in written comments. LE A BEARING CHORD 431 . CES S E A S E M E N T R: B O A R D O F G O V E R N O R S O F T H E OL O R A D O S T A T E U N I V E R S I T Y ET ) 60'40' NORTH Also needs to beEmergency AccessEasement Light and Power Comments By Daniel Paluzzi Engineering Comments by Sophie Buckingham WATER UTILITIES COMMENTS BY DEREK LUTZ BBBBAAAAYYYYDDDDRRRRBAYDR PPPPRRRROOOOSSSSPPPPEEEECCCCTTTTLLLLNNNN PROSPECTLN JJJJUUUUNNNNIIIIPPPPEEEERRRRLLLLNNNNJUNIPERLNRRRRR SSSSHHHHEEEEEEEELLLLYYYYDDDDRRRRSHEELYDR BBBBIIIIRRRRKKKKYYYYPPPPLLLLBIRKYPL HORIZONTAL DATUM: VERTICAL DATUM: FLOODPLAIN: V Please revise to match required format as shown in written comments. Subject: Line Page Label: [1] C0.1 GENERAL NOTES Author: ENG - Sophie Buckingham Measurement: 1 Count File Name: 4_UTILITY PLANS_Prospect Plaza Redevelopment_FDP_Rd1.pdf Subject: Line Page Label: [1] C0.1 GENERAL NOTES Author: ENG - Sophie Buckingham Measurement: 1 Count File Name: 4_UTILITY PLANS_Prospect Plaza Redevelopment_FDP_Rd1.pdf Subject: Line Page Label: [1] C0.1 GENERAL NOTES Author: ENG - Sophie Buckingham Measurement: 1 Count File Name: 4_UTILITY PLANS_Prospect Plaza Redevelopment_FDP_Rd1.pdf Subject: Line Page Label: [1] C0.1 GENERAL NOTES Author: ENG - Sophie Buckingham Measurement: 1 Count File Name: 4_UTILITY PLANS_Prospect Plaza Redevelopment_FDP_Rd1.pdf Subject: Line Page Label: [1] C0.1 GENERAL NOTES Author: ENG - Sophie Buckingham Measurement: 1 Count File Name: 4_UTILITY PLANS_Prospect Plaza Redevelopment_FDP_Rd1.pdf – STANDAR ’ “” – FORT COLLINS/LARIMER COUNTY GENERAL NOTES – – – – ’STR Subject: Line Page Label: [1] C0.1 GENERAL NOTES Author: ENG - Sophie Buckingham Measurement: 1 Count File Name: 4_UTILITY PLANS_Prospect Plaza Redevelopment_FDP_Rd1.pdf Subject: Line Page Label: [1] C0.1 GENERAL NOTES Author: ENG - Sophie Buckingham Measurement: 1 Count File Name: 4_UTILITY PLANS_Prospect Plaza Redevelopment_FDP_Rd1.pdf Subject: Line Page Label: [1] C0.1 GENERAL NOTES Author: ENG - Sophie Buckingham Measurement: 1 Count File Name: 4_UTILITY PLANS_Prospect Plaza Redevelopment_FDP_Rd1.pdf Subject: Line Page Label: [1] C0.1 GENERAL NOTES Author: ENG - Sophie Buckingham Measurement: 1 Count File Name: 4_UTILITY PLANS_Prospect Plaza Redevelopment_FDP_Rd1.pdf Subject: Cloud+ Page Label: [1] C0.1 GENERAL NOTES Author: ENG - Sophie Buckingham Measurement: 1 Count File Name: 4_UTILITY PLANS_Prospect Plaza Redevelopment_FDP_Rd1.pdf fill in benchmark info – ’ – ’ STREE – ’ – ’ – ’ – ’ — ’ “” – ’ – ’ — ’ – ’ — ’ “” – fill in benchmark info Subject: Ellipse Page Label: [1] C0.1 GENERAL NOTES Author: ENG - Sophie Buckingham Measurement: 1 Count File Name: 4_UTILITY PLANS_Prospect Plaza Redevelopment_FDP_Rd1.pdf Subject: Callout Page Label: [1] C0.1 GENERAL NOTES Author: ENG - Sophie Buckingham Measurement: 1 Count File Name: 4_UTILITY PLANS_Prospect Plaza Redevelopment_FDP_Rd1.pdf select either centerline or flowline Subject: Callout Page Label: [1] C0.1 GENERAL NOTES Author: ENG - Sophie Buckingham Measurement: 1 Count File Name: 4_UTILITY PLANS_Prospect Plaza Redevelopment_FDP_Rd1.pdf list the approved variances Subject: Line Page Label: [1] C0.1 GENERAL NOTES Author: ENG - Sophie Buckingham Measurement: 1 Count File Name: 4_UTILITY PLANS_Prospect Plaza Redevelopment_FDP_Rd1.pdf Subject: Line Page Label: [1] C0.1 GENERAL NOTES Author: ENG - Sophie Buckingham Measurement: 1 Count File Name: 4_UTILITY PLANS_Prospect Plaza Redevelopment_FDP_Rd1.pdf ’ — ’ select either centerline or flowline “” list the approved variances – ’ — ’ “” – Subject: Line Page Label: [1] C0.1 GENERAL NOTES Author: ENG - Sophie Buckingham Measurement: 1 Count File Name: 4_UTILITY PLANS_Prospect Plaza Redevelopment_FDP_Rd1.pdf Subject: Cloud+ Page Label: [1] C1.0 OVERALL SITE PLAN Author: ENG - Sophie Buckingham Measurement: 1 Count File Name: 4_UTILITY PLANS_Prospect Plaza Redevelopment_FDP_Rd1.pdf Why does the hatching change here? Is there a change of material? The brick hatching is not in the legend. Subject: Cloud+ Page Label: [1] C1.0 OVERALL SITE PLAN Author: ENG - Sophie Buckingham Measurement: 1 Count File Name: 4_UTILITY PLANS_Prospect Plaza Redevelopment_FDP_Rd1.pdf hatching change? Subject: Cloud Page Label: [1] C1.0 OVERALL SITE PLAN Author: ENG - Sophie Buckingham Measurement: 1 Count File Name: 4_UTILITY PLANS_Prospect Plaza Redevelopment_FDP_Rd1.pdf Subject: Line Page Label: [1] C1.0 OVERALL SITE PLAN Author: ENG - Sophie Buckingham Measurement: 1 Count File Name: 4_UTILITY PLANS_Prospect Plaza Redevelopment_FDP_Rd1.pdf – C.O. W X X XELEC Why does the hatching change here? Is there a change of material? The brick hatching is not in the legend. HYDWV GAS X X S THE COLORA STATE UNIVER hatching change? BREEEZEWAY REEEZEW Subject: Line Page Label: [1] C1.0 OVERALL SITE PLAN Author: ENG - Sophie Buckingham Measurement: 1 Count File Name: 4_UTILITY PLANS_Prospect Plaza Redevelopment_FDP_Rd1.pdf Subject: Callout Page Label: [1] C1.0 OVERALL SITE PLAN Author: ENG - Sophie Buckingham Measurement: 1 Count File Name: 4_UTILITY PLANS_Prospect Plaza Redevelopment_FDP_Rd1.pdf ADD NOTE: LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. ALL REPAIRS ARE TO BE IN ACCORDANCE WITH THE CITY STREET REPAIR STANDARDS. Subject: Callout Page Label: [1] C1.0 OVERALL SITE PLAN Author: PFA-Marcus Glasgow Measurement: 1 Count File Name: 4_UTILITY PLANS_Prospect Plaza Redevelopment_FDP_Rd1.pdf Hydrant requires 3 ft of clearance. Will also require bollards to protect from vehicle impact. Subject: Cloud+ Page Label: [1] C1.0 OVERALL SITE PLAN Author: TRF-STEVE-GILCHRIST Measurement: 1 Count File Name: 4_UTILITY PLANS_Prospect Plaza Redevelopment_FDP_Rd1.pdf The relocation of the sidewalk to the west side is going to be an issue for sight distance to this crosswalk. We removed parking in this area for the same reason. Subject: Callout Page Label: [1] C2.1 DETAILED GRADING PLAN Author: ENG - Sophie Buckingham Measurement: 1 Count File Name: 4_UTILITY PLANS_Prospect Plaza Redevelopment_FDP_Rd1.pdf scale seems to be 1" = 10' based on measurements REEEZEW VERTICAL DATUM: FLOODPLAIN: ADD NOTE:LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITSARE TO BE DETERMINED IN THE FIELD BY THE CITYENGINEERING INSPECTOR. ALL REPAIRS ARE TO BE IN ACCORDANCE WITH THE CITY STREET REPAIR STANDARDS. SS SS HYDWV GAS Hydrant requires 3 ft of clearance. Will also require bollards to protect from vehicle impact. SS SS SS SS SS SS G DSTST D T TT W PROSPECT RD(ROW WIDTH VARIES) COURTYARD PR M A I N D R I V E W A Y & E M E R G E N C Y A GARAGE The relocation of thesidewalk to the westside is going to be anissue for sightdistance to thiscrosswalk. Weremoved parking inthis area for thesame reason. scale seems to be 1" = 10' based on measurements Subject: Highlight Page Label: [1] C2.1 DETAILED GRADING PLAN Author: SW - Derek Lutz Measurement: 1 Count File Name: 4_UTILITY PLANS_Prospect Plaza Redevelopment_FDP_Rd1.pdf Subject: Callout Page Label: [1] C2.1 DETAILED GRADING PLAN Author: SW - Derek Lutz Measurement: 1 Count File Name: 4_UTILITY PLANS_Prospect Plaza Redevelopment_FDP_Rd1.pdf FG NEEDS TO MATCH RIM ELEV FOR METER VAULT Subject: Pen Page Label: [1] C2.1 DETAILED GRADING PLAN Author: SW - Derek Lutz Measurement: 1 Count File Name: 4_UTILITY PLANS_Prospect Plaza Redevelopment_FDP_Rd1.pdf \ Subject: Pen Page Label: [1] C2.1 DETAILED GRADING PLAN Author: SW - Derek Lutz Measurement: 1 Count File Name: 4_UTILITY PLANS_Prospect Plaza Redevelopment_FDP_Rd1.pdf , Subject: Callout Page Label: [1] C2.2 DETAILED GRADING PLAN Author: ENG - Sophie Buckingham Measurement: 1 Count File Name: 4_UTILITY PLANS_Prospect Plaza Redevelopment_FDP_Rd1.pdf scale seems to be 1" = 10' based on measurements -8.1% 5002 SW 2.61 SW 2.40 SW 2 . 1 1 04 15 -2. 0 FG 1.66F RIM 2.05 CS ELECELEC GAS SW 1 . 8 6 TP 1.2 5 BP 0.2 5 FL 1. 2 5 M 2.05 ME 1. 4 7 FG NEEDS TO MATCH RIM ELEV FOR METER VAULT -8.1% FFG 2 -8.1% FG scale seems to be 1" = 10' based on measurements Subject: Cloud+ Page Label: [1] C2.3 DETAILED GRADING PLAN Author: ENG - Sophie Buckingham Measurement: 1 Count File Name: 4_UTILITY PLANS_Prospect Plaza Redevelopment_FDP_Rd1.pdf Are there actually boulders next to this bike rack? Subject: Callout Page Label: [1] C2.3 DETAILED GRADING PLAN Author: ENG - Sophie Buckingham Measurement: 1 Count File Name: 4_UTILITY PLANS_Prospect Plaza Redevelopment_FDP_Rd1.pdf scale seems to be 1" = 10' based on measurements Subject: Highlight Page Label: [1] C2.3 DETAILED GRADING PLAN Author: SW - Derek Lutz Measurement: 1 Count File Name: 4_UTILITY PLANS_Prospect Plaza Redevelopment_FDP_Rd1.pdf Subject: Highlight Page Label: [1] C2.3 DETAILED GRADING PLAN Author: SW - Derek Lutz Measurement: 1 Count File Name: 4_UTILITY PLANS_Prospect Plaza Redevelopment_FDP_Rd1.pdf Subject: Highlight Page Label: [1] C2.3 DETAILED GRADING PLAN Author: SW - Derek Lutz Measurement: 1 Count File Name: 4_UTILITY PLANS_Prospect Plaza Redevelopment_FDP_Rd1.pdf 50 -1.6% FG 5.74FG 5.9 0 W 5.02 SW 5.18 Are there actually boulders next to this bike rack? scale seems to be 1" = 10' based on measurements SW 8 W 8.0 0 FL 7. 9 8 SW 7 SW 7 . 9 5 W 8.0 0 SW 7 . 9 0 FL 7. 8 2 W 8.0 0 9 S S FFE 8 . SW 8 . 0 0 SW 8 . 0 0 SW 7 FFE 8 . 0 0 8.00 SW 7. 9 2 SW 8 F FL 7.9 8 Subject: Highlight Page Label: [1] C2.3 DETAILED GRADING PLAN Author: SW - Derek Lutz Measurement: 1 Count File Name: 4_UTILITY PLANS_Prospect Plaza Redevelopment_FDP_Rd1.pdf Subject: Callout Page Label: [1] C2.3 DETAILED GRADING PLAN Author: SW - Derek Lutz Measurement: 1 Count File Name: 4_UTILITY PLANS_Prospect Plaza Redevelopment_FDP_Rd1.pdf IS IT POSSIBLE TO LOWER THESE POINTS (EVEN SLIGHTLY) TO ALLOW FOR SOME OVERFLOW ROUTING? Subject: Cloud+ Page Label: [1] C2.4 DETAILED GRADING PLAN Author: ENG - Sophie Buckingham Measurement: 1 Count File Name: 4_UTILITY PLANS_Prospect Plaza Redevelopment_FDP_Rd1.pdf show tie-in to existing sidewalk Subject: Callout Page Label: [1] C2.5 DETAILED GRADING PLAN Author: ENG - Sophie Buckingham Measurement: 1 Count File Name: 4_UTILITY PLANS_Prospect Plaza Redevelopment_FDP_Rd1.pdf scale seems to be 1" = 10' based on measurements Subject: Cloud+ Page Label: [1] C2.5 DETAILED GRADING PLAN Author: ENG - Sophie Buckingham Measurement: 1 Count File Name: 4_UTILITY PLANS_Prospect Plaza Redevelopment_FDP_Rd1.pdf show tie-in to existing sidewalk SW 7 . 3 1 95 SW 8 . 0 0 SW 7 . 9 0 FL 7.8 2 00 50 0 7 -1.7% 5007 SW 7.31 SW 7.6 6 SW 7.79 SW 7.9 2 SW 8.00 FFE 8.00 SW 8.00 SW 7.88 SW 8.00 SW 7.91 SW 7.84 SW 7.9 5 FFE 8. 0 0 SW 8.0 0 SW 7.90 SW 8.00 SW 8.0 0 FFE 8.0 0 SW 7.92 FL 7.82 FL 6.00 SW 8.0 0 FFE 8.0 0 FG 8.00 FG 7.33 FG 7.33 FG 7.22 FG 7.4 7 FG 7.30 FG 7.33 3 SW 7.8 2 SW 7.7 9 FG 7.33 FL 7.98 IS IT POSSIBLE TO LOWER THESEPOINTS (EVEN SLIGHTLY) TO ALLOWFOR SOME OVERFLOW ROUTING? D ST ST ST ST 5008 -2.0 % -2.0 % SW 8.1 8 FL 7.33 FL 8.09 SW 7.99 FL 7.34 SW 8.4 5 FL 7.3 6 SW 8.00 SW 8.2 0 ME 7.5 8 ME 7.54 SW 8.19 5008 5008 SW 8.3 7 -4.4 % show tie-in to existingsidewalk scale seems to be 1" = 10' based on measurements HYDWV X -2.2% 5006 SW 6.2 3 SW 6.03 FL 6.5 1 FL 6.25 FL 6.28 SW 6.33 FL 6.03 5.65 FL 6.05 FL 5.8 4 FL 5.3 7 SW 6.92 -8.0 % -2.8 % E 5.84 ME 5.5 2 ME 5.59 0.8 5006 5006 X X LEGAL DE show tie-in to existingsidewalk Subject: Text Box Page Label: [1] C3.1 EROSION CONTROL PHASE I Author: ESC - Drew Crecca Measurement: 1 Count File Name: 4_UTILITY PLANS_Prospect Plaza Redevelopment_FDP_Rd1.pdf This 3 phase ESC Plan will be acceptable for final, Subject: Stamp Page Label: [1] C3.1 EROSION CONTROL PHASE I Author: ESC - Drew Crecca Measurement: 1 Count File Name: 4_UTILITY PLANS_Prospect Plaza Redevelopment_FDP_Rd1.pdf Subject: Text Box Page Label: [1] C3.1 EROSION CONTROL PHASE I Author: ESC - Drew Crecca Measurement: 1 Count File Name: 4_UTILITY PLANS_Prospect Plaza Redevelopment_FDP_Rd1.pdf 4/15/2025 Subject: Text Box Page Label: [1] C3.2 EROSION CONTROL PHASE II Author: ESC - Drew Crecca Measurement: 1 Count File Name: 4_UTILITY PLANS_Prospect Plaza Redevelopment_FDP_Rd1.pdf This 3 phase ESC Plan will be acceptable for final, Subject: Text Box Page Label: [1] C3.3 EROSION CONTROL PHASE III Author: ESC - Drew Crecca Measurement: 1 Count File Name: 4_UTILITY PLANS_Prospect Plaza Redevelopment_FDP_Rd1.pdf This 3 phase ESC Plan will be acceptable for final, This 3 phase ESC Plan will be acceptable for final, 3575DEN(720) ERO 4/15/2025 This 3 phase ESC Plan will be acceptable for final, This 3 phase ESC Plan will be acceptable for final, Subject: Text Box Page Label: [1] C3.4 EROSION CONTROL NOTES Author: ESC - Drew Crecca Measurement: 1 Count File Name: 4_UTILITY PLANS_Prospect Plaza Redevelopment_FDP_Rd1.pdf This 3 phase ESC Plan will be acceptable for final, Subject: Text Box Page Label: [1] C3.5 EROSION CONTROL DETAILS Author: ESC - Drew Crecca Measurement: 1 Count File Name: 4_UTILITY PLANS_Prospect Plaza Redevelopment_FDP_Rd1.pdf This 3 phase ESC Plan will be acceptable for final, Subject: Text Box Page Label: [1] C3.6 EROSION CONTROL DETAILS Author: ESC - Drew Crecca Measurement: 1 Count File Name: 4_UTILITY PLANS_Prospect Plaza Redevelopment_FDP_Rd1.pdf This 3 phase ESC Plan will be acceptable for final, Subject: Text Box Page Label: [1] C3.7 EROSION CONTROL DETAILS Author: ESC - Drew Crecca Measurement: 1 Count File Name: 4_UTILITY PLANS_Prospect Plaza Redevelopment_FDP_Rd1.pdf This 3 phase ESC Plan will be acceptable for final, Subject: Text Box Page Label: [1] C3.8 EROSION CONTROL DETAILS Author: ESC - Drew Crecca Measurement: 1 Count File Name: 4_UTILITY PLANS_Prospect Plaza Redevelopment_FDP_Rd1.pdf This 3 phase ESC Plan will be acceptable for final, This 3 phase ESC Plan will be acceptable for final, This 3 phase ESC Plan will be acceptable for final, This 3 phase ESC Plan will be acceptable for final, 3D(7 ER This 3 phase ESC Plan will be acceptable for final, This 3 phase ESC Plan will be acceptable for final, Subject: PolyLine Page Label: [1] C4.0 OVERALL UTILITY PLAN Author: DPaluzzi Measurement: 1 Count File Name: 4_UTILITY PLANS_Prospect Plaza Redevelopment_FDP_Rd1.pdf Subject: PolyLine Page Label: [1] C4.0 OVERALL UTILITY PLAN Author: DPaluzzi Measurement: 1 Count File Name: 4_UTILITY PLANS_Prospect Plaza Redevelopment_FDP_Rd1.pdf Subject: Callout Page Label: [1] C4.0 OVERALL UTILITY PLAN Author: DPaluzzi Measurement: 1 Count File Name: 4_UTILITY PLANS_Prospect Plaza Redevelopment_FDP_Rd1.pdf Elec line to be in parkway. Subject: Callout Page Label: [1] C4.0 OVERALL UTILITY PLAN Author: DPaluzzi Measurement: 1 Count File Name: 4_UTILITY PLANS_Prospect Plaza Redevelopment_FDP_Rd1.pdf The plat says that the duct bank easement is to be vacated. That is fine, but please provide a 40ft wide utility easment for all utilities instead. Subject: Callout Page Label: [1] C4.0 OVERALL UTILITY PLAN Author: DPaluzzi Measurement: 1 Count File Name: 4_UTILITY PLANS_Prospect Plaza Redevelopment_FDP_Rd1.pdf Provide 6ft wide utility easement for electric line from transformers to property line. S SS SS SS SS SS SS SS SS SS D G G G G G G G G GWVWWWWWWWWW W T TT W PR(ROW N:123794.27E:193163.81 EEEEEE EEE EEE EEE EEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEE SS SS SS SS SS SS SS SS SS SS SS SS G HYDWV GAS ELEC ELEC G E E E E E E E E E E E E E E E X X X X X X X X X X G G G G G G G G G G G G G G D WV ST ST S D W W W W W W W W W W W W W T TT EME R G E N C Y A C C E S S D R W PROSPECT RD(ROW WIDTH VARIES) COURTYARDPARKINGGARAGE N:123790.41E:193510.47N:123794.27E:193163.81:123794.55E:193138.81 EEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEE SS SS G G W W W Elec line to be in parkway. E E E E X X X X X The plat says that the duct bank easement is to be vacated. That is fine, but please provide a 40ft wideutility easment for all utilities instead. T T 4.27 3.81 Provide 6ft wide utility easement for electric line from transformers to property line. Subject: Length Measurement Page Label: [1] C4.0 OVERALL UTILITY PLAN Author: DPaluzzi Measurement: 40.1159 ft' in" File Name: 4_UTILITY PLANS_Prospect Plaza Redevelopment_FDP_Rd1.pdf 40'-1 1/2" Subject: Callout Page Label: [1] C4.0 OVERALL UTILITY PLAN Author: DPaluzzi Measurement: 1 Count File Name: 4_UTILITY PLANS_Prospect Plaza Redevelopment_FDP_Rd1.pdf Please place our electric line 6ft off of the building. Subject: Callout Page Label: [1] C4.0 OVERALL UTILITY PLAN Author: ENG - Sophie Buckingham Measurement: 1 Count File Name: 4_UTILITY PLANS_Prospect Plaza Redevelopment_FDP_Rd1.pdf ADD NOTE: LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. ALL REPAIRS ARE TO BE IN ACCORDANCE WITH THE CITY STREET REPAIR STANDARDS. Subject: Callout Page Label: [1] C4.0 OVERALL UTILITY PLAN Author: ENG - Sophie Buckingham Measurement: 1 Count File Name: 4_UTILITY PLANS_Prospect Plaza Redevelopment_FDP_Rd1.pdf If this is proposed storm, please use black line color as shown in the legend. Subject: Callout Page Label: [1] C4.0 OVERALL UTILITY PLAN Author: ENG - Sophie Buckingham Measurement: 1 Count File Name: 4_UTILITY PLANS_Prospect Plaza Redevelopment_FDP_Rd1.pdf Why are these lines different thickness? E X X 40'-1 1/2" EM E R G E N C Y A C C E S S COURTYARD Please place our electric line 6ft offof the building. FLOODPLAIN: NOTES: ADD NOTE:LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITSARE TO BE DETERMINED IN THE FIELD BY THE CITYENGINEERING INSPECTOR. ALL REPAIRS ARE TO BE IN ACCORDANCE WITH THE CITY STREET REPAIR STANDARDS. SS SS SS SS G G G W W N:124325.04 E:193242.71 If this is proposed storm, please use black line color as shown in the legend. Why are these lines different thickness? Subject: Callout Page Label: [1] C4.0 OVERALL UTILITY PLAN Author: SW - Derek Lutz Measurement: 1 Count File Name: 4_UTILITY PLANS_Prospect Plaza Redevelopment_FDP_Rd1.pdf DIMENSIONS ON THIS SHEET ARE 1:30 SCALE. UPDATE BAR SCALE Subject: Callout Page Label: [1] C4.0 OVERALL UTILITY PLAN Author: SW - Derek Lutz Measurement: 1 Count File Name: 4_UTILITY PLANS_Prospect Plaza Redevelopment_FDP_Rd1.pdf RELOCATE IRRIGATION SERVICE AND METER AWAY FROM OTHER UTILITIES Subject: Callout Page Label: [1] C4.0 OVERALL UTILITY PLAN Author: SW - Derek Lutz Measurement: 1 Count File Name: 4_UTILITY PLANS_Prospect Plaza Redevelopment_FDP_Rd1.pdf 10-FT SEPARATION REQUIRED Subject: Length Measurement Page Label: [1] C4.0 OVERALL UTILITY PLAN Author: SW - Derek Lutz Measurement: 19.3339 ft' in" File Name: 4_UTILITY PLANS_Prospect Plaza Redevelopment_FDP_Rd1.pdf 19'-4" Subject: Length Measurement Page Label: [1] C4.0 OVERALL UTILITY PLAN Author: SW - Derek Lutz Measurement: 9.6569 ft' in" File Name: 4_UTILITY PLANS_Prospect Plaza Redevelopment_FDP_Rd1.pdf 9'-8" SS S G G E NDIMENSIONS ON THIS SHEET ARE 1:30 SCALE. UPDATE BAR SCALE G G G G G G GWVWWWWWW W RELOCATE IRRIGATION SERVICE ANDMETER AWAY FROM OTHER UTILITIES SS SS SS D G G G G DST W W N:123794.27 E:193163.814.55 8.81 10-FT SEPARATION REQUIRED E EN C Y A C C E S S 19'-4" E X Y A C C E S S 9'-8" Subject: Callout Page Label: [1] C4.0 OVERALL UTILITY PLAN Author: SW - Derek Lutz Measurement: 1 Count File Name: 4_UTILITY PLANS_Prospect Plaza Redevelopment_FDP_Rd1.pdf SPLIT THE DIFFERENCE BETWEEN THE BUILDING AND THE DUCTBANK Subject: Length Measurement Page Label: [1] C4.0 OVERALL UTILITY PLAN Author: SW - Derek Lutz Measurement: 7.9217 ft' in" File Name: 4_UTILITY PLANS_Prospect Plaza Redevelopment_FDP_Rd1.pdf 7'-11" Subject: Callout Page Label: [1] C4.0 OVERALL UTILITY PLAN Author: SW - Derek Lutz Measurement: 1 Count File Name: 4_UTILITY PLANS_Prospect Plaza Redevelopment_FDP_Rd1.pdf LOCATE STORM MIN 10-FT FROM BUILDING Subject: Callout Page Label: [1] C4.0 OVERALL UTILITY PLAN Author: SW - Derek Lutz Measurement: 1 Count File Name: 4_UTILITY PLANS_Prospect Plaza Redevelopment_FDP_Rd1.pdf IS THERE A GAS SERVICE TO THE BUILDING? Subject: Callout Page Label: [1] C4.0 OVERALL UTILITY PLAN Author: SW - Derek Lutz Measurement: 1 Count File Name: 4_UTILITY PLANS_Prospect Plaza Redevelopment_FDP_Rd1.pdf WATER UTILITIES ALSO PREFERS A SINGLE UTILITY EASEMENT INSTEAD OF SEVERAL SEPARATE EASEMENTS HYDWV GAS E E E E E X X X X G G S W W W W PROSPECT RD N:123790.41E:193510.47 SPLIT THE DIFFERENCE BETWEENTHE BUILDING AND THE DUCTBANK 7' - 1 1 " G G G GWVWWWW W LOCATE STORM MIN 10-FT FROM BUILDING IS THERE A GAS SERVICE TO THE BUILDING? FLOO NOT WATER UTILITIES ALSO PREFERS A SINGLE UTILITY EASEMENT INSTEAD OF SEVERAL SEPARATE EASEMENTS Subject: Cloud+ Page Label: [1] C4.0 OVERALL UTILITY PLAN Author: TRF-STEVE-GILCHRIST Measurement: 1 Count File Name: 4_UTILITY PLANS_Prospect Plaza Redevelopment_FDP_Rd1.pdf The relocation of the sidewalk to the west side is going to be an issue for sight distance to this crosswalk. We removed parking in this area for the same reason. Subject: Cloud+ Page Label: [1] C4.1 DETAILED UTILITY PLAN Author: ENG - Sophie Buckingham Measurement: 1 Count File Name: 4_UTILITY PLANS_Prospect Plaza Redevelopment_FDP_Rd1.pdf Would it make sense to just show the future property line on this sheet? Subject: Callout Page Label: [1] C4.1 DETAILED UTILITY PLAN Author: ENG - Sophie Buckingham Measurement: 1 Count File Name: 4_UTILITY PLANS_Prospect Plaza Redevelopment_FDP_Rd1.pdf Show location of access manhole for inspection of Arthur Ditch under Lake Street. Will access manhole location be changed by this project? Subject: Callout Page Label: [1] C4.1 DETAILED UTILITY PLAN Author: SW - Derek Lutz Measurement: 1 Count File Name: 4_UTILITY PLANS_Prospect Plaza Redevelopment_FDP_Rd1.pdf IS THERE A GAS SERVICE TO THE BUILDING? Subject: Callout Page Label: [1] C4.2 DETAILED UTILITY PLAN Author: ENG - Sophie Buckingham Measurement: 1 Count File Name: 4_UTILITY PLANS_Prospect Plaza Redevelopment_FDP_Rd1.pdf Show location of access manhole for inspection of Arthur Ditch under Prospect Road. Will access manhole location be changed by this project? SS SS SS SS SS SS D G E G G G G G G G G D W ST ST ST D W W W W W W T TT N:123794.27E:193163.81N:123794.55E:193138.81 The relocation of thesidewalk to the westside is going to be anissue for sightdistance to thiscrosswalk. Weremoved parking inthis area for thesame reason. SS SS SS ELEC WWould it make sense to just show the future property line on this sheet? D Show location of access manhole for inspection of Arthur Ditch under Lake Street. Will access manhole location be changed by this project? IS THERE A GAS SERVICE TO THE BUILDING? SS D Show location of access manhole for inspection of Arthur Ditch under Prospect Road. Will access manhole location be changed by this project? Subject: Callout Page Label: [1] C4.2 DETAILED UTILITY PLAN Author: SW - Derek Lutz Measurement: 1 Count File Name: 4_UTILITY PLANS_Prospect Plaza Redevelopment_FDP_Rd1.pdf IS THERE A GAS SERVICE TO THE BUILDING? Subject: Callout Page Label: [1] C5.0 OVERALL STORM SEWER PLAN Author: SW - Derek Lutz Measurement: 1 Count File Name: 4_UTILITY PLANS_Prospect Plaza Redevelopment_FDP_Rd1.pdf DIMENSIONS ON THIS SHEET ARE 1:30 SCALE. UPDATE BAR SCALE Subject: Callout Page Label: 40 Author: SW - Derek Lutz Measurement: 1 Count File Name: 5_DRAINAGE_Prospect Plaza Redevelopment_FDP_Rd1.pdf FF = 5008 5_DRAINAGE_Prospect Plaza Redevelopment_FDP_Rd1.pdf (4) Measurement: 4 Count Subject: Callout Page Label: 40 Author: SW - Derek Lutz Measurement: 1 Count File Name: 5_DRAINAGE_Prospect Plaza Redevelopment_FDP_Rd1.pdf FF = 5008 Subject: Callout Page Label: 40 Author: SW - Derek Lutz Measurement: 1 Count File Name: 5_DRAINAGE_Prospect Plaza Redevelopment_FDP_Rd1.pdf THIS EXHIBIT IS VERY INFORMATIVE. PLEASE LABEL FF AT DOORWAYS. IS THERE A GAS SERVICE TO THE BUILDING? SS WV S S G G E S SS NDIMENSIONS ON THIS SHEET ARE 1:30 SCALE. UPDATE BAR SCALE CENTRAL COURTYARD 5007.00 - 1ft of Freeboard 5007.00 - 100-YR Ponding Depth at 80% Clog FF = 5008 FF = 5008 5006.90 - Normal 100-YR Ponding Depth 5007.00 - 1ft of Freeboard 5007.00 - 100-YR Ponding Depth at 80% Clogging THIS EXHIBIT IS VERY INFORMATIVE. PLEASE LABEL FF AT DOORWAYS. Subject: Callout Page Label: 40 Author: SW - Derek Lutz Measurement: 1 Count File Name: 5_DRAINAGE_Prospect Plaza Redevelopment_FDP_Rd1.pdf IS THERE ANY OVERFLOW ROUTING POTENTIAL? MAYBE TWO INCHES? Subject: Text Box Page Label: 1 Author: ESC - Drew Crecca Measurement: 1 Count File Name: 5_SWMP_Prospect Plaza Redevelopment_FDP_Rd1.pdf Erosion Control Reports are required for all projects over an acre. The SWMP satisfies this requirement but will be reviewed according to the criteria set forth in the “City if Fort Collins Stormwater Criteria Manual” (FCSCM) Chapter 2 Section 6, which varies from the State requirements for a CO400000 Construction Stormwater Discharge Permit. The applicant may choose not to add the requested items to the SWMP but will be required to submit an Erosion Control Report as a "Stand Alone" Document. Otherwise, all required items need to be included per FCSCM Chapter 2 Section 6. A copy of the Erosion Control Submittal Checklist can be found at https://www.fcgov.com/utilities/b usiness/builders-and-developers /development-forms-guidelines-r egulations/erosion/ 5_SWMP_Prospect Plaza Redevelopment_FDP_Rd1.pdf (16) Measurement: 16 Count Subject: Stamp Page Label: 1 Author: ESC - Drew Crecca Measurement: 1 Count File Name: 5_SWMP_Prospect Plaza Redevelopment_FDP_Rd1.pdf Subject: Text Box Page Label: 1 Author: ESC - Drew Crecca Measurement: 1 Count File Name: 5_SWMP_Prospect Plaza Redevelopment_FDP_Rd1.pdf 4/15/2025 SUNNY CIVILCENTRAL COURTYARD INLET EXHIBIT 5007.00 - 1ft of Freeboard 5007.00 - 100-YR Ponding Depth at 80% Clogging IS THERE ANY OVERFLOW ROUTING POTENTIAL? MAYBE TWO INCHES? mplate, Version 1.1, September 17, 2007 i Project Start Date: May 2025 Project Completion Date: August 2027 Erosion Control Reports are required for all projects over an acre. TheSWMP satisfies this requirement but will be reviewed according to thecriteria set forth in the “City if Fort Collins Stormwater Criteria Manual” (FCSCM) Chapter 2 Section 6, which varies from the Staterequirements for a CO400000 Construction Stormwater Discharge Permit. The applicant may choose not to add the requested items to theSWMP but will be required to submit an Erosion Control Report as a "Stand Alone" Document. Otherwise, all required items need to beincluded per FCSCM Chapter 2 Section 6. A copy of the ErosionControl Submittal Checklist can be found athttps://www.fcgov.com/utilities/business/builders-and-developers/development-forms-guidelines-regulations/erosion/ 4/15/2025 Subject: Polygon Page Label: 27 Author: HopeCarlson Measurement: 1 Count File Name: 5_SWMP_Prospect Plaza Redevelopment_FDP_Rd1.pdf Subject: Text Box Page Label: 33 Author: ESC - Drew Crecca Measurement: 1 Count File Name: 5_SWMP_Prospect Plaza Redevelopment_FDP_Rd1.pdf Section not Required for Erosion Control Report per City of Fort Collins Criteria Subject: Text Box Page Label: 34 Author: ESC - Drew Crecca Measurement: 1 Count File Name: 5_SWMP_Prospect Plaza Redevelopment_FDP_Rd1.pdf Section not Required for Erosion Control Report per City of Fort Collins Criteria Subject: Text Box Page Label: 38 Author: ESC - Drew Crecca Measurement: 1 Count File Name: 5_SWMP_Prospect Plaza Redevelopment_FDP_Rd1.pdf Section not Required for Erosion Control Report per City of Fort Collins Criteria Subject: Text Box Page Label: 40 Author: ESC - Drew Crecca Measurement: 1 Count File Name: 5_SWMP_Prospect Plaza Redevelopment_FDP_Rd1.pdf Section not Required for Erosion Control Report per City of Fort Collins Criteria Project Lo Stor Prospec Appendix C – Construction General Perm Section not Required for Erosion Control Report per City ofFort Collins Criteria Prospect Plaza Redevelopment 03.19 NOI and Acknowledgment Letter from EPA/Stat Section not Required for Erosion Control Report per City ofFort Collins Criteria St Prosp Appendix H –Subcontractor Certificati SUBCONTRACTOR CER STORMWATER POLLUTION PR Section not Required for Erosion Control Report per City ofFort Collins Criteria Sto Prospe Appendix J – SWPPP Training Log Stormwater Pollution Preven Project Name: Section not Required for Erosion Control Report per City ofFort Collins Criteria Subject: Text Box Page Label: 41 Author: ESC - Drew Crecca Measurement: 1 Count File Name: 5_SWMP_Prospect Plaza Redevelopment_FDP_Rd1.pdf Section not Required for Erosion Control Report per City of Fort Collins Criteria Subject: Text Box Page Label: 42 Author: ESC - Drew Crecca Measurement: 1 Count File Name: 5_SWMP_Prospect Plaza Redevelopment_FDP_Rd1.pdf Section not Required for Erosion Control Report per City of Fort Collins Criteria Subject: Text Box Page Label: 43 Author: ESC - Drew Crecca Measurement: 1 Count File Name: 5_SWMP_Prospect Plaza Redevelopment_FDP_Rd1.pdf Section not Required for Erosion Control Report per City of Fort Collins Criteria Subject: Text Box Page Label: [1] C1.0 OVERALL SITE PLAN Author: ESC - Drew Crecca Measurement: 1 Count File Name: 5_SWMP_Prospect Plaza Redevelopment_FDP_Rd1.pdf Please include a copy of the Required City of Fort Collins Standard Erosion Notes either in the notes section of the utility plan or as separate sheet with the Erosion Control Plan. Please refer to the Fort Collins Stormwater Criteria Manual (FCSCM) Appendix F. A copy of these can be found at https://www.fcgov.com/utilities/b usiness/builders-and-developers /development-forms-guidelines-r egulations/stormwater-criteria Subject: Text Box Page Label: [1] C1.0 OVERALL SITE PLAN Author: ESC - Drew Crecca Measurement: 1 Count File Name: 5_SWMP_Prospect Plaza Redevelopment_FDP_Rd1.pdf Per City Criteria a Details Section must be included with Erosion Control Plans and Reports. Please add a Details Section including all Erosion Control Measures called out in the Erosion Control Plan. A copy of acceptable Details can be found in the Fort Collins Stormwater Criteria Manual Appendix E. https://www.fcgov.com/utilities/b usiness/builders-and-developers /development-forms-guidelines-r egulations/stormwater-criteria Sto Prospe Appendix K –Delegation of Authority F Delegation of Aut I, _______________________ (name), hereby des Section not Required for Erosion Control Report per City ofFort Collins Criteria St Prosp Appendix L –Additional Information Section not Required for Erosion Control Report per City ofFort Collins Criteria                   !"!# "&      ' ( )       E 40 6[1)5    Section not Required for Erosion Control Report per City ofFort Collins Criteria VERTICAL DATUM: FLOODPLAIN: Please include a copy of the Required City of Fort Collins Standard Erosion Notes either in the notes section of the utility plan or as separatesheet with the Erosion Control Plan. Please refer to the Fort Collins Stormwater Criteria Manual (FCSCM) Appendix F. A copy of these can befound at https://www.fcgov.com/utilities/business/builders-and-developers/development-forms-guidelines-regulations/stormwater-criteria Per City Criteria a Details Section must be included with Erosion Control Plans and Reports. Please add a Details Section including all ErosionControl Measures called out in the Erosion Control Plan. A copy of acceptable Details can be found in the Fort Collins Stormwater CriteriaManual Appendix E. https://www.fcgov.com/utilities/business/builders-and-developers/development-forms-guidelines-regulations/stormwater-criteria Subject: Text Box Page Label: [1] C3.1 EROSION CONTROL PHASE I Author: ESC - Drew Crecca Measurement: 1 Count File Name: 5_SWMP_Prospect Plaza Redevelopment_FDP_Rd1.pdf This 3 phase ESC Plan will be acceptable for final, however the plan needs to include the required Standard Erosion Control Notes and a Details Section to the ESC plans contained within the Erosion Control Report. See redlines from site plan page. Subject: Text Box Page Label: [1] C3.2 EROSION CONTROL PHASE II Author: ESC - Drew Crecca Measurement: 1 Count File Name: 5_SWMP_Prospect Plaza Redevelopment_FDP_Rd1.pdf This 3 phase ESC Plan will be acceptable for final, however the plan needs to include the required Standard Erosion Control Notes and a Details Section to the ESC plans contained within the Erosion Control Report. See redlines from site plan page. Subject: Text Box Page Label: [1] C3.3 EROSION CONTROL PHASE III Author: ESC - Drew Crecca Measurement: 1 Count File Name: 5_SWMP_Prospect Plaza Redevelopment_FDP_Rd1.pdf This 3 phase ESC Plan will be acceptable for final, however the plan needs to include the required Standard Erosion Control Notes and a Details Section to the ESC plans contained within the Erosion Control Report. See redlines from site plan page. Subject: Text Box Page Label: 1 Author: ESC - Drew Crecca Measurement: 1 Count File Name: 6_ESC_COST_Prospect Plaza Redevelopment_FDP_Rd1.pdf This Calculation will be acceptable for final. 6_ESC_COST_Prospect Plaza Redevelopment_FDP_Rd1.pdf (1) Measurement: 1 Count Subject: Callout Page Label: 1 Author: SW - Derek Lutz Measurement: 1 Count File Name: 6_WATER AD_Prospect Plaza Redevelopment_FDP_Rd1.pdf PLEASE SEPARATE THE WATER DEMAND/METER SIZING MEMO FROM THIS WATER ADEQUACY FORM 6_WATER AD_Prospect Plaza Redevelopment_FDP_Rd1.pdf (3) Measurement: 3 Count This 3 phase ESC Plan will be acceptable for final, however the plan needs to includethe required Standard Erosion Control Notes and a Details Section to the ESC planscontained within the Erosion Control Report. See redlines from site plan page. TUM: This 3 phase ESC Plan will be acceptable for final, however the plan needs to includethe required Standard Erosion Control Notes and a Details Section to the ESC planscontained within the Erosion Control Report. See redlines from site plan page. This 3 phase ESC Plan will be acceptable for final, however the plan needs to includethe required Standard Erosion Control Notes and a Details Section to the ESC planscontained within the Erosion Control Report. See redlines from site plan page. turbed Acres:4.71 curity Calculation s This Calculation will be acceptable for final. PLEASE SEPARATE THE WATER DEMAND/METER SIZING MEMO FROM THIS WATER ADEQUACY FORM Subject: Callout Page Label: 5 Author: SW - Derek Lutz Measurement: 1 Count File Name: 6_WATER AD_Prospect Plaza Redevelopment_FDP_Rd1.pdf Please provide a table similar to what was provided for the residential portion of the building. Subject: Callout Page Label: 5 Author: SW - Derek Lutz Measurement: 1 Count File Name: 6_WATER AD_Prospect Plaza Redevelopment_FDP_Rd1.pdf Please provide a peak demand in GPM. 0 zing of the water tap and meter for the er Avenue Ft. Collins, CO 80526. ng project with a core & shell coffee shop. itectural drawings. Note that the coffee shop er closets, (2) lavatories, (4) kitchen sink, (1) e providing water tap sizing information in Plumbing Code. Approximately 40 wsfu are 60psi the project will require a 1” tap with a Please provide a table similar to what was provided for the residential portion of the building. Housing project with a core & shell coffee shop. ry architectural drawings. Note that the coffee shop ank water closets, (2) lavatories, (4) kitchen sink, (1) . We are providing water tap sizing information in ational Plumbing Code. Approximately 40 wsfu are at over 60psi the project will require a 1” tap with a Please provide a peak demand in GPM.