HomeMy WebLinkAboutSupporting Documentation - Response to Comments - 04/23/2025Markup Summary_Prospect Plaza_FDP_Rd1
Subject: Length Measurement
Page Label: [6] PLAN-PROSPECT
PLAZA-LAND-SPAR-LP-101
Author: FS - Christine Holtz
Measurement: 1.6090 ft' in"
File Name: 2_LANDSCAPE_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
1'-7 1/4"
2_LANDSCAPE_Prospect Plaza Redevelopment_FDP_Rd1.pdf (7)
Measurement: 0.0000 ft' in"
Subject: Callout
Page Label: [6] PLAN-PROSPECT
PLAZA-LAND-SPAR-LP-101
Author: FS - Christine Holtz
Measurement: 1 Count
File Name: 2_LANDSCAPE_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
Please shift tree northwest away
from sanitary line
Subject: Length Measurement
Page Label: [7] PLAN-PROSPECT
PLAZA-LAND-SPAR-LP-102
Author: FS - Christine Holtz
Measurement: 6.3686 ft' in"
File Name: 2_LANDSCAPE_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
6'-4 1/2"
Subject: Callout
Page Label: [7] PLAN-PROSPECT
PLAZA-LAND-SPAR-LP-102
Author: FS - Christine Holtz
Measurement: 1 Count
File Name: 2_LANDSCAPE_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
Shift tree to ten feet from
stormwater pipe
Subject: Length Measurement
Page Label: [7] PLAN-PROSPECT
PLAZA-LAND-SPAR-LP-102
Author: FS - Christine Holtz
Measurement: 10.0168 ft' in"
File Name: 2_LANDSCAPE_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
10'-1/4"
1'-7 1/4"
M M03
Please shift tree northwest
away from sanitary line
6'-4
1
/
2
"
Shift tree to ten feet
from stormwater pipe
M 10'-1/4"
Subject: Length Measurement
Page Label: [7] PLAN-PROSPECT
PLAZA-LAND-SPAR-LP-102
Author: FS - Christine Holtz
Measurement: 4.3825 ft' in"
File Name: 2_LANDSCAPE_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
4'-4 1/2"
Subject: Callout
Page Label: [7] PLAN-PROSPECT
PLAZA-LAND-SPAR-LP-102
Author: FS - Christine Holtz
Measurement: 1 Count
File Name: 2_LANDSCAPE_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
Can shift to meet separation
requirements without removing
tree
Subject: Cloud+
Page Label: [2] 2 SHEET (2)
Author: ENG - Sophie Buckingham
Measurement: 1 Count
File Name: 3_PLAT_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
vacated?
3_PLAT_Prospect Plaza Redevelopment_FDP_Rd1.pdf (9)
Measurement: 9 Count
Subject: Cloud+
Page Label: [2] 2 SHEET (2)
Author: ENG - Sophie Buckingham
Measurement: 1 Count
File Name: 3_PLAT_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
vacated?
Subject: Cloud+
Page Label: [2] 2 SHEET (2)
Author: ENG - Sophie Buckingham
Measurement: 1 Count
File Name: 3_PLAT_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
vacated?
4'-4 1/2"
(3) PR AM
M
(1) PY CA
M-01
P-02
S-06
Can shift to meet
separation requirements
without removing tree
PROPERTY LINE
TO BE VACETED BY THIS PLA
vacated?
PROPERTY LINE
TO BE VACETED BY THIS PLA
vacated?
PEDESTRIAN INGRESS
PROPERTY LINE
TO BE VACETED BY THIS PLA
vacated?
Subject: Callout
Page Label: [2] 2 SHEET (2)
Author: SW - Derek Lutz
Measurement: 1 Count
File Name: 3_PLAT_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
UTILITY PLANS SHOW THIS
EASEMENT TO REMAIN.
PLEASE CLARIFY.
Subject: Cloud+
Page Label: [3] 3 SHEET (3)
Author: ENG - Sophie Buckingham
Measurement: 1 Count
File Name: 3_PLAT_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
vacated?
Subject: Cloud+
Page Label: [3] 3 SHEET (3)
Author: ENG - Sophie Buckingham
Measurement: 1 Count
File Name: 3_PLAT_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
vacated?
Subject: Cloud+
Page Label: [3] 3 SHEET (3)
Author: ENG - Sophie Buckingham
Measurement: 1 Count
File Name: 3_PLAT_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
vacated?
Subject: Callout
Page Label: [3] 3 SHEET (3)
Author: SW - Derek Lutz
Measurement: 1 Count
File Name: 3_PLAT_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
UTILITY PLANS SHOW THIS
EASEMENT TO REMAIN.
PLEASE CLARIFY.
88.
1
5
'
20'
DU
C
T
B
A
N
K
E
A
S
E
M
E
N
T
CIT
Y
O
F
F
O
R
T
C
O
L
L
I
N
S
(R
E
C
E
P
T
I
O
N
N
O
.
2
0
1
6
0
0
2
5
3
9
3
)
TO
B
E
V
A
C
A
T
E
D
B
Y
T
H
I
S
P
L
A
T
FOUND #4
REBAR
AR
I
Z
O
N
A
|
C
O
L
O
R
A
D
O
ep
s
g
r
o
u
p
i
n
c
.
c
o
m
97
0
.
2
2
1
.
4
1
5
8
UTILITY PLANS SHOW THIS
EASEMENT TO REMAIN.
PLEASE CLARIFY.
PROPERTY LIN
TO BE VACETED BY THIS PLA
vacated?
PROPERTY LIN
TO BE VACETED BY THIS PLA
vacated?
PEDESTRIAN INGRESS
PROPERTY LINE
TO BE VACETED BY THIS PLA
vacated?
443
.
5
1
'
20'
DU
C
T
B
A
N
K
E
A
S
E
M
E
N
T
CIT
Y
O
F
F
O
R
T
C
O
L
L
I
N
S
RE
C
E
P
T
I
O
N
N
O
.
2
0
1
6
0
0
2
5
3
9
3
TO
B
E
V
A
C
A
T
E
D
B
Y
T
H
I
S
P
L
A
T
S0
0
°
2
2
'
5
7
"
W
UTILITY PLANS SHOW THIS
EASEMENT TO REMAIN.PLEASE CLARIFY.
Subject: Callout
Page Label: [5] 5 SHEET 5
Author: PFA-Marcus Glasgow
Measurement: 1 Count
File Name: 3_PLAT_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
Also needs to be Emergency
Access Easement
Subject: Text Box
Page Label: [1] C0.0 COVER SHEET
Author: DPaluzzi
Measurement: 1 Count
File Name: 4_UTILITY PLANS_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
Light and Power Comments By
Daniel Paluzzi
4_UTILITY PLANS_Prospect Plaza Redevelopment_FDP_Rd1.pdf (81)
Measurement: 10 Count
Subject: Callout
Page Label: [1] C0.0 COVER SHEET
Author: ENG - Sophie Buckingham
Measurement: 1 Count
File Name: 4_UTILITY PLANS_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
Engineering Comments by
Sophie Buckingham
Subject: Callout
Page Label: [1] C0.0 COVER SHEET
Author: SW - Derek Lutz
Measurement: 1 Count
File Name: 4_UTILITY PLANS_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
WATER UTILITIES
COMMENTS BY DEREK LUTZ
Subject: Cloud+
Page Label: [1] C0.0 COVER SHEET
Author: TECHNICAL SERVICES-JEFF COUNTY
Measurement: 1 Count
File Name: 4_UTILITY PLANS_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
Please revise to match required
format as shown in written
comments.
LE
A BEARING CHORD
431
.
CES
S
E
A
S
E
M
E
N
T
R: B
O
A
R
D
O
F
G
O
V
E
R
N
O
R
S
O
F
T
H
E
OL
O
R
A
D
O
S
T
A
T
E
U
N
I
V
E
R
S
I
T
Y
ET )
60'40'
NORTH
Also needs to beEmergency AccessEasement
Light and Power Comments By
Daniel Paluzzi
Engineering Comments by
Sophie Buckingham
WATER UTILITIES COMMENTS
BY DEREK LUTZ
BBBBAAAAYYYYDDDDRRRRBAYDR
PPPPRRRROOOOSSSSPPPPEEEECCCCTTTTLLLLNNNN
PROSPECTLN
JJJJUUUUNNNNIIIIPPPPEEEERRRRLLLLNNNNJUNIPERLNRRRRR
SSSSHHHHEEEEEEEELLLLYYYYDDDDRRRRSHEELYDR
BBBBIIIIRRRRKKKKYYYYPPPPLLLLBIRKYPL
HORIZONTAL DATUM:
VERTICAL DATUM:
FLOODPLAIN:
V
Please revise to match required format as shown in written comments.
Subject: Line
Page Label: [1] C0.1 GENERAL NOTES
Author: ENG - Sophie Buckingham
Measurement: 1 Count
File Name: 4_UTILITY PLANS_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
Subject: Line
Page Label: [1] C0.1 GENERAL NOTES
Author: ENG - Sophie Buckingham
Measurement: 1 Count
File Name: 4_UTILITY PLANS_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
Subject: Line
Page Label: [1] C0.1 GENERAL NOTES
Author: ENG - Sophie Buckingham
Measurement: 1 Count
File Name: 4_UTILITY PLANS_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
Subject: Line
Page Label: [1] C0.1 GENERAL NOTES
Author: ENG - Sophie Buckingham
Measurement: 1 Count
File Name: 4_UTILITY PLANS_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
Subject: Line
Page Label: [1] C0.1 GENERAL NOTES
Author: ENG - Sophie Buckingham
Measurement: 1 Count
File Name: 4_UTILITY PLANS_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
–
STANDAR
’
“”
–
FORT COLLINS/LARIMER COUNTY GENERAL NOTES
–
–
–
–
’STR
Subject: Line
Page Label: [1] C0.1 GENERAL NOTES
Author: ENG - Sophie Buckingham
Measurement: 1 Count
File Name: 4_UTILITY PLANS_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
Subject: Line
Page Label: [1] C0.1 GENERAL NOTES
Author: ENG - Sophie Buckingham
Measurement: 1 Count
File Name: 4_UTILITY PLANS_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
Subject: Line
Page Label: [1] C0.1 GENERAL NOTES
Author: ENG - Sophie Buckingham
Measurement: 1 Count
File Name: 4_UTILITY PLANS_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
Subject: Line
Page Label: [1] C0.1 GENERAL NOTES
Author: ENG - Sophie Buckingham
Measurement: 1 Count
File Name: 4_UTILITY PLANS_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
Subject: Cloud+
Page Label: [1] C0.1 GENERAL NOTES
Author: ENG - Sophie Buckingham
Measurement: 1 Count
File Name: 4_UTILITY PLANS_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
fill in benchmark info
–
’
–
’
STREE
–
’
–
’
–
’
–
’
—
’
“”
–
’
–
’
—
’
–
’
—
’
“”
–
fill in benchmark info
Subject: Ellipse
Page Label: [1] C0.1 GENERAL NOTES
Author: ENG - Sophie Buckingham
Measurement: 1 Count
File Name: 4_UTILITY PLANS_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
Subject: Callout
Page Label: [1] C0.1 GENERAL NOTES
Author: ENG - Sophie Buckingham
Measurement: 1 Count
File Name: 4_UTILITY PLANS_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
select either centerline or
flowline
Subject: Callout
Page Label: [1] C0.1 GENERAL NOTES
Author: ENG - Sophie Buckingham
Measurement: 1 Count
File Name: 4_UTILITY PLANS_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
list the approved variances
Subject: Line
Page Label: [1] C0.1 GENERAL NOTES
Author: ENG - Sophie Buckingham
Measurement: 1 Count
File Name: 4_UTILITY PLANS_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
Subject: Line
Page Label: [1] C0.1 GENERAL NOTES
Author: ENG - Sophie Buckingham
Measurement: 1 Count
File Name: 4_UTILITY PLANS_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
’
—
’
select either
centerline or flowline
“”
list the approved variances
–
’
—
’
“”
–
Subject: Line
Page Label: [1] C0.1 GENERAL NOTES
Author: ENG - Sophie Buckingham
Measurement: 1 Count
File Name: 4_UTILITY PLANS_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
Subject: Cloud+
Page Label: [1] C1.0 OVERALL SITE PLAN
Author: ENG - Sophie Buckingham
Measurement: 1 Count
File Name: 4_UTILITY PLANS_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
Why does the hatching change
here? Is there a change of
material? The brick hatching is
not in the legend.
Subject: Cloud+
Page Label: [1] C1.0 OVERALL SITE PLAN
Author: ENG - Sophie Buckingham
Measurement: 1 Count
File Name: 4_UTILITY PLANS_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
hatching change?
Subject: Cloud
Page Label: [1] C1.0 OVERALL SITE PLAN
Author: ENG - Sophie Buckingham
Measurement: 1 Count
File Name: 4_UTILITY PLANS_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
Subject: Line
Page Label: [1] C1.0 OVERALL SITE PLAN
Author: ENG - Sophie Buckingham
Measurement: 1 Count
File Name: 4_UTILITY PLANS_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
–
C.O.
W
X
X
XELEC
Why does the
hatching change
here? Is there a
change of material?
The brick hatching is
not in the legend.
HYDWV
GAS
X
X
S
THE COLORA
STATE UNIVER
hatching change?
BREEEZEWAY
REEEZEW
Subject: Line
Page Label: [1] C1.0 OVERALL SITE PLAN
Author: ENG - Sophie Buckingham
Measurement: 1 Count
File Name: 4_UTILITY PLANS_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
Subject: Callout
Page Label: [1] C1.0 OVERALL SITE PLAN
Author: ENG - Sophie Buckingham
Measurement: 1 Count
File Name: 4_UTILITY PLANS_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
ADD NOTE:
LIMITS OF STREET CUT ARE
APPROXIMATE. FINAL LIMITS
ARE TO BE DETERMINED IN
THE FIELD BY THE CITY
ENGINEERING INSPECTOR.
ALL REPAIRS ARE TO BE IN
ACCORDANCE WITH THE
CITY STREET REPAIR
STANDARDS.
Subject: Callout
Page Label: [1] C1.0 OVERALL SITE PLAN
Author: PFA-Marcus Glasgow
Measurement: 1 Count
File Name: 4_UTILITY PLANS_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
Hydrant requires 3 ft of
clearance. Will also require
bollards to protect from vehicle
impact.
Subject: Cloud+
Page Label: [1] C1.0 OVERALL SITE PLAN
Author: TRF-STEVE-GILCHRIST
Measurement: 1 Count
File Name: 4_UTILITY PLANS_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
The relocation of the sidewalk to
the west side is going to be an
issue for sight distance to this
crosswalk. We removed parking
in this area for the same reason.
Subject: Callout
Page Label: [1] C2.1 DETAILED GRADING PLAN
Author: ENG - Sophie Buckingham
Measurement: 1 Count
File Name: 4_UTILITY PLANS_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
scale seems to be 1" = 10'
based on measurements
REEEZEW
VERTICAL DATUM:
FLOODPLAIN:
ADD NOTE:LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITSARE TO BE DETERMINED IN THE FIELD BY THE CITYENGINEERING INSPECTOR. ALL REPAIRS ARE TO BE IN
ACCORDANCE WITH THE CITY STREET REPAIR STANDARDS.
SS SS
HYDWV
GAS
Hydrant requires 3 ft of
clearance. Will also
require bollards to
protect from vehicle
impact.
SS SS SS SS SS SS
G
DSTST
D
T
TT
W PROSPECT RD(ROW WIDTH VARIES)
COURTYARD
PR
M
A
I
N
D
R
I
V
E
W
A
Y
&
E
M
E
R
G
E
N
C
Y
A
GARAGE
The relocation of thesidewalk to the westside is going to be anissue for sightdistance to thiscrosswalk. Weremoved parking inthis area for thesame reason.
scale seems to be
1" = 10' based on
measurements
Subject: Highlight
Page Label: [1] C2.1 DETAILED GRADING PLAN
Author: SW - Derek Lutz
Measurement: 1 Count
File Name: 4_UTILITY PLANS_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
Subject: Callout
Page Label: [1] C2.1 DETAILED GRADING PLAN
Author: SW - Derek Lutz
Measurement: 1 Count
File Name: 4_UTILITY PLANS_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
FG NEEDS TO MATCH RIM
ELEV FOR METER VAULT
Subject: Pen
Page Label: [1] C2.1 DETAILED GRADING PLAN
Author: SW - Derek Lutz
Measurement: 1 Count
File Name: 4_UTILITY PLANS_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
\
Subject: Pen
Page Label: [1] C2.1 DETAILED GRADING PLAN
Author: SW - Derek Lutz
Measurement: 1 Count
File Name: 4_UTILITY PLANS_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
,
Subject: Callout
Page Label: [1] C2.2 DETAILED GRADING PLAN
Author: ENG - Sophie Buckingham
Measurement: 1 Count
File Name: 4_UTILITY PLANS_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
scale seems to be 1" = 10'
based on measurements
-8.1%
5002
SW 2.61
SW 2.40
SW 2
.
1
1
04
15
-2.
0
FG 1.66F
RIM 2.05
CS
ELECELEC
GAS
SW 1
.
8
6
TP 1.2
5
BP 0.2
5
FL 1.
2
5
M 2.05
ME 1.
4
7
FG NEEDS TO
MATCH RIM ELEV
FOR METER VAULT
-8.1%
FFG 2
-8.1%
FG
scale seems to be
1" = 10' based on
measurements
Subject: Cloud+
Page Label: [1] C2.3 DETAILED GRADING PLAN
Author: ENG - Sophie Buckingham
Measurement: 1 Count
File Name: 4_UTILITY PLANS_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
Are there actually boulders next
to this bike rack?
Subject: Callout
Page Label: [1] C2.3 DETAILED GRADING PLAN
Author: ENG - Sophie Buckingham
Measurement: 1 Count
File Name: 4_UTILITY PLANS_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
scale seems to be 1" = 10'
based on measurements
Subject: Highlight
Page Label: [1] C2.3 DETAILED GRADING PLAN
Author: SW - Derek Lutz
Measurement: 1 Count
File Name: 4_UTILITY PLANS_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
Subject: Highlight
Page Label: [1] C2.3 DETAILED GRADING PLAN
Author: SW - Derek Lutz
Measurement: 1 Count
File Name: 4_UTILITY PLANS_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
Subject: Highlight
Page Label: [1] C2.3 DETAILED GRADING PLAN
Author: SW - Derek Lutz
Measurement: 1 Count
File Name: 4_UTILITY PLANS_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
50
-1.6%
FG 5.74FG 5.9
0
W 5.02
SW 5.18
Are there actually
boulders next to this
bike rack?
scale seems to be
1" = 10' based on
measurements
SW 8
W 8.0
0
FL 7.
9
8
SW 7
SW 7
.
9
5
W 8.0
0
SW 7
.
9
0
FL 7.
8
2
W 8.0
0
9
S S FFE 8
.
SW 8
.
0
0
SW 8
.
0
0
SW 7
FFE 8
.
0
0
8.00
SW 7.
9
2
SW 8
F
FL 7.9
8
Subject: Highlight
Page Label: [1] C2.3 DETAILED GRADING PLAN
Author: SW - Derek Lutz
Measurement: 1 Count
File Name: 4_UTILITY PLANS_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
Subject: Callout
Page Label: [1] C2.3 DETAILED GRADING PLAN
Author: SW - Derek Lutz
Measurement: 1 Count
File Name: 4_UTILITY PLANS_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
IS IT POSSIBLE TO LOWER
THESE POINTS (EVEN
SLIGHTLY) TO ALLOW FOR
SOME OVERFLOW ROUTING?
Subject: Cloud+
Page Label: [1] C2.4 DETAILED GRADING PLAN
Author: ENG - Sophie Buckingham
Measurement: 1 Count
File Name: 4_UTILITY PLANS_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
show tie-in to existing sidewalk
Subject: Callout
Page Label: [1] C2.5 DETAILED GRADING PLAN
Author: ENG - Sophie Buckingham
Measurement: 1 Count
File Name: 4_UTILITY PLANS_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
scale seems to be 1" = 10'
based on measurements
Subject: Cloud+
Page Label: [1] C2.5 DETAILED GRADING PLAN
Author: ENG - Sophie Buckingham
Measurement: 1 Count
File Name: 4_UTILITY PLANS_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
show tie-in to existing sidewalk
SW 7
.
3
1
95
SW 8
.
0
0
SW 7
.
9
0
FL 7.8
2
00
50
0
7
-1.7%
5007
SW 7.31
SW 7.6
6
SW 7.79
SW 7.9
2
SW 8.00
FFE 8.00
SW 8.00
SW 7.88
SW 8.00
SW 7.91
SW 7.84
SW 7.9
5
FFE 8.
0
0
SW 8.0
0
SW 7.90
SW 8.00
SW 8.0
0
FFE 8.0
0
SW 7.92
FL 7.82
FL 6.00
SW 8.0
0
FFE 8.0
0
FG 8.00
FG 7.33
FG 7.33
FG 7.22
FG 7.4
7
FG 7.30
FG 7.33
3
SW 7.8
2
SW 7.7
9
FG 7.33
FL 7.98
IS IT POSSIBLE TO LOWER THESEPOINTS (EVEN SLIGHTLY) TO ALLOWFOR SOME OVERFLOW ROUTING?
D
ST ST ST ST
5008
-2.0
%
-2.0
%
SW 8.1
8
FL 7.33
FL 8.09
SW 7.99
FL 7.34
SW 8.4
5
FL 7.3
6
SW 8.00
SW 8.2
0
ME 7.5
8 ME 7.54
SW 8.19
5008
5008
SW 8.3
7
-4.4
%
show tie-in to existingsidewalk
scale seems to be
1" = 10' based on
measurements
HYDWV
X
-2.2%
5006
SW 6.2
3
SW 6.03
FL 6.5
1
FL 6.25
FL 6.28
SW 6.33
FL 6.03
5.65
FL 6.05
FL 5.8
4
FL 5.3
7
SW 6.92
-8.0
%
-2.8
%
E 5.84 ME 5.5
2
ME 5.59
0.8
5006
5006
X
X
LEGAL DE
show tie-in to existingsidewalk
Subject: Text Box
Page Label: [1] C3.1 EROSION CONTROL PHASE I
Author: ESC - Drew Crecca
Measurement: 1 Count
File Name: 4_UTILITY PLANS_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
This 3 phase ESC Plan will be
acceptable for final,
Subject: Stamp
Page Label: [1] C3.1 EROSION CONTROL PHASE I
Author: ESC - Drew Crecca
Measurement: 1 Count
File Name: 4_UTILITY PLANS_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
Subject: Text Box
Page Label: [1] C3.1 EROSION CONTROL PHASE I
Author: ESC - Drew Crecca
Measurement: 1 Count
File Name: 4_UTILITY PLANS_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
4/15/2025
Subject: Text Box
Page Label: [1] C3.2 EROSION CONTROL PHASE II
Author: ESC - Drew Crecca
Measurement: 1 Count
File Name: 4_UTILITY PLANS_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
This 3 phase ESC Plan will be
acceptable for final,
Subject: Text Box
Page Label: [1] C3.3 EROSION CONTROL PHASE III
Author: ESC - Drew Crecca
Measurement: 1 Count
File Name: 4_UTILITY PLANS_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
This 3 phase ESC Plan will be
acceptable for final,
This 3 phase ESC Plan will be acceptable for final,
3575DEN(720)
ERO
4/15/2025
This 3 phase ESC Plan will be acceptable for final,
This 3 phase ESC Plan will be acceptable for final,
Subject: Text Box
Page Label: [1] C3.4 EROSION CONTROL NOTES
Author: ESC - Drew Crecca
Measurement: 1 Count
File Name: 4_UTILITY PLANS_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
This 3 phase ESC Plan will be
acceptable for final,
Subject: Text Box
Page Label: [1] C3.5 EROSION CONTROL DETAILS
Author: ESC - Drew Crecca
Measurement: 1 Count
File Name: 4_UTILITY PLANS_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
This 3 phase ESC Plan will be
acceptable for final,
Subject: Text Box
Page Label: [1] C3.6 EROSION CONTROL DETAILS
Author: ESC - Drew Crecca
Measurement: 1 Count
File Name: 4_UTILITY PLANS_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
This 3 phase ESC Plan will be
acceptable for final,
Subject: Text Box
Page Label: [1] C3.7 EROSION CONTROL DETAILS
Author: ESC - Drew Crecca
Measurement: 1 Count
File Name: 4_UTILITY PLANS_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
This 3 phase ESC Plan will be
acceptable for final,
Subject: Text Box
Page Label: [1] C3.8 EROSION CONTROL DETAILS
Author: ESC - Drew Crecca
Measurement: 1 Count
File Name: 4_UTILITY PLANS_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
This 3 phase ESC Plan will be
acceptable for final,
This 3 phase ESC Plan will be acceptable for final,
This 3 phase ESC Plan will be acceptable for final,
This 3 phase ESC Plan will be acceptable for final,
3D(7
ER
This 3 phase ESC Plan will be acceptable for final,
This 3 phase ESC Plan will be acceptable for final,
Subject: PolyLine
Page Label: [1] C4.0 OVERALL UTILITY PLAN
Author: DPaluzzi
Measurement: 1 Count
File Name: 4_UTILITY PLANS_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
Subject: PolyLine
Page Label: [1] C4.0 OVERALL UTILITY PLAN
Author: DPaluzzi
Measurement: 1 Count
File Name: 4_UTILITY PLANS_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
Subject: Callout
Page Label: [1] C4.0 OVERALL UTILITY PLAN
Author: DPaluzzi
Measurement: 1 Count
File Name: 4_UTILITY PLANS_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
Elec line to be in parkway.
Subject: Callout
Page Label: [1] C4.0 OVERALL UTILITY PLAN
Author: DPaluzzi
Measurement: 1 Count
File Name: 4_UTILITY PLANS_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
The plat says that the duct bank
easement is to be vacated. That
is fine, but please provide a 40ft
wide utility easment for all
utilities instead.
Subject: Callout
Page Label: [1] C4.0 OVERALL UTILITY PLAN
Author: DPaluzzi
Measurement: 1 Count
File Name: 4_UTILITY PLANS_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
Provide 6ft wide utility easement
for electric line from transformers
to property line.
S SS SS SS SS SS SS SS SS SS
D
G G G G G G G G GWVWWWWWWWWW W
T
TT
W PR(ROW
N:123794.27E:193163.81
EEEEEE
EEE
EEE
EEE
EEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEE
SS SS SS SS SS SS SS SS SS SS SS SS
G
HYDWV GAS
ELEC
ELEC
G
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
X
X
X
X
X
X
X
X
X
X
G
G
G G G G G G G G G G G G
D
WV
ST ST
S
D
W W W W W W W W W W W W W
T
TT
EME
R
G
E
N
C
Y
A
C
C
E
S
S
D
R
W PROSPECT RD(ROW WIDTH VARIES)
COURTYARDPARKINGGARAGE
N:123790.41E:193510.47N:123794.27E:193163.81:123794.55E:193138.81
EEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEE
SS SS
G G
W W W
Elec line to be in
parkway.
E
E
E
E
X
X
X
X
X
The plat says that the duct bank
easement is to be vacated. That is
fine, but please provide a 40ft wideutility easment for all utilities instead.
T
T
4.27
3.81
Provide 6ft wide
utility easement
for electric line
from transformers
to property line.
Subject: Length Measurement
Page Label: [1] C4.0 OVERALL UTILITY PLAN
Author: DPaluzzi
Measurement: 40.1159 ft' in"
File Name: 4_UTILITY PLANS_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
40'-1 1/2"
Subject: Callout
Page Label: [1] C4.0 OVERALL UTILITY PLAN
Author: DPaluzzi
Measurement: 1 Count
File Name: 4_UTILITY PLANS_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
Please place our electric line 6ft
off of the building.
Subject: Callout
Page Label: [1] C4.0 OVERALL UTILITY PLAN
Author: ENG - Sophie Buckingham
Measurement: 1 Count
File Name: 4_UTILITY PLANS_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
ADD NOTE:
LIMITS OF STREET CUT ARE
APPROXIMATE. FINAL LIMITS
ARE TO BE DETERMINED IN
THE FIELD BY THE CITY
ENGINEERING INSPECTOR.
ALL REPAIRS ARE TO BE IN
ACCORDANCE WITH THE
CITY STREET REPAIR
STANDARDS.
Subject: Callout
Page Label: [1] C4.0 OVERALL UTILITY PLAN
Author: ENG - Sophie Buckingham
Measurement: 1 Count
File Name: 4_UTILITY PLANS_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
If this is proposed storm, please
use black line color as shown in
the legend.
Subject: Callout
Page Label: [1] C4.0 OVERALL UTILITY PLAN
Author: ENG - Sophie Buckingham
Measurement: 1 Count
File Name: 4_UTILITY PLANS_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
Why are these lines different
thickness?
E
X
X
40'-1 1/2"
EM
E
R
G
E
N
C
Y
A
C
C
E
S
S
COURTYARD
Please place our electric line 6ft offof the building.
FLOODPLAIN:
NOTES:
ADD NOTE:LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITSARE TO BE DETERMINED IN THE FIELD BY THE CITYENGINEERING INSPECTOR. ALL REPAIRS ARE TO BE IN
ACCORDANCE WITH THE CITY STREET REPAIR STANDARDS.
SS SS SS SS
G G G
W W
N:124325.04
E:193242.71
If this is proposed
storm, please use
black line color as
shown in the legend.
Why are these lines
different thickness?
Subject: Callout
Page Label: [1] C4.0 OVERALL UTILITY PLAN
Author: SW - Derek Lutz
Measurement: 1 Count
File Name: 4_UTILITY PLANS_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
DIMENSIONS ON THIS SHEET
ARE 1:30 SCALE. UPDATE
BAR SCALE
Subject: Callout
Page Label: [1] C4.0 OVERALL UTILITY PLAN
Author: SW - Derek Lutz
Measurement: 1 Count
File Name: 4_UTILITY PLANS_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
RELOCATE IRRIGATION
SERVICE AND METER AWAY
FROM OTHER UTILITIES
Subject: Callout
Page Label: [1] C4.0 OVERALL UTILITY PLAN
Author: SW - Derek Lutz
Measurement: 1 Count
File Name: 4_UTILITY PLANS_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
10-FT SEPARATION
REQUIRED
Subject: Length Measurement
Page Label: [1] C4.0 OVERALL UTILITY PLAN
Author: SW - Derek Lutz
Measurement: 19.3339 ft' in"
File Name: 4_UTILITY PLANS_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
19'-4"
Subject: Length Measurement
Page Label: [1] C4.0 OVERALL UTILITY PLAN
Author: SW - Derek Lutz
Measurement: 9.6569 ft' in"
File Name: 4_UTILITY PLANS_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
9'-8"
SS S
G G
E
NDIMENSIONS ON THIS
SHEET ARE 1:30 SCALE.
UPDATE BAR SCALE
G G G G G G GWVWWWWWW W
RELOCATE IRRIGATION SERVICE ANDMETER AWAY FROM OTHER UTILITIES
SS SS SS
D
G
G G G
DST
W W
N:123794.27
E:193163.814.55
8.81
10-FT SEPARATION
REQUIRED
E
EN
C
Y
A
C
C
E
S
S
19'-4"
E
X
Y
A
C
C
E
S
S
9'-8"
Subject: Callout
Page Label: [1] C4.0 OVERALL UTILITY PLAN
Author: SW - Derek Lutz
Measurement: 1 Count
File Name: 4_UTILITY PLANS_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
SPLIT THE DIFFERENCE
BETWEEN THE BUILDING AND
THE DUCTBANK
Subject: Length Measurement
Page Label: [1] C4.0 OVERALL UTILITY PLAN
Author: SW - Derek Lutz
Measurement: 7.9217 ft' in"
File Name: 4_UTILITY PLANS_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
7'-11"
Subject: Callout
Page Label: [1] C4.0 OVERALL UTILITY PLAN
Author: SW - Derek Lutz
Measurement: 1 Count
File Name: 4_UTILITY PLANS_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
LOCATE STORM MIN 10-FT
FROM BUILDING
Subject: Callout
Page Label: [1] C4.0 OVERALL UTILITY PLAN
Author: SW - Derek Lutz
Measurement: 1 Count
File Name: 4_UTILITY PLANS_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
IS THERE A GAS SERVICE TO
THE BUILDING?
Subject: Callout
Page Label: [1] C4.0 OVERALL UTILITY PLAN
Author: SW - Derek Lutz
Measurement: 1 Count
File Name: 4_UTILITY PLANS_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
WATER UTILITIES ALSO
PREFERS A SINGLE UTILITY
EASEMENT INSTEAD OF
SEVERAL SEPARATE
EASEMENTS
HYDWV
GAS
E
E
E
E
E
X
X
X
X
G G
S
W W W W
PROSPECT RD
N:123790.41E:193510.47
SPLIT THE DIFFERENCE BETWEENTHE BUILDING AND THE DUCTBANK
7'
-
1
1
"
G G G
GWVWWWW W
LOCATE STORM MIN
10-FT FROM BUILDING
IS THERE A GAS SERVICE
TO THE BUILDING?
FLOO
NOT
WATER UTILITIES ALSO PREFERS A
SINGLE UTILITY EASEMENT INSTEAD OF
SEVERAL SEPARATE EASEMENTS
Subject: Cloud+
Page Label: [1] C4.0 OVERALL UTILITY PLAN
Author: TRF-STEVE-GILCHRIST
Measurement: 1 Count
File Name: 4_UTILITY PLANS_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
The relocation of the sidewalk to
the west side is going to be an
issue for sight distance to this
crosswalk. We removed parking
in this area for the same reason.
Subject: Cloud+
Page Label: [1] C4.1 DETAILED UTILITY PLAN
Author: ENG - Sophie Buckingham
Measurement: 1 Count
File Name: 4_UTILITY PLANS_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
Would it make sense to just
show the future property line on
this sheet?
Subject: Callout
Page Label: [1] C4.1 DETAILED UTILITY PLAN
Author: ENG - Sophie Buckingham
Measurement: 1 Count
File Name: 4_UTILITY PLANS_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
Show location of access
manhole for inspection of Arthur
Ditch under Lake Street. Will
access manhole location be
changed by this project?
Subject: Callout
Page Label: [1] C4.1 DETAILED UTILITY PLAN
Author: SW - Derek Lutz
Measurement: 1 Count
File Name: 4_UTILITY PLANS_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
IS THERE A GAS SERVICE TO
THE BUILDING?
Subject: Callout
Page Label: [1] C4.2 DETAILED UTILITY PLAN
Author: ENG - Sophie Buckingham
Measurement: 1 Count
File Name: 4_UTILITY PLANS_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
Show location of access
manhole for inspection of Arthur
Ditch under Prospect Road. Will
access manhole location be
changed by this project?
SS SS SS SS SS SS
D
G
E
G
G
G G G G G G
D
W
ST ST ST
D
W W W W W W
T
TT
N:123794.27E:193163.81N:123794.55E:193138.81
The relocation of thesidewalk to the westside is going to be anissue for sightdistance to thiscrosswalk. Weremoved parking inthis area for thesame reason.
SS SS SS
ELEC
WWould it make
sense to just show
the future property
line on this sheet?
D
Show location of access
manhole for inspection of
Arthur Ditch under Lake Street.
Will access manhole location
be changed by this project?
IS THERE A GAS SERVICE
TO THE BUILDING?
SS
D
Show location of access
manhole for inspection of
Arthur Ditch under Prospect
Road. Will access manhole
location be changed by this
project?
Subject: Callout
Page Label: [1] C4.2 DETAILED UTILITY PLAN
Author: SW - Derek Lutz
Measurement: 1 Count
File Name: 4_UTILITY PLANS_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
IS THERE A GAS SERVICE TO
THE BUILDING?
Subject: Callout
Page Label: [1] C5.0 OVERALL STORM SEWER PLAN
Author: SW - Derek Lutz
Measurement: 1 Count
File Name: 4_UTILITY PLANS_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
DIMENSIONS ON THIS SHEET
ARE 1:30 SCALE. UPDATE
BAR SCALE
Subject: Callout
Page Label: 40
Author: SW - Derek Lutz
Measurement: 1 Count
File Name: 5_DRAINAGE_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
FF = 5008
5_DRAINAGE_Prospect Plaza Redevelopment_FDP_Rd1.pdf (4)
Measurement: 4 Count
Subject: Callout
Page Label: 40
Author: SW - Derek Lutz
Measurement: 1 Count
File Name: 5_DRAINAGE_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
FF = 5008
Subject: Callout
Page Label: 40
Author: SW - Derek Lutz
Measurement: 1 Count
File Name: 5_DRAINAGE_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
THIS EXHIBIT IS VERY
INFORMATIVE. PLEASE
LABEL FF AT DOORWAYS.
IS THERE A GAS SERVICE
TO THE BUILDING?
SS
WV
S S
G G
E
S
SS
NDIMENSIONS ON THIS
SHEET ARE 1:30 SCALE.
UPDATE BAR SCALE
CENTRAL COURTYARD
5007.00 - 1ft of Freeboard
5007.00 - 100-YR Ponding Depth at 80% Clog
FF = 5008
FF = 5008
5006.90 - Normal 100-YR Ponding Depth
5007.00 - 1ft of Freeboard
5007.00 - 100-YR Ponding Depth at 80% Clogging
THIS EXHIBIT IS VERY INFORMATIVE.
PLEASE LABEL FF AT DOORWAYS.
Subject: Callout
Page Label: 40
Author: SW - Derek Lutz
Measurement: 1 Count
File Name: 5_DRAINAGE_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
IS THERE ANY OVERFLOW
ROUTING POTENTIAL?
MAYBE TWO INCHES?
Subject: Text Box
Page Label: 1
Author: ESC - Drew Crecca
Measurement: 1 Count
File Name: 5_SWMP_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
Erosion Control Reports are
required for all projects over an
acre. The SWMP satisfies this
requirement but will be reviewed
according to the criteria set forth
in the “City if Fort Collins
Stormwater Criteria Manual”
(FCSCM) Chapter 2 Section 6,
which varies from the State
requirements for a CO400000
Construction Stormwater
Discharge Permit. The applicant
may choose not to add the
requested items to the SWMP
but will be required to submit an
Erosion Control Report as a
"Stand Alone" Document.
Otherwise, all required items
need to be included per FCSCM
Chapter 2 Section 6. A copy of
the Erosion Control Submittal
Checklist can be found at
https://www.fcgov.com/utilities/b
usiness/builders-and-developers
/development-forms-guidelines-r
egulations/erosion/
5_SWMP_Prospect Plaza Redevelopment_FDP_Rd1.pdf (16)
Measurement: 16 Count
Subject: Stamp
Page Label: 1
Author: ESC - Drew Crecca
Measurement: 1 Count
File Name: 5_SWMP_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
Subject: Text Box
Page Label: 1
Author: ESC - Drew Crecca
Measurement: 1 Count
File Name: 5_SWMP_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
4/15/2025
SUNNY CIVILCENTRAL COURTYARD
INLET EXHIBIT
5007.00 - 1ft of Freeboard 5007.00 - 100-YR Ponding Depth at 80% Clogging
IS THERE ANY OVERFLOW ROUTING
POTENTIAL? MAYBE TWO INCHES?
mplate, Version 1.1, September 17, 2007 i
Project Start Date: May 2025 Project Completion Date: August 2027
Erosion Control Reports are required for all projects over an acre. TheSWMP satisfies this requirement but will be reviewed according to thecriteria set forth in the “City if Fort Collins Stormwater Criteria Manual”
(FCSCM) Chapter 2 Section 6, which varies from the Staterequirements for a CO400000 Construction Stormwater Discharge
Permit. The applicant may choose not to add the requested items to theSWMP but will be required to submit an Erosion Control Report as a
"Stand Alone" Document. Otherwise, all required items need to beincluded per FCSCM Chapter 2 Section 6. A copy of the ErosionControl Submittal Checklist can be found athttps://www.fcgov.com/utilities/business/builders-and-developers/development-forms-guidelines-regulations/erosion/
4/15/2025
Subject: Polygon
Page Label: 27
Author: HopeCarlson
Measurement: 1 Count
File Name: 5_SWMP_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
Subject: Text Box
Page Label: 33
Author: ESC - Drew Crecca
Measurement: 1 Count
File Name: 5_SWMP_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
Section not Required for Erosion
Control Report per City of Fort
Collins Criteria
Subject: Text Box
Page Label: 34
Author: ESC - Drew Crecca
Measurement: 1 Count
File Name: 5_SWMP_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
Section not Required for Erosion
Control Report per City of Fort
Collins Criteria
Subject: Text Box
Page Label: 38
Author: ESC - Drew Crecca
Measurement: 1 Count
File Name: 5_SWMP_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
Section not Required for Erosion
Control Report per City of Fort
Collins Criteria
Subject: Text Box
Page Label: 40
Author: ESC - Drew Crecca
Measurement: 1 Count
File Name: 5_SWMP_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
Section not Required for Erosion
Control Report per City of Fort
Collins Criteria
Project Lo
Stor
Prospec
Appendix C – Construction General Perm
Section not Required for Erosion Control Report per City ofFort Collins Criteria
Prospect Plaza Redevelopment 03.19
NOI and Acknowledgment Letter from EPA/Stat
Section not Required for Erosion Control Report per City ofFort Collins Criteria
St
Prosp
Appendix H –Subcontractor Certificati
SUBCONTRACTOR CER
STORMWATER POLLUTION PR
Section not Required for Erosion Control Report per City ofFort Collins Criteria
Sto
Prospe
Appendix J – SWPPP Training Log
Stormwater Pollution Preven
Project Name:
Section not Required for Erosion Control Report per City ofFort Collins Criteria
Subject: Text Box
Page Label: 41
Author: ESC - Drew Crecca
Measurement: 1 Count
File Name: 5_SWMP_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
Section not Required for Erosion
Control Report per City of Fort
Collins Criteria
Subject: Text Box
Page Label: 42
Author: ESC - Drew Crecca
Measurement: 1 Count
File Name: 5_SWMP_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
Section not Required for Erosion
Control Report per City of Fort
Collins Criteria
Subject: Text Box
Page Label: 43
Author: ESC - Drew Crecca
Measurement: 1 Count
File Name: 5_SWMP_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
Section not Required for Erosion
Control Report per City of Fort
Collins Criteria
Subject: Text Box
Page Label: [1] C1.0 OVERALL SITE PLAN
Author: ESC - Drew Crecca
Measurement: 1 Count
File Name: 5_SWMP_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
Please include a copy of the
Required City of Fort Collins
Standard Erosion Notes either in
the notes section of the utility
plan or as separate sheet with
the Erosion Control Plan.
Please refer to the Fort Collins
Stormwater Criteria Manual
(FCSCM) Appendix F. A copy of
these can be found at
https://www.fcgov.com/utilities/b
usiness/builders-and-developers
/development-forms-guidelines-r
egulations/stormwater-criteria
Subject: Text Box
Page Label: [1] C1.0 OVERALL SITE PLAN
Author: ESC - Drew Crecca
Measurement: 1 Count
File Name: 5_SWMP_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
Per City Criteria a Details
Section must be included with
Erosion Control Plans and
Reports. Please add a Details
Section including all Erosion
Control Measures called out in
the Erosion Control Plan. A
copy of acceptable Details can
be found in the Fort Collins
Stormwater Criteria Manual
Appendix E.
https://www.fcgov.com/utilities/b
usiness/builders-and-developers
/development-forms-guidelines-r
egulations/stormwater-criteria
Sto
Prospe
Appendix K –Delegation of Authority F
Delegation of Aut
I, _______________________ (name), hereby des
Section not Required for Erosion Control Report per City ofFort Collins Criteria
St
Prosp
Appendix L –Additional Information
Section not Required for Erosion Control Report per City ofFort Collins Criteria
!"!#
"&
'()
E
40
6[1)5
Section not Required for Erosion Control Report per City ofFort Collins Criteria
VERTICAL DATUM:
FLOODPLAIN:
Please include a copy of the Required City of Fort Collins Standard Erosion Notes either in the notes section of the utility plan or as separatesheet with the Erosion Control Plan. Please refer to the Fort Collins Stormwater Criteria Manual (FCSCM) Appendix F. A copy of these can befound at https://www.fcgov.com/utilities/business/builders-and-developers/development-forms-guidelines-regulations/stormwater-criteria
Per City Criteria a Details Section must be included with Erosion Control Plans and Reports. Please add a Details Section including all ErosionControl Measures called out in the Erosion Control Plan. A copy of acceptable Details can be found in the Fort Collins Stormwater CriteriaManual Appendix E.
https://www.fcgov.com/utilities/business/builders-and-developers/development-forms-guidelines-regulations/stormwater-criteria
Subject: Text Box
Page Label: [1] C3.1 EROSION CONTROL PHASE I
Author: ESC - Drew Crecca
Measurement: 1 Count
File Name: 5_SWMP_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
This 3 phase ESC Plan will be
acceptable for final, however the
plan needs to include the
required Standard Erosion
Control Notes and a Details
Section to the ESC plans
contained within the Erosion
Control Report. See redlines
from site plan page.
Subject: Text Box
Page Label: [1] C3.2 EROSION CONTROL PHASE II
Author: ESC - Drew Crecca
Measurement: 1 Count
File Name: 5_SWMP_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
This 3 phase ESC Plan will be
acceptable for final, however the
plan needs to include the
required Standard Erosion
Control Notes and a Details
Section to the ESC plans
contained within the Erosion
Control Report. See redlines
from site plan page.
Subject: Text Box
Page Label: [1] C3.3 EROSION CONTROL PHASE III
Author: ESC - Drew Crecca
Measurement: 1 Count
File Name: 5_SWMP_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
This 3 phase ESC Plan will be
acceptable for final, however the
plan needs to include the
required Standard Erosion
Control Notes and a Details
Section to the ESC plans
contained within the Erosion
Control Report. See redlines
from site plan page.
Subject: Text Box
Page Label: 1
Author: ESC - Drew Crecca
Measurement: 1 Count
File Name: 6_ESC_COST_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
This Calculation will be
acceptable for final.
6_ESC_COST_Prospect Plaza Redevelopment_FDP_Rd1.pdf (1)
Measurement: 1 Count
Subject: Callout
Page Label: 1
Author: SW - Derek Lutz
Measurement: 1 Count
File Name: 6_WATER AD_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
PLEASE SEPARATE THE
WATER DEMAND/METER
SIZING MEMO FROM THIS
WATER ADEQUACY FORM
6_WATER AD_Prospect Plaza Redevelopment_FDP_Rd1.pdf (3)
Measurement: 3 Count
This 3 phase ESC Plan will be acceptable for final, however the plan needs to includethe required Standard Erosion Control Notes and a Details Section to the ESC planscontained within the Erosion Control Report. See redlines from site plan page.
TUM:
This 3 phase ESC Plan will be acceptable for final, however the plan needs to includethe required Standard Erosion Control Notes and a Details Section to the ESC planscontained within the Erosion Control Report. See redlines from site plan page.
This 3 phase ESC Plan will be acceptable for final, however the plan needs to includethe required Standard Erosion Control Notes and a Details Section to the ESC planscontained within the Erosion Control Report. See redlines from site plan page.
turbed Acres:4.71
curity Calculation
s This Calculation will be
acceptable for final.
PLEASE SEPARATE THE WATER
DEMAND/METER SIZING MEMO FROM
THIS WATER ADEQUACY FORM
Subject: Callout
Page Label: 5
Author: SW - Derek Lutz
Measurement: 1 Count
File Name: 6_WATER AD_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
Please provide a table similar to
what was provided for the
residential portion of the
building.
Subject: Callout
Page Label: 5
Author: SW - Derek Lutz
Measurement: 1 Count
File Name: 6_WATER AD_Prospect Plaza
Redevelopment_FDP_Rd1.pdf
Please provide a peak demand
in GPM.
0
zing of the water tap and meter for the
er Avenue Ft. Collins, CO 80526.
ng project with a core & shell coffee shop.
itectural drawings. Note that the coffee shop
er closets, (2) lavatories, (4) kitchen sink, (1) e providing water tap sizing information in
Plumbing Code. Approximately 40 wsfu are
60psi the project will require a 1” tap with a
Please provide a table similar to
what was provided for the
residential portion of the building.
Housing project with a core & shell coffee shop. ry architectural drawings. Note that the coffee shop
ank water closets, (2) lavatories, (4) kitchen sink, (1)
. We are providing water tap sizing information in
ational Plumbing Code. Approximately 40 wsfu are
at over 60psi the project will require a 1” tap with a
Please provide a peak demand in GPM.