Loading...
HomeMy WebLinkAboutPlans - Utility Plan - 03/21/2025PROPOSED SPOT GRADE PROPOSED MINOR CONTOURS PROPOSED MAJOR CONTOURS PROPOSED FIRE HYDRANT PROPOSED GATE VALVE PROPOSED INLET ZONE LOT LINE PROPOSED WATER LINE PROPOSED ELECTRICAL PROPOSED TELEPHONE LINE PROPOSED SANITARY LINE PROPOSED STORM LINE LEGEND 8" 8" EVERGREEN TREE DIAMETER OF TRUNK NUMBER OF PARKING STALLS DECIDUOUS TREE WATER VALVE WATER METER DIAMETER OF TRUNK UTILITY POLE COMMUNICATIONS PEDESTAL STREET LIGHT MONITOR WELL SIGN ELECTRIC TRANSFORMER FILLER PLATE FIRE HYDRANT ELECTRICAL METER GAS METER MANHOLE (STORM) ELECTRICAL BOX ACCESS PLATE OVERHEAD UTILITY LINE A/C UNIT BOLLARD CLEANOUT FENCE LINE RAILING FIBER-OPTIC LINE STORM SEWER LINE SANITARY SEWER LINE ELECTRICAL LINE CONTOUR LINE WATER LINE GAS LINE IRRIGATION VALVE ELECTRIC VAULT LIGHT POLE (DIRECTIONAL) UTILITY MARKER FOUND MONUMENT AS DESCRIBED FOUND CHISELED CROSS RIGHT-OF-WAYR.O.W. LAND SURVEYOR NUMBERL.S. NO. BOOK AND PAGEBK. PG. RECEPTION NUMBERREC. NO. 0 ALIQUOT CORNER EXISTING LEGEND LANDSCAPINGL/S MANHOLE (SANITARY) BUILDING HEIGHT (FF - HIGHEST POINT)BLDGHT MANHOLE (MISCELLANEOUS) PROPOSED LEGEND PROPOSED ASPHALT PAVEMENT PROPOSED CONCRETE PAVEMENT PROPOSED LANDSCAPING 5415.0013 FL G P WALK TC LIP FFE FINISH FLOOR ELEVATION FLOWLINE GROUND (NON-PAVED AREA) PAVEMENT SIDEWALK (CONCRETE) TOP OF CURB GUTTER LIP INV.INVERT ELEVATION BW BOTTOM OF WALL TW TOP OF WALL BS BOTTOM OF STEPS TS TOP OF STEPS S=SLOPE PROPOSED FIRE HYDRANT PROPOSED TAPPING SLEEVE PROPOSED WATER VALVE PROPOSED WATER METER PROPOSED CURB STOP PROPOSED TAP/CORP STOP NOTE: WATER IMPROVEMENTS SHOWN FOR INFORMATION ONLY. ALL WATERIMPROVEMENTS SHALL BE CONSTRUCTED PER THE APPROVED DENVER WATER PLANS. AREA OF DEMOLITION FOUND PROPERTY BOUNDARY MONUMENT 38 8 S a n t a F e D r i v e D e n v e r , C O 8 0 2 2 3 DE N V E R RJP RJP SEL 03/21/2025 CURRENT.DWG PARIKH MZ . CO L O R A D O NA NA LA R I M E R FO R T C O L L I N S 30 2 C O N I F E R S T R E E T 2595 PONDEROSA ROAD FRANKTOWN, CO 80116 720.384.7661 Phone rpalmer@strategicls.net Robert J. Palmer, PE President 03/21/2025 SITE LOCATION MAP LEGAL DESCRIPTION 1. A PERMIT MUST BE OBTAINED FOR PRIVATE IMPROVEMENTS CONSTRUCTED WITHIN THE PUBLIC RIGHT OF WAY (R.O.W.). 3. THE CONTRACTOR MUST CONTACT CONSTRUCTION INSPECTION AT LEAST 5 BUSINESS DAYS BEFORE CONSTRUCTION TO OBTAIN A REVOCABLE STREET OCCUPANCY PERMIT, A STREET CUT PERMIT, OR A RIGHT-OF-WAY CONSTRUCTION PERMIT-303-446-3469. 4.THE WATER SYSTEM DESIGN SHOWN HEREON IS FOR INFORMATION ONLY. ALL WATER INFRASTRUCTURE SHALL BE BID AND CONSTRUCTED FROM THE APPROVED DENVER WATER PLANS. COVER SHEET1 OF 30 SITE PLAN 2 OF 30 3 OF 30 DRAWING LIST 6 OF 30 5 OF 30 03/21/2025 4 OF 30 UTILITY PLANS FOR 302 CONIFER APARTMENTS THE SOUTHWEST 1 4 OF SECTION 01, TOWNSHIP 7 NORTH, RANGE 69 WEST OF THE SIXTH P.M. CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO LOCATED AT: 302 CONIFER STREET FORT COLLINS, COLORADO FINAL APPROVAL DATE: LOT 13, BLOCK 5, REPLAT NO. 1 of EVERGREEN PARK LOCATED IN THE SOUTHWEST 1 4 OF SECTION 101, TOWNSHIP 7 NORTH, RANGE 69 WEST OF THE SIXTH PRINCIPAL MERIDIAN, CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO. BY: ___________________________ BASIS OF BEARINGS FLOOD ZONE BENCHMARK PROJECT DATUM: NAVD 88 BENCHMARK #1: CITY OF FORT COLLINS BENCHMARK 4-07 SOUTHWEST CORNER OF TIMBERLINE RO. AND BEAR MOUNTAIN OR. DUE NORTH OF NEW POLICE BUILDING ON THE SOUTHWEST CORNER OF A CATCH BASIN. ELEVATION = 4942.84 BENCHMARK #2: CITY OF FORT COLLINS BENCHMARK 17-92 300 FEET SOUTH OF THE SOUTHWEST CORNER OF EAST DRAKE RO. AND TIMBERLINE RO. IN THE TOP OF AN IRRIGATION STRUCTURE. ELEVATION = 4938.70 PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM} FOR THEIR VERTICAL DATUMS. IF NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLL/NS DATUM} IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQUATION SHOULD BE USED: NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) = NAVD88 3.185' THE BASIS OF BEARINGS IS THE EAST LINE OF LOTS 10-13, BLOCK 5, REPLAT (NO.1) OF EVERGREEN PARK, AS BEARING NORTH 0°37'46” EAST, WITH THE SOUTHEAST CORNER OF SAID LOT 13, BLOCK 5, BEING A #4 REBAR, NO CAP AND THE NORTHEAST CORNER OF SAID LOT 10, BLOCK 5, BEING A #4 REBAR WITH A YELLOW PLASTIC CAP STAMPED "LS 10855", AND WITH ALL BEARINGS CONTAINED HEREIN RELATIVE THERETO. BY GRAPHIC PLOTTING ONLY THE SUBJECT PROPERTY IS SITUATED IN FLOOD ZONE "X" ACCORDING TO FLOOD INSURANCE RATE MAP (FIRM) COMMUNITY PANEL NO. 0800460212G WITH AN EFFECTIVE DATE OF NOVEMBER 17, 2005. NO OFFICE CALCULATIONS OR FIELD SURVEYING WAS PERFORMED TO DETERMINE THIS INFORMATION. SITE SPECIFIC NOTES LINE AND CURVE TABLES STANDARD NOTES EXISTING CONDITIONS 7 OF 30 8 OF 30 9 OF 30 10 OF 30 11 OF 30 12 OF 30 13 OF 30 03/21/2025 03/21/2025 03/21/2025 03/21/2025 03/21/2025 03/21/2025 03/21/2025 03/21/2025 03/21/2025 03/21/2025 03/21/2025 03/21/2025 1 OF 30 COVER SHEET HW Y 2 8 7 CONIFER ST. BL U E S P R U C E D R . N. L E M A Y A V E . E. VINE DR. RE D W O O D S T . E. SUNIGA RD. SITE 14 OF 30 EXISTING DRAINAGE PLAN STORM DRAIN PROFILES DRAINAGE DETAILS UTILITY PLAN 15 OF 30 20 OF 30 22 OF 30 23 OF 30 24 OF 30 25 OF 30 26 OF 30 PROPOSED DRAINAGE PLAN 03/21/2025 03/21/2025 03/21/2025 03/21/2025 03/21/2025 03/21/2025 03/21/2025 03/21/2025 INITIAL EROSION CONTROL PLAN INTERIM EROSION CONTROL PLAN FINAL EROSION CONTROL PLAN EROSION CONTROL DETAILS EROSION CONTROL DETAILS EROSION CONTROL DETAILS EROSION CONTROL DETAILS EROSION CONTROL DETAILS EROSION CONTROL DETAILS FINAL STABILIZATION EROSION CONTROL DETAILS EROSION CONTROL DETAILS EROSION CONTROL DETAILS EROSION CONTROL DETAILS 16 OF 30 17 OF 30 18 OF 30 19 OF 30 GRADING PLAN 21 OF 30 DRAINAGE DETAILS 27 OF 30 DRAINAGE DETAILS 03/21/2025 03/21/2025 03/21/2025 03/21/2025 03/21/2025 03/21/2025 28 OF 30 CONSTRUCTION DETAILS 03/21/2025 29 OF 30 CONSTRUCTION DETAILS 03/21/2025 30 OF 30 CONSTRUCTION DETAILS 03/21/2025 INDEMNIFICATION THESE PLANS HAVE BEEN REVIEWED BY THE LOCAL ENTITY FOR CONCEPT ONLY. THE REVIEW DOES NOT IMPLY RESPONSIBILITY BY THE REVIEWING DEPARTMENT, THE LOCAL ENTITY ENGINEER, OR THE LOCAL ENTITY FOR ACCURACY AND CORRECTNESS OF THE CALCULATIONS. FURTHERMORE, THE REVIEW DOES NOT IMPLY THAT QUANTITIES OF ITEMS ON THE PLANS ARE THE FINAL QUANTITIES REQUIRED. THE REVIEW SHALL NOT BE CONSTRUED IN ANY REASON AS ACCEPTANCE OF FINANCIAL RESPONSIBILITY BY THE LOCAL ENTITY FOR ADDITIONAL QUANTITIES OF ITEMS SHOWN THAT MAY BE REQUIRED DURING THE CONSTRUCTION PHASE. I HEREBY AFFIRM THAT THESE FINAL CONSTRUCTION PLANS WERE PREPARED UNDER MY DIRECT SUPERVISION, IN ACCORDANCE WITH ALL APPLICABLE CITY OF FORT COLLINS AND STATE OF COLORADO STANDARDS AND STATUTES, RESPECTIVELY; AND THAT I AM FULLY RESPONSIBLE FOR THE ACCURACY OF ALL DESIGN, REVISIONS, AND RECORD CONDITIONS THAT I HAVE NOTED ON THESE PLANS. LICENSED PROFESSIONAL ENGINEER: STATE OF COLORADO NO. 36320 STRATEGIC LAND SOLUTIONS, INC. OWNER/DEVELOPER THE SZANTON COMPANY ATTN: NATHAN SZANTON TEN FREE STREET, 3RD FLOOR PORTLAND, ME 04101 EMAIL: NSZANTON@SZANTONCOMPANY.COM PHONE: (202) 871-9811 SITE ENGINEER STRATEGIC LAND SOLUTIONS, INC. ATTN: ROBERT PALMER, PE 2595 PONDEROSA ROAD FRANKTOWN, CO 80116 ROBERT J. PALMER, P.E. EMAIL: RPALMER@STRATEGICLS.NET PHONE (720) 384-7661 LANDSCAPE ARCHITECT STUDIO TERRA, INC. ATTN: CAROL ADAMS, ASLA, PLA 758 CLUB DRIVE LOUISVILLE, CO 80027 EMAIL: CAROL@STUDIOTERRA.NET PHONE: (303) 494-9138 ARCHITECT SANTULAN ARCHITECTURE ATTN: DILLON JONES 388 SANTA FE DRIVE DENVER, CO 80223 EMAIL: DILLON@SANTULANARCH.COM PHONE: (805) 2092 SURVEY EPS GROUP ATTN: THAREN HELGERSON, PLS 301 N. HOWES ST., SUITE 100 FORT COLLINS, CO 80521 EMAIL: THAREN.HELGERSON@EPSGROUPINC.COM PHONE: (970) 698-6367 CONTACT INFORMATION GEOTECHNICAL REPORT GEOTECHNICAL ENGINEERING STUDY AND PAVEMENT THICKNESS DESIGN PROPOSED CONIFER STREET APARTMENTS 302 CONIFER STREET FORT COLLINS, CO PREPARED BY KUMAR AND ASSOCIATES 11/07/2024 1.ALL MATERIALS, WORKMANSHIP, AND CONSTRUCTION OF PUBLIC IMPROVEMENTS SHALL MEET OR EXCEED THE STANDARDS AND SPECIFICATIONS SET FORTH IN THE LARIMER COUNTY URBAN AREA STREET STANDARDS AND APPLICABLE STATE AND FEDERAL REGULATIONS. WHERE THERE IS CONFLICT BETWEEN THESE PLANS AND THE SPECIFICATIONS, OR ANY APPLICABLE STANDARDS, THE MOST RESTRICTIVE STANDARD SHALL APPLY. ALL WORK SHALL BE INSPECTED AND APPROVED BY THE LOCAL ENTITY. 2.ALL REFERENCES TO ANY PUBLISHED STANDARDS SHALL REFER TO THE LATEST REVISION OF SAID STANDARD, UNLESS SPECIFICALLY STATED OTHERWISE. 3.THESE PUBLIC IMPROVEMENT CONSTRUCTION PLANS SHALL BE VALID FOR A PERIOD OF THREE YEARS FROM THE DATE OF APPROVAL BY THE LOCAL ENTITY ENGINEER. USE OF THESE PLANS AFTER THE EXPIRATION DATE WILL REQUIRE A NEW REVIEW AND APPROVAL PROCESS BY THE LOCAL ENTITY PRIOR TO COMMENCEMENT OF ANY WORK SHOWN IN THESE PLANS. 4.THE ENGINEER WHO HAS PREPARED THESE PLANS, BY EXECUTION AND/OR SEAL HEREOF, DOES HEREBY AFFIRM RESPONSIBILITY TO THE LOCAL ENTITY, AS BENEFICIARY OF SAID ENGINEER’S WORK, FOR ANY ERRORS AND OMISSIONS CONTAINED IN THESE PLANS, AND APPROVAL OF THESE PLANS BY THE LOCAL ENTITY ENGINEER SHALL NOT RELIEVE THE ENGINEER WHO HAS PREPARED THESE PLANS OF ALL SUCH RESPONSIBILITY. FURTHER, TO THE EXTENT PERMITTED BY LAW, THE ENGINEER HEREBY AGREES TO HOLD HARMLESS AND INDEMNIFY THE LOCAL ENTITY, AND ITS OFFICERS AND EMPLOYEES, FROM AND AGAINST ALL LIABILITIES, CLAIMS, AND DEMANDS WHICH MAY ARISE FROM ANY ERRORS AND OMISSIONS CONTAINED IN THESE PLANS. 5.ALL SANITARY SEWER, STORM SEWER, AND WATER LINE CONSTRUCTION, AS WELL AS POWER AND OTHER “DRY” UTILITY INSTALLATIONS, SHALL CONFORM TO THE LOCAL ENTITY STANDARDS AND SPECIFICATIONS CURRENT AT THE DATE OF APPROVAL OF THE PLANS BY THE LOCAL ENTITY ENGINEER. 6.THE TYPE, SIZE, LOCATION AND NUMBER OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER TO VERIFY THE EXISTENCE AND LOCATION OF ALL UNDERGROUND UTILITIES ALONG THE ROUTE OF THE WORK BEFORE COMMENCING NEW CONSTRUCTION. THE DEVELOPER SHALL BE RESPONSIBLE FOR UNKNOWN UNDERGROUND UTILITIES. 7.THE ENGINEER SHALL CONTACT THE UTILITY NOTIFICATION CENTER OF COLORADO (UNCC) AT 1800-922-1987, AT LEAST 2 WORKING DAYS PRIOR TO BEGINNING EXCAVATION OR GRADING, TO HAVE ALL REGISTERED UTILITY LOCATIONS MARKED. OTHER UNREGISTERED UTILITY ENTITIES (I.E. DITCH / IRRIGATION COMPANY) ARE TO BE LOCATED BY CONTACTING THE RESPECTIVE REPRESENTATIVE. UTILITY SERVICE LATERALS ARE ALSO TO BE LOCATED PRIOR TO BEGINNING EXCAVATION OR GRADING. IT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER TO RELOCATE ALL EXISTING UTILITIES THAT CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THESE PLANS. 8.THE DEVELOPER SHALL BE RESPONSIBLE FOR PROTECTING ALL UTILITIES DURING CONSTRUCTION AND FOR COORDINATING WITH THE APPROPRIATE UTILITY COMPANY FOR ANY UTILITY CROSSINGS REQUIRED. 9.IF A CONFLICT EXISTS BETWEEN EXISTING AND PROPOSED UTILITIES AND/OR A DESIGN MODIFICATION IS REQUIRED, THE DEVELOPER SHALL COORDINATE WITH THE ENGINEER TO MODIFY THE DESIGN MODIFICATION(S) MUST BE APPROVED BY THE LOCAL ENTITY PRIOR TO BEGINNING CONSTRUCTION. 10.THE DEVELOPER SHALL COORDINATE AND COOPERATE WITH THE LOCAL ENTITY, AND ALL UTILITY COMPANIES INVOLVED, TO ASSURE THAT THE WORK IS ACCOMPLISHED IN A TIMELY FASHION AND WITH A MINIMUM DISRUPTION OF SERVICE. THE DEVELOPER SHALL BE RESPONSIBLE FOR CONTACTING, IN ADVANCE, ALL PARTIES AFFECTED BY ANY DISRUPTION OF ANY UTILITY SERVICE AS WELL AS THE UTILITY COMPANIES. 11.NO WORK MAY COMMENCE WITHIN ANY PUBLIC STORM WATER, SANITARY SEWER OR POTABLE WATER SYSTEM UNTIL THE DEVELOPER NOTIFIES THE UTILITY PROVIDER. NOTIFICATION SHALL BE A MINIMUM OF 2 WORKING DAYS PRIOR TO COMMENCEMENT OF ANY WORK. AT THE DISCRETION OF THE WATER UTILITY PROVIDER, A PRE-CONSTRUCTION MEETING MAY BE REQUIRED PRIOR TO COMMENCEMENT OF ANY WORK. 12.THE DEVELOPER SHALL SEQUENCE INSTALLATION OF UTILITIES IN SUCH A MANNER AS TO MINIMIZE POTENTIAL UTILITY CONFLICTS. IN GENERAL, STORM SEWER AND SANITARY SEWER SHOULD BE CONSTRUCTED PRIOR TO INSTALLATION OF THE WATER LINES AND DRY UTILITIES. 13.THE MINIMUM COVER OVER WATER LINES IS 4.5 FEET AND THE MAXIMUM COVER IS 5.5 FEET UNLESS OTHERWISE NOTED IN THE PLANS AND APPROVED BY THE WATER UTILITY. 14.A STATE CONSTRUCTION DEWATERING WASTEWATER DISCHARGE PERMIT IS REQUIRED IF DEWATERING IS REQUIRED IN ORDER TO INSTALL UTILITIES OR WATER IS DISCHARGED INTO A STORM SEWER, CHANNEL, IRRIGATION DITCH OR ANY WATERS OF THE UNITED STATES. 15.THE DEVELOPER SHALL COMPLY WITH ALL TERMS AND CONDITIONS OF THE COLORADO PERMIT FOR STORM WATER DISCHARGE (CONTACT COLORADO DEPARTMENT OF HEALTH, WATER QUALITY CONTROL DIVISION, (303) 692-3590), THE STORM WATER MANAGEMENT PLAN, AND THE EROSION CONTROL PLAN. 16.THE LOCAL ENTITY SHALL NOT BE RESPONSIBLE FOR THE MAINTENANCE OF STORM DRAINAGE FACILITIES LOCATED ON PRIVATE PROPERTY. MAINTENANCE OF ONSITE DRAINAGE FACILITIES SHALL BE THE RESPONSIBILITY OF THE PROPERTY OWNER(S). 17.CERTIFICATION OF GRADING AND DRAINAGE FACILITIES MUST BE COMPLETED BY A REGISTERED ENGINEER AND SUBMITTED TO THE STORMWATER UTILITY DEPARTMENT AT LEAST TWO WEEKS PRIOR TO STORMWATER UTILITY DEPARTMENT ACCEPTANCE, OR OTHERWISE IN ACCORDANCE WITH THE DEVELOPMENT AGREEMENT. 18.THE LOCAL ENTITY SHALL NOT BE RESPONSIBLE FOR ANY DAMAGES OR INJURIES SUSTAINED IN THIS DEVELOPMENT AS A RESULT OF GROUNDWATER SEEPAGE, WHETHER RESULTING FROM GROUNDWATER FLOODING, STRUCTURAL DAMAGE OR OTHER DAMAGE UNLESS SUCH DAMAGE OR INJURIES ARE SUSTAINED AS A RESULT OF THE LOCAL ENTITY FAILURE TO PROPERLY MAINTAIN ITS WATER, WASTEWATER, AND/OR STORM DRAINAGE FACILITIES IN THE DEVELOPMENT. 19.ALL RECOMMENDATIONS OF THE FINAL DRAINAGE AND EROSION CONTROL STUDY FINAL DRAINAGE REPORT 302 CONIFER APARTMENTS DATED 02/14/2025 BY STRATEGIC LAND SOLUTIONS, INC. SHALL BE FOLLOWED AND IMPLEMENTED. 20.TEMPORARY EROSION CONTROL DURING CONSTRUCTION SHALL BE PROVIDED AS SHOWN ON THE EROSION CONTROL PLAN. ALL EROSION CONTROL MEASURES SHALL BE MAINTAINED IN GOOD REPAIR BY THE DEVELOPER, UNTIL SUCH TIME AS THE ENTIRE DISTURBED AREAS IS STABILIZED WITH HARD SURFACE OR LANDSCAPING. 21.THE DEVELOPER SHALL BE RESPONSIBLE FOR INSURING THAT NO MUD OR DEBRIS SHALL BE TRACKED ONTO THE EXISTING PUBLIC STREET SYSTEM. MUD AND DEBRIS MUST BE REMOVED WITHIN 24 HOURS BY AN APPROPRIATE MECHANICAL METHOD (I.E. MACHINE BROOM SWEEP, LIGHT DUTY FRONT-END LOADER, ETC.) OR AS APPROVED BY THE LOCAL ENTITY STREET INSPECTOR. 22.NO WORK MAY COMMENCE WITHIN ANY IMPROVED OR UNIMPROVED PUBLIC RIGHT-OF-WAY UNTIL A RIGHT-OF-WAY PERMIT OR DEVELOPMENT CONSTRUCTION PERMIT IS OBTAINED, IF APPLICABLE. 23.THE DEVELOPER SHALL BE RESPONSIBLE FOR OBTAINING ALL NECESSARY PERMITS FOR ALL APPLICABLE AGENCIES PRIOR TO COMMENCEMENT OF CONSTRUCTION. THE DEVELOPER SHALL NOTIFY THE LOCAL ENTITY ENGINEERING INSPECTOR (FORT COLLINS - 221-6605) AND THE LOCAL ENTITY EROSION CONTROL INSPECTOR (FORT COLLINS – 221-6700) AT LEAST 2 WORKING DAYS PRIOR TO THE START OF ANY EARTH DISTURBING ACTIVITY, OR CONSTRUCTION ON ANY AND ALL PUBLIC IMPROVEMENTS. IF THE LOCAL ENTITY ENGINEER IS NOT AVAILABLE AFTER PROPER NOTICE OF CONSTRUCTION ACTIVITY HAS BEEN PROVIDED, THE DEVELOPER MAY COMMENCE WORK IN THE ENGINEER ABSENCE. HOWEVER, THE LOCAL ENTITY RESERVES THE RIGHT NOT TO ACCEPT THE IMPROVEMENT IF SUBSEQUENT TESTING REVEALS AN IMPROPER INSTALLATION. 24.THE DEVELOPER SHALL BE RESPONSIBLE FOR OBTAINING SOILS TESTS WITHIN THE PUBLIC RIGHTOF-WAY AFTER RIGHT OF WAY GRADING AND ALL UTILITY TRENCH WORK IS COMPLETE AND PRIOR TO THE PLACEMENT OF CURB, GUTTER, SIDEWALK AND PAVEMENT. IF THE FINAL SOILS/PAVEMENT DESIGN REPORT DOES NOT CORRESPOND WITH THE RESULTS OF THE ORIGINAL GEOTECHNICAL REPORT, THE DEVELOPER SHALL BE RESPONSIBLE FOR A RE-DESIGN OF THE SUBJECT PAVEMENT SECTION OR, THE DEVELOPER MAY USE THE LOCAL ENTITY’S DEFAULT PAVEMENT THICKNESS SECTION(S). REGARDLESS OF THE OPTION USED, ALL FINAL SOILS/PAVEMENT DESIGN REPORTS SHALL BE PREPARED BY A LICENSED PROFESSIONAL ENGINEER. THE FINAL REPORT SHALL BE SUBMITTED TO THE INSPECTOR A MINIMUM OF 10 WORKING DAYS PRIOR TO PLACEMENT OF BASE AND ASPHALT. PLACEMENT OF CURB, GUTTER, SIDEWALK, BASE AND ASPHALT SHALL NOT OCCUR UNTIL THE LOCAL ENTITY ENGINEER APPROVES THE FINAL REPORT. 25.THE CONTRACTOR SHALL HIRE A LICENSED ENGINEER OR LAND SURVEYOR TO SURVEY THE CONSTRUCTED ELEVATIONS OF THE STREET SUBGRADE AND THE GUTTER FLOWLINE AT ALL INTERSECTIONS, INLETS, AND OTHER LOCATIONS REQUESTED BY THE LOCAL ENTITY INSPECTOR. THE ENGINEER OR SURVEYOR MUST CERTIFY IN A LETTER TO THE LOCAL ENTITY THAT THESE ELEVATIONS CONFORM TO THE APPROVED PLANS AND SPECIFICATIONS. ANY DEVIATIONS SHALL BE NOTED IN THE LETTER AND THEN RESOLVED WITH THE LOCAL ENTITY BEFORE INSTALLATION OF BASE COURSE OR ASPHALT WILL BE ALLOWED ON THE STREETS. 26.ALL UTILITY INSTALLATIONS WITHIN OR ACROSS THE ROADBED OF NEW RESIDENTIAL ROADS MUST BE COMPLETED PRIOR TO THE FINAL STAGES OF ROAD CONSTRUCTION. FOR THE PURPOSES OF THESE STANDARDS, ANY WORK EXCEPT C/G ABOVE THE SUBGRADE IS CONSIDERED FINAL STAGE WORK. ALL SERVICE LINES MUST BE STUBBED TO THE PROPERTY LINES AND MARKED SO AS TO REDUCE THE EXCAVATION NECESSARY FOR BUILDING CONNECTIONS. 27.PORTIONS OF LARIMER COUNTY ARE WITHIN OVERLAY DISTRICTS. THE LARIMER COUNTY FLOODPLAIN RESOLUTION SHOULD BE REFERRED TO FOR ADDITIONAL CRITERIA FOR ROADS WITHIN THESE DISTRICTS. 28.ALL ROAD CONSTRUCTION IN AREAS DESIGNATED AS WILD FIRE HAZARD AREAS SHALL BE DONE IN ACCORDANCE WITH THE CONSTRUCTION CRITERIA AS ESTABLISHED IN THE WILD FIRE HAZARD AREA MITIGATION REGULATIONS IN FORCE AT THE TIME OF FINAL PLAT APPROVAL. 29.PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION, THE CONTRACTOR SHALL CONTACT THE LOCAL ENTITY FORESTER TO SCHEDULE A SITE INSPECTION FOR ANY TREE REMOVAL REQUIRING A PERMIT. 30.THE DEVELOPER SHALL BE RESPONSIBLE FOR ALL ASPECTS OF SAFETY INCLUDING, BUT NOT LIMITED TO, EXCAVATION, TRENCHING, SHORING, TRAFFIC CONTROL, AND SECURITY. REFER TO OSHA PUBLICATION 2226, EXCAVATING AND TRENCHING. 31.THE DEVELOPER SHALL SUBMIT A CONSTRUCTION TRAFFIC CONTROL PLAN, IN ACCORDANCE WITH MUTCD, TO THE APPROPRIATE RIGHT-OF-WAY AUTHORITY. (LOCAL ENTITY, COUNTY OR STATE), FOR APPROVAL, PRIOR TO ANY CONSTRUCTION ACTIVITIES WITHIN, OR AFFECTING, THE RIGHT-OF-WAY. THE DEVELOPER SHALL BE RESPONSIBLE FOR PROVIDING ANY AND ALL TRAFFIC CONTROL DEVICES AS MAY BE REQUIRED BY THE CONSTRUCTION ACTIVITIES. 32.PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION THAT WILL AFFECT TRAFFIC SIGNS OF ANY TYPE, THE CONTRACTOR SHALL CONTACT LOCAL ENTITY TRAFFIC OPERATIONS DEPARTMENT, WHO WILL TEMPORARILY REMOVE OR RELOCATE THE SIGN AT NO COST TO THE CONTRACTOR; HOWEVER, IF THE CONTRACTOR MOVES THE TRAFFIC SIGN THEN THE CONTRACTOR WILL BE CHARGED FOR THE LABOR, MATERIALS AND EQUIPMENT TO REINSTALL THE SIGN AS NEEDED. 33.THE DEVELOPER IS RESPONSIBLE FOR ALL COSTS FOR THE INITIAL INSTALLATION OF TRAFFIC SIGNING AND STRIPING FOR THE DEVELOPMENT RELATED TO THE DEVELOPMENT’S LOCAL STREET OPERATIONS. IN ADDITION, THE DEVELOPER IS RESPONSIBLE FOR ALL COSTS FOR TRAFFIC SIGNING AND STRIPING RELATED TO DIRECTING TRAFFIC ACCESS TO AND FROM THE DEVELOPMENT. 34.THERE SHALL BE NO SITE CONSTRUCTION ACTIVITIES ON SATURDAYS, UNLESS SPECIFICALLY APPROVED BY THE LOCAL ENTITY ENGINEER, AND NO SITE CONSTRUCTION ACTIVITIES ON SUNDAYS OR HOLIDAYS, UNLESS THERE IS PRIOR WRITTEN APPROVAL BY THE LOCAL ENTITY. 35.THE DEVELOPER IS RESPONSIBLE FOR PROVIDING ALL LABOR AND MATERIALS NECESSARY FOR THE COMPLETION OF THE INTENDED IMPROVEMENTS, SHOWN ON THESE DRAWINGS, OR DESIGNATED TO BE PROVIDED, INSTALLED, OR CONSTRUCTED, UNLESS SPECIFICALLY NOTED OTHERWISE. 36.DIMENSIONS FOR LAYOUT AND CONSTRUCTION ARE NOT TO BE SCALED FROM ANY DRAWING. IF PERTINENT DIMENSIONS ARE NOT SHOWN, CONTACT THE DESIGNER FOR CLARIFICATION, AND ANNOTATE THE DIMENSION ON THE AS-BUILT RECORD DRAWINGS. 37.THE DEVELOPER SHALL HAVE, ONSITE AT ALL TIMES, ONE (1) SIGNED COPY OF THE APPROVED PLANS, ONE (1) COPY OF THE APPROPRIATE STANDARDS AND SPECIFICATIONS, AND A COPY OF ANY PERMITS AND EXTENSION AGREEMENTS NEEDED FOR THE JOB. 38.IF, DURING THE CONSTRUCTION PROCESS, CONDITIONS ARE ENCOUNTERED WHICH COULD INDICATE A SITUATION THAT IS NOT IDENTIFIED IN THE PLANS OR SPECIFICATIONS, THE DEVELOPER SHALL CONTACT THE DESIGNER AND THE LOCAL ENTITY ENGINEER IMMEDIATELY. 39.THE DEVELOPER SHALL BE RESPONSIBLE FOR RECORDING AS-BUILT INFORMATION ON A SET OF RECORD DRAWINGS KEPT ON THE CONSTRUCTION SITE, AND AVAILABLE TO THE LOCAL ENTITY’S INSPECTOR AT ALL TIMES. UPON COMPLETION OF THE WORK, THE CONTRACTOR(S) SHALL SUBMIT RECORD DRAWINGS TO THE LOCAL ENTITY ENGINEER. 40.THE DESIGNER SHALL PROVIDE, IN THIS LOCATION ON THE PLAN, THE LOCATION AND DESCRIPTION OF THE NEAREST SURVEY BENCHMARKS (2) FOR THE PROJECT AS WELL AS THE BASIS OF BEARINGS. THE INFORMATION SHALL BE AS FOLLOWS: PROJECT DATUM: NAVD 88 BENCHMARK #1: CITY OF FORT COLLINS BENCHMARK 4-07 SOUTHWEST CORNER OF TIMBERLINE RO. AND BEAR MOUNTAIN OR. DUE NORTH OF NEW POLICE BUILDING ON THE SOUTHWEST CORNER OF A CATCH BASIN. ELEVATION = 4942.84 BENCHMARK #2: CITY OF FORT COLLINS BENCHMARK 17-92 300 FEET SOUTH OF THE SOUTHWEST CORNER OF EAST DRAKE RO. AND TIMBERLINE RO. IN THE TOP OF AN IRRIGATION STRUCTURE. ELEVATION = 4938.70 PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM} FOR THEIR VERTICAL DATUMS. IF NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLL/NS DATUM} IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQUATION SHOULD BE USED: NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) = NAVD88 3.185' BASIS OF BEARING THE BASIS OF BEARINGS IS THE EAST LINE OF LOTS 10-13, BLOCK 5, REPLAT (NO.1) OF EVERGREEN PARK, AS BEARING NORTH 0°37'46” EAST, WITH THE SOUTHEAST CORNER OF SAID LOT 13, BLOCK 5, BEING A #4 REBAR, NO CAP AND THE NORTHEAST CORNER OF SAID LOT 10, BLOCK 5, BEING A #4 REBAR WITH A YELLOW PLASTIC CAP STAMPED "LS 10855", AND WITH ALL BEARINGS CONTAINED HEREIN RELATIVE THERETO. 41.ALL STATIONING IS BASED ON CENTERLINE/FLOWLINE (INSERT PROPER WORD) OF ROADWAYS UNLESS OTHERWISE NOTED. 42.DAMAGED CURB, GUTTER AND SIDEWALK EXISTING PRIOR TO CONSTRUCTION, AS WELL AS EXISTING FENCES, TREES, STREETS, SIDEWALKS, CURBS AND GUTTERS, LANDSCAPING, STRUCTURES, AND IMPROVEMENTS DESTROYED, DAMAGED OR REMOVED DUE TO CONSTRUCTION OF THIS PROJECT, SHALL BE REPLACED OR RESTORED IN LIKE KIND AT THE DEVELOPER’S EXPENSE, UNLESS OTHERWISE INDICATED ON THESE PLANS, PRIOR TO THE ACCEPTANCE OF COMPLETED IMPROVEMENTS AND/OR PRIOR TO THE ISSUANCE OF THE FIRST CERTIFICATE OF OCCUPANCY. 43.WHEN AN EXISTING ASPHALT STREET MUST BE CUT, THE STREET MUST BE RESTORED TO A CONDITION EQUAL TO OR BETTER THAN ITS ORIGINAL CONDITION. THE EXISTING STREET CONDITION SHALL BE DOCUMENTED BY THE LOCAL ENTITY CONSTRUCTION INSPECTOR BEFORE ANY CUTS ARE MADE. PATCHING SHALL BE DONE IN ACCORDANCE WITH THE LOCAL ENTITY STREET REPAIR STANDARDS. THE FINISHED PATCH SHALL BLEND IN SMOOTHLY INTO THE EXISTING SURFACE. ALL LARGE PATCHES SHALL BE PAVED WITH AN ASPHALT LAY-DOWN MACHINE. IN STREETS WHERE MORE THAN ONE CUT IS MADE, AN OVERLAY OF THE ENTIRE STREET WIDTH, INCLUDING THE PATCHED AREA, MAY BE REQUIRED. THE DETERMINATION OF NEED FOR A COMPLETE OVERLAY SHALL BE MADE BY THE LOCAL ENTITY ENGINEER AND/OR THE LOCAL ENTITY INSPECTOR AT THE TIME THE CUTS ARE MADE. 44.UPON COMPLETION OF CONSTRUCTION, THE SITE SHALL BE CLEANED AND RESTORED TO A CONDITION EQUAL TO, OR BETTER THAN, THAT WHICH EXISTED BEFORE CONSTRUCTION, OR TO THE GRADES AND CONDITION AS REQUIRED BY THESE PLANS. 45.STANDARD HANDICAP RAMPS ARE TO BE CONSTRUCTED AT ALL CURB RETURNS AND AT ALL “T” INTERSECTIONS. 46.AFTER ACCEPTANCE BY THE LOCAL ENTITY, PUBLIC IMPROVEMENTS DEPICTED IN THESE PLANS SHALL BE GUARANTEED TO BE FREE FROM MATERIAL AND WORKMANSHIP DEFECTS FOR A MINIMUM PERIOD OF TWO YEARS FROM THE DATE OF ACCEPTANCE. 47.THE LOCAL ENTITY SHALL NOT BE RESPONSIBLE FOR THE MAINTENANCE OF ROADWAY AND APPURTENANT IMPROVEMENTS, INCLUDING STORM DRAINAGE STRUCTURES AND PIPES, FOR THE FOLLOWING PRIVATE STREETS: (LIST). 48.APPROVED VARIANCES ARE LISTED AS FOLLOWS: DRIVEWAY/INTERSECTION SPACING VARIANCE IS EXPECTED. (THIS NOTE TO BE UPDATED ONCE VARIANCE IS APPROVED) STANDARD CONSTRUCTION NOTES 1.THE PROPERTY OWNER, OWNER’S REPRESENTATIVE, DEVELOPER, DESIGN ENGINEER, GENERAL CONTRACTOR, SUB-CONTRACTORS, OR SIMILAR TITLE FOR THE DEVELOPING ENTITY (HERE AFTER REFERRED TO AS THE DEVELOPER) HAS PROVIDED THESE EROSION CONTROL MATERIALS IN ACCORDANCE WITH EROSION CONTROL CRITERIA SET FORTH IN THE MANUAL AS AN ATTEMPT TO IDENTIFY EROSION, SEDIMENT, AND OTHER POTENTIAL POLLUTANT SOURCES ASSOCIATED WITH THESE CONSTRUCTION ACTIVITIES AND PREVENTING THOSE POLLUTANTS FROM LEAVING THE PROJECT SITE AS AN ILLICIT DISCHARGE. FULL CITY REQUIREMENTS AND ARE OUTLINED AND CLARIFIED IN THE MANUAL UNDER CHAPTER 4: CONSTRUCTION CONTROL MEASURES AND SHOULD BE USED TO IDENTIFY AND DEFINE WHAT IS NEEDED ON A PROJECT. 2.THE DEVELOPER SHALL MAKE THEMSELVES THOROUGHLY FAMILIAR WITH THE PROVISIONS AND THE CONTENT OF THE SPECIFICATIONS LAID OUT IN THE MANUAL, THE DEVELOPMENT AGREEMENT, THE EROSION CONTROL MATERIALS COMPILED FOR THIS PROJECT, AND THE FOLLOWING NOTES AS ALL THESE MATERIALS ARE APPLICABLE TO THIS PROJECT. 3.THE DEVELOPER SHALL IMPLEMENT AND MAINTAIN CONTROL MEASURES FOR ALL POTENTIAL POLLUTANTS FROM THE START OF LAND DISTURBING ACTIVITIES UNTIL FINAL STABILIZATION OF THE CONSTRUCTION SITE. 4.THE CITY EROSION CONTROL INSPECTOR SHALL BE NOTIFIED AT LEAST TWENTY-FOUR (24) HOURS PRIOR TO THE DESIRED START OF ANY CONSTRUCTION ACTIVITIES ON THIS SITE TO ALLOW ADEQUATE TIME FOR ON-SITE CONFIRMATION (INITIAL INSPECTION WHICH CAN TAKE UP TO TWO BUSINESS DAYS AFTER RECEIVING THE REQUEST) THAT THE SITE IS IN FACT PROTECTED FROM SEDIMENT AND POLLUTANTS DISCHARGES OFF SITE. PLEASE CONTACT EROSION@FCGOV.COM EARLY TO SCHEDULE THOSE INITIAL EROSION CONTROL INSPECTIONS WELL IN ADVANCE SO THAT DEMOLITION, CLEARING, GRUBBING, TREE REMOVAL, AND SCRAPING MAY BEGIN WITHOUT DELAY. FAILURE TO RECEIVE AN ON-SITE CONFIRMATION BEFORE CONSTRUCTION ACTIVITIES COMMENCE IS AN AUTOMATIC “NOTICE OF VIOLATION” AND CAN RESULT IN FURTHER ENFORCEMENT ACTIONS. 5.THE DEVELOPER SHALL PROACTIVELY PROVIDE ALL APPROPRIATE CONTROL MEASURES TO PREVENT DAMAGE TO ADJACENT DOWNSTREAM AND LEEWARD PROPERTIES. THIS INCLUDES BUT IS NOT LIMITED TO: TREES, SHRUBS, LAWNS, WALKS, PAVEMENTS, ROADWAYS, STRUCTURES, CREEKS, WETLANDS, STREAMS, RIVERS, AND UTILITIES THAT ARE NOT DESIGNED FOR REMOVAL, RELOCATION, OR REPLACEMENT IN THE COURSE OF CONSTRUCTION. 6.AT ALL TIMES THE DEVELOPER SHALL BE RESPONSIBLE TO ENSURE ADEQUATE CONTROL MEASURES ARE DESIGNED, SELECTED, INSTALLED, MAINTAIN, REPAIRED, REPLACED, AND ULTIMATELY REMOVED IN ORDER TO PREVENT AND CONTROL EROSION SUSPENSION, SEDIMENT TRANSPORTATION, AND POLLUTANT DISCHARGE AS A RESULT OF CONSTRUCTION ACTIVITIES ASSOCIATED WITH THIS PROJECT. 7.ALL APPLICABLE CONTROL MEASURES BASED UPON THE SEQUENCING AND/OR PHASING OF THE PROJECT SHALL BE INSTALLED PRIOR TO THOSE CONSTRUCTION ACTIVITIES COMMENCING. 8.AS DYNAMIC CONDITIONS (DUE TO THE NATURE, TIMING, SEQUENCE, AND PHASING OF CONSTRUCTION) IN THE FIELD MAY WARRANT CONTROL MEASURES IN ADDITION, OR DIFFERENT, TO WHAT IS SHOWN ON THESE PLANS, THE DEVELOPER SHALL AT ALL TIMES BE RESPONSIBLE TO IMPLEMENT THE CONTROL MEASURES THAT ARE MOST EFFECTIVE WITH THE CURRENT STATE AND PROGRESS OF CONSTRUCTION. THE DEVELOPER SHALL IMPLEMENT WHATEVER MEASURES ARE DETERMINED NECESSARY, AND/OR AS DIRECTED BY THE CITY EROSION CONTROL INSPECTOR. THE DEVELOPER SHALL INSURE THAT ALL EROSION CONTROL PLANS (MAPS) OR SWMP DOCUMENTS ARE UPDATED TO REFLECT THE CURRENT SITE CONDITIONS, WITH UPDATES BEING INITIALED AND DATED. THESE SITE INSPECTIONS AND SITE CONDITION UPDATES SHALL BE MADE AVAILABLE UPON REQUEST BY THE CITY. 9.ALL LISTINGS, PROVISIONS, MATERIALS, PROCEDURES, ACTIVITIES, SITE WORK AND THE LIKE ARTICULATED IN THIS OR OTHER WRITTEN SITE-SPECIFIC DOCUMENTS (INCLUDING BUT NOT LIMITED TO THE EROSION CONTROL REPORTS, DEVELOPMENT AGREEMENTS, LANDSCAPE, AND DRAINAGE MATERIALS) SHALL MEET OR EXCEED THE MOST RESTRICTIVE LANGUAGE FOR CITY, COUNTY, STATE, AND FEDERAL REGULATIONS WITH REGARDS TO EROSION, SEDIMENT, POLLUTANT, AND OTHER POLLUTION SOURCE CONTROL MEASURES. THE DEVELOPER SHALL BE RESPONSIBLE TO COMPLY WITH ALL OF THESE AFOREMENTIONED LAWS AND REGULATIONS. 10.THE DEVELOPER SHALL ENSURE THAT ALL APPROPRIATE PERMITS (CDPS GENERAL PERMIT STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY, DEWATERING, CLEAN WATER ACT, ARMY CORPS OF ENGINEERS’ 404 WETLANDS MITIGATION PERMIT, ETC.) HAVE BEEN ATTAINED PRIOR TO THE RELEVANT ACTIVITY HAS BEGUN. THESE PERMITS OR COPIES SHALL BE MADE AVAILABLE UPON REQUEST BY THE CITY. 11.THE DEVELOPER SHALL FURNISH ALL CONVENIENCES AND ASSISTANCES TO AID THE EROSION CONTROL INSPECTORS OF MATERIALS, WORKMANSHIP, RECORDS, AND SELF-INSPECTIONS, ETC. OF THE CONTROL MEASURES INVOLVED IN THE CONSTRUCTION ACTIVITIES. 12.THE DEVELOPER SHALL REQUEST CLARIFICATION OF ALL APPARENT SITE CONSTRUCTION ISSUES THAT MAY ARISE DUE TO INCONSISTENCIES IN CONSTRUCTION PLANS FOR THE SITE OR SITE CONDITIONS AROUND THE SELECTED CONTROL MEASURES BY CONTACTING THE EROSION CONTROL INSPECTOR. THE EROSION CONTROL INSPECTOR WILL NOT BE RESPONSIBLE FOR ANY EXPLANATIONS, INTERPRETATIONS, OR SUPPLEMENTARY DATA PROVIDED BY OTHERS. 13.ALL CONTROL MEASURES SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUAL. 14.THE CITY RESERVES THE RIGHT TO REQUIRE ADDITIONAL CONTROL MEASURES AS SITE CONDITIONS WARRANT, TO THE EXTENT AUTHORIZED BY RELEVANT LEGAL AUTHORITY. 15.AS WITH ANY CONSTRUCTION STANDARDS, OCCASIONS MAY ARISE WHERE THE MINIMUM EROSION CONTROL STANDARDS ARE EITHER INAPPROPRIATE OR CANNOT BE JUSTIFIED. IN THESE CASES, A VARIANCE TO THESE STANDARDS MAY BE APPLIED FOR PURSUANT TO THE TERMS, CONDITIONS, AND PROCEDURES OF THE MANUAL. 16.INSPECTION. THE CONTRACTOR SHALL INSPECT SITE POLLUTANT SOURCES AND IMPLEMENT CONTROL MEASURES AT A MINIMUM OF ONCE EVERY TWO WEEKS DURING CONSTRUCTION AND WITHIN 24 HOURS FOLLOWING A PRECIPITATION EVENT. DOCUMENTATION OF EACH INSPECTION SHALL BE RECORDED AND RETAINED BY THE CONTRACTOR. 17.ALL TEMPORARY CONTROL MEASURES SHALL BE CLEANED, REPAIRED, OR RECONSTRUCTED AS NECESSARY IN ORDER TO ASSURE CONTINUAL PERFORMANCE OF THEIR INTENDED FUNCTION. ALL RETAINED SEDIMENTS, PARTICULARLY THOSE ON PAVED ROADWAY SURFACES, SHALL BE REMOVED AND DISPOSED OF IN A MANNER AND LOCATION SO AS NOT TO CAUSE THEIR RELEASE INTO ANY DRAINAGE WAY. 18.ANY CONTROL MEASURE MAY BE SUBSTITUTED FOR ANOTHER STANDARD CONTROL MEASURE SO LONG AS THAT CONTROL MEASURE IS EQUAL TO, OR OF GREATER PROTECTION THAN THE ORIGINAL CONTROL MEASURE THAT WAS TO BE USED IN THAT LOCATION. (EX. SILT FENCE, FOR WATTLES, OR FOR COMPACT BERMS) WATTLE ALONE ON COMMERCIAL CONSTRUCTION SITES HAVE SHOWN TO BE AN INEFFECTIVE SUBSTITUTE FOR SILT FENCE OR COMPACT BERMS UNLESS IT IS ACCOMPANIED BY A CONSTRUCTION FENCE TO PREVENT VEHICLE TRAFFIC. 19.ANY IMPLEMENTATION OR REPLACEMENT OF EXISTING CONTROL MEASURES FOR A NON-STANDARD CONTROL, OR ALTERNATIVE CONTROL MEASURE, SHALL REQUIRE THE REVIEW AND ACCEPTANCE BY THE CITY EROSION CONTROL STAFF BEFORE THE MEASURE WILL BE ALLOWED TO BE USED ON THIS PROJECT. THESE CONTROL MEASURES’ DETAILS SHALL BE SUBMITTED, REVIEWED AND ACCEPTED TO BE IN ACCORDANCE WITH THE EROSION CONTROL CRITERIA BASED UPON THE FUNCTIONALITY AND EFFECTIVENESS IN ACCORDANCE WITH SOUND ENGINEERING AND HYDROLOGICAL PRACTICES LAND DISTURBANCE, STOCKPILES, AND STORAGE OF SOILS 20.THERE SHALL BE NO EARTH-DISTURBING ACTIVITY OUTSIDE THE LIMITS DESIGNATED ON THE ACCEPTED PLANS. OFF ROAD STAGING AREAS OR STOCKPILES MUST BE PREAPPROVED BY THE CITY. DISTURBANCES BEYOND THESE LIMITS WILL BE RESTORED TO ORIGINAL CONDITION. 21.PRE-DISTURBANCE VEGETATION SHALL BE IDENTIFIED, PROTECTED, AND RETAINED WHEREVER POSSIBLE. REMOVAL OR DISTURBANCE OF EXISTING VEGETATION SHALL BE LIMITED TO THE AREA REQUIRED FOR IMMEDIATE CONSTRUCTION OPERATIONS, AND FOR THE SHORTEST PRACTICAL PERIOD OF TIME. THIS SHOULD INCLUDE SEQUENCING AND PHASING CONSTRUCTION ACTIVITIES IN A WAY SO THAT THE SOIL IS NOT EXPOSED FOR LONG PERIODS OF TIME BY SCHEDULE OR LIMIT GRADING TO SMALL AREAS. THIS SHOULD ALSO INCLUDE WHEN PRACTICAL ADVANCING THE SCHEDULE ON STABILIZATION ACTIVITIES SUCH THAT LANDSCAPING TAKES PLACE SHORTLY IF NOT IMMEDIATELY AFTER GRADING HAS OCCURRED. VEGETATION EFFORTS SHALL START AS SOON AS POSSIBLE TO RETURN THE SITE TO A STABILIZED CONDITION. SENSITIVE AREAS SHOULD AVOID CLEARING AND GRADING ACTIVITIES AS MUCH POSSIBLE. 22.ALL EXPOSED SOILS OR DISTURBED AREAS ARE CONSIDERED A POTENTIAL POLLUTANT AND SHALL HAVE CONTROL MEASURES IMPLEMENTED ON THE SITE TO PREVENT MATERIALS FROM LEAVING THE SITE. 23.ALL SOILS EXPOSED DURING LAND DISTURBING ACTIVITY (STRIPPING, GRADING, UTILITY INSTALLATIONS, STOCKPILING, FILLING, ETC.) SHALL BE KEPT IN A ROUGHENED CONDITION AT ALL TIMES BY EQUIPMENT TRACKING, SCARIFYING OR DISKING THE SURFACE ON A CONTOUR WITH A 2 TO 4 INCH MINIMUM VARIATION IN SOIL SURFACE UNTIL MULCH, VEGETATION, AND/OR OTHER PERMANENT EROSION CONTROL IS INSTALLED. 24.NO SOIL STOCKPILE SHALL EXCEED TEN (10) FEET IN HEIGHT. ALL SOIL STOCKPILES SHALL BE PROTECTED FROM SEDIMENT TRANSPORT THROUGH THE USE OF SURFACE ROUGHENING, WATERING, AND DOWN GRADIENT PERIMETER CONTROLS. ALL SOIL STOCKPILES SHALL BE PROTECTED FROM SEDIMENT TRANSPORT BY WIND IN ACCORDANCE WITH MUNICIPAL CODE §12-150. ALL STOCKPILES SHALL BE FLATTENED TO MEET GRADE OR REMOVED FROM SITE AS SOON AS PRACTICAL, AND NO LATER THAN THE COMPLETION OF CONSTRUCTION ACTIVITIES OR ABANDONMENT OF THE PROJECT. ALL OFF-SITE STOCKPILE STORAGE LOCATIONS IN CITY LIMITS SHALL HAVE A STOCKPILE PERMIT FROM THE CITY ENGINEERING DEPARTMENT PRIOR TO USING THE AREA TO STORE MATERIAL. IF FREQUENT ACCESS FROM HARDSCAPE TO THE STOCKPILE IS NEEDED A STRUCTURAL TRACKING CONTROL MEASURE SHALL BE IMPLEMENTED. 25.ALL REQUIRED CONTROL MEASURES SHALL BE INSTALLED PRIOR TO ANY LAND DISTURBING ACTIVITY (STOCKPILING, STRIPPING, GRADING, ETC.). ALL OF THE REQUIRED EROSION CONTROL MEASURES MUST BE INSTALLED AT THE APPROPRIATE TIME IN THE CONSTRUCTION SEQUENCE AS INDICATED IN THE APPROVED PROJECT SCHEDULE, CONSTRUCTION PLANS, AND EROSION CONTROL REPORT. 26.ALL INLETS, CURB-CUTS, CULVERTS, AND OTHER STORM SEWER INFRASTRUCTURE WHICH COULD BE POTENTIALLY IMPACTED BY CONSTRUCTION ACTIVITIES SHALL BE PROTECTED WITH CONTROL MEASURES. MATERIAL ACCUMULATED FROM THIS CONTROL MEASURE SHALL BE PROMPTLY REMOVED AND IN CASES WHERE THE PROTECTION HAS FAILED, THE PIPES SHALL BE THOROUGHLY CLEANED OUT. 27.ALL STREAMS, STREAM CORRIDORS, BUFFERS, WOODLANDS, WETLANDS, OR OTHER SENSITIVE AREAS SHALL BE PROTECTED FROM IMPACT BY ANY CONSTRUCTION ACTIVITY THROUGH THE USE OF CONTROL MEASURES. 28.ALL EXPOSED DIRT SHALL HAVE PERIMETER CONTROL. ANY PERIMETER CONTROLS THAT DRAIN OFF OR HAS THE ABILITY TO BE TRACKED ONTO THE NEARBY HARDSCAPE SHALL HAVE SOME FORM OF EFFECTIVE SEDIMENT CONTROL AS THE, OR AS PART OF THE, PERIMETER CONTROL. 29.ALL EXPOSED SLOPES SHOULD BE PROTECTED. ALL EXPOSED STEEP SLOPES (STEEPER THAN 3:1 H:V) SHALL BE PROTECTED FROM EROSION AND SEDIMENT TRANSPORT THROUGH USE OF CONTROL MEASURES. 30.NO SOILS SHALL REMAIN EXPOSED BY LAND DISTURBING ACTIVITY FOR MORE THAN THIRTY (30) DAYS AFTER ACTIVITY HAS CEASED BEFORE REQUIRED TEMPORARY SEEDING OR PERMANENT EROSION CONTROL (E.G. SEED/MULCH, LANDSCAPING, ETC.) IS INSTALLED. THIS IS NOT JUST LIMITED TO PROJECTS THAT ARE ABANDONED; THIS INCLUDES ANY PROJECT THAT IS TEMPORARILY HALTED AND NO IMMEDIATE ACTIVITY IS TO RESUME WITHIN THE NEXT THIRTY (30) DAYS, UNLESS OTHERWISE APPROVED BY THE CITY EROSION CONTROL INSPECTOR. DURING A SEASON WHEN SEEDING DOES NOT PRODUCE VEGETATIVE COVER, ANOTHER TEMPORARY EROSION CONTROL SHALL BE IMPLEMENTED WITH OR UNTIL TEMPORARY SEEDING OR PERMANENT EROSION CONTROL CAN BE PERFORMED. 31) 31.ALL INDIVIDUAL LOTS SHALL HAVE EFFECTIVE SEDIMENT CONTROLS LOCATED ON THE STREET SIDE AND ANY DOWN GRADIENT SIDE. TYPICALLY MOST LOTS DRAIN TO THE FRONT YET ON THOSE CASES WHERE HOUSES ARE ALONG A POND OR DRAINAGE SWALE HAVE THE LOT DRAIN IN A DIFFERENT DIRECTION THAN THE STREET, THOSE INDIVIDUAL LOTS WILL NEED PROTECTION ON THAT DOWN GRADIENT SIDE TO PREVENT SEDIMENT FROM LEAVING THE LOT. SEE THE INDIVIDUAL LOT DETAILS FOR FURTHER CLARIFICATION. VEHICLE TRACKING. 32.AT ALL POINTS WHERE VEHICLES EXIT OR LEAVE THE EXPOSED DIRT AREA ON TO A HARDSCAPE OR SEMI HARDSCAPE (CONCRETE, ASPHALT, ROAD BASE, ETC.) SHALL HAVE INSTALLED AT LEAST ONE STRUCTURAL TRACKING CONTROL MEASURE TO PREVENT VEHICLE TRACKING. ALL AREAS NOT PROTECTED BY AN ADEQUATE PERIMETER CONTROL SHALL BE CONSIDERED A POINT WHERE VEHICLES EXIT THE SITE. ACCESS POINTS SHOULD BE LIMITED TO AS FEW ENTRANCES AS POSSIBLE (ALL PERIMETER AREAS SHALL BE PROTECTED FROM TRACKING ACTIVITIES). 33.IN ALL AREAS THAT THE STRUCTURAL TRACKING CONTROL MEASURES FAIL TO PREVENT VEHICLE TRACKING, COLLECTION AND PROPER DISPOSAL OF THAT MATERIAL IS REQUIRED. ALL INLETS LOCATED NEAR ACCESS POINTS AND AFFECTED BY TRACKING ACTIVITIES SHALL BE PREVENTED FROM THE INTRODUCTION OF SEDIMENT INTO THE DRAINAGE SYSTEM. 34.CITY MUNICIPAL CODE §20-62, AMONG OTHER THINGS, PROHIBITS THE TRACKING, DROPPING, OR DEPOSITING OF SOILS OR ANY OTHER MATERIAL ONTO CITY STREETS BY OR FROM ANY SOURCE. CITY MUNICIPAL CODE, §26-498, AMONG OTHER THINGS, PROHIBITS THE DISCHARGE OF POLLUTANTS ON PUBLIC OR PRIVATE PROPERTY IF THERE IS A SIGNIFICANT POTENTIAL FOR MIGRATION OF SUCH POLLUTANT. THEREFORE, ALL TRACKED OR DEPOSITED MATERIALS (INTENTIONAL OR INADVERTENT) ARE NOT PERMITTED TO REMAIN ON THE STREET OR GUTTER AND SHALL BE REMOVED AND LEGALLY DISPOSED OF BY THE DEVELOPER IN A TIMELY AND IMMEDIATE MANNER. DIRT RAMPS INSTALLED IN THE CURB-LINES ARE NOT EXEMPT TO THESE SECTIONS OF CODE AND SHALL NOT BE PERMITTED IN THE STREET RIGHT OF WAY (PUBLIC OR PRIVATE). 35.IF REPEATED DEPOSIT OF MATERIAL OCCURS ON A SITE, ADDITIONAL STRUCTURAL TRACKING CONTROLS MAY BE REQUIRED OF THE DEVELOPER BY THE CITY EROSION CONTROL INSPECTOR. LOADING AND UNLOADING OPERATIONS 36.THE DEVELOPER SHALL APPLY CONTROL MEASURE TO LIMIT TRAFFIC (SITE WORKER OR PUBLIC) IMPACTS AND PROACTIVELY LOCATE MATERIAL DELIVERED TO THE SITE IN CLOSE PROXIMITY TO THE WORK AREA OR IMMEDIATELY INCORPORATED IN THE CONSTRUCTION TO LIMIT OPERATIONAL IMPACTS TO DISTURBED AREAS, VEHICLE TRACKING, AND SEDIMENT DEPOSITION THAT COULD IMPACT WATER QUALITY. OUTDOOR STORAGE OR CONSTRUCTION SITE MATERIALS, BUILDING MATERIALS, FERTILIZERS, AND CHEMICALS 37.ANY MATERIALS OF A NON-POLLUTING NATURE (STEEL, ROCK, BRICK, LUMBER, ETC.) SHALL BE INSPECTED FOR ANY RESIDUE COMING OFF THE MATERIAL DURING ROUTINE INSPECTION AND WILL GENERALLY BE LOCATED WHERE PRACTICAL AT LEAST FIFTY (50) FEET FROM ANY PERMANENT STANDARD EROSION CONTROL NOTES ANY MATERIALS OF A NON-POLLUTING NATURE (STEEL, ROCK, BRICK, LUMBER, ETC.) SHALL BE INSPECTED FOR ANY RESIDUE COMING OFF THE MATERIAL DURING ROUTINE INSPECTION AND WILL GENERALLY BE LOCATED WHERE PRACTICAL AT LEAST FIFTY (50) FEET FROM ANY PERMANENT OR INTERIM DRAINAGE WAYS. 38.ANY HIGH ENVIRONMENTAL IMPACT POLLUTANT MATERIALS THAT HAVE A HIGH LIKELIHOOD TO RESULT IN DISCHARGE WHEN IN CONTACT WITH STORMWATER (LUBRICANTS, FUELS, PAINTS, SOLVENTS, DETERGENTS, FERTILIZERS, CHEMICAL SPRAYS, BAGS OF CEMENT MIX, ETC.) SHOULD NOT BE KEPT ON SITE WHERE PRACTICAL. WHEN NOT PRACTICAL, THEY SHOULD BE STORED INSIDE (VEHICLE, TRAILER, CONNEX, BUILDING, ETC.) AND OUT OF CONTACT WITH STORMWATER OR STORMWATER RUNOFF. WHERE NOT AVAILABLE, THEY SHALL BE STORED OUTSIDE IN A RAISED (HIGH SPOTS OR ON PALLETS), COVERED (PLASTIC OR TARPED), AND SEALED (LEAK PROOF CONTAINER) IN SECONDARY CONTAINMENT LOCATION. THE SECONDARY CONTAINMENT OR OTHER CONTROL MEASURE SHALL BE ADEQUATELY SIZED, LOCATED, WHERE PRACTICAL, AT LEAST FIFTY (50) FEET FROM ANY PERMANENT OR INTERIM STORMWATER STRUCTURES OR DRAINAGE WAYS AND SHALL BE MONITORED AS PART OF THE ROUTINE INSPECTIONS. VEHICLE AND EQUIPMENT MAINTENANCE AND FUELING 39.PARKING, REFUELING, AND MAINTENANCE OF VEHICLES AND EQUIPMENT SHOULD BE LIMITED IN ONE AREA OF THE SITE TO MINIMIZE POSSIBLE SPILLS AND FUEL STORAGE AREAS. THIS AREA SHALL BE LOCATED, WHERE PRACTICAL, AT LEAST FIFTY (50) FEET FROM ANY PERMANENT OR INTERIM STORMWATER STRUCTURES OR DRAINAGE WAYS AND SHALL BE MONITORED AS PART OF THE ROUTINE INSPECTIONS. ALL AREAS SHALL KEEP SPILL KITS AND SUPPLIES CLOSE. SIGNIFICANT DUST OR PARTICULATE GENERATING PROCESS 40.THE PROPERTY MUST BE ACTIVELY PREVENTING THE EMISSION OF FUGITIVE DUST AT ALL TIMES DURING CONSTRUCTION AND VEGETATION ACTIVITIES. ALL LAND DISTURBING ACTIVITIES THAT RESULT IN FUGITIVE DUST SHALL BE IN ACCORDANCE WITH MUNICIPAL CODE §12-150 TO REDUCE THE IMPACTS TO ADJACENT PROPERTIES AND COMMUNITY HEALTH. ALL REQUIRED PRACTICES SHALL BE IMPLEMENTED AND ADDITIONAL ONES SHALL BE FOLLOWED. THESE PRACTICES INCLUDE WATERING THE SITES AND DISCONTINUING CONSTRUCTION ACTIVITIES UNTIL THE WIND SUBSIDES AS DETERMINED BY ANY CITY INSPECTORS. CONCRETE TRUCK / EQUIPMENT WASHING, INCLUDING THE CONCRETE TRUCK CHUTE AND ASSOCIATED FIXTURES AND EQUIPMENT 41.ALL CONCRETE AND EQUIPMENT WASHING SHALL USE STRUCTURAL CONTROL MEASURES APPROPRIATE TO THE VOLUME OF WASH AND FREQUENCY OF USE. THESE CONTROL MEASURES SHALL BE LOCATED, WHERE PRACTICAL, AT LEAST FIFTY (50) FEET FROM ANY PERMANENT OR INTERIM STORMWATER STRUCTURES OR DRAINAGE WAYS AND SHALL BE MONITORED AS PART OF THE ROUTINE INSPECTIONS. THESE AREAS SHALL BE CLEARLY IDENTIFIED AND PROTECTED FROM ANY WASH FROM LEAVING THE CONTROL MEASURE. IF FREQUENT ACCESS FROM HARDSCAPE TO THE CONTROL MEASURE IS TO OCCUR, A STRUCTURAL TRACKING CONTROL MEASURE SHALL BE IMPLEMENTED. THESE CONTROL MEASURES SHALL BE FREQUENTLY CLEANED OUT. 42.THE DEVELOPER IS RESPONSIBLE FOR ENSURING WASHING ACTIVITY IS TAKING PLACE AT THE APPROPRIATE CONTROL MEASURE AND SITE WORKERS ARE NOT WASHING OR DUMPING WASH WATER ON TO THE DIRT OR OTHER UNCONTROLLED LOCATIONS. DEDICATED ASPHALT AND CONCRETE BATCH PLANTS 43.DEDICATED ASPHALT AND CONCRETE BATCH PLANTS ARE NOT ACCEPTABLE ON CONSTRUCTION SITES WITHIN THE CITY OF FORT COLLINS WITHOUT AN EXPRESSED WRITTEN REQUEST AND PLAN TO REDUCE POLLUTANTS ASSOCIATED WITH THAT TYPE OF ACTIVITY AND APPROVAL BY THE CITY OF FORT COLLINS SPECIFICALLY THE EROSION CONTROL INSPECTOR. THE DEVELOPER SHALL INFORM THE EROSION CONTROL INSPECTION STAFF OF ANY DEDICATED ASPHALT, OR CONCRETE BATCH PLANTS THAT IS TO BE USED ON SITE. CONCRETE SAW CUTTING MATERIALS 44.SAW CUTTING MATERIAL SHALL BE IN ACCORDANCE WITH MUNICIPAL CODE §12-150 FOR AIR EMISSIONS AND ALL WATER APPLICATIONS TO THE SAW CUTTING SHALL PREVENT MATERIAL FROM LEAVING THE IMMEDIATE SITE AND COLLECTED. THESE CUTTING LOCATIONS, ONCE DRIED, SHALL BE SWEPT AND SCRAPED OF ALL MATERIAL AND SHALL HAVE PROPER AND LEGAL DISPOSAL. WASTE MATERIALS STORAGE AND SANITARY FACILITIES 45.TRASH, DEBRIS, MATERIAL SALVAGE, AND/OR RECYCLING AREAS SHALL BE, WHERE PRACTICAL, AT LEAST FIFTY (50) FEET FROM ANY PERMANENT OR INTERIM STORMWATER STRUCTURES OR DRAINAGE WAYS AND SHALL BE MONITORED AS PART OF THE ROUTINE INSPECTIONS. THESE FACILITIES SHOULD BE LOCATED OUT OF THE WIND AND COVERED AS ABLE. WHERE NOT ABLE TO COVER, LOCATING SAID AREAS ON THE SIDE OF OTHER STRUCTURES TO REDUCE EXPOSURE TO WINDS, AND FOLLOW MAXIMUM LOADING GUIDELINES AS MARKED ON THE CONTAINER. THE DEVELOPER IS REQUIRED TO PRACTICE GOOD HOUSEKEEPING TO KEEP THE CONSTRUCTION SITE FREE OF LITTER, CONSTRUCTION DEBRIS, AND LEAKING CONTAINERS. 46.SANITARY FACILITIES SHALL BE PREVENTED FROM TIPPING THROUGH THE USE OF ANCHORING TO THE GROUND OR LASHING TO A STABILIZED STRUCTURE. THESE FACILITIES SHALL ALSO BE LOCATED AS FAR AS PRACTICAL FROM AN INLET, CURB CUT, DRAINAGE SWALE OR OTHER DRAINAGE CONVEYANCES TO PREVENT MATERIAL TRANSPORT FROM LEAVING THE LOCAL AREA. THIS CONSISTS OF THE FACILITY BEING LOCATED, WHERE PRACTICAL, AT LEAST FIFTY (50) FEET FROM ANY PERMANENT OR INTERIM DRAINAGE WAYS. OTHER SITE OPERATIONS AND POTENTIAL SPILL AREAS 47.SPILLS: FOR THOSE MINOR SPILLS THAT; ARE LESS THAN THE STATE’S REPORTABLE QUANTITY FOR SPILLS, STAY WITHIN THE PERMITTED AREA, AND IN NO WAY THREATEN ANY STORMWATER CONVEYANCE, NOTIFY THE CITY OF FORT COLLINS UTILITIES BY EMAIL AT EROSION@FCGOV.COM OR PHONE (970) 817-4770. FOR ANY SIGNIFICANT, MAJOR, OR HAZARDOUS SPILLS, NOTIFY THE CITY OF FORT COLLINS UTILITIES BY PHONE ONLY AFTER EMERGENCY RESPONSE (911) HAS BEEN NOTIFIED AND IS ON ROUTE, COUNTY HEALTH DEPARTMENT (LCDHE) HAS BEEN NOTIFIED THROUGH LARIMER COUNTY SHERIFF DISPATCH (970) 416-1985, AND THE STATE SPILL HOTLINE INCIDENT REPORTING HAVE BEEN CONTACTED 1-877-518-5608. WRITTEN DOCUMENTATION SHALL BE PROVIDED TO THE CITY WITHIN 5 DAYS OF THE EVENT. ALL SPILLS SHALL BE CLEANED UP IMMEDIATELY. 48.SELECTION OF “PLASTIC WELDED” EROSION CONTROL BLANKETS SHALL NOT BE USED IN AREAS THAT WILDLIFE, SUCH AS SNAKES, ARE LIKELY TO BE LOCATED AS THESE HAVE PROVEN TO CAUSE ENTRAPMENT ISSUES. FINAL STABILIZATION AND PROJECT COMPLETION 49.ANY STORMWATER FACILITIES USED AS A TEMPORARY CONTROL MEASURE WILL BE RESTORED AND STORM SEWER LINES WILL BE CLEANED UPON COMPLETION OF THE PROJECT AND BEFORE TURNING THE MAINTENANCE OVER TO THE OWNER, HOMEOWNERS ASSOCIATION (HOA), OR OTHER PARTY RESPONSIBLE FOR LONG TERM MAINTENANCE OF THOSE FACILITY. 50.ALL FINAL STABILIZATION SPECIFICATIONS SHALL BE DONE IN ACCORDANCE WITH THE MANUAL, CHAPTER 4: CONSTRUCTION CONTROL MEASURES. 51.ALL DISTURBED AREAS DESIGNED TO BE VEGETATED SHALL BE AMENDED, SEEDED & MULCHED, OR LANDSCAPED AS SPECIFIED IN THE LANDSCAPE PLANS WITHIN 14 WORKING DAYS OF FINAL GRADING. 52.SOIL IN ALL VEGETATED (LANDSCAPED OR SEEDED) AREAS, INCLUDING PARKWAYS AND MEDIANS SHALL COMPLY WITH ALL REQUIREMENTS SET FORTH IN SECTIONS 12-130 THROUGH 12-132 OF THE CITY MUNICIPAL CODE, AS WELL AS SECTION 3.8.21 FOR THE CITY LAND USE CODE. 53.ALL SEEDING SHALL REFER TO LANDSCAPING PLANS FOR SPECIES MIXTURE AND APPLICATION RATES AND DEPTHS REQUIREMENTS. 54.ALL SEED SHALL BE DRILLED WHERE PRACTICAL TO A DEPTH BASED UPON THE SEED TYPE. BROADCAST SEEDING SHALL BE APPLIED AT DOUBLE THE RATE AS PRESCRIBED FOR DRILL SEEDING AND SHALL BE LIGHTLY HAND RAKED AFTER APPLICATION. HYDROSEEDING MAY BE SUBSTITUTED FOR DRILL SEEDING ON SLOPES STEEPER THAN 3(H):1(V) OR ON OTHER AREAS NOT PRACTICAL TO DRILL SEED AND CRIMP AND MULCH. ALL HYDROSEEDING MUST BE CONDUCTED AS TWO SEPARATE PROCESSES OF SEEDING AND TACKIFICATION. 55.ALL SEEDED AREAS MUST BE MULCHED WITHIN TWENTY-FOUR (24) AFTER PLANTING. ALL MULCH SHALL BE MECHANICALLY CRIMPED AND OR ADEQUATELY APPLIED TACKIFIER. THE USE OF CRIMPED MULCH OR TACKIFIER MAY REQUIRE MULTIPLE RE-APPLICATIONS IF NOT PROPERLY INSTALLED OR HAVE WEATHERED OR DEGRADED BEFORE VEGETATION HAS BEEN ESTABLISHED. AREAS OF EMBANKMENTS HAVING SLOPES GREATER THAN OR EQUAL TO 3H:1V SHALL BE STABILIZED WITH AN EROSION MAT OR APPROVED EQUAL TO ENSURE SEED WILL BE ABLE TO GERMINATE ON THE STEEP SLOPES. DURING A SEASON WHEN SEEDING DOES NOT PRODUCE VEGETATIVE COVER, ANOTHER TEMPORARY EROSION CONTROL SHALL BE IMPLEMENTED ALONG WITH, OR UNTIL, TEMPORARY SEEDING OR PERMANENT EROSION CONTROL CAN BE PERFORMED. 56.THE DEVELOPER SHALL WARRANTY AND MAINTAIN ALL VEGETATIVE MEASURES FOR TWO GROWING SEASONS AFTER INSTALLATION OR UNTIL SEVENTY PERCENT (70%) VEGETATIVE COVER HAS BEEN ESTABLISHED, WHICHEVER IS LONGER AND MEETS ALL THE CRITERIA OUTLINED IN THE FORT COLLINS STORMWATER CRITERIA MANUAL CHAPTER 4: CONSTRUCTION CONTROL MEASURES. 57.THE DEVELOPER SHALL MAINTAIN, MONITOR, REPAIR, AND REPLACE ANY AND ALL APPLICABLE CONTROL MEASURES UNTIL FINAL STABILIZATION HAS BEEN OBTAINED. ALL CONTROL MEASURES MUST REMAIN UNTIL SUCH TIME AS ALL UPSTREAM CONTRIBUTING POLLUTANT SOURCES HAVE BEEN VEGETATED OR REMOVED FROM THE SITE. WHEN ANY CONTROL MEASURE IS REMOVED, THE DEVELOPER SHALL BE RESPONSIBLE FOR THE CLEANUP AND REMOVAL OF ALL SEDIMENT AND DEBRIS FROM THAT CONTROL MEASURE. AT THE POINT AT WHICH THE SITE HAS BEEN DEEMED STABILIZED AND VERIFIED BY CITY EROSION CONTROL INSPECTOR, ALL TEMPORARY CONTROL MEASURES CAN THEN BE FULLY REMOVED. ALL MEASURES SHALL BE REMOVED WITHIN 30 DAYS AFTER FINAL STABILIZATION IS ACHIEVED. 58.THE RESPONSIBLE PARTY SHALL MAINTAIN AND KEEP CURRENT ALL PAYMENTS OR RELATED FORMS OF SECURITY FOR THE EROSION CONTROL ESCROW UNTIL 1) STABILIZATION HAS BEEN REACHED AND 2) ALL CONTROL MEASURES AND/OR BMPS HAVE SEDIMENT MATERIALS COLLECTED AND THE CONTROL MEASURE REMOVED FROM THE SITE. AT THAT TIME THE SITE WILL BE CONSIDERED COMPLETED AND ANY REMAINING EROSION CONTROL ESCROW SHALL BE RETURNED TO THE APPROPRIATE PARTIES. 38 8 S a n t a F e D r i v e D e n v e r , C O 8 0 2 2 3 DE N V E R RJP RJP SEL 03/21/2025 CURRENT.DWG PARIKH MZ . CO L O R A D O NA NA LA R I M E R FO R T C O L L I N S 30 2 C O N I F E R S T R E E T 2595 PONDEROSA ROAD FRANKTOWN, CO 80116 720.384.7661 Phone rpalmer@strategicls.net Robert J. Palmer, PE President 03/21/2025 2 OF 30 STANDARD NOTES STANDARD EROSION CONTROL NOTES CONT: "NO TRESPASS" "NO TRESPASS" "NO TRESPASS" "PEDESTRIAN CROSSING" "NO TRESPASS" "STOP" "NO TRESPASS" X X X ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST CO M M CO M M CO M M CO M M CO M M CO M M CO M M CO M M CO M M CO M M CO M M CO M M CO M M CO M M CO M M COMM COMM COMM CO M M CO M M CO M M COMM COMM COMM CO M M CO M M CO M M G G G G G G G G G G G G G G G G W W W E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM CO M M COMM COMM ST C CABLE CABLE VAULT CABLE CABLE VAULT CABLE VAULT WV ELEC ELEC TEST STA ELEC F.O. VAULT HYD WV WV WV WV CABLE D S S S D SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SANITARY MANHOLE RIM = 4969.51' FL (N) = 4962.96' FL (S) = 4962.86' SANITARY MANHOLE RIM = 4968.12' FL (N) = 4961.57' FL (W) = 4961.62' FL (E) = 4961.12' SANITARY MANHOLE RIM = 4966.71' FL (W) = 4960.41' FL (E) = 4960.29' STORM MANHOLE WITH TYPE R INTAKE RIM = 4966.49' FL (S) 24" RCP = 4963.83' STORM MANHOLE RIM = 4968.27' FL (N) 24" RCP = 4964.16' FL (S) 24" RCP = 4964.07' FL (E) 18" RCP = 4964.16' FL (W) 18" RCP = 4964.17' ST ST ST ST ST ST STORM DRAIN INLET RIM = 4967.73' FL (W) 18" RCP = 4965.28' STORM DRAIN INLET RIM = 4967.73' FL (W) 18" RCP = 4965.28' PARKING BLOCK (TYPICAL) PARKING BLOCK (TYPICAL) "NO TRESPASS" SOUTH LINE OF LOT 13, BLOCK 5 REPLAT (NO.1) OF EVERGREEN PARK S89°20'47"E 383.00' EAST 383.00' (R) S0 0 ° 3 7 ' 4 6 " W 1 3 5 . 0 0 ' NO R T H 1 3 5 . 0 0 ' ( R ) N89°20'47"W 368.05' EAST 368.00' (R) NO R T H ( R ) N0 ° 3 8 ' 5 6 " E 47 7 . 3 5 ' S89°20'47"E 475.36' N0 ° 3 7 ' 4 6 " E 49 1 . 7 2 ' NO R T H ( R ) 17 5 . 0 0 ' 17 5 . 0 0 ' 107.41' (R) 107.31' PUBLIC 80' R.O.W. (BOOK 1597 PAGE 128) 47 7 . 4 8 ' 110.00' NORTHEAST CORNER OF LOT 13 REPLAT (NO.1) OF EVERGREEN PARK FOUND #4 REBAR SOUTH 75 FEET OF LOT 11 AND LOT 12 BLOCK 5 REPLAT (NO.1) OF EVERGREEN PARK VACANT LOT BA S I S O F B E A R I N G EA S T L I N E O F L O T S 1 0 - 1 3 , B L O C K 5 RE P L A T ( N O . 1 ) O F E V E R G R E E N P A R K WE S T L I N E O F L O T S 1 0 - 1 3 , B L O C K 5 RE P L A T ( N O . 1 ) O F E V E R G R E E N P A R K OWNER(S): OLEADA CONIFER LLC OWNER(S): D AND K GROUP LLC OWNER(S): LONG CREEK TRUST TRACT A PUBLIC R.O.W. (RECEPTION NO. 20130086239) 83 ' R . O . W . ASPEN HEIGHTS NORTH LINE OF LOT 13, BLOCK 5 REPLAT (NO.1) OF EVERGREEN PARK 5' 5' EASEMENT GRANTED TO U S WEST COMMUNICATIONS, INC. (RECEPTION NO. 19970035803) 16' 16' UTILITY & DRAINAGE EASEMENT (BOOK 1597 PAGE 128/ RECEPTION NO. 85405) 6' UTILITY EASEMENT (BOOK 1597 PAGE 128/ RECEPTION NO. 85405) 6' 6' UTILITY EASEMENT(BOOK 1597 PAGE 128/RECEPTION NO. 85405) 6' ZONING: COMMUNITY COMMERCIAL - NORTH COLLEGE DISTRICT ZONING: COMMUNITY COMMERCIAL - NORTH COLLEGE DISTRICT ZONING: INDUSTRIAL DISTRICT SS SS SS 66.09fl66.17fl66.26fl66.35fl66.44fl66.52fl66.61fl66.70fl66.79fl66.87fl66.96fl67.13fl67.26fl67.39fl67.51fl 68.00fl 67.73fl 68.12fl 68.24fl 68.36fl 68.48fl 4970 4971 49 7 0 4969 49 6 5 49 6 5 49 6 949 6 9 4967 4968 49 6 9 4971 4970 4970 4969 4968 49 6 8 49 6 7 49 6 6 49 6 4 36" RCP PIPE FL = 4962.58' 36" RCP PIPE FL = 4962.76' PORTION OF WEST 1/2 OF SECTION 01-T7N-R69W (RECEPTION NO. 20210016924) OWNER(S): LONG CREEK TRUST ZONING: COMMUNITY COMMERCIAL - NORTH COLLEGE DISTRICT SOUTHEAST CORNER OF LOT 13 REPLAT (NO.1) OF EVERGREEN PARK FOUND #4 REBAR 36" RCP PIPE FL = 4962.78' N0 0 ° 3 8 ' 5 6 " E 1 2 0 . 0 0 ' NO R T H 1 2 0 . 0 0 ' ( R ) 58.38' FL-FL CONIFER STREET 80.00' R.O.W. 80 . 0 0 ' R . O . W . 59 . 7 2 ' FL - F L 16.00' UTILITY ESMT. BL U E S P R U C E D R I V E EDGE OF ASPHALT BENCH BOLLARD CABLE BOX ELECTRIC BOX BREAKER BOX CONIFEROUS TREE DECIDUOUS TREE CLEANOUT FOUND MONUMENT AS NOTED FIRE HYDRANT INLET GRATE LIGHT POLE ELECTRIC METER TEST STATION WATER METER SANITARY MANHOLE STORM MANHOLE CABLE PEDESTAL TELEPHONE PEDESTAL RAMP SIGN WATER VALVE ELECTRIC VAULT CABLE ELEC ELEC BRKR C.O. HYD E W S D C T WV VAULT ELEC LEGEND RIGHT- OF-WAY LINE EASEMENT LINE LOT LINE BOUNDARY LINE (R)RECORD DIMENSION X FENCE BACK OF CURB AND LIP CURB AND GUTTER FLOWLINE TEST HOLETH MAJOR CONTOUR MINOR CONTOUR E ELECTRIC LINE COMM COMMUNICATION LINE G GAS LINE SS SANITARY SEWER LINE ST STORM DRAIN LINE W WATER MAIN LINE F E S CABLE CABLE VAULT TEST STA FLARED END SECTION CABLE BOX CABLE VAULT GATE MANHOLE BASE 38 8 S a n t a F e D r i v e D e n v e r , C O 8 0 2 2 3 DE N V E R RJP RJP SEL 03/21/2025 CURRENT.DWG PARIKH MZ . CO L O R A D O NA NA LA R I M E R FO R T C O L L I N S 30 2 C O N I F E R S T R E E T 2595 PONDEROSA ROAD FRANKTOWN, CO 80116 720.384.7661 Phone rpalmer@strategicls.net Robert J. Palmer, PE President 03/21/2025 3 OF 30 EXISTING CONDITIONS Know what's below. before you dig.Call R EXISTING TOP OF BANK X X X G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G F E SE C CABLE CABLE VAULT CABLE CABLE VAULT CABLE VAULT ELEC ELEC TEST STA ELEC F.O. VAULT CABLE D S S D SOUTH LINE OF LOT 13, BLOCK 5 REPLAT (NO.1) OF EVERGREEN PARK S89°20'47"E 383.00' EAST 383.00' (R) S0 0 ° 3 7 ' 4 6 " W 1 3 5 . 0 0 ' NO R T H 1 3 5 . 0 0 ' ( R ) N89°20'47"W 368.05' EAST 368.00' (R) NORTHEAST CORNER OF LOT 13 REPLAT (NO.1) OF EVERGREEN PARK FOUND #4 REBAR SOUTH 75 FEET OF LOT 11 AND LOT 12 BLOCK 5 REPLAT (NO.1) OF EVERGREEN PARK BA S I S O F B E A R I N G EA S T L I N E O F L O T S 1 0 - 1 3 , B L O C K 5 RE P L A T ( N O . 1 ) O F E V E R G R E E N P A R K WE S T L I N E O F L O T S 1 0 - 1 3 , B L O C K 5 RE P L A T ( N O . 1 ) O F E V E R G R E E N P A R K TRACT A RED PLASTIC CAP, LS 36062 NORTH LINE OF LOT 13, BLOCK 5 REPLAT (NO.1) OF EVERGREEN PARK PORTION OF WEST 1/2 OF SECTION 01-T7N-R69W (RECEPTION NO. 20210016924) SOUTHEAST CORNER OF LOT 13 REPLAT (NO.1) OF EVERGREEN PARK FOUND #4 REBAR N0 0 ° 3 8 ' 5 6 " E 1 2 0 . 0 0 ' NO R T H 1 2 0 . 0 0 ' ( R ) 50' NATURAL HABITAT BUFFER ZONE FFE=4969.50 17 . 0 0 ' 9.00' 24 . 0 0 ' 24 . 0 0 ' 13 . 0 0 ' 6.00'6.00' 5. 5 0 ' 24.00' 17.00' 9. 0 0 ' 7.00'3.00'3.00'3.00'3.00'3.00'3.00'6.00' 11.00'6. 0 0 ' 12.13'6. 0 0 ' 12.13'6. 0 0 ' 12.13' 6. 0 0 ' 12.13' 6. 0 0 ' 12.13'6. 0 0 ' 6. 0 0 ' 10.67' RAMP WITH HANDRAIL RE: ARCHITECTURAL PLAN FOR HANDRAIL DETAILS EXISTING PUBLIC SIDEWALK EXISTING CURB AND GUTTER TO REMAIN EXISTING CURB AND GUTTER TO REMAIN EXISTING CURB AND GUTTER TO REMAIN EXISTING CURB AND GUTTER TO REMAIN 11.00'6. 0 0 ' 5.00' 5. 0 0 ' WATER QUALITY POND POROUS PAVER WATER QUALITY/ UNDERGROUND STORM WATER DETENTION 8.00' 8.00' 5.00' 8.00' 17 . 0 0 ' 8.00' 8.00' 5.00' 9.00'9.00' 9. 0 0 ' OVERHANG COLUMN (TYP.) 4.00' 4. 0 0 ' 4" CURB W/1' GUTTER BEGIN 4" CURB W/1' GUTTER END 4" CURB W/1' GUTTER BEGIN 6" CURB W/1' GUTTER TRANSITION CURB HEIGHT THROUGH RETURN 6" CURB W/1' GUTTER 6" CURB W/1' GUTTER 9.00' 17 . 0 0 ' 17.00' 5. 0 0 ' 3.00'3.00'3.00'3.00'3.00' 12.13'12.13' 6. 0 0 ' 6. 0 0 ' 12.13' 6. 0 0 ' NDS YARD INLET (TYP.) TRASH ENCLOSURE RE: ARCHITECTURAL PLANS 7" 4,500 PSI CONC. 14.00' 20 ' 10.00' PEDESTRIAN GATE MAINTENANCE ROOM ELECTRICAL METERS WATER ENTRY ROOM 5. 0 0 ' 6. 0 0 ' 6. 0 0 ' RIGHT OUT ONLY (TYPE 2) PER LCUASS 706.2 5.00'4.00'4.00' 4. 0 0 ' 4.00' 10 ' 175' 17 5 ' PEDESTRIAN SITE TRIANGLE PEDESTRIAN SITE TRIANGLE PEDESTRIAN SITE TRIANGLE PEDESTRIAN SITE TRIANGLE 58.38' FL-FL CONIFER STREET 80.00' R.O.W. 80 . 0 0 ' R . O . W . 59 . 7 2 ' FL - F L FULL ACCESS (TYPE I) PER LCUASS 706.2 PRIVATE ONSITE SIDEWALKS 4" THICK 4,500 PSI CONC. (TYP.) PRIVATE ONSITE SIDEWALKS 4" THICK 4,500 PSI CONC. (TYP.) ELECTRICAL METERSPRIVATE PATIO (TYP.) PRIVATE PATIO (TYP.) PRIVATE PATIO (TYP.) POROUS PAVER WATER QUALITY/ UNDERGROUND STORM WATER DETENTION 16.00' UTILITY ESMT. 22.00'22.00'22.00' 13 . 0 0 ' 4.00' ACCESSIBLE PARKING STRIPING, MARKINGS, AND SIGNAGE PER DETAIL 2.7 & 2.8 ON SHEET 29 24.00' BL U E S P R U C E D R I V E 6" CURB W/1' GUTTER 10' UTIL. ESMT EX I S T I N G P U B L I C S I D E W A L K 12.13'12.13' SLIDING GATES SITE PLAN NOTES SITE PLAN LEGEND (PROPOSED) XX 38 8 S a n t a F e D r i v e D e n v e r , C O 8 0 2 2 3 DE N V E R RJP RJP SEL 03/21/2025 CURRENT.DWG PARIKH MZ . CO L O R A D O NA NA LA R I M E R FO R T C O L L I N S 30 2 C O N I F E R S T R E E T 2595 PONDEROSA ROAD FRANKTOWN, CO 80116 720.384.7661 Phone rpalmer@strategicls.net Robert J. Palmer, PE President 03/21/2025 4 OF 30 SITE PLAN Know what's below. before you dig.Call R FIRE LANE L FIRE LANE B FIRE LANE R 30"X30" MUTCD STOP SIGN R-1 30"X30" MUTCD STOP SIGN R-1W/R3-5R " RIGHTTURN ONLY" SIGN BELOW STOP SIGN & R5-1 "DONOT ENTER" SIGN BACK SIDE OF STOP SIGN LINE TABLE LINE L1 L2 L3 L4 L5 L6 L7 L8 L9 L10 L11 L12 L13 L14 L15 L16 L17 L18 L19 L20 L21 L22 L23 L24 L25 L26 L27 L28 L29 L30 L31 L32 L33 L34 L35 L36 L37 L38 L39 LENGTH 24.820 14.000 18.000 18.000 1.000 1.000 17.000 34.544 2.059 12.544 7.667 12.251 0.250 1.787 99.000 14.000 120.338 10.243 27.919 24.825 14.000 18.000 18.000 13.000 1.000 72.000 16.085 15.667 99.000 14.000 3.000 14.000 99.000 14.000 3.000 14.000 99.000 16.000 22.776 DIRECTION S00° 39' 13.26"W S89° 20' 46.74"E S00° 39' 13.26"W N89° 20' 46.74"W S00° 39' 13.26"W S89° 20' 46.74"E S89° 20' 46.74"E S00° 39' 13.26"W S45° 39' 13.26"W N89° 20' 46.74"W S00° 39' 13.26"W S89° 20' 46.74"E N00° 39' 13.27"E N00° 39' 13.26"E S89° 20' 46.74"E S00° 39' 13.26"W S89° 20' 46.74"E S44° 20' 46.74"E S89° 20' 46.74"E S00° 39' 13.26"W N89° 20' 46.74"W S00° 39' 13.26"W S89° 20' 46.74"E N89° 20' 46.74"W S00° 39' 13.26"W S00° 39' 13.26"W S89° 20' 46.74"E S00° 39' 13.26"W S89° 20' 46.74"E N00° 39' 13.26"E S89° 20' 46.74"E S00° 39' 13.26"W S89° 20' 46.74"E N00° 39' 13.26"E S89° 20' 46.74"E S00° 39' 13.26"W S89° 20' 46.74"E N00° 39' 13.26"E S89° 20' 46.74"E CURVE TABLE CURVE # C1 C2 C3 C4 C5 C6 C7 C8 C9 C10 C11 C12 C13 C14 C15 C16 C17 C18 LENGTH 4.712 1.571 1.571 4.712 12.566 1.571 4.712 2.356 2.356 4.712 1.571 1.571 12.566 4.712 4.712 4.712 4.712 4.712 RADIUS 3.000 1.000 1.000 3.000 8.000 1.000 3.000 3.000 3.000 3.000 1.000 1.000 8.000 3.000 3.000 3.000 3.000 3.000 DELTA 090.0000 090.0000 090.0000 090.0000 090.0000 090.0000 090.0000 045.0000 045.0000 090.0000 090.0000 090.0000 090.0000 090.0000 090.0000 090.0000 090.0000 090.0000 38 8 S a n t a F e D r i v e D e n v e r , C O 8 0 2 2 3 DE N V E R RJP RJP SEL 03/21/2025 CURRENT.DWG PARIKH MZ . CO L O R A D O NA NA LA R I M E R FO R T C O L L I N S 30 2 C O N I F E R S T R E E T 2595 PONDEROSA ROAD FRANKTOWN, CO 80116 720.384.7661 Phone rpalmer@strategicls.net Robert J. Palmer, PE President 03/21/2025 5 OF 30 LINE AND CURVE TABLE Know what's below. before you dig.Call R X X G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G C CABLE CABLE VAULT CABLE CABLE VAULT CABLE VAULT WV ELEC ELEC TEST STA D WV WV WV WV CABLE D S S D PUBLIC 80' R.O.W. (BOOK 1597 PAGE 128) VACANT LOT OWNER(S): OLEADA CONIFER LLC PUBLIC R.O.W. (RECEPTION NO. 20130086239) 83 ' R . O . W . ZONING: COMMUNITY COMMERCIAL - NORTH COLLEGE DISTRICT ZONING: INDUSTRIAL DISTRICT 4970 4971 49 7 0 4969 49 6 5 49 6 5 49 6 949 6 9 4967 4968 49 6 9 4970 4970 4969 4968 49 6 8 49 6 7 49 6 6 49 6 4 PORTION OF WEST 1/2 OF SECTION 01-T7N-R69W (RECEPTION NO. 20210016924) OWNER(S): LONG CREEK TRUST ZONING: COMMUNITY COMMERCIAL - NORTH COLLEGE DISTRICT FFE=4969.50 58.38' FL-FL CONIFER STREET 80.00' R.O.W. 80 . 0 0 ' R . O . W . 59 . 7 2 ' FL - F L 75 ' 25' 55 20 ' EMERGENCY CONSTRUCTION GATE PRIMARY CONSTRUCTION GATE 11 . 0 0 ' 11.00' 16.00' UTILITY ESMT. BL U E S P R U C E D R I V E 38 8 S a n t a F e D r i v e D e n v e r , C O 8 0 2 2 3 DE N V E R RJP RJP SEL 03/21/2025 CURRENT.DWG PARIKH MZ . CO L O R A D O NA NA LA R I M E R FO R T C O L L I N S 30 2 C O N I F E R S T R E E T 2595 PONDEROSA ROAD FRANKTOWN, CO 80116 720.384.7661 Phone rpalmer@strategicls.net Robert J. Palmer, PE President 03/21/2025 6 OF 30 INITIAL EROSION CONTROL Know what's below. before you dig.Call R DESCRIPTION TOTAL AREA OF DISTURBANCE HEAVY CONSTRUCTION VEHICLE TRAFFIC AREAS OFFSITE APPROXIMATE PERCENT OF PROJECT THAT WILL BE DISTURBED AT ANY ONE TIME ESTIMATED PRE-EXISTING VEGETATION COVERAGE EXISTING SOIL TYPE DEPTH TO GROUND WATER NUMBER OF PROJECT PHASES TOTAL VOLUME OF PROJECT EARTHWORK TOTAL STOCKPILE AREA TOTAL AREA OF ONSITE DISTURBANCE TOTAL AREA OF OFFSITE DISTURBANCE TOTAL STORAGE/STAGING AREAS NOT INCORPORATED IN ONSITE AND OFFSITE CALCULATIONS TOTAL AREA OF NEW OR IMPROVED HAUL ROADS STEEPEST SLOPE DISTANCE FROM RIPARIAN/SENSITIVE AREA EROSION CONTROL PLAN TABLE 1.25 ACRES 1.19 ACRES 0.06 ACRES 0 ACRE 0 ACRE 0 ACRE 95% 90% CARUSO CLAY (98.9%) AND NUNN CLAY LOAM (1.1%) 9'-10' IN GEOTECHNICAL REPORT TEST HOLES ONE (1) PHASE 3,240 CUFT CUT / 2,689 CUFT FILL / NET 551 CUFT HAUL OFF 0 CUFT (EXISTING PLANS ARE NON-NATIVE, AND THE SOIL IS NOT APPROPRIATE FOR TOP SOIL 22:1 (4.55%) 618 FEET (WATER QUALITY POND NE OF THE SITE QUANTITY X X ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST CO M M CO M M CO M M CO M M CO M M CO M M CO M M CO M M CO M M CO M M CO M M CO M M COMM COMM CO M M CO M M CO M M COMM COMM CO M M CO M M CO M M W COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM CO M M COMM COMM COMM ST C CABLE CABLE VAULT CABLE CABLE VAULT CABLE VAULT WV ELEC ELEC TEST STA WV WV WV WV CABLE D S S D SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS ST ST SS SS SS SS 4970 4971 49 7 0 4969 49 6 5 49 6 5 49 6 949 6 9 4967 4968 49 6 9 4970 4970 4969 4968 49 6 8 49 6 7 49 6 6 49 6 4 PORTION OF WEST 1/2 OF SECTION 01-T7N-R69W (RECEPTION NO. 20210016924) 58.38' FL-FL CONIFER STREET 80.00' R.O.W. 80 . 0 0 ' R . O . W . 59 . 7 2 ' FL - F L 75 ' 25' 55 20 ' EMERGENCY CONSTRUCTION GATE PRIMARY CONSTRUCTION GATE 11 . 0 0 ' 11.00' 4969 4968 49 6 8 4969 CAP PIPE END UNTIL POROUS PAVER ANDSTORAGE GRAVELARE INSTALLED 16.00' UTILITY ESMT. BL U E S P R U C E D R I V E 49 6 9 4969 38 8 S a n t a F e D r i v e D e n v e r , C O 8 0 2 2 3 DE N V E R RJP RJP SEL 03/21/2025 CURRENT.DWG PARIKH MZ . CO L O R A D O NA NA LA R I M E R FO R T C O L L I N S 30 2 C O N I F E R S T R E E T 2595 PONDEROSA ROAD FRANKTOWN, CO 80116 720.384.7661 Phone rpalmer@strategicls.net Robert J. Palmer, PE President 03/21/2025 7 OF 30 INTERIM EROSION CONTROL Know what's below. before you dig.Call R DESCRIPTION TOTAL AREA OF DISTURBANCE HEAVY CONSTRUCTION VEHICLE TRAFFIC AREAS OFFSITE APPROXIMATE PERCENT OF PROJECT THAT WILL BE DISTURBED AT ANY ONE TIME ESTIMATED PRE-EXISTING VEGETATION COVERAGE EXISTING SOIL TYPE DEPTH TO GROUND WATER NUMBER OF PROJECT PHASES TOTAL VOLUME OF PROJECT EARTHWORK TOTAL STOCKPILE AREA TOTAL AREA OF ONSITE DISTURBANCE TOTAL AREA OF OFFSITE DISTURBANCE TOTAL STORAGE/STAGING AREAS NOT INCORPORATED IN ONSITE AND OFFSITE CALCULATIONS TOTAL AREA OF NEW OR IMPROVED HAUL ROADS STEEPEST SLOPE DISTANCE FROM RIPARIAN/SENSITIVE AREA EROSION CONTROL PLAN TABLE 1.25 ACRES 1.19 ACRES 0.06 ACRES 0 ACRE 0 ACRE 0 ACRE 95% 90% CARUSO CLAY (98.9%) AND NUNN CLAY LOAM (1.1%) 9'-10' IN GEOTECHNICAL REPORT TEST HOLES ONE (1) PHASE 3,240 CUFT CUT / 2,689 CUFT FILL / NET 551 CUFT HAUL OFF 0 CUFT (EXISTING PLANS ARE NON-NATIVE, AND THE SOIL IS NOT APPROPRIATE FOR TOP SOIL 22:1 (4.55%) 618 FEET (WATER QUALITY POND NE OF THE SITE QUANTITY X X ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST CO M M CO M M CO M M CO M M CO M M CO M M CO M M CO M M CO M M CO M M CO M M CO M M COMM COMM CO M M CO M M CO M M COMM COMM CO M M CO M M CO M M W COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM CO M M COMM COMM COMM ST C CABLE CABLE VAULT CABLE CABLE VAULT CABLE VAULT WV ELEC ELEC TEST STA WV WV WV WV CABLE D S S D SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS ST ST SS SS SS SS 4970 4971 49 7 0 4969 49 6 5 49 6 5 49 6 949 6 9 4967 4968 49 6 9 4970 4970 4969 4968 49 6 8 49 6 7 49 6 6 49 6 4 PORTION OF WEST 1/2 OF SECTION 01-T7N-R69W (RECEPTION NO. 20210016924) 58.38' FL-FL CONIFER STREET 80.00' R.O.W. 80 . 0 0 ' R . O . W . 59 . 7 2 ' FL - F L EMERGENCY CONSTRUCTION GATE PRIMARY CONSTRUCTION GATE 4969 4968 49 6 8 4969 79.94'195.69' 57 . 1 7 ' 16.00' UTILITY ESMT. BL U E S P R U C E D R I V E 49 6 9 4969 38 8 S a n t a F e D r i v e D e n v e r , C O 8 0 2 2 3 DE N V E R RJP RJP SEL 03/21/2025 CURRENT.DWG PARIKH MZ . CO L O R A D O NA NA LA R I M E R FO R T C O L L I N S 30 2 C O N I F E R S T R E E T 2595 PONDEROSA ROAD FRANKTOWN, CO 80116 720.384.7661 Phone rpalmer@strategicls.net Robert J. Palmer, PE President 03/21/2025 8 OF 30 FINAL EROSION CONTROL Know what's below. before you dig.Call R FINAL EROSION CONTROL NOTES: 1.SCL TO REMAIN IN PLACE UNTIL LANDSCAPING IS ESTABLISHED 2.IPI TO REMAIN IN PLACE UNTIL LANDSCAPING IS ESTABLISHED 3.CS TO REMAIN IN PLACE UNTIL LANDSCAPING IS ESTABLISHED 4.SILT FENCE AND CONSTRUCTION FENCE TO REMAIN IN-PLACE UNTIL FINAL EROSION CONTROL INSPECTION SIGNOFF 5.EROSION CONTROL CLOSEOUT CAN OCCUR WHEN LANDSCAPING IS ESTABLISHED, INSPECTED, AND ALL EROSION BMP HAVE BEEN REMOVED. DESCRIPTION TOTAL AREA OF DISTURBANCE HEAVY CONSTRUCTION VEHICLE TRAFFIC AREAS OFFSITE APPROXIMATE PERCENT OF PROJECT THAT WILL BE DISTURBED AT ANY ONE TIME ESTIMATED PRE-EXISTING VEGETATION COVERAGE EXISTING SOIL TYPE DEPTH TO GROUND WATER NUMBER OF PROJECT PHASES TOTAL VOLUME OF PROJECT EARTHWORK TOTAL STOCKPILE AREA TOTAL AREA OF ONSITE DISTURBANCE TOTAL AREA OF OFFSITE DISTURBANCE TOTAL STORAGE/STAGING AREAS NOT INCORPORATED IN ONSITE AND OFFSITE CALCULATIONS TOTAL AREA OF NEW OR IMPROVED HAUL ROADS STEEPEST SLOPE DISTANCE FROM RIPARIAN/SENSITIVE AREA EROSION CONTROL PLAN TABLE 1.25 ACRES 1.19 ACRES 0.06 ACRES 0 ACRE 0 ACRE 0 ACRE 95% 90% CARUSO CLAY (98.9%) AND NUNN CLAY LOAM (1.1%) 9'-10' IN GEOTECHNICAL REPORT TEST HOLES ONE (1) PHASE 3,240 CUFT CUT / 2,689 CUFT FILL / NET 551 CUFT HAUL OFF 0 CUFT (EXISTING PLANS ARE NON-NATIVE, AND THE SOIL IS NOT APPROPRIATE FOR TOP SOIL 22:1 (4.55%) 618 FEET (WATER QUALITY POND NE OF THE SITE QUANTITY POROUS PAVER NOTE: POROUS PAVERS MUST BE PROTECTED FROM INFILTRATION FROM CONSTRUCTION DEBRIS AND EROSION RUNOFF ONCE INSTALLED. PROTECTION OPTION 1 PLACE FILTER FABRIC OVER THE PAVER AREAS, WITH A MINIMUM OF 2-INCHES OF GRAVEL OVER THE FILTER FABRIC. PROTECTION OPTION 2 PAVERS SHALL BE COVERED BY AND IMPERIOUS COVER (I.E. A POLY TARP OR SIMILAR) AND THEN COVERED BY PLYWOOD FOR THE DURATION OF CONSTRUCTION. 38 8 S a n t a F e D r i v e D e n v e r , C O 8 0 2 2 3 DE N V E R RJP RJP SEL 03/21/2025 CURRENT.DWG PARIKH MZ . CO L O R A D O NA NA LA R I M E R FO R T C O L L I N S 30 2 C O N I F E R S T R E E T 2595 PONDEROSA ROAD FRANKTOWN, CO 80116 720.384.7661 Phone rpalmer@strategicls.net Robert J. Palmer, PE President 03/21/2025 9 OF 30 FINAL STABILIZATION 38 8 S a n t a F e D r i v e D e n v e r , C O 8 0 2 2 3 DE N V E R RJP RJP SEL 03/21/2025 CURRENT.DWG PARIKH MZ . CO L O R A D O NA NA LA R I M E R FO R T C O L L I N S 30 2 C O N I F E R S T R E E T 2595 PONDEROSA ROAD FRANKTOWN, CO 80116 720.384.7661 Phone rpalmer@strategicls.net Robert J. Palmer, PE President 03/21/2025 10 OF 30 EROSION CONTROL DETAILS SURFACE ROUGHENING 2 MULCHING 3 4 ROLLED EROSION CONTROL PRODUCTS 756FUEL CONTAINMENT BERM 8 1 SURFACE ROUGHENING SURFACE ROUGHENING ROLLED EROSION CONTROL PRODUCTS 38 8 S a n t a F e D r i v e D e n v e r , C O 8 0 2 2 3 DE N V E R RJP RJP SEL 03/21/2025 CURRENT.DWG PARIKH MZ . CO L O R A D O NA NA LA R I M E R FO R T C O L L I N S 30 2 C O N I F E R S T R E E T 2595 PONDEROSA ROAD FRANKTOWN, CO 80116 720.384.7661 Phone rpalmer@strategicls.net Robert J. Palmer, PE President 03/21/2025 11 OF 30 EROSION CONTROL DETAILS 9 10 11 1614 11 13 15 ROLLED EROSION CONTROL PRODUCTS ROLLED EROSION CONTROL PRODUCTS ROLLED EROSION CONTROL PRODUCTS TEMPORARY OUTLET PROTECTION ROLLED EROSION CONTROL PRODUCTS TEMPORARY OUTLET PROTECTION TEMPORARY OUTLET PROTECTION EARTH DIKES AND DRAINAGE SWALES 38 8 S a n t a F e D r i v e D e n v e r , C O 8 0 2 2 3 DE N V E R RJP RJP SEL 03/21/2025 CURRENT.DWG PARIKH MZ . CO L O R A D O NA NA LA R I M E R FO R T C O L L I N S 30 2 C O N I F E R S T R E E T 2595 PONDEROSA ROAD FRANKTOWN, CO 80116 720.384.7661 Phone rpalmer@strategicls.net Robert J. Palmer, PE President 03/21/2025 12 OF 30 EROSION CONTROL DETAILS 17 18 19 2422 20 21 23 EARTH DIKES AND DRAINAGE SWALES CHECK DAMS CHECK DAMS CHECK DAMS EARTH DIKES AND DRAINAGE SWALES EARTH DIKES AND DRAINAGE SWALES CHECK DAMS CHECK DAMS 38 8 S a n t a F e D r i v e D e n v e r , C O 8 0 2 2 3 DE N V E R RJP RJP SEL 03/21/2025 CURRENT.DWG PARIKH MZ . CO L O R A D O NA NA LA R I M E R FO R T C O L L I N S 30 2 C O N I F E R S T R E E T 2595 PONDEROSA ROAD FRANKTOWN, CO 80116 720.384.7661 Phone rpalmer@strategicls.net Robert J. Palmer, PE President 03/21/2025 13 OF 30 EROSION CONTROL DETAILS 25 26 27 3230 28 29 31 CONCRETE WASHOUT AREAWIND AND DUST CONTROLCHECK DAMS CHECK DAMS STOCKPILE MANAGEMENTCONCRETE WASHOUT AREACONCRETE WASHOUT AREA STOCKPILE MANAGEMENT 38 8 S a n t a F e D r i v e D e n v e r , C O 8 0 2 2 3 DE N V E R RJP RJP SEL 03/21/2025 CURRENT.DWG PARIKH MZ . CO L O R A D O NA NA LA R I M E R FO R T C O L L I N S 30 2 C O N I F E R S T R E E T 2595 PONDEROSA ROAD FRANKTOWN, CO 80116 720.384.7661 Phone rpalmer@strategicls.net Robert J. Palmer, PE President 03/21/2025 14 OF 30 EROSION CONTROL DETAILS 33 34 35 4038 36 37 39 GOOD HOUSEKEEPINGSTOCKPILE MANAGEMENT STOCKPILE MANAGEMENT GOOD HOUSEKEEPING STOCKPILE MANAGEMENT GOOD HOUSEKEEPING GOOD HOUSEKEEPING GOOD HOUSEKEEPING 38 8 S a n t a F e D r i v e D e n v e r , C O 8 0 2 2 3 DE N V E R RJP RJP SEL 03/21/2025 CURRENT.DWG PARIKH MZ . CO L O R A D O NA NA LA R I M E R FO R T C O L L I N S 30 2 C O N I F E R S T R E E T 2595 PONDEROSA ROAD FRANKTOWN, CO 80116 720.384.7661 Phone rpalmer@strategicls.net Robert J. Palmer, PE President 03/21/2025 15 OF 30 EROSION CONTROL DETAILS 41 42 43 4846 44 45 47 SILT FENCE SEDIMENT CONTROL LOG GOOD HOUSEKEEPING SILT FENCE SILT FENCE SEDIMENT CONTROL LOG SEDIMENT CONTROL LOG SEDIMENT CONTROL LOG 38 8 S a n t a F e D r i v e D e n v e r , C O 8 0 2 2 3 DE N V E R RJP RJP SEL 03/21/2025 CURRENT.DWG PARIKH MZ . CO L O R A D O NA NA LA R I M E R FO R T C O L L I N S 30 2 C O N I F E R S T R E E T 2595 PONDEROSA ROAD FRANKTOWN, CO 80116 720.384.7661 Phone rpalmer@strategicls.net Robert J. Palmer, PE President 03/21/2025 16 OF 30 EROSION CONTROL DETAILS 49 50 51 5654 52 53 55 ROCK SOCK INLET PROTECTION SEDIMENT CONTROL LOG ROCK SOCK ROCK SOCK INLET PROTECTION INLET PROTECTION INLET PROTECTION 38 8 S a n t a F e D r i v e D e n v e r , C O 8 0 2 2 3 DE N V E R RJP RJP SEL 03/21/2025 CURRENT.DWG PARIKH MZ . CO L O R A D O NA NA LA R I M E R FO R T C O L L I N S 30 2 C O N I F E R S T R E E T 2595 PONDEROSA ROAD FRANKTOWN, CO 80116 720.384.7661 Phone rpalmer@strategicls.net Robert J. Palmer, PE President 03/21/2025 17 OF 30 EROSION CONTROL DETAILS 57 58 59 6462 60 61 63 SEDIMENT TRAPINLET PROTECTION INLET PROTECTION INLET PROTECTION SEDIMENT TRAP CONSTRUCTION FENCESEDIMENT TRAP CONSTRUCTION FENCE 38 8 S a n t a F e D r i v e D e n v e r , C O 8 0 2 2 3 DE N V E R RJP RJP SEL 03/21/2025 CURRENT.DWG PARIKH MZ . CO L O R A D O NA NA LA R I M E R FO R T C O L L I N S 30 2 C O N I F E R S T R E E T 2595 PONDEROSA ROAD FRANKTOWN, CO 80116 720.384.7661 Phone rpalmer@strategicls.net Robert J. Palmer, PE President 03/21/2025 18 OF 30 EROSION CONTROL DETAILS 65 66 67 7270 68 69 71 VEHICLE TRACKING CONTROLCONSTRUCTION FENCE VEHICLE TRACKING CONTROL VEHICLE TRACKING CONTROL VEHICLE TRACKING CONTROL STABILIZED STAGING AREAVEHICLE TRACKING CONTROL STABILIZED STAGING AREA 38 8 S a n t a F e D r i v e D e n v e r , C O 8 0 2 2 3 DE N V E R RJP RJP SEL 03/21/2025 CURRENT.DWG PARIKH MZ . CO L O R A D O NA NA LA R I M E R FO R T C O L L I N S 30 2 C O N I F E R S T R E E T 2595 PONDEROSA ROAD FRANKTOWN, CO 80116 720.384.7661 Phone rpalmer@strategicls.net Robert J. Palmer, PE President 03/21/2025 19 OF 30 EROSION CONTROL DETAILS 73 74 75 8078 76 77 79 NOT USED STREET SWEEPING & VACUUMING TEMPORARY DIVERSION METHODSSTABILIZED STAGING AREA TEMPORARY DIVERSION METHODS TEMPORARY DIVERSION METHODS TEMPORARY DIVERSION METHODS TEMPORARY DIVERSION METHODS X X ST ST ST ST ST ST ST ST ST ST ST ST G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G C CABLE CABLE VAULT CABLE CABLE VAULT CABLE VAULT WV ELEC ELEC TEST STA ELEC F.O. VAULT HYD WV WV WV WV CABLE D S S D STORM MANHOLE WITH TYPE R INTAKE RIM = 4966.49' FL (S) 24" RCP = 4963.83' STORM MANHOLE RIM = 4968.27' FL (N) 24" RCP = 4964.16' FL (S) 24" RCP = 4964.07' FL (E) 18" RCP = 4964.16' FL (W) 18" RCP = 4964.17' ST ST ST ST ST ST ST STORM DRAIN INLET RIM = 4967.73' FL (W) 18" RCP = 4965.28' STORM DRAIN INLET RIM = 4967.73' FL (W) 18" RCP = 4965.28' ST SOUTH LINE OF LOT 13, BLOCK 5 REPLAT (NO.1) OF EVERGREEN PARK NORTHEAST CORNER OF LOT 13 REPLAT (NO.1) OF EVERGREEN PARK FOUND #4 REBAR BA S I S O F B E A R I N G EA S T L I N E O F L O T S 1 0 - 1 3 , B L O C K 5 RE P L A T ( N O . 1 ) O F E V E R G R E E N P A R K UNITED WAY HOUSING SERVICES DAY CENTER NORTH LINE OF LOT 13, BLOCK 5 REPLAT (NO.1) OF EVERGREEN PARK 66.09fl66.17fl66.26fl66.35fl66.44fl66.52fl66.61fl66.70fl66.79fl66.87fl66.96fl67.13fl67.26fl67.39fl67.51fl 68.00fl 67.73fl 68.12fl 68.24fl 68.36fl 68.48fl 4971 49 7 0 4969 49 6 5 49 6 5 49 6 949 6 9 4967 4968 49 6 9 4970 4970 4969 4968 49 6 8 49 6 7 49 6 6 49 6 4 36" RCP PIPE FL = 4962.58' 36" RCP PIPE FL = 4962.76' PORTION OF WEST 1/2 OF SECTION 01-T7N-R69W (RECEPTION NO. 20210016924) SOUTHEAST CORNER OF LOT 13 REPLAT (NO.1) OF EVERGREEN PARK FOUND #4 REBAR 36" RCP PIPE FL = 4962.78' 50' NATURAL HABITAT BUFFER ZONE EXITING FIRE HYDRANT 15" CONC. FES INV.=4963.50 W/TYPE L SOIL RIPRAP 1.75' DEEP 15" RCP @0.50% STCB-1 10' TYPE RGRATE=4968.20INV. IN=496.20INV. OUT=4964.10 OCS 5'X6" IDRIM=4968.60 INV. IN (W)=4965.50INV. IN (S)=4965.50INV. OUT=4963.8020' L.F. 15" RCP STUB INV.=4966.26 OBSV. WELL W/TRAFFIC LIDINV.=4966.50 OBSV. WELL W/ TRAFFIC LID INV.=4966.50 OBSV. WELL W/TRAFFIC LID INV.=4965.50 OBSV. WELL W/ TRAFFIC LID INV.=4966.50 4" SLOTTED PIPE S=0.50% 4" SLOTTED PIPE S=0.50% 6" SLOTTED PIPE S=0.50% 4" SLOTTED PIPE S=0.50% 14'5. 5 0 ' 4"X4"X6" TEE 4" SLOTTED PIPE S=0.50%4"X4"X4" TEE FFE=4969.50 58.38' FL-FL CONIFER STREET 80.00' R.O.W. 80 . 0 0 ' R . O . W . 59 . 7 2 ' FL - F L 4969 4968 49 6 8 4969 16.00' UTILITY ESMT. BL U E S P R U C E D R I V E 49 6 9 4966.15fl 4966.13fl 4966.63tc 4966.70w4966.22w 4966.00fl 4966.23fl 4966.25fl 4966.75tc 4966.82w 4966.30w 4969.00g 4969.00g 4968.00g 4967.00g 4969.68g 4969.17P 4969.17P 4969.129 4969.129 4969.00W 4969.00W 4968.97W 4968.97W 4968.50fl 4967.16fl 4967.25fl 4968.00fl 4968.70fl 4968.60fl 4968.60fl 4968.65fl 4968.70fl 4968.85fl 4968.87fl4969.42w 4969.40W 4969.40W 4968.90FL 4968.90FL 4968.60P 4968.60P 4968.50FL 4969.00G4970.00G 4970.90g4970.00g 4968.90fl 4968.85fl 4968.82fl 4968.50fl 4968.45fl 4968.30fl 4968.55fl 4968.55fl 4968.00fl 4969.30g 4968.50fl 4968.90fl 4968.80p 4968.10fl 4968.00fl 4968.35fl4968.20fl 4968.70fl 4968.70fl 4968.70fl 4968.65fl4968.50fl 4968.50fl 4968.50fl 4968.50fl 4969.50fl 4968.80fl 4968.80fl4968.80fl 4969.25fl 4968.80fl 4968.50fl 4968.30g 4968.50g 4968.27fl 4968.34w 4968.34fl 4968.37fl 4968.87tc 4968.94w 4968.24fl 4968.74tc 4968.81w 4968.80fl 4968.90fl 4969.00fl 4969.00fl 4968.80fl 4968.80fl 4968.80fl 4968.80fl 4968.50g 4968.50g 4968.50g 4968.40fl 4967.90fl 4967.55fl 4967.15fl 4967.05fl 4969.05p 4969.05p 4969.05p 4969.05p 4969.05p 4969.05p 4969.05p4969.05p 4969.05p 4969.05p 4969.05p 4969.05p4969.05p 4969.05p 4969.05p4969.05p 4969.15p 4969.15p 4969.15p 4969.15p 4969.15p4969.15p 4969.15p 4969.15p 4969.15p 4969.15p 4969.15p 4969.15p4969.15p 4969.15p 4968.57w 4967.00w 4966.95w 4966.95w 4966.95w 4966.85w 4966.85w 4967.19w 4967.18w 4967.37w 4967.33w4967.70w 4967.65w 4967.65w 4967.72w 4967.83w 4968.22w 4968.00W 4969.45w 4969.45w 4969.45w 4969.45w 4968.10w 4968.05w 4968.50gt 4966.50gt 4966.57w 4968.77w 4968.75w 4968.97w 4969.15p 4969.15p 4969.15p 4969.15p 4969.15p 4969.15p 4969.15p 4969.15p 4969.05p 4969.05p4969.05p4969.05p4969.05p 4969.05p 4969.05p 4969.00p 4969.00p 4969.00p4969.00p 4969.00p 4969.00p4969.00p 4969.00p4969.00p 4968.95p 4968.95p 4968.95p 4969.40w 4969.40w 4968.90fl 4968.50p 4969.45w 4969.42w 4969.40w 4969.40w 4968.90w 4969.45w 4968.95w 4968.90w 4969.40w4968.80fl 4969.31w4969.28w 4968.81w 4968.80w 4968.70fl 4968.50fl 4969.15p 4968.10TW 4967.0BW 10" PVC @ 0.50% 4968.50p 4968.80p 4968.80p 4968.90fl 4968.90fl 4968.50p 4968.50p4968.50p 4968.50p 4968.50p 4969.00p 4969.00p 4969.009 4969.009 4968.57w 4968.50w 4969.45w 4969.45w 4968.50TW 4968.00BW 4968.41w 4967.81w4968.20w 4969.15p 4968.60p 4969 GRADING and DRAINAGE NOTES 5805 GRADING & DRAINAGE LEGEND 5811 38 8 S a n t a F e D r i v e D e n v e r , C O 8 0 2 2 3 DE N V E R RJP RJP SEL 03/21/2025 CURRENT.DWG PARIKH MZ . CO L O R A D O NA NA LA R I M E R FO R T C O L L I N S 30 2 C O N I F E R S T R E E T 2595 PONDEROSA ROAD FRANKTOWN, CO 80116 720.384.7661 Phone rpalmer@strategicls.net Robert J. Palmer, PE President 03/21/2025 20 OF 30 GRADING PLAN Know what's below. before you dig.Call R BASIS OF BEARINGS FLOOD ZONE BENCHMARK PROJECT DATUM: NAVD 88 BENCHMARK #1: CITY OF FORT COLLINS BENCHMARK 4-07 SOUTHWEST CORNER OF TIMBERLINE RO. AND BEAR MOUNTAIN OR. DUE NORTH OF NEW POLICE BUILDING ON THE SOUTHWEST CORNER OF A CATCH BASIN. ELEVATION = 4942.84 BENCHMARK #2: CITY OF FORT COLLINS BENCHMARK 17-92 300 FEET SOUTH OF THE SOUTHWEST CORNER OF EAST DRAKE RO. AND TIMBERLINE RO. IN THE TOP OF AN IRRIGATION STRUCTURE. ELEVATION = 4938.70 PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM} FOR THEIR VERTICAL DATUMS. IF NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLL/NS DATUM} IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQUATION SHOULD BE USED: NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) = NAVD88 3.185' THE BASIS OF BEARINGS IS THE EAST LINE OF LOTS 10-13, BLOCK 5, REPLAT (NO.1) OF EVERGREEN PARK, AS BEARING NORTH 0°37'46” EAST, WITH THE SOUTHEAST CORNER OF SAID LOT 13, BLOCK 5, BEING A #4 REBAR, NO CAP AND THE NORTHEAST CORNER OF SAID LOT 10, BLOCK 5, BEING A #4 REBAR WITH A YELLOW PLASTIC CAP STAMPED "LS 10855", AND WITH ALL BEARINGS CONTAINED HEREIN RELATIVE THERETO. BY GRAPHIC PLOTTING ONLY THE SUBJECT PROPERTY IS SITUATED IN FLOOD ZONE "X" ACCORDING TO FLOOD INSURANCE RATE MAP (FIRM) COMMUNITY PANEL NO. 0800460212G WITH AN EFFECTIVE DATE OF NOVEMBER 17, 2005. NO OFFICE CALCULATIONS OR FIELD SURVEYING WAS PERFORMED TO DETERMINE THIS INFORMATION. BUILDING FINISH FLOOR THE TOP OF FOUNDATION ELEVATIONS SHOWN ARE THE MINIMUM ELEVATIONS REQUIRED FOR PROTECTION FORM THE 100-YEAR STORM. NOTE: 1.THE NATURAL HABITAT BUFFER ZONE IS INTENDED TO BE MAINTAINED IN A NATIVE LANDSCAPE. PLEASE SEE SECTION 5.6 OF THE LAND USE CODE FOR ALLOWABLE USES WITHIN THE NATURAL HABITAT BUFFER ZONE. 2.POLLINATOR PATHS AND/OR GARDEN NOTES: a.BIWEEKLY HAND WEEDING IS RECOMMENDED DURING THE GROWING SEASON (MAY - NOVEMBER). b.MULCH IN POLLINATOR AREAS SHOULD BE SHALLOWER THAN STANDARD PLANTING BEDS AND MAY NEED MORE FREQUENT REPLACEMENT. BARE SOIL AREAS SHOULD OCCUR FOR GROUND NESTING BEE SPECIES. c.DO NOT USE CHEMICAL HERBICIDES OR PESTICIDES IN DESIGNATED POLLINATOR RESOURCE AREAS. DO NOT USE WEED BARRIER FABRIC IN DESIGNATED POLLINATOR RESOURCE AREAS. d.DO NOT TRIM PERENNIALS OR GRASSES EARLIER THAN MIDAPRIL IN DESIGNATED POLLINATOR RESOURCE AREAS. e.TRIM STEMS OF PERENNIALS TO A HEIGHT OF 68” AND LEAVE IN PLACE UNTIL THE NEXT GROWING SEASON. f.LEAVE SMALL BUNCHES OF CUT STEMS WITHIN POLLINATOR BEDS AFTER TRIMMING. STEMS TO BE PLACED IN THE BACK OF PLANTING BED OR DISPERSED IN BETWEEN PLANTINGS. g.LEAVE ANY FALLEN LEAVES WITHIN POLLINATOR BEDS THROUGH THE NEXT GROWING SEASON. COLLECTED LEAVES CAN ALSO BE PLACED IN SMALL PILES IN DESIGNATED OPEN SPACE AND/OR AGRICULTURAL AREAS TO PROVIDE ADDITIONAL OVERWINTERING HABITAT. UPLAND SEED MIX X X ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST CO M M CO M M CO M M CO M M CO M M CO M M CO M M CO M M CO M M CO M M CO M M CO M M CO M M COMM COMM COMM CO M M CO M M CO M M COMM COMM COMM CO M M CO M M CO M M G G G G G G G G G G G G G G G W W W E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM CO M M COMM COMM COMM ST ST F E SFESFES C CABLE CABLE VAULT CABLE CABLE VAULT CABLE VAULT WV ELEC ELEC TEST STA ELEC F.O. VAULT HYD WV WV WV WV CABLE D S S D SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SANITARY MANHOLE RIM = 4968.12' FL (N) = 4961.57' FL (W) = 4961.62' FL (E) = 4961.12' SANITARY MANHOLE RIM = 4966.71' FL (W) = 4960.41' FL (E) = 4960.29' STORM MANHOLE WITH TYPE R INTAKE RIM = 4966.49' FL (S) 24" RCP = 4963.83' STORM MANHOLE RIM = 4968.27' FL (N) 24" RCP = 4964.16' FL (S) 24" RCP = 4964.07' FL (E) 18" RCP = 4964.16' FL (W) 18" RCP = 4964.17' ST ST ST ST ST ST ST ST STORM DRAIN INLET RIM = 4967.73' FL (W) 18" RCP = 4965.28' STORM DRAIN INLET RIM = 4967.73' FL (W) 18" RCP = 4965.28' ST S89°20'47"E 383.00' EAST 383.00' (R) S0 0 ° 3 7 ' 4 6 " W 1 3 5 . 0 0 ' NO R T H 1 3 5 . 0 0 ' ( R ) N89°20'47"W 368.05' EAST 368.00' (R) NORTHEAST CORNER OF LOT 13 REPLAT (NO.1) OF EVERGREEN PARK FOUND #4 REBAR FOUND #5 REBAR WITH RED PLASTIC CAP, LS 36062 SS SS SS SS SS 36" RCP PIPE FL = 4962.58' 36" RCP PIPE FL = 4962.76' SOUTHEAST CORNER OF LOT 13 REPLAT (NO.1) OF EVERGREEN PARK FOUND #4 REBAR 36" RCP PIPE FL = 4962.78' N0 0 ° 3 8 ' 5 6 " E 1 2 0 . 0 0 ' NO R T H 1 2 0 . 0 0 ' ( R ) 50' NATURAL HABITAT BUFFER ZONE 8" PVC SANITARY SEWER LATERAL OUT (S)=4962.00 EXITING FIRE HYDRANT STMH-1 (PUBLIC) 4' DIA MANHOLE RIM=4967.50 INV. IN (N)=4960.90 INV.IN (W)=4960.75 INV. OUT (E)=4960.65 57 L.F. 8" SDR-35 PVC @ 2.0% 15" CONC. FES INV.=4963.50 W/TYPE L SOIL RIPRAP 1.75' DEEP 15" RCP @0.50% 1-1/2" WET TAP (DOMESTIC) 3 4" WET TAP (IRRIGATION) 3/4" CURB STOP 3/4" IRRIGATION METER 3 4" RP BACKFLOW PREVENTOR 49 L.F. 3 4" TYPE K COPPER 73 L.F. 2" TYPE K COPPER RP BACKFLOW PREVENTOR FIRE LINE BACK FLOW PREVENTOR 145 L.F. 6" POLY WRAPPED DI6" GATE VALVE 8"X6" STAINLESS STEEL TAPPING SLEEVE W/VALVE 8"X6" STAINLESS STEEL TAPPING SLEEVE W/VALVE NEW FIRE HYDRANT PER LUCAS ELECT. FROMSOURCE TOTRANSORMER BY FT. COLLINSLIGHT & POWER ELECT. FROMTRANSFORMER TOBUILDING BYCONTRACTOR COMM. LINE OUTSIDE OF EASEMENT TO BE RELOCATED. 1-1/2" CURB STOP 53 L.F. 1-1/2" TYPE K COPPER 1-1/2" COMPOUND WATER METER UPSIZE TO 2" TYPE K COPPER 5' PAST METER 10'17.26' 7.00'19.42' 7.00' 43 L.F. 6" POLY WRAPPED DI 6" GATE VALVE 3.00' 2. 0 0 ' STCB-1 10' TYPE RGRATE=4968.20INV. IN=496.20INV. OUT=4964.10 OCS 5'X6" IDRIM=4968.60INV. IN (W)=4965.50INV. IN (S)=4965.50 INV. OUT=4963.8020' L.F. 15" RCP STUB INV.=4966.26 OBSV. WELL W/TRAFFIC LIDINV.=4966.50 OBSV. WELL W/ TRAFFIC LID INV.=4966.50 OBSV. WELL W/TRAFFIC LID INV.=4965.50 OBSV. WELL W/ TRAFFIC LID INV.=4966.50 4" SLOTTED PIPE S=0.50% 4" SLOTTED PIPE S=0.50% 6" SLOTTED PIPE S=0.50% 4" SLOTTED PIPE S=0.50% 14'5. 5 0 ' STOP SIGN PARKING SIGNPARKING SIGN PARKING SIGN STOP SIGN EX. 8" CI WATER MAIN EX. 10" VCP SANITARY SEWER MAIN EX . 8 " P V C W A T E R M A I N EX . 8 " P V C S A N I T A R Y S E W E R M A I N EX. GATE VALVE PROPOSED 8" GATE VALVE PROPOSED FENCE EXISTING GRASS LINED DRAINAGE CHANNEL PROP. GATE PROP. GATE 4"X4"X6" TEE 4" SLOTTED PIPE S=0.50%4"X4"X4" TEE 10' UTIL. ESMT. FFE=4969.50 58.38' FL-FL CONIFER STREET 80.00' R.O.W. 80 . 0 0 ' R . O . W . 59 . 7 2 ' FL - F L 16.00' UTILITY ESMT. BL U E S P R U C E D R I V E UTILITY NOTES: CO UTILITY PLAN LEGEND 38 8 S a n t a F e D r i v e D e n v e r , C O 8 0 2 2 3 DE N V E R RJP RJP SEL 03/21/2025 CURRENT.DWG PARIKH MZ . CO L O R A D O NA NA LA R I M E R FO R T C O L L I N S 30 2 C O N I F E R S T R E E T 2595 PONDEROSA ROAD FRANKTOWN, CO 80116 720.384.7661 Phone rpalmer@strategicls.net Robert J. Palmer, PE President 03/21/2025 21 OF 30 UTILITY PLAN Know what's below. before you dig.Call R BASIS OF BEARINGS FLOOD ZONE BENCHMARK PROJECT DATUM: NAVD 88 BENCHMARK #1: CITY OF FORT COLLINS BENCHMARK 4-07 SOUTHWEST CORNER OF TIMBERLINE RO. AND BEAR MOUNTAIN OR. DUE NORTH OF NEW POLICE BUILDING ON THE SOUTHWEST CORNER OF A CATCH BASIN. ELEVATION = 4942.84 BENCHMARK #2: CITY OF FORT COLLINS BENCHMARK 17-92 300 FEET SOUTH OF THE SOUTHWEST CORNER OF EAST DRAKE RO. AND TIMBERLINE RO. IN THE TOP OF AN IRRIGATION STRUCTURE. ELEVATION = 4938.70 PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM} FOR THEIR VERTICAL DATUMS. IF NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLL/NS DATUM} IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQUATION SHOULD BE USED: NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) = NAVD88 3.185' THE BASIS OF BEARINGS IS THE EAST LINE OF LOTS 10-13, BLOCK 5, REPLAT (NO.1) OF EVERGREEN PARK, AS BEARING NORTH 0°37'46” EAST, WITH THE SOUTHEAST CORNER OF SAID LOT 13, BLOCK 5, BEING A #4 REBAR, NO CAP AND THE NORTHEAST CORNER OF SAID LOT 10, BLOCK 5, BEING A #4 REBAR WITH A YELLOW PLASTIC CAP STAMPED "LS 10855", AND WITH ALL BEARINGS CONTAINED HEREIN RELATIVE THERETO. BY GRAPHIC PLOTTING ONLY THE SUBJECT PROPERTY IS SITUATED IN FLOOD ZONE "X" ACCORDING TO FLOOD INSURANCE RATE MAP (FIRM) COMMUNITY PANEL NO. 0800460212G WITH AN EFFECTIVE DATE OF NOVEMBER 17, 2005. NO OFFICE CALCULATIONS OR FIELD SURVEYING WAS PERFORMED TO DETERMINE THIS INFORMATION. NOTE: 1.THE NATURAL HABITAT BUFFER ZONE IS INTENDED TO BE MAINTAINED IN A NATIVE LANDSCAPE. PLEASE SEE SECTION 5.6 OF THE LAND USE CODE FOR ALLOWABLE USES WITHIN THE NATURAL HABITAT BUFFER ZONE. 2.POLLINATOR PATHS AND/OR GARDEN NOTES: a.BIWEEKLY HAND WEEDING IS RECOMMENDED DURING THE GROWING SEASON (MAY - NOVEMBER). b.MULCH IN POLLINATOR AREAS SHOULD BE SHALLOWER THAN STANDARD PLANTING BEDS AND MAY NEED MORE FREQUENT REPLACEMENT. BARE SOIL AREAS SHOULD OCCUR FOR GROUND NESTING BEE SPECIES. c.DO NOT USE CHEMICAL HERBICIDES OR PESTICIDES IN DESIGNATED POLLINATOR RESOURCE AREAS. DO NOT USE WEED BARRIER FABRIC IN DESIGNATED POLLINATOR RESOURCE AREAS. d.DO NOT TRIM PERENNIALS OR GRASSES EARLIER THAN MIDAPRIL IN DESIGNATED POLLINATOR RESOURCE AREAS. e.TRIM STEMS OF PERENNIALS TO A HEIGHT OF 68” AND LEAVE IN PLACE UNTIL THE NEXT GROWING SEASON. f.LEAVE SMALL BUNCHES OF CUT STEMS WITHIN POLLINATOR BEDS AFTER TRIMMING. STEMS TO BE PLACED IN THE BACK OF PLANTING BED OR DISPERSED IN BETWEEN PLANTINGS. g.LEAVE ANY FALLEN LEAVES WITHIN POLLINATOR BEDS THROUGH THE NEXT GROWING SEASON. COLLECTED LEAVES CAN ALSO BE PLACED IN SMALL PILES IN DESIGNATED OPEN SPACE AND/OR AGRICULTURAL AREAS TO PROVIDE ADDITIONAL OVERWINTERING HABITAT. UPLAND SEED MIX CABLE S0 0 ° 3 7 ' 4 6 " W 1 3 5 . 0 0 ' NO R T H 1 3 5 . 0 0 ' ( R ) NORTHEAST CORNER OF LOT 13 REPLAT (NO.1) OF EVERGREEN PARK FOUND #4 REBAR EA S T L I N E O F L O T S 1 0 - 1 3 , B L O C K 5 RE P L A T ( N O . 1 ) O F E V E R G R E E N P A R K 4969 49 6 5 49 6 5 49 6 949 6 9 49 6 8 49 6 7 49 6 6 49 6 4 50' NATURAL HABITAT BUFFER ZONE 15" CONC. FES INV.=4963.50 W/TYPE L SOIL RIPRAP 1.75' DEEP 15" RCP @0.50% STCB-1 10' TYPE RGRATE=4968.20INV. IN=496.20INV. OUT=4964.10 OCS 5'X6" IDRIM=4968.60INV. IN (W)=4965.50INV. IN (S)=4965.50 INV. OUT=4963.8020' L.F. 15" RCP STUB INV.=4966.26 OBSV. WELL W/TRAFFIC LIDINV.=4966.50 OBSV. WELL W/TRAFFIC LID INV.=4965.50 OBSV. WELL W/ TRAFFIC LID INV.=4966.50 4" SLOTTED PIPE S=0.50%6" SLOTTED PIPE S=0.50% 4" SLOTTED PIPE S=0.50% 14'5. 5 0 ' 4"X4"X6" TEE 4"X4"X4" TEE 49 6 8 4969.00g 4969.00g 4969.68g 4969.00G4970.00 4968.90fl 4968.85fl 4968.82fl 4968.50fl 4968.45fl 4968.30fl 4968.00fl 4969.30g 4968.50fl 4968.10fl 4968.00fl 4968.35fl4968.20fl 4968.50fl 4969.00fl 4968.80 4968.80 4968.50g 4969.42w 4969.40 4969.40w 4968.90w 4969.45w 4968.95w 4968.90w 4969.40w4968.80fl 4969.31w4969.28w 4968.81w 4968.80w 4968.70fl 4968.10TW 4967.0BW 4968.90fl 4968.90fl 4968.50TW 4968.00BW 0+88.89 0+ 1 4 . 1 5 0+00 STORM LINE A 4970 4967 4968 4969 4966 4965 4964 4963 4962 (PRIVATE) THERE ARE NO EXISTING OR PROPOSED UTILITY CROSSING FOR THIS PROFILE 15 " F E S ST A . = 1 + 5 7 . 5 0 IN V O U T = 4 9 6 3 . 5 0 OU T L E T C O N T R O L ST R U C T U R E ( O C S ) ST A . = 0 + 3 0 . 7 5 RI M = 5 4 6 9 . 2 5 IN V . I N ( W ) = 4 9 6 5 . 8 0 IN V . I N ( S ) = 4 9 6 4 . 0 0 IN V O U T = 4 9 6 3 . 8 0 EXISTING GROUND PROPOSED GROUND 2-YEAR HGL 100-YEAR HGL 58.14 L.F. 15 CLS III RCP@0.50% 16.60 L.F. 15 CLS III RCP@0.50% 0+88.98 ST C B - 1 1 0 ' T R P E R ( P R I V A T E ) ST A . = 0 + 1 4 . 1 5 G R A T E = 5 4 6 8 . 5 0 FL O W L I N E = 4 9 6 7 . 9 0 IN V . I N = 4 9 6 4 . 2 0 IN V O U T = 4 9 6 4 . 1 0 38 8 S a n t a F e D r i v e D e n v e r , C O 8 0 2 2 3 DE N V E R RJP RJP SEL 03/21/2025 CURRENT.DWG PARIKH MZ . CO L O R A D O NA NA LA R I M E R FO R T C O L L I N S 30 2 C O N I F E R S T R E E T 2595 PONDEROSA ROAD FRANKTOWN, CO 80116 720.384.7661 Phone rpalmer@strategicls.net Robert J. Palmer, PE President 03/21/2025 22 OF 30 STORM DRAIN PROFILES Know what's below. before you dig.Call R STORM LINE A ST ST ST ST ST ST ST ST ST ST ST ST G G G G G G D S S D STORM MANHOLE WITH TYPE R INTAKE RIM = 4966.49' FL (S) 24" RCP = 4963.83' STORM MANHOLE RIM = 4968.27' FL (N) 24" RCP = 4964.16' FL (S) 24" RCP = 4964.07' FL (E) 18" RCP = 4964.16' FL (W) 18" RCP = 4964.17'ST STORM DRAIN INLET RIM = 4967.73' FL (W) 18" RCP = 4965.28' NORTHEAST CORNER OF LOT 13 REPLAT (NO.1) OF EVERGREEN PARK FOUND #4 REBAR VACANT LOT OWNER(S): OLEADA CONIFER LLC 5' 16' 16' UTILITY & DRAINAGE EASEMENT (BOOK 1597 PAGE 128/ RECEPTION NO. 85405) 6' UTILITY EASEMENT (BOOK 1597 PAGE 128/ RECEPTION NO. 85405) 6' 6' UTILITY EASEMENT(BOOK 1597 PAGE 128/RECEPTION NO. 85405) 6' ZONING: COMMUNITY COMMERCIAL - NORTH COLLEGE DISTRICT 49 7 0 4969 49 6 5 49 6 5 49 6 949 6 9 4967 4968 49 6 9 4970 4970 4969 4968 49 6 8 49 6 7 49 6 6 49 6 4 36" RCP PIPE FL = 4962.58' 36" RCP PIPE FL = 4962.76' PORTION OF WEST 1/2 OF SECTION 01-T7N-R69W (RECEPTION NO. 20210016924) OWNER(S): LONG CREEK TRUST ZONING: COMMUNITY COMMERCIAL - NORTH COLLEGE DISTRICT SOUTHEAST CORNER OF LOT 13 REPLAT (NO.1) OF EVERGREEN PARK FOUND #4 REBAR 36" RCP PIPE FL = 4962.78' 58.38' FL-FL CONIFER STREET 80.00' R.O.W. 80 . 0 0 ' R . O . W . 59 . 7 2 ' FL - F L E1 0.15 0.270.32 E2 1.04 0.240.29 16.00' UTILITY ESMT. BL U E S P R U C E D R I V E A BASIN DESIGNATION EXISTINGD SUMMARY RUNOFF TABLE CONTRIBUTINGDESIGN PT BASINS / AREA (acres)RUNOFF (cfs) 2-YEAR 100-YEAR PEAK RUNOFF (cfs) A BASIN AREA 2 YR COMPOSITE 'C' 100YR COMPOSITE 'C' DESIGN POINT BASIN LIMITS 0.09 0.36 TC CALCULATIONS LEGEND 0.54 2.29 0.63 2.65 E1/0.15 E2/1.04 TOTAL EX/1.19 38 8 S a n t a F e D r i v e D e n v e r , C O 8 0 2 2 3 DE N V E R RJP RJP SEL 03/21/2025 CURRENT.DWG PARIKH MZ . CO L O R A D O NA NA LA R I M E R FO R T C O L L I N S 30 2 C O N I F E R S T R E E T 2595 PONDEROSA ROAD FRANKTOWN, CO 80116 720.384.7661 Phone rpalmer@strategicls.net Robert J. Palmer, PE President 03/21/2025 23 OF 30 EXISTING DRAINAGE PLAN Know what's below. before you dig.Call R ST ST ST ST ST ST ST ST ST ST ST ST G G G G G G C CABLE CABLE VAULT CABLE CABLE VAULT CABLE VAULT ELEC ELEC D S S D STORM MANHOLE WITH TYPE R INTAKE RIM = 4966.49' FL (S) 24" RCP = 4963.83' STORM MANHOLE RIM = 4968.27' FL (N) 24" RCP = 4964.16' FL (S) 24" RCP = 4964.07' FL (E) 18" RCP = 4964.16' FL (W) 18" RCP = 4964.17'ST STORM DRAIN INLET RIM = 4967.73' FL (W) 18" RCP = 4965.28' 49 7 0 4969 49 6 5 49 6 5 49 6 949 6 9 4967 4968 49 6 9 4970 4970 4969 4968 49 6 8 49 6 7 49 6 6 49 6 4 36" RCP PIPE FL = 4962.58' 36" RCP PIPE FL = 4962.76' PORTION OF WEST 1/2 OF SECTION 01-T7N-R69W (RECEPTION NO. 20210016924) 36" RCP PIPE FL = 4962.78' 50' NATURAL HABITAT BUFFER ZONE 15" CONC. FES INV.=4963.50 W/TYPE L SOIL RIPRAP 1.75' DEEP 15" RCP @0.50% STCB-1 10' TYPE RGRATE=4968.20INV. IN=496.20 INV. OUT=4964.10 OCS 5'X6" IDRIM=4968.60INV. IN (W)=4965.50INV. IN (S)=4965.50INV. OUT=4963.8020' L.F. 15" RCP STUB INV.=4966.26 OBSV. WELL W/TRAFFIC LIDINV.=4966.50 OBSV. WELL W/ TRAFFIC LID INV.=4966.50 OBSV. WELL W/TRAFFIC LID INV.=4965.50 OBSV. WELL W/ TRAFFIC LID INV.=4966.50 4" SLOTTED PIPE S=0.50% 4" SLOTTED PIPE S=0.50% 6" SLOTTED PIPE S=0.50% 4" SLOTTED PIPE S=0.50% 14'5. 5 0 ' 4"X4"X6" TEE 4" SLOTTED PIPE S=0.50%4"X4"X4" TEE FFE=4969.50 58.38' FL-FL CONIFER STREET 80.00' R.O.W. 80 . 0 0 ' R . O . W . 59 . 7 2 ' FL - F L 4969 4968 49 6 8 4969 A 0.92 0.690.76 B 0.20 0.430.48 9.00' UTILITY ESMT 9. 0 0 ' UT I L I T Y ES M T . B 0.02 0.200.25 16.00' UTILITY ESMT. BL U E S P R U C E D R I V E 49 6 9 4966.15fl 4966.13fl 4966.63tc 4966.70w4966.22w 4966.00fl 4966.23fl 4966.25fl 4966.75tc 4966.82w 4966.30w 4969.00g 4969.00g 4968.00g 4967.00g 4969.68g 4969.17P 4969.17P 4969.129 4969.129 4969.00W 4969.00W 4968.97W 4968.97W 4968.50fl 4967.16fl 4967.25fl 4968.00fl 4968.70fl 4968.60fl 4968.60fl 4968.65fl 4968.70fl 4968.85fl 4968.87fl4969.42w 4969.40W 4969.40W 4968.90FL 4968.90FL 4968.60P 4968.60P 4968.50FL 4969.00G4970.00G 4970.90g4970.00g 4968.90fl 4968.85fl 4968.82fl 4968.50fl 4968.45fl 4968.30fl 4968.55fl 4968.55fl 4968.00fl 4969.30g 4968.50fl 4968.90fl 4968.80p 4968.10fl 4968.00fl 4968.35fl4968.20fl 4968.70fl 4968.70fl 4968.70fl 4968.65fl4968.50fl 4968.50fl 4968.50fl 4968.50fl 4969.50fl 4968.80fl 4968.80fl4968.80fl 4969.25fl 4968.80fl 4968.50fl 4968.30g 4968.50g 4968.27fl 4968.34w 4968.34fl 4968.37fl 4968.87tc 4968.94w 4968.24fl 4968.74tc 4968.81w 4968.80fl 4968.90fl 4969.00fl 4969.00fl 4968.80fl 4968.80fl 4968.80fl 4968.80fl 4968.50g 4968.50g 4968.50g 4968.40fl 4967.90fl 4967.55fl 4967.15fl 4967.05fl 4969.05p 4969.05p 4969.05p 4969.05p 4969.05p 4969.05p 4969.05p4969.05p 4969.05p 4969.05p 4969.05p 4969.05p4969.05p 4969.05p 4969.05p4969.05p 4969.15p 4969.15p 4969.15p 4969.15p 4969.15p4969.15p 4969.15p 4969.15p 4969.15p 4969.15p 4969.15p 4969.15p4969.15p 4969.15p 4968.57w 4967.00w 4966.95w 4966.95w 4966.95w 4966.85w 4966.85w 4967.19w 4967.18w 4967.37w 4967.33w4967.70w 4967.65w 4967.65w 4967.72w 4967.83w 4968.22w 4968.00W 4969.45w 4969.45w 4969.45w 4969.45w 4968.10w 4968.05w 4968.50gt 4966.50gt 4966.57w 4968.77w 4968.75w 4968.97w 4969.15p 4969.15p 4969.15p 4969.15p 4969.15p 4969.15p 4969.15p 4969.15p 4969.05p 4969.05p4969.05p4969.05p4969.05p 4969.05p 4969.05p 4969.00p 4969.00p 4969.00p4969.00p 4969.00p 4969.00p4969.00p 4969.00p4969.00p 4968.95p 4968.95p 4968.95p 4969.40w 4969.40w 4968.90fl 4968.50p 4969.45w 4969.42w 4969.40w 4969.40w 4968.90w 4969.45w 4968.95w 4968.90w 4969.40w4968.80fl 4969.31w4969.28w 4968.81w 4968.80w 4968.70fl 4968.50fl 4969.15p 4968.10TW 4967.0BW 10" PVC @ 0.50% 4968.50p 4968.80p 4968.80p 4968.90fl 4968.90fl 4968.50p 4968.50p4968.50p 4968.50p 4968.50p 4969.00p 4969.00p 4969.009 4969.009 4968.57w 4968.50w 4969.45w 4969.45w 4968.50TW 4968.00BW 4968.41w 4967.81w4968.20w 4969.15p 4968.60p 4969 A BASIN DESIGNATION PROPOSED SUMMARY RUNOFF TABLE CONTRIBUTINGDESIGN PT BASINS / AREA (acres)RUNOFF (cfs) 2-YEAR 100-YEAR PEAK RUNOFF (cfs) ABASIN AREA 2 YR COMPOSITE 'C' 100YR COMPOSITE 'C' DESIGN POINT BASIN LIMITS 1.53 5.90 TC CALCULATIONS LEGEND 0.19 0.73 0.01 0.04 A/0.972 B/0.195 C/0.01929 TOT SITE/1.19 1.69 6.50 DETENTION POND A WATER SURFACE ELEVATION (FEET) VOLUME (CUBIC FEET) NOTES WATER QUALITY CAPTURE VOLUME (WQCV) 100-YEAR DETENTION (TOTAL STORAGE) DATE: 02/14/2025 7264966.10 RELEASE RATE (CFS) 0.017 CFS 6,825 0.97CFS4967.75 POROUS PAVERS REQUIREDPROVIDED 726 6,825 MAX.PROVIDED 0.017 CFS 0.97 CFS POROUS PAVERS 38 8 S a n t a F e D r i v e D e n v e r , C O 8 0 2 2 3 DE N V E R RJP RJP SEL 03/21/2025 CURRENT.DWG PARIKH MZ . CO L O R A D O NA NA LA R I M E R FO R T C O L L I N S 30 2 C O N I F E R S T R E E T 2595 PONDEROSA ROAD FRANKTOWN, CO 80116 720.384.7661 Phone rpalmer@strategicls.net Robert J. Palmer, PE President 03/21/2025 24 OF 30 PROPOSED DRAINAGE PLAN Know what's below. before you dig.Call R 38 8 S a n t a F e D r i v e D e n v e r , C O 8 0 2 2 3 DE N V E R RJP RJP SEL 03/21/2025 CURRENT.DWG PARIKH MZ . CO L O R A D O NA NA LA R I M E R FO R T C O L L I N S 30 2 C O N I F E R S T R E E T 2595 PONDEROSA ROAD FRANKTOWN, CO 80116 720.384.7661 Phone rpalmer@strategicls.net Robert J. Palmer, PE President 03/21/2025 25 OF 30 DRAINAGE DETAILS 2" L CHANNEL US FILTER STAINLESS STEEL WELL-SCREEN (OR EQUAL) TRASH RACK DESIGN SPECIFICATIONS TABLE A: WATER QUALITY TRASH RACK 1/5"0.139" #93 VEE 0.31"TE 0.074"X0.5' SUPPORT CARBON STELL FRAME TYPE TOTAL SCREEN THICKNESS SUPPORT ROD, ON CENTER, SPACING SUPPORT ROD TYPE SCREEN #93 VEE WIRE SLOT OPENING MAX WIDTH OF OPENING RODS @ 1" O.C.(DIAG) 6.00' 5. 0 0 ' 2' ACCESS MANHOLE 2' ACCESS MANHOLE 4" SLOTTED UNDER DRAIN 4" SLOTTED PIPE UNDER DRAIN 15" CLS III RCP TO OUTFALL 15" RCP CLS III TO TYPE R INLET 15" CLASS III RCP TO CHANNEL OUTFALL ORIFICE WALL/OVERFLOW ELEV.=4968.00 4967.75 100-YEAR WSEL 4964.00 100-YEAR ORIFICE PRE-CAST VAULT STRUCTURE CONTRACTOR TO SUBMIT SHOP DRAWINGS TO ENGINEER FOR APPROVAL PRIOR TO ORDERING ORIFICE DIAMETER=1-13/16" ORIFICE PLATE W/WELL SCREEN TRASH RACK 19" 4. 0 0 ' 1/ 4 " T H I C K G A L V A N I Z E D S T E E L P L A T E 12" 1/4" BOLT TYP. TOP OF PLATE ELEVATION ELEV = 4968.00 4964.00(PLATE BOTTOM) ORIFICE PLATE 1-13/16" ORIFICE 4964.00 (WQ ORIFICE) INV, OUT=4963.80 DETENTION POND OUTLET CONTROL STRUCTURE (OCS) 4" SLOTTED PIPE INV. IN=49665.75 15" RCP INV. IN=4965.50 WEST AND SOUTH 15" RCP CLS III TO TYPE R INLET 15" RCP INV. IN=4965.50 WEST AND SOUTH 1"TRASH RACK 38 8 S a n t a F e D r i v e D e n v e r , C O 8 0 2 2 3 DE N V E R RJP RJP SEL 03/21/2025 CURRENT.DWG PARIKH MZ . CO L O R A D O NA NA LA R I M E R FO R T C O L L I N S 30 2 C O N I F E R S T R E E T 2595 PONDEROSA ROAD FRANKTOWN, CO 80116 720.384.7661 Phone rpalmer@strategicls.net Robert J. Palmer, PE President 03/21/2025 26 OF 30 DRAINAGE DETAILS POROUS PAVER DETENTION SECTION 23.5" 38 8 S a n t a F e D r i v e D e n v e r , C O 8 0 2 2 3 DE N V E R RJP RJP SEL 03/21/2025 CURRENT.DWG PARIKH MZ . CO L O R A D O NA NA LA R I M E R FO R T C O L L I N S 30 2 C O N I F E R S T R E E T 2595 PONDEROSA ROAD FRANKTOWN, CO 80116 720.384.7661 Phone rpalmer@strategicls.net Robert J. Palmer, PE President 03/21/2025 27 OF 30 DRAINAGE DETAILS NOTE: DOWNSPOUT CONNECTION CLEANOUT COVER DETAIL FOR CLEANOUTS LARGER THAN 6" DIAMETER REQUIRED GRATE 38 8 S a n t a F e D r i v e D e n v e r , C O 8 0 2 2 3 DE N V E R RJP RJP SEL 03/21/2025 CURRENT.DWG PARIKH MZ . CO L O R A D O NA NA LA R I M E R FO R T C O L L I N S 30 2 C O N I F E R S T R E E T 2595 PONDEROSA ROAD FRANKTOWN, CO 80116 720.384.7661 Phone rpalmer@strategicls.net Robert J. Palmer, PE President 03/21/2025 28 OF 30 CONSTRUCTION DETAILS 1.1 1.4 1.6 1.7 1.2 1.3 1.5 DRIVEWAY APPROACH DRIVEWAY APPROACH SIDEWALK SIDEWALK JOINT TRENCH DETAIL WATER SERVICE METER SETTING 1.8METER SETTING 38 8 S a n t a F e D r i v e D e n v e r , C O 8 0 2 2 3 DE N V E R RJP RJP SEL 03/21/2025 CURRENT.DWG PARIKH MZ . CO L O R A D O NA NA LA R I M E R FO R T C O L L I N S 30 2 C O N I F E R S T R E E T 2595 PONDEROSA ROAD FRANKTOWN, CO 80116 720.384.7661 Phone rpalmer@strategicls.net Robert J. Palmer, PE President 03/21/2025 29 OF 30 CONSTRUCTION DETAILS 2.1 2.4 2.6 2.7 2.2 2.3 2.5 METER SETTING METER SETTING SANITARY SEWER MANHOLE STORM DRAIN MANHOLE SANITARY SEWER CLEANOUT (PRIVATE) ACCESSIBLE PARKING 2.8 4"20" R 4' - 1 0 1 / 2 " 4'-3" HANDICAP ACCESSIBLE PARKING PAVEMENT MARKING "HANDICAP PARKING ONLY" SIGNAGE 9.00'9.00' FOR VAN ACCESSIBLE 5.00' FOR NON-VAN SPACE 9.00' ALL ADA STRIPING SHALL BE 4" WIDE STRIPING PAINTED BLUE SEALMASTER ACRYLIC PAINT OR APPROVED EQUAL. ADDITIONAL SIGNAGE ATEACH HANDICAPPEDPARKING SPACE MUTCD R7-201P (R7-201A) 3/8" X 4"IMPREGNATEDFIBERBOARDEXPANSIONJOINT 6" 3' - 0 " 3' - 6 " ADDITIONAL SIGNSTATING "VANACCESSIBLE SPACE"AT VAN SPACES ONLY (MUTCD R7-8P) UNIVERSAL HANDICAP SIGN (MUTCD R7-8) 12"X18"X.080 GA.BONDERIZEDSTEEL SIGN OR P E R L O C A L C O D E 7" 1' - 6 " PARKING VAN 9' - 9 " RADIUS 1 1/2" (TYP.) 6" FI R S T P L A C A R D 7' T O B O T T O M O F 4' DEEP X 18"DIA. CONCRETEFOOTING 2" SQUAREGALVANIZED SIGNPOST WITH SET IN 6"PIPE BOLLARD, PAINTBLACK, FILL WITHNON-SHRINK GROUT ACCESSIBLE RESERVED 2. 0 ' ADA PARKING SIGN 2. 0 ' ADA PARKING SIGN CONC. WHEEL STOPCONC. WHEEL STOP BLUE STRIPING BLUE STRIPING BLUE STRIPINGBLUE STRIPING BLUE STRIPING BLUE STRIPING 19 . 0 0 ' INTERNATIONAL ACCESSIBLE PARKING SYMBOL (VAN ACCESSIBLE DESIGNATION WHERE APPLICABLE) 1. 0 0 ' ACCESSIBLE AISLE STRIPING SHALL BE DIAGONAL CURB & GUTTER WHERE APPLICABLE (REF:NOTE 4 FOR CURB & GUTTER REQUIREMENTS) 1:50 (2%) MAXIMUM-SLOPE ALL DIRECTIONS NOTES: 1.EACH ACCESSIBLE PARKING SPACE IT TO BE A MINIMUM OF 8' WIDE AND HAVE A 96" ACCESS MINIMUM ACCESS AISLE FOR VANS OR 60" ACCESS AISLE FOR CARS ADJACENT TO THE SPACE. 2.CONSTRUCTED SLOPES WITHIN THE ACCESSIBLE PARKING SPACES AND ACCESS AISLE SHALL NOT EXCEED 1:50 (2%) IN ANY DIRECTION. 3.RAMPS MUST NOT EXTEND OUT FROM THE CURB INTO THE ACCESS AISLE OF ANY ACCESSIBLE PARKING SPACE. 4.CURB & GUTTER ADJACENT TO OR WITHIN ACCESSIBLE PARKING STALLS SHALL BE MODIFIED IN A MANNER THAT THE SLOPE CONSTRUCTED WITHIN THE GUTTER PAN SHALL NOT EXCEED 1:50 (2%) SLOPE IN ALL DIRECTIONS. 5.SURFACE STRIPING PAINT SHALL BE FS-TT-P-1952D (WATERBORNE), TYPE II ADVERSE CONDITIONS, COLOR: WHITE OR AS REQUIRED BY LOCAL CODES. ACCESSIBLE PARKING NOTE: CITY OF FORT COLLINS WASTEWATER DETAILS ARE NOT CURRENTLY AVAILABLE ONLINE. WE HAVE REACHED OUT TO THE CITY TO OBTAIN A COPY. THE SANITARY SEWER AND STORM DRAIN DETAILS WILL BE ADDED WHEN AVAILABLE. NOTE: CITY OF FORT COLLINS WASTEWATER DETAILS ARE NOT CURRENTLY AVAILABLE ONLINE. WE HAVE REACHED OUT TO THE CITY TO OBTAIN A COPY. THE SANITARY SEWER AND STORM DRAIN DETAILS WILL BE ADDED WHEN AVAILABLE. 4" MIN. 4" MIN. 4" MIN. 6" 11.5"11.5" 4" MIN.4" MIN. 4" MIN. VA R I E S 3' - 6 " M I N . 30° 3" 13" 10"3/8"3/8" 3" 7/8" 10 3/4" ACCESSIBLE PARKING 38 8 S a n t a F e D r i v e D e n v e r , C O 8 0 2 2 3 DE N V E R RJP RJP SEL 03/21/2025 CURRENT.DWG PARIKH MZ . CO L O R A D O NA NA LA R I M E R FO R T C O L L I N S 30 2 C O N I F E R S T R E E T 2595 PONDEROSA ROAD FRANKTOWN, CO 80116 720.384.7661 Phone rpalmer@strategicls.net Robert J. Palmer, PE President 03/21/2025 30 OF 30 CONSTRUCTION DETAILS 3.1 3.4 3.6 3.7 3.2 3.3 3.5 STOP SIGN FIRE LAN SIGNAGE FIRE LAN SIGNAGE SIGN POST FIRE SIGNAGE ONSITE CURB RAMPS ONSITE CURB RAMPS 3.8ONSITE CURB STOP30"X30"X.080 GA.BONDERIZEDSTEEL SIGN NOTE: BOTTOMOF SIGN MUSTBE A MINIMUMOF 7' ABOVEGROUND. 30"X30" MUTCD STOP SIGN R-1 ANCHOR SLEEVE 2 1 4" X 2 1 4" OR AS SPECIFIED. 36" LING PRE-GALVANIZED 2"X2"X10' 7 16" DIA. HOLES 1" O.C., PRE-GALVANIZED STEEL SIGN POST PER COA DETAIL TE-11.0 3' - 0 " FIRE LANE 3/8" X 4"IMPREGNATEDFIBERBOARDEXPANSIONJOINT 6" 3' - 0 " 3' - 6 " FI R S T P L A C A R D 7' T O B O T T O M O F 4' DEEP X 18"DIA. CONCRETEFOOTING FIRE LANE FIRE LANE6" 2" SQUAREGALVANIZED SIGNPOST WITH SET IN 6"PIPE BOLLARD, PAINTBLACK, FILL WITHNON-SHRINK GROUT 12"X18"X.080 GA.BONDERIZEDSTEEL SIGN (RIGHT) 1' - 6 " 1'-6" FIRE 12"X18"X.080 GA.BONDERIZEDSTEEL SIGN BLACK LETTERINGOVER WHITEBACKGROUND 1'-6" FDC 12"X18"X.080 GA.BONDERIZEDSTEEL SIGN WHITE LETTERINGOVER REDBACKGROUND SPRINKLER RISER ROOM TRANSITION FROM 8.3% T0 5% OVER 2' TRANSITION FROM 8.3% T0 5% OVER 2' 3" 3"FLOWLINE S=2% MAX FIRE LANE L B R FIRE LANE SIGNS AND NOTES:1.SIGNS SHALL BE SET AT AN ANGLE NOT LESS THAN 30 DEGREESAND NOT MORE THAN 45 DEGREES WITH THE CURB OR LINE OFTRAFFIC FLOW.2.SIGNS SHALL BE SPACED 50-FEET ON ALTERNATING SIDES OF THE FIRE LANE IN ACCORDANCE WITH THE IFC.3.SIGNS SHALL BE INSTALLED 2' BEHIND CURB OR SIDEWALK.4.FIRE LANE SIGNS SHALL SHOW L, R, B (OR SIMILARIDENTIFICATION FOR EACH SIGN UTILIZED TO MATCH LOCATIONSON PLANS.5.LOWEST SIGN SHALL BE MOUNTED 7' FEET ABOVE GRADE. 6" 7 16" HOLE PRIVATE CONCRETE CURB & GUTTER TYPE 1 RAMP 2.2 5 ' @ 5 . 0 % 12:1 4.75 ' 2% T R A N S I T I O N FRO M 5 % T O 8 . 3 3 % GUTT E R C R O S S S L O P E OVER 2 ' 2% T R A N S I T I O N FRO M 5 % T O 8 . 3 3 % GUTT E R C R O S S S L O P E OVER 2 ' 3" 5'MIN . 5'X5' (MIN.) LANDING S=2% MAX IN ALL DIRECTIONS 2"R 1"R 1'-0" 71 2" 11 2" NOTES: 1' - 0 " 6" 6" 6" 1. PROVIDE CONTRACTION JOINTS @ 15' CC & EXPANSION JOINTS @ 75' CC 2. REFER TO GRADING PLAN FOR SPILL GUTTER 3. MAX. GUTTER SLOPE AT CURB RAMPS IS 5.0% FIBERMESH REINFORCED CONCRETE ONSITE CURB ONLY (PRIVATE)