Loading...
HomeMy WebLinkAboutReports - Erosion Control - 01/15/2025Project:Disturbed Acres:0.25 EROSION CONTROL BMPs Units Estimated Quantity Unit Price Total Price each 2 $250.00 $500.00 L.F.320 $1.10 $352.00 each 14 $125.00 $1,750.00 each 1 $1,700.00 $1,700.00 each 1 $1,250.00 $1,250.00 Stabilized Staging Area S.Y.245 $4.75 $1,163.75 area 150 $3.50 $525.00 Sub-Total:$7,240.75 1.5 x Sub-Total:$10,861.13 Amount of security:$10,861.13 Minimum escrow amount:$3,000.00 Erosion Control Escrow:$10,861.13 Miniumum Escrow Amount Escrow Amount “The amount of the security must be based on one and one-half times the estimate of the cost to install the approved measures, or one and one-half times the cost to re-vegetate the disturbed land to dry land grasses based upon unit cost determined by the City's Annual Revegetation and Stabilization Bid, whichever is greater. In no instance, will the amount of security be less than one thousand five hundred dollars ($1,500) for residential development or three thousand dollars ($3,000) for commercial development” Inlet Protection Construction Fence Rock Socks Vehicle Tracking Control Pads Concrete Washout Area Final Erosion and Sediment Control Escrow/Security Calculation for the City of Fort Collins 300 E. Mountain BDR BMP Amount Vegetate Landscaped Areas 1/15/2025 10:03 AM S:\NEProjects\2102-001\Drainage\Reports\SWMP Report\2102-001_300 Mountain-EC_Escrow.xls