300 E Mountain
Alternative Compliance Request – Nonresidential Parking Requirements
April 2, 2025
Land Use Code
5.9.1(K)(2)(b) Nonresidential Parking Requirements
Parking Requirements for Nonresidential Uses:
Reason For Request
The proposal for 300 E Mountain is a commercial project subject to a Basic Development Review
(BDR) with 3,576 square feet of general office space and 200 square feet of bar space. The
proposed use includes a green room to only be used for shows, office space, indoor bicycle
parking, and storage for the Armory. Based on the above code section, 5 total parking spaces
would be required for bar and office uses. With the 25% parking reduction exemption through
the Transit-Oriented Development (TOD) overlay and with parking minimums applying to the net
increase in square footage in the existing building exemption, a new total of 1 parking space
would be required (excerpt from land use table below).
MINIMAL RISK. PAINLESS PROCESS. BEAUTIFUL SPACES.
o: 970.224.5828 | w: ripleydesigninc.com
RIPLEY DESIGN, INC. | 419 Canyon Avenue, Suite 200 | Fort Collins, CO 80521
The last active use of the site was The Lyric Cinema, a theater, which was more intense than an
office and bar use. A theater typically has higher occupancy loads, often seating many people
who arrive and leave within a relatively short timeframe. For many years, the Lyric Cinema movies
would run simultaneously with the shows at the Armory. Historically, there have never been any
parking spaces on-site even with the more intense theater use.
Due to site constraints and location, as well as an effort to align with the Downtown Plan and
existing conditions, the project is not proposing, nor can it add, any parking spaces on-site.
Through the alternative compliance criteria, the applicant is proposing to utilize nearby parking
garage capacity, as well as existing on-street parking as an alternative to providing commercial
parking spaces on site.
Land Use Code Criteria
There are two categories of criteria for the decision-maker to use when approving an alternative
compliance request. They are described below using numbers 1 and 2, with the applicant’s justifications
following the criteria:
1) Land Use Code section 5.9.1(K)(3) states that the decision-maker may approve an alternative parking
ratio…that may be substituted in whole or in part for a ratio meeting the standards of this Section . The
decision-maker must first find that the proposed alternative plan accomplishes the purposes of the
standard equally well or better than would a plan which complies with the standards.
The project is not proposing any parking spaces on site and the alternative is to utilize the Firehouse Alley
Parking Garage. A public-private partnership between the owner and city was realized when the Firehouse
Alley Parking Garage was built in 2018 to accommodate future parking for development in the downtown
area, which will be used by the 300 E Mtn development.
The following justifications show how the alternative plan is equally well or better than a plan that would
comply:
The purpose of section 5.9.1 “is intended to ensure that the parking and circulation aspects of all
developments are well designed with regard to safety, efficiency and convenience for vehicles,
bicycles, pedestrians, mobility assistance devices, and transit, both within the development and to
and from surrounding areas.”
MINIMAL RISK. PAINLESS PROCESS. BEAUTIFUL SPACES.
o: 970.224.5828 | w: ripleydesigninc.com
RIPLEY DESIGN, INC. | 419 Canyon Avenue, Suite 200 | Fort Collins, CO 80521
The alternative parking plan of utilizing the Firehouse Alley Parking to mitigate the need for
parking on-site is equally well or better than a plan that would comply because it will encourage
pedestrian circulation, increase safety, and will be efficient and convenient for all modes of travel.
An additional benefit is that the site will be able to focus on pedestrian safety and the streetscape
experience.
Safety and efficiency of transportation are critical considerations for proposing this alternative
plan. Parking lots inherently increase the conflicts between pedestrians and vehicles and can
create safety concerns in such a populated area of town. The Firehouse Alley Parking Garage will
provide the necessary parking spaces to accommodate this development within a short distance.
Outlined below are the existing parking garages, surface lots, and on-street public parking that
are well-lit and already have convenient routes in close proximity to the project at 300 E
Mountain:
➢ Parking Garages
o Firehouse Alley Parking Garage: ~425 feet
o Civic Center Parking Garage: ~1,700 feet
o Old Town Parking Garage: ~525 feet
➢ Surface Lots
o Jefferson Lot: ~1,900 feet
o Oak/Remington Lot: ~1,200 feet
o Olive Lot: ~1,300 feet
➢ On-street parking
o Available on most public streets throughout Old Town
In addition to parking options, Downtown offers a variety of well -developed infrastructure to
facilitate convenient and equitable access for residents and visitors without the need for a car:
• According to the Transfort website, the Max Bus Rapid Transit (BRT) “connects major
activity and employment centers in the Fort Collins community, including Midtown, CSU,
and Downtown. It links seamlessly with other Transfort bus routes, Park-n-Rides, and
other service lines, providing a hassle-free travel experience for our riders. With 12
stations and stops, MAX follows a dedicated transit-only guideway and mixed-traffic
streets, connecting the South Transit Center (STC) to Downtown, making it a convenien t
travel route.” Per the 2019 Transportation Master Plan, there will be a future ‘High
Frequency’ 15-minute bus route along Mountain Ave. See the below map showing the
high frequency bus route along Mountain and the other routes that link up to take
people to various parts of the City.
MINIMAL RISK. PAINLESS PROCESS. BEAUTIFUL SPACES.
o: 970.224.5828 | w: ripleydesigninc.com
RIPLEY DESIGN, INC. | 419 Canyon Avenue, Suite 200 | Fort Collins, CO 80521
• The Downtown Transit Center acts as a hub for buses with many different routes,
providing connections to other parts of the City and beyond. The buses are accessible for
mobility assistance devices, and are also equipped with bike racks. Regional bus service
routes also allow visitors from surrounding areas to access the destinations in Downtown
Fort Collins.
• Cyclists benefit from an extensive network of bikeways, including bike-friendly routes
along Magnolia, Remington, and Maple Streets, which offer direct paths into the heart of
Downtown. The 2022 Active Modes Plan not only envisions but recommends a future
buffered bike lane on Mountain (see below map). There is ample bike parking
throughout downtown, including in front of the site and in the parking garages. Four (4)
secure bike parking spaces for the development will also be provided inside the building.
MINIMAL RISK. PAINLESS PROCESS. BEAUTIFUL SPACES.
o: 970.224.5828 | w: ripleydesigninc.com
RIPLEY DESIGN, INC. | 419 Canyon Avenue, Suite 200 | Fort Collins, CO 80521
People that come downtown usually expect to walk to their destination and are not expecting to
park onsite. There were public improvements that were upgraded when the Elizabeth Hotel
opened its doors to create a convenient and safe route to various destinations nearby . By utilizing
on-street parking and nearby garage parking, it will ensure that the circulation and flow
surrounding the site remains intact to support a safer, more vibrant public realm. Limiting the
number of curbs cuts for parking lot access, the potential conflicts between cars and pedestrians
and bicyclists is minimized. Streetscapes without parking lots are often livelier and engaging, as
they prioritize people over vehicles. The building will also have lighting to directly activate the
streetscape and create a safer nighttime walking experience along the frontage.
According to the Downtown Plan, a prominent theme is that “Downtown will be designed to
provide ample transportation options and streets, buildings, and places that put pedestrians
first”(pg. 15). Sidewalks will be designed to meet ADA standards and the travel lanes are sufficient
for the amount of traffic. There are a combination of bike lane types in the area due to the road
width constraints. Although there is a shared bike lane on Mountain Ave, there is a dedicated bike
lane that begins on Walnut from Mountain.
The final benefit to approving the proposed alternative plan is that the architecture can really
shine. Building transparency and architectural details will complement the surrounding buildings
and will be incorporated into the historic nature of the area. A focus on the building architecture
will ensure that the site fits with the surrounding buildings, enhances the streetscape and
pedestrian experience and creates a sense of place within the Downtown area.
MINIMAL RISK. PAINLESS PROCESS. BEAUTIFUL SPACES.
o: 970.224.5828 | w: ripleydesigninc.com
RIPLEY DESIGN, INC. | 419 Canyon Avenue, Suite 200 | Fort Collins, CO 80521
2) In reviewing the request for an alternative parking ratio plan in order to determine whether it accomplishes
the purposes of this Section, as required above, the decision maker shall take into account the number of
employees occupying the building or land use, the number of expected customers or clients, the availability
of nearby on-street parking (if any), the availability of shared parking with abutting, adjacent or
surrounding land uses (if any), the provision of purchased or leased parking spaces in a municipal or private
parking lot meeting the requirements of the City, trip reduction programs (if any), or any other factors that
may be unique to the applicant's development request.
The decision maker shall not approve the alternative parking ratio plan unless it:
(I) does not detract from continuity, connectivity and convenient proximity for pedestrians
between or among existing or future uses in the vicinity,
The alternative parking plan with no spaces provided on-site does not detract
from continuity, connectivity nor convenient proximity for pedestrians
between or among existing future uses in the vicinity. The previous use as a
theater did not have any parking on-site, therefore the proposed project will
not be taking any parking away, which in turn keeps the pedestrian
connectivity and habit patterns the same. There are 14’ sidewalks adjacent to
the site, along Chestnut St and Mountain Ave, which provide connectivity to
other uses in the area. These sidewalks will remain with the proposed project,
and will continue to provide a pedestrian-friendly route to and from various
destinations in Old Town. In addition, without parking spaces, there will not be
any additional access or circulation needed within the site, which leads to a
safer and more pleasant walking environment for pedestrians.
This Downtown location is within convenient proximity to the Firehouse Alley
Parking Garage and other public parking spaces, therefore encouraging
continuity and connectivity to the existing uses and pedestrians to and from
the site.
(II) minimizes the visual and aesthetic impact along the public street by placing parking lots
to the rear or along the side of buildings, to the maximum extent feasible,
The site at 300 E Mountain is a triangular shape abutting two public streets,
with an approximately 3,800 square foot footprint. These factors make it
infeasible to consider parking on-site since there is nowhere to put parking
spaces that would minimize the aesthetic impacts from the street.
The Downtown Plan recognizes that “many Downtown sites have very limited
space for surface parking…” (pg 20), and that “Accommodating parking
MINIMAL RISK. PAINLESS PROCESS. BEAUTIFUL SPACES.
o: 970.224.5828 | w: ripleydesigninc.com
RIPLEY DESIGN, INC. | 419 Canyon Avenue, Suite 200 | Fort Collins, CO 80521
demand in each individual development project can constrain building design
and have a negative ripple effect on buildings, streetscapes, and outdoor
spaces (pg 31).” In this case, because the site has limited space, it makes sense
to focus on the architecture, landscaping and the pedestrian-friendly
environment to increase the visual and aesthetic impact along the public
streets that surround the project.
The Armory building is a historic building located right next door, so
protecting and enhancing the historic character is important for this project.
Having a well-designed building that creates a sense of place and visual
interest is better than a plan that includes a paved parking lot. A parking lot at
300 E Mountain would detract from the historic nature of the block and would
be a detriment to the useability of the space and visual attractiveness of a
well-designed building.
(III) minimizes the visual and aesthetic impact on the surrounding neighborhood,
Adding on to the previous section, the visual and aesthetic impacts are
minimized by the alternative plan because the appearance of the building
design is more visually interesting and appealing than a paved parking lot. The
neighborhood will be less impacted by a building that activates the pedestrian
environment because a parking lot has the potential for car light spillage,
collisions, and would be less aesthetically appealing overall.
(IV) creates no physical impact on any facilities serving alternative modes of transportation,
The alternative parking plan does not create a physical impact on any facilities
serving alternative modes of transportation. There are no proposed changes to
the way the site is accessed and people will still have access to bus stops,
scooters, bikes, etc. The adjacent sidewalk widths will also remain unchanged
to allow for accessible access around Downtown.
(V) creates no detrimental impact on natural areas or features,
There are no natural areas or features on or near the site, so there would be no
detriment to approving the alternative parking plan. All lighting proposed will
adhere to the dark sky requirements as outlined in the Land Use Code.
(VI) maintains handicap parking ratios, and
Because the alternative parking plan proposes the use of the Firehouse Alley
Parking Garage as well as on-street parking spaces, the handicap parking ratio
MINIMAL RISK. PAINLESS PROCESS. BEAUTIFUL SPACES.
o: 970.224.5828 | w: ripleydesigninc.com
RIPLEY DESIGN, INC. | 419 Canyon Avenue, Suite 200 | Fort Collins, CO 80521
would be maintained. There is currently one accessible parking space along
Mountain Ave and two across Chestnut Street outside of the Elizabeth Hotel,
and four (4) spaces in the Firehouse Alley Parking Garage.
(VII) for projects located in D, L-M-N, M-M-N and C-C zone districts, conforms with the
established street and alley block patterns, and places parking lots across the side
or to the rear of buildings.
This project is located in the Downtown (D) Zone District and conforms
to the established street and alley block patterns. Since there will be no
parking lot on site, there will be no changes to the existing streets, curb
cuts, or block patterns. The public right-of-way widths, travel lanes, and
connectivity will remain unchanged.
In summary, the proposed alternative plan accomplishes the purposes of the standard equally
well or better than would a plan which complies with the standards, and it aligns with all seven
criteria for the decision-maker to approve the alternative compliance request.