Loading...
HomeMy WebLinkAboutVariance Requests - 01/21/2025 1 MEMORANDUM TO: Fort Collins Planning and Zoning Commission FROM: Brad Buckman, City Engineer THRU: Arlo Schumann, City Planner Sophie Buckingham, Civil Engineer II DATE: January 21, 2025 SUBJECT: Prospect Plaza SPAR – Prospect Road ROW and Easement DECISION The Prospect Road Right-of-Way and Easement Variance Request for Prospect Plaza (SPA240003) is approved. BACKGROUND On January 3, 2025, the Engineering Department received a variance request for right-of- way (ROW) and easement width along Prospect Road. This request is associated with the Site Plan Advisory Review (SPAR) process for Prospect Plaza, a proposed student housing development project at 304 W. Prospect Road. The applicant has requested to maintain the existing ROW width of Prospect Road, which varies between approximately 60 to 80 feet along the property, and to dedicate a 16-foot access and utility easement behind the ROW. Prospect Road is classified as a 4-lane arterial street on the City of Fort Collins Master Street Plan, and it is a constrained corridor which is eligible to comply with Figure 7-2.5F instead of Figure 7-2F of the Larimer County Urban Area Street Standards (LCUASS). Figure 7-2.5F requires a total ROW width of 102 feet, with a 15-foot-wide utility easement behind the ROW. The dimensions depicted in Figure 7-2.5F are also documented in LCUASS Table 7-1. Through a variance process described in LCUASS Section 1.9.4, the City Engineer may approve any design that does not conform to the standards. This request has been evaluated on the criteria outlined in LCUASS Section 1.9.4.A.2: · Identifying Issue; · Proposing Alternate Design; Engineering Department 281 North College Ave. P.O. Box 580 Fort Collins, CO 80522-0580 970.221.6605 fcgov.com/engineering Docusign Envelope ID: AA54DA51-CA06-4994-BEB7-C01D2F547AA7 2 · Comparing to Standards; and · Justification. FINDINGS A. Identifying Issue: The required 102-foot ROW width is not feasible for this highly constrained section of the Prospect Road corridor. The Prospect Plaza property has approximately 370 feet of frontage along Prospect Road. Widening the street to comply with Figure 7-2.5F would require reconstruction of significantly more than 370 feet of the 1,880-foot (0.36-mile) corridor between Center Avenue and College Avenue. B. Proposing Alternate Design: The applicant has proposed to maintain the existing curb line along the property and implement an 8-foot tree parkway and 10-foot off-street bike and pedestrian path. The proposed design includes dedication of a 16-foot easement that would overlap with the bike and pedestrian path. C. Comparing to Standards: The proposed tree parkway width is consistent with Figure 7-2.5F. The proposed 10-foot bike and pedestrian path width is greater than the 6-foot sidewalk width required by Figure 7-2.5F, although it is narrower than the combined width of the 6-foot sidewalk and 6.5-foot bike lane required by Figure 7-2.5F. The 16-foot easement is slightly wider than the 15-foot easement required by Figure 7-2.5F. D. Justification: The proposed width of the bike and pedestrian path is consistent with recommendations in the West Central Area Plan, as well as infrastructure constructed by other recent developments along the Prospect Road corridor between Shields Street and College Avenue. Most of the utilities serving this corridor have already been installed within the constrained ROW, so it is somewhat unlikely that any utility providers will need to install new facilities within an easement on this property, but the easement dedication will allow utility providers to install facilities under the sidewalk if necessary. The request was routed to the relevant City departments and external utility providers, and City staff did not receive any objections to the request. If the City were to require this development project to comply with Figure 7-2.5F, this requirement would significantly increase the scope and cost of the project without providing a proportionate benefit to the City. CONCLUSION This variance request meets the criteria for the City Engineer to approve a variance from LCUASS Figure 7-2.5F. Therefore, the request is approved. _________________________ Brad Buckman, City Engineer Docusign Envelope ID: AA54DA51-CA06-4994-BEB7-C01D2F547AA7 Page 1 of 3 www.sunnycivil.com January 2, 2025 Sophie Buckingham, Civil Engineer II Engineering Development Review City of Fort Collins 281 North College Avenue Fort Collins, CO 80522 RE: Prospect Plaza – Prospect Road ROW Variance Request Ms. Buckingham: Sunny Civil, as a consultant representative of STRATA / Colorado State University, respectfully requests a variance to the City’s policy for public sidewalks being located within right-of-way (ROW). Instead, we propose to locate the sidewalk within a combined utility and access easement on the Prospect Plaza site. A site plan showing the proposed easement and surrounding infrastructure is included with this request. We are utilizing the procedure listed within Larimer County Urban Area Street Standards (LCUASS) section 1.9.4 Variance and Appeals Process. The code with our response is listed below. a. Identifying Issue. Identification of the standard to be waived or varied and why the standard is unfeasible or is not in the public interest. The City’s 4-Lane Modified Arterial Street Section specifies a 102-foot total ROW which includes the following elements: - Five 11-foot travel lanes including a center dual left turn lane - 9.5-foot bike lane including a 3-foot bike lane buffer (both sides) - 8-foot parkway/tree lawn (both sides) - 6-foot detached sidewalk (both sides) - 15-foot utility easement beyond the ROW (both sides) Due to space constraints along Prospect Road, the existing configuration is already missing several of the elements required by LCUASS. The existing street includes the following: - Five approximately 10-foot travel lanes including a center dual left turn lane - Approximately 5-foot attached sidewalk (both sides) Bringing the road fully into compliance with the standard would require extensive off-site improvements, making this infeasible and inconsistent with the scope of the Prospect Plaza project. b. Proposing Alternate Design. Identification of the proposed alternative design or construction criteria. The proposed alternative design improves the existing condition, aligning closer to the City’s ideal street section while maximizing site functionality. The proposed configuration is shown on the Site Plan sheet included with this request. The following elements will be added: - 8-foot parkway/tree lawn - 10-foot detached sidewalk Docusign Envelope ID: AA54DA51-CA06-4994-BEB7-C01D2F547AA7 Page 2 of 3 www.sunnycivil.com - 16-foot combined access and utility easement beyond the existing ROW which will contain the proposed detached sidewalk c. Comparing to Standards. A thorough description of the variance request including impact on capital and maintenance requirements, costs, and how the new design compares to the standard. The variance seeks relief from constructing the full ROW section due to limited space, off-site construction requirements, and the impracticality of utility placement in a dedicated easement. Key considerations include: - Land Use Efficiency: The alternative design uses land more effectively, allocating space to a wider sidewalk that can double as a shared bike path and housing for additional students, rather than reserving it for utilities that are unlikely to be installed. - Maintenance Impact: The City’s maintenance responsibilities are reduced, as the proposed design eliminates 15 feet of ROW space while ensuring the sidewalk and tree lawn remain functional and accessible. - Practical Utility Placement: Utilities, including stormwater drainage pipes and power lines, can be efficiently integrated into the combined easement beneath the sidewalk The proposed easement arrangement is necessary due to site-specific utility requirements. A small stormwater pipe must run beneath the sidewalk to provide drainage for two rain gardens situated within the building's courtyards. Additionally, the easement may accommodate power lines to serve the building. Adding a separate utility easement beyond a ROW dedication would be largely impractical. Such utilities that could potentially go in the easement would require realignment to connect with existing infrastructure on the west and east sides of the property, introducing unnecessary complexity and potential engineering challenges. While the alternative design does not include dedicated bike lanes or a separate utility easement, it closely aligns with the intent of the standard by enhancing pedestrian and bicyclist safety through separation from vehicular lanes by providing wider, multipurpose sidewalks. Extending bike lanes or utility easements along Prospect Road would require a comprehensive redesign of the entire corridor, which is outside the scope of this project. The proposed shared access and utility easement is the most practical and efficient solution for this site. d. Justification. The Professional Engineer must determine and state that the variance will not be detrimental to the public health, safety and welfare, will not reduce design life of the improvement nor cause the Local Entity additional maintenance costs. The proposed plan (as varied) must advance the public purpose of the standard sought to be varied equally well or better than would compliance with such standard. The proposed variance will not compromise public health, safety, or welfare. It ensures a safe, efficient design that meets or exceeds the intent of the LCUASS standards. Key benefits include: - Improved pedestrian and biker safety through wider, detached sidewalks separated from vehicular lanes. - Compatibility with recent developments west of the site, maintaining consistency in design. - No additional maintenance costs or reduction in the design life of the infrastructure for the City. By balancing site-specific needs with the City’s design goals, this proposal delivers an efficient, functional, and aesthetically pleasing solution. Docusign Envelope ID: AA54DA51-CA06-4994-BEB7-C01D2F547AA7 Page 3 of 3 www.sunnycivil.com We appreciate your consideration of this variance request and are happy to provide additional information or address any questions regarding the proposal. Thank you, Sunny Civil Megan Walter, PE, Principal Docusign Envelope ID: AA54DA51-CA06-4994-BEB7-C01D2F547AA7 ST ST ST ST ST ST ST ST ST ST D D G HYDWV GAS E E E E E E E E X X X X X X G G G G G G G G G G G G G G G G G G G G G G G G G G G G G D WV ST ST ST ST ST ST S W W W W W W W W W W W W W W W W W W W W W W W W W W EXISTING LAKE ST PARKING GARAGE W PROSPECT RD (ROW WIDTH VARIES/~60FT) PR COURTYARD W/DOG RUN PR COURTYARD PR BUILDING PR BUILDING PR BUILDING PROJECT *NOT FOR CONSTRUCTION CLIENT SEAL / DISCLAIMER PROJECT #: SHEET# 24014 DATE: TITLE PROSPECT PLAZA 3575 RINGSBY CT. SUITE 411 DENVER, CO 80216 (720) 677-7766 SPAR (ROUND 1)2024.11.22 SCHEMATIC DESIGN 2024.12.18 1 2 CONSULTANTS 12 / 9 / 2 0 2 4 1 2 : 5 8 : 0 9 P M Pr o s p e c t P l a z a NU M B E R 12/16/24NO.DESCRIPTION DATE SUNNY CIVIL N LEGEND HORIZONTAL DATUM: VERTICAL DATUM: ’ ’ ” ’ ’ LEGAL DESCRIPTION: FLOODPLAIN: NOTES: 1 OF 1 UTILITY/ACCESS EASEMENT VARIANCE CLIENT 3575 RINGSBY CT. SUITE 411 DENVER, CO 80216 (720) 677-7766 CLIENT 3575 RINGSBY CT. SUITE 411 DENVER, CO 80216 (720) 677-7766 1/2/25 Docusign Envelope ID: AA54DA51-CA06-4994-BEB7-C01D2F547AA7