Loading...
HomeMy WebLinkAboutMemorandums - Traffic - 03/14/2025 DELICH ASSOCIATES Traffic& Transportation Engineering 2272 Glen Haven Drive Loveland, Colorado 80538 , Phone: (970) 669-2061 Fax: (970) 669-5034E MEMORANDUM , To: David Karimi/Dan Dirksen, TETRAD Real Estate �' ) City of Fort Collins 8 �" From: Matt Delich `'��J///.)� / Date: March 14, 2025 Subject: Prospect Plaza Student Housing Transportation Impact Study — Final Compliance (File: 2409ME01) This memorandum provides a final compliance statement regarding the Prospect Plaza Student Housing Transportation Impact Study(TIS), dated January 2025,which was completed by Delich Associates, and accepted by the City of Fort Collins. The Fort Collins Planning &Zoning Commission approved this project. The plan, as reflected in the TIS, had 785 beds. As shown in Table 1, the calculated trip generation was 2018 daily trip ends, 55 morning peak hour trip ends, and 165 afternoon peak hour trip ends. Since the approval, the project size has been reduced to 696 beds. As reflected in Table 2, the new calculated trip generation is: 1788 daily trip ends, 49 morning peak hour trip ends, and 146 afternoon peak hour trip ends. There will be 230 less daily trip ends, 6 less morning peak hour trip ends, and 19 less afternoon peak hour trip ends. The conclusions/recommendations in the TIS will not change. It is respectfully requested that the cited TIS be accepted. TABLE 1 Trip Generation of Prospect Plaza with 785 Beds Code Use Size AWDTE AM Peak Hour PM Peak Hour Rate Trips Rate Total to Out Rate Total In out Off-Campus Student 25 30 78 226 Apartments(Mid-Rise) 785 Beds 2.57 2018 0.07 55 46%° 54% 0.21 165 47% :87 3°I° TABLE 2 Trip Generation of Prospect Plaza with 696 Beds AWDTE AM Peak Hour PM Peak Hour Code Use Size Rate Trips Rate Total In Out Rate Total In out 226 Off-Campus Student 696 Beds 2.57 1788 0.07 49 23 26 0.21 146 69 77 Apartments(Mid-Rise) 46% 54% 47% 53%