Loading...
HomeMy WebLinkAboutReports - Soils - 02/18/2025 Report Cover Page Prepared for: LCS Building Corporation 1725 Sharp Point Drive Fort Collins, Colorado 80525 Liberty School Addition Geotechnical Engineering Report Fort Collins, Colorado February 18, 2025 | Terracon Project No. P20245058 CDN#3493A-032 CDN#3493A-032 Geotechnical Engineering Report Liberty School Addition | Fort Collins, Colorado February 18, 2025 | Terracon Project No. P20245058 Facilities | Environmental | Geotechnical | Materials i Table of Contents Report Summary .............................................................................................. i Introduction .................................................................................................... 1 Project Description .......................................................................................... 1 Site Conditions ................................................................................................ 3 Geotechnical Characterization ......................................................................... 4 Subsurface Profile ..................................................................................... 4 Groundwater Conditions ............................................................................. 5 Seismic Site Class ............................................................................................ 5 Corrosivity ...................................................................................................... 6 Geotechnical Overview .................................................................................... 6 Existing, Undocumented Fill ........................................................................ 6 Expansive Soils and Bedrock ....................................................................... 7 Shallow Groundwater ................................................................................ 7 Foundation and Floor System Recommendations ............................................ 7 Earthwork ....................................................................................................... 8 Demolition ............................................................................................... 8 Site Preparation ........................................................................................ 9 Excavation ............................................................................................... 9 Subgrade Preparation ............................................................................... 10 Subgrade Stabilization .............................................................................. 11 Fill Material Types .................................................................................... 12 Fill Placement and Compaction Requirements ............................................... 13 Utility Trench Backfill ............................................................................... 14 Grading and Drainage ............................................................................... 14 Exterior Slab Design and Construction ......................................................... 15 Earthwork Construction Considerations ....................................................... 15 Construction Observation and Testing ......................................................... 16 Shallow Foundations ..................................................................................... 16 Spread Footings – Design Recommendations ................................................ 17 Shallow Foundation Construction Considerations ........................................... 18 Construction Adjacent to Existing Buildings .................................................. 19 Floor Slabs .................................................................................................... 19 Floor Slabs - Design Recommendations ....................................................... 20 Floor Slab Construction Considerations ........................................................ 20 Lateral Earth Pressures ................................................................................. 21 Design Parameters ................................................................................... 21 General Comments ........................................................................................ 23 Figures GeoModel CDN#3493A-032 Geotechnical Engineering Report Liberty School Addition | Fort Collins, Colorado February 18, 2025 | Terracon Project No. P20245058 Facilities | Environmental | Geotechnical | Materials ii Attachments Exploration and Testing Procedures Site Location and Exploration Plans Exploration and Laboratory Test Results Supporting Information Note: This report was originally delivered in a web -based format. Blue Bold text in the report indicates a referenced section heading. The PDF version also includes hyperlinks which direct the reader to that section and clicking on the logo will bring you back to this page. For more interactive features, please view your project online at client.terracon.com . Refer to each individual Attachment for a listing of contents. CDN#3493A-032 Geotechnical Engineering Report Liberty School Addition | Fort Collins, Colorado February 18, 2025 | Terracon Project No. P20245058 Facilities | Environmental | Geotechnical | Materials i Report Summary Topic 1 Overview Statement 2 Project Description A geotechnical exploration has been performed for the proposed Liberty School Addition to be constructed between the two existing single-story buildings located at 1825 and 1901 Sharp Point Drive in Fort Collins, Colorado. Five borings were performed to depths of approximately 10 to 29.4 feet below existing grades. Geotechnical Characterization Subsurface conditions encountered in our exploratory borings generally consisted of poorly graded sand with gravel and variable amounts of silt and cobbles overlying claystone bedrock. Claystone bedrock was encountered at depths of approximately 16 to 21 feet below existing site grades. Existing fill consisting primarily of sandy lean clay and sandy silt was encountered in most of the borings at depths of approximately 2 to 7 feet below existing grades. Groundwater was encountered at depths of approximately 6 to 13.3 feet below existing grades. Earthwork On-site soils typically appear suitable for use as engineered fill and backfill for the project provided they are placed and compacted as described in this report. Import materials (if needed) should be evaluated and approved by Terracon prior to delivery to the site. Remove existing fill from within the planned building addition area. Geotechnical engineer to further evaluate areas where existing fill is present after site stripping. Shallow Foundations We believe the proposed building addition can be constructed on a shallow, spread footing foundation system provided all existing fill within the building addition area is removed full depth a nd the soils are over -excavated to a depth of at least 2 feet below the bottom of footings and replaced with moisture conditioned, properly compacted engineered fill. On -site soils are suitable for use as engineered fill below foundations. Design recommendations for foundations for the proposed structure and related st ructural elements are presented in the Shallow Foundations section of this report. Allowable bearing pressure = 3,000 psf Expected settlements: about 1 inch total CDN#3493A-032 Geotechnical Engineering Report Liberty School Addition | Fort Collins, Colorado February 18, 2025 | Terracon Project No. P20245058 Facilities | Environmental | Geotechnical | Materials ii Topic 1 Overview Statement 2 Floor Slabs A slab-on-grade Floor Slab can be used for the proposed building provided all existing fill within the building addition area is removed full depth and the soils are over -excavated to a depth of at least 2 feet below the bottom of the proposed floor slab , if the existing fill thickness does not already extend to this depth below the floor slab, and replaced with moisture conditioned, properly compacted engineered fill. On -site soils are suitable as engineered fill below floor slabs . General Comments This section contains important information about the limitations of this geotechnical engineering report. 1. If the reader is reviewing this report as a pdf, the topics above can be used to access the appropriate section of the report by simply clicking on the topic itself. 2. This summary is for convenience only. It should be used in conjunction with the entire report for design purposes. CDN#3493A-032 Geotechnical Engineering Report Liberty School Addition | Fort Collins, Colorado February 18, 2025 | Terracon Project No. P20245058 Facilities | Environmental | Geotechnical | Materials 1 Introduction This report presents the results of our subsurface exploration and Geotechnical Engineering services performed for the proposed school addition to be located at 1825 and 1901 Sharp Point Drive in Fort Collins, Colorado . The purpose of these services was to provide information and geotechnical engineering recommendations relative to: ■ Sub surface soil and rock conditions ■ Groundwater conditions ■ Seismic site classification per IBC ■ Site preparation and earthwork ■ Dewatering considerations ■ Foundation design and construction ■ Floor s ystem design and construction ■ Lateral earth pressure s The geotechnical engineering Scope of Services for this project included the advancement of 5 test borings, laboratory testing, engineering analysis, and preparation of this report. Drawings showing the site and boring locations are shown in the Site Location and Exploration Plan section of this report . The results of the laboratory testing performed on soil and bedrock samples obtained from the site during our field exploration are included on the boring logs and as separate graphs in the Exploration Results section. Project Description Our initial understanding of the project was provided in our proposal and was discussed during project planning. A period of collaboration has transpired since the project was initiated, and our final understanding of the project conditions is as follows: CDN#3493A-032 Geotechnical Engineering Report Liberty School Addition | Fort Collins, Colorado February 18, 2025 | Terracon Project No. P20245058 Facilities | Environmental | Geotechnical | Materials 2 Item Description Information Provided The project information described below is based on the following: ■ Request for Proposal – Liberty School dated October 10, 2024 ■ 2024 1002 – Liberty Common Junior High – proposed geotech boring locations.pdf ■ Email and phone communication with the project design team Project Description We understand the project will consist of the construction of a new building addition to connect the two existing single -story buildings with addresses of 1825 and 1901 Sharp Point Drive. The two existing buildings along with the new addition will form a new junior high school for Liberty School. We anticipate Riverbend Court will be closed permanently to accommodate the proposal addition. The new addition will be a single -story structure which will add about 20,000 square feet of space to the two existing structures. The addition will include space for a cafeteria and gymnasium. Building construction for the addition is anticipated to consist of precast walls with a shallow, spread footing foundation system and a slab-on-grade floor system. Finished Floor Elevation Finished floor elevation for the addition is planned to be at 4,897 feet AMSL. This elevation is anticipated to be close to the finished floor of the existing building at 1825 Sharp Point Drive. The building at 1901 Sharp Point Drive has a slightly lower finished floor elevation than the existing building at 1825 Sharp Point Drive. Maximum Loads (provided by project design team) ■ Columns: up to 60 kips ■ Walls: up to 7 kips per linear foot (klf) ■ Slabs: 100 to 200 pounds per square foot (psf) Grading/Slopes Grading plans were not provided to Terracon at the time of this report . We anticipate minor cuts and fills on the order of 3 feet or less will be required to achieve proposed grades. We also anticipate deeper cuts and fills could be required for utility construction. Below-Grade Structures We understand no below-grade areas are planned for this site. CDN#3493A-032 Geotechnical Engineering Report Liberty School Addition | Fort Collins, Colorado February 18, 2025 | Terracon Project No. P20245058 Facilities | Environmental | Geotechnical | Materials 3 Item Description Free-Standing Retaining Walls Retaining walls are not expected to be constructed as part of site development to achieve final grades. Pavements The existing pavements will stay in place. LCS Building Corporation (LCS) does not plan to reconstruct the pavement s at this time. We have not performed a pavement condition assessment, and we are unsure of the age of the existing pavements. Therefore, we cannot provide an opinion on the quality of the existing pavements. Building Code 2021 International Building Code (IBC) Terracon should be notified if any of the above information is inconsistent with the planned construction, especially the grading limits , as modifications to our recommendations may be necessary. Site Conditions The following description of site conditions is derived from our site visit in association with the field exploration and our review of publicly available geologic and topographic maps. Item Description Parcel Information The site of the new addition is planned on the existing alignment of Riverbend Court between the two existing buildings with addresses of 1825 and 1901 Sharp Point Drive in Fort Collins, Colorado. Latitude/Longitude (approximate): 40.56237° N, 105.02839° W See Site Location Existing Improvements The site of the proposed addition is an existing asphalt -paved roadway with concrete curb and gutter and sidewalks. Current Ground Cover The existing roadway is paved with asphalt. Existing Topography Based on publicly available USGS topographic maps, ground surface elevations at the location of the proposed addition are relatively level along the existing street. Ground surface elevations on the site with an address of 1901 Sharp Point Drive site are somewhat lower than those of the site with an address of 1825 Sharp Point Drive. CDN#3493A-032 Geotechnical Engineering Report Liberty School Addition | Fort Collins, Colorado February 18, 2025 | Terracon Project No. P20245058 Facilities | Environmental | Geotechnical | Materials 4 Geotechnical Characterization We have developed a general characterization of the subsurface conditions based upon our review of the subsurface exploration, laboratory data, geologic setting , and our understanding of the project. This characterization, termed GeoModel, forms the basis of our geotechnical calculations and evaluation of the site. Conditions observed at each exploration point are indicated on the individual logs. The individual l ogs can be found in the Exploration Results and the GeoModel can be found in the Figures attachment of this report. Subsurface Profile As part of our analyses, we identified the following model layers within the subsurface profile. For a more detailed view of the model layer depths at each boring location, refer to the GeoModel . Stratification boundaries on the boring logs represent approximate locations of changes in material types; in situ, the transition between materials may be gradual. Further details of the borings can be found on the boring logs in Exploration Results. Based on the results of the laboratory testing and our experience with similar materials, we anticipate the clay and sand soils to have low expansive potential or to be non - expansive. The claystone bedrock is anticipated to have low to moderate expansive p otential. Model Layer Layer Name General Description Existing Pavement Section About 4 to 8 inches of asphalt. About 20 inches of aggregate base course was e ncountered below the asphalt in Boring No. B-1 only. 1 Existing Fill Existing fill consisting primarily of sandy lean clay and sandy silt; dark brown . Encountered in all borings except Boring No. B-1. 2 Sand Poorly graded sand with gravel with var iable amounts of silt and cobbles; loose to very dense, brown, gray, pink, red, tan 3 Bedrock Claystone bedrock; very hard, light gray to dark gray CDN#3493A-032 Geotechnical Engineering Report Liberty School Addition | Fort Collins, Colorado February 18, 2025 | Terracon Project No. P20245058 Facilities | Environmental | Geotechnical | Materials 5 Groundwater Conditions The boreholes were observed while drilling and shortly after completion for the presence and level of groundwater . The water levels observed in the boreholes are noted on the attached boring logs, and are summarized below: Boring Number Depth to Groundwater While Drilling, ft. Depth to Groundwater After Drilling, ft. Elevation of Groundwater After Drilling, ft.1 B-1 7 9 +/- 4,888 B-2 6 7 +/- 4,890 B-3 13 7.7 +/- 4,890 B-4 Not encountered Backfilled after drilling B-5 Not encountered Backfilled after drilling 1. Elevation of groundwater is based on the ground surface elevations, interpolated from a publicly available USGS topographic map (https://apps.nationalmap.gov/viewer/). These observations represent relatively short -term groundwater conditions at the time of and after completion of the field exploration and may not be indicative of other times or at other locations. Long -term groundwater monitoring was outside the scope of services for this project. Groundwater level fluctuations occur due to seasonal variations in the water levels present in nearby water features, amount of rainfall, runoff, and other factors not evident at the time the borings were performed. Therefore, groundwater levels during con struction or at other times in the life of the structure may be higher or lower than the levels indicated on the boring logs. The possibility of groundwater level fluctuations should be considered when developing the design and construction plans for the p roject. Seismic Site Class The seismic design requirements for buildings and other structures are based on Seismic Design Category. Site Classification is required to determine the Seismic Design Category for a structure. The Site Classification is based on the upper 100 feet of the site profile defined by a weighted average value of either shear wave velocity, standard penetration resistance, or undrained shear strength in accordance with Section 20.4 of ASCE 7 and the International Building Code (IBC). Based on the soil and bedrock properties observed at the site as described on the exploration logs and laboratory test results, our professional opinion is a Seismic Site Classification of C be considered for the project. Subsurface explorations at this site were extended to a maximum depth of 29.4 feet. The site properties below the boring depth to 100 feet were estimated based CDN#3493A-032 Geotechnical Engineering Report Liberty School Addition | Fort Collins, Colorado February 18, 2025 | Terracon Project No. P20245058 Facilities | Environmental | Geotechnical | Materials 6 on our experience and knowledge of geologic conditions of the general area. Additional deeper borings or geophysical testing may be performed to confirm the conditions below the current boring depth. Corrosivity Results of water-soluble sulfate testing indicate Exposure Class S0 according to ACI (American Concrete Institute) 318. ASTM Type I or II portland cement or Type IL portland-limestone cement can be specified for all project concrete on and below grade . Foundation concrete can be designed for low sulfate exposure in accordance with th e provisions of the ACI 318 . Numerous sources are available to characterize corrosion potential to buried metals using the parameters above. ANSI/AWWA is commonly used for ductile iron, while threshold values for evaluating the effect on steel can be specific to the buried feature (e.g., piling, culverts, welded wire reinforcement, etc.) or agency for which the work is performed. Imported fill materials may have significantly different properties than the site materials noted above and should be evaluated if expected to be in contact w ith metals used for construction. Consultation with a NACE certified corrosion professional is recommended for buried metals on the site. Geotechnical Overview Based on subsurface conditions encountered in the borings, the site appears suitable for the proposed construction from a geotechnical point of view provided certain precautions and design and construction recommendations described in this report are followed and the owner understands the inherent risks associated with construction on sites underlain by low to modera tely expansive soils and bedrock. We have identified several geotechnical conditions that could impact design, construction and performance of the proposed structure and other site improvements. These included existing, undocumented fill , expansive soils and bedrock, and shallow groundwater . These conditions will require particular attention in project planning, design and during construction and are discussed in greater detail in the following sections. Existing, Undocumented Fill Existing, undocumented fill was encountered to depths up to about 7 feet in all borings drilled at the site except Boring No. B-1. Existing fill could exist at other locations on the site and extend to greater depths. We do not possess any information regarding whether the fill was placed under the observation of a geotechnical engineer. Therefore, the fill is considered undocumented. Undocumented fill can present a greater than normal risk of post -construction movement of site improvements supported on or above these CDN#3493A-032 Geotechnical Engineering Report Liberty School Addition | Fort Collins, Colorado February 18, 2025 | Terracon Project No. P20245058 Facilities | Environmental | Geotechnical | Materials 7 materials. A low risk alternative is complete removal of existing fill below foundations, slabs, and other site improvements and replacement with newly compacted engineered fill . Expansive Soils and Bedrock Expansive soils and bedrock are present on this site; however, our experience in the area and laboratory swell test results indicate the site soils are generally low swelling. The claystone bedrock is generally considered low to moderate swelling; however, the bedrock was encountered at depths not likely to impact new construction. This report provides recommendations to help mitigate the effects of soil shrinkage and expansion. However, even if these procedures are followed, some movement and cracking in t he addition and flatwork is possible. The severity of cracking and other damage such as uneven floor slabs and flatwork will probably increase if modification of the site results in excessive wetting or drying of the expansive soils and bedrock. Eliminatin g the risk of movement and cosmetic distress is generally not feasible. It is imperative the recommendations described in section Grading and Drainage section of the Earthwork section of this report be followed to reduce potential movement. Shallow Groundwater As previously stated, groundwater was measured at depths ranging from about 6 to 13.3 feet below existing site grades. We understand a building addition is planned at this site. Terracon recommends maintaining a separation of at least 3 feet between the bottom of proposed below -grade foundations and measured groundwater levels. It is also possible and likely that groundwater levels below this site may rise as water levels in the Cache la Poudre River and the surrounding ponds rise. Final site grading shoul d be planned and designed to avoid cuts where shallow groundwater is known to exist, and also in areas where such grading would create shallow groundwater conditions. If deeper cuts are unavoidable, temporary construction dewatering and/or installation of a subsurface drainage system may be needed. Foundation and Floor System Recommendations We believe the proposed building addition can be constructed on a shallow, spread footing foundation system provided all existing fill within the building addition area is removed full depth and the soils are over-excavated to a depth of at least 2 feet below the bottom of footings and replaced with moisture conditioned, properly compacted engineered fill. On -site soils are suitable for use as engineered fill below foundations. Design recommendations for foundations for the proposed structure and related structural elements are presented in the Shallow Foundations section of this report. CDN#3493A-032 Geotechnical Engineering Report Liberty School Addition | Fort Collins, Colorado February 18, 2025 | Terracon Project No. P20245058 Facilities | Environmental | Geotechnical | Materials 8 We believe a concrete slab -on -grade floor system can be used for the proposed building addition provided all existing fill within the building addition area is removed full depth and the soils are over-excavated to a depth of at least 2 feet below the proposed floor slab, if the existing fill thickness does not already extend to this depth below the floor slab, and replaced with moisture conditioned, properly compacted engineered fill. On-site soils are suitable as over-excavation backfill below floor slabs. Design recommendations for floor systems for the proposed structure and related structural elements are presented in the Floor Slabs section of this report. The recommendations contained in this report are based upon the results of field and laboratory testing (presented in the Exploration Results ), engineering analyses, and our current understanding of the proposed project. The General Comments section provides an understanding of the report limitations. Earthwork Earthwork is anticipated to include demolition, site preparation, excavations, subgrade preparation, soil stabilization (if needed), and engineered fill placement. The following sections provide recommendations for use in the preparation of specifications for the project. Recommendations include critical quality criteria, as necessary, to render the site in the state considered in our geotechnical engineering evaluation for foundations and floor slabs . Demolition Demolition of any portions of the existing development at the project site should include complete removal of all above -grade structures/improvements, foundation systems, below -grade structural elements, retaining walls, landscaping, pavements, and exterio r flatwork within the proposed construction area. This should include removal of any utilities to be abandoned along with any loose utility trench backfill or loose backfill found adjacent to existing foundations. All materials derived from the demolition of existing structures and pavements should be removed from the site. Consideration could be given to re -using the asphalt and concrete produced from the demolition of any existing improvements or pavements provided the materials are processed and uniformly blended with the on -site soils. Asphalt and/or concrete materials sh ould be processed to a maximum size of 2 inches and blended at a ratio of 30 percent asphalt/concrete to 70 percent of on -site soils. CDN#3493A-032 Geotechnical Engineering Report Liberty School Addition | Fort Collins, Colorado February 18, 2025 | Terracon Project No. P20245058 Facilities | Environmental | Geotechnical | Materials 9 Site Preparation Prior to placing fill, existing vegetation, topsoil, and root mats should be removed. Complete stripping of the topsoil should be performed in the proposed building and parking/driveway areas (if any). As previously stated, we also recommend complete removal of existing, undocumented fill within proposed building areas. Existing fill was encountered in our borings extending to depths of about 2 to 7 feet below existing site grades. Stripped organic materials should be wasted from the site or used to re-vegetate landscaped areas or exposed slopes after completion of grading operations. Prior to the placement of fills, the site should be graded to create a relatively level surface to receive fill, and to provide for a relatively uniform thickness of fill beneath proposed structures. Mature trees are located within or near the footprint of the proposed addition , which will require removal at the onset of construction. Tree root systems can remove substantial moisture from surrounding soils. Where trees are removed, the full root ball and all associated dry and desiccated soils should be removed. The soil materia ls which contain less than 5 percent organics can be reused as engineered fill provided the material is moisture conditioned and properly compacted. Where fill is placed on existing slopes steeper than 5H:1V (Horizontal:Vertical), benches should be cut into the existing slopes prior to fill placement. The benches should have a minimum vertical face height of 1 foot and a maximum vertical face height of 3 feet and should be cut wide enough to accommodate the compaction equipment. T his benching will help provide a positive bond between the fill and natural soils and reduce the possibility of failure along the fill/natural soil interface. Although no evidence of underground facilities (such as septic tanks, cesspools and basements) was observed during the exploration and site reconnaissance, such features could be encountered during construction. If unexpected underground facilities are encountered, such features should be removed, and the excavation thoroughly cleaned prior to backfill placement and/or construction. Excavation We anticipate excavations for the proposed construction can be accomplished with conventional earthmoving equipment. Excavations into the on-site soils could encounter weak/loose and/or saturated soil conditions with possible caving conditions. The bottom of excavations should be thoroughly cleaned of loose/disturbed materials prior to backfill placement and/or construction. Any excavation extending below the bottom of foundation elevation should extend laterally beyond all edges of the foundations at least 8 inches per foot of excavation depth below the foundation base elevation. The excavation should be backfilled to the CDN#3493A-032 Geotechnical Engineering Report Liberty School Addition | Fort Collins, Colorado February 18, 2025 | Terracon Project No. P20245058 Facilities | Environmental | Geotechnical | Materials 10 foundation base elevation in accordance with the recommendations presented in this report. Any existing building foundations exposed during the excavation of the existing fill or for the new foundation excavations should be examined and evaluated by Terracon to determine the need for any shoring or underpinning. Excavations should not extend int o the stress influence zone of the existing foundations without prior evaluation by Terracon. The stress influence zone is defined as the area below a line projected down at a 1(H):1(V) (Horizontal:Vertical ) slope from the bottom edge of the existing found ation. Excavations within the influence zone of existing foundations can result in loss of support and can create settlement or failure of the existing foundations. While the evaluation of existing foundations and the design of a shoring system are beyond the scope of this study, we can perform these tasks as a separate study. Depending upon depth of excavation and seasonal conditions, surface water infiltration and/or groundwater may be encountered in excavations on the site. We anticipate pumping from sumps may be utilized to control water within excavations . Well points may be required for significant groundwater flow, or where excavations penetrate groundwater to a significant depth. The subgrade soil conditions should be evaluated during the excavation process and the stability of the soils determined at that time by the contractors’ Competent Person as defined by OSHA . Slope inclinations flatter than the OSHA maximum values may have to be used. The individual contractor(s) should be made responsible for designing and constructing stable, temporary excavations as required to maintain stability of both the excavation sides and bottom. All excavations should be sloped or shored in the in terest of safety following local, and federal regulations, including current OSHA excavation and trench safety standards. As a safety measure, we recommend all vehicles and soil piles be kept a minimum lateral distance from the crest of the slope equal to the slope height. The exposed slope face should be protected against the elements. Subgrade Preparation After site preparati on, complete removal of existin g fill within the building addit ion area, and completion of any required undercuts or the recommended over -excavation s, the top 10 inches of the exposed ground surface should be scarified, moisture conditioned, and compacted to at least 95 percent of the maximum dry unit weight as determined by ASTM D698 before any new fill , foundations, slabs and other site improvements are placed or constructed. Large areas of prepared subgrade should be proof rolled prior to new construction. Proof rolling is not required in areas which are inaccessible to proof rolling equipment. Subgrades should be proof rolled with an adequately loaded vehicle such as a fully - CDN#3493A-032 Geotechnical Engineering Report Liberty School Addition | Fort Collins, Colorado February 18, 2025 | Terracon Project No. P20245058 Facilities | Environmental | Geotechnical | Materials 11 loaded tandem-axle dump truck. Proof rolling should be performed under the observation of the Geotechnical Engineer or representative. Areas excessively deflecting under the proof roll should be delineated and subsequently addressed by the Geotechnical Engineer. Excessively wet or dry material should either be removed or moisture conditioned and compacted. Our experience indicates the subgrade materials below existing pavements and other flatwork after demolition will likely have relatively high moisture content and will tend to deflect and deform (pump) under construction traffic wheel loads. After removal of existing pavements and flatwork , the contractor should expect unstable subgrade materials will need to be stabilized prior to fill placement and/or construction. Consequently, Terracon recommends a contingency be provided in the construction budget to stabilize and correct weak/unstable subgrade. After the bottom of the excavation has been prepared as recommended above , engineered fill can be placed to bring the building pad to the desired grade. Engineered fill should be placed in accordance with the recommendations presented in subsequent sections of this report. Subgrade Stabilization Methods of subgrade stabilization/improvement, as described below, could include scarification, moisture conditioning and compaction, removal of unstable materials and replacement with granular fill (with or without geosynthetics), and chemical treatment. The appropriate method of improvement, if required, would be dependent on factors such as schedule, weather, the size of area to be stabilized, and the nature of the instability. More detailed recommendations can be provided during construction as the need for subgrade stabilization occurs . Performing site grading operations during warm seasons and dry periods would help reduce the amount of subgrade stabilization required. If the exposed subgrade is unstable during proof rolling operations, it could be stabilized using one of the methods described below. ■ Scarification and Compaction - It may be feasible to scarify, dry, and compact the exposed soils. The success of this procedure would depend primarily upon favorable weather and sufficient time to dry the soils. Stable subgrades likely would not be achievable if the thickness of the unstable soil is greater than about 1 foot, if the unstable soil is at or near groundwater levels, or if construction is performed during a period of wet or cool weather when drying is difficult. ■ Crushed Stone - The use of crushed stone or crushed concrete is a common procedure to improve subgra de stability. Typical undercut depths would be expected to range from about 6 to 24 inches below finished subgrade elevation. Crushed stone and/or concrete can be tracked or “crowded” into the unstable CDN#3493A-032 Geotechnical Engineering Report Liberty School Addition | Fort Collins, Colorado February 18, 2025 | Terracon Project No. P20245058 Facilities | Environmental | Geotechnical | Materials 12 subgrade until a stable working surface is attained. The use of high modulus geosynthetics (i.e., geotextile or geogrid) could also be considered after underground work such as utility construction is completed. Prior to placing the geosynthetic, we recommend all below -grade construction, such as utility line installation, be completed to avoid damaging the geosynthetic. Equipment should not be operated above the geosynthetic until one full lift of crushed stone fill is placed above it. ■ Chemical Treatment - Improvement of subgrades with portland cement , lime or fly ash could be considered for improving unstable soils. Chemical treatment should be performed by a pre -qualified contractor having experience with successfully treating subgrades in the project area on similar sized projects with similar soil conditions. Results of chemical analysis of the chemical treatment materials should be provided to the Geotechnical Engineer for review prior to use. The hazards of chemicals blowing across the site or onto adjacent propert ies should also be considered. Additional testing would be needed to develop specific recommendations to improve subgrade stability by blending chemicals with the site soils. Additional testing could include, but not be limited to, determining the most suitable chemical treating agent, the optimum amounts required, the presence of sulfates in the soil, and freeze -thaw durability of the subgrade. Further evaluation of the need and recommendations for subgrade stabilization can be provided during construction as the geotechnical conditions are exposed. Fill Material Types Fill for this project should consist of engineered fill. Engineered fill is fill that meets the criteria presented in this report and has been properly documented. On-site soils free of deleterious materials or approved granular and low plasticity cohesive imported materials may be used as fill material . The earthwork contractor should expect significant mechanical processing and moisture conditioning of the site soils will be needed to achieve proper compaction . Imported fill materials (if required) should meet the following material property requirements. Regardless of its source, compacted fill should consist of approved materials that are free of organic matter and debris. Frozen material should not be used, and fill should not be placed on a froz en subgrade. Gradation Percent Finer by Weight (ASTM C136) 3 ” 100 1 ” 70-100 No. 4 Sieve 30-100 No. 200 Sieve 15-50 CDN#3493A-032 Geotechnical Engineering Report Liberty School Addition | Fort Collins, Colorado February 18, 2025 | Terracon Project No. P20245058 Facilities | Environmental | Geotechnical | Materials 13 Soil Properties Values Liquid Limit 35 (max.) Plasticity Index 15 (max.) Other import fill material types may be suitable for use on the site depending upon proposed application and location on the site and could be tested and approved for use on a case-by-case basis. Fill Placement and Compaction Requirements Engineered fill should be placed and compacted in horizontal lifts, using equipment and procedures that will produce recommended moisture contents and densities throughout the lift. Item Description Maximum Lift Thickness 9 inches or less in loose thickness when heavy, self -propelled compaction equipment is used 4 to 6 inches in loose thickness when hand -guided equipment (i.e., jumping jack or plate compactor) is used Minimum Compaction Requirements 1 Engineered Fill : At least 95% of the maximum dry unit weight as determined by ASTM D698. Engineered Fill 8 Feet or Greater : At least 98% of the maximum dry unit weight as determined by ASTM D698 for the entire depth of fill in areas receiving 8 feet of fill or greater. Water Content Range 2 ,3 Cohesive (clay): -1% to +3% of optimum moisture content Granular (sand): -3% to +3% of optimum moisture content 1. We recommend engineered fill be tested for moisture content and compaction during placement. If the results of the in -place density tests indicate the specified moisture or compaction limits have not been met, the area represented by the test should be reworked and retested as required until the specified moisture and compaction requirements are achieved. 2. Moisture conditioned clay materials should not be allowed to dry out. A loss of moisture within these materials could result in an increase in the material’s expansive potential. Subsequent wetting of these materials could result in undesirable movement. 3. Specifically, moisture levels should be maintained low enough to allow for satisfactory compaction to be achieved without the fill material pumping when proof rolled. CDN#3493A-032 Geotechnical Engineering Report Liberty School Addition | Fort Collins, Colorado February 18, 2025 | Terracon Project No. P20245058 Facilities | Environmental | Geotechnical | Materials 14 Utility Trench Backfill Any loose, soft, or unsuitable materials encountered at the bottom of utility trench excavations should be removed and replaced with engineered fill or bedding material in accordance with public works specifications for the utility to be supported. This recommendation is particularly applicable to utility work where settlement control of the utility is critical. Utility t rench excavation should not be conducted below a downward 1(H):1(V) projection from existing foundations without engineering review of shoring requirements a nd geotechnical observation during construction. On -site materials are considered suitable for backfill of utility and pipe trenches provided the material is free of organic matter and deleterious substances. Utility trench backfill should be placed and compacted as discussed earlier in this report. Compaction of initial lifts should be accomplished with hand -operated tampers or other lightweight compactors. Flooding or jetting for placement and compaction of backfill i s not recommended. If utility trenches are backfilled with relatively clean granular material, they should be capped with at least 18 inches of cohesive fill in non-pavement areas to reduce the infiltration and conveyance of surface water through the trench backfill. All underground piping within or near the proposed structure should be designed with flexible couplings, so minor deviations in alignment do not result in breakage or distress. Utility knockouts in foundation walls should be oversized to accommodate differ ential movements. We recommend a representative of the Geotechnical Engineer provide full-time observation and compaction testing of trench backfill within building areas. Grading and Drainage All grades must provide effective drainage away from the existing buildings and proposed addition during and after construction and should be maintained throughout the life of the structure s. Water retained next to the building s can result in soil movements greater than those discussed in this report. Greater movements can result in unacceptable differential floor slab and/or foundation movements, cracked slabs and walls, and roof leaks . The roof should have gutters/drains with downspouts that discharge ont o splash blocks at a distance of at least 10 feet from the building s. Exposed ground should be sloped and maintained at a minimum 5% away from the building s for at least 10 feet beyond the perimeter of the building s. Locally, flatter grades may be necessary to transition ADA access requirements for flatwork. After building construction and landscaping have been completed, final grades should be verified to document effective drainage has been achieved. Grades around the structure s CDN#3493A-032 Geotechnical Engineering Report Liberty School Addition | Fort Collins, Colorado February 18, 2025 | Terracon Project No. P20245058 Facilities | Environmental | Geotechnical | Materials 15 should also be periodically inspected and adjusted, as necessary, as part of the structures’ maintenance program. Flatwork and pavements will be subject to post -construction movement. Maximum grades practical should be used for paving and flatwork to prevent areas where water can pond. In addition, allowances in final grades should take into consideration post - constru ction movement of flatwork, particularly if such movement would be critical. Where paving or flatwork abuts the structures, care should be taken that joints are properly sealed and maintained to prevent the infiltration of surface water. Planters located adjacent to structures (if any) should preferably be self -contained. Sprinkler mains and spray heads should be located a minimum of 5 feet away from the building line(s). Low-volume, drip style landscaped irrigation should be used sparingly near the building s. Exterior Slab Design and Construction Exterior slabs -on-grade, exterior architectural features, and utilities founded on, or in backfill or the site soils will likely experience some movement due to the volume change of the material. Subgrade soils below new fill should be scarified to a depth of at least 10 inches, moisture conditioned, and compacted prior to placement/construction of new engineered fill, aggregate base course, o r flatwork materials. Potential movement could be reduced by: ■ Minimizing moisture increases in subgrade soils and new fill; ■ Controlling moisture -density during subgrade preparation and new fill placement; ■ Using designs which allow vertical movement between the exterior features and adjoining structural elements; and ■ Placing control joints on relatively close centers. Earthwork Construction Considerations Upon completion of filling and grading, care should be taken to maintain the subgrade water content prior to construction of grade -supported improvements such as floor slabs. Construction traffic over the completed subgrades should be avoided. The site should also be graded to prevent ponding of surface water on the prepared subgrades or in excavations. Water collecting over or adjacent to construction areas should be removed. If the subgrade freezes, desiccates, saturates, or is disturbed, the affected material should be removed, or the mater ials should be scarified, moisture conditioned, and recompacted prior to floor slab construction. Construction site safety is the sole responsibility of the contractor who controls the means, methods, and sequencing of construction operations. Under no circumstances CDN#3493A-032 Geotechnical Engineering Report Liberty School Addition | Fort Collins, Colorado February 18, 2025 | Terracon Project No. P20245058 Facilities | Environmental | Geotechnical | Materials 16 shall the information provided herein be interpreted to mean Terracon is assuming responsibility for construction site safety or the contractor's activities; such responsibility shall neither be implied nor inferred. Excavations or other activities resulting in ground disturbance have the potential to affect adjoining properties and structures. Our scope of services does not include review of available final grading information or consider potential temporary grading performed by the contractor for potential effe cts such as ground movement beyond the project limits. A preconstruction/precondition survey should be conducted to document nearby property/infrastructure prior to any site development activity. Ex cavation or g round disturbance activit i es adjacent or near property lines should be monitored or instrumented for potential ground movements that could negatively af fect adjoining property and/or structures. Construction Observation and Testing The earthwork efforts should be observed by the Geotechnical Engineer (or others under their direction). Observation should include documentation of adequate removal of surficial materials (vegetation, topsoil, and existing pavements), evaluation and remediation of existing fill materials, subgrade stabilization, as well as proof rolling and mitigation of unsuitable areas delineated by the proof roll. Each lift of compacted fill should be tested, evaluated, and reworked, as necessary, as recommended by the Geotechnical Engineer prior to placement of additional lifts. In areas of foundation excavations, the bearing subgrade and exposed conditions at the base of the recommended over -excavation should be evaluated by the Geotechnical Engineer. If unanticipated conditions are observed, the Geotechnical Engineer should prescribe mitigation options. In addition to the documentation of the essential parameters necessary for construction, the continuation of the Geotechnical Engineer into the construction phase of the project provides the continuity to maintain the Geotechnical Engineer’s evaluation of subsurface conditions, including assessing variations and associated design changes. Shallow Foundations If the site has been prepared in accordance with the recommendations and requirements noted in Geotechnical Overview and Earthwork, the following design parameters are applicable for shallow foundations for the proposed addition . CDN#3493A-032 Geotechnical Engineering Report Liberty School Addition | Fort Collins, Colorado February 18, 2025 | Terracon Project No. P20245058 Facilities | Environmental | Geotechnical | Materials 17 Spread Footings – Design Recommendations Item Description Maximum Net Allowable Bearing Pressure 1 3,000 psf Required Bearing Stratum 2 At least 2 feet of moisture conditioned , properly compacted engineered fill and all existing fill has been completely removed below foundations Minimum Foundation Dimensions Columns: 30 inches Continuous: 18 inches Lateral Earth Pressure Coefficients 3 On-site granular soils and engineered fill: Active, Ka = 0.33 Passive, Kp = 3.00 At-rest, Ko = 0.50 Sliding Resistance On-site granular soils and engineered fill: μ = 0.46 (ultimate) Moist Soil Unit Weight γ = 120 pcf Minimum Embedment Below Finished Grade 4 Exterior footings in unheated areas: 30 inches Interior footings and column pads in heated areas: 12 inches Estimated Total Movement 5 About 1 inch Estimated Differential Movement 5 About ½ to ¾ of total movement 1. The maximum net allowable bearing pressure is the pressure in excess of the minimum surrounding overburden pressure at the footing base elevation. Values assume exterior grades are no steeper than 20% within 10 feet of structure . The design bearing pressure applies to a dead load plus design live load condition. The design bearing pressure may be increased by one -third when considering total loads that include wind or seismic conditions . 2. Unsuitable or soft/loose soils should be over -excavated and replaced with engineered fill per the recommendations presented in Earthwork. 3. Use of lateral earth pressures require the footing forms be removed and compacted engineered fill be placed against the vertical footing face. Assumes no hydrostatic pressure. The lateral earth pressure coefficients are ultimate values and do not include a factor of safety. The foundation designer should include the appropriate factors of safety. 4. Embedment necessary to minimize the effects of frost and/or seasonal water content variations. For sloping ground, maintain depth below the lowest adjacent exterior grade within 5 horizontal feet of the structure. 5. The estimated movements presented above assume the maximum footing dimension is 8 feet for column footings and maximum footing width is 3½ feet for continuous CDN#3493A-032 Geotechnical Engineering Report Liberty School Addition | Fort Collins, Colorado February 18, 2025 | Terracon Project No. P20245058 Facilities | Environmental | Geotechnical | Materials 18 Item Description footings. Larger foundation footprints will likely require reduced net allowable soil bearing pressures to reduce risk for potential settlement. Footings should be proportioned to reduce differential foundation movement. As discussed, total movement resulting from the assumed structural loads is estimated to be on the order of about 1 inch. Additional foundation movements could occur if water from any source infiltrates the foundation soils; therefore, proper drainage should be provided in the final design and during construction and throughout the life of the structure. Failure to maintain the proper drainage as recommended in the Grading and Drain age section of the Earthwork section of this report will nullify the movement estimates provided above. Any excavation extending below the bottom of foundation elevation should extend laterally beyond all edges of the foundations at least 8 inches per foot of excavation depth below the foundation base elevation. The excavation should be backfilled to the foundation base elevation i n accordance with the recommendations presented in this report. Shallow Foundation Construction Considerations F oundation excavations should be evaluated under the observation of the Geotechnical Engineer. The base of all foundation excavations should be free of water and loose soil, prior to placing concrete. Concrete should be placed soon after excavating to reduce bearing soil disturbance. Care should be taken to prevent wetting or drying of the bearing materials during construction. Excessively wet or dry material or any loose/disturbed material in the bottom of foundation excavations should be removed/reconditi oned before foundation concrete is placed. Spread footing construction should only be considered if the estimated foundation movement can be tolerated. Subgrade soils beneath footings should be moisture conditioned and compacted as described in Earthwork. The moisture content and compaction of subgrade soils should be maintained until foundation construction. To reduce the potential of “pumping” and softening of the foundation soils at the foundation bearing level and the requirement for corrective work, we suggest the foundation excavation for the building be completed remotely with a track -hoe operating outside of the excavation limits. Foundation elements should be reinforced as necessary to reduce the potential for distress caused by differential foundation movement. Unstable subgrade conditions encountered in foundation excavations should be observed by the Geotechnical Engineer to assess the subgrade and provide suitable alternatives CDN#3493A-032 Geotechnical Engineering Report Liberty School Addition | Fort Collins, Colorado February 18, 2025 | Terracon Project No. P20245058 Facilities | Environmental | Geotechnical | Materials 19 for stabilization. Typical methods of stabilization/improvement are presented in the Subgrade Stabilization section of Earthwork . Construction Adjacent to Existing Building s Differential settlement between the additions and the existing building s is expected to approach the magnitude of the total settlement of the addition. Expansion joints should be provided between the existing building s and the proposed addition to accommodate differential movements between the two structures. Underground piping between the addition and existing structures should be designed with flexible couplings and utility knockouts in foundation walls should be oversized so minor deflections in alignmen t do not result in breakage or distress. Care should be taken during excavation adjacent to existing foundations to avoid disturbing existing foundation bearing soils. New footings should bear at or near the bearing elevation of immediately adjacent existing foundations. Depending upon their locations and current loads on the existing footings, footings for the new addition could cause settlement of adjacent walls. To reduce this concern and risk, clear distances at least equal to the new footing widths should be maintained between the addition’s footings and footings supporting the existing building s. Additional loads (if any) from the new addition placed on the existing foundations could cause other building settlements to occur. The structural capacity of existing foundations should be evaluated by a licensed structural engineer, where increases in loading are planned. Floor Slabs A slab-on-grade floor system can be used for the proposed building addition provided all existing fill within the building addition area is removed full depth and the soils are over - excavated to a depth of at least 2 feet below the bottom of the proposed floor slab , if the existing fill thickness does not already extend to this depth below the floor slab, and replaced with moisture conditioned, properly compacted engineered fill. On -site soils are suitable as engineered fill below floor slabs. If the estimated movement cannot be tolerated, a structurally -supported floor system, supported independent of the subgrade materials, is recommended. Subgrade soils beneath interior and exterior slabs and at the base of the recommended over-excavation should be scarified to a depth of at least 10 inches, moisture conditioned, and compacted. The moisture content and compaction of subgrade soils should be maintained until slab construction. CDN#3493A-032 Geotechnical Engineering Report Liberty School Addition | Fort Collins, Colorado February 18, 2025 | Terracon Project No. P20245058 Facilities | Environmental | Geotechnical | Materials 20 Floor Slab s - Design Recommendations Even when bearing on properly prepared soils, movement of the slab -on-grade floor system is possible should the subgrade soils undergo an increase in moisture content. We estimate movement of about 1 inch is possible. If the owner cannot accept the risk of slab movement, a structural floor should be used. If conventional slab -on-grade is utilized, the subgrade soils should be over -excavated and prepared as recommended above and in the Earthwork section of this report. For structural design of concrete slabs -on -grade subjected to point loadings, a modulus of subgrade reaction of 150 pounds per cubic inch (pci) may be used for floors. The use of a vapor retarder should be considered beneath concrete slabs on grade covered with wood, tile, carpet, or other moisture sensitive or impervious coverings, when the project includes humidity -controlled areas, or when the slab will support equipment sensitive to moisture. When conditions warrant the use of a vapor retarder, the slab designer should refer to ACI 302 and/or ACI 360 for procedures and cautions regarding the use and placement of a vapor retarder. Additional floor slab design and construction recommendations are as follows: ■ Positive separations and/or isolation joints should be provided between slabs and all foundations, columns, or utility lines to allow independent movement. ■ Control joints should be saw -cut in slabs in accordance with ACI Design Manual, Section 302.1R -37 8.3.12 (tooled control joints are not recommended) to control the location and extent of cracking. ■ Interior utility trench backfill placed beneath slabs should be compacted in accordance with the recommendations presented in the Earthwork section of this report. ■ Floor slabs should not be constructed on frozen subgrade. ■ Other design and construction considerations, as outlined in the ACI Design Manual, Section 302.1R are recommended. Floor Slab Construction Considerations Movements of slabs -on-grade using the recommendations discussed in previous sections of this report will likely be reduced and tend to be more uniform. The estimates discussed above assume that the other recommendations in this report are followed. Additional movement could occur should the subsurface soils become wetted to significant depths, which could result in potential excessive movement causing uneven floor slabs and severe cracking. This could be due to over watering of landscaping, poor drainage, improperly functioning drain systems, and/or broken utility lines. Therefore, it is imperative that the recommendations presented in this report be followed. CDN#3493A-032 Geotechnical Engineering Report Liberty School Addition | Fort Collins, Colorado February 18, 2025 | Terracon Project No. P20245058 Facilities | Environmental | Geotechnical | Materials 21 Finished subgrade, within and for at least 10 feet beyond the floor slab, should be protected from traffic, rutting, or other disturbance and maintained in a relatively moist condition until floor slabs are constructed. If the subgrade should become damage d or desiccated prior to construction of floor slabs, the affected material should be removed, and engineered fill should be added to replace the resulting excavation. Final conditioning of the finished subgrade should be performed immediately prior to placement of the floor slab support course. The Geotechnical Engineer should observe the condition of the floor slab subgrades immediately prior to placement of the floor slab support course, reinforcing steel, and concrete. Attention should be paid to high traffic areas that were rutted and disturb ed earlier, and to areas where backfilled trenches are located. Lateral Earth Pressures Design Parameters Structures with unbalanced backfill levels on opposite sides should be designed for earth pressures at least equal to values indicated in the following table. Earth pressures will be influenced by structural design of the walls, conditions of wall restraint, methods of construction, and/or compaction and the strength of the materials being restrained. Two wall restraint conditions are shown in the diagram below. Active earth pressure is commonly used for design of free -standing cantilever retaining walls and assumes wall movement. The “at -rest” condition assumes no wall movement and is commonly used for basement walls, loading dock walls, or other walls restrained at the top. The recommended design lateral earth pressures do not include a factor of safety and do not provide for possible hydrostatic pressure on the walls (unless stated). CDN#3493A-032 Geotechnical Engineering Report Liberty School Addition | Fort Collins, Colorado February 18, 2025 | Terracon Project No. P20245058 Facilities | Environmental | Geotechnical | Materials 22 Lateral Earth Pressure Design Parameters Earth Pressure Condition 1 Coefficient for Backfill Type 2 Surcharge Pressure 3 p1 (psf) Equivalent Fluid Pressures (psf) 2,4 Unsaturated 5 Submerged 5 Active (Ka) Granular - 0.33 (0.33)S (40)H (85)H At-Rest (Ko) Granular -0.50 (0.50)S (60)H (95)H Passive (Kp) Granular -3.00 --- --- --- 1. For active earth pressure, wall must rotate about base, with top lateral movements 0.002 H to 0.004 H, where H is wall height. For passive earth pressure, wall must move horizontally to mobilize resistance. Fat clay or other expansive soils should not be used as backfill behind the wall . 2. Uniform, horizontal backfill, with a maximum unit weight of 120 pcf. 3. Uniform surcharge, where S is surcharge pressure. 4. Loading from heavy compaction equipment is not included. 5. To achieve “Unsaturated” conditions, follow guidelines in Subsurface Drainage for Below-Grade Walls below. “Submerged” conditions are recommended when drainage behind walls is not incorporated into the design. Backfill placed against structures should consist of granular soils or low plasticity cohesive soils. For the granular values to be valid, the granular backfill must extend out and up from the base of the wall at an angle of at least 45 and 60 degrees from vertical for the active and passive cases, respectively. To control hydrostatic pressure behind walls, we typically recommend a drain be installed at the base of walls with a collection pipe leading to a reliable discharge. However, if no below -grade drainage system is planned for the proposed building addition, the below-grade walls of the new building addition should be designed to resist combined hydrostatic and lateral earth pressures. The hydrostatic and lateral earth pressures should be calculated for granular backfill using the submerged earth pressures provided in the above table. These pressures do not include the influence of surcharge, equipment, or floor loading, which should be added. Heavy equipment should not operate within a distance closer than the exposed height of retaining walls to prevent lateral pressures more than those provided. Foundations , floor slabs or other loads bearing on backfill behind walls may have a significant influence on the lateral earth pressure. Placing fo undations within wall backfill and in the zone of active soil influence on the wall should be avoided unless structural analyses indicate the wall can safely withstand the increased pressure. The lateral earth pressure recommendations given in this section are applicable to the design of rigid retaining walls subject to slight rotation, such as cantilever, or gravity type concrete walls. These recommendations are not applicable to the design of modular CDN#3493A-032 Geotechnical Engineering Report Liberty School Addition | Fort Collins, Colorado February 18, 2025 | Terracon Project No. P20245058 Facilities | Environmental | Geotechnical | Materials 23 block - geogrid reinforced backfill walls (also termed MSE walls). Recommendations covering these types of wall systems are beyond the scope of services for this assignment. However, we would be pleased to develop a proposal for evaluation and design of su ch wall systems upon request. General Comments Our analysis and opinions are based upon our understanding of the project, the geotechnical conditions in the area, and the data obtained from our site exploration. Variations will occur between exploration point locations or due to the modifying effects of construction or weather. The nature and extent of such variations may not become evident until during or after construction. Terracon should be retained as the Geotechnical Engineer, where noted in this report, to provide observation and testing services during pertinent construction phases. If variations appear, we can provide further evaluation and supplemental recommendations. If variations are noted in the absence of our observation and testing services on -site, we should be immediately notified so th at we can provide evaluation and supplemental recommendations. Our Scope of Services does not include either specifically or by implication any environmental or biological (e.g., mold, fungi, bacteria) assessment of the site or identification or prevention of pollutants, hazardous materials or conditions. If the owner is concerned about the potential for such contamination or pollution, other studies should be undertaken. Our services and any correspondence are intended for the sole benefit and exclusive use of our client for specific application to the project discussed and are accomplished in accordance with generally accepted geotechnical engineering practices with no th ird- party beneficiaries intended. Any third -party access to services or correspondence is solely for information purposes to support the services provided by Terracon to our client. Reliance upon the services and any work product is limited to our client a nd is not intended for third parties. Any use or reliance of the provided information by third parties is done solely at their own risk. No warranties, either express or implied, are intended or made. Site characteristics as provided are for design purposes and not to estimate excavation cost. Any use of our report in that regard is done at the sole risk of the excavating cost estimator as there may be variations on the site that are not apparent in the data that could significantly effect excavation cost. Any parties charged with estimating excavation costs should seek their own site characterization for specific purposes to obtain the specific level of detail necessary for costing. Site safety and cost estimating including excavation support and dewatering requirements/design are the responsibility of others. Construction and site development have the potential to affect adjacent prop erties. Such impacts can include damages due to vibration, modification of groundwater/surface CDN#3493A-032 Geotechnical Engineering Report Liberty School Addition | Fort Collins, Colorado February 18, 2025 | Terracon Project No. P20245058 Facilities | Environmental | Geotechnical | Materials 24 water flow during construction, foundation movement due to undermining or subsidence from excavation , as well as noise or air quality concerns. Evaluation of these items on nearby properties are commonly associated with contractor means and methods and are not addressed in this report. The owner and contractor should consider a preconstruction/precondition survey of surrounding development. If changes in the nature, design, or location of the project are planned, our conclusions and recommendations shall no t be considered valid unless we review the changes and either verify or modify our conclusions in writing. CDN#3493A-032 Geotechnical Engineering Report Liberty School Addition | Fort Collins, Colorado February 18, 2025 | Terracon Project No. P20245058 Facilities | Environmental | Geotechnical | Materials Figures Contents: GeoModel CDN#3493A-032 4,865 4,870 4,875 4,880 4,885 4,890 4,895 4,900 EL E V A T I O N ( M S L ) ( f e e t ) Layering shown on this figure has been developed by the geotechnical engineer for purposes of modeling the subsurface conditions as required for the subsequent geotechnical engineering for this project. Numbers adjacent to soil column indicate depth below ground surface. NOTES: B-1 B-2 B-3 B-4 B-5 Legend This is not a cross section. This is intended to display the Geotechnical Model only. See individual logs for more detailed conditions. GeoModel 1825 and 1901 Sharp Point Drive | Fort Collins, CO Terracon Project No. 20245058 Liberty School Addition 1901 Sharp Point Dr Ste C Fort Collins, CO Second Water Observation First Water Observation Groundwater levels are temporal. The levels shown are representative of the date and time of our exploration. Significant changes are possible over time. Water levels shown are as measured during and/or after drilling. In some cases, boring advancement methods mask the presence/absence of groundwater. See individual logs for details. Asphalt Aggregate Base Course Poorly-graded Sand with Gravel Sandy Lean Clay Poorly-graded Sand with Silt and Gravel Sandy Silt Model Layer Layer Name General Description 1 Existing fill consisting primarily of sandy lean clay and sandy silt; dark brown 3 Claystone bedrock; very hard, light gray to dark gray 2 Poorly graded sand with gravel with variable amounts of silt and cobbles; loose to very dense, brown, gray, pink, red, tan Existing Fill Bedrock Sand 2 3 9 7 16 29.4 1 2 3 7 6 4 21 29.3 1 2 3 7.7 13 4 20 29.4 1 2 7 10 1 2 2 10 CDN#3493A-032 Geotechnical Engineering Report Liberty School Addition | Fort Collins, Colorado February 18, 2025 | Terracon Project No. P20245058 Facilities | Environmental | Geotechnical | Materials Attachments CDN#3493A-032 Geotechnical Engineering Report Liberty School Addition | Fort Collins, Colorado February 18, 2025 | Terracon Project No. P20245058 Facilities | Environmental | Geotechnical | Materials Exploration and Testing Procedures Field Exploration Number of Borings Approximate Boring Depth (feet) Location 3 (Boring Nos. B -1 through B-3) 29.3 to 29.4 Near and within the proposed building addition area 2 (Boring Nos. B-4 and B-5) 10 Parking areas Boring Layout and Elevations: Terracon personnel provided the boring layout using handheld GPS equipment (estimated horizontal accuracy of about ±1 5 feet) and referencing existing site features. Approximate ground surface elevations were estimated using a publicly available USGS topographic map . If surface elevations and a more precise boring layout are desired, we recommend the borings be surveyed. Subsurface Exploration Procedures: We advanced the borings with a truck -mounted drill rig using solid-stem and hollow -stem continuous-flight augers. Sampling was performed using standard split -barrel and modified California barrel sampling procedures. Bulk samples of auger cuttings from the upper approximately 5 feet of each borehole were also collected for laboratory testing . In the split-barrel sampling procedure, a standard 2 -inch outer diameter split -barrel sampling spoon was driven into the ground by a 140-pound automatic hammer falling a distance of 30 inches. The number of blows required to advance the sampling spoon the last 12 inches of a normal 18 -inch penetration is recorded as the Standard Penetration Test (SPT) resistance value. The SPT resistan ce values, also referred to as N -values, are indicated on the boring logs at the test depths. In the modified California barrel sampling procedure, a 2½-inch outer diameter split-barrel sampling spoon is used for sampling. Modified California barrel sampling procedures are similar to standard split spoon sampling procedure; however, blow counts are typically recorded for 6 -inch intervals for a total of 12 inches of penetration. Modified California barrel sampler blow counts are not considered N -values. The samples were placed in appropriate containers and taken to our soil laboratory for testing and classification by a Geotechnical Engineer. We also observed the boreholes while drilling and at the completion of drilling for the presence of groundwater. The groundwater levels are shown on the attached boring logs. Our exploration team prepared field boring logs as part of the drilling operations. The sampling depths, penetration distances, and other sampling information were recorded CDN#3493A-032 Geotechnical Engineering Report Liberty School Addition | Fort Collins, Colorado February 18, 2025 | Terracon Project No. P20245058 Facilities | Environmental | Geotechnical | Materials on the field boring logs. These field logs included visual classifications of the materials observed during drilling and our interpretation of the subsurface conditions between samples. Final boring logs were prepared from the field logs. The final boring logs represent the Geotec hnical Engineer's interpretation of the subsurface conditions at the boring locations based on field data, observation of samples, and laboratory test results. We backfilled the borings with cementitious flowable backfill after completion of drilling. Pavements were patched with hot -mix asphalt. Our services did not include repair of the site beyond backfilling the boreholes and patching existing pavements. Excess auger cuttings were removed from the site. Laboratory Testing The project engineer reviewed the field data and assigned laboratory tests. The laboratory testing program included the following types of tests: ■ Moisture Content ■ Dry Unit Weight ■ Atterberg Limits ■ Grain-size Analysis ■ One-dimensional Swell ■ Unconfined Compressi ve Strength ■ Water-soluble Sulfates The laboratory testing program included examination of soil samples by an engineer and/or geologist . Based on the results of our field and laboratory programs, we described and classified the soil samples in accordance with the Unified Soil Classification System. A brief description of this classification system as well as the General Notes can be found in the Supporting Information section. Rock classification was conducted using locally accepted practices for engineering purposes. Laboratory test results are indicated on the boring logs and are presented in depth in the Exploration Results section. Laboratory tests are performed in general accordance with applicable local standards or other acceptable standards. In some cases, variations to methods are applied as a result of local practice or professional judgement . CDN#3493A-032 Geotechnical Engineering Report Liberty School Addition | Fort Collins, Colorado February 18, 2025 | Terracon Project No. P20245058 Facilities | Environmental | Geotechnical | Materials Site Location and Exploration Plans Contents: Site Location Plan Exploration Plan Note: All attachments are one page unless noted above. CDN#3493A-032 Geotechnical Engineering Report Liberty School Addition | Fort Collins, Colorado February 18, 2025 | Terracon Project No. P20245058 Facilities | Environmental | Geotechnical | Materials Note to Preparer: This is a large table with outside borders. Just click inside the table above this text box, then paste your GIS Toolbox image. When paragraph markers are turned on you may notice a line of hidden text above and outside the table – please leave that alone. Limit editing to inside the table. The line at the bottom about the general location is a separate table line. You can edit it as desired, but try to keep to a single line of text to avoid reformatting the page. Site Location DIAGRAM IS FOR GENERAL LOCATION ONLY, AND IS NOT INTENDED FOR CONSTRUCTION PURPOSES MAP PROVIDED BY MICROSOFT BING MAPS CDN#3493A-032 Geotechnical Engineering Report Liberty School Addition | Fort Collins, Colorado February 18, 2025 | Terracon Project No. P20245058 Facilities | Environmental | Geotechnical | Materials Note to Preparer: This is a large table with outside borders. Just click inside the table above this text box, then paste your GIS Toolbox image. When paragraph markers are turned on you may notice a line of hidden text above and outside the table – please leave that alone. Limit editing to inside the table. The line at the bottom about the general location is a separate table line. You can edit it as desired, but try to keep to a single line of text to avoid reformatting the page. Exploration Plan DIAGRAM IS FOR GENERAL LOCATION ONLY, AND IS NOT INTENDED FOR CONSTRUCTION PURPOSES MAP PROVIDED BY MICROSOFT BING MAPS CDN#3493A-032 Geotechnical Engineering Report Liberty School Addition | Fort Collins, Colorado February 18, 2025 | Terracon Project No. P20245058 Facilities | Environmental | Geotechnical | Materials Exploration and Laboratory Results Contents: Boring Logs (B-1 through B-5) Atterberg Limits Grain Size Distribution Consolidation/Swell (3 pages) Unconfined Compressive Strength Water-Soluble Sulfates Note: All attachments are one page unless noted above. CDN#3493A-032 4896.7 4895 4881 4867.6 ASPHALT, about 4 inches thick AGGREGATE BASE COURSE, about 20 inches thick POORLY GRADED SAND WITH GRAVEL, with cobbles, brown with gray, pink and red, medium dense to very dense CLAYSTONE BEDROCK, light gray to dark gray, very hard Boring Terminated at 29.4 Feet Boring Log No. B-1 De p t h ( F t . ) 5 10 15 20 25 Wa t e r L e v e l Ob s e r v a t i o n s Facilities | Environmental |Geotechnical | Materials Gr a p h i c L o g Mo d e l L a y e r 1.1 0.9 6.7 13.0 9.6 18.1 14.8 22.4 127 112 0.3 2.0 16.0 29.4 12-23 35/12" 15-23-31 N=54 50/6" 9-6-10 N=16 11-11 22/12" 50/5" 50/4" 50/5" Abandonment Method Borings were backfilled with cementitous flowable fill and patched with asphalt Advancement Method 4.25-inch inside diameter, continuous-flight, hollow-stem augers Liberty School Addition 1825 and 1901 Sharp Point Drive | Fort Collins, CO Terracon Project No. 20245058 Water Level Observations 7 feet while drilling 9 feet at completion of drilling Fort Collins, CO 1901 Sharp Point Dr Ste C Notes See Exploration and Testing Procedures for a description of field and laboratory procedures used and additional data (If any). See Supporting Information for explanation of symbols and abbreviations. Elevation Reference: Elevations were interpolated from a publicly available USGS topographic map Drill Rig CME 55 Boring Started 01-30-2025 Boring Completed 01-30-2025 Logged by PA Hammer Type Automatic, Hammer Efficiency = 68% Driller Terracon Consultants Sa m p l e T y p e Pe r c e n t Fi n e s Un c o n f i n e d Co m p r e s s i v e St r e n g t h ( p s f ) Wa t e r Co n t e n t ( % ) Dr y U n i t We i g h t ( p c f ) Approximate Elevation: 4897 (Ft.) LL-PL-PI Atterberg LimitsSeeExploration Plan Latitude: 40.5624° Longitude: -105.0281° Location: Depth (Ft.) Sw e l l - C o n s o l / Lo a d ( % / p s f ) Fi e l d T e s t Re s u l t s 2 3 CDN#3493A-032 4896.3 4893 4876 4867.7 ASPHALT, about 8 inches thick FILL - SANDY LEAN CLAY (CL), dark brown POORLY GRADED SAND WITH GRAVEL, with cobbles, brown with gray, pink and red, medium dense to very dense loose at about 14 feet CLAYSTONE BEDROCK, light gray to dark gray, very hard Boring Terminated at 29.3 Feet Boring Log No. B-2 De p t h ( F t . ) 5 10 15 20 25 Wa t e r L e v e l Ob s e r v a t i o n s Facilities | Environmental |Geotechnical | Materials Gr a p h i c L o g Mo d e l L a y e r 66.519.2 2.1 2.0 5.8 14.1 18.6 18.1 20.7 108 97 107 100 41-16-25 0.7 4.0 21.0 29.3 +0.3/2005-7 12/12" 3-8-11 N=19 34-46 80/12" 18-24-25 N=49 4-11 15/12" 44-50/4" 50/5" 50/3" Abandonment Method Borings were backfilled with cementitous flowable fill and patched with asphalt Advancement Method 4.25-inch inside diameter, continuous-flight, hollow-stem augers Liberty School Addition 1825 and 1901 Sharp Point Drive | Fort Collins, CO Terracon Project No. 20245058 Water Level Observations 6 feet while drilling 7 feet at completion of drilling Fort Collins, CO 1901 Sharp Point Dr Ste C Notes See Exploration and Testing Procedures for a description of field and laboratory procedures used and additional data (If any). See Supporting Information for explanation of symbols and abbreviations. Elevation Reference: Elevations were interpolated from a publicly available USGS topographic map Drill Rig CME 75 Boring Started 01-21-2025 Boring Completed 01-21-2025 Logged by PA Hammer Type Automatic, Hammer Efficiency = 95% Driller Terracon Consultants Sa m p l e T y p e Pe r c e n t Fi n e s Un c o n f i n e d Co m p r e s s i v e St r e n g t h ( p s f ) Wa t e r Co n t e n t ( % ) Dr y U n i t We i g h t ( p c f ) Approximate Elevation: 4897 (Ft.) LL-PL-PI Atterberg LimitsSeeExploration Plan Latitude: 40.5624° Longitude: -105.0283° Location: Depth (Ft.) Sw e l l - C o n s o l / Lo a d ( % / p s f ) Fi e l d T e s t Re s u l t s 1 2 3 CDN#3493A-032 4897.3 4894 4878 4868.6 ASPHALT, about 8 inches thick FILL - SANDY LEAN CLAY, dark brown POORLY GRADED SAND WITH SILT AND GRAVEL (SP-SM), with cobbles, tan to brown with gray, red and pink, dense to very dense CLAYSTONE BEDROCK, dark gray, very hard Boring Terminated at 29.4 Feet Boring Log No. B-3 De p t h ( F t . ) 5 10 15 20 25 Wa t e r L e v e l Ob s e r v a t i o n s Facilities | Environmental |Geotechnical | Materials Gr a p h i c L o g Mo d e l L a y e r 8.4 974010 21.1 1.8 0.9 4.4 5.6 19.4 17.7 18.6 100 132 110 NP 51-20-31 0.7 4.0 20.0 29.4 +0.5/2006-10 16/12" 16-20-25 N=45 29-34 63/12" 18-26-25 N=51 11-50/5" 13-14-24 N=38 50/5" 50/5" Abandonment Method Borings were backfilled with cementitous flowable fill and patched with asphalt Advancement Method 4.25-inch inside diameter, continuous-flight, hollow-stem augers Liberty School Addition 1825 and 1901 Sharp Point Drive | Fort Collins, CO Terracon Project No. 20245058 Water Level Observations 13 feet while drilling 7.7 feet at completion of drilling Fort Collins, CO 1901 Sharp Point Dr Ste C Notes See Exploration and Testing Procedures for a description of field and laboratory procedures used and additional data (If any). See Supporting Information for explanation of symbols and abbreviations. Elevation Reference: Elevations were interpolated from a publicly available USGS topographic map Drill Rig CME 75 Boring Started 01-21-2025 Boring Completed 01-21-2025 Logged by PA Hammer Type Automatic, Hammer Efficiency = 95% Driller Terracon Consultants Sa m p l e T y p e Pe r c e n t Fi n e s Un c o n f i n e d Co m p r e s s i v e St r e n g t h ( p s f ) Wa t e r Co n t e n t ( % ) Dr y U n i t We i g h t ( p c f ) Approximate Elevation: 4898 (Ft.) LL-PL-PI Atterberg LimitsSeeExploration Plan Latitude: 40.5623° Longitude: -105.0286° Location: Depth (Ft.) Sw e l l - C o n s o l / Lo a d ( % / p s f ) Fi e l d T e s t Re s u l t s 1 2 3 CDN#3493A-032 4895.7 4889 4886 ASPHALT, about 4 inches thick FILL - SANDY SILT (ML), dark brown POORLY GRADED SAND WITH GRAVEL, brown with gray, pink and red, medium dense to dense Boring Terminated at 10 Feet Boring Log No. B-4 De p t h ( F t . ) 5 10 Wa t e r L e v e l Ob s e r v a t i o n s Facilities | Environmental |Geotechnical | Materials Gr a p h i c L o g Mo d e l L a y e r 51.8 20.4 20.8 6.5 13.5 107 103 NP 0.3 7.0 10.0 <-0.1/500 6-8 14/12" 3-4 7/12" 18-20-21 N=41 17-27 44/12" Abandonment Method Borings were backfilled with cementitous flowable fill and patched with asphalt Advancement Method 4-inch outside diameter, continuous-flight, solid-stem augers Liberty School Addition 1825 and 1901 Sharp Point Drive | Fort Collins, CO Terracon Project No. 20245058 No free water observed Water Level Observations Fort Collins, CO 1901 Sharp Point Dr Ste C Notes See Exploration and Testing Procedures for a description of field and laboratory procedures used and additional data (If any). See Supporting Information for explanation of symbols and abbreviations. Elevation Reference: Elevations were interpolated from a publicly available USGS topographic map Drill Rig CME 75 Boring Started 01-21-2025 Boring Completed 01-21-2025 Logged by PA Hammer Type Automatic, Hammer Efficiency = 95% Driller Terracon Consultants Sa m p l e T y p e Pe r c e n t Fi n e s Un c o n f i n e d Co m p r e s s i v e St r e n g t h ( p s f ) Wa t e r Co n t e n t ( % ) Dr y U n i t We i g h t ( p c f ) Approximate Elevation: 4896 (Ft.) LL-PL-PI Atterberg LimitsSeeExploration Plan Latitude: 40.5625° Longitude: -105.0290° Location: Depth (Ft.) Sw e l l - C o n s o l / Lo a d ( % / p s f ) Fi e l d T e s t Re s u l t s 1 2 CDN#3493A-032 4894.7 4893 4885 ASPHALT, about 4 inches thick FILL - SANDY LEAN CLAY, dark brown POORLY GRADED SAND WITH GRAVEL, tan to brown with gray, red and pink, medium dense to very dense Boring Terminated at 10 Feet Boring Log No. B-5 De p t h ( F t . ) 5 10 Wa t e r L e v e l Ob s e r v a t i o n s Facilities | Environmental |Geotechnical | Materials Gr a p h i c L o g Mo d e l L a y e r 1.3 1.3 2.8 6.3 123 118 0.3 2.0 10.0 6-27 33/12" 17-32 49/12" 8-50/6" 32-47 79/12" Abandonment Method Borings were backfilled with cementitous flowable fill and patched with asphalt Advancement Method 4-inch outside diameter, continuous-flight, solid-stem augers Liberty School Addition 1825 and 1901 Sharp Point Drive | Fort Collins, CO Terracon Project No. 20245058 No free water observed Water Level Observations Fort Collins, CO 1901 Sharp Point Dr Ste C Notes See Exploration and Testing Procedures for a description of field and laboratory procedures used and additional data (If any). See Supporting Information for explanation of symbols and abbreviations. Elevation Reference: Elevations were interpolated from a publicly available USGS topographic map Drill Rig CME 75 Boring Started 01-21-2025 Boring Completed 01-21-2025 Logged by PA Hammer Type Automatic, Hammer Efficiency = 95% Driller Terracon Consultants Sa m p l e T y p e Pe r c e n t Fi n e s Un c o n f i n e d Co m p r e s s i v e St r e n g t h ( p s f ) Wa t e r Co n t e n t ( % ) Dr y U n i t We i g h t ( p c f ) Approximate Elevation: 4895 (Ft.) LL-PL-PI Atterberg LimitsSeeExploration Plan Latitude: 40.5618° Longitude: -105.0282° Location: Depth (Ft.) Sw e l l - C o n s o l / Lo a d ( % / p s f ) Fi e l d T e s t Re s u l t s 1 2 CDN#3493A-032 0 10 20 30 40 50 60 0 10 20 30 40 50 60 70 80 90 100 110 "A" Line ASTM D4318 CH or OH CL or OL ML or OL MH or OH 25 NP 31 NP 66.5 8.4 97.0 51.8 CL SP-SM CH ML 16 NP 20 NP 25 NP 31 NP 66.5 8.4 97.0 51.8 CL SP-SM CH ML 16 NP 20 NP 41 NP 51 NP SANDY LEAN CLAY POORLY GRADED SAND with SILT and GRAVEL K SANDY SILT Atterberg Limit Results "U" Line Liquid Limit LL PL PI Fines USCS DescriptionFines Pl a s t i c i t y I n d e x CL - ML 16 4 7 Facilities | Environmental |Geotechnical | Materials 2 - 3 4 - 5.5 24 - 24.4 4 - 5 B-2 B-3 B-3 B-4 Boring ID Depth (Ft) 1901 Sharp Point Dr Ste C Fort Collins, COTerracon Project No. 20245058 1825 and 1901 Sharp Point Drive | Fort Collins, CO Liberty School Addition CDN#3493A-032 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 0.0010.010.1110100 140 HydrometerU.S. Sieve Opening in Inches Grain Size Distribution ASTM D422 / ASTM C136 SandGravel 2 10 14 506 2001.5 83/4 1/23/8 30 403 601 U.S. Sieve Numbers 16 2044 10063 Grain Size (mm) coarse fine coarse finemedium Silt or ClayCobbles Pe r c e n t C o a r s e r b y W e i g h t Pe r c e n t F i n e r b y W e i g h t 100 90 80 70 60 50 40 30 20 10 0 AASHTOUSCSUSCS Classification A-7-6 (14) A-1-a (0) A-7-6 (33) A-4 (0) CL SP-SM CH ML SANDY LEAN CLAY POORLY GRADED SAND with SILT and GRAVEL K SANDY SILT Facilities | Environmental |Geotechnical | Materials 41 NP 51 NP 0.66 25 NP 31 NP 16 NP 20 NP %CobblesD60 5.952 0.12 D100 40.08 %Clay%Sand%Gravel 0.2 44.2 0.0 2.3 33.2 47.5 3.0 45.9 66.5 8.4 97.0 51.8 LL PL PI Cc Cu 0.0 0.0 0.0 0.0 D10 0.149 D30 0.763 9.5 37.5 4.75 12.5 %Fines %Silt 1901 Sharp Point Dr Ste C Fort Collins, COTerracon Project No. 20245058 1825 and 1901 Sharp Point Drive | Fort Collins, CO Liberty School Addition Boring ID 2 - 3 4 - 5.5 24 - 24.4 4 - 5 B-2 B-3 B-3 B-4 2 - 3 4 - 5.5 24 - 24.4 4 - 5 Depth (Ft)Boring ID B-2 B-3 B-3 B-4 Depth (Ft) CDN#3493A-032 -4 -3 -2 -1 0 1 2 3 4 100 1,000 10,000 Ax i a l S t r a i n ( % ) Pressure (psf) ASTM D4546 One-Dimensional Swell or Collapse Facilities | Environmental |Geotechnical | Materials Notes: Sample exhibited 0.3 percent swell upon wetting under an applied pressure of 200 psf. 19.2108 (pcf) WC (%)Description USCS CLSANDY LEAN CLAY (CL) Boring ID Depth (Ft) 2 - 3B-2 1901 Sharp Point Dr Ste C Fort Collins, COTerracon Project No. 20245058 1825 and 1901 Sharp Point Drive | Fort Collins, CO Liberty School Addition CDN#3493A-032 -4 -3 -2 -1 0 1 2 3 4 100 1,000 10,000 Ax i a l S t r a i n ( % ) Pressure (psf) ASTM D4546 One-Dimensional Swell or Collapse Facilities | Environmental |Geotechnical | Materials Notes: Sample exhibited 0.5 percent swell upon wetting under an applied pressure of 200 psf. 21.189 (pcf) WC (%)Description USCS SANDY LEAN CLAY Boring ID Depth (Ft) 2 - 3B-3 1901 Sharp Point Dr Ste C Fort Collins, COTerracon Project No. 20245058 1825 and 1901 Sharp Point Drive | Fort Collins, CO Liberty School Addition CDN#3493A-032 -4 -3 -2 -1 0 1 2 3 4 100 1,000 10,000 Ax i a l S t r a i n ( % ) Pressure (psf) ASTM D4546 One-Dimensional Swell or Collapse Facilities | Environmental |Geotechnical | Materials Notes: Sample exhibited less than 0.1 percent compression upon wetting under an applied pressure of 500 psf. 20.8105 (pcf) WC (%)Description USCS MLSANDY SILT (ML) Boring ID Depth (Ft) 4 - 5B-4 1901 Sharp Point Dr Ste C Fort Collins, COTerracon Project No. 20245058 1825 and 1901 Sharp Point Drive | Fort Collins, CO Liberty School Addition CDN#3493A-032 0 500 1,000 1,500 2,000 2,500 3,000 3,500 4,000 4,500 0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 5.5 Facilities | Environmental |Geotechnical | Materials Depth (Ft) 24 - 24.4 ASTM D2166 Unconfined Compression Test Specimen Test DataSpecimen Failure Mode Sample type LL PL PI Strain Rate (in/min): Boring ID Description CLAYSTONE BEDROCK Unconfined Compressive Strength (psf): B-3 97.0 Fines (%) 1901 Sharp Point Dr Ste C Fort Collins, COTerracon Project No. 20245058 1825 and 1901 Sharp Point Drive | Fort Collins, CO Liberty School Addition 0.08 CDN#3493A-032 Client B-1 B-5 2'-5'0.3'-5' 5 129 5 140 5 5 Laboratory Manager LCS Building Corporation Liberty School Addition Fort Collins, CO Sample Location Sample Depth (ft.) The tests were performed in general accordance with applicable ASTM and AWWA test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. 2/7/2025Date Received: Results from Corrosion Testing Water Soluble Sulfate, ASTM C1580, (mg/kg) 20245058 Project CDN#3493A-032 Geotechnical Engineering Report Liberty School Addition | Fort Collins, Colorado February 18, 2025 | Terracon Project No. P20245058 Facilities | Environmental | Geotechnical | Materials Supporting Information Contents: General Notes Unified Soil Classification System Note: All attachments are one page unless noted above. CDN#3493A-032 Auger Cuttings Modified California Ring Sampler Standard Penetration Test Facilities | Environmental |Geotechnical | Materials Unconfined Compressive Strength Qu (tsf) less than 0.25 0.25 to 0.50 0.50 to 1.00 1.00 to 2.00 2.00 to 4.00 > 4.00 Liberty School Addition 1825 and 1901 Sharp Point Drive | Fort Collins, CO Terracon Project No. 20245058 1901 Sharp Point Dr Ste C Fort Collins, CO N (HP) (T) (DCP) UC (PID) (OVA) Standard Penetration Test Resistance (Blows/Ft.) Hand Penetrometer Torvane Dynamic Cone Penetrometer Unconfined Compressive Strength Photo-Ionization Detector Organic Vapor Analyzer Water Level After a Specified Period of Time Water Level After a Specified Period of Time Cave In Encountered Water Level Field Tests Water Initially Encountered Sampling Water levels indicated on the soil boring logs are the levels measured in the borehole at the times indicated. Groundwater level variations will occur over time. In low permeability soils, accurate determination of groundwater levels is not possible with short term water level observations. General Notes Location And Elevation Notes Exploration point locations as shown on the Exploration Plan and as noted on the soil boring logs in the form of Latitude and Longitude are approximate. See Exploration and Testing Procedures in the report for the methods used to locate the exploration points for this project. Surface elevation data annotated with +/- indicates that no actual topographical survey was conducted to confirm the surface elevation. Instead, the surface elevation was approximately determined from topographic maps of the area. Soil classification as noted on the soil boring logs is based Unified Soil Classification System. Where sufficient laboratory data exist to classify the soils consistent with ASTM D2487 "Classification of Soils for Engineering Purposes" this procedure is used. ASTM D2488 "Description and Identification of Soils (Visual-Manual Procedure)" is also used to classify the soils, particularly where insufficient laboratory data exist to classify the soils in accordance with ASTM D2487. In addition to USCS classification, coarse grained soils are classified on the basis of their in-place relative density, and fine-grained soils are classified on the basis of their consistency. See "Strength Terms" table below for details. The ASTM standards noted above are for reference to methodology in general. In some cases, variations to methods are applied as a result of local practice or professional judgment. Exploration/field results and/or laboratory test data contained within this document are intended for application to the project as described in this document. Use of such exploration/field results and/or laboratory test data should not be used independently of this document. Relevance of Exploration and Laboratory Test Results Descriptive Soil Classification > 30 15 - 30 8 - 15 4 - 8 2 - 4 0 - 1 Very Stiff Consistency of Fine-Grained Soils Bedrock (More than 50% retained on No. 200 sieve.) Density determined by Standard Penetration Resistance Relative Density of Coarse-Grained Soils < 3 Consistency Stiff Medium Stiff Soft Very Soft (50% or more passing the No. 200 sieve.) Consistency determined by laboratory shear strength testing, field visual-manual procedures or standard penetration resistance Strength Terms 6- 10 11 - 18 19 - 36 > 36 Standard Penetration or N-Value (Blows/Ft.) Ring Sampler (Blows/Ft.) Relative Density Very Loose Loose Standard Penetration or N-Value (Blows/Ft.) > 50 30 - 50 10 - 29 4 - 9 Ring Sampler (Blows/Ft.) Hard Medium Dense Dense Very Dense 15 - 46 0 - 3 3 - 5 Consistency Standard Penetration or N-Value (Blows/Ft.) < 20 20 - 29 30 - 49 50 - 79 > 96 0 - 5 6 - 14 > 80 Firm _ 47 - 79 Medium Hard Hard Very Hard Ring Sampler (Blows/Ft.) < 24 24 - 35 36 - 60 61 - 96 >79 CDN#3493A-032 Geotechnical Engineering Report Liberty School Addition | Fort Collins, Colorado February 18, 2025 | Terracon Project No. P20245058 Facilities | Environmental | Geotechnical | Materials Unified Soil Classification System Criteria for Assigning Group Symbols and Group Names Using Laboratory Tests A Soil Classification Group Symbol Group Name B Coarse-Grained Soils: More than 50% retained on No. 200 sieve Gravels: More than 50% of coarse fraction retained on No. 4 sieve Clean Gravels: Less than 5% fines C Cu≥4 and 1≤Cc≤3 E GW Well-graded gravel F Cu<4 and/or [Cc<1 or Cc>3.0] E GP Poorly graded gravel F Gravels with Fines: More than 12% fines C Fines classify as ML or MH GM Silty gravel F, G, H Fines classify as CL or CH GC Clayey gravel F, G, H Sands: 50% or more of coarse fraction passes No. 4 sieve Clean Sands: Less than 5% fines D Cu≥6 and 1≤Cc≤3 E SW Well-graded sand I Cu<6 and/or [Cc<1 or Cc>3.0] E SP Poorly graded sand I Sands with Fines: More than 12% fines D Fines classify as ML or MH SM Silty sand G, H, I Fines classify as CL or CH SC Clayey sand G, H, I Fine-Grained Soils: 50% or more passes the No. 200 sieve Silts and Clays: Liquid limit less than 50 Inorganic: PI > 7 and plots above “A” line J CL Lean clay K, L, M PI < 4 or plots below “A” line J ML Silt K, L, M Organic: 𝐿𝐿 𝑜𝑣𝑒𝑛 𝑑𝑟𝑖𝑒𝑑 𝐿𝐿 𝑛𝑜𝑡 𝑑𝑟𝑖𝑒𝑑<0.75 OL Organic clay K, L, M, N Organic silt K, L, M, O Silts and Clays: Liquid limit 50 or more Inorganic: PI plots on or above “A” line CH Fat clay K, L, M PI plots below “A” line MH Elastic silt K, L, M Organic: 𝐿𝐿 𝑜𝑣𝑒𝑛 𝑑𝑟𝑖𝑒𝑑 𝐿𝐿 𝑛𝑜𝑡 𝑑𝑟𝑖𝑒𝑑<0.75 OH Organic clay K, L, M, P Organic silt K, L, M, Q Highly organic soils: Primarily organic matter, dark in color, and organic odor PT Peat A Based on the material passing the 3 -inch (75-mm) sieve. B If field sample contained cobbles or boulders, or both, add “with cobbles or boulders, or both” to group name. C Gravels with 5 to 12% fines require dual symbols: GW -GM well- graded gravel with silt, GW -GC well-graded gravel with clay, GP -GM poorly graded gravel with silt, GP -GC poorly graded gravel with clay. D Sands with 5 to 12% fines require dual symbols: SW -SM well- graded sand with silt, SW -SC well -graded sand with clay, SP -SM poorly graded sand with silt, SP -SC poorly graded sand with clay. E Cu = D 60/D 10 Cc = F If soil contains ≥ 15% sand, add “with sand” to group name. G If fines classify as CL -ML, use dual symbol GC -GM, or SC -SM. H If fines are organic, add “with organic fines” to group name. I If soil contains ≥ 15% gravel, add “with gravel” to group name. J If Atterberg limits plot in shaded area, soil is a CL -ML, silty clay. K If soil contains 15 to 29% plus No. 200, add “with sand” or “with gravel,” whichever is predominant. L If soil contains ≥ 30% plus No. 200 predominantly sand, add “sandy” to group name. M If soil contains ≥ 30% plus No. 200, predominantly gravel, add “gravelly” to group name. N PI ≥ 4 and plots on or above “A” line. O PI < 4 or plots below “A” line. P PI plots on or above “A” line. Q PI plots below “A” line. 6010 2 30 DxD )(D CDN#3493A-032