Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutBLOOM FILING THREE - FDP250003 - SUBMITTAL DOCUMENTS - ROUND 1 - Responses (2)3201 East Mulberry, Unit Q – P.O. Box 1518 • Fort Collins, Colorado 80522
Phone (970) 498-0604 •Fax (970) 498-0701 •www.boxeldersanitation.org
July 11, 2023
Brandy Bethuram Harras
Community Development and Neighborhood Services
City of Fort Collins
281 North College Avenue, PO Box 580
Fort Collins, CO 80522
RE: Case Number: PDP220011
Title: Bloom Filing 3
Engineering/Survey:
Engineer Contact:
Applicant: Vignette Studios LLC – Terence Hoaglund
Parcel Number(s):
Boxelder Sanitation District (BSD) has reviewed the proposed project identified as:
Proposed 360 multi-family dwelling units
The District hereby advises as follows:
There is no objection to this proposal.
Responses required to comments below.
The District will respond at the hearing date of ______________.
Comments:
1) The PDP proposal is general in nature and more detailed review will occur during the
FDP stage. The nature of the development will require close coordination with all
utilities to assure the issue related to access and maintenance are addressed. We
anticipate that these issues will be addressed during FDP process.
2) Standalone easement will be required for all sewers that are not located in the public
R.O.W. and in alley tracts. The easements are necessary to address access and
maintenance issue that are not included on the plat. Standard easement width for
Boxelder is 30-feet. The alleys are only 26 feet so the easement width will need to be
discussed.
3) Show the location of the existing Boxelder Sewer Easement in the area of
International Drive on the Plat
4) The proposed plan shows a pool. Discharges from swimming pools to the District
sewers are a prohibited use. Provide information and design showing that the pool
with not discharge to the sewer.
5) Provide information on kitchen and bathroom facilities for the community building.
6) Specify and show the location of service connections to each building.
We look forward to reviewing future submittals on this project. Please feel free to contact
me if you have any questions.
Sincerely,
Daniel Richardson, PE
District Engineer