BLOOM SUBDIVISION (MULBERRY)
FILING - 3
Fort Collins, Colorado
PREPARED FOR: �Ppo LICFNs
Hartford Homes ooQP��•H0,9�•Fp
PREPARED BY: 53042 CIC
. 41
Brian Horan, PE 6-6-23•;'
Daniela Gonzalez ocF'••..•.•...•• ..'
SS10NA .
Galloway & Company, Inc.
550 Greenwood Plaza Blvd, Suite 200
Greenwood Village, CO 80111
DATE:
August 2, 2022
REVISED: June 6, 2023
Bloom (Mulberry)
Filing 3 Traffic Memorandum
Introduction
The following memorandum provides support for the initial Project Development Plan (PDP)described
herein as "Filing 3" of the Bloom Subdivision (Mulberry) development. The site plan for Filing 3 is provided
as Attachment I. A Master Traffic Impact Study (MTIS) by Galloway dated revised January 17, 2022 is
currently in process for the overall Bloom development. The Master TIS provides operational level
analysis to support the initial PDP which is being reviewed concurrently. Excerpts from the Bloom MTIS
are provided in Attachment II.
The MTIS analyzed the overall project in two distinct phases to provide triggers for infrastructure and the
ultimate improvements necessary to accommodate development. Filing 3 of the Bloom development
consists of Parcel D of the Mulberry Master Plan highlighted within the overall Phase 1 plan in Figure 1.
Infrastructure necessary to support Filing 3 is proposed to be constructed with Filing 2. Infrastructure
proposed to be constructed with Filing 3 consists of the construction of local roads within the parcel. The
development area and roadways proposed with Filing 3 are highlighted in Figure 1.
As shown in Figure 1, the Applicant is proposing to construct all proposed roadway connections to their
ultimate buildout as recommended by the MTIS. The operational analysis contained herein provides
summary of the analysis of the build out of Filing 3 and the proposed geometries as shown in Figure 1.
A scoping call was had with the City on March 31,2023,to discuss the scope of the analysis and information
contained herein. Generally, it was determined that this memorandum would include a comparison of the
MTIS, what has been approved with previous Filings, and inclusion of additional background information.
A number of comments and concerns are addressed in the Filing 4 project as they are the responsibility of
the overall developer. The following memorandum addresses the scope of what was discussed in the
meeting.
Methodology
The analysis contained herein utilizes the same assumptions found within the MTIS in order to determine
consistency with the MTIS. Forecasts for the operational analysis utilize existing volumes and background
growth consistent with the MTIS. Figures from the MTIS are provided as Attachment II and annotated for
ease of reference.
Synchro software version 11 was used to evaluate levels of service at each of the study intersections during
the weekday AM and PM peak hours. Synchro is a macroscopic model used for optimizing traffic signal
timing and performing capacity analyses. The software can model existing traffic signal timings or optimize
splits, offsets, and cycle lengths for individual intersections, an arterial, or a complete network. Synchro
allows the user to evaluate the effects of changing intersection geometrics, traffic demands, traffic control,
and/or traffic signal settings as well as optimize traffic signal timings.
The levels of service reported for the signalized and unsignalized intersections analyzed herein were taken
from the Highway Capacity Manual (HCM) 6ch reports generated by Synchro 11.
2
Figure 1 Filing 3&Infrastructure
r
Vine Drive
_- _. ` ' FUTURE PHASE
i
ark/Detention/Amenity
_ N FUTURE
N DEVELOPMENT
PARCEL A uture Phase
f i c -Bww�,
FUTUREa -..
AMENITY
AREA
=�-y Sykes Drive
1 4 i l L FUTURE
L DEVELOPMENT G'•►
PARCEL B ep� FUTURE PHASE
v - L Irk
a — N
oig
p rr L FUTURE �pl `.` C+�ji'-' r''; < - Iv DEVELOPMENT :'
L PARCEL
L C `
_._ L — ; Y
International Boulevard
...,.�„ .- " . ,� � •�• ��%yam`+. I .,frtf� �`-
Detention )etention `t
•. • LEGEND
•
- • •
Phase One
FUTURE L 46 FUTURE j i Phase One Tracts Only
DEVELOPMENT 4 DEVELOPMENT '
L! Future Phase tR'l
PARCEL PARCEL r N Y ,
D L E r p ;
C , ;%` Phase One Major a"
L • �_ Roadways
L•
L• Detention ROW/Parkway
L. ILM La
L Corridor
L City/ Community
- L o Gateway Monument
A Drive
?r Future Regional Trail
a ° L FUTURE (� -
0 DEVELOPMENT Future Community
�- PARCEL > Monument
L F _
•
d 4 ' �p�• LREA F TO BE DESIGNED IN FUTURE PHASE(S)
� r
3ATEWAY OPEN SPACE/DETENTION
FUTURE
t COMMERCIAL • •
a,k /RETAIL
East Mulberry Street
Ml."� ^` ' - a '�.i "7: .. 7!'�" .• � a "''�y 4
Note:Plan is conceptual and subject to change.
Filing 3 Development and Infrastructure , 0 200 400 800
MULBERRY PHASE ONE I CONCEPT REVIEW - PLAN J J J J
06/24/2021 3 HARTFORD NOKKIS DESIGN
H o M E $ Planning I Landscape Architecture I Branding
Bloom (Mulberry)
Filing 3 Traffic Memorandum
Existing Conditions and Future Conditions without Site Development
Overview
The following section summarizes the results from the MTIS for the existing and background conditions.
The assumptions and results for existing and background conditions are still valid and have been
recreated herein.
Traffic Volumes
Existing counts collected in March of 2021 were presented as Figure 3-1 in the MTIS. The existing
volumes, consistent with the MTIS, are provided annotated in Attachment II and recreated herein as
Figure 2. Background growth for the Filing 3 2023 build out year was applied to the through movements
along Timberline Road to account for regional development outside the boundary of the study scope.
These growth projections are provided in Attachment II and recreated herein as Figure 3.
ih
29/15 a 0/0 0 �' $11/15 v-12/12
SykesDr 73/54 one s+—258/200 n a Rd (�53/77
0/4 p Sykes Dr 15/27-1` Vine Dr 1D/13 Frontage Rd
0/0-4- `,� 4 128/222 15/33
«u 45/35�y
�rnN
08
-C N
E'
5
M
a
m
n N
8
N � N 1-3/10
`) 8 k' a—1635/1389
Mulberry St 56/96
26/39 o Mulberry St
1054/2010—-
63/M-,
a.
c�
Figure 2 Existing Traffic Volumes
Since the time of completion of the MTIS, a nearby background study has been submitted supporting the
Montava development specifically Phases G and E. With this study more recent existing counts were
conducted. Excerpts from this study are provided in Attachment III. Figure 3 of the Montava study
provides the more recent counts. In order to provide a comparison a section was isolated between the
Timberline RoadNine Drive intersection and Timberline Road/Sykes Drive intersection. A comparison
shows that the Bloom MTIS counts are approximately 7% greater in both the southbound and northbound
direction for both AM and PM peak hours. With this confirmation it should be noted that the Bloom MTIS
provides a more conservative analysis of the region and therefore the Bloom MTIS conclusions and
recommendations are still considered valid as they relate to existing conditions.
4
Bloom (Mulberry)
Filing 3 Traffic Memorandum
Its
V C
O N O 0 0
�0/0
40 e—0/0 18 0/0 a—0/0
Sykes Dr 0/0 Vine Or o-10/8 Front a Rd 0/0
0/0—s' Sykes Or 0/0�} Vine Or 0/0 Frontage Rd
0/0 5/9 0/0
Q/Q 0 6 6
O O o 0
mrw
5
4l
V
O O O
� a � 4 0/0
o—67/50
Mulberry St o ,(�0/0
0/0-0` Mulberry St
36/73� `� 4 '
0/0�, o C 0
q
v
K
Figure 3 Build out 2023 Growth Projections
Capacity and Queue Analysis
Existing levels of service (LOS) and queues for the subject intersections operate acceptably. As shown in
Table 1 and Table 2 below and consistent with the MTIS, the studied intersections operate at LOS E or
better in existing conditions and background future 2023 conditions and queues are contained within their
effective storage.
5
Table 1
Bloom
Existinq Intersection Level of Service Summary 1 2
Existing 2021
Operating
.. PM
ConditionIntersection .
1 Sykes Dr/Timberline Rd STOP EB C 1`15.11 B[12.21
Sykes Dr EBL C[23.7] D[26.6]
EBTR B[13.6] B[10.5]
WB D[28.11 D[29.91
Sykes Dr WBL E[35.3] E[35.1]
WBTR A[9.8] B[11.2]
NB A[0.31 A[1.01
Timberline Rd NBL A[8.9] A[8.2]
NBT A[0.0] A[0.0]
NBR A[0.0] A[0.0]
SB A[0.21 A[0.71
Timberline Rd SBL A[8.0] A[8.7]
SBTR A[0.0] A[0.0]
2 Vine Dr/Greenfields Dr STOP EB A[0.81 A[0.81
Vine Dr EBL A[7.9] A[7.8]
EBT A[0.0] A[0.0]
Vine Dr WB A[0.01 A[0.01
W BTR A[0.0] A[0.0]
SB B[10.81 B[10.81
Greenfields Dr SBL B[12.3] B[13.1]
SBR A[10.0] A[9.6]
3 Frontage Rd/Greenfields Ct STOP EB A[6.81 A[6.91
Frontage Rd EBTR A[6.8] A[6.9]
Frontage Rd WB A[7.61 A[7.81
WBLT A[7.6] A[7.8]
Greenfields Ct NB A I6.71 A LI
NBLR A[6.7] A[6.9]
5 Mulberry St/Greenfields Ct Signal EB B(11.1) D(43.6)
Mulberry St EBL C(20.8) B(10.2)
EBT B(11.0) D(45.8)
EBR A(7.6) A(7.8)
WB C 25.6 B 13.6
Mulberry St WBL A(8.2) C(27.1)
WBT C(26.1) B(12.7)
WBR A(6.7) A(6.8)
NB C(31.9) C(34.1)
Greenfields Ct NBL C(31.3) C(34.7)
NBTR C(32.5) C(33.5)
Greenfields Ct SB C(30.7) D(43.4)
SBLTR C 30.7 D 43.4
Overall C(21.0) C(31.9)
Notes: (1)Numbers in brackets p represent delay at unsignalized intersections in seconds per vehicle-
(2)Numbers in parenthesis()represent delay at signalized intersections in seconds per vehicle.
6
Table 2
Bloom
Existing Intersection Queueing Summary(1)
OperatingExisting 2021
ConditionIntersection .
1 Sykes Dr/Timberline Rd STOP Sykes Dr EBL 130 2.5 2.5
EBTR - 7.5 5
Sykes Dr WBL 200 45 35
WBTR - 2.5 2.5
NBL - 0 5
Timberline Rd NBT - 0 0
NBR 375 0 0
Timberline Rd SBL 145 0 2.5
SBTR - 0 0
2 Vine Dr/Greenfields Dr STOP Vine Dr EBL 300 0 2.5
EBT - 0 0
Vine Dr WBT - 0 0
Greenfields Dr SBL - 2.5 2.5
SBR - 2.5 2.5
3 Frontage Rd/Greenfields Ct STOP Frontage Rd EBTR - 2.5 5
Frontage Rd W BLT - 7.5 10
Greenfields Ct NBLR - 2.5 2.5
5 Mulberry St/Greenfields Ct Signal EBL 185 12 15
Mulberry St EBT - 254 850
EBR 280 15 18
WBL 575 21 71
Mulberry St WBT - 756 378
WBR 240 0 0
Greenfields Ct NBL 210 86 102
NBTR - 42 48
Greenfields Ct SBLTR - 56 146
Notes: (1)Queue length is based on the 95th percentile queue as reported by Synchro,Version 10.
7
Bloom (Mulberry)
Filing 3 Traffic Memorandum
Site Analysis
Overview
As mentioned previously, the first phase of the MTIS analyzed all the development that could be
supported by the initial infrastructure improvements of the overall Bloom development. Filing 3 is
proposed to consist of the development areas previously highlighted of the project and access via the
connections of Greenfields Drive, Sykes Drive, International Boulevard, and internal local roads also
highlighted.
Proposed Site Access
Filing 3 is proposed to be accessed via Delozier Road, Donella Drive and Aria Way. The internal
roadways will align with Filing 4 to the east as requested by the City and will create a grid of streets
throughout the overall development. The Applicant is proposing to build out the connections to their full
geometry as required by the LCUASS consistent with volumes determined by the MTIS.
Site Trips
Trip generation estimates for the weekday AM and PM peak hours, as well as the weekday average daily
traffic (ADT), were derived from the standard Institute of Transportation Engineers (ITE)Trip Generation
Manual rates/equations, as published in the 11th edition. The vehicle trips that would be generated by the
proposed development plan are consistent with those analyzed in the MTIS.
Site Trip Comparison
A comparison is provided herein of the trip generation used in the MTIS for the first three filings to what
was ultimately approved. As shown in Table 3, 841 units were assumed in the first three filings while 772
units were ultimately approved/proposed. This represents 42 fewer AM peak hour and 49 fewer PM peak
hour trips. This reduction results from a combination of fewer overall units as well as the updated trip
generation rates between the 10th and 111h editions.
8
Table 3
Bloom-Filing 3
Site Trip Generation
Land AM Peak Hour PM Peak Hour Average
Land Use Use Daily
Code Amount Units In Out Out Total Trips
Approved:
Filing 1+2
Single Family Detached Housing 210 371 DU 67 201 268 226 132 358 3,473
Filing 1 +2 Total 371 DU 67 201 268 226 132 358 3,473
Filing 3
Multifamily Housing(Mid-Rise) 221 470 DU 41 115 156 120 76 196 2,560
Filing 3 Total 470 DU 41 115 156 120 76 196 2,560
Approved Total Site Trips(Filings 1-3) 841 DU 108 316 424 346 208 554 6,033
Proposed:(2)
Filing 1+Z
Single Family Detached Housing 210 260 DU 45 133 178 154 90 244 2,430
Multifamily Housing(Low-Rise) 220 152 DU 17 53 70 54 32 86 1,050
Filing 1 +2 Total 412 DU 62 186 248 208 122 330 3,480
Filing 3
Multifamily Housing(Low-Rise) 220 360 DU 32 102 134 110 65 175 2,383
Filing 3 Total 360 DU 32 102 134 110 65 175 2,383
Proposed Actual Total Site Trips(Filings 1-3) 772 DU 94 288 382 318 187 505 5,863
Difference(Proposed-Approved) (69) DU (14) (28) (42) (28) (21) (49) (170)
Note(s):
(1)Trip generation based on the Institute of Transportation Engineers' Trip Generation Manual, 10th Edition
(2)Trip generation based on the Institute of Transportation Engineers' Trip Generation Manual,11th Edition
9
Bloom (Mulberry)
Filing 3 Traffic Memorandum
Analysis of Future Conditions with Filing 3 Site Development
Total Future 2023 Operational Analysis with Proposed Development
Future levels of service with the proposed development plan were estimated based on the future traffic
volumes shown on Figure 4 and the HCM 6th methodologies for signalized and unsignalized intersections.
The results of these analyses are provided in Attachment II and presented in Table 4 and Table 5.
As shown in Table 4, levels of service under future site development conditions for the Frontage
Road/Greenfields Drive and International Drive/Greenfields Drive intersections are projected to operate at
LOS "A" in the AM and PM peak hours in 2023.
The International Drive/Greenfields Drive intersection is forecasted to operate acceptably as a two-way
STOP controlled intersection as shown herein and within the MTIS. As noted in the MTIS this intersection
is shown on the Master Street Plan as a roundabout. It was likely assumed that such control would be
necessary at the intersection of two arterials. As shown in the MTIS and herein trips to and from the
eastern approach of this intersection are forecasted to be minor. The volumes shown herein and the
MTIS would not necessitate the need for improvements.
As an additional check regarding the operations of the future International Drive/Greenfields Drive
intersection a Peak Hour signal warrant was performed for 2023 conditions. The Manual on Uniform Traffic
Control Devices 2009 Edition (MUTCD) provides a nine (9) distinct warrants for determining the
appropriateness of a traffic signal as an operational improvement for an intersection. Due to the availability
of the data from this traffic study, Warrant 3— Peak Hour warrant, although not the proper warrant for this
intersection, was considered to confirm the use of a traffic signal as an improvement for the above
intersection. As shown below in Figure 5, significant growth would need to occur before a signal would be
warranted.
Total future queues were forecasted using Synchro software. The results of the queuing analysis are
summarized in Table 5. As shown in Table 5, vehicle queues are forecasted to remain within their
proposed effective storage.
As shown in Table 4, levels of service under future site development conditions for the left turn
movements at the Sykes Drive/Timberline Road intersection are projected to operate at LOS "F" in the
AM and PM peak hours in 2023, however queues are contained within their effective storage, and
operations do not warrant a signal for 2023 as shown in the MTIS.
Conclusions and Recommendations
Conclusions
• Filing 3 of the Bloom Subdivision is consistent with the assumptions and analysis found within the
Bloom Subdivision (Mulberry) Master TIS.
• The existing volumes found in the MTIS are approximately 7%greater than a recent data collection
with the nearby Montava development. The existing conditions analysis should be considered
conservative and valid.
10
Bloom (Mulberry)
Filing 3 Traffic Memorandum
• The first three filings of the Bloom development were approved/proposed with 69 fewer dwelling
units than studied in the MTIS. This represents 42 fewer AM peak hour and 49 fewer PM peak hour
trips than studied.
Under 2023 total future traffic conditions with development of Filing 3 of the site, the study
intersections would operate at overall acceptable levels of service consistent with the findings of
the Bloom Subdivision (Mulberry) Master TIS.
® No additional improvements or signalization would be required with the approval of Filing 3.
Recommendations
• The Applicant should provide discussed roadway connections constructed to their ultimate
geometry to provide access for Filing 3 development consistent with the recommendations of the
Bloom Subdivision (Mulberry) TIS.
11
Figure 5 AM and PM Signal Warrants 2023 International/Greenfie/ds
Warrants Summary Report
4: Greenfield Dr& International Dr 2023 AM
Intersection Information
Major Street Minor Street
Street Name Greenfield Dr International Dr
Direction NB/SB EB/WB
Number of Lane: 2 2
Approach Speed 30 30
Warrant Met? Notes
Warrant 1, Eight-Hour Vehicular Volume
No
Condition A or B Met' No 0 Hours met (8 required)
Condition A and B ME No 0 Hours met (8 required)
Warrant 2, Four-Hour Vehicular Volume
No 0 Hours met (4 required)
Warrant 3, Peak Hour
No
Condition A Met? No 0 Hours met (1 required)
Condition B Met? No 0 Hours met (1 required)
Warrant 4, Pedestrian Volume
No
Peds > 100 Conditior No 0 Hours met (4 required)
Peds > 190 Conditior No 0 Hours met (1 required)
Warrant 5, School Crossing
No
Federal 2003 1 8/17/2021
Figure 5 AM and PM Signal Warrants 2023 International/Greenfie/ds
Warrants Summary Report
4: Greenfield Dr& International Dr 2023 AM
Warrant 6, Coordinated Signal System
No
Warrant 7, Crash Experience
No
Traffic Volume Condi No 0 Hours met (8 required)
Ped Condition? _ No 0 Hours met (8 required)
Warrant 8, Roadway Network
Federal 2003 2 8/17/2021
Figure 5 AM and PM Signal Warrants 2023 International/Greenfields
Warrants Summary Report
4: Greenfield Dr& International Dr 2023 PM
Intersection Information
Major Street Minor Street
Street Name Greenfield Dr International Dr
Direction NB/SB EB/WB
Number of Lane: 2 2
Approach Speed 30 30
Warrant Met? Notes
Warrant 1, Eight-Hour Vehicular Volume
No
Condition A or B Met' No 0 Hours met (8 required)
Condition A and B ME No 0 Hours met (8 required)
Warrant 2, Four-Hour Vehicular Volume
No 0 Hours met (4 required)
Warrant 3, Peak Hour
No
Condition A Met? No 0 Hours met (1 required)
Condition B Met? No 0 Hours met (1 required)
Warrant 4, Pedestrian Volume
No
Peds > 100 Conditior No 0 Hours met (4 required)
Peds > 190 Conditior No 0 Hours met (1 required)
Warrant 5, School Crossing
No
Federal 2003 1 8/17/2021
Figure 5 AM and PM Signal Warrants 2023 International/Greenfie/ds
Warrants Summary Report
4: Greenfield Dr& International Dr 2023 PM
Warrant 6, Coordinated Signal System
No
Warrant 7, Crash Experience
No
Traffic Volume Condi No 0 Hours met (8 required)
Ped Condition? _ No 0 Hours met (8 required)
Warrant 8, Roadway Network
Federal 2003 2 8/17/2021
Table 4
Bloo
Total Future Intersection Level of Service Summary(1)(2)
Existing 2021 Background 2023 To at Future 2023
Intersection Condition Name Movement PeakMour Peapk Hour Pea I Hour Peak Hour Peak Hour Peak Ho.,
1 Sykes Dr/Timbedine Rd STOP EB C 115.11 B[12.21 C 115.61 B 12.4 C[17.11 B l
Sykes Or EBL C[23.7] D[26.6] C[25.01 D[27.8] D[34.91 F[51.3]
EBTR B[13.61 B[10.5] B[13.91 B.[10.6] B[13.91 B 110.61
WB D[28.11 D f29.91 D f30..41 D f31.81 E f47.01 F f73.51
Sykes Or WBL E[35.31 E[35.1] E[38.6] E[37.5] F[84.5] F[129.1]
WBTR A[9.8] B[11.2] A[9.9] B[11.31 B[10.71 B[12.21
NB A FO.31 A[1.01 A[0.31 A.[1.01 A[0.31 A10.91
Timberline Rd NBL A[8.9] A[8.2] A[9.0] A[8.3] A[9.0] A[8.3]
NBT A[0.0] A[0.0] A[0.0] A[0.0] A[0.0] A[0.0]
NBR A[0.0] A[0.0] A[0.0] A[0.0] A[0.01 A[0.0]
SB A[0.21 A III A[0.21 A,[0._] A[0.61 A 12.61
Timberline Rd SBL A[8.0] A[8.7] A[8.0] A 18.71 A[8.1] A[9.5]
SBTR A[0.01 A10:01 A[0.01 A10.01 A[0.01 A10.01
2 Vine Dr/Greenfields Or STOP EB A l A 10.61 A[008[ A[0.81 n/a n/a
Vine.Or EBL A[7.9] A[7.8] A[7.9] A[7.8] n/a rate
EST A[0.0] A[0.0] A[0.0] A[0.0] n/a n/a
Vine Or WB A FO.01 A[0.01 A[0.01 A.[0.01. n/a all
WBTR A[0.0] A[0.0] A[0.0] A[0.0] n/a n/a
SB BI10.81 13110.81 B Ill B 1`10.91 n/a We
Greenfields Dr SBL B[12.31 B[13.1] 8[12.5] B[13.4] n/a n/a
SBR A[10.01 A[9.6] A[10.0] A[9.6] We n/a
Greenfields Ct Access added
STOP EB rate n/a n/a We Al Aill
Vine Or EBL We n/a n/a n/a A[7.9] A[7.9]
EBTR n/a n/a We n/a A[0.0] A.(0.0)
KB n/a We n/a n/a A[0.01 A
Vine Or WBL No ale n/a n/a A[0.0] A[0.01
WBTR nla n/a n/a We A[0.0] A[0.0]
NB n/a We n/a We A[0.01 A[0.01
Greenfields Ct NBL No n/a n/a n/a A[0.0] A[0.0]
NBTR nla We n/a n/a A[0.0] A[0.0)
SB n/a L n/a r a BB11111 BB1131
Greenfields Ct SBL n/a We Na Na B[13.01 B[14.21
SBTR n/a n/a n/a Na B[10.11 A[9.8]
3 Frontage Rd/Greenfields Ct STOP EB A 6.8 A 6.9 A[6.81 A 6.9 No We
Frontage Rd EBTR A[6.8] A[6.9] A[6.8] A[6.9] rate n/a
Frontage Rd WB A[7.61 A[7.91 A Z6 A 17.91 n/a n/a
W BLT A[7.6] A[7.8] A[7.6] A[7.8[ n/a n!a
Greenfields Ct NB A 63 A[6.91 A 6.7 A.f6.91, nla n/a
NBLR A[6.7] A[6.9] A[6.7] A[6.9] n/a n/a
GreenSelds Gf Access added
Roundabout constructed CIRCLE EB n/a rate n/a We A 3L.61 A[3.71
Frontage Rd EBLTR n/a We n/a We A[3.6] A[3.7]
Frontage Rd WB n/a n/a n/a n/a A[3_3[ Af4.,
W BLTR n/a We n/a We A[3.3] A[4.11
NB n/a We We We Af2.91 Af3.71
Greenfields Ct NBLTR n/a We We n/a A[3.0] A[3.91
NBR n/a n/a n/a n/a A[2.8] A[2.9]
SB n/a Na n/a n/a A[4.01 A[3.61
Greenfields Ct SBLT n/a n/a n/a n/a A[4.0] A[3.6]
SBR No We n/a n/a A[2.7] A[2.8]
Overall n/a n/a n/a n/a A[3.61 A[3.81
4 International Dr/Private.Dr/Greenfields Ct STOP EB n/a n/a n/a We A 9l A19_81
International Dr EBL n/a n/a Into Na A[0.0] A[0.0]
EBTR. alto We We n/a A[9.1] A[8.81
M n/a n/a n/a n/a A f0.01 A[0.01
Private Dr WBL No n/a n/a n/a A[0.0] A10.01
WBTR nla n/a n/a n/a A[0.0] A[0.0]
NB n/a We n/a We A F5.41 A f5.51
Greenfields Ct NBL n/a We n/a n/a A[7.4] A[7.5]
NBTR nla n/a nta No A[0.01 A 10.01
SB n/a n/a n/a n/a A Ol A Of_.O]
Greenfields Ct SBL n/a n/a n/a n/a A[0.0] A[0.0]
SBTR ruin n/a We We A[0.0] A[0.0]
5 Mulberry St/Greenfields Ct Signal EB B 11.1 D 43.6 B 11.3 E 55.7 n/a We
Mulberry St EEL C(20.8) B(10.2) C(22.4) B.(10.8) We n/a
EBT B(11.0) D(45.8) B(11.2) E(58.4) n/a n/a
EBR A(7.6) A(7.8) A(7.5) A(7.8) We n/a
WB C(25.6) B(13.61 C(31.5) B 14.0 n/a We
Mulberry St WBL A(8.2) C(27.1) A(8.4) C(27.1) n/a Na
WET C(26.1) B(12.7) C(32.2) B(13.2) n/a nla
WBR A(6.7) A(6.8) A(6.6) A(6.8) n/a Na
NB C 31.9 C 34.1 C(32.2) C(34.1) n/a n/a
Greenfields Ct NBL C(31.3) C(34.7) C(31.6) C(34.7) n/a all
NBTR C(32.5) C(33.5) C(32.8) C(33.5) We n/a
Greenfields Ct SB C(30.7) D(43.41 C(31.0) D(43.41 n/a n/a
SBLTR C 30.7 D 43.4 C 31.0 D(43.4) n/a Na
Overall C(21.0) C(31.9) C(24.6) D(39.5) n/a n/a
SB Greenfields Ct Lane Improvements
Signal EB n/a We n/a We B(14.5) B(14.5)
Mulberry St EBL We We We n/a B(16.0) A(8.0)
EBT We n/a n/a n/a B T4.6) B(15.0)
EBR Na We r la el B(11.6) A(8.2)
KB n/a We n/a n/a B(19.51 B(11.71
Mulberry St WBL n/a n/a n/a No B(11.1) B(18.4)
WET n/a n/a n/a n/a B(19.8) B(11.3).
WBR me nto We We A(0.0) A(0.0)
NB n/a We n/a n/a C(28.3) C(30.51
Greenfields Ct NBL n/a n/a n/a n/a C(28.2) C(30.8)
NBTR n/a We n/a n/a C(28.3) C(30.3)
SB We n/a n/a n/a C(31.8) CC l
Greenfields Ct SBL n/a n/a n/a n/a C(32.3) C(34.0)
SBTR n/a n/a n/a We C 25.3 C 26.6
Overall n/a n/a n/a n/a B(18.9) B(15.1)
Notes: (1)Numbers In brackets 8 represent delay at unsignallzed Intersections In second,per vehicle.
(2)Numbers.In parenthesis()represent delay at signalizetl Intersections in second,per vehicle.
Table 5
Bloom
Total Future Intersection Queueing Summa 1
Existing 2021 Background 2023i
Operating
Intersection Condition Name Movement Storage Peak Hour Peak Hour Peak Hour Peak Hour Peak Hour Peak Hour
1 Sykes Dr/Timberline Rd STOP EBL 130 2.5 2.5 2.5 2.5 5 5
Sykes Dr EBTR - 7.5 5 10 5 10 5
Sykes Dr WBL 200 45 35 50 37.5 132.5 127.5
WBTR - 2.5 2.5 2.5 2.5 15 12.5
NBL - 0 5 0 5 0 5
Timberline Rd NBT - 0 0 0 0 0 0
NBR 375 0 0 0 0 0 0
Timberline Rd SBL 145 0 2.5 0 2.5 2.5 12.5
SBTR - 0 0 0 0 0 0
2 Vine Dr/Greenfields Dr STOP EBL 30r- 0 2.5 0 2.5 We n/a
Vine Dr EBT - 0 0 0 0 n/a n/a
Vine Dr WBT - 0 0 0 0 n/a n/a
Greenfields Dr SBL - 2.5 2.5 2.5 2.5 n/a n/a
SBR - 2.5 2.5 2.5 2.5 n/a n/a
Greenfields Ct Access added
STOP Vine Dr EBL 300 n/a n/a n/a n/a 0 2.5
EBTR - n/a n/a n/a n/a 0 0
Vine Dr WBL 250 n/a We n/a n/a 0 0
WBTR - n/a n/a n/a n/a 0 0
Greenfields Ct NBL 100 n/a n/a n/a n/a 0 0
NBTR - n/a n/a n/a n/a 0 0
Greenfields Dr SBL - n/a n/a n/a n/a 2.5 2.5
SBTR - n/a n/a n/a n/a 2.5 2.5
3 Frontage Rd/Greenfields Ct STOP Frontage Rd EBTR - 2.5 5 2.5 5 n/a n/a
Frontage Rd WBLT - 7.5 10 7.5 10 n/a n/a
Greenfields Ct NBLR - 2.5 2.5 2.5 2.5 n/a n/a
Greenfields Ct Access added
Roundabout constructed CIRCLE Frontage Rd EBLTR n/a n/a n/a n/a 0 0
Frontage Rd WBLTR - n/a n/a n/a n/a 0 0
Greenfields Ct NBLTR - n/a n/a n/a n/a 0 25
Greenfields Ct SBLTR - n/a n/a n/a n/a 25 0
4 Intemational Dr/Private Dr/Greenfields Ct STOP EBL 100 n/a n/a n/a n/a 0 0
International Dr EBTR - n/a n/a n/a n/a 12.5 7.5
Private Dr WBL 100 n/a n/a n/a n/a 0 0
WBTR - n/a n/a n/a n/a 0 0
Greenfields Ct NBL 100 n/a n/a n/a n/a 2.5 7.5
NBTR - n/a n/a n/a n/a 0 0
Greenfields Ct SBL 100 n/a n/a n/a n/a 0 0
SBTR - n/a n/a n/a n/a 0 0
5 Mulberry St/Greenfields Ct Signal EBL 185 12 15 12 15 n/a n/a
Mulberry St EBT - 254 850 268 900 n/a n/a
EBR 280 15 18 15 18 n/a n/a
WBL 575 21 71 21 71 n/a n/a
Mulberry St WBT - 756 378 804 402 n/a n/a
WBR 240 0 0 0 0 n/a n/a
Greenfields Ct NBL 210 86 102 86 102 n/a n/a
NBTR - 42 48 42 48 n/a n/a
Greenfields Ct SBLTR - 56 146 56 146 n/a n/a
SB Greenfields Ct Lane Improvements
Signal EBL 360 n/a n/a n/a n/a 11 14
Mulberry St EBT - n/a n/a n/a n/a 206 376
EBR 280 We n/a n/a n/a 19 18
WBL 575 n/a n/a We n/a 30 56
Mulberry St WBT - n/a n/a n/a n/a 468 214
WBR - n/a n/a n/a n/a 3 24
Greenfields Ct NBL 210 n/a n/a n/a n/a 95 101
NBTR - n/a n/a n/a n/a 42 48
Greenfields Ct SBL - n/a n/a n/a n/a 80 79
SBTR - n/a n/a n/a n/a 44 53
Notes: (1)Queue length is based on the 95th percentile queue as reported by Synchro,Version 10.
Bloom (Mulberry)
Filing 3 Traffic Memorandum
Attachment I
Filing 3 Site Plan
VIGNETTE
stud i o s
PROPERTY DESCRIPTION Planning - Landscape Architecture - Graphics
— ---------------- ---' 71. _ _I
' _ _________ ________ _ __ ____ __ _ ___ — A parcel of land located in the Southwest Quarter SW1/4 of Section Nine (9), Township Seven North T.7.N. Range Sixtynine West
____ r _ _
p ( ) ( ) P ( ) 9 - PO Box 1889
i (R.69.W.), of the Sixth Principal Meridian (6th P.M), City of Fort Collins, County of Larimer, State of Colorado Fort Collins, Colorado 80522-1889
970.472.9125 T
970.494.0728 F
www.vignettestudios.com
SITE PLAN NOTES
1. REFER TO FINAL UTILITY PLANS FOR EXACT LOCATIONS AND CONSTRUCTION INFORMATION FOR STORM DRAINAGE STRUCTURES, UTILITY
�• i \`i I MAINS AND SERVICES, PROPOSED TOPOGRAPHY, STREET IMPROVEMENTS.
2. REFER TO THE SUBDIVISION PLAT AND UTILITY PLANS FOR EXACT LOCATIONS,AREAS AND DIMENSIONS OF ALL EASEMENTS, LOTS,TRACTS,
I i! STREETS,WALKS AND OTHER SURVEY INFORMATION.
MOSAIC i BLOOM FILING -- i i FUTURE BLOOM
LMN ZONING 3. THE PROJECT SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE FINAL PLANS.AMENDMENTS TO THE PLANS MUST BE REVIEWED AND
ONE - -_-- y j;` DEVELOPMENT APPROVED BY THE CITY PRIOR TO THE IMPLEMENTATION OF ANY CHANGES TO THE PLANS.
�> i LMN ZONING i i, LMN ZONING
1 ; j 4. ALL ROOFTOP AND GROUND MOUNTED MECHANICAL EQUIPMENT MUST BE SCREENED FROM VIEW FROM ADJACENT PROPERTY AND PUBLIC
---------- _______ STREETS. IN CASES WHERE BUILDING PARAPETS DO NOT ACCOMPLISH SUFFICIENT SCREENING,THEN FREE-STANDING SCREEN WALLS
MATCHING THE PREDOMINANT COLOR OF THE BUILDING SHALL BE CONSTRUCTED. OTHER MINOR EQUIPMENT SUCH AS CONDUIT, METERS AND
PLUMBING VENTS SHALL BE SCREENED OR PAINTED TO MATCH SURROUNDING BUILDING SURFACES.
O 5. ALL CONSTRUCTION WITH THIS DEVELOPMENT PLAN MUST BE COMPLETED IN ONE PHASE UNLESS A PHASING PLAN IS SHOWN WITH THESE
..5„!,,° 1`< PLANS.
a �I �i ��('+ \ � 6. ALL EXTERIOR LIGHTING PROVIDED SHALL COMPLY WITH THE FOOT-CANDLE REQUIREMENTS IN SECTION 3.2.4 OF THE LAND USE CODE AND
- SHALL USE A CONCEALED, FULLY SHIELDED LIGHT SOURCE WITH SHARP CUT-OFF CAPABILITY SO AS TO MINIMIZE UP-LIGHT, SPILL LIGHT,
GLARE AND UNNECESSARY DIFFUSION.
l BLOOM FILING PARK AREA
1 TWO i I 7. SIGNAGE AND ADDRESSING ARE NOT PERMITTED WITH THIS PLANNING DOCUMENT AND MUST BE APPROVED BY SEPARATE CITY PERMIT PRIOR
LMN ZONING i TO CONSTRUCTION. SIGNS MUST COMPLY WITH CITY SIGN CODE UNLESS A SPECIFIC VARIANCE IS GRANTED BY THE CITY.
8. FIRE HYDRANTS MUST MEET OR EXCEED POUDRE FIRE AUTHORITY STANDARDS. ALL BUILDINGS MUST PROVIDE AN APPROVED FIRE
EXTINGUISHING SYSTEM.
"—INTERNATIONAL BLVD 9. ALL BIKE RACKS PROVIDED MUST BE PERMANENTLY ANCHORED.
10. ALL SIDEWALKS AND RAMPS MUST CONFORM TO CITY STANDARDS. ACCESSABLE RAMPS MUST BE PROVIDED AT ALL STREET AND DRIVE
e { INTERSECTIONS AND AT ALL DESIGNATED ACCESSABLE PARKING SPACES. ACCESSABLE PARKING SPACES MUST SLOPE NO MORE THAN 1:48 IN
ANY DIRECTION. ALL ACCESSIBLE ROUTES MUST SLOPE NO MORE THAN 1:20 IN DIRECTION OF TRAVEL AND WITH NO MORE THAN 1:48 CROSS
SLOPE.
- I I 11. COMMON OPEN SPACE AREAS AND LANDSCAPING WITHIN RIGHT OF WAYS,STREET MEDIANS,AND TRAFFIC CIRCLES ADJACENT TO COMMON
- -:- I OPEN SPACE AREAS ARE REQUIRED TO BE MAINTAINED BY A PROPERTY OWNERS'ASSOCIATION.THE PROPERTY OWNERS'ASSOCIATION IS
i RESPONSIBLE FOR SNOW REMOVAL ON ALL ADJACENT STREET SIDEWALKS AND SIDEWALKS IN COMMON OPEN SPACE AREAS.
U 12. DESIGN AND INSTALLATION OF ALL PARKWAY/TREE LAWN AND MEDIAN AREAS IN THE RIGHT-OF-WAY SHALL BE IN ACCORDANCE WITH CITY
cn STANDARDS. UNLESS OTHERWISE AGREED TO BY THE CITY WITH THE FINAL PLANS,ALL ONGOING MAINTENANCE OF SUCH AREAS IS THE
j d { RESPONSIBILITY OF THE OWNER/DEVELOPER.
BARKER PROPERTY - ' - - { - W
INDUSTRIAL ZONING O 'ILL a. 13. THE PROPERTY OWNER FOR EACH RESIDENTIAL LOT IS RESPONSIBLE FOR SNOW REMOVAL ON ALL STREET SIDEWALKS ADJACENT TO EACH
(COUNTY) I _.._... �. _._ _ _. Jw
RESIDENTIAL LOT.
L
I FUTURE BLOOM
O _ _ _ I I FILING FOUR C7 14. PRIVATE CONDITIONS,COVENANTS,AND RESTRICTIONS(CC&R'S), OR ANY OTHER PRIVATE RESTRICTIVE COVENANT IMPOSED ON
LANDOWNERS WITHIN THE DEVELOPMENT, MAY NOT BE CREATED OR ENFORCED HAVING THE EFFECT OF PROHIBITING OR LIMITING THE
MMN ZONING INSTALLATION OF XERISCAPE LANDSCAPING, SOLAR/PHOTO-VOLTAIC COLLECTORS(IF MOUNTED FLUSH UPON ANY ESTABLISHED ROOF LINE),
- i UNDEVELOPED CLOTHES LINES(IF LOCATED IN BACK YARDS), ODOR-CONTROLLED COMPOST BINS,OR WHICH HAVE THE EFFECT OF REQUIRING THAT A
BLOOM FILING COMMERCIAL PORTION OF ANY INDIVIDUAL LOT BE PLANTED IN TURF GRASS.
THREE Q
ZONING 15. ANY DAMAGED CURB, GUTTER AND SIDEWALK EXISTING PRIOR TO CONSTRUCTION,AS WELL AS STREETS, SIDEWALKS, CURBS AND GUTTERS,
(COUNTY) DESTROYED, DAMAGED OR REMOVED DUE TO CONSTRUCTION OF THIS PROJECT,SHALL BE REPLACED OR RESTORED TO CITY OF FORT
ai
L_" s Q o COLLINS STANDARDS AT THE DEVELOPER'S EXPENSE PRIOR TO THE ACCEPTANCE OF COMPLETED IMPROVEMENTS AND/OR PRIOR TO THE
I ISSUANCE OF THE FIRST CERTIFICATE OF OCCUPANCY.
" .r . ...................... ......................................... ......
- � � � 16. FIRE LANE MARKING:A FIRE LANE MARKING PLAN MUST BE REVIEWED AND APPROVED BY THE FIRE OFFICIAL PRIOR TO THE ISSUANCE OF ANY
� � I CERTIFICATE OF OCCUPANCY.WHERE REQUIRED BY THE FIRE CODE OFFICIAL,APPROVED SIGNS OR OTHER APPROVED NOTICES THAT
_ I I INCLUDE THE WORDS NO PARKING FIRE LANE SHALL BE PROVIDED FOR FIRE APPARATUS ACCESS ROADS TO IDENTIFY SUCH ROADS OR
PROHIBIT THE OBSTRUCTION THEREOF.THE MEANS BY WHICH FIRE LANES ARE DESIGNATED SHALL BE MAINTAINED IN A CLEAN AND LEGIBLE
CONDITION AT ALL TIMES AD BE REPLACED OR REPAIRED WHEN NECESSARY TO PROVIDE ADEQUATE VISIBILITY.
i 17. PREMISE IDENTIFICATION:AN ADDRESSING PLAN IS REQUIRED TO BE REVIEWED AND APPROVED BY THE CITY AND POUDRE FIRE AUTHORITY
PRIOR TO THE ISSUANCE OF ANY CERTIFICATE OF OCCUPANCY. UNLESS THE PRIVATE DRIVE IS NAMED, MONUMENT SIGNAGE MAY BE L
o� p REQUIRED TO ALLOW WAY FINDING.ALL BUILDINGS SHALL HAVE ADDRESS NUMBERS, BUILDING NUMBERS OR APPROVED BUILDING
IDENTIFICATION PLACED IN A POSITION THAT IS PLAINLY LEGIBLE,VISIBLE FROM THE STREET OR ROAD FRONTING THE PROPERTY,AND
j I ,4:s". ;, I POSTED WITH A MINIMUM OF SIX INCH NUMERALS ON A CONTRASTING BACKGROUND.WHERE ACCESS IS BY MEANS OF A PRIVATE ROAD AND O
I THE BUILDING CANNOT BE VIEWED FROM THE PUBLIC WAY,A MONUMENT, POLE OR OTHER SIGN OR MEANS SHALL BE USED TO IDENTIFY THE Q
r..
I +t''`- i STRUCTURE.
�t< < 18. ^
CONTRACTOR SHALL COORDINATE WITH THE CITY OF FORT COLLINS BUILDING DEPARTMENT PRIOR TO WALL CONSTRUCTION.A BUILDING V) a
i I PERMIT MAY BE REQUIRED FOR CONSTRUCTION OF WALLS.
* i z ..0L
___ I__DONELLA DRIVE ___ __ LANDUSE TABLE
EXISTING ZONING LMN/MMN/PUD L.L
SITE AREA AREA ACRES
i \ GROSS 712,642 SF z 16.36 AC± .,
FUTURE BLOOM
NET 712,642 SF 16.36 AC± ■ W >-
� � �
DEVELOPMENT AREA COVERAGE (NET) AREA PERCENT
MMN ZONING _ PUBLIC ROW 0 SF 0.0% ^ z
MIXED INDUSTRIAL \ I, PARKING & DRIVES 224,486 SF 31.5% L.L
ZONING (COUNTY) I � BUILDINGS 164,845 SF 23.1% � O
I MULTIFAMILY BUILDINGS 142,725 SF J O
1 COMMUNITY BUILDING 5,680 SF r ,
GARAGES 16,440 SF W
CONTEXT DIAGRAM SCALE 1 99200, LANDSCAPE AREA 323,311 SF 45.4% > N
ACTIVE PARK AREA 85,112 SF 1 ' ' LL
TOTAL 712,642 SF Q O
DWELLING UNITS >-
SIGNATURES SIGHT DISTANCE EASEMENT NOTES VICINITY MAP MULTI-FAMILY 360 0
OWNER'S CERTIFICATION SCALE 1"=2000'APPROXIMATE NORTH DENSITY
SIGHT DISTANCE EASEMENT-THE SIGHT DISTANCE EASEMENT IS AN EASEMENT REQUIRED BY THE CITY AT
THE UNDERSIGNED DOES/DO HEREBY CERTIFY THAT I/WE ARE THE LAWFUL OWNERS OF SOME STREET INTERSECTIONS WHERE IT IS NECESSARY TO PROTECT THE LINE OF SIGHT FOR A MOTORIST GROSS 22.00 DU/AC Uj
REAL PROPERTY DESCRIBED ON THIS SITE PLAN AND DO HEREBY CERTIFY THAT I/WE NEEDING TO SEE APPROACHING TRAFFIC AND TO REACT SAFELY FOR MERGING THEIR VEHICLE INTO THE NET 22.00 DU/AC 0
ACCEPT THE CONDITIONS AND RESTRICTIONS SET FORTH ON SAID SITE PLAN. TRAFFIC FLOW.THE FOLLOWING ARE REQUIREMENTS FOR CERTAIN OBJECTS THAT MAY OCCUPY ASIGHT DISTANCE EASEMENT FOR LEVEL GRADE: O
(1)STRUCTURES AND LANDSCAPING WITHIN THE EASEMENT SHALL NOT EXCEED(24)INCHES IN HEIGHT VINE DRIVE FLOOR AREA RATIO
WITH THE FOLLOWING EXCEPTIONS. BUILDING AREA (BUILDINGS AND GARAGES) 450,295 SF O
SITE AREA 712,642 SF U_
A)FENCES UP TO 42 INCHES IN HEIGHT MAY BE ALLOWED AS LONG AS THEY DO NOT OBSTRUCT THE > FLOOR AREA RATIO 0.63
OWNER DATE LINE OF SIGHT FOR MOTORISTS Q
B)DECIDUOUS TREES MAY BE ALLOWED AS LONG AS ALL BRANCHES OF THE TREES ARE TRIMMED SO Z <��CT JOB NO: 25028
THAT NO PORTION THEREOF OR LEAVES THEREON HANG LOWER THAN (6)FEET ABOVE THE W �� ACAD FILE: 25028PDP3
NOTARY CERTIFICATE GROUND,AND THE TREES ARE SPACED SUCH THAT THEY DO NOT OBSTRUCT LINE OF SIGHT FOR m SHEET INDEX
STATE OF COLORADO ss.) MOTORISTS. DECIDUOUS TREES WITH TRUNKS LARGE ENOUGH TO OBSTRUCT THE LINE OF SIGHT t g NORTHERN DRAWN: TXH
COUNTY OF ) FOR MOTORISTS SHALL BE REMOVED BY THE OWNER. 3 S01 COVER SHEET CHECKED: TCH
"I B'"a SITE LOCATION S02 SITE PLAN OVERALL ISSUE DATE: August 31, 2022
SUBSCRIBED and sworn to before this day of 20 °ene °nn°Roe S03 SITE PLAN NORTH REVISIONS DATE
by. SO4 SITE PLAN SOUTH
WITNESS my hand and official seal. My commission expires: "yq Ne'ef 9 ""Ne5'ef$' S05 SITE PLAN DETAILS City Comments 5/2/23
we,°ke,Dr
v WM1ea1 L01 OVERALL LANDSCAPE PLAN
dB a L02 LANDSCAPE NOTES & HYDROZONE PLAN
Notary Public MULBERRY STREET L03 LANDSCAPE PLAN NORTH
DIRECTOR OF PLANNING % L04 LANDSCAPE PLAN MIDDLE NORTH
APPROVED BY THE DIRECTOR OF COMMUNITY DEVELOPMENT AND NEIGHBORHOOD zoa;e i°e°' L05 LANDSCAPE PLAN MIDDLE SOUTH
5` - L06 LANDSCAPE PLAN SOUTH
SERVICES OF THE CITY OF FORT COLLINS, COLORADO
�� - �, L07 LANDSCAPE DETAILS
ON THIS DAY OF 20 a p € -
B a,e B
°
SHEET TITLE:
MAINTENANCE OF COMMON ELEMENTS COVER SHEET
BeReY"
r -
A HOMEOWNERS ASSOCIATION OR OTHER APPROVED CITY ENTITY SHALL BE ESTABLISHED FOR THE DEVELOPMENT
DIRECTORS SIGNATURE AND SHALL BE RESPONSIBLE FOR THE CONTINUED MAINTENANCE OF ALL COMMON ELEMENTS.ALL OPEN SPACE
TRACTS, MEDIANS AND ROUND-A-BOUTS , ALL PRIVATE DRIVES, COMMUNITY FACILITIES, NATURAL HABITAT
Ken
BUFFERS,SHALL BE MAINTAINED BY THE HOMEOWNERS ASSOCIATION. SHEET NO:
Sol
LANDUSE TABLE VIGNETTE
EXISTING ZONING LMN/MMN/PUD studio s
SITE AREA AREA ACRES g - P Graphics
P annin Landscape Architecture -
GROSS 712,642 SF 16.36 AC± PO Box 1889
NET 712,642 SF 16.36 AC±
Fort Collins, Colorado 80522-1889
• I
-r IRR IRR IRR � \ y�' •.�$$
IRR R R IRR I I IRR A EA COVERAGE (NET) AREA PERCENT
- 970 472 9125 T
PUBLIC ROW 0 SF 0.0%
PARKING & DRIVES 224,486 SF 31 5% ww .vi 0728 F
_ _—_— _—_—_—_—_—_ INTERNATIONAL BOULEVARD BUILDINGS 164,845 SF 23.1% www•vignettestudios.tom
MULTIFAMILY BUILDINGS 142,725 SF
---- -- - CLIENT
------
-- -- I ( COMMUNITY BUILDING 5,680 SF
GARAGES 16,440 SF
---- - _______ LANDSCAPE AREA 323,311 SF 45.4%
ACTIVE PARK AREA 85,112 SF
j I TOTAL 712,642 SF
I I DWELLING UNITS
j BUILDING 14 I F _ MULTI-FAMILY 360
BUILDING 15 I F —BOILDING 13—
I � I
I DENSITY
GROSS 22.00 DU/AC
NET 22.00 DU/AC 0
j FLOOR AREA RATIO
_ I BUILDING AREA (BUILDINGS AND GARAGES) 450,295 SF
I I I LLLLL I I SITE AREA 712,642 SF
k_`J L�`l L_�I L��J L�_J L�J I�_
j IIr FLOOR AREA RATIO 0.63
I
66 ,
- ------ BUILDING SUMMARY
BUILDING STORIES QTY 1 BDR 2 BDR 3 BDR TOTAL
BUILDING TYPE III 3 5 0 60 60 120
- BUILDING TYPE II 3 5 60 60 0 120
/1HH1HULLLFF11L �w HiI � I
BUILDING TYPE 1 3 5 60 60 0 120
BUILDING 12 o r
I
91* BUILDING 10 I I TOTAL 15 120 180 60 360
I 11 BUILDING 11 BUILDING STORIES TYPE SQ. FT. 1 BDR 2 BDR 3 BDR TOTAL
HIM I
- - I BUILDING 1 3 3 10,945 0 12 12 24
BUILDING 2 3 2 8,800 12 12 0 24
BUILDING 3 3 1 8,800 12 12 0 24
- _ BUILDING 4 3 2 8,800 12 12 0 24
I BUILDING 5 3 3 10,945 0 12 12 24
- --------""- Eli 1111 BUILDING 6 3 2 8,800 12 12 0 24
0 BUILDING 7 3 1 8,800 12 12 0 24
BUILDING 8 3 1 8,800 12 12 0 24
j = ANGELA AVENUE — ji-------------- BUILDING 9 3 3 10,945 0 12 12 24
BUILDING 10 3 2 8,800 12 12 0 24
} + \ BUILDING 11 3 3 10,945 0 12 12 24
QQ BUILDING 12 3 1 8,800 12 12 0 24
�i�i�r ,x ;��°x �ilii�� � I BUILDING 13 3 1 8,800 12 12 0 24
BUILDING 14 3 3 10,945 0 12 12 24
BUILDING 15 3 2 8,800 12 12 0 24
W r"'r�-'r`- r,-I F"+r"'r`-'r"' Q TOTAL 142,725 120 180 60 360
N _
0 11 1
I = _
I ' w PLAY �LL REQUIRED PARKING
= BUILDING 8 UNIT TYPE QTY REQ. PARKING TOTAL
in 1 BDR 120 1.5 180
2 BDR 180 1.75 315
I - � 3 BDR 60 2 120
TOTAL 360 615
j141
POOL _ L
_ - I PROVIDED PARKIN
BUILDING 9 I � � PR� G
o BUILDING 7 O
I i STANDARD PARKING 503
- I LONG TERM PARKING 8 Q
I J Q I HANDICAP PARKING 29
M - TOTAL STANDARD PARKING 540
CLUBHOUSE C�
L. a I ON STREET PARKING 54 Z L.L
TOTAL 594 Q O
I y _
I J
J EXTERNAL GARAGES 60
` TOTAL 654 O
j = = BODE BOULEVARD — I _ ___ V
- REQURIED BIKE PARKING � � Z �
� _ I
BEDROOM COUNT QTY Uj
�rriil �IVI�I 660 660
II G I 60% COVERED 396 z
j I 40% FIXED 264 (30 RACKS, 9 PER RACK)
jMr. I R _ i PROVIDED BIKE PARKING J
BUILDING 5 ' _ 1 Uj (,)
PATIO STORAGE SHEDS 120 8 PER BUILDING
BUILDING 6 1 4
f i i i i BUILDING 4 EXTERNAL COVERED BIKE RACKS 279 (31 RACKS)9 PER RACK w 0
O FFFFFLJFfl_FAI GARAGE 60 1 PER GARAGE SPACE Q
j I i - w I TOTAL COVERED 459
FIXED RACK 207 (23 RACKS) 9 PER RACK
TOTAL 666 Uj U
e = I I NOTE: ALL PATIO STORAGE IS ON GROUND FLOOR UNITS AND IS IN ENCLOSED STORAGE 0
SHEDS O
0
T I l%7 LL.
SITE PLAN LEGEND
JOB NO: 25028
PROPERTY LINE
ACAD FILE:
BARK PARK
— UTILITY EASEMENT DRAWN: TXH
I — — LOT LINE CHECKED: TCH
ryl 1— I — — ISSUE DATE: August 31, 2022
BUILDING 3 � _ RIGHT OF WAY LINE
,p, REVISIONS DATE
BUFFER LINE
va BUILDING 2 — BUILDING 1 i _ LIMITS OF DISTURBANCE City Comments 5/2/23
_ I FLOWLINE, CURB&GUTTER
3 CENTERLINE
9 — Y
I o o PROPOSED WALK
I I
j t 4 � � � MATCHLINE
41
—�— j
J NEW 6'WOOD FENCE
IV
i — OPEN RAIL FENCE
I i I BUILDING ENVELOPE
191 5' A�_ SHEET TITLE:
—_ _-- „ DONELLA DRIVE 81'ROW — --�--� — -- -- -- -- --�— B BIKE RACK
— — — — — — —_� OVERALL SITE PLAN
9 I APPROXIMATE CENTER LINE 0���7I�l�f[J7=CQZI'EF�' — — — — — — — — — — — — — ���--�-� EV EV PARKING
C m CHARGING STATION NORTH
JUNCTION BOX
II EXISTING CONCRETE
SHEET NO:
II
0 35 70 140 S02
SCALE 1"=70'
y —inrt IRR IRR IRR V I G N E TT E
Ii IRR I R I R IRR I IRR
Q.
a - s t u d 1 o s
77,
p Planning - Landscape Architecture - Graphics
Q
PO Box 1889
INTERNATIONAL BOULEVAR , 84' ROW Fort Collins, Colorado 80522-1889
- - - - - - - -— - 970.472.9125 T
odero�� 970.472.9125 F
— — — — — — — — 20' ELCO EASEMEN 10' PARKWAY - - - - -
www.vignettestudios.com
o 6'WALK
15' UTILITY EASEMENT
N _ , CLIENT
-- --------- ---�-- ---------.I� ----- o---
o OR °
Li co a,
7-0 07
N o
B_
�i B 0 0
21.8' BUILDING 15 E ' BUILDING 14 I
I 3 TYPE II F TYPE III - - I F, EV
1.6'
12B/12A 12B/12C 5B lz EV
f7F iFi
28.0' 24 UNITS 24 UNITS W
F. 5 9' UTILITY E SE ENT
o C o C BIB ] C C 4G BUILDING 13
p l o �#; o 11 1 1 1 1 1 TYPE II
SIN I EV EV J 7 EV EV 15 EV EV `I 15 EV EV 12B/12A
o U I 24 UNITS 14P
d I 2 0' W � 14
Q 24. q o o 0
6 WALKS (T )
o
� 7.5' 0.0 9.
5 ~ - 2 BDR v
27.0' 1 I�'_��I I�'_��I I�'_s�l I�'_�I i i i O i i i 'i s
w I 2B 4G �_� L_j, 4G I__ j k._J L_A L_ �_� ADA
UNIT
o f � I _ 4G Eve Co
J Cp —
o Cm EV _ PHASE_2 N 81.01
+ 10F_'I F�-4'I F�-4' — 10 PHASE 1 F�� N
11 1ADAR( -EV ,C —
I I m UNIT + � � o — I{
I � m
dM
8 _ m
I U EV EV 14 0 11 �EV�EV�
I BUILDING 12 I
j I TYPE I I I I I I I C - - o N. C I I II
12A/12B °� BUILDING 10
— 3 BDR TYPE I o
24 UNITS � a
BUILDING 11 C ADA 12A/12B
6 17.0'f-26.0'-*17.0'60 E TYPE IV F, 9 24 UNITS
6 ATTACHED WALK AT — 12B/12C �' — O
PARKING (TYP u 9 _ 24 UNITS F'
- — co
9
F`
—EV , BDR SWINGING GATES
LIC
ADA Q
EV B UNIT 11.6' It
5 WALKS (TYP) -- -- -- Q I ACCESSIBLE PEDESTRIAN
— - - - - - - - 8 - - -
I_C IIIIII o o B B C 1 1 1 1 1 1 .5I j
�'- - � 46.5' ACCESS BOTH SIDES
REV\EV \N 1 1 EV\EV �0 7 5 51
5 Q
o ANGELA AVENUE _ _ _—_ _ 6 YARD TRASH s Z �
PLAZA WITH BENCHES (TYP) _ — - PRIVATE STREET _ - J O
J
5 \iQ \11 11 t \ 4 YARD RECYCLING o 0- 0
U
IIIIII �' 0'
-EV 1C cfl - _ 56 I 11 ■ Uj
- 5B - - EV o - - -
TRASH/ RECYCLING LOCATION (TYP) 4G 2 PICNIC PAVILION r �; 4G _ _ _ TYPICAL TRASH DUMPSTER ~
i F\ SCALE 1"- 10'
Lim
2 CHARCOAL GRILLS _
J O
ACTIVE OPEN SPACE/ PARK ' 221m B _ 0 16.0' I W U
AREA WITH CLUBHOUSE/ OPEN PLAY — 12 \\
LEASING CENTER I 6L AREA rD 7 >
55,407 SF 1.27 AC I i D O
o I I— �-
B -
TRICKLE PAN g 12 �$ENCH I
o GC EV BUILDING 8 0
oil _ EV C 12P U I--
2 BDR TYPE 111 o y ` ,
ADA EV / EV I LU V
UNIT 12B/12C
I 27.0--- 24 UNITS
C ,,,,,,,,�;Aum I BENCH 9 11 O
I
u _ — B*
o ll SITE PLAN LEGEND O
POOL °� 1 26.0'-4 LL
20' ANHEUSER BUSCH BUILDING 9 8
17- — I PROPERTY LINE
EASEMENT TYPE II _�1 BUILDING 7 UTILITY EASEMENT
JOB NO: 25028
12B/12A EV TYPE I I — — LOT LINE ACAD FILE: 25028PDP3
10' WALK I 0 24 UNITS 12 EV �\ ,B 1213/12A I I — — RIGHT OF WAY LINE DRAWN: TXH
P24 UNITS I BUFFER LINE CHECKED: TCH
4' ACCESS EASEMENT I I ,-� o o I _ LIMITS OF DISTURBANCE ISSUE DATE: August 31, 2022
(� - — MAIL KIOSK REVISIONS DATE
� m ,� CLUBHOUSE/ ' -� _9 i FLOWLINE,CURB&GUTTER
`�i ===� � m CENTERLINE City Comments 5/2/23
RETAINING WALL ,� LEASING � � 2 BDR
�4G CENTER E="� ADA I PROPOSED WALK
9' UTILTY EASEMENT I �_--=:a EV'P' UNIT
EV IC MATCHLINE
h � 4 " NEW 6'WOOD FENCE
C� EV B 2 — a O OPEN RAIL FENCE
5' DETACHED WALK (TYP) Ev
— B ' BUILDING ENVELOPE
B (I I I I I I X _C—rn o IIIIII I B BIKE RACK
COMMUNITY SIGN EV EV PARKING
6 g �� EV\EV N 12 I C CHARGING STATION SHEET TITLE:
C(i _ \ � JUNCTION BOX SITE PLAN NORTH
^ BODE BOULEVARD Iv — T I EXISTING CONCRETE NORTH
T;■ ■ i■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ � ■ ■ ■ ■ ■ ■ PRIVATESTREET I ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■oi ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ r■ ■ ■ ■ ■ o ■ ■ ■ ■ ■ ■ ■ : ■ ■ ■ ■ ■ ■ ■ ■ ■ � -- -
SHEET NO:
MATCHLINE SHEET 4 0 20 40 80
SCALE 1"=40' S03
rVIGNETTE
s t u d i o s
MATC H LI N E SHEET 3 Planning - Landscape Architecture - Graphics
PO Box 1889
91 — BODE BOULEVARD — _ _ Fort Collins, Colorado 80522-1889
I■ ■ ■ 0 ■ ■ ■ ■ ■ ■ ■ ol ■ ■ ■ ■ ■ ■ j ■ ■ I■ ■ ■ ■ PRIVATESTREET I ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■oi ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ �■ ■ ■ ■ ■ o ■ ■ ■ ■ ■ ■ ■ ■ � ■ ■ ■ ■ ■ ■ ■ ■ ■ �
_ 970.472.9125 T
\ �10 \11 \' / } 970.494.0728 F
5 C° www.vignettestudios.com
\\ \ N
5' DETACH Y
" IIIIII C o � CLIENT
c� EV 2 B B EV -
1C
EV - 2 EV
I 1 BDR 26.0'-fir B
UNIT ,�, BUILDING 5 ,
I F
n 9 � TYPE IV - F` —8 n 9 UTILITY E
20 ANHEUSER BUSCH :�4G 12B/12C - 4G l , i
EASEMENT , 24 UNITS 5B F,
_ I
BUILDING 6 ' BUILDING 4
10' WALK TYPE I �� C C TYPE I
4' ACCESS EASEMENT I 2 12ANIT tl o � o -- I I I I I I 12A/12B 6' WALKS (T P)
24 UNITS 24 UNITS 11.8
o 112 EV EV o ( , 131 EV EV
_J7
2- �� N)
9' UTILTY EASEMENT 8 - - _ — w
r 10
RETAINING WALL
0
8
5 DETACHED WALK (TYP) o B N
EV - IIIIII
C EV 141 4 — 18P
_ EV 6 mC
o EV 4G
23.
SH/ RECYCLING LOCATION (TYP) I 4G 2 �
f ` o
I i � 26l I�'_�I I�'_�I
4G C
8C
8 — . C)
B EV 4G ' EV —'—C� — �' I
EV
C y
0 2 BDR 0 -6 EV 9 F'
2 ADA � O
UNIT BARK PARK
— — 24.1' coTRICKLE PAN j >
ui 7 m
ACTIVE OPEN SPACE
20,532 SF 0.47 AC CC=
0 BUILDING 3 EV 'CEL TYPE BUILDIINB1
TYPE II III(B) �
12B/12A 17.0' 26.0'�E17.0' B B 17.0' -2G.0'- 17.0' 12B/12C I'
I 24 UNITS L 24 UNITS
o 10 I
— f - - 15 —10
m 9 O
I � = BUILDING 2 w I Q
g TYPE ME
U) Q
C1 EV EV 12A/12B EV V
0 0 EV EV �C 24 UNITS — 'C z
EV 3 < O
-J J
y v
- CO
3P
3P 4P LLI
5' WALK 00 9' UTILITY EASEMENJ
oD
DONELLA DRIVE MINOR COLLECTOR 81' ROW -I O
Lu U
Wo
I 0
I � �
Uj U
O0�
� O
SITE PLAN LEGEND 0- LL
PROPERTY LINE
JOB NO: 25028
UTILITY EASEMENT ACAD FILE: 25028PDP3
LOT LINE DRAWN: TXH
RIGHT OF WAY LINE CHECKED: TCH
BUFFER LINE ISSUE DATE: August 31, 2022
LIMITS OF DISTURBANCE REVISIONS DATE
FLOWLINE,CURB&GUTTER City Comments 5/2/23
CENTERLINE
PROPOSED WALK
MATCHLINE
NEW&WOOD FENCE
OPEN RAIL FENCE
BUILDING ENVELOPE
B BIKE RACK
SHEET TITLE:
EV EV PARKING
Cm CHARGING STATION SITE PLAN SOUTH
JUNCTION BOX
EXISTING CONCRETE NORTH
SHEET NO:
20 40 80 SO4
SCALE 1"=40'
Bloom
Filing 4 Traffic Memorandum
Attachment II
Excerpts from Bloom Subdivision (Mulberry)
Traffic Impact Study
Bloom
Fort Collins, CO
Executive Summary
Site Location and Study Area
The property that comprises the application area for the proposed development is approximately 235 acres
in size and is largely vacant. It is located east of Timberline Road, west of NW Frontage Road, south of
Vine Drive and north of Frontage Road.
The study area, as reviewed and agreed to by the City of Fort Collins (Staff), is generally bounded by the
site boundaries to the east and west, Vine Drive to the north, as well as Frontage Road to the south. The
study area for the project includes those intersections identified by Staff that could be affected by the
proposed development:
• Sykes Drive/Timberline Road
• Vine Drive/Greenfields Court/Greenfields Drive
• Frontage Road/Greenfields Court
• International Drive/Greenfields Court
• Mulberry Street/Greenfields Court
Description of Proposed Development
The Applicant, Hartford Homes, seeks to develop the property with a mix of commercial and residential
uses.A grid of streets is being proposed to tie into the existing network and facilitate access and circulation
throughout the site and to the existing network. In furtherance of the connectivity of the project the following
standard is included in the PUD language:
To the extent feasible, all development plans shall provide bicycle and pedestrian and/or vehicular
connection at all sub-arterial streets stubbed to the boundary of the development plan by previously
approved development plans or existing development.All development plans shall provide for future bicycle
and pedestrian and/or vehicular connections to adjacent developable parcels by providing a local street or
landscape tract connection spaced at intervals not to exceed six hundred sixty (660) feet along each
development plan boundary that abuts potentially developable or redevelop able land, to the extent
feasible. When adjacent to open space, natural areas, railroad tracks, or other similar natural or manmade
impediments that inhibit this standard from being met this standard is not required to be met.
Conclusions and Recommendations
Conclusions
Based on the results of this traffic impact study, the following may be concluded:
• Under existing traffic conditions, the stop-controlled intersections within the study area currently
operate at overall acceptable levels of service (LOS) "E" or better during the weekday AM and PM
peak hours.
• Under background future 2023 and 2030 traffic conditions, without the development of the subject
site, delays would increase slightly at study intersections due to regional traffic growth. The stop-
controlled intersections would continue to operate at LOS "D" or better with Sykes Drive operating
at capacity LOS "F" in the 2030 AM peak hours.
Galloway&Company, Inc.
Bloom
Fort Collins, CO
• The proposed site development would generate, upon completion and full occupancy, 1,569 new
weekday AM and 1,857 new weekday PM peak hour vehicle trips as well as 21,821 new weekday
daily trips.
• Under 2023 total future traffic conditions with development of Phase 1 of the site, all study
intersections, including proposed site connections would operate at overall acceptable levels of
service consistent with background conditions. The exception to this is the westbound left
movement at Sykes Drive/Timberline Road. A signal would not be warranted at this level of
forecasted volume. Phase 1 of the proposed development can be accommodated solely through
the connection at Sykes Drive through the Mosaic development and the extension of Greenfields
Court to the south via a newly constructed roundabout.
• Under 2030 total future traffic conditions the full buildout of the proposed development will be
accommodated by the proposed connections to the surrounding network. The exception to this is
the westbound left movement at Sykes Drive/Timberline Road.A signal would be warranted at this
level of forecasted volume.
• In 2040 long range conditions would be accommodated by the full buildout of the proposed network
with all study intersections operating at acceptable levels of service.
Recommendations
• During Phase 1 of development the Applicant should provide the following improvements to
accommodate site development:
o Construct Greenfields Court from Sykes Drive to the Frontage Road
o Improve the Greenfields Court/Frontage Road intersection to a roundabout with flared dual
lane approaches on the north and southbound approaches
o Provide connections to the west to connect to the Sykes Drive/Timberline Road intersection
• New roadways within the site should be constructed per the City of Fort Collins design guidelines
contained within the LCUASS and analyzed herein.
• It is recommended that as nearby pipeline development is constructed, and growth continues to
occur, signal warrant studies be conducted at Sykes Drive/Timberline Road to determine timing
and cost share for future signalization. At such a time where a signal is warranted at Sykes
Drive/Timberline Road or a filing is forecasted to trigger a warrant the Applicant should:
o Contribute to the signalization of Sykes Drive/Timberline Road intersection
• In order to accommodate development traffic north of the Great Western Railroad the Applicant
should provide the following improvements to accommodate site development:
o Construct Greenfields Court from Sykes Drive north to connect to Vine Drive
o Provide pedestrian and bicycle connection to facilitate access across the Great Western
Railroad
• During Phase 2 of the development contributions should be made to the improvement of Mulberry
Road/Greenfields intersections improvements.
Galloway&Company, Inc.
Bloom
Fort Collins, CO
II. Background Information
Study Area
During the scoping meeting the study area and study intersections were agreed upon. The agreed upon
scope of work form is provided as Appendix B. As discussed, and agreed upon, the traffic study focuses
primarily on the following intersections:
Study Intersections
• Sykes Drive/Timberline Road
• Vine Drive/Greenfields Court/Greenfields Drive
• Mulberry Frontage Road/Greenfields Court
• International Drive/Greenfields Court
• Mulberry Street/Greenfields Court
Study Assumptions
For purposes of this analysis only, the proposed uses are assumed to be built and occupied in two distinct
phases. It was assumed that Phase 1 uses would be built and operational in study year 2023 and the
remainder of the site would be developed by 2030. As requested by Staff, a long-term analysis of 2040 was
also provided. One pipeline development was identified that would utilize study intersections. The pipeline
development was assumed complete after the development of Phase 1 of the subject site.
Study Methodology
Synchro software version 11 was used to evaluate levels of service at each of the study intersections during
the weekday AM and PM peak hours. Synchro is a macroscopic model used for optimizing traffic signal
timing and performing capacity analyses. The software can model existing traffic signal timings or optimize
splits, offsets, and cycle lengths for individual intersections, an arterial, or a complete network. Synchro
allows the user to evaluate the effects of changing intersection geometrics, traffic demands, traffic control,
and/or traffic signal settings as well as optimize traffic signal timings.
The levels of service reported for the signalized and unsignalized intersections analyzed herein were taken
from the Highway Capacity Manual (HCM) 6th reports generated by Synchro 11. Level of service
descriptions are included in Appendix C. In order to maintain a conservative analysis a default percent
heavy vehicle (%HV)factor of 2%was used for all movements in the study area.
The LCUASS provides acceptable level of service(LOS)standards for the City of Fort Collins.The following
standards, provided by LCUASS in Chapter 4 — Transportation Impact Study Table 4-3, were used to
evaluate the results of the analysis contained herein:
Overall Any Approach Leg Any Movement
Signalized D E E
Unsignalized
• Arterial/Arterial E F
• Collector/Collector
Unsignalized D F
Roundabout E E E
Galloway&Company, Inc.
Bloom
Fort Collins, CO
Existing Roadway Network
Regional access to the subject site is provided by Interstate 25 and CO 14/Mulberry Street, and local access
is provided via Vine Drive and Sykes Drive via Timberline Road. Figure 2-1 depicts existing lane use and
traffic controls in the vicinity of the subject site.The following provides a description of each of the roadways
within the study network.
Vine Drive
Vine Drive is an undivided two-lane roadway. The posted speed limit is 45 mph in the vicinity of the subject
site.The roadway is classified by Larimer County as an arterial providing east-west connection through the
region and access to several residential developments. Bike lanes exist in both directions along the site
frontage. The intersection with Timberline Road operates under STOP control and the intersection with
Greenfields Drive also operates under STOP control. The Master Street Plan designates Vine Drive
proximate to the site as a 2-lane arterial.
Greenfields Drive
North of the site Greenfields Drive is an undivided two-lane roadway with bike lanes and a center turn lane.
The posted speed limit is 25 mph in the vicinity of the subject site. The roadway is classified by Larimer
County as a Collector and provides north-south connection through the region and access to several
residential developments.The intersection with Vine Drive operates under unsignalized control.The Master
Street Plan designates future Greenfields Court through the site as a 2-lane arterial.
Frontage Road
Frontage Road is an undivided two-lane roadway. The posted speed limit is 25 mph in the vicinity of the
subject site. The roadway is classified by Larimer County as a Collector providing east-west connection
through the region and access to several commercial developments. The intersection with Greenfields
Court operates under unsignalized control. The Master Street Plan designates Frontage Road proximate
to the site as a 2-lane collector.
Timberline Road
Timberline Road is an undivided two-lane roadway expanding to a two-lane roadway with a center turn lane
provides access to residential and commercial development through the City. The roadway is classified by
Larimer County as an arterial providing north-south connection through the region and access to several
residential and commercial developments. The posted speed limit is 30-45 mph in the vicinity of the subject
site. The intersection with Vine Drive operates under unsignalized control. The Master Street Plan
designates Timberline Road proximate to the site as a 4-lane arterial.
Existing Non-Auto Connections
As shown on the City of Fort Collins existing bike map there currently exists limited bike and pedestrian
trails in the area. The City Bike Map is provided as Figure 2-2. This is largely due to the subject area being
undeveloped as well as surrounding areas not being developed. The only designated bike route in the
existing condition is along Vine Street and is designated as a "higher volume, higher speed roadway".
The adopted Bicycle Master Plan, provided as Figure 2-3, calls for a "Paved Trail/Shared Use Path to cut
through the entirety of the site from Vine Street along the rail line and then along Greenfields and across
Mulberry. The Bloom project proposes to provide this connection in addition to many others to further build
out the non-auto connections in the area. As shown in Figure 2-4, this project will construct the trail as
Galloway&Company, Inc.
Mr /� `� 0.i 'Imo. '� �� � N v�'••
a� f��'17tr�"•, -=-mow N d
Sykes Dr Vine Dr 1
Sykes Dr Si' Vine Dr
®� Vine Dr n
r4111"11,
SITE
Sykes Dr
0
r
zt �.
4�+, ,,t v • '+� '
7r
International Dr40
4
5 � 3 v
+ a ® ca
a
Mulberry St Fronts a Rd �t
Q 5 Mulberry St Frontage Rd
® 4vO®
3O Frontage Rd
Mulberry St
FIGURE 2-1 a MOVEMENT
Existing Lane Use and Traffic Control SIGNALIZED INTERSECTION
Mulberry STOP SIGN
Fort Collins, CO YIELD SIGN
Bloom
Fort Collins, CO
III. Analysis of Existing Conditions
Traffic Volumes
Weekday AM and PM peak hour traffic volumes counts were conducted on Tuesday March 9, 2021 and
Tuesday August 17, 2021 from 7:00 AM to 9:00 AM and 4:00 PM to 6:00 PM at the study intersections by
IDAX Data Solutions. Due to the current Covid-19 global pandemic consideration has been given to the
accuracy of the collected counts. It has been observed by CDOT,that traffic counts are generally consistent
or greater than pre-Covid conditions. With that observation in mind, and consistent with nearby traffic
studies the collected counts were considered useable for this analysis
For purposes of this study, the individual peak hours were selected based on a review of the intersection
volumes. The existing volumes are summarized on Figure 3-1. Copies of traffic counts are included in
Appendix D. Existing peak hour factors (PHF)were also computed by approach from the traffic counts and
applied to the analysis with a minimum of 0.85 and a maximum of 0.92.
Operational Analysis
Capacity/level of service (LOS) analyses were conducted at the study intersections based on the existing
lane use and traffic controls shown on Figure 2-1, existing baseline vehicular traffic volumes shown on
Figure 3-1. The capacity analysis results are presented in Appendix E and summarized in Table 3-1 and
on Figure 3-2.
As shown in Table 3-1, the study intersections currently operate at overall acceptable levels of service
(LOS) "E" or better during the weekday peak hours.
Existing Intersection Queues
An analysis of intersection 95'h-percentile queues was performed at key locations. The results of the
queuing analysis, as reported by Synchro, are summarized in Table 3-2.
As shown in the table, the existing queues are contained within the effective storage within the study area.
Galloway&Company, Inc.
IFF
110
\rn co � M � �- • 1 � -
w 29/15
) b 1 o—0/0 `� 4 11/15 w
73/54 a—258/200 11 �
Sykes D_r Vine Dr .17)`"'�t•fpg�t
8 4 Sykes Dr 15 27 Vine Dr
0/0-0- 128/222—►
45/35-,%, n n w
L� N Vine Dr n
SITE
Sykes Dr
r
zt �.
f7 r c �
International Dr 4
5 � 3 v
1 b 43/10 C.D
V o—1835/1389 a 12/12
Mulberry St 56/96 Frontage Rd 53/77
26/39 J' Mulberry St 10/13 Frontage Rd
1054/2010—v- 41 Q 0 15/33 Zy b 0 Q 1
63/83 ^z \M
% O^ M N
OD 3O Frontage Rd
Mulberry St O —`
r I�l
y
FIGURE 3-1 A/A INTERSECTION LOS a MOVEMENT
Existing Volumes 0000/0000 (AM PEAK HOUR/PM PEAK HOUR) SIGNALIZED INTERSECTION
Mulberry STOP SIGN
Fort Collins, CO YIELD SIGN
IFF
4
Sykes Dr E/E Vine Dr A/A
C/D Sykes Dr A/A-T Vine Dr CD
A/A-� 5 t Aowli I
Vine Dr
r44"11,
SITE
Sykes Dr
0
r
zt �.
7r
International Dr 4
htAy f �. tiy�s•`r
r .
7 �+
5
11, A/A
c� C/B
'Q' o-C/B
Mulberry St A/C Fronts Rd a$A/A
C/B Mulberry St A/A Frontage Rd
B/D B/D V+' ® `.O
� -
A/A q C.> C.> 6
' -5 3O Frontage Rd
4 '
_- - — Mulberry St MEN
O -- —
At
l r r FIGURE 3-2 A/A INTERSECTION LOS a MOVEMENT
Existing LOS 0000/0000 (AM PEAK HOUR/PM PEAK HOUR) SIGNALIZED INTERSECTION
Mulberry 0 STOP SIGN
Fort Collins, CO YIELD SIGN
Table 3-1
Bloom
Existinq Intersection Level of Service Summary 1 2
Existing 2021
Operating
.. PM
ConditionIntersection .
1 Sykes Dr/Timberline Rd STOP EB C f15.11 B[12.21
Sykes Dr EBL C[23.7] D[26.6]
EBTR B[13.6] B[10.5]
WB D[28.11 D[29.91
Sykes Dr WBL E[35.3] E[35.1]
WBTR A[9.8] B[11.2]
NB A[0.31 A[1.01
Timberline Rd NBL A[8.9] A[8.2]
NBT A[0.0] A[0.0]
NBR A[0.0] A[0.0]
SB A[0.21 A[0.71
Timberline Rd SBL A[8.0] A[8.7]
SBTR A[0.0] A[0.0]
2 Vine Dr/Greenfields Dr STOP EB A[0.81 A[0.81
Vine Dr EBL A[7.9] A[7.8]
EBT A[0.0] A[0.0]
Vine Dr WB A[0.01 A[0.01
W BTR A[0.0] A[0.0]
SB B[10.81 B[10.81
Greenfields Dr SBL B[12.3] B[13.1]
SBR A[10.0] A[9.6]
3 Frontage Rd/Greenfields Ct STOP EB A[6.81 A[6.91
Frontage Rd EBTR A[6.8] A[6.9]
Frontage Rd WB A[7.61 A[7.81
WBLT A[7.6] A[7.8]
Greenfields Ct NB A I6.71 A LI
NBLR A[6.7] A[6.9]
5 Mulberry St/Greenfields Ct Signal EB B(11.1) D(43.6)
Mulberry St EBL C(20.8) B(10.2)
EBT B(11.0) D(45.8)
EBR A(7.6) A(7.8)
WB C 25.6 B 13.6
Mulberry St WBL A(8.2) C(27.1)
WBT C(26.1) B(12.7)
WBR A(6.7) A(6.8)
NB C(31.9) C(34.1)
Greenfields Ct NBL C(31.3) C(34.7)
NBTR C(32.5) C(33.5)
Greenfields Ct SB C(30.7) D(43.4)
SBLTR C 30.7 D 43.4
Overall C(21.0) C(31.9)
Notes: (1)Numbers in brackets p represent delay at unsignalized intersections in seconds per vehicle.
(2)Numbers in parenthesis()represent delay at signalized intersections in seconds per vehicle.
Table 3-2
Bloom
Existing Intersection Queueing Summary 1
Existing 2021•.• PM
ConditionIntersection .
1 Sykes Dr/Timberline Rd STOP Sykes Dr EBL 130 2.5 2.5
EBTR - 7.5 5
Sykes Dr WBL 200 45 35
WBTR - 2.5 2.5
NBL 0 5
Timberline Rd NBT - 0 0
NBR 375 0 0
Timberline Rd SBL 145 0 2.5
SBTR - 0 0
2 Vine Dr/Greenfields Dr STOP EBL 300 0 2.5
Vine Dr EBT - 0 0
Vine Dr WBT - 0 0
Greenfields Dr SBL - 2.5 2.5
SBR - 2.5 2.5
3 Frontage Rd/Greenfields Ct STOP Frontage Rd EBTR - 2.5 5
Frontage Rd W BLT - 7.5 10
Greenfields Ct NBLR - 2.5 2.5
5 Mulberry St/Greenfields Ct Signal EBL 185 12 15
Mulberry St EBT - 254 850
EBR 280 15 18
WBL 575 21 71
Mulberry St WBT - 756 378
WBR 240 0 0
Greenfields Ct NBL 210 86 102
NBTR - 42 48
Greenfields Ct SBLTR - 56 146
Notes: (1)Queue length is based on the 95th percentile queue as reported by Synchro,Version 10.
Bloom
Fort Collins, CO
V. Site Analysis
Overview
The Applicant proposes to develop the 235-acre site with residential and commercial uses. The
development will be built in phases to be determined. For purposes of this study only, the site will be
developed in two phases. The analysis contained herein concludes that Phase 1 (first PDP submission)
can be accommodated solely with the proposed extension of Greenfields Court between Sykes Drive and
Frontage Road as well as connections to Sykes Drive through the Mosaic development. It is proposed that
the Greenfields Court/Frontage Road intersection will be reconstructed as a roundabout. The remainder of
the site will benefit from further connecting Greenfields Court to the north and the signalization of Sykes
Drive/Timberline Road. These phases were based on the portion of the overall site that would likely be filed
initially for Phase 1 PDP and the necessary improvements to accommodate that initial development. Phase
2 represents the ultimate buildout of the site to identify any additional improvements that may be necessary.
The future lane use and traffic control is shown on Figure 5-1 for 2023 Phase 1 and Figure 5-2 for 2030
Phase 2.
For analysis purposes it was assumed that Phase 1 would be complete in 2023 and Phase 2 would be
complete in 2030. The following land use development programs were analyzed:
Phase 1 - 2023
371 DU Single Family Detached
470 DU Multifamily Housing (Mid-Rise)
Phase 2—2030
336 DU Single Family Detached
1260 DU Multifamily Housing (Mid-Rise)
49,230 SF General Office Building
184,860 SF Retail
Grid of Streets
As mentioned previously the proposed ultimate layout of this project furthers the City's Master Street Plan
shown in Figure 1-4. As shown in the Master Street Plan a north-south and east-west arterial are planned
which are provided as the extension of Greenfields Court and International Drive respectively. Additionally,
two east-west collectors are planned as the extension of Sykes Drive and Donella Court as it is shown in
the current plans. A north-south collector connection is also planned for which is the extension of Delozier
Drive. Finally, a north-south Spine Road/Parkway Corridor will provide significant non-vehicular connection
for the development as well as provide connection to the future regional trail that parallels that existing rail.
These connections are being provided for to the extent possible that the development can provide.
The connections of Donella Drive and Delozier Drive as well as the ultimate extension of International Drive
are dependent on neighboring properties to be completed. This project will further these connections and
extensions to the extent possible and will allow for the ultimate conditions being realized once neighboring
properties redevelop.A quick description of each new roadway connection and its furtherance of the overall
network connectivity is provided below:
Galloway&Company, Inc.
Bloom
Fort Collins, CO
Sykes Drive
As mentioned previously Sykes Drive will provide a necessary east-west connection to the existing
neighborhood to the west as well as provide connection to the future connection of Greenfields Court, and
the north-south spine road shown as the Parkway Corridor. This roadway will provide substantial east-west
collector connections for existing and future development for both vehicular and non-vehicular traffic.
Donella Drive
Similar to the Sykes Drive connection mentioned previously, Donella Drive provide connection to existing
neighborhoods to the west as well as providing connection to the north-south spine road One Drive and
future Greenfields Drive extension. This roadway will provide essential connections to any future north-
south Delozier Drive extensions.
Greenfields Court
The north-south arterial extension of Greenfields Court will further the Master Street Plan and provide
essential connection for the future development and existing network. The roadway will provide vehicular,
bicycle, and pedestrian crossing of the Great Western Railway and provide connection between Vine Drive
and Mulberry Street, a connection that currently only exists at Timberline Drive to the west. This roadway
will help activate connection between the proposed residential developments to the commercial
developments oriented along Mulberry Street. It is designed that this connection will be utilized for both
vehicular and non-vehicular traffic for the existing neighborhoods to the north of Vine Street as well as to
the west of the proposed developments.
One Drive/Parkway Corridor
This north-south connection will provide primarily non-vehicular connectivity between the proposed
development areas. The roadway will be designed as a collector but is planned for greater use for bicycle
and pedestrian traffic. This will allow residential and commercial connection to prioritize walking and biking
trips and take vehicular traffic off the network.
International Drive
As shown on the Master Plan, International Drive would ultimately provide east-west connection regionally
and provide alternatives to Vine Street and Mulberry Street. The ultimate alignment of International Drive
on the Master Plan shows a circuitous route around an existing runway. It is anticipated that although the
opportunity exists for east-west mobility with the construction of International Drive it would be a less
desirable route than either Vine Street or Mulberry Street. This development would construct International
Drive to its Master Planned section.
Delozier Road
As shown on the Master Plan, the existing segment of Delozier Road is planned to provide a north south
connection to the Mulberry Street frontage road, which it currently intersects with the east west collectors
and arterials to the north, specifically Donella Drive, International Drive and Sykes Drive. Right-of-way for
this roadway currently exists through a number of existing buildings and is offset to the west of the subject
property.This project proposes to provide the right-of-way necessary to construct a half section of Delozier
on the property and provide a fee-in-lieu as it is understood that the ultimate connection of Delozier Road
requires so further design and the redevelopment of neighboring properties. Until such a time that Delozier
can be designed a constructed a temporary trail would be provided for to maintain non-auto connections to
the extent possible.
Galloway&Company, Inc.
Bloom
Fort Collins, CO
The connections as proposed and shown will provide high levels of connectivity for existing neighborhoods
to the west to the surrounding network. Additionally, the ultimate development is providing a number of
additional elements of connectivity to serve the proposed development and neighboring developments.
Connections both vehicular and non-vehicular are being provided every approximately 660'feet to provide
recommended connectivity opportunities.
Additional benefits of the planned grid of streets and the larger cohesive neighborhoods are greater
Transportation Demand Management(TDM)opportunities.TDM refers to the strategies and programs that
leverage existing infrastructure to cut down on single occupancy vehicle (SOV) trips. The planned
connection to the regional trail, bicycle and pedestrian focused Parkway and consideration for bicycle and
pedestrian connections under the railway will help to promote non-SOV trips. Although specific programs
have not been determined to date,opportunities for reducing non-SOV trips through cohesive neighborhood
programs would be available due to the planned branding and vision for the Bloom project.
As mentioned previously, in furtherance of the connectivity of the project the following standard is included
in the PUD language:
To the extent feasible, all development plans shall provide bicycle and pedestrian and/or vehicular
connection at all sub-arterial streets stubbed to the boundary of the development plan by previously
approved development plans or existing development.All development plans shall provide for future bicycle
and pedestrian and/or vehicular connections to adjacent developable parcels by providing a local street or
landscape tract connection spaced at intervals not to exceed six hundred sixty (660) feet along each
development plan boundary that abuts potentially developable or redevelop able land, to the extent
feasible. When adjacent to open space, natural areas, railroad tracks, or other similar natural or manmade
impediments that inhibit this standard from being met this standard is not required to be met.
Proposed Site Access
As shown on the Applicant's plan (Figure 1-2)and mentioned above access to Phase 1 will be provided via
the following connections/improvements:
• Sykes Drive
• Greenfields Court
• Greenfields Court/Frontage Round roundabout
Access to the full buildout of the development, Phase 2, would be provided via the following additional
connections/improvements:
• Greenfields Court/Vine Drive
• Signalization of Sykes Drive/Timberline Road
• Mulberry Street/Greenfields Court improvements
o Eastbound Dual Lefts
o Westbound Right Channelization
0 6 lanes of through capacity along Mulberry Street
Galloway&Company, Inc.
Bloom
Fort Collins, CO
VI. Analysis of Future Conditions with Site Development
Overview
An analysis of total future conditions,with development of the site, is provided for each of the buildout phase
years (2023 and 2030). It was determined that in addition to background growth as described previously,
the nearby Peakview development would be built coincident with Phase 2 of the subject site.
Pipeline Development
As agreed, to with Staff, an approved but unbuilt/unoccupied (i.e., "pipeline") development was identified
for consideration within the study. According to a TIS provided by Staff the Peakview development would
be built with the following mix of uses:
6,500 SF Drive in Bank
54,500 SF Office
154,500 SF Retail
4,000 SF High Turnover Sit-down Restaurant
70 Rooms Hotel
3,000 SF Fast Food with Drive-thru
The location of the pipeline development in relation to the Applicant's property is shown in Figure 6-1.
Pipeline development trips were generated using the Institute of Transportation Engineers (ITE) 101h
Generation Trip Generation rates/equations and applied to the study intersections in Figure 8 of the
pipeline's TIS. The site trip assignments contained therein assume the full buildout of the network and have
been assumed for both the 2030 (Phase 2)and long range analyzes. Relevant excerpts from the Peakview
TIS are provided in Appendix H.
Total Future Traffic Forecasts
The 2023 and 2030 total future traffic forecasts associated with the proposed development were developed
by combining the baseline traffic volumes shown on Figure 3-1, background future forecasts shown on
Figure 4-3 (2023), Figure 4-4 (2030), the Peakview trips for the 2030 scenario only and the total site trip
assignments shown on Figure 5-4 (2023) and Figure 5-5 (2030). The resulting total future traffic forecasts
are provided on Figure 6-2 for 2023 and Figure 6-3 for 2030.
Total Future 2023 and 2030 Levels of Service with Proposed Development
Future levels of service with the proposed development plan were estimated at key study intersections
based on the future traffic volumes shown on Figure 6-2 and Figure 6-3, the future lane use on Figure 5-1
and Figure 5-2, and the HCM 61h methodologies for signalized, roundabout and unsignalized intersections.
The results of these analyses are provided in Appendix I and presented in Table 6-1. Total future levels of
service are also presented graphically on Figure 6-4 (2023) and Figure 6-5 (2030).
2023 Phase 1 Levels of Service
As shown in Table 6-1, levels of service under Phase 1 future site development conditions would generally
remain consistent with background conditions. All study intersections would continue to operate at overall
Galloway&Company, Inc.
Bloom
Fort Collins, CO
acceptable levels of service with the exception of Sykes Dr/Timberline Rd. Consistent with background
conditions side street delays are forecasting to operate at LOS "F".
2030 Phase 2 Levels of Service
As shown in Table 6-1, levels of service under Phase 2 future site development conditions would generally
remain consistent with Phase 1 conditions. All study intersections would continue to operate at overall
acceptable levels of service with the exception of Sykes Drive/Timberline Road. Consistent with Phase 1
conditions side street delays are forecasting to operate at LOS "F".
Total Future 2023 and 2030 Queuing
Total future queues were forecasted using Synchro software. The results of the queuing analysis are
summarized in Table 6-2. In general, vehicle queues would be consistent with background future
conditions. However, as shown in Table 6-2, the westbound left at Sykes Drive/Timberline Road is
forecasted to exceed the available storage during 2030 Phase 2 buildout conditions.
Total Future 2023 and 2030 Improvements
As shown in Table 6-1 and Table 6-2 the side street delays at the Sykes Drive/Timberline Road are
forecasting to operate at LOS "F" during the background and total future scenarios. A signal warrant
analysis was done, which is detailed in future sections of this report, and found that a signal was NOT
warranted in 2023 scenarios but was warranted in 2030 scenarios. The Sykes Drive/Timberline Road was
analyzed as a signalized intersection for the 2030 scenario with signalized improvement.
Under signalized control the Sykes Drive/Timberline Road intersection is forecasted to operate at
acceptable LOS as well as experience queues that are contained within the effective storage of the
intersection.
It is recommended that Sykes Drive/Timberline Road be improved to a signalized intersection as the full
buildout of Bloom and Peakview developments and additional regional growth generate sufficient trips to
trigger warrants consistent with guidance found in the Manual on Uniform Traffic Control Devices(MUTCD).
A sensitivity analysis for this proposed signal is provided in later sections of this report.
Galloway&Company, Inc.
-MIJ
r,
Vine Dr
SIZE
Sykes Dr t N
w
�r 9
International Dr
40
Peakview
46
1 Frontage Rd
Mulberry St
- I -
FIGURE 6-1
Pipeline Location
Mulberry
Fort Collins, CO
1 v 2
N\� E N • F
:2 -
b g 124/77 b `-11/15 (D
o—0/0 -^+—279 243
Sykes Dr (C 120/85 Vine Dr 0/0
8 4 Sykes Dr 15 27 Yore Dr „
0/0—- 165/252—� C�
r-
�/ N 1 �/� aaa Vne Dr n
0
'y SITE
O Sykes Dr
4 Z5
0
4J b b a 0/' Intemational Dr0/0
4
International Dr 0/0
0/0 Private Drive
0/0—P ,� 4
126/83
- Zo
c
5 Z5 3 ;5
U
�i
Q 46/148 0/0
�' o-1902/1439 o-12/12
Mulberry St 1C 56/96 Frontage Rd 53/77
42/91 Mulberry St 0/0 k Frontage Rd
1092/2083 b 4 Q 0 10/13-- Q
63/83 15/33 \rn n
OD O y N O
3 Frontage Rd
o.
_-- .- Mulberry St O
FIGURE 6-2 A/A INTERSECTON LOS a MOVEMENT
Total Future 2023 0000/0000 (AM PEAK HOUR/PM PEAK HOUR) SIGNALIZED INTERSECTION
Mulberry STOP SIGN
Fort Collins, CO YIELD SIGN
4
b FB ®� A/A
Sykes Dr Q B Vine Dr /
DB Sykes Dr AAA-29. Vine Dr CD
BB AAA �� t
<¢ Vine Dr n _
s�
SIZE
Sykes Dr
r
zt 4@.
b AAA International Dr 4
International Dr A/A
A/A 40' Private Drive
A/A 4, Q
d
a
Ss
c�
U
5 � 3AWL
ig Q A/A
chi chi chi 6 _B/B
B/B A+ A/A C.D
Mulberry St 8 B/B Frontage Rd 0
B/A�' Mulberry St Frontage Rd
B/B Qa A/A+ �Y
B/B b U U c� c:> a
B/A O Frontage Rd
.r
Mulberry St 5
FIGURE 6-4 A/A INTERSECTION LOS o- MOVEMENT
Total Future 2023 LOS D000/0000 (AM PEAK HOUR/PM PEAK HOUR) SIGNALIZED INTERSECTION
Mulberry STOP SIGN
Fort Collirs, CO YIELD SIGN
Table 6-1
Blown
Total Future Intersection Level of Service Summa 1 2
Background 2023 Background 2030 To al Future 2023 Total Future 2030
opera Street Approachl AM AM P AM PM
ndi�inq Pe on,
im--lin- Cc im, Nam, Nl-numt PeaAkHour Peapk"Hou, A H Paapk Mo., Peak Hour Peak Hour Peak Hcmr Peak Mon,
1 Sykes Dr/Timberline Rd STOP E8 C f15.61 8 12.4 C 117.61 B[13.4T C 1`17.11 B 14.8 Na n/a
Sykas Or EBL C[25.01 D[27.81 D[30.31 D[33.21 D[34.91 F[51.3] Na n/a
EBTR B[13.91 B[10.61 C(15.41 B(11.11 8[13.91 B[10.6] Na n/a
WB D[30,41 D 1`31.81 Er43.21 Er41.51 Er47.a1 F 1`73.51 Na We
Sykes Or WBL E[38.61 E[37.5] F[56.4] E 149.71 F[84.51 F[129.11 Na We
W BTR A[9.9] B[11.31 B[10.11 B[12.01 8[10.71 B[12,21 Na n/a
NB A[0.31 A[1.01 Af0.31 A 0.9 A rO.31 Af0.91 Na We
Timberline.Rd NBL A[9.0] A[8.31 A[9.4] A[8.41 A[9.0] A[8.31 Na We
NBT A[0.01 A[0.01 A[0.0] A[0.01 A[0.01 A[0.01 Ne n/a
NBR A[0.01 A[0.01 A[0.0] A[0.01 A[0.0] A(0.01 Na n/a
SB A 1`0.21 A rO.61 A[0.21 A rG.61 A[0.61 A[2.61 n1a We
Timberline Rd 58L A[8.01 A[8.71 A(8.1] A[9.01 A[8.1] A[9.51 Na n/a
SBTR A[0.01 A[0.01 A[0.0] A[0.01 A[0.0] A[0.01 Na n/a
Signal added
Signal EB Na We Na We Na Na 13 13.11 B 13.
Sykes Or EBL nle We Na Na We n/a 8(15.8) B(14.7)
EBTR Na We Na We Na n/a B(13.4) B(13.5)
WB Na n/a Na We Na We B 15.7 B 15.1
Sykes Or WBL We We Na Na We n/a 8(16.3) B(15.4)
WBTR III n/a III We Na We B(15.0) B(14.6)
NB Na We Na We Na n/a A 5.1 A i0
Timberline Rd NBL Na n/a Na We We n/a 8(13.8) A(6.7)
NBT Na We Na II/a 'Na n/a A(5.1) A(52)
NBR Na We nia We Na n/a A(4.2) A(3.6)
SB Na Na Na Na We We AIM A 5.9
Timberline Rd SBL We n/a n1a We Na n/a A(6.7) B(10.1)
SBTR Na ri/a Na We Na n/a A(9.71 AL4.,
Overall Na Na we
Na Wa We A(9.5) A(6.6)
2 Vine Dr/Grearlfek[s Or STOP EB ARM A10._1 A 0.7 A[0.71 We n/a Na Na
Vine Or EBL A[7.91 A[7.81. A[8,0] A[7.91 Na We Na We
EST A[0.0] A 10.01 A[0.0] A[0.01 Na n/a We We
Vine Or M A[0M A[O.01 A[0.01 A[O.01 Na n/a Na Na
W BTR A 10.0] A[0.01 A[0.0] A[0.01 Na n/a Na We
SB 8 1`10.91 B 10. B 1`111.31 B 111.31 Na n/a Na We
Greenitaide Or SBL 8(12,51 B[13.41 B[13.31 B.[14.31 We n/a We n/a
SBR A 110.01 A[9.61 B[10.31 A(9.81 Na We n/a We
Greenflelds Ct Access added
STOP EB Na Na Na Na A[0.71 A r0_1 A[0.51 A[0.51
Vine Dr EBL We n/a n1a We A[7,91 A[7.9] A[8.0] A[8.01
EBTR Na ri/a rva Na A[0.0] A[0.01 A[0.0] A[0.01
WB Na Na Ne Na A[0.01 AJO_.g1 AL1 AL1
Vine Or WBL Na We Na We A[0.01 A[0.0] A[7.9] A[8.41
W BTR Na n/a Na We A[0.0] A[0.0] A[0.0] A[0.01
NB Na Na Na Na A[0.01 AJO_.g1 C[15.51 C[18.91
Greenfield.Ct NBL Na We Na We A[0.0] A[0.0] C[21.31 D[28.21
NBTR Na n/a Na Na A[0.01 A 10.01 A[9.9] B[10.91
SB Na Na Na Na B 1`11.11 B 1`11.31 B 1`13.41 C 1`15.11
GreanWda Ct SBL Na We Na We B 113.01 B[14.21 C[19,21 C[24.71
SBTR Na Na Na Na 8[10.11 A[9.81 B[10.41 B[10.11
3 Frontage Rd/Gwn0elds Ct STOP Fmnlage Rd EB AL7 A[6.91 A[6.81 A1s_s1 Na nfe Ne n/a
EBTR A[6.81 A[6.91 A[6.8] A[6.91 Na We Na Na
Frontage Rd we A[7.61 A[7.81 A 17.61 A r7.81 We n/a Na n/a
W BLT A[7.6] A 17.81 A[7.61 A[7.8] Na We Na We
Greenfield.Ct NB A 1`6.71 A r6.1 A[6.71 A r6.91 We n/a Na Na
NBLR A16.7] A16.91 A16.71 A[6.91 Na We Na We
Greenfields Ct Access added
Roundabout constructed CIRCLE Frontage Rd EB Na Na Ne Na A r3_61 A r3.71 A j_1 D 1`28.41
EBLTR Na We Na n/a A[3,6] A[3.71 A[9.6] D[28.41
Frontage Rd WB Na n/a Na We A[3.31 A 4.1 A 8.9 C 16.3
W BLTR We We Na Na A[3.3] A[4.11 A 16.9]. C[16.31
NB Na We Na We A[2.91 A[3.71 A A.71 D 1`30.11
Greenfield.Ct NBLTR We n/a We We A[3.01 A[3.9] A[7.91 D[31.01
NBR We n/a Na We A[2.81 A[2.9] A[2.9]. A[3.0]
SB Na n/a Na We A[401 A 3J_[.6 A rg,331 D 1`25.11
Greenfield.Cl SBLT Na We Na We A[4.0] A[3.61 A[9.51 D[26.21
SBR Na n/a Na We A[2.71 A[2.81 A73.61 A[4.11
Overall Na n/a Na We A[3.61 A[3.81 A[8.5] D[27.5]
4 International Dr/Private Dr/Greenfelds Cl STOP EB Na Na Na Na A[9.11 A r8.01 B 1`11.01 B 1`11.91
International Or EBL n/a n/a n1a We A[0.0] A[0.0] 8[13.71 C[22.21
EBTR Na We rva Na A[9.1] A[8.81 B[10.71 A[10.0]
WB Na Na Na Na A[0.01 AJO_1 C 15. C[22.81
Private Or WBL Na We n1a We A[0.0] A[0.01 C(18.21 D[28.11
WBT We We We W. A[0.0] A[0.0] A[9.01 A[9.91
NB Na We Na We A r5.41 A[5.51 Ar2_61 AL1
Greenfield.Cl NBL Na Na Ne Na A[7.4] A[7.5] A[7.9] A(B.11
NBTR Na n/a Na We A[0.0] A 10.01 A[0.0] A[0.01
SB Na n/a III: We A[0.01 A OJ_.1 A[0.11 ArG.51
Greenfield,Ct SBL Na We Na Na A[0.01 A[0D7 A[7.5]. A[7.9]
SBTR Na n/a Na Wa A.[0.0] A[0.01 A10.01 A[0.01
5 Mulberry St(G-field.Ct Signal EB B 11r3 E 55. B 12A F 11.8 Na n/a We We
Mulberry Bl E8L C(22.4) B(10.8) C(22.6) B(14.0) Na We We We
EBT B(11.2) E(58A) B(12.4) F(116.9) n1a n/a Na We
EBR A(7.5) A(7.8) AITS) A(7.8) Na We Na We
WB C(31.51 B 14.0 E 73.9 B 16.5 Na We Na We
Mulberry St WBL A 18.4) C(27.1) A(9.7) C(27.1) Na n/a Na n/a
WBT C(32.2) B(13.2) E(75.7) B It 5.9) Na We n1a We
W BR A(6.6) A(6.8) A(6.6) A(6.8) Na Na Na We
NB C 32.2 C(34.11 C 32,2 C 34.1 Na n/a Na Na
Greenf da Ct NBL C(31.6) C(34.7) C(31.6) C(34.7) n1a n/a Na n/a
NBTR C(32.8) C(33.5) C(32.8) C(33.5) Na n/a Na Na
Greenfield.Ct SB C 31.0 0(43.4) C 31.0 D 43.4 Na n/a Na Na
SSLTR C(31.0) D(43.4) C 31.0 0 43.4 Na n/a Na We
Overall C(24.6) 0(38.5) D(49.7) E(69.8) Na Na Na We
SB Gyeenfields Ct Lane Improvements
Signal EB Na n/a Na We B(14.51 B 14.5 B 12.2. B 19.3
Mulberry St EBL Na We Na n/a B(16.0) A(8.0) C(23.6) C(34.5)
EB T Ina We Na We B(14.6) B(15.0) A(10.0) B(16.5)
EBR Na n/a Na We B(11.6) A(8.2) A(7.6) A(8.0)
WB We We Na n/a IS 19.5 B 11.7 B 16.1 B 12.4
Mulberry St WBL We We We Na B(11.1) B(18.4) AITS) C(21.1)
WBT Na n/a n1a We B(191) B(11.3) B(16.3) B(11.9)
WBR III n/a We We A(0.0) A(0.0) A(0.0) A(0,0)
NB Na We Na We C 28.3 C 30.5 C(32.61 C 133.51
Greenf Ms Ct NBL Na n/a Na We C(28:2) C.(30.8) C(31.8) C(33.9)
NET We n/a We n/a C(28.3) C(30.3) C(33.1) C(33.2)
SB Na We Na We C 31.8 C(33.31 F 105.6 F 229.9
Greenfield.Ct SBL Na Na Na Na C(32.3) C(34.0) F(109.2) F(244.3)
SBTR We n/a n/a We C 25.3 C 26.8 C(27.9) C 28.9
were@ Na n/a We We B(18.9) B(15.1) C(25.7) D(45.0)
Notes: III Numbers inb Io.0 representdelay.!unsigneli-IIMersecgwcv in seconds per vehiele.
(2)N-ers In perenlb a()represent deky at slgnegzed Irdersec#.m In--Per vehicle.
Table 6-2
Bloom
Total Future Intersection Queueino Summarvill
Background 2023 Background 2030 2030
..'a rating S rest Approach/Available AM PM AM AM PM AM P
�wlor...ti.a Con dition Name Movement Storage Peak Hour Peak Hour Peak Hour Pe.kMour Peak Hour Peak Hour Peak Hour Peak"Hour
1 Sykes Dr/Timberline Rd STOP EBL 130 2.5 2.5 5 2.5 5 5 We Na
Sykes Dr EBTR - 10 5 10 5 10 5 n/a Na
Sykes Or WBL 200 50 37.5 67.5 47.5 132.5 127.5 n/a n/a
WBTR - 2.5 2.5 2.5 2.5 15 12.5 We n/a
NBL - 0 5 0 5 0 5 n/a nla
Timberline Rd NBT - 0 0 0 0 0 0 We We
NBR 375 0 0 0 0 0 0 n/a n/a
Timberline Rd SBL 145 0 2.5 0 2.5 2.5 12.5 We Na
SBTR - 0 0 0 0 0 0 n/a Na.
Signal added
Signal Sykes Or EBL 130 n/a nla n/a n/a n/a n/a 11 7
EBT - n/a Na Na We Na n/a 0 0
Sykes Or WBL 200 n/a n/a We Na We n/a 101 73
WBT - n/a We We We We Na 0 0
NBL - n/a Na Na Na We Na 9 29
Timberline Rd NBT - n/a n/a Na Na We Na 123 209
NBR 375 n/a n/a We n/a n/a We 17 20
Timberline Rd SBL 145 We N. We n/a n/a n/a 24 66
SBTR - n/a We Na n/a We n/a 471 153
2 Vine Dr/Greenfields Or STOP EBL 300 0 2.5 0. 2.5 n/a We n/a We
Vine Dr EBT - 0 0 0 0 We Na n/a n/a
Vine Or WBT - 0 0 0 0 n/a Na We We
Greenfields Or SBL - 2.5 2.5 2.5 2.5 We Na We Na
SBR - 2.5 2.5 2.5 2.5 We Na Na. Na
Greenfields Ct Access added
STOP Vine Or EBL 300 Na n/a Na Na 0 2.5 0 2.5
EBTR - We n/a n/a Na 0 0 0 0
Vine Or WBL 250 We n/a n/a n/a 0 0. 5 7.5
WBTR - n/a We We Na 0 0 0 0
Greenfields Ct NBL t00 n/a n/a n/a Na 0 0 25 32.5
NBTR - Na n/a We Na 0 0 7.5 10
Greenfields Or SBL - n/a n/a We We 2.5 2.5 5 5
SBTR - Na n/a Na Na 2.5 2.5 2.5 2.5
3 Frontage Rd/Greenfields Ct STOP Frontage Rd EBTR - 2.5 5 2.5 5 n/a n/a Na Na
Frontage Rd W BLT - 7.5 10 7.5 10 We We n/a n/a
Greenfields Ct NBLR - 2.6 2.5 2.5 2.5 n/s We Na Na
Greenfields Ct Access added
Roundabout constructed CIRCLE Frontage Rd EBLTR - We Na n/a n/a 0 0 50 150
Frontage Rd WBLTR - n/a n/a nla n/a 0 0 0 25
Greenfields Ct NBLTR - Na We Na Na 0 25 75 425
Greenfields Ct SBLTR We Na We n/a 25 0 75 275
4 International Dr/Private Dr/Greenfields Ct STOP International Or EBL 100 Na We Na Na 0 0 2.5 7.5
EBTR - n/a n/a n/a n/a 12.5 7.5 17.5 12.5
Private Or WBL 100 We n/a rife rife 0 0 12.5 15
WBTR - Na nla Na Na 0 0 2.5 0
Greenfields Ct NBL 100 We Na n/a We 2.5 7.5 5 12.5
NBTR - n/a n/a We n/a 0 0 0 0
Greenfields Ct SBL 100 n/a N. We n/a 0 0 0 0
SBTR - n/a n/a n/a We 0 0 0 0
5 Mulberry StlGreenfields Ct Signal EBL 185 12 15 12 15 We Na We n/a
Mulberry St EBT - 268. 900. 325 1088 We Na n/a n/a
EBR 280 15 18 15 21 We n/a Na Na
WBL 575 21 71 21 71 n/a We n/a Na
Mulberry St WBT - 804 402 980 512 n/a We We We
WBR 240 0 0 0 0 n/a We n/a n/a
Greenfields Ct NBL 210 85 102 86 102 n/a We n/a Na
NBTR - 42 48 42 48 n/a n/a We n/a
Greenfields Ct SBLTR - 56 146 56 146 We Na We Na
SB Greenfields Ct Lane Improvements
Signal EBL 360 n/a We We We 11 14 101 245
Mulberry St EBT - n/a Na We Na 206 376 181 448
EBR 280 We n/a n/a We 19 18 15 18
WBL 575 n/a nla n/a n/a 30 56 21 58
Mulberry St WBT - rife nla We n/a 468 214 416 239
WBR - n/a n/a We Na 3 24 32 50
Greenfields Ct NBL 210 We Na We We 95 101 149 174
NBTR - n/a We n/a n/a 42 48 52 65
Greenfields Ct SBL - n/a We We Na 80 79 276 401
SBTR - We n/a We Na. 44 53 242 628
Notes: (1)Queue length is based on the 95th percentile queue as reported by Synchro,version 10.
Bloom
Fort Collins, CO
VII. Analysis of 2040 (Long Range) Future Conditions
Methodology
The 2040 future traffic forecasts were developed for 2040 conditions based on a composite of 2030 total
future conditions, and additional regional traffic. The total future 2040 lane use and traffic control is
consistent with total future Phase 2 2030 lane use provided on Figure 5-2.
Regional Growth
Consistent with previous methodologies increases in traffic associated with regional growth were estimated
at two (2.0) percent per year, as agreed upon in the scope of work, compounded for through movements
along Timberline Road and Vine Drive up to 2040. The resulting increases in traffic within the study area
are reflected on Figure 7-1.
Total Future 2040 Traffic Forecasts
A long range 2040 analysis is provided for informational and planning purposes. The 2040 total future traffic
forecasts were created by combining the baseline traffic volumes shown on Figure 3-1, growth up to the
year 2040 shown on Figure 7-1. The resulting total future 2040 traffic forecasts are provided on Figure 7-
2.
Total Future 2040 Levels of Service
Future levels of service with the proposed development plan were estimated at key study intersections
based on the future traffic volumes shown on Figure 7-2, the lane use and traffic control shown on Figure
5-2, and the HCM 6t" methodologies for signalized, roundabout and unsignalized intersections. The results
of these analyses are provided in Appendix J and presented in Table 7-1. Total future 2040 levels of service
are also presented graphically on Figure 7-3 (2040).
As shown in Table 7-1,during the 2040 scenario all study intersections would continue to operate at overall
acceptable levels of service consistent with 2030 conditions with improvements.
Total Future 2040 Queuing
Total future queues were forecasted using Synchro software. The results of the queuing analysis are
summarized in Table 7-2. As shown in Table 7-2, during the 2040 all study intersection queues would be
contained within their effective storage.
The 2040 long range analysis is provided for informational purposes only. Due to the long range of timing
the level of growth and development may not materialize,and certain developments may not be constructed
as studied.
Master Plan Street Considerations
The analysis above does not consider the implications of the ultimate connections of International
Boulevard and Delozier Road as these connections require the redevelopment of neighboring properties.
According to the analysis contained herein the proposed development and pipeline developments would
require the previously mentioned improvements and would not require the International Boulevard and
Galloway&Company, Inc.
Bloom
Fort Collins, CO
Delozier Road connections. At such a time that these connections were made the following considerations
should be made.
International Boulevard
The ultimate connection of International Boulevard would provide additional opportunities for the
development proximate to Bloom to travel between Greenfields Drive and Timberline Drive. This would
relieve some of the burden from the Timberline Drive/Sykes Drive intersection. At such a time that
International Drive can feasibly connect a signal study should be conducted for the Timberline Drive
corridor. If signals are warranted along Timberline Drive at Vine Drive, Sykes Drive, and International Drive
they would be appropriately spaced at quarter mile intervals. This analysis shows that a signal would likely
be warranted at Sykes Drive in the event that a connection at International Boulevard is not available.
As shown in the next section of the report the signal at Sykes Drive and Timberline Drive would meet only
the AM peak hour warrant. It is likely that a connection of International Drive would shift enough traffic that
a signal would not be warranted at either Sykes or International. As stated previously, warrant studies
should be conducted at such time as additional development or the extension of International Drive is
contemplated.
Delozier Road
The ultimate connection of Delozier has been shown to not be necessary for the Bloom development and
the Peakview pipeline development. This connection provides access to the Frontage Road which
ultimately provides connection to the Greenfields Court roundabout. Traffic destined for points east and
west will utilize the roundabout regardless of the Delozier connection as they would enter via the frontage
road or Greenfields Court. The connection at Delozier Road would ultimately only serve the redevelopment
of the Barker property. This connection should be evaluated with future redevelopment.
Galloway&Company, Inc.
N
N b 4t°/° 4J b w
b a-0/0 ® Q 0/0
Sykes Dr d 0/0 Vine Dr o-118/91 l`t•f p9 2"
Y C.9
0/0 4 Sykes Dr 0/0 1j Vine Dr ; r;yll7i�,_-_-,
0/0 4 58/101 b � - r
0/0
o o Ine Dr n
E
Y, ,
SITE
Sykes Dr
rX�
zt 4@.
l f7
International Dr 4
a,
as
4bb 40/0
-a--740/560 a 0/0
Mulberry St 0/0 Frontage Rd 0/0
0/0—1), Mulberry St 0/0 Frontage Rd i
425/811—m- Q 0/0 4W &
0/0$ i
YJ' O O O U O O
w 3O Frontage Rd
- - _-- .- - Mulberry St O -`
c -
FIGURE 7-1 A/A INTERSEC11ON LOS a MOVEMENT
Growth 2040 0000/0000 (AM PEAK HOUR/PM PEAK HOUR) SIGNALIZED INTERSECTION
Mulberry STOP SIGN
Fort Collins, CO YIELD SIGN
2 s w
N\� E N � _ ' - ►,- y F
SG 136/85 b Q 11/15 _ a�
b o—0/0 a 387/326
Sykes Dr 161/112 Vine Dr F 59/86 •�- `
8 4 Syites Dr 15 27 3) Yme Dr
0/0—P `� 4 218/344—� Fi
�/�$ 45/83 Vne Dr
—y SITE
Sykes Dr
14kr ,
1
iE 4 U
0 N\N
40 b b .0-0/0 International Dr 4
International Dr 40/27
19/21-' Private Drive
0/0—P ,� 4
146/113
0
6
U
'Z
`V 4 328/633 N ' 4 14/22
40 b b o—2575/1877 4 b o—12/12
Mulberry St 56/96 Frontage Rd 53/77
229/443 J" Mulberry St 33/43-6 0 Frontage Rd
1479/2749—P 41 10/13—-
63/83 Q 185/296%, � Q
;m 5 o NN 2
V m N 00 N N O
3 Frontage Rd
Mulberry St O —
T
FIGURE 7-2 A/A INTERSEC11ON LOS a MOVEMENT
Total Future 2040 0000/0000 (AM PEAK HOUR/PM PEAK HOUR) SIGNALIZED INTERSECTION
Mulberry STOP SIGN
Fort Collins, CO YIELD SIGN
Aim (D
4 B/B 04 A/A
Sykes Dr o Vine Dr /
Sykes Dr �j Vine Dr CD
B/B A/A � i=>•✓r
B/I 4 A/A If O t o
m« t5 o m Vine Dr n
c `
SIIE
>r
Sykes Dr
6
E 4 ,
4 a -A-B/C Intemational Dr 4
International Dr C/D
B/C Private Drive
B/B 4
5 3
_ U
a .g -moo
4 A/A
6 _C/p N
C�' 40 A/C C D
Mulberry St A/F Frontage Rd
C/F Mulberry St O Frontage Rd
B/F Qa A/D+ AQ
B/F
B/F b U
"/B O Frontage Rd
Mulberry St 5
At
FIGURE 7-3 A/A INTERSECTION LOS o- MOVEMENT
Total Future 2040 LOS 0000/0000 (AM PEAK HOUR/PM PEAK HOUR) SIGNALIZED INTERSECTION
Mulberry STOP SIGN
Fort Collins, CO YIELD SIGN
Table 7-1
Bloom
Total Future 2040 Intersection Level of Service Summer 1 2
To lFuture2023 Total Future 203 Total Future 2040
Intersection c Name Mowment Peak Hour Peak Hour Peak Hour Peak Hour Peak Hour Peak Hour
1 Sykes DrRmbedlns Rd STOP EB C 117.t1 B 114.8) n/a We We We
Sykes Or EBL D f34.91 F 151,31 n/a Na We Na
EBTR 8113.91 Sfi0.fil n/a We n/a W.
Will E f47.01 F[73.51 n/a Na We Na
Sykes Dr W13L F[84.51 Ff12911 n/a We n/a nla
WBTR B[10.71 Bf12.21 We We We Na
NB A[0.31 A[0.9] Na We Na Na
Timberline Rd NBL A 19.01 A fe.31 n/a We Ne We
NBT A 10.01 A(0.01 n/a nla We n/a
NBR A10.01 A10.01 n/a Na We Na
SB A10.61 A[2.61 n/a W. n" n/a
Timberline Rd SBL A[8.11 A[9.51 Na Na We Na
SBTR A 10.01 A f0.01 n/a No n/a No
Sign.]added
Skmal EB We Na 1103A B(13.7) B(16.81 1306.1)
Sykes Dr EBL We n/a B(15.8) B(74.7) B(19.2) B(17.3)
EBTR Na Na B(1341 S(13.5) 8(16.3) 8(16.0)
WB nfa Na 8115.7) B(15.1) B(19.11 B(17.8)
Sykes Or WBL We Na Bf16.3) S(15.41 Et JSS) B(18.2)
WET R We We B116.0) 0(14.61 B(18.2) B(17.2)
NB Na Na A(5.1) A(5.0) A(5.3) A(5.5)
Timberline Rd NBL n/a Na B(13.8) A(6.7) B(19.2) A(7.4)
NBT We We A15.11 Af5.21 A(5.1) A(5.81
NBR Na Na AS51 A(3.61 A(4.0) A(3.4)
SB We We A19.5) A(5.9) B(16.81 A(6.3)
Timberline Rd SBL We n/a A(63) B(10.1) AIT 11 B02.41
SBTR Na We A(9.7) A(4.6) B(17.3) A(4.71
Overall n/a Na A(9.5) A(8.81 1103.91 A(7.21
2 Vine Or/Greenfieids Or STOP ES A[0.71 A[0.8] A[0.51 A[0.51 A[0.4] A[0.51
Vine Or EBL A17.91 A17.91 A18.01 Af8.01 A18.21 Af8.11
EBTR A10.01 Af0.01 A[0.01 A(0.O1 Af0.01 A(0.01
WB A[0.0] A[0.0] Af1.21 A[7.91 A[7.01 A[7.71
Vine Dr WBL Af0.01 A(0:01 A 17.91 A18.41 A18.01 A18.61
WBTR Af0.01 AM.01 A[0.01 AfO.01 Af0.01 Af0.01
NB A[0.01 A10.01 C(15.51 Cit8.91 Cf17.91 C[22.81
Greenf ld,Ct NBL A f0.01 A f0.01 C 121.31 D 128.21 D.128.01 E f36.01
NBTR A1O.01 Af0.01 A19.91 800.91 B110.21 a111.51
Sit B.I11.t] B[11.31 B[131 C115.11 B(14.8] C(t7.01
Greenftelds Ct SBL 13I.-,, 8 fi4.21 C(79.21 C[24.71 C 122.21 0 f29.3]
SBTR B[10.71 A[9.81 B110.41 Bf70.11 B111D1 Bf70.51
3 Frontage Rd/Greanfields Ct CIRCLE Frontage Rd EB A[3.61 A[3.71 A[9.61 D[28.41 Af9.61 D[28.41
EBLTR A 13.61 A 13.71 A[9.61 D[28.41 A WS D 128.41
Frontage Rd WB A[3.31 A[4.11 A[6.91 C[t 6.3] Alit 91 C[t6.,
WBLTR A13.31 AWIT A16.91 C116.31 A16.91 C116.31
NS A[2.91 A[3.71 A[/.71 O ISO.11 A 1-7.71 D[30.11
Greenfelds Ct NBLTR A 13,01 A(3.91 A[/.91 D 131.01 A 17.91 D 131.01
NBR Al2.81 A[2.91 Al2.91 AI3.01 Al2.91 A IS,O1
58 A[4.01 A[3.61 A 19.3] D[25.11 A[9.3] D[25.7]
Greenfield.Ct SBLT A[4.0] A(3.61 A[9.5] D[26.2] A[9.5] D[2fi.2]
SBR Al2,71 A1281 A13.61 A(4.71 A13.91 AW11
Overall A[1611 A13.81 A[8.51 D[27.51 A[8.51 D[27.61
4 Intema0onal DrlPimmu,Or/Greenfield.Ct STOP EB A[9.11 A[8.81 B[11.0] B[11.9] B[11.0] B[tt.8]
International Or EBL A 10.01 A f0.01 B 113.71 C f22:21 B 11J.71 C 122.51
EBTR A19.11 Af8.81 8110.71 A[10.01 B110.71 Bf12.51
VIB A[0.01 A10.01 C[15.51 C[22.81 C f15.51 C[22.81
Private Dr WBL A[0.03 A(0.0] C[18.2] D[28.11 C[1821 D[29.71
WBTR A[0.01 A10.01 AI9.a1 A(9.91 A19.01 C[16.21
NB Ar5.41 Af5.51 Al2.81 A[3.01 A[2.61 AMill
Greenfield.Ct NBL A(7.4] A[7.51 A(1.9] A(8.11 A[7.9] A[8.1)
NBTR A[0.01 Af0.01 A10.01 AfOD1 A10.01 A[0,01
SB A[0.01 A10.01 A[0.11 A[0.51 A[0.11 A[0.51
Greenfields Ct SBL A[0.0] A[0.01 A[7.51 A[7.9] A[7.5] .A[7.9]
SBTR Af0.01 Af0.01 A10.01 Af0.01 A10.01 Af0.01
5 Mulberry St/GmnfWds Ct Signal EB B(14.5) B(14.5) B(12.2) B(19.3) B(12.8) F(81.7)
Mulberry$t EBL B(16.0) A(8.0) C 123.fi1 C f34:S) C(27.51 F(904)
EST B(14.6) B(15.01 A(10,0) B(165) B(I DS) F(822)
EBR 8(11.13 A(8.2) A17.61 A(8.0) A(7,4) B(17.11
WB B119.5) B(11.7) B(16.1) B(12.4) C(24.9) D(s2.8)
Mulberry St W13L B111.1) 8(18,4) A(7,61 C(21.1) A(8.3) F(102.51
WBT Bl19.8) B(11.3) 8116.3) B(11.9) C(25,2) D(50.3)
WEIR A(0.0) A(0.0) A(0.01 A(0.0) A(0,0) AMM
INS C128.3) C(30.11 C(32.6) C(33.51 C(34.4) E(67.7)
Greenfield.Ct NSL C(28.21 C(30.8) C(31.81 C(33.9) C f33.41 E(56.11
NBTR C(28.3) C(30.3) C(33.1) C(332) D(35.1) E(76.7)
SB C 131.8) (105.6) F(229.91 11109.3) F(109.4)
Greenflelds Ct SBL C(32.3) C(34.0) F(109.21 F(244.3) F(112,41 F(113-8)
38TR C(25.31 C(26.6) C 127.9) C(28.9) C(29.31 O(41.7)
Overall B(i 8.91 B(15.1) C(25.7) D(45.0) C(29.0) E(74.8)
Natty: (1)N.-in bec arep ant delay et@n.gnelis@d int@rse r.in seconds per reniee.
(2)Nutnoers In pz-a()reP-r,dale,.l9nalh@tl INereeNans In seconds P@r-Io.
Table 7-2
Bloom
Total Future 2040 Intersection Queuein Summar 1
Total Future 2023 Total Future 2030 Total Future 2040
Operating
Intersection Condition Name Movement Storage Peak Hour Peak Hour Peak Hour Peak Hour Peak Hour Peak Hour
1 Sykes Dr/Timberline Rd STOP EBL 130 5 5 n/a n/a n/a n/a
Sykes Dr EBTR - 10 5 n/a n/a n/a n/a
Sykes Or WBL 200 132.5 127.5 n/a n/a n/a n/a
W BTR - 15 12.5 n/a We n/a n/a
NBL - 0 5 We n/a We n/a
Timberline Rd NBT - 0 0 We n/a n/a We
NBR 375 0 0 n/a n/a We We
Timberline Rd SBL 145 2.5 12.5 n/a n/a n/a n/a
SBTR - 0 0 n/a We We n/a
Signal added
Signal Sykes Or EBL 130 n/a n/a 11 7 11 7
EBT - n/a We 0 0 9 0
Sykes Dr WBL 200 n/a We 101 73 101 73
WBT - n/a n/a 0 0 0 6
NBL - n/a n/a 9 29 10 30
Timberline Rd NBT - n/a n/a 123 209 150 280
NBR 375 We n/a 17 20 17 20
Timberline Rd SBL 145 n/a n/a 24 66 24 82
SBTR - n/a n/a 471 153 614 191
2 Vine Dr/Greenfields Or STOP EBL 300 0 2.5 0 2.5 0 2.5
Vine Dr EBTR - 0 0 0 0 0 0
Vine Dr WBL 250 0 0 5 7.5 5 7.5
W BTR - 0 0 0 0 0 0
Greenfields Ct NBL 100 0 0 25 32.5 32.5 42.5
NBTR - 0 0 7.5 10 10 10
Greenfields Or SBL - 2.5 2.5 5 5 5 5
SBTR - 2.5 2.5 2.5 2.5 2.5 2.5
3 Frontage Rd/Greenfields Ct CIRCLE Frontage Rd EBLTR 0 0 50 150 50 150
Frontage Rd WBLTR - 0 0 0 25 0 25
Greenfields Ct NBLTR - 0 25 75 425 75 425
Greenfields Ct SBLTR - 25 0 75 275 75 275
4 International Dr/Private Dr/Greenfields Ct STOP International Or EBL 100 0 0 2.5 7.5 2.5 7.5
EBTR - 12.5 7.5 17.5 12.5 17.5 12.5
Private Or WBL 100 0 0 12.5 15 12.5 15
W BTR - 0 0 2.5 0 2.5 0
Greenfields Ct NBL 100 2.5 7.5 5 12.5 5 12.5
NBTR - 0 0 0 0 0 0
Greenfields Ct SBL 100 0 0 0 0 0 0
SBTR - 0 0 0 0 0 0
5 Mulberry St/Greenfields Ct Signal EBL 360 11 14 101 245 76 355
Mulberry St EBT - 206 376 181 448 231 1479
EBR 280 19 18 15 18 15 18
WBL 575 30 56 21 58 21 175
Mulberry St WBT - 468 214 416 239 629 773
WEIR - 3 24 32 50 40 461
Greenfields Ct NBL 210 95 101 149 174 141 160
NBTR - 42 48 52 65 52 141
Greenfields Ct SBL - 80 79 276 401 258 486
SBTR - 44 53 242 628 194 632
Notes: (1)Queue length is based on the 95th percentile queue as reported by Synchro,Version 10.
Bloom
Fort Collins, CO
VIII. Access Management and Improvements
Signal Warrants
It was identified in 2023 and 2030 analyses that at capacity levels of service on the side streets of the
following intersections may warrant signalization in order to operate at acceptable levels of service:
• Sykes Drive/Timberline Road
The Manual on Uniform Traffic Control Devices 2009 Edition (MUTCD) provides a nine (9)distinct warrants
for determining the appropriateness of a traffic signal as an operational improvement for an intersection.
Warrant 1 — Eight-Hour Vehicular Volume
Condition A— Minimum Vehicular Volume
Condition B— Interruption of Continuous Traffic
Condition C—Combination of Warrants
Warrant 2— Four-Hour Vehicular Volume
Warrant 3— Peak Hour
Condition A— Peak Hour Delay
Condition B— Peak Hour Volume
Warrant 4— Pedestrian Volume
Condition A— Peak Hour Volume
Condition B— Four-Hour Volume
Warrant 5—School Crossing
Warrant 6—Coordinated Signal System
Warrant 7—Crash Experience
Warrant 8— Roadway Network
Warrant 9— Intersection Near a Grade Crossing
Due to the availability of the data from this traffic study, Warrant 3 was considered to confirm the use of a
traffic signal as an improvement for the above intersection.The peak hour warrant worksheets are provided
in Appendix J and based on the 2023 and 2030 forecasts provided in Figure 6-2 (2023) and Figure 6-3
(2030) and the LOS analysis provided on Table 7-1. The following scenarios were evaluated for Warrant 3
— Peak Hour warrants:
• Sykes Drive/Timberline Road (2023— Phase 1)— NOT Warranted
• Sykes Drive/Timberline Road (2030— Phase 2)—Warranted
As mentioned previously, a sensitivity analysis was performed to determine approximately how much
additional development can be accommodated above Phase 1 assumptions before a signal would be
triggered. For this sensitivity analysis, it was assumed that development would occur south of the Great
Western Railroad tracks after Phase 1 and that the Peakview development would not be constructed and
occupied. With these assumptions and those assumptions guiding Phase 1 analyzes, the Phase 1
multifamily unit count was increased until the Peak Hour Warrant was trigger. From this exercise it was
determined that approximately 1,000 additional multifamily units could be accommodated before a signal
was warranted. The worksheet for this analysis is provided in Appendix J. It should be noted that due to the
uncertainty of the pace of background regional growth, the development timeline of the Peakview
Galloway&Company, Inc.
Bloom
Fort Collins, CO
development and other uncertainties the proposed signal at Sykes Drive and Timberline Road should be
reassessed with filings above and beyond the Phase 1 analysis contained herein.
Access Management
According to access management guidelines provided in the LCUASS signalized spacing along Timberline
Road should be spaced at a minimum of a quarter mile. It is anticipated that the Vine Drive/Timberline Road
intersection will be signalized in the future and is the nearest signalized intersection to the proposed Sykes
Drive/Timberline Road signal.These two intersections are approximately a quarter mile apart and therefore
would meet access management standards. Additionally, if a future signal warrant anticipates that a signal
would be warranted at a future International Boulevard/Timberline Road intersection the spacing of all
signals along Timberline Road would be adequate and operate effectively.
International Boulevard/Greenfields Drive Operations
It has been shown previously in this TIS that the International Boulevard/Greenfields Drive intersection
would operate effectively as a STOP controlled intersection. It has been requested by the City of Fort Collins
to provide a sensitivity analysis related to the possible signalization improvement of this intersection. Peak
hour signal warrants were conducted base on the 2040 volumes contained herein.As provided in Appendix
K and shown below the intersection would require significant additional growth and/or development to
warrant signalization. It is not anticipated that regional growth or regional pipeline development would utilize
the proposed intersection in percentages great enough to trigger the warrant signalization. In the event that
this assumption is wrong the right-of-way would exist to improve the intersection to a signal. A roundabout
would be precluded as an improvement at this location as it would likely never be warranted.
Peak Hour Vehicular Volume
Community Population Greater Than 1 o,000 and Major Street Approach Speed Below 40 mph
600
a
Warrant Guru e
m ----- ■Warranted
- ♦ Unwarranted
400 ------�`-------'-------`----_-_-'-------`-- --`-------'-------` ---'-------'-------`------ -------------- 1 Ma1w.1 Manor
- 1 Major,2+Minor
I I I I
I I
300 ------+--------------�"'---_+------- --------`-^ ------- ---- ------•-------I------- ------'+------- ------ 2-Major.1 Mirror
2+Major,2+Minor
a -
200 - ,r r -
100 ------
-----------------i______2______-l__ ___ _______I I_______i_____ <�--�
N
r
� o
400 500 600 700 800 900 1000 1100 12M 1300 14M 1500 1600 1700 18M
Map Street-Total of Both Approaches{V'PF@
Figure 8-1 International/Greenfields 2040 AM Peak Hour Warrant
Galloway&Company, Inc.
Bloom
Fort Collins, CO
Peak Hour Vehicular Volume
community Population Greater Than 10,000 and Major Street Approach Speed Below 40 mph
r 606
a
CL —Warrant Curve
$ SOD ------'-.----'-------`—- -' ---,`------ ------ ------ -------- -- - -------
i warranted
a - ♦Unwarranted
a 400 ------ `-----'-------`- ------ ------ ------- ----- -------------- ------ ----- -----
1 Major,1 Mirwr
1 Major,2+Minor
5 30(F ----- --`--%------`;.'`.--- -`---- — ------ - -- ----- ------ --"-- -'--- ----` -`--- 2+Major.1 Minor
2+Maps,2+Minor
d -
a
_ -
=s 1DO _____________J_______L----—-=-------l--—--- _--—--——_———-——__________—_ _
� 0
400 S00 600 700 SOO 900 10D0 1100 1200 1300 140D 15M 16M 1700 1NO
Major Street-Total of Both Approaches(VPFQ
Figure 8-2 International/Greenfields 2040 PM Peak Hour Warrant
Nearby potential development was considered per conversations with the City of Fort Collins. It was
identified that there is potentially± 80 acres west of the Bloom development and south of International
Boulevard extension that could be developed (57.41 on Barker and ± 20 acres additional proximate to
Timberline Road. Per the densities provided in the East Mulberry Corridor approximately 3.39 du/acre
was assumed on Barker and 7-12 du/acre (assumed 12 du/ac to be conservative)for the remaining land
area. This would equate to fewer than 500 residential units that would be developed with their own
access and opportunity to access the local network. This represents approximately 350 additional AM and
450 PM peak hour trips spread out over multiple intersections. This additional development and trip
generation is conservative in estimation and on an unknown timeline of development. It is unlikely that
nearby development would trigger the long range signal warrant at International Boulevard and
Greenfields Drive on its own.
Safety Assessment of Mulberry Road/Greenfields Court
Per the request of the City of Fort Collins a safety assessment is being provided for the existing and future
signalized intersection of Mulberry Road/Greenfields Court. Crash data was available for the most recent
four years at the subject intersection provided by Larimer County. Raw crash data is provided as Appendix
K. According to the data there was one (1) incident in 2018, four(4) incidents in 2019, two (2) in 2020 and
two (2) in 2021. Of the nine (9) reported incidents five (5) were directly related to drive behavior (DUI,
distracted, etc.). An additional incident was reported as a vehicle striking a fixed object, and another has a
hit and run. The remaining two incidents are typical of a signalized intersection although one of these is
reported as "non-intersection"The accidents reported for this intersection also reported no pedestrian/bike
accidents. It can be concluded that there is no safety concern at the existing signalized intersection. All
non-driver incidents were reported as 25 mph or less. Improvements to this intersection will be designed
with all appropriate LCUASS and national guidelines considered. It is anticipated that this intersection will
continue to operate in a safe and effective manner.
Galloway&Company, Inc.
Bloom
Fort Collins, CO
Vill. Conclusions and Recommendations
Conclusions
Based on the results of this traffic impact study, the following may be concluded:
• Under existing traffic conditions, the stop-controlled intersections within the study area currently
operate at overall acceptable levels of service (LOS) "E" or better during the weekday AM and PM
peak hours.
• Under background future 2023 and 2030 traffic conditions, without the development of the subject
site, delays would increase slightly at study intersections due to regional traffic growth. The stop-
controlled intersections would continue to operate at LOS "D" or better with Sykes Drive operating
at capacity LOS "F" in the 2030 AM peak hours.
• The proposed site development would generate, upon completion and full occupancy, 1,569 new
weekday AM and 1,857 new weekday PM peak hour vehicle trips as well as 21,821 new weekday
daily trips.
• Under 2023 total future traffic conditions with development of Phase 1 of the site, all study
intersections, including proposed site connections would operate at overall acceptable levels of
service consistent with background conditions. The exception to this is the westbound left
movement at Sykes Drive/Timberline Road. A signal would not be warranted at this level of
forecasted volume. Phase 1 of the proposed development can be accommodated solely through
the connection at Sykes Drive through the Mosaic development and the extension of Greenfields
Court to the south via a newly constructed roundabout.
• Under 2030 total future traffic conditions the full buildout of the proposed development will be
accommodated by the proposed connections to the surrounding network. The exception to this is
the westbound left movement at Sykes Drive/Timberline Road.A signal would be warranted at this
level of forecasted volume.
• In 2040 long range conditions would be accommodated by the full buildout of the proposed network
with all study intersections operating at acceptable levels of service.
Recommendations
• During Phase 1 of development the Applicant should provide the following improvements to
accommodate site development:
o Construct Greenfields Court from Sykes Drive to the Frontage Road
o Improve the Greenfields Court/Frontage Road intersection to a roundabout with flared dual
lane approaches on the north and southbound approaches
o Provide connections to the west to connect to the Sykes Drive/Timberline Road intersection
• New roadways within the site should be constructed per the City of Fort Collins design guidelines
contained within the LCUASS and analyzed herein.
Galloway&Company, Inc.
Bloom
Fort Collins, CO
• It is recommended that as nearby pipeline development is constructed, and growth continues to
occur, signal warrant studies be conducted at Sykes Drive/Timberline Road to determine timing
and cost share for future signalization. At such a time where a signal is warranted at Sykes
Drive/Timberline Road or a filing is forecasted to trigger a warrant the Applicant should:
o Contribute to the signalization of Sykes Drive/Timberline Road intersection
• In order to accommodate development traffic north of the Great Western Railroad the Applicant
should provide the following improvements to accommodate site development:
o Construct Greenfields Court from Sykes Drive north to connect to Vine Drive
o Provide pedestrian and bicycle connection to facilitate access across the Great Western
Railroad
• During Phase 2 of the development contributions should be made to the improvement of Mulberry
Road/Greenfields intersections improvements
Galloway&Company, Inc.
Bloom
Filing 4 Traffic Memorandum
Attachment III
Excerpts from Montava Phase G&E Traffic Impact
Study
O _ II"I THURSDAY, APRIL 28, 2022 THURSDAY, APRIL 28, 2022 THURSDAY, APRIL 28, 2022 THURSDAY, APRIL 28, 2022
w r� 04� I` m 7:45-8:45AM (4:15-5:15PM) 7:15-8:15AM (4:45-5:45PM) 7:45-8:45AM (4:00-5:OOPM) 7:45-8:45AM (4:00-5:OOPM)
• 2 3 4
RICHARDS LAKE ROAD
M, o 0
LO
•k l . iq ! Q1' -i w�• 1,500 T _o °3 4(6) c� rc°i ao 7(10) o o 1(D) o o 1(1)
D' a o n+ p(g) N N +n 13(13) 37(43) N +OF
75 44 y 10 17 y 45 53 y 71 42
_ _ _
a
MAPLE HILL DR ��y 1(0) � � � 20(34)
� '` 2(1) 15(20)— co co v 28(29) i r m
O w S N ODD Ln N N N O V
O, # 04
+' 16(16)� n C) LO 55(23)� N o m 2(14)� c2 co o
>
5,100 CAl
CV ° ,> I �"
_ pQ r ; p RICHARDS LAKE & TURNBERRY RD RICHARDS LAKE & GIDDINGS RD RICHARDS LAKE & BUSC H DR MAPLE HILL DR & TURNBERRY RD
74
Rp t f 7 qC THURSDAY, APRIL 28, 2022 TUESDAY, AUGUST 24, 2021 THURSDAY, APRIL 28, 2022 WEDNESDAY, MAY 4, 202:%
0 m I' 7:30-8:30AM (4:00-5:OOPM) 7:45-8:45AM (4:30-5:30PM) 7:45-8:45AM (4:00-5:OOPM) 7:00-8:DDAM (4:45-5:45PM)
W °_• ° s z
6 7 8
W
ww
°F 4'KF `'t om m _ �. FZ Ch
Q )t ''� g1 its ,g I'I rn 2(0) ^ N 10(21) o G �, 96(231)
Q # � F"�''�`I' I¢'' MOUNTAIN VISTA DRIVE � t v —33(15) d � N �172(142) N m � �44(29) d• N <--2(22)
w 8 - 9 10 1(1) ,--183(151) 125(19)
J 4(7)--7 4(11)— 100(205)— 9(5)�
H A s E E 7(10)— v rn 177(253)— rn N n 30(57)— M rn 26(8)
iJJo y sue, ._3 ems+ i.• 1(2) , N N 80(53)-y c o m 132(149) v
i # .� PHASE G M - a M i r
t
ao II
n
N MAPLE HILL DR & BAR HARBOR COUNTRY CLUB & LEMAY AVE COUNTRY CLUB & TURNBERRY MOUNTAIN VSTA & TURNBERRY RD
W
u� w H THURSDAY, APRIL 28, 2022 THURSDAY, APRIL 28, 2022 THURSDAY, APRIL 28, 2022 THURSDAY, APRIL 28, 2022
tl m W„ ` 7:45-8:45AM (4:00-5:00PM) 7:00-8:OOAM (4:45-5:45PM) 7:00-8:OOAM (4:00-5:OOPM) 7:00-8:OOAM (4:00-5:OOPM)
9 10 11 12
tit R z`
1 O m in
r, 63(118) r n 39(59) v CO
—91(175) —142(216) + —192(302) It c' <--191(314)
L 206(152) L y y y 184(105)
VINE D 7rw.�i i m' :�. r 7 58(137) , 8(7) ,
5,300 4 -- 63(120)-> a ^ 205(159) 346(232) 73(70)�
15 -
O'P, !111 � ) . T €1 11 ( r 38 ( )�
. 1
8 91)� 5 241
- ���.^ 0�1coo 0
C41
13 14 15 MOUNTAIN VISTA & TIMBERLINE RD MOUNTAIN VISTA & GIDDINGS RD MOUNTAIN VISTA & BUSCH DR MOUNTAIN VSTA & -25 SB RAMP
CY
O
26(20) rn v �67(51) Cl) r-9(10)
<--237(144) (0 v <--221(212) Lco:' N 1� <--197(164)
67(37) ) 1 1 115(89)
33(31)— 1(8) T � 20(45)— T
39(63)— n r rn 155(205) o EQ, m 108(171) a 6 iz�,
co <r co ) co
m w 27(59) a m 65 N 115(112)� J Z
co rn rn o2
MOUNTAIN VISTA & 1-25 NB RAMP VINE DR & LEMAY AVE VINE DR & TIMBERLINE RD
THURSDAY, APRIL 28, 2022 THURSDAY, APRIL 28, 2022 THURSDAY, APRIL 28, 2022 LEGEND
7:15-8:15AM (4:30-5:30PM) 7:30-8:30AM (4:30-5:30PM) 7:30-8:30AM (4:15-5:15PM) O Study Area Key Intersection
XXX(XXX) Weekday AM(PM)
FIGURE 3 Peak Hour Traffic Volumes
MONTAVA PHASE G & E
FORT COLLINS, COLORADO NORTH Xx,X00 Estimated Daily Traffic Volume
NTS 196474000
2022 EXISTING TRAFFIC VOLUMES
Kimley*Horn