HomeMy WebLinkAboutBLOOM COMMUNITY POOL & PARK - BDR250007 - SUBMITTAL DOCUMENTS - ROUND 1 - Drainage Related Document IG
CiviiWorx
Final Drainage and Erosion Control Report
----------------
Bloom Park tic Pool `�..
Fort Collins, CO ..
V
ID
it
I •
�'t'�'•"-t COMMUNITY
Prepared for:
Hartford Acquisitions LLC
4801 Goodman Road
Timnath,CO 80547
February 19, 2025
4025 Automation Way,Ste B2 Fort Collins,CO 80525 1 970-698-6046 1 www.civilworxeng.com
Final Drainage and Erosion Control Report
Bloom Park&Pool
CivilWorx Fort Collins,CO
February 19, 2025
Mr. Wes Lamarque
City of Fort Collins Engineer
281 North College Ave
Fort Collins, CO 80524
RE: Bloom Park& Pool Final Drainage Design and Erosion Control Report
Project Number:C24008
Dear Wes,
CivilWorx, LLC is pleased to submit this Final Design and Erosion Control Report for the Bloom Park&Pool
Development in Fort Collins, Colorado. This report serves to document the Final design plans for the
Bloom Park and Pool Development, and to show conformance with the previously approved drainage
master plan by Galloway (Bloom Filing 1 and Filing 1 Amendment). The proposed modifications to the
park site include updates to the existing catchment delineations and impervious areas, and new storm
flow routing based on a review of the overall drainage plan for the greater subdivision. In general, the
proposed plan is not substantially different from the drainage plan presented with the preliminary plan
review. CivilWorx has re-evaluated flows and capacity information for the existing storm sewer which
bisects this park site as it will be used to convey the minor flows generated by the park site into the existing
sand filter, and ultimately outfall into Pond D.
We understand that review by the City of Fort Collins is to assure general compliance with standardized
criteria contained in City of Fort Collins Storm Drainage Design Criteria and Construction Standards. This
report was prepared in compliance with technical criteria set forth in both the Urban Drainage and Flood
Control District(UDFCD) Urban Storm Drainage Criteria Manual and the City of Fort Collins Storm Drainage
Design Criteria.
If you should have any questions or comments as you review this report, please feel free to contact me at
your convenience.
Respectfully,
Scott Nesbitt, PE
Senior Project Engineer
CivilWorx, LLC
I C24008-Bloom Park&Pool Drainage Report
Final Drainage and Erosion Control Report
Bloom Park&Pool
CiVilWorx Fort Collins,CO
TABLE OF CONTENTS
PAGE
I. General Location and Description........................................................................................................................1
A. Location .......................................................................................................................................................1
B. Description of Property...............................................................................................................................1
II. Drainage Basins and Catchments.........................................................................................................................3
A. Major Basin Description...............................................................................................................................3
B. Pre-Project, Planned Drainage Patterns......................................................................................................3
III. Drainage Design Criteria ......................................................................................................................................4
A. Regulations..................................................................................................................................................4
B. Development Criteria Reference and Constraints.......................................................................................4
C. Hydrological Criteria....................................................................................................................................4
D. Hydraulic Criteria and Governing Standards ...............................................................................................4
IV. Drainage Facility Design.......................................................................................................................................5
A. General Developed Project Overview..........................................................................................................5
V. Sediment/Erosion Control..................................................................................................................................10
VI. Conclusions........................................................................................................................................................10
A. Compliance with Standards.......................................................................................................................10
B. Drainage Plan.............................................................................................................................................11
VII. References.....................................................................................................................................................11
Vill. Certification...................................................................................................................................................12
List of Figures
Figure1.Vicinity and Phase Map...................................................................................................................................1
Figure 2. Lower Cooper Slough Drainage Basin—As Shown on the City of Fort Collins Website..................................3
Figure 3. Proposed Drainage Plan..................................................................................................................................6
List of Tables
Table 1. Existing Catchment Planned Drainage Parameters..........................................................................................3
Table 2. Developed Catchment Runoff Summary.........................................................................................................7
Table 3.Storm Sewer Piping Summary..........................................................................................................................8
Table 4.Storm Sewer Hydraulic Grade Line Summary..................................................................................................9
Table 5.Storm Sewer Inlet Interception Summary.....................................................................................................10
APPENDICES
APPENDIX A—Drainage and Erosion Control Plans
APPENDIX B—Hydrological Modelling(EPA SWMM)
APPENDIX C—LID/Water Quality Calculations
APPENDIX D—Referenced Reports
I I C24008-Bloom Park&Pool Drainage Report
Final Drainage and Erosion Control Report
Bloom Park&Pool
CivilWorx Fort Collins,CO
I. General Location and Description
A. Location
The Bloom Development (referred herein as "the site") is located north of State Highway 14 (Mulberry
Street)and just west of Interstate 25.The site is located within the southwest half of Section 9,Township
7 North, Range 68 West of the 6th Principal Meridian in the City of Fort Collins,County of Larimer,State of
Colorado. The site is located on the parcel of land #8709229005 owned by "MULBERRY DEVELOPMENT
LLC". A vicinity map is shown with Figure 1.
i rJ t'HI Il•NU�te• �;
� Qa h(u dl*'atialf/ IttOHfp 41 '�,_�
'I ; _ 75rit/lilFj.il101A1. T— J�L �
C291if `i'�"7917N {
� I
.?� r l+tt'L.,i.i '
tie rl ff.IJ1 —..(,r- t1�.
j {•fd 1 `,f
qq h
o 645 r �,
'S.$"� -'"- cl 1 1 } ',1� I �,,��' •-�,[.a �,{ it N11
t.
Figure 1. Vicinity and Phase Map
B. Description of Property
Currently, the project site is partially developed with the adjacent roads to the south and west sides of
the site already constructed. The park site is directly adjacent to Pond D, which sits just east of the site
and is currently operational.There is an existing pump house on the eastern side of the site,which will be
incorporated into the landscaping and design of the park.There is also an existing mail kiosk structure on
the west side of the site which will be protected in place during the construction of this park. An existing
private storm line and associated easement is located in the center of the site running east to west. This
storm line conveys flows from previously constructed portions of the site with an outfall into the sand
1
Final Drainage and Erosion Control Report
Bloom Park&Pool
CivilWorx Fort Collins,CO
filter within Pond D. The historic use of the property was agriculture and farming and thus characterized
as a tilled field.The site currently has been overlot graded and largely filled. Below is a detailed summary
of the existing conditions:
Ground Cover-The site is currently partially developed,with some existing structures and utilities
therefore ground conditions can be characterized as bare native soils roughly graded to support
the construction of the pumphouse and grading of Pond D.
Grades—In general,the entire site drains to the south southeast.These grades are generally less
than 1%,with a few localized areas that slope between 2-5%.
Soil Type-According to the Natural Resources Conservation (NRCS)web soil survey and report,the
site consists of Garret loam and Ascalon sandy loam soils of hydrologic soils groups Type B and C.
Soils are assumed type C/D for drainage purposes.
Utilities—The site includes the existing storm sewer within property,which will be utilized in the
drainage design of the park. Domestic water and sanitary sewers stubs have been provided along
the west side of the site, south of the mail kiosk. There are utilities associated with the pump
house including an electrical service, gas services, and associated irrigation lines. Natural gas,
telephone,fiber, and electric are installed around the perimeter of the site on the west and south
sides of the site.
Groundwater—Groundwater was observed at depths of 10'to 12' below the general project site
(Appendix D). Note that this site will generally be filled during the earthwork phase of
construction.
2
Final Drainage and Erosion Control Report
Bloom Park&Pool
CivilWorx Fort Collins,CO
II. Drainage Basins and Catchments
A. Major Basin Description
This site is located within the Cooper Slough drainage basin as most recently described in the Mulberry
Master Drainage Plan (MDP) by Galloway Engineering Firm and dated April 6th, 2021,with the last revision
of the report being dated as June 20, 2023.
Figure 2. Lower Cooper Slough Drainage Basin—As Shown on the City of Fort Collins Website
B. Pre-Project, Planned Drainage Patterns
The project site is located within the Cooper Slough Drainage Basin as shown in Figure 2 above. The
proposed site area for the park is minor, consisting of only 2.45 acres.The pre-project drainage pattern
for the site is generally flowing south southeast with overland flows either running off directly into Pond
D or reaching adjacent streets N Aria Way and Skyes Dr, where flows will reach existing storm drain
inlets which outfall into Pond D. The nearest receiving waters to the site are the Cooper slough drainage
and wetlands (approximately 1,200 feet from the site)that flow into the Boxelder Creek,which further
transports water to the Poudre River. Below is summary of the existing catchments within which the
project sits, these catchments had planned C-values as a broad way of estimating the planned
impervious areas for the future development areas. The site is primarily located within Basin "D18.1"
with minor impacts to "D14" and "D19".
Table 1. Existing Catchment Planned Drainage Parameters
Existing Basin Area(ac.) C2 Cioo
D18.1 2.22 0.8 1.0
D14 0.75 0.7 0.87
D19 0.62 0.79 0.99
3
Final Drainage and Erosion Control Report
Bloom Park&Pool
CivilWorx Fort Collins,CO
III. Drainage Design Criteria
A. Regulations
The design criteria for this development are the City of Fort Collins Stormwater Drainage Criteria Manual
(FCSDCM) dated March 2018 and the Mile High Flood District Criteria Manuals Volumes 2, and 3 (referred
to herein as MHFDCM).
B. Development Criteria Reference and Constraints
The criteria used as the basis to analyze and design stormwater features of this project were done
according to the references cited in this report.
C. Hydrological Criteria
In accordance with the City of Fort Collins policy, a minor and major storm are identified as the 2-year and
100-year storms, respectively. These storms have been used as a basis for planning and design. The
proposed developed drainage networks, including the stormwater detention system, are designed using
the USEPA Stormwater Management Model (SWMM version 5.2.4) software. SWMM input parameters
for catchment runoff utilized Table 4.1-1 of the referenced FCSDCM, as was done with a previous
CivilWorx analysis of the Bloom Multi Family Development(dated 6/25/2024).
Post development runoff for the site will be in accordance with the previously approved Bloom Filing 1
Amendment — drainage modifications and the Mulberry and Greenfields Master Drainage Plan both of
which were developed by Galloway Engineering.
D. Hydraulic Criteria and Governing Standards
The developed site will convey runoff to an existing detention pond, adjacent to the site to the east via a
combination of channelized flow, sheet flow, and storm sewer, then release to the downstream system
per the approved Mulberry and Greenfields Master Drainage Report as currently amended by Galloway
Engineering. SWMM modeling was used to verify conformance with the Galloway drainage report and to
ensure the existing storm lines have adequate capacity to convey the runoff created by the development
of this park and pool site. Hydraulic calculations for all pipes and swales were also completed using EPA-
SWMM and are included in this report. SWMM catchment width parameters are calibrated using the
theory of cascading planes (see Guo reference). This method was also documented in the 2016 SWMM
Hydrology Reference Manual published by the EPA.
4
Final Drainage and Erosion Control Report
Bloom Park&Pool
CivilWorx Fort Collins,CO
IV. Drainage Facility Design
A. General Developed Project Overview
The developed Bloom project site area includes the construction of a pool with associated buildings,
parking areas, landscaped areas, a playground, a pickleball court, sidewalks and gravel paths. The Bloom
Park and Pool project is part of the Cooper Slough basin whose ultimate outfall is Boxelder Creek, located
south of Colorado Highway 14 (Mulberry Street). Runoff from the Bloom Park and Pool site will be
captured using a combination of curb&gutter,storm inlets,and storm sewer pipe(existing and proposed)
being conveyed to an existing onsite detention facility. This detention pond, designated as Pond D, will
also include inflow from adjacent property to the east, west and north as shown on the Mulberry and
Greenfields Master Drainage Plan (as currently amended) by Galloway Engineering.
It is noted that the Galloway drainage modelling for the Bloom site and impacted basins had C-values
ranging near 1 and therefore would be approaching an assumed 100%impervious coverage based on the
catchment parameters within the referenced report (Appendix D). The proposed impervious area is
considerably less than the full impervious coverage originally assumed by the drainage master plan.
Modifications to the drainage plan from previous submittals include the addition of building roof drain
collection and a more detailed design for the LID chamber system.
Overall Drainage Plan
The overall drainage plan is to convey runoff to the detention facility Pond D, on the east side of the site
prior to discharging via the existing Pond D outlet as was planned in the Galloway Master drainage report.
Following is an analysis of the site drainage concepts and routing as well as a summary of all of the
proposed on site drainage Catchments. All flow summaries at design points, including conveyance
facilities, have been designed in detail as part of the EPA SWMM model.
Catchments D14-1 and D14-2:
These two catchments are situated on the west side of the site,they represent areas of the site which will
flow overland westward to the existing Aria Way street.These minor flows will be intercepted by existing
storm inlets on Aria near the northwest corner of the site. From here it is carried through Storm Line Z
and into the existing detention pond D. Street capacities, inlet sizing, and storm sewer sizing were all
completed using EPA-SWMM.
Catchment D18.1A—D18.1H:
These catchments represent most of the developed park area, all falling within the existing planned
catchment area for D18.1, according to the Galloway Master Drainage report. These catchments are
summarized below in Table 2.These catchments generally flow toward the existing storm sewer situated
in the center of the site running from the west to the east, with an outfall into Pond D via a forebay and
sand filter. Internal site runoff is conveyed via gentle overland flow channelized curb/gutter/pan flow,
storm pipes ranging from 8"to 18"in size,some smaller area inlets including 24"x24" Nyloplast area inlets,
and one type 13-inlet near the SW corner of the site. Street capacities, inlet sizing,and storm sewer sizing
were all completed using EPA-SWMM.
5
Final Drainage and Erosion Control Report
Bloom Park&Pool
CivilWorx Fort Collins,CO
Catchment D19-1:
This 0.06-acre catchment is located at the south side of the site, near the SW corner of the site. This
catchment flows south to the existing Skyes Drive.These minor flows will be intercepted by existing storm
inlets on Skyes Drive just east of the project site, ultimately flowing into the existing detention pond D.
Street capacities, inlet sizing, and storm sewer sizing were all completed using EPA-SWMM.
Catchment D24-1:
This small 0.02-acre catchment is located on the west side of the park site, just east of the proposed
courts.This small area will flow overland directly into pond D.
-------------- ----------------------------------------------------- r
1
Ir
� r
■ f
arm .!
SMNA,3 I �
iSIQMlNELv f
ST.IiNAt••-1 -
` /��� 1 �N b,o�•�. --� sy 5 die, ,.
1 a•i.vxw owuu � Ime �j
sror-
R mom
� I
�--.-----.------- j
SYKES DOW
Figure 3. Proposed Drainage Plan
6
Final Drainage and Erosion Control Report
Bloom Park&Pool
CivilWorx Fort Collins,CO
Drainage Catchment Summaries
The following is a summary of the Catchment runoff characteristics:
Table 2. Developed Catchment Runoff Summary
Catchment Area % C2 Q2 Cioo Qioo
(ac.) Imperv. cfs cfs
D14-1 0.26 9% 0.059 0.05 0.553 1.57
D14-2 0.11 34% 0.23 0.08 0.683 0.98
D18.1A 0.75 8% 0.054 0.13 0.502 2.52
D18.1B 0.03 26% 0.176 0.02 0.647 0.26
D18.1C 0.18 83% 0.66 0.36 0.894 1.72
D18.111) 0.43 31% 0.209 0.29 0.657 3.23
D18.1E 0.11 48% 0.332 0.1 0.74 0.88
D18.1F 0.11 89% 0.722 0.22 0.92 1.03
D18.1G 0.07 21% 0.142 0.03 0.616 0.52
D18.1H 0.31 78% 0.605 0.55 0.871 2.9
D19-1 0.06 20% 0.135 0.03 0.621 0.51
D24-1 0.02 38% 0.607 0.56 0.872 2.93
Note the infiltration parameters prescribed by the FCSDCM represent fully saturated underlying soil
moisture conditions and thus produce very high runoff rates and volumetric yields.
Storm Sewers
The proposed drainage system for Bloom Park and Pool was modeled in EPA-SWMM to determine pipe
sizing and flow routing. The SWMM models for the 100-year and 2-year storms are included in Appendix
B for reference.
• Storm Line A.1-This system drains the western portion of the site to the existing storm
drainage line 29x45 HERCP pipe running east-west through the site,and into Pond D. This
storm drainage infrastructure is composed of 8" and 12" ADS storm pipe with small area
inlets to capture flows caught between the existing mail kiosk and the slide hill.
• Storm Line B-This system collects drainage along the southern and eastern portions of
the site, south of the pump house. Flows from the parking lot and ball courts are routed
to a pan and type-13 inlet. From here flows are conveyed to the north through 12" and
18" storm lines, connecting to the existing 36-inch storm line via a new connection
Manhole constructed over the existing storm.These flows outfall into Pond D
• Storm Line B.1-This system collects drainage along the pool deck between the pool and
the pool buildings captured via a trench drain. The trench drain then connects to 8-inch
ADS lines which feed back into the main trunk of Storm Line B, and its outfall into the
existing 36-inch RCP storm and into Pond D.
Table 3 summarizes the pipe flows for the storm sewer systems for the project.
7
Final Drainage and Erosion Control Report
Bloom Park&Pool
CiVil''W orx Fort Collins,CO
v v Table 3.Storm Sewer Piping Summary
Link Element Size V2 Q2 Vioo Qioo Upstream Downstream
(in) fps cfs fps cfs Node Node
EX PIPE A.1-1 Zl 29x45 1.94 0.42 5.39 1.48 STM.MH A.1-1 SDMHZI
EX PIPE B-1 POND-D 36 4.07 0.93 7.93 3.33 STM.MH B-1 POND D
EX PIPE Zl B-1 36 3.02 0.79 5.74 2.75 SDMHZI STM.MH B-1
EX PIPE Z2 A.1-1 29x45 2.19 0.43 5.41 1.51 SDMHZ2 STM.MH A.1-1
PIPE A.1-2 A.1-1 12 1.47 0 2.65 0.13 STM A.1-2 INV. STM.MH A.1-1
PIPE B.1-0 B.1-OA 4 3.75 0.82 3.92 1.05 STM B.1-0 INV STM 6.1-0A INV.
PIPE B.1-0 B-2 8 2.15 0.11 2.87 0.35 STM 6.1-1 INV. STM B-2 INV
PIPE B.1-OA B.1-1 8 3.17 0.14 3.51 0.21 STM 13.1-0A INV. STM B.1-1 INV.
PIPE B-1 18 2.71 0.1 4.25 0.49 STM B-1 INV STM.MH B-1
PIPE B-2 B-1 18 2.71 0.1 4.21 0.49 STM B-2 INV STM B-1 INV
PIPE B-3 B-2 12 2.49 0.21 4.36 1.13 STM B-3 INV STM B-2 INV
PIPE B-4 B-3 12 2.59 0.21 3.94 1.12 STM B-4 INV. STM B-4 INV.
EX PIPE A.1-1 Zl 29x45 1.94 0.42 5.39 1.48 STM.MH A.1-1 SDMHZI
EX PIPE B-1 POND-D 36 4.07 0.93 7.93 3.33 STM.MH B-1 POND D
EX PIPE Z1 B-1 36 3.02 0.79 5.74 2.75 SDMHZI STM.MH B-1
EX PIPE Z2 A.1-1 29x45 2.19 0.43 5.41 1.51 SDMHZ2 STM.MH A.1-1
PIPE A.1-2 A.1-1 12 1.47 0 2.65 0.13 STM A.1-2 INV. STM.MH A.1-1
PIPE B.1-0 B.1-OA 4 3.75 0.82 3.92 1.05 STM B.1-0 INV STM B.1-0A INV.
PIPE B.1-0 B-2 8 2.15 0.11 2.87 0.35 STM 6.1-1 INV. STM B-2 INV
PIPE B.1-OA B.1-1 8 3.17 0.14 3.51 0.21 STM 13.1-0A INV. STM 6.1-1 INV.
PIPE B-1 18 2.71 0.1 4.25 0.49 STM B-1 INV STM.MH B-1
PIPE B-2 B-1 18 2.71 0.1 4.21 0.49 STM B-2 INV STM B-1 INV
PIPE B-3 B-2 12 2.49 0.21 4.36 1.13 STM B-3 INV STM B-2 INV
PIPE B-4 B-3 12 2.59 0.21 3.94 1.12 STM B-4 INV. STM B-4 INV.
EX PIPE A.1-1 Zl 29x45 1.94 0.42 5.39 1.48 STM.MH A.1-1 SDMHZI
EX PIPE B-1 POND-D 36 4.07 0.93 7.93 3.33 STM.MH B-1 POND D
EX PIPE Z1 B-1 36 3.02 0.79 5.74 2.75 SDMHZI STM.MH B-1
EX PIPE Z2 A.1-1 29x45 2.19 0.43 5.41 1.51 SDMHZ2 STM.MH A.1-1
PIPE A.1-2 A.1-1 12 1.47 0 2.65 0.13 STM A.1-2 INV. STM.MH A.1-1
8
Final Drainage and Erosion Control Report
Bloom Park&Pool
CiVilWorx Fort Collins,CO
Table 4 summarizes the hydraulics of the proposed drainage plan for major and minor storm events.
Table 4.Storm Sewer Hydraulic Grade Line Summary
Node Element D2 HGL2 Q2 Dioo HGLioo Qioo
ft ft cfs ft ft cfs
Storm Sewer Structures
SDMHZ1 1.8 4944.3 11.71 4.1 4946.6 40.60
SDMHZ2 1.6 4944.4 11.73 5.0 4947.8 40.11
STM.MH A.1-1 1.7 4944.4 11.44 4.6 4947.3 40.12
STM.MH B-1 1.6 4944.1 12.30 3.4 4945.9 43.93
STM A.1-2 INV. 0.0 4946.0 0.02 1.3 4947.3 0.31
STM A.1-2 RIM 0.0 4949.4 0.02 0.1 4949.5 0.26
STM B.1-0 INV 0.2 4950.2 0.22 0.4 4950.4 0.27
STM 8.1-0 RIM 0.4 4952.1 0.22 0.5 4952.2 1.03
STM B.1-OA INV. 0.2 4948.8 0.41 0.2 4948.8 1.44
STM B.1-1 INV. 0.2 4948.3 0.23 0.3 4948.4 0.76
STM 8.1-1 RIM 0.0 4950.6 0.03 0.1 4950.7 0.52
STM B-i INV 0.1 4946.1 0.76 0.3 4946.3 3.66
STM B-2 INV 0.3 4946.6 0.76 0.7 4947.0 3.61
STM B-3 INV 0.3 4946.8 0.54 0.8 4947.3 2.88
STM B-4 INV. 0.3 4947.3 0.54 0.9 4947.9 2.89
STM_B-4_RIM 0.1 4949.4 0.54 0.3 4949.6 2.90
Roadway Flowline/Curb at Storm Sewer Inlets
FL_D18.1H 0.1 4949.8 0.55 0.2 4949.9 2.90
RD.FL. D14-1 0.1 4948.6 0.13 0.3 4948.8 2.50
RD.FL. D14-2 0.1 4949.6 0.08 0.2 4949.7 0.98
Playground Sump Node
STORE D.18.1D* 0.2 4947.7 0.65 0.8 4948.3 5.68
* Note this the area of the playground which will be confined by a vertical curb,with an inlet into the
existing storm line at SDMHZI.
Inlets
The proposed drainage system was modeled in EPA-SWMM. Inlet sizing and intercepted flows were
modeled using the SWMM analysis, with corresponding flowline depths associated with inlets listed in
Table 4 from the assessment.
9
Final Drainage and Erosion Control Report
Bloom Park&Pool
CivilWorx Fort Collins,CO
Table 5 below summarizes intercepted flow with the proposed inlets for the minor and major storms:
Table 5.Storm Sewer Inlet Interception Summary
Inlet Name Inlet Type/Size Q2 Qioo
cfs cfs
STM A.1-2 INLET 24x24 Area Inlet 0.02 0.26
STM B.1-0 INLET 24x24 Area Inlet 0.22 0.27
STM B.1-1 INLET 24x24 Area Inlet 0.03 0.52
STM—B-4—INLET Type 13 0.54 2.89
Existing Detention Pond Conformance
The existing detention pond D was designed by Galloway, which was designed to provide storage for all
storm flows generated by this park and pool site. Given the fact that the Catchment D18.1 was planned
for a near 100% impervious area while the proposed average impervious for the entire site coming in at
under 40%composite imperviousness. Therefore, Pond D has been designed to manage flows more than
what is being proposed for the Park and Pool and the pond's performance will not be compromised. All
existing storm drainage information was sourced from the Bloom Filing 1 Amendment — Drainage
Modifications report by Galloway Engineering for the overall development.
Water Quality and LID Design
The subdivision infrastructure design includes provisions for Water Quality/LID associated with the Sand
Filter for Area D (LID 1 & LID 2). The drainage report for Filing 1 included design computations for 23.68
acres of tributary area. A review of the Filing 1 amendment drainage report found that the final tributary
for the LID sand filters is 17.74 acres including the proposed park area. Based on these findings, the
proposed site improvements are submitted as in conformance with the LID/WQ planning assumptions of
the original site infrastructure and no additional features or mitigation are required for the project. A
summary of the findings is included with Appendix C.
V. Sediment/Erosion Control
In addition to the information provided below, a separate Storm Water Management Plan (SWMP) was
prepared for this site in accordance with the Stormwater Discharge Permit for Colorado Department of
Public Health and Environment and the City of Fort Collins criteria. This document is not included with
this report but is part of the submittal. The SWMP has more detailed information on the sediment and
erosion control items for this project. For reference, the erosion control plan sheets are provided in
Appendix A.
VI. Conclusions
A. Compliance with Standards
Storm drainage calculations have followed the guidelines provided by the City of Fort Collins Stormwater
Criteria Manual and the Mile High Flood District Manuals Volumes Z and 3.
10
Final Drainage and Erosion Control Report
Bloom Park&Pool
CivilWorx Fort Collins,CO
B. Drainage Plan
The proposed drainage system is not anticipated to have issues associated with conveyance,collection or
detention based on the work to date in the subdivision planning. No negative impacts are expected due
to this development as related to the existing downstream drainage networks or subdivisions. The minor
increase in HGL is anticipated on the existing storm sewer due to the approx. 4-5 cfs of additional inflow
for a major storm. The depth of flow in the upstream connected street network was verified to maintain
the city depth criteria for the major storm event. In general,the proposed development is less impervious
than originally assumed for the affected sub catchments. Pond D will have a smaller overall inflow runoff
volume than originally planned based with the referenced Galloway drainage plan.
The Final drainage plan for the Bloom park and pool is submitted as being both viable and sound in terms
of drainage planning in both the short and long-term for the City of Fort Collins.
VII. References
1. City of Fort Collins Stormwater Criteria Manual, As adopted by the City Council of the City of
Fort Collins, as referenced in Section 26-500 of the Code of the City of Fort Collins, Revised
December 2018.
2. Mile High Floor District Drainage Criteria Manuals 2 and 3, Urban Drainage and Flood Control
District, Denver, Colorado, November 2010 with some sections revised January 2021.
3. Storm Water Management Model, Reference Manual Volume I, Hydrology, U.S.
Environmental Protection Agency,January 2016.
4. Storm Water Management Model, Reference Manual Volume II, Hydraulics, U.S.
Environmental Protection Agency, May 2017.
5. Mulberry Master Drainage Report,City of Fort Collins—Galloway, revised October 131h, 2021.
11
Final Drainage and Erosion Control Report
Bloom Park&Pool
Civi1'V"I orx Fort Collins,CO
VIII. Certification
"I hereby attest that this report for the Final drainage design of the Bloom Park and Pool was prepared by
me, or under my direct supervision, in general accordance with the provisions of the City of Fort Collins
Storm Drainage Design Criteria for the responsible parties thereof. I understand that the City of Fort
Collins does not and shall not assume liability for drainage facilities designed by others."
<Sealed with Final Approval>
Scott Nesbitt
Registered Professional Engineer
State of Colorado No. 52479
12
Final Drainage and Erosion Control Report
Bloom Park& Pool
CIVIL' orx Fort Collins,CO
APPENDIX A
• DRAINAGE AND EROSION CONTROL PLAN MAPS
A
d
° ° a
a ° A d .4 d" d..
d vdd° A 4
\ Node Bement IType I D 2(ft) HI 2(ft) (L2(cfs) Cl 00(ft) HCIL 100(ft) C 100(cfs)
d STOW SEVVB2STN;lJCTURES
I ` 9DMHZ1 JJNC11ON 1.8 4944.3 11.71 4.1 4946.E 40.60 CivilWorx SDMHZ2 .UNCTNON 1.6 4944.4 11.73 50 4947.8 40.11
STM.MH Al-1 ,JUNCTION 1.7 4944.4 11.44 4.61 4947.3 40.12
- - 4
_ 4025 Way
1 A: Automation
NCTNON 0 946 0 0 1 94 0 3 Suite B2
\ STM MH B-1 .J<JNCTNON 1 6 4944 1 12 30 3 4 4945 9 43 93
Au n a
STM A l-2 INV .)<J .0 4 .0 2 .3 4 7.3 1 ui e
STM Al-2 RIM ,1<JNCTNON 0.0 4949.4 0.02 0.1 4949.5 0.2E Fort Collins, CO 80525
/ 1 STM Rl-O INV .UNC_n0N 0.2 4950.2 0.22 0.4 4950.4 0.27 (970) 698-6046
I STM B 1-0 RIM ,UNCTNON 0.4 4952.1 0.22 0.5 4952.2 1.03 CivilWorxen .com
KEYMAP g
a STM B.1-0A INV ,UNCTNON 0.2 4948.8 0.41 0.2 4948.8 1.44 NTS
STM B.1-1 INV. ,UNCTNON 0.2 4948.31 0.23 0.3 4948.4 0.76
STM B.1-1 RIM .JIJNCTNON 0.0 4950.E 0.03 0.1 4950.7 0.52 y
N
STM B-1 11W ,UNC-n0N 0.1 4946.1 0.76 0.3 4946.3 3.66 LEGEND N o
\� STM B-2 INV .UNCTNON 0.3 4946.6 0.76 0.7 4947.0 3.61 v
/ STM B-3 INV ,ILINCTNON 0.3 4946.8 0.54 0.8 4947.3 2.88
° STM B-4 I JJNC11ON 0.3 4947.3 0.54 0.9 4947.9 2.89
/ 11 NV. MAPPING / SITE 3 Y
. \ STM B-4_RIM JJNC11ON 0.1 4949.4 0.54 0.3 4949.6 2.90
� C'_ °
4e ^ A \ ROADWAY FLONEICURBNODES PROPERTY BOUNDARY g a L) En
IM.I a
�\ I • FL D18.1H ,JUNCTION 0.1 4949.8 0.55 0.2 4949.9 2.9� RIGHT-OF-WAY w a) a
I I RD.FL D14-1 ,UNC-n0N 0.1 4948.E 0.13 0.3 o 4948.8 2.50 m 0 r ID
RD.FL D14-2 ,)<JNCTION 0.1 4949.E 0.08 0.2 4949.7 0.98 LOT LINES
PLAYGROUND SUMP =E - - - - - - EASEMENTS �' '
ao o
STORE_D.18.1D STORAGE 0.2 4947.7 0.65 0.8 4948.3 5.68 _ a��i � � a
OTHER
CENTER LINEM.
} m m
m C
D19-1 OUT OUTFALL 0.0 4950.5 0.031 0.0 4950.51 0.51 CURB AND GUTTER
/ -5100_ EXISTING CONTOURS o NUIlf 1dC
- - - - - - - - • 5100 PROPOSED CONTOURS
Size V 2 CL2 \ 100 Q 100 Downstream
Link Bement - - - Upstream Node ������������������ PHASING LINE N
(in) (fps) (cfs) (fps) (cfs) Node o
- - - _ •.'
d j / D( PIPE A 1-1 Z1 29x45 1.94 0.42 5.39 1.48 STM.MH Al-1 SDMHZ1 N
p D( PIPE B-1 POND-D 36 4.07 0.93 7.93 3.33 STM.MH B-1 POND D PROPOSED UTILITIES N
1 d a EXISTING STORM SEWER / D( PIPE Z1 B-1 36 3.02 0.79 5.74 2.75 SDMHZ1 STM.MH-
TM.MH B-1- - STORM DRAIN PIPE Li
r.1 1A
OUTLET STRUCTURE i/ B( PIPE 71 A 1-1 29x45 2.19 0.43 5.41 1.51 SDMHZ2 STM.MH A 1-1 w
PIPE A 1-2 A 1-1 12 1.47 0 2.65 0.13 S1M A 1-2_INV SW.MH A 1-1 m FLARED END SECTION
PIPE B.1-0 B.1-OA 4 3.75 0.82 3.92 1.05 STM B.1-0 INV STM B.1-OA INV ® STORM DRAIN INLET m
PIPE B.1-0_B-2 8 2.15 0.11 2.87 0.35 5'NM B.1-1 1W.. STM B-2-INV
-1
OD STORM DRAIN OUTLET
PIPE B.1-0A_B.1-1 8 3.17 0.14 3.51 0.21 STM B.1-OA_INV STM-B.1-1-1W.. U)
\\ I I EXlS77NG STORM SEWER . /// ///// /' PIPE 18 2.71 0.1 4.25 0.49 STM B-1_INV SNM.MH_B-1 RIP RAP w
/ OUTLET STRUCTURE
- � // /� ��// / PIPE B-2 B-1 18 2.71 0.1 4.21 0.49 STM B-2 INV STM B-1 INV ® 0
PIPE B-3 B-2 12 2.49 0.21 4.36 1.13 STM B-3 INV STM B-2 INV
PIPEB-4 B-3 12 2.59 0.21 3.94 1.12STM B-4-INV. STnn_B-4 INV. EXISTING UTILITIES
ST STORM DRAIN PIPE
I �'' ° C 2 ® FLARED END SECTION
/o
Subcatchment
Area Q 2 C 100 Q 100
' STORM DRAIN INLET
STM MH A.1-1 (Acres) Imperv. (CFS) (CFS)
' -- STM MH B-1 \ \ \ 1 I I I I � STORM DRAIN OUTLET
\ \ \ \ III I I 1 I I D14-1 0.26 9% 0.059 0.05 0.553 1.57
.2' , \ \\ \ I I i I I 1 I I D14-2 0.11 34% 0.23 0.08 0.683 0.98 RIP RAP O
J►� � �, t ? \ \11 \ I I I I I111 I D 181 A 0.75 8% 0.054 0.13 0.502 2.52 O
STORM LINEA.1 x X D18.1 0.03 26% 0.176 0.02 0.647 0.26STM IN B-
Oust"
` 4. , FF l I I/ 1I I1 I D18.1C 0.18 83/ 0.66 0.36 0.894 1.72 GRADING
5
D18.1D 0.43 31% 0.209 0.29 0.657 3.23
Q
D18.
1110 BASIN BOUNDARY
STORM LINE A.1.1 STM IN A.1-2 D181D \ 0.11 ae, / I \\ 1 I / I I I I I I D18.1 E 0.11 48% 0.332 0.1 0.74 0.88 z
a D18.1 F 0.11 89% 0.722 0.22 0.92 1.03
d I QI STORM LINE B
/ I I I I I I I I I I I I I I D18.1G 0.07 21% 0.142 0.03 0.616 0.52 DESIGN POINT Ld
II STM IN A.1.1-1.• i i I I II III I D18.1 H 0.31 78% 0.605 0.55 0.871 2.9 0-101
_
D18.1B I I I I 1 1 I I I I I I I D19-1 0.06 20% 0.135 0.03 0.621 0.51 Q
J °
26, STM IN A.1-3 STM IN B-2 I I I I I I D24-1 0.02 38% 0.607 0.56 0.872 2.93 7
z BASIN LABEL
4 q I I I I 2.45 36%
+ STORM LINE B.1 I / I / I I I I I I I I a_
♦+ $ �+ ' I / IIIII I I Total Area Ste Impery
STM IN A.j4 \+ I I Ir l I I 1 1 / III l
Q + a' I / / BASIN IMPERVIOUSNESS
, �
D1s,c I / // / / I / I BASIN AREA IN
O
0.18 83% TRENCH DRAIN END
x \+ STM IN B.1-1 , //// / �/ / // /// / / / I FLOW DIRECTION O
I
I
\ \ \ I I III \ 1 \ NOTES
MUG I
I 0.11 34% 4"TRENCH DRAIN 0.07 21% STORM LINE B Lill I
I I I \
�► x /X 11 1 1 1 1 I I 1 \
\ \ 1. SEE GRADING SHEETS FOR ADDITIONAL Q
/ \
d - - - - - - - - - - _ SPOT ELEVATIONS FOR THE PROJECT. _
-
D18AH D241
0.31 78% EXISTING STORM SEW - - 2. SEE EROSION CONTROL PLA
NS FOR
X x 0.02 OUTLET STRUCTURE ADDITIONAL INFORMATION.
_-
O` - - = - - - - -
D18.1 F `
0.11
j STM INB-4
ILL
Lk , D19-1 I I \
.06 20%
,
W
4
PRELIMINARY
SYKES DRI VE NOT F O R
CONSTRUCTION
a SHEET NUMBER
% ,d °. ed. .d.a ad'.. °
r a. DN01
° a
4
10 OF 31 SHEETS
0 15' 30' 60'
SCALE
SCALE: 1"= 30'
VERTICAL: N/A
4_ HORIZONTAL: 1"=30'
JOB NUMBER
C24008
A d <G 'd° 4
E E E
E . . . E. . . E E. . . . E♦
d/ \
�,
� � °ed S SS S SS S SS SS S SS SS SS SS SS SS \ CivilWorx
zz
Li
i\
E � E r. rF
E E E E - - EAU E E G� �\ \
E V) \ \ 4025 Automation Way
♦ .
..de Suite 132
e N
\ Fort Collins, CO 80525
sb� sz b� — �� — s� �b�s — G (970) 698-6046
G \
G GKEYMAP I CivilWorxeng.com
c G G G G w G G NTS
Q m a�
LEGEND N �
ca.w -o
o 0 c
°. ... cu
a / 1 c 0
0 S N
A. D 1 MAPPING / SITE 3 cn -0 c
N co
ae ^ PROPERTY BOUNDARY g 0 c a
m � I �� I — — — RIGHT-OF-WAY UU = N
m I my � �
A. LOT LINES LU
— Q c rn
N 3 � -0
CENTER LINE c a_o` M 'o
g — — / / ,e CURB AND GUTTER �@ Q
cn T11" MAN WAS
onooG000 m N
IRR IRR I R ` . IR IRR IRR IRR IRR IRR IR — — — IRR
/ / / II1111111111111111 PHASING LINE H a E
Nounvo
SF
(10
I \— _ _ i _ _ _ _ —
M . a 1 I I I I I I / � � _ - - - - - - J SF � — =494& - - IRR
< UL`4 Us _ /
04
w I\ I I I I E E / ,\ d♦ //// / , / / EROSION CONTROL
IP LL.
IP LIMITS OF DISTURBANCE
/ I' w � 44
RIP RAP m
I" ()
N N / \ /�/ / FLOW DIRECTION W
PERIMETER CONTROL Q
WATTLES
/
/
E A-' E cn �\ �_ 1 / // / / — WD WATTLE DIKE
\ / \ 1VEHICLE W W W / v1 1 1 1 1 VTC CONTROL PApKING J
m I / / �,� Ill 11 I 1 �/ Q
SS SS SS SS in I III I NOTES J —
/ I I I I I I I I � RS ROCK SOCK O �—
// Z
1. THE CONTRACTOR IS RESPONSIBLE FOR _ —
E / `� I I I I I I I I I VERIFYING THE FIELD CONDITIONS ARE AS —J TS TEMPORARY SEDIMENT O
AUL
E \ I I I I SHOWN IN THE DRAWINGS. IF THE
d. PUMP HOUSE ) I I '
d � FF.'S1.44 / I I � / �/ I I I I CONTRACTOR FINDS DISCREPANCIES THE z
Q e.. 1 I I CONTRACTOR SHALL CONTACT THE
`yS \ 1 / I 1 I I I I I I I I I ENGINEER. �q IP INLET PROTECTION
� � <. I I I \ I \ J
I I I I I I I I 2. ALL DISTURBED AREAS SHALL BE
j e' \ \ 1st / I \I 1 I I I I I I REVEGETATED.
cn — SILT FENCE J
I l l SF SF
d SF ¢° O
3. EROSION CONTROL PRACTICES,SITE
e d \ NTI\/��Q I I I I I I I I I I PROTECTION,AND REVEGETATION
SS I e 1 I I I I I I I I I ' 1 METHODS SHALL FOLLOW CITY
D e e. SF I I I I I I I I I REGULATIONS.
w e °A. STOCKPILE MANAGEMENT Q
I I I I I I I I I I I 4. IN ADDITION TO THE EROSION CONTROL \ z
e' ;.• MEASURES SHOWN ON THIS DRAWING,THE �� O
\ cn CONTRACTOR SHALL COMPLETE,
COORDINATE WITH,AND UPDATE AS SURFACE ROUGHENING
° \ Q I I I I IIII I REQUIRED,THE STORMWATER POLLUTION SR
� aj a _ \ �
PREVENTION PLAN(SWPP)FOR THIS z
e:', d♦.. / / ' 1 / / / / / // / I h PROJECT.rT
O
w g J CONCRETE WASHOUT O_
Q / / 1 1� 5. CONTRACTOR TO TERRACE SLOPES USING I I I CW STRUCTURE(SUBJECT TO O '^
/ / / / / 1 1 A"TRACKED"VEHICLE, RUN �J MOVE IF NECESSARY) v,
6, SS D C PERPENDICULAR TO SLOPE TO INHIBIT
E 0 a,°I / I / �I I ( / I 1 1 1 RILL/GULLEY EROSION,CONTRACTOR MAY O
IRR IRR IRR IRR IR \ / / / I / I I I I 1 1 \ USE OTHER WINDROW-TYPE METHODS AS
\ I/ / / / / I I I, I i I I I 1 \� APPROVED BY ENGINEER.TYPICAL ALL PS PERMANENT SEEDING W
d LL.N ed
e w \ _` p rn rn rn SLOPES,REPEAT AS NECESSARY UNTIL
1 i p p� Zp , p co LANDSCAPING IS INSTALLED.
0 �t I rn 4
rnrnrnrnrnrn °�
� �' i i ; \ 6. ANY AREAS USED FOR STOCKPILING W
AND/OR STAGING SHOULD ALSO HAVE
SEDIMENT AND EROSION CONTROL \ SILT FENCE TO BE REMOVED
N / I 1 1 1 I \_ MEASURES AS NECESSARY. THESE AREAS
\ `�" SHOULD BE LOCATED AT LEAST 100'AWAY =
—
♦ S cn 1 1 I I \ \\\ _ -- \ \ \ — — — — — — \ — FROM DRAINAGE WAYS. THE SWMP Q
1 _ SHOULD BE UPDATED TO SHOW THESE
\ 4 I ( 1 \ ` _— — — — — — — — — — — — — — — _ AREAS AND SEDIMENT AND EROSION 0
wo N "°I ( / ` \ \ \\ ` ` — — — — — — — — — — — — CONTROL ITEMS. THE ITEMS MAY INCLUDE 11
BUT ARE NOT LIMITED TO VEHICLE
TRACKING CONTROL,SILT FENCE, Q
CONSTRUCTION FENCE,CONCRETE
w WASHOUT,AND SEDIMENT TRAP. _
7. TEMPORARY SEEDING OR TACKIFER
PLACEMENT SHALL BE UTILIZED IN THE O
_ _ LL
> ° I VTC da I A. \�\ I
\ �\ ` — — — _ — — _ _ — LONGER THAN G4 DAYS WITH NOEXPOSED Q
? �� ♦ I \ 1 \ — — — CONSTRUCTION ACTIVITY. W
S / — — — — — — \
GAS G S b 4 — — 8. TURF REINFORCEMENT MAT SHALL BE Q
SF � - - PYRAMAT OR—
e S - - [� _ ` �— — — — — NECESSARY. APPROVED EQUAL IF
IL
,° A.a °d a 4d .d° �� �J a GT- o—S` p —
°. A GAS S A" `l W
° d _
'lam `- GAS GAS GAS GAS Sb
a� �S b
i d' d ° � Sb0 9. CONTRACTOR SHALL REMOVE ALL
AULT ' E E L — E E E E ° E ed' bO SEDIMENT,MUD,CONSTRUCTION DEBRIS,
a �
OR OTHER POTENTIAL POLLUTANTS THAT
� E MAY HAVE BEEN DISCHARGED TO OR,
cn //// IP ACCUMULATE IN,THE FLOW LINES AND
IWW
W W W W W W W W W W W PUBLIC RIGHTS-OF-WAY OF THE CITY,AS A
m
w // RESULT OF CONSTRUCTION ACTIVITIES PRELIMINARY
W ASSOCIATED WITH THIS DEVELOPMENT OR
SS SS w S w SS SYKES DRII/E w SHALL BE CONNDUCTT CONSTRUCTION OED DAILY,IAS MAY OBEL
NOT FOR
REQUIRED.SUCH MATERIALS SHALL BE CONSTRUCTION
PREVENTED FROM ENTERING THE STORM
EWER.
10. THE PROJECT LANDSCAPE PLAN WILL
cf) //// //// //// CONTAIN THE DETAILED INFORMATION
E E E --- REGARDING REQUIRED SEED TYPES/MIXES.
° CE E _ SHEET NUMBER
a E 11
E E
° d <.. .ad".: .e d 4 � � .e.Q _ 4 L
E
E E E SEETHE GENERAL NOTES SHEETS FOR AL
a ae OF THE CITY OF FORT COLLINS EROSION
° 17
IP EC01
E CONTROL NOTES.
11 OF 31 SHEETS
SCALE
d SCALE: 1"= 30'
VERTICAL: N/A
HORIZONTAL: 1"=30'
cn JOB NUMBER
C24008
E E E E E. . . E E. E, `�
N 7
5 \
W w W W W w w w w w W w
<°.S SS S SS S SS SS S SS SS SS SS SS SS \ \
wCIvIlWory
A.
E E E E E E E VAU E E G \ � \
E � - \ \ 4025 Automation Way
AA_. ..de d / \� Suite B2
.. a ..
\ Fort Collins, CO 80525
e s G 970 698-6046
��, sb� � sz� � be _ SttO _ s� �b.� — \ ( )
G \
G G KEYMAP I CivilWorxeng.com
G G G G w G G NTS
Q M 0
LEGEND 0
0 c
M � � @
(f) � m co
` d �/ \ MAPPING / SITE
(n \ C o
m @ E m
a ^ ) PROPERTY BOUNDARY 0 a a
m � �\ I — — — RIGHT-OF-WAY r o
ID
m I mw _ w
LOT LINES m ° -
1fY�, I a c m
lJ — I a N 0
— — — — — — / CENTER LINE a `o c o
— — — / co
,e CURB AND GUTTER
__ / / m c — a
onoo 000 0 C w IRR IRR I R IR :� Rf� IRR IRR IRR IRR IRR IR IRR IRR / PHASING LINE a E
Q 495
0
— N011fld0
cn
M .
�g� _ R = — IRR o
9 - '
E_ --9�— a. EROSION CONTROL N
E \�
- _ _ _ / 'ice
/ / w
A.
/ LIMITS OF DISTURBANCE
Q WD crn ! 9S °) RIP RAP m
0) FLOW I r /� // /\\////// / /// FLOW DIRECTION LLl
d / / / /// //
A. 046
) / 1
A . oho / / /////j / PERIMETER CONTROL 0
// WATTLES
°g .�q) \ \ I \ / // /\// WATTLE DIKE
E E `� E I \ / //�///// /� W D
I 3,
/ VTC VEHICLE
PAD KING
8 \ \ I
SS SS SS SS m , - - \ R9 , \1\ NOTES J
TA R9 \ \ \ , I I RS ROCK SOCK LLB
99 � � I II I O O
1. THE CONTRACTOR IS RESPONSIBLE FOR _ Z
\ \ O
VERIFYING THE FIELD CONDITIONS ARE AS j TS TEMPORARY SEDIMENT
SHOWN IN THE DRAWINGS. IF THE L - � \
d' d a � IP PUMP HOUSE ) I I I CONTRACTOR FINDS DISCREPANCIES THE 7
Q, I FF.'51.44 / I � l 111 I I I I I CONTRACTOR SHALL CONTACT THE Q L
r. I P INLET PROTECTION Q
WD d IP "�I / \ \ I I I III I I 2. ALL DISTURBED AREAS SHALL BE J
L IP o``� x \ I I I I I I I REVEGETATED. Q
a • 1�N ' I I I I I I I I I I -SF- SF SILT FENCE J
d _ p 3. EROSION CONTROL PRACTICES,SITE \
l a' .d • I \ I I I PROTECTION,AND REVEGETATION
SS I ° rn `719,
) I �I I I 1 I I I METHODS SHALL FOLLOW CITY NO/
d I s I , I , I I , I I I II REGULATIONS. i'�
w e4.
• \ I I I I I I I \ SF STOCKPILE MANAGEMENT Q
\ \, I P I I I I I I I I 4. IN ADDITION TO THE EROSION CONTROL ,/ \ z
MEASURES SHOWN ON THIS DRAWING,THE
\ \+ I I I I I I I CONTRACTOR SHALL COMPLETE, \/ O
I
4 COORDINATE WITH AND UPDATE AS
IP 1 I
9 I ,
SURFACE ROUGHENING ! ,
a ` - a// IP \+ IP 4952 I I / I I / III I REQUIRED,THE STORMWATER POLLUTION SR V
I I / I I I / I I I I / I PROJECTION PLAN(SWPP)FOR THIS
w + / / // CONCRETE WASHOUT O
S. I P \ / // / / 1 ` 5. CONTRACTOR TO TERRACE SLOPES USING I CW STRUCTURE(SUBJECT TO O
x / // \ A"TRACKED"VEHICLE, RUN �J MOVE IF NECESSARY) U)
E 6, SS " n • + I kg�j2 IP I I / I I I l PERPENDICULAR TO SLOPE TO INHIBIT
1 40 I ( I \ \ 1 \ RILL/GULLEY EROSION, CONTRACTOR MAY In O
IRR IRR IRR IRR p IR °� - •>� d I I I I I I I I I I \ \ USE OTHER WINDROW-TYPE METHODS AS
x I I I / I I �� I \ APPROVED BY ENGINEER,TYPICAL ALL PS PERMANENT SEEDING
d' 011-0
a, . I \ • °' I I I I I 1 SLOPES, REPEAT AS NECESSARY UNTIL \ W
a. w / I I / \ �\ \ I� �I I I \\ LANDSCAPING IS INSTALLED.
I I I I I I I 1 \ 6. ANY AREAS USED FOR STOCKPILING W
\ I I \ AND/OR STAGING SHOULD ALSO HAVE
- ---" -m i x - ,: / / \ A SILT FENCE TO BE REMOVED
I I I I SEDIMENT AND EROSION CONTROL \ O
d. a °1 WD I I I / I I I I \_ - - - - MEASURES AS NECESSARY. THESE AREAS =
x I \ \ - SHOULD BE LOCATED AT LEAST 100'AWAY
A.
I p - \\ \\ FROM DRAINAGE WAYS. THE SWMP o
_ _ _ _ _ SHOULD BE UPDATED TO SHOW THESE �
F S n \ I ( I I\I \\ \\\ _- - - - - - - - - - - - - AREAS AND SEDIMENT AND EROSION O
wp I I I 495 Q I ( I I \ \ ` - - - - - - - CONTROL ITEMS. THE ITEMS MAY INCLUDE �
- - - - - - - BUT ARE NOT LIMITED TO VEHICLE
x • • \ \ \ \ \ - _ - _ - TRACKING CONTROL, SILT FENCE, Q
CONSTRUCTION FENCE,CONCRETE _
w � I \ nNgh ( \ \ \ ` - - - - _ -- - - _ _ _ WASHOUT,AND SEDIMENT TRAP.
\ \ _
x % T IP 7. TEMPORARY SEEDING OR TACKIFER
RS I e v �_ PLACEMENT SHALL BE UTILIZED IN THE O
W D \ d: / \ EVENT THAT A GRADED AREA IS EXPOSED U-
\ - - LONGER THAN 14 DAYS WITH NO
A.
x_ N00 ^\ CONSTRUCTION ACTIVITY. LLI
S x X_x / E I I I
GAS G S ✓0 WD m IRS \ _ _ \ 8. TURF REINFORCEMENT MAT SHALL BE Q
PYRAMAT OR APPROVED EQUAL IF
- - - NECESSARY
.. °•• -
V
AS GAS GH. 4 S -�GAS S
.. ,. RS n d .
50 —
`� ! St1J� �
RS
° - SbO g CONTRACTOR SHALL REMOVE ALL
r A- .
A.
AULr - �;..a�.'„_-- WD- / E - 495 F F - E ° .d SEDIMENT, MUD, CONSTRUCTION DEBRIS,
w .�
E ° ' " . a OR OTHER POTENTIAL POLLUTANTS THAT
(n 0 off -
- E MAY HAVE BEEN DISCHARGED TO OR,
w - - w W- w w ACCUMULATE IN,THE FLOW LINES AND
m WD WD W w RESULT OF CON PUBLIC STRUCTION UCT ON ACTIVITIES F-WAY OF THE I S A
ASSOCIATED WITH THIS DEVELOPMENT OR PRELIMINARY
CONSTRUCTION PROJECT.SAID REMOVAL NOT FOR
SS SS w S w SS SYKES DRI VE SHALL BE CONDUCTED DAILY,AS MAY BE
REQUIRED.SUCH MATERIALS SHALL BE
PREVENTED FROM ENTERING THE STORM CONSTRUCTION
10, THE PROJECT LANDSCAPE PLAN WILL
//// //// //// //// CONTAIN THE DETAILED INFORMATION
E E E REGARDING REQUIRED SEED TYPES/MIXES.
a � a E E E E � E E E E -E _
SHEET NUMBER
a d..' ° 11, SEETHE GENERAL NOTES SHEETS FOR ALL
d. ° a` a, E THE CITY OF FORT COLLINS EROSION E C 0 2
E CONTROL NOTES.
A.
A A A 'NA -4
k:�:� A
_ E
12 OF 31 SHEETS
SCALE
SCALE: V = 30' VERTICAL: N/A
HORIZONTAL:
JOB NUMBER
C24008
E E E E E. . . E E. E° \
5 �d
W W W W W W W ,w W W W W �,
i \
S SS S SS S SS SS S SS SS SS SS SS SS \
w CivilWorx
\ \ \
� \
E E E E E E VGA E G 4025 Way
d e � fA
� E ° � ° �� E \ Automation a
.a ,, ° Suite B2
a ° \ Fort Collins, CO 80525
m S-V sz � b! — �S — s �b�s — G (970) 698-6046
G \
G G KEYMAP I CivilWorxeng.com
c G G G G w G G NTS
Q m a�
LEGEND N �
o 0 c
M � � �
1 MAPPING / SITE = N Y
D 3 m
C� � \ o
z m @ E m
a ^ PROPERTY BOUNDARYLn
a a
m � I I - - - RIGHT-OF-WAY r o
m I I mw � w
A. LOT LINES ccu
5 °
° _ o o o) m
CENTER LINE a_o c cu o
- /e a - CURB AND GUTTER } �� ¢WIN a
// / m c a
o000 00o L O N
IRR IRR I R IR 7. Rf� IRR IRR IRR IRR IRR IR IRR IRR / /
d \R9S - L L / \/// / PHASING LINE o H a E
495 Z NO nv0
cn L0
CV
m \ \ 959� RR - - I RR _/ / // - CCD
V
- - _ _ _ CV
r E_ A9�_ = / �e ! / . �.: a. / \\'/ EROSION CONTROL N
v E E -
PS
/ice / LIMITS OF DISTURBANCE
PS PS e �" / / —
_
1� ° w
RIP RAP m
N I �� �� / / / //// �j FLOW DIRECTION W
Q
PERIMETER CONTROL Q
-GAS / iN P,S' o°o , r/ / //// // /// // WATTLES
"p Oi \L10 ` I / / //
°g ..� �... ..°. a \ /� J / /// // /
WATTLE DIKE
E E C E I 1` / / //�/////
W W WVEHICLE
CONTROL PAD KING
8
T710SS SS SS SS - NOTES Q
9 � � \ � , I I I � ROCK SOCK z
M '1� 01 � �/ � 99 � � I II I IS
O
9 _J � �` � I I III I III
9S S _= I , ' I I I 1. THE CONTRACTOR IS RESPONSIBLE FOR _
E E AUL PS x 9 9ss. X \-i` , ` �, I I I I I I I I I I VERIFYING THE FIELD CONDITIONS ARE AS , TS TEMPORARY SEDIMENT ^
/ I I I I SHOWN IN THE DRAWINGS. IF THE
d PUMP HOUSE i
d a Q IP / I I I CONTRACTOR FINDS DISCREPANCIES THE z
Q e I FF.'51.44 � � /1 I I I I I CONTRACTOR SHALL CONTACT THE Q Q
r ENGINEER. �q IP INLET PROTECTION J
x � 1 � 1 1 I \
/ I I I III I I 2. ALL DISTURBED AREAS SHALL BE Z
A. cam^'I \ I \ 1 I I 1 1 I I I I I REVEGETATED. J
a 0 ��N I ' I I I I I I I I I I _SF- SF SILT FENCE
d cn IP _ IP IoL \ �, I I 3. EROSION CONTROL PRACTICES,SITE O O
SS I O . • rn 4. �A,g I I I I METTHODSPROTECTIOSHALLDFOLLOW CITY
LL
IP o) S I I � I I I I I I I I I REGULATIONS.
w \ 1 I I STOCKPILE MANAGEMENT
IPI I I I I I I 4. IN ADDITION TO THE EROSION CONTROL `. > SF Q Z
I I II \
.' + I I I I I I I I I MEASURES SHOWN ON THIS DRAWING,THE � O
v�i \ I I I I I CONTRACTOR SHALL COMPLETE,
IP + IP 4 I I I I I COORDINATE WITH,AND UPDATE AS SURFACE ROUGHENING
° \ Q \+ 4952 I I I I I I I I REQUIRED,THE STORMWATER POLLUTION SR 7
�% I l I I I / / I PREVENTION PLAN(SWPP)FOR THIS z
e'.d 3. .d° \+ / / I PROJECT. O O
Q ° I
CONCRETE WASHOUT
Q w ° % IP \+ / / / / / ` 5. CONTRACTOR TO TERRACE SLOPES USING I I I CW STRUCTURE(SUBJECT TO
0 U)
S. K I I // / 1 A"TRACKED"VEHICLE, RUN �J MOVE IF NECESSARY) O
,O I <j PERPENDICULAR TO SLOPE TO INHIBIT
E 4 SS + �9 l l �I I ( / ( 1 RILL/GULLEY EROSION,CONTRACTOR MAY NN
O rn 0.
IRR IRR -rn - �IRR IRR IR � • � I I PS �`; I I � � I I 1 � USE OTHER WINDROW-TYPE METHODS AS
x ! / I I �� I APPROVED BY ENGINEER.TYPICAL ALL PS PERMANENT SEEDING
° d <d : I i 1 " .. ( I I I 11 SLOPES,REPEAT AS NECESSARY UNTIL O
• rp
S I I / 1 �1 1 I I� II I I I �\ LANDSCAPING IS INSTALLED.
V) w
1 ' I I I I I I 1 6. ANY AREAS USED FOR STOCKPILING
d ° N \ I I / ) 1 I I I \ AND/OR STAGING SHOULD ALSO HAVE W
l PS x / / 1 I I I I I 1 1 ` \ SEDIMENT AND EROSION CONTROL SILT FENCE TO BE REMOVED 0
i _ \ o
\ I I I . .. I I � MEASURES AS NECESSARY. THESE AREAS
II I II II, I ` 1\ 1\ 1 _- - - - - — SHOULD BE LOCATED AT LEAST 100'AWAY =
° _ -
FROM DRAINAGE WAYS. THE SWMP Q
_ - - - - - - - - __ SHOULD BE UPDATED TO SHOW THESE
w ° N I l I \ \ \ - - - - - - - - - - - - - - - - - AREAS AND SEDIMENT AND EROSION O
CONTROL ITEMS. THE ITEMS MAY INCLUDE �
BUT ARE NOT LIMITED TO VEHICLE
TRACKING CONTROL,SILT FENCE, Q
CONSTRUCTION FENCE,CONCRETE _
w ^�5 ( \ \ \` - - - - -- _ - - WASHOUT,AND SEDIMENT TRAP.
s. PS T IP ) \� \\ \ \ V - / \ ��\ 7. TEMPORARY SEEDING OR TACKIFER �
PLACEMENT SHALL BE UTILIZED IN THE o
g I " \ / \ \ EVENT THAT A GRADED AREA IS EXPOSED L.L
LONGER THAN 14 DAYSd" I I \\ \\ 1 ^\ CONSTRUCTION ACTIVITY.
WITH NO Q
LX_X Dc9� � -
S / E I I " I — — — — — — — i \
- 8. TURF REINFORCEMENT MAT SHALL BE
GAS G S rri - - _ = PYRAMAT OR APPROVED EQUAL IF
A
ad - _ -- - -- - - - - - - - - _ - NECESSARY.
e .. ° -
W
GAS PS AS GAS 4`�50 ����; GAS SVC Sb0 �
d <° i d` —�SbO 9 CONTRACTOR SHALL REMOVE ALL
_ -
AULT E E 95 E a E - --- --- --- _ E ,.' SEDIMENT,MUD,CONSTRUCTION DEBRIS,
.° e♦: ° e♦
E E
_ ° . a � OR OTHER POTENTIAL POLLUTANTS THAT
-� -
1 7 MAY HAVE BEEN DISCHARGED TO OR,
_ E
W W W w W W W W W / ACCUMULATE IN,THE FLOW LINES AND
m W PUBLIC RIGHTS-OF-WAY OF THE CITY,AS A
w /,// RESULT OF CONSTRUCTION ACTIVITIES PRELIMINARY
W ASSOCIATED WITH THIS DEVELOPMENT OR
CONSTRUCTION PROJECT.SAID REMOVAL NOT FOR
_SS_SS w SS-1 w SS SYKES DRI VE w SHALL BE CONDUCTED DAILY,AS MAY BE
REQUIRED.SUCH MATERIALS SHALL BE
PREVENTED FROM ENTERING THE STORM CONSTRUCTION
EWER.
EM 10. THE PROJECT LANDSCAPE PLAN WILL
CONTAIN THE DETAILED INFORMATION
E E E REGARDING REQUIRED SEED TYPES/MIXES.
a E SHEET NUMBER
- � a E E E E . -E
11
E E E
.a d".: .e G 4 x .,.d ... SEETHE GENERAL NOTES SHEETS FOR L
° a a♦ FORT COLLINS EROSION E C 0 3
`. CONTROL NOTES
A.
E OF THE CITY OF
_ E
13 OF 31 SHEETS
SCALE
d SCALE: 1"= 30'
VERTICAL: N/A
HORIZONTAL: 1"=30'
cn JOB NUMBER
C24008
Final Drainage and Erosion Control Report
Bloom Park& Pool
CIVIL' orx Fort Collins,CO
APPENDIX B
• SWMM Model Overview
• 2-Year SWMM Model Status Report
• 100-Year SWMM Model Status Report
B
BLOOM PARK AND POOL - SWMM
Subcatch 12/20/2024 00:01:00
Imperviousness
' 20.00
40.00
60.00
' 80.00
Z5.1
8
Z6
85 Out-1
Ori rice-1 SDMHZ56'6 2%1 ,� P-1'
�W-2.1-2
000
Z3.1 iiv-��`..SDMHZ2.12,2 D18.1A
Rain Gage-1 �P-2 4 GUTTER D1 1 1 J - POND D
Pipe - (2) iTiiiiRD.FL. D14-1 /R
JunJunction-5 P-5� IN-Z3.1 j_IN-Z3 13.1 L��EX PIPE B-1 POND-D
"' rr �,-�' -,; _lM/� STM.MH B-1
SDMHZ4 Pipe - 3) Orifice-5 SDMHZ33DMHZ2,STM.MH A.1-1_ESC""
�1Nc I� J .. _ STM_B-1_INV
IN-(Orifice-
f✓ipe - k ��� �. �"� A.1-1 � _
Z3.A-W GU I I tK 4-Z u Junc_ tion-';STM A.1-2 R STORE D.18.1 D
OL 01-0 BYPASl '95 MPIPI= Fnin ' STM B-2 INV
Z3.A-E OPSTM_B.1-1_INLE� STM 1.1-.STM_B-3 INV
SWMM5.2 95 PIPE RD.FL. D_ 14-21 9) D24-1
— PID� R-d R-3 Page 1
STM B�0 INLET (cTnn Q � n ini��
,STM B.1-0 RIMt3.1 78
3 D PAN D 8.1iSTM B.STM_B-4_RIM
IL— Ff D 18.1 H
D19-1 OUT.
BLOOM PARK AND POOL - SWMM (PARK AREA)
IaoP�o� ,zza.oz�oa o,Po
A
95
P-,
W-2.1 2 2
INY2.1A Jw50MH]2:1 J�IN�Z2.2
iPe- LF��... INLET22.2
GUTTER f-t JINZ22
RD.FL fl' POND C
2
EX/PPIIPEE B I POND U
I MH 0
8
6DMH23 _ _ STM.Mill nl-t x PIPF ml-1 Zt. ZI
itAZ-P'IPe-Id
/ GUTTER DI \ /
/j DiB.,E
PIPE B]B 2
Dtg:l Ot F fSTM B 1- ILFf / E-3 INV
v 83 ��FSTM1I 8.f-1_RI
Vr
BTM B.1-0 INLET Di3 EA
eJ/
ITM
11
PPE I,_
/ STM B.,U RIM pt&1H
Q
g� 8-1_MIriM _kIM
PAN_D,btH B/�
\\\1L me.1N
BLOOM PARK AND POOL - 2-YEAR
EPA STORM WATER MANAGEMENT MODEL - VERSION 5.2 (Build 5.2.4)
------------------------------------------------------------
WARNING 04: minimum elevation drop used for Conduit OL B.1-0_BYPASS
WARNING 05: minimum slope used for Conduit OL B.1-0 BYPASS
Element Count
*************
Number of rain gages . . . . . . 1
Number of subcatchments . . . 19
Number of nodes . . . . . . . . . . . 44
Number of links . . . . . . . . . . . 52
Number of pollutants . . . . . . 0
Number of land uses . . . . . . . 0
****************
Raingage Summary
Data Recording
Name Data Source Type Interval
------------------------------------------------------------------------
Rain Gage-1 2-YR INTENSITY 5 min.
********************
Subcatchment Summary
********************
Name Area Width %Impery %Slope Rain Gage Outlet
-----------------------------------------------------------------------------------------------------------
D14-1 0.26 75.00 8.80 4.5000 Rain Gage-1 RD.FL._D14-1
D14-2 0.11 75.00 34.00 5.0000 Rain Gage-1 RD.FL._D14-2
D18.1A 0.75 100.00 8.00 2.5000 Rain Gage-1 POND_D
D18.1B 0.03 20.00 26.00 5.0000 Rain Gage-1 STM_A.1-2 RIM
D18.1C 0.18 50.00 83.00 2.0000 Rain Gage-1 STORE_D.18.1D
D18.1D 0.43 120.00 31.00 5.0000 Rain Gage-1 STORE D.18.1D
D18.1E 0.10 60.00 48.00 2.0000 Rain Gage-1 POND_D
D18.1F 0.11 25.00 89.00 1.0000 Rain Gage-1 STM_B.1-0_RIM
D18.1G 0.07 40.00 21.00 2.0000 Rain Gage-1 STM_B.1-1 RIM
D18.1H 0.31 75.00 78.00 2.5000 Rain Gage-1 FL_D18.1H
D19-1 0.06 50.00 20.00 3.5000 Rain Gage-1 D19-1_OUT
D24-1 0.31 50.00 78.00 7.5000 Rain Gage-1 POND D
SWMM 5.2 Pagel
BLOOM PARK AND POOL - 2-YEAR
Z2.1-A 0.25 50.00 95.00 3.0000 Rain Gage-1 J-IN-Z2.1-A
Z2.2 0.82 120.00 85.00 3.0000 Rain Gage-1 J-IN-Z2.2
Z3.1 1.60 125.00 90.00 3.0000 Rain Gage-1 J-IN-Z3.1
Z3.A-E 1.04 50.00 95.00 3.0000 Rain Gage-1 Junction-10
Z3.A-W 0.65 75.00 95.00 3.0000 Rain Gage-1 J-IN-Z3.A
Z5.1 1.50 120.00 85.00 3.0000 Rain Gage-1 J-IN-Z5.1
Z6 0.46 80.00 85.00 3.0000 Rain Gage-1 J-IN-Z6
************
Node Summary
************
Invert Max. Ponded External
Name Type Elev. Depth Area Inflow
-------------------------------------------------------------------------------
INLETZ2.1-A JUNCTION 4943.92 6.00 0.0
INLETZ2.2 JUNCTION 4943.94 6.00 0.0
INLETZ3.1 JUNCTION 4943.92 6.00 0.0
INLETZ3.A JUNCTION 4943.85 6.00 0.0
INLETZ5.1 JUNCTION 4945.90 6.00 0.0
INLETZ6 JUNCTION 4945.98 6.00 0.0
STM B.1-OA BYPASS JUNCTION 4948.25 20.00 50.0
STM_B.l-0_BYPASS JUNCTION 4948.00 20.00 50.0
J-IN-Z2.1-A JUNCTION 4948.07 6.00 50.0
J-IN-Z2.2 JUNCTION 4948.07 6.00 50.0
J-IN-Z3.1 JUNCTION 4947.72 6.00 50.0
J-IN-Z3.A JUNCTION 4947.63 6.00 50.0
J-IN-Z5.1 JUNCTION 4952.17 6.00 50.0
J-IN-Z6 JUNCTION 4952.03 6.00 50.0
Junction-10 JUNCTION 4948.50 6.00 50.0
FL_D18.1H JUNCTION 4949.70 10.00 50.0
RD.FL._D14-2 JUNCTION 4949.50 10.00 50.0
RD.FL._D14-1 JUNCTION 4948.50 10.00 50.0
Junction-4 JUNCTION 4953.00 6.00 50.0
Junction-5 JUNCTION 4952.75 6.00 50.0
SDMHZI JUNCTION 4942.50 6.00 0.0
SDMHZ2 JUNCTION 4942.84 6.00 0.0
SDMHZ2.1 JUNCTION 4943.73 6.00 0.0
SDMHZ3 JUNCTION 4943.80 6.00 0.0
SDMHZ4 JUNCTION 4945.33 6.00 0.0
SDMHZ5 JUNCTION 4945.77 6.00 0.0
STM.MH_A.1-1 JUNCTION 4942.72 6.00 0.0
STM.MH B-1 JUNCTION 4942.48 6.00 50.0
STM A.1-2 INV. JUNCTION 4945.97 20.00 50.0
SWMM 5.2 Page 2
BLOOM PARK AND POOL - 2-YEAR
STM A.1-2 RIM JUNCTION 4949.40 20.00 50.0
STM_B.1-0_INV JUNCTION 4950.00 20.00 50.0
STM_B.1-0_RIM JUNCTION 4951.70 10.00 50.0
STM_B.1-OA_INV. JUNCTION 4948.58 20.00 50.0
STM_B.1-1_INV. JUNCTION 4948.16 20.00 50.0
STM_B.1-1 RIM JUNCTION 4950.60 10.00 50.0
STM_B-1_INV JUNCTION 4945.96 10.00 50.0
STM_B-2 INV JUNCTION 4946.28 20.00 50.0
STM_B-3 INV JUNCTION 4946.50 20.00 50.0
STM B-4 INV. JUNCTION 4947.00 10.00 50.0
STM B-4 RIM JUNCTION 4949.30 10.00 50.0
Out-1 OUTFALL 4942.00 0.50 0.0
D19-1_OUT OUTFALL 4950.50 0.00 0.0
POND_D STORAGE 4942.44 6.00 0.0
STORE D.18.1D STORAGE 4947.50 6.00 0.0
************
Link Summary
************
Name From Node To Node Type Length %Slope Roughness
---------------------------------------------------------------------------------------------
EX_PIPE_A.1-1_Zl STM.MH_A.1-1 SDMHZl CONDUIT 143.9 0.1529 0.0130
EX PIPE B-1 POND-D STM.MH B-1 POND D CONDUIT 102.3 0.0391 0.0130
EX_PIPE_Z1_B-1 SDMHZI STM.MH_B-1 CONDUIT 40.8 0.0490 0.0130
EX_PIPE_Z2_A.1-1 SDMHZ2 STM.MH_A.1-1 CONDUIT 81.6 0.1470 0.0130
GUTTER D14-1 J-IN-Z2.2 RD.FL._D14-1 J-IN-Z2.2 CONDUIT 26.0 1.6553 0.0140
GUTTER_D14-2 D14-1 RD.FL._D14-2 RD.FL._D14-1 CONDUIT 190.0 0.5263 0.0140
OL_B.1-0 STM_B.1-0_RIM STM_B.1-OA_BYPASS CONDUIT 95.1 4.1567 0.0120
OL B.1-0 BYPASS STM B.1-0 BYPASS STORE D.18.1D CONDUIT 49.8 0.0200 0.0120
OL_B.1-OA STM_B.1-OA_INV. STM_B.1-OA_BYPASS CONDUIT 10.0 -1.7002 0.0120
OL_B.1-OA_BYPASS STM_B.1-OA_BYPASS STM_B.1-0_BYPASS CONDUIT 28.6 0.8751 0.0160
OL_B.1-1 STM_B.1-1_INV. STM_B.1-0_BYPASS CONDUIT 10.0 -3.4020 0.0120
P-1 POND_D Out-1 CONDUIT 216.4 0.2034 0.0130
P-2 J-IN-Z5.1 Junction-4 CONDUIT 83.4 -0. 9948 0.0140
P-3 Junction-4 Junction-5 CONDUIT 30.4 0.8235 0.0140
P-4 J-IN-Z6 Junction-5 CONDUIT 82.0 -0.8775 0.0140
P-5 Junction-5 J-IN-Z3.1 CONDUIT 392.2 1.2825 0.0140
P-6 J-IN-Z2.1-A J-IN-Z3.1 CONDUIT 130.7 0.2677 0.0140
P-7 Junction-10 J-IN-Z3.A CONDUIT 102.1 0.8518 0.0140
PAN_D18.1H_B-4 FL_D18.1H STM_B-4 RIM CONDUIT 29.8 1.3411 0.0130
Pipe - (10) INLETZ2.1-A SDMHZ2.1 CONDUIT 10.1 1.8730 0.0130
Pipe - (11) INLETZ2.2 SDMHZ2.1 CONDUIT 30.4 0.6902 0.0130
Pipe - (12) INLETZ5.1 SDMHZ5 CONDUIT 7.7 1.6839 0.0130
SWMM 5.2 Page 3
BLOOM PARK AND POOL - 2-YEAR
Pipe - (13) INLETZ6 SDMHZ5 CONDUIT 25.5 0.8241 0.0130
Pipe - (2) SDMHZ5 SDMHZ4 CONDUIT 108.5 0.4057 0.0130
Pipe - (3) SDMHZ4 SDMHZ3 CONDUIT 424.6 0.3604 0.0130
Pipe - (4) SDMHZ3 SDMHZ2 CONDUIT 77.2 1.2437 0.0130
Pipe - (7) SDMHZ2.1 SDMHZ2 CONDUIT 85.1 1.0460 0.0130
Pipe - (8) INLETZ3.1 SDMHZ3 CONDUIT 31.9 0.3763 0.0130
Pipe - (9) INLETZ3.A SDMHZ3 CONDUIT 8.6 0.5820 0.0130
PIPE_A.1-2 A.1-1 STM_A.1-2 INV. STM.MH_A.1-1 CONDUIT 41.0 1.9980 0.0130
PIPE B.1-0 B.1-OA STM B.1-0 INV STM B.1-0A INV. CONDUIT 75.2 1.8899 0.0130
PIPE B.1-0 B-2 STM B.1-1 INV. STM B-2 INV CONDUIT 60.0 3.1349 0.0130
PIPE B.1-OA B.1-1 STM B.1-6A INV. STM BA-1 INV. CONDUIT 28.4 1.4811 0.0130
PIPE_B-1 STM_B-1_INV STM.MH_B-1 CONDUIT 30.1 0.4987 0.0130
PIPE_B-2 B-1 STM_B-2_INV STM_B-1_INV CONDUIT 63.8 0.5013 0.0130
PIPE B-3 B-2 STM B-3 INV STM B-2 INV CONDUIT 43.0 0.5118 0.0130
PIPE_B-4_B-3 STM_B-4_INV. STM_B-3 INV CONDUIT 96.5 0.5179 0.0130
IN-PARK STORE_D.18.1D SDMHZI ORIFICE
IN-Z2.1-A J-IN-Z2.1-A INLETZ2.1-A ORIFICE
IN-Z2.2 J-IN-Z2.2 INLETZ2.2 ORIFICE
IN-Z3.1 J-IN-Z3.1 INLETZ3.1 ORIFICE
IN-Z3.A J-IN-Z3.A INLETZ3.A ORIFICE
IN-Z5.1 J-IN-Z5.1 INLETZ5.1 ORIFICE
IN-Z6 J-IN-Z6 INLETZ6 ORIFICE
Orifice-1 STORE_D.18.1D SDMHZI ORIFICE
STM B-4 INLET STM B-4 RIM STM B-4 INV. ORIFICE
STM_B.l-0_INLET STM_B.1-0_RIM STM_B.1-0_INV ORIFICE
STM B.1-1 INLET STM B.1-1 RIM STM B.1-1 INV. ORIFICE
STM_A.l-2 INLET STM_A.1-2 RIM STM_A.1-2 INV. ORIFICE
Orifice-10 J-IN-Z6 J-IN-Z5.1 WEIR
Orifice-5 J-IN-Z3.A J-IN-Z3.1 WEIR
W-2.1-2.2 J-IN-Z2.2 J-IN-Z2.1-A WEIR
Cross Section Summary
Full Full Hyd. Max. No. of Full
Conduit Shape Depth Area Rad. Width Barrels Flow
---------------------------------------------------------------------------------------
EX_PIPE_A.1-1_Zl HORIZ_ELLIPSE 2.42 7.40 0.74 3.75 1 26.96
EX PIPE B-1 POND-D CIRCULAR 3.00 7.07 0.75 3.00 1 13.19
EX_PIPE_Z1_B-1 CIRCULAR 3.00 7.07 0.75 3.00 1 14.77
EX_PIPE_Z2_A.1-1 HORIZ_ELLIPSE 2.42 7.40 0.74 3.75 1 26.44
GUTTER_D14-1 J-IN-Z2.2 1/GUTTER 3.00 69.77 1.63 26.50 1 1318.85
GUTTER D14-2 D14-1 1/GUTTER 3.00 69.77 1.63 26.50 1 743.67
SWMM 5.2 Page 4
BLOOM PARK AND POOL - 2-YEAR
OL_B.1-0 TRAPEZOIDAL 3.00 195.00 1.56 125.00 1 6616.80
OL_B.1-0_BYPASS TRAPEZOIDAL 3.00 195.00 1.56 125.00 1 458.98
OL_B.1-OA TRAPEZOIDAL 3.00 186.00 1.52 122.00 1 3975.14
OL_B.1-OA_BYPASS TRAPEZOIDAL 3.00 109.50 1.58 68.00 1 1290.38
OL_B.1-1 TRAPEZOIDAL 3.00 186.00 1.52 122.00 1 5622.92
P-1 CIRCULAR 0.50 0.20 0.12 0.50 1 0.25
P-2 1/GUTTER 3.00 69.77 1.63 26.50 1 1022.39
P-3 1/GUTTER 3.00 69.77 1.63 26.50 1 930.20
P-4 1/GUTTER 3.00 69.77 1.63 26.50 1 960.26
P-5 1/GUTTER 3.00 69.77 1.63 26.50 1 1160.87
P-6 1/GUTTER 3.00 69.77 1.63 26.50 1 530.41
P-7 1/GUTTER 3.00 69.77 1.63 26.50 1 946.07
PAN_D18.1H_B-4 TRAPEZOIDAL 3.00 180.30 1.50 120.10 1 3126.57
Pipe - (10) CIRCULAR 1.50 1.77 0.38 1.50 1 14.38
Pipe - (11) CIRCULAR 1.50 1.77 0.38 1.50 1 8.73
Pipe - (12) CIRCULAR 1.50 1.77 0.38 1.50 1 13.63
Pipe - (13) CIRCULAR 1.50 1.77 0.38 1.50 1 9.54
Pipe - (2) CIRCULAR 2.50 4.91 0.62 2.50 1 26.12
Pipe - (3) CIRCULAR 2.50 4.91 0.62 2.50 1 24.62
Pipe - (4) HORIZ_ELLIPSE 2.42 7.40 0.74 3.75 1 76.90
Pipe - (7) CIRCULAR 2.00 3.14 0.50 2.00 1 23.14
Pipe - (8) CIRCULAR 1.50 1.77 0.38 1.50 1 6.44
Pipe - (9) CIRCULAR 1.50 1.77 0.38 1.50 1 8.01
PIPE A.1-2 A.1-1 CIRCULAR 1.00 0.79 0.25 1.00 1 5.04
PIPE_B.1-0_B.1-OA CIRCULAR 0.33 0.09 0.08 0.33 1 0.26
PIPE B.1-0 B-2 CIRCULAR 0.67 0.35 0.17 0.67 1 2.14
PIPE_B.1-OA_B.1-1 CIRCULAR 0.67 0.35 0.17 0.67 1 1.47
PIPE_B-1 CIRCULAR 1.50 1.77 0.38 1.50 1 7.42
PIPE B-2 B-1 CIRCULAR 1.50 1.77 0.38 1.50 1 7.44
PIPE B-3 B-2 CIRCULAR 1.00 0.79 0.25 1.00 1 2.55
PIPE B-4 B-3 CIRCULAR 1.00 0.79 0.25 1.00 1 2.56
****************
Transect Summary
****************
Transect 1/GUTTER
Area:
0.0004 0.0015 0.0046 0.0106 0.0194
0.0322 0.0493 0.0698 0.0913 0.1129
0.1345 0.1561 0.1777 0.1994 0.2211
0.2428 0.2646 0.2864 0.3082 0.3301
0.3520 0.3739 0.3958 0.4178 0.4398
SWMM 5.2 Page 5
BLOOM PARK AND POOL - 2-YEAR
0.4619 0.4839 0.5060 0.5282 0.5503
0.5725 0.5948 0.6170 0.6393 0.6616
0.6840 0.7063 0.7287 0.7512 0.7736
0.7961 0.8187 0.8412 0.8638 0.8864
0.9091 0. 9318 0.9545 0.9772 1.0000
Hrad:
0.0182 0.0370 0.0466 0.0563 0.0694
0.0814 0.0917 0.1098 0.1318 0.1547
0.1779 0.2013 0.2247 0.2481 0.2714
0.2945 0.3176 0.3405 0.3632 0.3858
0.4083 0.4307 0.4528 0.4749 0.4968
0.5185 0.5401 0.5616 0.5829 0.6040
0.6251 0. 6460 0.6667 0.6873 0.7078
0.7282 0.7484 0.7685 0.7885 0.8083
0.8280 0.8476 0.8671 0.8864 0.9056
0.9247 0.9437 0.9626 0.9814 1.0000
Width:
0.0328 0.0739 0.1985 0.3231 0.4675
0.6552 0.8429 0.9422 0.9451 0.9464
0.9477 0.9491 0.9504 0.9518 0.9531
0.9544 0.9558 0.9571 0.9585 0.9598
0.9611 0.9625 0.9638 0.9652 0.9665
0.9678 0.9692 0.9705 0.9719 0.9732
0.9745 0.9759 0.9772 0.9786 0.9799
0.9812 0.9826 0.9839 0.9853 0.9866
0.9879 0.9893 0.9906 0.9920 0.9933
0.9946 0.9960 0.9973 0.9987 1.0000
****************
Analysis Options
Flow Units . . . . . . . . . . . . . . . CFS
Process Models:
Rainfall/Runoff . . . . . . . . YES
RDII . . . . . . . . . . . . . . . . . . . NO
Snowmelt . . . . . . . . . . . . . . . NO
Groundwater . . . . . . . . . . . . NO
Flow Routing . . . . . . . . . . . YES
Ponding Allowed . . . . . . . . YES
Water Quality . . . . . . . . . . NO
Infiltration Method . . . . . . GREEN_AMPT
Flow Routing Method . . . . . . DYNWAVE
Surcharge Method . . . . . . . . . SLOT
SWMM 5.2 Page 6
BLOOM PARK AND POOL - 2-YEAR
Starting Date . . . . . . . . . . . . 12/20/2024 00:00:00
Ending Date . . . . . . . . . . . . . . 12/20/2024 04:00:00
Antecedent Dry Days . . . . . . 0.0
Report Time Step . . . . . . . . . 00:01:00
Wet Time Step . . . . . . . . . . . . 00:01:00
Dry Time Step . . . . . . . . . . . . 00:01:00
Routing Time Step . . . . . . . . 1.00 sec
Variable Time Step . . . . . . . YES
Maximum Trials . . . . . . . . . . . 20
Number of Threads . . . . . . . . 1
Head Tolerance . . . . . . . . . . . 0.005000 ft
Control Actions Taken
Volume Depth
Runoff Quantity Continuity acre-feet inches
--------- -------
Total Precipitation . . . . . . 0.736 0.978
Evaporation Loss . . . . . . . . . 0.000 0.000
Infiltration Loss . . . . . . . . 0.202 0.269
Surface Runoff . . . . . . . . . . . 0.477 0.633
Final Storage . . . . . . . . . . . . 0.058 0.076
Continuity Error (%) . . . . . -0.041
Volume Volume
Flow Routing Continuity acre-feet 10^6 gal
--------- ---------
Dry Weather Inflow . . . . . . . 0.000 0.000
Wet Weather Inflow . . . . . . . 0.477 0.155
Groundwater Inflow . . . . . . . 0.000 0.000
RDII Inflow . . . . . . . . . . . . . . 0.000 0.000
External Inflow . . . . . . . . . . 0.000 0.000
External Outflow . . . . . . . . . 0.127 0.041
Flooding Loss . . . . . . . . . . . . 0.000 0.000
Evaporation Loss . . . . . . . . . 0.000 0.000
Exfiltration Loss . . . . . . . . 0.000 0.000
Initial Stored Volume . . . . 1.885 0.614
Final Stored Volume . . . . . . 2.236 0.729
Continuity Error (%) . . . . . -0.034
S WMM 5.2 Page 7
BLOOM PARK AND POOL - 2-YEAR
*************************
Highest Continuity Errors
Node STM_B.1-0_BYPASS (81.43%)
Node STM_B.l-OA_BYPASS (8.64%)
Node STM MH_A.1-1 (1.51%)
Node SDMHZl (1.33%)
Node SDMHZ2 (1.07%)
Time-Step Critical Elements
***************************
None
Highest Flow Instability Indexes
Link Pipe - (9) (7)
Link Pipe - (8) (4)
Link Pipe - (4) (1)
*********************************
Most Frequent Nonconverging Nodes
Convergence obtained at all time steps.
Routing Time Step Summary
Minimum Time Step 0.50 sec
Average Time Step 1.00 sec
Maximum Time Step 1.00 sec
% of Time in Steady State 0.00
Average Iterations per Step 2.00
% of Steps Not Converging 0.00
Time Step Frequencies
1.000 - 0.871 sec 99.99 %
0.871 - 0.758 sec 0.00 %
SWMM 5.2 Page 8
BLOOM PARK AND POOL - 2-YEAR
0.758 - 0. 660 sec 0.00 %
0.660 - 0.574 sec 0.00 %
0.574 - 0.500 sec 0.01 %
Subcatchment Runoff Summary
----------------------------------------------------------------------------------------------------------------------
Total Total Total Total Impery Pery Total Total Peak
Precip Runon Evap Infil Runoff Runoff Runoff Runoff Runoff
Subcatchment in in in in in in in 10^6 gal CFS
----------------------------------------------------------------------------------------------------------------------
D14-1 0.98 0.00 0.00 0.91 0.08 0.00 0.06 0.00 0.05
D14-2 0.98 0.00 0.00 0.72 0.30 0.00 0.22 0.00 0.08
D18.1A 0.98 0.00 0.00 0.92 0.07 0.00 0.05 0.00 0.13
D18.1B 0.98 0.00 0.00 0.78 0.23 0.00 0.17 0.00 0.02
D18.1C 0.98 0.00 0.00 0.25 0.73 0.10 0.65 0.00 0.36
D18.1D 0.98 0.00 0.00 0.74 0.27 0.00 0.20 0.00 0.29
D18.1E 0.98 0.00 0.00 0.61 0.42 0.01 0.32 0.00 0.10
D18.1F 0.98 0.00 0.00 0.18 0.78 0.12 0.71 0.00 0.22
D18.1G 0.98 0.00 0.00 0.82 0.18 0.00 0.14 0.00 0.03
D18.1H 0.98 0.00 0.00 0.31 0.69 0.08 0.59 0.00 0.55
D19-1 0.98 0.00 0.00 0.83 0.18 0.00 0.13 0.00 0.03
D24-1 0.98 0.00 0.00 0.31 0.69 0.08 0.59 0.00 0.56
Z2.1-A 0.98 0.00 0.00 0.05 0.83 0.00 0.83 0.01 0.64
Z2.2 0.98 0.00 0.00 0.15 0.75 0.00 0.75 0.02 1.82
Z3.1 0.98 0.00 0.00 0.10 0.79 0.00 0.79 0.03 3.24
Z3.A-E 0.98 0.00 0.00 0.05 0.83 0.00 0.83 0.02 1.81
Z3.A-W 0.98 0.00 0.00 0.05 0.83 0.00 0.83 0.01 1.52
Z5.1 0.98 0.00 0.00 0.15 0.74 0.00 0.74 0.03 2.94
Z6 0.98 0.00 0.00 0.15 0.75 0.00 0.75 0.01 1.05
******************
Node Depth Summary
---------------------------------------------------------------------------------
Average Maximum Maximum Time of Max Reported
Depth Depth HGL Occurrence Max Depth
Node Type Feet Feet Feet days hr:min Feet
---------------------------------------------------------------------------------
SWMM 5.2 Page 9
BLOOM PARK AND POOL - 2-YEAR
INLETZ2.1-A JUNCTION 0.05 0.52 4944.44 0 00:42 0.52
INLETZ2.2 JUNCTION 0.11 0.58 4944.52 0 00:40 0.58
INLETZ3.1 JUNCTION 0.21 0.93 4944.85 0 00:41 0. 93
INLETZ3.A JUNCTION 0.23 0.96 4944.81 0 00:40 0.96
INLETZ5.1 JUNCTION 0.13 0.71 4946.61 0 00:40 0.71
INLETZ6 JUNCTION 0.08 0.51 4946.49 0 00:40 0.51
STM_B.1-OA_BYPASS JUNCTION 0.00 0.00 4948.25 0 00:42 0.00
STM_B.1-0_BYPASS JUNCTION 0.00 0.00 4948.00 0 01:27 0.00
J-IN-Z2.1-A JUNCTION 0.01 0.07 4948.14 0 00:40 0.07
J-IN-Z2.2 JUNCTION 0.02 0.15 4948.22 0 00:40 0.15
J-IN-Z3.1 JUNCTION 0.04 0.21 4947.93 0 00:40 0.21
J-IN-Z3.A JUNCTION 0.04 0.21 4947.84 0 00:40 0.21
J-IN-Z5.1 JUNCTION 0.03 0.20 4952.37 0 00:40 0.20
J-IN-Z6 JUNCTION 0.01 0.10 4952.13 0 00:40 0.10
Junction-10 JUNCTION 0.11 0.26 4948.76 0 00:40 0.26
FL_D18.1H JUNCTION 0.03 0.12 4949.82 0 00:40 0.12
RD.FL._D14-2 JUNCTION 0.03 0.11 4949.61 0 00:40 0.11
RD.FL._D14-1 JUNCTION 0.03 0.10 4948.60 0 00:40 0.10
Junction-4 JUNCTION 0.00 0.00 4953.00 0 00:00 0.00
Junction-5 JUNCTION 0.00 0.00 4952.75 0 00:00 0.00
SDMHZI JUNCTION 1.13 1.80 4944.30 0 00:42 1.80
SDMHZ2 JUNCTION 0.81 1.60 4944.44 0 00:42 1.59
SDMHZ2.1 JUNCTION 0.10 0.71 4944.44 0 00:42 0.71
SDMHZ3 JUNCTION 0.15 0.63 4944.43 0 00:41 0.63
SDMHZ4 JUNCTION 0.15 0.67 4946.00 0 00:41 0.67
SDMHZ5 JUNCTION 0.15 0.71 4946.48 0 00:40 0.71
STM.MH_A.1-1 JUNCTION 0.92 1.65 4944.37 0 00:42 1.65
STM.MH_B-1 JUNCTION 1.14 1.62 4944.10 0 00:42 1.62
STM_A.l-2 INV. JUNCTION 0.01 0.04 4946.01 0 00:40 0.04
STM A.1-2 RIM JUNCTION 0.00 0.01 4949.41 0 00:40 0.01
STM_B.l-0_INV JUNCTION 0.04 0.24 4950.24 0 00:40 0.24
STM_B.1-0_RIM JUNCTION 0.05 0.40 4952.10 0 00:40 0.39
STM_B.1-OA_INV. JUNCTION 0.04 0.18 4948.76 0 00:40 0.18
STM_B.1-1_INV. JUNCTION 0.03 0.15 4948.31 0 00:40 0.15
STM_B.1-1_RIM JUNCTION 0.00 0.01 4950.61 0 00:40 0.01
STM_B-1 INV JUNCTION 0.07 0.32 4946.28 0 00:41 0.32
STM_B-2_INV JUNCTION 0.07 0.32 4946.60 0 00:40 0.32
STM_B-3_INV JUNCTION 0.06 0.31 4946.81 0 00:40 0.31
STM_B-4_INV. JUNCTION 0.06 0.31 4947.31 0 00:40 0.31
STM_B-4 RIM JUNCTION 0.01 0.09 4949.39 0 00:40 0.09
Out-1 OUTFALL 0.50 0.50 4942.50 0 00:00 0.50
D19-1_OUT OUTFALL 0.00 0.00 4950.50 0 00:00 0.00
POND_D STORAGE 1.14 1.20 4943.64 0 02:20 1.20
STORE D.18.1D STORAGE 0.03 0.17 4947.67 0 00:43 0.17
SWMM 5.2 Page 10
BLOOM PARK AND POOL - 2-YEAR
*******************
Node Inflow Summary
*******************
-------------------------------------------------------------------------------------------------
Maximum Maximum Lateral Total Flow
Lateral Total Time of Max Inflow Inflow Balance
Inflow Inflow Occurrence Volume Volume Error
Node Type CFS CFS days hr:min 10^6 gal 10^6 gal Percent
-------------------------------------------------------------------------------------------------
INLETZ2.1-A JUNCTION 0.00 0.58 0 00:40 0 0.00557 0.000
INLETZ2.2 JUNCTION 0.00 1.88 0 00:40 0 0.0177 0.004
INLETZ3.1 JUNCTION 0.00 2.96 0 00:40 0 0.0343 0.057
INLETZ3.A JUNCTION 0.00 3.12 0 00:40 0 0.038 0.044
INLETZ5.1 JUNCTION 0.00 2.80 0 00:40 0 0.0303 0.005
INLETZ6 JUNCTION 0.00 0.99 0 00:40 0 0.00931 0.003
STM B.1-OA BYPASS JUNCTION 0.00 0.01 0 00:40 0 6.11e-06 0.528 gal
STM B.1-0 BYPASS JUNCTION 0.00 0.00 0 00:42 0 1.02e-06 0.828 gal
J-IN-Z2.1-A JUNCTION 0.64 0.64 0 00:40 0.00566 0.00566 -0.030
J-IN-Z2.2 JUNCTION 1.82 1.95 0 00:40 0.0166 0.0177 0.040
J-IN-Z3.1 JUNCTION 3.24 3.26 0 00:40 0.0342 0.0343 0.077
J-IN-Z3.A JUNCTION 1.52 3.28 0 00:40 0.0147 0.038 0.064
J-IN-Z5.1 JUNCTION 2.94 2.94 0 00:40 0.0303 0.0303 0.051
J-IN-Z6 JUNCTION 1.05 1.05 0 00:40 0.00932 0.00932 0.039
Junction-10 JUNCTION 1.81 1.81 0 00:40 0.0233 0.0233 0.056
FL_D18.1H JUNCTION 0.55 0.55 0 00:40 0.00497 0.00497 0.005
RD.FL._D14-2 JUNCTION 0.08 0.08 0 00:40 0.00067 0.00067 0.464
RD.FL._D14-1 JUNCTION 0.05 0.13 0 00:40 0.00041 0.00108 0.514
Junction-4 JUNCTION 0.00 0.00 0 00:00 0 0 0.000 gal
Junction-5 JUNCTION 0.00 0.00 0 00:00 0 0 0.000 gal
SDMHZI JUNCTION 0.00 11.71 0 00:42 0 0.147 1.351
SDMHZ2 JUNCTION 0.00 11.73 0 00:41 0 0.137 1.085
SDMHZ2.1 JUNCTION 0.00 2.43 0 00:40 0 0.0232 -0.020
SDMHZ3 JUNCTION 0.00 9.71 0 00:41 0 0.112 -0.015
SDMHZ4 JUNCTION 0.00 3.78 0 00:40 0 0.0396 0.058
SDMHZ5 JUNCTION 0.00 3.78 0 00:40 0 0.0396 -0.023
STM.MH A.1-1 JUNCTION 0.00 11.44 0 00:41 0 0.139 1.528
STM.MH_B-1 JUNCTION 0.00 12.31 0 00:42 0 0.156 0.892
STM A.1-2 INV. JUNCTION 0.00 0.02 0 00:40 0 0.00014 0.115
STM_A.1-2_RIM JUNCTION 0.02 0.02 0 00:40 0.00014 0.00014 0.000
STM_B.1-0_INV JUNCTION 0.00 0.22 0 00:40 0 0.00211 0.026
STM B.1-0 RIM JUNCTION 0.22 0.22 0 00:40 0.00211 0.00211 0.011
SWMM 5.2 Page 11
BLOOM PARK AND POOL - 2-YEAR
STM B.1-OA_INV. JUNCTION 0.00 0.41 0 00:42 0 0.00211 0.028
STM_B.1-1 INV. JUNCTION 0.00 0.23 0 00:40 0 0.00237 0.012
STM_B.1-1_RIM JUNCTION 0.03 0.03 0 00:40 0.000263 0.000263 -0.002
STM_B-1 INV JUNCTION 0.00 0.76 0 00:40 0 0.00734 0.019
STM_B-2_INV JUNCTION 0.00 0.76 0 00:40 0 0.00734 0.002
STM_B-3 INV JUNCTION 0.00 0.54 0 00:40 0 0.00497 0.019
STM_B-4_INV. JUNCTION 0.00 0.54 0 00:40 0 0.00497 -0.006
STM_B-4 RIM JUNCTION 0.00 0.54 0 00:40 0 0.00497 0.003
Out-1 OUTFALL 0.00 0.39 0 02:20 0 0.041 0.000
D19-1_OUT OUTFALL 0.03 0.03 0 00:40 0.000215 0.000215 0.000
POND_D STORAGE 0.79 12.79 0 00:43 0.00695 0.769 0.025
STORE D.18.1D STORAGE 0.65 0.65 0 00:40 0.00554 0.00554 0.000
**********************
Node Surcharge Summary
**********************
No nodes were surcharged.
*********************
Node Flooding Summary
*********************
No nodes were flooded.
Storage Volume Summary
------------------------------------------------------------------------------------------------
Average Avg Evap Exfil Maximum Max Time of Max Maximum
Volume Pcnt Pcnt Pcnt Volume Pcnt Occurrence Outflow
Storage Unit 1000 ft3 Full Loss Loss 1000 ft3 Full days hr:min CFS
------------------------------------------------------------------------------------------------
POND_D 93.687 19.0 0.0 0.0 98.006 19.9 0 02:20 4.46
STORE D.18.1D 0.031 0.0 0.0 0.0 0.195 0.0 0 00:43 0.37
Outfall Loading Summary
SWMM 5.2 Page 12
BLOOM PARK AND POOL - 2-YEAR
-----------------------------------------------------------
Flow Avg Max Total
Freq Flow Flow Volume
Outfall Node Pcnt CFS CFS 10^6 gal
-----------------------------------------------------------
Out-1 100.00 0.38 0.39 0.041
D19-1 OUT 43.12 0.00 0.03 0.000
-----------------------------------------------------------
System 71.56 0.39 0.39 0.041
Link Flow Summary
-----------------------------------------------------------------------------
Maximum Time of Max Maximum Max/ Max/
IFlowl Occurrence IVelocl Full Full
Link Type CFS days hr:min ft/sec Flow Depth
-----------------------------------------------------------------------------
EX PIPE A.1-1 Zl CONDUIT 11.35 0 00:42 1.94 0.42 0.71
EX PIPE B-1 POND-D CONDUIT 12.32 0 00:43 4.07 0.93 0.44
EX PIPE Z1 B-1 CONDUIT 11.67 0 00:42 3.02 0.79 0.57
EX PIPE Z2 A.1-1 CONDUIT 11.43 0 00:41 2.19 0.43 0.67
GUTTER D14-1 J-IN-Z2.2 CHANNEL 0.13 0 00:40 1.63 0.00 0.04
GUTTER_D14-2 D14-1 CHANNEL 0.08 0 00:40 1.13 0.00 0.03
OL_B.l-0 CONDUIT 0.00 0 00:00 0.00 0.00 0.00
OL_B.l-0_BYPASS CONDUIT 0.00 0 01:27 0.00 0.00 0.00
OL_B.l-OA CONDUIT 0.23 0 00:42 0.50 0.00 0.04
OL_B.l-OA_BYPASS CONDUIT 0.00 0 00:42 0.00 0.00 0.00
OL_B.1-1 CONDUIT 0.00 0 00:00 0.00 0.00 0.02
P-1 CONDUIT 0.39 0 02:20 1.98 1.54 1.00
P-2 CHANNEL 0.00 0 00:00 0.00 0.00 0.03
P-3 CHANNEL 0.00 0 00:00 0.00 0.00 0.00
P-4 CHANNEL 0.00 0 00:00 0.00 0.00 0.02
P-5 CHANNEL 0.00 0 00:00 0.00 0.00 0.03
P-6 CHANNEL 0.02 0 00:40 0.15 0.00 0.05
P-7 CHANNEL 1.80 0 00:40 3.29 0.00 0.08
PAN_D18.1H_B-4 CONDUIT 0.54 0 00:40 2.38 0.00 0.03
Pipe - (10) CONDUIT 0.56 0 00:40 1.78 0.04 0.41
Pipe - (11) CONDUIT 1.86 0 00:40 3.67 0.21 0.42
Pipe - (12) CONDUIT 2.80 0 00:40 3.38 0.21 0.48
Pipe - (13) CONDUIT 0.99 0 00:40 1.50 0.10 0.41
SWMM 5.2 Page 13
BLOOM PARK AND POOL - 2-YEAR
Pipe - (2) CONDUIT 3.78 0 00:40 3.45 0.14 0.28
Pipe - (3) CONDUIT 3.69 0 00:41 3. 63 0.15 0.26
Pipe - (4) CONDUIT 9.67 0 00:41 3.10 0.13 0.46
Pipe - (7) CONDUIT 2.27 0 00:40 1.72 0.10 0.58
Pipe - (8) CONDUIT 2.96 0 00:41 3.24 0.46 0.52
Pipe - (9) CONDUIT 3.12 0 00:40 3.37 0.39 0.53
PIPE_A.1-2 A.1-1 CONDUIT 0.02 0 00:40 1.47 0.00 0.04
PIPE_B.1-0_B.1-OA CONDUIT 0.21 0 00:40 3.75 0.82 0.63
PIPE_B.1-0_B-2 CONDUIT 0.23 0 00:40 2.15 0.11 0.35
PIPE B.1-OA B.1-1 CONDUIT 0.20 0 00:40 3.17 0.14 0.24
PIPE_B-1 CONDUIT 0.76 0 00:41 2.71 0.10 0.22
PIPE B-2 B-1 CONDUIT 0.76 0 00:40 2.71 0.10 0.22
PIPE_B-3 B-2 CONDUIT 0.53 0 00:40 2.49 0.21 0.32
PIPE B-4 B-3 CONDUIT 0.54 0 00:40 2.59 0.21 0.31
IN-PARK ORIFICE 0.37 0 00:43
IN-Z2.1-A ORIFICE 0.58 0 00:40 0.14
IN-Z2.2 ORIFICE 1.88 0 00:40 0.31
IN-Z3.1 ORIFICE 2.96 0 00:40 0.41
IN-Z3.A ORIFICE 3.12 0 00:40 0.43
IN-Z5.1 ORIFICE 2.80 0 00:40 0.40
IN-Z6 ORIFICE 0.99 0 00:40 0.20
Orifice-1 ORIFICE 0.00 0 00:00
STM B-4 INLET ORIFICE 0.54 0 00:40
STM B.1-0 INLET ORIFICE 0.22 0 00:40 1.00
STM_B.l-1_INLET ORIFICE 0.03 0 00:40
STM A.1-2 INLET ORIFICE 0.02 0 00:40
Orifice-1-0 WEIR 0.00 0 00:00 0.00
Orifice-5 WEIR 0.00 0 00:00 0.00
W-2.1-2.2 WEIR 0.00 0 00:00 0.00
Flow Classification Summary
***************************
-------------------------------------------------------------------------------------
Adjusted ---------- Fraction of Time in Flow Class ----------
/Actual Up Down Sub Sup Up Down Norm Inlet
Conduit Length Dry Dry Dry Crit Crit Crit Crit Ltd Ctrl
-------------------------------------------------------------------------------------
EX_PIPE_A.1-1_Zl 1.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.00 0.00
EX PIPE B-1 POND-D 1.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.00 0.00
EX_PIPE_Z1_B-1 1.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.00 0.00
EX PIPE Z2 A.1-1 1.00 0.00 0.00 0.00 0.99 0.00 0.00 0.00 0.00 0.00
SWMM 5.2 Page 14
BLOOM PARK AND POOL - 2-YEAR
GUTTER D14-1 J-IN-Z2.2 1.00 0.03 0.00 0.00 0.11 0.86 0.00 0.00 0.17 0.00
GUTTER_D14-2 D14-1 1.00 0.03 0.00 0.00 0.96 0.02 0.00 0.00 0.70 0.00
OL_B.1-0 1.00 0.80 0.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00
OL_B.1-0_BYPASS 1.00 0.17 0.00 0.00 0.00 0.00 0.00 0.83 0.00 0.00
OL_B.1-OA 1.00 0.09 0. 90 0.00 0.00 0.00 0.02 0.00 0.00 0.00
OL_B.1-OA_BYPASS 1.00 0.17 0.64 0.00 0.20 0.00 0.00 0.00 0.82 0.00
OL_B.1-1 1.00 0.03 0. 97 0.00 0.00 0.00 0.00 0.00 0.00 0.00
P-1 1.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.00 0.00
P-2 1.00 0.03 0.97 0.00 0.00 0.00 0.00 0.00 0.00 0.00
P-3 1.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
P-4 1.00 0.03 0.97 0.00 0.00 0.00 0.00 0.00 0.00 0.00
P-5 1.00 0.02 0.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00
P-6 1.00 0.02 0.01 0.00 0.97 0.00 0.00 0.00 0.95 0.00
P-7 1.00 0.03 0.00 0.00 0.04 0.93 0.00 0.00 0.03 0.00
PAN_D18.1H_B-4 1.00 0.03 0.00 0.00 0.01 0.96 0.00 0.00 0.00 0.00
Pipe - (10) 1.00 0.03 0.00 0.00 0.96 0.01 0.00 0.00 0.85 0.00
Pipe - (11) 1.00 0.03 0.00 0.00 0.56 0.41 0.00 0.00 0.00 0.00
Pipe - (12) 1.00 0.03 0.00 0.00 0.28 0.69 0.00 0.00 0.29 0.00
Pipe - (13) 1.00 0.03 0.00 0.00 0.97 0.00 0.00 0.00 0.84 0.00
Pipe - (2) 1.00 0.05 0.00 0.00 0.92 0.03 0.00 0.00 0.47 0.00
Pipe - (3) 1.00 0.05 0.00 0.00 0.94 0.00 0.00 0.00 0.15 0.00
Pipe - (4) 1.00 0.01 0.05 0.00 0.95 0.00 0.00 0.00 0.95 0.00
Pipe - (7) 1.00 0.01 0.05 0.00 0.95 0.00 0.00 0.00 0.89 0.00
Pipe - (8) 1.00 0.03 0.00 0.00 0.96 0.02 0.00 0.00 0.00 0.76
Pipe - (9) 1.00 0.03 0.00 0.00 0.95 0.02 0.00 0.00 0.00 0.85
PIPE A.1-2 A.1-1 1.00 0.04 0.00 0.00 0.00 0.00 0.00 0.96 0.00 0.00
PIPE_B.1-0_B.1-OA 1.00 0.05 0.00 0.00 0.04 0.91 0.00 0.00 0.00 0.00
PIPE B.1-0 B-2 1.00 0.03 0.00 0.00 0.95 0.02 0.00 0.00 0.90 0.00
PIPE_B.1-OA_B.1-1 1.00 0.03 0.05 0.00 0.13 0.78 0.00 0.00 0.02 0.00
PIPE_B-1 1.00 0.10 0.00 0.00 0.00 0.00 0.00 0.90 0.00 0.00
PIPE_B-2 B-1 1.00 0.08 0.00 0.00 0.90 0.02 0.00 0.00 0.83 0.00
PIPE_B-3 B-2 1.00 0.06 0.00 0.00 0.93 0.01 0.00 0.00 0.83 0.00
PIPE B-4 B-3 1.00 0.05 0.00 0.00 0.94 0.01 0.00 0.00 0.83 0.00
*************************
Conduit Surcharge Summary
----------------------------------------------------------------------------
Hours Hours
-- ------ Hours Full ---- --- Above Full Capacity
Conduit Both Ends Upstream Dnstream Normal Flow Limited
----------------------------------------------------------------------------
SWMM 5.2 Page 15
BLOOM PARK AND POOL - 2-YEAR
P-1 4.00 4 .00 4 .00 4 .00 4.00
Analysis begun on: Wed Feb 19 08:45:22 2025
Analysis ended on: Wed Feb 19 08:45:23 2025
Total elapsed time: 00:00:01
SWMM 5.2 Page 16
BLOOM PARK AND POOL - 100-YEAR
EPA STORM WATER MANAGEMENT MODEL - VERSION 5.2 (Build 5.2.4)
------------------------------------------------------------
WARNING 04: minimum elevation drop used for Conduit OL B.1-0_BYPASS
WARNING 05: minimum slope used for Conduit OL B.1-0 BYPASS
Element Count
*************
Number of rain gages . . . . . . 1
Number of subcatchments . . . 19
Number of nodes . . . . . . . . . . . 44
Number of links . . . . . . . . . . . 52
Number of pollutants . . . . . . 0
Number of land uses . . . . . . . 0
****************
Raingage Summary
Data Recording
Name Data Source Type Interval
------------------------------------------------------------------------
Rain Gage-1 100-YR INTENSITY 5 min.
********************
Subcatchment Summary
********************
Name Area Width %Impery %Slope Rain Gage Outlet
-----------------------------------------------------------------------------------------------------------
D14-1 0.26 75.00 8.80 4.5000 Rain Gage-1 RD.FL._D14-1
D14-2 0.11 75.00 34.00 5.0000 Rain Gage-1 RD.FL._D14-2
D18.1A 0.75 100.00 8.00 2.5000 Rain Gage-1 POND_D
D18.1B 0.03 20.00 26.00 5.0000 Rain Gage-1 STM_A.1-2 RIM
D18.1C 0.18 50.00 83.00 2.0000 Rain Gage-1 STORE_D.18.1D
D18.1D 0.43 120.00 31.00 5.0000 Rain Gage-1 STORE D.18.1D
D18.1E 0.10 60.00 48.00 2.0000 Rain Gage-1 POND_D
D18.1F 0.11 25.00 89.00 1.0000 Rain Gage-1 STM_B.1-0_RIM
D18.1G 0.07 40.00 21.00 2.0000 Rain Gage-1 STM_B.1-1 RIM
D18.1H 0.31 75.00 78.00 2.5000 Rain Gage-1 FL_D18.1H
D19-1 0.06 50.00 20.00 3.5000 Rain Gage-1 D19-1_OUT
D24-1 0.31 50.00 78.00 7.5000 Rain Gage-1 POND D
SWMM 5.2 Pagel
BLOOM PARK AND POOL - 100-YEAR
Z2.1-A 0.25 50.00 95.00 3.0000 Rain Gage-1 J-IN-Z2.1-A
Z2.2 0.82 120.00 85.00 3.0000 Rain Gage-1 J-IN-Z2.2
Z3.1 1.60 125.00 90.00 3.0000 Rain Gage-1 J-IN-Z3.1
Z3.A-E 1.04 50.00 95.00 3.0000 Rain Gage-1 Junction-10
Z3.A-W 0.65 75.00 95.00 3.0000 Rain Gage-1 J-IN-Z3.A
Z5.1 1.50 120.00 85.00 3.0000 Rain Gage-1 J-IN-Z5.1
Z6 0.46 80.00 85.00 3.0000 Rain Gage-1 J-IN-Z6
************
Node Summary
************
Invert Max. Ponded External
Name Type Elev. Depth Area Inflow
-------------------------------------------------------------------------------
INLETZ2.1-A JUNCTION 4943.92 6.00 0.0
INLETZ2.2 JUNCTION 4943.94 6.00 0.0
INLETZ3.1 JUNCTION 4943.92 6.00 0.0
INLETZ3.A JUNCTION 4943.85 6.00 0.0
INLETZ5.1 JUNCTION 4945.90 6.00 0.0
INLETZ6 JUNCTION 4945.98 6.00 0.0
STM B.1-OA BYPASS JUNCTION 4948.25 20.00 50.0
STM_B.l-0_BYPASS JUNCTION 4948.00 20.00 50.0
J-IN-Z2.1-A JUNCTION 4948.07 6.00 50.0
J-IN-Z2.2 JUNCTION 4948.07 6.00 50.0
J-IN-Z3.1 JUNCTION 4947.72 6.00 50.0
J-IN-Z3.A JUNCTION 4947.63 6.00 50.0
J-IN-Z5.1 JUNCTION 4952.17 6.00 50.0
J-IN-Z6 JUNCTION 4952.03 6.00 50.0
Junction-10 JUNCTION 4948.50 6.00 50.0
FL_D18.1H JUNCTION 4949.70 10.00 50.0
RD.FL._D14-2 JUNCTION 4949.50 10.00 50.0
RD.FL._D14-1 JUNCTION 4948.50 10.00 50.0
Junction-4 JUNCTION 4953.00 6.00 50.0
Junction-5 JUNCTION 4952.75 6.00 50.0
SDMHZI JUNCTION 4942.50 6.00 0.0
SDMHZ2 JUNCTION 4942.84 6.00 0.0
SDMHZ2.1 JUNCTION 4943.73 6.00 0.0
SDMHZ3 JUNCTION 4943.80 6.00 0.0
SDMHZ4 JUNCTION 4945.33 6.00 0.0
SDMHZ5 JUNCTION 4945.77 6.00 0.0
STM.MH_A.1-1 JUNCTION 4942.72 6.00 0.0
STM.MH B-1 JUNCTION 4942.48 6.00 50.0
STM A.1-2 INV. JUNCTION 4945.97 20.00 50.0
SWMM 5.2 Page 2
BLOOM PARK AND POOL - 100-YEAR
STM A.1-2 RIM JUNCTION 4949.40 20.00 50.0
STM_B.1-0_INV JUNCTION 4950.00 20.00 50.0
STM_B.1-0_RIM JUNCTION 4951.70 10.00 50.0
STM_B.1-OA_INV. JUNCTION 4948.58 20.00 50.0
STM_B.1-1_INV. JUNCTION 4948.16 20.00 50.0
STM_B.1-1 RIM JUNCTION 4950.60 10.00 50.0
STM_B-1_INV JUNCTION 4945.96 10.00 50.0
STM_B-2 INV JUNCTION 4946.28 20.00 50.0
STM_B-3 INV JUNCTION 4946.50 20.00 50.0
STM B-4 INV. JUNCTION 4947.00 10.00 50.0
STM B-4 RIM JUNCTION 4949.30 10.00 50.0
Out-1 OUTFALL 4942.00 0.50 0.0
D19-1_OUT OUTFALL 4950.50 0.00 0.0
POND_D STORAGE 4942.44 6.00 0.0
STORE D.18.1D STORAGE 4947.50 6.00 0.0
************
Link Summary
************
Name From Node To Node Type Length %Slope Roughness
---------------------------------------------------------------------------------------------
EX_PIPE_A.1-1_Zl STM.MH_A.1-1 SDMHZl CONDUIT 143.9 0.1529 0.0130
EX PIPE B-1 POND-D STM.MH B-1 POND D CONDUIT 102.3 0.0391 0.0130
EX_PIPE_Z1_B-1 SDMHZI STM.MH_B-1 CONDUIT 40.8 0.0490 0.0130
EX_PIPE_Z2_A.1-1 SDMHZ2 STM.MH_A.1-1 CONDUIT 81.6 0.1470 0.0130
GUTTER D14-1 J-IN-Z2.2 RD.FL._D14-1 J-IN-Z2.2 CONDUIT 26.0 1.6553 0.0140
GUTTER_D14-2 D14-1 RD.FL._D14-2 RD.FL._D14-1 CONDUIT 190.0 0.5263 0.0140
OL_B.1-0 STM_B.1-0_RIM STM_B.1-OA_BYPASS CONDUIT 95.1 4.1567 0.0120
OL B.1-0 BYPASS STM B.1-0 BYPASS STORE D.18.1D CONDUIT 49.8 0.0200 0.0120
OL_B.1-OA STM_B.1-OA_INV. STM_B.1-OA_BYPASS CONDUIT 10.0 -1.7002 0.0120
OL_B.1-OA_BYPASS STM_B.1-OA_BYPASS STM_B.1-0_BYPASS CONDUIT 28.6 0.8751 0.0160
OL_B.1-1 STM_B.1-1_INV. STM_B.1-0_BYPASS CONDUIT 10.0 -3.4020 0.0120
P-1 POND_D Out-1 CONDUIT 216.4 0.2034 0.0130
P-2 J-IN-Z5.1 Junction-4 CONDUIT 83.4 -0. 9948 0.0140
P-3 Junction-4 Junction-5 CONDUIT 30.4 0.8235 0.0140
P-4 J-IN-Z6 Junction-5 CONDUIT 82.0 -0.8775 0.0140
P-5 Junction-5 J-IN-Z3.1 CONDUIT 392.2 1.2825 0.0140
P-6 J-IN-Z2.1-A J-IN-Z3.1 CONDUIT 130.7 0.2677 0.0140
P-7 Junction-10 J-IN-Z3.A CONDUIT 102.1 0.8518 0.0140
PAN_D18.1H_B-4 FL_D18.1H STM_B-4 RIM CONDUIT 29.8 1.3411 0.0130
Pipe - (10) INLETZ2.1-A SDMHZ2.1 CONDUIT 10.1 1.8730 0.0130
Pipe - (11) INLETZ2.2 SDMHZ2.1 CONDUIT 30.4 0.6902 0.0130
Pipe - (12) INLETZ5.1 SDMHZ5 CONDUIT 7.7 1.6839 0.0130
SWMM 5.2 Page 3
BLOOM PARK AND POOL - 100-YEAR
Pipe - (13) INLETZ6 SDMHZ5 CONDUIT 25.5 0.8241 0.0130
Pipe - (2) SDMHZ5 SDMHZ4 CONDUIT 108.5 0.4057 0.0130
Pipe - (3) SDMHZ4 SDMHZ3 CONDUIT 424.6 0.3604 0.0130
Pipe - (4) SDMHZ3 SDMHZ2 CONDUIT 77.2 1.2437 0.0130
Pipe - (7) SDMHZ2.1 SDMHZ2 CONDUIT 85.1 1.0460 0.0130
Pipe - (8) INLETZ3.1 SDMHZ3 CONDUIT 31.9 0.3763 0.0130
Pipe - (9) INLETZ3.A SDMHZ3 CONDUIT 8.6 0.5820 0.0130
PIPE_A.1-2 A.1-1 STM_A.1-2 INV. STM.MH_A.1-1 CONDUIT 41.0 1.9980 0.0130
PIPE B.1-0 B.1-OA STM B.1-0 INV STM B.1-0A INV. CONDUIT 75.2 1.8899 0.0130
PIPE B.1-0 B-2 STM B.1-1 INV. STM B-2 INV CONDUIT 60.0 3.1349 0.0130
PIPE B.1-OA B.1-1 STM B.1-6A INV. STM BA-1 INV. CONDUIT 28.4 1.4811 0.0130
PIPE_B-1 STM_B-1_INV STM.MH_B-1 CONDUIT 30.1 0.4987 0.0130
PIPE_B-2 B-1 STM_B-2_INV STM_B-1_INV CONDUIT 63.8 0.5013 0.0130
PIPE B-3 B-2 STM B-3 INV STM B-2 INV CONDUIT 43.0 0.5118 0.0130
PIPE_B-4_B-3 STM_B-4_INV. STM_B-3 INV CONDUIT 96.5 0.5179 0.0130
IN-PARK STORE_D.18.1D SDMHZI ORIFICE
IN-Z2.1-A J-IN-Z2.1-A INLETZ2.1-A ORIFICE
IN-Z2.2 J-IN-Z2.2 INLETZ2.2 ORIFICE
IN-Z3.1 J-IN-Z3.1 INLETZ3.1 ORIFICE
IN-Z3.A J-IN-Z3.A INLETZ3.A ORIFICE
IN-Z5.1 J-IN-Z5.1 INLETZ5.1 ORIFICE
IN-Z6 J-IN-Z6 INLETZ6 ORIFICE
Orifice-1 STORE_D.18.1D SDMHZI ORIFICE
STM B-4 INLET STM B-4 RIM STM B-4 INV. ORIFICE
STM_B.l-0_INLET STM_B.1-0_RIM STM_B.1-0_INV ORIFICE
STM B.1-1 INLET STM B.1-1 RIM STM B.1-1 INV. ORIFICE
STM_A.l-2 INLET STM_A.1-2 RIM STM_A.1-2 INV. ORIFICE
Orifice-10 J-IN-Z6 J-IN-Z5.1 WEIR
Orifice-5 J-IN-Z3.A J-IN-Z3.1 WEIR
W-2.1-2.2 J-IN-Z2.2 J-IN-Z2.1-A WEIR
Cross Section Summary
Full Full Hyd. Max. No. of Full
Conduit Shape Depth Area Rad. Width Barrels Flow
---------------------------------------------------------------------------------------
EX_PIPE_A.1-1_Zl HORIZ_ELLIPSE 2.42 7.40 0.74 3.75 1 26.96
EX PIPE B-1 POND-D CIRCULAR 3.00 7.07 0.75 3.00 1 13.19
EX_PIPE_Z1_B-1 CIRCULAR 3.00 7.07 0.75 3.00 1 14.77
EX_PIPE_Z2_A.1-1 HORIZ_ELLIPSE 2.42 7.40 0.74 3.75 1 26.44
GUTTER_D14-1 J-IN-Z2.2 1/GUTTER 3.00 69.77 1.63 26.50 1 1318.85
GUTTER D14-2 D14-1 1/GUTTER 3.00 69.77 1.63 26.50 1 743.67
SWMM 5.2 Page 4
BLOOM PARK AND POOL - 100-YEAR
OL_B.1-0 TRAPEZOIDAL 3.00 195.00 1.56 125.00 1 6616.80
OL_B.1-0_BYPASS TRAPEZOIDAL 3.00 195.00 1.56 125.00 1 458.98
OL_B.1-OA TRAPEZOIDAL 3.00 186.00 1.52 122.00 1 3975.14
OL_B.1-OA_BYPASS TRAPEZOIDAL 3.00 109.50 1.58 68.00 1 1290.38
OL_B.1-1 TRAPEZOIDAL 3.00 186.00 1.52 122.00 1 5622.92
P-1 CIRCULAR 0.50 0.20 0.12 0.50 1 0.25
P-2 1/GUTTER 3.00 69.77 1.63 26.50 1 1022.39
P-3 1/GUTTER 3.00 69.77 1.63 26.50 1 930.20
P-4 1/GUTTER 3.00 69.77 1.63 26.50 1 960.26
P-5 1/GUTTER 3.00 69.77 1.63 26.50 1 1160.87
P-6 1/GUTTER 3.00 69.77 1.63 26.50 1 530.41
P-7 1/GUTTER 3.00 69.77 1.63 26.50 1 946.07
PAN_D18.1H_B-4 TRAPEZOIDAL 3.00 180.30 1.50 120.10 1 3126.57
Pipe - (10) CIRCULAR 1.50 1.77 0.38 1.50 1 14.38
Pipe - (11) CIRCULAR 1.50 1.77 0.38 1.50 1 8.73
Pipe - (12) CIRCULAR 1.50 1.77 0.38 1.50 1 13.63
Pipe - (13) CIRCULAR 1.50 1.77 0.38 1.50 1 9.54
Pipe - (2) CIRCULAR 2.50 4.91 0.62 2.50 1 26.12
Pipe - (3) CIRCULAR 2.50 4.91 0.62 2.50 1 24.62
Pipe - (4) HORIZ_ELLIPSE 2.42 7.40 0.74 3.75 1 76.90
Pipe - (7) CIRCULAR 2.00 3.14 0.50 2.00 1 23.14
Pipe - (8) CIRCULAR 1.50 1.77 0.38 1.50 1 6.44
Pipe - (9) CIRCULAR 1.50 1.77 0.38 1.50 1 8.01
PIPE A.1-2 A.1-1 CIRCULAR 1.00 0.79 0.25 1.00 1 5.04
PIPE_B.1-0_B.1-OA CIRCULAR 0.33 0.09 0.08 0.33 1 0.26
PIPE B.1-0 B-2 CIRCULAR 0.67 0.35 0.17 0.67 1 2.14
PIPE_B.1-OA_B.1-1 CIRCULAR 0.67 0.35 0.17 0.67 1 1.47
PIPE_B-1 CIRCULAR 1.50 1.77 0.38 1.50 1 7.42
PIPE B-2 B-1 CIRCULAR 1.50 1.77 0.38 1.50 1 7.44
PIPE B-3 B-2 CIRCULAR 1.00 0.79 0.25 1.00 1 2.55
PIPE B-4 B-3 CIRCULAR 1.00 0.79 0.25 1.00 1 2.56
****************
Transect Summary
****************
Transect 1/GUTTER
Area:
0.0004 0.0015 0.0046 0.0106 0.0194
0.0322 0.0493 0.0698 0.0913 0.1129
0.1345 0.1561 0.1777 0.1994 0.2211
0.2428 0.2646 0.2864 0.3082 0.3301
0.3520 0.3739 0.3958 0.4178 0.4398
SWMM 5.2 Page 5
BLOOM PARK AND POOL - 100-YEAR
0.4619 0.4839 0.5060 0.5282 0.5503
0.5725 0.5948 0.6170 0.6393 0.6616
0.6840 0.7063 0.7287 0.7512 0.7736
0.7961 0.8187 0.8412 0.8638 0.8864
0.9091 0. 9318 0.9545 0.9772 1.0000
Hrad:
0.0182 0.0370 0.0466 0.0563 0.0694
0.0814 0.0917 0.1098 0.1318 0.1547
0.1779 0.2013 0.2247 0.2481 0.2714
0.2945 0.3176 0.3405 0.3632 0.3858
0.4083 0.4307 0.4528 0.4749 0.4968
0.5185 0.5401 0.5616 0.5829 0.6040
0.6251 0. 6460 0.6667 0.6873 0.7078
0.7282 0.7484 0.7685 0.7885 0.8083
0.8280 0.8476 0.8671 0.8864 0.9056
0.9247 0.9437 0.9626 0.9814 1.0000
Width:
0.0328 0.0739 0.1985 0.3231 0.4675
0.6552 0.8429 0.9422 0.9451 0.9464
0.9477 0.9491 0.9504 0.9518 0.9531
0.9544 0.9558 0.9571 0.9585 0.9598
0.9611 0.9625 0.9638 0.9652 0.9665
0.9678 0.9692 0.9705 0.9719 0.9732
0.9745 0.9759 0.9772 0.9786 0.9799
0.9812 0.9826 0.9839 0.9853 0.9866
0.9879 0.9893 0.9906 0.9920 0.9933
0.9946 0.9960 0.9973 0.9987 1.0000
****************
Analysis Options
Flow Units . . . . . . . . . . . . . . . CFS
Process Models:
Rainfall/Runoff . . . . . . . . YES
RDII . . . . . . . . . . . . . . . . . . . NO
Snowmelt . . . . . . . . . . . . . . . NO
Groundwater . . . . . . . . . . . . NO
Flow Routing . . . . . . . . . . . YES
Ponding Allowed . . . . . . . . YES
Water Quality . . . . . . . . . . NO
Infiltration Method . . . . . . GREEN_AMPT
Flow Routing Method . . . . . . DYNWAVE
Surcharge Method . . . . . . . . . SLOT
SWMM 5.2 Page 6
BLOOM PARK AND POOL - 100-YEAR
Starting Date . . . . . . . . . . . . 12/20/2024 00:00:00
Ending Date . . . . . . . . . . . . . . 12/20/2024 04:00:00
Antecedent Dry Days . . . . . . 0.0
Report Time Step . . . . . . . . . 00:01:00
Wet Time Step . . . . . . . . . . . . 00:01:00
Dry Time Step . . . . . . . . . . . . 00:01:00
Routing Time Step . . . . . . . . 1.00 sec
Variable Time Step . . . . . . . YES
Maximum Trials . . . . . . . . . . . 20
Number of Threads . . . . . . . . 1
Head Tolerance . . . . . . . . . . . 0.005000 ft
Control Actions Taken
Volume Depth
Runoff Quantity Continuity acre-feet inches
--------- -------
Total Precipitation . . . . . . 2.959 3.928
Evaporation Loss . . . . . . . . . 0.000 0.000
Infiltration Loss . . . . . . . . 0.379 0.503
Surface Runoff . . . . . . . . . . . 2.524 3.350
Final Storage . . . . . . . . . . . . 0.058 0.077
Continuity Error (%) . . . . . -0.058
Volume Volume
Flow Routing Continuity acre-feet 10^6 gal
--------- ---------
Dry Weather Inflow . . . . . . . 0.000 0.000
Wet Weather Inflow . . . . . . . 2.524 0.822
Groundwater Inflow . . . . . . . 0.000 0.000
RDII Inflow . . . . . . . . . . . . . . 0.000 0.000
External Inflow . . . . . . . . . . 0.000 0.000
External Outflow . . . . . . . . . 0.177 0.058
Flooding Loss . . . . . . . . . . . . 0.000 0.000
Evaporation Loss . . . . . . . . . 0.000 0.000
Exfiltration Loss . . . . . . . . 0.000 0.000
Initial Stored Volume . . . . 1.885 0.614
Final Stored Volume . . . . . . 4.240 1.382
Continuity Error (%) . . . . . -0.201
S WMM 5.2 Page 7
BLOOM PARK AND POOL - 100-YEAR
*************************
Highest Continuity Errors
Node STM B.1-0 BYPASS (5.20%)
***************************
Time-Step Critical Elements
***************************
None
********************************
Highest Flow Instability Indexes
Link Orifice-5 (2)
Link IN-Z3.A (1)
Link Pipe - (9) (1)
Link IN-Z3.1 (1)
*********************************
Most Frequent Nonconverging Nodes
*********************************
Convergence obtained at all time steps.
*************************
Routing Time Step Summary
Minimum Time Step 0.21 sec
Average Time Step 1.00 sec
Maximum Time Step 1.00 sec
% of Time in Steady State 0.00
Average Iterations per Step 2.00
% of Steps Not Converging 0.00
Time Step Frequencies
1.000 - 0.871 sec 99.42 %
0.871 - 0.758 sec 0.23 %
0.758 - 0.660 sec 0.10 %
0.660 - 0.574 sec 0.06 %
0.574 - 0.500 sec 0.19 %
SWMM 5.2 Page 8
BLOOM PARK AND POOL - 100-YEAR
***************************
Subcatchment Runoff Summary
----------------------------------------------------------------------------------------------------------------------
Total Total Total Total Impery Pery Total Total Peak
Precip Runon Evap Infil Runoff Runoff Runoff Runoff Runoff
Subcatchment in in in in in in in 10^6 gal CFS
----------------------------------------------------------------------------------------------------------------------
D14-1 3.93 0.00 0.00 1.75 0.34 1. 92 2.17 0.02 1.57
D14-2 3.93 0.00 0.00 1.21 1.30 1.71 2.68 0.01 0.98
D18.1A 3.93 0.00 0.00 1.95 0.31 1.74 1.97 0.04 2.52
D18.1B 3.93 0.00 0.00 1.36 1.00 1.79 2.54 0.00 0.26
D18.1C 3.93 0.00 0.00 0.34 3.18 1.13 3.51 0.02 1.72
D18.1D 3.93 0.00 0.00 1.32 1.19 1. 69 2.58 0.03 3.23
D18.1E 3.93 0.00 0.00 0.98 1.84 1.53 2.91 0.01 0.88
D18.1F 3.93 0.00 0.00 0.23 3.41 1.06 3.61 0.01 1.03
D18.1G 3.93 0.00 0.00 1.49 0.81 1.82 2.42 0.00 0.52
D18.1H 3.93 0.00 0.00 0.43 2.99 1.18 3.42 0.03 2.90
D19-1 3.93 0.00 0.00 1.47 0.77 1.86 2.44 0.00 0.51
D24-1 3.93 0.00 0.00 0.43 2.99 1.18 3.42 0.03 2.93
Z2.1-A 3.93 0.00 0.00 0.09 3.75 0.11 3.75 0.03 2.46
Z2.2 3.93 0.00 0.00 0.28 3.57 0.31 3.57 0.08 7.66
Z3.1 3.93 0.00 0.00 0.18 3.65 0.21 3.65 0.16 14.36
Z3.A-E 3.93 0.00 0.00 0.09 3.73 0.10 3.73 0.11 8.85
Z3.A-W 3.93 0.00 0.00 0.09 3.74 0.11 3.74 0.07 6.20
Z5.1 3.93 0.00 0.00 0.28 3.56 0.31 3.56 0.14 13.10
Z6 3.93 0.00 0.00 0.27 3.57 0.32 3.57 0.04 4.36
Node Depth Summary
---------------------------------------------------------------------------------
Average Maximum Maximum Time of Max Reported
Depth Depth HGL Occurrence Max Depth
Node Type Feet Feet Feet days hr:min Feet
---------------------------------------------------------------------------------
INLETZ2.1-A JUNCTION 0.91 4.38 4948.30 0 00:43 4.38
INLETZ2.2 JUNCTION 0.92 4.48 4948.42 0 00:42 4.48
INLETZ3.1 JUNCTION 0.96 4.45 4948.37 0 00:41 4.45
SWMM 5.2 Page 9
BLOOM PARK AND POOL - 100-YEAR
INLETZ3.A JUNCTION 1.02 4.49 4948.34 0 00:41 4.49
INLETZ5.1 JUNCTION 0.41 3.85 4949.75 0 00:39 3.74
INLETZ6 JUNCTION 0.31 3.94 4949.92 0 00:39 3.75
STM_B.1-OA_BYPASS JUNCTION 0.01 0.09 4948.34 0 00:40 0.08
STM B.1-0_BYPASS JUNCTION 0.08 0.27 4948.27 0 00:57 0.27
J-IN-Z2.1-A JUNCTION 0.04 0.37 4948.44 0 00:43 0.37
J-IN-Z2.2 JUNCTION 0.08 0.47 4948.54 0 00:40 0.47
J-IN-Z3.1 JUNCTION 0.11 0.76 4948.48 0 00:42 0.76
J-IN-Z3.A JUNCTION 0.12 0.85 4948.48 0 00:42 0.85
J-IN-Z5.1 JUNCTION 0.09 0.40 4952.57 0 00:40 0.40
J-IN-Z6 JUNCTION 0.05 0.43 4952.46 0 00:40 0.43
Junction-10 JUNCTION 0.17 0.41 4948.91 0 00:40 0.41
FL_D18.1H JUNCTION 0.06 0.22 4949.92 0 00:40 0.22
RD.FL._D14-2 JUNCTION 0.06 0.22 4949.72 0 00:40 0.22
RD.FL. D14-1 JUNCTION 0.07 0.25 4948.75 0 00:40 0.25
Junction-4 JUNCTION 0.00 0.00 4953.00 0 00:00 0.00
Junction-5 JUNCTION 0.00 0.00 4952.75 0 00:00 0.00
SDMHZI JUNCTION 2.15 4.08 4946.58 0 00:41 4.08
SDMHZ2 JUNCTION 1.91 4.99 4947.83 0 00:41 4.99
SDMHZ2.1 JUNCTION 1.08 4.43 4948.16 0 00:43 4.43
SDMHZ3 JUNCTION 1.01 4.33 4948.13 0 00:40 4.33
SDMHZ4 JUNCTION 0.42 3.79 4949.12 0 00:38 3.76
SDMHZ5 JUNCTION 0.42 3.75 4949.52 0 00:39 3.67
STM.MH_A.1-1 JUNCTION 1.99 4.59 4947.31 0 00:41 4.59
STM.MH_B-1 JUNCTION 2.09 3.43 4945.91 0 00:40 3.43
STM A.1-2 INV. JUNCTION 0.08 1.34 4947.31 0 00:41 1.34
STM_A.l-2 RIM JUNCTION 0.01 0.06 4949.46 0 00:40 0.06
STM B.1-0 INV JUNCTION 0.11 0.40 4950.40 0 00:40 0.40
STM_B.l-0_RIM JUNCTION 0.15 0.54 4952.24 0 00:40 0.54
STM B.1-OA INV. JUNCTION 0.07 0.23 4948.81 0 00:56 0.19
STM_B.l-1_INV. JUNCTION 0.07 0.27 4948.43 0 00:40 0.27
STM_B.1-1 RIM JUNCTION 0.01 0.09 4950.69 0 00:40 0.09
STM_B-1_INV JUNCTION 0.16 0.73 4946.69 0 00:40 0.73
STM_B-2 INV JUNCTION 0.16 0.74 4947.02 0 00:40 0.73
STM_B-3_INV JUNCTION 0.15 0.83 4947.33 0 00:40 0.82
STM_B-4 INV. JUNCTION 0.15 0.92 4947.92 0 00:40 0.92
STM B-4 RIM JUNCTION 0.04 0.28 4949.58 0 00:40 0.28
Out-1 OUTFALL 0.50 0.50 4942.50 0 00:00 0.50
D19-1_OUT OUTFALL 0.00 0.00 4950.50 0 00:00 0.00
POND_D STORAGE 1.93 2.23 4944.67 0 02:55 2.23
STORE D.18.1D STORAGE 0.38 0.77 4948.27 0 00:58 0.77
*******************
SWMM 5.2 Page 10
BLOOM PARK AND POOL - 100-YEAR
Node Inflow Summary
-------------------------------------------------------------------------------------------------
Maximum Maximum Lateral Total Flow
Lateral Total Time of Max Inflow Inflow Balance
Inflow Inflow Occurrence Volume Volume Error
Node Type CFS CFS days hr:min 10^6 gal 10^6 gal Percent
-------------------------------------------------------------------------------------------------
INLETZ2.1-A JUNCTION 0.00 5.47 0 00:42 0 0.0372 0.177
INLETZ2.2 JUNCTION 0.00 9.16 0 00:39 0 0.101 0.083
INLETZ3.1 JUNCTION 0.00 10.31 0 00:38 0 0.15 -0.525
INLETZ3.A JUNCTION 0.00 12.16 0 00:38 0 0.169 -0.568
INLETZ5.1 JUNCTION 0.00 8.02 0 00:40 0 0.13 0.001
INLETZ6 JUNCTION 0.00 8.87 0 00:40 0 0.0593 -0.002
STM B.1-OA BYPASS JUNCTION 0.00 0.79 0 00:40 0 0.00365 -0.150
STM B.1-0_BYPASS JUNCTION 0.00 0.77 0 00:40 0 0.00372 5.483
J-IN-Z2.1-A JUNCTION 2.46 7.18 0 00:41 0.0254 0.038 0.040
J-IN-Z2.2 JUNCTION 7.66 10.07 0 00:40 0.0795 0.103 0.001
J-IN-Z3.1 JUNCTION 14.36 18.92 0 00:40 0.159 0.167 -0.007
J-IN-Z3.A JUNCTION 6.20 14.89 0 00:40 0.0661 0.177 0.085
J-IN-Z5.1 JUNCTION 13.10 13.10 0 00:40 0.145 0.145 0.013
J-IN-Z6 JUNCTION 4.36 9.28 0 00:40 0.0446 0.0593 0.007
Junction-10 JUNCTION 8.85 8.85 0 00:40 0.105 0.105 -0.082
FL_D18.1H JUNCTION 2.90 2.90 0 00:40 0.0288 0.0288 -0.001
RD.FL._D14-2 JUNCTION 0.98 0.98 0 00:40 0.00801 0.00801 -0.472
RD.FL. D14-1 JUNCTION 1.57 2.50 0 00:40 0.0153 0.0234 0.232
Junction-4 JUNCTION 0.00 0.00 0 00:00 0 0 0.000 gal
Junction-5 JUNCTION 0.00 0.00 0 00:00 0 0 0.000 gal
SDMHZ1 JUNCTION 0.00 40.60 0 00:39 0 0.698 0.621
SDMHZ2 JUNCTION 0.00 40.09 0 00:39 0 0.647 0.671
SDMHZ2.1 JUNCTION 0.00 11.77 0 00:46 0 0.138 0.483
SDMHZ3 JUNCTION 0.00 31.26 0 00:39 0 0.511 0.696
SDMHZ4 JUNCTION 0.00 17.11 0 00:39 0 0.19 -0.279
SDMHZ5 JUNCTION 0.00 16.86 0 00:39 0 0.19 -0.015
STM.MH A.1-1 JUNCTION 0.00 40.09 0 00:39 0 0.648 0.814
STM.MH B-1 JUNCTION 0.00 43.96 0 00:40 0 0.737 0.414
STM_A.1-2 INV. JUNCTION 0.00 0.31 0 00:48 0 0.00209 0.057
STM_A.1-2_RIM JUNCTION 0.26 0.26 0 00:40 0.00207 0.00207 0.000
STM_B.1-0_INV JUNCTION 0.00 0.27 0 00:40 0 0.00774 0.008
STM_B.1-0_RIM JUNCTION 1.03 1.03 0 00:40 0.0108 0.0108 -0.022
STM_B.1-OA_INV. JUNCTION 0.00 1.44 0 00:56 0 0.00779 0.027
STM_B.1-1_INV. JUNCTION 0.00 0.76 0 00:40 0 0.0119 0.003
STM B.1-1 RIM JUNCTION 0.52 0.52 0 00:40 0.0046 0.0046 0.000
SWMM 5.2 Page 11
BLOOM PARK AND POOL - 100-YEAR
STM B-1_INV JUNCTION 0.00 3.62 0 00:40 0 0.0406 -0.001
STM_B-2 INV JUNCTION 0.00 3.61 0 00:40 0 0.0406 0.004
STM_B-3_INV JUNCTION 0.00 2.87 0 00:40 0 0.0288 -0.001
STM_B-4 INV. JUNCTION 0.00 2.89 0 00:40 0 0.0288 0.003
STM B-4 RIM JUNCTION 0.00 2.90 0 00:40 0 0.0288 0.002
Out-1 OUTFALL 0.00 0.54 0 02:55 0 0.0538 0.000
D19-1_OUT OUTFALL 0.51 0.51 0 00:40 0.00397 0.00397 0.000
POND_D STORAGE 6.34 49.80 0 00:39 0.0769 1.42 0.092
STORE D.18.1D STORAGE 4.95 5.68 0 00:40 0.0473 0.0508 -0.244
**********************
Node Surcharge Summary
**********************
Surcharging occurs when water rises above the top of the highest conduit.
---------------------------------------------------------------------
Max. Height Min. Depth
Hours Above Crown Below Rim
Node Type Surcharged Feet Feet
---------------------------------------------------------------------
INLETZ2.1-A JUNCTION 0.34 2.882 1.618
INLETZ2.2 JUNCTION 0.35 2.981 1.519
INLETZ3.1 JUNCTION 0.35 2.954 1.546
INLETZ3.A JUNCTION 0.36 2.987 1.513
INLETZ5.1 JUNCTION 0.23 2.351 2.149
INLETZ6 JUNCTION 0.21 2.436 2.064
SDMHZI JUNCTION 0.27 1.079 1.921
SDMHZ2 JUNCTION 0.36 2.575 1.008
SDMHZ2.1 JUNCTION 0.31 2.431 1.569
SDMHZ3 JUNCTION 0.26 1.829 1.671
SDMHZ4 JUNCTION 0.16 1.293 2.207
SDMHZ5 JUNCTION 0.11 1.250 2.250
STM.MH_A.1-1 JUNCTION 0.23 1.161 1.409
STM B.1-0 INV JUNCTION 0.29 0.066 19.601
Node Flooding Summary
No nodes were flooded.
SWMM 5.2 Page 12
BLOOM PARK AND POOL - 100-YEAR
**********************
Storage Volume Summary
**********************
------------------------------------------------------------------------------------------------
Average Avg Evap Exfil Maximum Max Time of Max Maximum
Volume Pcnt Pcnt Pcnt Volume Pcnt Occurrence Outflow
Storage Unit 1000 ft3 Full Loss Loss 1000 ft3 Full days hr:min CFS
------------------------------------------------------------------------------------------------
POND_D 158.498 32.2 0.0 0.0 183.071 37.2 0 02:55 4.46
STORE D.18.1D 1.306 0.2 0.0 0.0 3.459 0.4 0 00:58 1.01
***********************
Outfall Loading Summary
***********************
-----------------------------------------------------------
Flow Avg Max Total
Freq Flow Flow Volume
Outfall Node Pcnt CFS CFS 10^6 gal
-----------------------------------------------------------
Out-1 100.00 0.50 0.54 0.054
D19-1 OUT 49.24 0.08 0.51 0.004
-----------------------------------------------------------
System 74.62 0.58 0.92 0.058
Link Flow Summary
********************
-----------------------------------------------------------------------------
Maximum Time of Max Maximum Max/ Max/
IFlowl Occurrence IVelocl Full Full
Link Type CFS days hr:min ft/sec Flow Depth
-----------------------------------------------------------------------------
EX_PIPE_A.1-1_Zl CONDUIT 39.89 0 00:39 5.39 1.48 1.00
EX_PIPE_B-1 POND-D CONDUIT 43.95 0 00:40 7.93 3.33 0.81
EX_PIPE_Zl_B-1 CONDUIT 40.58 0 00:42 5.74 2.75 1.00
EX_PIPE_Z2_A.1-1 CONDUIT 40.02 0 00:39 5.41 1.51 1.00
GUTTER D14-1 J-IN-Z2.2 CHANNEL 2.44 0 00:40 2.69 0.00 0.12
GUTTER_D14-2 D14-1 CHANNEL 0.94 0 00:40 1.31 0.00 0.08
OL B.1-0 CONDUIT 0.75 0 00:40 1.84 0.00 0.02
SWMM 5.2 Page 13
BLOOM PARK AND POOL - 100-YEAR
OL_B.1-0_BYPASS CONDUIT 0.75 0 00:40 0.77 0.00 0.09
OL_B.1-OA CONDUIT 1.25 0 00:56 1.45 0.00 0.06
OL_B.1-OA_BYPASS CONDUIT 0.77 0 00:40 1.00 0.00 0.05
OL_B.1-1 CONDUIT 0.00 0 00:00 0.00 0.00 0.05
P-1 CONDUIT 0.54 0 02:55 2.77 2.15 1.00
P-2 CHANNEL 0.00 0 00:00 0.00 0.00 0.07
P-3 CHANNEL 0.00 0 00:00 0.00 0.00 0.00
P-4 CHANNEL 0.00 0 00:00 0.00 0.00 0.07
P-5 CHANNEL 0.00 0 00:00 0.00 0.00 0.13
P-6 CHANNEL 4.93 0 00:41 0.79 0.01 0.19
P-7 CHANNEL 8.72 0 00:40 3.46 0.01 0.21
PAN D18.1H B-4 CONDUIT 2.90 0 00:40 2.48 0.00 0.08
Pipe - (10) CONDUIT 5.49 0 00:44 3.11 0.38 1.00
Pipe - (11) CONDUIT 8.70 0 00:38 4.92 1.00 1.00
Pipe - (12) CONDUIT 8.18 0 00:39 4.63 0.60 1.00
Pipe - (13) CONDUIT 8.81 0 00:40 4.98 0.92 1.00
Pipe - (2) CONDUIT 17.11 0 00:39 4.68 0.65 1.00
Pipe - (3) CONDUIT 17.62 0 00:39 3.94 0.72 1.00
Pipe - (4) CONDUIT 31.22 0 00:39 4.22 0.41 1.00
Pipe - (7) CONDUIT 11.79 0 00:46 3.75 0.51 1.00
Pipe - (8) CONDUIT 10.17 0 00:49 5.75 1.58 1.00
Pipe - (9) CONDUIT 12.04 0 00:38 6.82 1.50 1.00
PIPE_A.1-2 A.1-1 CONDUIT 0.66 0 00:51 2.65 0.13 1.00
PIPE B.1-0 B.1-OA CONDUIT 0.27 0 00:40 3.92 1.05 0.88
PIPE_B.1-0_B-2 CONDUIT 0.75 0 00:40 2.87 0.35 0.76
PIPE B.1-OA B.1-1 CONDUIT 0.31 0 00:56 3.51 0.21 0.34
PIPE_B-1 CONDUIT 3.62 0 00:40 4.25 0.49 0.49
PIPE B-2 B-1 CONDUIT 3.62 0 00:40 4.21 0.49 0.49
PIPE_B-3 B-2 CONDUIT 2.87 0 00:40 4.36 1.13 0.78
PIPE B-4 B-3 CONDUIT 2.87 0 00:40 3.94 1.12 0.88
IN-PARK ORIFICE 0.83 0 00:58
IN-Z2.1-A ORIFICE 5.47 0 00:42 0.74
IN-Z2.2 ORIFICE 9.16 0 00:39 0.94
IN-Z3.1 ORIFICE 10.31 0 00:38 1.00
IN-Z3.A ORIFICE 12.16 0 00:38 1.00
IN-Z5.1 ORIFICE 8.02 0 00:40 0.81
IN-Z6 ORIFICE 8.87 0 00:40 0.86
Orifice-1 ORIFICE 0.00 0 00:00
STM_B-4_INLET ORIFICE 2.89 0 00:40
STM_B.1-0_INLET ORIFICE 0.27 0 00:40 1.00
STM B.1-1 INLET ORIFICE 0.52 0 00:40
STM_A.1-2 INLET ORIFICE 0.26 0 00:40
Orifice-10 WEIR 4.95 0 00:40 0.11
Orifice-5 WEIR 4.79 0 00:40 0.42
SWMM 5.2 Page 14
BLOOM PARK AND POOL - 100-YEAR
W-2.1-2.2 WEIR 1 .00 0 00 :40 0 .04
Flow Classification Summary
-------------------------------------------------------------------------------------
Adjusted ---------- Fraction of Time in Flow Class ----------
/Actual Up Down Sub Sup Up Down Norm Inlet
Conduit Length Dry Dry Dry Crit Crit Crit Crit Ltd Ctrl
-------------------------------------------------------------------------------------
EX_PIPE A.1-1 Zl 1.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.00 0.00
EX PIPE B-1 POND-D 1.00 0.00 0.00 0.00 0.99 0.01 0.00 0.00 0.00 0.00
EX PIPE Zl B-1 1.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.00 0.00
EX PIPE Z2 A.1-1 1.00 0.00 0.00 0.00 0.99 0.00 0.00 0.00 0.00 0.00
GUTTER D14-1 J-IN-Z2.2 1.00 0.02 0.00 0.00 0.13 0.84 0.00 0.00 0.17 0.00
GUTTER D14-2 D14-1 1.00 0.02 0.00 0.00 0.97 0.01 0.00 0.00 0.88 0.00
OL_B.1-0 1.00 0.45 0.41 0.00 0.06 0.07 0.00 0.00 0.92 0.00
OL B.1-0 BYPASS 1.00 0.08 0.00 0.00 0.42 0.00 0.00 0.49 0.00 0.00
OL_B.1-OA 1.00 0.05 0.79 0.00 0.00 0.00 0.16 0.00 0.00 0.00
OL B.1-OA BYPASS 1.00 0.08 0.37 0.00 0.54 0.01 0.00 0.00 0.84 0.00
OL_B.1-1 1.00 0.03 0.97 0.00 0.00 0.00 0.00 0.00 0.00 0.00
P-1 1.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.00 0.00
P-2 1.00 0.02 0.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00
P-3 1.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
P-4 1.00 0.02 0.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00
P-5 1.00 0.02 0.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00
P-6 1.00 0.02 0.00 0.00 0.98 0.00 0.00 0.00 0.92 0.00
P-7 1.00 0.02 0.00 0.00 0.09 0.89 0.00 0.00 0.10 0.00
PAN_D18.1H_B-4 1.00 0.02 0.00 0.00 0.01 0.97 0.00 0.00 0.05 0.00
Pipe - (10) 1.00 0.03 0.00 0.00 0.96 0.02 0.00 0.00 0.01 0.00
Pipe - (11) 1.00 0.02 0.00 0.00 0.94 0.04 0.00 0.00 0.00 0.00
Pipe - (12) 1.00 0.03 0.00 0.00 0.50 0.47 0.00 0.00 0.20 0.00
Pipe - (13) 1.00 0.03 0.00 0.00 0.97 0.00 0.00 0.00 0.49 0.00
Pipe - (2) 1.00 0.04 0.00 0.00 0.94 0.02 0.00 0.00 0.45 0.00
Pipe - (3) 1.00 0.04 0.00 0.00 0.96 0.00 0.00 0.00 0.85 0.00
Pipe - (4) 1.00 0.01 0.04 0.00 0.96 0.00 0.00 0.00 0.05 0.00
Pipe - (7) 1.00 0.01 0.03 0.00 0.96 0.00 0.00 0.00 0.04 0.00
Pipe - (8) 1.00 0.03 0.00 0.00 0.96 0.02 0.00 0.00 0.00 0.12
Pipe - (9) 1.00 0.03 0.00 0.00 0.96 0.02 0.00 0.00 0.00 0.09
PIPE_A.1-2 A.1-1 1.00 0.03 0.00 0.00 0.08 0.00 0.00 0.89 0.03 0.00
PIPE_B.1-0_B.1-OA 1.00 0.03 0.00 0.00 0.04 0.93 0.00 0.00 0.00 0.00
PIPE B.1-0 B-2 1.00 0.03 0.00 0.00 0.91 0.06 0.00 0.00 0.94 0.00
SWMM 5.2 Page 15
BLOOM PARK AND POOL - 100-YEAR
PIPE B.1-0A B.1-1 1.00 0.03 0.02 0.00 0.09 0.86 0.00 0.00 0.01 0.00
PIPE_B-1 1.00 0.05 0.00 0.00 0.00 0.00 0.00 0.95 0.00 0.00
PIPE_B-2 B-1 1.00 0.05 0.00 0.00 0.81 0.14 0.00 0.00 0.65 0.00
PIPE_B-3 B-2 1.00 0.04 0.00 0.00 0.94 0.02 0.00 0.00 0.78 0.00
PIPE B-4 B-3 1.00 0.03 0.00 0.00 0.95 0.02 0.00 0.00 0.84 0.00
Conduit Surcharge Summary
*************************
----------------------------------------------------------------------------
Hours Hours
--------- Hours Full -------- Above Full Capacity
Conduit Both Ends Upstream Dnstream Normal Flow Limited
----------------------------------------------------------------------------
EX_PIPE A.1-1 Z1 0.35 0.35 0.37 0.28 0.32
EX PIPE B-1 POND-D 0.01 0.20 0.01 0.64 0.01
EX PIPE Z1 B-1 0.20 0.27 0.20 0.58 0.22
EX PIPE Z2 A.1-1 0.35 0.36 0.35 0.28 0.34
P-1 4.00 4.00 4.00 4.00 4.00
Pipe - (10) 0.34 0.34 0.36 0.01 0.01
Pipe - (11) 0.35 0.35 0.36 0.01 0.21
Pipe - (12) 0.22 0.23 0.23 0.01 0.14
Pipe - (13) 0.21 0.21 0.23 0.01 0.08
Pipe - (2) 0.11 0.11 0.16 0.01 0.01
Pipe - (3) 0.16 0.16 0.26 0.01 0.01
Pipe - (4) 0.27 0.27 0.36 0.01 0.01
Pipe - (7) 0.31 0.31 0.45 0.01 0.01
Pipe - (8) 0.35 0.35 0.35 0.24 0.33
Pipe - (9) 0.35 0.36 0.35 0.21 0.36
PIPE_A.1-2 A.1-1 0.15 0.15 0.23 0.01 0.01
PIPE_B.1-0_B.1-OA 0.01 0.29 0.01 0.35 0.01
PIPE_B.1-0_B-2 0.01 0.01 0.07 0.01 0.01
PIPE_B-3 B-2 0.01 0.01 0.01 0.05 0.01
PIPE B-4 B-3 0.01 0.01 0.01 0.05 0.01
Analysis begun on: Wed Feb 19 10:24:58 2025
Analysis ended on: Wed Feb 19 10:24:59 2025
Total elapsed time: 00:00:01
SWMM 5.2 Page 16
Final Drainage and Erosion Control Report
Bloom Park&Pool
CivilWorx Fort Collins,CO
APPENDIX C
• LID Design Tool Outlet
C
Bloom Park and Pool
LID Review
uta-nmr fuarr+ata o.ua,ralaacn cu»al meet w Y
rJ�aalptrner. w.F"ep6f
LID SUMMARY ca mPoftg; "lowwrey
tare': tdN+28,29M
N
Tributary
Treated Added Valuate Req. Volume Provided 1'majacl: u Filling i
Starmwater Quality Strategy Tributary Basins Area{acres} (cu.ft) (cu.it Impervious ) rocallen, LID 1(Baaln D1,03.1,D3,D4,012 D211
1-Sand Filter D21,D21.1 37.17 8.75 4615 8500 f Barsn Sh xm9e Vokrrn®
D2,D5,136,D7, D8,
A)Etted.7hre Eatpeivlcwsrlear.oP Tributary Area.i, I,= d4.Q 96
D8.1,D9,DID,1D11r (fCG%if all pawed assd foofao yeas upstream of s"Fitter)
2-Sand Filter D13,D14,D15,D15.1 28.49 0.76 10083 10625
B) Titulary Arsa's Impervioasnesa Raba(r=I,)106F
4-Biaretention 016 1.07 0.76 869 906 C) Water Qualay Capture Volume{W CV)Based an 12-haur Dran Time '•IOQCV= ti 1 h watershed iri&Kis
Total Treatment;D Basins 11.03 MCV-D.s`(f}.9l r'-1.19`i`+0.7t-li
••. �r R -ry' ,• .A tA) Conariqudiig V.-vt rwiedArea(irdWing said filter ama) Afe;a 3$3,32MS tq n
E) lAr w Iguatty QsVure Volume(UNGGVi Design Volume eu rt
LID 1 AREA FROM PHASE 1 REPORT V,,4,,=WOCV d 12'Area
D1 1.37
D3.1 0.71 Design Procedure Form: Sand Filter(SF)
D3 1.11
D4 1.04 UD-13MP SWrs.ian 3.Ci7 March 2f)18) Sheet 1 of 2
D12 1.48 Designer: M.Pepin
Company: Galloway
D21 1.6
Date: May zs,2023
CALC 7.31 318,424
Project- Mulberry Filing t
FROM REPORT 8.35 363,726
Location: LID Y Tributary(02,D5.DB,08,08,Dti,015,1 D22)
DIFFERENCE (1.04) (45,302.40) NEGATIVE IS OVERACCOLINTING
LID 2 AREA FROM PHASE 1 REPORT t.6asm storage voiurna
D2 3.29 A)Effective Imperviousness of Tributary Area,1, I.,
D5 1.13 (1OD%Ial paved and roofed areas upstream of ramd filter).
D6 1.32 B) Tributary Area's Imperviousness Ratio(i=1.1100) t= D.57d
D8 1.24
G? Water Quality Capture Volume(WQCV)Based on 12-riour Drain Time WgGV= 0.98 watershed inches
D9 1.56 WQCV-D.S'(0:91'P}-1.19-F-0.78.1)
D11 1.15 0) Contributing Watershed Arse(sncAading send alter area) Area= 667,774 sq fl
D 15 0.7
D18 0.37 E) Water Quality Capture Volume(WQCV)Oesign Volume `vwacv= 10.083 cu ft
D22 0.24 Vw ,,,=WQCV f$2•Area
CALC 11 479,160 F) For Watersheds outside of the Denver Region.Depth of dr= it
FROM REPORT 15.33 667,774 Average Runoff Producing Storm
DIFFERENCE (4.33) (188,614.00) G) For Watersheds Outside of the Denver Region, V.rvacvoTr.es= cu It
Water Quality Capture Volume(WQCV)Design Volume
FROM AMENDED BASIN MAPPING (Actual Acreage) H) User Input or Water Quality Capture Volume(WQCV)Design Volume Va . USER= ar It
LID 1 D2 3.29 (Only it a different WOGV Design Voi#me is dewed)
LID 1 D5 1.13
LID 1 D6 1.32
LID 1 D8 1.24
LID 1 D8.1 0.17
LID 1 D11 1.15
LID 1 D22 0.24
LID 2 D7 1.57
LID 2 D9 1.56
LID 2 D10 0.54
LID 2 D14 0.75
LID 2 D16 1.06
LID 2 D17 1.07
PARK D18.1 2.22
LID LID 0.43
Acres SF
CALC 17.74 772,754
FROM REPORT 23.68 1,031,500
DIFFERENCE (5.94) (258,745.60)
Final Drainage and Erosion Control Report
Bloom Park&Pool
CivilWorx Fort Collins,CO
APPENDIX D
• Full Galloway Drainage Report, Amendment 1
• Bloom Geotechnical Report
D
Ga;10
owa 5265 Ronald Reagan Blvd Suite 210
I Johnstown,CO 80534
970.800.3300•GallowayUS.com Memorandum
To: Wes Lamarque, PE
City of Fort Collins
From: Matthew Pepin, PE
Galloway, Inc.
Date: 06/20/2023
Re: Bloom Filing 1 Amendment - Drainage Modifications
To Mr. Lamarque,
Bloom Filing 1 required revisions that would include a modified pond, an added pond, and
modifications to associated storm infrastructure. This memorandum is to help provide
information on the changes from the approved Bloom F1 Final Drainage Report for the stated
Amendment.
Pond Modification /Addition
Pond G was initially approved to provide 9.5 ac-ft of volume and release at a rate of 17.6 cfs.
This pond is being split into two separate ponds to allow for increased development within the
piece of land where Pond G initially was planned. Pond G will now be reduced to a volume of
4.8 ac-ft and releasing at 13.5 cfs. A second pond, Pond G1, will be located on the western
part of the site. Pond G1 will provide 5.1 ac-ft of volume and release at 4.4 cfs. This would
increase the amount of total flow existing both ponds from the original by 0.2 cfs. In order to
maintain a maximum of 22.3 cfs releasing into the southern part of the Cooper Slough outfall,
Pond I's flow will be restricted from 0.35 cfs to 0.15 cfs.
Storm Infrastructure
The associated basin that were tributary to the effected modification storm infrastructure are
labeled as A-G1, A-G2....A-G6. Inlet calculations were added for these basins as well. An
updated StormCAD output for the effected storm lines has been included a part of this memo.
Tailwater conditions were set based on the 100-year WSEL for the major storm event and a
free outfall condition in the minor event. Note: there is HGL surcharging from SD Inlet L1.5
and SD Inlet L1. The HGL at this location is .27 higher than the RIM at the MH of SD MH
L1.4. This equates to 3.24 inches and would remain within the ROW, not impacting the lots.
Storm Infrastructure incorporating Bloom F2
In order to take into account LID's within Bloom F2, there is another modification to the storm
pipe infrastructure. A concern of too much flow entering the LID in the major storm events
would cause damage needed to be mitigated. To prevent this from happening, a manhole
would split flow from outfalling into the LID and by passing downstream to outfall into the EDB
(Pond E). This flow split would have flow entering into the LID at a maximum of 15.5 cfs in the
major storm event. The flow split is achieved by having the smaller 15" pipe sit lower than the
larger pipe, restricting flow for the minor event to only pass through the 15" pipe. The flow
rate allowing for all flow in the minor storm event to enter the LID at a flow rate of 12.02 cfs.
HFH22-Memorandum F1 Amendment.docx
Page 1 of 2
Bloom Filing 1
06/20/2023
CONCLUSION
The modifications to the site will not change the overall design intent that was originally
approved with Bloom F1 Drainage Report.
Sincerely, OP
GALLOWAY p� ANEW /;o••. cS'�
60198
Matthew Pepin, PE """"'" • G
Civil Project Engineer
SS�ONAL E�
MatthewPepin@Gallowayus.com 01/02/2024
HFH22-Memorandum F1 Amendment.docx
Galloway&Company, Inc. Page 2 of 2
BASIN SUMMARY TABLE
Tributary Area C2 C'oo tc 2-Year tc 100-Year Q2 Q100
Sub-basin (acres) (min) (min) (cfs) (cfs)
D1 1.37 0.59 0.73 10.8 8.4 1.7 8.5
D2 3.29 0.59 0.74 15.9 15.9 3.6 15.5
D3 1.11 0.69 0.86 10.2 7.4 1.7 8.5
D3.1 0.71 0.60 0.75 13.2 10.7 1.3 4.0
D4 1.04 0.60 0.75 10.8 8.4 1.3 6.6
D5 1.13 0.62 0.77 12.8 10.3 1.4 6.6
D6 1.32 0.63 0.78 13.8 11.3 1.6 7.7
D7 1.57 0.62 0.78 12.8 10.3 2.0 9.4
D8 1.24 0.60 0.75 6.4 5.4 2.0 9.1
D8.1 0.17 0.79 0.99 8.1 5.0 0.3 1.7
D9 1.56 0.63 0.79 6.9 6.0 2.6 11.8
D 10 0.54 0.72 0.91 7.8 5.0 1.0 4.9
D11 1.15 0.65 0.81 9.6 6.9 1.7 8.5
D 12 1.48 0.64 0.80 11.6 9.4 2.0 9.4
D 13 0.97 0.20 0.26 11.9 11.9 0.4 1.8
D 14 0.75 0.70 0.87 6.2 5.0 1.4 6.5
D 15 0.70 0.59 0.74 8.3 7.1 1.0 4.7
D 15.1 0.93 0.63 0.79 10.7 9.4 1.3 5.9
D16 1.06 0.72 0.91 6.2 5.0 2.1 9.5
D 17 1.07 0.72 0.90 6.2 5.0 2.1 9.6
D 18 0.37 0.25 0.31 13.1 13.1 0.2 0.8
D 19 0.62 0.79 0.99 13.3 11.4 1.0 4.5
D20 0.60 0.82 1.00 9.2 7.5 1.1 5.3
D21 1.60 0.19 0.23 15.1 15.1 0.6 2.4
D22 0.24 0.15 0.19 5.6 5.5 0.1 0.4
D23 0.68 0.43 0.53 9.8 8.7 0.7 3.0
D24 3.02 0.15 0.19 5.0 5.0 1.3 5.6
OS1 0.70 0.44 0.55 9.0 7.8 0.7 3.3
OS2 0.54 0.35 0.44 9.0 8.1 0.4 2.0
OS3 0.85 0.33 0.41 12.4 11.8 0.6 2.6
OS4 0.29 0.46 0.57 5.0 5.0 0.4 1.7
OS5 0.15 0.79 0.99 5.0 5.0 0.3 1.5
OS6 0.43 0.60 0.75 8.2 7.2 0.6 2.9
OS7 0.41 0.57 0.72 8.4 7.4 0.6 2.6
H:\Hartford Homes\HFHLV0001.01 Timberline Vine Dr\3.Permit Const Docs\3.04 Grading-Drainage Studies\3.04.2 Proposed Drainage Reports-
Info\Hydrology\Rational\HFHLV 0001.01 Drainage_Calcs_Template_v2.0-CoFC.xls
E1 1.07 0.72 0.90 6.6 5.0 2.0 9.6
E2 0.96 0.76 0.95 6.0 5.0 2.0 9.1
E3 0.80 0.68 0.85 10.7 9.4 1.2 5.4
E3.1 0.80 0.68 0.85 10.7 9.4 1.2 5.4
E4 0.40 0.22 0.28 10.3 9.8 0.2 0.9
E5 1.07 0.72 0.90 5.0 5.0 2.2 9.5
E6 0.63 0.68 0.85 7.9 6.8 1.1 4.9
E7 1.03 0.74 0.92 5.0 5.0 2.2 9.5
E8 0.35 0.21 0.27 10.4 9.9 0.2 0.7
E9 1.07 0.72 0.90 5.0 5.0 2.2 9.6
E 10 1.03 0.74 0.93 5.0 5.0 2.2 9.5
Ell 0.40 0.55 0.68 8.8 7.9 0.5 2.3
E11.1 0.34 0.68 0.85 7.9 6.7 0.6 2.7
E 12 0.44 0.79 0.99 7.2 5.9 0.9 4.1
E12.1 0.21 0.94 1.00 5.0 5.0 0.6 2.1
E13 0.59 0.15 0.19 10.1 9.8 0.2 0.9
E14 0.30 0.65 0.81 8.8 6.5 0.5 2.2
E14.1 1.30 0.80 1.00 10.0 10.0 2.3 10.0
E 15 0.57 0.82 1.00 14.4 12.3 0.9 4.1
E15.1 0.56 0.80 1.00 10.0 10.0 1.0 4.3
E16 1.00 0.15 0.19 14.8 14.8 0.3 1.2
E17 0.59 0.65 0.81 9.2 7.6 0.9 4.2
E 17.1 0.40 0.55 0.69 10.1 8.8 0.5 2.3
E18 0.41 0.55 0.69 7.8 6.6 0.6 2.6
E 19 2.72 0.80 1.00 10.0 10.0 4.8 21.0
E20 0.74 0.76 0.95 15.7 15.7 1.0 4.5
E20.1 0.23 0.76 0.96 8.5 7.0 0.4 2.0
E21 1.04 0.20 0.26 14.0 14.0 0.4 1.8
E22 0.99 0.76 0.96 5.0 5.0 0.4 9.4
E23 0.99 0.77 0.96 5.0 5.0 2.2 9.4
E24 0.73 0.54 0.67 12.8 11.6 0.8 3.6
E24.1 0.36 0.67 0.84 11.6 9.4 0.5 2.4
E25 0.74 0.78 0.98 14.0 13.3 1.1 5.0
E25.1 0.19 0.62 0.78 9.8 8.5 0.3 1.2
E26 2.39 0.80 1.00 10.0 10.0 0.3 18.5
E26.1 0.72 0.80 1.00 10.0 10.0 1.3 5.5
E27 0.33 0.69 0.86 6.5 5.0 0.6 2.9
E28 0.84 0.76 0.95 14.6 14.6 1.2 5.3
E29 1.77 0.15 0.19 5.0 5.0 0.8 3.3
E30 1.04 0.77 0.97 15.7 15.7 1.5 6.4
A-G 1 1.91 0.71 0.88 18.6 18.6 2.3 9.9
A-G2 0.20 0.76 0.94 5.0 5.0 0.4 1.9
A-G3 1.15 0.78 0.98 16.5 16.5 1.6 7.0
A-G4 1.15 0.79 0.99 17.7 17.7 1.6 6.9
A-G5 0.87 0.54 0.68 13.4 13.0 0.9 4.1
A-G6 0.83 0.58 0.73 11.1 10.0 1.0 4.6
G5 0.34 0.77 0.96 9.0 7.6 0.6 2.9
G6 0.37 0.77 0.96 9.0 7.6 0.7 3.1
G6.1 0.45 0.77 0.96 9.0 7.6 0.8 3.8
G7.1 0.42 0.81 1.00 8.7 7.3 0.8 3.7
G7 0.46 0.78 0.98 6.8 5.4 0.9 4.4
G8 0.48 0.78 0.97 6.9 5.5 1.0 4.5
H 1 0.44 0.77 0.97 7.3 5.9 0.0 4.1
H:\Hartford Homes\HFHLV0001.01 Timberline Vine Dr\3.Permit Const Docs\3.04 Grading-Drainage Studies\3.04.2 Proposed Drainage Reports-
Info\Hydrology\Rational\HFHLV 0001.01 Drainage_Calcs_Template_v2.0-CoFC.xls
H2 O.53 0.77 0.96 7.3 5.9 0.9 4.9
H3 0.92 0.80 1.00 7.3 5.8 1.0 8.8
H4 1 1.02 0.80 0.99 7.4 5.9 1.9 9.7
H:\Hartford Homes\HFHLV0001.01 Timberline Vine Dr\3.Permit Const Docs\3.04 Grading-Drainage Studies\3.04.2 Proposed Drainage Reports-
Info\Hydrology\Rational\HFHLV 0001.01 Drainage_Calcs_Template_v2.0-CoFC.xls
STANDARD FORM SF-2
TIME OF CONCENTRATION
Subdivision:Mulberry Project Name: Mulberry Filing 1
Location:CO,Fort Collins Project No.:HFH22
Calculated By: MJP
Checked By: JP
Date: 8/3/21
SUB-BASIN INITIAL/OVERLAND TRAVEL TIME T,CHECK FINAL
DATA (Ti) (TJ (URBANIZED BASINS)
BASIN D.A. Hydrologic Cz Co Cleo L S Tali-yaar T;I10-ar L S Cy VEL. Tt COMP.Tc Iz-year COMP.T.I ioo-raa, TOTAL Urbanized T. T� 2-year T.I loo-yea,
ID (AC) Soils Group Cr=1.00 Cr=1.00 Cp1.25 (FT) (%) (MIN) (MIN) (FT) (%) (FPS) (MIN) (MIN) (MIN) LENGTH(FT) (MIN) (MIN) (MIN)
D1 1.37 B 0.59 0.59 0.73 130 2.00 8.7 6.2 325 0.50 20 2.51 2.1 10.8 8.4 455 12.5 10.8 8.4
D2 3.29 B 0.59 0.59 0.74 100 2.00 7.5 5.3 966 0.50 20 1.2 13.0 20.5 18.3 1066 15.9 15.9 15.9
D3 1.11 B 0.69 0.69 0.86 120 2.00 6.7 3.9 400 0.50 20 1.9 3.6 10.2 7.4 520 12.9 10.2 7.4
D3.1 0.71 B 0.60 0.60 0.75 120 2.00 8.2 5.8 500 0.50 20 1.7 5.0 13.2 10.7 620 13.4 13.2 10.7
D4 1.04 B 0.60 0.60 0.75 120 2.00 8.2 5.7 300 0.87 20 1.9 2.7 10.8 8.4 420 12.3 10.8 8.4
D5 1.13 B 0.62 0.62 0.77 120 2.00 7.9 5.4 480 0.67 20 1.6 4.9 12.8 10.3 600 13.3 12.8 10.3
D6 1.32 B 0.63 0.63 0.78 1201 2.00 7.7 5.2 6401 0.761 20 1.7 6.1 13.8 11.3 760 14.2 13.8 11.3
D7 1.57 B 0.62 0.62 0.78 1201 2.00 7.8 5.3 430 0.51 20 1.4 5.0 12.8 10.3 550 13.1 12.8 10.3
D8 1.24 B 0.60 0.60 0.75 20 2.00 3.31 2.3 360 0.92 20 1.9 3.1 6.41 5.4 380 12.1 6.41 5.4
D8.1 0.17 B 0.79 0.79 0.99 120 2.00 5.0 1.8 360 0.92 20 1.9 3.1 8.1 4.9 480 12.7 8.1 5.0
D9 1.56 B 0.63 0.63 0.79 15 2.00 2.7 1.8 560 1.20 20 2.2 4.3 6.9 6.0 575 13.2 6.9 6.0
D10 0.54 B 0.72 0.72 0.91 120 2.00 6.1 3.2 160 0.63 20 1.6 1.7 7.8 4.9 280 11.6 7.8 5.0
D11 1.15 B 0.65 0.65 0.81 120 2.00 7.3 4.7 210 0.60 20 1.5 2.3 9.6 6.9 330 11.8 9.6 6.9
D12 1.48 B 0.64 0.64 0.80 90 2.00 6.5 4.3 500 0.66 20 1.6 5.1 11.6 9.4 590 13.3 11.6 9.4
D13 0.97 B 0.20 0.20 1 0.26 90 2.00 12.6 11.9 250 0.68 20 1.6 2.5 15.1 14.4 340 11.9 11.9 11.9
D14 0.75 B 0.70 0.70 0.87 30 2.00 3.3 1.91 250 0.501 20 1.4 2.9 6.2 4.8 280 11.6 6.2 5.0
D15 0.70 B 0.59 0.59 0.74 1 30 2.00 4.1 2.9 560 1.25 20 2.2 4.2 8.3 7.1 590 13.3 8.3 7.1
D15.1 0.93 B 0.63 0.63 0.79 30 2.00 3.8 2.5 780 0.50 20 1.91 6.9 10.71 9.4 810 14.5 10.7 9.4
D16 1.06 B 0.72 0.72 0.91 80 2.00 5.0 2.6 100 0.50 20 1.4 1.2 6.2 3.8 180 11.0 6.2 5.0
D17 1.07 B 0.72 0.72 0.90 80 2.00 5.0 2.6 100 0.50 20 1.4 1.2 6.2 3.8 180 11.0 6.2 5.0
D18 0.37 B 0.25 0.25 0.31 100 2.00 12.6 11.7 450 0.67 20 1.6 4.6 17.2 16.3 550 13.1 13.1 13.1
D19 0.62 B 0.79 0.79 0.99 40 2.00 2.9 1.0 950 0.58 20 1.5 10.4 13.3 11.4 990 15.5 13.3 11.4
D20 0.60 B 0.82 0.82 1.00 40 2.00 2.6 0.9 700 0.50 20 1.8 6.6 9.2 7.5 740 14.1 9.2 7.5
D21 1.60 B 0.19 0.19 0.23 300 0.50 37.3 35.4 610 0.98 20 2.0 5.1 42.4 40.5 910 15.1 15.1 15.1
D22 0.24 B 0.15 0.15 0.19 101 2.00 4.51 4.3 1001 0.511 20 1.4 1.2 5.6 5.5 110 10.6 5.6 5.5
D23 0.68 B 1 0.43 0.43 1 0.53 50 2.00 7.1 6.0 300 0.86 20 1.9 2.7 9.8 8.7 350 11.9 9.81 8.7
D24 3.02 B 0.15 0.15 0.19 30 25.00 3.3 3.2 100 0.91 20 1.91 0.9 4.21 4.1 130 10.7 5.01 5.0
0S1 0.70 B 0.44 0.44 0.55 50 2.00 7.0 5.8 180 1.00 20 1.5 2.0 9.0 7.8 230 11.3 9.0 7.8
OS2 0.54 B 0.35 0.35 0.44 50 2.00 7.9 7.0 120 1.00 20 1.8 1.1 9.0 8.1 170 10.9 9.0 8.1
OS3 0.85 B 0.33 0.33 0.41 25 2.00 5.7 5.1 400 1.00 20 1.0 6.7 12.4 11.8 425 12.4 12.4 11.8
OS4 0.29 B 0.46 0.46 0.57 25 2.00 4.8 3.9 45 2.00 20 3.0 0.3 5.0 4.21 70 10.4 5.0 5.0
OS5 0.15 B 0.79 0.79 0.99 50 2.00 3.3 1.2 45 2.00 20 3.0 0.3 3.5 1.41 95 10.5 5.0 5.0
056 0.43 B 0.60 0.60 0.75 20 2.00 3.3 2.3 325 1.25 20 1.1 4.9 8.2 7.2 345 11.9 8.2 7.2
OS7 0.41 B 0.57 0.57 0.72 20 2.00 3.5 2.6 325 1.25 20 1.1 4.9 8.4 7.4 345 11.9 8.4 7.4
EX-1 0.78 B 0.88 0.88 1:00 20 2.00 1.5 0.7 1170 0.50 20 0.7 21.4 22.9 22.01 8901 9 14.9
Page 5 of 14 6/20/2023
STANDARD FORM SF-2
TIME OF CONCENTRATION
Subdivision:Mulberry Project Name: Mulberry Filing 1
Location:CO,Fort Collins Project No.:HFH22
Calculated By: MJP
Checked By: JP
Date: 8/3/21
SUB-BASIN INITIAL/OVERLAND TRAVEL TIME T,CHECK FINAL
DATA (T) (TJ (URBANIZED BASINS)
BASIN D.A. Hydrologic Ci Cs C+oo L S Ti I a-rear T;1 mo-rear L S C„ VEL. Tt COMP.T,I 2-Year COMP.T.I,00-Yea, TOTAL Urbanized T. T.I a-Yea, T.I ioo-Yea,
ID (AC) Soils Group Cr=1.00 Cr=1.00 Cp1.25 (FT) (%) (MIN) (MIN) (FT) M) (FPS) (MIN) (MIN) (MIN) LENGTH(FT) (MIN) (MIN) (MIN)
E1 1.07 C 0.72 0.72 0.90 80 2.00 5.1 2.7 150 0.67 20 1.61 1.5 6.6 4.2 230 11.3 6.6 5.0
E2 0.96 C 0.76 0.76 0.95 80 2.00 4.5 2.0 150 0.67 20 1.6 1.5 6.0 3.5 230 11.3 6.0 5.0
E3 0.80 C 0.68 0.68 0.85 30 2.00 3.4 2.0 585 0.44 20 1.3 7.3 10.7 9.4 615 13.4 10.7 9.4
E3.1 0.80 C 0.68 0.68 0.85 30 2.00 3.4 2.0 585 0.44 20 1.3 7.3 10.7 9.4 615 13.4 10.7 9.4
E4 0.40 C 0.22 0.22 0.28 40 2.00 8.3 7.7 250 1.04 20 2.0 2.0 10.3 9.8 290 11.6 10.3 9.8
E5 1.07 C 0.72 0.72 0.90 45 2.00 3.8 2.0 100 2.59 20 3.2 0.5 4.3 2.5 145 10.8 5.0 5.0
E6 0.63 C 0.68 0.68 0.85 20 2.00 2.8 1.7 460 0.56 20 1.5 5.1 7.9 6.8 480 12.7 7.91 6.8
E7 1.03 C 0.74 0.74 0.92 45 2.00 3.6 1.7 100 2.59 20 3.2 0.5 4.1 2.3 145 10.8 5.0 5.0
E8 0.35 C 0.21 0.21 0.27 40 2.00 8.3 7.8 250 1.04 20 2.0 2.0 10.4 9.9 290 11.6 10.4 9.9
E9 1.07 C 0.72 0.72 0.90 45 2.00 3.8 2.0 100 2.59 20 3.2 0.5 4.3 2.5 145 10.8 5.0 5.0
E10 1.03 C 0.74 0.74 0.93 45 2.00 3.6 1.7 100 2.59 20 3.2 0.5 4.1 2.2 145 10.8 5.0 5.0
E11 0.40 C 0.55 0.55 0.68 20 2.00 3.7 2.8 460 0.56 20 1.5 5.1 8.8 7.9 480 12.7 8.8 7.9
E11.1 0.34 C 0.68 0.68 0.85 20 2.00 2.8 1.6 460 0.56 20 1.5 5.1 7.9 6.7 480 12.7 7.9 6.7
E12 0.44 C 0.79 0.79 0.99 20 2.00 2.1 0.8 460 0.56 20 1.5 5.1 7.2 5.9 480 12.7 7.2 5.9
E12.1 0.21 C 1 0.94 0.94 1 1.00 201 2.00 1.1 0.7 200 1.3E 20 2.3 1.5 2.6 2.1 220 11.2 5.0 5.0
E13 0.59 C 0.15 0.15 0.19 20 2.00 6.3 6.1 375 0.69 20 1.7 511 10.1 9.8 395 12.2 10.1 9.8
E14 0.30 C 0.65 0.65 0.81 90 2.00 6.4 4.11 2751 0.941 20 1.91 2.41 8.81 6.51 365 12.0 8.8 6.5
E14.1 1.30 C 0.80 0.80 1.00 Future Developed Area Multi-Family 10.0 10.0 10.0
E15 0.57 C 0.82 0.82 1.00 60 2.00 3.2 1.1 775 0.33 20 1.2 11.2 14.4 12.3 835 14.6 14.4 12.3
E15.1 0.56 C 0.80 0.80 1.00 Future Developed Area Multi-Family 10.0 10.0 10.0
E16 1.00 C 0.15 0.15 0.19 101 2.00 4.5 4.3 855 0.30 20 1.1 12.9 17.4 17.2 865 14.8 14.8 14.8
E17 0.59 C 0.65 0.65 0.81 40 2.00 4.2 2.7 450 0.58 20 1.5 4.9 9.2 7.6 490 12.7 9.2 7.6
E17.1 0.40 C 0.55 0.55 0.69 40 2.001 5.11 3.81 4501 0.581 201 1.51 4.91 10.11 8.8 490 12.7 10.1 8.8
E18 0.41 C 0.55 0.55 0.69 40 2.001 5.21 3.91 3001 0.861 201 1.91 2.71 7.81 6.6 340 11.9 7.8 6.6
E19 2.72 C 0.80 0.80 1.00 Future Developed Area I Multi-Family 10.0 10.0 10.0
E20 0.74 C 0.76 0.76 0.95 301 2.00 2.8 1.2 1000 0.26 20 1.0 16.4 19.1 17.6 1030 15.7 15.7 15.7
E20.1 0.23 C 0.76 0.76 0.96 301 2.00 2.7 1.2 500 0.50 20 1.4 5.8 8.5 7.0 530 12.9 8.5 7.0
E21 1.04 C 0.20 0.20 0.26 50 2.00 9.4 8.9 675 2.00 15 0.9 12.1 21.5 21.0 725 14.0 14.01 14.0
E22 0.99 C 0.76 0.76 0.96 45 2.00 3.3 1.4 100 2.59 20 3.2 0.5 3.9 2.0 145 10.8 5.01 5.0
E23 0.99 C 0.77 0.77 0.96 45 2.00 3.3 iiA2.46
100 1.47 20 2.4 0.7 4.0 2.1 145 10.8 5.0 5.0
E24 0.73 C 0.54 0.54 0.67 80 2.00 7.5 420 0.35 20 1.2 5.9 13.4 11.6 500 12.8 12.8 11.6
E24.1 0.36 C 0.67 0.67 0.84 80 2.00 5.7 420 0.50 20 1.2 5.9 11.6 9.4 500 12.8 11.6 9.4
E25 0.74 C 0.78 0.78 0.98 50 2.00 3.3 675 0.22 20 0.9 12.1 15.4 13.3 725 14.0 14.0 13.3
E25.1 0.19 C 0.62 0.62 0.78 30 2.00 3.9 420 0.50 20 1.2 5.9 9.11 8.51 450 12.5 9.8 8.5
E26 2.39 C 0.80 0.80 1.00 Future Developed Area I Multi-Family 10.0 10.0 10.0
E26.1 0.72 C 0.80 0.80 1.00 Future Developed Area Multi-Family 10.0 10.0 10.0
E27 0.33 C 0.69 0.69 0.86 1001 2.00 6.1 3.5 75 1.96 20 2.8 0.4 6.5 4.0 175 11.0 6.5 5.0
E28 0.84 C 0.76 0.76 0.95 201 2.00 2.3 1.0 800 0.18 20 0.9 15.6 17.8 16.6 820 14.6 14.6 14.6
E29 1.77 C 0.15 0.15 0.19 10 2.00 4.5 4.3 75 1.96 20 2.8 0.4 4.9 4.7 85 10.5 5.0 5.0
E30 1.04 C 0.77 0.77 0.97 25 2.00 2.4 1.0 1000 0.50 20 0.8 21.7 24.2 22.7 1025 15.7 15.7 15.7
A-7-1- 1.91 C 0.71 0.71 0.88 25 2.00 2.9 1.6 1520 0.60 20 0.6 40.7 43.7 42.4 1545 18.6 18.6 18.6
A-G2 0.20 C 0.76 0.76 0.94 25 2.00 2.6 1.2 173 0.60 20 1.8 1.6 4.1 2.7 198 11.1 5.0 5.0
A-G3 1.15 C 0.78 0.78 0.98 25 2.00 2.4 0.9 1140 0.60 20 0.7 26.5 28.8 27.4 1165 16.5 16.5 16.5
A-G4 1.15 C 0.79 0.79 0.99 25 2.00 2.31 0.8 1355 0.60 20 0.71 34.3 36.61 35.1 1380 17.7 17.7 17.7
A-G5 0.87 C 0.54 0.54 0.68 25 2.00 4.2 3.2 590 0.60 20 1.0 9.9 14.0 13.0 615 13.4 13.41 13.0
A-G6 0.83 C 0.58 0.58 0.73 251 2.00 3.9 2.8 480 0.67 20 1.1 7.2 11.1 10.0 505 12.8 11.1 10.0
G5 0.34 C 0.77 0.77 0.96 25 2.00 2.5 1.1 450 1.50 20 1.1 6.6 9.0 7.6 475 12.6 9.0 7.6
G6 0.37 C 0.77 0.77 0.96 25 2.00 2.5 1.1 450 1.50 20 1.1 6.6 9.0 7.6 475 12.6 9.0 7.6
G6.1 0.45 C 0.77 0.77 0.96 25 2.00 2.5 1.0 450 1.50 20 1.1 6.6 9.0 7.6 475 12.6 9.0 7.6
G7.1 0.42 C 0.81 0.81 1.00 25 2.00 2.2 0.7 450 1.50 20 1.1 6.6 8.7 7.3 475 12.6 8.7 7.3
G7 0.46 C 0.78 0.78 0.98 25 2.00 2.3 0.9 350 0.60 20 1.3 4.5 6.8 5.4 375 12.1 6.8 5.4
G8 0.48 C 0.78 0.78 0.97 25 2.00 2.4 1.0 350 0.60 20 1.3 4.5 6.9 5.5 375 12.1 6.9 5.5
FUT-G 17.03 C 0.85 0.85 1.00 100 2.00 3.71 1.5 500 0.05 20 1.11 7.7 11.4 9.2 600 13.3 11.4 9.2
Hi 0.44 C 0.77 0.77 0.97 25 2.00 2.4 1.0 370 0.50 20 1.3 4.9 7.3 5.91 395 12.2 7.3 5.9
H2 O.53 C 0.77 0.77 0.96 25 2.00 2.4 1.0 370 0.50 20 1.3 4.9 7.3 5.91 395 12.2 7.3 5.9
H3 0.92 C 1 0.80 0.80 1.00 25 2.00 2.2 0.7 380 0.50 20 1.2 5.1 7.3 5.8 405 12.3 7.3 5.8
H4 1.02 C 0.80 0.80 0.99 25 2.00 2.3 0.8 380 0.50 20 1.2 5.1 7.4 5.9 405 12.3 7.4 5.9
FUT-A 56.00 C 0.80 0.80 1.00 Future Developed Area 10.0 10:0 10.0
FUT-B 15.30 C 0.80 0.80 1.00 Future Developed Area 10.0 10.0 10.0
FUT-C 22.00 C 0.80 0.80 1.00 1 Future Developed Area 01 10.0 10.0
Page 6 of 14 6120/2023
STANDARD FORM SF-2
TIME OF CONCENTRATION
Subdivision:Mulberry Project Name: Mulberry Filing 1
Location:CO,Fort Collins Project No.:HFH22
Calculated By: MJP
Checked By: JP
Date: 8/3/21
SUB-BASIN INITIALIOVERLAND TRAVEL TIME Tc CHECK FINAL
DATA (TJ (Tr) (URBANIZED BASINS)
BASIN D.A. Hydrologic Cz Cs Cie. L S T;I i.ya,r T;11oo1— L S C„ VEL. Tt COMP.Tc I2-.r COMP.T.I iee-rear TOTAL Urbanized Tc T�:xaar T� ioe-ve,r
ID (AC) Soils Group Cr=1.00 Cr=1.00 Cf=1.25 (FT) I%) (MIN) (MIN) (FT) (%) (FPS) (MIN) (MIN) (MIN) LENGTH(FT) (MIN) (MIN) (MIN)
NOTES:
T;=(1.87*(1.1-CCf)*(L)^0.5)/((S)^0.33), S in% Type of Land Surface Cv
Ti L/60V Heavy Meadow 2.5
Velocity V=CV*S^0.5, S in ft/ft Tillage/Field 5
T.Check=10+L/180 Short Pasture and Lawns 7
For urbanized basins a minimum T,of 5.0 minutes is required. Needy Bare Ground 10
For non-urbanized basins a minimum T.of 10.0 minutes is required Grassed Waterway 15
Paved Areas and Shallow Paved Swales 20
Page 7 of 14 6/20/2023
STANDARD FORM SF-3
STORM DRAINAGE SYSTEM DESIGN
(RATIONAL METHOD PROCEDURE)
Project Name: Mulberry Filing 1
Subdivision: Mulberry Project No.: HFH22
Location: CO, Fort Collins Calculated By: MJP
Design Storm: 2-Year Checked By: JP
Date: 8/3/21
DIRECT RUNOFF TOTAL RUNOFF STREET PIPE TRAVEL TIME
U m
U
STREET �° ° _ o o - - 0 REMARKS
Q Q a) co
Cn m Q U' c, Q
o 1 m Q CO 0- J > F-
D1 D1 1.37 0.59 10.8 0.80 2.15 1.7
D2 D2 3.29 0.59 15.9 1.95 1.82 3.6
D3 D3 1.11 0.69 10.2 0.76 2.19 1.7
D3.1 D3.1 0.71 0.60 13.2 0.42 2.00 0.8
D4 D4 1.04 0.60 10.8 0.63 2.15 1.3
D5 D5 1.13 0.62 12.8 0.69 2.02 1.4
D6 D6 1.32 0.63 13.8 0.83 1.95 1.6
13.8 1.52 1.95 3.0
D7 D7 1.57 0.62 12.8 0.98 2.02 2.0
D8 D8 1.24 0.60 6.4 0.74 2.67 2.0
D8.1 D8.1 0.17 0.79 8.1 0.14 2.45 0.3
D9 D9 1.56 0.63 6.9 0.99 2.60 2.6
D 10 D 10 0.54 0.72 7.8 0.39 2.49 1.0
D11 D11 1.15 0.65 9.6 0.75 2.27 1.7
D12 D12 1.48 0.64 11.6 0.94 2.10 2.0
D13 D13 0.97 0.20 11.9 0.20 2.08 0.4
D14 D14 0.75 0.70 6.2 0.52 2.69 1.4
D15 D15 0.70 0.59 8.3 0.42 2.43 1.0
D15.1 D15.1 0.93 0.63 10.7 0.59 2.16 1.3
D16 D16 1.06 0.72 6.2 0.77 2.70 2.1
D17 D17 1.07 0.72 6.2 0.77 2.69 2.1
D18 D18 0.37 0.25 13.1 0.09 2.00 0.2
D19 D19 0.62 0.79 13.3 0.49 1.99 1.0
D20 D20 0.60 0.82 9.2 0.49 2.31 1.1
D21 D21 1.60 0.19 15.1 0.30 1.87 0.6
D22 D22 0.24 0.15 5.6 0.04 2.77 0.1
D23 D23 0.68 0.43 9.8 0.29 2.24 0.7
D24 D24 3.02 0.15 5.0 0.45 2.85 1.3
0S1 0S1 0.70 0.44 9.0 0.31 2.34 0.7
OS2 OS2 0.54 0.35 9.0 0.19 2.34 0.4
OS3 OS3 0.85 0.33 12.4 0.28 2.05 0.6
OS4 OS4 0.29 0.46 5.0 0.13 2.85 0.4
OS5 OS5 0.15 0.79 5.0 0.12 2.85 0.3
OS6 OS6 0.43 0.60 8.2 0.26 2.44 0.6
OS7 OS7 0.41 0.57 8.4 0.23 2.42 0.6
Page 8 of 14 6/20/2023
STANDARD FORM SF-3
STORM DRAINAGE SYSTEM DESIGN
(RATIONAL METHOD PROCEDURE)
Project Name: Mulberry Filing 1
Subdivision: Mulberry Project No.: HFH22
Location: CO, Fort Collins Calculated By: MJP
Design Storm: 2-Year Checked By: JP
Date: 8/3/21
DIRECT RUNOFF TOTAL RUNOFF STREET PIPE TRAVEL TIME
U m
U
STREET �° ° _ o o - - 0 REMARKS
Q Q a) co
Cn m Q U' c, Q
o 1 00 Q co 0- J > F-
E1 E1 1.07 0.72 6.6 0.77 2.65 2.0
E2 E2 0.96 0.76 6.0 0.73 2.72 2.0
E3 E3 0.80 0.68 10.7 0.54 2.16 1.2
E3.1 E3.1 0.80 0.68 10.7 0.54 2.16 1.2
E4 E4 0.40 0.22 10.3 0.09 2.19 0.2
E5 E5 1.07 0.72 5.0 0.77 2.85 2.2
E6 E6 0.63 0.68 7.9 0.43 2.48 1.1
E7 E7 1.03 0.74 5.0 0.76 2.85 2.2
E8 E8 0.35 0.21 10.4 0.07 2.18 0.2
E9 E9 1.07 0.72 5.0 0.77 2.85 2.2
E10 E10 1.03 0.74 5.0 0.76 2.85 2.2
E11 E11 0.40 0.55 8.8 0.22 2.37 0.5
El 1.1 E11.1 0.34 0.68 7.9 0.23 2.48 0.6
E 12 E 12 0.44 0.79 7.2 0.34 2.57 0.9
E12.1 E12.1 0.21 0.94 5.0 0.20 2.85 0.6
E13 E13 0.59 0.15 10.1 0.09 2.21 0.2
E14 E14 0.30 0.65 8.8 0.19 2.37 0.5
E14.1 E14.1 1.30 0.80 10.0 1.04 2.21 2.3
E15 E15 0.57 0.82 14.4 0.47 1.91 0.9
E15.1 E15.1 0.56 0.80 10.0 0.45 2.21 1.0
E16 E16 1.00 0.15 14.8 0.15 1.88 0.3
E17 E17 0.59 0.65 9.2 0.38 2.32 0.9
E17.1 E17.1 0.40 0.55 10.1 0.22 2.21 0.5
E18 E18 0.41 0.55 7.8 0.22 2.49 0.6
E19 E19 2.72 0.80 10.0 2.18 2.21 4.8
E20 E20 0.74 0.76 15.7 0.57 1.83 1.0
E20.1 E20.1 0.23 0.76 8.5 0.18 2.40 0.4
E21 E21 1.04 0.20 14.0 0.21 1.94 0.4
E22 E22 0.99 0.76 5.0 0.76 2.85 2.2
E23 E23 0.99 0.77 5.0 0.76 2.85 2.2
E24 E24 0.73 0.54 12.8 0.39 2.02 0.8
E24.1 E24.1 0.36 0.67 11.6 0.24 2.10 0.5
E25 E25 0.74 0.78 14.0 0.58 1.94 1.1
E25.1 E25.1 0.19 0.62 9.8 0.12 2.24 0.3
E26 E26 2.39 0.80 10.0 1.91 2.21 4.2
E26.1 E26.1 0.72 0.80 10.0 0.57 2.21 1.3
E27 E27 0.33 0.69 6.5 0.23 2.66 0.6
E28 E28 0.84 0.76 14.6 0.64 1.90 1.2
E29 E29 1.77 0.15 5.0 0.27 2.85 0.8
E30 E30 1.04 0.77 15.7 0.80 1.83 1.5
Page 9 of 14 6/20/2023
STANDARD FORM SF-3
STORM DRAINAGE SYSTEM DESIGN
(RATIONAL METHOD PROCEDURE)
Project Name: Mulberry Filing 1
Subdivision: Mulberry Project No.: HFH22
Location: CO, Fort Collins Calculated By: MJP
Design Storm: 2-Year Checked By: JP
Date: 8/3/21
DIRECT RUNOFF TOTAL RUNOFF STREET PIPE TRAVEL TIME
U
STREET a° o Q U } _ o O LL a m _ REMARKS
Q Q i CO
_P C_ O N L E L .� O C� O U
to VI C _ v U O ( N O E
N Q c Q O O _Q C
o m U U) co o U) a J
G1 A-G1 1.91 0.71 18.6 1.35 1.68 2.3
G2 A-G2 0.20 0.76 5.0 0.15 2.85 0.4
G3 A-G3 1.15 0.78 16.5 0.90 1.79 1.6
G4 A-G4 1.15 0.79 17.7 0.91 1.73 1.6
A-G5 A-G5 0.87 0.54 13.4 0.47 1.98 0.9
A-G6 A-G6 0.83 1 0.58 11.1 1 0.48 2.14 1 1.0
G5 G5 0.34 0.77 9.0 0.26 2.33 0.6
G6 G6 0.37 0.77 9.0 0.28 2.33 0.7
G6.1 G6.1 0.45 0.77 9.0 0.34 2.33 0.8
G7.1 G7.1 0.42 0.81 8.7 0.34 2.37 0.8
G7 G7 0.46 0.78 6.8 0.36 2.61 0.9
G8 G8 0.48 0.78 6.9 0.37 2.61 1.0
H 1 H 1 0.44 0.77 7.3 0.34 2.55 0.9
H2 H2 O.53 0.77 7.3 0.41 2.55 1.0
H3 H3 0.92 0.80 7.3 0.73 2.55 1.9
H4 H4 1.02 0.80 7.4 0.81 2.55 2.1
Page 10 of 14 6/20/2023
STANDARD FORM SF-3
STORM DRAINAGE SYSTEM DESIGN
(RATIONAL METHOD PROCEDURE)
Project Name: Mulberry Filing 1
Subdivision: Mulberry Project No.: HFH22
Location: CO, Fort Collins Calculated By: MJP
Design Storm: 100-Year Checked By: JP
Date: 6/2/21
DIRECT RUNOFF TOTAL RUNOFF STREET PIPE TRAVEL TIME
o _
U N `a
STREET o o '' o `' _^ REMARKS
d Q U U } U U o o N
Q o Q Q c U) c
o� c o o s a� a) a� 0
a� Q c Q o - 2n _
Q coO' H U C'I H U C'I fn W Q U) a J Io IH
D1 D1 1.37 0.73 8.4 1.00 8.45 8.5 0.5 3.7 734 14.1 0.9
D2 D2 3.29 0.74 15.9 2.44 6.35 15.5
D3 D3 1.11 0.86 7.4 0.96 8.86 8.5 0.5 8.5 400 14.1 0.5
8.8 1.96 8.24 16.1
D3.1 D3.1 0.71 0.75 10.7 0.53 7.54 4.0 10.7 2.48 7.54 18.7 Total Flow at D3
D4 D4 1.04 0.75 8.4 0.78 8.43 6.6
D5 D5 1.13 0.77 10.3 0.87 7.66 6.6
D6 D6 1.32 0.78 11.3 1.03 7.41 7.7
11.3 1.90 7.41 14.1
D7 D7 1.57 0.78 10.3 1.22 7.65 9.4
D8 D8 1.24 0.75 5.4 0.93 9.75 9.1
D8.1 D8.1 0.17 0.99 5.0 0.17 9.95 1.7
D9 D9 1.56 0.79 6.0 1.24 9.49 11.8
D10 D10 0.54 0.91 5.0 0.49 9.95 4.9
D11 D11 1.15 0.81 6.9 0.94 9.09 8.5
D12 D12 1.48 0.80 9.4 1.18 7.99 9.4
D13 D13 0.97 0.26 11.9 0.25 7.27 1.8
D14 D14 0.75 0.87 5.0 0.66 9.95 6.5
D15 D15 0.70 0.74 7.1 0.52 9.01 4.7
D15.1 D15.1 0.93 0.79 9.4 0.73 8.00 5.9
D16 D16 1.06 0.91 5.0 0.96 9.95 9.5
D17 D17 1.07 0.90 5.0 0.96 9.95 9.6
D18 D18 0.37 0.31 13.1 0.11 6.99 0.8
D19 D19 0.62 0.99 11.4 0.61 7.38 4.5
11.4 0.94 7.38 7.0 Combined with D23
D20 D20 0.60 1.00 7.5 0.60 8.83 5.3
D21 D21 1.60 0.23 15.1 0.37 6.51 2.4
D22 D22 0.24 0.19 5.5 0.05 9.75 0.4
D23 D23 0.68 0.53 8.7 0.36 8.32 3.0
D24 D24 3.02 0.19 5.0 0.57 9.95 5.6
0S1 OS1 0.70 0.55 7.8 0.38 8.69 3.3
OS2 OS2 0.54 0.44 8.1 0.24 8.58 2.0
OS3 OS3 0.85 0.41 11.8 0.35 7.30 2.6
OS4 OS4 0.29 0.57 5.0 0.17 9.95 1.7
OS5 OS5 0.15 0.99 5.0 0.15 9.95 1.5
OS6 OS6 0.43 0.75 7.2 0.32 8.96 2.9
OS7 OS7 0.41 0.72 7.4 0.29 8.87 2.6
EX-1 EX-1 0.78 1.00 14.9 0.78 6.53 5.1 14.9 2.68 6.53 17.5 Total Flow to Existing Inlet
Page 11 of 14 6/20/2023
STANDARD FORM SF-3
STORM DRAINAGE SYSTEM DESIGN
(RATIONAL METHOD PROCEDURE)
Project Name: Mulberry Filing 1
Subdivision: Mulberry Project No.: HFH22
Location: CO, Fort Collins Calculated By: MJP
Design Storm: 100-Year Checked By: JP
Date: 6/2/21
DIRECT RUNOFF TOTAL RUNOFF STREET PIPE TRAVEL TIME
o _
U N `�
STREET o o '' o `' _^ REMARKS
d Q U U } U U o o N
Q o Q Q c U) c
o� c o o s a� a) a� 0
a� Q c Q o - 2n _
Q m � U 0 � U C3 fn () Q (n a J o �
E1 E1 1.07 0.90 5.0 0.96 9.95 9.6
E2 E2 0.96 0.95 5.0 0.91 9.95 9.1
E3 E3 0.80 0.85 9.4 0.68 8.01 5.4
E3.1 E3.1 0.80 0.85 9.4 0.68 8.01 5.4
E4 E4 0.40 0.28 9.8 0.11 7.81 0.9
E5 E5 1.07 0.90 5.0 0.96 9.95 9.5
E6 E6 0.63 0.85 6.8 0.54 9.16 4.9
E7 E7 1.03 0.92 5.0 0.95 9.95 9.5
E8 E8 0.35 0.27 9.9 0.09 7.78 0.7
E9 E9 1.07 0.90 5.0 0.96 9.95 9.6
E10 E10 1.03 0.93 5.0 0.95 9.95 9.5
Ell Ell 0.40 0.68 7.9 0.27 8.66 2.3
E11.1 E11.1 0.34 0.85 6.7 0.29 9.18 2.7
E12 E12 0.44 0.99 5.9 0.43 9.56 4.1
E12.1 E12.1 0.21 1.00 5.0 0.21 9.95 2.1
E13 E13 0.59 0.19 9.8 0.11 7.80 0.9
E14 E14 0.30 0.81 6.5 0.24 9.29 2.2
E14.1 E14.1 1.30 1.00 10.0 1.30 7.72 10.0
E15 E15 0.57 1.00 12.3 0.57 7.16 4.1
E15.1 E15.1 0.56 1.00 10.0 0.56 7.72 4.3
E16 E16 1.00 0.19 14.8 0.19 6.57 1.2
E17 E17 0.59 0.81 7.6 0.48 8.78 4.2
E17.1 E17.1 0.40 0.69 8.8 0.28 8.27 2.3
E18 E18 0.41 0.69 6.6 0.28 9.26 2.6
E19 E19 2.72 1.00 10.0 2.72 7.72 21.0
E20 E20 0.74 0.95 15.7 0.71 6.39 4.5
E21 E20.1 0.23 0.96 7.0 0.22 9.08 2.0
E21 E21 1.04 0.26 14.0 0.27 6.75 1.8
E22 E22 0.99 0.96 5.0 0.95 9.95 9.4
E23 E23 0.99 0.96 5.0 0.94 9.95 9.4
E24 E24 0.73 0.67 11.6 0.49 7.33 3.6
E24.1 E24.1 0.36 0.84 9.4 0.30 7.97 2.4
E25 E25 0.74 0.98 13.3 0.73 6.93 5.0
E25.1 E25.1 0.19 0.78 8.5 0.15 8.37 1.2
E26 E26 2.39 1.00 10.0 2.39 7.72 18.5
E26.1 E26.1 0.72 1.00 10.0 0.72 7.72 5.5
E27 E27 0.33 0.86 5.0 0.29 9.95 2.9
E28 E28 0.84 0.95 14.6 0.80 6.63 5.3
E29 E29 1.77 0.19 5.0 0.33 9.95 3.3
E30 E30 1.04 0.97 15.7 1.00 6.39 6.4
Page 12 of 14 6/20/2023
STANDARD FORM SF-3
STORM DRAINAGE SYSTEM DESIGN
(RATIONAL METHOD PROCEDURE)
Project Name: Mulberry Filing 1
Subdivision: Mulberry Project No.: HFH22
Location: CO, Fort Collins Calculated By: MJP
Design Storm: 100-Year Checked By: JP
Date: 6/2/21
DIRECT RUNOFF TOTAL RUNOFF STREET PIPE TRAVEL TIME
o _
U N `a
STREET o o '' o `' _^ REMARKS
d Q U U } U U o o N
Q o Q Q c U) c
CD Ma� Q c Q o - 2n _
Q 10 � U `� 0 U C'I fn W Q U) 0- J o
G 1 A-G 1 1.91 0.88 18.6 1.68 5.86 9.9
G2 A-G2 0.20 0.94 5.0 0.19 9.95 1.9
G3 A-G3 1.15 0.98 16.5 1.13 6.25 7.0
G4 A-G4 1.15 0.99 17.7 1.14 6.03 6.9
A-G5 A-G5 0.87 0.68 13.0 0.59 7.00 4.1
A-G6 A-G6 0.83 0.73 10.0 0.60 7.72 1 4.6
G5 G5 0.34 0.96 7.6 0.33 8.78 2.9
G6 G6 0.37 0.96 7.6 0.35 8.78 3.1
G6.1 G6.1 0.45 0.96 7.6 0.43 8.79 3.8
G7.1 G7.1 0.42 1.00 7.3 0.42 8.92 3.7
G7 G7 0.46 0.98 5.4 0.45 9.78 4.4
G8 G8 0.48 0.97 5.5 0.47 9.74 4.5
FUT-G FUT-G 17.03 1.00 9.2 17.03 8.09 137.8
H 1 H 1 0.44 0.97 5.9 0.43 9.56 4.1
H2 H2 O.53 0.96 5.9 0.51 9.55 4.9
H3 H3 0.92 1.00 5.8 0.92 9.58 8.8
H4 I H4 1 1.02 1 0.99 1 5.9 1 1.02 1 9.56 1 9.7
Page 13 of 14 6/20/2023
PIPE OUTFALL RIPRAP SIZING CALCULATIONS
Subdivision: Project Name: Mulberry Filing 1
Location: CO,Fort Collins Project No.: HFH22
Calculated By: MJP
Checked By: JP
Date: 8/3/21
STORM DRAIN SYSTEM
FUT-C
DP-18.1 DP-1322 FUT-B (Cooper DP-E20 G2 G3 G7
Slough)
Q100(cfs) 37.2 38.0 17.2 23.0 54.5 13.9 84.3 32.8 Flows are the greater of proposed vs.
future
D or H(in) 36 48 24 30 42 28.8 54 36
W(ft) 3.8
Slope(%) 0.30 0.3 0.4 0.1 0.4 0.4 0.2 0.1
Yn(in) 23.16 23.50 18.00 19.60 29.00 12.00 43.20 19.80
Yt(ft) 2.00 2.00 1.50 1.50 2.00 1.00 3.60 2.00 If"unknown"Yt/D=0.4
Yt/D,Yt/H 0.67 0.50 0.75 0.60 0.57 0.42 0.80 0.67 Per section 11-3
Supercritical Yes Yes Yes Yes Yes Yes Yes Yes
Q/DA2.5,Q/WHA1.5 2.39 1.19 3.04 2.33 2.38 0.98 1.96 2.10
Q/DA1.5,Q/WHA0.5
Da,Ha(in)* 29.58 35.75 21.00 24.80 35.50 20.40 48.60 27.90 Da=0.5(D+Yn),Ha=0.5(H+Yn)
Q/DaA1.5,Q/WHaA0.5* 9.61 7.39 7.43 7.74 10.71 2.81 10.34 9.25
d50(in),Required 4.50 4.89 3.02 4.12 6.04 1.13 3.89 4.33
Required Riprap Size L L L L L L L L Fig.8-34
Use Riprap Size L L L L L L L L
d50(in) 9 9 9 9 9 9 9 9 Fig.8-34
1/(2 tan q) 4.30 0.00 2.00 1.00 2.00 0.00 0.00 0.00 Fig.9-35 OR Fig 9-36
Erosive Soils Yes Yes Yes Yes Yes Yes Yes Yes
At 6.76 6.91 3.13 4.18 9.91 2.53 15.33 5.96 At=Q/5.5
L 1.6 0.0 0.2 0.3 2.9 0.0 0.0 0.0 L=(1/(2 tan q))(At/Yt-D)
Min L 9.0 12.0 6.0 7.5 10.5 7.2 13.5 9.0 Min L=3D or3H
Max L 30.0 40.0 20.0 25.0 35.0 24.0 45.0 30.0 Max L=10D or 10H
Length(it) 9.0 12.0 6.0 7.5 10.5 7.2 13.5 9.0
Bottom Width(ft) 9.0 12.0 6.0 7.5 10.5 7.2 13.5 9.0 Width=3D(Minimum)
Riprap Depth(in) 18 18 18 18 18 18 18 18 Depth=2(d50)
Type II Base Depth(in) 6 6 6 6 6 6 6 6 Table 8-34 fine grained soils)
Cutoff Wall No No No No No No No No
Cutoff Wall Depth(it) Depth of Riprap and Base
Cutoff Wall Width(ft)
FUT-A 56.00 0.80 1.00
FUT-B 15.30 0.80 1.00
FUT-C 22.00 0.80 1.00
D BASINS
(TO DETENTION) 37.17 - - 37.3 172.1
E BASINS
(TO DETENTION) 28.49 - - 42.2 213.0
TO LID 1 8.35 - -
TO LID 2 15.33 - -
TO LID 3 1.06 - -
TO LID 4 1.03 - -
TO LID 5 1.07 - -
TO LID 6 1.07 - -
TO LID 7 0.96 -TO LID 8 1.03 -TO LID 9 1.07 -TO LID 10 1.03 -TO LID 12 0.99 -TO LID 13 0.99 - -
H:\Hartford Homes\HFHLV0001.01 Timberline Vine Dr\3.Permit Const Docs\3.04 Grading-Drainage Studies\3.04.2 Proposed Drainage Reports-
Info\Hydrology\Rational\HFHLV0001.01_Drainage_Calcs Template_v2.0-CoFC.xls
P-194P-101 ,'SD INLET L1 (PUBLIC)
SD INLET L1.5 SDMH L1.4
4
PP
S
l C'?
I
rK
SD INLET L1.3A �, STUB 1-1.1-1 STUB L1.2-1 9 1
SD INLET L1.2A
ao CO TD INLET K1
SDMH L1.1Aa SDMH L1.1 P-191 SDMH L12 P_19, SDMH L1.3 INLET K2
� o
s d t
air
Page 1 of 1
Scenario: 2 Year
Current Time Step: 0.000 h
FlexTable: GAL Conduit
Invert Invert
Length Slope Capacity Hydraulic Hydraulic Energy Energy
Label Start Node Stop Node (Start) (Stop) (Calculated)
(User Diameter Manning's Flow Velocity (Full Grade Grade Grade Grade Headloss
(ft) (ft) Defined} (ft/ft) (in) n (cfs) ONFlow) Line(In) Line Line(In) Line (ft)
(ft) (ds) (ft) (Out)(ft) (ft) (Out)(ft)
P-189(2)(Storm K) SD INLET K2 SD INLET K1 4,932.19 4,931.97 55.0 0.004 24.0 0.013 2.37 3.37 14.31 4,932.92 4,932.91 4,933.00 4,932.95 0.05
P-189(1)(Storm K) SD INLET K1 SD FES K 4,931.97 4,931.58 98.5 0.004 24.0 0.013 3.19 3.67 14.31 4,932.61 4,932.20 4,932.82 4,932.43 0.40
P-191(Storm L) SDMH 11.1(Storm L) SDMH 11.2(Storm L) 4,928.43 4,929.78 337.0 -0.004 60.0 0.013 60.89 7.76 164.71 4,932.11 4,932.14 4,932.83 4,932.36 0.46
P-187(2)(Storm L) STUB 1-1.1-1 SDMH 11.1(Storm L) 4,930.19 4,929.93 50.5 0.005 42.0 0.013 10.00 5.22 71.14 4,932.25 4,932.25 4,932.30 4,932.29 0.01
P-190(Storm L) SDMH 11.1(Storm L) SD FES 1-1.0(Storm L) 4,928A3 4,928.10 83.1 0.004 60.0 0.013 70.77 6.07 164.71 4,930.81 4,930.39 4.931.73 4,931.40 0.33
P-192(Storm L) SDMH 11.2(Storm L) SDMH 1-1.3(Storm L) 4,929.76 4,930.46 171.0 -0.004 36.0 0.013 5.99 4.23 42.18 4,933.27 4,933.26 4,933.29 4,933.27 0.01
P-166(Storm L) STUB 1-1.2-1 SDMH 11.2(Storm L) 4,931.03 4,930.76 50.5 0.005 42.0 0.013 55.00 8.16 71.14 4,933.35 4,933.09 4,934.38 4,933.62 0.76
P-193(Storm L) SDMH 11.4(Storm L) SDMH 1-1.3(Storm L) 4,931.10 4,930.46 158.8 0.004 - 0.013 6.11 4.00 41.77 4,933.29 4,933.28 4,933.30 4,933.29 0.01
P-187(5)(Storm L) SDMH L1.1A SD FES OA 4,929.62 4,928.21 87.9 0.016 24.0 0.013 3.14 5.99 28.64 4,930.24 4,929.42 4,930.46 4,929.46 1.00
P-187(6)(Storm L) SD INLET L1.2A SDMH L1.1A 4,930.72 4,930.12 37.5 0.016 18.0 0.013 3.14 6.16 13.29 4,931.39 4,930.62 4,931.65 4,931.19 0.46
P-187(7)(Storm L) SD INLET L1.3A SD INLET L1.2A 4,931.40 4,930.72 42.7 0.016 18.0 0.013 2.84 5.98 13.29 4,932.04 4,931.74 4,93228 4,931.81 0.47
P-101(Storm L) SDMH 11.4(Storm L) SD INLET L1(PUBLIC)(Storm L) 4,931.73 4,931.88 37.5 -0.004 24.0 0.013 2.99 3.60 14.31 4,933.30 4,933.30 4,933.33 4,933.32 0.01
P-194(Storm L) SD INLET 1-1.5(Storm L) SDMH 11.4(Storm L) 4,931.83 4,931.76 17.5 0.004 24.0 0.013 3.25 3.69 14.31 4,933.30 4,933.29 4.933.32 4,933.32 0.00
HAHartford Homes\CO Fort Collins HFH22-Mulberry\OCIV\Drain Reports\Prop\Hydraulics\FDP_F1\StormCAD\HFH022_Storm F1 Amendment.stsw
file:///C:/Users/Matthew_pepin/AppData/Local/Temp/Bentley/StormCAD/i4vtg5xl.xml 5/9/2023
Page 1 of 1
Scenario: 2 Year
Current Time Step: 0.000 h
FlexTable: GAL Manhole
Elevation Hydraulic Hydraulic Energy Energy
Elevation Grade Grade Grade Grade Headloss
Label (Rim)(ft) (Invert)
Line(In) Line Line(In) Line (ft)
(ft) (Out)(ft) (ft) (Out)(ft)
SD INLET K2 4,936.80 4,932.19 4,932.93 4,932.93 4,933.01 4,933.01 0.02
SD INLET K1 4,936.80 4,931.97 4,932.72 4,932.65 4,932.93 4,932.86 0.11
SDMH 1-1.1 (Storm L) 4,938.88 4,928.43 4,931.35 4,930.99 4,932.27 4,931.91 0.55
SDMH 1-1.2(Storm L) 4,938.70 4,929.78 4,932.55 4,932.25 4,933.27 4,932.97 0.44
SDMH 1-1.3(Storm L) 4,937.81 4,930.46 4,933.27 4,933.27 4,933.29 4,933.29 0.00
SDMH L1.1A 4,936.99 4,929.62 4,930.31 4,930.28 4,930.54 4,930.51 0.07
SD INLET L1.2A 4,936.70 4,930.72 4,931.52 4,931.45 4,931.78 4,931.70 0.13
SD INLET L1.3A 4,936.58 4,931.40 4,932.09 4,932.09 4,932.33 4,932.33 0.05
SDMH 1-1.4(Storm L) 4,936.27 4,931.10 4,933.30 4,933.29 4,933.31 4,933.30 0.01
SD INLET L1 (PUBLIC)(Storm L) 4,936.17 4,931.88 4,933.30 4,933.30 4,933.33 4,933.33 0.00
SD INLET 1-1.5(Storm L) 4,936.17 4,931.83 4,933.30 4,933.30 4,933.32 4,933.32 0.00
STUB 1-1.2-1 4,936.12 4,931.03 4,933.35 4,933.35 4,934.38 4,934.38 0.00
STUB 1-1.1-1 1 4,936.27 1 4,930.19 1 4,932.25 1 4,932.25 1 4,932.30 1 4,932.30 1 0.00
HAHartford Homes\CO Fort Collins HFH22-Mulberry\OCIV\Drain Reports\Prop\Hydraulics\FDP_F1\StormCAD\HFH022_Storm F1
Amendment.stsw
file:///C:/Users/matthew pepin/AppData/Local/Temp/Bentley/StormCAD/2zyvz4ui.xml 5/9/2023
Page 1 of 1
Scenario: 2 Year
Current Time Step: 0.000 h
FlexTable: GAL Outfall
Flow Elevation
Elevation (User
Elevation (Total Boundary
Label (Invert) Defined
(ft) (Rim)(ft) Ofsj Condition Type Tailwater)
(ft)
SD FES K 4,931.58 4,935.41 3.13 User Defined Tailwater 4,931.26
SD FES L1.0(Storm L) 4,928.10 4,932.48 70.75 User Defined Tailwater 4,929.42
SD FES L1A 4,928.21 4,931.50 3.12 User Defined Tailwater 4,929.42
HAHartford Homes\CO Fort Collins HFH22-Mulberry\OCIV\Drain Reports\Prop\Hydraulics\FDP_F1
\StormCAD\HFH022_Storm F1 Amendment.stsw
file:///C:/Users/matthew pepin/AppData/Local/Temp/Bentley/StormCAD/Ovbgbcje.xml 5/9/2023
Page 1 of 1
Scenario: 100 Year
Current Time Step: 0.000 h
FlexTable: GAL Conduit
Length Capacity Hydraulic Hydraulic Energy Energy
Invert Invert Slope
(User Diameter Manning's Flow Velocity (Full Grade Grade Grade Grade Headloss
Label Start Node Stop Node (Start) (Stop) (Calculated)
(ft) (ft) Defined) (ft/ft) (in) n (cfs) (ft/s) Flow) Line(In) Line Line(In) Line (ft)
(ft) (cfs) (ft) (Out)(ft) (ft) (Out)(ft)
P-189(2)(Storm K) SD INLET K2 SD INLET K1 4,932.19 4,931.97 55.0 0.004 24.0 0.013 8.25 2.63 14.31 4,936.79 4,936.72 4,936.90 4,936.83 0.07
P-189(1)(Storm K) SD INLET K1 SD FES K 4,931.97 4,931.58 98.5 0.004 24.0 0.013 11.14 3.54 14.31 4,936.49 4,936.25 4,936.66 4,936.45 0.24
P-191(Storm L) SDMH L1.1(Storm L) SDMH L1.2(Stone L) 4,928.43 4,929.78 337.0 -0.004 60.0 0.013 125.24 6.38 164.71 4,935.17 4,934.39 4,935.80 4,935.02 0.78
P-187(2)(Storm L) STUB L1.1-1 SDMH 1-1.1(Stone L) 4,930.19 4,929.93 50.5 0.005 42.0 0,013 20.00 2.08 71.14 4,934.75 4,934.73 4,934.62 4,934.80 0.02
P-190(Stone L) SDMH 11.1(Storm L) SD FESL1.0(Storm L) 4,928.43 4,928.10 83.1 0.004 60.0 0.013 144.78 9.46 164.71 4,933.40 4,933.15 4,934.25 4,934.00 0.25
P-192(Storm L) SDMH 11.2(Storm L) SDMH 1-1.3(Storm L) 4,929.78 4,930.46 171.0 -0.004 36.0 0.013 20.77 2.94 42.18 4,936.27 4,936.11 4,936.41 4,936.24 0.17
P-166(Storm L) STUB L1.2-1 SDMH L1.2(Stone L) 4,931.03 4,930.78 50.5 0.005 42.0 0.013 105.00 10.91 71.14 4,935.63 4,935.08 4,937.48 4,936.93 0.55
P-193(Storm L) SDMH 1-1.4(Storm L) SDMH 1-1.3(Stone L) 4,931.10 4,930.46 158.8 0.004 - 0,013 21.29 2.99 41.77 4,936.43 4,936.27 4,936.57 4,936.41 0.17
P-187(5)(Storm L) SDMH L1.1A SD FES L1A 4,929.62 4,928.21 87.9 0.016 24.0 0.013 13.95 4A4 28.64 4,933.48 4,933.15 4,933.79 4,933.46 0.33
P-187(6)(Storm L) SD INLET L1.2A SDMH L1.1A 4,930.72 4,930.12 37.5 0.016 18.0 0.013 13.97 7.91 13.29 4,933.97 4,933.31 4,934.95 4,934.28 0.66
P-187(7)(Storm L) SD INLET L1.3A SD INLET L1.2A 4,931.40 4,930.72 42.7 0.016 18.0 0.013 12.90 7.30 1329 4,935.59 4,934.94 4,936.41 4,935.77 0.64
P-101(Storm L) SDMH 1-1.4(Storm L) SD INLET L1(PUBLIC)(Storm L) 4,931.73 4,931.88 37.5 -0.004 24.0 0,013 10.45 3.32 14.31 4,936.66 4,936.58 4,936.83 4,936.75 0.08
P-194(Stone L) SD INLET L1.5(Storm L) SDMH 1-1.4(Storm L) 4,931.83 4,931.76 17.5 0.004 24.0 0.013 11.34 3.61 14.31 4,936.60 4,936.56 4,936.80 4,936.76 0.04
HAHartford Homes\CO Fort Collins HFH22-Mulbeny\OCIV\Drain Reports\Prop\Hydraulics\FDP_Fl\StormCAD\HFH022_Storm F1 AmendmenLstsw
file:///C:/Users/Matthew_pepin/AppData/Local/Temp/Bentley/StormCAD/a4kzopc2.xml 5/9/2023
Page 1 of 1
Scenario: 100 Year
Current Time Step: 0.000 h
FlexTable: GAL Manhole
Elevation Hydraulic Hydraulic Energy Energy
Elevation Grade Grade Grade Grade Headloss
Label (Rim)(ft) (Invert)
Line(In) Line Line(In) Line (ft)
(ft) (Out)(ft) (ft) (Out)(ft)
SD INLET K2 4,936.80 4,932.19 4,936.80 4,936.80 4,936.90 4,936.90 0.00
SD INLET K1 4,936.80 4,931.97 4,936.59 4,936.53 4,936.79 4,936.72 0.10
SDMH 1-1.1 (Storm L) 4,938.88 4,928.43 4,933.92 4,933.57 4,934.77 4,934.42 0.52
SDMH 1-1.2(Storm L) 4,938.70 4,929.78 4,935.55 4,935.30 4,936.19 4,935.93 0.38
SDMH 1-1.3(Storm L) 4,937.81 4,930.46 4,936.27 4,936.27 4,936.41 4,936.41 0.00
SDMH L1.1A 4,936.99 4,929.62 4,933.59 4,933.55 4,933.89 4,933.85 0.10
SD INLET L1.2A 4,936.70 4,930.72 4,934.47 4,934.17 4,935.44 4,935.14 0.49
SD INLET L1.3A 4,936.58 4,931.40 4,935.75 4,935.75 4,936.58 4,936.58 0.17
SDMH 1-1.4(Storm L) 4,936.27 4,931.10 4,936.54 4,936.46 4,936.68 4,936.60 0.11
SD INLET L1 (PUBLIC)(Storm L) 4,936.17 4,931.88 4,936.17 4,936.17 4,936.34 4,936.34 0.00
SD INLET 1-1.5(Storm L) 4,936.17 4,931.83 4,936.17 4,936.17 4,936.37 4,936.37 0.00
STUB 1-1.2-1 4,936.12 4,931.03 4,935.63 4,935.63 4,937.48 4,937.48 0.00
STUB 1-1.1-1 1 4,936.27 1 4,930.19 1 4,934.75 1 4,934.75 1 4,934.82 1 4,934.82 1 0.00
HAHartford Homes\CO Fort Collins HFH22-Mulberry\OCIV\Drain Reports\Prop\Hydraulics\FDP_F1\StormCAD\HFH022_Storm F1
Amendment.stsw
file:///C:/Users/matthew_pepin/AppData/Local/Temp/Bentley/StormCAD/doij rrkx.xml 5/9/2023
Page 1 of 1
Scenario: 100 Year
Current Time Step: 0.000 h
FlexTable: GAL Outfall
Flow Elevation
Elevation (User
Elevation (Total Boundary
Label (Invert) (Rim)(ft) Out) Condition Type Defined
(ft) (cfs) Tailwater)
(ft)
SD FES K 4,931.58 4,935.41 10.92 User Defined Tailwater 4,936.25
SD FES 1-1.0(Storm L) 4,928.10 4,932.48 144.70 User Defined Tailwater 4,933.15
SD FES L1A 4,928.21 4,931.50 13.85 User Defined Tailwater 4,933.15
HAHartford Homes\CO Fort Collins HFH22-Mulberry\OCIV\Drain Reports\Prop\Hydraulics\FDP_F1
\StormCAD\HFH022_Storm F1 Amendment.stsw
file:///C:/Users/matthew pepin/AppData/Local/Temp/Bentley/StormCAD/eogfdv33.xm1 5/9/2023
f1H-1
SDf,•Ni 12-A.6 MH•2
SDM H 12-A 5
SLAM Q-A.-: PAH-.'is
l
' Sr Apr.,%IAI f TIti:S DAR=Y N_E—K.1-A TSL,
A�fA IW rT Mj A
�U AIiLA INLtI K.2 3DARCAINL-T Mi.1 smm If. AREA 14LET G•A.1 F1-4fa�•�
SD 12-A.3
5n Rr.4 I NI -T 13.a 7 SC A4RPONLET 5-k 1 Sr m 1 m SU Al f bN N Lt I i.I
NHv
SDUH 12-A.2
SO A+tA I LLt I I!%-A A Sp AREA IN LET I S A.'-.4 S]AR=A IN-ET h3.2
f H-zm r I Js,
r•aH-3o f —
Y •�
';r INI -T P 1 1r 1 1-3 j
IAH-26 NIH-25 � SD INLET 11 I I IIM-,t 5,NH I--A I
=DMH Is
SD`AF 4 SLL1H 11 GAF-27
S�h•H 14 1
, h 1 j(j IFJ1 rT L3 1 r. A4M-5L
� t
.y
SCF i .1unD
YI -SE)INLEq INLET D2
SC FES J ]
Y I ,•.
,SUIn4"Ja.2
So01F A* AiH :•'
1AF•11
SDf•4H J% SUM Jt• SD61-4 J5 3DNI 1.4 SDPA I J3 SGMI I J2
�D Inlet J:i 1 SD Inlet J2 1
E
Page 1 of 1
Scenario: 100 Year
Current Time Step: 0.000 h
FlexTable: GAL Conduit
Length Sloe Capacity Hydraulic Hydraulic Energy .Energy
Node (User p Diameter Manning's Flow Velocity p itY Grade Grade Grade Grade Headloss
Label Start Node Stop Invert Invert (Calculated) (Full Flow)
(Start)(ft) (Stop)(ft) Defined) (wft) (in) n (cfs) IWO (cfs) Line(In) Line(Out) Line(In) Line(Out) (ft)
(ft) (ft) (ft) (ft) (ft)
P-156(Storm 1) MH-1 SDMH 12-A.6 4,942.30 4,942.10 50.5 0.004 24.0 0.013 7.00 2.23 14.23 4,947.73 4.947.68 4,947.81 4,947.76 0.05
P-143(Storm 1) SDMH 12-A.6 SDMH 12-A.5 4,942.10 4,941.60 134.8 0.004 24.0 0.013 7.00 2.23 13.78 4.947.59 4,947.46 4,947.67 4,947.54 0.13
P-142(Storm 1) SDMH 12-A.5 SDMH 12-A.4 4,941.60 4,941.20 99.8 0.004 24.0 0.013 14.00 4.46 14.32 4,946.95 4,946.56 4,947.25 4,946.87 0.38
P-141(Storm 1) SDMH 12-A.4 SDMH 12-A.3 4,941.20 4,940.60 141.4 0.004 36.0 0.013 21.00 2.97 43.44 4,946.55 4.946.41 4,946.69 4,946.55 0.14
P-140(Storm 1) SDMH 12-A.3 SDMH 12-A.2 4,940.60 4,940.40 51.0 0.004 36.0 0.013 30.25 4.28 41.78 4,946.10 4,945.99 4,946.38 4,946.28 0.10
CO-32 SDMH 12-A.2 MH-33 4,940.40 4,939.95 108.0 0.004 42.0 0.013 39.50 4.11 64.94 4,945.81 4,945.65 4,946.08 4,945.91 0.17
CO-33 MH-33 SDMH 12-A.1 4,939.95 4,939.70 70.7 0.004 42.0 0.013 54.61 5.68 59.82 4,945.16 4,944.95 4,945.66 4,945.46 0.21
CO-36 SDMH 12 SD FES I(Storm 1) 4,937.25 4,937.00 - 0.004 54.0 0.013 100.75 6.33 125.31 4,944.27 4,944.11 4,944.90 4,944.73 0.16
C0-41 SDMH 12-A.1 0-4 4,939.70 4,939.52 61.4 0.003 15.0 0.013 15.46 0.00 3.50 4,944.28 4,940.76 4,946.75 4,943.23 3.52
CO-42 SDMH 12-A.1 SDMH 12 1 4,940.95 1 4,937.75 60.9 1 0.053 1 48.0 1 0.013 1 39.05 1 3.1.1 1 329.25 1 4,945.07 1 4,945.03 1 4,945.23 1 4,945.18 1 0.05
H:\H\Hartford Homes\CO Fort Collins HFH22-MulberrykOCMDrain Reports\Prop\HydraulicslFDP_F1\StormCAD\HFH022_Storm E_Split_Amendment F1.stsw
file:///C:/Users/Matthew_pepin/AppData/Local/Temp/Bentley/StonnCAD/ig4Onuyi.xml 6/20/2023
Page 1 of 1
Scenario: 100 Year
Current Time Step: 0.000 h
FlexTable: GAL Manhole
Elevation Elevation Hydraulic Hydraulic Energy Energy Headloss
Label Grade Line Grade Line Grade Line Grade Line
(Rim)(ft) (Invert)(ft) (In)(ft) (Out)(ft) (In)(ft) (Out)(ft) (ft)
MH-1 4,948.00 4,942.82 4,947.75 4,947.75 4,947.83 4,947.83 0.02
MH-33 4,946.64 4,939.74 4,945.30 4,945.26 4,945.80 4,945.76 0.14
SDMH 12 4,947.01 4,937.75 4,944.50 4,944.40 4,945.12 4,945.02 0.22
SDMH 12-A.1 4,946.69 4,937.55 4,945.10 4,945.10 4,945.26 4,945.26 0.03
SDMH 12-A.2 4,946.46 4,938.26 4,945.90 4,945.87 4,946.16 4,946.13 0.09
SDMH 12-A.3 4,946.72 4,940.69 4,946.21 4,946.15 4,946.50 4,946.44 0.12
SDMH 12-A.4 4,947.44 4,941.40 4,946.61 4,946.58 4,946.75 4,946.72 0.06
SDMH 12-A.5 4,947.84 4,941.90 4,947.20 4,947.01 4,947.51 4,947.32 0.25
SDMH 12-A.6 4,948.96 4,942.57 4,947.65 4,947.60 4,947.73 4,947.68 0.06
H:\H\Hartford Homes\CO Fort Collins HFH22- Mulberry\OCIV\Drain Reports\Prop\Hydraulics\FDP_F1
\StormCAD\HFH022_Storm E_Split_Amendment F1.stsw
file:///C:/Users/matthew_pepin/AppData/Local/Temp/Bentley/StormCAD/oglfwcgi.xml 6/20/2023
Page 1 of 1
Scenario: 100 Year
Current Time Step: 0.000 h
FlexTable: GAL Outfall
Flow Elevation
Elevation (User
Elevation (Total Boundary
Label (Invert) Defined
(ft) (Rim)(ft) Ofsj Condition Type Tailwater)
(ft)
SD FES I (Storm 1) 4,939.01 4,945.07 111.60 User Defined Tailwater 4,944.11
04 4,939.52 4,937.55 15.46 User Defined Tailwater 4,944.50
H:\H\Hartford Homes\CO Fort Collins HFH22- Mulberry\OCIV\Drain Reports\Prop\Hydraulics\FDP_F1
\StormCAD\HFH022_Storm E_Split_Amendment F1.stsw
file:///C:/Users/matthew pepin/AppData/Local/Temp/Bentley/StormCAD/hyugttla.xml 6/20/2023
Page 1 of 1
Scenario: 2 Year
Current Time Step: 0.000 h
FlexTable: GAL Conduit
Length Energy Energy
Slope Capacity Hydraulic Hydraulic
Label Start Node StopNode (User Diameter Manning Flow Velocity Grade Grade Headloss
avert overt (Calculated) (Full Flow) Grade Line Grade Line
(Start)(ft) (Stop)(ft) Defined) (flat) (in) n (cfs) (ft/s) (ots) (In)(ft) (Out)(ft) Line(in) Lin((Out) (ft)
(
P-156(Storm 1) MH-1 SDMH 12-A.6 4,942.30 4,942.10 50.5 0.004 24.0 0.013 2.40 3.37 14.23 4,942.99 4,942.98 4.943.09 4,943.03 0.06
P-143(Storm 1) SDMH 12-A.6 SDMH 12-A.5 4,942.10 4,941.60 134.8 0.004 24.0 0,013 2.40 3.29 13.78 4,942.88 4,942.86 4,942.95 4.942.88 0.07
P-142(Storm 1) SDMH 12-A.5 SDMH 12-A.4 4,941.60 4,941.20 99.8 0.004 24.0 0.013 4.80 4.11 14.32 4,942.40 4,942.30 4,942.66 4,942.40 0.26
P-141(Storm 1) SDMH 12-A.4 SDMH 12-A.3 4,941.20 4,940.60 141.4 0.004 36.0 0.013 6.20 4.36 43.44 4,941.98 4,941.84 4.942.26 4,941.91 0.35
P-140(Storm 1) SDMH 12-A.3 SDMH 12-A.2 4,940.60 4,940.40 51.0 0.004 36.0 0.013 7.60 4.49 41.78 4,941.63 4,941.63 4,941.82 4,941.73 0.09
CO-32 SDMH 12-A.2 MH-33 4,940.40 4,939.95 108.0 0.004 42.0 0.013 9.00 4.75 64.94 4,941.38 4,941.41 4,941.64 4,941.49 0.15
CO-33 MH-33 SDMH 12-A.1 4,939.95 4,939.70 70.7 0.004 42.0 0.013 12.02 4.86 59.82 4,941.01 4,940.75 4,941.38 0.00 4,941.38
CO-36 SDMH 12 SD FES I(Storm 1) 4,937.25 4,937.00 0.004 54.0 0.013 14.33 5.24 125.31 4,939.01 4,939.01 4,939.10 4,939.08 0.02
C0-41 SDMH 12-A.1 0-4 4,939.70 4,939.52 61.4 0.003 15.0 0.013 12.01 0.00 3.50 4,942.88 4,940.74 4,944.37 4,942.25 2.12
CO-42 SDMH 12-A.1 SDMH 12 1 4,940.95 1 4,937.75 60.9 1 0.053 1 48.0 1 0.013 1 0.00 1 0.00 1 329.25 1 4,940.95 1 4,939.12 1 4,940.95 1 4,939.12 1 1.83
H:\H\Hartford Homes\CO Fort Collins HFH22-MulberrykOCMDrain Reports\Prop\HydraulicslFDP_Fl\StormCAD\HFH022_Storm E_Split_Amendment F1.stsw
file:///C:/Users/Matthew_pepin/AppData/Local/Temp/Bentley/StormCAD/iysl lwyO.xml 6/20/2023
Page 1 of 1
Scenario: 2 Year
Current Time Step: 0.000 h
FlexTable: GAL Manhole
Elevation Elevation Hydraulic Hydraulic Energy Energy Headloss
Label Grade Line Grade Line Grade Line Grade Line
(Rim)(ft) (Invert)(ft) (In)(ft) (Out)(ft) (In)(ft) (Out)(ft) (ft)
MH-1 4,948.00 4,942.82 4,943.01 4,943.01 4,943.11 4,943.11 0.02
MH-33 4,946.64 4,939.74 4,941.09 4,941.09 4,941.46 4,941.45 0.07
SDMH 12 4,947.01 4,937.75 4,939.03 4,939.03 4,939.12 4,939.12 0.02
SDMH 12-A.1 4,946.69 4,937.55 (N/A) (N/A) (N/A) (N/A) 0.00
SDMH 12-A.2 4,946.46 4,938.26 4,941.43 4,941.43 4,941.69 4,941.69 0.05
SDMH 12-A.3 4,946.72 4,940.69 4,941.69 4,941.67 4,941.89 4,941.86 0.06
SDMH 12-A.4 4,947.44 4,941.40 4,942.08 4,942.04 4,942.36 4,942.32 0.10
SDMH 12-A.5 4,947.84 4,941.90 4,942.61 4,942.45 4,942.87 4,942.71 0.21
SDMH 12-A.6 4,948.96 4,942.57 4,942.94 4,942.89 4,943.01 4,942.96 0.06
H:\H\Hartford Homes\CO Fort Collins HFH22- Mulberry\OCIV\Drain Reports\Prop\Hydraulics\FDP_F1
\StormCAD\HFH022_Storm E_Split_Amendment F1.stsw
file:///C:/Users/matthew pepin/AppData/Local/Temp/Bentley/StormCAD/hj2dpjxz.xml 6/20/2023
Page 1 of 1
Scenario: 2 Year
Current Time Step: 0.000 h
FlexTable: GAL Outfall
Flow Elevation
Elevation Boundary (User
Elevation (Total
Label (Invert) (Rim)(ft) Out) Condition Defined
(ft) (cfs) Type Tailwater)
(ft)
SD FES I (Storm 1) 4,939.01 4,945.07 23.24 Free Outfall -
04 4,939.52 4,937.55 12.01 Free Outfall -
H:\H\Hartford Homes\CO Fort Collins HFH22- Mulberry\OCIV\Drain Reports\Prop\Hydraulics\FDP_F1
\StormCAD\HFH022_Storm E_Split_Amendment F1.stsw
file:///C:/Users/matthew_pepin/AppData/Local/Temp/Bentley/StormCAD/mmt4vwtr.xml 6/20/2023
Profile Report
Engineering Profile - Storm 12-A SDMH 12 - SDMH 12-A.6 (HFH022_Storm E_Split_Amendment
F1.stsw)
SDMH 12-A.6
Rim:4,948.96 ft SDMH 12-A.5
Invert:4,942.57 ft SDMH 12-A.4
4,950.00 Rim:4,947.84 ft SDMH 12-A:3 SDMH 12-A.1-1 SDMH 12-A.1 SDMH 12
/ Invert:4,941.90 ft `Rim:t:4,941.40 SDMH Rim: ,947.01 ft
/ Invert:4,941.40 ft Rim:4,946.72f gim.4,946.46ft Rim:4,946.64ft Rim:4,946.69ft Invert:4,937.75 ft
I nvert:4,940. lhvert:4,938.26 ft Invert:4,939.74 ft Invert:4,937.55
4,945.00 - - - -
4 99.8 It @ 0.0.ft/ft P-141(Storm I):14. �$6
-1 Corm 1):51.0 It OQ111`08.0 ft 0.004 H/
Circle-36.0 in RCP CO-3 7 I
m Circle 6.0 in RCP Circle-42.0 in P@
w Circle-4 m IwO�6
4,940.00 - - - -
4,935.00
-0+50 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00
Station(ft)
StormCAD
HFH022_Storm E_Split_Amendment F1.stsw Bentley Systems,Inc. Haestad Methods Solution Center [10.03.01.081
6/19/2023 27 Siemon Company Drive Suite 200 W Watertown,CT 06795 USA Page 1 of 1
+1-203-755-1666
Profile Report
Engineering Profile - Storm 12-A SDMH 12 - SDMH 12-A.6 (HFH022_Storm E_Split_Amendment
F1.stsw)
SDMH 12-A.6
Rim:4,948.96 ft SDMH 12-A.5
Invert:4,942.57 ft SDMH 12-A.4
Rim:4,947.84 ft SDMH 12
4.950.00 Rim:4,947:44 ft I � SDMH 12-A:3 SDMH 12-A.1-1 SDMH 12-A.1
Invert:4,941.90ft ` SDMH 12-A.2 Rim:4,947.01 ft
/ Invert:4,941.40f Rim, 946.72 Dim 4,946.46ft Rimert:9,6.64ft Rim, 4437.55 Invert:4,937.75 ft
Invert:4.,940. 1hvert:4,938.26ft Invert:4,939.74 ft Invert:4,937.55
4.945.00 -
c 4 ft/ft :99.8 k @ 0.004 k/k P-141(Storm 1):14. �$6
`o RCP - 1 t -1 1):51 torm .
. p4figt18.0 ft 0004. fli
RCP Cir cle-36. i 0-33:7; ®�9
m 0i RCP 0 ft Circle 6.0 in RCP Circl -420 in P ft�
w Circle-4 in 00
4,940.00
4,935.00 -
-0+50 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00
Station(ft)
StormCAD
HFH022_Storm E_Split_Amendment F1.stsw Bentley Systems,Inc. Haestad Methods Solution Center [10.03.01.081
6/19/2023 27 Siemon Company Drive Suite 200 W Watertown,CT 06795 USA Page 1 of 1
+1-203-755-1666
Bloom Filing 1
Final Drainage Report
Proposed SWMM Model
03/19/2021 00:15:00
CoFC_2yr
CityofFortCollins
A
D
Pond—A
CooperSloughNorth
Pond_D Pond A Outle
B
FPond D Outlet J1 C Pond B
Pond E
C1 Pond C
Pond B utlet
J2 CooperSlough
Pond C Outlet
/G
G'Pond E Outlet
777j
Pond G1
S4
Pond CII
PondG1_Outlet 01
PondG Outlet J3
// F CommerdalPond
Pond f d Hg1
iI Lake Cana
Pond_I Outle I!T///.C5 and H OuteY JgCq Peakdew_Storm_Stub
SWMM 5.1 Page 1
***2-Year Storm Event***
EPA STORM WATER MANAGEMENT MODEL - VERSION 5.2 (Build 5.2.3)
------------------------------------------------------------
****************
Analysis Options
****************
Flow Units . . . . . . . . . . . . . . . CFS
Process Models:
Rainfall/Runoff . . . . . . . . YES
RDII . . . . . . . . . . . . . . . . . . . NO
Snowmelt . . . . . . . . . . . . . . . NO
Groundwater . . . . . . . . . . . . NO
Flow Routing . . . . . . . . . . . YES
Ponding Allowed . . . . . . . . NO
Water Quality . . . . . . . . . . NO
Infiltration Method . . . . . . HORTON
Flow Routing Method . . . . . . KINWAVE
Starting Date . . . . . . . . . . . . 03/19/2021 00:00:00
Ending Date . . . . . . . . . . . . . . 03/20/2021 00:00:00
Antecedent Dry Days . . . . . . 0.0
Report Time Step . . . . . . . . . 00:15:00
Wet Time Step . . . . . . . . . . . . 00:05:00
Dry Time Step . . . . . . . . . . . . 01:00:00
Routing Time Step . . . . . . . . 30.00 sec
************************** Volume Depth
Runoff Quantity Continuity acre-feet inches
************************** --------- -------
Total Precipitation . . . . . . 18.191 0.978
Evaporation Loss . . . . . . . . . 0.000 0.000
Infiltration Loss . . . . . . . . 5.155 0.277
Surface Runoff . . . . . . . . . . . 11.762 0.633
Final Storage . . . . . . . . . . . . 1.334 0.072
Continuity Error (%) . . . . . -0.330
************************** Volume Volume
Flow Routing Continuity acre-feet 10^6 gal
************************** --------- ---------
Dry Weather Inflow . . . . . . . 0.000 0.000
Wet Weather Inflow . . . . . . . 11.762 3.833
Groundwater Inflow . . . . . . . 0.000 0.000
RDII Inflow . . . . . . . . . . . . . . 0.000 0.000
External Inflow . . . . . . . . . . 0.000 0.000
External Outflow . . . . . . . . . 10.809 3.522
Flooding Loss . . . . . . . . . . . . 0.000 0.000
Evaporation Loss . . . . . . . . . 0.000 0.000
Exfiltration Loss . . . . . . . . 0.000 0.000
Initial Stored Volume . . . . 0.000 0.000
Final Stored Volume . . . . . . 0.945 0.308
Continuity Error (%) . . . . . 0.063
********************************
Highest Flow Instability Indexes
********************************
Link Pond_C_Outlet (54)
*************************
Routing Time Step Summary
*************************
Minimum Time Step 30.00 sec
Average Time Step 30.00 sec
Maximum Time Step 30.00 sec
of Time in Steady State 0.00
Average Iterations per Step 1.00
of Steps Not Converging 0.00
***************************
Subcatchment Runoff Summary
***************************
------------------------------------------------------------------------------------
------------------------------------------
Total Total Total Total Impery
Pery Total Total Peak Runoff
Precip Runon Evap Infil Runoff
Runoff Runoff Runoff Runoff Coeff
Subcatchment in in in in in
in in 10^6 gal CFS
------------------------------------------------------------------------------------
------------------------------------------
A 0.98 0.00 0.00 0.29 0.62
0.00 0.62 0.94 35.83 0.631
D 0.98 0.00 0.00 0.51 0.42
0.00 0.43 0.43 23.47 0.435
E 0.98 0.00 0.00 0.38 0.54
0.00 0.54 0.39 16.91 0.551
C 0.98 0.00 0.00 0.10 0.79
0.00 0.80 0.48 22.13 0.813
G 0.98 0.00 0.00 0.10 0.79
0.00 0.80 0.42 20.75 0.814
H 0.98 0.00 0.00 0.19 0.71
0.00 0.71 0.32 21.49 0.727
B 0.98 0.00 0.00 0.29 0.62
0.00 0.62 0.26 13.91 0.634
I 0.98 0.00 0.00 0.19 0.71
0.00 0.71 0.12 9.41 0.728
S4 0.98 0.00 0.00 0.20 0.70
0.02 0.72 0.02 2.01 0.731
S5 0.98 0.00 0.00 0.69 0.22
0.05 0.27 0.02 1.59 0.276
G1 0.98 0.00 0.00 0.10 0.79
0.00 0.80 0.44 22.00 0.814
******************
Node Depth Summary
******************
---------------------------------------------------------------------------------
Average Maximum Maximum Time of Max Reported
Depth Depth HGL Occurrence Max Depth
Node Type Feet Feet Feet days hr:min Feet
---------------------------------------------------------------------------------
J2 JUNCTION 0.00 0.00 4935.00 0 00:00 0.00
31 JUNCTION 0.00 0.00 4943.00 0 00:00 0.00
33 JUNCTION 0.00 0.00 4927.00 0 00:00 0.00
34 JUNCTION 0.00 0.00 4923.00 0 00:00 0.00
Peakview_Storm_Stub OUTFALL 0.00 0.00 4922.94 0 00:00 0.00
CooperSlough OUTFALL 0.00 0.00 4938.00 0 00:00 0.00
Lake Canal OUTFALL 0.00 0.00 0.00 0 00:00 0.00
CooperSloughNorth OUTFALL 0.00 0.00 4940.00 0 00:00 0.00
01 OUTFALL 0.00 0.00 0.00 0 00:00 0.00
Pond_A STORAGE 0.51 2.30 4947.80 0 02:11 2.30
Pond_B STORAGE 0.97 2.80 4945.30 0 04:58 2.80
Pond_C STORAGE 0.24 2.49 4940.99 0 01:16 2.49
Pond_D STORAGE 0.86 1.03 4945.03 0 03:24 1.03
Pond_E STORAGE 0.28 1.11 4937.11 0 01:59 1.11
Pond_G STORAGE 0.51 3.01 4931.01 0 01:35 3.01
Pond_H STORAGE 0.48 2.36 4925.36 0 01:58 2.36
Pond_I STORAGE 2.49 2.87 4925.37 0 02:58 2.87
Fut_CommercialPond STORAGE 0.10 0.19 4924.19 0 02:07 0.18
Pond G1 STORAGE 0.56 2.27 2.27 0 02:11 2.27
*******************
Node Inflow Summary
*******************
------------------------------------------------------------------------------------
Maximum Maximum Lateral
Total Flow
Lateral Total Time of Max Inflow
Inflow Balance
Inflow Inflow Occurrence Volume
Volume Error
Node Type CFS CFS days hr:min 10^6 gal 10^6
gal Percent
------------------------------------------------------------------------------------
-------------
J2 JUNCTION 0.00 0.35 0 03:24 0
0.198 0.000
31 JUNCTION 0.00 0.35 0 03:24 0
0.198 0.000
33 JUNCTION 0.00 7.77 0 01:35 0
0.82 0.000
34 JUNCTION 0.00 9.99 0 01:39 0
1.15 0.000
Peakview_Storm_Stub OUTFALL 0.00 9.99 0 01:39 0
1.15 0.000
CooperSlough OUTFALL 0.00 12.69 0 01:30 0
1.87 0.000
Lake-Canal OUTFALL 0.00 0.10 0 02:58 0
0.0588 0.000
CooperSloughNorth OUTFALL 0.00 0.00 0 00:00 0
0 0.000 gal
01 OUTFALL 0.00 2.56 0 02:11 0
0.443 0.000
Pond_A STORAGE 35.83 35.83 0 00:45 0.938
0.938 0.069
Pond_B STORAGE 13.91 17.84 0 00:45 0.258
1.2 0.021
Pond_C STORAGE 22.13 22.13 0 00:45 0.475
0.475 0.072
Pond_D STORAGE 23.47 23.47 0 00:40 0.429
0.429 -0.002
Pond_E STORAGE 16.91 16.91 0 00:45 0.389
0.389 0.058
Pond_G STORAGE 22.57 22.80 0 00:40 0.439
0.821 0.057
Pond_H STORAGE 21.49 21.49 0 00:40 0.321
0.321 0.071
Pond_I STORAGE 9.41 9.41 0 00:40 0.124
0.124 0.000
Fut_CommercialPond STORAGE 1.59 1.59 0 00:40 0.0155
0.0155 -0.004
Pond_G1 STORAGE 22.00 22.00 0 00:45 0.443
0.443 0.058
*********************
Node Flooding Summary
*********************
No nodes were flooded.
**********************
Storage Volume Summary
**********************
------------------------------------------------------------------------------------
------------
Average Avg Evap Exfil Maximum Max Time of
Max Maximum
Volume Pcnt Pcnt Pcnt Volume Pcnt
Occurrence Outflow
Storage Unit 1000 ft3 Full Loss Loss 1000 ft3 Full days
hr:min CFS
------------------------------------------------------------------------------------
------------
Pond_A 10.714 1.9 0.0 0.0 70.020 12.7 0
02:11 6.56
Pond_B 14.711 4.4 0.0 0.0 53.442 15.9 0
04:58 5.09
Pond_C 1.141 0.6 0.0 0.0 19.947 11.0 0
01:16 8.11
Pond_D 41.008 10.3 0.0 0.0 52.428 13.2 0
03:24 0.35
Pond_E 7.177 2.4 0.0 0.0 30.543 10.1 0
01:59 3.20
Pond_G 2.492 1.2 0.0 0.0 25.454 12.1 0
01:35 7.77
Pond_H 4.597 2.3 0.0 0.0 28.178 14.0 0
01:58 2.19
Pond_I 11.848 11.3 0.0 0.0 15.361 14.6 0
02:58 0.10
Fut_CommercialPond 0.957 3.2 0.0 0.0 1.850 6.2 0
02:07 0.05
Pond-GI 6.908 3.1 0.0 0.0 38.755 17.6 0
02:11 2.56
***********************
Outfall Loading Summary
***********************
-----------------------------------------------------------
Flow Avg Max Total
Freq Flow Flow Volume
Outfall Node Pcnt CFS CFS 10^6 gal
-----------------------------------------------------------
Peakview_Storm_Stub 99.55 1.79 9.99 1.153
CooperSlough 99.55 2.90 12.69 1.867
Lake Canal 99.03 0.09 0.10 0.059
CooperSloughNorth 0.00 0.00 0.00 0.000
01 98.72 0.69 2.56 0.443
-----------------------------------------------------------
System 79.37 5.48 25.28 3.522
********************
Link Flow Summary
********************
-----------------------------------------------------------------------------
Maximum Time of Max Maximum Max/ Max/
IFlowl Occurrence Ivelocl Full Full
Link Type CFS days hr:min ft/sec Flow Depth
-----------------------------------------------------------------------------
C1 DUMMY 0.35 0 03:24
C2 DUMMY 0.35 0 03:24
C3 DUMMY 7.77 0 01:35
C4 DUMMY 9.99 0 01:39
Pond_H_Outlet ORIFICE 2.19 0 01:58 0.00
Pond_D_Outlet ORIFICE 0.35 0 03:24 0.00
Pond_E_Outlet ORIFICE 3.20 0 01:59 0.00
Pond_B_Outlet ORIFICE 5.09 0 04:58 0.00
Pond_C_Outlet ORIFICE 8.11 0 01:16 0.00
Pond_A_Outlet ORIFICE 6.56 0 02:11 0.00
PondG_Outlet ORIFICE 7.77 0 01:35 0.00
Pond_I_Outlet ORIFICE 0.10 0 02:58 0.00
C5 ORIFICE 0.05 0 02:07 0.00
PondG1 Outlet ORIFICE 2.56 0 02:11 0.00
*************************
Conduit Surcharge Summary
*************************
No conduits were surcharged.
Analysis begun on: Tue May 9 16:24:04 2023
Analysis ended on: Tue May 9 16:24:04 2023
Total elapsed time: < 1 sec
***100-Year Storm Event***
EPA STORM WATER MANAGEMENT MODEL - VERSION 5.2 (Build 5.2.3)
------------------------------------------------------------
****************
Analysis Options
****************
Flow Units . . . . . . . . . . . . . . . CFS
Process Models:
Rainfall/Runoff . . . . . . . . YES
RDII . . . . . . . . . . . . . . . . . . . NO
Snowmelt . . . . . . . . . . . . . . . NO
Groundwater . . . . . . . . . . . . NO
Flow Routing . . . . . . . . . . . YES
Ponding Allowed . . . . . . . . NO
Water Quality . . . . . . . . . . NO
Infiltration Method . . . . . . HORTON
Flow Routing Method . . . . . . KINWAVE
Starting Date . . . . . . . . . . . . 03/19/2021 00:00:00
Ending Date . . . . . . . . . . . . . . 03/20/2021 00:00:00
Antecedent Dry Days . . . . . . 0.0
Report Time Step . . . . . . . . . 00:15:00
Wet Time Step . . . . . . . . . . . . 00:05:00
Dry Time Step . . . . . . . . . . . . 01:00:00
Routing Time Step . . . . . . . . 30.00 sec
************************** Volume Depth
Runoff Quantity Continuity acre-feet inches
************************** --------- -------
Total Precipitation . . . . . . 68.225 3.669
Evaporation Loss . . . . . . . . . 0.000 0.000
Infiltration Loss . . . . . . . . 10.547 0.567
Surface Runoff . . . . . . . . . . . 56.639 3.046
Final Storage . . . . . . . . . . . . 1.335 0.072
Continuity Error (%) . . . . . -0.433
************************** Volume Volume
Flow Routing Continuity acre-feet 10^6 gal
************************** --------- ---------
Dry Weather Inflow . . . . . . . 0.000 0.000
Wet Weather Inflow . . . . . . . 56.639 18.457
Groundwater Inflow . . . . . . . 0.000 0.000
RDII Inflow . . . . . . . . . . . . . . 0.000 0.000
External Inflow . . . . . . . . . . 0.000 0.000
External Outflow . . . . . . . . . 46.231 15.065
Flooding Loss . . . . . . . . . . . . 0.000 0.000
Evaporation Loss . . . . . . . . . 0.000 0.000
Exfiltration Loss . . . . . . . . 0.000 0.000
Initial Stored Volume . . . . 0.000 0.000
Final Stored Volume . . . . . . 10.394 3.387
Continuity Error (%) . . . . . 0.025
********************************
Highest Flow Instability Indexes
********************************
Link Pond_C_Outlet (53)
*************************
Routing Time Step Summary
*************************
Minimum Time Step 30.00 sec
Average Time Step 30.00 sec
Maximum Time Step 30.00 sec
of Time in Steady State 0.00
Average Iterations per Step 1.00
of Steps Not Converging 0.00
***************************
Subcatchment Runoff Summary
***************************
------------------------------------------------------------------------------------
------------------------------------------
Total Total Total Total Impery
Pery Total Total Peak Runoff
Precip Runon Evap Infil Runoff
Runoff Runoff Runoff Runoff Coeff
Subcatchment in in in in in
in in 10^6 gal CFS
------------------------------------------------------------------------------------
------------------------------------------
A 3.67 0.00 0.00 0.62 2.51
0.48 2.99 4.55 233.48 0.815
D 3.67 0.00 0.00 1.14 1.72
0.77 2.49 2.52 144.67 0.679
E 3.67 0.00 0.00 0.84 2.19
0.59 2.78 2.01 108.80 0.758
C 3.67 0.00 0.00 0.15 3.23
0.22 3.45 2.06 138.82 0.939
G 3.67 0.00 0.00 0.15 3.23
0.22 3.45 1.83 129.25 0.940
H 3.67 0.00 0.00 0.31 2.87
0.43 3.30 1.49 119.43 0.900
B 3.67 0.00 0.00 0.54 2.51
0.56 3.08 1.28 85.59 0.838
I 3.67 0.00 0.00 0.30 2.88
0.44 3.31 0.58 49.26 0.903
S4 3.67 0.00 0.00 0.29 2.80
0.52 3.32 0.08 8.81 0.906
S5 3.67 0.00 0.00 1.01 0.90
1.77 2.67 0.15 19.35 0.726
G1 3.67 0.00 0.00 0.15 3.23
0.22 3.45 1.92 136.89 0.940
******************
Node Depth Summary
******************
---------------------------------------------------------------------------------
Average Maximum Maximum Time of Max Reported
Depth Depth HGL Occurrence Max Depth
Node Type Feet Feet Feet days hr:min Feet
---------------------------------------------------------------------------------
J2 JUNCTION 0.00 0.00 4935.00 0 00:00 0.00
31 JUNCTION 0.00 0.00 4943.00 0 00:00 0.00
33 JUNCTION 0.00 0.00 4927.00 0 00:00 0.00
34 JUNCTION 0.00 0.00 4923.00 0 00:00 0.00
Peakview_Storm_Stub OUTFALL 0.00 0.00 4922.94 0 00:00 0.00
CooperSlough OUTFALL 0.00 0.00 4938.00 0 00:00 0.00
Lake Canal OUTFALL 0.00 0.00 0.00 0 00:00 0.00
CooperSloughNorth OUTFALL 0.00 0.00 4940.00 0 00:00 0.00
01 OUTFALL 0.00 0.00 0.00 0 00:00 0.00
Pond_A STORAGE 3.18 6.54 4952.04 0 02:36 6.53
Pond_B STORAGE 6.13 7.11 4949.61 0 11:54 7.11
Pond_C STORAGE 1.24 5.94 4944.44 0 02:07 5.93
Pond_D STORAGE 3.87 4.29 4948.29 0 03:36 4.28
Pond_E STORAGE 1.54 5.17 4941.17 0 02:22 5.16
Pond_G STORAGE 3.14 7.98 4935.98 0 02:23 7.98
Pond_H STORAGE 3.46 8.00 4931.00 0 02:17 8.00
Pond_I STORAGE 5.30 5.60 4928.10 0 03:05 5.60
Fut_CommercialPond STORAGE 1.19 1.93 4925.93 0 02:09 1.92
Pond G1 STORAGE 3.33 5.99 5.99 0 02:25 5.99
*******************
Node Inflow Summary
*******************
------------------------------------------------------------------------------------
Maximum Maximum Lateral
Total Flow
Lateral Total Time of Max Inflow
Inflow Balance
Inflow Inflow Occurrence Volume
Volume Error
Node Type CFS CFS days hr:min 10^6 gal 10^6
gal Percent
------------------------------------------------------------------------------------
-------------
J2 JUNCTION 0.00 0.75 0 03:36 0
0.454 0.000
31 JUNCTION 0.00 0.75 0 03:36 0
0.454 0.000
33 JUNCTION 0.00 13.51 0 02:23 0
3.9 0.000
34 JUNCTION 0.00 17.96 0 02:21 0
5.5 0.000
Peakview_Storm_Stub OUTFALL 0.00 17.96 0 02:21 0
5.5 0.000
CooperSlough OUTFALL 0.00 21.91 0 02:20 0
7.56 0.000
Lake-Canal OUTFALL 0.00 0.14 0 03:05 0
0.0866 0.000
CooperSloughNorth OUTFALL 0.00 0.00 0 00:00 0
0 0.000 gal
01 OUTFALL 0.00 4.37 0 02:25 0
1.92 0.000
Pond_A STORAGE 233.48 233.48 0 00:40 4.55
4.55 0.029
Pond_B STORAGE 85.59 92.51 0 00:40 1.28
5.82 0.002
Pond_C STORAGE 138.82 138.82 0 00:40 2.06
2.06 0.029
Pond_D STORAGE 144.67 144.67 0 00:40 2.52
2.52 -0.000
Pond_E STORAGE 108.80 108.80 0 00:40 2.01
2.01 0.046
Pond_G STORAGE 138.06 142.01 0 00:40 1.91
3.9 0.019
Pond_H STORAGE 119.43 119.43 0 00:40 1.49
1.49 0.031
Pond_I STORAGE 49.26 49.26 0 00:40 0.576
0.576 -0.000
Fut_CommercialPond STORAGE 19.35 19.35 0 00:40 0.153
0.153 0.004
Pond_G1 STORAGE 136.89 136.89 0 00:40 1.92
1.92 0.024
*********************
Node Flooding Summary
*********************
No nodes were flooded.
**********************
Storage Volume Summary
**********************
------------------------------------------------------------------------------------
------------
Average Avg Evap Exfil Maximum Max Time of
Max Maximum
Volume Pcnt Pcnt Pcnt Volume Pcnt
Occurrence Outflow
Storage Unit 1000 ft3 Full Loss Loss 1000 ft3 Full days
hr:min CFS
------------------------------------------------------------------------------------
------------
Pond_A 185.389 33.6 0.0 0.0 495.551 89.8 0
02:36 12.13
Pond_B 219.784 65.5 0.0 0.0 274.945 81.9 0
11:54 8.57
Pond_C 27.246 15.0 0.0 0.0 177.236 97.9 0
02:07 13.64
Pond_D 289.304 72.7 0.0 0.0 326.657 82.1 0
03:36 0.75
Pond_E 52.777 17.4 0.0 0.0 201.128 66.2 0
02:22 8.85
Pond_G 62.862 30.0 0.0 0.0 208.826 99.5 0
02:23 13.51
Pond_H 59.829 29.7 0.0 0.0 168.893 83.8 0
02:17 4.23
Pond_I 68.022 64.6 0.0 0.0 75.236 71.5 0
03:05 0.14
Fut_CommercialPond 11.941 39.8 0.0 0.0 19.259 64.2 0
02:09 0.22
Pond-GI 94.135 42.9 0.0 0.0 219.170 99.8 0
02:25 4.37
***********************
Outfall Loading Summary
***********************
-----------------------------------------------------------
Flow Avg Max Total
Freq Flow Flow Volume
Outfall Node Pcnt CFS CFS 10^6 gal
-----------------------------------------------------------
Peakview_Storm_Stub 99.62 8.54 17.96 5.501
CooperSlough 99.58 11.74 21.91 7.558
Lake Canal 99.41 0.13 0.14 0.087
CooperSloughNorth 0.00 0.00 0.00 0.000
01 99.27 2.99 4.37 1.919
-----------------------------------------------------------
System 79.58 23.41 44.38 15.064
********************
Link Flow Summary
********************
-----------------------------------------------------------------------------
Maximum Time of Max Maximum Max/ Max/
IFlowl Occurrence Ivelocl Full Full
Link Type CFS days hr:min ft/sec Flow Depth
-----------------------------------------------------------------------------
C1 DUMMY 0.75 0 03:36
C2 DUMMY 0.75 0 03:36
C3 DUMMY 13.51 0 02:23
C4 DUMMY 17.96 0 02:21
Pond_H_Outlet ORIFICE 4.23 0 02:17 0.00
Pond_D_Outlet ORIFICE 0.75 0 03:36 0.00
Pond_E_Outlet ORIFICE 8.85 0 02:22 0.00
Pond_B_Outlet ORIFICE 8.57 0 11:54 0.00
Pond_C_Outlet ORIFICE 13.64 0 02:07 0.00
Pond_A_Outlet ORIFICE 12.13 0 02:36 0.00
PondG_Outlet ORIFICE 13.51 0 02:23 0.00
Pond_I_Outlet ORIFICE 0.14 0 03:05 0.00
C5 ORIFICE 0.22 0 02:09 0.00
PondG1 Outlet ORIFICE 4.37 0 02:25 0.00
*************************
Conduit Surcharge Summary
*************************
No conduits were surcharged.
Analysis begun on: Tue May 9 16:22:43 2023
Analysis ended on: Tue May 9 16:22:43 2023
Total elapsed time: < 1 sec
STAGE-DISCHARGE SIZING OF THE WATER QUALITY CAPTURE VOLUME(WQCV)OUTLET
Project: Bloom Filing 1
Basin ID:Pond G1-Filing 1 Amendment
WQCV Design Volume(Input):
Catchment Imperviousness,la= 90.0 percent
Catchment Area,A= 2050. acres Diameter of holes,D= 1.275 inches
Depth at WQCV outlet above lowest perforation,H= 3.00 feet Number of holes per row,N= 1
Vertical distance between rows,h= 4.00 inches OR
Number of rows,NIL= 9.00
Orifice discharge coefficient,Co= 0.65 Height of slot,H= inches
Slope of Basin Trickle Channel,S= 0.008 ft/ft Width of slot,W= inches
Time to Drain the Pond= 40 hours
Watershed Design Information(Input): 0 ° 0 0 ° °0° Perforated
0 0 0 o Plate
Percent Soil Type A= % 0 ° 0 0 0 o Examples
Percent Soil Type B_ 0 % 0 0 0 p o°
Percent Soil Type C/D= 100
Outlet Design Information(Output):
Water Capture Volume,WQCV= 0. watershed 4„
inches
0 0 0 0
Water Quality Capture Volume(WQCV)= 0.685 acre-feet o o O 0
Design Volume
e V1(WQQCV/12'Area'1.2)Vol= 0.823 823 acre-feet
Outlet area per row,Ao= 1.28 square inches
Total opening area at each raw based on user-input above,Ao= 1.28 square inches
Total opening area at each row based on user-input above,Ao= 0.009 square feet
3
Central Elevations of Rows of Holes in feet
Row 1 Row 2 Row 3 Row 4 Row 5 Row 6 Row 7 Row 8 Row 9 Row 10 Row 11 Row 12 Row 13 Row 14 Row 15 Row 16 Row 17 Row 18 Row 19 Row 20 Row 21 Row 22 Row 23 Row 23 E
4927.11 4927.44 1 4927.78 1 4928.11 1 4928A4 4928.78 4929.11 1 4929.44 1 4929.r8 1 1 1 1 1 1 1 1 1 1 1 1 1 Flow
Collection Capacity for Each Row of Hot"In do
4927.11 0.0000 0.0000 0.0000 0.0000 0,0000 0.0000 0.0000 0.0000 1 0.0000 0.00
4927.61 0.0327 0.0191 0.0000 0.0000 0 woo 0.0000 0.0000 0.0000 0.0000 0.05
4928.11 0.0462 0.0378 0.0265 0.0000 0.0001) 0.0000 0.0000 0.0000 0.0000 0.11
492861 0.0566 0.0500 0.0421 0.0327 0.0191 0.0000 0.0000 0.0000 0.0000 0.20
4929.11 0.0654 0,0597 0,0533 0.0462 0.0378 0.0265 0,0000 0.0000 0.0000 0.29
4929.61 0.0731 0.0681 0.0625 0.0566 0.0500 0.0421 0.0327 0.0191 0.0000 0.40
4930.11 0.0801 0.0755 0.0705 0.0654 0.0597 0.0533 0.0462 0.0378 0.0265 0.52
4930.61 0.0865 0.0823 0.0777 0.0731 0.0681 0.0625 0.0566 0.0500 0.0421 0.60
4931.11 0.0924 0.0885 0,0843 0.0801 0.0755 0.0705 0.0664 0.0597 0.0533 0.67
4931.61 1 0.0980 0.0944 0.0904 0.0865 0.0823 0.0777 0.0731 0.0681 0.0625 0.73
4932.11 1 0.1033 0.0999 0.0962 0.0924 0.0885 0.0843 0.0801 0.0755 0.0705 0.79
4932.61 1 0.1084 0.1051 0,1016 0.0980 0.0944 0.0904 0,0865 0.0823 0.0777 0.84
4933.11 1 0.1132 0.1101 0,1067 0.1033 0.0999 0.0962 0.0924 0.0885 0.0843 0.89
4933.61 1 0.1178 0.1148 0.1116 6.1084 0.1051 0.1016 0.0980 0.0944 0.0904 0.94
4934.11 1 0.1223 0.1194 0.1163 0.1132 0.1101 0.1067 0.1033 0.0999 0.0962 0.99
4934.61 0.1266 0.1238 0,1208 0.1178 0.1148 0.1116 0,1084 0.1051 0.1016 1.03
4935.11 0.1307 0.1280 0,1251 0.1223 0.1194 0.1163 0,1132 0.1101 0.1067 1.07
4935,61 0.1347 0.1321 0.1293 0.1266 0.1238 0.1208 0.1178 0.1148 0.1116 1.11
4936.11 0.1387 0.1361 0.1334 0.1307 0.1280 1 0.1251 0.1223 0.1194 1 0.1163 1.15
4936.61 0.1425 0.1400 0,1373 0.1347 0.1321 1 0.1293 0.1266 0.1238 0.1208 1.19
#WA #WA #WA #WA #WA #WA #WA #WA #WA #NIA
#WA. #WA #WA #WA #WA #WA #WA #WA #WA #NIA
#WA #WA #WA #WA #WA #WA #WA #WA #WA #NIA
#WA #WA #WA #WA #WA #WA #WA #N/A #WA #N/A
#WA #WA #WA #WA #WA #WA #WA #WA #WA #NIA
#WA #WA. #WA #WA #N/A #WA. #WA #WA #WA #NIA
#WA #WA #WA #WA #WA #WA #WA #WA #WA #NIA
#WA #WA MA #WA #WA #WA MA #WA #WA #N/A
#WA #WA #WA #WA #WA #WA #WA #WA #WA. #N/A
#WA #WA. #WA #WA #WA #WA #WA #WA #WA #WA
#WA #N/A #WA #WA #WA #WA #WA #WA #WA #NIA
#WA #WA #WA #WA #WA #WA #WA #WA #WA #WA
#WA. #WA #WA #WA #WA #WA #WA #WA #WA #WA
#WA #WA. #WA #WA #WA #WA. #WA #WA #WA #WA
#WA #WA #WA #WA #WA #N/A #WA #WA #WA #NIA
#WA #NIA #WA #WA #WA MA #WA MA #WA #N/A
#WA #WA #WA #WA #WA #WA #WA #WA #WA #WA
#WA #WA #WA #WA #WA #WA #WA #WA #WA #N/A
#WA #WA #WA #WA #WA #WA #WA #WA #WA #WA
#WA #WA #WA #WA #WA .#WA #WA #WA #WA MIA
#WA #NIA #WA #WA #WA #WA #WA #WA #WA #WA
#WA #WA #WA #WA #WA #WA #WA #WA #WA #N/A
#WA #N/A #WA #WA #WA #WA #WA #WA #WA #WA
#WA #WA #WA #WA #WA #WA #WA #WA #WA #WA
Override Override Override Override Override Override Override Override Override Override Override Override Override Override Override Override Override Override Override Override Override Override Override Override
Area Area Area Area Area Area Area Area Area Area Area Area Area Area Area Area Area Area Area Area Area Area Area Area
Row i Row 2 Row 3 Row 4 Row 5 Row 6 Row 7 Row 8 Row 9 Row 10 Row 11 Row 12 Row 13 Row 14 Row 15 Row 16 Row 17 Row 18 Row 19 Row 20 Row 21 Row 22 Row 23 Row 24
HFH22_Pond Gl WQCV_Fl Amendment.As,WQCV 5/8/2023,3:46 PM
STAGE-DISCHARGE SIZING OF THE WATER QUALITY CAPTURE VOLUME(WQCV)OUTLET
Project: Bloom Filing 1
Basin ID:Pond G1-Filing 1 Amendment
STAGE-DISCHARGE CURVE FOR THE WQCV OUTLET STRUCTURE
4938.00
0. 0 0. 0 0. 0 0. 0 0. 0 1. 0 1.0 1. 0
4936.00
4934.00
N
N
N
4932.00
N
aI
:6
4930.00
4928.00
4926.00
Discharge(cfs)
HFH22_Pond G1 WQCV_F1 AmenomentAs,WQCV 5/8/2023,3:46 PM
F_ RESTRICTOR PLATE SIZING FOR CIRCULAR VERTICAL ORIFICES
Project: Bloom Filing 1
Basin ID: Pond G1 Restrictor Plate
x o _ / — � o
0 0
'o
_i
#1 Vertical #2 Vertical
Sizinq the Restrictor Plate for Circular Vertical Orifices or Pipes (input) Orifice Orifice
Water Surface Elevation at Design Depth Elev: WS = 5.99
Pipe/Vertical Orifice Entrance Invert Elevation Elev: Invert= 0.00
Required Peak Flow through Orifice at Design Depth Q = 4.37
Pipe/Vertical Orifice Diameter(inches) Dia =1 18.0
Orifice Coefficient Co= 0.65
Full-flow Capacity(Calculated)
Full-flow area Af= 1.77
Half Central Angle in Radians Theta = 3.14
Full-flow capacity Qf= 21.1
Percent of Design Flow= 483%
Calculation of Orifice Flow Condition
Half Central Angle (0<Theta<3.1416) Theta = 1.05
Flow area Ao= 0.35
Top width of Orifice(inches) To= 15.61
Height from Invert of Orifice to Bottom of Plate(feet) Yo= 0.38
Elevation of Bottom of Plate Elev Plate Bottom Edge= 0.38
Resultant Peak Flow Through Orifice at Design Depth Qo= 4.4
Width of Equivalent Rectangular Vertical Orifice Equivalent Width =1 0.92
Centroid Elevation of Equivalent Rectangular Vertical Orifice Equiv. Centroid El. =1 0.19
HFH22 Pond G1 WQCV F1 Amendment.xls, Restrictor Plate 5/8/2023, 3:46 PM
STAGE-DISCHARGE SIZING OF THE WATER QUALITY CAPTURE VOLUME(WQCV)OUTLET
Project: Bloom Filing 1
Basin ID:Pond G
WQCV Design Volume(Input):
Catchment Imperviousness,la= 90.0 percent
Catchment Area,A= 19.50 acres Diameter of holes,0= 1.593 inches
Depth at WQCV outlet above lowest perforation,H= 3.75 feet Number of holes per row,N= 1
Vertical distance between rows,h= 4.00 inches OR
Number of rows,NIL= 11.00
Orifice discharge coefficient,Co= 0.65 Height of slot,H= inches
Slope of Basin Trickle Channel,S= 0.008 ft/ft Width of slot,W= inches
Time to Drain the Pond= 40 hours
Watershed Design Information(Input): plae
° ° ° ° Perforated
PercentTypeBFfl
Exatmples
Percent Soil Type C/D= 100
Outlet Design Information(Output):
Water Quality Capture Volume,WQCV= 0.401 watershed ,�
inches
0 0 0 0
Water Quality Capture Volume(WQCV)= 0.652 acre-feet o O O 0
Design Volume(WQCV/12'Area.1.2)Vol= 0.782 acre-feet
Outlet area per row,Ao= 1.08 square inches
Total opening area at each raw based on user-input above,Ao= 1.99 square inches
Total opening area at each row based on user-input above,Ao= 0.014 square feet
3
Central Elevations of Rows of Holes in feet
Row 1 Row 2 Row 3 Row 4 Row 5 Row 6 Row 7 Row 8 Row 9 Row 10 Row 11 Row 12 Row 13 Row 14 Row 15 Row 16 Row 17 Row 18 Row 19 Row 20 Row 21 Row 22 Row 23 Row 23 E
4929.00 4929.33 1 4929.67 1 4930.00 1 4930.33 4930.67 4931.00 1 4931.33 1 4931.67 4932.00 1 4932.33 1 1 1 1 1 1 1 1 1 1 1 1 1 Flow
Collection Capacity for Each Row of Holes In dfs
4929.00 0.0000 0.0000 0.0000 0.0000 0,0000 0.0000 0.0000 0.0000 1 0,0000 0.0000 1 0.0000 0.00
4929.50 0.0511 0.0298 0.0000 0.0000 0:woo 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.08
4930.00 0.0722 0.0591 0.0415 0.0000 0.0000 6.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.17
4930.50 0.0885 0.0781 0.0658 0.0511 OM98 0.0000 0.0000 MOW 0.0000 0.0000 0.0000 0.31
4931.00 0.1022 0,0933 0.0833 0.0722 0.0591 0.0415 0.0000 0.0000 0.0000 0.0000 0,0000 0.45
4931.50 0.1142 0.1064 0.0977 0.0885 0.0781 0.0658 0.0511 0.0298 0.0000 0.0000 0.0000 0.63
4932.00 0.1251 0.1180 0.1103 0.1022 0.0933 0.0833 0.0722 0.0591 0.0415 0.0000 0.0000 0.81
4932.50 0.1351 0.1286 0.1215 0.1142 0.1064 0.0977 0.0885 0.0781 0.0658 0.0511 0.0298 1.02
4933.00 0.1445 0,1384 0.1318 0.1251 0.1180 0..1103 0.1022 0.0933 0.0833 0,0722 0.0591 1.18
4933.50 0.1532 01475 0.1414 0.1351 0.1286 01215 0.1142 0.1064 0.0977 00885 0.0781 1.31
4934.00 0.1815 0.1561 0.1503 0.1445 0.1384 0.1318 0.1251 0.1180 0.1103 0.1022 0.0933 1.43
4934.50 0.1694 0.1642 0.1588 0.1532 0.1475 0.1414 0,1351 0.1286 0.1215 0.1142 0,1064 1.54
4935.00 0.1769 0.1720 0.1668 0.1615 0.1561 0.1503 0.1445 0.1384 0.1318 0.1251 0.1180 1.64
4935.50 0.1842 0.1794 0.1744 0.1694 0.1642 0.1588 0.1532 0.1475 0.1414 0.1351 0.1286 1.74
4936.00 0.1911 0.1866 0.1817 0.1769 0.1720 0.1668 0.1615 0.1561 0.1503 0.1445 0.1384 1.83
4936.50 0.1978 0.1934 0.1888 0.1842 0.1794 0.1744 0.1694 0.1642 0.1688 0.1532 0.1475 1.91
4937.00 0.2043 0.2001 0.1956 0.1911 0.1866 0.1817 0,1769 0.1720 0.1668 0.1615 0,1561 1.99
4937.50 0.2106 0.2065 0.2021 0.1978 0.1934 0.1888 0.1842 0.1794 0.1744 K02106
0.1642 2.07
4938.00 0.2167 0.2127 0.2085 0.2043 0.2001 0.1956 0.1911 0.1866 0.1817 0.1720 2.15
4938.50 02226 0.2187 0.2147 0.2106 02065 0.2021 0.1978 0.1934 0.1888 0.1794 2.22
4939.00 0.2284 0.2246 0.2206 0.2167 0.2127 0.2085 0.2043 0.2001 0.1956 0.1866 2.29
4939.50 0.2341 0.2304 0.2265 0.2228 0.2187 0.2147 0.2106 0.2065 0.2021 0.1934 2.36
4940.00 0.2396 0.2360 0.2322 0.2284 0.2246 0.2206 0.2167 0.2127 0.2085 0.2001 2.42
4940.50 0.2450 0.2414 0.2377 0.2341 0.2304 0.2265 0.2226 0.2187 0.2147 02065 2.49
4941.00 02502 02468 02431 02396 02360 0.2322 0,2284 0.2246 0.2206 0,2127 2.55
4941.50 02554 02520 02485 02450 02414 02377 02341 02304 02265 02187 2.61
494200 02604 02571 02536 02502 02468 02431 02396 02360 02322 0.2246 2.67
4942.50 0.2654 0.2621 0.2587 0.2554 0.2520 0.2485 0.2450 0.2414 0.2377 0.2341 0.2304 2.73
4943.00 02703 0.2671 0,2637 0.2604 02571 0.2536 0,2502 0.2468 02431 0.2396 0,2360 2.79
4943.50 0.2751 0.2719 0.2686 0.2654 0.2621 0.2587 0.2554 0.2520 0.2485 0.2450 0.2414 2.84
4944.00 0.2798 0.2767 0.2734 0.2703 0.2671 0.2637 0.2604 0.2571 0.2536 0.2502 0.2468 2.90
4944.50 0.2844 0.2813 0.2782 02751 0.2719 0.2686 0.2654 02621 0.2587 0.2554 0.2520 2.95
4945.00 02889 0.2859 0.2828 0.2798 02767 0.2734 0.2703 0.2671 02637 0.2604 0,2571 3.01
4945.50 0.2934 0.2905 0.2874 0.2844 0.2813 0.2782 0.2751 0.2719 0.2686 0.2654 0.2621 3.06
4946.00 0.2978 0.2949 0.2919 0.2889 0.2859 0.2828 0.2798 0.2767 0.2734 0.2703 0.2671 3.11
4946.50 0.3022 0.2993 0.2963 02934 0.2905 0.2874 0.2844 02813 0.2782 0.2751 0.2719 3.16
4947.00 0.3065 0.3036 0.3007 0.2978 0.2949 0.2919 02889 0.2859 0.2828 0.2798 02767 3.21
4947.50 0.3107 0.3079 0.3050 0.3022 0.2993 0.2963 0.2934 0.2905 1 0.2874 0.2844 0.2813 3.26
4948.00 0.3149 0.3121 0.3093 0.3065 0.3036 0.3007 0.2978 0.2949 0.2919 0.2889 0.2859 3.31
4948.50 0,3190 0,3163 0.3135 0.3107 0.3079 0,3050 0.3022 0.2993 0.2963 0,2934 0,2905 3.35
4949.00 0.3230 0.3204 0.3176 0.3149 0.3121 0.3093 0.3065 0.3036 0.3007 0.2978 0.2949 3.40
4949.50 0.3271 0.3244 0.3217 0.3190 0.3163 0.3135 0.3107 0.3079 0.3050 0.3022 0.2993 3.45
4950.00 0.3310 0.3284 0.3257 0.3230 03204 0.3176 0.3149 0.3121 03093 0.3065 0.3036 3.49
4950.50 0.3349 0.3324 0.3297 0.3271 0.3244 03217 0.3190 0.3163 0.3135 0.3107 0.3079 3:54
Override Override Override Override Override Override Override Override Override Override Override Override Override Override Override Override Override Override Override Override Override Override Override Override
Area Area Area Area Area Area Area Area Area Area Area Area Area Area Area Area Area Area Area Area Area Area Area Area
Row 1 Row 2 Row 3 Row 4 Row 5 Row 6 Row 7 Row 8 Row 9 Row 10 Row 11 Row 12 Row 13 Row 14 Row 15 Row 16 Row 17 Row 18 Row 19 Row 20 Row 21 Row 22 Row 23 Row 24
HFH22_Pond G WQCV_Fl Amendmentxls,WQCV 5/8/2023,3:44 PM
STAGE-DISCHARGE SIZING OF THE WATER QUALITY CAPTURE VOLUME(WQCV)OUTLET
Project: Bloom Filing 1
Basin ID:Pond G
STAGE-DISCHARGE CURVE FOR THE WQCV OUTLET STRUCTURE
4955.00
0.100 0. 0 1.00 1. 0 2.10 2. 0 1110 3.50 4.10
4950.00
4945.00
N
N
N
4940.00
N
aI
:6
4935.00
4930.00
4925.00
Discharge(cfs)
HFH22_Pond G WQC%_F7 A—drnentAs,WQCV 5/8/2023,3:44 PM
F_ RESTRICTOR PLATE SIZING FOR CIRCULAR VERTICAL ORIFICES
Project: Bloom Filing 1
Basin ID: Pond G Restrictor Plate
o I'DX _ / — � o
0 0 C
'o
_i
#1 Vertical #2 Vertical
Sizinq the Restrictor Plate for Circular Vertical Orifices or Pipes (input) Orifice Orifice
Water Surface Elevation at Design Depth Elev: WS = 7.98
Pipe/Vertical Orifice Entrance Invert Elevation Elev: Invert= 0.00
Required Peak Flow through Orifice at Design Depth Q = 13.51
Pipe/Vertical Orifice Diameter(inches) Dia = 18.0
Orifice Coefficient Co= 0.65
Full-flow Capacity(Calculated)
Full-flow area Af= 1.77
Half Central Angle in Radians Theta = 3.14
Full-flow capacity Qf= 24.8
Percent of Design Flow= 183%
Calculation of Orifice Flow Condition
Half Central Angle (0<Theta<3.1416) Theta = 1.62
Flow area Ao= 0.94
Top width of Orifice(inches) To= 17.98
Height from Invert of Orifice to Bottom of Plate(feet) Yo= 0.79
Elevation of Bottom of Plate Elev Plate Bottom Edge= 0.79
Resultant Peak Flow Through Orifice at Design Depth Qo= 13.5
Width of Equivalent Rectangular Vertical Orifice Equivalent Width =1 1.19
Centroid Elevation of Equivalent Rectangular Vertical Orifice Equiv. Centroid El. =1 0.40
HFH22 Pond G WQCV F1 Amendment.xls, Restrictor Plate 5/8/2023, 3:42 PM
_ PROPOSED MAJOR CONTOUR j
------- -------------------
\ _ ' - 4y� - - PROPOSED MINOR CONTOUR36 Gamuloway
-------------- ao�
�� - _ �\ \ - --- 82---- -- - - -- --- --- EXISTING MAJOR CONTOUR - - -4835- - -
------------------------------ L _ \ - - - - aao
' _ `\ \ - _ EXISTING MINOR CONTOUR 36 -----
° � 77 EXISTING STORM DRAIN - - - SD - - - 5265 Ronald Reagan Blvd.,Suite 210
\ - - - - - - - Johnstown,CO 80534
PROPOSED STORM DRAIN
� \ ` \ 970.800.3300
�. D21 \
\ \ PROPOSED STORM INLET 8 aaa ao� GallowayUS.com
A'•;r+••~ ` \ PROPERTY BOUNDARY
- i :'-;:•, ; � \ \\ \ � PROPOSED RIGHT-OF-WAY q0A
0.15 2.84 \ \ `\ PROPOSED LOTUNE ID ffl l
P, \ \
-------------
0.19 acres \ \
\ \ \ \ EASEMENT LINE
\ \ \ ou aoa
\ \ BASIN ID -
.. }• � 1 � '�. � �' , �,�\ `� ,� \ ; \ '\.\ � Al
2-YR RUNOFF
COEFFICIENT 0.05 pp� CIOf
2.50
\ \` \ \ ♦`\ \ 0.35 acres BASIN AREA
7 1 ♦ ` \ \ ♦\ 7/ 100-YR RUNOFF (ACRES)
,• : ti I D 1 `\ \\ \ \ ♦ COEFFICIENT
0.59 1 .37 \\ ` �. \ \ \ �.v
1 I 1 \ a�,4 \ \ `\\ \ \ l DESIGN POINT �q COPYRIGHT
i 0.73 acres ____ ::. �'' \ \ \ THESE PLANS ARE AN INSTRUMENT OF SERVICE
----- - --- ---r I- ;�, \ \ DETENTION POND BASIN BOUNDARY AND ARE THE PROPERTY OF GALLOWAY,AND MAY
(i.e.,MHFD-Detention_v4.03 and/or SWMM)
--., •r • :+ ' : ___ _ \`♦\ \ \\ ";: 4 O \ \ \ \ NOT BE DUPLICATED,DISCLOSED,OR REPRODUCED
\ \ ♦ 72 WITHOUT THE WRITTEN CONSENT OF GALLOW .
,� \\ \\ \\ \ \ ♦ \ SUB-BASIN BOUNDARY(i.e.,Rational Method) COPYRIGHTS AND INFRINGEMENTS WILL BE
-12 W - 1- - - - - W ♦ \ \ \ FEMA CROSS SECTION � anu ENFORCED AND PROSECUTED.
\\ \ �'' � \ \ \ ` _ -
\\ \ \ "' �\ \ ♦\ \ K EYMAP
ECTION
Aj
- \ ( LANDSCAPING)
.. : .: ...:.. :• :-: \ I I _ \�\ ♦`\\ \ \ 71 OVERLAND FLOW GIR I r---------I r--------1 n-----------1, - ----- , \I I I \`�� \ \\ \ \ DIRECT FLOW DIRECTION
\ I I I \ \\ \ ♦\ \ (I.E.,PAVEMENT,CURB AND
GUTTER)
I I I I I I � � I '•'I I I � I I \\ \
I I I I I I I � I I ��� I I I I . \ \ � ♦ \
4970 APPROXIMATE DETENTION POND
I I I I I I f I I \
OVERFLOW PATH 100-Year 100-Year
�r i �♦ 1► \ \\ \ \ `\ \ Detention Pond CV aGc ft Volume 1 W EL r Release Rate
I I LOT 12 I I LOT 13 I I LOT 14 I I r. \\ \\ \\ \ \ aC-ft CfS
I I I I I I I `.•. I I I I I �
I I I I I I I I I I I I I ♦♦ \
I I I I I I I I I I '• I \� \\ \ \ ♦ IRRIGATION POND LIMITS
I I I I \ \ \ '� \ \\ \\ \ `\ \ A N/A 10.5 4953.73 12.1
'' I I I L ------ - --- I I- \ � \♦ \ S \`\ ` \i` \` 67 `\ \ \ 69
B N/A 6.6 4948.31 8.6
J L-------J L-------J L----------J I I I
- \\ \ \\ \ ♦ \ \ C N/A 4.6 4944.9 13.6
I I
1 r-----------7 ---------------- }, I I .•........:
D 0.23 6.4 4946.3 0.75
%> \\ �� \\ \\ ♦\\ \ \ E 0.38 5.1 4944.16 8.9
D12
I G N/A 4.8 4933.15 13.5
I I LOT 19 G1 N/A 5.1 4936.25 4.4
// ,'' \♦� H N/A 4.4 4933 4.2
LOT 20 064
i I 1
� .
� ` '� � ♦ \ \ \ ♦ � I N/A 1.7 4930.54 0.15
48
i :•' 0.80 acres
// / I i i i - --- --_ y .'' ♦♦\ / >'� ♦\ Y ' \ SDMH H2 (PRIVATE\ BASIN SUMMARY TABLE
D3 . 1
D 21 ` :i ;. MH-ECCENTRIC (6' 0) \ `\
J , I ♦ \ \ ♦ C1oo
Tributary Area Cz t�1z-v.ar tc Iioo-v.ar Qz Qioo
` /' / I ■ I \ ♦ e \ \ ♦ Sub-basin acres min min) (cfs) (cfs
`` /' ,/ I ■I I I I I \�'•v.. }`\v/�'//,' LOT 18 I �I I I II II II 0 D1 1.37 0.59 0.73 10.8 8.4 1.7 8.5
.60
D2 3.29 09 0.74 15.9 15.9 3.6 15.50.71 D3 1.11 09 0.86 10.2 7.4 1.7 8.5// ♦\ \\ / �Q ♦\ \ ,� \ \ \ D3.1 0.71 0.60 0.75 13.2 10.7 1.3 4.0
0.75 acres / \ \ / `� \ \ \\ `�O \ \ `\ D4 1.04 0.60 0.75 - - 1.3 6.6
D5 1.13 0.62 0.77 12.8 10.3 1.4 6.6
\ I I I r I'. \`------------ I:,• I / \ /, �� \ \ \ \ D6 1.32 0.63 0.78 13.8 11.3 1.6 7.7
d{{•• I ..• , ♦\ \ \ D7 1:57 0.62 0.78 12.$ 1 D.3 2.0 9.4
r- ---, Ir' I I 1 I ' ' ` \9 \ \\\ DS 1.24 0.60 0.75 6.a 5.4 2.0 9.1
---------- •.
♦♦ �" ..♦ \\\ ♦\ Ds.1 0.17 0.79 0.79 6.1 6.0 2.3 1.7SDMH H3 (PRIVATE) �
� I --- --- --� \ \ D9 1.00 0.63 0.79 6.9 6.0 2.6 11.8
------ --- D 3 MH-ECCENTRIC (5' 0) \ \ D10 0.54 0.72 0.91 7.8 5.0 - 4.9
I LOT 17 I I ---- -- ------ ------- \ ` \` \ `\ D11 1.15 0.65 0.81 9.6 6.9 1.7 8.5
' I I �I ::• I I Jam` \ \ \ \ D12 1.48 0.64 0.80 11.6 9.4 2.0 9.4 U)
I j �� I I I ♦` ` ♦♦ ••; .♦ \ \\ D13 0.97 0.20 0.26 11.9 11.9 0.4 1.8
SDMH H1 (PRIVATE
\ \ \ \ D14 0.75 0.70 0.87 6.2 5.0 1.4 6.5 7
�' I I I �• I \ \ r H-E CCENTRIC (5' 0\ ♦ ♦ D16 1. . 0..74 8.3 57.1 1.0 4.70.69 3 0.79 10.7 9.4 1.3 5.9
SD INLET H5.1 (PUBLIC) \ � 0 7 091 2 0 2 9
L------------- 0.86 acres
INLET (10')� \ \� �� \ \ \ D17 1.07 0.72 0.90 6.2 5.0 2.1 9.6
SDMH H4 (PUBLIC) \ \ \ ♦ D18 0.37 0.25 0.31 13.1 13.1 0.2 0.8
MH-ECCENTRIC (5' 0) ♦♦ \\ \ • D19 0.62 0.79 0.99 13.3 11.4 1.0 4.5
\\ \ ` �� D20 0.60 0.82 1.00 9.2 7.5 1.1 5.3 7
UJ
LOT 16 I I +I ( I , �CA a�GQ \\ \\ \� \ \ D22 0.24 0.15 0.19 5.6 15.5 0.5.1 1 0.4 W
_J I N I I I I D13 , ,/ ��� �,o SDMH H5 (PUBLIC) \ \ \\ D21 . 1 D23 0.68 0.43 0.53 9.8 8.7 0.7 3.0 z
I I I I �� D3 oG0 MH-ECCENTRIC (6' �O. D24 3.02 0.15 0.19 5.0 5.0 1.3 5.6
~ O o
•�: s � \ \ ,�,• OS1 0.70 0.4a 0.55 9,0 7.8 D.7 3.3
LJJ I BLOCK 21 I I I ( \>0`� its RCP (PUBLIC) \` \` \` \\ \ \�� OS2 054 035 044 90 81 04 20
I I I I L-------- _ SDMH H6 PUBUC Q U
0.20 ------ ------ GQ` SD INLET H5.1A (PUBLIC) ',• ♦ D 2 \ \� 2 84 OS3 0.85 0.33 0.41 12.4 11.8 0.6 2.6 O f
I I 0.97 ,. - NTRIC (5' 0) - ( \ \ \�G', Z
MH ECCE OS4 0.29 0.46 0.57 5.0 5,0 0.4 1.7 _
• � �,�g I CDOT TYPE R INLET ... \\ \\ OS5 0.15 0.79 0.99 5.0 5.0 D.3 1.5 '^
o ;: I I 0.26 acres �,�� D4 I `\ `\ 0.19 acres OS6 D a3 0.75 8.2 7.2 0.6 2.9 w -
J I r ---- 1 ■ I I Q�� I \ \ \ \ OS7 0.41 0.57 0.72 S.a 7.4 0.6 2.6 J..•')j •-,• 8U„w II IjvII •'. ...iiIl-,`•_`.�-•..;-<-.-•.::-.;-
•.•-•..'-,,-`'-•::--,••-':-s'�-:.w.-. '-J:iIIj II ��• II.• y`:'=.'.".'. IIIIIII IIII � I� I� D 11 2. ..•:II: "•• ,_ :.;, :: '• 's•:: ".: ' SRDC MP �FU a Fi' t /' , IjIIII I1IIII ♦ ..
\ \\ \\\ \ \ \\
1
\
E2 096 076 0.955 6.0 5.0 2.0 9. w ULOT15 0.59 E3 0.80 0.68 0.85 10.7 9.4 1.2 5.43.2Q E3.1 0.80 0.68 0.85 10.7 9.4 1.2 5.4 0 JG
O
16" RCP (PUBLIC) SDMH H7 (PUBLIC) 0.74 acres E4 0.40 0.22 0.28 10.3 9.8 0.2 0.9
1.07 as a 5.0 sMH-ECCENTRIC (5' m) \ 1.1 4.9 H8 (PUBUC) D5 36A FES \ E7 1:03 074 092 5.0 O
MH-ECCENTRIC (5' 0) E8 035 0.21 0.27 10.4 9.9 OE9 1.07 0.72 0.90 5.0 5.0 2.2 9.6I7 E10 1.03 074 093 5.0 5.0 2.2 9.5
BC) 0.68 8.8 7.9 0.5 2.3SD AREA INLET H9 (PU 062 1 .13 E11.1 0.34 0.68 0.85 7.9 6 7 0.6 2.7 4CDOT-TYPE 13 COMBO INLET (TRIPLE) 0.77 acres E12 0.44 0.79 0.99 7.2 5.9 0.9 4.1D4 LJU
D21M E12.1 0.21 0.94 1.00 5.0 5.0 0.6 2.1
`'J E13 0.59 0.15 0.19 10.1 9:$ 0.2 0.9
( '°;•' ' ' I \
: • 0.5 2.2
1 I f :,•:• I �•. ..:.. ,� �^.II L � III .1. • � _ - I I ♦ \)I I J X O
EE1146.1 11..:.3000 00...8105 001...081091 11940.2...0$ 1
104...08 2.3
9 1410...220O60 CDOT-TYPE C INLET (35 E15 057 082 1.00 144 123 0.9 4.1
_ Date
Issue
Description
A Init.
� - E15.1 0.56 0.80 1.00 10.0 10.0 1.0 4:3
---_-_ -
---------------, 0.75 acres E17 059 0.65
24" RCP (PRIVA 0.55 0.69 10.1 8.8 0.5 2.3
P
1 05/1012023 F1 AMENDMENT JEP
.: II LOT 1 _ _ ---- -
_ -�- _ I r I I E18 0,41 0.55 0,69 7.8 6,6 0.6 2.6
ui
E19 2.72 0.80 1:00 10.0 10.0 1 4.8 21.0 -
__------- _---_- --J I I I I I _ Lli
E20 0.74 0.76 0.95 15.7 15.7 1.0 4.5
I I I -------------------- ----- I I I E20.1 0.23 0.76 0.96 8.5 7.0 0.4 2.0
BLOCK 22 ( I I ------------ -------------- I \v ~• I r- ---- ----------- E21 1.04 0.20 0.26 14.0 14.0 0.4 1.8
E22 0.99 0.76 0.96 5.0 5.0 0.4 9.4
I I I I I E23 0.99 0.77 0.96 5.
-----
J - L---- ------- • I I - - - / I - - - - - - - I- _ E24 U. 0.54 0.67 12.8 11.6 0.8 3.6
I I I I I r-----------------1 I I \ I I -
I w E2a.1 0.36 0.67 0.84 11.6 9.a D.5 2:4
E25 0.74 0.78 0.98 14.0 13.3 1 1.1 5.0
E25.1 0.19 0.62 0.78 9.8 8.5 0.3 1.2
e LOT 2 i i / i I ///��� W I I I I I E26 2.39 0.80 1.00 10.0 10.0 0.3 18.5
E26.1 0.72 0.80 1.00 10.0 10.0 1.3 5.5 -
;:�I I I I I E27 0.33 0.69 0.86 6.5 5,0 0.6 2.9 _
I„I„I E28 0.84 0.76 0.95 14.6 14.6 1.2 5.3
E29 1.77 0.15 0.19 5.0 5.0 0.8 3.3 _
J I I Ij_• I I ` LII ---------
------ II III II
E30 1..04 0..77 0...97 15..7 15..7 1.5 6.40.63 �
r ---------------- D 7
1 .32 A-G1 1:91 071 088 186 186 2.3 9.9
LOT3 0.78 acres A-G2 020 0.76 094 5.0 5.0 0.4 1.9
-
N A-G3 1.15 0.78 0.98 16.5 16.5 1.6 7.0
Y I • I I 1 y L` N .� I I I I ' L-- ---------- _------ ------- ________ '• L A-G4 1.15 0.79 0.99 17.7 17.7 1.6 6.9
i SO INLET E3.1 A-G5 0.87 0.54 0.68 13.4 13.0 0.9 4.1
-------- (PUBLIC ) -
`t •a 0.62 I ;: �, :. 6 (PU LIC) _ T (10'), A-G6 0.83 0.58 0.73 11.1 10:0 1.0 4.6
..:•'• :. T TYPE R INLE �.�.i,. ...:;.•..
L_______________J 1 .57 I D6 __: SD INLET E L ( ),' CDOSDMH E3 (PUBUC) c�
.J I :'•' I I i• ' � � •� � •' •• � CDOT-TYPE R INLET 10 G5 0.34 0.77 0.96 9.0 7.6 0.6 2.9
G
a �, G6 0.37 0.77 0.96 9,0 7.6 0.7 3.1
I ----------------, i +'. I 0.78 acres I SDMH E5 (PUBUC) MH-FLAT TOP (T0) m Gs1 Day 9.0 7.6 0.8 38
z I I I I I n� p� G7.1 0.42 0.81 1.00 8.7 7.3 0.8 3.7
I I I I LOT4 I I I �� SD INLET E5.1 (PUBUC) -tea J MH-FLAT TOP (6'0) SD INLET E3.1A (PUBUC) �7 0.46 0.78 0.98 6.8 5.4 0.9 4.4
CDOT-TYPE R INLET (10') G8 0.48 0.78 0.97 6.9 5.5 1.0 4.5 Project Na: HFH000022
CDOT-TYPE R INLET (10')
X 38" HE-RCP (PUBUC) 29" X 45" HE RCP (PUBLIC) 3' X 60" HE-RCP H1 0.44 0.77 0.97 7.3 5.9 0.0 4.1 Drawn By: JKD
■ ■ � . ■ . ■ � ! /. W EV■ .^ 1 IC� -- M O.92 0.80 1.00 7.3 5.8 1.0 8.9
H3 0.92 o.s0 1.00 7.3 5.s 1.o s.s Checked By: JEP
MATC H L I N E-SEE SHEET C, 0. 1 NOTES: Ha 102 0.80 0.99 7.4 5.9 1.9 9.7
1, PORTIONS OF THIS PROPERTY ARE LOCATED IN THE FEMA-REGULATED,100-YEAR COOPER SLOUGH FLOODPLAINIFLOODWAY AND MUST COMPLY WITH THE SAFETY REGULATIONS OF CHAPTER 10 OF Date: 11.07.2022
U FUT-A 5600 0.80 1.00
CITY MUNICIPAL CODE. FUT-B 15.30 MO 1.00
2. THE DEVELOPER SHALL OBTAIN A FLOODPLAIN USE PERMIT FROM THE CITY OF FORT COLLINS AND PAY ALL APPLICABLE FLOODPLAIN USE PERMIT FEES PRIOR TO COMMENCING ANY CONSTRUCTION FUT-C 22.00 o.so 1.00 DRAINAGE PLAN
NOTES CONTINUED:
ACTIVITY(BUILDING OF STRUCTURES,GRADING,FILL,DETENTION PONDS,BIKE PATHS,PARKING LOTS,UTILITIES,LANDSCAPED AREAS,FLOOD CONTROL CHANNELS,ETC.)WITHIN THE COOPER 5. AN APPROVED FEMA ELEVATION CERTIFICATE COMPLETED BY A LICENSED SURVEYOR OR CIVIL
SLOUGH FLOODPLAIN LIMITS--.STORAGE OF EQUIPMENT AND MATERIALS(TEMPORARY OR PERMANENT)IS NOT ALLOWED IN THE FLOODWAY.ALL ACTIVITIES WITHIN THE FLOODPLAIN ARE SUBJECT TO ENGINEER SHOWING THAT THE BUILDING IS CONSTRUCTED TO THE REQUIRED ELEVATION IS REQUIRED
THE REQUIREMENTS OF CHAPTER 10 OF THE FORT COLLINS MUNICIPAL CODE. POST-CONSTRUCTION PRIOR TO A CERTIFICATE OF OCCUPANCY(CO)BEING ISSUED.PLEASE NOTE:
3. CRITICAL FACILITIES ARE PROHIBITED IN THE 100-YEAR FLOODPLAIN.CRITICAL FACILITIES INCLUDE ESSENTIAL SERVICES,AT-RISK POPULATION,HAZARDOUS MATERIALS,AND GOVERNMENT IF ANY PART OF THE BUILDING IS WITHIN THE FLOODPLAIN BOUNDARY,THEN THE ENTIRE STRUCTURE 0 0
FACILITIES. IS CONSIDERED IN THE FLOODPLAIN AND THE ENTIRE BUILDING ENVELOPE MUST MEET THE
4. CONSTRUCTION OF NEW STRUCTURES,HARD SURFACE PATHS,WALKWAYS,DRIVEWAYS,WALLS,AND PARKING AREAS IS PROHIBITED IN THE FLOODWAY UNLESS NO-RISE CONDITIONS ARE MET.ANY REQUIREMENTS OF ELEVATING TO THE RFPE. 0 10 20 50
CONSTRUCTION ACTIVITIES IN THE REGULATORY FLOODWAY MUST ALSO INCLUDE A NO-RISE CERTIFICATION PREPARED BY A PROFESSIONAL ENGINEER LICENSED IN COLORADO. 6. ALL BASE FLOOD ELEVATIONS ARE BASED ON NAVD 1988 DATUM. �■■ - Know what'sbel ow. C1 0 , 0
z
SCALE:1"=50' Call beforeyoudig.
ii
MATCHLINE-SEE SHEET C10.0W-W-ULPRWFFIL m m m -_ Gammoway
-, r-----------------I I 0.78 acres i SDMH E5 (PUBLIC) MH-FLAT TOP (T0)
j LOT 4 I I : I I I v �°� - - 5265 Ronald Reagan Blvd.,Suite 210
t I �� SD INLET E5.1 (PUBUC)�-tea MH-FLAT TOP (6'0) SD INLET E3.1A (PUBLIC)
I I I I I C CDOT-TYPE R INLET (10') Johnstown,CO 80534
I I I I I CDOT-TYPE R INLET (10') - v -
970.800.3300
R14N
- �IE-RCI
Gallow y S com
E" X (PUBLIC) �29" X 45" HE RCP (PUBUC) 8" X 60" aas aaa
_J I : I . :•�-:: .:• : : ••'.:: •.�• H E4 (PUBLIC) • }: - .
38" HE RCP (PU C)
} �---------------� i i - - --- ------- - - ------ ------- D8 I -FLAT TOP (6,0) . . .. RCP (PUBUC) : mil
- --____-- --- -------- - ------ ------- [
.. ... ...:. ....
r----------------� i i i i ---- , - - I, I•
LOT 5 I I I I I I I I _1W
N I
IUl
I I y I I I D10I I D 8 - -_
I
I I I I I I I I 0.6 qob
I I I I ' I D8 . 1 'I I I I I ` ' I 8 q021 .24D 14 0.720.60 ; ■
' LOT 6 I I 0.54 ; 0.75 acres 0.79
0.91 acres 0.17
0.70
�I I � 0.99 acres 0.75
- L_______________� i --- - ---- ----------------------- - 0.87 acres - -- ----- -------- ----
.:
I -- - ---- ------------------- ----- --- --
I
SDMH Z5 (PUBLIC) i I n i i ■
I J BLOCK 22 i I I I / MH ECCENTRIC (5' 0) I D �/ I I Iv �
`. ��//
SD INLET Z5.1 (PUBLIC) 24" RCP (PUBLIC);D INLET Z6 (PUBLIC) I I
_J / i I SD INLET 1-A (PUBUC) COPYRIGHT
_______________J I :•,, I I CDOT-TYPE R INLET 10' CDOT-TYPE R INLET (10')
I CDOT-TYP R INLET (10')
r----------------, I I 18" RCP (PUBUC) I { THESE PLANS ARE AN INSTRUMENT OF SERVICE
I I I '• I I � I._I II AND ARE THE PROPERTY OF GALLOWAY,AND MAY
LL_ LOT 8 \ s I ' ; 1 ,56 I 18" RCP (PUB )SD INLET Z2.2 (PUBUC)\ NOT BE DUPLICATED,DISCLOSED,OR REPRODUCED
I I I I I I D7 = I I 0.79 acres I CDOT-TYPE R INLET (10) ■
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
COPYRIGHTS AND INFRINGEMENTS WILL BE
I I I I = I I I 18' RCP (PUBUC) ■ gaff
I n? I I I I m I ENFORCED AND PROSECUTED.
I ••`. � :1 I I � ': I I � ; e m � � I I I SDMH Z2.1 (PUBLIC) .-. �
( I --- __J v ' ____-�_-- ' I-- MH-ECCENTRIC (5' 0) _ K YMAP
------------�- L------- , - ----- -- --
:.
`--------------1 --- ------- -------- --- --- --- ------- m D14 M
D 13 D" •'SD INLET Z3.1 (PUBLIC) �i� I 0
� CDOT-TYPE R INLET (10) r
N r , PROPOSED MAJOR CONTOUR
., V
- -r ` -_->� - a _____ _____ ___ __ PROPOSED MINOR CONTOUR 36
I I \ SDMH Z4 (PUBLIC) c� F-----------
=MH-ECCENTRIC (5' 0) m I J SDMH Z1 (PRIVA■ EXISTING MAJOR CONTOUR
-- -4835-- -
- - - X 38 HE-RCP BUHE-RCP - - - - CCELli
-
» � co � MH E NTRIC f
a (PU C) SDMH Z3 (PUBUC) a X 45" (PUBLIC) I - 29" X 45" (PRIVATE)- EXISTING MINOR CONTOUR
24"
: .. . ..;•:r•... Y .•.:.. :::.•..., H / S H Z2 (PUBLIC) - - - SD - - -
•.L :.. .. •......... :. . :•.•..•. :•; :.. -.:_,. -., :.M. FLAT TOP. ... _ STORM DRAIN
--- 1 r-----1 r-----1 F--- - ---t - -- - -- • __-- _-- SD INLET Z3-A (PUB °° 1 H-FLAT TOP (6'0) 18 . 1
= EXISTINGZl ---NONNI Nonni t-- D5 - 1 r^ PROPOSED STORM DRAIN
I I I I I I I CDOT-TYPE R INLET ( 0') ; I ,- V J
I I I I I I D18 I i • � :2 1-- PROPOSED STORM INLET Ea
' D 16 I I ? ',:`'••° ; O.4 0 ■ W PROPERTY BOUNDARY
LOT 5 I I LOT 6 I I LOT 7 , I LOT D 17 I I \ I i I I '` '•
15. I 2.22 ■ W PROPOSED RIGHT-OF-WAY
:• I \ I I ' I '{ I 1 .00 acres PROPOSED LOTLINE
0'25 0.37 0.72 D150.72 1 .06 ` ' -' W EASEMENT LINE
--------------
1 .07 D 16 I z
0.31 acres _ 0.91 acres - `�
' ' 0.90 acres
S AREA INLET (PRIVATE SD AREA INLE IF4-A.2 P ATE I J
) D 17 0.61 ( ) BASIN ID
_-�� :� I AP A-CIRCULAR IN T (24" 0) 0.86 ----- - t APWA-CIRCU R INLET (18" ) ' ■
- - - - *. -- 76 Al
!fl --- --- 0. acres - - -----�-- ■
I 18" RCP RIVATE)
18" RCP (P ATE)' � •
�:•:: ---- - ------- ---- rJ I 2-YRRUNOFF
----, r----_, r----- $ gp SD AREA INLET 4-A.1 PRIV COEFFICIENT
AR ATE) I F ( ATE) ;: I ` I Q 0.05
D 5 ■ r��- A -CIRC R INLE 24" 0 APWA-CIRCULAR INLET (18" 0) . :; I I i 0.35 acres
I I I I osi I I BASIN AREA
I I 100-YR RUNOFF ACRES
_OT 12 ; ; LOT 11 ; ; LOT I \ I I I COEFFICIENT
0.63 '
0.44 0.70 I r. 0.9 I \ ` \ I :� rJ �� D 19 ■
BLOC 24 0.55 acres _ i I I 0.79 acr s 0
a: � ` � DESIGN POINT A
----1 L----- J L-----J U- - - - }- - - 0.79
- -- ---- --- -- ---- - ---- ----------- --- --- ------------- HFD Detente BASINDETENTION POND BOUNDARY
and/orARY
__ I
ii:
.. .:.
.. I
i.e. on v
62
0 acres
SUB-BASIN BOUNDARY(i.e.,Rational Method)
W- -$ w I I S4 \ FEMA CROSS SECTION - z
--$""" SDMH F6 (PUBLIC) r��� r��� OVERLAND FLOW DIRECTION
MH-ECCENTRIC (4' 0) �_ _�
r I I � 53 � 52 51 4955 (I.E.,LANDSCAPING)
I I 18" RCP SDMH F5 (PUBLIC) 24" RCP (PUBLIC) SDMH F4 (PUBLIC) --36" RCP (PI'• J) -42" RCP
':•:•:•:. .•. .:.•. .•....•. EN CURB- _ E20 . 1 LE,PAVMH ECCENTRIC (4' 0) --� ME 6' 0 __� SDMH F3 PUB (IRECT FELMW DIRCECTIO Mw H ECCENTRIC (6 R)
- (PUBUC)
-�--I- --- - .,-- ------ --T - ---- ---- 4----- - ------ ---- ---- --- --- - z
w
I I I I I I I r I I i S - ---------- APPROXIMATE DETENTION POND 0
I I I I I I I I I j E3 . 1 I I 0.67 1 .11 OVERFLOW PATH 0
0 � _
LOT 7 i i LOT 8 i i LOT 9 i 4 I I I I a ' I ,: , 0.83 acres z cn
OS2 �: `�► ' I I I I I I IRRIGATION POND LIMITS w -
I I I I I I �: is I 0.690.71 cc D20 - . > J z
II II L'" 0.86 acres ■ p o
I I NOTES:
I I I I I I 0.41 0.68 ' SD ARE T F5.2 ( VATE) • I ; p
I I I I I �,.; E 3
____�� ' APW IRCULAR INLET 18" 0 IN T F4.2 (PRIVA ) - 0
_____� L_____J �_ � .• O 82 1. PORTIONS OF THIS PROPERTY ARE LOCATED IN THE FEMA-REGULATED, COOPER SLOUGH FLOODPLAIN/FLOODWAY MUST J
0.51 acres i ;.,- �II-_ _� -___- A-CIRCU R INLET (1 0) ' '- N 0.60 COMPLY WITH THE SAFETY REGULATIONS OF CHAPTER 10 OF CITY MUNICIPAL CODE ~
SO AREA INLET F5.1 PRIVATE `
( ) 18" RCP (PRIVA E) 1 .00 acres
s
I I --- APWA-CIRCULAR INLET (18" 0 _ __ i 2. THE DEVELOPER SHALL OBTAIN A FLOODPLAIN USE PERMIT FROM THE CITY OF FORT COLLINS AND PAY ALL APPLICABLE FLOODPLAIN USE z J 0
.; N ` I I I v T 0.72 1 •07 18" RCP ( IVATE) E2 7 i PERMIT FEES PRIOR TO COMMENCING ANY CONSTRUCTION ACTIVITY(BUILDING OF STRUCTURES,GRADING,FILL,DETENTION PONDS,BIKE U_ m U_
r-----, r-----, r-----, � � I I .' ., ::..,....: ----- ----- 0.76 0.96 . :..:. ac3es
I I I 0.90 acre I 0,60 PATHS,PARKING LOTS,UTILITIES,LANDSCAPED AREAS,FLOOD CONTROL CHANNELS,ETC.)WITHIN THE COOPER SLOUGH FLOODPLAIN
E 1 AREA INLET F4.1 (PRIVATE) { I E3• r:, LIMITS--.STORAGE OF EQUIPMENT AND MATERIALS(TEMPORARY OR PERMANENT)IS NOT ALLOWED IN THE FLOODWAY.ALL ACTIVITIES WITHIN
APWA-CIRCULAR INLET (18" 0) 1 THE FLOODPLAIN ARE SUBJECT TO THE REQUIREMENTS OF CHAPTER 10 OF THE FORT COLLINS MUNICIPAL CODE,
F3-B (PU
j LOT 12 I I LOT 11 I I LOT 10 I I I : •r I I I i I I 1 I '• CDOT-TYPE R INLET 10' I 3. CRITICAL FACILITIES ARE PROHIBITED IN THE 100-YEAR FLOODPLAIN.CRITICAL FACILITIES INCLUDE ESSENTIAL SERVICES,AT-RISK
I I I I I I :•I I I I I I ( )
RCP (PUBLIC) POPULATION,HAZARDOUS MATERIALS,AND GOVERNMENT FACILITIES. # Date Issue/Description Init.
i I I I I II I v =��► I I � ' ^ I T ■ 4. CONSTRUCTION OF NEW STRUCTURES,HARD SURFACE PATHS,WALKWAYS,DRIVEWAYS,WALLS,AND PARKING AREAS IS PROHIBITED IN THE o2.13.2023 ENGINEERS STAMP ADDED JEP
I I I I I I I I - I I I • I I I S-217 (PUBLIC �
( ) ■ 0 1 05/10/2023 F1 AMENDMENT JEP
BL CK 26 I I �I I - - - I I i FLOODWAY UNLESS NO RISE CONDITIONS ARE MET.ANY CONSTRUCTION ACTIVITIES IN THE REGULATORY FLOODWAY MUST ALSO INCLUDE A
I. I, I C OT-TYPE R INLET (10')l 20
I I I I I I I I I I ; I U NO-RISE CERTIFICATION PREPARED BY A PROFESSIONAL ENGINEER LICENSED IN COLORADO.AN APPROVED FEMA ELEVATION CERTIFICATE
L_____J L_____J L_____.� I _ __ I_ ��' __---_ ' ___s2 __ ____ ___ _1--L fit ;� �- _- 1 l \ ----�_ I -- _ COMPLETED BY A LICENSED SURVEYOR OR CIVIL ENGINEER SHOWING THAT THE BUILDING IS CONSTRUCTED TO THE REQUIRED ELEVATION IS -
' I •• •••"''' -••'> •'- �.•.•:. N• • •' ' • - .. J �•• � � REQUIRED POST-CONSTRUCTION PRIOR TO A CERTIFICATE OF OCCUPANCY(CO)BEING ISSUED.PLEASE NOTE: IF ANY PART OF THE
I W BUILDING IS WITHIN THE FLOODPLAIN BOUNDARY,THEN THE ENTIRE STRUCTURE IS CONSIDERED IN THE FLOODPLAIN AND THE ENTIRE
-g w I ■ W BUILDING ENVELOPE MUST MEET THE REQUIREMENTS OF ELEVATING TO THE RFPE. -
�S _ E25
- 5. ALL BASE FLOOD ELEVATIONS ARE BASED ON NAVD 1988 DATUM.
S 51 N SDMH 12-A.6 (PUBUC' -
T I 2 52 \ \ MH-ECCENTRIC (5' 0
�I E8 '7 0.74 24 W
__�..r------ --- Ex- 1 --F- - --- - --- --- --- --- --- --- ---- --- - - -- - --- 0.98 acres
I ■ -
1I I I I �•
I I I I 0.41 ' ,: • I f ' I >� 1 ■ z -
Y I I LOT 7 I I 0.68 I El 1 . 1 I .
I I I I 0.51 acres I I 0 I ,
�•I I I
w I I I I � qh ::: '' .'
0.68
I I I I I g I I I ,.. ---- ;.I '� '' 0.34 ---- -- ---- ---- ---- Project No: HFH000022
II II . - E6 - 1
4
__J L_______J � � I I ' II i SD AREA INLET 16.3 0.85 acres --- 0.21 0.35 IRR �, ___ - - _ ■ Q
Q I E22
Drawn By: JKD
_• Q I APWA-CIRCULAR INLET (18" 0) ■
I '
= I I I '. CC
I I I I I I I I I I A I VATE)
Checked By: JEP
I I I I I I r E 2 Date: 11.07.2022
I ; I APWA-CIRCULAR INLET (18 0
w I ' E5 0.85 acres
_ I I 1 I I E 9 `` SD AREA INLET 16.1-A
1 i i LOT 10 LOT 9 i N I I i ' I J APWA-CIRCULAR INLET (18" 0) \ _ 0.76 0.99
..
I I _ DRAINAGE PLAN
C =�- -- ---------- --------
■ I ■ �r ■ I ■ ■ - - �� ■ 0.96acre
MATCHLINE-SEE SHEET C10.2
U 0
LL 0
O
y
0 10 20 50
Knowwhat'sbelow. C 10 ,
z
SCALE:1"=50' Call beforeyoudig.
ii
MATCHLINE-SEE SHEET C10. 1 Gan owa I,• LLI E5 0.85 acres I 5D AREA INLET 16.1-A \ I c -- - 5265 Ronald Reagan Blvd.,Suite 210
i I I I APWA-CIRCULAR INLET (18" 0) _ O'76 - 9
I LOT 10 : ' LOT 9 i C I i I I i _ I ---- 0.99 - Johnstown,CO 80534
I
I I I I I J I I E 5 ------ ------ acres = 970 800 3300
6••.�• 0 9 a
Q .�
rG I I I I :� «I' •I.•r E 9 �� %I `+i GallowayUS.com
L
I I 1 I 1 I I I I i SDMH'-6 I (PUBUC) ■ _
B OCK 28 I is j n I I I MH-ECCENTRIC s 0 n n 1if11
I I I I " SO AREA INLET 16.2 ( ) -
I I I I I 0.72 _ : 24" RCP (PRIVATE) _ LSD AREA INLET 16-A.1 (PRIVATE) -
? I ;:
1 ,07 -CIRCULAR INLET (18" 0) 0.72 - - - - APWA-CIRCULAR INLET (18" 0) II II Llllll
_J L-------J -------� I
0.90 acres 24' RCP i 1 .07 24" RCP I `
• I . ;•.:::'•' '.; � '• I SD ARE INLET 161 I '� « `>,• 'I I i'I
0 acres APWA- C1l/ NLET 18" 0
IOU
,o „ I I II I I ; L�� I E24 I ,
W- I I F
-$ w
I
0.54 0.73 17,rJ
■
SD AREA IN T IS-A.2 (PRIVATE) I 0.67 acres SD AREA INLET 15.1 (PRIVATE)
12
I •'q. �: , . '" I I SD AREA INLET 15-A.1 PRIVA I APWA-CIRCULAR INLET 18 0 aa� aiw
-, I--------- ----- I F APWA-CIR LAR INLET (18" 0) I I APWA-CIRCULAR INLET (18" 0) ( )CULAR T
v
■ I I 30" RCP (PRIVATE)
y1 I 24" RCP (PRIVATE) i 0.79 i SDMH 15 (PUBLIC)
-- a ■
0.74 v 0.44 1 ( ) SD AREA INLET 15.2 (PRIVATE) v �'
•:' 1 .03 APWA-CIRCULAR INLET (18" 0) E 2
I I MH-ECCENTRIC 6 0 LOT 7 ; ; LOT 8 0E10 .99 acres .: ( ) � �
OS3 0.92 acres
�-
AREA INLET 15-A.3 (PRIVATE) .. . ' ..
Ii NPWA-CIRCULAR INLET (18" 0) --- I : I • N ------- " :N COPYRIGHT
T I THESE PLANS ARE AN INSTRUMENT OF SERVICE
';'• i '� i SD AREA INLET 15-A.1-A (PRIVATE).' �:
I I I I 0.33 0.85 I I E7 I I APWA-CIRCULAR INLET (12" 0) �'' .- E23 0.77 0. AND ARE THE PROPERTY OF GALLOWAY,AND MAY
O :• L
0.74 _ 96 ® NOT BE DUPLICATED,DISCLOSED,OR REPRODUCED
.
__ �______-i �___-____� I I �' : 1 i 1 .03 I <a aci WITHOUT THE WRITTEN CONSENT OFGALLOWAY.
0.41 acres ;: 1 I f' 1 I 1 I COPYRIGHTS AND INFRINGEMENTS WILL BE
:.: :; I •. I E 1 0 SD INLET 14-A.1 (PUBUC) I �
I I S I SD A I .,~C) I �pnts ENFORCED AND PROSECUTED.
I
I I I I I -
I -- -- -- I I _ ___ _ M -ECCENTRIC (8' 0) N K YMAP
i
18" RCP (PUBUC) . ..•.. .... •. .,. _ ___---
DO
--- -- - INLET 14.3-1 (PUBLIC) ---- - -- ----
LOT 9 i I INLET 14.4 PUBLIC
LOT 10 i i i I IT- R I (T (10') 18" RCP (PUBLIC) :. -TYPE R I T (10' _
I I I I I I - 24" RCP (PUBUC) PROPOSED MAJOR CONTOUR
El 0.84 acres 36
11.1 " - SD INLET 14-A.2 (PUBLIC) PROPOSED MINOR CONTOUR
B, OCK 30 I f E6 I m "CDOT-TYPE R INLET (10') CDOT-TV --
0.55 EXISTING MAJOR CONTOUR -4835-- -
,;
I I I I 0.46 0.29 m - ---_ ` - EXISTING MINOR CONTOUR
-J L-------J -------�� I �. - +-v r - 9 --- --- ; � acres ___-r1----�J - � ---r�---- ---J L EXISTING STORM DRAIN U - - - SD - - -
/. / } SDMH 14.2 (PUBLIC) 0.68 z --•S 210 (PUBLIC)
,' . ::: :.;..:.
:•:: �.=:-•. ..�.:.••. ••.-'__ .;. ••�..--•••.' 0.57 acres • ... .; ..,......:...y....::,....::•.:� .. . :..., � MH-ECCENTRIC 8 0 ...:.;. . , .. . . •, . :• CDOT-TYPE R INLET (10').•..:.•.• :.. - .•_•:�•:
/ I ( )' "' SD INLET 14.1-A.1 (PUBUCo _ PROPOSED STORM DRAIN
610 E 11 CDOT-TYPE R INLET (10')J`n 24.1 " (PUBLIC)m x PROPOSED STORM INLET Ea
-8 W � SDMH I-3A PUBUC
v SDMH 14.1 (PUBLIC) M ' ° MH-RECT. FLAT TOP (9' X 9') �� ■ PROPERTY BOUNDARY
MH-ECCENTRIC (8' 0) PROPOSED RIGHT-OF-WAY
a > co 1 PROPOSED LOTUNE
• I I 36 RCP BU - 43 X 68" HE-RCP PUBUC)-- 43 BUC)
" X 518'HRCPr(PUBUC)�) SDMH 14 (PUBUC) EASEMENT LINE --------------
II .. . . �-.. ,y...•. . ,. .. .. •. ... :.... MH-RECT ....-..: .;..
N
�. .. ... . .. 251
--1 r---------i r------ - --- ---- -------------- _ SD INLET 14.1-A (PUBLIC) . FLAT TOP (9' X 9')
-----
� I I � .� ---------------------- ----CDOT-TYPE R INLET (10') ( T- ..:• ----�,
BASIN ID
I I I I I V I II I\ I E14 . 1
E 2
LOT 7 LOT s i I I I Wl
El 2 . 1 I r Al
I I I I j I ; \� II - I II 0 2-YR RUNOFF
0.80 COEFFICIENT
OS5 1 .3 �� = 0.69 .33 Uo.052.50
1 .00 acresE140.94 I . , 0.35acresBASIN AREA
0.21 I 0.86 a res 100-YR RUNOFF
� (ACRES)
1
I I I I I ' I I I 1 .00 acres I I ; �II ' _ W COEFFICIENT
L-------J L--------J I I I 0.79
.SO D INLET E R INLET
I I 0.15 c o -TYP 1 (10') W
0.99 acres 0.65 0.30 i 1 i SDMH J4.1 (PUBLIC) ■
0.62 DESIGN POINT A
- - - -2, SS I d 0.81 acres I -EC 1C V J
! El 5 . 1
N I E 16 \il 6 . 1 I •• � 0.78
DETENTION POND BASIN BOUNDARY
■ I� W i.e.,MHFD-Detention_v4.03 and/or SWMM
li - i .:� = 18" (PUBLIC E 2 7 'w/� ( >
0.80 24' RCP (PUBIJ SUB-BASIN BOUNDARY i.e.,Rational Method
1 .15 .8 ( )
I I I I I I I ' SD INLET J4.2 (PUBUC) 0.72 W
`I «: 1 .0 acres 12.1 CDOT-TYPE R INLET (10') ■
OS6 �
_ E 5 � .00 acres FEMA CROSS SECTION - z
------ ----- ---------- -------- -------------------
' = l fY' ' ' z
.'_.f s. " :',;•. `: --------- -- ----- - OVERLAND FLOW DIRECTION
y ..
�.
0.60 ":.:: .. r.<.. : .e.. 0.82 ;j¢ -TYPE (I.E.,LANDSCAPING)
5D INLET J5 A (PUBLIC)
I� 0.43 - - -� - - - - - - - - - - - � - 0.57 _ _
CDOT R INLET (10')
I v - - - - - - -J E 15 - - - == - - - -,: z-_ - - - - ' ' U DIRECT FLOW DIRECTION
i I 0.75 acres SDMH J7 (PUBLIC) 1 .00 acres SDMH J5 (PUBLIC) •- v - - - - - ■ (I.E.,PAVEMENT,CURB AND z
°2 CENTRIC (5' 0) a SDMH J4 (PUBUC) GUTTER) L U
W -- [ �, I _ MH-ECCENTRIC (8' 0) Q LJJ
•' 9 SDMH JE �v -ECCENTRIC 8' 0) _ - - C C z
-W- I I -( ) - MH'ECCENTRIC (5' 0) `� X 45" HE-RCP PUBUC °O SDMH J3 (PUBUC) G G O
vv N/ W 24" RCP PUBUC °O C°" ( ) 34" X 53III 1� - APPROXIMATE DETENTION POND- 24" RCP PUBUC
W_ W ( W ) " HE-RCP (PUBUC) MH-ECCENTRI-C!)-- OVERFLOW PATH 0
0 U
t - - - - -_-_ - - - -. - - - - - - _ _ _ SO INLETJ5.1 (PUBLIC) � I W - - w z U�
OS7
r -, F y _ m IRRIGATION POND LIMITS
- , '�� �'_. .-� -'.: •' 1 ''*'`' �.• -. _- - - -CDOT-TYPE R INLET (10')- -r -�- -.I - - - - - - - - - - - - J Z_
I ----- L ----- =Ir ■ W I�
_ _ _LL__ E17 � as ______ � o
0.60 : ;` ------- - _____aal NOTES:
0.41 E 7 1. PORTIONS OF THIS PROPERTY ARE LOCATED IN THE FEMA-REGULATED,100 YEAR COOPER SLOUGH FLOODPLAINIFLOODWAYRND MUST J O U
I 0.75 acres - I - - - - -* - - - - - COMPLY WITH THE SAFETY REGULATIONS OF CHAPTER 10 OF CITY MUNICIPAL CODE. Q 0
4• 0.65 2. THE DEVELOPER SHALL OBTAIN A FLOODPLAIN USE PERMIT FROM THE CITY OF FORT COLLINS AND PAY ALL APPLICABLE FLOODPLAIN USE Z J 0
,, :• i, / / I : r I 0.59
- \ ■ PERMIT FEES PRIOR TO COMMENCING ANY CONSTRUCTION ACTIVITY(BUILDING OF STRUCTURES,GRADING,FILL,DETENTION PONDS,BIKE LL m LL
6• I � .1 L•
0.81 acres PATHS,PARKING LOTS,UTILITIES,LANDSCAPED AREAS,FLOOD CONTROL CHANNELS,ETC.)WITHIN THE COOPER SLOUGH FLOODPLAIN
I ,' � I .`i is
LIMITS--.STORAGE OF EQUIPMENT AND MATERIALS(TEMPORARY OR PERMANENT)IS NOT ALLOWED IN THE FLOODWAY.ALL ACTIVITIES WITHIN
THE FLOODPLAIN ARE SUBJECT TO THE REQUIREMENTS OF CHAPTER 10 OF THE FORT COLLINS MUNICIPAL CODE,
3. CRITICAL FACILITIES ARE PROHIBITED IN THE 100-YEAR FLOODPLAIN.CRITICAL FACILITIES INCLUDE ESSENTIAL SERVICES,AT-RISK
�I 1 / I i POPULATION,HAZARDOUS MATERIALS,AND GOVERNMENT FACILITIES. # Date Issue/Description Init.
02.13.2023 ENGINEERS STAMP ADDED JEP
4. CONSTRUCTION OF NEW STRUCTURES,HARD SURFACE PATHS,WALKWAYS,DRIVEWAYS,WALLS,AND PARKING AREAS IS PROHIBITED IN THE
�.1 1 05I10/2023 F1 AMENDMENT JEP
:i I / i �. i ■ FLOODWAY UNLESS NO-RISE CONDITIONS ARE MET.ANY CONSTRUCTION ACTIVITIES IN THE REGULATORY FLOODWAY MUST ALSO INCLUDE A
�� i i I-- i ■ NO-RISE CERTIFICATION PREPARED BY A PROFESSIONAL ENGINEER LICENSED IN COLORADO.AN APPROVED FEMA ELEVATION CERTIFICATE
/ i I COMPLETED BY A LICENSED SURVEYOR OR CIVIL ENGINEER SHOWING THAT THE BUILDING IS CONSTRUCTED TO THE REQUIRED ELEVATION IS -
I I REQUIRED POST-CONSTRUCTION PRIOR TO A CERTIFICATE OF OCCUPANCY CO BEING ISSUED.PLEASE NOTE: IF ANY PART OF THE -
i•,••., I ::i I BUILDING IS WITHIN THE FLOODPLAIN BOUNDARY,THEN THE ENTIRE STRUCTURE IS CONSIDERED IN THE FLOODPLAIN AND THE ENTIRE
Jy BUILDING ENVELOPE MUST MEET THE REQUIREMENTS OF ELEVATING TO THE RFPE. _
5. ALL BASE FLOOD ELEVATIONS ARE BASED ON NAVD 1988 DATUM.
I I -
r :• I I
/ I i J. I -
:T.
: 1 FUT-G
I ��
ll
0.90 I I
20.5 }
'.• I - - - - - I 4
_ _ J 1 .00 acres r i Project No: HFH000022
o F: •: I � i I i•.
U' ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ Drawn By: JKD
MATC H L I N E-SEE SHEET C 10.8 Checked By: JEP
Date: 11.07.2022
0
U
z
DRAINAGE PLAN
U 0
LL 0
U
y
0 10 20 50C1 Knowwhat'sbelow. 0 , 2
z
SCALE:1"=50' Call before you dig.
ii
aowa
` \ I
j 5265 Ronald Reagan Blvd.,Suite 210
` \ I - :T
Johnstown,CO 80534
■ \ I _ - 970.800.3300
■ `v I I ■ all ql GallowayUS.com
\ �ti
Tm
\ \ � \ / s9 O i I ■
O \ \ I I
CE
== Elmu
aa� aos
U ■�\ \ I ITmmT
\ \
W \ \ I I 61
\ I
- ♦ �\\\\ \\ ��o i I I � ao� aw
SDMH G3 (PRIVAT\E)\ \ I I I
LU A MH-ECCENTRIC (5' 0)\ \ \ r Q
W - \\ \\ I '_1 I , ■
I I ■
W \`\ • \� \\ \ \ ' all
z \ N� \\ \ 59 COPYRIGHT
THESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY,AND MAY
■ \/y \� Z \\ `\ _ — — _ I I( / NOT BE DUPLICATED,DISCLOSED,OR REPRODUCED
U ■ \\ _ , — — — I I I ) ■ ® WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
% / � COPYRIGHTS AND INFRINGEMENTS WILL BE
5a I I
\ ,� `\ —� — — — — — — — I �� / ■ Ipnts ENFORCED AND PROSECUTED.
K YMAP
-4960-
SDMH Ei JUBLIC) \ \ c+
I i) I/ ■ PROPOSED MAJOR CONTOUR
MH-FLAT TOP (8'0)N \ I I 36
'I PROPOSED MINOR CONTOUR
QJeJ1 •� \ \ D22 56 I I i � )�I ■ EXISTING MAJOR CONTOUR —— —4835—— —
EXISTING MINOR CONTOUR
- � _ �• \i `�°' .� i I j (���I EXISTING STORM DRAIN — — — SD — — —
`\ \ \ 0.15 0,24 i I I i (li PROPOSED STORM DRAIN
SDMH E2 (PUBLIC) \ ` I
PROPOSED STORM INLET
MH-FLAT TOP (8'0) `\\` \ � � 0.19 acres \\\ i I i � PROPERTY BOUNDARY
mD1 1 � I \\ � Ea
SDMH G2 ` / �MH-ECCENTRI ` \\ I i ■ PROPOSED RIGHT-OF-WAY
PROPOSED LOTLINE
5 j - \ I \\ `\ EASEMENT LINE --------------
1 .15
1 acres I I I \ \ \ \\ AgSS l l , 59
I j I^ ¢ II \ \ \ `\ / / / ■ BASIN ID
Al
■ I I \\\ 2-YR RUNOFF
v ••:..
COEFFICIENTOD
0 05
ID22-
.: r `� acres BASIN AREA
SO FES E (PRIVATE) -•• \ \ \ / / 100-YR RUNOFF (ACRES)
54
COEFFICIENT
----------- -----
SD AREA INLET G�PRIVATE) \�� \\ \\\ i/ � / // ■ (D
■ CDOT-TYPE C INLET (35" X 35") �� \ \\ \� / i ■ O
DESIGN POINT Q
SD
24" FES \ \ Q `\ j / DETENTION POND BASIN BOUNDARY
♦ 5 ,� / / / / (i.e.,MHFD-Detention_v4.03 and/or SWMM)
LU
',;: ��� 4� �� \ \\ \\ /i / / 58 ��h ■ W SUB-BASIN BOUNDARY(i.e.,Rational Method)
■ SD FES Z (PRIVATE) �o�o `�
\ '
36" FES .fig � /
■ �9 \ \ �� / / FEMA CROSS SECTIONCn
— z
` \ \
\ \ \ i / W OVERLAND FLOW DIRECTION
D2N5 / / W (I.E.,LANDSCAPING)
G ::: � / '^
g6 F%�� �� Y�' i / / DIRECT FLOW DIRECTION
U �A s), 0.43 ■ W GUTTER)( EMENT,CURB AND W W
sv ) 0.99 � � ■ Z
/ z
W o �M 0.53 acres /j 5 J APPROXIMATE DETENTION POND O
W 0 \ / / OVERFLOW PATH !!nn 0
d / �/ O V
\ / Z�`�' �; Q�\�P�1•" • SDMH B7 (PRIVATE) \\ �, / i� 54 U J �
IRRIGATION POND LIMITS W
MH-ECCENTRIC (5 0), \\ / ■ J z
UJ
w 3 . D24 SD OUTLr I STRUCTURE BS► „ ] \ i ■ W LL.
■ 6.1 Cool--TYPE C INLET (35 X 35 ) \ / NOTES: 0 0
U) (PRIVATE) \\\\\ / 1. PORTIONS OF THIS PROPERTY ARE LOCATED IN THE FEMA-REGULATED,100-YEARCOOPER SLOUGH FLOODPLAIN/FLOODWAY AND MUST J O U
z 3 OZ •- ,� \\\\ / / 5� COMPLY WITH THE SAFETY REGULATIONS OF CHAPTER 10 OF CITY MUNICIPAL CODE. z O
0.19 acres D24 1• •'` 2. THE DEVELOPER SHALL OBTAIN A FLOODPLAIN USE PERMIT FROM THE CITY OF FORT COLLINS AND PAY ALL APPLICABLE FLOODPLAIN USE J O
J / �� \\\\ / i ■ PERMIT FEES PRIOR TO COMMENCING ANY CONSTRUCTION ACTIVITY(BUILDING OF STRUCTURES,GRADING,FILL,DETENTION PONDS,BIKE LL m LL
■ / �'� \ \ I \ \ ■ PATHS,PARKING LOTS,UTILITIES,LANDSCAPED AREAS,FLOOD CONTROL CHANNELS,ETC.)WITHIN THE COOPER SLOUGH FLOODPLAIN
U ■ ��'i9 \ y LIMITS--.STORAGE OF EQUIPMENT AND MATERIALS(TEMPORARY OR PERMANENT)IS NOT ALLOWED IN THE FLOODWAY.ALL ACTIVITIES WITHIN
THE FLOODPLAIN ARE SUBJECT TO THE REQUIREMENTS OF CHAPTER 10 OF THE FORT COLLINS MUNICIPAL CODE.
CQ \ \ / 3. CRITICAL FACILITIES ARE PROHIBITED IN THE 100-YEAR FLOODPLAIN.CRITICAL FACILITIES INCLUDE ESSENTIAL SERVICES,AT-RISK
c ,' � �\ \ ♦ POPULATION,HAZARDOUS MATERIALS,AND GOVERNMENT FACILITIES. # Date Issue/Description Init.
SD FES F (PUBLIC) 4,7.7 / ;' �� i \\ \ - 02.13.2023 ENGINEERS STAMP ADDED JEP
36" FES `\, \\\\ �\ /� ■ 4. CONSTRUCTION OF NEW STRUCTURES,HARD SURFACE PATHS,WALKWAYS,DRIVEWAYS,WALLS,AND PARKING AREAS IS PROHIBITED IN THE
■ , ��`\ \\\\ FLOODWAY UNLESS NO-RISE CONDITIONS ARE MET.ANY CONSTRUCTION ACTIVITIES IN THE REGULATORY FLOODWAY MUST ALSO INCLUDE A 1 05I10/2023 F1 AMENDMENT JEP
■ �� ; •a. �� \ \ \\\ �\ ■ NO-RISE CERTIFICATION PREPARED BY A PROFESSIONAL ENGINEER LICENSED IN COLORADO.AN APPROVED FEMA ELEVATION CERTIFICATE —
?\ COMPLETED BY A LICENSED SURVEYOR OR CIVIL ENGINEER SHOWING THAT THE BUILDING IS CONSTRUCTED TO THE REQUIRED ELEVATION IS —
------- -- ------
��SD INLET F1 (PUBLIC) �'.' `\ `\ \\\\ . REQUIRED POST-CONSTRUCTION PRIOR TO A CERTIFICATE OF OCCUPANCY(CO)BEING ISSUED.PLEASE NOTE: IF ANY PART OF THE
CDOT-TYPE R INLET (10') / i� `\ `\ \\\� S2 i BUILDING IS WITHIN THE FLOODPLAIN BOUNDARY,THEN THE ENTIRE STRUCTURE IS CONSIDERED IN THE FLOODPLAIN AND THE ENTIRE —
. f" - ;• _ _ r SDMH B6 (PRIVATE) `\ / BUILDING ENVELOPE MUST MEET THE REQUIREMENTS OF ELEVATING TO THE RFPE.
• D1 9 '�-��� D23 � MH-ECCENTRIC (5' �) — — — — — — I / ■ —
■ ,\\ I /i `\\ �\ �\ `\ — \ )( / 5. ALL BASE FLOOD ELEVATIONS ARE BASED ON NAVD 1988 DATUM.
■ SDMH F2 (Pm JC) —
�� MH-FLAT Ti.
SD INLET F2.1 (PUBLIC) —
Y : :-.;• ,...: • 6 CDO -TYPE R INLET (10)
3 � T T '
\ \\\ ( ■
----- ----------_ D20
o
Project No: HFH000022
Drawn By: JKD
LL
■ ' \\ \\�� \ \ �\ ■ Checked By: JEP
/ \
■ l / \\ o \ \ Date: 11.07.2022
0.80 2 72 �l \ i \\\ \q` \\\ DRAINAGE PLAN
MATCHLINE-SEE SHEET C10.4
U 0
LL 0
O
y
0 10 20 50C1 Knowwhat'sbelow. 0 , 3
z
SCALE:1"=50' Call beforeyoudig.
ii
MATCHLINE-SEE SHEET C10.3 - =4 Gammoway
�115265 Ronald Reagan Blvd.,Suite 210
' � \ � �\\ Johnstown,CO 80534
■ 0,80 9� `' \ \\ ♦ 970.800.3300
■ mu
2.72 i i �\ �\ \ \ \ ■ GallowayUS.com
1 .00 acres \ \ ♦ ■ _
r I \ I .�� .�� A \V\ ♦ �rl L�ll
O 4.y
�X aa+E aoa
U ■ I t` I ; \
L1J 49 LL1 \ \ \\\ ♦ ■
E1 9011110
I \
w SDMH 12-A.5 (PUBLIC) I j ��\ \ SDMH B5 (PRIVATE)
■_ MH-ECCENTRIC (5' 0) -' MH-ECCENTRIC (5' 0)
UBUC) 24" RCP (PRIVATE)
w 24' RCP (PUBLIC)
COPYRIGHT
/ �� �� \ \ \ \ ♦ THESE PLANS ARE AN INSTRUMENT OF SERVICE
J --L 1- AND ARE THE PROPERTY OF GALLOWAY,AND MAY
■ I i I / `� `� \ \ \ \ ` ' NOT BE DUPLICATED,DISCLOSED,OR REPRODUCED
CL
I 48 I I I �\ �\'I \ \ \ \ ♦ ■ ® WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
U ■ I I I r- I \ \ � COPYRIGHTS AND INFRINGEMENTS WILL BE
N ENFORCED AND PROSECUTED.
\ I
I SDMH 12-A.4 I �� ' �� \ \\ \
NK I E:YMAP
MH-ECCENTRIC (5' 0)
----- --- -------------
■ 18" RCP (PRIVATE)-_______ E26
PROPOSED MAJOR CONTOUR
\ PROPOSED MINOR CONTOUR 36
0.80
2.39 ' ' 1 � � \�`�\ \�`��� \\�\\ \ � EXISTING MAJOR CONTOUR -- -4835-- -
1 .0 acres i 1 I ��A \ \\ \ EXISTING MINOR CONTOUR
�\ �rr'rG \\\\ EXISTING STORM DRAIN - - - SD - - -
99 I I I - 9j �\ PROPOSED STORM DRAIN
res PROPOSED STORM INLET Ea
I �\ �\ ■ gPIROOPEERTY QBOLU`NNDARY
I-I IRRIGF'KUAg&KI(�H bF-WAY
E28
-Now-
IVATE) I •: I
10) I I �� �� PROPOSED LOTUNE
EASEMENT LINE --------------
I • y
la'
SYROOLI
0.76 Q '..'
I I E26 0.84 BASIN ID
18" RCP (PRIVATE) 0.95 acres
E30
48
Al
., n I ,
I 2-YR RUNOFF
IVATE SDMH 12-A.3 (PUBLIC)) COEFFICIENT
18" 0) i �', i MH-ECCENTRIC (5' 0) i I a, i 0.77 1 .04 0.05 2.50
0.97 acres 0.35 acres BASIN AREA
100-YR RUNOFF
24" RCP (PRIVATE) i i i �� ■ COEFFICIENT (ACRES)
SDMH 12-A.2 (PRIVA ; Q
3 MH-ECCENTRIC 6'
( I I � DESIGN POINT Q
E20
FUT-C
I I I DETENTION POND BASIN BOUNDARY
0.^^ I I '� (i.e.,MHFD-Detention-v4.03 and/or SWMM)
acres v I 0.57 1 .44 ■
' I I 0.80 LJJ SUB-BASIN BOUNDARY(i.e.,Rational Method)
� U
I 0.71 acres 22.00
I 1 .00 acres FEMA CROSS SECTION - z
--- E25 E20
I - - W OVERLAND FLOW DIRECTION J
24" RCP (PUBLIC) � -
N s w (I.E.,LANDSCAPING)
O 2 " RCP (PUBU j S-205 (PUBLIC)
I I DIRECT FLOW DIRECTION F
r I CDOT-TYPE R INLET (10') i i / / ■ (I.E.,PAVEMENT,CURB AND z
U ■ S-202 (PUBLIC) a SDMH 12-A.1-1 (PUBLIC) = LJJLU
DOT-TYPE R INLET (10') MH-ECCENTRIC (6' 0) j ; / ■ Z GUTTER) LJJ Z
I- I I / -
W 46 ; `• I 46 / J APPROXIMATE DETENTION POND O
W r i '`' / OVERFLOW PATH O O
SDMH 12-A.1 PUBLIC
MH-FLAT TOP (8'0) I
IRRIGATION POND LIMITS w J z
O
I .. 1
/' ; •': :,..:- :,..,.... 36" RCP (PUBLIC) NOTES:
' r +� "'•`"'' `"'•'" ��� �NIF-
SD INLET D2 (PUBLIC) � U
rr SO INLET D1 (PUBLIC) CDOT-TYPE R INLET (10') 1. PORTIONS OF THIS PROPERTY ARE LOCATED IN THE FEMA-REGULATED,100-YEARCOOPER SLOUGH FLOODPLAIN/FLOODWAY AND MUST J O
w CDOT-TYPE R INLET (10')F. I i COMPLY WITH THE SAFETY REGULATIONS OF CHAPTER 10 OF CITY MUNICIPAL CODE. Q ~
z SDMH C5 I 2. THE DEVELOPER SHALL OBTAIN A FLOODPLAIN USE PERMIT FROM THE CITY OF FORT COLLINS AND PAY ALL APPLICABLE FLOODPLAIN USE z O
SDMH 13 (P C) vet\G� ) I PERMIT FEES PRIOR TO COMMENCING ANY CONSTRUCTION ACTIVITY BUILDING OF STRUCTURES,GRADING,FILL,DETENTION PONDS,BIKE LL m 0
S; / Q r ■
J .y:• MH-ECCENTRIC A• m) „ ��Q � .-
■ TOA �� :� I E30X PATHS,PARKING LOTS,UTILITIES,LANDSCAPED AREAS,FLOOD CONTROL CHANNELS,ETC.)WITHIN THE COOPER SLOUGH FLOODPLAIN
D (PUBLIC)< I ' ■
U ■ •� ��� jCJ SD FES I (PUBU �� FES :.. :: I / � - - - - � ' LIMITS--.STORAGE OF EQUIPMENT AND MATERIALS(TEMPORARY OR PERMANENT)IS NOT ALLOWED IN THE FLOODWAY.ALL ACTIVITIES WITHIN
54' FES' E29 i EIre? , i THE FLOODPLAIN ARE SUBJECT TO THE REQUIREMENTS OF CHAPTER 10 OF THE FORT COLLINS MUNICIPAL CODE,
Q i I 3. CRITICAL FACILITIES ARE PROHIBITED IN THE 100-YEAR FLOODPLAIN.CRITICAL FACILITIES INCLUDE ESSENTIAL SERVICES,AT-RISK
POPULATION,HAZARDOUS MATERIALS,AND GOVERNMENT FACILITIES. # Date Issue Description Init.
5 . 1 0.15 1 .77 I • I ; / / __ 4. CONSTRUCTION OF NEW STRUCTURES,HARD SURFACE PATHS,WALKWAYS,DRIVEWAYS,WALLS,AND PARKING AREAS IS PROHIBITED IN THE = 02.13.2023 ENGINEERS STAMP ADDED JEP
1 05/1012023 F1 AMENDMENT JEP
0.19 acres FLOODWAY UNLESS NO RISE CONDITIONS ARE MET.ANY CONSTRUCTION ACTIVITIES IN THE REGULATORY FLOODWAY MUST ALSO INCLUDE A -
■ NO-RISE CERTIFICATION PREPARED BY A PROFESSIONAL ENGINEER LICENSED IN COLORADO.AN APPROVED FEMA ELEVATION CERTIFICATE
mm COMPLETED BY A LICENSED SURVEYOR OR CIVIL ENGINEER SHOWING THAT THE BUILDING IS CONSTRUCTED TO THE REQUIRED ELEVATION IS
III
0.19 i I REQUIRED POST-CONSTRUCTION PRIOR TO A CERTIFICATE OF OCCUPANCY(CO)BEING ISSUED.PLEASE NOTE: IF ANY PART OF THE
acres SD FES J (PUBLIC) I i BUILDING IS WITHIN THE FLOODPLAIN BOUNDARY,THEN THE ENTIRE STRUCTURE IS CONSIDERED IN THE FLOODPLAIN AND THE ENTIRE
48" FES� I - - -
BUILDING ENVELOPE MUST MEET THE REQUIREMENTS OF ELEVATING TO THE RFPE.
�, I I i ■ 5. ALL BASE FLOOD ELEVATIONS ARE BASED ON NAVD 1988 DATUM.
39 38 37 36 4g40 i� i ■ -
0 I�
■ El 5 . 1 I�
4945 -
----- �� SD INLET J1 (PUBLIC) _
o R _ _ -.�,
0.80 -
CDOT TYPE R INLET (10') � I
..
0.56
1 .00 acres - - - - - - - - - = �'._ _" ;
15.
46
- I� - - - - - - - - - - - - - - - - _ _ _ _ _ _ _ _
980=0-
- _ 34" X 53" HE-RCP (PUBLIC) SDMH J2 (PUBLIC) - C4N(TPRUBLI 5),i t N HFH000022
- SDMH
- - \ - - MH-ECCENTRIC IC ( 0)
Nt- - -MH-ECCENTRIC (8' 0)_ Project a:
Drawn By: JKD
■ - - - - - - - - - - - - - - - - - ���S-98 (PUBLIC) - N/- - - - - - - Checked By: JEP
■ - �_� �I 17 -._.•-.-_ .,CDOT-TYPE R INLET (10') W -
_aaI - N -` Date: 11.07.2022
------ ---- aa1 NMI
------ DRAINAGE PLAN
49 ■ ■ ■ �� ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■
7
MATCHLINE-SEE SHEET C10.9
U 0
LL 0
O
y
0 10 20 50C1 Knowwhafsbelow. 0 , 4
z
SCALE:1"=50' Call beforeyoudig.
ii
MATCHm 0LINE-SEE SHEET C10.6 0 �� m m �� m m �� m 0 �� m N % Gammoway
m m m m =OPEN 0 m ( II \ \ m m 0
5265 Ronald Reagan Blvd.,Suite 210 XS: 5806 _ _
__ Johnstown,CO 80534
WSEL: 4946
I I I I \` _ —_ _ — —�— 970.800.3300
/ s I SDMH Al (PRIVATE) .8_ _ ` _ aaa aaa
GallowayUS.com
_� MH—FLAT TOP (5'0) \
�TRTI
�95° i I IIEa-= El EE
I
/ i I I I aa4 aoa
■ / ' i i I III � � � it
I I I
I II
aw
I
I I ` G0.10 dQ11
THESE
COPYRIGHT
ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY,AND MAY
NOT BE DUPLICATED,DISCLOSED,OR REPRODUCED
i III WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
CPYRIGHTS AND
FUT— B I� I � amEOFOR ED AND PROSEICUTEDENTS WILL BE
M I I III /
, I K YMAP
0.80 /
15.30 � � � I // / �'
1 .00 acres i , I III / / I PROPOSED MAJOR CONTOUR
EFFECTIVE COOPER SLOUGH / l PROPOSED MINOR CONTOUR 36
IEXISTING MAJOR CONTOUR — —4835—— —FEMA 100 YEAR FLOODPLAIN LIMITS / —
I EXISTING MINOR CONTOUR
EXISTING STORM DRAIN — — — SD — — —
\ \` �♦ i I I / I PROPOSED STORM DRAIN
PROPOSED STORM INLET 8
\\ \ I ! II11 XS: 5347 /
PROPERTY BOUNDARY
\\ — — _ _ _ _ _ _ _ —— I I WSEL: 4945.7 % PROPOSED RIGHT—OF—WAY
— — — PROPOSED LOTLINE
\\\�\ ♦ ,� I I / j EASEMENT LINE ——————————————
SO FES A (PRIVATE) / I BASIN ID
. �� \\ �� ♦ ` �� ' 36" FES I �I
�♦ I Al
2-YR RUNOFF
// COEFFICIENT�i� I I / 0.05 2.50
FF\ / II /
\ / I
`\ `\ SDMH 64 (PRIVATE) ` ` I I III 0-YR RUN0.35 acres
BAS IN
`� `� ` �' 10CIENT O (ACRES)
MH—ECCENTRIC 0REA
� � \ (� � � ♦ 10,
� � I � I EFFECTIVE COOPER SLOUGH FLOODWAY LIMITS COEFF
I
o•. I
p \ \ ♦ /
\` `" \\�\ ` ♦ /// / I i I I DESIGN POINT Q
\` ♦ ` \\\ ♦ // '' I I I DETENTION POND BASIN BOUNDARY
\ ` \
L1J (i.e.,MHFD-Detention_v4.03 and/or SWMM)
00,
w \`� ♦\`� \\\ ` ♦ // �i' SUB-BASIN BOUNDARY(i.e.,Rational Method)
_
\`�_ ♦\`� \\\ ♦ ice' / 9.7:1, I I I I FEMA CROSS SECTION — z
L1J FUTURE POND BOVLAND FLOW
I IIII / I Q
LL] \ \ \\\\ \\\ ` ��' DETENTION POND `♦ I III I I (I EERANDSCAP NG)RECTION
r^ i /
V; \�\\ \` \\\ ♦ / / I / DIRECT FLOW DIRECTION
L1J �\ ,�' \\\ ♦, �i� / / I i III I (I.E.,PAVEMENT,CURB AND z
\ I I GUTTER) L U UJ
APPROXIMATE DETENTION POND OVERFLOW PATH 0— O O
2 0`♦ 9 \
U � � \ \���� � I � I � �s �9so
`� \ \\�� � ♦ � I ` IRRIGATION POND LIMITS w J z
S /
G 0.80 ` \\ �\\ \ I i III / / L U LL J
22.00 ♦ \ \ \ ` J I / / NOTES: 0
1 .00 acres I ` \\\\\ \� I III `` / / 1. PORTIONS OF THIS PROPERTY ARE LOCATED IN THE FEMA-REGULATED,100-YEAR COOPER SLOUGH FLOODPLAIN/FLOODWAY AND MUST J O
`�\ ♦ \ \ �► I I ` / / COMPLY WITH THE SAFETY REGULATIONS OF CHAPTER 10 OF CITY MUNICIPAL CODE. Q O 0
F-
�� �g�� ♦ I i III 2. THE DEVELOPER SHALL OBTAIN A FLOODPLAIN USE PERMIT FROM THE CITY OF FORT COLLINS AND PAY ALL APPLICABLE FLOODPLAIN USE Z J 0
PERMIT FEES PRIOR TO COMMENCING ANY CONSTRUCTION ACTIVITY(BUILDING OF STRUCTURES,GRADING,FILL,DETENTION PONDS,BIKE LL m LL
PATHS,PARKING LOTS,UTILITIES,LANDSCAPED AREAS,FLOOD CONTROL CHANNELS,ETC.)WITHIN THE COOPER SLOUGH FLOODPLAIN
LIMITS--.STORAGE OF EQUIPMENT AND MATERIALS TEMPORARY OR PERMANENT IS NOT ALLOWED IN THE FLOODWAY.ALL ACTIVITIES WITHIN
i IIII / THE FLOODPLAIN ARE SUBJECT TO THE REQUIREMENTS OF CHAPTER 10 OF THE FORT COLLINS MUNICIPAL CODE,
I �__ _ _ _ _ _ — — —— 3. CRITICAL FACILITIES ARE PROHIBITED IN THE 100-YEAR FLOODPLAIN.CRITICAL FACILITIES INCLUDE ESSENTIAL SERVICES,AT-RISK
` ♦ SDMH B3 PRIVATE A SO AREA INLET B2.1 I I ..
` ( ) ♦ CDOT—TYPE C INLET 35' X 35" POPULATION,HAZARDOUS MATERIALS,AND GOVERNMENT FACILITIES. # Date Issue Description Init.
10.5:1 `� MH—FLAT TOP (5'0)\ \� (,, )
/ - 02.13.2023 ENGINEERS STAMP ADDED JEP 4. CONSTRUCTION OF NEW STRUCTURES,HARD SURFACE PATHS,WALKWAYS,DRIVEWAYS,WALLS,AND PARKING AREAS IS PROHIBITED IN THE
�� �P�1 ♦ \ \ \\\ I i IIII FLOODWAY UNLESS NO-RISE CONDITIONS ARE MET.ANY CONSTRUCTION ACTIVITIES IN THE REGULATORY FLOODWAY MUST ALSO INCLUDE A 1 05/10/2023 F1 AMENDMENT JEP=
NO-RISE CERTIFICATION PREPARED BY A PROFESSIONAL ENGINEER LICENSED IN COLORADO.AN APPROVED FEMA ELEVATION CERTIFICATE
�Q \ ♦ , III / COMPLETED BY A LICENSED SURVEYOR OR CIVIL ENGINEER SHOWING THAT THE BUILDING IS CONSTRUCTED TO THE REQUIRED ELEVATION IS
SD C♦e T STRUCTURE 63.1 ♦♦ ` \ \\ � , I
CDOT—TYPE C INLET (35" X 35") �� ��\ �\ ��wQ ♦ I / REQUIRED POST CONSTRUCTION PRIOR TO A CERTIFICATE OF OCCUPANCY(CO)BEING ISSUED.PLEASE NOTE: IF ANY PART OF THE —
(PRIVATE) \ �� I / BUILDING IS WITHIN THE FLOODPLAIN BOUNDARY,THEN THE ENTIRE STRUCTURE IS CONSIDERED IN THE FLOODPLAIN AND THE ENTIRE —
♦ `\ �G `\ \\ •� I I / BUILDING ENVELOPE MUST MEET THE REQUIREMENTS OF ELEVATING TO THE RFPE. -
9
\PON C g�1 \\\\ ♦` \\ \ \ \ �� �+\ I i♦ ICI �sF srj� / �./ 5. ALL BASE FLOOD ELEVATIONS ARE BASED ON NAVD 1988 DATUM. -
' DETE N POND \ �� I ' I `• �9� I —
♦ SDMH B2 (PRIVATE) \\ \ \ �` ♦ i I `♦ —
MH—FLAT TOP (50)
468,
1
— — — — _ — — _ — — — \ I \\ ♦ _ _ _ — _ _ _ — _ _ _ Project No: HFH000022
SDMH Bl (PRIVATE) Drawn By: JKD
LL — MH—FLAT TOP (5'0) / I
`ate I I I Checked By: JEP
Date: 11.07.2022
U W W as, W W
v SD FES B (PRIVATE) —
♦ rr . DRAINAGE PLAN
z / `< �Irg, 30" FES /
I
U 0
LL 0
O
y
0 10 20 50C1 Knowwhat'sbelow. 0 , 5
z
SCALE:1"=50' Call beforeyoudig.
ii
MATCHLINE-SEE SHEET C10.7 Gam,loway
r77 5265 Ronald Reagan Blvd.,Suite 210
/ — / ♦ _ Johnstown,CO 80534
970.800.3300
\�
■ / i � / I � � GallowayUS.com
iiiiiii mom
iL i
/ LILIuu
I
7
T I rWLW1R9q
I / ♦ - �EE= EIE= EEqa1 aos
/ EFFECTIVE COOPER SLOUGH FLOODWAY LIMITS /
,n
N,
COPYRIGHT
THESE PLANS ARE AN INSTRUMENT OF SERVICE
4951.4 —_ —' PROPERTYAND ARE THE OF GALLOWAY,AND MAY NOT BE DUPLICATED,DISCLOSED,OR REPRODUCED
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
■ I I / I I I ` / ® COPYRIGHTS AND INFRINGEMENTS WILL BE
■ I / j I ( I � Ipnts ENFORCED AND PROSECUTED.
I
/ i I K YMAP
/ T�1
■ I I / I I 1 I PROPOSED MAJOR CONTOUR
I
■ I / I I I I PROPOSED MINOR CONTOUR 36
EXISTING MAJOR CONTOUR —— —4835—— —
I EXISTING MINOR CONTOUR
1 EXISTING STORM DRAIN — — — SD — — —
"' I I I J I I 1 PROPOSED STORM DRAIN
■ FL11II.11 E OND A �/ I Ali I I PROPOSED STORM INLETEa
DETENTION POND i I I I 1 PROPERTY BOUNDARY
■ It / I 1 PROPOSED RIGHT—OF—WAY
t / I I PROPOSED LOTLINE
——————————————
FUT—A EASEMENT LINE
tl 7.7:1 / 8.8:1 "AGE SWIM
I
■ 0.80 BASIN ID
■ 56.00 /
1 .00 acres I I I Al
2-YR RUNOFF
�I ♦ COEFFICIENT
I I I ♦ 0.05 2.50
I
I I I ♦ 0.35 acres BASIN AREA
100-YR RUNOFF
(ACRES)
COEFFICIENT
M
O ■ /
DESIGN POINT Q
DETENTION POND BASIN BOUNDARY
♦♦ ♦` (i.e.,MHFD-Detention_v4.03 and/orSWMM)
W `� I � I I I
� I
w ■ / i I I I SUB-BASIN BOUNDARY(i.e.,Rational Method)
I I ♦ EFFECTIVE COOPER SLOUGH ` FEMA CROSS SECTION z
/ I i I I FEMA 100 YEAR FLOODPLAIN LIMITS Q
LL] I
W / / i \ I I I __ —— OVERLAND FLOW DIRECTION J
I (LE.,LANDSCAPING)
SD OUTLET STRUCTURE A3
■ / I CDOT—TYPE C INLET (35 X 35') 1 ♦ DIRECT FLOW DIRECTION
(PRIVATE) ` / (I.E.,PAVEMENT,CURB AND z
z ■ / I �A. 1 1 I I I I I 1 �� / GUTTER) w J 7
\ / / APPROXIMATE DETENTION POND 2-7
SDMH A2 (PRIVATE) I _ � ` � O
—ECCENTRIC (5 0)
MH ' I I
/ ` OVERFLOW PATH O
O U
■ i I I , `` ♦ IRRIGATION POND LIMITS cn
w Z
Q / I I I ♦ / J J
� ■ ' � ��� I I ICI � � W LL. �
NOTES: O
1. PORTIONS OF THIS PROPERTY ARE LOCATED IN THE FEMA-REGULATED,100-YEAR COOPER SLOUGH FLOODPLAIN/FLOODWAY AND MUST J O U
°° i \ I I ` COMPLY WITH THE SAFETY REGULATIONS OF CHAPTER 10 OF CITY MUNICIPAL CODE. z O
------- ------------ I ♦ / 2. THE DEVELOPER SHALL OBTAINAFLOODPLAINUSEPERMITFROMTHECITYOFFORTCOLLINSANDPAYALLAPPLICABLEFLOODPLAINUSE _ J O
XS: 6204 I I \
■ / i - - - -WSEL: 4949.2 i i /I I� I — — — — ` PERMIT FEES PRIOR TO COMMENCING ANY CONSTRUCTION ACTIVITY(BUILDING OF STRUCTURES,GRADING,FILL,DETENTION PONDS,BIKE LL m LL
-
■ i `� I I ♦ PATHS,PARKING LOTS,UTILITIES,LANDSCAPED AREAS,FLOOD CONTROL CHANNELS,ETC.)WITHIN THE COOPER SLOUGH FLOODPLAIN
i I ! / I ♦ ` LIMITS--.STORAGE OF EQUIPMENT AND MATERIALS(TEMPORARY OR PERMANENT)IS NOT ALLOWED IN THE FLOODWAY.ALL ACTIVITIES WITHIN
■ ■ m I ♦ THE FLOODPLAIN ARE SUBJECT TO THE REQUIREMENTS OF CHAPTER 10 OF THE FORT COLLINS MUNICIPAL CODE,
I I�I `♦ 3. CRITICAL FACILITIES ARE PROHIBITED IN THE 100-YEAR FLOODPLAIN.CRITICAL FACILITIES INCLUDE ESSENTIAL SERVICES,AT-RISK
POPULATION,HAZARDOUS MATERIALS,AND GOVERNMENT FACILITIES. # Date Issue Description Init.
- 02.13.2023 ENGINEERS STAMP ADDED JEP
4. CONSTRUCTION OF NEW STRUCTURES,HARD SURFACE PATHS,WALKWAYS,DRIVEWAYS,WALLS,AND PARKING AREAS IS PROHIBITED IN THE
■ // i I I I �� ` FLOODWAY UNLESS NO-RISE CONDITIONS ARE MET.ANY CONSTRUCTION ACTIVITIES IN THE REGULATORY FLOODWAY MUST ALSO INCLUDE A 1 05I10/2023 F1 AMENDMENT JEP
■ // i I I `` NO-RISE CERTIFICATION PREPARED BY A PROFESSIONAL ENGINEER LICENSED IN COLORADO.AN APPROVED FEMA ELEVATION CERTIFICATE -
/i I I `♦ ♦ COMPLETED BY A LICENSED SURVEYOR OR CIVIL ENGINEER SHOWING THAT THE BUILDING IS CONSTRUCTED TO THE REQUIRED ELEVATION IS -
/ REQUIRED POST-CONSTRUCTION PRIOR TO A CERTIFICATE OF OCCUPANCY(CO)BEING ISSUED.PLEASE NOTE: IF ANY PART OF THE
BUILDING IS WITHIN THE FLOODPLAIN BOUNDARY,THEN THE ENTIRE STRUCTURE IS CONSIDERED IN THE FLOODPLAIN AND THE ENTIRE -
/ I� lI III �1 �♦ ` BUILDING ENVELOPE MUST MEET THE REQUIREMENTS OF ELEVATING TO THE RFPE.
■ / i" i I� I 1 ` �` 5. ALL BASE FLOOD ELEVATIONS ARE BASED ON NAVD 1988 DATUM. -
■
FUT- B I -
s3 � � � i I III �� ♦` �` -
■ 5� 0.80 15.30 i �� —
3 1 .00 acres I II X,
II
EFFECTIVE COOPER SLOUGH
FE 100 YEAR FLOODPLAIN LIMITS \ Project Na: HFH000022
�`
III ` \ // Drawn By: JKD
■ 51
/ I I �� ♦V Checked By: JEP
III Date: 11.07.2022
s
I
I
XS: 5806 —
s2 I SDMH Al (PRIVATE) WSEL: 4946.8_ _ _ _ �` DRAINAGE PLAN
MATCHLINE-SEE SHEET C10.5
U 0
LL 0
O
y
0 10 20 50C1 Knowwhat'sbelow. 0 , 6
z
SCALE:1"=50' Call before you dig.
ii
aowa
5265 Ronald Reagan Blvd.,Suite 210
r Johnstown,CO 80534
970.800.3300
/ 1 ° C1u GallowayUS.com
� ► il I �
/ LI1W
1 i
1 r I M4 aoa
1gE
1 i l G
1 at_
r '
i 1 mu
LL
i 1
i
I 1 my can
COPYRIGHT
THESE PLANS ARE AN INSTRUMENT OF SERVICE
——— I AND ARE THE PROPERTY OF GALLOWAY,AND MAY
/ — I NOT BE DUPLICATED,DISCLOSED,OR REPRODUCED
® WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
\ Iu COPYRIGHTS AND INFRINGEMENTS WILL BE
mm
qn� ENFORCED AND PROSECUTED.
NK YMAP
XS: 7842 ' PROPOSED MAJOR CONTOUR
WSEL: 4960.2 _ _ �—_-------------- — — — — — — I — — —
—� PROPOSED MINOR CONTOUR 36
- I EXISTING MAJOR CONTOUR —— —4835—— -
- EXISTING MINOR CONTOUR
IEXISTING STORM DRAIN — SD —
SS PROPOSED STORM DRAIN
' � SS SS PROPOSED STORM INLET
Ea-
IPROPERTY BOUNDARY
PROPOSED RIGHT-OF-WAY
-- - - -
• � I XS' 7754 PROPOSED LOTLINE
— _ - - -- - -
WSEL: 4957.3 -- - EASEMENT LINE --------------
— — _ —3���--- ---------- --"
XS• 7724 "AGE SAMOM
---- — -- ————————— — —————— 1 I WSEL: 4956 9
E— � ---- I IA — — —I — — — — — — — _ � �' _ — 1 — BASIN ID
2-YR RUNOFF
/ / I I I / I ' COEFFICIENT 0.05 2.50
/ I I EFFECTIVE COOPER SLOUGH / I 1 0.35 acres BASIN AREA
FEMA 100 YEAR FLOODPLAIN LIMITS / I ► 100-YR RUNOFF
v? / 1 1 COEFFICIENT (ACRES)
DESIGN POINT A
1 I I I 1 DETENTION POND BASIN BOUNDARY
(i.e.,MHFD-Detention—v4.03 and/or SWMM)
/ I III II i i 1 SUB-BASIN BOUNDARY(i.e.,Rational Method) ^
/ I I ► FEMA CROSS SECTION — v,
/ i 1
OVERLAND FLOW DIRECTION
I.E.,LANDSCAPING)
DIRECT FLOW DIRECTION
E.,PAVEMENT,CURB AND
S9 I ` I ` GUTTER) LU 6� 6, / I III LUz
/ i 1 APPROXIMATE DETENTION POND
/—o Q I III I OVERFLOW PATH O 0
_ 73_4 54.6 1 1 II / IRRIGATION POND LIMITS LU J z
WSEL _
> L _
W J
NOTES: 0 �E 0
1. PORTIONS OF THIS PROPERTY ARE LOCATED IN THE FEMA-REGULATED,100-YEAR COOPER SLOUGH FLOODPLAIN/FLOODWAY AND MUST J O 0
COMPLY WITH THE SAFETY REGULATIONS OF CHAPTER 10 OF CITY MUNICIPAL CODE. z 0 F-
2. THE DEVELOPER SHALL OBTAIN A FLOODPLAIN USE PERMIT FROM THE CITY OF FORT COLLINS AND PAY ALL APPLICABLE FLOODPLAIN USE _ J
/ PERMIT FEES PRIOR TO COMMENCING ANY CONSTRUCTION ACTIVITY(BUILDING OF STRUCTURES,GRADING,FILL,DETENTION PONDS,BIKE LL m 0
/ PATHS,PARKING LOTS,UTILITIES,LANDSCAPED AREAS,FLOOD CONTROL CHANNELS,ETC.)WITHIN THE COOPER SLOUGH FLOODPLAIN
�—
_ LIMITS--.STORAGE OF EQUIPMENT AND MATERIALS(TEMPORARY OR PERMANENT)IS NOT ALLOWED IN THE FLOODWAY.ALL ACTIVITIES WITHIN
THE FLOODPLAIN ARE SUBJECT TO THE REQUIREMENTS OF CHAPTER 10 OF THE FORT COLLINS MUNICIPAL CODE,
3. CRITICAL FACILITIES ARE PROHIBITED IN THE 100-YEAR FLOODPLAIN.CRITICAL FACILITIES INCLUDE ESSENTIAL SERVICES,AT-RISK
EFFECTIVE COOPER SLOUGH FLOODWAY LIMITS POPULATION,HAZARDOUS MATERIALS,AND GOVERNMENT FACILITIES. # Date Issue/Description Init.
4. CONSTRUCTION OF NEW STRUCTURES,HARD SURFACE PATHS,WALKWAYS,DRIVEWAYS,WALLS,AND PARKING AREAS IS PROHIBITED IN THE - 02.13.2023 ENGINEERS STAMP ADDED JEP—
FLOODWAY UNLESS NO-RISE CONDITIONS ARE MET.ANY CONSTRUCTION ACTIVITIES IN THE REGULATORY FLOODWAY MUST ALSO INCLUDE A
1 05/1012023 F1 AMENDMENT JEP
NO-RISE CERTIFICATION PREPARED BY A PROFESSIONAL ENGINEER LICENSED IN COLORADO.AN APPROVED FEMA ELEVATION CERTIFICATE
�49636 1 I � COMPLETED BY A LICENSED SURVEYOR OR CIVIL ENGINEER SHOWING THAT THE BUILDING IS CONSTRUCTED TO THE REQUIRED ELEVATION IS —
/ REQUIRED POST-CONSTRUCTION PRIOR TO A CERTIFICATE OF OCCUPANCY(CO)BEING ISSUED.PLEASE NOTE: IF ANY PART OF THE
BUILDING IS WITHIN THE FLOODPLAIN BOUNDARY,THEN THE ENTIRE STRUCTURE IS CONSIDERED IN THE FLOODPLAIN AND THE ENTIRE —
/ I / BUILDING ENVELOPE MUST MEET THE REQUIREMENTS OF ELEVATING TO THE RFPE.
FUT-A / / I i i 5. ALL BASE FLOOD ELEVATIONS ARE BASED ON NAVD 1988 DATUM. =
0.80 I 1
56.00 / I I I •' �' —
1 .00 acres
/
10,
Project No: HFH000022
Drawn By: JKD
Checked By: JEP
,f
Date: 11.07.2022
N. DRAINAGE PLAN
MATCHLINE-SEE SHEET C10.6
U 0
LL 0
O
y
0 10 20 50C1 Knowwhat'sbelow. 0 , 7
z
SCALE:1"=50' Call beforeyoudig.
ii
MATCHLINE-SEE SHEET C10.2 Gammoway
0.41
' I 5265 Ronald Reagan Blvd.,Suite 210
I 0.75 acres I _ _ _ -:- - - - - - - il -
r. I r I Johnstown,CO 80534
j II`• I - i s c� I - 11:1 970.800.3300
,r.:•. I I I r: I 0.65
k:.. I�� / i i 4, I 0.59 ■ ° q04 GallowayUS.com
NN
`. i
i L J. ,I 0.81 acres
i i I "I
NMI
MIF
, t .. / I .i Ir• I � G0.1
i
I � I::::� I I •I j:• I aa� aos
' L� I ' � I I �.1 G I ■
mu am
• I I• I 39
I r. •. I � I .� r I
I I y
� my dQ11
Kill COPYRIGHT
THESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY,AND MAY
' FUT-G ' I ,
h,•F::I I / I [;. I NOT BE DUPLICATED,DISCLOSED,OR REPRODUCED
+ ■ ® WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
7 In .I F:
� a� 'I i. I �� COPYRIGHTS AND INFRINGEMENTS WILL BE
i•. II% Ipnts ENFORCED AND PROSECUTED.
/ 0.90 I ' �' I N K YMAP
/ 20.5
I :I ti•
-
\ - - - 1 .00 acres I I
_ I
i� I ■ PROPOSED MAJOR CONTOUR
I I r
I'.': I r-:•: i ■ PROPOSED MINOR CONTOUR 36
A-G3 ' I A-G4
EXISTING MAJOR CONTOUR -- -4835-- -
I
EXISTING MINOR CONTOUR - - - -
I F ► I ='='
1'. EXISTING STORM DRAIN - SD -
• { I 0.78 ± �- 0.78 PROPOSED STORM DRAIN
_ 1 .15 I 1 .15
I i 0.98 acres i I 0.98 acres ■ PROPOSED STORM INLETEa
XS: 3Q$$ I PROPERTY BOUNDARY
I A-G 1 WSEL: 4 ' t' I ■
PROPOSED RIGHT-OF-WAY
937.7 I I:
PROPOSED LOTUNE
--------------
- EASEMENT LINE
0.71 1 .91 - - _ I _ -
-. 0.88 acres _ - - _ ■ BASIN ID
- _ XS: 3046
SEL: 49 A 1
2-YR RUNOFF
( I _ I •� _ - I COEFFICIENT 0.05 2.50
is I J
0.35 acres
BASIN AREA
100-YR RUNOFF (ACRES)
I i COEFFICIENT
,37
L..:;
I I I I DESIGN POINT A
DETENTION POND BASIN BOUNDARY
(i.e.,MHFD-Detention_v4.03 and/or SWMM)
I� I I i,.•� j I ,•1 ��
I
SUB-BASIN BOUNDARY(i.e.,Rational Method)
XS: 2793 I FEMA CROSS SECTION - z
WSEL: 4933.9 r I w Q
•"'i I - _ _ _ 1•I I ��//�'� OVERLAND FLOW DIRECTION
�+/ (I.E.,LANDSCAPING)
r
I
I rj.:•;)' � � ?j �" I - -■ W DIRECT FLOW DIRECTION 7
I ;� i•' I z (I.E.,PAVEMENT,CURB AND
r -A I l• ■ GUTTER) w UJ
J Z
I•.
APPROXIMATE DETENTION POND O
I ,•:;, I I ;: I OVERFLOW PATH 0 O
t.,•; I I_
I I I Q IRRIGATION POND LIMITS w
I ty': I I ■ J z
_ I L U L.L J
1 [,�•.I I / I Q \ is
NOTES: 0
1. PORTIONS OF THIS PROPERTY ARE LOCATED IN THE FEMA-REGULATED,100-YEAR COOPER SLOUGH FLOODPLAIN/FLOODWAY AND MUST J
COMPLY WITH THE SAFETY REGULATIONS OF CHAPTER 10 OF CITY MUNICIPAL CODE. Q O
-I
2. THE DEVELOPER SHALL OBTAIN A FLOODPLAIN USE PERMIT FROM THE CITY OF FORT COLLINS AND PAY ALL APPLICABLE FLOODPLAIN USE Z J 0
I I I / / I- I \ ■ PERMIT FEES PRIOR TO COMMENCING ANY CONSTRUCTION ACTIVITY(BUILDING OF STRUCTURES,GRADING,FILL,DETENTION PONDS,BIKE I..L m L.L
\ PATHS,PARKING LOTS,UTILITIES,LANDSCAPED AREAS,FLOOD CONTROL CHANNELS,ETC.)WITHIN THE COOPER SLOUGH FLOODPLAIN
I I � _ ■
/ I i LIMITS--.STORAGE OF EQUIPMENT AND MATERIALS(TEMPORARY OR PERMANENT)IS NOT ALLOWED IN THE FLOODWAY.ALL ACTIVITIES WITHIN
1 - - _ - i \ THE FLOODPLAIN ARE SUBJECT TO THE REQUIREMENTS OF CHAPTER 10 OF THE FORT COLLINS MUNICIPAL CODE,
_ 3. CRITICAL FACILITIES ARE PROHIBITED IN THE 100-YEAR FLOODPLAIN.CRITICAL FACILITIES INCLUDE ESSENTIAL SERVICES,AT-RISK
XS' 2618 I i \ # Date Issue/Description Init.
WSEL: 4932.7 _ i L I POPULATION,HAZARDOUS MATERIALS,AND GOVERNMENT FACILITIES. p
/ - �' I - 02.13.2023 ENGINEERS STAMP ADDED JEP
4. CONSTRUCTION OF NEW STRUCTURES,HARD SURFACE PATHS,WALKWAYS,DRIVEWAYS,WALLS,AND PARKING AREAS IS PROHIBITED IN THE
I I I•�• I �- _ !" I � ■ 1 05I10/2023 F1 AMENDMENT JEP
`• ;� I I I FLOODWAY UNLESS NO-RISE CONDITIONS ARE MET.ANY CONSTRUCTION ACTIVITIES IN THE REGULATORY FLOODWAY MUST ALSO INCLUDE A
NO-RISE CERTIFICATION PREPARED BY A PROFESSIONAL ENGINEER LICENSED IN COLORADO.AN APPROVED FEMA ELEVATION CERTIFICATE
COMPLETED BY A LICENSED SURVEYOR OR CIVIL ENGINEER SHOWING THAT THE BUILDING IS CONSTRUCTED TO THE REQUIRED ELEVATION IS
REQUIRED POST-CONSTRUCTION PRIOR TO A CERTIFICATE OF OCCUPANCY(CO)BEING ISSUED.PLEASE NOTE: IF ANY PART OF THE -
I l`
I I I1.�' , j / I :I i•. "s BUILDING IS WITHIN THE FLOODPLAIN BOUNDARY,THEN THE ENTIRE STRUCTURE IS CONSIDERED IN THE FLOODPLAIN AND THE ENTIRE -
• BUILDING ENVELOPE MUST MEET THE REQUIREMENTS OF ELEVATING TO THE RFPE.
i
\ 5. ALL BASE FLOOD ELEVATIONS ARE BASED ON NAVD 1988 DATUM. -
r": J I
I -I / r -
I -
•I I \
I I .l r;.i I ■
Z r.::�.• I � I t.J r..
t:
I",.�� I I •ri I Project No: HFH000022
Ir,'••'I I I .. I•• i
I L; I I ,� t I ■ Drawn By: JKD
' ( I �4 :. I / I I•�I •�:•.i I �� ■ Checked By: JEP
Date: 11.07.2022
U 1 I I c '• I _
I �+'•' • I � I •I I+' I
DRAINAGE PLAN
NS
7
LL
MATCHLINE-SEE SHEET C10. 10 o
T
0 10 20 50C1 Knowwhat'sbelow. 0 , 8
z
SCALE:1"=50' Call beforeyoudig.
MATCHLINE-SEE SHEET C10M M -M .4 '■'■
Gammoway
F7:71 '? 5265 Ronald Reagan Blvd.,Suite 210
E 1 7 .
44 � Johnstown,CO 80534
0.55 - 970.800.3300
ou
. \ 0.40 �TRTI GallowayUS.com
0.69 acres
` - - - - - - - � \ +• 1 ao� aoa
�I
U I
G5 M. G6 m mu
0.77 0.34 *. 0.77 0.45
0.96 acres 0.96 acres
„ COPYRIGHT
THESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY,AND MAY
NOT BE DUPLICATED,DISCLOSED,OR REPRODUCED
■ ® WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
COPYRIGHTS AND INFRINGEMENTS WILL BE
■ aau cau
I ENFORCED AND PROSECUTED.
FUT-GKI YMAP
0.90 19,5 G5 PROPOSED MAJOR CONTOUR
1 .0 0 acres G6 PROPOSED MINOR CONTOUR 36
1 36" RCP (IPUBUC)45" HE-RCP EXISTING MAJOR CONTOUR - - -4835-- -
SO INLET C3.1A (PUBUC) EXISTING MINOR CONTOUR
C -TYPE I T (10 EXISTING STORM DRAIN - - - SD - - -
SDI T C3.1 (PUBLIC)
Aqlk
SDMH C3 (PUBLIC) _ CDOT- E R INLET (10') PROPOSED STORM DRAIN
. MH-FLAT TOP (7'0) PROPOSED STORM INLETEa
PROPERTY BOUNDARY
PROPOSED RIGHT-OF-WAY
'. PROPOSED LOTLINE
.: EASEMENT LINE --------------
"AGE SAMOM
■
BASIN ID
- - XS: 3088
Al
� _ _ - WSEL: 4937.7 2-YR RUNOFF
COEFFICIENT 0.05
2.50
0.35 acres BASIN AREA
10 RUNOFF
COEFFICIENT
COEFFICIENT (ACRES)
00 - - XS: 3046 - - -
Q -
WSEL: 4935.3 -
m DESIGN POINT Q
- - _-- - - DETENTION POND BASIN BOUNDARY
(i.e.,MHFD-Detention_v4.03 and/or SWMM)
w � - -
w SUB-BASIN BOUNDARY(i.e.,Rational Method)
I vJ
co G6 . 1 I G7 . 1 FEMA CROSS SECTION -
W / OVERLAND FLOW DIRECTION
w (I.E.,LANDSCAPING)
1
VJ - - _ _
0.77 0.45 0 1 0.42 / DIRECT FLOW DIRECTION
LJJ 0.96 acres _ 1 .00 acres 933.9 / GUTTER) w W
(I.E.,PAVEMENT,CURB AND z
_ APPROXIMATE DETENTION POND
J - OVERFLOW PATH O O
IRRIGATION POND LIMITS w J z
W LL. J
NOTES: fn � 0
1. PORTIONS OF THIS PROPERTY ARE LOCATED IN THE FEMA-REGULATED,100-YEAR COOPER SLOUGH FLOODPLAIN/FLOODWAY AND MUST J0 U
COMPLY WITH THE SAFETY REGULATIONS OF CHAPTER 10 OF CITY MUNICIPAL CODE. 0
18" RCP (11'e X-23' HE-RCP 2. THE DEVELOPER SHALL OBTAIN A FLOODPLAIN USE PERMIT FROM THE CITY OF FORT COLLINS AND PAY ALL APPLICABLE FLOODPLAIN USE _ J 0
SD INLET C2.1A (PUBLIC) PERMIT FEES PRIOR TO COMMENCING ANY CONSTRUCTION ACTIVITY(BUILDING OF STRUCTURES,GRADING,FILL,DETENTION PONDS,BIKE LL m LL
CDOT-TYPE R INLET (10') I / PATHS,PARKING LOTS,UTILITIES,LANDSCAPED AREAS,FLOOD CONTROL CHANNELS,ETC.)WITHIN THE COOPER SLOUGH FLOODPLAIN
LIMITS--.STORAGE OF EQUIPMENT AND MATERIALS(TEMPORARY OR PERMANENT)IS NOT ALLOWED IN THE FLOODWAY.ALL ACTIVITIES WITHIN
I SDMH (PUBLIC)
MH-FLAT TOP (60) THE FLOODPLAIN ARE SUBJECT TO THE REQUIREMENTS OF CHAPTER 10 OF THE FORT COLLINS MUNICIPAL CODE.
� /
i 3. CRITICAL FACILITIES ARE PROHIBITED IN THE 100-YEAR FLOODPLAIN.CRITICAL FACILITIES INCLUDE ESSENTIAL SERVICES,AT-RISK
Q [ / POPULATION,HAZARDOUS MATERIALS,AND GOVERNMENT FACILITIES. # Date Issue Description Init.
1 02.13.2023 ENGINEERS STAMP ADDED JEP
4. CONSTRUCTION OF NEW STRUCTURES,HARD SURFACE PATHS,WALKWAYS,DRIVEWAYS,WALLS,AND PARKING AREAS IS PROHIBITED IN THE
1 05/10/2023 F1 AMENDMENT JEP
II y ® FLOODWAY UNLESS NO-RISE CONDITIONS ARE MET.ANY CONSTRUCTION ACTIVITIES IN THE REGULATORY FLOODWAY MUST ALSO INCLUDE A
NO-RISE CERTIFICATION PREPARED BY A PROFESSIONAL ENGINEER LICENSED IN COLORADO.AN APPROVED FEMA ELEVATION CERTIFICATE -
_ XS: 2618 / COMPLETED BY A LICENSED SURVEYOR OR CIVIL ENGINEER SHOWING THAT THE BUILDING IS CONSTRUCTED TO THE REQUIRED ELEVATION IS -
WSEL: 4932.7 REQUIRED POST-CONSTRUCTION PRIOR TO A CERTIFICATE OF OCCUPANCY(CO)BEING ISSUED.PLEASE NOTE: IF ANY PART OF THE -
_ BUILDING IS WITHIN THE FLOODPLAIN BOUNDARY,THEN THE ENTIRE STRUCTURE IS CONSIDERED IN THE FLOODPLAIN AND THE ENTIRE -
--- BUILDING ENVELOPE MUST MEET THE REQUIREMENTS OF ELEVATING TO THE RFPE. -
�i' 5. ALL BASE FLOOD ELEVATIONS ARE BASED ON NAVD 1988 DATUM. -
G7 G 8
0.78 0.78
Y \ 0.46 0.48 -
■ 0.98 acres cr 0.97 acres
w I
z I I I I
IProject Na: HFH000022
I I
. I / Drawn By: JKD
LL 1
Checked By: JEP
a' • ` I I II I t
Date: 11.07.2022
DRAINAGE PLAN
■ �` ' ■ ■ ■ I ■ ■ ■ ■ ■ ■ MMMI1111111M ■ ■ ■ ■ M1IIIIIMIIMIIIM ■ ■ ■ ■ ■ ■ ■ ■
LL
N MATCHLINE-SEE SHEET C10. 11 0
U
LL N 0
O
y
0 10 20 50
Knowwhat'sbelow. C1 0 , 9
z
SCALE:1"=50' Call beforeyoudig.
ii
MATCHLINE-SEE SHEET C10.8 -- Gam,loway
I I I / � ••i h„ j - - III_ I � 5265 Ronald Reagan Blvd.,Suite 210
Johnstown,CO 80534
970.800.3300
' I I �.. ' i ■ qos q04 GallowayUS.com
.. I I �� I ■ II �T(il 14
4'•,I I I,
1 A-G 1
1W
LU Um
LU
LU
G0.A au
- El E
0.71 1 .91 G3 G4au
0.88 acres I I POND G
i 0.90 , ' RCP (PUBLIC) L I WQ DETENTION PO ■
I' J: 20.5 SD INLET L1.5 ii `� I': 0 10 20 50
. i 1 .00 acres CDOT-TYPE R INLET (10') SD INLET L1 (PUBLIC) �+A-G2 j2 I .<I CDOT-TYPE R INLET (10') SCALE:1"=50'
h A-G5
20 0. I r`
0.94 0.52 I
I I
0.87
T. 0.76 acres 0.65 acres I ��
G 1 i I r COPYRIGHT I 1 L'• I 1
THESE PLANS ARE AN INSTRUMENT OF SERVICE
------------
SD INLET L1. ,� - ---- -r->--- -r-r-- ----I-I-- ��------------------ - ---- --- -- -------- --� `I L------------------ I
__ AND ARE THE PROPERTY OF GALLOWAY,AND MAY
CDOT-TYPE R INLET ( ') r..`
NOT BE DUPLICATED,DISCLOSED,OR REPRODUCED
-I .• u .- ��__ �_ -. _ .,. �•_ .�' - __- _■ WITHOUT THE WRITTEN CONSENT OFGALLOWAY.
ENFORCED AND PROSECUTED.
COPYRIGHTS AND INFRINGEMENTS WILL BE
\ �� -G -
SD I ET L1.2A �
iV
K
3
- ��. 8 YMAP
CDOT TYPE R IN T (10') � I
SDMH L1.1A SDMH L1.1 SDMH L1.2 SDMH L1.3 -��■��
�I II I MH-ECCENTRIC (1 0) MH-ECCENTRIC (8' 0)_ _ _ 0-RECT. FLAT TOP (7' X 7') KU MH-ECCENTRIC (8' 0)
36" RCP
L
�...-• ••�• -�-._.. t-.:--..-.:' - -- 7 -� - - -- ---- -- - - - ---- ---- - --- - - ---- -- - _ PROPOSED MAJOR CONTOUR 36-�,....
1
.
� - •• .:--• �..: -- -4835-- -
1 --I- --- - - -- ' ---- -� - -- --- 7--------- ------ ---- ----------------------------------- - - ,-.�
1 F _--_- T EXISTING MAJOR CONTOUR
39
--- ''' EXISTING MINOR CONTOUR
to 1
� ' I 38 --------_ EXISTING STORM DRAIN - - - SD - - -
PROPOSED STORM DRAIN
SD FES LTA SD FES L1.0 37 I � PROPOSED STORM INLET Ea
30" FES 60 FES PROPERTY BOUNDARY
I �
II I I
A-G6 ■ PROPOSED RIGHT-OF-WAY
PROPOSED LOTLINE
0.55 EASEMENT LINE --------------
I
0.69 acres ■
BASIN ID
XS: 2198 ■
WSEL: 4930.7 A 1
-- - - T--�-- I - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 2-YR RUNOFF
l
COEFFICIENT 0.05
2.50
BASIN AREA
I I
100-YR RUNOFF 0.35 acres■ COEFFICIENT (ACRES)
I III ■ �
I III I
O DESIGN POINT Q
A
II I DETENTION POND BASIN BOUNDARY
EFFECTIVE COOPER SLOUGH � (i.e.,MHFD-Detention-v4.03 and/or SWMM)
FEMA 100 YEAR FLOODPLAIN LIMITS UJ
■ SUB-BASIN BOUNDARY(i.e.,Rational Method)UJ 10
FEMA CROSS SECTION - z
\ V, Q
I I I I
W OVERLAND FLOW DIRECTION J
/ \ (I.E.,LANDSCAPING)
UJ
/ \ '^
I I V, DIRECT FLOW DIRECTION
I / \ ■ 1 (I.E.,PAVEMENT,CURB AND z
W GUTTER) LU LLI
Z
III I I APPROXIMATE DETENTION POND
J OVERFLOW PATH O O
OO v
I J
1 `` ■ IRRIGATION POND LIMITS LU J z
/ �\ ■ Q Lu LL
CC
XS: 1748 G NOTES: �� O
\ WSEL: 4930.5 1. PORTIONS OF THIS PROPERTY ARE LOCATED IN THE FEMA-REGULATED,100-YEAR COOPER SLOUGH FLOODPLAIN/FLOODWAY AND MUST J O U
/
\ COMPLY WITH THE SAFETY REGULATIONS OF CHAPTER 10 OF CITY MUNICIPAL CODE. Q O
2. THE DEVELOPER SHALL OBTAIN A FLOODPLAIN USE PERMIT FROM THE CITY OF FORT COLLINS AND PAY ALL APPLICABLE FLOODPLAIN USE Z J O
_ I �,' I ■ PERMIT FEES PRIOR TO COMMENCING ANY CONSTRUCTION ACTIVITY(BUILDING OF STRUCTURES,GRADING,FILL,DETENTION PONDS,BIKE LL m LL
\ \ \ F \\ ■ PATHS,PARKING LOTS,UTILITIES,LANDSCAPED AREAS,FLOOD CONTROL CHANNELS,ETC.)WITHIN THE COOPER SLOUGH FLOODPLAIN
LIMITS--.STORAGE OF EQUIPMENT AND MATERIALS(TEMPORARY OR PERMANENT)IS NOT ALLOWED IN THE FLOODWAY.ALL ACTIVITIES WITHIN
\\'■ �.�
\ THE FLOODPLAIN ARE SUBJECT TO THE REQUIREMENTS OF CHAPTER 10 OF THE FORT COLLINS MUNICIPAL CODE.
3. CRITICAL FACILITIES ARE PROHIBITED IN THE 100-YEAR FLOODPLAIN.CRITICAL FACILITIES INCLUDE ESSENTIAL SERVICES,AT-RISK
\ ( \ # Date Issue/Description Init.
EFFECTIVE COOPER SLOUGH POPULATION,HAZARDOUS MATERIALS,AND GOVERNMENT FACILITIES.
\ = - FEMA 100 YEAR FLOODPLAIN LIMITS \ FUT- H 4. CONSTRUCTION OF NEW STRUCTURES,HARD SURFACE PATHS,WALKWAYS,DRIVEWAYS,WALLS,AND PARKING AREAS IS PROHIBITED IN THE - 0 ENGINEERS STAMP ADDED JEP
■ 1 05I10/2023 12023 F1 AMENDMENT JEP
\� \ FLOODWAY UNLESS NO-RISE CONDITIONS ARE MET.ANY CONSTRUCTION ACTIVITIES IN THE REGULATORY FLOODWAY MUST ALSO INCLUDE A
_ _ �� \ ■ NO-RISE CERTIFICATION PREPARED BY A PROFESSIONAL ENGINEER LICENSED IN COLORADO.AN APPROVED FEMA ELEVATION CERTIFICATE -
��\�\ `\ \ 0.80 33, COMPLETED BY A LICENSED SURVEYOR OR CIVIL ENGINEER SHOWING THAT THE BUILDING IS CONSTRUCTED TO THE REQUIRED ELEVATION IS -
\ REQUIRED POST-CONSTRUCTION PRIOR TO A CERTIFICATE OF OCCUPANCY(CO)BEING ISSUED.PLEASE NOTE: IF ANY PART OF THE
1 .00 acres
\\ \ \ BUILDING IS WITHIN THE FLOODPLAIN BOUNDARY,THEN THE ENTIRE STRUCTURE IS CONSIDERED IN THE FLOODPLAIN AND THE ENTIRE -
\\ \ \ \\ - ■ BUILDING ENVELOPE MUST MEET THE REQUIREMENTS OF ELEVATING TO THE RFPE.
5. ALL BASE FLOOD ELEVATIONS ARE BASED ON NAVD 1988 DATUM. -
I
z i 0 1
5.6:1 WQ / DETENTION POND \\\ `\ \ o Project No: HFH000022
01
\ \\\ `� \
Drawn By: JKD
\`�\ \\ \ �\`\ \\�\ \`�\ \ - ' \ ■ Checked By: JEP
I \ KnowwhatsbeloW. Date: 11.07.2022
I \ \ \ \ Call before you dig.
DRAINAGE PLAN
■ ■ � ■ ■ ; ■ ■ ��� � � � � ■ ■ � ■ ■ ■ � ■ ■ ' ■ ■ ■ ■ � ■ ■ ' ■ � CITY OFGREELEY
LL MATCHLINE-SEE SHEET C10. 12
Reviewed By.
U
LL WATER/SEWER CHIEF ENGINEER DATE
0
U
C 10 10
Review does not constitute "approval" of plans. Permittee is
responsible for accuracy and completeness of plans.
L •'
MATCHLINE-SEE SHEET C10.9 Gan owa
� I
I 5265 Ronald Reagan Blvd.,Suite 210
I Johnstown,CO 80534
I
_ 970.800.3300
■ I I �� GOs qIN GallowayUS.com
I
G 7
G8ID JIM
�I
1 0.78 0.57 1REP
010
0.98 acres ,
�; 0.78 0.48
ArRawl
I v v v v «�
i 36" RCP (PRIVATE) 0.97 acres
7.
v 1
POND G STORM FES C (PRIVATE) SDMH C1 (PUBLIC)
WQ DETENTION POND 36" FES �� v MH-ECCENTRIC (7' 0) 010 mu
SD INLET 02 (PUBLIC):.. v v v v
SD 0 T STRUCTURE 01 (PRIVATE) CDOT-TYPE R INLET (10') SDMH 03 (PUBLIC)
A-G5 CDO -TYPE C INLET (35" X 35") � MH-ECCENTRIC (6' 0) \\ \ \
1� ° 18�RCP
- v v v aaio �ann
24" RCP (PRIVATE) 24" LP � � v v ,
COPYRIGHT
0.52 ES PLANS
H ARE AN INSTRUMENT OF SERVICE
0.87 G7 `-'" AND ARE THE PROPERTY OF GALLOWAY,AND MAY
0.65 acres \ NOT BE DUPLICATED,DISCLOSED,OR REPRODUCED
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
ENFORCED AND PROSECUTED.
COPYRIGHTS AND INFRINGEMENTS WILL BE
:. U
---------- --• -.- . .: L
.�- v v K YMAP
PROPOSED MAJOR CONTOUR
�- SDMH M6 (PUBLIC) - - PROPOSED MINOR CONTOUR 36
3g MH-ECCENTRIC (5 0) EXISTING MAJOR CONTOUR -- -4835-- -
EXISTING MINOR CONTOUR
-- - - - -�-� - - - - - -
EXISTING STORM DRAIN SD
---_ -x. _ - v v
---______ ' .• _� \ PROPOSED STORM DRAIN
--------
----------------- - ---
■ 8
--�-- PROPOSED STORM INLET
■ (S. 2198 _ PROPERTY BOUNDARY
WSEL:
4930.7 - - PROPOSED RIGHT-OF-WAY
\
- - v PROPOSED LOTLINE
EASEMENT LINE
--------------
A-G6
BASIN ID
H 2
■ 0.55 0.83
- - - - 0.69 acres Al
0.7 0.77 2-YR RUNOFF
0.55 , 0.53 COEFFICIENT 0.05
2.50
0.9 acres 0.96 acres 0.35 acres
0-YR RUNOFF BASIN AREA
■ \ 1000EFFICIENT (ACRES)
SDMH M5 (PUBLIC)
■ �� MH-ECCENTRIC (5' 0)
DESIGN POINT
I
DETENTION POND BASIN BOUNDARY
(i.e.,MHFD-Detention-v4.03 and/or SWMM)
W ■
SUB-BASIN BOUNDARY(i.e.,Rational Method)
W
\
= I FEMA CROSS SECTION z
Q
OVERLAND FLOW DIRECTION J
1
L1J 11 o � 1 \ 1 (LE.,LANDSCAPING)
``^^ \ DIRECT FLOW DIRECTION
V ■ (I.E.,PAVEMENT,CURB AND z
L U ■ (FUT- H 11 170 GUTTER) LU L U
� 1 1
II l APPROXIMATE DETENTION POND 0
J I I OVERFLOW PATH O
= 0.80 33.3 11 O 0 U
IU 1 .00 acres J zSD INLET M4 (PUBLIC) IRRIGATION POND LIMITS w
■ CDOT-TYPE R INLET (10') \ J z
■ 1 18 RCP (PUBLICS
.' � 'I t 1 w LL. J
XS: 1748 0 p
NOTES: U
- - - - - - - - - - - - WSEL: 4930.5 - - - - - - - - - - - - - - - - - - `' 1. PORTIONS OF THIS PROPERTY ARE LOCATED IN THE FEMA-REGULATED,100-YEAR COOPER SLOUGH FLOODPLAIN/FLOODWAY AND MUST _I O
COMPLY WITH THE SAFETY REGULATIONS OF CHAPTER 10 OF CITY MUNICIPAL CODE. Q O
H 1 2. THE DEVELOPER SHALL OBTAIN A FLOODPLAIN USE PERMIT FROM THE CITY OF FORT COLLINS AND PAY ALL APPLICABLE FLOODPLAIN USE z J
■ __ PERMIT FEES PRIOR TO COMMENCING ANY CONSTRUCTION ACTIVITY(BUILDING OF STRUCTURES,GRADING,FILL,DETENTION PONDS,BIKE LL m U_
■ -- PATHS,PARKING LOTS,UTILITIES,LANDSCAPED AREAS,FLOOD CONTROL CHANNELS,ETC.)WITHIN THE COOPER SLOUGH FLOODPLAIN
H3 --
LIMITS--.STORAGE OF EQUIPMENT AND MATERIALS(TEMPORARY OR PERMANENT)IS NOT ALLOWED IN THE FLOODWAY.ALL ACTIVITIES WITHIN
THE FLOODPLAIN ARE SUBJECT TO THE REQUIREMENTS OF CHAPTER 10 OF THE FORT COLLINS MUNICIPAL CODE,
- 3. CRITICAL FACILITIES ARE PROHIBITED IN THE 100-YEAR FLOODPLAIN.CRITICAL FACILITIES INCLUDE ESSENTIAL SERVICES,AT-RISK
I
0.80 0 92 m POPULATION,HAZARDOUS MATERIALS,AND GOVERNMENT FACILITIES. # Date Issue I Description Init.
4. CONSTRUCTION OF NEW STRUCTURES,HARD SURFACE PATHS,WALKWAYS,DRIVEWAYS,WALLS,AND PARKING AREAS IS PROHIBITED IN THE - 02.13.2023 ENGINEERS STAMP ADDED JEP
■ 1 .00 acres � I 1 , I -
■ FLOODWAY UNLESS NO-RISE CONDITIONS ARE MET.ANY CONSTRUCTION ACTIVITIES IN THE REGULATORY FLOODWAY MUST ALSO INCLUDE A 1 05/10/2023 F1 AMENDMENT JEP
II
M NO-RISE CERTIFICATION PREPARED BY A PROFESSIONAL ENGINEER LICENSED IN COLORADO.AN APPROVED FEMA ELEVATION CERTIFICATE -
1
1 COMPLETED BY A LICENSED SURVEYOR OR CIVIL ENGINEER SHOWING THAT THE BUILDING IS CONSTRUCTED TO THE REQUIRED ELEVATION IS
REQUIRED POST-CONSTRUCTION PRIOR TO A CERTIFICATE OF OCCUPANCY(CO)BEING ISSUED.PLEASE NOTE: IF ANY PART OF THE
\
BUILDING IS WITHIN THE FLOODPLAIN BOUNDARY,THEN THE ENTIRE STRUCTURE IS CONSIDERED IN THE FLOODPLAIN AND THE ENTIRE -
BUILDING ENVELOPE MUST MEET THE REQUIREMENTS OF ELEVATING TO THE RFPE. -
■ I 5. ALL BASE FLOOD ELEVATIONS ARE BASED ON NAVD 1988 DATUM.
I I -
I
SDMH M3 (PUBLIC)
H4 -_
MH-ECCENTRIC (6' 0)
0.80
I I 1 .02
■ 0.99 acres
■ I I '
I I 1
Project Na: HFH000022
I I \ I
01 ■ II _--- 1 ` i Drawn By: JKD
Checked By: JEP
a' ■ I I 1 \ I I I
1 Date: 11.07.2022
z
I DRAINAGE PLAN
I � �
■ ■ ■ ■ ■ ■ ■ ■ ■ �� ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■
MATCHLINE-SEE SHEET C10. 13
U 0
LL 0
O
y
0 10 20 5010-��- Knowwhat'sbeloW. C ■
z
SCALE:1"=50' Call before you dig.
ii
Gammoway
5265 Ronald Reagan Blvd.,Suite 210
Johnstown,CO 80534
970.800.3300
ao� GallowayUS.com
ID rii MIT
I �
E�]L
ou aoa
l au
® aot aat
MATCHLINE-SEE SHEET C10. 10
my ann
SCALE:1°=50' COPYRIGHT
THESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY,AND MAYNOT BE DUPLICATED,\ \ \ \ WITHOUT THE WR TTEN CONOSENT OF GASED,OR P OWAY REPRODUCED
COPYRIGHTS AND INFRINGEMENTS WILL BE
acts ENFORCED AND PROSECUTED.
K Y�MAP ;
PROPOSED MAJOR CONTOUR
PROPOSED MINOR CONTOUR — — 36
EXISTING MAJOR CONTOUR —4835—— —
��� XS: 1277 EXISTING MINOR CONTOUR
\ WSEL: 4930.5
- - - SD — — —
\, EXISTING STORM DRAIN
�- - - - - - - - - - - - - - - PROPOSED STORM DRAIN
PROPOSED STORM INLET 8
PROPERTY BOUNDARY
PROPOSED RIGHT-OF-WAY
PROPOSED LOTUNE
EASEMENT LINE --------------
���� rFUT- H
BASIN ID
M Al
0.80 2-YR RUNOFF
33.3 CDCOEFFICIENT 0.05
1 .00 acres 7— 2.
0.35 acrree
s
10
/ \ \ U BASIN AREA
\ \ \ COEFFICIENT (ACRES)
LLI
DESIGN POINT A
DETENTION POND BASIN BOUNDARY
1 �
W (i.e.,MHFD-Detention_v4.03 and/or SWMM)
W SUB-BASIN BOUNDARY(i.e.,Rational Method)
FEMA CROSS SECTION — z
i
W
Q
FUT- 1 z
OVERLAND FLOW DIRECTION
J (LE.,LANDSCAPING)
\ \ i \ I \ t \ �+'`•"~ DIRECT FLOW DIRECTION
0.80 6.A 'tl \ 1 \ \ \ t� \ �•.' � U (I.E.,PAVEMENT,CURB AND � z
V `F t 1I I \ \ \ I r GUTTER) w W
1 .00 acres Q zo
t \ \ APPROXIMATE DETENTION POND
/��.•," � OVERFLOW PATH � O
l � !!nn
—� � --------------------- �,.o O V U
IRRIGATION POND LIMITS w J Z
--�1 --------------------- W L.L J
XS: 9o0 .,..: p O
WSEL: 4930.5 NOTES: U
—�— — — _ _ _ _ _ _ _ _ _ _ _ _ _ _ 3: •' — — 4 1. PORTIONS OF THIS PROPERTY ARE LOCATED IN THE FEMA-REGULATED O
FEMA-REGULATED, COOPER SLOUGH FLOODPLAIN/FLOODWAY AND MUST J
— — — — — — —� ` ' — — — — Q ~COMPLY WITH THE SAFETY REGULATIONS OF CHAPTER 10 OF CITY MUNICIPAL CODE.
1 � , .. 0 Of
"�"' 2. THE DEVELOPER SHALL OBTAIN A FLOODPLAIN USE PERMIT FROM THE CITY OF FORT COLLINS AND PAY ALL APPLICABLE FLOODPLAIN USE Z J 0
\ W
s PERMIT FEES PRIOR TO COMMENCING ANY CONSTRUCTION ACTIVITY(BUILDING OF STRUCTURES,GRADING,FILL,DETENTION PONDS,BIKE U_ m L1_
Ili � z 1 . .ti . — — w • , •�. —W
'1 `1 i 1 r::• +:.:.• '. PATHS,PARKING LOTS,UTILITIES,LANDSCAPED AREAS,FLOOD CONTROL CHANNELS,ETC.)WITHIN THE COOPER SLOUGH FLOODPLAIN
'v XS: 844 \— — , — — — — — —- - — �` ' LIMITS--.STORAGE OF EQUIPMENT AND MATERIALS(TEMPORARY OR PERMANENT)IS NOT ALLOWED IN THE FLOODWAY.ALL ACTIVITIES WITHIN
WSEL. 4930.5
ro — — THE FLOODPLAIN ARE SUBJECT TO THE REQUIREMENTS OF CHAPTER 10 OF THE FORT COLLINS MUNICIPAL CODE,
— — — — — _ -
p -c
_ "" — — _ , , _ — �0 F° ro —FO G ——_Eo— — —��o _ __ 3. CRITICAL FACILITIES ARE PROHIBITED IN THE 100-YEAR FLOODPLAIN.CRITICAL FACILITIES INCLUDE ESSENTIAL SERVICES,AT-RISK
.
_ _ • 4 CONSTRUCTION OF NEW STRUCTURE HARD SURFACE PATH WALKWAYS,DRIVEWAYS, AL AND PARKING AREAS IS PROHIBITED IN THE D2 13.2023 ENGINEERS STAMP ADDED I JEP
POPULATION HAZARDOUS MATERIALS AND GOVERNMENT FACILITIES
W- -
- S,H S,W S,D S,WALLS,A
� � � FLOODWAY UNLESS NO-RISE CONDITIONS ARE MET.ANY CONSTRUCTION ACTIVITIES IN THE REGULATORY FLOODWAY MUST ALSO INCLUDE A 1 05/1012023 F1 AMENDMENT JEP
———— ——� ————— ————————'———— ——————--
NO-RISE CERTIFICATION PREPARED BY A PROFESSIONAL ENGINEER LICENSED IN COLORADO.AN APPROVED FEMA ELEVATION CERTIFICATE
COMPLETED BY A LICENSED SURVEYOR OR CIVIL ENGINEER SHOWING THAT THE BUILDING IS CONSTRUCTED TO THE REQUIRED ELEVATION IS
REQUIRED POST-CONSTRUCTION PRIOR TO A CERTIFICATE OF OCCUPANCY(CO)BEING ISSUED.PLEASE NOTE: IF ANY PART OF THE
. BUILDING IS WITHIN THE FLOODPLAIN BOUNDARY,THEN THE ENTIRE STRUCTURE IS CONSIDERED IN THE FLOODPLAIN AND THE ENTIRE -
BUILDING ENVELOPE MUST MEET THE REQUIREMENTS OF ELEVATING TO THE RFPE. —
_ 5. ALL BASE FLOOD ELEVATIONS ARE BASED ON NAVD 1988 DATUM.
Y
3
3
ui
C7
Q
z_
Project Na: HFH000022
U
0 o Drawn By: JKD
Checked By: JEP
0
Knowwhat'sbelow. Date: 11.07.2022
Call beforeyoudig.
DRAINAGE PLAN
CITY OF GREELEY
Reviewed By.
U
LL WATER/SEWER CHIEF ENGINEER DATE
0
U
C10 , 12
Review does not constitute "approval" of plans. Permittee is
responsible for accuracy and completeness of plans.
ii
Gammoway
5265 Ronald Reagan Blvd.,Suite 210
Johnstown,CO 80534
970.800.3300
ao� GallowayUS.com
fTm
I �
cloA q0a
TmnT
ao� aat
MATCHLINE-SEE SHEET C10. 11
COPYRIGHT
0 10 20 50 HPLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY,AND MAY
I N ; ; - NOT BE DUPLICATED,DISCLOSED,OR REPRODUCED
■ �� `� ;
CA LE:1"=50' ® WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
S
COPYRIGHTS AND INFRINGEMENTS WILL BE
■ H 4 ; �
� \\ i i l l dots ENFORCED AND PROSECUTED.
i i i NK,EYMAP
FUT- H 11
EFFECTIVE COOPER SLOUGH
FEMA 100 YEAR FLOODPLAIN LIMITS
0.80
1 .02
_ I� I 0.99 acres I PROPOSED MAJOR CONTOUR
33.3 �"' i a `� PROPOSED MINOR CONTOUR 36
■ 1 .00 acres I I EXISTING MAJOR CONTOUR —— —4835—— —
I - EXISTING MINOR CONTOUR
XS: 1277 -; � ��\ ; EXISTING STORM DRAIN — — — SD — — —
WSEL: 4930.5 PROPOSED STORM DRAIN
PROPOSED STORM INLET Ea
■ H 3 ����, �� ; ; PROPERTY BOUNDARY
■ rF �� `v �� ; PROPOSED RIGHT-OF-WAY
H3 PROPOSED L01UNE
EASEMENT LINE --------------
0.80 0.92 _ ` H4 _
■ 1 .00 acres ----- — _--__ BASIN ID
■ � - _ 1 - - - ; , , � 2-YR RUNOFF
Al
N ` _ _ _ I COEFFICIENT 0.05
2.50
BAS IN
0.35 acres M2 (PUBLIC) �N 1 0-YR RUNOFF (ACRES)AREA
SDMH
= __ MH-ECCENTRIC (6' 0) 0
COEFFICIENT
DESIGN POINT
i
L1J _ `\ DETENTION POND BASIN BOUNDARY
2 �o -.::.. I /; - \ \\ (i.e.,MHFD-Detention-v4.03 and/or SWMM)
VJ o'• - r i
SD OUTLET STRUCTURE M1.1 I / \` /
\ SUB-BASIN BOUNDARY(i.e.,Rational Method)
w '••" CDOT-TYPE C INLET (35" X 35") (n
LJJ Z
�•' i � (PRIVATE) i a� ���� \\ �\ 1 FEMA CROSS SECTION —
� SDMH M1 PUBLIC
7�\ `
OVERLAND FLOW DIRECTION
POND H MH-ECCENTRIC
i I.E.,LANDSCAPING
/:.•.: 1 ATE) ( ) ��, ( )
18" RCP (PRIV
WQ / DETENTION POND
DIRECT FLOW DIRECTION
y (I.E.,PAVEMENT,CURB AND
GUTTER) LU W
y G Z
y
APPROXIMATE DETENTION POND O r\ OVERFLOW PATH O
O C� U
Q a -xCEt X EL
II .., (O
- - ------------- ---------- - IRRIGATION POND LIMITS
II UJ J Z
0
32 w J
t. -------------------- _ — NOTES:
_ SDMH M PUBLIC I O
I - S 1. PORTIONS OF THIS PROPERTY ARE LOCATED IN THE FEMA-REGULATED,100-YEAR COOPER SLOUGH FLOODPLAIN/FLOODWAY AND MUST J U
MH-ECCENTRIC (8' 0) - - - - - - - - - - - - _ - _ COMPLY WITH THE SAFETY REGULATIONS OF CHAPTER 10 OF CITY MUNICIPAL CODE
2. THE DEVELOPER SHALL OBTAIN A FLOODPLAIN USE PERMIT FROM THE CITY OF FORT COLLINS AND PAY ALL APPLICABLE FLOODPLAIN USE Z O 0
■ w 11 - --__ 02 PERMIT FEES PRIOR TO COMMENCING ANY CONSTRUCTION ACTIVITY(BUILDING OF STRUCTURES,GRADING,FILL,DETENTION PONDS,BIKE U_ m L.L
_ -- PATHS,PARKING LOTS,UTILITIES,LANDSCAPED AREAS,FLOOD CONTROL CHANNELS,ETC.)WITHIN THE COOPER SLOUGH FLOODPLAIN
W —W w LJ w — — —" - - " - — ��w / I W �L LIMITS--.STORAGE OF EQUIPMENT AND MATERIALS(TEMPORARY OR PERMANENT)IS NOT ALLOWED IN THE FLOODWAY.ALL ACTIVITIES WITHIN
W - — THE FLOODPLAIN ARE SUBJECT TO THE REQUIREMENTS OF CHAPTER 10 OF THE FORT COLLINS MUNICIPAL CODE,
IF 7
—— — — = 3. CRITICAL FACILITIES INCLUDE ESSENTIAL SERVICES,AT-RISK
FACILITIES ARE PROHIBITED IN THE 100-YEAR FLOODPLAIN ESRISKA -
# Date Issue/Description Init.
—ro— — —ro — ro - Fo Fo - _ t�_ _ POPULATION,HAZARDOUS MATERIALS,AND GOVERNMENT FACILITIES. P
� rt I — -- --- ----- -- - 02.13,2023 ENGINEERS STAMP ADDED JEP 4. CONSTRUCTION OF NEW STRUCTURES,HARD SURFACE PATHS,WALKWAYS,DRIVEWAYS,WALLS,AND PARKING AREAS IS PROHIBITED IN THE
— — - — ----- — *----- — — — — — =--- 1 05/1012023 F1 AMENDMENT JEP
FLOODWAY UNLESS NO-RISE CONDITIONS ARE MET ANY CONSTRUCTION ACTIVITIES IN THE REGULATORY FLOODWAY MUST ALSO INCLUDE A
--
� NO-RISE CERTIFICATION PREPARED BY PROFESSIONAL ENGINEER LICENSED IN COLORADO.AN APPROVED FEMA ELEVATION CERTIFICATE —
�_ COMPLETED BY A LICENSED SURVEYOR OR CIVIL ENGINEER SHOWING THAT THE BUILDING IS CONSTRUCTED TO THE REQUIRED ELEVATION IS —
I REQUIRED POST-CONSTRUCTION PRIOR TO A CERTIFICATE OF OCCUPANCY(CO)BEING ISSUED.PLEASE NOTE: IF ANY PART OF THE
-- - -
-- - BUILDING IS WITHIN THE FLOODPLAIN BOUNDARY,THEN THE ENTIRE STRUCTURE IS CONSIDERED IN THE FLOODPLAIN AND THE ENTIRE
BUILDING ENVELOPE MUST MEET THE REQUIREMENTS OF ELEVATING TO THE RFPE. =
■ 5. ALL BASE FLOOD ELEVATIONS ARE BASED ON NAVD 1988 DATUM. =
------------- ---------=______ - ______________---------_-=
Y
3
3
ui
C7
Q
z_
o 0 Project No HFH000022
�, • Drawn By: JKD
Checked By: JEP
0
Knowwhat'sbelow. Date: 11.07.2022
Call before you dig.
DRAINAGE PLAN
CITY OF GREELEY
Reviewed By:
U
LL WATER/SEWER CHIEF ENGINEER DATE
0
U
C1 0 , 13
Review does not constitute "approval" of plans. Permittee is
responsible for accuracy and completeness of plans.
CTLITHOMPSON
Founded •
Oigltally signed by Robert Mosbey
DN:CN=Ruben Mosbey,OU=Users
and Groups,OU=Engineering,
Robert Mosbey OU=POT,DC=es,DC=oily, Inge,.
DC=oorn
Data:2023.09.26 08:45:37-06'00'
SUBGRADE INVESTIGATION AND PAVEMENT RECOMMENDATIONS
Bloom Subdivision
Filing 1 Roads, Phase 2
Aria Way, Tourmaline Place, Parkland Street, Roselyn Street, Flourish Lane, and Portions of
Conquest Street, Sykes Drive, Comet Street, Crusader Street, and Greenfields Drive
Fort Collins, Colorado
Prepared for:
HARTFORD HOMES
4801 Goodman Street
Timnath, Colorado 80542
Attention:
Shane Westlind
Vice President of Land
CTLIT Project No. FC07733.008-135
September 25, 2023
CTLIThompson, Inc.
Denver, Fort Collins, Colorado Springs, Glenwood Springs, Pueblo, Summit County—Colorado
Cheyenne, Wyoming and Bozeman, Montana
Table of Contents
Scope 1
Summary Of Conclusions 1
Site Location and Project Description 2
Previous Investigations 2
Field and Laboratory Investigation 2
Subsurface Conditions 3
Pavement Design 4
Traffic Projections 4
Subgrade and Groundwater Conditions 5
Pavement Thickness Calculations 5
Pavement Recommendations 5
Subgrade and Pavement Materials and Construction 6
Water-Soluble Sulfates 7
Maintenance 9
Surface Drainage 9
Limitations 10
FIGURES 1 AND 2 — LOCATIONS OF EXPLORATORY BORINGS
APPENDIX A— SUMMARY LOGS OF EXPLORATORY BORINGS
APPENDIX B — RESULTS OF LABORATORY TESTING
APPENDIX C — PAVEMENT DESIGN CALCULATIONS
APPENDIX D — PAVEMENT CONSTRUCTION RECOMMENDATIONS
APPENDIX E — MAINTENANCE PROGRAM
Scope
This report presents the results of our subgrade investigation and pavement
recommendations for the proposed roadways in the Bloom Subdivision in Fort Collins,
Colorado. The purpose of our subgrade investigation was to determine the subsurface
conditions and to evaluate pavement support characteristics for our pavement
recommendations. The report was conducted in general conformance with the Larimer County
Urban Area Street Standards, August 2021.
This report was prepared from data developed during field exploration, laboratory testing,
engineering analysis, and experience with similar conditions. The report includes a description
of the subsurface conditions found in exploratory borings, laboratory test results, and pavement
construction and material recommendations for the construction of Aria Way, Tourmaline Place,
Parkland Street, Roselyn Street, Flourish Lane, and portions of Conquest Street, Sykes Drive,
Comet Street, Crusader Street, and Greenfields Drive. If plans change significantly, we should
be contacted to review our investigation and determine if our recommendations still apply. A
brief summary of our conclusions is presented below, with more detailed criteria and
recommendations contained in the report.
Summary Of Conclusions
1. Soils encountered in our borings generally consisted of 10 feet of clean to clayey,
gravelly sand or sandy clay. The upper 3 to 5 feet of all but six borings was fill,
placed during site grading and/or utility installation. Bedrock was not encountered
during this investigation. Groundwater was encountered in ten borings at
approximately 4 to 9 feet. Only one boring indicated water within 5 feet of the
subgrade surface.
2. The subgrade soils classified as A-2-4 to A-6 according to AASHTO methods.
Such material is considered to exhibit good to poor subgrade support. Swell-
consolidation testing indicated swells of nil to 2.8 percent. Based on our lab data,
subgrade conditions and our experience, we recommend mitigation for swelling
soils.
3. Precipitation in the area was observed to create soft, saturated soil conditions. If
soft soils are encountered during construction stabilization can likely be achieved
by crowding 1'/2 to 3-inch nominal size crushed rock into the subgrade until the
base does not deform by more than about 1-inch under compactive effort.
Chemical treatment (cement, fly ash, lime) can also be considered for
stabilization. We understand that cement stabilization has been the preferred
method at this site. Soft soil mitigation is discussed in the report.
HARTFORD HOMES
BLOOM FILING 1 ROADS-PHASE 2 1
CTL I T PROJECT NO.FC07733.008-135
4. Asphaltic concrete and/or Portland cement concrete over aggregate base course
are appropriate surface pavements for the included roadways. Minimum
pavement recommendations are presented in this report.
Site Location and Project Description
The Bloom Subdivision is located between East Vine Drive and Mulberry Street, east of
Timberline Drive in Fort Collins, Colorado (Figure 1). Phase 2 includes the portion of
Greenfields Drive between International Boulevard and Sykes Drive. Also included in the
investigation are Aria Way, Tourmaline Place, Parkland Street, Roselyn Street, Flourish Lane,
and portions of Conquest Street, Sykes Drive, Comet Street, and Crusader Street. The roads
are anticipated to be paved with hot mix asphalt and/or Portland cement concrete.
Previous Investigations
CTLIThompson previously performed a Preliminary Geotechnical Investigation at Bloom
Subdivision under CTLIT project No. FC07733-115, report dated May 11, 2017, and a
Geotechnical Investigation for various Filing 1 structures under FC07733.005-125 dated July 18,
2023. A Subgrade Investigation and Pavement Design was performed for the Phase 1 roads
under CTLIT Project No. FC07733.006-135, report dated July 26, 2023. Data from the previous
investigations were considered for this report.
Field and Laboratory Investigation
Our field investigation consisted of drilling twenty-one borings to a depth of approximately
10 feet, logging the subsurface conditions, recording penetration-resistance tests, and acquiring
samples of the subgrade materials. Borings were drilled at approximate 500-foot spacing, or
less. The approximate locations of our borings are presented on Figures 1 and 2. The borings
were drilled with 4-inch diameter continuous-flight augers and a truck-mounted drill. Our field
representative directed the field investigation as the borings were advanced. Bulk samples
were obtained from the upper 4 feet of the borings and modified California samples were
obtained from selected intervals within the borings. The number of blows from a 140-pound
hammer failing 30 inches, required to drive the modified California sampler, were recorded.
Summary logs of the borings, including results of field penetration resistance tests, are
presented in Appendix A.
HARTFORD HOMES
BLOOM FILING 1 ROADS-PHASE 2 2
CTL I T PROJECT NO.FC07733.008-135
After the samples were returned to our laboratory, our geotechnical engineer for this
project examined the samples and assigned laboratory testing. Laboratory testing was
performed in general accordance with AASHTO and ASTM methods to determine index
properties, classification, and subgrade support values for those soil types influencing the
pavement design. To evaluate potential heave, swell-consolidation testing was performed on
samples of the subgrade soils. Swell testing samples were inadvertently tested under a
pressure of 500 pounds per square foot (psf) instead of the required 150 psf. We have adjusted
the recommendations in this report accordingly. Other laboratory tests and analysis included
moisture content, dry density, Atterberg limits, gradation analysis, swell consolidation, particle-
size analysis, and water-soluble sulfate tests. We performed one Hveem stabilometer tests on
bulk samples during this investigation and two during the previous investigation. Results of
laboratory tests are presented on Appendix B and summarized in Table B-I.
Subsurface Conditions
Soils encountered in our borings generally consisted of clean to clayey, gravelly sand or
sandy clay to the depths explored of 10 feet. The upper 3 to 5 feet of all but six borings was
identified as fill, placed during site grading and/or utility installation. The fill was tested by our
firm and generally found to meet project specifications at the time of placement. Bedrock was
not encountered during this investigation. Swell-consolidation testing of the upper 5 feet
indicated nil to 2.8 percent swell. Samples tested in the laboratory contained 5 to 58 percent
clay and silt-sized particles (passing the No. 200 sieve). Atterberg limit testing indicated liquid
limits of 21 to 32 and plasticity indices of 5 to 18. Hveem Stabilometer tests of three bulk
samples collected from the Filing 1 interior roads and Greenfields Drive indicated R-values of
15, 25, and 25.
Groundwater was encountered in ten borings at approximately 4 to 9 feet. Only one
boring indicated water within 5 feet of the subgrade surface and not indicative of a shallow
groundwater table. Groundwater fluctuates seasonally and will be affected by irrigation and
precipitation. Groundwater is not expected to affect pavement construction for the included
roads. Further description of the subsurface conditions is presented in our boring logs and
laboratory test results.
HARTFORD HOMES
BLOOM FILING 1 ROADS-PHASE 2 3
CTL I T PROJECT NO.FC07733.008-135
Pavement Design
New construction is planned for the subject roadways. We understand roadway
improvements are regulated by the Larimer County Urban Area Street Standards August 2021
(LCUASS), which requires the use of the AASHTO pavement design methods for their
roadways. These design methods require input parameters for traffic projections for a specified
design life, roadway classification, characteristics of the subgrade materials, type and strength
characteristics of pavement materials, groundwater conditions, drainage conditions, and
statistical data.
Traffic Projections
Traffic projections are typically expressed as an 18-kip Equivalent Daily Load Application
(EDLA) for a single day or as an 18-kip Equivalent Single Axle Load (ESAL) for the design
period of 20 years. Traffic projections were not provided to us for this report. We used Table
10.1: Flexible Pavement Design Criteria from LCUASS for assumed ESAL loads. Table A
presents the roadway classifications and Design ESALs used with our calculations.
Table A:
Design 18-kip Equivalent Single Axle Loads (ESALs)
Street Flexible ESAL Rigid ESAL
Aria Way (Parkland to Sykes), Tourmaline Place,
Parkland Street, Conquest Street, Comet Street, 36,500/73,000 47,900/95,700
Crusader Street, Roselyn Street, and Flourish Lane
(Local/Cul-de-sac)
Sykes Drive and Aria Way (Sykes to Donnella) 182,500 239,000
(Minor Collector)
Greenfields Drive 730,000 957,000
(Two-Lane Arterial)
HARTFORD HOMES
BLOOM FILING 1 ROADS-PHASE 2 4
CTL I T PROJECT NO.FC07733.008-135
Subgrade and Groundwater Conditions
The subgrade soils generally consist of clean to clayey, gravelly sand or sandy clay that
classifies as A-2-4 to A-6 in accordance with AASHTO classification methods. Hveem
stabilometer tests of composite samples of nearby sandy clay and clayey sand resulted in R-
values of 15 to 25. We used the R-value of 15 which we converted to a resilient modulus of
7,247 psi based on CDOT criteria. Moderately to highly plastic clay and higher swelling soils
were encountered during this investigation. Based on our experience at the site and laboratory
data, we recommend mitigation for swelling soils. Mitigation should consist of the removal,
moisture or chemical treatment, and re-compaction of 12 inches of the subgrade below the
included roadways. We understand that cement treatment is the preferred stabilization method
at this site. Groundwater was encountered at depths of approximately 4 to 9 feet in ten borings
during this investigation. Only one boring indicated water within 5 feet of the subgrade surface
and not indicative of a shallow groundwater table. Groundwater is not expected to interfere with
the performance of the pavement.
Pavement Thickness Calculations
We used AASHTO methods to develop our pavement thickness calculations for flexible
and rigid pavements with input values provided by the LCUASS, our laboratory tests, and
observations. Input values including initial and terminal serviceability indices, reliability factor,
and layer strength coefficients were taken from LCUASS. Other input values not specified by
the LCUASS were estimated based on our experience with similar projects. Computer-
generated printouts of the pavement calculations are presented in Appendix C.
Pavement Recommendations
For our design, we assume the pavement will be constructed during a single stage. If
multiple-stage construction is desired, we should be consulted to revise our recommendations.
We have provided pavement design recommendations for new construction including hot mix
asphalt (HMA) on aggregate base course (ABC), and Portland cement concrete (PCC). Cement
treatment of the upper 12 inches of subgrade is recommended to mitigate swelling soils and soft
soils. Minimum pavement thickness recommendations are presented on Table B.
HARTFORD HOMES
BLOOM FILING 1 ROADS-PHASE 2 5
CTL I T PROJECT NO.FC07733.008-135
TABLE B:
MINIMUM PAVEMENT THICKNESS RECOMMENDATIONS
Hot Mix Asphalt Portland Cement
(HMA) + Aggregate Concrete
Roadway Base Course (ABC) (PCC) +
+ Chemical Treated Chemical Treated
Subgrade CTS Sub grade CTS
Aria Way (Parkland to Sykes),
Tourmaline Place, Parkland
Street, Conquest Street, Comet 4" HMA + 6" PCC + 12" CTS
Street, Crusader Street, Roselyn 6" ABC + 12" CTS
Street, and Flourish Lane
Local
Sykes Drive and Aria Way 5.5" HMA +
(Sykes to Donnella) 7" ABC + 12" CTS 6" PCC + 12" CTS
(Minor Collector)
Greenfields Drive 7.5" HMA + g" PCC +
(Two-Lane Arterial) 11.5" ABC + 12" CTS
12" CTS
Subgrade and Pavement Materials and Construction
The construction materials are assumed to possess sufficient quality as reflected by the
strength factors used in our design calculations. Materials and construction requirements of
LCUASS 2021 or CDOT should be followed. LUCASS requires mitigation of swelling soils when
swell potential is 2.0 percent or greater. Based on the results of laboratory testing, our
experience, and LCUASS, we believe that mitigation for swell will be required below the
included roadways. Soft saturated soils have been encountered throughout the site because of
higher-than-normal precipitation. Cement treatment has been used as the preferred stabilization
method for the site roadways to address both problems. Cement reduces the plasticity and swell
potential of soil and also increases its bearing capacity. Cement concentration for subgrade
stabilization typically ranges between 4 to 7 percent by weight. We believe 4 to 5 percent will
likely be necessary at this site.
We recommend a minimum of 1-day curing period (3 days is preferred) prior to paving
for cement treatment. The surface of the stabilized area should be kept moist during the cure
period by periodic, light sprinkling if needed. Strength gains will be slower during cooler
weather. Traffic should not be permitted on the treated subgrade during the curing period.
Mixing of the treated subgrade should not occur if the temperature of the soil mixture is below
HARTFORD HOMES
BLOOM FILING 1 ROADS-PHASE 2 6
CTL I T PROJECT NO.FC07733.008-135
40 degrees Fahrenheit. The subgrade should be protected from freezing or drying at all times
until paving. We do not recommend placing asphalt pavement directly on cement treated
subgrade. Placement, mixing, and compaction of stabilized subgrade should be observed and
tested by our firm.
Recommendations for paving materials and subgrade preparations, including moisture
and chemical treatment, are presented in Appendix D. Preparation of the subgrade should
extend from back-of-walk to back-of-walk for attached or monolithic walks or back-of-curb to
back-of-curb.
These criteria were developed from analysis of the field and laboratory data, our
experience, LCUASS, and CDOT requirements. If the materials cannot meet these
requirements, our pavement recommendations should be re-evaluated based upon available
materials. The use of recycled materials, such as recycled asphalt pavement (RAP) and
recycled concrete may be used in place of aggregate base course (ABC) provided they meet
minimum R-values and gradations established by LCUASS. Materials planned for construction
should be submitted and the applicable laboratory tests performed to verify compliance with the
specifications.
Water-Soluble Sulfates
The method of applying the stabilizing agent to the soil will depend partly on the level of
water-soluble sulfates in the subgrade soil. A reaction of water-soluble sulfates in the soil and
available calcium in the stabilizing agent can occur creating the mineral ettringite, which can
swell causing detrimental effects to the pavement surface. If unacceptable concentrations of
water-soluble sulfates are present in the soil, the double-application method can reduce the risk
of pavement heave due to ettringite formation to an acceptable level. We measured water-
soluble sulfate concentrations in twenty-one samples for this investigation and fifteen samples
from previous investigations at less than 0.01 to 0.55 percent. Five samples were between 0.20
and 0.55 percent and three were between 0.10 to 0.20 percent with all other samples being
below measurable to 0.08 percent. Our threshold limit of water-soluble sulfates in soils for single
application of cement, fly ash, or lime for stabilization is 0.5 percent. Based on our test results,
we believe single application is appropriate for the site.
HARTFORD HOMES
BLOOM FILING 1 ROADS-PHASE 2 7
CTL I T PROJECT NO.FC07733.008-135
In addition to the interaction of water-soluble sulfates with chemical treatment agents,
concrete that is exposed to sulfate-rich soils can be subject to sulfate attack. If concrete
pavements or structures will not be in contact with sulfate-rich soils, by means of an aggregate
base course layer or other materials, the risk of sulfate attack should be low. Based on our
cumulative test results, our experience, and ACI 332-20, the sulfate exposure class is RS2 (see
Table C). Deviations from the exposure class may occur as a result of additional sampling and
testing.
TABLE C:
SULFATE EXPOSURE CLASSES PER ACI 332-20
Water-Soluble Sulfate(SO4)
Exposure Classes in Soil
Not Applicable RSO <0.10
Moderate RS1 0.10 to 0.20
Severe RS2 0.20 to 2.00
Very Severe RS3 >2.00
A) Percent sulfate by mass in soil determined by ASTM C1580
For this level of sulfate concentration, ACI 332-20 indicates there are special cement
type requirements for sulfate resistance as indicated in Table D.
TABLE D:
CONCRETE DESIGN REQUIREMENTS FOR SULFATE EXPOSURE PER ACI 332-20
E0Maximum Minimum Cementitious Material Types B
a
Water/ Compressive ASTM ASTM ASTM Calcium
Cement Strength a C150/ C595/ C1157/ Chloride
Ratio (psi) C150M C595M C1157MNo Type No Type Admixtures
No No
RSO N/A 2500 Restrictions Restrictions Type Restrictions
Restrictions
RS1 0.50 2500 II Type with (MS) MS No
Designation Restrictions
RS2 0.45 3000 V c Type with (HS) HS Not Permitted
Design tion
Type with (HS)
V+ Pozzolan Designation HS+ Pozzolan
RS3 0.45 3000 or Slag plus Pozzolan or Slag Not Permitted
Cement° or Slag Cement Cement E
E
A) Concrete compressive strength specified shall be based on 28-day tests per ASTM C39/C39M
B) Alternate combinations of cementitious materials of those listed in ACI 332-20 Table 5.4.2 shall be permitted when
tested for sulfate resistance meeting the criteria in section 5.5.
C) Other available types of cement such as Type III or Type I are permitted in Exposure Classes RS1 or RS2 if the
C3A contents are less than 8 or 5 percent, respectively.
D) The amount of the specific source of pozzolan or slag to be used shall not be less than the amount that has been
determined by service record to improve sulfate resistance when used in concrete containing Type V cement.
Alternatively, the amount of the specific source of the pozzolan or slab to be used shall not be less than the
amount tested in accordance with ASTM C1012/C1012M and meeting the criteria in section 5.5.1 of ACI 332-20.
E) Water-soluble chloride ion content that is contributed from the ingredients including water aggregates,
cementitious materials, and admixtures shall be determined on the concrete mixture ASTM C1218/C1218M
between 29 and 42 days.
HARTFORD HOMES
BLOOM FILING 1 ROADS-PHASE 2 8
CTL I T PROJECT NO.FC07733.008-135
Superficial damage may occur to the exposed surfaces of highly permeable concrete,
even though sulfate levels are relatively low. To control this risk and to resist freeze-thaw
deterioration, the water-to-cementitious materials ratio should not exceed 0.50 for concrete in
contact with soils that are likely to stay moist due to surface drainage or high-water tables.
Concrete should have a total air content of 6 percent ± 1.5 percent.
Maintenance
Routine maintenance, such as sealing and repair of cracks, is necessary to achieve the
long-term life of a pavement system. We recommend a preventive maintenance program be
developed and followed for all pavement systems to ensure that design life can be realized.
Choosing to defer maintenance usually results in accelerated deterioration leading to higher
future maintenance costs and/or repair. A recommended maintenance program is outlined in
Appendix E.
Excavation of completed pavement for utility construction or repair can destroy the
integrity of the pavement and result in a severe decrease in serviceability. To restore the
pavement top original serviceability, careful backfill compaction before repaving is necessary.
Surface Drainage
A primary cause of premature pavement deterioration is infiltration of water into the
pavement system. This increase in moisture content usually results in the softening of base
course and subgrade soil and eventual failure of the pavement. In addition, parts of Colorado
experience many freeze-thaw cycles each season that can result in deterioration of the
pavement. We recommend that subgrade, pavement, and surrounding ground surface be
sloped to cause surface water to run off rapidly and away from pavements. Backs of curbs and
gutters should be backfilled with compacted fill and sloped to prevent ponding adjacent to backs
of curbs and to paving. The final grading of the subgrade should be carefully controlled so the
pavement design cross-section can be maintained. Low spots in the subgrade that can trap
water should be eliminated. Seals should be provided within the curb and pavement, and in all
joints to reduce the possibility of water infiltration.
HARTFORD HOMES
BLOOM FILING 1 ROADS-PHASE 2 9
CTL I T PROJECT NO.FC07733.008-135
Limitations
This report has been prepared for the exclusive use of Hartford Homes for the purpose
of providing geotechnical design and construction criteria for the proposed project. This report
was prepared from data developed during our field exploration, laboratory testing, engineering
analysis, and experience with similar conditions. The borings were spaced to obtain a
reasonably accurate understanding of the existing pavements and subsurface conditions. The
borings are representative of conditions encountered only at the exact boring locations.
Variations in subsurface conditions not indicated by our borings are always possible. The
recommendations contained in this report were based upon our understanding of the planned
construction. If plans change or differ from the assumptions presented herein, we should be
contacted to review our recommendations.
A representative of our firm should observe subgrade preparation and pavement
construction. Our representative should also conduct tests of construction materials for
compliance with recommendations presented in this report and/or specifications of the
controlling agency.
Due to the changing nature of site characterization, pavement design methods,
standards, and practices, the information and recommendations provided in this report are only
valid for one year following the date of issue. Following that time, our office should be
contacted to provide, if necessary, any updated recommendations and design criteria as
appropriate for the engineering methodologies used at that time.
We believe this investigation was conducted in a manner consistent with that level of
skill and care ordinarily used by members of the profession currently practicing under similar
conditions in the locality of this project. No warranty, express or implied, is made. If we can be
of further service in discussing the contents of this report or in the analysis of the influence of
subsurface conditions on design of the pavements, please call.
CTL THOMPSON, INC.
oa'°0 c�i
wa Rw4F �� Trace Krausse
K Sep 25 2023 2:42 PM
Trace Krausse, PE R.B. "Chip" Leadbetter, III, PE
Geotechnical Project Engineer Senior Engineer
HARTFORD HOMES
BLOOM FILING 1 ROADS-PHASE 2 10
CTL I T PROJECT NO.FC07733.008-135
E.VINE DR.
LEGEND: SITE
Z N
TH-1 INDICATES APPROXIMATE W
LOCATION OF EXPLORATORY
BORING
E.MULBERRY ST.
APPROXIMATE
SCALE: 1"=200' TH-1 INDICATES APPROXIMATE
0' 100, 200' 9 LOCATION OF PAST COMPLETED VICINITY MAP
BORINGS FROM FC07733.006-135 FORT COLLINS,COLORADO
NOT TO SCALE
TH-1
- - F
TH-1�
-'t—TH-2
-� C: TH-2
------------
Ti An
C H-3 - ` TH-4 - �.- - _TH-6_ -
Parkland Street :.
4-4
"TH-4
Conquest Street
Locations of
Exploratory Borings
HARTFORD HOMES FIGURE 1
BLOOM FILING 1 ROADS-PHASE 2
CTL I T PROJECT NO.FC07733.008-135
LEGEND:
APPROXIMATE TH-1 INDICATES APPROXIMATE
SCALE: 1"=225' LOCATION OF EXPLORATORY
0' 112.5' 225' BORING
AlI�� - -e�- •rr�•� '- .ems ,FF—�.�''�.` - t � .. o..-
I'WF
—
Sykes Drive == • TH-10
— - i
TH-21 TH-17
Comet Street
� I
4 L J
k `
I :r .
TH 18 L
TH-20 TH-16
_ } ! _T
.- _ � 41� - P - �i I11v �•
r —15
d�R
Crusader Street 0 TH-19
1
ti• •k----• '- wa
TH
Locations of
Exploratory Borings
HARTFORD HOMES FIGURE 2
BLOOM FILING 1 ROADS-PHASE 2
CTL I T PROJECT NO.FC07733.008-135
APPENDIX A
SUMMARY LOGS OF EXPLORATORY BORINGS
TH-1 TH-2 TH-3 TH-4 TH-5 TH-6
0 0
40
15/12 00, 7/12 00, 23/12 10/12 6/12 6/12 LEGEND:
WC=8.8 WC=9.9 WC=8.4 WC=14.9 WC=15.6 WC=12.4
DD=123 DD=126 DD=127 DD=114 DD=116 DD=121 FILL,CLAY,SANDY WITH OCCASIONAL GRAVEL, MOIST,MEDIUM STIFF TO VERY STIFF,
SW=1.3 SW=0.2 SW=0.1 SW=0.4 LL=30 PI=16 SW=0.2
SS=<0.01 V SS=0.320 SS=0.030 SS=0.550 -200=56 SS=0.530 BROWN
7/12 9/12 24/12 11/12 11/12 11/12
5 WC=7.3 WC=9.4 WC=9.5 5
WC=12.1 -200=5 DD=122 WC=3.2 DD=125 LL=27 PI=12
DD=127 200=5 LL=21 PI=5 200=6 Sw=0.1 200=28 FILL,SAND,CLEAN TO CLAYEY,GRAVELLY, MOIST,SOFT TO MEDIUM DENSE,BROWN
-200= PI=9 -200=24 SS=0.460
-200=32
SAND,CLAYEY,SLIGHTLY MOIST TO MOIST, LOOSE, BROWN(SC)
4/12 12/12 5/12 11/12 6/12 15/12
10 10
SAND,GRAVELLEY,SLIGHTLY SILTY,WET, LOOSE,TAN, PINK, GREY(SP)
CLAY,SANDY,SLIGHTLY MOIST TO MOIST, MEDIUM STIFF TO VERY STIFF,
- F1 BROWN(CL)
15 15
DRIVE SAMPLE.THE SYMBOL 15/12 INDICATES 15 BLOWS OF A 140-POUND HAMMER
FALLING 30 INCHES WERE REQUIRED TO DRIVE A 2.5-INCH O.D.SAMPLER 12 INCHES.
w H-
w w
w w
w 11
= 20 20 = SZ WATER LEVEL MEASURED AT TIME OF DRILLING.
q-
a a
w w
25 25
NOTES:
1. THE BORINGS WERE DRILLED ON AUGUST 30TH,2023 USING 4-INCH DIAMETER
CONTINUOUS-FLIGHT AUGERS AND A TRUCK-MOUNTED DRILL RIG.
2. THESE LOGS ARE SUBJECT TO THE EXPLANATIONS, LIMITATIONS AND CONCLUSIONS IN
30 30 THIS REPORT.
3. WC INDICATES MOISTURE CONTENT(%).
DID - INDICATES DRY DENSITY(PCF).
SW - INDICATES SWELL WHEN WETTED UNDER OVERBURDEN PRESSURE(%).
-200- INDICATES PASSING NO.200 SIEVE(%).
35 35 ILL - INDICATES LIQUID LIMIT.
PI INDICATES PLASTICITY INDEX.
SS INDICATES SOLUBLE SULFATE CONTENT(%).
40 40
Summary Logs of
HARTFORD HOMES Exploratory Borings
BLOOM FILING 1 ROADS-PHASE 2
CTL I T PROJECT NO.FC07733.008-135 FIGURE A-1
11111
TH-7 TH-8 TH-9 TH-10 TH-11 TH-12 TH-13 TH-14
0 0
9/12 14/12 00, 10/12 11/12 00, 18/12 32/12 17/12 23/12
WC=12.2 WC=11.5 WC=11.8 WC=1.4 WC=8.4 WC=6.8 WC=8.6 WC=17.2
DD=123 DD=121 oop DD=121 -200=6 DD=120 DD=128 DD=120 DD=118
LL=32 PI=18 SW=0.2 LL=28 PI=13 SS=0.030 00, SW=2.8 SW=1.2 LL=27 PI=10 LL=24 PI=9
-200=45 SS=<0.01 -200=44 46/12 SS=<0.01 SS=0.030 -200-53 -200=32
5 15/12 14/12 00, 8/12 we=1.s 16/12 41/12 14/12 17/12 5
W C=9.4 W C=10.2 W C=10.8 -200=7 W C-5.1 W C=7.5 W C=10.7 W C=8.3
DD=124 DD=117 OOP DD=120 DD=111 DD=111 DD=120 DD=120
SW=0.3 LL=26 PI=11 SW=0.4 LL=25 PI=10 -200=16 SW=1.6 SW=0.2
SS=0.030 -200=42 SS=0.010 -200=36 SS=0.030 SS=<0.01
16/12 12/12 30/12 10/12 11/12 9/12 10/12 19/12
10 10
15 15
0 0
m m
U _U
= 20 20 =
n T7
m m
m m
25 25
30 30
35 35
40 40
Summary Logs of
HARTFBLOOM FILING
HOMES Exploratory Borings
BLOOM FILING 1 ROADS-PHASE 2
CTL I T PROJECT NO.FC07733.008-135
FIGURE A-2
11111
TH-15 TH-16 TH-17 TH-18 TH-19 TH-20 TH-21
0 KIM 0
10/12 10/12 17/12 12/12 16/12 11/12 19/12
WC=9.6 WC=11.9 WC=10.1 WC=8.9 WC=8.9 WC=9.2 WC=10.8
DD=121 DD=121 DD=125 DD=123 DD=120 DD=124 DD=124
-200=38 SW=0.2 LL=26 PI=10 LL=25 PI=10 -200=30 LL=25 PI=10 SW=0.4
SS=<0.01 SS=0.080 -200=39 -200-32 SS=0.030 -200-36 SS-0.010
5 7/12 1 13/12 15/12 12/12 13/12 10/12 21/12 5
W C=8.6 W C=7.6 W C=8.3 W C=8.1 W C=8.0 W C=7.5
-200=40 DD=126 DD=130 DD=123 DD=121 DD=127
SW=0.0 SW=0.0 LL=26 PI=12 SW=0.1 LL=24 PI=9
SS=<0.01 SS=<0.01 -200=36 SS=<0.01 -200=28
Ez 24/12 26/12 29/12 3/12
10 10
15 15
0 0
m m
m m
= 20 20 =
n -n
m m
m m
25 25
30 30
35 35
40 40
Summary Logs of
HARTFBLOOM FILING
HOMES Exploratory Borings
BLOOM FILING 1 ROADS-PHASE 2
CTL I T PROJECT NO.FC07733.008-135
FIGURE A-3
APPENDIX B
RESULTS OF LABORATORY TESTS
TABLE B-1 - SUMMARY OF LABORATORY TESTING
3
iEXPANSION UNDER CONSTANT
1 1 ! ! PRESSURE DUE TO WETTING
ii
i t i I I I
i
i i i i l l l i i i i i i I l i i
-
z ! 1 1 1 1
g
Zi
THI I
W ! I
-2 -- - - -� �.------ - -- ...- -- ----- -------�- 1
LU _3 ! i -!
W i t
O
U -4
0.1 1.0 10 100
APPLIED PRESSURE -KSF
Sample of SAND, CLAYEY(SC) DRY UNIT WEIGHT= 123 PCF
From TH- 1 AT 2 FEET MOISTURE CONTENT= 8.8 %
3
I
EXPANSION UNDER CONSTANT
2
PRESSURE DUE TO WETTING
i i i I I T i I �
I I I I ! I I I I
I
I I I I I I I I I I I I
Z
O 0
� I i
a i
LLI
--.._. rr
8-0
Z
l
cl)
w
-3
O
U I I i l I i I
4
0 1APPLIED PRESSURE - KSF 1•0 10 100
Sample Of SAND, CLAYEY(SC) DRY UNIT WEIGHT= 126 PCF
From TH-2 AT 2 FEET MOISTURE CONTENT= 9.9 %
HARTFORD HOMES Swell Consolidation
BLOOM FILING 1 ROADS-PHASE 2
CTL I T PROJECT NO.FC07733.008-135 FIGURE B-1
3
EXPANSION UNDER CONSTANT
2 — PRESSURE DUE TO WETTING
I I i I I I
I I I I i i l I I I
--- �. -� -
Z
Z j l
a I I j j i i
W
o -2
ZO
W -3 1 1!
U -4
0.1 1.0 10 100
APPLIED PRESSURE -KSF
Sample of SAND, CLAYEY(SC) DRY UNIT WEIGHT= 127 PCF
From TH-3 AT 2 FEET MOISTURE CONTENT= 8.4 %
3
l
III EXPANSION UNDER CONSTANT
l PRESSURE DUE TO WETTING
I I I I
I I I I i i j i i I
I I I I ! I I I I
i i i 1
Z
O 0
Z
a i i i i i i i i i i i i i l i
w
I
o I I I I I I I I I I I I
Z
i
Ocn
� I
W
I I
a
� 3
U I I i t I j i I I I
-4
01APPLIED PRESSURE - KSF 1•0 10 100
Sample Of SAND, CLAYEY(SC) DRY UNIT WEIGHT= 114 PCF
From TH-4 AT 2 FEET MOISTURE CONTENT= 14.9 %
HARTFORD HOMES Swell Consolidation
BLOOM FILING 1 ROADS-PHASE 2
CTL I T PROJECT NO.FC07733.008-135 FIGURE B-2
3
EXPANSION UNDER CONSTANT
2 PRESSURE DUE TO WETTING
i i
o
Z
L
l l l l
N i i I i l
Z
W
e -2 1.- --�.---------
-------�--- ----------� -I-- --------- ---------I --- -I--�
Ocn
LLj -3
ll
U -4
0.1 1.0 10 100
APPLIED PRESSURE -KSF
Sample of FILL, CLAY, SANDY(CL) DRY UNIT WEIGHT= 125 PCF
From TH-5 AT 4 FEET MOISTURE CONTENT= 9.4 %
3
EXPANSION UNDER CONSTANT
PRESSURE DUE TO WETTING
I i i I I i I I
Fri-
I I I I
i i i l i i i i i i i l
Z
O O
Z
Q i i
W - _ 1_ t_ ......................._.....................-......... ___ ..._.........
_ ---------- __ __ __ - -
o :
II :
Z - � _ �_ 1
cn
ji
N l j
w
-3
O
I I I I I I I I I I I I I
_4
01APPLIED PRESSURE - KSF 1.0 10 100
Sample Of FILL, CLAY, SANDY(CL) DRY UNIT WEIGHT= 121 PCF
From TH-6 AT 2 FEET MOISTURE CONTENT= 12.4 %
HARTFORD HOMES Swell Consolidation
BLOOM FILING 1 ROADS-PHASE 2
CTL I T PROJECT NO.FC07733.008-135 FIGURE B-3
3
EXPANSION UNDER CONSTANT
z ___ li _PRESSURE DUE TO WETTING
I l i i I j
! ! ! ! I
! ! I I I I I ! ! I
Z !
Z it
i
W I
-2 --- -- - - - .-------- --- -+-� -i. ----- ------- �-
ZO i !
U -4
0.1 1.0 10 100
APPLIED PRESSURE -KSF
Sample of FILL, SAND, CLAYEY(SC) DRY UNIT WEIGHT= 124 PCF
From TH-7 AT 4 FEET MOISTURE CONTENT= 9.4 %
3
! ! EXPANSION UNDER CONSTANT
2 PRESSURE DUE TO WETTING
I I I I I J I
I I I
Z ! j
O 0
Z
a i i i i i i i
W ----__ ----__�_ _1__� - --- 1___ _;
0
LD
11
w
I
-3 �
0
U I I i t I j I I I I
-4
0 1APPLIED PRESSURE - KSF 1•0 10 100
Sample Of SAND, CLAYEY(SC) DRY UNIT WEIGHT= 121 PCF
From TH-8 AT 2 FEET MOISTURE CONTENT= 11.5 %
HARTFORD HOMES Swell Consolidation
BLOOM FILING 1 ROADS-PHASE 2
CTL I T PROJECT NO.FC07733.008-135 FIGURE B-4
3
ll EXPANSION UNDER CONSTANT
2 ___ l ill PRESSURE DUE TO WETTING
I I I I I I I I
I I �
Z l
O i !
Z lii i
a _
a i i i I i t i i
w
-z -- - - -� �.------ - -- ...- -- ----- -------�- 1
� _3
w I I I I i I I I I
O
U 4
0.1 1.0 10 100
APPLIED PRESSURE -KSF
Sample of SAND, CLAYEY(SC) DRY UNIT WEIGHT= 120 PCF
From TH-9 AT 4 FEET MOISTURE CONTENT= 10.8 %
4
I
EXPANSION UNDER CONSTANT
3 T
PRESSURE DUE TO WETTING
i
2
Z —
�
Z
a
w I � I I I I
:
- � 1_ 1
o
cl) it i
w l
-2
O
U I I i l I I
3
u'APPLIED PRESSURE - KSF 1•0 10 iuu
Sample Of CLAY, SANDY(CL) DRY UNIT WEIGHT= 120 PCF
From TH- 11 AT 2 FEET MOISTURE CONTENT= 8.4 %
HARTFORD HOMES Swell Consolidation
BLOOM FILING 1 ROADS-PHASE 2
CTL I T PROJECT NO.FC07733.008-135 FIGURE B-5
3
li
l EXPANSION UNDER CONSTANT
! ! ! PRESSURE DUE TO WETTING
I � I
!
► -
z � !
l l l
I
z
W ! I I
! ! ! !
p
U -4
0.1 1.0 10 100
APPLIED PRESSURE -KSF
Sample of FILL,SAND, CLAYEY(SC) DRY UNIT WEIGHT= 128 PCF
From TH- 12 AT 2 FEET MOISTURE CONTENT= 6.8 %
3
I ! ! ! EXPANSION UNDER CONSTANT
z PRESSURE DUE TO WETTING
I i t I I I
I I I
z
0 -
�
Q
Lu
LD
0
W
d -3 �
OIH
-4
01APPLIED PRESSURE - KSF 1.0 10 100
Sample Of CLAY, SANDY(CL) DRY UNIT WEIGHT= 120 PCF
From TH- 13 AT 4 FEET MOISTURE CONTENT= 10.7 %
HARTFORD HOMES Swell Consolidation
BLOOM FILING 1 ROADS-PHASE 2
CTL I T PROJECT NO.FC07733.008-135 FIGURE B-6
3
i
EXPANSION UNDER CONSTANT
z — PRESSURE DUE TO WETTING
I I I I I I
i i i i i i
i i I I i i I
Z l l
l l l
Z
w l l l l
-z ---- -- - - - �.-------- --- -- ...----� -� ----- ------ -}- -
ZO
U -4
0.1 1.0 10 100
APPLIED PRESSURE -KSF
Sample of FILL, CLAY, SANDY(CL) DRY UNIT WEIGHT= 120 PCF
From TH- 14 AT 4 FEET MOISTURE CONTENT= 8.3 %
3
l l l l EXPANSION UNDER CONSTANT
l PRESSURE DUE TO WETTING
I I I I
I I I I i i j i i I
i i i 1 I
Z
I I I I i j i l i i
O o
l l I I I I I
Z
a i i i i i i i i i l
I I I i I I I I I
I
Z j II
-z - -
iI`
W
I I
a
� 3
-4
0.1APPLIED PRESSURE - KSF 1•0 10 100
Sample of FILL, SAND, CLAYEY(SC) DRY UNIT WEIGHT= 121 PCF
From TH- 16 AT 2 FEET MOISTURE CONTENT= 11.9 %
HARTFORD HOMES Swell Consolidation
BLOOM FILING 1 ROADS-PHASE 2
CTL I T PROJECT NO.FC07733.008-135 FIGURE B-7
3
I I I I
NO SWELL AFTER WETTING
I I I I ! I I t I I
z -
III
i i I I i i
Z o �—I -- --� _
O
N I I I I I I I I I I
Z
a
w ! 1 l I !
-z ---- -- - - - �.-------- --- -+ -� ----- ------ -}- -
Z -�O i
U -4
0.1 1.0 10 100
APPLIED PRESSURE -KSF
Sample of FILL, SAND, CLAYEY(SC) DRY UNIT WEIGHT= 126 PCF
From TH- 17 AT 4 FEET MOISTURE CONTENT= 7.6 %
3
I ! I I
I ! I 11 I ! I NO SWELL AFTER WETTING
2
1
I I I I
Z
I I I I I i l i i
O o
Z
a i i i i i i � �
w 1 ......----.._._. ..----_.._.i._..�_..._i......+..__.i.. . ------ ---__._�._..__ ......................_...........
...i.
0
I j
O
jl 1
w
I
3 �
O
4
0.1APPLIED PRESSURE - KSF 1•0 10 100
Sample of FILL, SAND, CLAYEY(SC) DRY UNIT WEIGHT= 130 PCF
From TH- 18 AT 4 FEET MOISTURE CONTENT= 8.3 %
HARTFORD HOMES Swell Consolidation
BLOOM FILING 1 ROADS PHASE 2
CTL I T PROJECT NO.FC07733.008-135 FIGURE B-8
3
EXPANSION UNDER CONSTANT
2 — PRESSURE DUE TO WETTING
I I ! I I I
I I I I i i j I I I
Z
0
Z lil
i I I l i I
X
W
o -2
ZO
cl) l
LLj -3
U 4
0.1 1.0 10 100
APPLIED PRESSURE -KSF
Sample of FILL, SAND, CLAYEY(SC) DRY UNIT WEIGHT= 121 PCF
From TH-20 AT 4 FEET MOISTURE CONTENT= 8.0 %
3
l
EXPANSION UNDER CONSTANT
2 l PRESSURE DUE TO WETTING
I I I I
I I I I i i j i i I
I I I I ! I I I I
i j j I j I
Z
I
I I j l I i i j I I I
0 0
Z
a i i i i i i i i i i i i i l
W _ _ _ �__1__�__, _ _ ........
o I I I I I i I I I I I I I I I
Z
o 1_ IJ
I—
wI I I I I
a
� 3
0 l
I
U _4
APPLIED PRE55URE -K5F
Sample Of FILL, SAND, CLAYEY(SC) DRY UNIT WEIGHT= 124 PCF
From TH-21 AT 2 FEET MOISTURE CONTENT= 10.8 %
HARTFORD HOMES Swell Consolidation
BLOOM FILING 1 ROADS-PHASE 2
CTL I T PROJECT NO.FC07733.008-135 FIGURE B-9
HYDROMETER ANALYSIS SIEVE ANALYSIS
25 HR. 7 HR. TIME READINGS U.S.STANDARD SERIES CLEAR SQUARE OPENINGS
45 MIN. 15 MIN. 60 MIN. 19 MIN. 4 MIN. 1 MIN. *200 *100 *50 *40 *30 *16 *10 *8 *4 3/8" 3/4" 11/" 3" 5"6" R"
100 0
90 10
80 20
z 70 30 w
z_
W
d 60 40 Uj
z
z
U 50 50 LU
w �
w w
IL 40 60 a
30 70
20 80
10 90
0 1 1 fl, g 100
.001 0.002 .005 .009 .019 .037 .074 .149 .297 .590 1.19 2.0 2.38 4.76 9.52 19.1 36.1 76.2 127 200
0.42 152
DIAMETER OF PARTICLE IN MILLIMETERS
SANDS GRAVEL
CLAY(PLASTIC)TO SILT(NON-PLASTIC) IF
FINE I MEDIUM ICOARSEI FINE I COARSE I COBBLES
Sample of CLAY, SANDY(CL) GRAVEL 1 % SAND 41 %
From S- 1 AT 0-4 FEET SILT&CLAY 58 % LIQUID LIMIT 28 %
PLASTICITY INDEX 13 %
HYDROMETER ANALYSIS SIEVE ANALYSIS
25 HR. 7 HR. TIME READINGS U.S.STANDARD SERIES CLEAR SQUARE OPENINGS
45 MIN. 15 MIN. 60 MIN. 19 MIN. 4 MIN. 1 MIN. *200 *100 *50 *40 *30 *16 *10 *8 *4 3/8" 3/4" 11/2" 3" 5"6" 8"0
100
90 10
80 20
z 70 30 w
z
a
EL 60 40 w
z
z
v 50 50 w
w w
IL 40 60 n.
30 70
20 80
10 90
0 100
.001 0.002 .005 .009 .019 .037 .074 .149 .297 .590 1.19 2.0 2.38 4.76 9.52 19.1 36.1 76.2 127 200
0.42 152
DIAMETER OF PARTICLE IN MILLIMETERS
CLAY(PLASTIC)TO SILT(NON-PLASTIC) SANDS GRAVEL
FINE MEDIUM 1COARSE1 FINE COARSE I COBBLES
Sample of SAND, CLAYEY(SC) GRAVEL 11 % SAND 54 %
From S-2 AT 0-4 FEET SILT&CLAY 35 % LIQUID LIMIT 24 %
PLASTICITY INDEX 9 %
HARTFORD HOMES Gradation
BLOOM FILING 1 ROADS-PHASE 2
CTL I T PROJECT NO.FC07733.008-135 Test Results
FIGURE B-10
HYDROMETER ANALYSIS SIEVE ANALYSIS
25 HR. 7 HR. TIME READINGS U.S.STANDARD SERIES CLEAR SQUARE OPENINGS
45 MIN. 15 MIN. 60 MIN. 19 MIN. 4 MIN. 1 MIN. *200 *100 *50 *40 *30 *16 *10 *8 *4 3/8" 3/4" 11/" 3" 5"6" R"
100 0
90 10
80 20
z 70 30 w
z_
W
d 60 40 LLj
z
z
U 50 50 LLJ
w
wOF w
a 40 160 a
30 70
20 80
10 90
0 100
.001 0.002 .005 .009 .019 .037 .074 .149 .297 .590 1.19 2.0 2.38 4.76 9.52 19.1 36.1 76.2 127 200
0.42 152
DIAMETER OF PARTICLE IN MILLIMETERS
SANDS GRAVEL
CLAY(PLASTIC)TO SILT(NON-PLASTIC) IF
FINE I MEDIUM ICOARSEI FINE I COARSE I COBBLES
Sample of SAND (SP) GRAVEL 35 % SAND 60 %
From TH-2 AT 4 FEET SILT&CLAY 5 % LIQUID LIMIT %
PLASTICITY INDEX %
HYDROMETER ANALYSIS SIEVE ANALYSIS
25 HR. 7 HR. TIME READINGS U.S.STANDARD SERIES CLEAR SQUARE OPENINGS
45 MIN. 15 MIN. 60 MIN. 19 MIN. 4 MIN. 1 MIN. *200 *100 *50 *40 *30 *16 *10 *8 *4 3/8" 3/4" 11/2" 3" 5"6" 8"0
100
90 10
80 20
070 30 w
z
V) a
EL 60 40 w
v z 50 50 w
w w
IL 40 60 a
30 70
20 80
10 90
0 100
.001 0.002 .005 .009 .019 .037 .074 .149 .297 .590 1.19 2.0 2.38 4.76 9.52 19.1 36.1 76.2 127 200
0.42 152
DIAMETER OF PARTICLE IN MILLIMETERS
CLAY(PLASTIC)TO SILT(NON-PLASTIC) SANDS GRAVEL
FINE MEDIUM 1COARSE1 FINE COARSE I COBBLES
Sample of SAND (SP) GRAVEL 18 % SAND 76 %
From TH-4 AT 4 FEET SILT&CLAY 6 % LIQUID LIMIT %
PLASTICITY INDEX %
HARTFORD HOMES Gradation
BLOOM FILING 1 ROADS-PHASE 2
CTL I T PROJECT NO.FC07733.008-135 Test Results
FIGURE B-11
HYDROMETER ANALYSIS SIEVE ANALYSIS
25 HR. 7 HR. TIME READINGS U.S.STANDARD SERIES CLEAR SQUARE OPENINGS
45 MIN. 15 MIN. 60 MIN. 19 MIN. 4 MIN. 1 MIN. *200 *100 *50 *40 *30 *16 *10 *8 *4 3/8" 3/4" 11/" 3" 5"6" R"
100 0
90 10
80 20
z 70 30 w
z_
W
d 60 40 uj
Ar
U 50 50 czwi
w �
w w
IL 40 60 a
30 70
20 80
10 90
0 100
.001 0.002 .005 .009 .019 .037 .074 .149 .297 .590 1.19 2.0 2.38 4.76 9.52 19.1 36.1 76.2 127 200
0.42 152
DIAMETER OF PARTICLE IN MILLIMETERS
SANDS GRAVEL
CLAY(PLASTIC)TO SILT(NON-PLASTIC) IF
FINE I MEDIUM ICOARSEI FINE I COARSE I COBBLES
Sample of SAND, GRAVELLY(SP) GRAVEL 24 % SAND 69 %
From TH- 10 AT 4 FEET SILT&CLAY 7 % LIQUID LIMIT %
PLASTICITY INDEX %
HYDROMETER ANALYSIS SIEVE ANALYSIS
25 HR. 7 HR. TIME READINGS U.S.STANDARD SERIES CLEAR SQUARE OPENINGS
45 MIN. 15 MIN. 60 MIN. 19 MIN. 4 MIN. 1 MIN. *200 *100 *50 *40 *30 *16 *10 *8 *4 3/8" 3/4" 11/:" 3" 5"6" 8"0
100
90 10
80 20
070 30 w
z
V) a
EL 60 40 w
z
z
v 50 50 w
w w
IL 40 60 n.
30 70
20 80
10 90
0 i I i k ii I A 100
.001 0.002 .005 .009 .019 .037 .074 .149 .297 .590 1.19 2.0 2.38 4.76 9.52 19.1 36.1 76.2 127 200
0.42 152
DIAMETER OF PARTICLE IN MILLIMETERS
CLAY(PLASTIC)TO SILT(NON-PLASTIC) SANDS GRAVEL
FINE MEDIUM 1COARSE1 FINE COARSE I COBBLES
Sample Of FILL, SAND, CLAYEY(SC) GRAVEL 8 % SAND 60 %
From TH- 14 AT 2 FEET SILT&CLAY 32 % LIQUID LIMIT 24 %
PLASTICITY INDEX 9 %
HARTFORD HOMES Gradation
BLOOM FILING 1 ROADS-PHASE 2
CTL I T PROJECT NO.FC07733.008-135 Test Results
FIGURE B-12
HYDROMETER ANALYSIS SIEVE ANALYSIS
25 HR. 7 HR. TIME READINGS U.S.STANDARD SERIES CLEAR SQUARE OPENINGS
45 MIN. 15 MIN. 60 MIN. 19 MIN. 4 MIN. 1 MIN. *200 *100 *50 *40 *30 *16 *10 *8 *4 3/8" 3/4" 11/" 3" 5"6" R"
100 0
90 10
80 20
z 70 30 w
z_
W
d 60 40
z
z
U 50 50 czwi
w
w w
a 40 80 a
30 70
20 80
10 90
0 100
.001 0.002 .005 .009 .019 .037 .074 .149 .297 .590 1.19 2.0 2.38 4.76 9.52 19.1 36.1 76.2 127 200
0.42 152
DIAMETER OF PARTICLE IN MILLIMETERS
SANDS GRAVEL
CLAY(PLASTIC)TO SILT(NON-PLASTIC) IF
FINE I MEDIUM ICOARSEI FINE I COARSE I COBBLES
Sample of SAND, CLAYEY(SC) GRAVEL 18 % SAND 42 %
From TH- 15 AT 4 FEET SILT&CLAY 40 % LIQUID LIMIT %
PLASTICITY INDEX %
HARTFORD HOMES Gradation
BLOOM FILING 1 ROADS-PHASE 2
CTL I T PROJECT NO.FC07733.008-135 Test Results
FIGURE B-13
TABLE B-1
SUMMARY OF LABORATORY TESTING
ATTERBERG LIMITS SWELL TEST RESULTS* PASSING WATER-
MOISTURE DRY LIQUID PLASTICITY APPLIED NO. 200 SOLUBLE
DEPTH CONTENT DENSITY LIMIT INDEX SWELL* PRESSURE SIEVE SULFATES
BORING (FEET) N (PCF) (%) (PSF) N (%) DESCRIPTION
S-1 0-4 9.3 28 13 58 CLAY, SANDY (CL)
S-2 0-4 6.5 24 9 35 SAND, CLAYEY (SC)
TH-1 2 8.8 123 1.3 500 <0.01 SAND, CLAYEY (SC)
TH-1 4 12.1 127 24 9 32 SAND, CLAYEY (SC)
TH-2 1 2 9.9 126 0.2 500 0.32 SAND, CLAYEY (SC)
TH-2 4 4.8 5 SAND (SP)
TH-3 2 8.4 127 0.1 500 0.03 SAND, CLAYEY (SC)
TH-3 4 7.3 122 21 5 24 SAND, CLAYEY (SC)
TH-4 2 14.9 114 0.4 500 0.55 SAND, CLAYEY (SC)
TH-4 4 3.2 6 SAND (SP)
TH-5 2 15.6 116 30 16 56 FILL, CLAY, SANDY (CL)
TH-5 4 9.4 125 0.1 500 0.46 FILL, CLAY, SANDY (CL)
TH-6 2 12.4 121 0.2 500 0.53 FILL, CLAY, SANDY (CL)
TH-6 4 9.5 27 12 28 FILL, SAND, CLAYEY (SC)
TH-7 2 12.2 123 32 18 45 FILL, SAND, CLAYEY (SC)
TH-7 4 9.4 124 0.3 500 0.03 FILL, SAND, CLAYEY (SC)
TH-8 2 11.5 121 0.2 500 <0.01 SAND, CLAYEY (SC)
TH-8 4 10.2 117 26 11 42 SAND, CLAYEY (SC)
TH-9 2 11.8 121 28 13 44 SAND, CLAYEY (SC)
TH-9 4 10.8 120 0.4 500 0.01 SAND, CLAYEY (SC)
TH-10 2 1.4 6 0.03 FILL, SAND, CLAYEY (SC)
TH-10 4 1.8 7 SAND (SP)
TH-11 2 8.4 120 2.8 500 <0.01 CLAY, SANDY (CL)
TH-11 4 5.1 111 25 10 36 SAND, CLAYEY (SC)
TH-12 2 6.8 128 1.2 500 0.03 FILL, SAND, CLAYEY (SC)
* NEGATIVE VALUE INDICATES COMPRESSION.
HARTFORD HOMES
BLOOM FILING 1 ROADS-PHASE 2
CTLIT PROJECT NO.FC07733.008-135 Page 1 of 3
TABLE B-1
SUMMARY OF LABORATORY TESTING
ATTERBERG LIMITS SWELL TEST RESULTS* PASSING WATER-
MOISTURE DRY LIQUID PLASTICITY APPLIED NO. 200 SOLUBLE
DEPTH CONTENT DENSITY LIMIT INDEX SWELL* PRESSURE SIEVE SULFATES
BORING (FEET) (%) (PCF) (%) (PSF) (%) (%) DESCRIPTION
TH-12 4 7.5 111 16 SAND, CLAYEY (SC)
TH-13 2 8.6 120 27 10 53 CLAY, SANDY (CL)
TH-13 4 10.7 120 1.6 500 0.03 CLAY, SANDY (CL)
TH-14 2 17.2 118 24 9 32 FILL, SAND, CLAYEY (SC)
TH-14 4 8.3 120 1 0.2 500 <0.01 FILL, CLAY, SANDY (CL)
TH-15 2 9.6 121 38 <0.01 FILL, SAND, CLAYEY (SC)
TH-15 4 8.6 40 SAND, CLAYEY (SC)
TH-16 2 11.9 121 0.2 500 0.08 FILL, SAND, CLAYEY (SC)
TH-17 2 10.1 125 26 10 1 39 FILL, SAND, CLAYEY (SC)
TH-17 4 7.6 126 0.0 500 <0.01 FILL, SAND, CLAYEY (SC)
TH-18 2 8.9 123 25 10 32 FILL, SAND, CLAYEY (SC)
TH-18 4 8.3 130 0.0 500 <0.01 FILL, SAND, CLAYEY (SC)
TH-19 2 8.9 120 30 0.03 FILL, SAND, CLAYEY (SC)
TH-19 4 8.1 123 26 12 36 FILL, SAND, CLAYEY (SC)
TH-20 2 9.2 124 25 10 36 FILL, SAND, CLAYEY (SC)
TH-20 4 8.0 121 0.1 500 <0.01 FILL, SAND, CLAYEY (SC)
TH-21 2 1 10.8 1 124 0.4 500 0.01 FILL, SAND, CLAYEY (SC)
TH-21 4 7.5 127 24 9 28 FILL, SAND, CLAYEY (SC)
* NEGATIVE VALUE INDICATES COMPRESSION.
HARTFORD HOMES
BLOOM FILING 1 ROADS-PHASE 2
CTLIT PROJECT NO.FC07733.008-135 Page 2 of 3
GROUND
ENGINEERING
CTL Thompson - 2021-2022 Misc Lab Testing
Report Date: Sep 14,2023 Work Order No.: 21-0609.SoilSampling.0038;ver: 1
Work Order Date: Sep 5,2023 Reviewed by: Joe Zorack
SoillAggregate Laboratory
Specification Title: Onsite/Native(Granular)
Sampling Method: ASTM D75/AASHTO T2/CDOT CP30
Material Description: Very pale brownlLight brown,GRAVEL with clay
Sample Location: Location 1
R-Value (ASTM D2844)
100
Test Moisture Exudation
Point (%) Pressure R-Value
80 si
1 12.2 165 11
60 2 8.6 467 19
m 3 10.2 307 15
40
R-Value at 300 psi
19 Exudation Pressure
20 15
11
Remarks:
0
700 600 500 400 300 200 100 0
Exudation Pressure(psi)
50
40
0
c
30
c
0
U
2 20
LO
0 102 12.2
10
4111
700 600 500 400 300 200 100 0
Exudation Pressure(psi)
Results apply only to the specific items and locations referenced and at the time of testing,observations or special inspections.Unless noted otherwise,samples were received in adequate condition.
This report should not be reproduced,except in full,without the written permission of GROUND Engineering Consultants,Inc.
41 Inverness Drive East, Englewood, Colorado www.groundeng.com 303-289-1989
Englewood I Commerce City I Loveland I Granby I Gypsum I Colorado Springs
HARTFORD HOMES
BLOOM FILING 1 ROADS-PHASE 2 Page 3 of 3
CTLIT PROJECT NO.FC07733.008-135
APPENDIX C
AASHTO FLEXIBLE PAVEMENT DESIGN CALCULATIONS
Flexible Structural Design
Local
Roadway(s): Aria Way, Tourmaline PI., Conquest St., Comet St., Crusader St.,
Roselyn St. and Flourish Lane
Reliability 75 %
Standard Deviation 0.44
Initial Serviceability 4.5
Terminal Serviceability 2.0
Resilient Modulus 7,247 psi
Design ESALs 36,500
Design Structural Number
1.80
Structural
Layers Coefficient Drainage Thickness SN
HMA 0.44 1 4 1.76
ABC 0.11 1.05 6 0.69
CSS 0.1 1 0 0.00
SUM11 2.451
HARTFORD HOMES
BLOOM FILING 1 ROADS-PHASE 2
CTLIT PROJECT NO.FC07733.008-135 FIGURE C-1
Flexible Structural Design
Local Cul-de-Sac
Roadway(s): Parkland Street
Reliability 80 %
Standard Deviation 0.44
Initial Serviceability 4.5
Terminal Serviceability 2
Resilient Modulus 7,247 psi
Design ESALs 73,000
Design Structural Number
2.07
Structural
Layers Coefficient Drainage Thickness SN
HMA 0.44 1 4 1.76
ABC 0.11 1.05 6 0.69
CSS 0.1 1 0 0.00
SUM11 2,451
HARTFORD HOMES
BLOOM FILING 1 ROADS-PHASE 2
CTLIT PROJECT NO.FC07733.008-135 FIGURE C-2
Flexible Structural Design
Minor Collector
Roadway(s): Sykes Drive and Aria Way (Sykes to Donella)
Reliability 75 %
Standard Deviation 0.44
Initial Serviceability 4.5
Terminal Serviceability 2.3
Resilient Modulus 7,247 psi
Design ESALs 182,500
Design Structural Number
2.34
Structural
Layers Coefficient Drainage Thickness SN
HMA 0.44 1 5.5 2.42
ABC 0.11 1.05 7 0.81
CSS 0.1 1 0 0.00
SUM11 3.23
HARTFORD HOMES
BLOOM FILING 1 ROADS-PHASE 2
CTLIT PROJECT NO.FC07733.008-135 FIGURE C-3
Flexible Structural Design
Two-Lane Arterial
Roadway(s): Greenfields Drive
Reliability 90 %
Standard Deviation 0.44
Initial Serviceability 4.5
Terminal Serviceability 2.5
Resilient Modulus 7,247 psi
Design ESALs 730,000
Design Structural Number
3.14
Structural
Layers Coefficient Drainage Thickness SN
HMA 0.44 1 7.5 3.30
ABC 0.11 1.05 11.5 1.33
CSS 0.1 1 0 0.00
Sum 4.63
HARTFORD HOMES
BLOOM FILING 1 ROADS-PHASE 2
CTLIT PROJECT NO.FC07733.008-135 FIGURE C-4
Rigid Pavement Design - Based on AASHTO Supplemental Guide
RIGID PAVEMENT DESIGN
TWO-LANE ARTERIAL
Greenfields Drive between International Blvd.and Sykes Drive
Bloom Filing 1 Phase 2
Project#FC07733.008-135
Fort Collins,Colorado
Slab Thickness Design
Pavement Type JPCP
18-kip ESALs Over Initial Performance Period(million) 0.96 million
Initial Serviceability 4.5
Terminal Serviceability 2.5
28-day Mean PCC Modulus of Rupture 600 psi
Elastic Modulus of Slab 3,400,000 psi
Elastic Modulus of Base 1,200 psi
Base Thickness 6 in.
Mean Effective k-Value 60 psi/in
Reliability Level 90 %
Overall Standard Deviation 0.44
Calculated Design Thickness 8.0 in
HARTFORD HOMES
BLOOM FILING 1 ROADS-PHASE 2
CTLIT PROJECT NO.FC07733.008-135 FIGURE C-5
APPENDIX D
PAVEMENT CONSTRUCTION RECOMMENDATIONS
SUBGRADE PREPARATION
Chemically Stabilized Subgrade (CSS)
1. Utility trenches and all subsequently placed fill should be properly compacted
and tested prior to subgrade preparation. As a minimum, fill should be
compacted to 95 percent of standard Proctor maximum dry density.
2. The subgrade should be stripped of organic matter and should be shaped to final
line and grade.
3. The contractor or owner's representative can, if directed, have a mix design
performed in general accordance with ASTM D 558 using the actual site soils
and the approved stabilizing agent (lime, fly ash or a combination of lime and fly
ash). Scheduling should allow at least eight weeks for the mix design to be
completed prior to construction.
4. High calcium quicklime should conform to the requirements of ASTM C 977 and
ASTM C 110. Dolomitic quicklime, magnesia quicklime with magnesium oxide
contents in excess of 4 percent, or carbonated quicklime should not be used.
5. Fly ash should consist of Class C in accordance with ASTM C 593 and C 618.
6. All stabilizing agents should come from the same source as used in the mix
design. If the source is changed, a new mix design should be performed.
7. Stabilizing agents should be spread with a mechanical spreader from back of
curb to back of curb for detached sidewalks or back of walk to back of walk for
attached sidewalks, where applicable.
8. The subgrade should be mixed to the specified depth and at the specified
concentration until a uniform blend of soil, stabilizing agent and water is obtained
and the moisture content is at least 2 percent (for cement and fly ash) and 3
percent (for lime) above the optimum moisture content of the design mixture
(ASTM D 558).
9. If lime is used, a mellowing period of up to seven days may be required following
initial mixing. Once the pH of the mixture is 12.3 or higher and the plasticity
index is less than 10, the soils shall again be mixed and moisture conditioned to
at least 3 percent over optimum moisture content and compacted to at least 95
percent of the mixture's maximum dry density (ASTM D 558). Up to
seven additional days may be required for curing prior to paving. The treated
surface shall be kept moist or sealed with emulsified asphalt. Traffic should not
be allowed on the surface during the mellowing and curing periods.
10. If fly ash is used, the mixture should be moisture conditioned to at least 2 percent
over optimum moisture content and compacted to at least 95 percent of the
mixture's maximum dry density (ASTM D 558) within 2 hours from the time of
initial fly ash mixing.
HARTFORD HOMES D-1
BLOOM FILING 1 ROADS-PHASE 2
CTL I T PROJECT NO.FC07733.008-135
11. If a lime/fly ash combination is used, the lime should be mixed first and allowed
to mellow as indicated for lime treatment in item 9. Following the mellowing
period, the fly ash should be added, moisture conditioned and compacted as
indicated above within 2 hours of initial fly ash mixing.
12. Samples of loose, blended stabilizing agent/soil mixture should be sampled by a
representative of CTL Thompson, Inc. for compressive strength testing (ASTM D
1663) to determine compliance (optional) when full credit for the FASS layer is
used in the pavement thickness design.
13. Batch tickets should be supplied to the owner or owner's representative with the
application area for that batch to determine compliance with the recommended
proportions of fly ash to soil.
14. The subgrade should be re-shaped to final line and grade.
15. The subgrade should be sealed with a pneumatic-tire roller that is sufficiently
light in weight so as to not cause hairline cracking of the subgrade.
16. Where sulfate concentrations are over 0.5 percent, a double treatment method
should be performed. When a double treatment is required, the first half of the
stabilizing agent should be placed, moisture treated and allowed to mellow or
cure for at least two weeks. The remaining half of the stabilizing agent plus an
additional 0.5 (for lime) to 2 (for fly ash) percent shall then be applied.
17. Mixing of the fly ash, lime, or lime/fly ash treated subgrade should not occur if the
temperature of the soil mixture is below 40°F.
18. We recommend a minimum of 2 days curing prior to paving. The surface of the
stabilized area should be kept moist during the cure period by periodic, light
sprinkling if needed. Strength gains will be slower during cooler weather. Traffic
should not be permitted on the treated subgrade during the curing period. The
subgrade should be protected from freezing or drying at all times until paving.
19. Placement, mixing and compaction of stabilized subgrade should be observed
and tested by a representative of our firm.
Aggregate Base Course (ABC)
1. A Class 5 or 6 Colorado Department of Transportation (CDOT) specified ABC
should be used. Reclaimed asphalt pavement (RAP) or reclaimed concrete
pavement (RCP) alternative which meets the Class 5 or 6 designation and
design R-value/strength coefficient is also acceptable.
2. Bases should have a minimum Hveem stabilometer value of 78, or greater. ABC,
RAP, and RCP must be moisture stable. The change in R-value from 300-psi to
100-psi exudation pressure should be 12 points or less.
HARTFORD HOMES D-2
BLOOM FILING 1 ROADS-PHASE 2
CTL I T PROJECT NO.FC07733.008-135
3. ABC, RAP, or RCP bases should be placed in thin lifts not to exceed 6 inches
and moisture treated to near optimum moisture content. Bases should be
moisture treated to near optimum moisture content and compacted to at least 95
percent of standard Proctor maximum dry density (ASTM D 698, AASHTO T 99).
4. Placement and compaction of ABC, RAP, or RCP should be observed and tested
by a representative of our firm. Placement should not commence until the
underlying subgrade is properly prepared and tested.
Hot Mix Asphalt (HMA)
1. HMA should be composed of a mixture of aggregate, filler, hydrated lime, and
asphalt cement. Some mixes may require polymer modified asphalt cement, or
make use of up to 20 percent reclaimed asphalt pavement (RAP). A mob mix
design is recommended and periodic checks on the mob site should be made to
verify compliance with specifications.
2. HMA should be relatively impermeable to moisture and should be designed with
crushed aggregates that have a minimum of 80 percent of the aggregate retained
on the No. 4 sieve with two mechanically fractured faces.
3. Gradations that approach the maximum density line (within 5 percent between
the No. 4 and 50 sieves) should be avoided. A gradation with a nominal
maximum size of 1 or 2 inches developed on the fine side of the maximum
density line should be used.
4. Total void content, voids in the mineral aggregate (VMA) and voids filled should
be considered in the selection of the optimum asphalt cement content. The
optimum asphalt content should be selected at a total air void content of
approximately 4 percent. The mixture should have a minimum VMA of 14
percent and between 65 percent and 80 percent of voids filled.
5. Asphalt cement should meet the requirements of the Superpave Performance
Graded (PG) Binders. The minimum performing asphalt cement should conform
to the requirements of the governing agency.
6. Hydrated lime should be added at the rate of 1 percent by dry weight of the
aggregate and should be included in the amount passing the No. 200 sieve.
Hydrated lime for aggregate pretreatment should conform to the requirements of
ASTM C 207, Type N.
7. Paving should be performed on properly prepared, unfrozen surfaces that are
free of water, snow, and ice. Paving should only be performed when both air and
surface temperatures equal, or exceed, the temperatures specified in Table 401-
3 of the 2021 Colorado Department of Transportation Standard Specifications for
Road and Bridge Construction.
8. HMA should not be placed at a temperature lower than 2450F for mixes
containing PG 64-22 asphalt, and 290OF for mixes containing polymer-modified
asphalt. The breakdown compaction should be completed before the HMA
temperature drops 20°F.
HARTFORD HOMES D-3
BLOOM FILING 1 ROADS-PHASE 2
CTL I T PROJECT NO.FC07733.008-135
9. Wearing surface course shall be Grading S or SX for residential roadway
classifications and Grading S for collector, arterial, industrial, and commercial
roadway classifications.
10. The minimum/maximum lift thicknesses for Grade SX shall be 1'/2 inches/2'/2
inches. The minimum/maximum lift thicknesses for Grade S shall be 2 inches/3'/2
inches. The minimum/maximum lift thicknesses for Grade SG shall be 3 inches/5
inches.
11. Joints should be staggered. No joints should be placed within wheel paths.
12. HMA should be compacted to between 92 and 96 percent of Maximum
Theoretical Density. The surface shall be sealed with a finish roller prior to the
mix cooling to 185°F.
13. Placement and compaction of HMA should be observed and tested by a
representative of our firm. Placement should not commence until approval of the
proof rolling as discussed in the Subgrade Preparation section of this report.
Sub-base, base course or initial pavement course shall be placed within 48 hours
of approval of the proof rolling. If the Contractor fails to place the sub-base, base
course or initial pavement course within 48 hours or the condition of the subgrade
changes due to weather or other conditions, proof rolling and correction shall be
performed again.
Portland Cement Concrete (PCC)
1. Portland cement concrete should consist of Class P of the 2021 CDOT -
Standard Specifications for Road and Bridge Construction specifications for
normal placement. PCC should have a minimum compressive strength of 4,500
psi at 28 days and a minimum modulus of rupture (flexural strength) of 600 psi.
Job mix designs are recommended and periodic checks on the iob site should be
made to verify compliance with specifications.
2. Portland cement should be Type II "low alkali" and should conform to ASTM C
150.
3. Portland cement concrete should not be placed when the subgrade or air
temperature is below 40°F.
4. Concrete should not be placed during warm weather if the mixed concrete has a
temperature of 90°F, or higher.
5. Mixed concrete temperature placed during cold weather should have a
temperature between 50°F and 90°F.
6. Free water should not be finished into the concrete surface. Atomizing nozzle
pressure sprayers for applying finishing compounds are recommended whenever
the concrete surface becomes difficult to finish.
HARTFORD HOMES D-4
BLOOM FILING 1 ROADS-PHASE 2
CTL I T PROJECT NO.FC07733.008-135
7. Curing of the Portland cement concrete should be accomplished by the use of a
curing compound. The curing compound should be applied in accordance with
manufacturer recommendations.
8. Curing procedures should be implemented, as necessary, to protect the
pavement against moisture loss, rapid temperature change, freezing, and
mechanical injury.
9. Construction joints, including longitudinal joints and transverse joints, should be
formed during construction, or sawed after the concrete has begun to set, but
prior to uncontrolled cracking.
10. All joints should be properly sealed using a rod back-up and approved epoxy
sealant.
11. Traffic should not be allowed on the pavement until it has properly cured and
achieved at least 80 percent of the design strength, with saw joints already cut.
12. Placement of Portland cement concrete should be observed and tested by a
representative of our firm. Placement should not commence until the subgrade is
properly prepared and tested.
HARTFORD HOMES D-rj
BLOOM FILING 1 ROADS-PHASE 2
CTL I T PROJECT NO.FC07733.008-135
APPENDIX E
MAINTENANCE PROGRAM
MAINTENANCE RECOMMENDATIONS FOR FLEXIBLE PAVEMENTS
A primary cause for deterioration of pavements is oxidative aging resulting in brittle
pavements. Tire loads from traffic are necessary to "work" or knead the asphalt concrete to
keep it flexible and rejuvenated. Preventive maintenance treatments will typically preserve the
original or existing pavement by providing a protective seal or rejuvenating the asphalt binder to
extend pavement life.
1. Annual Preventive Maintenance
a. Visual pavement evaluations should be performed each spring or fall.
b. Reports documenting the progress of distress should be kept current to
provide information on effective times to apply preventive maintenance
treatments.
c. Crack sealing should be performed annually as new cracks appear.
2. 3 to 5 Year Preventive Maintenance
a. The owner should budget for a preventive treatment at approximate intervals
of 3 to 5 years to reduce oxidative embrittlement problems.
b. Typical preventive maintenance treatments include chip seals, fog seals,
slurry seals and crack sealing.
3. 5 to 10 Year Corrective Maintenance
a. Corrective maintenance may be necessary, as dictated by the pavement
condition, to correct rutting, cracking, and structurally failed areas.
b. Corrective maintenance may include full depth patching, milling and overlays.
c. In order for the pavement to provide a 20-year service life, at least one major
corrective overlay should be expected.
HARTFORD HOMES E-1
BLOOM FILING 1 ROADS-PHASE 2
CTL I T PROJECT NO.FC07733.008-135
MAINTENANCE RECOMMENDATIONS FOR RIGID PAVEMENTS
High traffic volumes create pavement rutting and smooth, polished surfaces.
Preventive maintenance treatments will typically preserve the original or existing pavement by
providing a protective seal and improving skid resistance through a new wearing course.
1. Annual Preventive Maintenance
a. Visual pavement evaluations should be performed each spring or fall.
b. Reports documenting the progress of distress should be kept current to
provide information of effective times to apply preventive maintenance.
c. Crack sealing should be performed annually as new cracks appear.
2. 4 to 8 Year Preventive Maintenance
a. The owner should budget for a preventive treatment at approximate intervals
of 4 to 8 years to reduce joint deterioration.
b. Typical preventive maintenance for rigid pavements includes patching, crack
sealing and joint cleaning and sealing.
c. Where joint sealants are missing or distressed, resealing is mandatory.
3. 15 to 20 Year Corrective Maintenance
a. Corrective maintenance for rigid pavements includes patching and slab
replacement to correct subgrade failures, edge damage and material failure.
b. Asphalt concrete overlays may be required at 15-to-20-year intervals to
improve the structural capacity of the pavement.
HARTFORD HOMES E-2
BLOOM FILING 1 ROADS-PHASE 2
CTL I T PROJECT NO.FC07733.008-135