UTILITY PLANS FOR
BLOOM PARK AND POOL
A PARCEL OF LAND IN THE CITY OF FORT COLLINS, COUNTY OF LARIMER, COLORADO, SITUATED IN THE
SOUTHWEST QUARTER OF SECTION 9, TOWNSHIP 7 NORTH (T.7N), RANGE 68 WEST (R.68W) OF THE
6TH PRINCIPAL MERIDIAN (6TH P.M.), CITY OF FORT COLLINS, COLORADO
VICINITY MAP
SCALE: 1" = 1000'
OWNER / APPLICANT
MULBERRY DEVELOPMENT, LLC
4801 GOODMAN ROAD
TIMNATH, CO 80547
PHONE: (970) 614-4219
CONTACT: JAMIE THORPE
CIVIL ENGINEER
CIVILWORX, LLC
4025 AUTOMATION WAY, SUITE B2
FORT COLLINS, CO 80525
PHONE: (970) 698-6046
CONTACT: SCOTT NESBITT
SURVEYORS
GALLOWAY
5265 RONALD REAGAN BLVD., SUITE 210
JOHNSTOWN, CO 80534
PHONE: (970) 800-3300
CONTACT: READE ROSELLES
PROJECT TEAM
UTILITY PROVIDER CONTACT PHONE
WATER EAST LARIMER COUNTY WATER DISTRICT MIKE SCHEID (970) 493-2044
WASTEWATER BOXELDER SANITATION DISTRICT BRIAN ZICK (970) 498-0604
STORMWATER CITY OF FORT COLLINS WES LAMARQUE (970) 212-2900
POWER CITY OF FORT COLLINS TYLER SIEGMUND (970) 416-2772
NATURAL GAS XCEL ENERGY RIGGEN BIPPUS (970) 408-1289
TELECOM/CABLE CENTURYLINK BOB RULI (970) 988-2120
Note: All utility providers listed herein is provided as a courtesy. It is the responsibility of the recipient to verify the accuracy and completeness of the information shown.
UTILITY PROVIDERS
PROJECT COORDINATES:
PROJECT DATUM: NAVD88.
BENCHMARK #1: CITY OF FORT COLLINS VERTICAL CONTROL LANGENBERGER, WEST
HEADWALL AT THE LAKE CANAL AND THE SOUTH FRONTAGE ROAD OF MULBERRY STREET,
EAST OF 3201 EAST MULBERRY STREET.
ELEVATION: 4928.52
BENCHMARK #2: CITY OF FORT COLLINS VERTICAL CONTROL FEAVER, ON THE NORTH SIDE OF
MULBERRY STREET, APPROXIMATELY 540 FEET EAST OF AIRPARK DRIVE ON A HEADWALL THAT
IS OVER AND IRRIGATION CANAL, 8' FROM THE EAST END OF THE HEADWALL
ELEVATION: 4924.80
PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM. SURROUNDING DEVELOPMENTS HAVE
USED NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) FOR THEIR VERTICAL DATUMS.
IF NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) IS REQUIRED FOR ANY PURPOSE, THE
FOLLOWING EQUATION SHOULD BE USED: NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM)
= NAVD88 DATUM - X.XX'.
PROJECT HORIZONTAL DATUM:
ASSUMING THE NORTH LINE OF THE SOUTHWEST QUARTER OF SECTION 9, TOWNSHIP 7 NORTH, RANGE 69
WEST OF THE 6TH P.M., MONUMENTED AS SHOWN ON THIS DRAWING, AS BEARING SOUTH 89°14'06" EAST, BEING
A GRID BEARING OF THE COLORADO STATE PLANE, NORTH ZONE, NORTH AMERICAN DATUM 1983/2011, A
DISTANCE OF 2,646.69 FEET AND WITH ALL OTHER BEARINGS CONTAINED HEREIN RELATIVE THERETO.
THE LINEAL DIMENSIONS AS CONTAINED HEREIN ARE BASED UPON THE "U.S. SURVEY FOOT".
PR
E
P
A
R
E
D
F
O
R
:
JOB NUMBER
SHEET NUMBER
SHEETSOF
DA
T
E
S
U
B
M
I
T
T
E
D
:
Th
e
e
n
g
i
n
e
e
r
p
r
e
p
a
r
i
n
g
t
h
e
s
e
p
l
a
n
s
w
i
l
l
n
o
t
b
e
r
e
s
p
o
n
s
i
b
l
e
fo
r
,
o
r
l
i
a
b
l
e
f
o
r
,
u
n
a
u
t
h
o
r
i
z
e
d
c
h
a
n
g
e
s
t
o
o
r
u
s
e
s
o
f
t
h
e
s
e
pl
a
n
s
.
A
l
l
c
h
a
n
g
e
s
t
o
t
h
e
p
l
a
n
s
m
u
s
t
b
e
i
n
w
r
i
t
i
n
g
a
n
d
mu
s
t
b
e
a
p
p
r
o
v
e
d
b
y
t
h
e
p
r
e
p
a
r
e
r
o
f
t
h
e
s
e
p
l
a
n
s
.
NO
.
BY
DA
T
E
CAUTION
RE
V
I
S
I
O
N
S
:
VERTICAL:
HORIZONTAL:
SCALE
4025 Automation Way
Suite B2
Fort Collins, CO 80525
(970) 698-6046
CivilWorxeng.com
BL
O
O
M
P
A
R
K
A
N
D
P
O
O
L
C24008
HA
R
T
F
O
R
D
H
O
M
E
S
2/
1
2
/
2
0
2
5
31
PRELIMINARY
NOT FOR
CONSTRUCTION
BOXELDER SANITATION DISTRICT
UTILITY PLAN REVIEW
REVIEWED BY: ____________________________________
GENERAL MANAGER
DATE: ________________
REVIEW DOES NOT CONSTITUTE "APPROVAL" OF PLANS. PLAN
ENGINEER IS RESPONSIBLE FOR ACCURACY AND COMPLETENESS.
EAST LARIMER COUNTY WATER DISTRICT
UTILITY PLAN REVIEW
REVIEWED BY: ___________________________________________ DATE: ________________
GENERAL MANAGER
REVIEW DOES NOT CONSTITUTE "APPROVAL" OF PLANS. PLAN ENGINEER IS RESPONSIBLE
FOR ACCURACY AND COMPLETENESS.
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
APPROVED: ___________________________________ ______________________________
City Engineer, ________________ Approved Sheets Date
APPROVED: ___________________________________ ______________________________
Water & Wastewater Utility , ________________ Approved Sheets Date
APPROVED: ___________________________________ ______________________________
Stormwater Utility, ________________ Approved Sheets Date
APPROVED: ___________________________________ ______________________________
Park Planning & Development, ________________ Approved Sheets Date
APPROVED: ___________________________________ ______________________________
Traffic Operations, ________________ Approved Sheets Date
APPROVED: ___________________________________ ______________________________
Environmental Planner, ________________ Approved Sheets Date
MAY 2024
SUBSURFACE EXPLORATION BY:
Sheet List Table
Sheet Title Sheet Number Sheet Description
CV01 1 COVER SHEET
GN01 2 GENERAL NOTES
GN02 3 GENERAL NOTES
EX01 4 EXISTING CONDITIONS & DEMOLITION PLAN
GR01 5 SITE GRADING PLAN - OVERALL
GR02 6 POOL AREA GRADING PLAN
GR03 7 PICKLEBALL AREA GRADING PLAN
GR04 8 PLAY AREA GRADING PLAN
GR05 9 PLAY AREA GRADING PLAN
DN01 10 DRAINAGE PLAN
EC01 11 EROSION CONTROL PLAN - INITIAL
EC02 12 EROSION CONTROL PLAN - INTERM
EC03 13 EROSION CONTROL PLAN - FINAL
UT01 14 OVERALL UTILITY PLAN
SD01 15 STORM DRAIN PLAN & PROFILES
SD02 16 STORM DRAIN PLAN & PROFILES
SD03 17 STORM DRAIN PLAN & PROFILES
DT01 18 CONSTRUCTION DETAILS
DT02 19 CONSTRUCTION DETAILS
DT03 20 CONSTRUCTION DETAILS
DT04 21 CONSTRUCTION DETAILS
DT05 22 CONSTRUCTION DETAILS
DT06 23 CONSTRUCTION DETAILS
DT07 24 CONSTRUCTION DETAILS
DT08 25 CONSTRUCTION DETAILS
DT09 26 CONSTRUCTION DETAILS
DT10 27 CONSTRUCTION DETAILS
DT11 28 CONSTRUCTION DETAILS
DT12 29 CONSTRUCTION DETAILS
DT13 30 CONSTRUCTION DETAILS
DT14 31 CONSTRUCTION DETAILS
CTL THOMPSON, INC.
GEOTECHNICAL INVESTIGATION
BLOOM SUBDIVISION
FILING 1 ROADS, PHASE 2
FORT COLLINS, COLORADO
PROJECT NO: FC07733.008-135
SEPTEMBER 25, 2023
DISCLAIMER STATEMENT:
THESE PLANS HAVE BEEN REVIEWED BY THE CITY OF FORT COLLINS FOR CONCEPT ONLY. THE REVIEW DOES
NOT IMPLY RESPONSIBILITY BY THE REVIEWING DEPARTMENT, THE CITY OF FORT COLLINS ENGINEER, OR THE
CITY OF FORT COLLINS FOR ACCURACY AND CORRECTNESS OF THE CALCULATIONS. FURTHERMORE, THE
REVIEW DOES NOT IMPLY THAT QUANTITIES OF ITEMS ON THE PLANS ARE THE FINAL QUANTITIES REQUIRED.
THE REVIEW SHALL NOT BE CONSTRUED IN ANY REASON AS ACCEPTANCE OF FINANCIAL RESPONSIBILITY BY
THE CITY OF FORT COLLINS FOR ADDITIONAL QUANTITIES OF ITEMS SHOWN THAT MAY BE REQUIRED DURING
THE CONSTRUCTION PHASE.
CERTIFICATION STATEMENT:
I HEREBY AFFIRM THAT THESE FINAL CONSTRUCT PLANS WERE
PREPARED UNDER MY DIRECT SUPERVISION IN ACCORDANCE WITH ALL
APPLICABLE CITY OF FORT COLLINS AND STATE OF COLORADO
STANDARDS AND STATUTES, RESPECTIVELY; AND THAT I AM FULLY
RESPONSIBLE FOR THE ACCURACY OF ALL DESIGN, REVISION, AND
RECORD CONDITIONS THAT I HAVE NOTED ON THESE PLANS.
PR
E
P
A
R
E
D
F
O
R
:
JOB NUMBER
SHEET NUMBER
SHEETSOF
DA
T
E
S
U
B
M
I
T
T
E
D
:
Th
e
e
n
g
i
n
e
e
r
p
r
e
p
a
r
i
n
g
t
h
e
s
e
p
l
a
n
s
w
i
l
l
n
o
t
b
e
r
e
s
p
o
n
s
i
b
l
e
fo
r
,
o
r
l
i
a
b
l
e
f
o
r
,
u
n
a
u
t
h
o
r
i
z
e
d
c
h
a
n
g
e
s
t
o
o
r
u
s
e
s
o
f
t
h
e
s
e
pl
a
n
s
.
A
l
l
c
h
a
n
g
e
s
t
o
t
h
e
p
l
a
n
s
m
u
s
t
b
e
i
n
w
r
i
t
i
n
g
a
n
d
mu
s
t
b
e
a
p
p
r
o
v
e
d
b
y
t
h
e
p
r
e
p
a
r
e
r
o
f
t
h
e
s
e
p
l
a
n
s
.
NO
.
BY
DA
T
E
CAUTION
RE
V
I
S
I
O
N
S
:
VERTICAL:
HORIZONTAL:
SCALE
4025 Automation Way
Suite B2
Fort Collins, CO 80525
(970) 698-6046
CivilWorxeng.com
BL
O
O
M
P
A
R
K
A
N
D
P
O
O
L
C24008
HA
R
T
F
O
R
D
H
O
M
E
S
2/
1
2
/
2
0
2
5
31
PRELIMINARY
NOT FOR
CONSTRUCTION
GE
N
E
R
A
L
N
O
T
E
S
N/A
N/A
2
GN01
LARIMER COUNTY URBAN AREA STREET STANDARDS - (8/1/2021)
GENERAL NOTES
1.ALL MATERIALS, WORKMANSHIP, AND CONSTRUCTION OF PUBLIC IMPROVEMENTS SHALL MEET OR
EXCEED THE STANDARDS AND SPECIFICATIONS SET FORTH IN THE LARIMER COUNTY URBAN AREA
STREET STANDARDS AND APPLICABLE STATE AND FEDERAL REGULATIONS. WHERE THERE IS
CONFLICT BETWEEN THESE PLANS AND THE SPECIFICATIONS, OR ANY APPLICABLE STANDARDS,
THE MOST RESTRICTIVE STANDARD SHALL APPLY. ALL WORK SHALL BE INSPECTED AND
APPROVED BY THE LOCAL ENTITY.
2.ALL REFERENCES TO ANY PUBLISHED STANDARDS SHALL REFER TO THE LATEST REVISION OF
SAID STANDARD, UNLESS SPECIFICALLY STATED OTHERWISE.
3.THESE PUBLIC IMPROVEMENT CONSTRUCTION PLANS SHALL BE VALID FOR A PERIOD OF THREE
YEARS FROM THE DATE OF APPROVAL BY THE LOCAL ENTITY ENGINEER. USE OF THESE PLANS
AFTER THE EXPIRATION DATE WILL REQUIRE A NEW REVIEW AND APPROVAL PROCESS BY THE
LOCAL ENTITY PRIOR TO COMMENCEMENT OF ANY WORK SHOWN IN THESE PLANS.
4.THE ENGINEER WHO HAS PREPARED THESE PLANS, BY EXECUTION AND/OR SEAL HEREOF, DOES
HEREBY AFFIRM RESPONSIBILITY TO THE LOCAL ENTITY, AS BENEFICIARY OF SAID ENGINEER'S
WORK, FOR ANY ERRORS AND OMISSIONS CONTAINED IN THESE PLANS, AND APPROVAL OF THESE
PLANS BY THE LOCAL ENTITY ENGINEER SHALL NOT RELIEVE THE ENGINEER WHO HAS PREPARED
THESE PLANS OF ALL SUCH RESPONSIBILITY. FURTHER, TO THE EXTENT PERMITTED BY LAW, THE
ENGINEER HEREBY AGREES TO HOLD HARMLESS AND INDEMNIFY THE LOCAL ENTITY, AND ITS
OFFICERS AND EMPLOYEES, FROM AND AGAINST ALL LIABILITIES, CLAIMS, AND DEMANDS WHICH
MAY ARISE FROM ANY ERRORS AND OMISSIONS CONTAINED IN THESE PLANS.
5.ALL SANITARY SEWER, STORM SEWER, AND WATER LINE CONSTRUCTION, AS WELL AS POWER AND
OTHER “DRY” UTILITY INSTALLATIONS, SHALL CONFORM TO THE LOCAL ENTITY STANDARDS AND
SPECIFICATIONS CURRENT AT THE DATE OF APPROVAL OF THE PLANS BY THE LOCAL ENTITY
ENGINEER.
6.THE TYPE, SIZE, LOCATION AND NUMBER OF ALL KNOWN UNDERGROUND UTILITIES ARE
APPROXIMATE WHEN SHOWN ON THE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE
DEVELOPER TO VERIFY THE EXISTENCE AND LOCATION OF ALL UNDERGROUND UTILITIES ALONG
THE ROUTE OF THE WORK BEFORE COMMENCING NEW CONSTRUCTION. THE DEVELOPER SHALL
BE RESPONSIBLE FOR UNKNOWN UNDERGROUND UTILITIES.
7.THE ENGINEER SHALL CONTACT THE UTILITY NOTIFICATION CENTER OF COLORADO (UNCC) AT 1-
800-922-1987, AT LEAST 2 WORKING DAYS PRIOR TO BEGINNING EXCAVATION OR GRADING, TO
HAVE ALL REGISTERED UTILITY LOCATIONS MARKED. OTHER UNREGISTERED UTILITY ENTITIES (I.E.
DITCH / IRRIGATION COMPANY) ARE TO BE LOCATED BY CONTACTING THE RESPECTIVE
REPRESENTATIVE. UTILITY SERVICE LATERALS ARE ALSO TO BE LOCATED PRIOR TO BEGINNING
EXCAVATION OR GRADING. IT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER TO RELOCATE
ALL EXISTING UTILITIES THAT CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THESE
PLANS.
8.THE DEVELOPER SHALL BE RESPONSIBLE FOR PROTECTING ALL UTILITIES DURING CONSTRUCTION
AND FOR COORDINATING WITH THE APPROPRIATE UTILITY COMPANY FOR ANY UTILITY CROSSINGS
REQUIRED.
9.IF A CONFLICT EXISTS BETWEEN EXISTING AND PROPOSED UTILITIES AND/OR A DESIGN
MODIFICATION IS REQUIRED, THE DEVELOPER SHALL COORDINATE WITH THE ENGINEER TO
MODIFY THE DESIGN. DESIGN MODIFICATION(S) MUST BE APPROVED BY THE LOCAL ENTITY PRIOR
TO BEGINNING CONSTRUCTION.
10.THE DEVELOPER SHALL COORDINATE AND COOPERATE WITH THE LOCAL ENTITY, AND ALL UTILITY
COMPANIES INVOLVED, TO ASSURE THAT THE WORK IS ACCOMPLISHED IN A TIMELY FASHION AND
WITH A MINIMUM DISRUPTION OF SERVICE. THE DEVELOPER SHALL BE RESPONSIBLE FOR
CONTACTING, IN ADVANCE, ALL PARTIES AFFECTED BY ANY DISRUPTION OF ANY UTILITY SERVICE
AS WELL AS THE UTILITY COMPANIES.
11.NO WORK MAY COMMENCE WITHIN ANY PUBLIC STORM WATER, SANITARY SEWER OR POTABLE
WATER SYSTEM UNTIL THE DEVELOPER NOTIFIES THE UTILITY PROVIDER. NOTIFICATION SHALL BE
A MINIMUM OF 2 WORKING DAYS PRIOR TO COMMENCEMENT OF ANY WORK. AT THE DISCRETION
OF THE WATER UTILITY PROVIDER, A PRE-CONSTRUCTION MEETING MAY BE REQUIRED PRIOR TO
COMMENCEMENT OF ANY WORK.
12.THE DEVELOPER SHALL SEQUENCE INSTALLATION OF UTILITIES IN SUCH A MANNER AS TO
MINIMIZE POTENTIAL UTILITY CONFLICTS. IN GENERAL, STORM SEWER AND SANITARY SEWER
SHOULD BE CONSTRUCTED PRIOR TO INSTALLATION OF THE WATER LINES AND DRY UTILITIES.
13.THE MINIMUM COVER OVER WATER LINES IS 4.5 FEET AND THE MAXIMUM COVER IS 5.5 FEET
UNLESS OTHERWISE NOTED IN THE PLANS AND APPROVED BY THE WATER UTILITY.
14.A STATE CONSTRUCTION DEWATERING WASTEWATER DISCHARGE PERMIT IS REQUIRED IF
DEWATERING IS REQUIRED IN ORDER TO INSTALL UTILITIES OR WATER IS DISCHARGED INTO A
STORM SEWER, CHANNEL, IRRIGATION DITCH OR ANY WATERS OF THE UNITED STATES.
15.THE DEVELOPER SHALL COMPLY WITH ALL TERMS AND CONDITIONS OF THE COLORADO PERMIT
FOR STORM WATER DISCHARGE (CONTACT COLORADO DEPARTMENT OF HEALTH, WATER QUALITY
CONTROL DIVISION, (303) 692-3590), THE STORM WATER MANAGEMENT PLAN, AND THE EROSION
CONTROL PLAN.
16.THE LOCAL ENTITY SHALL NOT BE RESPONSIBLE FOR THE MAINTENANCE OF STORM DRAINAGE
FACILITIES LOCATED ON PRIVATE PROPERTY. MAINTENANCE OF ONSITE DRAINAGE FACILITIES
SHALL BE THE RESPONSIBILITY OF THE PROPERTY OWNER(S).
17.CERTIFICATION OF GRADING AND DRAINAGE FACILITIES MUST BE COMPLETED BY A REGISTERED
ENGINEER AND SUBMITTED TO THE STORMWATER UTILITY DEPARTMENT AT LEAST TWO WEEKS
PRIOR TO STORMWATER UTILITY DEPARTMENT ACCEPTANCE, OR OTHERWISE IN ACCORDANCE
WITH THE DEVELOPMENT AGREEMENT.
18.THE LOCAL ENTITY SHALL NOT BE RESPONSIBLE FOR ANY DAMAGES OR INJURIES SUSTAINED IN
THIS DEVELOPMENT AS A RESULT OF GROUNDWATER SEEPAGE, WHETHER RESULTING FROM
GROUNDWATER FLOODING, STRUCTURAL DAMAGE OR OTHER DAMAGE UNLESS SUCH DAMAGE OR
INJURIES ARE SUSTAINED AS A RESULT OF THE LOCAL ENTITY FAILURE TO PROPERLY MAINTAIN
ITS WATER , WASTEWATER, AND/OR STORM DRAINAGE FACILITIES IN THE DEVELOPMENT.
19.ALL RECOMMENDATIONS OF THE BLOOM FILING 1 REVISED MASTER DRAINAGE STUDY, AS WELL AS
THE BLOOM FILING 4 FINAL DRAINAGE AND EROSION CONTROL STUDY, SHALL BE FOLLOWED AND
IMPLEMENTED.
20.TEMPORARY EROSION CONTROL DURING CONSTRUCTION SHALL BE PROVIDED AS SHOWN ON THE
EROSION CONTROL PLAN. ALL EROSION CONTROL MEASURES SHALL BE MAINTAINED IN GOOD
REPAIR BY THE DEVELOPER, UNTIL SUCH TIME AS THE ENTIRE DISTURBED AREAS IS STABILIZED
WITH HARD SURFACE OR LANDSCAPING.
21.THE DEVELOPER SHALL BE RESPONSIBLE FOR INSURING THAT NO MUD OR DEBRIS SHALL BE
TRACKED ONTO THE EXISTING PUBLIC STREET SYSTEM. MUD AND DEBRIS MUST BE REMOVED
WITHIN 24 HOURS BY AN APPROPRIATE MECHANICAL METHOD (I.E. MACHINE BROOM SWEEP, LIGHT
DUTY FRONT-END LOADER, ETC.) OR AS APPROVED BY THE LOCAL ENTITY STREET INSPECTOR.
22.NO WORK MAY COMMENCE WITHIN ANY IMPROVED OR UNIMPROVED PUBLIC RIGHT-OF-WAY UNTIL
A RIGHT-OF-WAY PERMIT OR DEVELOPMENT CONSTRUCTION PERMIT IS OBTAINED, IF APPLICABLE.
23.THE DEVELOPER SHALL BE RESPONSIBLE FOR OBTAINING ALL NECESSARY PERMITS FOR ALL
APPLICABLE AGENCIES PRIOR TO COMMENCEMENT OF CONSTRUCTION. THE DEVELOPER SHALL
NOTIFY THE LOCAL ENTITY ENGINEERING INSPECTOR (FORT COLLINS - 221-6605) AND THE LOCAL
ENTITY EROSION CONTROL INSPECTOR (FORT COLLINS - 221-6700) AT LEAST 2 WORKING DAYS
PRIOR TO THE START OF ANY EARTH DISTURBING ACTIVITY, OR CONSTRUCTION ON ANY AND ALL
PUBLIC IMPROVEMENTS. IF THE LOCAL ENTITY ENGINEER IS NOT AVAILABLE AFTER PROPER
NOTICE OF CONSTRUCTION ACTIVITY HAS BEEN PROVIDED, THE DEVELOPER MAY COMMENCE
WORK IN THE ENGINEER ABSENCE. HOWEVER, THE LOCAL ENTITY RESERVES THE RIGHT NOT TO
ACCEPT THE IMPROVEMENT IF SUBSEQUENT TESTING REVEALS AN IMPROPER INSTALLATION.
24.THE DEVELOPER SHALL BE RESPONSIBLE FOR OBTAINING SOILS TESTS WITHIN THE PUBLIC RIGHT-
OF-WAY AFTER RIGHT OF WAY GRADING AND ALL UTILITY TRENCH WORK IS COMPLETE AND PRIOR
TO THE PLACEMENT OF CURB, GUTTER, SIDEWALK AND PAVEMENT. IF THE FINAL SOILS/PAVEMENT
DESIGN REPORT DOES NOT CORRESPOND WITH THE RESULTS OF THE ORIGINAL GEOTECHNICAL
REPORT, THE DEVELOPER SHALL BE RESPONSIBLE FOR A RE-DESIGN OF THE SUBJECT PAVEMENT
SECTION OR, THE DEVELOPER MAY USE THE LOCAL ENTITY'S DEFAULT PAVEMENT THICKNESS
SECTION(S). REGARDLESS OF THE OPTION USED, ALL FINAL SOILS/PAVEMENT DESIGN REPORTS
SHALL BE PREPARED BY A LICENSED PROFESSIONAL ENGINEER. THE FINAL REPORT SHALL BE
SUBMITTED TO THE INSPECTOR A MINIMUM OF 10 WORKING DAYS PRIOR TO PLACEMENT OF BASE
AND ASPHALT. PLACEMENT OF CURB, GUTTER, SIDEWALK, BASE AND ASPHALT SHALL NOT OCCUR
UNTIL THE LOCAL ENTITY ENGINEER APPROVES THE FINAL REPORT.
25.THE CONTRACTOR SHALL HIRE A LICENSED ENGINEER OR LAND SURVEYOR TO SURVEY THE
CONSTRUCTED ELEVATIONS OF THE STREET SUBGRADE AND THE GUTTER FLOWLINE AT ALL
INTERSECTIONS, INLETS, AND OTHER LOCATIONS REQUESTED BY THE LOCAL ENTITY INSPECTOR.
THE ENGINEER OR SURVEYOR MUST CERTIFY IN A LETTER TO THE LOCAL ENTITY THAT THESE
ELEVATIONS CONFORM TO THE APPROVED PLANS AND SPECIFICATIONS. ANY DEVIATIONS SHALL
BE NOTED IN THE LETTER AND THEN RESOLVED WITH THE LOCAL ENTITY BEFORE INSTALLATION
OF BASE COURSE OR ASPHALT WILL BE ALLOWED ON THE STREETS.
26.ALL UTILITY INSTALLATIONS WITHIN OR ACROSS THE ROADBED OF NEW RESIDENTIAL ROADS MUST
BE COMPLETED PRIOR TO THE FINAL STAGES OF ROAD CONSTRUCTION. FOR THE PURPOSES OF
THESE STANDARDS, ANY WORK EXCEPT C/G ABOVE THE SUBGRADE IS CONSIDERED FINAL STAGE
WORK. ALL SERVICE LINES MUST BE STUBBED TO THE PROPERTY LINES AND MARKED SO AS TO
REDUCE THE EXCAVATION NECESSARY FOR BUILDING CONNECTIONS.
27.PORTIONS OF LARIMER COUNTY ARE WITHIN OVERLAY DISTRICTS. THE LARIMER COUNTY
FLOODPLAIN RESOLUTION SHOULD BE REFERRED TO FOR ADDITIONAL CRITERIA FOR ROADS
WITHIN THESE DISTRICTS.
28.ALL ROAD CONSTRUCTION IN AREAS DESIGNATED AS WILD FIRE HAZARD AREAS SHALL BE DONE IN
ACCORDANCE WITH THE CONSTRUCTION CRITERIA AS ESTABLISHED IN THE WILD FIRE HAZARD
AREA MITIGATION REGULATIONS IN FORCE AT THE TIME OF FINAL PLAT APPROVAL.
29.PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION, THE CONTRACTOR SHALL CONTACT THE
LOCAL ENTITY FORESTER TO SCHEDULE A SITE INSPECTION FOR ANY TREE REMOVAL REQUIRING
A PERMIT.
30.THE DEVELOPER SHALL BE RESPONSIBLE FOR ALL ASPECTS OF SAFETY INCLUDING, BUT NOT
LIMITED TO, EXCAVATION, TRENCHING, SHORING, TRAFFIC CONTROL, AND SECURITY. REFER TO
OSHA PUBLICATION 2226, EXCAVATING AND TRENCHING.
31.THE DEVELOPER SHALL SUBMIT A CONSTRUCTION TRAFFIC CONTROL PLAN, IN ACCORDANCE WITH
MUTCD, TO THE APPROPRIATE RIGHT-OF-WAY AUTHORITY FOR APPROVAL, PRIOR TO ANY
CONSTRUCTION ACTIVITIES WITHIN, OR AFFECTING, THE RIGHT-OF-WAY. THE DEVELOPER SHALL
BE RESPONSIBLE FOR PROVIDING ANY AND ALL TRAFFIC CONTROL DEVICES AS MAY BE REQUIRED
BY THE CONSTRUCTION ACTIVITIES.
32.PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION THAT WILL AFFECT TRAFFIC SIGNS OF
ANY TYPE, THE CONTRACTOR SHALL CONTACT LOCAL ENTITY TRAFFIC OPERATIONS DEPARTMENT,
WHO WILL TEMPORARILY REMOVE OR RELOCATE THE SIGN AT NO COST TO THE CONTRACTOR;
HOWEVER, IF THE CONTRACTOR MOVES THE TRAFFIC SIGN THEN THE CONTRACTOR WILL BE
CHARGED FOR THE LABOR, MATERIALS AND EQUIPMENT TO REINSTALL THE SIGN AS NEEDED.
33.THE DEVELOPER IS RESPONSIBLE FOR ALL COSTS FOR THE INITIAL INSTALLATION OF TRAFFIC
SIGNING AND STRIPING FOR THE DEVELOPMENT RELATED TO THE DEVELOPMENT'S LOCAL STREET
OPERATIONS. IN ADDITION, THE DEVELOPER IS RESPONSIBLE FOR ALL COSTS FOR TRAFFIC
SIGNING AND STRIPING RELATED TO DIRECTING TRAFFIC ACCESS TO AND FROM THE
DEVELOPMENT.
34.THERE SHALL BE NO SITE CONSTRUCTION ACTIVITIES ON SATURDAYS, UNLESS SPECIFICALLY
APPROVED BY THE LOCAL ENTITY ENGINEER, AND NO SITE CONSTRUCTION ACTIVITIES ON
SUNDAYS OR HOLIDAYS, UNLESS THERE IS PRIOR WRITTEN APPROVAL BY THE LOCAL ENTITY.
35.THE DEVELOPER IS RESPONSIBLE FOR PROVIDING ALL LABOR AND MATERIALS NECESSARY FOR
THE COMPLETION OF THE INTENDED IMPROVEMENTS, SHOWN ON THESE DRAWINGS, OR
DESIGNATED TO BE PROVIDED, INSTALLED, OR CONSTRUCTED, UNLESS SPECIFICALLY NOTED
OTHERWISE.
36.DIMENSIONS FOR LAYOUT AND CONSTRUCTION ARE NOT TO BE SCALED FROM ANY DRAWING. IF
PERTINENT DIMENSIONS ARE NOT SHOWN, CONTACT THE DESIGNER FOR CLARIFICATION, AND
ANNOTATE THE DIMENSION ON THE AS-BUILT RECORD DRAWINGS.
37.THE DEVELOPER SHALL HAVE, ONSITE AT ALL TIMES, ONE (1) SIGNED COPY OF THE APPROVED
PLANS, ONE (1) COPY OF THE APPROPRIATE STANDARDS AND SPECIFICATIONS, AND A COPY OF
ANY PERMITS AND EXTENSION AGREEMENTS NEEDED FOR THE JOB.
38.IF, DURING THE CONSTRUCTION PROCESS, CONDITIONS ARE ENCOUNTERED WHICH COULD
INDICATE A SITUATION THAT IS NOT IDENTIFIED IN THE PLANS OR SPECIFICATIONS, THE
DEVELOPER SHALL CONTACT THE DESIGNER AND THE LOCAL ENTITY ENGINEER IMMEDIATELY.
39.THE DEVELOPER SHALL BE RESPONSIBLE FOR RECORDING AS-BUILT INFORMATION ON A SET OF
RECORD DRAWINGS KEPT ON THE CONSTRUCTION SITE, AND AVAILABLE TO THE LOCAL ENTITY'S
INSPECTOR AT ALL TIMES. UPON COMPLETION OF THE WORK, THE CONTRACTOR(S) SHALL SUBMIT
RECORD DRAWINGS TO THE LOCAL ENTITY ENGINEER.
40.PROJECT DATUM: NAVD88.
BENCHMARK #1: CITY OF FORT COLLINS VERTICAL CONTROL LANGENBERGER, WEST
HEADWALL AT THE LAKE CANAL AND THE SOUTH FRONTAGE ROAD OF MULBERRY STREET,
EAST OF 3201 EAST MULBERRY STREET
ELEVATION: 4928.52
BENCHMARK #2: CITY OF FORT COLLINS VERTICAL CONTROL FEAVER, ON THE NORTH SIDE OF
MULBERRY STREET, APPROXIMATELY 540 FEET EAST OF AIRPARK DRIVE ON A HEADWALL
THAT IS OVER AND IRRIGATION CANAL, 8' FROM THE EAST END OF THE HEADWALL
ELEVATION: 4924.80
PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM. SURROUNDING
DEVELOPMENTS HAVE USED NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS
DATUM) FOR THEIR VERTICAL DATUMS.
IF NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) IS REQUIRED FOR ANY
PURPOSE, THE FOLLOWING EQUATION SHOULD BE USED: NGVD29 UNADJUSTED DATUM
(PRIOR CITY OF FORT COLLINS DATUM) = NAVD88 DATUM - X.XX'.
PROJECT HORIZONTAL DATUM:
ASSUMING THE NORTH LINE OF THE SOUTHWEST QUARTER OF SECTION 9, TOWNSHIP 7 NORTH,
RANGE 69 WEST OF THE 6TH P.M., MONUMENTED AS SHOWN ON THIS DRAWING, AS BEARING
SOUTH 89°14'06" EAST, BEING A GRID BEARING OF THE COLORADO STATE PLANE, NORTH ZONE,
NORTH AMERICAN DATUM 1983/2011, A DISTANCE OF 2,646.69 FEET AND WITH ALL OTHER
BEARINGS CONTAINED HEREIN RELATIVE THERETO.
41.ALL STATIONING IS BASED ON CENTERLINE OF THE PIPES AND/OR ROADWAYS UNLESS OTHERWISE
NOTED.
42.DAMAGED CURB, GUTTER AND SIDEWALK EXISTING PRIOR TO CONSTRUCTION, AS WELL AS
EXISTING FENCES, TREES, STREETS, SIDEWALKS, CURBS AND GUTTERS, LANDSCAPING,
STRUCTURES, AND IMPROVEMENTS DESTROYED, DAMAGED OR REMOVED DUE TO CONSTRUCTION
OF THIS PROJECT, SHALL BE REPLACED OR RESTORED IN LIKE KIND AT THE DEVELOPER'S
EXPENSE, UNLESS OTHERWISE INDICATED ON THESE PLANS, PRIOR TO THE ACCEPTANCE OF
COMPLETED IMPROVEMENTS AND/OR PRIOR TO THE ISSUANCE OF THE FIRST CERTIFICATE OF
OCCUPANCY.
43.WHEN AN EXISTING ASPHALT STREET MUST BE CUT, THE STREET MUST BE RESTORED TO A
CONDITION EQUAL TO OR BETTER THAN ITS ORIGINAL CONDITION. THE EXISTING STREET
CONDITION SHALL BE DOCUMENTED BY THE LOCAL ENTITY CONSTRUCTION INSPECTOR BEFORE
ANY CUTS ARE MADE. PATCHING SHALL BE DONE IN ACCORDANCE WITH THE LOCAL ENTITY
STREET REPAIR STANDARDS. THE FINISHED PATCH SHALL BLEND IN SMOOTHLY INTO THE EXISTING
SURFACE. ALL LARGE PATCHES SHALL BE PAVED WITH AN ASPHALT LAY-DOWN MACHINE. IN
STREETS WHERE MORE THAN ONE CUT IS MADE, AN OVERLAY OF THE ENTIRE STREET WIDTH,
INCLUDING THE PATCHED AREA, MAY BE REQUIRED. THE DETERMINATION OF NEED FOR A
COMPLETE OVERLAY SHALL BE MADE BY THE LOCAL ENTITY ENGINEER AND/OR THE LOCAL ENTITY
INSPECTOR AT THE TIME THE CUTS ARE MADE.
44.UPON COMPLETION OF CONSTRUCTION, THE SITE SHALL BE CLEANED AND RESTORED TO A
CONDITION EQUAL TO, OR BETTER THAN, THAT WHICH EXISTED BEFORE CONSTRUCTION, OR TO
THE GRADES AND CONDITION AS REQUIRED BY THESE PLANS.
45.STANDARD HANDICAP RAMPS ARE TO BE CONSTRUCTED AT ALL CURB RETURNS AND AT ALL “T”
INTERSECTIONS.
46.AFTER ACCEPTANCE BY THE LOCAL ENTITY, PUBLIC IMPROVEMENTS DEPICTED IN THESE PLANS
SHALL BE GUARANTEED TO BE FREE FROM MATERIAL AND WORKMANSHIP DEFECTS FOR A
MINIMUM PERIOD OF TWO YEARS FROM THE DATE OF ACCEPTANCE.
47.THE LOCAL ENTITY SHALL NOT BE RESPONSIBLE FOR THE MAINTENANCE OF ROADWAY AND
APPURTENANT IMPROVEMENTS, INCLUDING STORM DRAINAGE STRUCTURES AND PIPES, FOR THE
FOLLOWING PRIVATE STREETS: POTTER DRIVE AND BELLAMY LANE.
48.APPROVED VARIANCES ARE LISTED AS FOLLOWS: APPROVED VARIANCE FOR THE POTTER
DRIVE ACCESS OFF OF GREENFIELDS DRIVE.
BOXELDER SANITATION DISTRICT CONSTRUCTION NOTES:
1.EXISTING UTILITY LOCATES: IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO
COORDINATE FIELD LOCATES OF ALL EXISTING UTILITIES PRIOR TO COMMENCEMENT OF ANY
CONSTRUCTION. CONTRACTOR SHALL ALSO NOTIFY ALL AFFECTED UTILITY COMPANIES PRIOR TO
COMMENCING CONSTRUCTION. IN THE EVENT OF DAMAGE TO ANY EXISTING UTILITY, THE
CONTRACTOR SHALL IMMEDIATELY NOTIFY THE OWNER OF THE UTILITY INVOLVED AND UNLESS
AUTHORIZED IN WRITING BY THE OWNER OF THE SUBJECT UTILITY, SHALL NOT ATTEMPT TO
MAKE REPAIRS. THE COST OF REPAIRS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.
2.DISTRICT OWNED EASEMENT PICTURES: CONTRACTOR TO PROVIDE SEQUENTIAL DIGITAL
PICTURES SPACED AT NO MORE THAN 300 FEET DETAILING CONDITIONS OF THE OFF-SITE
BOXELDER OWNED EASEMENT CONDITIONS AND ANY STRUCTURES THAT COULD BE
AFFECTED, TO THE DISTRICT AND THE PROPERTY OWNER PRIOR TO THE START OF ANY OFF-SITE
WORK. THESE PICTURES SHALL INCLUDE ALL EXISTING FENCE, DITCHES, DITCH STRUCTURES,
OUT BUILDINGS, WATER TROUGHS, TREES AND ALL OTHER LANDSCAPING. PICTURES ARE TO
BE PLACED AT NO MORE THAN FOUR (4) PICTURES ON A 11X8 SHEET OF PHOTO PAPER
INSERTED INTO TRANSPARENT SLEEVES AND DELIVERED WITH THE DRAWINGS OF RECORD IN
A THREE (3) RING BINDER.
3.PROTECTION OF PROPERTY: CONTRACTOR SHALL CONTINUOUSLY MAINTAIN ADEQUATE
PROTECTION FROM DAMAGE OF ALL PUBLIC AND PRIVATE PROPERTY THROUGH WHICH THE
WORK IS DONE.
4.SAFETY: ALL SEWER MAIN INSTALLATION WITHIN THE DISTRICT SHALL BE SUBJECT TO
CURRENT (OCCUPATIONAL SAFETY AND HEATH ASSOCIATION (OSHA) AND THE
COLORADO SAFETY ASSOCIATION, (CSA) SAFETY REQUIREMENTS. CONTRACTOR SHALL
ALSO COMPLY WITH ANY AND ALL REQUIREMENTS AND REGULATIONS AS SET FORTH BY
CITY, COUNTY, STATE AND FEDERAL AGENCIES HAVING APPLICABLE AUTHORITY.
5.START OF CONSTRUCTION: NO CONSTRUCTION SHALL BEGIN WITHOUT PRIOR DESIGN REVIEW
OF THE DISTRICT. THE DISTRICT SHALL BE NOTIFIED 48 HOURS IN ADVANCE OF STARTING
CONSTRUCTION OR TESTING TO ALLOW FOR SCHEDULING.
6.ROAD EXCAVATION PERMITS: IN EVENT THAT STATE, COUNTY OR CITY ROAD EXCAVATION
PERMIT(S) ARE REQUIRED, THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL ROAD
PERMITS WHICH MAY BE REQUIRED.
7.OTHER PERMITS: THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL PERMITS
REQUIRED FOR CONSTRUCTION.
8.REVISIONS: NO VERBAL AUTHORIZATION FOR FIELD REVISION SHALL BE GIVEN. ALL
REQUESTS FOR FIELD REVISION SHALL BE MADE IN WRITING ACCOMPANIED BY PROPOSED
CHANGE INDICATED ON COPY OF THE APPROVED DESIGN DRAWINGS. ANY FIELD
REVISION APPROVED AND INSTALLED SHALL ALSO BE ACCURATELY DOCUMENTED ON THE
DRAWINGS OF RECORD.
S:\DEVELOPMENT\ENGINEERING-DESIGN-PROCESS\CONSTRUCTION-DWG-NOTES&SPECS.DOC 1
9.MATERIALS: PLASTIC PIPE –ALL GRAVITY SANITARY SEWER PIPING SHALL BE POLYVINYL
CHLORIDE (PVC) UNLESS OTHERWISE NOTED ON THE APPROVED DRAWINGS. PIPE 15” AND
SMALLER SHALL CONFORM TO ASTM D3034, TYPE PSM, AND SDR 35. PIPE 18” AND LARGER SHALL
CONFORM TO ASTM F679. ALL FITTINGS SHALL BE (PVC) UNLESS OTHERWISE NOTED.
10.PIPE COVER: A MINIMUM COVER OF 3-1/2 FEET OF COVER SHALL BE MAINTAINED THROUGHOUT
THE SEWER LINE AND SERVICE LINE INSTALLATION.
11.BEDDING: ALL SEWER MAIN INSTALLATION SHALL INCLUDE BEDDING. BEDDING SHALL BE
3/4" WASHED ROCK UNIFORMLY GRADED AND COMPACTED. REFER TO FORCE MAIN DESIGN FOR
FORCE MAIN BEDDING REQUIREMENTS. TRENCH SHALL BE EXCAVATED TO A DEPTH BELOW
ESTABLISHED GRADE EQUAL TO ¼ OF PIPE DIAMETER (MIN. 4”). BELL DEPRESSIONS SHALL BE
PROVIDED FOR ALL JOINTS. IN EVENT THAT UNSTABLE TRENCH CONDITIONS ARE ENCOUNTERED
AT PIPELINE GRADE 1-1/2” UNIFORMLY GRADED WASHED ROCK SHALL BE USED FOR
STABILIZATION. BEDDING MATERIAL SHALL BE PLACED AND COMPACTED UNDER AND AROUND
SIDES OF THE PIPE. PLACE BEDDING IN SUCH A MANNER AS TO PROVIDE SOLID, UNIFORM BEARING
SURFACE FOR FULL LENGTH OF BARREL. MINIMUM 30” INITIAL LIFT ABOVE PIPE BEFORE OTHER
THAN HAND COMPACTION EQUIPMENT IS TO BE USED. NOTE MAXIMUM TRENCH WIDTH DETAIL.
12.BACKFILL: BACKFILLING OF TRENCH SHALL BE PERFORMED AS SOON AS PRACTICAL, SUBSEQUENT
TO INSPECTION AND APPROVAL. BACKFILLING OF ACCEPTABLE MATERIAL SHALL NOT BE PLACED IN
LIFTS OF GREATER THAN ONE (1) FOOT. BACKFILL SHALL BE COMPACTED TO 95% OF OPTIMUM
DENSITY IN ROADWAY AND RESIDENTIAL AREAS AND 90% IN ALL OFF-SITE EASEMENT AREAS
UNLESS OTHERWISE NOTED. COMPACTION TESTING OF BEDDING AND BACK FILL SHALL BE AT
LEAST FIVE TESTS PER 1,000 FEET AND AT VARYING DEPTHS AND LOCATIONS IN ACCORDANCE
WITH THE REQUIREMENTS OF THE APPLICABLE AUTHORITY OR AS REQUIRED IN PROJECT SPECIFIC
SPECIFICATIONS.
13.CONCRETE: ALL CONCRETE CONSTRUCTION SHALL BE COMPLETED UTILIZING 3,000 PSI AT
TWENTY-EIGHT (28) DAYS OR EQUAL CONCRETE.
14.PAVEMENT OR OTHER REPAIRS: IN EVENT THAT ASPHALT OR CONCRETE PAVEMENT,
SIDEWALKS, STORM SEWERS, WATERLINE OR ANY OTHER PUBLIC OR PRIVATELY OWNED
PROPERTY IS DAMAGED OR REQUIRES RECONSTRUCTION DUE TO THE WORK, REPAIRS OR
REPLACEMENT WILL BE MADE IN ACCORDANCE WITH THE REQUIREMENTS OF THE APPROPRIATE
GOVERNING AUTHORITY. PRIVATE PROPERTY WILL BE RETURNED TO ITS ORIGINAL CONDITION OR
AS CLOSE TO ORIGINAL CONDITION AS REASONABLY POSSIBLE, UNLESS OTHERWISE NOTED ON
THE DRAWINGS.
15.SERVICE TAPS ON EXISTING LINES: ALL TAPS MADE ON EXISTING LINES SHALL BE COMPLETED AT
DEVELOPER’S EXPENSE BY DISTRICT PERSONNEL OR THE DISTRICT’S AUTHORIZED CONTRACTOR
WITH NO EXCEPTION.
16.INSPECTION: CONSTRUCTION SHALL CONFORM TO DISTRICT STANDARDS AND SPECIFICATIONS OR
PROJECT SPECIFIC SPECIFICATIONS AT ALL TIMES. THE DISTRICT SHALL INSPECT THE
CONSTRUCTION AS NECESSARY AND SHALL OBSERVE ALL LINE TESTING. THE DISTRICT SHALL
HAVE THE AUTHORITY TO ASCERTAIN THAT ALL CONSTRUCTION OF FACILITIES IS EQUAL TO OR
BETTER THAN MINIMUM CONSTRUCTION REQUIREMENTS AS SET FORTH IN:
S:\DEVELOPMENT\ENGINEERING-DESIGN-PROCESS\CONSTRUCTION-DWG-NOTES&SPECS.DOC 2
S:\DEVELOPMENT\ENGINEERING-DESIGN-PROCESS\CONSTRUCTION-DWG-NOTES&SPECS.DOC 3
17.TESTING: ALL LINES SHALL BE PRESSURE TESTED AND FLUSHED BY THE CONTRACTOR IN
ACCORDANCE WITH DISTRICT STANDARDS AND SPECIFICATIONS AND UNDER THE DISTRICT’S
SUPERVISION. UPON PASSING, COPIES OF ALL PASSING TEST RESULTS INCLUDING SOILS
COMPACTION IN THE AREA OF SEWER MAIN CONSTRUCTION SHALL BE PROVIDED TO THE
DISTRICT.
18.ACCEPTANCE: UPON COMPLETION OF ALL UTILITY CONSTRUCTION (SEWER AND OTHER) AND
FULFILLMENT OF ALL DISTRICT REQUIREMENTS, PRELIMINARY ACCEPTANCE OF NEW SEWER
SYSTEM IMPROVEMENTS WILL OCCUR IN ACCORDANCE WITH DISTRICT’S ACCEPTANCE
PROCEDURE.
19.WARRANTY: THE CONTRACTOR SHALL WARRANT THE MATERIALS, INSTALLATION, WORKMANSHIP
AND SURFACE RESTORATION FOR A PERIOD OF TWO YEARS FROM DATE OF PRELIMINARY
ACCEPTANCE. DURING THIS WARRANTY PERIOD THE DEVELOPER SHALL PROMPTLY REPAIR ANY
DEFECTS IN THE WORK AND MAINTAIN THE WORK AREA. AT THE CLOSE OF THE TWO-YEAR
WARRANTY PERIOD THE DISTRICT WILL MAKE A FIELD INSPECTION. UPON SATISFACTORY
CORRECTION OF ANY DEFICIENCIES NOTED THE DISTRICT WOULD MAKE FINAL ACCEPTANCE OF
THE LINES AND WORK. THE LINES AND THE APPURTENANCES SHALL THEN BECOME THE SOLE
PROPERTY AND RESPONSIBILITY OF BOXELDER SANITATION DISTRICT.
20.DRAWINGS OF RECORD AND TOTAL COSTS: WITHIN 90 DAYS OF PRELIMINARY ACCEPTANCE OF
THE NEW FACILITIES, THE DISTRICT SHALL BE PROVIDED WITH ACCEPTABLE DRAWINGS OF
RECORD OF THE COMPLETE SYSTEM CONSISTING OF TWO SETS OF FILL SIZE REPRODUCED
PRINTS, TWO SETS OF ½-SIZE REPRODUCED PRINTS, ONE SET OF 6 MIL DOUBLE MATTED
REPRODUCIBLE MYLARS AND ONE COMPLETE DIGITAL FILE EQUIVALENT (SOFTWARE AND VERSION
TO BE CONFIRMED AT TIME OF DELIVERY). WRITTEN CONFIRMATION OF THE TOTAL COST OF ALL
SEWER SYSTEM IMPROVEMENTS SHALL ALSO BE SUBMITTED WITH THE DRAWINGS OF RECORD.
EAST LARIMER COUNTY WATER DISTRICT CONSTRUCTION NOTES:
1.STANDARDS AND SPECIFICATIONS: CONSTRUCTION SHALL BE PER THE DISTRICT
SPECIFICATIONS IN EFFECT AT THE START OF CONSTRUCTION. MATERIAL OR EQUIPMENT SHALL
BE MANUFACTURED PER THE MOST RECENT VERSION OF APPLICABLE INDUSTRY STANDARDS.
2.LOCATES: CONTRACTOR SHALL COORDINATE FIELD LOCATES OF ALL EXISTING UTILITIES PRIOR TO
COMMENCEMENT OF ANY CONSTRUCTION AND AS REQUIRED NOTIFY ALL AFFECTED UTILITY
COMPANIES PRIOR TO COMMENCING CONSTRUCTION. COST OF REPAIRS TO ANY UTILITY
DAMAGED DURING DISTRICT WATERLINE INSTALLATION SHALL BE THE RESPONSIBILITY OF THE
CONTRACTOR.
3.DAMAGE TO PROPERTY: CONTRACTOR SHALL CONTINUOUSLY MAINTAIN ADEQUATE PROTECTION
FROM DAMAGE OF ALL PUBLIC AND PRIVATE PROPERTY THROUGH WHICH THE WORK IS DONE AND
SHALL BE FULLY RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH DAMAGE TO ANY AND ALL
PUBLIC AND PRIVATE PROPERTY.
4.SAFETY: CONTRACTOR SHALL COMPLY WITH ANY AND ALL REQUIREMENTS AND REGULATIONS AS
SET FORTH BY ANY LOCAL, CITY, COUNTY, STATE OR FEDERAL AGENCY HAVING APPLICABLE
AUTHORITY.
5.LANDSCAPING ADJACENT TO DISTRICT WATERLINES: NO LANDSCAPING (BUSHES, SHRUBS,
TREES OR OTHER PLANTINGS) THAT HAS A MATURE HEIGHT OF OVER 3 FEET (3-FT) SHALL BE
PLACED WITHIN TEN FEET (10-FT) OF ANY DISTRICT WATERLINE OR APPURTENANCE (DISTRIBUTION
MAIN, SERVICE LINE, FIRE HYDRANT, METER, ETC.). BUSHES OR SHRUBS WITH A MATURE HEIGHT
OF LESS THAN 3-FT SHALL BE PLACED A MINIMUM 5-FT FROM ANY DISTRICT WATER LINE, SERVICE
LINE OR APPURTENANCE. THE DISTRICT SHALL HAVE THE RIGHT TO REMOVE ANY LANDSCAPING
THAT VIOLATES THIS STANDARD, AT ANY TIME SUCH LANDSCAPING IS DISCOVERED, AND SHALL
NOT BE REQUIRED TO REPLACE THE REMOVED LANDSCAPING.
6.DESIGN APPROVAL AND CONSTRUCTION START: NO CONSTRUCTION SHALL BEGIN WITHOUT PRIOR
DESIGN ACCEPTANCE FROM ELCO. DISTRICT SHALL BE NOTIFIED 48 HOURS IN ADVANCE OF
STARTING CONSTRUCTION OR TESTING TO ALLOW FOR SCHEDULING. PERMITS: CONTRACTOR IS
RESPONSIBLE FOR OBTAINING ALL PERMITS WHICH MAY BE REQUIRED. FOR ANY PERMITTING
WHERE THE DISTRICT MUST APPLY FOR A PERMIT THE CONTRACTOR SHALL COORDINATE, COVER
THE COST AND SCHEDULE THE PERMIT ACQUISITION WITH THE DISTRICT.
7.CHANGES DURING CONSTRUCTION: NO VERBAL AUTHORIZATION FOR FIELD REVISION SHALL BE
WORK. ALL REQUESTS FOR SUCH FIELD REVISION SHALL BE MADE IN WRITING WITH THE
PROPOSED CHANGE INDICATED ON A COPY OF THE SIGNED DESIGN DRAWINGS. ANY FIELD
REVISION APPROVED AND INSTALLED SHALL ALSO BE ACCURATELY DOCUMENTED ON THE
AS-BUILT DRAWINGS.
8.MATERIALS OF CONSTRUCTION:
A. PIPE: ALL WATER LINE PIPING SHALL BE POLYVINYL CHLORIDE (PVC), DR 18 (PRESSURE
CLASS 235 PSI) AND MANUFACTURED IN ACCORDANCE WITH AWWA STANDARD C900-16,
"POLYVINYL CHLORIDE (PVC) PRESSURE PIPE AND FABRICATED FITTING, 4-INCH THROUGH
60-INCH, ", OR MOST RECENT VERSION.
B. TRACER WIRE: ALL WATER PIPING SHALL BE INSTALLED WITH A TWELVE (12) GAUGE SOLID
COPPER WIRE, PLASTIC COATED, SIX HUNDRED (600) VOLTS, TAPED TO TOP OF PIPE AND
SURFACED AT EACH HYDRANT INTO A TRACER WIRE BOX.
C. PIPE JOINTS: PIPE JOINTS SHALL BE MADE USING AN INTEGRAL BELL WITH AN ELASTOMERIC
GASKET PUSH-ON TYPE JOINT OR USING MACHINED COUPLINGS OF A SLEEVE TYPE WITH
RUBBER RING GASKETS AND MACHINED PIPE ENDS TO FORM A PUSH-ON TYPE JOINT.
D. MATERIALS AND INSTALLATION: ALL MATERIALS INSTALLED SHALL BE NEW AND FREE OF
MANUFACTURER DEFECTS OR DAMAGE.
E. PIPE FITTINGS: ALL FITTINGS SHALL BE DUCTILE IRON MECHANICAL JOINT AND
MANUFACTURED IN ACCORDANCE WITH AWWA STANDARD C153, 250 PSI RATING. FITTINGS
SHALL BE FURNISHED WITH FUSION BONDED EPOXY EXTERIOR COATING AND INTERIOR
LINING. ALL FITTING CONNECTIONS TO VALVES, FIRE HYDRANTS OR OTHER MJ TYPE
CONNECTIONS SHALL USE FOSTER ADAPTOR TYPE CONNECTORS.
F. GATE VALVES: GATE VALVES SHALL CONFORM TO AWWA STANDARD C509 WITH
MECHANICAL JOINT, 2" OPEN LEFT OPERATING NUT AND RESILIENT SEAT.
G. BUTTERFLY VALVES: BUTTERFLY VALVES SHALL BE USED FOR ALL VALVES 12-INCHES AND
LARGER AND CONFORM TO AWWA STANDARD C504 WITH MECHANICAL JOINT, 2" OPEN LEFT
OPERATING NUT WITH RESILIENT SEAT.
H. FIRE HYDRANTS: HYDRANTS SHALL CONFORM TO AWWA STANDARD C502, 1" SQUARE
OPEN-RIGHT OPERATING NUT WITH EPOXY COATED SHOE.
I. PIPE, VALVE AND FITTING WRAP: ALL DUCTILE IRON FITTINGS, VALVES, FIRE HYDRANT SHOES
AND PLUGS SHALL BE POLY-WRAPPED WITH 8-MIL THICK POLYETHYLENE PLASTIC WRAP,
DOUBLE LAYERED, AND ENDS SECURELY TAPED PRIOR TO BACKFILL. ALL FITTING BOLTS SHALL BE
FLUOROPOLYMER COATED (‘BLUE BOLT’ TYPE) WITH ZINC CAPS INSTALLED.
9.BEDDING: ALL PIPE SHALL BE BEDDED IN 3/4" WASHED ROCK UNIFORMLY GRADED AND
COMPACTED. TRENCH SHALL BE EXCAVATED TO A DEPTH BELOW ESTABLISHED GRADE EQUAL TO
1/4 OF PIPE DIAMETER (MIN. 4"). 1-1/2" UNIFORMLY GRADED WASHED ROCK SHALL BE USED FOR
STABILIZATION WHERE NEEDED. BEDDING MATERIAL SHALL BE PLACED AND COMPACTED UNDER
AND AROUND SIDES OF THE PIPE PER THE PIPE MANUFACTURER’S INSTALLATION
RECOMMENDATIONS.
10.BACKFILL: BACKFILL OF ACCEPTABLE MATERIAL SHALL BE PLACED IN ‘LIFTS’ OF UNIFORM
HORIZONTAL LAYERS NOT TO EXCEED 6-INCHES OF COMPACTED DEPTH PER LIFT. MINIMUM 18" OF
COMPACTED BACKFILL ABOVE PIPE MUST BE IN PLACE BEFORE ROLLING MECHANICAL EQUIPMENT
TYPE COMPACTION IS TO BE USED. BACKFILL SHALL BE COMPACTED TO 95% OF OPTIMUM DENSITY
IN ROADWAY AREAS OR PER ROAD AUTHORITY’S REQUIREMENTS, AND 90% IN FIELDS OR
NON-ROAD LOCATIONS. BACKFILL COMPACTION TESTING FREQUENCY SHALL BE AT LEAST ONE
TEST PER 100-LINEAL FEET OF PIPELINE LENGTH AND AT VARYING DEPTHS AND LOCATIONS IN
ACCORDANCE WITH THE REQUIREMENTS OF THE APPLICABLE ROAD AUTHORITY OR BEGINNING
1.5-FEET ABOVE TOP OF PIPE AND AT 1-FOOT INCREMENTS TO GRADE.
11.JOINT RESTRAINT: ALL FITTINGS, TEES, PLUGS AND FIRE HYDRANTS SHALL BE PROVIDED WITH
FOSTER ADAPTOR TYPE AND/OR OTHER MECHANICAL JOINT RESTRAINT IN ACCORDANCE WITH
DISTRICT SPECIFICATIONS OR AS REQUIRED PER ENGINEER’S DESIGN. THRUST BLOCKS SHALL BE
USED ONLY AS REQUIRED PER FIELD CONDITIONS AND AS APPROVED OR DIRECTED BY THE
DISTRICT FIELD INSPECTOR.
12.CONCRETE: ALL CONCRETE CONSTRUCTION, INCLUDING THRUST BLOCKS, SHALL BE COMPLETED
UTILIZING TYPE 5 OR EQUAL CEMENT ONLY.
13.ASPHALT REPLACEMENT: FOR ASPHALT PAVEMENT THAT IS CUT AND HAS BEEN IN PLACE
LESS THAN TWO YEARS (ACCORDING TO CITY OR COUNTY ENGINEER'S RECORD), THE CUT SHALL
BE A MINIMUM OF 20 FEET IN WIDTH AND WILL BE REPLACED TO THE SPECIFIED DEPTH BY A
PAVING MACHINE.
14.PIPE COVER: PIPE COVER OF 4-1/2 TO 5-1/2 FEET OVER TOP OF PIPE SHALL BE MAINTAINED
THROUGHOUT THE WATERLINE AND SERVICE LINE INSTALLATION, PARTICULARLY IN AREAS OF
NEW GRADING AND DRAINAGE SWALES. MAXIMUM ALLOWABLE COVER SHALL BE 6 FEET, UNLESS
SPECIFICALLY APPROVED BY THE DISTRICT.
15.CONNECTION TO EXISTING SYSTEM: ALL CONNECTIONS TO EXISTING WATERLINES SHALL BE
COMPLETED AT THE DEVELOPER'S EXPENSE.
16.INSPECTION: THE DISTRICT SHALL HAVE THE AUTHORITY TO ASSIGN AN INSPECTOR WHO SHALL
INSPECT, CHECK AND VERIFY THAT ANY AND ALL WORK, INCLUDING ALL MATERIALS TO BE
INCORPORATED IN THE WORK, EXCAVATION, BEDDING, BACKFILL, TESTING AND ALL
CONSTRUCTION METHODS AND PRACTICES OF THE INSTALLED FACILITIES IS EQUAL TO OR BETTER
THAN MINIMUM CONSTRUCTION REQUIREMENTS AS SET FORTH IN THE DISTRICT’S
SPECIFICATIONS.
17.TESTING: ALL LINES SHALL BE PRESSURE TESTED, CHLORINATED AND FLUSHED BY THE
CONTRACTOR IN ACCORDANCE WITH DISTRICT SPECIFICATIONS AND UNDER THE DISTRICT'S
SUPERVISION. UPON PASSING CHLORINATION TESTING, BACTERIOLOGICAL TESTING WILL BE
COMPLETED BY A STATE CERTIFIED WATER QUALITY CONTROL LABORATORY. COPIES OF ALL
PASSING TEST RESULTS, INCLUDING SOILS COMPACTION IN THE AREA OF WATER MAIN
CONSTRUCTION, SHALL BE PROVIDED TO THE DISTRICT.
18.PRELIMINARY ACCEPTANCE: PRELIMINARY ACCEPTANCE SHALL BE ISSUED TO THE OWNER
WHEN ALL PROJECT WORK IS COMPLETE, TESTED AND OPERATIONAL SUCH THAT THE
INFRASTRUCTURE IS READY TO BE ACCEPTED BY THE DISTRICT. DOCUMENTATION REQUIRED
PRIOR TO ISSUANCE OF PRELIMINARY ACCEPTANCE INCLUDES BUT IS NOT LIMITED TO
BACTERIOLOGICAL TEST REPORT, FLUSHING REPORT, HYDRO-TEST REPORT, COMPACTION
TESTING REPORTS WITH MAP OF TEST LOCATIONS, STATEMENT OF WATER LINE INSTALLATION
COSTS, AS-BUILT DRAWINGS AND RECORD DRAWINGS. FOLLOWING RECEIPT, REVIEW AND
ACCEPTANCE BY THE DISTRICT OF THESE AND OTHER DOCUMENTS AS MAY BE REQUIRED PER
PROJECT SPECIFICS, THE DISTRICT WILL ISSUE PRELIMINARY ACCEPTANCE.
19.PROJECT AS-BUILT AND RECORD DRAWING REQUIREMENTS:
A. AS-BUILT DRAWINGS ARE COMPILED AND MAINTAINED DURING CONSTRUCTION BY THE
CONTRACTOR AND IDENTIFY, IN RED INK, ON-SITE CHANGES TO THE ORIGINAL DESIGN.
AS-BUILT DRAWINGS SHALL BE DELIVERED TO THE DISTRICT (ELECTRONICALLY IN PDF
FORMAT OR OTHERWISE AS REQUESTED BY THE DISTRICT) FOR ACCEPTANCE AND TO THE
PROJECT’S DESIGN ENGINEER FOR CREATION OF RECORD DRAWINGS.
B. RECORD DRAWINGS ARE PREPARED BY THE PROJECT’S DESIGN ENGINEER AND SHALL
ACCURATELY REFLECT ANY CHANGE MADE IN THE FIELD WHICH VARIES FROM THE ACCEPTED
CONSTRUCTION PLANS, AS NOTED IN THE AS-BUILT DRAWINGS, INCLUDING AT A MINIMUM,
FIELD DIMENSIONS AND ELEVATIONS, HORIZONTAL AND VERTICAL LOCATIONS OF
UNDERGROUND UTILITIES AND APPURTENANCES. THE CONTRACTOR’S SURVEYOR SHALL
SURVEY IN ALL FITTINGS, VALVES, WATER SERVICE CURB STOPS AND OTHER
APPURTENANCES SO AS TO ACCURATELY DOCUMENT AND CREATE A FINAL SET OF RECORD
DRAWINGS WITH WATER LINE, FITTING AND APPURTENANCE LOCATIONS THAT ACCURATELY
REPRESENTS THE FINAL, INSTALLED INFRASTRUCTURE. THE RECORD DRAWINGS SHALL BE
REVIEWED AND ACCEPTED BY THE DISTRICT PRIOR TO PRELIMINARY ACCEPTANCE OF THE
PROJECT. RECORD DRAWINGS ARE TO BE DELIVERED TO THE DISTRICT IN ELECTRONIC
FORMAT AS ADOBE (PDF), AUTOCAD AND ARCVIEW SHAPE FILES (RELEASE VERSION TO BE
CONFIRMED WITH DISTRICT AT TIME OF SUBMITTAL).
20.WARRANTY: THE OWNER/DEVELOPER SHALL WARRANT ALL WORK ASSOCIATED WITH THE
WATERLINE INSTALLATION INCLUDING, BUT NOT LIMITED TO THE MATERIALS, INSTALLATION
WORKMANSHIP AND SURFACE RESTORATION FOR A PERIOD OF TWO (2) YEARS FROM DATE OF
PRELIMINARY ACCEPTANCE. DURING THIS WARRANTY PERIOD THE OWNER/DEVELOPER SHALL
REPAIR ANY DEFECTS IN THE WORK AND MAINTAIN THE WORK AREA. AT THE CLOSE OF THE
TWO-YEAR WARRANTY PERIOD AND UPON SATISFACTORY CORRECTION OF ANY DEFICIENCIES
NOTED, THE DISTRICT SHALL ACCEPT THE CONSTRUCTED LINES AND APPURTENANCES AS THE
SOLE PROPERTY AND RESPONSIBILITY OF THE DISTRICT.
PR
E
P
A
R
E
D
F
O
R
:
JOB NUMBER
SHEET NUMBER
SHEETSOF
DA
T
E
S
U
B
M
I
T
T
E
D
:
Th
e
e
n
g
i
n
e
e
r
p
r
e
p
a
r
i
n
g
t
h
e
s
e
p
l
a
n
s
w
i
l
l
n
o
t
b
e
r
e
s
p
o
n
s
i
b
l
e
fo
r
,
o
r
l
i
a
b
l
e
f
o
r
,
u
n
a
u
t
h
o
r
i
z
e
d
c
h
a
n
g
e
s
t
o
o
r
u
s
e
s
o
f
t
h
e
s
e
pl
a
n
s
.
A
l
l
c
h
a
n
g
e
s
t
o
t
h
e
p
l
a
n
s
m
u
s
t
b
e
i
n
w
r
i
t
i
n
g
a
n
d
mu
s
t
b
e
a
p
p
r
o
v
e
d
b
y
t
h
e
p
r
e
p
a
r
e
r
o
f
t
h
e
s
e
p
l
a
n
s
.
NO
.
BY
DA
T
E
CAUTION
RE
V
I
S
I
O
N
S
:
VERTICAL:
HORIZONTAL:
SCALE
4025 Automation Way
Suite B2
Fort Collins, CO 80525
(970) 698-6046
CivilWorxeng.com
BL
O
O
M
P
A
R
K
A
N
D
P
O
O
L
C24008
HA
R
T
F
O
R
D
H
O
M
E
S
2/
1
2
/
2
0
2
5
31
PRELIMINARY
NOT FOR
CONSTRUCTION
GE
N
E
R
A
L
N
O
T
E
S
N/A
N/A
3
GN02
CITY OF FORT COLLINS GRADING AND EROSION CONTROL NOTES
GENERAL EROSION CONTROL REQUIREMENTS: THESE NOTES ARE A SUMMARY FOR THE LEGAL
REQUIREMENTS, THAT ARE SET FORTH IN THE FORT COLLINS STORMWATER CRITERIA MANUAL (FCSCM), AND
THAT ANY CONFLICT IS RESOLVED BY THE MORE STRINGENT REQUIREMENT CONTROLLING.
1.THE PROPERTY OWNER, OWNER’S REPRESENTATIVE, DEVELOPER, DESIGN ENGINEER, GENERAL
CONTRACTOR, SUB-CONTRACTORS, OR SIMILAR TITLE FOR THE DEVELOPING ENTITY (HERE AFTER
REFERRED TO AS THE DEVELOPER) HAS PROVIDED THESE EROSION CONTROL MATERIALS IN
ACCORDANCE WITH EROSION CONTROL CRITERIA SET FORTH IN THE MANUAL AS AN ATTEMPT TO
IDENTIFY EROSION, SEDIMENT, AND OTHER POTENTIAL POLLUTANT SOURCES ASSOCIATED WITH THESE
CONSTRUCTION ACTIVITIES AND PREVENTING THOSE POLLUTANTS FROM LEAVING THE PROJECT SITE
AS AN ILLICIT DISCHARGE. FULL CITY REQUIREMENTS AND ARE OUTLINED AND CLARIFIED IN THE MANUAL
UNDER CHAPTER 4: CONSTRUCTION CONTROL MEASURES AND SHOULD BE USED TO IDENTIFY AND
DEFINE WHAT IS NEEDED ON A PROJECT.
2.THE DEVELOPER SHALL MAKE THEMSELVES THOROUGHLY FAMILIAR WITH THE PROVISIONS AND THE
CONTENT OF THE SPECIFICATIONS LAID OUT IN THE MANUAL, THE DEVELOPMENT AGREEMENT, THE
EROSION CONTROL MATERIALS COMPILED FOR THIS PROJECT, AND THE FOLLOWING NOTES AS ALL
THESE MATERIALS ARE APPLICABLE TO THIS PROJECT.
3.THE DEVELOPER SHALL IMPLEMENT AND MAINTAIN CONTROL MEASURES FOR ALL POTENTIAL
POLLUTANTS FROM THE START OF LAND DISTURBING ACTIVITIES UNTIL FINAL STABILIZATION OF THE
CONSTRUCTION SITE.
4.THE CITY EROSION CONTROL INSPECTOR SHALL BE NOTIFIED AT LEAST TWENTY-FOUR (24) HOURS
PRIOR TO THE DESIRED START OF ANY CONSTRUCTION ACTIVITIES ON THIS SITE TO ALLOW ADEQUATE
TIME FOR ON-SITE CONFIRMATION (INITIAL INSPECTION WHICH CAN TAKE UP TO TWO BUSINESS DAYS
AFTER RECEIVING THE REQUEST) THAT THE SITE IS IN FACT PROTECTED FROM SEDIMENT AND
POLLUTANTS DISCHARGES OFF SITE. PLEASE CONTACT EROSION@FCGOV.COM EARLY TO SCHEDULE
THOSE INITIAL EROSION CONTROL INSPECTIONS WELL IN ADVANCE SO THAT DEMOLITION, CLEARING,
GRUBBING, TREE REMOVAL, AND SCRAPING MAY BEGIN WITHOUT DELAY. FAILURE TO RECEIVE AN
ON-SITE CONFIRMATION BEFORE CONSTRUCTION ACTIVITIES COMMENCE IS AN AUTOMATIC “NOTICE OF
VIOLATION” AND CAN RESULT IN FURTHER ENFORCEMENT ACTIONS.
5.THE DEVELOPER SHALL PROACTIVELY PROVIDE ALL APPROPRIATE CONTROL MEASURES TO PREVENT
DAMAGE TO ADJACENT DOWNSTREAM AND LEEWARD PROPERTIES. THIS INCLUDES BUT IS NOT LIMITED
TO: TREES, SHRUBS, LAWNS, WALKS, PAVEMENTS, ROADWAYS, STRUCTURES, CREEKS, WETLANDS,
STREAMS, RIVERS, AND UTILITIES THAT ARE NOT DESIGNED FOR REMOVAL, RELOCATION, OR
REPLACEMENT IN THE COURSE OF CONSTRUCTION.
6.AT ALL TIMES THE DEVELOPER SHALL BE RESPONSIBLE TO ENSURE ADEQUATE CONTROL MEASURES
ARE DESIGNED, SELECTED, INSTALLED, MAINTAIN, REPAIRED, REPLACED, AND ULTIMATELY REMOVED IN
ORDER TO PREVENT AND CONTROL EROSION SUSPENSION, SEDIMENT TRANSPORTATION, AND
POLLUTANT DISCHARGE AS A RESULT OF CONSTRUCTION ACTIVITIES ASSOCIATED WITH THIS PROJECT.
7.ALL APPLICABLE CONTROL MEASURES BASED UPON THE SEQUENCING AND/OR PHASING OF THE
PROJECT SHALL BE INSTALLED PRIOR TO THOSE CONSTRUCTION ACTIVITIES COMMENCING.
8.AS DYNAMIC CONDITIONS (DUE TO THE NATURE, TIMING, SEQUENCE, AND PHASING OF CONSTRUCTION)
IN THE FIELD MAY WARRANT CONTROL MEASURES IN ADDITION, OR DIFFERENT, TO WHAT IS SHOWN ON
THESE PLANS, THE DEVELOPER SHALL AT ALL TIMES BE RESPONSIBLE TO IMPLEMENT THE CONTROL
MEASURES THAT ARE MOST EFFECTIVE WITH THE CURRENT STATE AND PROGRESS OF CONSTRUCTION.
THE DEVELOPER SHALL IMPLEMENT WHATEVER MEASURES ARE DETERMINED NECESSARY, AND/OR AS
DIRECTED BY THE CITY EROSION CONTROL INSPECTOR. THE DEVELOPER SHALL INSURE THAT ALL
EROSION CONTROL PLANS (MAPS) OR SWMP DOCUMENTS ARE UPDATED TO REFLECT THE CURRENT
SITE CONDITIONS, WITH UPDATES BEING INITIALED AND DATED. THESE SITE INSPECTIONS AND SITE
CONDITION UPDATES SHALL BE MADE AVAILABLE UPON REQUEST BY THE CITY.
9.ALL LISTINGS, PROVISIONS, MATERIALS, PROCEDURES, ACTIVITIES, SITE WORK AND THE LIKE
ARTICULATED IN THIS OR OTHER WRITTEN SITE-SPECIFIC DOCUMENTS (INCLUDING BUT NOT LIMITED TO
THE EROSION CONTROL REPORTS, DEVELOPMENT AGREEMENTS, LANDSCAPE, AND DRAINAGE
MATERIALS) SHALL MEET OR EXCEED THE MOST RESTRICTIVE LANGUAGE FOR CITY, COUNTY, STATE,
AND FEDERAL REGULATIONS WITH REGARDS TO EROSION, SEDIMENT, POLLUTANT, AND OTHER
POLLUTION SOURCE CONTROL MEASURES. THE DEVELOPER SHALL BE RESPONSIBLE TO COMPLY WITH
ALL OF THESE AFOREMENTIONED LAWS AND REGULATIONS.
10.THE DEVELOPER SHALL ENSURE THAT ALL APPROPRIATE PERMITS (CDPS GENERAL PERMIT
STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY, DEWATERING, CLEAN WATER
ACT, ARMY CORPS OF ENGINEERS’ 404 WETLANDS MITIGATION PERMIT, ETC.) HAVE BEEN ATTAINED
PRIOR TO THE RELEVANT ACTIVITY HAS BEGUN. THESE PERMITS OR COPIES SHALL BE MADE AVAILABLE
UPON REQUEST BY THE CITY.
11.THE DEVELOPER SHALL FURNISH ALL CONVENIENCES AND ASSISTANCES TO AID THE EROSION CONTROL
INSPECTORS OF MATERIALS, WORKMANSHIP, RECORDS, AND SELF-INSPECTIONS, ETC. OF THE CONTROL
MEASURES INVOLVED IN THE CONSTRUCTION ACTIVITIES.
12.THE DEVELOPER SHALL REQUEST CLARIFICATION OF ALL APPARENT SITE CONSTRUCTION ISSUES THAT
MAY ARISE DUE TO INCONSISTENCIES IN CONSTRUCTION PLANS FOR THE SITE OR SITE CONDITIONS
AROUND THE SELECTED CONTROL MEASURES BY CONTACTING THE EROSION CONTROL INSPECTOR.
THE EROSION CONTROL INSPECTOR WILL NOT BE RESPONSIBLE FOR ANY EXPLANATIONS,
INTERPRETATIONS, OR SUPPLEMENTARY DATA PROVIDED BY OTHERS.
13.ALL CONTROL MEASURES SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUAL.
14.THE CITY RESERVES THE RIGHT TO REQUIRE ADDITIONAL CONTROL MEASURES AS SITE CONDITIONS
WARRANT, TO THE EXTENT AUTHORIZED BY RELEVANT LEGAL AUTHORITY.
15.AS WITH ANY CONSTRUCTION STANDARDS, OCCASIONS MAY ARISE WHERE THE MINIMUM EROSION
CONTROL STANDARDS ARE EITHER INAPPROPRIATE OR CANNOT BE JUSTIFIED. IN THESE CASES, A
VARIANCE TO THESE STANDARDS MAY BE APPLIED FOR PURSUANT TO THE TERMS, CONDITIONS, AND
PROCEDURES OF THE MANUAL.
16.INSPECTION. THE CONTRACTOR SHALL INSPECT SITE POLLUTANT SOURCES AND IMPLEMENT CONTROL
MEASURES AT A MINIMUM OF ONCE EVERY TWO WEEKS DURING CONSTRUCTION AND WITHIN 24 HOURS
FOLLOWING A PRECIPITATION EVENT. DOCUMENTATION OF EACH INSPECTION SHALL BE RECORDED AND
RETAINED BY THE CONTRACTOR.
17.ALL TEMPORARY CONTROL MEASURES SHALL BE CLEANED, REPAIRED, OR RECONSTRUCTED AS
NECESSARY IN ORDER TO ASSURE CONTINUAL PERFORMANCE OF THEIR INTENDED FUNCTION. ALL
RETAINED SEDIMENTS, PARTICULARLY THOSE ON PAVED ROADWAY SURFACES, SHALL BE REMOVED
AND DISPOSED OF IN A MANNER AND LOCATION SO AS NOT TO CAUSE THEIR RELEASE INTO ANY
DRAINAGE WAY.
18.ANY CONTROL MEASURE MAY BE SUBSTITUTED FOR ANOTHER STANDARD CONTROL MEASURE SO LONG
AS THAT CONTROL MEASURE IS EQUAL TO, OR OF GREATER PROTECTION THAN THE ORIGINAL CONTROL
MEASURE THAT WAS TO BE USED IN THAT LOCATION. (EX. SILT FENCE, FOR WATTLES, OR FOR COMPACT
BERMS) WATTLE ALONE ON COMMERCIAL CONSTRUCTION SITES HAVE SHOWN TO BE AN INEFFECTIVE
SUBSTITUTE FOR SILT FENCE OR COMPACT BERMS UNLESS IT IS ACCOMPANIED BY A CONSTRUCTION
FENCE TO PREVENT VEHICLE TRAFFIC.
19.ANY IMPLEMENTATION OR REPLACEMENT OF EXISTING CONTROL MEASURES FOR A NON-STANDARD
CONTROL, OR ALTERNATIVE CONTROL MEASURE, SHALL REQUIRE THE REVIEW AND ACCEPTANCE BY
THE CITY EROSION CONTROL STAFF BEFORE THE MEASURE WILL BE ALLOWED TO BE USED ON THIS
PROJECT. THESE CONTROL MEASURES’ DETAILS SHALL BE SUBMITTED, REVIEWED AND ACCEPTED TO BE
IN ACCORDANCE WITH THE EROSION CONTROL CRITERIA BASED UPON THE FUNCTIONALITY AND
EFFECTIVENESS IN ACCORDANCE WITH SOUND ENGINEERING AND HYDROLOGICAL PRACTICES LAND
DISTURBANCE, STOCKPILES, AND STORAGE OF SOILS
20.THERE SHALL BE NO EARTH-DISTURBING ACTIVITY OUTSIDE THE LIMITS DESIGNATED ON THE ACCEPTED
PLANS. OFF ROAD STAGING AREAS OR STOCKPILES MUST BE PRE-APPROVED BY THE CITY.
DISTURBANCES BEYOND THESE LIMITS WILL BE RESTORED TO ORIGINAL CONDITION.
21.PRE-DISTURBANCE VEGETATION SHALL BE IDENTIFIED, PROTECTED, AND RETAINED WHEREVER
POSSIBLE. REMOVAL OR DISTURBANCE OF EXISTING VEGETATION SHALL BE LIMITED TO THE AREA
REQUIRED FOR IMMEDIATE CONSTRUCTION OPERATIONS, AND FOR THE SHORTEST PRACTICAL PERIOD
OF TIME. THIS SHOULD INCLUDE SEQUENCING AND PHASING CONSTRUCTION ACTIVITIES IN A WAY SO
THAT THE SOIL IS NOT EXPOSED FOR LONG PERIODS OF TIME BY SCHEDULE OR LIMIT GRADING TO
SMALL AREAS. THIS SHOULD ALSO INCLUDE WHEN PRACTICAL ADVANCING THE SCHEDULE ON
STABILIZATION ACTIVITIES SUCH THAT LANDSCAPING TAKES PLACE SHORTLY IF NOT IMMEDIATELY
AFTER GRADING HAS OCCURRED. VEGETATION EFFORTS SHALL START AS SOON AS POSSIBLE TO
RETURN THE SITE TO A STABILIZED CONDITION. SENSITIVE AREAS SHOULD AVOID CLEARING AND
GRADING ACTIVITIES AS MUCH POSSIBLE.
22.ALL EXPOSED SOILS OR DISTURBED AREAS ARE CONSIDERED A POTENTIAL POLLUTANT AND SHALL HAVE
CONTROL MEASURES IMPLEMENTED ON THE SITE TO PREVENT MATERIALS FROM LEAVING THE SITE.
23.ALL SOILS EXPOSED DURING LAND DISTURBING ACTIVITY (STRIPPING, GRADING, UTILITY INSTALLATIONS,
STOCKPILING, FILLING, ETC.) SHALL BE KEPT IN A ROUGHENED CONDITION AT ALL TIMES BY EQUIPMENT
TRACKING, SCARIFYING OR DISKING THE SURFACE ON A CONTOUR WITH A 2 TO 4 INCH MINIMUM
VARIATION IN SOIL SURFACE UNTIL MULCH, VEGETATION, AND/OR OTHER PERMANENT EROSION
CONTROL IS INSTALLED.
24.NO SOIL STOCKPILE SHALL EXCEED TEN (10) FEET IN HEIGHT. ALL SOIL STOCKPILES SHALL BE
PROTECTED FROM SEDIMENT TRANSPORT THROUGH THE USE OF SURFACE ROUGHENING, WATERING,
AND DOWN GRADIENT PERIMETER CONTROLS. ALL SOIL STOCKPILES SHALL BE PROTECTED FROM
SEDIMENT TRANSPORT BY WIND IN ACCORDANCE WITH MUNICIPAL CODE §12-150. ALL STOCKPILES
SHALL BE FLATTENED TO MEET GRADE OR REMOVED FROM SITE AS SOON AS PRACTICAL, AND NO LATER
THAN THE COMPLETION OF CONSTRUCTION ACTIVITIES OR ABANDONMENT OF THE PROJECT. ALL
OFF-SITE STOCKPILE STORAGE LOCATIONS IN CITY LIMITS SHALL HAVE A STOCKPILE PERMIT FROM THE
CITY ENGINEERING DEPARTMENT PRIOR TO USING THE AREA TO STORE MATERIAL. IF FREQUENT
ACCESS FROM HARDSCAPE TO THE STOCKPILE IS NEEDED A STRUCTURAL TRACKING CONTROL
MEASURE SHALL BE IMPLEMENTED.
25.ALL REQUIRED CONTROL MEASURES SHALL BE INSTALLED PRIOR TO ANY LAND DISTURBING ACTIVITY
(STOCKPILING, STRIPPING, GRADING, ETC.). ALL OF THE REQUIRED EROSION CONTROL MEASURES MUST
BE INSTALLED AT THE APPROPRIATE TIME IN THE CONSTRUCTION SEQUENCE AS INDICATED IN THE
APPROVED PROJECT SCHEDULE, CONSTRUCTION PLANS, AND EROSION CONTROL REPORT.
26.ALL INLETS, CURB-CUTS, CULVERTS, AND OTHER STORM SEWER INFRASTRUCTURE WHICH COULD BE
POTENTIALLY IMPACTED BY CONSTRUCTION ACTIVITIES SHALL BE PROTECTED WITH CONTROL
MEASURES. MATERIAL ACCUMULATED FROM THIS CONTROL MEASURE SHALL BE PROMPTLY REMOVED
AND IN CASES WHERE THE PROTECTION HAS FAILED, THE PIPES SHALL BE THOROUGHLY CLEANED OUT.
27.ALL STREAMS, STREAM CORRIDORS, BUFFERS, WOODLANDS, WETLANDS, OR OTHER SENSITIVE AREAS
SHALL BE PROTECTED FROM IMPACT BY ANY CONSTRUCTION ACTIVITY THROUGH THE USE OF CONTROL
MEASURES.
28.ALL EXPOSED DIRT SHALL HAVE PERIMETER CONTROL. ANY PERIMETER CONTROLS THAT DRAIN OFF OR
HAS THE ABILITY TO BE TRACKED ONTO THE NEARBY HARDSCAPE SHALL HAVE SOME FORM OF
EFFECTIVE SEDIMENT CONTROL AS THE, OR AS PART OF THE, PERIMETER CONTROL.
29.ALL EXPOSED SLOPES SHOULD BE PROTECTED. ALL EXPOSED STEEP SLOPES (STEEPER THAN 3:1 H:V)
SHALL BE PROTECTED FROM EROSION AND SEDIMENT TRANSPORT THROUGH USE OF CONTROL
MEASURES.
30.NO SOILS SHALL REMAIN EXPOSED BY LAND DISTURBING ACTIVITY FOR MORE THAN THIRTY (30) DAYS
AFTER ACTIVITY HAS CEASED BEFORE REQUIRED TEMPORARY SEEDING OR PERMANENT EROSION
CONTROL (E.G. SEED/MULCH, LANDSCAPING, ETC.) IS INSTALLED. THIS IS NOT JUST LIMITED TO
PROJECTS THAT ARE ABANDONED; THIS INCLUDES ANY PROJECT THAT IS TEMPORARILY HALTED AND NO
IMMEDIATE ACTIVITY IS TO RESUME WITHIN THE NEXT THIRTY (30) DAYS, UNLESS OTHERWISE APPROVED
BY THE CITY EROSION CONTROL INSPECTOR. DURING A SEASON WHEN SEEDING DOES NOT PRODUCE
VEGETATIVE COVER, ANOTHER TEMPORARY EROSION CONTROL SHALL BE IMPLEMENTED WITH OR UNTIL
TEMPORARY SEEDING OR PERMANENT EROSION CONTROL CAN BE PERFORMED.
31.ALL INDIVIDUAL LOTS SHALL HAVE EFFECTIVE SEDIMENT CONTROLS LOCATED ON THE STREET SIDE AND
ANY DOWN GRADIENT SIDE. TYPICALLY MOST LOTS DRAIN TO THE FRONT YET ON THOSE CASES WHERE
HOUSES ARE ALONG A POND OR DRAINAGE SWALE HAVE THE LOT DRAIN IN A DIFFERENT DIRECTION
THAN THE STREET, THOSE INDIVIDUAL LOTS WILL NEED PROTECTION ON THAT DOWN GRADIENT SIDE TO
PREVENT SEDIMENT FROM LEAVING THE LOT. SEE THE INDIVIDUAL LOT DETAILS FOR FURTHER
CLARIFICATION. VEHICLE TRACKING
32.AT ALL POINTS WHERE VEHICLES EXIT OR LEAVE THE EXPOSED DIRT AREA ON TO A HARDSCAPE OR SEMI
HARDSCAPE (CONCRETE, ASPHALT, ROAD BASE, ETC.) SHALL HAVE INSTALLED AT LEAST ONE
STRUCTURAL TRACKING CONTROL MEASURE TO PREVENT VEHICLE TRACKING. ALL AREAS NOT
PROTECTED BY AN ADEQUATE PERIMETER CONTROL SHALL BE CONSIDERED A POINT WHERE VEHICLES
EXIT THE SITE. ACCESS POINTS SHOULD BE LIMITED TO AS FEW ENTRANCES AS POSSIBLE (ALL
PERIMETER AREAS SHALL BE PROTECTED FROM TRACKING ACTIVITIES).
33.IN ALL AREAS THAT THE STRUCTURAL TRACKING CONTROL MEASURES FAIL TO PREVENT VEHICLE
TRACKING, COLLECTION AND PROPER DISPOSAL OF THAT MATERIAL IS REQUIRED. ALL INLETS LOCATED
NEAR ACCESS POINTS AND AFFECTED BY TRACKING ACTIVITIES SHALL BE PREVENTED FROM THE
INTRODUCTION OF SEDIMENT INTO THE DRAINAGE SYSTEM.
34.CITY MUNICIPAL CODE §20-62, AMONG OTHER THINGS, PROHIBITS THE TRACKING, DROPPING, OR
DEPOSITING OF SOILS OR ANY OTHER MATERIAL ONTO CITY STREETS BY OR FROM ANY SOURCE. CITY
MUNICIPAL CODE, §26-498, AMONG OTHER THINGS, PROHIBITS THE DISCHARGE OF POLLUTANTS ON
PUBLIC
OR PRIVATE PROPERTY IF THERE IS A SIGNIFICANT POTENTIAL FOR MIGRATION OF SUCH POLLUTANT.
THEREFORE, ALL TRACKED OR DEPOSITED MATERIALS (INTENTIONAL OR INADVERTENT) ARE NOT
PERMITTED TO REMAIN ON THE STREET OR GUTTER AND SHALL BE REMOVED AND LEGALLY DISPOSED
OF BY THE DEVELOPER IN A TIMELY AND IMMEDIATE MANNER. DIRT RAMPS INSTALLED IN THE
CURB-LINES ARE NOT EXEMPT TO THESE SECTIONS OF CODE AND SHALL NOT BE PERMITTED IN THE
STREET RIGHT OF WAY (PUBLIC OR PRIVATE).
35.IF REPEATED DEPOSIT OF MATERIAL OCCURS ON A SITE, ADDITIONAL STRUCTURAL TRACKING
CONTROLS MAY BE REQUIRED OF THE DEVELOPER BY THE CITY EROSION CONTROL INSPECTOR.
LOADING AND UNLOADING OPERATIONS
36.THE DEVELOPER SHALL APPLY CONTROL MEASURE TO LIMIT TRAFFIC (SITE WORKER OR PUBLIC)
IMPACTS AND PROACTIVELY LOCATE MATERIAL DELIVERED TO THE SITE IN CLOSE PROXIMITY TO THE
WORK AREA OR IMMEDIATELY INCORPORATED IN THE CONSTRUCTION TO LIMIT OPERATIONAL IMPACTS
TO DISTURBED AREAS, VEHICLE TRACKING, AND SEDIMENT DEPOSITION THAT COULD IMPACT WATER
QUALITY.
OUTDOOR STORAGE OR CONSTRUCTION SITE MATERIALS, BUILDING MATERIALS, FERTILIZERS, AND
CHEMICALS
37.ANY MATERIALS OF A NON-POLLUTING NATURE (STEEL, ROCK, BRICK, LUMBER, ETC.) SHALL BE
INSPECTED FOR ANY RESIDUE COMING OFF THE MATERIAL DURING ROUTINE INSPECTION AND WILL
GENERALLY BE LOCATED WHERE PRACTICAL AT LEAST FIFTY (50) FEET FROM ANY PERMANENT OR
INTERIM DRAINAGE WAYS.
38.ANY HIGH ENVIRONMENTAL IMPACT POLLUTANT MATERIALS THAT HAVE A HIGH LIKELIHOOD TO RESULT
IN
DISCHARGE WHEN IN CONTACT WITH STORMWATER (LUBRICANTS, FUELS, PAINTS, SOLVENTS,
DETERGENTS, FERTILIZERS, CHEMICAL SPRAYS, BAGS OF CEMENT MIX, ETC.) SHOULD NOT BE KEPT ON
SITE WHERE PRACTICAL. WHEN NOT PRACTICAL, THEY SHOULD BE STORED INSIDE (VEHICLE, TRAILER,
CONNEX, BUILDING, ETC.) AND OUT OF CONTACT WITH STORMWATER OR STORMWATER RUNOFF. WHERE
NOT AVAILABLE, THEY SHALL BE STORED OUTSIDE IN A RAISED (HIGH SPOTS OR ON PALLETS), COVERED
(PLASTIC OR TARPED), AND SEALED (LEAK PROOF CONTAINER) IN SECONDARY CONTAINMENT LOCATION.
THE SECONDARY CONTAINMENT OR OTHER CONTROL MEASURE SHALL BE ADEQUATELY SIZED,
LOCATED, WHERE PRACTICAL, AT LEAST FIFTY (50) FEET FROM ANY PERMANENT OR INTERIM
STORMWATER STRUCTURES OR DRAINAGE WAYS AND SHALL BE MONITORED AS PART OF THE ROUTINE
INSPECTIONS.
VEHICLE AND EQUIPMENT MAINTENANCE AND FUELING
39.PARKING, REFUELING, AND MAINTENANCE OF VEHICLES AND EQUIPMENT SHOULD BE LIMITED IN ONE
AREA
OF THE SITE TO MINIMIZE POSSIBLE SPILLS AND FUEL STORAGE AREAS. THIS AREA SHALL BE LOCATED,
WHERE PRACTICAL, AT LEAST FIFTY (50) FEET FROM ANY PERMANENT OR INTERIM STORMWATER
STRUCTURES OR DRAINAGE WAYS AND SHALL BE MONITORED AS PART OF THE ROUTINE INSPECTIONS.
ALL AREAS SHALL KEEP SPILL KITS AND SUPPLIES CLOSE.
SIGNIFICANT DUST OR PARTICULATE GENERATING PROCESS
40.THE PROPERTY MUST BE ACTIVELY PREVENTING THE EMISSION OF FUGITIVE DUST AT ALL TIMES DURING
CONSTRUCTION AND VEGETATION ACTIVITIES. ALL LAND DISTURBING ACTIVITIES THAT RESULT IN
FUGITIVE DUST SHALL BE IN ACCORDANCE WITH MUNICIPAL CODE §12-150 TO REDUCE THE IMPACTS TO
ADJACENT
PROPERTIES AND COMMUNITY HEALTH. ALL REQUIRED PRACTICES SHALL BE IMPLEMENTED AND
ADDITIONAL ONES SHALL BE FOLLOWED. THESE PRACTICES INCLUDE WATERING THE SITES AND
DISCONTINUING CONSTRUCTION ACTIVITIES UNTIL THE WIND SUBSIDES AS DETERMINED BY ANY CITY
INSPECTORS.
CONCRETE TRUCK / EQUIPMENT WASHING, INCLUDING THE CONCRETE TRUCK CHUTE AND ASSOCIATED
FIXTURES AND EQUIPMENT.
41.ALL CONCRETE AND EQUIPMENT WASHING SHALL USE STRUCTURAL CONTROL MEASURES APPROPRIATE
TO THE VOLUME OF WASH AND FREQUENCY OF USE. THESE CONTROL MEASURES SHALL BE LOCATED,
WHERE
PRACTICAL, AT LEAST FIFTY (50) FEET FROM ANY PERMANENT OR INTERIM STORMWATER STRUCTURES
OR
DRAINAGE WAYS AND SHALL BE MONITORED AS PART OF THE ROUTINE INSPECTIONS. THESE AREAS
SHALL BE CLEARLY IDENTIFIED AND PROTECTED FROM ANY WASH FROM LEAVING THE CONTROL
MEASURE. IF FREQUENT ACCESS FROM HARDSCAPE TO THE CONTROL MEASURE IS TO OCCUR, A
STRUCTURAL TRACKING CONTROL MEASURE SHALL BE IMPLEMENTED. THESE CONTROL MEASURES
SHALL BE FREQUENTLY CLEANED OUT.
42.THE DEVELOPER IS RESPONSIBLE FOR ENSURING WASHING ACTIVITY IS TAKING PLACE AT THE
APPROPRIATE CONTROL MEASURE AND SITE WORKERS ARE NOT WASHING OR DUMPING WASH WATER
ON TO THE DIRT OR OTHER UNCONTROLLED LOCATIONS.
DEDICATED ASPHALT AND CONCRETE BATCH PLANTS
43.DEDICATED ASPHALT AND CONCRETE BATCH PLANTS ARE NOT ACCEPTABLE ON CONSTRUCTION SITES
WITHIN THE CITY OF FORT COLLINS WITHOUT AN EXPRESSED WRITTEN REQUEST AND PLAN TO REDUCE
POLLUTANTS ASSOCIATED WITH THAT TYPE OF ACTIVITY AND APPROVAL BY THE CITY OF FORT COLLINS
SPECIFICALLY THE EROSION CONTROL INSPECTOR. THE DEVELOPER SHALL INFORM THE EROSION
CONTROL INSPECTION STAFF OF ANY DEDICATED ASPHALT, OR CONCRETE BATCH PLANTS THAT IS TO
BE USED ON SITE.
CONCRETE SAW CUTTING MATERIALS
44.SAW CUTTING MATERIAL SHALL BE IN ACCORDANCE WITH MUNICIPAL CODE §12-150 FOR AIR EMISSIONS
AND ALL WATER APPLICATIONS TO THE SAW CUTTING SHALL PREVENT MATERIAL FROM LEAVING THE
IMMEDIATE SITE AND COLLECTED. THESE CUTTING LOCATIONS, ONCE DRIED, SHALL BE SWEPT AND
SCRAPED OF ALL MATERIAL AND SHALL HAVE PROPER AND LEGAL DISPOSAL.
WASTE MATERIALS STORAGE AND SANITARY FACILITIES
45.TRASH, DEBRIS, MATERIAL SALVAGE, AND/OR RECYCLING AREAS SHALL BE, WHERE PRACTICAL, AT
LEAST FIFTY (50) FEET FROM ANY PERMANENT OR INTERIM STORMWATER STRUCTURES OR DRAINAGE
WAYS AND SHALL BE MONITORED AS PART OF THE ROUTINE INSPECTIONS. THESE FACILITIES SHOULD BE
LOCATED OUT OF THE WIND AND COVERED AS ABLE. WHERE NOT ABLE TO COVER, LOCATING SAID
AREAS ON THE SIDE OF OTHER STRUCTURES TO REDUCE EXPOSURE TO WINDS, AND FOLLOW MAXIMUM
LOADING GUIDELINES AS MARKED ON THE CONTAINER. THE DEVELOPER IS REQUIRED TO PRACTICE
GOOD HOUSEKEEPING TO KEEP THE CONSTRUCTION SITE FREE OF LITTER, CONSTRUCTION DEBRIS,
AND LEAKING CONTAINERS.
46.SANITARY FACILITIES SHALL BE PREVENTED FROM TIPPING THROUGH THE USE OF ANCHORING TO THE
GROUND OR LASHING TO A STABILIZED STRUCTURE. THESE FACILITIES SHALL ALSO BE LOCATED AS FAR
AS PRACTICAL FROM AN INLET, CURB CUT, DRAINAGE SWALE OR OTHER DRAINAGE CONVEYANCES TO
PREVENT MATERIAL TRANSPORT FROM LEAVING THE LOCAL AREA. THIS CONSISTS OF THE FACILITY
BEING LOCATED, WHERE PRACTICAL, AT LEAST FIFTY (50) FEET FROM ANY PERMANENT OR INTERIM
DRAINAGE WAYS.
OTHER SITE OPERATIONS AND POTENTIAL SPILL AREAS
47.SPILLS: FOR THOSE MINOR SPILLS THAT; ARE LESS THAN THE STATE’S REPORTABLE QUANTITY FOR
SPILLS, STAY WITHIN THE PERMITTED AREA, AND IN NO WAY THREATEN ANY STORMWATER
CONVEYANCE, NOTIFY THE CITY OF FORT COLLINS UTILITIES BY EMAIL AT EROSION@FCGOV.COM OR
PHONE (970) 817-4770. FOR ANY SIGNIFICANT, MAJOR, OR HAZARDOUS SPILLS, NOTIFY THE CITY OF FORT
COLLINS UTILITIES BY PHONE ONLY AFTER EMERGENCY RESPONSE (911) HAS BEEN NOTIFIED AND IS ON
ROUTE, COUNTY HEALTH DEPARTMENT HAS BEEN NOTIFIED THROUGH LARIMER COUNTY SHERIFF
DISPATCH (970) 416-1985, AND THE STATE SPILL HOTLINE INCIDENT REPORTING HAVE BEEN CONTACTED
1-877-518-5608. WRITTEN DOCUMENTATION SHALL BE PROVIDED TO THE CITY WITHIN 5 DAYS OF THE
EVENT. ALL SPILLS SHALL BE CLEANED UP IMMEDIATELY.
48.SELECTION OF “PLASTIC WELDED” EROSION CONTROL BLANKETS SHALL NOT BE USED IN AREAS THAT
WILDLIFE, SUCH AS SNAKES, ARE LIKELY TO BE LOCATED AS THESE HAVE PROVEN TO CAUSE
ENTRAPMENT ISSUES.
FINAL STABILIZATION AND PROJECT COMPLETION
49.ANY STORMWATER FACILITIES USED AS A TEMPORARY CONTROL MEASURE WILL BE RESTORED AND
STORM SEWER LINES WILL BE CLEANED UPON COMPLETION OF THE PROJECT AND BEFORE TURNING
THE MAINTENANCE OVER TO THE OWNER, HOMEOWNERS ASSOCIATION (HOA), OR OTHER PARTY
RESPONSIBLE FOR LONG TERM MAINTENANCE OF THOSE FACILITY.
50.ALL FINAL STABILIZATION SPECIFICATIONS SHALL BE DONE IN ACCORDANCE WITH THE MANUAL,
CHAPTER 4: CONSTRUCTION CONTROL MEASURES.
51.ALL DISTURBED AREAS DESIGNED TO BE VEGETATED SHALL BE AMENDED, SEEDED & MULCHED, OR
LANDSCAPED AS SPECIFIED IN THE LANDSCAPE PLANS WITHIN 14 WORKING DAYS OF FINAL GRADING.
52.SOIL IN ALL VEGETATED (LANDSCAPED OR SEEDED) AREAS, INCLUDING PARKWAYS AND MEDIANS SHALL
COMPLY WITH ALL REQUIREMENTS SET FORTH IN SECTIONS 12-130 THROUGH 12-132 OF THE CITY
MUNICIPAL CODE, AS WELL AS SECTION 3.8.21 FOR THE CITY LAND USE CODE.
53.ALL SEEDING SHALL REFER TO LANDSCAPING PLANS FOR SPECIES MIXTURE AND APPLICATION RATES
AND DEPTHS REQUIREMENTS.
54.ALL SEED SHALL BE DRILLED WHERE PRACTICAL TO A DEPTH BASED UPON THE SEED TYPE. BROADCAST
SEEDING SHALL BE APPLIED AT DOUBLE THE RATE AS PRESCRIBED FOR DRILL SEEDING AND SHALL BE
LIGHTLY HAND RAKED AFTER APPLICATION. HYDROSEEDING MAY BE SUBSTITUTED FOR DRILL SEEDING
ON SLOPES STEEPER THAN 3(H):1(V) OR ON OTHER AREAS NOT PRACTICAL TO DRILL SEED AND CRIMP
AND MULCH. ALL HYDROSEEDING MUST BE CONDUCTED AS TWO SEPARATE PROCESSES OF SEEDING
AND TACKIFICATION.
55.ALL SEEDED AREAS MUST BE MULCHED WITHIN TWENTY-FOUR (24) AFTER PLANTING. ALL MULCH SHALL
BE MECHANICALLY CRIMPED AND OR ADEQUATELY APPLIED TACKIFIER. THE USE OF CRIMPED MULCH OR
TACKIFIER MAY REQUIRE MULTIPLE RE-APPLICATIONS IF NOT PROPERLY INSTALLED OR HAVE
WEATHERED OR DEGRADED BEFORE VEGETATION HAS BEEN ESTABLISHED. AREAS OF EMBANKMENTS
HAVING SLOPES GREATER THAN OR EQUAL TO 3H:1V SHALL BE STABILIZED WITH AN EROSION MAT OR
APPROVED EQUAL TO ENSURE SEED WILL BE ABLE TO GERMINATE ON THE STEEP SLOPES. DURING A
SEASON WHEN SEEDING DOES NOT PRODUCE VEGETATIVE COVER, ANOTHER TEMPORARY EROSION
CONTROL SHALL BE IMPLEMENTED ALONG WITH, OR UNTIL, TEMPORARY SEEDING OR PERMANENT
EROSION CONTROL CAN BE PERFORMED.
56.THE DEVELOPER SHALL WARRANTY AND MAINTAIN ALL VEGETATIVE MEASURES FOR TWO GROWING
SEASONS AFTER INSTALLATION OR UNTIL SEVENTY PERCENT (70%) VEGETATIVE COVER HAS BEEN
ESTABLISHED, WHICHEVER IS LONGER AND MEETS ALL THE CRITERIA OUTLINED IN THE FORT COLLINS
STORMWATER CRITERIA MANUAL CHAPTER 4: CONSTRUCTION CONTROL MEASURES.
57.THE DEVELOPER SHALL MAINTAIN, MONITOR, REPAIR, AND REPLACE ANY AND ALL APPLICABLE CONTROL
MEASURES UNTIL FINAL STABILIZATION HAS BEEN OBTAINED. ALL CONTROL MEASURES MUST REMAIN
UNTIL SUCH TIME AS ALL UPSTREAM CONTRIBUTING POLLUTANT SOURCES HAVE BEEN VEGETATED OR
REMOVED FROM THE SITE. WHEN ANY CONTROL MEASURE IS REMOVED, THE DEVELOPER SHALL BE
RESPONSIBLE FOR THE CLEANUP AND REMOVAL OF ALL SEDIMENT AND DEBRIS FROM THAT CONTROL
MEASURE. AT THE POINT AT WHICH THE SITE HAS BEEN DEEMED STABILIZED AND VERIFIED BY CITY
EROSION CONTROL INSPECTOR, ALL TEMPORARY CONTROL MEASURES CAN THEN BE FULLY REMOVED.
ALL MEASURES SHALL BE REMOVED WITHIN 30 DAYS AFTER FINAL STABILIZATION IS ACHIEVED.
58.THE RESPONSIBLE PARTY SHALL MAINTAIN AND KEEP CURRENT ALL PAYMENTS OR RELATED FORMS OF
SECURITY FOR THE EROSION CONTROL ESCROW UNTIL 1) STABILIZATION HAS BEEN REACHED AND 2)
ALL CONTROL MEASURES AND/OR BMPS HAVE SEDIMENT MATERIALS COLLECTED AND THE CONTROL
MEASURE REMOVED FROM THE SITE. AT THAT TIME THE SITE WILL BE CONSIDERED COMPLETED AND
ANY REMAINING EROSION CONTROL ESCROW SHALL BE RETURNED TO THE APPROPRIATE PARTIES.
G G
G G
G G G G
G
G
F
VAULT
VA
U
L
T
VA
U
L
T
VAULT
VAULT
VAUL
T
G G
VA
U
L
T
VA
U
L
T
G
E
E
IRR
EX. STORM MANHOLE RIM
TO BE LOWERED (NEW
RIM ELEV. =4949.74)
KEYMAP
NTS
LEGEND
MAPPING / SITE
PROPERTY BOUNDARY
RIGHT-OF-WAY
LOT LINES
EASEMENTS
CENTER LINE
CURB AND GUTTER
EXISTING CONTOURS
UTILITIES
WATER LINE
SANITARY LINE
IRRIGATION LINE
RECLAIMED WATER LINE
STORM DRAIN PIPE
OVERHEAD ELECTRIC
ELECTRICAL LINE
FIBRE OPTIC CABLE LINE
COMMUNICATION LINE
FIRE HYDRANT
STREET LIGHT
NOTES
1.EXISTING UNDERGROUND AND OVERHEAD
PUBLIC AND PRIVATE UTILITIES AS SHOWN
ARE INDICATED ACCORDING TO THE BEST
INFORMATION AVAILABLE TO THE ENGINEER.
2.THE CONTRACTOR SHALL PROTECT ALL
EXISTING FEATURES THAT ARE NOT TO BE
REMOVED ADJACENT TO THE CONSTRUCTION
AREA INCLUDING, BUT NOT LIMITED TO,
PAVEMENT, PRIVATE FENCES, ABOVE GROUND
OR UNDERGROUND UTILITIES, STRUCTURES,
AND UNDERGROUND FOUNDATIONS. THE
CONTRACTOR SHALL BE RESPONSIBLE FOR
ANY DAMAGE THAT SHOULD OCCUR TO ANY
ON-SITE, OFF-SITE, PUBLIC OR PRIVATE
FACILITY OR FEATURE AS A RESULT OF THE
CONSTRUCTION PROCESS FOR THIS PROJECT.
3.CURB, GUTTER AND SIDEWALK SHALL BE
REMOVED TO THE NEAREST JOINT.
4.LIMITS OF STREET CUT AS REQUIRED FOR
UTILITY CONSTRUCTION ARE TO BE
DETERMINED IN THE FIELD BY THE CITY
ENGINEERING INSPECTOR. ALL REPAIRS TO
BE IN ACCORDANCE WITH CITY STREET
REPAIR STANDARDS.
5.CONTRACTOR SHALL COORDINATE ALL
CONSTRUCTION ITEMS IMPACTING ADJACENT
PROPERTIES WITH THE PROPERTY OWNERS
PRIOR TO BEGINNING ANY CONSTRUCTION
ACTIVITIES.
6.THE STRIPING ON GREENFIELDS DRIVE WILL
BE UPDATED AS PART OF THE BLOOM FILING 1
PROJECT
7.UTILITIES SIDEWALKS, STREET LIGHTS, AND
OTHER GRADE FEATURES REFERENCING
BLOOM FILING ONE AND TWO DRAWINGS ARE
BASED ON THE MOST RECENT SUBMITTALS.
DEMOLITION
LIMITS OF DISTURBANCE
REMOVE EXISTING UTILITY
SAWCUT LINE
REMOVE EXISTING
CURB AND GUTTER
REMOVE EXISTING
CONCRETE
REMOVE EXISTING
ASPHALT PAVEMENT
UTILITY TRENCHING
KEY NOTES
X-A SIDEWALK TO BE REMOVED
PR
E
P
A
R
E
D
F
O
R
:
JOB NUMBER
SHEET NUMBER
SHEETSOF
DA
T
E
S
U
B
M
I
T
T
E
D
:
Th
e
e
n
g
i
n
e
e
r
p
r
e
p
a
r
i
n
g
t
h
e
s
e
p
l
a
n
s
w
i
l
l
n
o
t
b
e
r
e
s
p
o
n
s
i
b
l
e
fo
r
,
o
r
l
i
a
b
l
e
f
o
r
,
u
n
a
u
t
h
o
r
i
z
e
d
c
h
a
n
g
e
s
t
o
o
r
u
s
e
s
o
f
t
h
e
s
e
pl
a
n
s
.
A
l
l
c
h
a
n
g
e
s
t
o
t
h
e
p
l
a
n
s
m
u
s
t
b
e
i
n
w
r
i
t
i
n
g
a
n
d
mu
s
t
b
e
a
p
p
r
o
v
e
d
b
y
t
h
e
p
r
e
p
a
r
e
r
o
f
t
h
e
s
e
p
l
a
n
s
.
NO
.
BY
DA
T
E
CAUTION
RE
V
I
S
I
O
N
S
:
VERTICAL:
HORIZONTAL:
SCALE
4025 Automation Way
Suite B2
Fort Collins, CO 80525
(970) 698-6046
CivilWorxeng.com
BL
O
O
M
P
A
R
K
A
N
D
P
O
O
L
C24008
HA
R
T
F
O
R
D
H
O
M
E
S
2/
1
2
/
2
0
2
5
31
PRELIMINARY
NOT FOR
CONSTRUCTION
EX
I
S
T
I
N
G
C
O
N
D
I
T
I
O
N
S
&
D
E
M
O
L
I
T
I
O
N
P
L
A
N
1" = 30'
N/A
4
EX01
0 30'60'
SCALE: 1" = 30'
15'
4"
TRENCH
DRAIN
SI
T
E
G
R
A
D
I
N
G
P
L
A
N
-
O
V
E
R
A
L
L
1" = 30'
N/A
5
GR01
PR
E
P
A
R
E
D
F
O
R
:
JOB NUMBER
SHEET NUMBER
SHEETSOF
DA
T
E
S
U
B
M
I
T
T
E
D
:
Th
e
e
n
g
i
n
e
e
r
p
r
e
p
a
r
i
n
g
t
h
e
s
e
p
l
a
n
s
w
i
l
l
n
o
t
b
e
r
e
s
p
o
n
s
i
b
l
e
fo
r
,
o
r
l
i
a
b
l
e
f
o
r
,
u
n
a
u
t
h
o
r
i
z
e
d
c
h
a
n
g
e
s
t
o
o
r
u
s
e
s
o
f
t
h
e
s
e
pl
a
n
s
.
A
l
l
c
h
a
n
g
e
s
t
o
t
h
e
p
l
a
n
s
m
u
s
t
b
e
i
n
w
r
i
t
i
n
g
a
n
d
mu
s
t
b
e
a
p
p
r
o
v
e
d
b
y
t
h
e
p
r
e
p
a
r
e
r
o
f
t
h
e
s
e
p
l
a
n
s
.
NO
.
BY
DA
T
E
CAUTION
RE
V
I
S
I
O
N
S
:
VERTICAL:
HORIZONTAL:
SCALE
4025 Automation Way
Suite B2
Fort Collins, CO 80525
(970) 698-6046
CivilWorxeng.com
BL
O
O
M
P
A
R
K
A
N
D
P
O
O
L
C24008
HA
R
T
F
O
R
D
H
O
M
E
S
2/
1
2
/
2
0
2
5
31
PRELIMINARY
NOT FOR
CONSTRUCTION
0 30'60'
SCALE: 1" = 30'
15'
KEYMAP
NTS
LEGEND
MAPPING / SITE
PROPERTY BOUNDARY
RIGHT-OF-WAY
LOT LINES
EASEMENTS
CENTER LINE
CURB AND GUTTER
EXISTING CONTOURS
PROPOSED CONTOURS
PROPOSED FENCING
SIDEWALK CHASE
SHEET BOUNDARY
PROPOSED BUILDING
TRASH ENCLOSURE
ASPHALT PAVING
CONCRETE SIDEWALK
GRAVEL PATH
OUTFALL CURB & GUTTER
PROPOSED UTILITIES
STORM DRAIN PIPE
FLARED END SECTION
STORM DRAIN INLET
STORM DRAIN OUTLET
RIP RAP
NOTES
1.SPOT ELEVATIONS ON THE ROAD ARE TO
FINISHED SURFACE. CONSULT THE SOILS
REPORT FOR PAVEMENT SECTION. SPOT
ELEVATIONS ALONG CURB AND GUTTER ARE
TO FLOWLINE UNLESS OTHERWISE NOTED.
2.THE CONTRACTOR IS RESPONSIBLE FOR
VERIFYING THE FIELD CONDITIONS ARE AS
SHOWN IN THE DRAWINGS. IF THE
CONTRACTOR FINDS DISCREPANCIES THE
CONTRACTOR SHALL CONTACT THE
ENGINEER.
3.ALL DISTURBED AREAS NOT PAVED SHALL BE
RE-VEGETATED.
4.THE FIRE LANES AS DENOTED BY THE
EMERGENCY ACCESS EASEMENTS WILL HAVE
A FLAT ALL WEATHER DRIVING SURFACE THAT
IS CAPABLE OF SUPPORTING 40 TONS.
5.PARKING AREAS (NOT HATCHED) SHALL HAVE
A PAVEMENT SECTION OF 4" HMA + 6" ABC OR
5" PCC. TRASH ENCLOSURES SHALL HAVE A 6"
PCC PAVEMENT SECTION.
EXISTING UTILITIES
STORM DRAIN PIPE
FLARED END SECTION
STORM DRAIN INLET
STORM DRAIN OUTLET
RIP RAP
GRADING
FFE = FINISHED FLOOR ELEVATION
FG = FINISHED GRADE ELEVATION
FL = FLOWLINE ELEVATION
TC = TOP OF CONCRETE ELEVATION
62.
8
7
62.
8
7
62.
7
9
62.
7
9
56.04 56.04
52.77
52.95
51.6451.64
51.60
51.60
51.76
51.76
51.66
51.63
51.71
51
.
6
3
51
.
6
6
49
.
7
1
51.66
51.60
51.60
51.76
51.73
51.45
51.35
51.51
51.66
51.74
51.99
50.94
50.92 51.61
51.72
50.79
50.74
51.34
51.20
51.30
52.00 51.72 51.72
51.34
52.00
51.38
50.66FL
51.22
50.75FL
51.53TC
51.56
50.90FL
50.52FL
51.41
51.36
51.30
51.10
50.99
50.85
50.59
50.66
50.75
50.91
51.60
52.29
52
.
1
3
52
.
0
5
51.63
51.08
50.
6
3
T
C
50.
6
4
50.
6
2
T
C
50.
6
3
50.6150.56TC
50.80TC
50
.
5
8
50.5
9
50.59
50.61
50.58
50.51
50.58
50.24TC 50.68
49.85TC 50.82
50.8349.84TC 50.85
49.9
3
T
C
50.89
49.9
2
T
C
50.79
49.9
6
T
C
49.92TC
49
.
9
4
50
.
0
3
50
.
1
1
50.02
50.08
50.15
51.2
3
51.31
52.
1
7
52.
3
0
51.
9
3
52.
0
4
52.
2
7
51.
9
6
52.
1
0
52.
2
8
52.
2
7
52.
2
2
52.
5
4
52.
4
3
52.
1
5
52.
4
2
63.01
63.01
60.04
60.11
59.03
59.23
57.97
58.45
56.19
56.00
52.6
4
52.4
7
51.88
51.88
51.
8
8
51.8
8
51.8
8
51.8
851.8
8
51.8
8
51.8
8 51.
8
8
51.8
8
51.
8
8
51.
8
8
51.8851.88
51.8
8
51.88
51
.
8
8
51.8
8
51
.
8
8
51
.
8
8
51.8
8
51.88
51.88
51.88
51.
8
8
51.8
8
51.8
8
51.8
8
51.8
8
51.8
8
51.8
8
51.8
8
51.
8
8
51.
8
8
51.8
8
51.8
8
51.89
51.89
51.96
51.84
51.96
51.03FL
51.67
52.14
52.05
51.97
52.15
51.60
53.40
52.71
51.
6
9
53.29
50.50
50.32
51.02
50.67
50.44
50.54
51.10
51.58
50.4
1
51.32
52.0
9
52
.
1
1
51
.
9
8
50.0
1
T
C
51
.
2
9
51.43
51.46 51.33
51.7
5
F
L
51.
7
1
51.70
51.89
52.00
51.89
52.00
51.89
51.
8
0
51.80
51.80
51.72
51.76
51.76
52.0
0
52.0052.0051.86
51.75
51.72
51.72
50.59
50.66
29.3%
26.6%
16.0
%
29
.
5
%
49.49FL
63.01
1.0
%
0.4%
1.1
%
49.99FL
0.4%
1.3%
0.9%
1.
6
%
1.
5
%
1.
5
%
0.
7
%
2.0%
0.
1
%
3.
1
%
1.
6
%
1.
5
%
2.
9
%
2.
9
%
1.5%
49.
3
9
F
L
49.
6
2
F
L
49.
6
0
F
L
51.63FL
50.61FL
4" TRENCH
DRAIN
FG=52.00
TOF=52.67
FG=52.00
TOF=52.67
50.92 51.07
51.27TC
51.15TC
51.10TC
50.81TC
50
.
4
8
F
L
50.14
50.67
51.17
49.88
50.46
51.03
51.7
5
F
L
51.81
49
.
7
4
PO
O
L
A
R
E
A
G
R
A
D
I
N
G
P
L
A
N
1" = 10'
N/A
6
GR02
PR
E
P
A
R
E
D
F
O
R
:
JOB NUMBER
SHEET NUMBER
SHEETSOF
DA
T
E
S
U
B
M
I
T
T
E
D
:
Th
e
e
n
g
i
n
e
e
r
p
r
e
p
a
r
i
n
g
t
h
e
s
e
p
l
a
n
s
w
i
l
l
n
o
t
b
e
r
e
s
p
o
n
s
i
b
l
e
fo
r
,
o
r
l
i
a
b
l
e
f
o
r
,
u
n
a
u
t
h
o
r
i
z
e
d
c
h
a
n
g
e
s
t
o
o
r
u
s
e
s
o
f
t
h
e
s
e
pl
a
n
s
.
A
l
l
c
h
a
n
g
e
s
t
o
t
h
e
p
l
a
n
s
m
u
s
t
b
e
i
n
w
r
i
t
i
n
g
a
n
d
mu
s
t
b
e
a
p
p
r
o
v
e
d
b
y
t
h
e
p
r
e
p
a
r
e
r
o
f
t
h
e
s
e
p
l
a
n
s
.
NO
.
BY
DA
T
E
CAUTION
RE
V
I
S
I
O
N
S
:
VERTICAL:
HORIZONTAL:
SCALE
4025 Automation Way
Suite B2
Fort Collins, CO 80525
(970) 698-6046
CivilWorxeng.com
BL
O
O
M
P
A
R
K
A
N
D
P
O
O
L
C24008
HA
R
T
F
O
R
D
H
O
M
E
S
2/
1
2
/
2
0
2
5
31
PRELIMINARY
NOT FOR
CONSTRUCTION
0 10'20'
SCALE: 1" = 10'
5'
KEYMAP
NTS
LEGEND
MAPPING / SITE
PROPERTY BOUNDARY
RIGHT-OF-WAY
LOT LINES
EASEMENTS
CENTER LINE
CURB AND GUTTER
EXISTING CONTOURS
PROPOSED CONTOURS
PROPOSED FENCING
SIDEWALK CHASE
SHEET BOUNDARY
PROPOSED BUILDING
TRASH ENCLOSURE
ASPHALT PAVING
CONCRETE SIDEWALK
GRAVEL PATH
OUTFALL CURB & GUTTER
PROPOSED UTILITIES
STORM DRAIN PIPE
FLARED END SECTION
STORM DRAIN INLET
STORM DRAIN OUTLET
RIP RAP
NOTES
1.SPOT ELEVATIONS ON THE ROAD ARE TO
FINISHED SURFACE. CONSULT THE SOILS
REPORT FOR PAVEMENT SECTION. SPOT
ELEVATIONS ALONG CURB AND GUTTER ARE
TO FLOWLINE UNLESS OTHERWISE NOTED.
2.THE CONTRACTOR IS RESPONSIBLE FOR
VERIFYING THE FIELD CONDITIONS ARE AS
SHOWN IN THE DRAWINGS. IF THE
CONTRACTOR FINDS DISCREPANCIES THE
CONTRACTOR SHALL CONTACT THE
ENGINEER.
3.ALL DISTURBED AREAS NOT PAVED SHALL BE
RE-VEGETATED.
4.THE FIRE LANES AS DENOTED BY THE
EMERGENCY ACCESS EASEMENTS WILL HAVE
A FLAT ALL WEATHER DRIVING SURFACE THAT
IS CAPABLE OF SUPPORTING 40 TONS.
5.PARKING AREAS (NOT HATCHED) SHALL HAVE
A PAVEMENT SECTION OF 4" HMA + 6" ABC OR
5" PCC. TRASH ENCLOSURES SHALL HAVE A 6"
PCC PAVEMENT SECTION.
EXISTING UTILITIES
STORM DRAIN PIPE
FLARED END SECTION
STORM DRAIN INLET
STORM DRAIN OUTLET
RIP RAP
GRADING
FFE = FINISHED FLOOR ELEVATION
FG = FINISHED GRADE ELEVATION
FL = FLOWLINE ELEVATION
TC = TOP OF CONCRETE ELEVATION
MA
T
C
H
L
I
N
E
SE
E
S
H
E
E
T
G
R
0
4
MATCHLINE
SEE SHEET GR03
MATCHLINE
SEE SHEET GR05
50.7
4
51.
3
4
51.
2
0
51.
3
0
52.
0
0
51.
7
2
51.
7
2
51.
3
4
52.
0
0
51.
3
8
50.
6
6
F
L
51.
2
2
50.
7
5
F
L
51.
5
3
T
C
51.
5
6
50.
9
0
F
L
50.
5
2
F
L
51.
4
1
51.
3
6
51.
3
0
51.
1
0
50.
9
9
50.
8
5
50.
5
9
50.
6
6
50.
7
5
50.
9
1
51.
6
0
52.
2
9
52.13
52.05
51.
6
3
51.
0
8
50
.
6
3
T
C
50
.
6
4
50
.
6
2
T
C
50
.
6
3
50.
6
1
50.
5
6
T
C
50.
8
0
T
C
50.
5
8
50.59
50.
5
9
50.
6
1
50.
5
8
50.
5
1
50.
5
8
50.
2
4
T
C
50.
6
8
49.
8
5
T
C
56.
1
9
56.
0
0
52.64
52.47
51.
8
8
51.
8
8
51
.
8
8
51
.
8
8
51.88 51.88
51.88
51.88
51
.
8
8
51
.
8
8
51
.
8
8
51.88 51.88
51.
8
9
51.
8
9
51.
9
6
51.
8
4
51.
9
6
51.03FL
51.
6
7
52.
1
4
52.
0
5
51.
5
8
51.
9
7
52.
1
5
51.
0
2
50.
6
7
50.
2
9
F
L
50.
3
6
F
L
50.70TC
49.
7
5
F
L
49.72FL
49.
7
5
49.92TC
48.8
1
49.
5
2
F
L
49.
4
8
F
L
49.91TC
49.
9
3
49.
7
5
49.
8
8
49.
9
7
50.
0
6
50.
4
3
49.79
50.
5
3
50.
3
0
F
L
49.74FL
49.
6
9
F
L
49.
6
4
F
L
50.
3
9
F
L
50.
4
8
F
L
51.
3
2
51.
0
3
50.
9
8
51.
4
0
51.
4
4
51.
4
6
51.
4
2
50.
0
8
50.
4
6
51.
2
4
51.
8
6
51.
4
0
51.
5
0
50.
8
5
50.
9
5
51.
0
4
51.
2
6
51.
3
7
51.
3
7
51.36
51.34
51.78
51.6151.
5
3
51.
7
5
51.95
52.09
52.
1
1
51.
9
8
51.21
51.
1
3
51.
2
6
51.
2
4
F
L
51.
2
3
51.
2
5
51.
1
5
T
C
50.
6
5
50.
9
3
51.
2
0
T
C
51.
1
3
51.
1
5
51.
1
2
51.
2
5
50.91
50.
8
4
T
C
51.
0
4
51.
0
8
51.
0
7
50.
9
5
50.
9
1
50.
8
7
50.
8
8
50.
7
9
50.
7
0
50.
6
1
50.
6
0
50.
5
9
50.
5
9
50.
3
8
51.
9
3
51.43
51.46
51.33
51.75FL
51
.
7
1
51.
8
9
52.
0
0
51.
8
9
52.
0
0
51.
8
9
51
.
8
0
51.
8
0
51.
8
0
51.
7
2
51.
7
6
51.
7
2
49.
5
6
F
L
50.4
1
50.4
7
50.5
9
50.6
6
49.7
9
49.8
7
49.
6
7
49.6
7
49.
6
2
50.
7
0
50.
6
6
50.
3
1
1.
0
%
0.4%
1.
1
%
1.
0
%
0.6%
0.5%0.5%
50
.
4
8
F
L
49.
2
9
F
L
49.5
7
49.6
6
49
.
1
1
49.6
6
49.
9
9
F
L
0.4%
1.3%
0.1%
1.6%
1.5%
2.9%
2.9%
51.63FL
50.61FL
TRASH ENCLOSUREFG=52.00
TOF=52.67
FG=52.00
TOF=52.67
50.92
51.
0
7
51.27TC
51.15TC
51.10TC
50.81TC 50.
3
7
F
L
50.
4
8
F
L
49.79TC
49.
3
9
F
L
49.
5
6
F
L
50.05TC
49.
5
0
50.
1
3
F
L
50.98TC
50.
8
0
50.24TC
49.
6
3
F
L
49.
3
8
F
L
49.51
49.95
50.19
49.78
49.48
49.47
49.89TC
50.25TC
50.29TC
50.02
49.74
51.75FL
51.
8
1
50.
5
8
6' UTILITY EASEMENT
PI
C
K
L
E
B
A
L
L
A
R
E
A
G
R
A
D
I
N
G
P
L
A
N
1" = 20'
N/A
7
GR03
PR
E
P
A
R
E
D
F
O
R
:
JOB NUMBER
SHEET NUMBER
SHEETSOF
DA
T
E
S
U
B
M
I
T
T
E
D
:
Th
e
e
n
g
i
n
e
e
r
p
r
e
p
a
r
i
n
g
t
h
e
s
e
p
l
a
n
s
w
i
l
l
n
o
t
b
e
r
e
s
p
o
n
s
i
b
l
e
fo
r
,
o
r
l
i
a
b
l
e
f
o
r
,
u
n
a
u
t
h
o
r
i
z
e
d
c
h
a
n
g
e
s
t
o
o
r
u
s
e
s
o
f
t
h
e
s
e
pl
a
n
s
.
A
l
l
c
h
a
n
g
e
s
t
o
t
h
e
p
l
a
n
s
m
u
s
t
b
e
i
n
w
r
i
t
i
n
g
a
n
d
mu
s
t
b
e
a
p
p
r
o
v
e
d
b
y
t
h
e
p
r
e
p
a
r
e
r
o
f
t
h
e
s
e
p
l
a
n
s
.
NO
.
BY
DA
T
E
CAUTION
RE
V
I
S
I
O
N
S
:
VERTICAL:
HORIZONTAL:
SCALE
4025 Automation Way
Suite B2
Fort Collins, CO 80525
(970) 698-6046
CivilWorxeng.com
BL
O
O
M
P
A
R
K
A
N
D
P
O
O
L
C24008
HA
R
T
F
O
R
D
H
O
M
E
S
2/
1
2
/
2
0
2
5
31
PRELIMINARY
NOT FOR
CONSTRUCTION
0 10'20'
SCALE: 1" = 10'
5'
KEYMAP
NTS
LEGEND
MAPPING / SITE
PROPERTY BOUNDARY
RIGHT-OF-WAY
LOT LINES
EASEMENTS
CENTER LINE
CURB AND GUTTER
EXISTING CONTOURS
PROPOSED CONTOURS
PROPOSED FENCING
SIDEWALK CHASE
SHEET BOUNDARY
PROPOSED BUILDING
TRASH ENCLOSURE
ASPHALT PAVING
CONCRETE SIDEWALK
GRAVEL PATH
OUTFALL CURB & GUTTER
PROPOSED UTILITIES
STORM DRAIN PIPE
FLARED END SECTION
STORM DRAIN INLET
STORM DRAIN OUTLET
RIP RAP
NOTES
1.SPOT ELEVATIONS ON THE ROAD ARE TO
FINISHED SURFACE. CONSULT THE SOILS
REPORT FOR PAVEMENT SECTION. SPOT
ELEVATIONS ALONG CURB AND GUTTER ARE
TO FLOWLINE UNLESS OTHERWISE NOTED.
2.THE CONTRACTOR IS RESPONSIBLE FOR
VERIFYING THE FIELD CONDITIONS ARE AS
SHOWN IN THE DRAWINGS. IF THE
CONTRACTOR FINDS DISCREPANCIES THE
CONTRACTOR SHALL CONTACT THE
ENGINEER.
3.ALL DISTURBED AREAS NOT PAVED SHALL BE
RE-VEGETATED.
4.THE FIRE LANES AS DENOTED BY THE
EMERGENCY ACCESS EASEMENTS WILL HAVE
A FLAT ALL WEATHER DRIVING SURFACE THAT
IS CAPABLE OF SUPPORTING 40 TONS.
5.PARKING AREAS (NOT HATCHED) SHALL HAVE
A PAVEMENT SECTION OF 4" HMA + 6" ABC OR
5" PCC. TRASH ENCLOSURES SHALL HAVE A 6"
PCC PAVEMENT SECTION.
EXISTING UTILITIES
STORM DRAIN PIPE
FLARED END SECTION
STORM DRAIN INLET
STORM DRAIN OUTLET
RIP RAP
GRADING
FFE = FINISHED FLOOR ELEVATION
FG = FINISHED GRADE ELEVATION
FL = FLOWLINE ELEVATION
TC = TOP OF CONCRETE ELEVATION
MA
T
C
H
L
I
N
E
SE
E
S
H
E
E
T
G
R
0
2
MATCHLINE
SEE SHEET GR04
50.
5
9
50.
6
6
50.
7
5
50.
9
1
52.
2
9
52.13
52.05
51.
6
3
51.
0
8
50
.
6
3
T
C
50
.
6
4
50
.
6
2
T
C
50
.
6
3
50.
6
1
50.
5
6
T
C
50.
8
0
T
C
50.
5
8
50.59
50.
5
9
50.
6
1
50.
5
8
50.
5
1
50.
5
8
50.
2
4
T
C
50.
6
8
49.
8
5
T
C
50.
8
2
50.
8
3
49.
8
4
T
C
50.
8
5
49.93TC
50.
8
9
49.92TC
50.
7
9
49.96TC
49.
9
2
T
C
49.
9
4
50.
0
3
50.
1
1
50.
0
2
50.
0
850.
1
5
51.23
51.
3
1
51
.
9
3
51
.
8
2
51
.
9
6
52
.
1
0
56.
1
9
56.
0
0
52.64
52.47
51.
8
8
51.
8
8
51
.
8
8
51
.
8
8
51.88 51.88
51.88
51.88
51
.
8
8
52.
1
5
51
.
6
9
50.
5
0
50.
3
2
51.
0
2
50.
6
7
50.
4
4
50.
5
4
51.
1
0
51.
5
8
50.41
50.
9
5
51.
0
4
51.
2
6
51.
3
7
51.
3
7
51.36
51.34
51.78
51.6151.
5
3
51.
7
5
51.95
52.09
52.
1
1
51.
9
8
51.21
51.
1
3
51.
2
6
51.
2
4
F
L
51.
2
3
51.
2
5
51.
1
5
T
C
50.
6
5
50.
9
3
51.
2
0
T
C
51.
1
3
51.
1
5
51.
1
2
51.
2
5
50.91
50.
8
4
T
C
51.
0
4
51.
0
8
51.
0
7
50.
9
5
50.
9
1
50.
8
7
50.
8
8
50.
7
9
50.
7
0
50.
6
1
50.
6
0
50.
5
9
50.
5
9
50.
3
8
51.
9
3
51.52TC 51.
0
2
50.77TC 50.
9
8
50.01TC 50.
9
5
51.
6
5
51.
6
4
51.
4
2
51.
5
0
51.
2
5
51.
1
7
T
C
51.
0
0
50.
9
8
50.
9
8
50.
9
850.
9
9
51.
0
1
50.
4
4
50.
5
1
T
C
50.96
50.95 50.
2
6
T
C
50.
2
8
T
C
50.95
50.
4
0
50.
4
5
50.39
50.
3
4
50.
2
9
49.
9
6
49.18
48.98
48.88
48.70
49.17
49.29
49.
9
5
50.
7
3
50.
3
7
50.
5
3
49.
2
4
48.
5
9
47
.
8
3
48.
0
3
47.42
48.
5
1
49.
3
8
49.
7
8
49.
2
3
49.
2
9
49.
6
1
49.
9
2
50.39
50.
3
1
50.67
50.76
50.
5
1
50.
6
0
50.73
51.44
51.44
50.89
50.78
50.
6
250.
5
7
50.
5
2
50.
6
2
50.
7
3
50.
8
6
51.
4
4
50.
8
2
T
C
50.92
50.92
50.
7
3
T
C
50.93
50.
6
2
T
C
50.93
50.
4
5
T
C
50.94 50.31TC
49.
7
2
49.
6
2
49.
3
5
48.
5
1
49.
9
6
49.
9
8
50.
9
0
50.
8
9
49.
9
7
51.
0
1
49.
9
8
50.
7
0
50.
6
6
50.
3
1
16.0%
50
.
4
8
F
L
48.59
49.
0
7
49.
5
1
49.
9
4
50.
7
0
0.4%
50.61FL
50.92FL
4950.46
50.
5
8
48.47
47.79
47.65
PR
E
P
A
R
E
D
F
O
R
:
JOB NUMBER
SHEET NUMBER
SHEETSOF
DA
T
E
S
U
B
M
I
T
T
E
D
:
Th
e
e
n
g
i
n
e
e
r
p
r
e
p
a
r
i
n
g
t
h
e
s
e
p
l
a
n
s
w
i
l
l
n
o
t
b
e
r
e
s
p
o
n
s
i
b
l
e
fo
r
,
o
r
l
i
a
b
l
e
f
o
r
,
u
n
a
u
t
h
o
r
i
z
e
d
c
h
a
n
g
e
s
t
o
o
r
u
s
e
s
o
f
t
h
e
s
e
pl
a
n
s
.
A
l
l
c
h
a
n
g
e
s
t
o
t
h
e
p
l
a
n
s
m
u
s
t
b
e
i
n
w
r
i
t
i
n
g
a
n
d
mu
s
t
b
e
a
p
p
r
o
v
e
d
b
y
t
h
e
p
r
e
p
a
r
e
r
o
f
t
h
e
s
e
p
l
a
n
s
.
NO
.
BY
DA
T
E
CAUTION
RE
V
I
S
I
O
N
S
:
VERTICAL:
HORIZONTAL:
SCALE
4025 Automation Way
Suite B2
Fort Collins, CO 80525
(970) 698-6046
CivilWorxeng.com
BL
O
O
M
P
A
R
K
A
N
D
P
O
O
L
C24008
HA
R
T
F
O
R
D
H
O
M
E
S
2/
1
2
/
2
0
2
5
31
PRELIMINARY
NOT FOR
CONSTRUCTION
PL
A
Y
A
R
E
A
G
R
A
D
I
N
G
P
L
A
N
1" = 20'
N/A
8
GR04
0 10'20'
SCALE: 1" = 10'
5'
MATCHLINE
SEE SHEET GR05
KEYMAP
NTS
LEGEND
MAPPING / SITE
PROPERTY BOUNDARY
RIGHT-OF-WAY
LOT LINES
EASEMENTS
CENTER LINE
CURB AND GUTTER
EXISTING CONTOURS
PROPOSED CONTOURS
PROPOSED FENCING
SIDEWALK CHASE
SHEET BOUNDARY
PROPOSED BUILDING
TRASH ENCLOSURE
ASPHALT PAVING
CONCRETE SIDEWALK
GRAVEL PATH
OUTFALL CURB & GUTTER
PROPOSED UTILITIES
STORM DRAIN PIPE
FLARED END SECTION
STORM DRAIN INLET
STORM DRAIN OUTLET
RIP RAP
NOTES
1.SPOT ELEVATIONS ON THE ROAD ARE TO
FINISHED SURFACE. CONSULT THE SOILS
REPORT FOR PAVEMENT SECTION. SPOT
ELEVATIONS ALONG CURB AND GUTTER ARE
TO FLOWLINE UNLESS OTHERWISE NOTED.
2.THE CONTRACTOR IS RESPONSIBLE FOR
VERIFYING THE FIELD CONDITIONS ARE AS
SHOWN IN THE DRAWINGS. IF THE
CONTRACTOR FINDS DISCREPANCIES THE
CONTRACTOR SHALL CONTACT THE
ENGINEER.
3.ALL DISTURBED AREAS NOT PAVED SHALL BE
RE-VEGETATED.
4.THE FIRE LANES AS DENOTED BY THE
EMERGENCY ACCESS EASEMENTS WILL HAVE
A FLAT ALL WEATHER DRIVING SURFACE THAT
IS CAPABLE OF SUPPORTING 40 TONS.
5.PARKING AREAS (NOT HATCHED) SHALL HAVE
A PAVEMENT SECTION OF 4" HMA + 6" ABC OR
5" PCC. TRASH ENCLOSURES SHALL HAVE A 6"
PCC PAVEMENT SECTION.
EXISTING UTILITIES
STORM DRAIN PIPE
FLARED END SECTION
STORM DRAIN INLET
STORM DRAIN OUTLET
RIP RAP
GRADING
FFE = FINISHED FLOOR ELEVATION
FG = FINISHED GRADE ELEVATION
FL = FLOWLINE ELEVATION
TC = TOP OF CONCRETE ELEVATION
MATCHLINE
SEE SHEET GR03
MA
T
C
H
L
I
N
E
SE
E
S
H
E
E
T
G
R
0
2
62
.
8
7
62
.
8
7
62
.
7
9
62
.
7
9
56.
0
4
49.
8
5
T
C
50.
8
2
50.
8
3
49.
8
4
T
C
50.
8
5
49.93TC
50.
8
9
49.92TC
50.
7
9
49.96TC
49.
9
2
T
C
49.
9
4
50.
0
3
50.
1
1
50.
0
2
50.
0
850.
1
5
51.23
51.
3
1
52
.
1
7
52
.
3
0
51
.
9
3
52
.
0
4
51
.
8
2
52
.
2
7
51
.
9
6
52
.
1
0
52
.
2
8
52
.
2
7
52
.
2
2
52
.
5
4
52
.
4
3
52
.
1
5
52
.
4
2
63.
0
1
63.
0
1
60.
0
4
60.
1
1
59.
0
3
59.
2
3
57.
9
7
58.
4
5
56.
1
9
53.
4
0
51
.
6
9
53.
2
9
50.
5
0
50.
3
2
50.
4
4
50.
5
4
51.
1
0
51.
5
8
50.41
50.91
51.52TC 51.
0
2
50.77TC 50.
9
8
50.01TC 50.
9
5
51.
6
5
51.
6
4
51.
4
2
51.
5
0
51.
2
5
51.
1
7
T
C
51.
0
0
50.
9
8
50.
9
8
50.
9
8
50.
9
9
51.
0
1
50.
5
1
T
C
50.96
50.95 50.
2
6
T
C
50.
2
8
T
C
50.95
50.
4
0
50.
4
5
49.
7
8
50.
5
7
50.
5
2
50.
6
2
50.
7
3
50.
8
2
T
C
50.92
50.92
50.
7
3
T
C
50.93
50.
6
2
T
C
50.93
50.
4
5
T
C
50.94 50.31TC
49.
9
6
49.
9
8
50.
9
0
50.
8
9
50.
0
5
49.
9
6
51
.
0
9
51
.
1
2
51.
0
5
51.
2
0
51.30
51.24
51.
1
7
51.
1
3
51.
0
9
51.17
51.40
51.
1
8
52.
2
6
51.
0
1
49.
9
8
50.
2
2
50.
5
6
51.
4
1
50.77
49.76
51.
2
9
49.64
50.
8
6
49.08
48
.
7
5
48
.
7
8
29.3%
26.
6
%
16.0%
29.5
%
50.52
50.63
49.51
49.38
63.01
50.92FL
48
.
8
3
48
.
8
0
49.04
49.15
49.28
0 10'20'
SCALE: 1" = 10'
5'
MATCHLINE
SEE SHEET GR02
MA
T
C
H
L
I
N
E
SE
E
S
H
E
E
T
G
R
0
4
PR
E
P
A
R
E
D
F
O
R
:
JOB NUMBER
SHEET NUMBER
SHEETSOF
DA
T
E
S
U
B
M
I
T
T
E
D
:
Th
e
e
n
g
i
n
e
e
r
p
r
e
p
a
r
i
n
g
t
h
e
s
e
p
l
a
n
s
w
i
l
l
n
o
t
b
e
r
e
s
p
o
n
s
i
b
l
e
fo
r
,
o
r
l
i
a
b
l
e
f
o
r
,
u
n
a
u
t
h
o
r
i
z
e
d
c
h
a
n
g
e
s
t
o
o
r
u
s
e
s
o
f
t
h
e
s
e
pl
a
n
s
.
A
l
l
c
h
a
n
g
e
s
t
o
t
h
e
p
l
a
n
s
m
u
s
t
b
e
i
n
w
r
i
t
i
n
g
a
n
d
mu
s
t
b
e
a
p
p
r
o
v
e
d
b
y
t
h
e
p
r
e
p
a
r
e
r
o
f
t
h
e
s
e
p
l
a
n
s
.
NO
.
BY
DA
T
E
CAUTION
RE
V
I
S
I
O
N
S
:
VERTICAL:
HORIZONTAL:
SCALE
4025 Automation Way
Suite B2
Fort Collins, CO 80525
(970) 698-6046
CivilWorxeng.com
BL
O
O
M
P
A
R
K
A
N
D
P
O
O
L
C24008
HA
R
T
F
O
R
D
H
O
M
E
S
2/
1
2
/
2
0
2
5
31
PRELIMINARY
NOT FOR
CONSTRUCTION
PL
A
Y
A
R
E
A
G
R
A
D
I
N
G
P
L
A
N
1" = 20'
N/A
9
GR05
KEYMAP
NTS
LEGEND
MAPPING / SITE
PROPERTY BOUNDARY
RIGHT-OF-WAY
LOT LINES
EASEMENTS
CENTER LINE
CURB AND GUTTER
EXISTING CONTOURS
PROPOSED CONTOURS
PROPOSED FENCING
SIDEWALK CHASE
SHEET BOUNDARY
PROPOSED BUILDING
TRASH ENCLOSURE
ASPHALT PAVING
CONCRETE SIDEWALK
GRAVEL PATH
OUTFALL CURB & GUTTER
PROPOSED UTILITIES
STORM DRAIN PIPE
FLARED END SECTION
STORM DRAIN INLET
STORM DRAIN OUTLET
RIP RAP
NOTES
1.SPOT ELEVATIONS ON THE ROAD ARE TO
FINISHED SURFACE. CONSULT THE SOILS
REPORT FOR PAVEMENT SECTION. SPOT
ELEVATIONS ALONG CURB AND GUTTER ARE
TO FLOWLINE UNLESS OTHERWISE NOTED.
2.THE CONTRACTOR IS RESPONSIBLE FOR
VERIFYING THE FIELD CONDITIONS ARE AS
SHOWN IN THE DRAWINGS. IF THE
CONTRACTOR FINDS DISCREPANCIES THE
CONTRACTOR SHALL CONTACT THE
ENGINEER.
3.ALL DISTURBED AREAS NOT PAVED SHALL BE
RE-VEGETATED.
4.THE FIRE LANES AS DENOTED BY THE
EMERGENCY ACCESS EASEMENTS WILL HAVE
A FLAT ALL WEATHER DRIVING SURFACE THAT
IS CAPABLE OF SUPPORTING 40 TONS.
5.PARKING AREAS (NOT HATCHED) SHALL HAVE
A PAVEMENT SECTION OF 4" HMA + 6" ABC OR
5" PCC. TRASH ENCLOSURES SHALL HAVE A 6"
PCC PAVEMENT SECTION.
EXISTING UTILITIES
STORM DRAIN PIPE
FLARED END SECTION
STORM DRAIN INLET
STORM DRAIN OUTLET
RIP RAP
GRADING
FFE = FINISHED FLOOR ELEVATION
FG = FINISHED GRADE ELEVATION
FL = FLOWLINE ELEVATION
TC = TOP OF CONCRETE ELEVATION
8"
8"
12
"
12"
18
"
18
"
8"
8"
8"
12
"
STM MH A.1-1
STM IN A.1.1-1
STM IN A.1-2
STM IN A.1-3
STM IN A.1-4
STM MH B-1
STM IN B-1
STM IN B-2
STM IN B.1-1
TRENCH DRAIN END
STM IN B-3
STM IN B-4
STORM LINE A.1
STORM LINE A.1.1
STORM LINE B.1
STORM LINE B
STORM LINE B4" TRENCH DRAIN
D14-1
0.26 8.8%
D18.1A
0.75 8.0%
D18.1D
0.43 31%
D18.1C
0.18 83%
D14-2
0.11 34%
D18.1F
0.11 89%
D18.1H
0.31 78%
D18.1G
0.07 21%
D18.1E
0.11 48%
D24-1
0.02 38%
D19-1
.06 20%
D18.1B
.03 26%
DR
A
I
N
A
G
E
P
L
A
N
1" = 30'
N/A
10
DN01
PR
E
P
A
R
E
D
F
O
R
:
JOB NUMBER
SHEET NUMBER
SHEETSOF
DA
T
E
S
U
B
M
I
T
T
E
D
:
Th
e
e
n
g
i
n
e
e
r
p
r
e
p
a
r
i
n
g
t
h
e
s
e
p
l
a
n
s
w
i
l
l
n
o
t
b
e
r
e
s
p
o
n
s
i
b
l
e
fo
r
,
o
r
l
i
a
b
l
e
f
o
r
,
u
n
a
u
t
h
o
r
i
z
e
d
c
h
a
n
g
e
s
t
o
o
r
u
s
e
s
o
f
t
h
e
s
e
pl
a
n
s
.
A
l
l
c
h
a
n
g
e
s
t
o
t
h
e
p
l
a
n
s
m
u
s
t
b
e
i
n
w
r
i
t
i
n
g
a
n
d
mu
s
t
b
e
a
p
p
r
o
v
e
d
b
y
t
h
e
p
r
e
p
a
r
e
r
o
f
t
h
e
s
e
p
l
a
n
s
.
NO
.
BY
DA
T
E
CAUTION
RE
V
I
S
I
O
N
S
:
VERTICAL:
HORIZONTAL:
SCALE
4025 Automation Way
Suite B2
Fort Collins, CO 80525
(970) 698-6046
CivilWorxeng.com
BL
O
O
M
P
A
R
K
A
N
D
P
O
O
L
C24008
HA
R
T
F
O
R
D
H
O
M
E
S
2/
1
2
/
2
0
2
5
31
PRELIMINARY
NOT FOR
CONSTRUCTION
0 30'60'
SCALE: 1" = 30'
15'
KEYMAP
NTS
LEGEND
MAPPING / SITE
PROPERTY BOUNDARY
RIGHT-OF-WAY
LOT LINES
EASEMENTS
CENTER LINE
CURB AND GUTTER
EXISTING CONTOURS
PROPOSED CONTOURS
PHASING LINE
PROPOSED UTILITIES
STORM DRAIN PIPE
FLARED END SECTION
STORM DRAIN INLET
STORM DRAIN OUTLET
RIP RAP
NOTES
1.SEE GRADING SHEETS FOR ADDITIONAL
SPOT ELEVATIONS FOR THE PROJECT.
2.SEE EROSION CONTROL PLANS FOR
ADDITIONAL INFORMATION.
EXISTING UTILITIES
STORM DRAIN PIPE
FLARED END SECTION
STORM DRAIN INLET
STORM DRAIN OUTLET
RIP RAP
D-101
GRADING
BASIN BOUNDARY
DESIGN POINT
BASIN LABEL
BASIN IMPERVIOUSNESS
BASIN AREA
FLOW DIRECTION
G G
G G
G G G G
G
G
F
VAULT
VA
U
L
T
VA
U
L
T
VAULT
VAULT
G G
VA
U
L
T
VA
U
L
T
G
E
E
IRR
IP
IP
SF SF
SF
SF
SF
SF
VTC
STOCKPILE
CWA
IP
IP
ER
O
S
I
O
N
C
O
N
T
R
O
L
P
L
A
N
-
I
N
I
T
I
A
L
1" = 30'
N/A
11
EC01
PR
E
P
A
R
E
D
F
O
R
:
JOB NUMBER
SHEET NUMBER
SHEETSOF
DA
T
E
S
U
B
M
I
T
T
E
D
:
Th
e
e
n
g
i
n
e
e
r
p
r
e
p
a
r
i
n
g
t
h
e
s
e
p
l
a
n
s
w
i
l
l
n
o
t
b
e
r
e
s
p
o
n
s
i
b
l
e
fo
r
,
o
r
l
i
a
b
l
e
f
o
r
,
u
n
a
u
t
h
o
r
i
z
e
d
c
h
a
n
g
e
s
t
o
o
r
u
s
e
s
o
f
t
h
e
s
e
pl
a
n
s
.
A
l
l
c
h
a
n
g
e
s
t
o
t
h
e
p
l
a
n
s
m
u
s
t
b
e
i
n
w
r
i
t
i
n
g
a
n
d
mu
s
t
b
e
a
p
p
r
o
v
e
d
b
y
t
h
e
p
r
e
p
a
r
e
r
o
f
t
h
e
s
e
p
l
a
n
s
.
NO
.
BY
DA
T
E
CAUTION
RE
V
I
S
I
O
N
S
:
VERTICAL:
HORIZONTAL:
SCALE
4025 Automation Way
Suite B2
Fort Collins, CO 80525
(970) 698-6046
CivilWorxeng.com
BL
O
O
M
P
A
R
K
A
N
D
P
O
O
L
C24008
HA
R
T
F
O
R
D
H
O
M
E
S
2/
1
2
/
2
0
2
5
31
PRELIMINARY
NOT FOR
CONSTRUCTION
0 30'60'
SCALE: 1" = 30'
15'
KEYMAP
NTS
LEGEND
MAPPING / SITE
PROPERTY BOUNDARY
RIGHT-OF-WAY
LOT LINES
CENTER LINE
CURB AND GUTTER
PHASING LINE
EROSION CONTROL
WATTLE DIKE
VEHICLE TRACKING
CONTROL PAD
ROCK SOCK
TEMPORARY SEDIMENT
INLET PROTECTION
SILT FENCE
STOCKPILE MANAGEMENT
SURFACE ROUGHENING
CONCRETE WASHOUT
STRUCTURE (SUBJECT TO
MOVE IF NECESSARY)
PERMANENT SEEDING
SILT FENCE TO BE REMOVED
NOTES
1.THE CONTRACTOR IS RESPONSIBLE FOR
VERIFYING THE FIELD CONDITIONS ARE AS
SHOWN IN THE DRAWINGS. IF THE
CONTRACTOR FINDS DISCREPANCIES THE
CONTRACTOR SHALL CONTACT THE
ENGINEER.
2.ALL DISTURBED AREAS SHALL BE
REVEGETATED.
3.EROSION CONTROL PRACTICES, SITE
PROTECTION, AND REVEGETATION
METHODS SHALL FOLLOW CITY
REGULATIONS.
4.IN ADDITION TO THE EROSION CONTROL
MEASURES SHOWN ON THIS DRAWING, THE
CONTRACTOR SHALL COMPLETE,
COORDINATE WITH, AND UPDATE AS
REQUIRED, THE STORMWATER POLLUTION
PREVENTION PLAN (SWPP) FOR THIS
PROJECT.
5.CONTRACTOR TO TERRACE SLOPES USING
A "TRACKED" VEHICLE, RUN
PERPENDICULAR TO SLOPE TO INHIBIT
RILL/GULLEY EROSION, CONTRACTOR MAY
USE OTHER WINDROW-TYPE METHODS AS
APPROVED BY ENGINEER. TYPICAL ALL
SLOPES, REPEAT AS NECESSARY UNTIL
LANDSCAPING IS INSTALLED.
6.ANY AREAS USED FOR STOCKPILING
AND/OR STAGING SHOULD ALSO HAVE
SEDIMENT AND EROSION CONTROL
MEASURES AS NECESSARY. THESE AREAS
SHOULD BE LOCATED AT LEAST 100' AWAY
FROM DRAINAGE WAYS. THE SWMP
SHOULD BE UPDATED TO SHOW THESE
AREAS AND SEDIMENT AND EROSION
CONTROL ITEMS. THE ITEMS MAY INCLUDE
BUT ARE NOT LIMITED TO VEHICLE
TRACKING CONTROL, SILT FENCE,
CONSTRUCTION FENCE, CONCRETE
WASHOUT, AND SEDIMENT TRAP.
7.TEMPORARY SEEDING OR TACKIFER
PLACEMENT SHALL BE UTILIZED IN THE
EVENT THAT A GRADED AREA IS EXPOSED
LONGER THAN 14 DAYS WITH NO
CONSTRUCTION ACTIVITY.
8.TURF REINFORCEMENT MAT SHALL BE
PYRAMAT OR APPROVED EQUAL IF
NECESSARY.
9.CONTRACTOR SHALL REMOVE ALL
SEDIMENT, MUD, CONSTRUCTION DEBRIS,
OR OTHER POTENTIAL POLLUTANTS THAT
MAY HAVE BEEN DISCHARGED TO OR,
ACCUMULATE IN, THE FLOW LINES AND
PUBLIC RIGHTS-OF-WAY OF THE CITY, AS A
RESULT OF CONSTRUCTION ACTIVITIES
ASSOCIATED WITH THIS DEVELOPMENT OR
CONSTRUCTION PROJECT. SAID REMOVAL
SHALL BE CONDUCTED DAILY, AS MAY BE
REQUIRED. SUCH MATERIALS SHALL BE
PREVENTED FROM ENTERING THE STORM
SEWER.
10.THE PROJECT LANDSCAPE PLAN WILL
CONTAIN THE DETAILED INFORMATION
REGARDING REQUIRED SEED TYPES/MIXES.
11.SEE THE GENERAL NOTES SHEETS FOR ALL
OF THE CITY OF FORT COLLINS EROSION
CONTROL NOTES.
WD
VTC
TS
IP
SF
LIMITS OF DISTURBANCE
RIP RAP
FLOW DIRECTION
PERIMETER CONTROL
WATTLES
SF
SRSR
CWA
PSPS
A
RS
G G
G G
G G G G
G
G
F
VAULT
VA
U
L
T
VA
U
L
T
VAULT
VAULT
G G
VA
U
L
T
VA
U
L
T
G
E
E
IRR
E
T
IP IP
IP IP
IP
IP
IP
IP
IP
STOCKPILE
RS
RS
RS
RS
WD
WD
WD
WD
WD
WD
WD WD
IP
PR
E
P
A
R
E
D
F
O
R
:
JOB NUMBER
SHEET NUMBER
SHEETSOF
DA
T
E
S
U
B
M
I
T
T
E
D
:
Th
e
e
n
g
i
n
e
e
r
p
r
e
p
a
r
i
n
g
t
h
e
s
e
p
l
a
n
s
w
i
l
l
n
o
t
b
e
r
e
s
p
o
n
s
i
b
l
e
fo
r
,
o
r
l
i
a
b
l
e
f
o
r
,
u
n
a
u
t
h
o
r
i
z
e
d
c
h
a
n
g
e
s
t
o
o
r
u
s
e
s
o
f
t
h
e
s
e
pl
a
n
s
.
A
l
l
c
h
a
n
g
e
s
t
o
t
h
e
p
l
a
n
s
m
u
s
t
b
e
i
n
w
r
i
t
i
n
g
a
n
d
mu
s
t
b
e
a
p
p
r
o
v
e
d
b
y
t
h
e
p
r
e
p
a
r
e
r
o
f
t
h
e
s
e
p
l
a
n
s
.
NO
.
BY
DA
T
E
CAUTION
RE
V
I
S
I
O
N
S
:
VERTICAL:
HORIZONTAL:
SCALE
4025 Automation Way
Suite B2
Fort Collins, CO 80525
(970) 698-6046
CivilWorxeng.com
BL
O
O
M
P
A
R
K
A
N
D
P
O
O
L
C24008
HA
R
T
F
O
R
D
H
O
M
E
S
2/
1
2
/
2
0
2
5
31
PRELIMINARY
NOT FOR
CONSTRUCTION
KEYMAP
NTS
LEGEND
MAPPING / SITE
PROPERTY BOUNDARY
RIGHT-OF-WAY
LOT LINES
CENTER LINE
CURB AND GUTTER
PHASING LINE
EROSION CONTROL
WATTLE DIKE
VEHICLE TRACKING
CONTROL PAD
ROCK SOCK
TEMPORARY SEDIMENT
INLET PROTECTION
SILT FENCE
STOCKPILE MANAGEMENT
SURFACE ROUGHENING
CONCRETE WASHOUT
STRUCTURE (SUBJECT TO
MOVE IF NECESSARY)
PERMANENT SEEDING
SILT FENCE TO BE REMOVED
NOTES
1.THE CONTRACTOR IS RESPONSIBLE FOR
VERIFYING THE FIELD CONDITIONS ARE AS
SHOWN IN THE DRAWINGS. IF THE
CONTRACTOR FINDS DISCREPANCIES THE
CONTRACTOR SHALL CONTACT THE
ENGINEER.
2.ALL DISTURBED AREAS SHALL BE
REVEGETATED.
3.EROSION CONTROL PRACTICES, SITE
PROTECTION, AND REVEGETATION
METHODS SHALL FOLLOW CITY
REGULATIONS.
4.IN ADDITION TO THE EROSION CONTROL
MEASURES SHOWN ON THIS DRAWING, THE
CONTRACTOR SHALL COMPLETE,
COORDINATE WITH, AND UPDATE AS
REQUIRED, THE STORMWATER POLLUTION
PREVENTION PLAN (SWPP) FOR THIS
PROJECT.
5.CONTRACTOR TO TERRACE SLOPES USING
A "TRACKED" VEHICLE, RUN
PERPENDICULAR TO SLOPE TO INHIBIT
RILL/GULLEY EROSION, CONTRACTOR MAY
USE OTHER WINDROW-TYPE METHODS AS
APPROVED BY ENGINEER. TYPICAL ALL
SLOPES, REPEAT AS NECESSARY UNTIL
LANDSCAPING IS INSTALLED.
6.ANY AREAS USED FOR STOCKPILING
AND/OR STAGING SHOULD ALSO HAVE
SEDIMENT AND EROSION CONTROL
MEASURES AS NECESSARY. THESE AREAS
SHOULD BE LOCATED AT LEAST 100' AWAY
FROM DRAINAGE WAYS. THE SWMP
SHOULD BE UPDATED TO SHOW THESE
AREAS AND SEDIMENT AND EROSION
CONTROL ITEMS. THE ITEMS MAY INCLUDE
BUT ARE NOT LIMITED TO VEHICLE
TRACKING CONTROL, SILT FENCE,
CONSTRUCTION FENCE, CONCRETE
WASHOUT, AND SEDIMENT TRAP.
7.TEMPORARY SEEDING OR TACKIFER
PLACEMENT SHALL BE UTILIZED IN THE
EVENT THAT A GRADED AREA IS EXPOSED
LONGER THAN 14 DAYS WITH NO
CONSTRUCTION ACTIVITY.
8.TURF REINFORCEMENT MAT SHALL BE
PYRAMAT OR APPROVED EQUAL IF
NECESSARY.
9.CONTRACTOR SHALL REMOVE ALL
SEDIMENT, MUD, CONSTRUCTION DEBRIS,
OR OTHER POTENTIAL POLLUTANTS THAT
MAY HAVE BEEN DISCHARGED TO OR,
ACCUMULATE IN, THE FLOW LINES AND
PUBLIC RIGHTS-OF-WAY OF THE CITY, AS A
RESULT OF CONSTRUCTION ACTIVITIES
ASSOCIATED WITH THIS DEVELOPMENT OR
CONSTRUCTION PROJECT. SAID REMOVAL
SHALL BE CONDUCTED DAILY, AS MAY BE
REQUIRED. SUCH MATERIALS SHALL BE
PREVENTED FROM ENTERING THE STORM
SEWER.
10.THE PROJECT LANDSCAPE PLAN WILL
CONTAIN THE DETAILED INFORMATION
REGARDING REQUIRED SEED TYPES/MIXES.
11.SEE THE GENERAL NOTES SHEETS FOR ALL
OF THE CITY OF FORT COLLINS EROSION
CONTROL NOTES.
WD
VTC
TS
IP
SF
LIMITS OF DISTURBANCE
RIP RAP
FLOW DIRECTION
PERIMETER CONTROL
WATTLES
SF
SRSR
CWA
PSPS
A
RS
ER
O
S
I
O
N
C
O
N
T
R
O
L
P
L
A
N
-
I
N
T
E
R
M
1" = 30'
N/A
12
EC02
0 30'60'
SCALE: 1" = 30'
15'
G G
G G
G G G G
G
G
F
VAULT
VA
U
L
T
VA
U
L
T
VAULT
VAULT
G G
VA
U
L
T
VA
U
L
T
G
E
E
IRR
E
T
PS
PS
PS
PS
PS
PSPS
PS
PS
PS
PS
IP
IP
IP
IP
IP
IP
IP IP
IP
IP
PR
E
P
A
R
E
D
F
O
R
:
JOB NUMBER
SHEET NUMBER
SHEETSOF
DA
T
E
S
U
B
M
I
T
T
E
D
:
Th
e
e
n
g
i
n
e
e
r
p
r
e
p
a
r
i
n
g
t
h
e
s
e
p
l
a
n
s
w
i
l
l
n
o
t
b
e
r
e
s
p
o
n
s
i
b
l
e
fo
r
,
o
r
l
i
a
b
l
e
f
o
r
,
u
n
a
u
t
h
o
r
i
z
e
d
c
h
a
n
g
e
s
t
o
o
r
u
s
e
s
o
f
t
h
e
s
e
pl
a
n
s
.
A
l
l
c
h
a
n
g
e
s
t
o
t
h
e
p
l
a
n
s
m
u
s
t
b
e
i
n
w
r
i
t
i
n
g
a
n
d
mu
s
t
b
e
a
p
p
r
o
v
e
d
b
y
t
h
e
p
r
e
p
a
r
e
r
o
f
t
h
e
s
e
p
l
a
n
s
.
NO
.
BY
DA
T
E
CAUTION
RE
V
I
S
I
O
N
S
:
VERTICAL:
HORIZONTAL:
SCALE
4025 Automation Way
Suite B2
Fort Collins, CO 80525
(970) 698-6046
CivilWorxeng.com
BL
O
O
M
P
A
R
K
A
N
D
P
O
O
L
C24008
HA
R
T
F
O
R
D
H
O
M
E
S
2/
1
2
/
2
0
2
5
31
PRELIMINARY
NOT FOR
CONSTRUCTION
KEYMAP
NTS
LEGEND
MAPPING / SITE
PROPERTY BOUNDARY
RIGHT-OF-WAY
LOT LINES
CENTER LINE
CURB AND GUTTER
PHASING LINE
EROSION CONTROL
WATTLE DIKE
VEHICLE TRACKING
CONTROL PAD
ROCK SOCK
TEMPORARY SEDIMENT
INLET PROTECTION
SILT FENCE
STOCKPILE MANAGEMENT
SURFACE ROUGHENING
CONCRETE WASHOUT
STRUCTURE (SUBJECT TO
MOVE IF NECESSARY)
PERMANENT SEEDING
SILT FENCE TO BE REMOVED
NOTES
1.THE CONTRACTOR IS RESPONSIBLE FOR
VERIFYING THE FIELD CONDITIONS ARE AS
SHOWN IN THE DRAWINGS. IF THE
CONTRACTOR FINDS DISCREPANCIES THE
CONTRACTOR SHALL CONTACT THE
ENGINEER.
2.ALL DISTURBED AREAS SHALL BE
REVEGETATED.
3.EROSION CONTROL PRACTICES, SITE
PROTECTION, AND REVEGETATION
METHODS SHALL FOLLOW CITY
REGULATIONS.
4.IN ADDITION TO THE EROSION CONTROL
MEASURES SHOWN ON THIS DRAWING, THE
CONTRACTOR SHALL COMPLETE,
COORDINATE WITH, AND UPDATE AS
REQUIRED, THE STORMWATER POLLUTION
PREVENTION PLAN (SWPP) FOR THIS
PROJECT.
5.CONTRACTOR TO TERRACE SLOPES USING
A "TRACKED" VEHICLE, RUN
PERPENDICULAR TO SLOPE TO INHIBIT
RILL/GULLEY EROSION, CONTRACTOR MAY
USE OTHER WINDROW-TYPE METHODS AS
APPROVED BY ENGINEER. TYPICAL ALL
SLOPES, REPEAT AS NECESSARY UNTIL
LANDSCAPING IS INSTALLED.
6.ANY AREAS USED FOR STOCKPILING
AND/OR STAGING SHOULD ALSO HAVE
SEDIMENT AND EROSION CONTROL
MEASURES AS NECESSARY. THESE AREAS
SHOULD BE LOCATED AT LEAST 100' AWAY
FROM DRAINAGE WAYS. THE SWMP
SHOULD BE UPDATED TO SHOW THESE
AREAS AND SEDIMENT AND EROSION
CONTROL ITEMS. THE ITEMS MAY INCLUDE
BUT ARE NOT LIMITED TO VEHICLE
TRACKING CONTROL, SILT FENCE,
CONSTRUCTION FENCE, CONCRETE
WASHOUT, AND SEDIMENT TRAP.
7.TEMPORARY SEEDING OR TACKIFER
PLACEMENT SHALL BE UTILIZED IN THE
EVENT THAT A GRADED AREA IS EXPOSED
LONGER THAN 14 DAYS WITH NO
CONSTRUCTION ACTIVITY.
8.TURF REINFORCEMENT MAT SHALL BE
PYRAMAT OR APPROVED EQUAL IF
NECESSARY.
9.CONTRACTOR SHALL REMOVE ALL
SEDIMENT, MUD, CONSTRUCTION DEBRIS,
OR OTHER POTENTIAL POLLUTANTS THAT
MAY HAVE BEEN DISCHARGED TO OR,
ACCUMULATE IN, THE FLOW LINES AND
PUBLIC RIGHTS-OF-WAY OF THE CITY, AS A
RESULT OF CONSTRUCTION ACTIVITIES
ASSOCIATED WITH THIS DEVELOPMENT OR
CONSTRUCTION PROJECT. SAID REMOVAL
SHALL BE CONDUCTED DAILY, AS MAY BE
REQUIRED. SUCH MATERIALS SHALL BE
PREVENTED FROM ENTERING THE STORM
SEWER.
10.THE PROJECT LANDSCAPE PLAN WILL
CONTAIN THE DETAILED INFORMATION
REGARDING REQUIRED SEED TYPES/MIXES.
11.SEE THE GENERAL NOTES SHEETS FOR ALL
OF THE CITY OF FORT COLLINS EROSION
CONTROL NOTES.
WD
VTC
TS
IP
SF
LIMITS OF DISTURBANCE
RIP RAP
FLOW DIRECTION
PERIMETER CONTROL
WATTLES
SF
SRSR
CWA
PSPS
A
RS
ER
O
S
I
O
N
C
O
N
T
R
O
L
P
L
A
N
-
F
I
N
A
L
1" = 30'
N/A
13
EC03
0 30'60'
SCALE: 1" = 30'
15'
G G
G G
G G G G
G
G
F
F
VAULT
VA
U
L
T
VA
U
L
T
VAULT
VAULT
G G
VA
U
L
T
VA
U
L
T
G
E
E
IRR
E
T
12" STORM SEWER
AREA INLET 8" NYLOPLAST
INLET
18" STORM
SEWER
8" STORM SEWER
8" NYLOPLAST INLETS
SAN SERVICE
CLEANOUTS
SAN SERVICE
CLEANOUT
SAN SEWER
SERVICE
SAN SEWER
SERVICE
WATER SERVICE
CONNECT TO EX
WATER SERVICE
STUB
CONNECT TO EX
SAN SEWER
SERVICE STUB
SAN SERVICE
CLEANOUT
4" TRENCH
DRAIN
8" NYLOPLAST INLETS
4" TRENCH
DRAIN
8" STORM SEWER
WATER SERVICE
METER
18" STORM
SEWER
12" STORM SEWER
AREA INLET /
JUNCTION BOX
AREA INLET
DRAINAGE PAN
18" STORM SEWER
AREA INLET /
JUNCTION BOX
AREA INLET /
JUNCTION BOX
OUTFALL MH
CONSTRUCTED
OVER EX. STORM
OUTFALL MH
CONSTRUCTED
OVER EX. STORM
ELECTRIC SERVICE
6' UTILITY EASEMENT
ELECTRIC TRANSFORMER
ELECTRIC SERVICE
PR
E
P
A
R
E
D
F
O
R
:
JOB NUMBER
SHEET NUMBER
SHEETSOF
DA
T
E
S
U
B
M
I
T
T
E
D
:
Th
e
e
n
g
i
n
e
e
r
p
r
e
p
a
r
i
n
g
t
h
e
s
e
p
l
a
n
s
w
i
l
l
n
o
t
b
e
r
e
s
p
o
n
s
i
b
l
e
fo
r
,
o
r
l
i
a
b
l
e
f
o
r
,
u
n
a
u
t
h
o
r
i
z
e
d
c
h
a
n
g
e
s
t
o
o
r
u
s
e
s
o
f
t
h
e
s
e
pl
a
n
s
.
A
l
l
c
h
a
n
g
e
s
t
o
t
h
e
p
l
a
n
s
m
u
s
t
b
e
i
n
w
r
i
t
i
n
g
a
n
d
mu
s
t
b
e
a
p
p
r
o
v
e
d
b
y
t
h
e
p
r
e
p
a
r
e
r
o
f
t
h
e
s
e
p
l
a
n
s
.
NO
.
BY
DA
T
E
CAUTION
RE
V
I
S
I
O
N
S
:
VERTICAL:
HORIZONTAL:
SCALE
4025 Automation Way
Suite B2
Fort Collins, CO 80525
(970) 698-6046
CivilWorxeng.com
BL
O
O
M
P
A
R
K
A
N
D
P
O
O
L
C24008
HA
R
T
F
O
R
D
H
O
M
E
S
2/
1
2
/
2
0
2
5
31
PRELIMINARY
NOT FOR
CONSTRUCTION
OV
E
R
A
L
L
U
T
I
L
I
T
Y
P
L
A
N
1" = 30'
1" = 30'
14
UT01
0 30'60'
SCALE: 1" = 30'
15'
EAST LARIMER COUNTY WATER DISTRICT
UTILITY PLAN REVIEW
REVIEWED BY: ___________________________________________ DATE: ________________
GENERAL MANAGER
REVIEW DOES NOT CONSTITUTE "APPROVAL" OF PLANS. PLAN ENGINEER IS RESPONSIBLE
FOR ACCURACY AND COMPLETENESS.
BOXELDER SANITATION DISTRICT
UTILITY PLAN REVIEW
REVIEWED BY: ____________________________________
GENERAL MANAGER
DATE: ________________
REVIEW DOES NOT CONSTITUTE "APPROVAL" OF PLANS. PLAN
ENGINEER IS RESPONSIBLE FOR ACCURACY AND COMPLETENESS.
LEGEND
MAPPING / SITE
PROPERTY BOUNDARY
RIGHT-OF-WAY
LOT LINES
EASEMENTS
CURB AND GUTTER
GRASS PAVED AREA
PROPOSED UTILITIES
WATER LINE
WATER SERVICE
FIRE HYDRANT
SANITARY LINE
SANITARY SERVICE
SANITARY SERVICE
SANITARY CLEANOUT
RECLAIMED WATER LINE
RECLAIMED WATER
SERVICE
IRRIGATION LINE
IRRIGATION SERVICE
STORM DRAIN PIPE
FLARED END SECTION
STORM DRAIN INLET
STORM DRAIN OUTLET
RIP RAP
STREET LIGHT
ELECTRICAL LINE
ELECTRIC METER
TRANSFORMER
GAS METER
NOTES
1.MINIMUM HORIZONTAL EDGE TO EDGE
SEPARATION BETWEEN SANITARY SEWER &
WATER LINES IS 10 FEET.
2.WATER MAINS CROSSING OVER A SANITARY
OR STORM SEWER SHALL MAINTAIN AN 18"
VERTICAL EDGE TO EDGE CLEARANCE.
WATER MAINS CLOSER THAN 18" OR UNDER
SEWERS SHALL BE ENCASED.
3.ALL PROPOSED SANITARY SEWER LINES
ARE 8" UNLESS NOTED OTHERWISE ON THE
PLANS.
4.PIPE COVER OF 4-1/2' TO 5-1/2' OVER TOP OF
PIPE SHALL BE MAINTAINED THROUGHOUT
WATER LINE AND SERVICE LINE
INSTALLATION.
5.ALL EXISTING UTILITIES TO BE FIELD
VERIFIED PRIOR TO CONSTRUCTION.
6.REFER TO SANITARY SEWER PLAN AND
PROFILES FOR MORE INFORMATION.
7.REFER TO WATER PLAN AND PROFILES FOR
MORE INFORMATION.
8.REFER TO STORM DRAIN PLAN & PROFILES
FOR MORE INFORMATION.
9.CURB STOPS SHALL BE A MINIMUM OF 4.5'
TALL AND BURIED 6" BELOW FINISHED
GROUND ELEVATION.
EXISTING UTILITIES
STORM DRAIN PIPE
FLARED END SECTION
STORM DRAIN INLET
STORM DRAIN OUTLET
RIP RAP
STREET LIGHT
KEYMAP
NTS
E
T
G
G G
VA
U
L
T
VAULT
G
E
E
IRR
9+75
10+0
0
11+0
0
12+0013+0013+93
EX STM MH 1
STA 11+43.05
N: 18616.53
E: 13503.94
EX STM MH 2
STA 13+68.49
N: 18617.65
E: 13278.50
EX FES 1
STA 10+19.37
N: 18668.24
E: 13616.29
225.44 LF 29" X 45" HE-RCP @ 0.14%
STM MH A.1-1
STA 10+00.00
N: 18617.24
E: 13360.00
STM MH B-1
STA 10+00.00
N: 18633.49
E: 13540.78
123.68 LF 36" RCP @ 0.05%
E
G G
VA
U
L
T
VAULT
VA
U
L
T
VA
U
L
T
IRR
10+99
9+
7
5
10
+
0
0
STM MH A.1-1
STA 10+00.00
N: 18617.24
E: 13360.00
STM IN A.1-4
STA 10+73.72
N: 18548.16
E: 13355.15
STM IN A.1-3
STA 10+69.09
N: 18548.16
E: 13359.78
STM IN A.1-2
STA 10+41.41
N: 18575.83
E: 13359.92
41.41 LF 12" ADS @ 2.00%
27.67 LF 8" ADS @ 2.00%
4.63 LF 8" ADS @ 2.00%
STORM ALGN A PROFILE
SCALE: (H) 1" = 10' (V) 1" = 1'
START STA: 9+75.00, END STA: 14+00.00
4935
4940
4945
4950
4955
4960
4965
4935
4940
4945
4950
4955
4960
4965
FG
=
FG
=
FG
=
4
9
4
9
.
2
1
FG
=
4
9
5
0
.
4
3
FG
=
4
9
5
0
.
9
0
FG
=
4
9
5
0
.
2
2
FG
=
4
9
5
5
.
1
1
FG
=
4
9
5
1
.
1
8
FG
=
FG
=
9+7510+0010+5011+0011+5012+0012+5013+0013+5014+00
EX
S
T
M
M
H
1
ST
A
1
1
+
4
3
.
0
5
RI
M
4
9
5
0
.
1
±
IN
V
.
I
N
4
9
4
2
.
5
2
(
W
)
IN
V
.
O
U
T
4
9
4
2
.
5
0
(
N
E
)
225.44 LF 29" x 45" HE-RCP @ 0.14%
EX
S
T
M
M
H
2
ST
A
1
3
+
6
8
.
4
9
RI
M
4
9
4
6
.
1
±
IN
V
.
O
U
T
4
9
4
2
.
8
4
(
E
)
EX
F
E
S
1
ST
A
1
0
+
1
9
.
3
7
RI
M
4
9
4
6
.
0
±
IN
V
.
I
N
4
9
4
2
.
4
4
(
S
W
)
PROPOSED GROUND
@ PIPE CENTERLINE
PR
O
P
O
S
E
D
L
O
C
A
T
I
O
N
O
F
DO
G
H
O
U
S
E
M
A
N
H
O
L
E
ST
A
:
1
2
+
8
7
.
0
0
IN
V
.
E
L
E
V
.
=
4
9
4
2
.
7
2
'
ST
M
M
H
A
.
1
-
1
ST
A
1
0
+
0
0
.
0
0
RI
M
4
9
5
4
.
0
±
IN
V
.
I
N
4
9
4
5
.
1
5
(
S
)
PR
O
P
O
S
E
D
L
O
C
A
T
I
O
N
O
F
DO
G
H
O
U
S
E
M
A
N
H
O
L
E
ST
A
:
1
1
+
0
2
.
4
9
IN
V
.
E
L
E
V
.
=
4
9
4
2
.
4
8
'
ST
M
M
H
B
-
1
ST
A
1
0
+
0
0
.
0
0
RI
M
4
9
5
0
.
5
±
IN
V
.
I
N
4
9
4
5
.
8
1
(
S
W
)
IN
V
.
I
N
4
9
4
2
.
4
9
(
W
)
IN
V
.
O
U
T
4
9
4
2
.
4
9
(
E
)
123.68 LF 36" RCP @ 0.05%
STORM ALGN A.1 PROFILE
SCALE: (H) 1" = 10' (V) 1" = 1'
START STA: 9+00.00, END STA: 11+50.00
4935
4940
4945
4950
4955
4960
4965
4935
4940
4945
4950
4955
4960
4965
FG
=
FG
=
FG
=
4
9
5
3
.
9
5
FG
=
4
9
4
9
.
4
5
FG
=
FG
=
9+009+5010+0010+5011+0011+50
ST
M
M
H
A
.
1
-
1
ST
A
1
0
+
0
0
.
0
0
RI
M
4
9
5
4
.
0
±
IN
V
.
I
N
4
9
4
5
.
1
5
(
S
)
41.41 LF 12" ADS @ 2.00%
ST
M
I
N
A
.
1
-
2
ST
A
1
0
+
4
1
.
4
1
RI
M
4
9
4
9
.
4
±
IN
V
.
I
N
4
9
4
5
.
9
7
(
S
)
IN
V
.
I
N
4
9
4
5
.
9
7
(
W
)
IN
V
.
O
U
T
4
9
4
5
.
9
7
(
N
)
27.67 LF 8" ADS @ 2.00%
ST
M
I
N
A
.
1
-
3
ST
A
1
0
+
6
9
.
0
9
RI
M
4
9
4
9
.
6
±
IN
V
.
I
N
4
9
4
6
.
5
3
(
W
)
IN
V
.
O
U
T
4
9
4
6
.
5
3
(
N
)
ST
M
I
N
A
.
1
-
4
ST
A
1
0
+
7
3
.
7
2
RI
M
4
9
4
9
.
6
±
IN
V
.
O
U
T
4
9
4
6
.
6
2
(
E
)
4.63 LF 8" ADS @ 2.00%
PROPOSED GROUND
@ PIPE CENTERLINE ST
O
R
M
D
R
A
I
N
P
L
A
N
&
P
R
O
F
I
L
E
S
1" = 40'
1" = 4'
15
SD01
0 40'80'
SCALE: 1" = 40'
20'
PR
E
P
A
R
E
D
F
O
R
:
JOB NUMBER
SHEET NUMBER
SHEETSOF
DA
T
E
S
U
B
M
I
T
T
E
D
:
Th
e
e
n
g
i
n
e
e
r
p
r
e
p
a
r
i
n
g
t
h
e
s
e
p
l
a
n
s
w
i
l
l
n
o
t
b
e
r
e
s
p
o
n
s
i
b
l
e
fo
r
,
o
r
l
i
a
b
l
e
f
o
r
,
u
n
a
u
t
h
o
r
i
z
e
d
c
h
a
n
g
e
s
t
o
o
r
u
s
e
s
o
f
t
h
e
s
e
pl
a
n
s
.
A
l
l
c
h
a
n
g
e
s
t
o
t
h
e
p
l
a
n
s
m
u
s
t
b
e
i
n
w
r
i
t
i
n
g
a
n
d
mu
s
t
b
e
a
p
p
r
o
v
e
d
b
y
t
h
e
p
r
e
p
a
r
e
r
o
f
t
h
e
s
e
p
l
a
n
s
.
NO
.
BY
DA
T
E
CAUTION
RE
V
I
S
I
O
N
S
:
VERTICAL:
HORIZONTAL:
SCALE
4025 Automation Way
Suite B2
Fort Collins, CO 80525
(970) 698-6046
CivilWorxeng.com
BL
O
O
M
P
A
R
K
A
N
D
P
O
O
L
C24008
HA
R
T
F
O
R
D
H
O
M
E
S
2/
1
2
/
2
0
2
5
31
PRELIMINARY
NOT FOR
CONSTRUCTION
KEYMAP
NTS
LEGEND
MAPPING / SITE
PROPERTY BOUNDARY
RIGHT-OF-WAY
LOT LINES
EASEMENTS
CURB AND GUTTER
NOTES
1.EXISTING UNDERGROUND AND OVERHEAD
PUBLIC AND PRIVATE UTILITIES AS SHOWN
ARE INDICATED ACCORDING TO THE BEST
INFORMATION AVAILABLE TO THE ENGINEER.
2.ALL STORM SEWER CONSTRUCTION SHALL
BE PER TOWN OF FORT MORGAN STANDARD
CONSTRUCTION SPECIFICATIONS, LATEST
EDITION.
3.ALL PIPE LENGTHS ARE FROM CENTER TO
CENTER OF ADJACENT STRUCTURES
UNLESS OTHERWISE NOTED.
4.STORM SEWER MAINS SHOWN ON THESE
DRAWINGS AS HIGH-DENSITY
POLYETHYLENE (HDPE) UNLESS OTHERWISE
NOTED.
5.MAINTAIN 10' HORIZONTAL AND 18"
VERTICAL MINIMUM SEPARATION BETWEEN
ALL SANITARY SEWER & WATER MAINS &
SERVICES.
6.STORM SEWER ON THE BLOOM 4TH FILING
SITE IS PRIVATE
PROPOSED UTILITIES
WATER LINE
WATER SERVICE
FIRE HYDRANT
SANITARY LINE
SANITARY SERVICE
SANITARY MANHOLE
RECLAIMED WATER LINE
RECLAIMED WATER
SERVICE
STORM DRAIN PIPE
FLARED END SECTION
STORM DRAIN INLET
STORM DRAIN MANHOLE
RIP RAP
EXISTING UTILITIES
WATER LINE
SANITARY LINE
IRRIGATION LINE
RECLAIMED WATER LINE
STORM DRAIN PIPE
OVERHEAD ELECTRIC
STORM DRAIN PIPE
STORM DRAIN INLET
FLARED END SECTION
RIPRAP
STORM DRAIN MANHOLE
FIRE HYDRANT
SANITARY MANHOLE
E
VA
U
L
T
VAULT
VAULT
VA
U
L
T
VA
U
L
T
IRR
9+7510+0010+37
STM IN A.1.1-1
STA 10+11.66
N: 18575.89
E: 13348.26
11.66 LF 8" ADS @ 2.00%
STM IN A.1-2
STA 10+41.41
N: 18575.83
E: 13359.92
STORM ALGN A.1.1 PROFILE
SCALE: (H) 1" = 10' (V) 1" = 1'
START STA: 9+00.00, END STA: 11+00.00
4940
4945
4950
4955
4960
4965
4970
4940
4945
4950
4955
4960
4965
4970
FG
=
FG
=
FG
=
4
9
4
9
.
3
9
FG
=
FG
=
9+009+5010+0010+5011+00
ST
M
I
N
A
.
1
-
2
ST
A
1
0
+
4
1
.
4
1
RI
M
4
9
4
9
.
4
±
IN
V
.
I
N
4
9
4
5
.
9
7
(
S
)
IN
V
.
I
N
4
9
4
5
.
9
7
(
W
)
IN
V
.
O
U
T
4
9
4
5
.
9
7
(
N
)
11.66 LF 8" ADS @ 2.00%
ST
M
I
N
A
.
1
.
1
-
1
ST
A
1
0
+
1
1
.
6
6
RI
M
4
9
4
9
.
5
±
IN
V
.
O
U
T
4
9
4
6
.
2
1
(
E
)
PROPOSED GROUND
@ PIPE CENTERLINE
STORM ALGN B PROFILE
SCALE: (H) 1" = 10' (V) 1" = 1'
START STA: 9+00.00, END STA: 13+50.00
4940
4945
4950
4955
4960
4965
4970
4940
4945
4950
4955
4960
4965
4970
FG
=
FG
=
FG
=
4
9
5
0
.
4
6
FG
=
4
9
5
0
.
9
0
FG
=
4
9
5
1
.
2
4
FG
=
4
9
5
0
.
8
0
FG
=
4
9
5
0
.
3
8
FG
=
4
9
4
9
.
8
1
FG
=
FG
=
9+009+5010+0010+5011+0011+5012+0012+5013+0013+50
29.75 LF 18" ADS @ 0.50%
99.09 LF 12" ADS @ 0.50%
ST
M
I
N
B
-
4
ST
A
1
2
+
3
5
.
2
9
RI
M
4
9
4
9
.
3
±
IN
V
.
O
U
T
4
9
4
7
.
0
0
(
N
)
ST
M
M
H
B
-
1
ST
A
1
0
+
0
0
.
0
0
RI
M
4
9
5
0
.
5
±
IN
V
.
I
N
4
9
4
5
.
8
1
(
S
W
)
IN
V
.
I
N
4
9
4
2
.
4
9
(
W
)
IN
V
.
O
U
T
4
9
4
2
.
4
9
(
E
)
PROPOSED GROUND
@ PIPE CENTERLINE
ST
A
:
1
1
+
9
1
.
9
0
IN
V
.
=
4
9
4
6
.
1
'
±
AP
P
R
O
X
.
D
E
P
T
H
O
F
AD
J
A
C
E
N
T
E
X
.
G
A
S
(T
O
B
E
F
I
E
L
D
V
E
R
I
F
I
E
D
)
ST
M
I
N
B
-
2
ST
A
1
0
+
9
3
.
6
3
RI
M
4
9
5
1
.
2
±
IN
V
.
I
N
4
9
4
7
.
2
5
(
W
)
IN
V
.
I
N
4
9
4
6
.
2
8
(
S
E
)
IN
V
.
O
U
T
4
9
4
6
.
2
8
(
N
)
63.87 LF 18" ADS @ 0.50%
ST
M
I
N
B
-
1
ST
A
1
0
+
2
9
.
7
5
RI
M
4
9
5
0
.
9
±
IN
V
.
I
N
4
9
4
5
.
9
6
(
S
)
IN
V
.
O
U
T
4
9
4
5
.
9
6
(
N
E
)
ST
M
I
N
B
-
3
ST
A
1
1
+
3
6
.
2
0
RI
M
4
9
5
0
.
5
±
IN
V
.
I
N
4
9
4
6
.
5
0
(
S
)
IN
V
.
O
U
T
4
9
4
6
.
5
0
(
N
W
)
ST
M
I
N
B
-
3
ST
A
1
1
+
3
6
.
2
0
RI
M
4
9
5
0
.
5
±
IN
V
.
I
N
4
9
4
6
.
5
0
(
S
)
IN
V
.
O
U
T
4
9
4
6
.
5
0
(
N
W
)
ST
M
I
N
B
-
3
ST
A
1
1
+
3
6
.
2
0
RI
M
4
9
5
0
.
5
±
IN
V
.
I
N
4
9
4
6
.
5
0
(
S
)
IN
V
.
O
U
T
4
9
4
6
.
5
0
(
N
W
)
42.58 LF 12" ADS @ 0.52%
T
F
G
E
E
12+50
9+75
10+0
0
11+
0
0
12+00
STM IN B-4
STA 12+35.29
N: 18421.97
E: 13577.06
STM MH B-1
STA 10+00.00
N: 18633.49
E: 13540.78
99.09 LF 12" ADS @ 0.50%
42.58 LF 12" ADS @ 0.52%
29.75 LF 18" ADS @ 0.50%
STM IN B-3
STA 11+36.20
N: 18521.06
E: 13578.37
STA.=11+92 ±
ADJACENT EX.
GAS SERVICE
63.87 LF 18" ADS @ 0.50%
STM IN B-2
STA 10+93.63
N: 18546.96
E: 13544.58
STM IN B-1
STA 10+29.75
N: 18607.93
E: 13525.56
ST
O
R
M
D
R
A
I
N
P
L
A
N
&
P
R
O
F
I
L
E
S
1" = 40'
1" = 4'
16
SD02
0 40'80'
SCALE: 1" = 40'
20'
PR
E
P
A
R
E
D
F
O
R
:
JOB NUMBER
SHEET NUMBER
SHEETSOF
DA
T
E
S
U
B
M
I
T
T
E
D
:
Th
e
e
n
g
i
n
e
e
r
p
r
e
p
a
r
i
n
g
t
h
e
s
e
p
l
a
n
s
w
i
l
l
n
o
t
b
e
r
e
s
p
o
n
s
i
b
l
e
fo
r
,
o
r
l
i
a
b
l
e
f
o
r
,
u
n
a
u
t
h
o
r
i
z
e
d
c
h
a
n
g
e
s
t
o
o
r
u
s
e
s
o
f
t
h
e
s
e
pl
a
n
s
.
A
l
l
c
h
a
n
g
e
s
t
o
t
h
e
p
l
a
n
s
m
u
s
t
b
e
i
n
w
r
i
t
i
n
g
a
n
d
mu
s
t
b
e
a
p
p
r
o
v
e
d
b
y
t
h
e
p
r
e
p
a
r
e
r
o
f
t
h
e
s
e
p
l
a
n
s
.
NO
.
BY
DA
T
E
CAUTION
RE
V
I
S
I
O
N
S
:
VERTICAL:
HORIZONTAL:
SCALE
4025 Automation Way
Suite B2
Fort Collins, CO 80525
(970) 698-6046
CivilWorxeng.com
BL
O
O
M
P
A
R
K
A
N
D
P
O
O
L
C24008
HA
R
T
F
O
R
D
H
O
M
E
S
2/
1
2
/
2
0
2
5
31
PRELIMINARY
NOT FOR
CONSTRUCTION
KEYMAP
NTS
LEGEND
MAPPING / SITE
PROPERTY BOUNDARY
RIGHT-OF-WAY
LOT LINES
EASEMENTS
CURB AND GUTTER
NOTES
1.EXISTING UNDERGROUND AND OVERHEAD
PUBLIC AND PRIVATE UTILITIES AS SHOWN
ARE INDICATED ACCORDING TO THE BEST
INFORMATION AVAILABLE TO THE ENGINEER.
2.ALL STORM SEWER CONSTRUCTION SHALL
BE PER TOWN OF FORT MORGAN STANDARD
CONSTRUCTION SPECIFICATIONS, LATEST
EDITION.
3.ALL PIPE LENGTHS ARE FROM CENTER TO
CENTER OF ADJACENT STRUCTURES
UNLESS OTHERWISE NOTED.
4.STORM SEWER MAINS SHOWN ON THESE
DRAWINGS AS HIGH-DENSITY
POLYETHYLENE (HDPE) UNLESS OTHERWISE
NOTED.
5.MAINTAIN 10' HORIZONTAL AND 18"
VERTICAL MINIMUM SEPARATION BETWEEN
ALL SANITARY SEWER & WATER MAINS &
SERVICES.
6.STORM SEWER ON THE BLOOM 4TH FILING
SITE IS PRIVATE
PROPOSED UTILITIES
WATER LINE
WATER SERVICE
FIRE HYDRANT
SANITARY LINE
SANITARY SERVICE
SANITARY MANHOLE
RECLAIMED WATER LINE
RECLAIMED WATER
SERVICE
STORM DRAIN PIPE
FLARED END SECTION
STORM DRAIN INLET
STORM DRAIN MANHOLE
RIP RAP
EXISTING UTILITIES
WATER LINE
SANITARY LINE
IRRIGATION LINE
RECLAIMED WATER LINE
STORM DRAIN PIPE
OVERHEAD ELECTRIC
STORM DRAIN PIPE
STORM DRAIN INLET
FLARED END SECTION
RIPRAP
STORM DRAIN MANHOLE
FIRE HYDRANT
SANITARY MANHOLE
E
T
G
E
9+75
10+00
11+
0
0
12+
0
0
12+
2
5
TRENCH DRAIN END
STA 10+88.51
N: 18514.19
E: 13462.88
STM IN B-2
STA 10+93.63
N: 18546.96
E: 13544.58STM IN B.1-1
STA 10+60.82
N: 18528.33
E: 13486.68
27.69 LF 8" ADS @ 1.50%
60.82 LF 8" ADS @ 1.50%
STORM ALGN B.1 PROFILE
SCALE: (H) 1" = 10' (V) 1" = 1'
START STA: 9+00.00, END STA: 13+00.00
4935
4940
4945
4950
4955
4960
4965
4935
4940
4945
4950
4955
4960
4965
FG
=
FG
=
FG
=
4
9
5
0
.
1
6
FG
=
4
9
4
9
.
9
8
FG
=
4
9
4
9
.
9
5
FG
=
4
9
4
9
.
9
4
FG
=
4
9
5
0
.
2
9
FG
=
FG
=
9+009+5010+0010+5011+0011+5012+0012+5013+00
60.82 LF 8" ADS @ 1.50%
ST
M
I
N
B
-
2
ST
A
1
0
+
9
3
.
6
3
RI
M
4
9
5
1
.
2
±
IN
V
.
I
N
4
9
4
7
.
2
5
(
W
)
IN
V
.
I
N
4
9
4
6
.
2
8
(
S
E
)
IN
V
.
O
U
T
4
9
4
6
.
2
8
(
N
)
ST
M
I
N
B
.
1
-
1
ST
A
1
0
+
6
0
.
8
2
RI
M
4
9
5
0
.
6
±
IN
V
.
I
N
4
9
4
8
.
1
6
(
S
W
)
IN
V
.
O
U
T
4
9
4
8
.
1
6
(
E
)
27.69 LF 8" ADS @ 1.50%
TR
E
N
C
H
D
R
A
I
N
E
N
D
ST
A
1
0
+
8
8
.
5
1
RI
M
4
9
5
1
.
6
±
IN
V
.
I
N
4
9
5
0
.
5
5
(
S
W
)
IN
V
.
O
U
T
4
9
4
8
.
5
8
(
N
E
)
PROPOSED GROUND
@ PIPE CENTERLINE
121.81 LF 4" TRENCH DRAIN @ 0.60%
ST
O
R
M
D
R
A
I
N
P
L
A
N
&
P
R
O
F
I
L
E
S
1" = 40'
1" = 4'
17
SD03
0 40'80'
SCALE: 1" = 40'
20'
PR
E
P
A
R
E
D
F
O
R
:
JOB NUMBER
SHEET NUMBER
SHEETSOF
DA
T
E
S
U
B
M
I
T
T
E
D
:
Th
e
e
n
g
i
n
e
e
r
p
r
e
p
a
r
i
n
g
t
h
e
s
e
p
l
a
n
s
w
i
l
l
n
o
t
b
e
r
e
s
p
o
n
s
i
b
l
e
fo
r
,
o
r
l
i
a
b
l
e
f
o
r
,
u
n
a
u
t
h
o
r
i
z
e
d
c
h
a
n
g
e
s
t
o
o
r
u
s
e
s
o
f
t
h
e
s
e
pl
a
n
s
.
A
l
l
c
h
a
n
g
e
s
t
o
t
h
e
p
l
a
n
s
m
u
s
t
b
e
i
n
w
r
i
t
i
n
g
a
n
d
mu
s
t
b
e
a
p
p
r
o
v
e
d
b
y
t
h
e
p
r
e
p
a
r
e
r
o
f
t
h
e
s
e
p
l
a
n
s
.
NO
.
BY
DA
T
E
CAUTION
RE
V
I
S
I
O
N
S
:
VERTICAL:
HORIZONTAL:
SCALE
4025 Automation Way
Suite B2
Fort Collins, CO 80525
(970) 698-6046
CivilWorxeng.com
BL
O
O
M
P
A
R
K
A
N
D
P
O
O
L
C24008
HA
R
T
F
O
R
D
H
O
M
E
S
2/
1
2
/
2
0
2
5
31
PRELIMINARY
NOT FOR
CONSTRUCTION
KEYMAP
NTS
LEGEND
MAPPING / SITE
PROPERTY BOUNDARY
RIGHT-OF-WAY
LOT LINES
EASEMENTS
CURB AND GUTTER
NOTES
1.EXISTING UNDERGROUND AND OVERHEAD
PUBLIC AND PRIVATE UTILITIES AS SHOWN
ARE INDICATED ACCORDING TO THE BEST
INFORMATION AVAILABLE TO THE ENGINEER.
2.ALL STORM SEWER CONSTRUCTION SHALL
BE PER TOWN OF FORT MORGAN STANDARD
CONSTRUCTION SPECIFICATIONS, LATEST
EDITION.
3.ALL PIPE LENGTHS ARE FROM CENTER TO
CENTER OF ADJACENT STRUCTURES
UNLESS OTHERWISE NOTED.
4.STORM SEWER MAINS SHOWN ON THESE
DRAWINGS AS HIGH-DENSITY
POLYETHYLENE (HDPE) UNLESS OTHERWISE
NOTED.
5.MAINTAIN 10' HORIZONTAL AND 18"
VERTICAL MINIMUM SEPARATION BETWEEN
ALL SANITARY SEWER & WATER MAINS &
SERVICES.
6.STORM SEWER ON THE BLOOM 4TH FILING
SITE IS PRIVATE
PROPOSED UTILITIES
WATER LINE
WATER SERVICE
FIRE HYDRANT
SANITARY LINE
SANITARY SERVICE
SANITARY MANHOLE
RECLAIMED WATER LINE
RECLAIMED WATER
SERVICE
STORM DRAIN PIPE
FLARED END SECTION
STORM DRAIN INLET
STORM DRAIN MANHOLE
RIP RAP
EXISTING UTILITIES
WATER LINE
SANITARY LINE
IRRIGATION LINE
RECLAIMED WATER LINE
STORM DRAIN PIPE
OVERHEAD ELECTRIC
STORM DRAIN PIPE
STORM DRAIN INLET
FLARED END SECTION
RIPRAP
STORM DRAIN MANHOLE
FIRE HYDRANT
SANITARY MANHOLE
PR
E
P
A
R
E
D
F
O
R
:
JOB NUMBER
SHEET NUMBER
SHEETSOF
DA
T
E
S
U
B
M
I
T
T
E
D
:
Th
e
e
n
g
i
n
e
e
r
p
r
e
p
a
r
i
n
g
t
h
e
s
e
p
l
a
n
s
w
i
l
l
n
o
t
b
e
r
e
s
p
o
n
s
i
b
l
e
fo
r
,
o
r
l
i
a
b
l
e
f
o
r
,
u
n
a
u
t
h
o
r
i
z
e
d
c
h
a
n
g
e
s
t
o
o
r
u
s
e
s
o
f
t
h
e
s
e
pl
a
n
s
.
A
l
l
c
h
a
n
g
e
s
t
o
t
h
e
p
l
a
n
s
m
u
s
t
b
e
i
n
w
r
i
t
i
n
g
a
n
d
mu
s
t
b
e
a
p
p
r
o
v
e
d
b
y
t
h
e
p
r
e
p
a
r
e
r
o
f
t
h
e
s
e
p
l
a
n
s
.
NO
.
BY
DA
T
E
CAUTION
RE
V
I
S
I
O
N
S
:
VERTICAL:
HORIZONTAL:
SCALE
4025 Automation Way
Suite B2
Fort Collins, CO 80525
(970) 698-6046
CivilWorxeng.com
BL
O
O
M
P
A
R
K
A
N
D
P
O
O
L
C24008
HA
R
T
F
O
R
D
H
O
M
E
S
2/
1
2
/
2
0
2
5
31
PRELIMINARY
NOT FOR
CONSTRUCTION
CO
N
S
T
R
U
C
T
I
O
N
D
E
T
A
I
L
S
N/A
N/A
18
DT01
PR
E
P
A
R
E
D
F
O
R
:
JOB NUMBER
SHEET NUMBER
SHEETSOF
DA
T
E
S
U
B
M
I
T
T
E
D
:
Th
e
e
n
g
i
n
e
e
r
p
r
e
p
a
r
i
n
g
t
h
e
s
e
p
l
a
n
s
w
i
l
l
n
o
t
b
e
r
e
s
p
o
n
s
i
b
l
e
fo
r
,
o
r
l
i
a
b
l
e
f
o
r
,
u
n
a
u
t
h
o
r
i
z
e
d
c
h
a
n
g
e
s
t
o
o
r
u
s
e
s
o
f
t
h
e
s
e
pl
a
n
s
.
A
l
l
c
h
a
n
g
e
s
t
o
t
h
e
p
l
a
n
s
m
u
s
t
b
e
i
n
w
r
i
t
i
n
g
a
n
d
mu
s
t
b
e
a
p
p
r
o
v
e
d
b
y
t
h
e
p
r
e
p
a
r
e
r
o
f
t
h
e
s
e
p
l
a
n
s
.
NO
.
BY
DA
T
E
CAUTION
RE
V
I
S
I
O
N
S
:
VERTICAL:
HORIZONTAL:
SCALE
4025 Automation Way
Suite B2
Fort Collins, CO 80525
(970) 698-6046
CivilWorxeng.com
BL
O
O
M
P
A
R
K
A
N
D
P
O
O
L
C24008
HA
R
T
F
O
R
D
H
O
M
E
S
2/
1
2
/
2
0
2
5
31
PRELIMINARY
NOT FOR
CONSTRUCTION
CO
N
S
T
R
U
C
T
I
O
N
D
E
T
A
I
L
S
N/A
N/A
19
DT02
24"30"5"24"30"5"11"2' WIDE CURB CHASE2' WIDE CURB CUT 6"HAND FORM CURB TRANSITIONFROM 6" BARRIER CURB TO0" CURB WITHIN 6"2'6"HAND FORM CURB TRANSITIONFROM 6" BARRIER CURB TO0" CURB WITHIN 6"CURB CUT DETAILNOT TO SCALE
0.67'4'1"TYPICAL SECTION4' VALLEY GUTTER PAN DETAIL0.5"2'1"TYPICAL SECTION2' VALLEY GUTTER PAN DETAIL
2'-6"
6"
1 1/2"R.4 1/2"
2"R.
A -
Gutter edge may be -
tapered or battered.
(Typical for all Curb &
& Gutter Types)
id
?r
4
<•
^4 • •• "'4
<r id4 4
-g -4
-4
INFLOW CURB & GUTTER
1"
6"
6"
12
"
6"
24"
30"
5"
24"
30"
5"
11"
2' WIDE CURB CHASE
2' WIDE CURB CUT
0.67'
4'
1"
TYPICAL SECTION
4' VALLEY GUTTER PAN DETAIL
0.5"
2'
1"
TYPICAL SECTION
2' VALLEY GUTTER PAN DETAIL
2'-6"
6"
1 1/2"R.4 1/2"
2"R.
A -
Gutter edge may be -
tapered or battered.
(Typical for all Curb &
& Gutter Types)
id
?r
4
<•
^4 • •• "'4
<r id4 4
-g -4
-4
INFLOW CURB & GUTTER
1"
6"
6"
12
"
6"
PR
E
P
A
R
E
D
F
O
R
:
JOB NUMBER
SHEET NUMBER
SHEETSOF
DA
T
E
S
U
B
M
I
T
T
E
D
:
Th
e
e
n
g
i
n
e
e
r
p
r
e
p
a
r
i
n
g
t
h
e
s
e
p
l
a
n
s
w
i
l
l
n
o
t
b
e
r
e
s
p
o
n
s
i
b
l
e
fo
r
,
o
r
l
i
a
b
l
e
f
o
r
,
u
n
a
u
t
h
o
r
i
z
e
d
c
h
a
n
g
e
s
t
o
o
r
u
s
e
s
o
f
t
h
e
s
e
pl
a
n
s
.
A
l
l
c
h
a
n
g
e
s
t
o
t
h
e
p
l
a
n
s
m
u
s
t
b
e
i
n
w
r
i
t
i
n
g
a
n
d
mu
s
t
b
e
a
p
p
r
o
v
e
d
b
y
t
h
e
p
r
e
p
a
r
e
r
o
f
t
h
e
s
e
p
l
a
n
s
.
NO
.
BY
DA
T
E
CAUTION
RE
V
I
S
I
O
N
S
:
VERTICAL:
HORIZONTAL:
SCALE
4025 Automation Way
Suite B2
Fort Collins, CO 80525
(970) 698-6046
CivilWorxeng.com
BL
O
O
M
P
A
R
K
A
N
D
P
O
O
L
C24008
HA
R
T
F
O
R
D
H
O
M
E
S
2/
1
2
/
2
0
2
5
31
PRELIMINARY
NOT FOR
CONSTRUCTION
CO
N
S
T
R
U
C
T
I
O
N
D
E
T
A
I
L
S
N/A
N/A
20
DT03
PIPE-THRU MANHOLE DETAIL
EXTEND TROUGH ABOVE
PIPE EDGES & SLOPE
TO DRAIN
CAST-IN-PLACE
MANHOLE BASE
2 WATER-STOP
GASKETS AT EACH
PENETRATION (TYP.)
TROUGH (TYP.)
4' M.H. CENTERED OVER
EXISTING STORM
CARRY STORM SEWER
AT DESIGN PIPE SLOPE
GRADE THROUGH
MANHOLE
REMOVE
TOP 1/2 OF
PIPE, AND SIDE
AT PIPE INTERSECT
PR
E
P
A
R
E
D
F
O
R
:
JOB NUMBER
SHEET NUMBER
SHEETSOF
DA
T
E
S
U
B
M
I
T
T
E
D
:
Th
e
e
n
g
i
n
e
e
r
p
r
e
p
a
r
i
n
g
t
h
e
s
e
p
l
a
n
s
w
i
l
l
n
o
t
b
e
r
e
s
p
o
n
s
i
b
l
e
fo
r
,
o
r
l
i
a
b
l
e
f
o
r
,
u
n
a
u
t
h
o
r
i
z
e
d
c
h
a
n
g
e
s
t
o
o
r
u
s
e
s
o
f
t
h
e
s
e
pl
a
n
s
.
A
l
l
c
h
a
n
g
e
s
t
o
t
h
e
p
l
a
n
s
m
u
s
t
b
e
i
n
w
r
i
t
i
n
g
a
n
d
mu
s
t
b
e
a
p
p
r
o
v
e
d
b
y
t
h
e
p
r
e
p
a
r
e
r
o
f
t
h
e
s
e
p
l
a
n
s
.
NO
.
BY
DA
T
E
CAUTION
RE
V
I
S
I
O
N
S
:
VERTICAL:
HORIZONTAL:
SCALE
4025 Automation Way
Suite B2
Fort Collins, CO 80525
(970) 698-6046
CivilWorxeng.com
BL
O
O
M
P
A
R
K
A
N
D
P
O
O
L
C24008
HA
R
T
F
O
R
D
H
O
M
E
S
2/
1
2
/
2
0
2
5
31
PRELIMINARY
NOT FOR
CONSTRUCTION
CO
N
S
T
R
U
C
T
I
O
N
D
E
T
A
I
L
S
N/A
N/A
21
DT04
PR
E
P
A
R
E
D
F
O
R
:
JOB NUMBER
SHEET NUMBER
SHEETSOF
DA
T
E
S
U
B
M
I
T
T
E
D
:
Th
e
e
n
g
i
n
e
e
r
p
r
e
p
a
r
i
n
g
t
h
e
s
e
p
l
a
n
s
w
i
l
l
n
o
t
b
e
r
e
s
p
o
n
s
i
b
l
e
fo
r
,
o
r
l
i
a
b
l
e
f
o
r
,
u
n
a
u
t
h
o
r
i
z
e
d
c
h
a
n
g
e
s
t
o
o
r
u
s
e
s
o
f
t
h
e
s
e
pl
a
n
s
.
A
l
l
c
h
a
n
g
e
s
t
o
t
h
e
p
l
a
n
s
m
u
s
t
b
e
i
n
w
r
i
t
i
n
g
a
n
d
mu
s
t
b
e
a
p
p
r
o
v
e
d
b
y
t
h
e
p
r
e
p
a
r
e
r
o
f
t
h
e
s
e
p
l
a
n
s
.
NO
.
BY
DA
T
E
CAUTION
RE
V
I
S
I
O
N
S
:
VERTICAL:
HORIZONTAL:
SCALE
4025 Automation Way
Suite B2
Fort Collins, CO 80525
(970) 698-6046
CivilWorxeng.com
BL
O
O
M
P
A
R
K
A
N
D
P
O
O
L
C24008
HA
R
T
F
O
R
D
H
O
M
E
S
2/
1
2
/
2
0
2
5
31
PRELIMINARY
NOT FOR
CONSTRUCTION
CO
N
S
T
R
U
C
T
I
O
N
D
E
T
A
I
L
S
N/A
N/A
22
DT05
PR
E
P
A
R
E
D
F
O
R
:
JOB NUMBER
SHEET NUMBER
SHEETSOF
DA
T
E
S
U
B
M
I
T
T
E
D
:
Th
e
e
n
g
i
n
e
e
r
p
r
e
p
a
r
i
n
g
t
h
e
s
e
p
l
a
n
s
w
i
l
l
n
o
t
b
e
r
e
s
p
o
n
s
i
b
l
e
fo
r
,
o
r
l
i
a
b
l
e
f
o
r
,
u
n
a
u
t
h
o
r
i
z
e
d
c
h
a
n
g
e
s
t
o
o
r
u
s
e
s
o
f
t
h
e
s
e
pl
a
n
s
.
A
l
l
c
h
a
n
g
e
s
t
o
t
h
e
p
l
a
n
s
m
u
s
t
b
e
i
n
w
r
i
t
i
n
g
a
n
d
mu
s
t
b
e
a
p
p
r
o
v
e
d
b
y
t
h
e
p
r
e
p
a
r
e
r
o
f
t
h
e
s
e
p
l
a
n
s
.
NO
.
BY
DA
T
E
CAUTION
RE
V
I
S
I
O
N
S
:
VERTICAL:
HORIZONTAL:
SCALE
4025 Automation Way
Suite B2
Fort Collins, CO 80525
(970) 698-6046
CivilWorxeng.com
BL
O
O
M
P
A
R
K
A
N
D
P
O
O
L
C24008
HA
R
T
F
O
R
D
H
O
M
E
S
2/
1
2
/
2
0
2
5
31
PRELIMINARY
NOT FOR
CONSTRUCTION
CO
N
S
T
R
U
C
T
I
O
N
D
E
T
A
I
L
S
N/A
N/A
23
DT06
PR
E
P
A
R
E
D
F
O
R
:
JOB NUMBER
SHEET NUMBER
SHEETSOF
DA
T
E
S
U
B
M
I
T
T
E
D
:
Th
e
e
n
g
i
n
e
e
r
p
r
e
p
a
r
i
n
g
t
h
e
s
e
p
l
a
n
s
w
i
l
l
n
o
t
b
e
r
e
s
p
o
n
s
i
b
l
e
fo
r
,
o
r
l
i
a
b
l
e
f
o
r
,
u
n
a
u
t
h
o
r
i
z
e
d
c
h
a
n
g
e
s
t
o
o
r
u
s
e
s
o
f
t
h
e
s
e
pl
a
n
s
.
A
l
l
c
h
a
n
g
e
s
t
o
t
h
e
p
l
a
n
s
m
u
s
t
b
e
i
n
w
r
i
t
i
n
g
a
n
d
mu
s
t
b
e
a
p
p
r
o
v
e
d
b
y
t
h
e
p
r
e
p
a
r
e
r
o
f
t
h
e
s
e
p
l
a
n
s
.
NO
.
BY
DA
T
E
CAUTION
RE
V
I
S
I
O
N
S
:
VERTICAL:
HORIZONTAL:
SCALE
4025 Automation Way
Suite B2
Fort Collins, CO 80525
(970) 698-6046
CivilWorxeng.com
BL
O
O
M
P
A
R
K
A
N
D
P
O
O
L
C24008
HA
R
T
F
O
R
D
H
O
M
E
S
2/
1
2
/
2
0
2
5
31
PRELIMINARY
NOT FOR
CONSTRUCTION
CO
N
S
T
R
U
C
T
I
O
N
D
E
T
A
I
L
S
N/A
N/A
24
DT07
PR
E
P
A
R
E
D
F
O
R
:
JOB NUMBER
SHEET NUMBER
SHEETSOF
DA
T
E
S
U
B
M
I
T
T
E
D
:
Th
e
e
n
g
i
n
e
e
r
p
r
e
p
a
r
i
n
g
t
h
e
s
e
p
l
a
n
s
w
i
l
l
n
o
t
b
e
r
e
s
p
o
n
s
i
b
l
e
fo
r
,
o
r
l
i
a
b
l
e
f
o
r
,
u
n
a
u
t
h
o
r
i
z
e
d
c
h
a
n
g
e
s
t
o
o
r
u
s
e
s
o
f
t
h
e
s
e
pl
a
n
s
.
A
l
l
c
h
a
n
g
e
s
t
o
t
h
e
p
l
a
n
s
m
u
s
t
b
e
i
n
w
r
i
t
i
n
g
a
n
d
mu
s
t
b
e
a
p
p
r
o
v
e
d
b
y
t
h
e
p
r
e
p
a
r
e
r
o
f
t
h
e
s
e
p
l
a
n
s
.
NO
.
BY
DA
T
E
CAUTION
RE
V
I
S
I
O
N
S
:
VERTICAL:
HORIZONTAL:
SCALE
4025 Automation Way
Suite B2
Fort Collins, CO 80525
(970) 698-6046
CivilWorxeng.com
BL
O
O
M
P
A
R
K
A
N
D
P
O
O
L
C24008
HA
R
T
F
O
R
D
H
O
M
E
S
2/
1
2
/
2
0
2
5
31
PRELIMINARY
NOT FOR
CONSTRUCTION
CO
N
S
T
R
U
C
T
I
O
N
D
E
T
A
I
L
S
N/A
N/A
25
DT08
PR
E
P
A
R
E
D
F
O
R
:
JOB NUMBER
SHEET NUMBER
SHEETSOF
DA
T
E
S
U
B
M
I
T
T
E
D
:
Th
e
e
n
g
i
n
e
e
r
p
r
e
p
a
r
i
n
g
t
h
e
s
e
p
l
a
n
s
w
i
l
l
n
o
t
b
e
r
e
s
p
o
n
s
i
b
l
e
fo
r
,
o
r
l
i
a
b
l
e
f
o
r
,
u
n
a
u
t
h
o
r
i
z
e
d
c
h
a
n
g
e
s
t
o
o
r
u
s
e
s
o
f
t
h
e
s
e
pl
a
n
s
.
A
l
l
c
h
a
n
g
e
s
t
o
t
h
e
p
l
a
n
s
m
u
s
t
b
e
i
n
w
r
i
t
i
n
g
a
n
d
mu
s
t
b
e
a
p
p
r
o
v
e
d
b
y
t
h
e
p
r
e
p
a
r
e
r
o
f
t
h
e
s
e
p
l
a
n
s
.
NO
.
BY
DA
T
E
CAUTION
RE
V
I
S
I
O
N
S
:
VERTICAL:
HORIZONTAL:
SCALE
4025 Automation Way
Suite B2
Fort Collins, CO 80525
(970) 698-6046
CivilWorxeng.com
BL
O
O
M
P
A
R
K
A
N
D
P
O
O
L
C24008
HA
R
T
F
O
R
D
H
O
M
E
S
2/
1
2
/
2
0
2
5
31
PRELIMINARY
NOT FOR
CONSTRUCTION
CO
N
S
T
R
U
C
T
I
O
N
D
E
T
A
I
L
S
N/A
N/A
26
DT09
PR
E
P
A
R
E
D
F
O
R
:
JOB NUMBER
SHEET NUMBER
SHEETSOF
DA
T
E
S
U
B
M
I
T
T
E
D
:
Th
e
e
n
g
i
n
e
e
r
p
r
e
p
a
r
i
n
g
t
h
e
s
e
p
l
a
n
s
w
i
l
l
n
o
t
b
e
r
e
s
p
o
n
s
i
b
l
e
fo
r
,
o
r
l
i
a
b
l
e
f
o
r
,
u
n
a
u
t
h
o
r
i
z
e
d
c
h
a
n
g
e
s
t
o
o
r
u
s
e
s
o
f
t
h
e
s
e
pl
a
n
s
.
A
l
l
c
h
a
n
g
e
s
t
o
t
h
e
p
l
a
n
s
m
u
s
t
b
e
i
n
w
r
i
t
i
n
g
a
n
d
mu
s
t
b
e
a
p
p
r
o
v
e
d
b
y
t
h
e
p
r
e
p
a
r
e
r
o
f
t
h
e
s
e
p
l
a
n
s
.
NO
.
BY
DA
T
E
CAUTION
RE
V
I
S
I
O
N
S
:
VERTICAL:
HORIZONTAL:
SCALE
4025 Automation Way
Suite B2
Fort Collins, CO 80525
(970) 698-6046
CivilWorxeng.com
BL
O
O
M
P
A
R
K
A
N
D
P
O
O
L
C24008
HA
R
T
F
O
R
D
H
O
M
E
S
2/
1
2
/
2
0
2
5
31
PRELIMINARY
NOT FOR
CONSTRUCTION
CO
N
S
T
R
U
C
T
I
O
N
D
E
T
A
I
L
S
N/A
N/A
27
DT10
PR
E
P
A
R
E
D
F
O
R
:
JOB NUMBER
SHEET NUMBER
SHEETSOF
DA
T
E
S
U
B
M
I
T
T
E
D
:
Th
e
e
n
g
i
n
e
e
r
p
r
e
p
a
r
i
n
g
t
h
e
s
e
p
l
a
n
s
w
i
l
l
n
o
t
b
e
r
e
s
p
o
n
s
i
b
l
e
fo
r
,
o
r
l
i
a
b
l
e
f
o
r
,
u
n
a
u
t
h
o
r
i
z
e
d
c
h
a
n
g
e
s
t
o
o
r
u
s
e
s
o
f
t
h
e
s
e
pl
a
n
s
.
A
l
l
c
h
a
n
g
e
s
t
o
t
h
e
p
l
a
n
s
m
u
s
t
b
e
i
n
w
r
i
t
i
n
g
a
n
d
mu
s
t
b
e
a
p
p
r
o
v
e
d
b
y
t
h
e
p
r
e
p
a
r
e
r
o
f
t
h
e
s
e
p
l
a
n
s
.
NO
.
BY
DA
T
E
CAUTION
RE
V
I
S
I
O
N
S
:
VERTICAL:
HORIZONTAL:
SCALE
4025 Automation Way
Suite B2
Fort Collins, CO 80525
(970) 698-6046
CivilWorxeng.com
BL
O
O
M
P
A
R
K
A
N
D
P
O
O
L
C24008
HA
R
T
F
O
R
D
H
O
M
E
S
2/
1
2
/
2
0
2
5
31
PRELIMINARY
NOT FOR
CONSTRUCTION
CO
N
S
T
R
U
C
T
I
O
N
D
E
T
A
I
L
S
N/A
N/A
28
DT11
PR
E
P
A
R
E
D
F
O
R
:
JOB NUMBER
SHEET NUMBER
SHEETSOF
DA
T
E
S
U
B
M
I
T
T
E
D
:
Th
e
e
n
g
i
n
e
e
r
p
r
e
p
a
r
i
n
g
t
h
e
s
e
p
l
a
n
s
w
i
l
l
n
o
t
b
e
r
e
s
p
o
n
s
i
b
l
e
fo
r
,
o
r
l
i
a
b
l
e
f
o
r
,
u
n
a
u
t
h
o
r
i
z
e
d
c
h
a
n
g
e
s
t
o
o
r
u
s
e
s
o
f
t
h
e
s
e
pl
a
n
s
.
A
l
l
c
h
a
n
g
e
s
t
o
t
h
e
p
l
a
n
s
m
u
s
t
b
e
i
n
w
r
i
t
i
n
g
a
n
d
mu
s
t
b
e
a
p
p
r
o
v
e
d
b
y
t
h
e
p
r
e
p
a
r
e
r
o
f
t
h
e
s
e
p
l
a
n
s
.
NO
.
BY
DA
T
E
CAUTION
RE
V
I
S
I
O
N
S
:
VERTICAL:
HORIZONTAL:
SCALE
4025 Automation Way
Suite B2
Fort Collins, CO 80525
(970) 698-6046
CivilWorxeng.com
BL
O
O
M
P
A
R
K
A
N
D
P
O
O
L
C24008
HA
R
T
F
O
R
D
H
O
M
E
S
2/
1
2
/
2
0
2
5
31
PRELIMINARY
NOT FOR
CONSTRUCTION
CO
N
S
T
R
U
C
T
I
O
N
D
E
T
A
I
L
S
N/A
N/A
29
DT12
PR
E
P
A
R
E
D
F
O
R
:
JOB NUMBER
SHEET NUMBER
SHEETSOF
DA
T
E
S
U
B
M
I
T
T
E
D
:
Th
e
e
n
g
i
n
e
e
r
p
r
e
p
a
r
i
n
g
t
h
e
s
e
p
l
a
n
s
w
i
l
l
n
o
t
b
e
r
e
s
p
o
n
s
i
b
l
e
fo
r
,
o
r
l
i
a
b
l
e
f
o
r
,
u
n
a
u
t
h
o
r
i
z
e
d
c
h
a
n
g
e
s
t
o
o
r
u
s
e
s
o
f
t
h
e
s
e
pl
a
n
s
.
A
l
l
c
h
a
n
g
e
s
t
o
t
h
e
p
l
a
n
s
m
u
s
t
b
e
i
n
w
r
i
t
i
n
g
a
n
d
mu
s
t
b
e
a
p
p
r
o
v
e
d
b
y
t
h
e
p
r
e
p
a
r
e
r
o
f
t
h
e
s
e
p
l
a
n
s
.
NO
.
BY
DA
T
E
CAUTION
RE
V
I
S
I
O
N
S
:
VERTICAL:
HORIZONTAL:
SCALE
4025 Automation Way
Suite B2
Fort Collins, CO 80525
(970) 698-6046
CivilWorxeng.com
BL
O
O
M
P
A
R
K
A
N
D
P
O
O
L
C24008
HA
R
T
F
O
R
D
H
O
M
E
S
2/
1
2
/
2
0
2
5
31
PRELIMINARY
NOT FOR
CONSTRUCTION
CO
N
S
T
R
U
C
T
I
O
N
D
E
T
A
I
L
S
N/A
N/A
30
DT13
PR
E
P
A
R
E
D
F
O
R
:
JOB NUMBER
SHEET NUMBER
SHEETSOF
DA
T
E
S
U
B
M
I
T
T
E
D
:
Th
e
e
n
g
i
n
e
e
r
p
r
e
p
a
r
i
n
g
t
h
e
s
e
p
l
a
n
s
w
i
l
l
n
o
t
b
e
r
e
s
p
o
n
s
i
b
l
e
fo
r
,
o
r
l
i
a
b
l
e
f
o
r
,
u
n
a
u
t
h
o
r
i
z
e
d
c
h
a
n
g
e
s
t
o
o
r
u
s
e
s
o
f
t
h
e
s
e
pl
a
n
s
.
A
l
l
c
h
a
n
g
e
s
t
o
t
h
e
p
l
a
n
s
m
u
s
t
b
e
i
n
w
r
i
t
i
n
g
a
n
d
mu
s
t
b
e
a
p
p
r
o
v
e
d
b
y
t
h
e
p
r
e
p
a
r
e
r
o
f
t
h
e
s
e
p
l
a
n
s
.
NO
.
BY
DA
T
E
CAUTION
RE
V
I
S
I
O
N
S
:
VERTICAL:
HORIZONTAL:
SCALE
4025 Automation Way
Suite B2
Fort Collins, CO 80525
(970) 698-6046
CivilWorxeng.com
BL
O
O
M
P
A
R
K
A
N
D
P
O
O
L
C24008
HA
R
T
F
O
R
D
H
O
M
E
S
2/
1
2
/
2
0
2
5
31
PRELIMINARY
NOT FOR
CONSTRUCTION
CO
N
S
T
R
U
C
T
I
O
N
D
E
T
A
I
L
S
N/A
N/A
31
DT14