Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutBLOOM COMMUNITY POOL & PARK - BDR250007 - SUBMITTAL DOCUMENTS - ROUND 1 - Submittal Checklist City of Development Application
Fort Collins Complete Submittal Checklist
Submittal Instructions
• A City Development Review Coordinator will be assigned to all projects - Your Development Review
Coordinator is available to assist you with the review process. If you do not have a review coordinator
assigned to your project, please contact us at 970-221-6689 or DRCoord(o)fcgov.com for assistance.
• Advanced notice of Submittal and resubmittals is appreciated - A completed copy of this checklist, all
submittal materials and fee payments are due at the time of project submittal. Please contact your
Development Review Coordinator at 970-221-6689 or DRCoord(c�fcgov.com for more submittal details
including turnaround times and next steps.
• Only complete submittals are accepted - The submittal may be returned to the applicant if any required
materials or application fees are missing or insufficient. Submittals received Monday morning through
Wednesday noon will be routed for review the same week and submittals received after Wednesday
noon will be held and routed the following week.
• This checklist shall be used in tandem with the Submittal Requirements Document. The applicant must
complete this checklist and acknowledgement of the Submittal Requirements Document.
• The applicant shall be the designated contact person who will receive correspondence from city staff
and referral agencies.
Additional Resources
• Development Review Guide and Flowchart:
https://www.fcgov.com/drg/
• Development Review Applications and Submittal Requirements Main Page:
https://www.fcqov.com/developmentreview/applications.php
• City Land Use Code:
https://www.fcgov.com/planning-development-services/Iuc
• City Utilities:
Development Forms, Guidelines & Regulations
• City Engineering main page:
https://www.fcgov.com/engineering/
• The City's Comprehensive Plans:
City Plan and Transportation Master Plan
• Online City Map Resources:
https://www.fcgov.com/gis/maps.php
• Larimer County Urban Area Street Standards:
https://www.larimer.org/engineering/standards-and-guides/urban-area-street-standards
Development Review Center 1 281 N College Ave I Fort Collins CO 80522 1 970.221.6689 1 DRCoord(c�fcgov.com
Complete Submittal Checklist:
Final Development Plan (FDP) • Basic Development Review (BDR)
Project Name: Bloom Community Pool and Park
Applicant Name: Mulberry Development, LLC
Project Type: BDR Project Number (if assigned):
rNew Submittal Revision Review Round: Submittal Date:
Project Review Meeting Date:
Development Review Coordinator: Brandy Bethurem Harras, BBethuremHarras@fcgov.com
This checklist is for the Final Review phase for all development projects (see Step 7 of the process
flowchart). This includes final detail required for Project Development Plans (PDP). The checklist shall also
be used for Basic Development Reviews (BDR) or plan amendments including Major Amendments (MJA)
and Minor Amendments (MA) as determined by staff.
All checklist items are required unless city staff indicates an item is (W)aived, (D)eferred, (N/A) Not
Applicable or already (R)eceived. If the staff code is blank, then the item is required.
This checklist must be reviewed, completed and accepted by staff prior to project routing. Additional
information may be requested from the applicant during the review process, if necessary, to address
specific issues that arise. Please note that all application materials, once submitted, become a matter of
public record.
Checklist, Submittal Forms and Fees:
Staff Applicant Item Description Submittal Requirement
Code Validation Resources
REQUIRED ❑ One copy of this checklist, completed and signed by applicant Development Review
Coordination
REQUIRED ❑ One signed copy of Development Application Form
Payment for the above application form D a6fcgov.com
970-221-(-221-6689
Payments can be made by check,debit/credit card or eCheck.
Check:Make payable to City of Fort Collins.
REQUIRED Mail to the Development Review Center,281 N College Ave,Fort Collins,
CO 80524,OR place in the blue drop box located at the west side of the building.
Card or eCheck:Would be processed at fcqov.com/CitizenAccess.
• Debit/Credit card payments include a convenience fee of 2%+$0.25 added to all
payments under$2,500.00,and 2.75%added to all payments over$2,500.00.
• ECheck payments include a convenience fee of$0.50 added to all payments
between$0.00-$99,999.99.
If choosing to pay online,your Development Review Coordinator will provide you with the
ro'ect information when the fees are available to be paid.
5/16/2024 FDP/BDR Development Application Submittal Checklist
Electronic Copies*
All copies must be provided per City file naming standards and submitted electronically. All copies must be
prepared per city PDF formatting standards.
See: Submittal Requirements Section M — File Naming Standards & PDF formatting standards
* Paper copies of plans and reports are not required during development review. See Submittal Requirements,
Section D for drawing format guidelines. All plan elements shall be clearly drawn and labelled. A scale bar must
be provided on all scaled drawings. Paper copies of plan sheets may be requested complete a timely review,
including instances when the drawing scale is not accurately depicted.
1) General Information:
Staff Applicant Item Description Submittal Requirement
Code Validation Resources
A comment response letter from the project's Conceptual Section C
Review or Preliminary Development Review staff meeting;
REQUIRED for 1st round FDP include response from the last round Development Review
PDP; or for resubmittals include a comment response letter Coordination
from the prior round of review. To receive a final copy of
the staff comment letter, contact your Development Review DRCoord anfcgov.com
Coordinator 970-221-6689
REQUIRED ® Project Information and Design Narrative
2) Planning Submittal Package:
Staff Applicant Item Description Submittal Requirement
Code Validation Resources
REQUIRED ❑ Title Block information on all plan sheets
REQUIRED Cover Page, including: Section D
Title Block
Land Use Table Section E Requirements
REQUIRED ❑ -
Sheet Index
❑ — Section D
Signature Blocks
Site Plan Notes Standard Notes
REQUIRED (also available in Word
format at the Submittal
Requirements web page)
REQUIRED Site Location Map
Section D
REQUIRED Legal Description
5/16/2024 3 FDP/BDR Development Application Submittal Checklist
REQUIRED Final Site Plan Sheet(s) (and related hardscape design Section F
detail sheets, See Section I for Requirements)
REQUIRED Final Architectural Elevation Sheet(s), Materials and other Section G
Detail Sheets (color elevations recommended)
Section H and I
Final Landscape Plan Sheet(s) Standard Notes
REQUIRED Standard city landscape notes, and related planting detail (also available in Word
sheets (See Section I for planting detail requirements) format at the Submittal
Requirements web page)
Section H
REQUIRED ❑ Preliminary Irrigation Plan Water Conservation
REQUIRED Final Lighting Plan, Photometric Plan and Lighting Detail
Sheets
Section I
REQUIRED Final Trash and Recycling Enclosure Details (include these
details with the site plan sheets or elevation sheets)
REQUIRED Confirmation that all Sheets provided incorporate City Section D
drafting and format standards
REQUIRED Staff Comments:
511612024 4 FDP/BDR Development Application Submittal Checklist
3) Final Subdivision Plat:
Staff Applicant Item Description Submittal Requirement
Code Validation Resources
A final subdivision plat of the site. This plat must conform to
the subdivision requirements of the City. The subdivision
❑ plat shall contain proper designations for public streets, Section J
easements, flood plains, floodways with base flood
elevations if required and all other public rights-of-way.
Approval by the Director for Type I Administrative Review, LUC Division 5.4
and approval by the Planning and Zoning Board for Type II Engineering Standards
Review by the Planning and Zoning Board, of the final plan
and subdivision plat, and complete execution, together with
all necessary certifications, shall be required before filing of
the subdivision plat or issuance of building permits. City Contact(
• Technical
Services—
Jeff County,
nty
Each residential lot on the subdivision plat shall identify if JCountynty com
the garage door(s) is recessed behind the front face of the . Surveying—
building, located on one of the other sides of the building, John Von Nieda
detached from the building or located to the front of the front JVonNieda(cDfcgov.com
face of the building.
Please note that, with the Recording submittal, the subdivision
REQUIRED plat is required to be provided in CAD format at time of
recordation. The CAD file for plat must be set up to be in
conformance with GIS's Subdivision Plat Digital Submittal
Standards. Refer to the Recording Submittal Checklist which
will be provided by your Development Review Coordinator.
Monument Records
Closure Report
511612024 5 FDP/BDR Development Application Submittal Checklist
4) Final Utility Plans (Civil Construction Plans):
Staff Applicant Item Description Submittal Requirement
Code Validation Resources
REQUIRED ❑ Cover Sheet Utility Plans Checklist.pdf
City Contact: Engineering
REQUIRED Standard Notes Sheet Development Review
EngDevRev(cDfcgov.com
970-221-6605
REQUIRED ❑ Existing Conditions and/or Demolition Plan
REQUIRED ❑ Overall Grading Plan
REQUIRED ❑ Detailed Grading Plan Sheets
REQUIRED ❑ Overall Utility Plan Sheet
REQUIRED ❑ Detailed Utility Plan Sheets
REQUIRED ❑ Sanitary Sewer Plan and Profile Sheets
REQUIRED ❑ Storm Sewer Plan and Profile Sheets
REQUIRED ❑ Water Plan and Profile Sheets
REQUIRED ❑ Street Plan and Profile Sheets
REQUIRED Street Cross-sections
REQUIRED ❑ City of Fort Collins Standard Construction Details
5/16/2024 6 FDP/BDR Development Application Submittal Checklist
5) Final Drainage and Erosion Control Report:
Staff Applicant Item Description Submittal Requirement
Code Validation Resources
Final Drainage and Erosion Control Report may include Stormwater Criteria Manual
the following: Resource Page
Stormwater Criteria Manual
Items from the PDP Checklist: Appendices:
-I Detention Requirements and Calculations
A. Required Submittal
El Offsite Flows Content
B. Stormwater Facilities
Floodplain Zone-- Contact Floodplain Landscape Standards
Administration staff at 970-416-2632 forquestions C. LID Implementation
Hydraulic Calculations D. Erosion Control
Guidance
-I Detention Basin Calculations E. Erosion Control
=I Standard Water Quality and LID Calculations Construction Measures
Fact Sheets
_I Include Drainage Plan or Exhibit in the report F. Erosion Control
REQUIRED Construction Measures
Standard Notes
Additional Final Items:
I Hydraulic Calculations City Utilities:
Development Forms,
❑ Four Step Process Guidelines & Regulations
Li SDI Data Spreadsheet(if required)
CI Erosion Control Materials For Stormwater or
Floodplain questions,
contact:
waterutilitieseng(c
Note: All items shown above are components that may fcqov.com
be necessary with a drainage report analysis. Not all 970-221-6689
components may be necessary. The drainage report
analysis must be prepared by a professional engineer.
Erosion Control Information:
www.fcqov.com/erosion
511612024 7 FDP/BDR Development Application Submittal Checklist
6) Final Reports and Supporting Documents:
Staff Applicant Item Description Submittal Requirement
Code Validation Resources
Building Services: Please Note: Building
Permits will not be reviewed
REQUIRED PRIOR TO FDP SUBMITTAL until Development Plan
Building Services Presubmittal Meeting: review process is completed
Confirmation of completed Pre-Submittal Code Feasibility and recorded.
Meeting Meeting with Building Services.
Date: Building Codes and
New Commercial Projects require a pre-submittal meeting for Standards
REQUIRED building code feasibility. This typically takes place when
drawings are 50% complete and in the mid phases of the
(mm/dd/yy) Development Review Process, and prior to Building Permit Building Permit Fees
Submittal.
Applicants are encouraged to review building requirements as
early as possible in the process. For questions or to schedule
this meeting contact your Development Review Coordinator.
Planning Services:
REQUIRED :1 Perspective views of the Building Exterior
(Incorporated into the building elevation sheets) Section G
REQUIRED - Electronic Building Material Sample Board
(Physical board maybe required upon request)
Neighborhood Context Plan
REQUIRED ❑ (Overall site plan diagram indicating surrounding Section C
neighborhood features, to be incorporated into Site
Plan sheets or cover page)
_H Land Use Code Modification and Alternative Compliance LUC Division 6.8
REQUIRED El Requests; staff review, and approval required prior to City Contact: Planning
Development Review Completion Services
(If Modifications are proposed) planning(a-)fcgov.com
970-416-4311
n Parking Alternative Compliance Studies LUC Section 5.9.1(K)
City Contact: Planning
REQUIRED „ Guidelines for these studies are held by the Director Services
Parking Impact Study Guidelines planning(cDfcgov.com
(If Alternative Compliance is proposed) 970-416-4311
Certification of Mineral Estate
REQUIRED D Certification of Notice to Mineral Owner(s) Owner Notification
*If provided with PDP please submit same copy C.R.S.A§24-65.5-103
LUC Section 5.17
FCMC $26-148 to -150
REQUIRED _i Water Adequacy Determination & Demand City Contact: Planning
Summary Worksheet Services
planninq(cDfcgov.com
970-416-4311
511612024 8 FDP/BDR Development Application Submittal Checklist
Staff Applicant Item Description Submittal Requirement
Code Validation Resources
Development Review Engineering:
❑ - Soils Report
REQUIRED Larimer County Urban Area
In conformance with the Larimer County Urban Area Street Standards
Street Standards
REQUIRED -i Subsurface Hydrologic Study
Development Agreement Information Form Engineering Main Page
City Contact: Engineering
REQUIRED C Recorded Statement of Authority (§38-30-172, C.R.S.)for Development Review
❑ Developer and/or Owner[whoever will be signing the EngDevRev(aVcgov.com
Development Agreement] 970-221-6605
REQUIRED ❑ Final legal descriptions for accompanying deeds of Easement and Right-of-Way
dedication by separate document Dedication Process
REQUIRED F-1 F ii Final legal descriptions for accompanying easement Vacation of Easements
vacation request by separate document Process
❑ Closure Report for any Easements and/or Right of REQUIRED ❑
Ways submitted for review.
REQUIRED -i Approved and Signed Engineering or Utility Variance Larimer County Urban Area
Requests Street Standards
Traffic Operations:
_ Transportation Impact Study(TIS) OR waiver Traffic Operations
Resource Page
REQUIRED indicated from Traffic Operations staff
City Contact:
(Waiver indication to be provided with initial submittal) Traffic Operations
970-221-6630
Utilities — Environmental Engineering: City Utilities: Development
REQUIRED g. g' Forms. Guidelines &
Erosion Control Cost Estimate Regulations
REQUIRED Utilities — Electric Systems Engineering: City Utilities: Development
Forms, Guidelines &
Electric Utility Service G-1 Fora Regulations
REQUIRED ❑ Utilities —Water Development Fees: City Utilities: Water
❑ Water Fee Form development fees page
511612024 9 FDP/BDR Development Application Submittal Checklist
Staff Applicant Item Description Submittal Requirement
Code Validation Resources
Environmental Planning: Section J
Ecological Characterization Study (ECS) Section H
LUC Section 5.6.1
REQUIRED If an ECS is required, this must be submitted at least
ten days prior to the development review application. A City Contact:
copy shall also be submitted at the time of the Environmental Planning
application with this checklist. 970-416-4311
:i Phase 1 Environmental Site Assessment
REQUIRED ❑ Has there been previous uses on the site that could To be provided by qualified
cause contamination of some sort? i.e., mechanic third-party consultant
shops, quick lube shops, chemical storage/processing,
manufacturing, gas stations or anything with fuel
storage (above or below ground), dry cleaners, etc.
City Forestry:
Fi Existing Tree Inventory Plan
REQUIRED Prior to the review submittal, the applicant must
schedule an on-site meeting with City Forestry to
obtain tree inventory information for all existing trees
within the development area. The meeting is also See Submittal Requirements
intended to discuss any proposed tree removal. Sections H and L for more
information regarding
documentation of existing and
PLEASE NOTE THAT EXISTING TREES SHOULD proposed trees on landscape
NOT BE REMOVED OR DAMAGED PRIOR TO plans
SUBMITTAL, REVIEW AND APPROVAL OF THE
PROPOSED DEVELOPMENT. City Contact:
City Forestry
❑ -i Existing Tree Removal Feasibility Request forestryCubfcgov.com
REQUIRED 970.221.6660
Provide a letter to City Forestry outlining the justification
for the removal of any existing trees, if proposed. City Forestry Resources:
www.fcqov.com/forestr
Land Use Code Section:
Existing Tree Mitigation Plan 5.10.1(F) Tree Preservation
and Mitigation
❑ At your site meeting, City Forestry will determine the Replacement
REQUIRED characteristics and mitigation requirements for all
existing trees within the project's proposed Limits of
Disturbance.
(If tree removal is proposed).
511612024 10 FDP/BDR Development Application Submittal Checklist
Other information and data as required for the full
and complete consideration of the development(to
be completed by City staff):
REQUIRED
Hazardous Materials Impact Analysis.
Any special wildlife,wetland, natural habitats and
features, ecological or environmental study or mapping
pursuant to Section 5.4 and 5.6 of the Land Use Code
as requested by the Director.
Other items required:
City Contact: Development
Review Coordination
DRCoord(a)fcgov.com
970-221-6689
Applicant Acknowledgement:
I have reviewed the Development Application Submittal Requirements, Sections A—M. All documents submitted
are complete and the Development Application Submittal Requirements have been incorporated into the plans
(See Development Application Submittal Requirements for detailed description of requirements). All documents
submitted have been compared and consistent design information is shown on all plan sheets and reports.
I understand that submittal requirements not sufficiently addressed or deferred may result in added review time.
Applicant Signature: Date:
t
Phone: 970-674-1109 ext. 128 Email: jthorpe@hartfordco.com
(See Development Application Submittal Requirements for detailed description of requirements)
511612024 11 FDP/BDR Development Application Submittal Checklist