HomeMy WebLinkAboutReports - Drainage - 01/08/2025 Fort Collins | Greeley | (970) 221-4158 | epsgroupinc.com Final Drainage Memorandum For 300 E. Mountain Avenue Dated: January 7, 2024 Fort Collins, Colorado Developer Mountain 300, LLC 1130 N. Alma School Road, Suite 120 Mesa, AZ 85201 o: 480.503.2250 f: 480.503.2258 Project No. 2102-001 Date: January 2025 EPS Group Fort Collins | Greeley 970.221.4158 epsgroupinc.com Fort Collins | Greeley | (970) 221-4158 | epsgroupinc.com January 8, 2025` City of Fort Collins Stormwater Utility 700 Wood Street Fort Collins, Colorado 80521 RE: Final Drainage Memorandum for 300 E. Mountain Avenue Dear Staff: EPS Group is pleased to submit this Final Drainage Memorandum for your review. This memorandum accompanies the Basic Development Review submittal for the proposed 300 E. Mountain Avenue. This memorandum has been prepared in accordance to Fort Collins Stormwater Criteria Manual (FCSCM), and serves to document the stormwater impacts associated with the proposed project. We understand that review by the City is to assure general compliance with standardized criteria contained in the FCSCM. If you should have any questions as you review this memorandum, please feel free to contact us. Sincerely, EPS GROUP, INC. Amber Ortiz Cragg, PE Blaine Mathisen, PE Project Engineer Project Manager ATTACHMENTS: • Rational Calculations • Sidewalk Chase Capacity Calculation • Cash-In-Lieu LID Spreadsheet • Existing and Proposed Drainage Exhibit – 300 E. Mountain Avenue FINAL DRAINAGE MEMORANDUM Fort Collins | Greeley | (970) 221-4158 | epsgroupinc.com 3 GENERAL LOCATION AND DESCRIPTION Figure 1: Vicinity Map PROPERTY DESCRIPTION The project Site of 300 East Mountain Avenue is located in the southwest quarter of Section 12, Township 7 North, Range 69 West of the 6th Principal Meridian, City of Fort Collins, County of Larimer, State of Colorado. The project Site is the northeast corner lot at the intersection of Chestnut Street and Mountain Avenue. The Site is currently composed of the remains of a demolished existing building and street parking. Existing ground slopes are flat through the interior of the property. General topography slopes from south to north. As this is an infill site, the area surrounding the site is fully developed. According to the United States Department of Agriculture (USDA) Natural Resources Conservation Service (NRCS) Soil Survey website: http://websoilsurvey.nrcs.usda.gov/app/WebSoilSurvey.aspx, the site consists of Satanta loam (Hydrologic Soil Group C). The proposed project Site Plan is composed of the development of a new commercial building where the former Lyric used to be. Associated site work includes the demolition of the existing building, which occurred in September 2024, and a proposed new building within the same footprint. Sidewalk, curb and gutter will be replaced along the north and south sides of the site to achieve sidewalk grades no steeper than 2% cross slope. Existing utility services will be utilized for the proposed building. The development area is roughly 0.2 net acres. This developed building is 0.09-acres and the improved area north the building Site is 0.10-acre, while the improved area south of the building is 0.03-acre. There are no known irrigation laterals crossing the site. The project site is not encroached by any City or FEMA designated 100-year floodplain. The Site can be found within the limits of FIRM Map 08069C0979H, Panel 979 of 1420, dated May 2, 2012. FINAL DRAINAGE MEMORANDUM Fort Collins | Greeley | (970) 221-4158 | epsgroupinc.com 4 DRAINAGE BASINS MAJOR BASIN DESCRIPTION The project site lies within the Old Town Basin. Detention requirements for this basin are to detain the difference between the 100-year developed inflow rate and the historic 2-year release rate if there is an increase in impervious area greater than 5,000 square feet. The proposed project does not increase the impervious area by 5,000 square feet; therefore no detention is required. The site building will have a roof drain connection along the Chestnut Street side where it will discharge into a sidewalk chase. From there the runoff will enter the curb and gutter and flow north where it eventually is captured by an inlet at the southeast corner of the Jefferson Street and Chestnut Street intersection. From there the runoff is routed into the existing storm sewer system in Chestnut Street, which conveys flows into the Cache La Poudre River. The subject property historically drains overland from northwest to southeast. Runoff from the site and adjacent paved areas have historically been collected in existing inlets located within Chestnut Street and Mountain Ave. It is not feasible to connect the roof drain to the existing 30” RCP Storm Sewer in Chestnut Street because of an existing 8” VCP Sanitary Sewer main as well as a 24”x30” concrete electrical duct bank that runs roughly 5”-11” below existing grade near the lip of the east gutter. The electrical duct was potholed in December of 2024. Due to the vertical location of these existing utilities running an 8” HP HDPE pipe from the downspout connection to the existing 30” RCP does not allow us to meet minimum vertical separation. Additionally, it is not feasible to relocate the existing 24”x30” concrete electrical duct. DRAINAGE DESIGN CRITERIA FOUR STEP PROCESS The overall stormwater management strategy employed with the proposed project utilizes the “Four Step Process” to minimize adverse impacts of urbanization on receiving waters. The following is a description of how the proposed development has incorporated each step. Figure 2: Existing Site Conditions – Looking northeast FINAL DRAINAGE MEMORANDUM Fort Collins | Greeley | (970) 221-4158 | epsgroupinc.com 5 Step 1 – Employ Runoff Reduction Practices Techniques have been utilized with the proposed development to facilitate the reduction of runoff peaks, volumes, and pollutant loads as the site: i. Conserving existing amenities at the site including the existing 4 mature trees within tree wells. Tree grates are proposed for the existing 4 mature trees to provide protection from soil compaction. ii. Proposed a new landscape area of 160 square feet with a new tree on the north side of the building. A tree grate will provide protection from soil compaction. Step 2 – Implement BMPs That Provide a Water Quality Capture Volume (WQCV) with Slow Release The efforts taken in Step 1 will facilitate the reduction of runoff; however, urban development of this intensity will still generate stormwater runoff that will require additional BMPs and water quality. With the constraints of this infill Site, WQCV will be provided offsite at the discretion of the City of Fort Collins. The main constraint of the Site is the limited space to accommodate WQCV that is outside of the right-of-way and outside of the building footprint. An additional constraint of the Site is the limited ability to change elevations of the adjacent site hardscapes and the entry elevations of the proposed building. City leadership discussed and agreed with the Applicant Team to waive LID requirements for this Site. i. City Leadership discussed with the Applicant Team to waive LID requirements for this Site with the condition that the Applicant include Cash-in-Lieu for LID requirements that can be used for larger regional projects. The value of $43,070 was calculated by the City of Fort Collins by completing a 50-year life cycle analysis using the 2017 Urban Drainages (MHFD) model. The final cost to be paid by the Applicant will be inflated to 2025-dollar value. Refer to “Cash-in-Lieu” spreadsheet that was provided by the City in the Appendix of this Memo. Step 3 – Stabilize Streams There are no streams or major drainageways within the subject property or directly adjacent to it. While this step may not seem applicable to proposed development, the project indirectly helps achieve stabilized drainageways nonetheless by providing funds as cash-in-lieu to the City for regional water quality control projects. Furthermore, this project will pay one- time stormwater development fees, as well as ongoing monthly stormwater utility fees, both of which help achieve City- wide drainageway stability. Step 4 – Implement Site Specific and Other Source Control BMPs. The proposed project will improve upon site specific source controls compared to historic conditions: i. The trash enclosure will remain in the existing location for the Site which is away from Storm Inlets and offsite rain gardens. Trash will be placed directly into the bins in the designated enclosure. ii. During construction material storage areas will be placed away from Storm Inlets and offsite rain gardens. HYDROLOGICAL CRITERIA 1. The City of Fort Collins Rainfall Intensity-Duration-Frequency Curves, as depicted in Figure 3.4-1 of the FCSCM, serve as the source for all hydrologic computations associated with the proposed development. Tabulated data contained in Table 3.4-1 has been utilized for Rational Method runoff calculations. 2. The Rational Method has been employed to compute stormwater runoff utilizing coefficients contained in Table 3.2-2 of the FCSCM. 3. Three separate design storms have been utilized to address distinct drainage scenarios. The first event analyzed is the “Minor,” or “Initial” Storm, which has a 2-year recurrence interval. The second storm computed, for comparison FINAL DRAINAGE MEMORANDUM Fort Collins | Greeley | (970) 221-4158 | epsgroupinc.com 6 purposes only, is the 10-year event. The third event considered is the “Major Storm,” which has a 100-year recurrence interval. 4. No other assumptions or calculation methods have been used with this development that are not referenced by current City of Fort Collins criteria. MODIFICATIONS OF CRITERIA This project Site proposed a variance to the LID requirement that will be approved by the Applicant providing Cash-in- Lieu for City regional LID projects. Refer to the Cash-in-Lieu spreadsheet, that was prepared by the City, in the Attachments for further clarification. DRAINAGE FACILTY DESIGN GENERAL CONCEPT The main objectives of the project drainage design are to maintain existing drainage patterns, and to ensure no adverse impacts to any adjacent properties. Basin A1 Basin A1 consists of the new building that encompasses the extent of the Lot. The existing building has been removed and a temporary asphalt layer has been placed on the surface. The proposed extents of the building and roof will match the existing condition, having a 95% imperviousness for the basin. Drainage from the rooftop will be captured within a roof drain system, which will be tied to a proposed 2’ sidewalk chase in Chestnut Street. In a major storm event, it is calculated that 0.9-cfs will be collected from the rooftop and be conveyed through the proposed sidewalk chase to the existing Chestnut Street curb and gutter where it will eventually be captured by an existing inlet at the intersection of Jefferson St and Chestnut St. From there the runoff will be routed via the existing storm infrastructure to the Cache La Poudre River Proposed hydraulic calculations with 100-year hydraulic grade line (HGL) are attached. Basins A2 Basins A2 consists of a portion of the adjacent Right of Way of Chestnut Street to the north of the building that is being rebuilt. This basin limit matches the extent of asphalt, curb, and sidewalk improvements to reconstruct sidewalk grades to be 2% maximum cross slope. The existing flowline along the curb varies between surveyed points and appears to have a section that is near 0.5% for approximately 40-ft between the existing trees adjacent to the Site. The sidewalk cross slope varies between 3% and 5% towards the parking area and curb. Proposed improvements in this basin include sidewalk reconstruction with a 2% maximum cross slope, 0.57% gutter flowline grade that brings up the curb and gutter about 3- inches from existing grades. Stormwater continues to flow northeast along the curb and gutter to an existing inlet at the corner of Chestnut Street and Jefferson Street where stormwater drains into the existing below ground storm pipe system. In a major storm event, it is calculated that 1.0-cfs will be collected from this basin, the same flowrate as existing conditions. Basins A3 Basins A3 consists of a portion of the adjacent Right of Way of Mountain Avenue to the south of the building that is being rebuilt. This basin limit matches the extent of sidewalk improvements to reconstruct sidewalk grades to be 2% maximum cross slope. The existing sidewalk cross slope varies between 2% and 3% towards the curb. Proposed improvements in this basin include sidewalk reconstruction with a 2% maximum cross slope, bringing down the sidewalk down about 2-inches from existing grades adjacent to the proposed building. Stormwater continues to sheet flow south from the sidewalk over the curb into the gutter to an existing inlet at the corner of Mountain Avenue and Jefferson Street where stormwater drains into the existing below ground storm pipe system. In a major storm event, it is calculated that 0.3-cfs will be collected from this basin, the same flowrate as existing conditions. Runoff computations for these basins based on the Rational Method and the Drainage Exhibit can be found at the end of this memorandum. FINAL DRAINAGE MEMORANDUM Fort Collins | Greeley | (970) 221-4158 | epsgroupinc.com 7 CONCLUSIONS COMPLIANCE WITH STANDARDS 1. The drainage design proposed with the proposed project complies with the City of Fort Collins’ Stormwater Criteria Manual. 2. The drainage design proposed with this project complies with requirements for the Old Town Basin. 3. The drainage plan and stormwater management measures proposed with the proposed development are compliant with all applicable State and Federal regulations governing stormwater discharge. DRAINAGE CONCEPT 1. The drainage design proposed with this project will effectively limit any potential damage associated with its stormwater runoff by compliance with requirements set forth in current City master plans. 2. The drainage concept for the proposed development is consistent with requirements for the Old Town Basin and the Downtown River District Final Design Report. REFERENCES 1. Fort Collins Stormwater Criteria Manual, City of Fort Collins, Colorado, as adopted by Ordinance No. 159, December 2018, and referenced in Section 26-500 (c) of the City of Fort Collins Municipal Code. 2. Urban Storm Drainage Criteria Manual, Volumes 1 & 2, Urban Drainage and Flood Control District, Wright- McLaughlin Engineers, Denver, Colorado, January 2016 and Partially Updated March 2024. 3. Urban Storm Drainage Criteria Manual, Volumes 3, Urban Drainage and Flood Control District, Wright- McLaughlin Engineers, Denver, Colorado, November 2010 and Partially Updated March 2024. ATTACHMENT Fort Collins | Greeley | (970) 221-4158 | epsgroupinc.com RATIONAL CALCULATIONS EPS Group Runoff Coefficient1 Percent Impervious1 Project: Location: 0.10 2%Calc. By: 0.95 95%Date: 0.95 95% 0.00 0% 0.00 0% 0.00 0% Basin ID Basin Area (sq.ft.) Basin Area (acres) Lawns, Sandy Soil, Flat Slope < 2% (acres) Asphalt, Concrete (acres)Rooftop (acres)Percent Impervious C2*Cf Cf = 1.00 C5*Cf Cf = 1.00 C10*Cf Cf = 1.00 C100*Cf Cf = 1.25 A1 - Building 3,884 0.09 0.00 0.00 0.09 0.00 0.00 95%0.95 0.95 0.95 1.00 A2 - Chestnut Exist 4,533 0.10 0.00 0.10 0.00 0.00 0.00 94%0.94 0.94 0.94 1.00 A2 - Chestnut Proposed 4,533 0.10 0.01 0.10 0.00 0.00 0.00 90%0.91 0.91 0.91 1.00 A3 - Mountain 1,185 0.03 0.00 0.03 0.00 0.00 0.00 95%0.95 0.95 0.95 1.00 Lawns and Landscaping: 2) Composite Runoff Coefficient adjusted per Table 3.2-3 of the Fort Collins Stormwater Manual (FCSM).USDA SOIL TYPE: C Composite Runoff Coefficient2 1) Runoff coefficients per Tables 3.2-1 & 3.2 of the FCSM. Percent impervious per Tables 4.1-2 & 4.1-3 of the FCSM. DEVELOPED RUNOFF COEFFICIENT CALCULATIONS Lawns, Sandy Soil, Flat Slope < 2% Asphalt, Concrete Rooftop Streets, Parking Lots, Roofs, Alleys, and Drives: Character of Surface:300 E. Mountain Ave Fort Collins Amber Ortiz Cragg January 6, 2025 Page 1 of 1 EPS Group Where: Length (ft) Slope (%) Ti 2-Yr (min) Ti 10-Yr (min) Ti 100-Yr (min) Length (ft) Slope (%)Surface n Flow Area3 (sq.ft.) WP3 (ft)R (ft)V (ft/s) Tt (min) Max. Tc (min) Comp. Tc 2-Yr (min) Tc 2-Yr (min) Comp. Tc 10-Yr (min) Tc 10-Yr (min) Comp. Tc 100- Yr (min) Tc 100-Yr (min) A1 A1 - Building 50 0.50%2.50 2.50 1.67 50 1.00%Gutter 0.035 3.61 19.18 0.19 1.40 0.60 10.56 3.09 5.00 3.09 5.00 2.26 5.00 A2 A2 - Chestnut Exist 18 3.00%0.89 0.89 0.55 120 0.60% Gutter 0.035 3.61 19.18 0.19 1.08 1.85 10.77 2.73 5.00 2.73 5.00 2.40 5.00 A2 A2 - Chestnut Proposed 18 3.00%1.05 1.05 0.55 120 0.60% Gutter 0.035 3.61 19.18 0.19 1.08 1.85 10.77 2.90 5.00 2.90 5.00 2.40 5.00 A3 A3 - Mountain 15 2.00%0.86 0.86 0.57 50 1.00% Gutter 0.035 3.61 19.18 0.19 1.40 0.60 10.36 1.46 5.00 1.46 5.00 1.17 5.00 Design Point Basin ID Overland Flow Channelized Flow Time of Concentration DEVELOPED TIME OF CONCENTRATION COMPUTATIONS Location: Maximum Tc:Overland Flow, Time of Concentration: Channelized Flow, Velocity: Channelized Flow, Time of Concentration: 300 E. Mountain Ave Fort Collins Amber Ortiz Cragg January 6, 2025 Project: Calculations By: Date: Notes S = Longitudinal Slope, feet/feet R = Hydraulic Radius (feet) n = Roughness Coefficient V = Velocity (ft/sec) WP = Wetted Perimeter (ft) (Equation 3.3-2 per Fort Collins =1.87 1.1 − ∗   =1.49 ∗ /∗ (Equation 5-4 per Fort Collins  = 180 + 10 (Equation 3.3-5 per Fort Collins Stormwater Manual)  =  ∗ 60 (Equation 5-5 per Fort Collins 1) Add 4900 to all elevations. 2) Per Fort Collins Stormwater Manual, minimum Tc = 5 min. 3) Assume a water depth of 6" and a typical curb and gutter per Larimer County Urban Street Standard Detail 701 for curb and gutter channelized flow. Assume a water depth of 1', fixed side slopes, and a triangular swale section for grass channelized flow. Assume a water depth of 1', 4:1 side slopes, and a 2' wide valley pan for channelized flow in a valley pan. Page 1 of 1 EPS Group Tc2 Tc10 Tc100 C2 C10 C100 I2 I10 I100 Q2 Q10 Q100 Q2 Q10 Q100 A1 A1 - Building 0.09 5.0 5.0 5.0 1.0 1.0 1.0 2.9 4.9 10.0 0.2 0.4 0.9 108.3 185.1 398.2 A2 A2 - Chestnut Exist 0.10 5.0 5.0 5.0 0.9 0.9 1.0 2.9 4.9 10.0 0.3 0.5 1.0 124.9 213.5 464.7 A2 A2 - Chestnut Proposed 0.10 5.0 5.0 5.0 0.9 0.9 1.0 2.9 4.9 10.0 0.3 0.5 1.0 121.0 206.7 464.7 A3 A3 - Mountain 0.03 5.0 5.0 5.0 1.0 1.0 1.0 2.9 4.9 10.0 0.1 0.1 0.3 33.1 56.5 121.5 Flow (gpm) DEVELOPED DIRECT RUNOFF COMPUTATIONS Date: Fort Collins Project: Location: Calc. By: Intensity (in/hr)Flow (cfs) 300 E. Mountain Ave Amber Ortiz Cragg January 6, 2025 Design Point Basin Intensity, I, from Fig. 3.4.1 Fort Collins Stormwater Manual. Rational Equation: Q = CiA (Equation 6-1 per MHFD) Area (acres) Runoff CTc (Min) Page 1 of 1 ATTACHMENT Fort Collins | Greeley | (970) 221-4158 | epsgroupinc.com SIDEWALK CHASE CALCULATIONS Channel Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Tuesday, Jan 7 2025 Sidewalk Chase Rectangular Bottom Width (ft) = 2.00 Total Depth (ft) = 0.50 Invert Elev (ft) = 1.00 Slope (%) = 1.90 N-Value = 0.013 Calculations Compute by: Known Q Known Q (cfs) = 0.89 Highlighted Depth (ft) = 0.13 Q (cfs) = 0.890 Area (sqft) = 0.26 Velocity (ft/s) = 3.42 Wetted Perim (ft) = 2.26 Crit Depth, Yc (ft) = 0.19 Top Width (ft) = 2.00 EGL (ft) = 0.31 0 .5 1 1.5 2 2.5 3 Elev (ft)Depth (ft)Section 0.75 -0.25 1.00 0.00 1.25 0.25 1.50 0.50 1.75 0.75 2.00 1.00 Reach (ft) ATTACHMENT Fort Collins | Greeley | (970) 221-4158 | epsgroupinc.com CASH-IN-LIEU SPREADSHEET This spreadsheet came from Nicole Poncelet-Johnson on December 23, 2024 Below is the email from Nicole with stated instructions: The team completed a 50-year life cycle analysis using Urban Drainages (MHFD) model. Please see the estimated “cash-in-lieu” amount and associated assumption (with more detail in the attached spreadsheet). We would be happy to discuss the assumptions with your team. Note these funds would be used for larger regional projects, like the Oak Street stormwater gardens or the wetland improvements that treat stormwater from downtown. TOTAL: $43,070 The resulting costs are calculated in 2017 dollars, so an inflation factor will be needed to bring these to today’s dollars. The cost of land is built into the capital cost calculation, so we did not utilize Real Estates estimate of $90/SF for land in Old Town. We did not modify any of the parameters from the spreadsheet for rehabilitation, maintenance, or administrative costs either. We felt that utilizing the default values may be the most straightforward approach. Page 1/3 Project: 300 E. Mountain Description: * *Note: E. coli reported in $/1012 cfu removed. Totals Summary of Average Annual Runoff Results 4,798 2,727 43% Yes 8141 $6,288 #N/A 2,727 $550,200 Costs based on ENR CCI = For Month/Year = For Location = 0 Discharge to Receiving Water 5.03E+08 0 $19,820 NPVC of Capital Costs 76% NPVC of Administrative Costs NPVC of Maintenance Costs NPVC of Rehabilitation Costs $13,628 Peak Flow Control Summary of Net Present Value of Costs Aug-09 DenverE. coli 1 Watershed Runoff 4,798 43% Runoff Reduction $3,334 D. Copper TP TN Subcatchm ent No.(ft3/yr) 0 D. Zinc T. Zinc 0 0 0 2.07E+09 Other (ft3/yr) (%) 0 0 UDFCD BMP-REALCOST Model Results Worksheet Summary of Water Quality Results Constituent Discharged Pollutant Load T. Copper 0 $50 ($/lb) TSS 0 1 0 23 77% (lb/yr) Pollutant Reduction Cost per Unit Removed Be sure to update report if changes to model inputs have been made TKN $68,790 $1,670 0 Watershed Pollutant Load (lb/yr) 5 (%) 0 1 0 #N/A 62% 71% 53% 74% $664,070 $892,900 25% 66% 36% $393,440 $68,060 $2,740 All Costs for 50 years $3,334$13,628 $6,288 Total NPVC $43,070 $19,820 Update Summary Report Page 2/3 Project: 300 E. Mountain Description: Annual Runoff Volume Reduction Summary UDFCD BMP-REALCOST Model Results Worksheet Summary of Watershed and Discharged Pollutant Loads 1.0E+00 1.0E+01 1.0E+02 1.0E+03 1.0E+04 1.0E+05 1.0E+06 1.0E+07 1.0E+08 1.0E+09 1.0E+10 0 1 10 100 TSS TP TN TKN T. Zinc D. Zinc T. Copper D. Copper Other E. coli An n u a l E c o l i C o u n t ( # ) An n u a l P o l l u t a n t L o a d ( l b ) Watershed Pollutant Loading Discharged Pollutant Loading 2,727 - 323 2,394 Total Runoff Discharged (CF) Runoff Reduced due to Source Controls (CF) Runoff Reduced due to BMPs (CF) Page 1/2 Project:300 E. Mountain Description: Subcatchmen t No. Subcatchment ID Area (ac) Land Use Total Imperviousn ess (%) Source Control (LID) Effective Impervious ness (%) NRCS Soil Type Subarea Slope (%) Effective Runoff Coefficient 1 1 0.09 Commercial 100% Level 0 100% C 1.00% 0.95 0.1 Area-Weighted Imperviousness 100.00% 100.00% 0.95 Watershed Parameters Watershed Summary Total Area Area-Weighted Runoff Coefficient UDFCD BMP-REALCOST Model Input Parameters Worksheet Mean Storm Depth (in) Default Default Project-Specific Precipitation and Cost Parameters Planning Horizon (yrs) Other 15.8 0.82 0.6 Buttons for Automating Watershed Parameter Inputs Default Default Current/Regional ENR CCI Mean Annual Precipitation (in) 2-Year, 1-Hour Precipitation (in) User-Entered 50 Default Rate of Return (%) Admin. Costs as % of Maint. (%) Select Location for Precip. Values Inflation Rate (%)4.60% 5.00% 12.00% 8141 Enter Default Imperviousness Values Calculate Runoff Coefficients Calculate Effective Imperviousness Restore Default Values ? ? ? ? ? ? ? ? ? ? ? ? Import Inputs from another workbook Page 2/2 Project:300 E. Mountain Description: After entering all required information on the left, select whether you want to use regional-scale BMPs or local scale BMPs Regional BMPs - Select the Regional BMP option button, then select a BMP from the drop-down box, then click on the "Calculate BMP Sizes" button Subarea No.Area (ac)Regional BMP Selection WQCV/EURV (AF)BMP Size Units Subarea No. Area (ac) Site BMP Selection Total Impervious Acres (IA) per BMP or PP Run-on Area PP Surface Area (acres) WQCV/EUR V (AF) BMP Size Units No. of BMPs 1 0 Bioretention - Underdrain 0.09 0.00 0.00 182.34 CF 1 0.00 1Total Water Quality Control Volume within watershed (Acre- BMP Summary Total # of BMPs UDFCD BMP-REALCOST Model Input Parameters Worksheet Land Cost/ac Local BMPs - Select the Local BMP option button, select a BMP for each subarea, enter the number of impervious acres draining to each BMP, then click on the "Calculate BMP Sizes" button Calculate BMP Sizes Select Regional-Control BMP Select Site-Control BMP BMP-REALCOST Best Management Practices – Rational Estimation of Actual Likely Costs of Stormwater Treatment A SPREADSHEET TOOL FOR EVALUATING BMP EFFECTIVENESS AND LIFE CYCLE COSTS User’s Manual and Documentation Version 2.0 November 2017 Prepared by: Chris Olson Larry A. Roesner Colorado State University Department of Civil and Environmental Engineering Fort Collins, CO 80523 Ben Urbonas Urban Watersheds Research Institute Denver, CO Ken MacKenzie and Holly Piza Urban Drainage Flood Control District 2480 West 26th Avenue Suite 156-B Denver, Colorado 80211 Jane Clary and Andrew Earles (2017 Update) Wright Water Engineers, Inc. 2490 W. 26th Ave., Suite 100A Denver, CO 80211 ATTACHMENT Fort Collins | Greeley | (970) 221-4158 | epsgroupinc.com MAP POCKET X VAULT ELEC ELEC ELEC TRAFFIC VAULT VAULT ELEC CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR VAULT ELEC ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ELE C BRK R G F.O. C.O.V.P. CSCS WV WV S D D S WV WV G ELE C T T F.O. VAULT ELEC G ELEC F.O . VAU L T S S MOUNTAIN AVENUE SITE CH E S T N U T S T R E E T (10 0 ' R O W ) THE ARMORY BUILDING CHESTNUT STREET ALLEY A1 A2 A1 A2 A3 A3 ELI Z A B E T H DO W N T O W N H O T E L 111 C H E S T N U T S T R E E T MOUNTAIN AVE. 334 E MOUNTAIN AVENUE THE ARMORY 314 E MOUNTAIN AVENUE X VAULT ELEC ELEC ELEC TRAFFIC VAULT VAULT ELEC CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR VAULT ELEC ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ELE C BRK R G F.O. C.O.V.P. CSCS WV WV S D D S WV WV G ELE C T T F.O. VAULT ELEC G ELEC F.O . VAU L T S S MOUNTAIN AVENUE SITE CH E S T N U T S T R E E T (10 0 ' R O W ) THE ARMORY BUILDING CHESTNUT STREET ALLEY A1 A2 A1 A2 PROPOSED ROOF DRAIN CONNECTION TO STORM LINE. PROPOSED LANDSCAPE AREA A3 A3 ELI Z A B E T H DO W N T O W N H O T E L 111 C H E S T N U T S T R E E T MOUNTAIN AVE. 334 E MOUNTAIN AVENUE THE ARMORY 314 E MOUNTAIN AVENUE 11 DR A I N A G E E X H I B I T NORTH ( IN FEET ) 1 inch = ft. Feet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cfs) Q2 (gpm) Q100 (cfs) Q100 (gpm) Sheet 30 0 E . M O U N T A I N A V E Th e s e d r a w i n g s a r e in s t r u m e n t s o f s e r v i c e pr o v i d e d b y E P S G r o u p , In c . a n d a r e n o t t o b e u s e d fo r a n y t y p e o f c o n s t r u c t i o n un l e s s s i g n e d a n d s e a l e d by a P r o f e s s i o n a l E n g i n e e r in t h e e m p l o y o f E P S Gr o u p , I n c . NO T F O R C O N S T R U C T I O N RE V I E W S E T of 11 UT I L I T Y P L A N S AR I Z O N A | C O L O R A D O ep s g r o u p i n c . c o m 97 0 . 2 2 1 . 4 1 5 8