HomeMy WebLinkAboutProject Narratives - 01/15/2025
MINIMAL RISK. PAINLESS PROCESS. BEAUTIFUL SPACES.
o: 970.224.5828 | w: ripleydesigninc.com
RIPLEY DESIGN, INC. | 419 Canyon Avenue, Suite 200 | Fort Collins, CO 80521
300 E Mountain Avenue
Basic Development Review | Narrative
January 15, 2025
Past Meeting Dates:
• Conceptual Review Meeting – 10/03/2024
• Neighborhood Meeting – N/A (not required with BDR process)
Owner Info:
• Existing owner – MOUNTAIN 300 LLC
• Proposed owner - MOUNTAIN 300 LLC
General Information
The proposed project site is .09 acres, situated on a triangular parcel at the southeast corner of
Chestnut St and Mountain Ave. The former building remained unused for several years following the
move of longtime tenant, The Lyric, to their new location at North College. Demolition of the building
was completed in the summer of 2024, and the site is well positioned for infill development with the
opportunity to revitalize this corner of Old Town.
This proposal plans to redevelop the site with a new 2-story building for use as offices with a green
room to support the Armory next door. There will be a box office and shared bar expansion between
the new building and the Armory.
The site is located within the Downtown (D) zone district and Transit-Oriented Development (TOD)
Overlay Zone, within the Historic Core (H/C) subdistrict.
Site Layout & Parking
The proposed site plan envisions a building-centric site, with the building being a typical zero-lot-line
footprint, typical of Old Town. Given the unique shape and size of the site and proximity to the
intersection at Mountain and Chestnut/Walnut, parking will be accommodated on-street and in
nearby parking garages.
General site circulation will be pedestrian oriented along Chestnut St and Mountain Ave. The
applicant has submitted an alternative compliance request to the minimum parking requirements. The
previous use did not have any parking on-site; therefore, no parking spaces will be eliminated as part
of this project. There is existing on-street parking in front of the site along Mountain Ave and
MINIMAL RISK. PAINLESS PROCESS. BEAUTIFUL SPACES.
o: 970.224.5828 | w: ripleydesigninc.com
RIPLEY DESIGN, INC. | 419 Canyon Avenue, Suite 200 | Fort Collins, CO 80521
Chestnut St, in addition to the nearby parking garages available to the public. This plan follows
precedence set by surrounding businesses and coordinates with the existing neighborhood that is
already pedestrian-friendly with cars parking in garages or on the street. Bike parking also exists along
Mountain Ave, which can accommodate 4 bikes for the public. The required enclosed bicycle parking
is located inside the building.
Design & Architecture
The 2-story, 7,370 sq foot building (plus a basement) is designed with purpose and creativity in mind.
The design reflects an urban character that aligns with the vision outlined in the Downtown Plan. The
building complements the historic character as well, by relation design features, utilizing high quality
materials and incorporating transparency on both floors. Design features, such as faceted radial
glazing on the corner and cladding patterns create visual interest and ample daylight into the
building.
The massing and scale of the building has similarity to The Armory building, with high-quality durable
materials including laminate cladding, brick, and window glazing. Windows will also be similar in
proportion and alignment to the existing windows on the Armory building. The mechanical screening
on the roof will be stepped back from the façade to reduce the massing. The architectural roof
elements on the Armory building will not be obscured by the new construction of the 300 E Mountain
building.
Compatibility
Historic & Building
The architecture will be compatible with the surrounding area, and also will celebrate the lot’s
triangular shape and corner presence, while acknowledging the adjacent historic structure, the
Armory. The building will incorporate the historic requirements and guidelines from the code,
which will be reviewed by the HPC.
Along with the historical compatibility, the height and use are also compatible for the area.
The 2-story height and massing aligns with the adjacent Armory building and with the
surrounding 2-4 story buildings within the area. The mix of building heights creates variety in
the architectural landscape and supports a dynamic urban environment with a mix of uses.
Downtown Plan
According to the Downtown Plan, this area has many “creative industries” that are significant
to the culture and economy. The Armory falls into this category as a music venue and with
MINIMAL RISK. PAINLESS PROCESS. BEAUTIFUL SPACES.
o: 970.224.5828 | w: ripleydesigninc.com
RIPLEY DESIGN, INC. | 419 Canyon Avenue, Suite 200 | Fort Collins, CO 80521
several other creative industries located nearby, it makes this building an ideal addition to the
area. The music marquee and box office are functional, while also adding character and
complementing the artistic nature of the block.
The Downtown Plan outlines 6 topic areas that help guide and enhance the vision of the area.
For this project at 300 E Mountain, here are the policies that align with the intent of the plan:
• Urban Design
o Policy UD 1b: Transitions between Character Subdistricts. Provide appropriate
transitions in building mass, bulk and scale between character subdistricts that
have a different desired building scale, at the edge of Downtown adjacent to the
Old Town Neighborhoods, and along the Poudre River Corridor
o As a two-story building, with surrounding 2-4 story buildings, it is part of
the transition in scale within the subdistricts of Old Town.
o Policy UD 2d: Building Massing. Mitigate the impacts of larger buildings and
additions through massing techniques that respond to positive, defining patterns
in the surrounding area
o Two story buildings are inherently compatible with the other buildings in
the Historic Core due to the similar building heights. With the height
consistent across the building frontage along Mountain Ave, this building
won’t have any massing impacts on the other buildings.
o Policy UD 3a: Context Sensitive Building Design. Clarify City requirements for the
design character of new buildings to be context sensitive, drawing on existing
patterns, terms of typology, building proportions and massing in the surrounding
area
o The proposed building will be sensitive to the surrounding context
through articulation that is similar in mass and scale, materials will have
similar type and scale, window proportions will have a similar pattern to
the adjacent Armory building and the alignment will create continuity
along the frontage.
o Policy UD 3b: Building Materials and Fenestration. Clarify City requirements for
building material and fenestration compatibility, while acknowledging the need for
designs that exemplify the contemporary era of development
o High-quality materials on the façade ensure that the building is
compatible with other buildings, while some of the architectural features
also showcase the artistic spirit of the area.
o Policy UD 4a: New Buildings/Additions to Designated and Significant Buildings.
Design new construction adjacent to historic buildings and additions to be
MINIMAL RISK. PAINLESS PROCESS. BEAUTIFUL SPACES.
o: 970.224.5828 | w: ripleydesigninc.com
RIPLEY DESIGN, INC. | 419 Canyon Avenue, Suite 200 | Fort Collins, CO 80521
consistent with the Secretary of the Interior's standards and local preservation
standards
o The design of the building will adhere to historic preservation standards
and will not impact or impede nearby historic resources. The architectural
details will relate to the adjacent building and ensure that the historical
significance of other buildings is not compromised.
o Policy UD 5a: Street Level Interest. Street level space should be activated with
building entrances, openings, windows and outdoor spaces for people
o The building incorporates elements of transparency with many windows,
high-quality materials, and a box office window that activates the street
level and creates a place that people want to be.
o Policy UD 5b: Streetscape Design. Continue a program of improving sidewalks
along Downtown streets with paving details, street trees, pedestrian and
landscape lighting, benches, planters, and other street furnishings appropriate to
each character subdistrict
o The sidewalks will remain accessible with existing street trees and bike
racks, and the streetscape will ensure a safe and accessible pedestrian
experience.
o Policy UD 5e: Access Management. Limit curb cuts, driveways and drop-off areas,
and restrict drive-through facilities that interrupt the continuity of pedestrian
movements.
o There are no proposed curb cuts, driveways or drop-off areas with this
project, therefore the project aligns with this policy to limit these things
and manage access to properties.
• Transportation and Parking
o Policy TB 2a: Bicycle Parking. Provide and manage easy-to-use, convenient bicycle
parking that adequately accommodates existing and future demand.
o There are convenient bicycle parking spaces located along Walnut and
along Mountain that have availability to accommodate the existing
uses as well as the proposed office and bar uses.
• Market and Economy
o Policy ME 1b: Commercial Space. Increase the supply of high-quality commercial
space in the Downtown area.
o The proposed office and Armory enhancements align with this policy
in that it provides high-quality commercial space Downtown and is
complementary to other surrounding uses.
MINIMAL RISK. PAINLESS PROCESS. BEAUTIFUL SPACES.
o: 970.224.5828 | w: ripleydesigninc.com
RIPLEY DESIGN, INC. | 419 Canyon Avenue, Suite 200 | Fort Collins, CO 80521
o Policy ME 1c: Employment. Strengthen primary employment, innovation, creative
business and entrepreneurship in the Downtown area.
o The office and Armory enhancements in the proposed project at 300
E Mountain will strengthen employment by providing additional office
space Downtown. The project also fosters innovation and creative
business because it supports to the Armory building next door, which
is known for its cultural significance, creativity, and innovation.
• Arts & Culture
o Policy AC 1a: Networks. Establish and sustain networks for artists and creatives.
o The greenroom proposed with this project will provide space for
artists and creatives to work and the building will encourage as well as
sustain networks for those artists by providing a place that furthers
creativity and collaboration and provides additional accessibility with
ramps and elevator for artists and staff.
o Policy AC 1b: Around the Clock. Recognize and support Downtown’s 24-hour
creative economy.
o This project aligns with this policy in that it directly impacts the creative
economy by increasing support for musical talent, providing more
space for musical artists to create, and locating the project next to The
Armory where artists can perform their work.
• Energy and Environment
o Policy EE 3b: Tree Canopy. Maintain and expand the Downtown tree canopy.
o The existing trees along the adjacent streets will remain and the tree
canopy will not be affected.
o Policy EE 3c: Night Sky Protection. Reduce the impact of Downtown lighting on
dark night skies, human health and wildlife habitat.
o All proposed lighting will be Dark Sky compliant and will follow the
requirements in the Land Use Code. By proposing these types of
fixtures, the project will minimize the impact on human health and
wildlife, while also enhancing safety onsite.
Utilities
The proposed project will be installing a new 6” Fire Service line off Mountain Avenue. An HDPE storm
line will be installed within Chestnut Street that will route our downspout runoff to the existing storm
line in Chestnut Street. The proposed project plans on utilizing the existing water meter pit/service
MINIMAL RISK. PAINLESS PROCESS. BEAUTIFUL SPACES.
o: 970.224.5828 | w: ripleydesigninc.com
RIPLEY DESIGN, INC. | 419 Canyon Avenue, Suite 200 | Fort Collins, CO 80521
line and existing sanitary service line. Overall, there is very minimal utility work associated with this
project.
Drainage & Grading
The proposed project is going to be maintaining existing drainage and grading patterns. Because
existing runoff rates and existing impervious values are being maintained no detention is required.
The applicant team has worked with City Leadership on a payment in-lieu for a 50-year life cycle
analysis using Urban Drainages (MHFD) model for regional LID requirements. These funds would be
used for larger regional projects, like the Oak Street stormwater gardens or the wetland
improvements that treat stormwater from downtown. Therefore, no LID will be installed with the
proposed project.
Impact to Natural Features
There will be no impact to natural features or trees. The applicant team has met with Forestry onsite
to discuss tree impacts and there will not be any tree removal or mitigation required. During
construction, proper care will be taken to ensure that existing trees are minimally impacted, and all
Forestry department requirements will be met.