Loading...
HomeMy WebLinkAboutSupporting Documentation - Water - 12/12/2024Revised 05/16/2024 281 N College Ave, Fort Collins, CO 80525 970.221.6689 drcoord@fcgov.com Request for Extension 1|2 Water Adequacy Determination Application Purpose & Applicability To fulfill the water adequacy requirements of the City of Fort Collins (LUC Division 5.17), every development or redevelopment that requires new, expanded, or increased water use must provide information related to the ensuring the proposed water supply is adequate for long-term satisfaction of potable and non-potable water demands of the development, based upon FCMC §26-148 to -150. The Applicant is responsible for familiarity with applicable code and requirements. The checklists and requirements below summarize the code; more detail regarding contents of documents and needed information may be found within the Fort Collins Land Use Code (LUC) and Municipal Code. Project Information Project Name: ______________________________________________ Project # : ____________________ Project Type: Standard ____________________ Deferral ______________________ Waiver ____________________ Change _____________________ Date of Prior Determination_________________________ Address or Parcel # ______________________________________________________________________ Water Provider Please SUBMIT a SEPARATE Water Adequacy Determination Application for each water provider that services the development Established Providers: ______________________________________ Other: ___________________________________ IF OTHER: Please Provide Contact Information for Water Provider Manager: _______________________________________________ Public Water Service Permit #: _________________ Email: ___________________________________________________ Phone: ____________________________________ Applicant Certification By submitting these materials and my signature affixed below, I acknowledge my awareness of Land Use Code Division 5.17 regulating the Determination of Water Adequacy and submit my Request for Review to the City of Fort Collins. I agree to reimburse the City for all costs associated with reviewing the attached application and associated materials, including costs associated with hiring consultants, not to exceed costs directly- attributable to the review [LUC §5.17.5.B(1) and 5.17.6.B(1)]. I also acknowledge that this Determination may contain conditions, shall be final, and becomes a material part of all future associated development applications. Applicant Name (printed): ______________________________________________________________________________________ Email: ________________________________________________________________ Phone: _______________________________ Signature: _____________________________________________________________ Date: ________________________________ Revised 05/16/2024 281 N College Ave, Fort Collins, CO 80525 970.221.6689, planning@fcgov.com Water Adequacy Determination 2|2 Water Adequacy Determination Application Required Submittal Materials □Overall Map of Development area to be served. o Deferral request (For simple projects; materials due at Construction or Building Permit stage); OR o Detailed information related to the water demand of the project. For areas served by Fort Collins Utilities, City approval of Final Plans acts as acknowledgment of willingness and ability to serve. For areas served by ELCO and FCLWD: □Please provide “Will Serve” Letter from a Colorado Licensed PE or Water Supply Expert from the Water Supply Entity which: •Describes the development area(s) to be served; •States the ability to provide an adequate water supply; •States the entities commitment, and any conditions, to provide adequate supply and service; and •Identifies the length of time for which the letter is valid. Non-Potable Water Suppliers for Permanent Irrigation Systems □Summary document linking the information provided to the standard of review as indicated in the land use code. □Provide a report from a Professional Engineer, licensed in Colorado, providing the Water Supply Description, to include at minimum: Estimated demand analysis of project through build-out, including impact of phasing. Physical Source of Water Provider’s water supply, and water quality test results. Description of all elements of the Project’s Water Portfolio, currently-owned or planned. Description and Estimate of Total Project Portfolio Yield under various hydrologic conditions. -Historical temporal availability of proposed supplies, annual volumetric yield, and frequent and flow rate of deliveries. -Decreed place of use -Augmentation requirements Water demand management measures that may be implemented to account for hydrologic variability. Description of all water conservation measures to be applied; and how enforced and effectuated. Financial documents reflecting entity’s ability to create and maintain supply in perpetuity. Statement describing how the entity ensures water conservation measures that meet or exceed City requirements. Approval documentation from other regulatory agencies, as well as any established potable water supply entity whose service area contains the proposed non-potable system. Upon review of submittal materials, the Director may require additional information be provided; all such information shall be provided prior to final approval of any development or permit. Fort Collins-Loveland Water District 5150 Snead Drive Fort Collins, CO 80525 Phone: 970-226-3104 www.fclwd.com June 9, 2023 Kolby O’Herron, Senior Vice President Sent via email: Kolby.oherron@zocalodevelopment.com Zócalo Community Development Click or tap here to enter text. Re: 6301 S. College Will Serve Letter Dear Kolby: The above reference property, located on the northwest corner of College Avenue and Trilby Road, is approximately 39 acres and within the service area boundary of the Fort Collins-Loveland Water District. It is our understanding that the currently proposed development will be approximately 268 single family residences. It is FCLWD’s intent to provide water service to this property, provided that all District requirements are satisfied. If you have any additional questions ore require additional information, please feel free to contact me. Sincerely, Sam Lowe, PE Civil Engineer III CC: Sandra Bratlie, PE - District Engineer A Westrian Company       COLLEGE & TRILBY | DUPLEX, TOWNHOME & MULTI-FAMILY COMMUNITY VAULT VAULT VAULT VAULT VAULT VAULT VAULT VAULT VAULT VAULT VAULT VAULT VAULT VAULT VAULT VAULT M M M M M M M M MM M MM MMM M MM M M M M M M M M MM MM M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M VA U L T VA U L T M M M M VAULT VAULT M M M M M M M M M M MM MM M M VAULT VAULT VAULT MM M M VA U L T MARS DRIVE ROVER DRIVE MARS DRI V E NOVA LA N E STARDU S T   L A N E NOVA LANE LU N A R   C O U R T ST E L L A R   D R I V E MOONBEAM WAY GALACTIC LANE GALACTI C   L A N E GALAC T I C   L A N E MO O N B E A M   W A Y