Loading...
HomeMy WebLinkAboutProject Narratives - 12/04/2024 December 4, 2024 City of Fort Collins – Planning & Development Services Attn: Mr. Kai Kleer – City Planner 281 North College Avenue Fort Collins, CO 80524 Re: SWC Drake/College – BDR and Subdivision Project Information and Design Narrative Dear Mr. Kleer, On behalf of the owner and applicant, KRF Drake, we are pleased to provide to this City of Fort Collins application materials for a Basic Development Review (BDR) and Subdivision for the 6.94-acre property referred to as SWC Drake/College and generally located at the southwest corner of the S College Avenue and Drake Road intersection within the City of Fort Collins. The following information provides additional application details as required by the City of Fort Collins. • Project Title: SWC Drake/College BDR (previous, abandoned application was known as “Drake Redevelopment”) • Past Meeting Dates: o City Council determined property is not eligible for historic preservation: June 4, 2024 o Concept Review Meeting: July 15, 2024 o Neighborhood Meeting: November 6, 2024 • General Information: The information provided is used to describe the project in the City’s online review database. General information includes the following (as applicable): o Project Location Located at the southwest corner of the intersection of S College Avenue and W Drake Road o Overall size of the development in acres Approximately 6.94 acres o Existing Zoning Commercial – General (CG) o Proposed Zoning Commercial – General (CG), no change to zoning proposed. o Number of Dwellings No residential units are proposed as part of this development application. This application is site planning overall infrastructure and developing pads for future development. Specific uses for the pads developed as part of this BDR will be identified as part of future land use applications. o Amount and Type of Commercial Space No specific uses are proposed as part of this development application. This application is site planning overall infrastructure and developing pads for future development. Specific uses for the pads developed as part of this BDR will be identified as part of future land use applications. o Number of off-street parking spaces provided No off-street parking spaces are proposed as part of this development application. This application is site planning overall infrastructure and developing pads for future development. Specific uses for the pads developed as part of this BDR will be identified as part of future land use applications. o Number of building stories proposed No buildings are proposed as part of this development application. This application is site planning overall infrastructure and developing pads for future development. Specific uses for the pads developed as part of this BDR will be identified as part of future land use applications. o Description of any Land Use Code Modifications proposed. No Land Use Code Modifications are proposed as part of this BDR, although a variance request for utility easement widths is included as part of this application. • Proposed Owners: KRF Drake 1509 York Street, Suite 201 Denver, Colorado 80206 • Existing Owners: DRACOL LLC 5994 S Holly St, #185 Greenwood Village, CO 80111 • Transportation Improvements: Summary of any proposed on and off-site improvements identified with the Traffic Impact Study (if applicable). The only offsite improvement that is identified per the provided TIS is the eastbound right turn lane on Drake. Currently, the City has that turn lane included in their capital project, and the current plan has based all ROW dedication and the adjacent walk on that future projects layout to accommodate the future improvement by the City. • Neighborhood Meeting Summary A neighborhood meeting was held on the evening of November 6, 2024. The meeting was attended in- person by three members of the applicant team, and three City staff members: Em Myler, Kai Kleer, and Sophie Buckingham. The meeting was attended in-person by nine (9) neighbors/members of the community and was attended virtually by another eleven (11) people. The meeting began with Em Myler introducing the protocol for neighborhood meetings, the review process, and resources available to members of the community. Kai Kleer, the lead plan reviewer for this application, then introduced the project and discussed the history of the project including long range planning documents and how they applied to the site. Mr. Kleer covered City Plan (2019), the Midtown Redevelopment Study (2010), Midtown Plan (2013), and the Midtown in Motion Plan (2014). The applicant team gave a brief presentation, building upon the process and proposed designs for the site before answering questions and fielding concerns from those in attendance, both in-person and online. Questions included: (responses are also noted below and include a mix of Applicant and City Staff responses, as appropriate) • Which buildings are included in the subject property? o Subject property shown and defined at the neighborhood meeting. A survey including a written legal description and graphic depiction of the property and its extents are included as part of this application. • Would a stoplight (traffic signal) be proposed at the intersection of Access A and Drake? o A stoplight (traffic signal) would not be permitted and will not be proposed as part of this application. • If the future development contains residential, will the future residents have dedicated parking? o The applicant team responded to assure neighbors that parking will be included on-site regardless of the final users as is standard for Kentro Group projects. No uses/users are proposed; therefore, no parking is proposed at this time. • Does the Urban Mixed Use City Plan designation require a mix of uses? o The Urban Mixed-Use designation does not require a mix of uses. Kai Kleer clarified the Urban Mixed-Use designation, its intention and its requirements, for attendees of the neighborhood meeting. • General questions regarding the URA, its geographic extents, and its incentives o Kai Kleer clarified the purpose, the geographic area which the URA applies to, and incentives available for this site. While incentives are available for this site, coordination with the URA and use of incentives from URA are not required. • General questions regarding the final/future users of the property o The applicant team answered questions about uses and users of the property based on known information at the time of the neighborhood meeting. • General questions regarding expedited review timelines o Em Myler and Kai Kleer answered questions about the review process and expedited review timelines available to the applicant team, such as the BDR process. Concerns included: • Traffic impacts at and around the College and Drake intersection o The applicant team and staff clarified what is within and what is outside of the purview of the proposed redevelopment, and what improvements are required per the rules and regulations of the City of Fort Collins. The capital improvement project for the College and Drake intersection was discussed, and details were provided as available and appropriate. • Existing walkability in vicinity o The applicant team and staff clarified what is within and what is outside of the purview of the proposed redevelopment, and what improvements are required per the rules and regulations of the City of Fort Collins. Proposed site and public improvements will enhance the pedestrian experience on and adjacent to the subject property. • Dangerous traffic encounters at the intersections in vicinity of Redwing/Mason/McClelland and Drake o The applicant team and staff clarified what is within and what is outside of the purview of the proposed redevelopment, and what improvements are required per the rules and regulations of the City of Fort Collins. The intersections in question are off-site, and improvements to the Redwing/Mason intersections with Drake are not proposed as part of this application. • ADA compliance along Drake o Any and all improvements shown here will be ADA compliant. Existing ADA non-compliance that exists along Drake, but not adjacent to the site, is outside the scope of this project. • Residential being located on this site due to unsafe pedestrian conditions o A number of residential uses are permitted at this location per the Land Use Code; however, no residential uses are proposed at this time. • Lack of housing o A number of residential uses are permitted at this location per the Land Use Code, however, no residential uses are required or proposed at this time. • Excess parking on-site o No specific uses are proposed at this time; therefore, no parking designs or counts are proposed at this time. • Construction phasing and impacts of construction on the area o No construction phasing is known at this time; however, future construction will be planned to optimize efficiency and minimize negative impacts on neighbors and the surrounding environment. Comments included: o Desire for multi-modal improvements on the site and prioritization of pedestrian and bicycle infrastructure o Multi-modal improvements including the provision of pedestrian and bicycle infrastructure are proposed as part of this application. o Need for public infrastructure to be improved before pad sites are developed  Funds for public infrastructure improvements and improvements themselves will be provided as required by Code and by staff in response to increased demand. Demand will be projected by the appropriate reports such as a traffic impact study (TIS), and requirements for improvements such as fee-in-lieu or construction of infrastructure will be determined at the appropriate time. o Desire for greater height  This comment is acknowledged. No structures are proposed as part of this application. Future built forms on this site will comply with City zoning regulations. o Desire for shielding noise from freight line  No uses or users are proposed with this application. Mitigating noise from the nearby rail lines will be the responsibility of future users/developers. The applicant team and staff coordinated responses to neighbors’ comments, concerns, and questions, • Narrative description of the site design including building placement, vehicular and pedestrian circulation, landscaping, proposed open space and treatments of wetlands, natural habitats, and features on site and in the general vicinity of the project. The intent of this BDR is to create a cohesive infrastructure plan that creates 4 pads that can accommodate future development, along with several infrastructure improvements as follows: There are numerous improvements proposed: o College Ave: This BDR includes the design of the walk and parkway, including landscape, that falls in line with the currently in-design improvements that the City is preparing for the College and Drake intersection. It is anticipated that the walk will be constructed, with landscape designed, but not installed until the City completes the planned College and Drake improvements at a TBD date. o Drake Road: This BDR includes the design of the walk and parkway, including landscape, that falls in line with the currently in-design improvements that the City is preparing for the College and Drake intersection. It is anticipated that the walk will be constructed, with landscape designed, but not installed until the City completes the planned College and Drake improvements at a TBD date. o McClelland: This BDR includes the design of the walk and parkway. The installation of this section of walk and parkway landscape will be implemented at the time of development of the adjacent parcel. o Thunderbird: This BDR includes the design of the walk and parkway. The installation of this section of walk and parkway landscape will be implemented at the time of development of the adjacent parcel. o Internal Access – N/S: This BDR includes the design of the road, and wider walk with landscape treatments. The street from curb to curb would be developed initially with the installation of each section of walk and parkway landscape (as applicable) implemented at the time of development of the adjacent parcel. o Internal Access – E/W: This BDR includes the design of the road and landscape treatments. The street from curb to curb would be developed initially with the installation of each section of walk and parkway landscape (as applicable) constructed at the time of development of the adjacent parcel. This BDR serves to establish the public ROW improvements as well as the design of internal circulation, future site development applications will implement these designs as they move forward with development within each parcel. • Narrative description of how disturbances to wetlands, natural habitats, and features and/or wildlife are being avoided to the maximum extent feasible. With the property being previously developed and nearly entirely covered with building and hardscape, there will be no negative impact on wetlands, natural habitats, and features and/or wildlife as these conditions do not occur on site. Any trees removed will be replaced and mitigation pursued per coordination with the City Forester. • Narrative description of transition techniques associated buffering and how conflicts between existing and proposed land uses are mitigated. With cohesive zoning within the site and in the adjoining areas, no conflicts between land uses are anticipated. All standards for buffering and transitions per Fort Collins Land Use Code shall be followed at the time of future development, as applicable. • Narrative description of the architectural design including general description of how Building Standards are met (Sections 3.5.1 and other applicable Sections in 3.5). No buildings are proposed as part of this development application. This application is site planning overall infrastructure and developing pads for future development. Specific uses for the pads developed as part of this BDR will be identified as part of future land use applications. It should be noted that there are existing buildings located on-site that are slated for demolition. A historic survey was previously conducted and per Senior Historic Preservation Planner, Jim Bertolini, in correspondence dated June 5, 2024: “With the Council determining 4-2 that the property at 2601 S. College Ave is Not Eligible, this resolves the Historic Preservation comments from the PDR. Should your clients move forward the development application to a [PDP submittal, with Council’s decision, there are no historic resources on the development site that need considered, nor are there any resources near the development site (within 200ft) that need considered for the purposes of design compatibility. Under Section 5.8.1 (formerly 3.4.7) of the Land Use Code, no historic review would be required.” • Development Phasing Schedule (if applicable). The exact phasing and development of the newly created pads is unknown, with the ultimate timing being market driven. The following details are the anticipated development of the ROW and internal circulation/landscape improvements: o College Ave: The walk will be constructed, with landscape designed, but not installed until the City completes the planned College and Drake improvements at a TBD date. o Drake Road: The walk will be constructed, with landscape designed, but not installed until the City completes the planned College and Drake improvements at a TBD date. o McClelland: Installation of the of walk and parkway landscape will be constructed at the time of development of the adjacent parcel. o Thunderbird: Installation of the walk and parkway landscape will be construction at the time of development of the adjacent parcel. o Internal Access – N/S: The street from curb to curb would be constructed initially with the installation of each section of walk and parkway landscape (as applicable) constructed at the time of development of the adjacent parcel. o Internal Access – E/W: The street from curb to curb would be constructed initially with the installation of landscape constructed at the time of development of the adjacent parcel. We appreciate your careful review of these materials and look forward to continued collaboration with City Staff as we navigate this ODP process. Please feel free to reach out to me at 970.409.3414 or rmcbreen@norris- design.com with any questions or comments. Sincerely, Norris Design Ryan F. McBreen Principal