Loading...
HomeMy WebLinkAboutTHE ELLIE AT OLD TOWN NORTH - FDP240015 - SUBMITTAL DOCUMENTS - ROUND 1 - Erosion Control Letter/ReportProject: The Ellie at Old Town Disturbed Area: 0.9 acres EROSION CONTROL BMPS UNITS ESTIMATED QUANTITY UNIT PRICE TOTAL PRICE Silt Fence LFT 3.00$ 792.00$ Construction Fence LFT 2.50$ 850.00$ VTC EACH 1 2,000.00$ 2,000.00$ Inlet Protection EACH 1 350.00$ 350.00$ Curb Socks EACH 1 350.00$ 350.00$ Stabilized Staging Area EACH 1 1,000.00$ 1,000.00$ Stockpile Management Area EACH 1 1,000.00$ 1,000.00$ Concerete Washout EACH 1 800.00$ 800.00$ Street Sweeping EACH 1 500.00$ 500.00$ Mobilization EACH 1 1,000.00$ 1,000.00$ Sub-total 7,642.00$ 1.5 x Sub-total 11,463.00$ Amount of Security 11,463.00$ 1,500.00$ Sub-total 1,350.00$ 1.5 x Sub-total 2,025.00$ Amount of Security ,025.00$ Minimum escrow amount 3,000.00$ Minimum escrow account 11,463.00$ Erosion and Sediment Control Security Calculation BMP Amount Reseeding Amount Unit Price of Seeding per Acre = Minimum Escrow Amount Final Escrow Amount "The amount of the security must be based on one and one-half times the estimate of the cost to install the approved measures or one and one-half times the cost to revegetate the disturbed area to dry land grasses based upon the unit cost determined by the City's Annual Revegetation and Stabilization Bid, whichever is greater. In no instance, will the amount of the security to be less than one thousand five hundred dollars for residential development or three