HomeMy WebLinkAboutTHE ELLIE AT OLD TOWN NORTH - FDP240015 - SUBMITTAL DOCUMENTS - ROUND 1 - Erosion Control Letter/ReportProject: The Ellie at Old Town
Disturbed Area: 0.9 acres
EROSION CONTROL BMPS UNITS
ESTIMATED
QUANTITY UNIT PRICE TOTAL PRICE
Silt Fence LFT 3.00$ 792.00$
Construction Fence LFT 2.50$ 850.00$
VTC EACH 1 2,000.00$ 2,000.00$
Inlet Protection EACH 1 350.00$ 350.00$
Curb Socks EACH 1 350.00$ 350.00$
Stabilized Staging Area EACH 1 1,000.00$ 1,000.00$
Stockpile Management Area EACH 1 1,000.00$ 1,000.00$
Concerete Washout EACH 1 800.00$ 800.00$
Street Sweeping EACH 1 500.00$ 500.00$
Mobilization EACH 1 1,000.00$ 1,000.00$
Sub-total 7,642.00$
1.5 x Sub-total 11,463.00$
Amount of Security 11,463.00$
1,500.00$
Sub-total 1,350.00$
1.5 x Sub-total 2,025.00$
Amount of Security ,025.00$
Minimum escrow amount 3,000.00$
Minimum escrow account 11,463.00$
Erosion and Sediment Control Security Calculation
BMP Amount
Reseeding Amount
Unit Price of Seeding per Acre =
Minimum Escrow Amount
Final Escrow Amount
"The amount of the security must be based on one and one-half times the estimate of the
cost to install the approved measures or one and one-half times the cost to revegetate the
disturbed area to dry land grasses based upon the unit cost determined by the City's Annual
Revegetation and Stabilization Bid, whichever is greater. In no instance, will the amount of
the security to be less than one thousand five hundred dollars for residential development or
three