September 17, 2024
Brandy Bethuram Harras
Community Development and neighborhood Services
City of Fort Collins
281 North College Avenue, PO Box 580
Fort Collins, CO 80522
RE: Case Number: PDP230017
Title: Bloom Filing Six
Engineering/Survey: Planscapes Design Group
Engineer Contact: Emily Tarantini
Applicant: MIC TDC Mulberry St Fort Collins, LLC
Parcel Number(s): 8709307009
Boxelder Sanitation District (BSD) has reviewed the proposed project identified as:
Retail development consisting of 4 pads.
The District hereby advises as follows:
There is no objection to this proposal.
Responses required to comments below.
The District will respond at the hearing date of .
Comments:
1) Boxelder Sanitation District Rules and Regulation have specific requirements for
monitoring and treating industrial waste. If any use within the building uses falls into
those regulations, it will be necessary to coordinate the requirements with Kevin
Schmitz, District Pretreatment Coordinator. This could include the design for
grease interceptor and monitoring manholes. Applicant shall provide information
about the intended use of the facility and potential discharges that may require
treatment/monitoring of industrial wastes.
RESPONSE: This comment has been reviewed and acknowledged, please
note that at this stage we only have conceptual ideas for users but are aware
of the requirements. Does the District have a list of building uses that fall
into this category?
2) Applicant shall confirm feasibility of connecting to service line along East Mulberry
(Hwy 14) Frontage Road. The line labeled as existing sanitary sewer on sheet C-6
is a service line that is not owned by the District. Coordination with the service line
owner will be required.
RESPONSE: This comment has been reviewed and acknowledged. The
developer and team will coordinate this with you. Developer would like to
know who is the owner of the service line so that they can coordinate as
requested. If the District has that information please provide.
3201 East Mulberry, Unit Q – P.O. Box 1518 • Fort Collins, Colorado 80522
Phone (970) 498-0604 •Fax (970) 498-0701 •www.boxeldersanitation.org
3) The E One sewer system is facilitated by Ambiente H2O. It will be necessary to
contact them for proper pump capacity verification. Correspondence with
AmbienteH2O must be provided to the district before taps can be approved.
RESPONSE: This comment has been reviewed and acknowledged. The
developer and team will coordinate with AmbienteH2O and share with you.
Developer has been in communications with AmbienteH2O.
4) The District requires an agreement that describes that the lift station and force main
are the responsibility of the property owner and not the District. The proposed
agreement has been provided.
RESPONSE: This comment has been reviewed and acknowledged. We will
provide the agreement to the individual site developers and they will work
with you to execute when they are in their design/entitlements phase.
5) See attached letter regarding development review fees required by the District.
RESPONSE: We have not received the letter regarding the fees, please
resend when able.
Please feel free to contact me if you have any questions.
Sincerely,
Daniel Richardson, PE
District Engineer