HomeMy WebLinkAboutBUCKING HORSE FILING FIVE - MA240135 - SUBMITTAL DOCUMENTS - ROUND 1 - Supporting Documentation
To: Gino Campana
Date: October 30th, 2024
Re: Building 12 – Jessup Dr
Fort Collins, Colorado
A new 1.5” water tap and meter shall be provided to serve commercial Building 12. This 1.5” tap
and meter shall include a 1.5” water service pipe for distribution within the building. The charts below provide
the fixture counts, pressure, and flow calculations for the building and all calculations used are based on
the 2021 International Plumbing Code Appendix E.
The following fixtures have been accounted for in the calculation of the water service:
The 47.65 WSFU translates to 28.4 GPM peak domestic demand flow rate per Table E103.3(3). This value
has been utilized in the following pressure and flow calculation:
Page 2 of 2
The 26.56 value represents the remaining available pressure for allowable pressure drop within the building .
This value represents the total allowable pressure drop for piping within the building. This allowable
pressure loss is addressed with internal building pipe sizing methods.
This office accepts the calculations and has determined the 1.5” tap and meter is acceptable per the sizing
guidelines of the 2021 IPC.
Respectfully,
Tierney Anderson