HomeMy WebLinkAboutLIBERTY COMMON JUNIOR HIGH SCHOOL - PHASE 1 - SPA240002 - SUBMITTAL DOCUMENTS - ROUND 1 - Project NarrativeProject Information and Design Narrative
Liberty Common Junior High School – Phase 1
October 28, 2024
The project consists of the change of use, change of occupancy and interior tenant finish renovations to
change the existing building located at 1825 Sharp Point Drive from an office building into a school,
Liberty Common Junior High School. There are no proposed changes to the site grading, utilities, site
drainage, landscape, or irrigation as part of this project. There are no proposed changes to the existing
building elevations or building envelope as part of this project.
The tenant finish will include construction of classrooms, administrative space, a cafeteria and support
spaces to accommodate 240 junior high school students, opening in the fall of 2025.
Liberty Common is working on plans to develop the site farther to the southeast, including vacation of
the ROW in Riverbend Court and tenant finish of the building at 1901 Sharp Point. The future work will
be submitted as a separate SPAR submittal in the future.