Loading...
HomeMy WebLinkAboutSCHOOLSIDE PARK - BDR240009 - SUBMITTAL DOCUMENTS - ROUND 3 - Erosion Control Letter/Report EROSION CONTROL REPORT FOR SCHOOLSIDE PARK AT 5830 S TIMBERLINE RD FORT COLLINS, CO 80528 PREPARED FOR THE CITY OF FORT COLLINS Fort Collins, CO 80523 October 21, 2024 NOTIFICATION OF RESPONSIBILITY CONTACT INFO: Owner/Developer: City of Fort Collins Park Planning & Development 215 N Mason St. Fort Collins, CO 80521 (970) 221-6360 Contractor: TBD Design Engineer: JVA, Inc. 213 Linden St., Ste 200 Fort Collins, CO 80524 (303) 444-1951 Erosion Control Administrator (SWMP Administrator): TBD by Contractor: _____________________________________________ _____________________________________________ _____________________________________________ _____________________________________________ Schoolside Park - Erosion Control Report Page 1 of 7 TABLE OF CONTENTS PROJECT DESCRIPTION AND NATURE OF CONSTRUCTION ...................................................... 3 SITE LOCATION ............................................................................................................ 3 EXISTING SITE CONDITION .............................................................................................. 3 PROPOSED CONSTRUCTION ACTIVITIES............................................................................ 3 POTENTIAL POLLUTANT SOURCES ........................................................................................ 3 DISTURBED & STORED SOILS ........................................................................................... 3 VEHICLE TRACKING OF SEDIMENTS .................................................................................. 3 MANAGEMENT OF CONTAMINATED SOILS ....................................................................... 4 LOADING AND UNLOADING OPERATIONS ....................................................................... 4 OUTDOOR STORAGE OF MATERIALS ............................................................................... 4 BULK STORAGE OF MATERIALS ....................................................................................... 4 VEHICLE EQUIPMENT AND MAINTENANCE ........................................................................ 4 SIGNIFICANT DUST GENERATING PROCESSES .................................................................... 4 ROUTINE MAINTENANCE ACTIVITIES ................................................................................ 4 ON-SITE WASTE MANAGEMENT ..................................................................................... 4 CONCRETE TRUCK/EQUIPMENT WASHING ....................................................................... 5 DEDICATED ASPHALT AND CONCRETE BATCH PLANTS ....................................................... 5 NON-INDUSTRIAL WASTE MANAGEMENT ......................................................................... 5 SAW CUTTING AND GRINDING ....................................................................................... 5 OTHER NON-STORMWATER DISCHARGES ........................................................................ 5 CONSTRUCTION CONTROL MEASURES ................................................................................ 5 INSTALLATION AND REMOVAL SEQUENCE OF CONSTRUCTION MEASURES ................................. 6 PHASING ........................................................................................................................ 6 MAINTENANCE AND INSPECTION REQUIREMENTS .................................................................. 7 FINAL VEGETATION AND STABILIZATION ............................................................................... 7 SEQUENCE OF CONSTRUCTION ACTIVITIES ........................................................................... 7 REFERENCES ................................................................................................................... 8 APPENDIX APPENDIX A – UTILITY CONSTRUCTION PLANS 1. EROSION CONTROL PLANS (CE100-CE102) 2. SWMP AND EROSION CONTROL DETAILS (CE103-CE105) 3. GRADING AND DRAINAGE PLAN (C100-C106) Schoolside Park - Erosion Control Report Page 2 of 7 ENGINEER’S STATEMENT: “I hereby certify that this report (plan) for the erosion control for the Schoolside Park was prepared by me (or under my direct supervision) in accordance with the provisions of the City of Fort Collins Standards for the Responsible Parties thereof. I understand that the City of Fort Collins does not and shall not assume liability for erosion control facilities designed by others.” ______________________________ Cody F Gratny, P.E. Registered Professional Engineer State of Colorado No. 45353 10/21/24 Schoolside Park - Erosion Control Report Page 3 of 7 PROJECT DESCRIPTION AND NATURE OF CONSTRUCTION SITE LOCATION The Schoolside Park (site) is located in Section 8, Township 6 North, Range 68 West of the 6th Principal Meridian, in Larimer County, Fort Collins, Colorado. The address of the site is 5830 S Timberline Rd, Fort Collins, CO 80528. The site is bordered to the north and east by Mail Creek Ditch, to the west by S Timberline Road, and to the south by Bacon Elementary School. Developed residential areas are to the north, south, and east of the site. The property is owned by the City of Fort Collins and is parcel number 8608253901. The approximate GPS coordinates for the site are 40.504933°N, -105.038809°W. EXISTING SITE CONDITION The site is approximately 5.3 acres and has an existing percent impervious of 9.6%. The existing site is made up of park vegetation and a building to be demolished and is approximately 50% covered. The existing ground surface is relatively flat with areas of steep slopes in the north portion of the site. Grades generally slope to the southeast at grades ranging from 0.5% to 3.0%, with areas of steep slopes down to the existing sidewalk at the north of the site. The existing site consists of three historical onsite basins H1, O1, and O2. The majority of the site flows to the southwest and onto the Bacon Elementary property. The portions that consist of multi-use path drains to the Mail Creek Ditch. There are no offsite basins that flow onto the site. There is no existing onsite detention for the site. Existing Bacon Elementary School drainage is managed by storm infrastructure on Bacon Elementary School property. The site is comprised of one soil type: Nunn clay loam. Nunn clay loam is classified as hydrologic soil group C and is considered well-drained. From the geotechnical report dated April 10, 2024, the soil is mainly sandy clay. Groundwater was encountered at 13 ft to 18 ft below the ground surface. The rainfall erodibility is K=0.24 for type C soil and will cause rilling and gulling over longer distances and steeper slopes PROPOSED CONSTRUCTION ACTIVITIES In general, the proposed redevelopment of the site consists of utility service connections, overlot grading, paving of sidewalks, play areas and a parking lot. POTENTIAL POLLUTANT SOURCES DISTURBED & STORED SOILS The total disturbed area will be approximately 4.29 acres. Soil stockpiles should be kept below the locally mandated maximum height of 10 feet and surrounded with sediment control devices. If the storage of these soils occurs over a period greater than 30 days, then consider temporarily seeding the soil to minimize soil loss to wind and water erosion. VEHICLE TRACKING OF SEDIMENTS The existing site is mostly undeveloped. A temporary stabilized stone pad and/or Trackout Plate (Vehicle Tracking Control pad, VTC) will be provided at points of ingress and egress onto the unpaved area. The VTC is designed to reduce the amount of mud transported onto the public Schoolside Park - Erosion Control Report Page 4 of 7 roads by construction traffic. If the site is extraordinarily muddy, then consider designating an area to wash construction vehicles before they leave the site and enter the public right-of-way. A best management practice (BMP) such as this is a good way to avoid the costs associated with street cleaning or accidentally discharging large amounts of sediment into other storm drain systems. When in doubt, choose methods that prevent pollution rather than ones that force clean-up at the downstream end just before the stormwater enters the receiving waters. In other words, the most efficient construction site BMPs are those that prevent erosion from happening. MANAGEMENT OF CONTAMINATED SOILS There are no known, existing contaminated soils on site. If contaminated soils are found, the contractor shall report to the SWMP administrator. LOADING AND UNLOADING OPERATIONS The existing entrance to the site is not currently paved and loading/unloading activities will occur within the site where a temporary gravel staging area will be provided. OUTDOOR STORAGE OF MATERIALS Materials storage, waste disposal, and vehicle maintenance and fueling can occur within an enclosed and secure area. BULK STORAGE OF MATERIALS Bulk liquids may be stored on site and should be stored in a secondary containment area with a fence so that if a spill were to happen the contents would pool in the containment area and prevent it from entering stormwater runoff. VEHICLE EQUIPMENT AND MAINTENANCE Materials should be stored and handled in covered areas to prevent contact with stormwater, and chemicals should be stored within berms or secondary containment devices to prevent leaks and spills from entering stormwater runoff. SIGNIFICANT DUST GENERATING PROCESSES Disturbed areas not yet ready to be seeded, landscaped, paved, or otherwise stabilized shall be watered, or ripped as necessary to preclude visible dust emissions. Contractor shall make every effort to minimize particulate emissions from vehicles performing the work, including but not limited to regular maintenance of construction equipment. ROUTINE MAINTENANCE ACTIVITIES Materials should be stored and handled in covered areas to prevent contact with stormwater, and chemicals should be stored within berms or secondary containment devices to prevent leaks and spills from entering stormwater runoff. ON-SITE WASTE MANAGEMENT Schoolside Park - Erosion Control Report Page 5 of 7 Materials storage, waste disposal, and vehicle maintenance and fueling can occur within an enclosed and secure area. The area can be enclosed with temporary fencing and accessed through a gate with a lock. CONCRETE TRUCK/EQUIPMENT WASHING A concrete washout facility will be provided onsite. Properly wash out concrete trucks and other equipment in a manner and location (a minimum of 50 feet away from any inlet structures) so that the materials and wash water cannot discharge from the site, and never into a storm drain system or stream. DEDICATED ASPHALT AND CONCRETE BATCH PLANTS There will be no dedicated batch plant on site. NON-INDUSTRIAL WASTE MANAGEMENT Garbage cans shall be located at break areas and portable toilets shall be provided if onsite bathroom facilities cannot be used. Locate dumpsters and portable toilets away from drainage courses (minimum 50 feet from any inlet structures) and stake down toilets to prevent tipping. SAW CUTTING AND GRINDING The surface being cut shall be wetted to prevent dust. To prevent slurry from entering stormwater runoff and discharging from the site, the contractor should use the minimum amount of water necessary to prevent dust. Cutting slurry should be collected via vacuum or allowed to dry out and be swept up after cutting is finished. OTHER NON-STORMWATER DISCHARGES Records of spills, leaks, or overflows that result in the discharge of pollutants must be documented and maintained. Record all spills that are responded to, even if they do not result in a discharge of pollutants. Information that should be recorded for all occurrences includes the time and date, weather conditions, reasons for the spill, etc. Some spills may need to be reported to immediately. Specifically, a release of any chemical, oil, petroleum product, sewage, etc., which may enter waters of the State of Colorado (which include surface water, ground water and dry gullies or storm sewers leading to surface water) must be reported. More guidance is available on the web at www.colorado.gov. The Division’s toll-free 24-hour number for environmental hazards and chemical spills and releases is 1-877-518-5608. CONSTRUCTION CONTROL MEASURES Vehicle Tracking Control (VTC): A stabilized construction entrance will be provided at S Timberline Road to minimize tracking of mud and sediment onto paved surfaces and neighboring roadways. The construction access and parking will be graded and covered with a crushed stone base course during construction. The VTC will be relocated with the construction access as necessary. Silt Fencing (SF) and Sediment Control Logs (SCL): Sediment control logs shall be installed with respect to proposed drainage patterns. Sediment control logs shall be constructed along the portions of the east, west, south, and north sides of the property and along any drainage areas Schoolside Park - Erosion Control Report Page 6 of 7 subject to erosion. The sediment control logs shall be installed at the downhill side of the existing slopes across the site and at all point discharge areas where shown or not, sediment control logs shall be maintained as needed throughout the construction process. Inlet Protection (IP): Each inlet on the proposed storm sewer system will have a temporary inlet sediment trap constructed around it. In paved areas, this trap consists of wire mesh socks, concrete blocks, and/or screens to filter the storm runoff and allow any silt to settle out. In fields or landscaped areas this trap consists of wire mesh socks. Overlot Grading: All overlot grading in the non-irrigated areas will have the surface roughened and will be permanently landscaped or temporarily seeded until the planned installations are completed. Alternately, rough-cut driveways or proposed paved areas can be covered with a layer of aggregate, road base or asphalt paving. Dust Control Measures: Disturbed areas not yet ready to be seeded, landscapes, paved, or otherwise stabilized shall be watered, or ripped as necessary to preclude visible dust emissions. INSTALLATION AND REMOVAL SEQUENCE OF CONSTRUCTION MEASURES Vehicle Tracking Control: VTC shall be installed prior to any construction activity, site excavation or earthwork activities. VTC shall be removed once activities that require going from dirt to hardscape are done for the site. Silt Fencing (SF) and Sediment Control Logs (SCL): Sediment control logs shall be installed once overlot grading is completed. The temporary sediment control logs will remain until the storm sewer structures are completed and ground cover is effective. Inlet Protection (IP): The inlet protection will be installed as the storm sewer structures are constructed. Inlet protection will remain until the site has been restored. Overlot Grading: All open areas will be treated within 14 days of completion of the overlot grading. At the completion of the mass grading, all exposed soil areas will have the surface roughened and planted with revegetation seed mix. Vegetation is to be maintained throughout construction by the contractor until areas are permanently landscaped. Dust Control Measures: Dust control measures shall be provided as soon as soils are being disturbed until the site has been restored. PHASING Construction Start Date: March 2025. Overlot Grading: April 2025 Utility Construction: May 2025 Building Construction: June 2025 Schoolside Park - Erosion Control Report Page 7 of 7 Paving: July 2025 Site Restoration: August 2025. MAINTENANCE AND INSPECTION REQUIREMENTS The erosion control measures will be inspected daily during construction by the contractor and after each rain event. All inspections shall be documented and shall include the date of inspection, any incidence of non-compliance, signed certification that the site is in compliance, and any notes, drawings, maps, etc. pertaining to repairs. Copies of all documentation shall be distributed to municipalities and owner on a regular basis as specified by owner. Silt fence and straw bale barriers will be checked for undermining and bypass and repaired or expanded as needed. Sediment should be removed from inlet filters and silt fencing before one half of the design depth has been filled. Sediments deposited in the public rights-of-way will be removed immediately. The temporary vegetation of bare soils will be checked regularly and areas where it is lost or damaged will be reseeded. At minimum, the contractor or his agent shall inspect all BMPs every 14 days and after significant precipitation or snow melt events. Installations and modifications as required by the City of Fort Collins will be implemented within 48 hours of notification. Contractor shall remove temporary erosion control measures and repair areas as required after vegetation is established and accepted by owner and municipality. FINAL VEGETATION AND STABILIZATION Soil bed preparation activities will be in accordance with Municipal Code 12-132. Permanent landscaping will include sodding, seeding, trees, shrubs or other vegetative cover to open areas. Native perennial seeding will be established in non-irrigated areas and sod or other vegetative cover will be established in irrigated open areas. Final stabilization is reached when all soil disturbing activities at the site have been completed, and uniform vegetative cover has been established with a density of at least 70% of pre-disturbance levels or equivalent permanent, physical erosion reduction methods have been employed. Final stabilization will be achieved using sod, native seeding, permanent BMPs and other methods. The contractor will be responsible for final stabilization. SEQUENCE OF CONSTRUCTION ACTIVITIES Construction Sequencing: (Detailed construction sequencing to be determined by the contractor) 1. Installation of temporary erosion and sediment control measures. This includes all sediment control logs, rock socks, erosion control blankets, and silt fence where all land disturbing activities will occur. 2. Sequence of all land disturbing activity. Overlot grading in preparation for the pouring of new sidewalks will occur early in the construction schedule. Additional land disturbance will occur around the site for utility installation and the construction of the new structures. 3. Drainage facility construction. Schoolside Park - Erosion Control Report Page 8 of 7 Grade detention pond and install required detention outlets. 4. Sediment basins, temporary channel stabilization. Sediment control logs or erosion control blankets will be installed on the perimeters of the vegetated grass buffers on the north and west sides of the site. 5. Seeding All disturbed areas will be seeded upon completing of finish grading. Refer to the landscape plans for detailed planting and seeding schedule. 6. Mulching. Spread straw mulch uniformly over seeded areas at a rate of 90 lbs per 1000 square feet of ground. No more than 25% of the ground should be visible. Crimp or pinch mulch into soil 2-4 inches by using either a mulch anchoring tool, a farm disk operating on the contour of the slope, or by cleating with bulldozer tracks operating up and down the slopes (to prevent tracks from forming gullies). 7. Required maintenance activities (e.g. after-storm checks of all BMPs, etc.). All temporary sediment control BMPs shall be inspected after each rain event to ensure proper protection and to determine if cleaning is necessary. Final cleaning of all storm facilities shall be provided upon final stabilization of site. REFERENCES 1. “Final Drainage and Erosion Control Report”, Nolte Associates, Inc, Dated May 28, 2002. 2. “Geotechnical Investigation Bacon Park Improvements”, CTL Thompson Incorporated, Dated April 10, 2024. APPENDIX A – UTILITY CONSTRUCTION PLANS 15 ' U T I L I T Y E S M T . T O CI T Y O F F O R T C O L L I N S , RE C . N O . 2 0 0 3 0 0 8 3 3 1 9 20' DRAINAGE ESMT. TO CITY OF FORT COLLINS, REC. NO. 20030083318 EMERG. ACCESS ESMT. TO CITY OF FORT COLLINS, REC. NO. 20030083320 JVA, Inc.213 Linden Street, Suite 200 www.jvajva.com Fort Collins, CO 80524 970.225.9099 Boulder ● Fort Collins ● Winter Park Glenwood Springs ● Denver PROJ. NO. DRAWN: CHECKED: DATE: REVISIONS : SHEET NUMBER: SHEET TITLE: ISSUED FOR: APPROVED: 270702026 OCTOBER 23, 2024 SCHOOLSIDE PARK FOR THE MARKING OF UNDERGROUND BEFORE YOU DIG, GRADE, OR EXCAVATE CALL 2 BUSINESS DAYS IN ADVANCE IN METRO DENVER 1-800-922-1987 CENTER OF COLORADO CALL UTILITY NOTIFICATION MEMBER UTILITIES 534-6700OR Park Planning & Development City of 215 North Mason Street Fort Collins, Colorado 80521 tel: 970.221.6360 www.fcgov.com/parkplanning/ Park Planning & Development CMS/MMC JPW CFG CI T Y O F F O R T C O L L I N S FO R T C O L L I N S , C O L O R A D O SC H O O L S I D E P A R K BA S I C D E V E L O P M E N T R E V I E W S U B M I T T A L BDR SUBMITTAL INITIAL EROSION CONTROL PLAN CE100 15 ' U T I L I T Y E S M T . T O CI T Y O F F O R T C O L L I N S , RE C . N O . 2 0 0 3 0 0 8 3 3 1 9 20' DRAINAGE ESMT. TO CITY OF FORT COLLINS, REC. NO. 20030083318 EMERG. ACCESS ESMT. TO CITY OF FORT COLLINS, REC. NO. 20030083320 JVA, Inc.213 Linden Street, Suite 200 www.jvajva.com Fort Collins, CO 80524 970.225.9099 Boulder ● Fort Collins ● Winter Park Glenwood Springs ● Denver PROJ. NO. DRAWN: CHECKED: DATE: REVISIONS : SHEET NUMBER: SHEET TITLE: ISSUED FOR: APPROVED: 270702026 OCTOBER 23, 2024 SCHOOLSIDE PARK FOR THE MARKING OF UNDERGROUND BEFORE YOU DIG, GRADE, OR EXCAVATE CALL 2 BUSINESS DAYS IN ADVANCE IN METRO DENVER 1-800-922-1987 CENTER OF COLORADO CALL UTILITY NOTIFICATION MEMBER UTILITIES 534-6700OR Park Planning & Development City of 215 North Mason Street Fort Collins, Colorado 80521 tel: 970.221.6360 www.fcgov.com/parkplanning/ Park Planning & Development CMS/MMC JPW CFG CI T Y O F F O R T C O L L I N S FO R T C O L L I N S , C O L O R A D O SC H O O L S I D E P A R K BA S I C D E V E L O P M E N T R E V I E W S U B M I T T A L BDR SUBMITTAL INTERIM EROSION CONTROL PLAN CE101 15 ' U T I L I T Y E S M T . T O CI T Y O F F O R T C O L L I N S , RE C . N O . 2 0 0 3 0 0 8 3 3 1 9 20' DRAINAGE ESMT. TO CITY OF FORT COLLINS, REC. NO. 20030083318 EMERG. ACCESS ESMT. TO CITY OF FORT COLLINS, REC. NO. 20030083320 JVA, Inc.213 Linden Street, Suite 200 www.jvajva.com Fort Collins, CO 80524 970.225.9099 Boulder ● Fort Collins ● Winter Park Glenwood Springs ● Denver PROJ. NO. DRAWN: CHECKED: DATE: REVISIONS : SHEET NUMBER: SHEET TITLE: ISSUED FOR: APPROVED: 270702026 OCTOBER 23, 2024 SCHOOLSIDE PARK FOR THE MARKING OF UNDERGROUND BEFORE YOU DIG, GRADE, OR EXCAVATE CALL 2 BUSINESS DAYS IN ADVANCE IN METRO DENVER 1-800-922-1987 CENTER OF COLORADO CALL UTILITY NOTIFICATION MEMBER UTILITIES 534-6700OR Park Planning & Development City of 215 North Mason Street Fort Collins, Colorado 80521 tel: 970.221.6360 www.fcgov.com/parkplanning/ Park Planning & Development CMS/MMC JPW CFG CI T Y O F F O R T C O L L I N S FO R T C O L L I N S , C O L O R A D O SC H O O L S I D E P A R K BA S I C D E V E L O P M E N T R E V I E W S U B M I T T A L BDR SUBMITTAL FINAL EROSION CONTROL PLAN CE102 TABLE OF CALCULATIONS TOTAL DISTURBED AREA 4.29 ACRES TOTAL "ONSITE" DISTURBED AREA 4.17 ACRES TOTAL "OFFSITE" DISTURBED AREA 0.12 ACRES TOTAL STORAGE/STAGING N/A TOTAL HAUL ROADS AREA N/A CONSTRUCTION VEHICLE TRAFFIC AREA N/A EST. PERCENT OF PROJECT AREA EXPOSED N/A EST. PERCENT VEGETATIVE COVER N/A EXISTING SOIL TYPE TYPE C GROUNDWATER DEPTH 15.00 FEET NUMBER OF PHASES W/ PROJECT N/A TOTAL VOLUME IMPORTED (+) / EXPORTED (-) MATERIALS 5594.00 CY TOTAL AREA OF STOCKPILING FILL OR BORROW AREAS OFF SITE N/A STEEPEST SLOPE 4:1 H:V DISTANCE FROM A RIPARIAN AREA OR SENSITIVE AREA N/A FEET JVA, Inc.213 Linden Street, Suite 200 www.jvajva.com Fort Collins, CO 80524 970.225.9099 Boulder ● Fort Collins ● Winter Park Glenwood Springs ● Denver PROJ. NO. DRAWN: CHECKED: DATE: REVISIONS : SHEET NUMBER: SHEET TITLE: ISSUED FOR: APPROVED: 270702026 OCTOBER 23, 2024 SCHOOLSIDE PARK FOR THE MARKING OF UNDERGROUND BEFORE YOU DIG, GRADE, OR EXCAVATE CALL 2 BUSINESS DAYS IN ADVANCE IN METRO DENVER 1-800-922-1987 CENTER OF COLORADO CALL UTILITY NOTIFICATION MEMBER UTILITIES 534-6700OR Park Planning & Development City of 215 North Mason Street Fort Collins, Colorado 80521 tel: 970.221.6360 www.fcgov.com/parkplanning/ Park Planning & Development CMS/MMC JPW CFG CI T Y O F F O R T C O L L I N S FO R T C O L L I N S , C O L O R A D O SC H O O L S I D E P A R K BA S I C D E V E L O P M E N T R E V I E W S U B M I T T A L BDR SUBMITTAL SWMP NOTES CE103 JVA, Inc.213 Linden Street, Suite 200 www.jvajva.com Fort Collins, CO 80524 970.225.9099 Boulder ● Fort Collins ● Winter Park Glenwood Springs ● Denver PROJ. NO. DRAWN: CHECKED: DATE: REVISIONS : SHEET NUMBER: SHEET TITLE: ISSUED FOR: APPROVED: 270702026 OCTOBER 23, 2024 SCHOOLSIDE PARK FOR THE MARKING OF UNDERGROUND BEFORE YOU DIG, GRADE, OR EXCAVATE CALL 2 BUSINESS DAYS IN ADVANCE IN METRO DENVER 1-800-922-1987 CENTER OF COLORADO CALL UTILITY NOTIFICATION MEMBER UTILITIES 534-6700OR Park Planning & Development City of 215 North Mason Street Fort Collins, Colorado 80521 tel: 970.221.6360 www.fcgov.com/parkplanning/ Park Planning & Development CMS/MMC JPW CFG CI T Y O F F O R T C O L L I N S FO R T C O L L I N S , C O L O R A D O SC H O O L S I D E P A R K BA S I C D E V E L O P M E N T R E V I E W S U B M I T T A L BDR SUBMITTAL EROSION CONTROL DETAILS CE104 JVA, Inc.213 Linden Street, Suite 200 www.jvajva.com Fort Collins, CO 80524 970.225.9099 Boulder ● Fort Collins ● Winter Park Glenwood Springs ● Denver PROJ. NO. DRAWN: CHECKED: DATE: REVISIONS : SHEET NUMBER: SHEET TITLE: ISSUED FOR: APPROVED: 270702026 OCTOBER 23, 2024 SCHOOLSIDE PARK FOR THE MARKING OF UNDERGROUND BEFORE YOU DIG, GRADE, OR EXCAVATE CALL 2 BUSINESS DAYS IN ADVANCE IN METRO DENVER 1-800-922-1987 CENTER OF COLORADO CALL UTILITY NOTIFICATION MEMBER UTILITIES 534-6700OR Park Planning & Development City of 215 North Mason Street Fort Collins, Colorado 80521 tel: 970.221.6360 www.fcgov.com/parkplanning/ Park Planning & Development CMS/MMC JPW CFG CI T Y O F F O R T C O L L I N S FO R T C O L L I N S , C O L O R A D O SC H O O L S I D E P A R K BA S I C D E V E L O P M E N T R E V I E W S U B M I T T A L BDR SUBMITTAL EROSION CONTROL DETAILS CE105 JVA, Inc.213 Linden Street, Suite 200 www.jvajva.com Fort Collins, CO 80524 970.225.9099 Boulder ● Fort Collins ● Winter Park Glenwood Springs ● Denver PROJ. NO. DRAWN: CHECKED: DATE: REVISIONS : SHEET NUMBER: SHEET TITLE: ISSUED FOR: APPROVED: 270702026 OCTOBER 23, 2024 SCHOOLSIDE PARK FOR THE MARKING OF UNDERGROUND BEFORE YOU DIG, GRADE, OR EXCAVATE CALL 2 BUSINESS DAYS IN ADVANCE IN METRO DENVER 1-800-922-1987 CENTER OF COLORADO CALL UTILITY NOTIFICATION MEMBER UTILITIES 534-6700OR Park Planning & Development City of 215 North Mason Street Fort Collins, Colorado 80521 tel: 970.221.6360 www.fcgov.com/parkplanning/ Park Planning & Development CMS/MMC JPW CFG CI T Y O F F O R T C O L L I N S FO R T C O L L I N S , C O L O R A D O SC H O O L S I D E P A R K BA S I C D E V E L O P M E N T R E V I E W S U B M I T T A L BDR SUBMITTAL GRADING AND DRAINAGE PLAN C100 C102 C101 C103 C104 C105 C106 JVA, Inc.213 Linden Street, Suite 200 www.jvajva.com Fort Collins, CO 80524 970.225.9099 Boulder ● Fort Collins ● Winter Park Glenwood Springs ● Denver PROJ. NO. DRAWN: CHECKED: DATE: REVISIONS : SHEET NUMBER: SHEET TITLE: ISSUED FOR: APPROVED: 270702026 OCTOBER 23, 2024 SCHOOLSIDE PARK FOR THE MARKING OF UNDERGROUND BEFORE YOU DIG, GRADE, OR EXCAVATE CALL 2 BUSINESS DAYS IN ADVANCE IN METRO DENVER 1-800-922-1987 CENTER OF COLORADO CALL UTILITY NOTIFICATION MEMBER UTILITIES 534-6700OR Park Planning & Development City of 215 North Mason Street Fort Collins, Colorado 80521 tel: 970.221.6360 www.fcgov.com/parkplanning/ Park Planning & Development CMS/MMC JPW CFG CI T Y O F F O R T C O L L I N S FO R T C O L L I N S , C O L O R A D O SC H O O L S I D E P A R K BA S I C D E V E L O P M E N T R E V I E W S U B M I T T A L BDR SUBMITTAL GRADING AND DRAINAGE PLAN C101 JVA, Inc.213 Linden Street, Suite 200 www.jvajva.com Fort Collins, CO 80524 970.225.9099 Boulder ● Fort Collins ● Winter Park Glenwood Springs ● Denver PROJ. NO. DRAWN: CHECKED: DATE: REVISIONS : SHEET NUMBER: SHEET TITLE: ISSUED FOR: APPROVED: 270702026 OCTOBER 23, 2024 SCHOOLSIDE PARK FOR THE MARKING OF UNDERGROUND BEFORE YOU DIG, GRADE, OR EXCAVATE CALL 2 BUSINESS DAYS IN ADVANCE IN METRO DENVER 1-800-922-1987 CENTER OF COLORADO CALL UTILITY NOTIFICATION MEMBER UTILITIES 534-6700OR Park Planning & Development City of 215 North Mason Street Fort Collins, Colorado 80521 tel: 970.221.6360 www.fcgov.com/parkplanning/ Park Planning & Development CMS/MMC JPW CFG CI T Y O F F O R T C O L L I N S FO R T C O L L I N S , C O L O R A D O SC H O O L S I D E P A R K BA S I C D E V E L O P M E N T R E V I E W S U B M I T T A L BDR SUBMITTAL GRADING AND DRAINAGE PLAN C102 EMERG. ACCESS ESMT. TO CITY OF FORT COLLINS, REC. NO. 20030083320 20' DRAINAGE ESMT. TO CITY OF FORT COLLINS, REC. NO. 20030083318 15 ' U T I L I T Y E S M T . T O CI T Y O F F O R T C O L L I N S , RE C . N O . 2 0 0 3 0 0 8 3 3 1 9 JVA, Inc.213 Linden Street, Suite 200 www.jvajva.com Fort Collins, CO 80524 970.225.9099 Boulder ● Fort Collins ● Winter Park Glenwood Springs ● Denver PROJ. NO. DRAWN: CHECKED: DATE: REVISIONS : SHEET NUMBER: SHEET TITLE: ISSUED FOR: APPROVED: 270702026 OCTOBER 23, 2024 SCHOOLSIDE PARK FOR THE MARKING OF UNDERGROUND BEFORE YOU DIG, GRADE, OR EXCAVATE CALL 2 BUSINESS DAYS IN ADVANCE IN METRO DENVER 1-800-922-1987 CENTER OF COLORADO CALL UTILITY NOTIFICATION MEMBER UTILITIES 534-6700OR Park Planning & Development City of 215 North Mason Street Fort Collins, Colorado 80521 tel: 970.221.6360 www.fcgov.com/parkplanning/ Park Planning & Development CMS/MMC JPW CFG CI T Y O F F O R T C O L L I N S FO R T C O L L I N S , C O L O R A D O SC H O O L S I D E P A R K BA S I C D E V E L O P M E N T R E V I E W S U B M I T T A L BDR SUBMITTAL GRADING AND DRAINAGE PLAN C103 20' DRAINAGE ESMT. TO CITY OF FORT COLLINS, REC. NO. 20030083318 JVA, Inc.213 Linden Street, Suite 200 www.jvajva.com Fort Collins, CO 80524 970.225.9099 Boulder ● Fort Collins ● Winter Park Glenwood Springs ● Denver PROJ. NO. DRAWN: CHECKED: DATE: REVISIONS : SHEET NUMBER: SHEET TITLE: ISSUED FOR: APPROVED: 270702026 OCTOBER 23, 2024 SCHOOLSIDE PARK FOR THE MARKING OF UNDERGROUND BEFORE YOU DIG, GRADE, OR EXCAVATE CALL 2 BUSINESS DAYS IN ADVANCE IN METRO DENVER 1-800-922-1987 CENTER OF COLORADO CALL UTILITY NOTIFICATION MEMBER UTILITIES 534-6700OR Park Planning & Development City of 215 North Mason Street Fort Collins, Colorado 80521 tel: 970.221.6360 www.fcgov.com/parkplanning/ Park Planning & Development CMS/MMC JPW CFG CI T Y O F F O R T C O L L I N S FO R T C O L L I N S , C O L O R A D O SC H O O L S I D E P A R K BA S I C D E V E L O P M E N T R E V I E W S U B M I T T A L BDR SUBMITTAL GRADING AND DRAINAGE PLAN C104 20' DRAINAGE ESMT. TO CITY OF FORT COLLINS, REC. NO. 20030083318 JVA, Inc.213 Linden Street, Suite 200 www.jvajva.com Fort Collins, CO 80524 970.225.9099 Boulder ● Fort Collins ● Winter Park Glenwood Springs ● Denver PROJ. NO. DRAWN: CHECKED: DATE: REVISIONS : SHEET NUMBER: SHEET TITLE: ISSUED FOR: APPROVED: 270702026 OCTOBER 23, 2024 SCHOOLSIDE PARK FOR THE MARKING OF UNDERGROUND BEFORE YOU DIG, GRADE, OR EXCAVATE CALL 2 BUSINESS DAYS IN ADVANCE IN METRO DENVER 1-800-922-1987 CENTER OF COLORADO CALL UTILITY NOTIFICATION MEMBER UTILITIES 534-6700OR Park Planning & Development City of 215 North Mason Street Fort Collins, Colorado 80521 tel: 970.221.6360 www.fcgov.com/parkplanning/ Park Planning & Development CMS/MMC JPW CFG CI T Y O F F O R T C O L L I N S FO R T C O L L I N S , C O L O R A D O SC H O O L S I D E P A R K BA S I C D E V E L O P M E N T R E V I E W S U B M I T T A L BDR SUBMITTAL GRADING AND DRAINAGE PLAN C105 JVA, Inc.213 Linden Street, Suite 200 www.jvajva.com Fort Collins, CO 80524 970.225.9099 Boulder ● Fort Collins ● Winter Park Glenwood Springs ● Denver PROJ. NO. DRAWN: CHECKED: DATE: REVISIONS : SHEET NUMBER: SHEET TITLE: ISSUED FOR: APPROVED: 270702026 OCTOBER 23, 2024 SCHOOLSIDE PARK FOR THE MARKING OF UNDERGROUND BEFORE YOU DIG, GRADE, OR EXCAVATE CALL 2 BUSINESS DAYS IN ADVANCE IN METRO DENVER 1-800-922-1987 CENTER OF COLORADO CALL UTILITY NOTIFICATION MEMBER UTILITIES 534-6700OR Park Planning & Development City of 215 North Mason Street Fort Collins, Colorado 80521 tel: 970.221.6360 www.fcgov.com/parkplanning/ Park Planning & Development CMS/MMC JPW CFG CI T Y O F F O R T C O L L I N S FO R T C O L L I N S , C O L O R A D O SC H O O L S I D E P A R K BA S I C D E V E L O P M E N T R E V I E W S U B M I T T A L BDR SUBMITTAL GRADING AND DRAINAGE PLAN C106