HomeMy WebLinkAboutCROWNE AT SUNIGA - FDP230023 - SUBMITTAL DOCUMENTS - ROUND 4 - Irrigation PlansSYMBOL MANUFACTURER/MODEL/DESCRIPTION
RAIN BIRD XCZ-100-PRB-COM
WIDE FLOW DRIP CONTROL KIT FOR COMMERCIAL
APPLICATIONS. 1" BALL VALVE WITH 1" PESB VALVE AND 1"
PRESSURE REGULATING 40PSI QUICK-CHECK BASKET
FILTER. 0.3 GPM-20 GPM
PIPE TRANSITION POINT IN DRIP BOX
PIPE TRANSITION POINT FROM PVC LATERAL TO DRIP
TUBING WITH RISER IN 6" (150MM) DRIP BOX.
DRIP FLUSH VALVE
3/4" PVC BALL VALVE
SYMBOL MANUFACTURER/MODEL/DESCRIPTION
REMOTE CONTROL VALVE ASSEMBLY
HUNTER ICV-G-FS: 1", 1-1/2", 2", AND 3" PLASTIC ELECTRIC
REMOTE CONTROL VALVES, GLOBE CONFIGURATION, WITH
NPT THREADED INLET/OUTLET, FOR
COMMERCIAL/MUNICIPAL USE. WITH FILTER SENTRY.
QUICK COUPLER ASSEMBLY
RAIN BIRD 5-RC: 1" BRASS QUICK-COUPLING VALVE, WITH
CORROSION-RESISTANT STAINLESS STEEL SPRING,
THERMOPLASTIC RUBBER COVER, AND 1-PIECE BODY.
ISOLATION GATE VALVE ASSEMBLY
MATCO-NORCA 514TX: 1/2"-4" BRASS GATE VALVE, FULL
PORT, WITH SOLID WEDGE. IPS. CROSS HANDLE. SAME SIZE
AS MAINLINE PIPE.
MASTER VALVE ASSEMBLY
BUCKNER-SUPERIOR 3100-PRS, NORMALLY OPEN BRASS
MASTER VALVE THAT PROVIDES DIRTY WATER PROTECTION.
PRESSURE REGULATING, SET TO 70. SIZE TO MATCH POC
REDUCED PRESSURE BACKFLOW PREVENTER
FEBCO 825YA: SIZED TO MATCH POC METER SIZE. REDUCED
PRESSURE BACKFLOW PREVENTER IN STRONG BOX
SBBC-30AL: LOW PROFILE BACKFLOW ENCLOSURE, WITH
MARINE GRADE ALUMINUM. 30"L, 30"H, 16.25"W (76.2CM L,
76.2CM H, 41.275CM W).
PEDESTAL MOUNT 2-WIRE CONTROLLER
HUNTER PED-SS-A2C-75D-SS:75-STATION DECODER
CONTROLLER IN AN OUTDOOR STAINLESS STEEL PEDESTAL.
INSTALL WIRELESS RAIN SENSOR AND SOLAR SYNC
CREATIVE SENSOR TECHNOLOGY FSI-T
1.5" PVC TEE TYPE FLOW SENSOR W/SOCKET ENDS,
CUSTOM MOUNTING TEE AND ULTRA-LIGHTWEIGHT
IMPELLER ENHANCES LOW FLOW MEASUREMENT. 2 WIRE
DIGITAL OUTPUT. FLOW RANGE 1.8-108 GPM.
IRRIGATION LATERAL LINE: PVC CLASS 200 SDR 21
PVC CLASS 200 IRRIGATION PIPE. ONLY LATERAL
TRANSITION PIPE SIZES 1 1/4" AND ABOVE ARE INDICATED
ON THE PLAN, WITH ALL OTHERS BEING 1" IN SIZE.
IRRIGATION LATERAL LINE: PLANTING BED DRIP IRRIGATION
LATERAL LINE:
3/4-INCH BLANK UV RADIATION RESISTANT POLYETHYLENE
PIPE TO SINGLE OUTLET EMITTERS PER ADJACENT EMITTER
CHART.
IRRIGATION LATERAL LINE: NATIVE PLANTING DRIP
IRRIGATION LATERAL LINE:
3/4-INCH BLANK UV RADIATION RESISTANT POLYETHYLENE
PIPE TO TREE RINGS, NETAFIM INLINE DRIP TUBING
MODEL TLCV6-18, AND SINGLE OUTLET EMITTERS FOR
SHRUBS PER ADJACENT EMITTER CHART
IRRIGATION MAINLINE: PVC CLASS 200 SDR 21
2-INCH UNLESS OTHERWISE NOTED
PIPE SLEEVE: PVC SCHEDULE 40
INSTALL AS SHOWN ON DESIGN OR TWICE THE SIZE OF THE
PIPE OR WIRE RUNNING THRU IT. NO TWO PIPES OR WIRE
BUNDLES SHALL SHARE THE SAME SLEEVE.
A
SYMBOL MANUFACTURER/MODEL/DESCRIPTION PSI
HUNTER PROS-06-PRS30-CV 5` STRIP SPRAY
TURF SPRAY, 30 PSI REGULATED 6.0" POP-UP. WITH
FACTORY INSTALLED DRAIN CHECK VALVE. CO-MOLDED
WIPER SEAL WITH UV RESISTANT MATERIAL.
30
HUNTER PROS-06-PRS30-CV 8` RADIUS
TURF SPRAY, 30 PSI REGULATED 6.0" POP-UP. WITH
FACTORY INSTALLED DRAIN CHECK VALVE. CO-MOLDED
WIPER SEAL WITH UV RESISTANT MATERIAL.
30
HUNTER PROS-06-PRS30-CV 10` RADIUS
TURF SPRAY, 30 PSI REGULATED 6.0" POP-UP. WITH
FACTORY INSTALLED DRAIN CHECK VALVE. CO-MOLDED
WIPER SEAL WITH UV RESISTANT MATERIAL.
30
HUNTER PROS-06-PRS30-CV 12` RADIUS
TURF SPRAY, 30 PSI REGULATED 6.0" POP-UP. WITH
FACTORY INSTALLED DRAIN CHECK VALVE. CO-MOLDED
WIPER SEAL WITH UV RESISTANT MATERIAL.
30
HUNTER PROS-06-PRS30-CV 15` RADIUS
TURF SPRAY, 30 PSI REGULATED 6.0" POP-UP. WITH
FACTORY INSTALLED DRAIN CHECK VALVE. CO-MOLDED
WIPER SEAL WITH UV RESISTANT MATERIAL.
30
HUNTER PROS-06-PRS30-CV 17` RADIUS
TURF SPRAY, 30 PSI REGULATED 6.0" POP-UP. WITH
FACTORY INSTALLED DRAIN CHECK VALVE. CO-MOLDED
WIPER SEAL WITH UV RESISTANT MATERIAL.
30
HUNTER MP CORNER PROS-06-PRS40-CV
TURF ROTATOR, 6" POP-UP WITH FACTORY INSTALLED
CHECK VALVE, PRESSURE REGULATED TO 40 PSI, MP
ROTATOR NOZZLE ON PRS40 BODY. T=TURQUOISE ADJ ARC
45-105.
40
HUNTER MP STRIP PROS-06-PRS40-CV
TURF ROTATOR, 6" POP-UP WITH FACTORY INSTALLED
CHECK VALVE, PRESSURE REGULATED TO 40 PSI, MP
ROTATOR NOZZLE ON PRS40 BODY. LST=IVORY LEFT STRIP,
SST=BROWN SIDE STRIP, RST=COPPER RIGHT STRIP.
40
HUNTER MP1000 PROS-06-PRS40-CV
TURF ROTATOR, 6" POP-UP WITH CHECK VALVE, PRESSURE
REGULATED TO 40 PSI, MP ROTATOR NOZZLE ON PRS40
BODY. M=MAROON ADJ ARC 90 TO 210, L=LIGHT BLUE 210
TO 270 ARC, O=OLIVE 360 ARC.
40
HUNTER MP2000 PROS-06-PRS40-CV
TURF ROTATOR, 6" POP-UP WITH FACTORY INSTALLED
CHECK VALVE, PRESSURE REGULATED TO 40 PSI, MP
ROTATOR NOZZLE ON PRS40 BODY. K=BLACK ADJ ARC
90-210, G=GREEN ADJ ARC 210-270, R=RED 360 ARC.
40
HUNTER MP3000 PROS-06-PRS40-CV
TURF ROTATOR, 6" POP-UP WITH FACTORY INSTALLED
CHECK VALVE, PRESSURE REGULATED TO 40 PSI, MP
ROTATOR NOZZLE ON PRS40 BODY. B=BLUE ADJ ARC
90-210, Y=YELLOW ADJ ARC 210-270, A=GRAY 360 ARC.
40
HUNTER MP3500 PROS-06-PRS40-CV
TURF ROTATOR, 6.0" POP-UP WITH FACTORY INSTALLED
CHECK VALVE, PRESSURE REGULATED TO 40 PSI, MP
ROTATOR NOZZLE ON PRS40 BODY. LB=LIGHT BROWN
ADJUSTABLE ARC, 90-210.
40
HUNTER MP800SR PROS-06-PRS40-CV
TURF ROTATOR, 6.0" POP-UP WITH CHECK VALVE, PRESSURE
REGULATED TO 40 PSI, MP ROTATOR NOZZLE ON PRS40
BODY. ADJ=ORANGE AND GRAY ( ARC 90-210), 360=LIME
GREEN AND GRAY (ARC 360)
40
SYMBOL MANUFACTURER/MODEL/DESCRIPTION PSI GPM RADIUS
HUNTER I-20-06-SS 4.0
TURF ROTOR, 6.0" POP-UP. ADJUSTABLE AND FULL CIRCLE.
STAINLESS STEEL RISER. DRAIN CHECK VALVE. STANDARD
NOZZLE. I-20 ROTORS IN NATIVE SEED AREAS SHALL BE
PLASTIC RISERS
45 4 40'
HUNTER I-20-06-SS 6.0
TURF ROTOR, 6.0" POP-UP. ADJUSTABLE AND FULL CIRCLE.
STAINLESS STEEL RISER. DRAIN CHECK VALVE. STANDARD
NOZZLE. I-20 ROTORS IN NATIVE SEED AREAS SHALL BE
PLASTIC RISERS
45 6 43'
HUNTER I-20-06-SS 8.0
TURF ROTOR, 6.0" POP-UP. ADJUSTABLE AND FULL CIRCLE.
STAINLESS STEEL RISER. DRAIN CHECK VALVE. STANDARD
NOZZLE. I-20 ROTORS IN NATIVE SEED AREAS SHALL BE
PLASTIC RISERS
45 8 44'
IRRIGATION SCHEDULE INSTALLATION GENERAL NOTES
1.DESIGN ASSUMES A MINIMUM DYNAMIC PRESSURE AVAILABLE FOR THE IRRIGATION
SYSTEM (PER CITY OR ENGINEER OF 70 PSI-100 PSI, AT A MAXIMUM PEAK FLOW OF 40 GPM
AT THE 1.5-INCH POINT-OF-CONNECTION (POC). VERIFY PRESSURE AND FLOW ON SITE
PRIOR TO CONSTRUCTION. CONTACT GENERAL CONTRACTOR OR OWNER'S
REPRESENTATIVE IMMEDIATELY IF FLOW OR PRESSURE ARE LOWER THAN LISTED ABOVE.
1.1.IRRIGATION TAP, METER, SERVICE LINES, AND BACKFLOW SHALL ALL BE THE SAME
SIZE, AS STATED ABOVE.
2.ALL MAINLINES SHALL BE INSTALLED AT LEAST 5' FROM CENTER OF TREES, WHERE
POSSIBLE. DESIGN IS SHOWN FOR CLARITY, THUS MAINLINE ROUTING IN FIELD MAY LOOK
SLIGHTLY DIFFERENT THAN DEPICTED IN DRAWINGS.
3.CONTRACTOR SHALL CREATE A LAMINATED CONTROLLER CHART ADHERED TO THE
INSIDE OF THE CONTROLLER COVER OR A LAMINATED COLORED CONTROLLER MAP.
4.CONTRACTOR SHALL BECOME FAMILIAR WITH THE SPECIFICATIONS AND
INSTALLATION DETAILS FOR THIS AND RELATED WORK PRIOR TO CONSTRUCTION. FOR
CLARIFICATION, CONTACT IRRIGATION DESIGNER PRIOR TO CONSTRUCTION.
4.1.UPON FINAL ACCEPTANCE, CONTRACTOR SHALL TURN OVER REQUIRED
ADJUSTMENT KEYS INCLUDING BUT NOT LIMITED TO CONTROLLER ENCLOSURE AND
BACKFLOW ENCLOSURE KEY, LOCKING VALVE BOX KEYS, QUICK COUPLER KEYS, GATE
VALVE KEY, SPRINKLER HEAD AND NOZZLE ADJUSTMENT KEYS.
4.2. UPON FINAL ACCEPTANCE, CONTRACTOR SHALL TURN OVER SPARE PARTS
PERTAINING TO INSTALLED SYSTEM: BACKFLOW WINTERIZATION INSERT, TWO OF
EVERY HEAD AND NOZZLE (ROTOR NOZZLE TREE INCLUDED), ONE RCV DIAPHRAGM,
ETC.
5.COORDINATE UTILITY LOCATES OF UNDERGROUND UTILITIES PRIOR TO
CONSTRUCTION ("811-CALL BEFORE YOU DIG") .
6.IF DISCREPANCIES ARE NOTED IN THE FIELD BETWEEN SITE CONDITIONS AND
PROVIDED DESIGNS, CONTRACTOR SHALL NOTIFY OWNER'S REPRESENTATIVE OR
GENERAL CONTRACTOR IMMEDIATELY. DO NOT PROCEED WITH THE INSTALLATION OF
THE IRRIGATION SYSTEM IF SUCH DISCREPANCIES IN THE FIELD AFFECT THE PROVIDED
DESIGN, DETAILS, OR SPECIFICATIONS.
7.ALL IRRIGATION COMPONENTS (MAINLINE, WIRES, LATERAL LINES, ETC.) SHALL BE
INSTALLED IN LANDSCAPED AREAS WHENEVER POSSIBLE, EVEN THOUGH SAID IRRIGATION
COMPONENTS MAY BE SHOWN OUTSIDE PLANTING AREAS FOR CLARITY.
8. AVOID CONFLICTS BETWEEN THE IRRIGATION SYSTEM, PLANTING MATERIALS, AND
ARCHITECTURAL FEATURES WHENEVER POSSIBLE. COORDINATE POTENTIAL RELOCATION
OF BOULDERS AND TREES IN TURF AREAS WITH LANDSCAPE ARCHITECT PRIOR TO
SPRINKLER LAYOUT. IF LANDSCAPE MATERIAL CANNOT BE RELOCATED,ADDITIONAL
SPRINKLERS MAY BE REQUIRED.
8.1.WHERE POSSIBLE, MAINTAIN 3'-5' DISTANCE FROM CENTER OF TREE TO MAINLINE
AND WIRES. VALVE BOXES SHALL BE AT LEAST 3' FROM TREE CENTER. MAINLINE
ROUTING AND VALVE LOCATIONS ARE SHOWN FOR CLARITY AND MAY BE SHOWN
WITHIN THE 3'-5' RANGE NOTED ABOVE.
9. CROSS FITTINGS ARE NOT ALLOWED, ONLY STANDARD TEES AND ELBOWS.
10.CONTRACTOR SHALL INSTALL NOZZLES PER PLAN, UNLESS IRRIGATED AREA
CHANGED IN SIZE OR PLANT MATERIAL TYPE CHANGES. IF NOZZLE CHANGES ARE
REQUIRED AND ARE SIGNIFICANT IN SIZE, CONTRACTOR SHALL CONTACT IRRIGATION
DESIGNER FOR APPROVAL.
11.CONTRACTOR SHALL FIELD LOCATE ANY EXISTING SLEEVES ON SITE PRIOR TO
CONSTRUCTION WITH THE AID OF THE GENERAL CONTRACTOR. MISSING SLEEVES SHALL
BE REPORTED IMMEDIATELY. NEW SLEEVES SHOWN ON PLANS ARE REQUIRED FOR BOTH
PIPING AND ELECTRICAL WIRING AT EACH HARDSCAPE CROSSING. COORDINATE
INSTALLATION OF SLEEVING WITH OTHER TRADES. ANY PIPE OR WIRE WHICH PASSES
BENEATH EXISTING HARDSCAPE WHERE SLEEVING WAS NOT INSTALLED WILL REQUIRE
HORIZONTAL BORING BY THE IRRIGATION CONTRACTOR.
12.INSTALL ALL ELECTRICAL POWER TO THE IRRIGATION CONTROL SYSTEM IN
ACCORDANCE WITH THE NATIONAL ELECTRIC CODE AND ALL APPLICABLE LOCAL
ELECTRIC UTILITY CODES.
13.THE FOLLOWING SHOULD BE NOTED REGARDING PIPE SIZING: IF A SECTION OF
UNSIZED PIPE IS LOCATED BETWEEN THE IDENTICALLY SIZED SECTIONS, THE UNSIZED
PIPE IS THE SAME NOMINAL SIZE AS THE TWO SIZED SECTIONS. THE UNSIZED PIPE
SHOULD NOT BE CONFUSED WITH THE DEFAULT PIPE SIZE NOTED IN THE LEGEND.
13.1.MAINLINE PIPE SIZES MAY VARY THROUGHOUT PROJECT. EACH MAINLINE LEG
IS SIZED TO ACCOMMODATE LARGEST VALVE ON THAT LEG. STATED SIZE IN LEGEND
MAY NOT BE THE LARGEST SIZE ON PLANS.
14.TWO-WIRE CONTROL CABLE DOES NOT REQUIRE ADDITIONAL SPARE WIRES TO BE
ROUTED WITH MAINLINE.
14.1.TWO-WIRE CONTROL SURGE ARRESTORS SHALL BE INSTALLED PER
MANUFACTURER'S RECOMMENDATIONS. ARRESTORS ARE NOT DEPICTED ON PLANS
15.TREES IN TURF ARE NOT IRRIGATED BY DRIP SYSTEM. DRIP LATERAL ROUTED NEAR
TREES IN TURF ARE NOT TO RECEIVE DRIP IRRIGATION. TREES IN NATIVE SEEDED AREAS
ARE IRRIGATED ON DRIP SYSTEM.
16.VALVES FOR NATIVE SEEDED AREAS SHALL BE ON A SEPARATE PROGRAM.
17.NATIVE SEEDED AREAS ARE TO BE IRRIGATED WITH A BELOW GRADE SYSTEM BUT
UTILIZED FOR ESTABLISHMENT OF SEED. SYSTEM IS NOT INTENDED TO OPERATE BEYOND
ESTABLISHMENT.
18.NO IRRIGATION EQUIPMENT, INCLUDING BUT NOT LIMITED TO, MAINLINE, VALVES,
AND SPRINKLERS, SHALL BE INSTALLED WITHIN 3' OF NEW BUILDING FOUNDATION.
EMITTER SCHEDULE
PLANT TYPE EMITTER TYPE GPH/OUTLET N0. OF EMITTERS TOTAL FLOW
GROUNDCOVER SINGLE OUTLET 1 GPH 1 1 GPH
PERENNIALS SINGLE OUTLET 1 GPH 1 1 GPH
1 GAL. SHRUB SINGLE OUTLET 1 GPH 1 1 GPH
5 GAL. SHRUB SINGLE OUTLET 1 GPH 2 2 GPH
TREE IN SHRUB BED SINGLE OUTLET 1 GPH 4-8 4-8 GPH
TREE IN NATIVE SEED INLINE DRIP 0.6 GPH N/A N/A
NOTES:
1.MULTIPLE OUTLET EMITTERS CAN BE UTILIZED IN DENSELY PLANTED AREAS AND FOR TREES IN SHRUB
BEDS.
2.NETAFIM TECHLINE CV DRIP TUBING MODEL TLCV6-18 FOR NATIVE TREE RINGS.
SYMBOL DESCRIPTION
THE IRRIGATION SYSTEM POINT-OF-CONNECTION (POC) SHALL BE
DOWNSTREAM OF THE DEDICATED IRRIGATION WATER TAP AND
METER AT THE APPROXIMATE LOCATION SHOWN (REFER TO CIVIL
PLANS FOR EXACT LOCATION). TAP, METER, SERVICE LINE, AND
BACKFLOW SHALL ALL BE THE SAME SIZE, AS STATED IN POC
NOTE. INSTALL BACKFLOW PREVENTION UNIT, MASTER VALVE
ASSEMBLY, AND FLOW SENSOR AS INDICATED. VERIFY EXACT
LOCATION OF POC WITH OWNER`S REPRESENTATIVE. VERIFY
PRESSURE AND FLOW ON SITE PRIOR TO CONSTRUCTION.
CONTRACTOR TO INSTALL BACKFLOW PER NATIONAL PLUMBERS
CODE AND PER LOCAL CODE. BACKFLOW SHALL BE TESTED UPON
INSTALLATION AND ANNUALLY THEREAFTER.
PEDESTAL MOUNT THE IRRIGATION CONTROLLER AT THE
APPROXIMATE LOCATION SHOWN. COORDINATE ELECTRICAL
POWER TO THE CONTROLLER WITH THE OWNER`S
REPRESENTATIVE. CARE SHOULD BE TAKEN TO INSTALL THE
IRRIGATION CONTROLLER IN A LOCATION THAT IS ACCESSIBLE FOR
MAINTENANCE, AND SCREENED FROM VIEW BEHIND PLANT
MATERIAL WHERE APPLICABLE. FINAL LOCATION TO BE APPROVED
BY OWNER`S REPRESENTATIVE. CONTROLLER TO BE INSTALLED
PER NATIONAL ELECTRIC CODE.
1
2
REFERENCE NOTES SCHEDULE
NORTH
SHEET TITLE:
SHEET NO:
ACAD FILE:
DRAWN:
CHECKED:
JOB NO:
REVISIONS DATE
ISSUE DATE:
CLIENT
SCALE 1"=20'
20100
FO
R
T
C
O
L
L
I
N
S
,
C
O
L
O
R
A
D
O
Fi
n
a
l
P
l
a
n
s
Cr
o
w
n
e
a
t
S
u
n
i
g
a
IRRIGATION LEGEND
AND NOTES
IR1.0
-
-
22501
22501L1
MLP
MLP
--
---
August 16, 2024
40
MPi Designs
PO BOX 369 ● AULT, CO ● 80610
970-402-3047
Michelle@MPiDesignsllc.com
8"
W
8"
W
8" W 8" W 8" W 8" W 8" W 8" W 8" W
E
E
E
E
TSALPOLYN
D
D D
ONOTPOLLTE
UCTILEIRON
RAINSTOWATERWAYS
U
TSALPOLYN
D
D D
ONOTPOLLTE
UCTILEIRON RAINSTOWATERWAYS
U
TSALPOLYN
D
D D
ONOTPOLLTE
UCTILEIRONRAINS
TOWATERWAYS
U
E E EEEE
E
E
E
E
E
E
E E E
E
E
E
E
E E E E E E E E E E E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
24
"
W
24
"
W
24
"
W
24
"
W
24
"
W
24
"
W
24
"
W
24
"
W
24
"
W
24
"
W
24
"
W
24
"
W
24
"
W
24
"
W
24
"
W
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
D
12
'
'
W
12
'
'
W
12
'
'
W
12
'
'
W
12
'
'
W
12
'
'
W
12
'
'
W
12
'
'
W
12
'
'
W
12
'
'
W
12
'
'
W
12
'
'
W
12
'
'
W
12
'
'
W
12
'
'
W
12
'
'
W
12
'
'
W
12
'
'
W
12
'
'
W
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
LI
N
D
E
N
M
E
I
E
R
R
O
A
D
LE
M
A
Y
A
V
E
N
U
E
AR
T
E
R
I
A
L
BUILDING 6000
(2)2"(2)2"
(2)2"(2)2"
(2)2"
(2)2"
A19
161"
A20
171"
A21
Drip1"
A22
Drip1"
A23
Drip1"
A28
Drip1"
A40
23N1"
A41
39N112"
2"112"
114"
114"
11 4"
NORTH
SHEET TITLE:
SHEET NO:
ACAD FILE:
DRAWN:
CHECKED:
JOB NO:
REVISIONS DATE
ISSUE DATE:
CLIENT
SCALE 1"=20'
20100
FO
R
T
C
O
L
L
I
N
S
,
C
O
L
O
R
A
D
O
Fi
n
a
l
P
l
a
n
s
Cr
o
w
n
e
a
t
S
u
n
i
g
a
IRRIGATION PLAN
NORTH
IR1.1
-
-
22501
22501L1
MLP
MLP
--
---
August 16, 2024
40
MATCHLINE - SEE SHEET IR1.2
MPi Designs
PO BOX 369 ● AULT, CO ● 80610
970-402-3047
Michelle@MPiDesignsllc.com
8" SS 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS
8"
W
8"
W
8"
W
8"
W
8"
W
8"
W
8"
W
8"
W
8"
W
8"
W
8"
W
8"
W
8"
W
8"
W
8"
W
8"
W
8"
W
E
E
E
E
E
E
E
E
E
E
E E E E E E E E E E E E
E
E
E
E
E
E
E
E
E
E
E
E E E E E E E E
E E
E
E
E
8" W 8" W 8" W 8" W 8" W 8" W 8" W
8" SS 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS
8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W
E
E
E
TSALPOLYN
D
D
D
ONOT
POLL
TE
UCTILE IRON
RAINS
TO
WATERWAYS
U
E E E E E E
EEEEEE
E
E
E
E
E
E
E
E
E
E
E
E
E
E /
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
24
"
W
24
"
W
24
"
W
24
"
W
24
"
W
24
"
W
24
"
W
24
"
W
24
"
W
24
"
W
24
"
W
24
"
W
24
"
W
24
"
W
24
"
W
24
"
W
12
"
W
12
"
W
12
"
W
12
"
W
12
"
W
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
D
15
"
S
S
15
"
S
S
15
"
S
S
15
"
S
S
15
"
S
S
15
"
S
S
15
"
S
S
S
18
"
S
S
18
"
S
S
18
"
S
S
18
"
S
S
18
"
S
S
18
"
S
S
18
"
S
S
18
"
S
S
18
"
S
S
(1)4"&(2)3"
(1)4"&(2)3"
(1)4"&(2)3"
10'' SS 10'' SS 10'' SS 10'' SS
8'' SS 8'' SS 8'' SS 8'' SS
8'' W 8'' W 8'' W
8'' W
F
F
UGE UGE
8'
'
U
D
8'
'
U
D
8'
'
U
D
8'
'
U
D
8'
'
U
D
8'
'
U
D
8'
'
U
D
8'
'
U
D
8'
'
U
D
8'
'
U
D
8'
'
U
D
8'
'
U
D
8'
'
U
D
8'
'
U
D
8'
'
U
D
8'
'
U
D
8'
'
U
D
8'
'
U
D
8'
'
U
D
8'
'
U
D
12
'
'
W
12
'
'
W
12
'
'
W
12
'
'
W
12
'
'
W
12
'
'
W
12
'
'
W
12
'
'
W
12
'
'
W
12
'
'
W
12
'
'
W
12
'
'
W
12
'
'
W
12
'
'
W
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
LI
N
D
E
N
M
E
I
E
R
R
O
A
D
BUILDING 3000
BUILDING 4000
BUILDING 5000
(2)2"
(2)2"
(2)3"
(2)2"
2"
A3
38112"
A4
241"
A5
35112"
A14
35112"
A15
38112"
A16
181"
A17
29112"
A18
40112"
A24
Drip1"
A27
Drip1"
A29
Drip1"
A39
12N1"
A25
Drip1"
A26
Drip1"
112"
112"
2"
114"
114"
2"114"
114"
114"
11 4"
2"
114"112"
2"
114"
11 4"112"114"
112"
NORTH
SHEET TITLE:
SHEET NO:
ACAD FILE:
DRAWN:
CHECKED:
JOB NO:
REVISIONS DATE
ISSUE DATE:
CLIENT
SCALE 1"=20'
20100
FO
R
T
C
O
L
L
I
N
S
,
C
O
L
O
R
A
D
O
Fi
n
a
l
P
l
a
n
s
Cr
o
w
n
e
a
t
S
u
n
i
g
a
IRRIGATION PLAN
NORTH
IR1.2
-
-
22501
22501L1
MLP
MLP
--
---
August 16, 2024
40
MATCHLINE - SEE SHEET IR1.3
MPi Designs
PO BOX 369 ● AULT, CO ● 80610
970-402-3047
Michelle@MPiDesignsllc.com
MATCHLINE - SEE SHEET IR1.1
MA
T
C
H
L
I
N
E
-
S
E
E
S
H
E
E
T
I
R
1
.
4
UP
UD UD UD UD UD UD UD UD UD UD UD UD UD UD UD UD UD UD UD UD UD UD
8" SS 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS
8"
S
S
8"
S
S
8"
S
S
8" SS 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS
8" W 8" W 8" W 8" W 8" W 8" W 8" W
8"
W
8"
W
8"
W
EEE
E
EEEE
E
E
E
E
E
8"
W
8"
W
8"
W
8"
W
8"
W
8" W
8" W8" W8" W8" W8" W8" W8" W8" W8" W8" W8" W
8"
W
8" W8" W8" W
MON
I
T
O
R
I
N
G
W
E
L
L
TRA
F
F
I
C
R
A
T
E
D
E
E
E
E
E
E
E
E E
E
E
E
TSALPOLYN
D
D D
ONOTPOLLTE
UCTILEIRON
RAINSTOWATERWAYS
U
E E
E
EE
E E E E E E E
E
E
E
E
E
E
E
E
E
E
E
W
60" W
60" W 60" W
EEEEEEEE
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
24
"
W
24
"
W
24
"
W
24
"
W
24
"
W
24
"
W
24
"
W
24" W
60" W 60" W 60" W 60" W 60" W 60" W 60" W 60" W 60" W 60" W 60" W 60" W 60" W
12
"
W
12
"
W
12
"
W
12
"
W
12
"
W
12
"
W
12
"
W
12
"
W
12
"
W
12
"
W
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
D
D
D
18
"
S
S
18
"
S
S
18
"
S
S
18
"
S
S
18
"
S
S
18
"
S
S
18
"
S
S
18
"
S
S
18
"
S
S
18
"
S
S
18
"
S
S
18
"
S
S
18
"
S
S
18
"
S
S
18
"
S
S
18
"
S
S
12'' W 12'' W 12'' W 12'' W 12'' W
60'' W 60'' W
60'' W
T
T
T
T
T
42'' W 42'' W 42'' W 42'' W 42'' W 42'' W 42'' W 42'' W 42'' W 42'' W 42'' W
4'' UD 4'' UD 4'' UD
UGE UGE UGE UGE
UG
E
UGE
UGE UGE UGE UGE UGE
UG
E
8'
'
U
D
8'
'
U
D
8'
'
U
D
8'
'
U
D
8'
'
U
D
8'
'
U
D
8'
'
U
D
G
G
G
G
G
G
G
G
G
G
G
G
G
CONTRACTOR SHALL INSTALL MAINLINE
AND WIRES AT HIGH POINT WHERE
POSSIBLE, WHILE AVOIDING UTILITY
LINES. MAINLINE ROUTING SHOWN FOR
CLARITY (TYP).
(2)2"(2)2"
(2)2"
(2)2"
(2)2"
(2)2"
LI
N
D
E
N
M
E
I
E
R
R
O
A
D
BUILDING 1000
(2)2"
(2)2"
A10
40112"
A11
39112"
A12
27112"
A13
40112"
A30
Drip1"
A31
Drip1"
A38
22N1"
114"
2"
114"
114"
2"
112"
114"
2"
114"
NORTH
SHEET TITLE:
SHEET NO:
ACAD FILE:
DRAWN:
CHECKED:
JOB NO:
REVISIONS DATE
ISSUE DATE:
CLIENT
SCALE 1"=20'
20100
FO
R
T
C
O
L
L
I
N
S
,
C
O
L
O
R
A
D
O
Fi
n
a
l
P
l
a
n
s
Cr
o
w
n
e
a
t
S
u
n
i
g
a
IRRIGATION PLAN
NORTH
IR1.3
-
-
22501
22501L1
MLP
MLP
--
---
August 16, 2024
40
MPi Designs
PO BOX 369 ● AULT, CO ● 80610
970-402-3047
Michelle@MPiDesignsllc.com
MATCHLINE - SEE SHEET IR1.2
MA
T
C
H
L
I
N
E
-
S
E
E
S
H
E
E
T
I
R
1
.
5
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
8" W 8" W
8" W
IR
E
TSALPOLYN
D
D D
ONOTPOLLTE
UCTILEIRON
RAINSTOWATERWAYS
U
TSALPOLYN
D
D
D
O
NOT
POLL
TE
UCTILE IRON
RAINS
TO
WATERWAYS
U
E
E
E
E
E
E
E
E
E
UG
U
UG
U
UG
U
UG
U
UG
U
UG
U
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
POC NO.1
TAP,METER, BACKFLOW SIZE: 1.5-INCH
SERVICE LINE SIZE: 1.5-INCH
PEAK DEMAND: 40 GPM
AVAILABLE PRESSURE: 70 PSI -100 PSI
CONTROLLER 'A'
120 VAC POWER REQUIRED
1
2
M
A
(2)2"
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
CONTRACTOR SHALL FIELD LOCATE
EXISTING TREES AND INSTALL LINES AT
LEAST 10' FROM TREE CENTER. HAND
DIG IF NECESSARY. INSTALL MAINLINE
ON TOP OF GRADE WHERE POSSIBLE.
CONTRACTOR SHALL INSTALL MAINLINE
AND WIRES AT HIGH POINT WHERE
POSSIBLE, WHILE AVOIDING UTILITY
LINES. MAINLINE ROUTING SHOWN FOR
CLARITY (TYP).
(1)4"&(2)3"
(2)2"
LE
M
A
Y
A
V
E
N
U
E
AR
T
E
R
I
A
L
BUILDING 4000
BU
I
L
D
I
N
G
5
0
0
0
114"
A1
40112"
A2
41112"
A6
27112"
A34
Drip1"
A35
Drip1"
A36
36N112"
2"
114"
114"114"
2"
114"
114"
112"
112"
2"
114"
114"
NORTH
SHEET TITLE:
SHEET NO:
ACAD FILE:
DRAWN:
CHECKED:
JOB NO:
REVISIONS DATE
ISSUE DATE:
CLIENT
SCALE 1"=20'
20100
FO
R
T
C
O
L
L
I
N
S
,
C
O
L
O
R
A
D
O
Fi
n
a
l
P
l
a
n
s
Cr
o
w
n
e
a
t
S
u
n
i
g
a
IRRIGATION PLAN
NORTH
IR1.4
-
-
22501
22501L1
MLP
MLP
--
---
August 16, 2024
40
MATCHLINE - SEE SHEET IR1.5
MPi Designs
PO BOX 369 ● AULT, CO ● 80610
970-402-3047
Michelle@MPiDesignsllc.com
MATCHLINE - SEE SHEET IR1.1
MA
T
C
H
L
I
N
E
-
S
E
E
S
H
E
E
T
I
R
1
.
2
UD UD UD UD UD UD UD UD UD
8" SS 8" SS
E E E E E E E
E E E E E E E E E E E E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
EE
EEEEEEEE
E E
E
E
60" W 60" W 60" W 60" W 60" W 60" W 60" W 60" W 60" W 60" W 60" W
D D
D
D
G
G
G
G
G
G
G
G
G
G
CONTRACTOR SHALL INSTALL MAINLINE
AND WIRES AT HIGH POINT WHERE
POSSIBLE, WHILE AVOIDING UTILITY
LINES. MAINLINE ROUTING SHOWN FOR
CLARITY (TYP).
(2)2"
(2)2"
LE
M
A
Y
A
V
E
N
U
E
AR
T
E
R
I
A
L
BUILDING 2000
114"
114"
A7
34112"
A8
40112"
A9
30112"
A32
Drip1"
A33
Drip1"
A37
18N1"
2"
2"
114"
112"
114"
114"
114"
NORTH
SHEET TITLE:
SHEET NO:
ACAD FILE:
DRAWN:
CHECKED:
JOB NO:
REVISIONS DATE
ISSUE DATE:
CLIENT
SCALE 1"=20'
20100
FO
R
T
C
O
L
L
I
N
S
,
C
O
L
O
R
A
D
O
Fi
n
a
l
P
l
a
n
s
Cr
o
w
n
e
a
t
S
u
n
i
g
a
IRRIGATION PLAN
NORTH
IR1.5
-
-
22501
22501L1
MLP
MLP
--
---
August 16, 2024
40
MPi Designs
PO BOX 369 ● AULT, CO ● 80610
970-402-3047
Michelle@MPiDesignsllc.com
MATCHLINE - SEE SHEET IR1.4
MA
T
C
H
L
I
N
E
-
S
E
E
S
H
E
E
T
I
R
1
.
3
NORTH
SHEET TITLE:
SHEET NO:
ACAD FILE:
DRAWN:
CHECKED:
JOB NO:
REVISIONS DATE
ISSUE DATE:
CLIENT
SCALE 1"=20'
20100
FO
R
T
C
O
L
L
I
N
S
,
C
O
L
O
R
A
D
O
Fi
n
a
l
P
l
a
n
s
Cr
o
w
n
e
a
t
S
u
n
i
g
a
IRRIGATION DETAILS
IR2.1
-
-
22501
22501L1
MLP
MLP
--
---
August 16, 2024
40
MPi Designs
PO BOX 369 ● AULT, CO ● 80610
970-402-3047
Michelle@MPiDesignsllc.com
MASTER VALVE
ASSEMBLY2 ISOLATION GATE VALVE
ASSEMBLY4
QUICK COUPLING VALVE
ASSEMBLY5 TYPICAL TRENCHING
DETAIL8
FLOW SENSOR
ASSEMBLY3
TYPICAL SLEEVING
DETAIL7
24" min.
PEDESTAL MOUNT CONTROLLER
ASSEMBLY6
BACKFLOW PREVENTION
UNIT1
NORTH
SHEET TITLE:
SHEET NO:
ACAD FILE:
DRAWN:
CHECKED:
JOB NO:
REVISIONS DATE
ISSUE DATE:
CLIENT
SCALE 1"=20'
20100
FO
R
T
C
O
L
L
I
N
S
,
C
O
L
O
R
A
D
O
Fi
n
a
l
P
l
a
n
s
Cr
o
w
n
e
a
t
S
u
n
i
g
a
IRRIGATION DETAILS
IR2.2
-
-
22501
22501L1
MLP
MLP
--
---
August 16, 2024
40
MPi Designs
PO BOX 369 ● AULT, CO ● 80610
970-402-3047
Michelle@MPiDesignsllc.com
REMOTE CONTROL TURF
VALVE ASSEMBLY9
REMOTE CONTROL DRIP
VALVE ASSEMBLY13
6-INCH GEAR-DRIVEN
ROTOR ASSEMBLY10 6-INCH POP-UP SPRAY
SPRINKLER ASSEMBLY11
SINGLE OUTLET EMITTER
ASSEMBLY14
INLINE DRIP PIPE ASSEMBLY
FOR TREES IN NATIVE 16
TYPICAL GROUNDING (AT VALVE)
ASSEMBLY12
DRIP FLUSH CAP
ASSEMBLY15
NORTH
SHEET TITLE:
SHEET NO:
ACAD FILE:
DRAWN:
CHECKED:
JOB NO:
REVISIONS DATE
ISSUE DATE:
CLIENT
SCALE 1"=20'
20100
FO
R
T
C
O
L
L
I
N
S
,
C
O
L
O
R
A
D
O
Fi
n
a
l
P
l
a
n
s
Cr
o
w
n
e
a
t
S
u
n
i
g
a
IRRIGATION
SPECIFICATIONS
IR2.3
-
-
22501
22501L1
MLP
MLP
--
---
August 16, 2024
40
MPi Designs
PO BOX 369 ● AULT, CO ● 80610
970-402-3047
Michelle@MPiDesignsllc.com
IRRIGATION SPECIFICATION SECTION 84 32 00
PART 1: GENERAL
1.1 SCOPE
Furnish all labor, materials, supplies, equipment, tools and transportation, and perform all operations in
connection with and reasonably incidental to the complete installation of the irrigation system, and
guarantee/warranty as shown on the drawings, the installation details, and as specified herein. Items of
work specifically included are:
A.Procurement of all applicable licenses, permits, and fees.
B.Coordination of Utility Locates (“Call Before You Dig”).
C.Verification of existing static pressure.
D.Connection of electrical power supply to the irrigation control system.
E.Connection to existing Mainline [or] copper tubing downstream of domestic meter or irrigation meter
(refer to civil drawings for connection location).
F.Maintenance period.
G.Sleeving for irrigation pipe and wire.
1.2 WORK NOT INCLUDED
Items of work specifically excluded or covered under other sections are:
A.Payment of all development, plant investment, or any other fees and permits associated with the
purchase and installation of the tap.
B.Excavation, installation, and backfill of tap into municipal water line.
C.Excavation, installation, and backfill of water meter and vault.
D.Provision of electrical power supply to the irrigation control system.
1.3 SUBMITTALS
A.Deliver four (4) copies of all required submittals to the Owners' Representative within 15 days from the
date of Notice to Proceed.
B.Materials List: Include pipe, fittings, mainline components, water emission components, control
system components. Quantities of materials need not be included.
C.Manufacturers' Data: Submit manufacturers' catalog cuts, specifications, and operating instructions
for equipment shown on the materials list.
D.Shop Drawings: Submit shop drawings for all details which will differ in the field from the typical detail
provided. Show products required for proper installation, their relative locations, and critical
dimensions. Note modifications to the installation detail. Shop drawings shall be submitted prior to
construction.
E.Project Record Drawings: Submit project record (as-built) drawings to Owner prior to commencement
of maintenance period (refer to specification section 3.10 for specific requirements).
1.4 RULES AND REGULATIONS
A.Work and materials shall be in accordance with the latest edition of the National Electric Code, the
Uniform Plumbing Code as published by the Western Plumbing Officials Association, and applicable
laws and regulations of the governing authorities; including local Municipality and Water District
details, standards, and specifications.
B.Backflow Prevention Device and water meter shall be installed per local code, tested, and approved
by local Water Department or District.
1.Local Municipality water details and specifications shall be utilized where applicable.
C.When the contract documents call for materials or construction of a better quality or larger size than
required by the above-mentioned rules and regulations, provide the quality and size required by the
contract documents.
D.If quantities are provided either in these specifications or on the drawings, these quantities are
provided for information only. It is the Contractor's responsibility to determine the actual quantities of
all material, equipment, and supplies required by the project and to complete an independent estimate
of quantities and wastage.
1.5 TESTING
A.Notify the Owners' Representative three days in advance of testing.
B.Pipelines jointed with rubber gaskets or threaded connections may be subjected to a pressure test at
any time after partial completion of backfill. Pipelines jointed with solvent-welded PVC joints shall be
allowed to cure at least 24 hours before testing.
C.Subsections of mainline pipe may be tested independently, subject to the review of the Owners'
Representative.
D.Furnish clean, clear water, pumps, labor, fittings, and equipment necessary to conduct tests or retests.
E.Hydrostatic Pressure Test:
1.Subject mainline pipe to a hydrostatic pressure equal to the anticipated operating pressure of 150
PSI for two hours. Test with mainline components installed. A 2 PSI pressure variation is allowed.
2.Subject lateral pipe to a hydrostatic pressure equal to the anticipated operating pressure of 50 PSI.
Test with risers for sprinklers capped.
3.Backfill to prevent pipe from moving under pressure. Expose couplings and fittings.
4.Leakage will be detected by visual inspection. Replace defective pipe, fitting, joint, valve, or
appurtenance. Repeat the test until the pipe passes test.
a.Cement or caulking to seal leaks is prohibited.
F.Operational Test:
1.Activate each remote control valve in sequence from controller. The Owners' Representative will
visually observe operation, water application patterns, and leakage.
2.Replace defective remote control valve, solenoid, wiring, or appurtenance to correct operational
deficiencies.
3.Replace, adjust, or move water emission devices to correct operational or coverage deficiencies.
4.Replace defective pipe, fitting, joint, valve, sprinkler, or appurtenance to correct leakage problems.
Cement or caulking to seal leaks is prohibited.
5.Repeat test(s) until each lateral passes all tests.
6.Final payment will be made after successful completion of the final System Acceptance Test.
1.6 CONSTRUCTION REVIEW
The purpose of on-site reviews by the Owners' Representative is to periodically observe the work in
progress and the Contractor's interpretation of the construction documents and to address questions with
regards to the installation.
A.Scheduled reviews such as those for irrigation system layout or testing should be scheduled with the
Owners' Representative as required by these specifications.
B.Impromptu reviews may occur at any time during the project.
C.Final review will occur at the completion of the irrigation system installation and Record (As-Built)
Drawing submittal.
1.7 GUARANTEE/ WARRANTY AND REPLACEMENT
The purpose of this guarantee/warranty is to insure that the Owner receives irrigation materials of prime
quality, installed and maintained in a thorough and careful manner.
A.For a period of one year from commencement of the formal maintenance period, guarantee/warranty
irrigation materials, equipment, and workmanship against defects. Fill and repair depressions.
Restore landscape or structural features damaged by the settlement of irrigation trenches or
excavations. Repair damage to the premises caused by a defective item. Make repairs within five (5)
days of notification from the Owners' Representative.
B.Contract documents govern replacements identically as with new work. Make replacements at no
additional cost to the contract price.
C.Guarantee/warranty applies to originally installed materials and equipment and replacements made
during the guarantee/warranty period.
PART 2: MATERIALS
2.1 QUALITY
Use materials which are new and without flaws or defects of any type, and which are the best of their
class and kind.
2.2 SUBSTITUTIONS
Pipe sizes referenced in the construction documents are minimum sizes, and may be increased at the
option of the Contractor.
2.3 SLEEVING
A.Install separate sleeve beneath paved areas to route each run of irrigation pipe or wiring bundle.
B.Sleeving material beneath pedestrian pavements shall be PVC Class 200 pipe with solvent welded
joints.
C.Sleeving beneath drives and streets shall be PVC Class 200 pipe with solvent welded joints.
D.Sleeving diameter: as indicated on the drawings and installation details or equal to twice that of the
pipe or wiring bundle.
2.4 PIPE AND FITTINGS
A.Mainline Pipe and Fittings:
1.Use rigid, unplasticized polyvinyl chloride (PVC) 1120, 1220 National Sanitation Foundation (NSF)
approved pipe, extruded from material meeting the requirements of Cell Classification 12454-A or
12454-B, ASTM Standard D1784, with an integral belled end.
2.Use Class 200, SDR-21, rated at 200 PSI, conforming to the dimensions and tolerances
established by ASTM Standard D2241. Use PVC pipe rated at higher pressures than Class 200 in
the case of small nominal diameters which are not manufactured in Class 200.
b.Use solvent weld pipe for mainline pipe with a nominal diameter less than 3-inches or where a
pipe connection occurs in a sleeve. Use Schedule 40, Type 1, PVC solvent weld fittings
conforming to ASTM Standards D2466 and D1784. Use primer approved by the pipe
manufacturer. Solvent cement to conform to ASTM Standard D2855 & D2564. Follow
pimer/cement manufacturer instructions for proper installation.
B.Lateral Pipe and Fittings:
1.Use rigid, unplasticized polyvinyl chloride (PVC) 1120, 1220 National Sanitation Foundation (NSF)
approved pipe, extruded from material meeting the requirements of Cell Classification 12454-A or
12454-B, ASTM Standard D1784, with an integral belled end suitable for solvent welding.
2.Use Class 200, SDR-21, rated at 200 PSI, conforming to the dimensions and tolerances
established by ASTM Standard D2241. Use PVC pipe rated at higher pressures than Class 200 in
the case of small nominal diameters which are not manufactured in Class 200.
Use UV radiation resistant Schedule 40, Type 1, PVC solvent weld fittings conforming to ASTM
Standards D2466 and D1784 for PVC pipe.
3.Use primer approved by the pipe manufacturer. Solvent cement to conform to ASTM Standard
D2855 & D2564, of a type approved by the pipe manufacturer.
4.For drip irrigation laterals around trees in native, use UV radiation resistant polyethylene pipe
manufactured from Prime Union Carbide G-resin 7510 Natural 7 manufactured by Union Carbide
or a Union Carbide Licensee with a minimum of 2% carbon black, and minimum nominal pipe ID
dimension of 0.810" for 3/4 inch pipe. or 0.613" for ½-inch pipe.
Use PVC /compression line fittings compatible with the drip lateral pipe. Use tubing stakes to hold
above-ground pipe in place.
C.Specialized Pipe and Fittings:
1. Copper pipe: Use Type "K" rigid conforming to ASTM Standard B88.
Use wrought copper or cast bronze fittings, soldered or threaded per the installation details. Use
a 95% tin and 5% antimony solder.
2.Use a dielectric union wherever a copper-based metal (copper, brass, bronze) is joined to an
iron-based metal (iron, galvanized steel, stainless steel).
3.Assemblies calling for pre-fabricated double swing joints shall utilize LASCO Unitized swing joints
or approved equal. Swing joints shall be rated at 315 psi, and use O-ring and street elbow
construction.
4.Inline Drip Emitter Tubing:
a.Provide a low volume dripper line with integral and evenly spaced pressure compensating
drippers at specified intervals in a discharge rate of 0.6 in gallons per hour (GPH). Inline Emitter
Drip Tubing shall consist of nominal sized one-half inch low-density linear polyethylene tubing.
The Inline Emitter Drip Tubing shall have internal pressure compensating, continuous
self-cleaning, integral drippers at a specified spacing of 18" on center, or blank tubing without
drippers where specified in details.
b.Use spiral barb fittings supplied by the same manufacturer as the hose.
c.All tubing shown outside of the bed area shall be UV Radiation Resistant Polyethylene pipe.
7.Low Density Polyethylene Hose:
a.Use pipe specifically intended for use as a flexible swing joint.
Inside diameter: 0.490+0.010 inch.
Wall thickness: 0.100+0.010 inch.
Color: Black.
b.Use spiral barb fittings supplied by the same manufacturer as the hose.
8.Assemblies calling for threaded pipe connections shall utilize PVC Schedule 80 nipples and PVC
Schedule 40 or 80 threaded fittings.
9.Joint sealant:
Use only Teflon-type tape pipe joint sealant on plastic threads. Use nonhardening, nontoxic pipe
joint sealant formulated for use on water-carrying pipes on metal threaded connections.
2.5 MAINLINE COMPONENTS
A.Main System Shutoff Valve: As per local practice and in compliance with local code.
B.Winterization Assembly: As per local practice and in compliance with local code.
C.Backflow Prevention Assembly: As per local practice and in compliance with local code, refer to
details for typical installation assembly. Utilize local Water Department Details and specifications
where applicable.
D.Master Valve Assembly: As presented in the installation details.
E.Isolation Gate Valve Assembly: As presented in the installation details. Install a separate valve box
over a 3-inch depth of 3/4-inch gravel for each assembly.
F.Quick Coupling Valve Assembly: Double swing joint arrangement as presented in the installation
details.
2.7 SPRINKLER IRRIGATION COMPONENTS
A.Remote Control Valve (RCV) Assembly for Sprinkler Laterals:
As presented in the installation details. Use wire connectors and waterproofing sealant to join control
wires to solenoid valves. Use standard Christy I.D. tags with hot-stamped black letters on a yellow
background. Install a separate valve box over a 3-inch depth of 3/4-inch gravel for each assembly.
Adjust flow control per manufacturer's recommendations prior to use. Install Hunter ICD100 decoder
on each valve for communication on 2-wire control system. Install one valve per decoder.
B.Sprinkler Assembly: As presented in the drawings and installation details. Use the sprinkler
manufacturer's pressure compensating screens (Rain Bird PCS) to achieve 30 PSI operating
conditions on each sprinkler and to control excessive operating pressures.
2.7 DRIP IRRIGATION COMPONENTS
A.Remote Control Valve (RCV) Assembly for Drip Laterals: As presented in the installation details. Use
wire connectors and waterproofing sealant to join control wires to solenoid valves. Use standard
Christy I.D. tags with hot-stamped black letters on a yellow background. Install a separate valve box
over a 3-inch depth of 3/4-inch gravel for each assembly. Adjust flow control per manufacturer's
recommendations prior to use. Install Hunter ICD100 decoder on each valve for communication on
2-wire control system. Install one valve per decoder.
B.Drip Emitter Assembly:
1.Utilize Netafim inline drip tubing around trees in native, per details and manufacture's
recommendations.
2.Barb-mounted, vortex and/or pressure compensating emitter device as presented in the installation
details. The device shall be Rain Bird Xeri-bug XB-10pc series.
3.Install emitter types and quantities on the following schedule:
a. Ground cover plant or perennial/annual beds: 1 single outlet emitter each or 1 single outlet
emitter per square foot of planting area, whichever is less.
b.Shrub: 2 single outlet emitters each.
c.Tree: 4 single outlet emitters each or 1 multi-outlet emitter each (with 4 outlets open).
4.Use 1/4-inch diameter flexible plastic tubing to direct water from emitter outlet to emission point.
Length of emitter outlet tubing shall not exceed five feet. Secure emitter outlet tubing with tubing
stakes.
5.Install an access sleeve for each multiple-outlet emitter located in a native area.
D.Flush Cap Assembly: as presented in the installation details. Locate at the end of each drip irrigation
lateral pipe. Install a separate valve box over a 3-inch depth of 3/4-inch gravel for each assembly.
2.8 CONTROL SYSTEM COMPONENTS
A.Irrigation Controller Unit:
1.As presented in the drawings and installation details.
2.Primary surge protection arrestors: per manufacturer's recommendations.
3.Valve output surge protection arrestors: per manufacturer's recommendations.
4.Lightning protection: 8-foot copper-clad grounding rod or 4” x 96” x 0.0625” copper-clad grounding
plate.
5.Wire markers: Pre-numbered or labeled with indelible non-fading ink, made of permanent,
non-fading material.
6.Valve output surge protection arrestors: As recommended by controller manufacturer. Ground
every 12 decoders or 1,000 feet per Hunter specifications.
7.Ground the end of every wire run per Hunter specifications
B.Instrumentation:
1.As presented in the drawings and installation details.
2.Rain Sensor: Mini-Clik II as manufactured by Hunter, Inc.
3.Flow Sensor: manufactured by Creative Sensor Technology (CST).
C.Control Wire:
4.Use Hunter IDEWIRE1 (#14 AWG wires) for power to decoders. Install per Hunter specifications.
5.Color: Use white for common ground wire. Use easily distinguished colors for other control wires.
Spare control wires shall be of a color different from that of the active control wire. Wire color shall
be continuous over its entire length.
6.Splices: Use wire connector with waterproof sealant. Wire connector to be of plastic construction
consisting of two (2) pieces, one piece which snap locks into the other. A copper crimp sleeve to
be provided with connector. Utilize DBR6-300 splices.
7.Encase wiring not located near PVC irrigation pipe in PVC Schedule 40 electrical conduit. Or
utilize warning tape: Inert plastic film highly resistant to alkalis, acids, or other destructive chemical
components likely to be encountered in soils. Three inches wide, colored yellow, and imprinted
with "CAUTION: BURIED ELECTRIC LINE BELOW."
2.9 OTHER COMPONENTS
A.Tools and Spare Parts: Provide operating keys, controller manual, servicing tools, sprinkler zone map
and schedule, test equipment, other items, and spare parts indicated in the General Notes of the
drawings.
PART 3: EXECUTION
3.1 INSPECTIONS AND REVIEWS
A.Site Inspections:
1.Verify site conditions and note irregularities affecting work of this section. Report irregularities to
the Owners' Representative prior to beginning work.
2.Beginning work of this section implies acceptance of existing conditions.
3.Contractor will be held responsible for coordination between landscape and irrigation system
installation.
4.Landscape material locations shown on the Landscape Plan shall take precedence over the
irrigation system equipment locations. If irrigation equipment is installed in conflict with the
landscape material locations shown on the Landscape Plan, the Contractor will be required to
relocate the irrigation equipment, as necessary, at Contractor's expense.
B.Utility Locates ("Call Before You Dig"):
1.Arrange for and coordinate with local authorities the location of all underground utilities.
2.Repair any underground utilities damaged during construction. Make repairs at no additional cost
to the contract price.
C.Irrigation System Layout Review: Irrigation system layout review will occur after the staking has been
completed. Notify the Owners' Representative two days in advance of review. Modifications will be
identified by the Owners' Representative at this review.
3.2 LAYOUT OF WORK
A.Stake out the irrigation system. Items staked include: sprinklers, pipe, control valves, controller, and
isolation valves.
B.Install all mainline pipe and mainline components inside of project property lines.
3.3 EXCAVATION, TRENCHING, AND BACKFILLING
A.Excavate to permit the pipes to be laid at the intended elevations and to permit work space for
installing connections and fittings.
B.Minimum cover (distance from top of pipe or control wire to finish grade):
1.24-inch over mainline pipe and over electrical conduit.
2.26-inch over control wire.
3.18-inch over lateral pipe to sprinklers.
4.8-inch over PVC drip lateral pipe to drip pipe transitions from drip system remote control valves in
shrub beds.
5.8-inch over UV radiation resistant lateral pipe in turf or native areas.
6.18-inch over PVC drip lateral pipe in turf or paved areas from drip system remote control valves to
PVC drip lateral pipe transitions.
7.3-inch minimum mulch cover over polyethylene drip lateral pipe in planting beds downstream of
drip system remote control valves. UV radiation resistant lateral pipe shall be installed on top of
landscape fabric under mulch cover, unless otherwise directed by owner.
8.Inline Drip tubing rings around trees in native shall be installed under mulch cover, unless
otherwise directed by owner.
C.Backfill only after lines have been reviewed and tested.
D.Excavated material is generally satisfactory for backfill. Backfill shall be free from rubbish, vegetable
matter, frozen materials, and stones larger than 2-inches in maximum dimension. Remove material
not suitable for backfill. Backfill placed next to pipe shall be free of sharp objects which may damage
the pipe. Stones larger than 1-inch maximum dimension are not permitted in first (deepest) 6-inches
of backfill.
E.Backfill unsleeved pipe and sleeves in either of the following manners:
1.Backfill and puddle the lower half of the trench. Allow to dry 24 hours. Backfill the remainder of
the trench in 6-inch layers. Compact to density of surrounding soil.
2.Backfill the trench by depositing the backfill material equally on both sides of the pipe in 6-inch
layers and compacting to the density of surrounding soil.
F.Backfill unsleeved pipe by depositing the backfill material equally on both sides of the pipe in 6-inch
layers and compacting each layer to 90% Standard Proctor Density, ASTM D698-78. Conduct one
compaction test for every 300 feet of trench. Costs for such testing and any necessary retesting shall
be borne by the Contractor. Use of water for compaction, "puddling", will not be permitted.
G.Enclose pipe and wiring beneath roadways, walks, curbs, etc. in sleeves. Minimum compaction of
backfill for sleeves shall be 95% Standard Proctor Density, ASTM D698-78. Conduct one
compaction test for each sleeved crossing less than 50 feet long. Conduct two compaction tests for
each sleeved crossing greater than 50 feet long. Costs for such testing and any necessary retesting
shall be borne by the Contractor. Use of water for compaction around sleeves, "puddling", will not be
permitted.
H.Dress backfilled areas to original grade. Incorporate excess backfill into existing site grades.
I.Where utilities conflict with irrigation trenching and pipe work, contact the Owners' Representative for
trench depth adjustments.
3.4 SLEEVING AND BORING
A.Install sleeving at a depth which permits the encased pipe or wiring to remain at the specified burial
depth.
B.Extend sleeve ends six inches beyond the edge of the paved surface. Cover pipe ends and mark with
stakes. Mark concrete with a chiseled "x" at sleeve end locations.
C.Bore for sleeves under obstructions which cannot be removed. Employ equipment and methods
designed for horizontal boring.
3.5 ASSEMBLING PIPE AND FITTINGS
A.General:
1.Keep pipe free from dirt and pipe scale. Cut pipe ends square and debur. Clean pipe ends.
2.Keep ends of assembled pipe capped. Remove caps only when necessary to continue assembly.
B.Mainline Pipe and Fittings:
1.Use only strap-type friction wrenches for threaded plastic pipe.
2.PVC Solvent Weld Pipe:
a.Use primer and solvent cement. Join pipe in a manner recommended by the manufacturer and
in accordance with accepted industry practices.
b.Cure for 30 minutes before handling and 24 hours before allowing water in pipe.
c.Snake pipe from side to side within the trench.
3.Fittings: The use of cross type fittings is not permitted.
C.Lateral Pipe and Fittings:
1.Use only strap-type friction wrenches for threaded plastic pipe.
2.PVC Solvent Weld Pipe:
a.Use primer and solvent cement. Join pipe in the manner recommended by the manufacturer
and in accordance with accepted industry practices.
b.Cure for 30 minutes before handling and 24 hours before allowing water in the pipe.
c.Snake pipe from side to side within the trench.
3.UV Radiation Resistant Polyethylene Pipe:
a.Join pipe in the manner recommended by manufacturer and in accordance with accepted
industry practices.
b.Snake pipe from side to side, on the soil surface, and hold in place with tubing stakes spaced
every five feet.
4.Fittings: The use of cross type fittings is not permitted.
D.Specialized Pipe and Fittings:
1.Copper Pipe:
a.Buff surfaces to be joined to a bright finish. Coat with solder flux.
b.Solder so that a continuous bead shows around the joint circumference.
2.Pre-fabricated double swing joints: Install per manufacturer's recommendations.
3.Low Density Polyethylene Hose: Install per manufacturer's recommendations.
4.PVC Threaded Connections:
a.Use only factory-formed threads. Field-cut threads are not permitted.
b.Use only Teflon-type tape.
c.When connection is plastic-to-metal, the plastic component shall have male threads and the
metal component shall have female threads.
8.Make metal-to-metal, threaded connections with Teflon-type tape or pipe joint compound applied
to the male threads only.
3.6 INSTALLATION OF MAINLINE COMPONENTS
A.Main System Shut Off Valve: As per local practice and in compliance with local code.
B.Winterization Assembly: As per local practice and in compliance with local code.
C.Backflow Prevention Assembly: Install where indicated on the drawings. Install assembly so that its
elevation, orientation, access, and drainage conform to the manufacturer's recommendations and
applicable health codes.
1.Pipe supports shall be utilized per industry standards and local codes where applicable.
D.Master Valve Assembly: Install where indicated on the drawings.
E.Isolation Gate Valve Assembly:
1.Install where indicated on the drawings.
2.Locate at least 12-inches from and align with adjacent walls or edges of paved areas.
F.Quick Coupling Valve Assembly: Install where indicated on the drawings.
3.8 INSTALLATION OF SPRINKLER IRRIGATION COMPONENTS
A.Remote Control Valve (RCV) Assembly for Sprinkler Laterals:
1.Flush mainline before installation of RCV assembly.
2.Install where indicated on the drawings. Wire connectors and waterproof sealant shall be used to
connect control wires to remote control valve wires. Install connectors and sealant per the
manufacturer's recommendations.
3.Install only one RCV to a valve box. Locate valve box at least 12-inches from and align with
nearby walls or edges of paved areas. Group RCV assemblies together where practical. Arrange
grouped valve boxes in rectangular patterns. Allow at least 12-inches between valve boxes.
4.Adjust RCV to regulate the downstream operating pressure.
5.Attach ID tag with controller station number to control wiring.
B.Sprinkler Assembly:
1.Flush lateral pipe before installing sprinkler assembly.
2.Install per the installation details at locations shown on the drawings.
3.Locate rotary sprinklers 6-inches from adjacent walls, fences, or edges of paved areas.
4.Locate spray & rotary sprinklers 3-inches from adjacent walls, fences, or edges of paved areas.
5.Set sprinklers perpendicular to the finish grade.
6.Supply appropriate nozzle or adjust arc of coverage of each sprinkler for best performance.
7.Adjust the radius of throw of each sprinkler for best performance.
3.8 INSTALLATION OF DRIP IRRIGATION COMPONENTS
A.Remote Control Valve (RCV) Assembly for Drip Laterals:
1.Flush mainline pipe before installing RCV assembly.
2.Locate as shown on the drawings. Wire connectors and waterproof sealant shall be used to
connect control wires to remote control valve wires. Connectors and sealant shall be installed as
per the manufacturer's recommendations.
3.Install only one RCV to valve box. Locate at least 12-inches from and align with nearby walls or
edges of paved areas. Group RCV assemblies together where practical.
4.Arrange grouped valve boxes in rectangular patterns.
B.Drip Emitter Assembly:
1.Locate as shown on the drawings and installation details.
2.Flush lateral pipe before installing emitter assembly.
3.Cut emitter outlet distribution tubing square.
4.Install an access sleeve as part of each multiple-outlet emitter assembly for emitters located in
native areas.
5.Use tools and techniques recommended by the manufacturer.
Make openings for barb-mounted emitters with the emitter manufacturer's hole-punching tool.
D.Flush Cap Assembly: Install at the end of each drip irrigation lateral pipe as shown on the installation
details.
3.9 INSTALLATION OF CONTROL SYSTEM COMPONENTS
A.Irrigation Controller Unit:
1.The location of the controller unit as depicted on the drawings is approximate; the Owners'
Representative will determine the exact site location.
2.Lightning protection: Ground rods are to have a minimum diameter of 5/8” and a minimum length
of 10 feet. These are to be driven into the ground in a vertical position or an oblique angle not to
exceed 45 degrees at a location 10 feet from the electronic equipment, the ground plate, or the
wires and cables connected to said equipment, as shown in the irrigation details. The rod is to be
stamped with the UL logo. A 6 AWG solid bare copper wire (about 12 feet long) shall be connected
to the ground rod by the installer using a Cadweld GR1161G ”One-Shot” welding kit [Paige Electric
part number 1820037.] This wire shall be connected to the electronic equipment ground lug as
shown in the detail above.
OR
3.Lightning Protection: A 25-foot continuous length (no splices allowed unless using exothermic
welding process) of 6 AWG solid bare copper wire is to be attached to the plate by the
manufacturer using an approved welding process. Install grounding plate to meet minimum
requirements of Article 250-52 (d) of the 199 National Electric Code. Plate must be made of a
copper alloy. Wire is to be connected to the electric equipment ground lug as shown in the detail
of page 1. The ground plate is to be installed to a minimum depth of 30”, or below the frost line if it
is lower than 30”, at a location 8 feet from the electronic equipment and underground wires and
cables.
Two (2) 50-pound bags of PowerSet [Paige Electric part number 1820058] earth contact
material must be spread so that it surrounds the copper plate evenly along its length within
a 6” wide trench. Salts, fertilizers, bentonite clay, cement, coke, carbon, and other
chemicals are not to be used to improve soil conductivity because these materials are
corrosive and will cause the copper electrodes to erode and become less effective with
time.
4.Install primary surge protection arrestors on incoming power lines.
5.Install one valve output surge protection arrestor on each control wire and one for the common
wire.
6.Attach wire markers to the ends of control wires inside the controller unit housing. Label wires with
the identification number (see drawings) of the remote control valve to which the control wire is
connected.
7.Install a 120-volt, 15 amp switched and grounded 3-prong receptacle with GFIC inside the
controller unit housing.
8.Connect control wires to the corresponding controller terminal.
B.Instrumentation:
1.Install sensors per the installation details and manufacturer's recommendations. Install at locations
shown on the drawings.
2.Install electrical connections between irrigation controller and sensors per manufacturer's
recommendations.
C.Control Wire:
1.Bundle control wires where two or more are in the same trench. Bundle with pipe wrapping tape
spaced at 10-foot intervals.
2.Provide a 24-inch excess length of wire in an 8-inch diameter loop at each 90 degree change of
direction, at both ends of sleeves, and at 100-foot intervals along continuous runs of wiring. Make
wiring loop by turning control wire 5 turns around 1-inch pipe. Coil 24-inch length of wire within
each remote control valve box.
3.Install common ground wire and one control wire for each remote control valve. Multiple valves on
a single control wire are not permitted.
4.If a control wire must be spliced, make splice with wire connectors and waterproof sealant,
installed per the manufacturer's instructions. Locate splice in a valve box which contains an
irrigation valve assembly, or in a separate 6-inch round valve box.
Use same procedure for connection to valves as for in-line splices.
5.Unless noted on plans, install wire parallel with and under PVC mainline pipe. If wire is installed
adjacent to section of metal pipe, separate wire from pipe minimum of 6-inches and install wire in
PVC conduit.
6.Encase wire not installed with PVC mainline pipe in electrical conduit. Or protect wire not installed
with PVC mainline pipe with a continuous run of warning tape placed in the backfill six inches
above the wiring.
3.11 INSTALLATION OF OTHER COMPONENTS
A.Tools and Spare Parts:
1.Prior to the Pre-Maintenance Review, supply to the Owner operating keys, servicing tools, test
equipment, and any other items indicated on the drawings.
2.Prior to Final Review, supply to the Owner the spare parts indicated in the General Notes on the
drawings.
B.Other Materials: Install other materials or equipment shown on the drawings or installation details to
be part of the irrigation system, even though such items may not have been referenced in these
specifications.
3.12 PROJECT RECORD (AS-BUILT) DRAWINGS
A.Maintain on-site and separate from documents used for construction, one complete set of contract
documents as Project Documents. Keep documents current. Do not permanently cover work until
as-built information is recorded.
B.Record pipe and wiring network alterations. Record work which is installed differently than shown on
the construction drawings. Record accurate reference dimensions, measured from at least two
permanent reference points, of each irrigation system valve, each backflow prevention device, each
controller or control unit, each sleeve end, each stub-out for future pipe or wiring connections, and
other irrigation components enclosed within a valve box.
C.Prior to Final Review, purchase from the Owners' Representative a reproducible mylar copy of the
drawings. Using technical drafting pen, duplicate information contained on the project drawings
maintained on site. Label each sheet "Record Drawing". Completion of the Record Drawings will be
a prerequisite for the Final Review.
3.13 MAINTENANCE
A.Upon completion of Final Review, maintain irrigation system for a duration of 30 calendar days. Make
periodic examinations and adjustments to irrigation system components so as to achieve the most
desirable application of water.
B.Following completion of the Contractor's maintenance period, the Owner will be responsible for
maintaining the system in working order during the remainder of the guarantee/warranty period, for
performing necessary minor maintenance, for trimming around sprinklers, for protecting against
vandalism, and for preventing damage during the landscape maintenance operation.
3.14 CLEAN-UP
A.Upon completion of work, remove from the site all machinery, tools, excess materials, and rubbish.
End of Section