Loading...
HomeMy WebLinkAboutMONTAVA - PHASE D CORE AND IRRIGATION POND - BDR240006 - SUBMITTAL DOCUMENTS - ROUND 3 - Erosion Control Letter/Report (2)Project: Disturbed Acres:15.5 EROSION CONTROL BMPs Units Estimated Quantity Unit Price Total Price EA 1 $532.00 $532.00 EA 1 $752.00 $752.00 SY 74,850 $0.26 $19,461.00 EA 1 $2,983.34 $2,983.34 EA 1 $800.00 $800.00 LS 1 $50,000.00 $50,000.00 LF 5,890 $2.00 $11,780.00 TONS 380 $175.00 $66,500.00 Sub-Total: $152,808.34 1.5 x Sub-Total: $229,212.51 Amount of security: $229,212.51 Total Acres x Price/acre: $17,568.42 $1,136.02 Sub-Total: $17,568.42 1.5 x Sub-Total: $26,352.63 Amount to Re-seed: $26,352.63 Minimum escrow amount: $3,000.00 Erosion Control Escrow:$229,212.51 Fields in yellow should be amended for this project. Silt Fence Rip Rap Concrete Washout Refresh Erosion Control Maintenance Erosion Control Inspection Dust Control Miniumum Escrow Amount Montava Subdivision Non-Pot Pump Station Unit Price of Seeding per acre: “The amount of the security must be based on one and one-half times the estimate of the cost to install the approved measures, or one and one-half times the cost to re- vegetate the disturbed land to dry land grasses based upon unit cost determined by the City's Annual Revegetation and Stabilization Bid, whichever is greater. In no instance, will the amount of security be less than one thousand five hundred dollars ($1,500) for residential development or three thousand dollars ($3,000) for commercial development” Surface Roughening Final Escrow Amount Example Erosion and Sediment Control Escrow/Security Calculation for The City of Fort Collins BMP Amount Reseeding Amount Concrete Washout 9/18/2024 9:55 AM K:\1230\0009\11 Cost Estimating\20240918_0005 Montava non-pot Escrow.xls