HomeMy WebLinkAboutMONTAVA - PHASE D CORE AND IRRIGATION POND - BDR240006 - SUBMITTAL DOCUMENTS - ROUND 3 - Erosion Control Letter/Report (2)Project: Disturbed Acres:15.5
EROSION CONTROL BMPs Units
Estimated
Quantity
Unit
Price
Total
Price
EA 1 $532.00 $532.00
EA 1 $752.00 $752.00
SY 74,850 $0.26 $19,461.00
EA 1 $2,983.34 $2,983.34
EA 1 $800.00 $800.00
LS 1 $50,000.00 $50,000.00
LF 5,890 $2.00 $11,780.00
TONS 380 $175.00 $66,500.00
Sub-Total: $152,808.34
1.5 x Sub-Total: $229,212.51
Amount of security: $229,212.51
Total Acres x Price/acre: $17,568.42
$1,136.02 Sub-Total: $17,568.42
1.5 x Sub-Total: $26,352.63
Amount to Re-seed: $26,352.63
Minimum escrow amount: $3,000.00
Erosion Control Escrow:$229,212.51
Fields in yellow should be amended for this project.
Silt Fence
Rip Rap
Concrete Washout Refresh
Erosion Control Maintenance
Erosion Control Inspection
Dust Control
Miniumum Escrow Amount
Montava Subdivision Non-Pot Pump Station
Unit Price of Seeding per acre:
“The amount of the security must be based on one and one-half times the estimate of the cost to install the approved measures, or one and one-half times the cost to re-
vegetate the disturbed land to dry land grasses based upon unit cost determined by the City's Annual Revegetation and Stabilization Bid, whichever is greater. In no
instance, will the amount of security be less than one thousand five hundred dollars ($1,500) for residential development or three thousand dollars ($3,000) for
commercial development”
Surface Roughening
Final Escrow Amount
Example Erosion and Sediment Control Escrow/Security
Calculation for The City of Fort Collins
BMP Amount
Reseeding Amount
Concrete Washout
9/18/2024 9:55 AM K:\1230\0009\11 Cost Estimating\20240918_0005 Montava non-pot Escrow.xls