Loading...
HomeMy WebLinkAboutMONTAVA - PHASE D CORE AND IRRIGATION POND - BDR240006 - SUBMITTAL DOCUMENTS - ROUND 3 - Utility Plans (2) I' 1Sanitary Sewer Analysis Results For Montava Phase J � July 16, submitted to: Boxelder Sanitation District c • , -4 T, INC. CONSULTING ENGINEERS �t v � r 'g Yr. Montava Phase D Sanitary Sewer Analysis 1.0 Introduction 1.1 Scope and Purpose This report presents the results of the Sanitary Sewer Analysis for the Montava Phase D Subdivision in Fort Collins, Colorado. This sanitary plan was prepared to identify infrastructure needs as the area develops. Montava Phase D is surrounded by future Montava Subdivision Phases, so the sanitary lines built with Phase D will be utilized to service the current and future phases. Certain assumptions were made concerning the development of the future surrounding properties. Updates to this Master Plan will be needed as plans for the future development of the area are finalized and changes to the overall concept necessitate an update. 1.2 Project Location and Description The proposed Montava Phase D Subdivision site is located west of N Giddings Rd between Richards Lake Rd and Mountain Vista Dr in Fort Collins, Colorado and consists of approximately 52 acres of undeveloped land. The proposed development contains 329 Single Family lots, Tracts intended for future multi-family development, and open space. 1BRI H�A®S LAKE RD Al �,M= PROJECT _JL �' MMMMI 00 LOCATION �® ®MM �� o ❑ ct Ln EM oIwo N MOUNTAIN VISTA DR N o a Li z J Q' W m VINE DR VICINITY MAP NOT TO SCALE TST,INC.CONSULTING ENGINEERS Page 1 Montana Phase D Sanitary Sewer Analysis 1.3 Existing Conditions The existing infrastructure around the Montava Subdivision includes a 21" Boxelder Sanitation District trunk line that runs through the middle of the proposed Montava Phase D site. This 21" trunk line carries effluent flow southeast through the Montava Subdivision. The layout of this existing trunk line can be seen in Appendix A. 2.0 Design Criteria and Assumptions 2.1 Sanitary Design Criteria and Assumptions The Boxelder Sanitation Districts Standards in combination with the Fort Collins Utilities Water and Wastewater Design Criteria Manual, adopted on May 2, 2017 was used to design the alignment, elevations, and sizing of internal sewer systems for Phase D. The future Montava Phases were based on the Montava Development Yield Estimate for Water System Analysis which can be seen in Appendix B. This yield estimate was used to determine the number of dwelling units as well as the square footage of commercial/employment buildings for each phase. Sanitary Design Criteria • Average Daily Residential Demand = 75 gal/capita/day • Average People per Dwelling Unit = 3 capita/DU • School Site = 1,020 gal/day/ac • Commercial Demand = 200 gal/day/1000 sq ft • Peaking Factor= 2.6 x Q average daily,cfs 0.16 • Infiltration & Inflow = 0.347 gpm/ac • The minimum and maximum velocity at the design flow rate shall be two (2) fps and ten (10)fps respectively • Manning's Equation Friction Factor ("n") = 0.010 3.0 Proposed Sanitary Layout 3.1 Proposed Conditions The proposed sanitary consists of 15", 12", and 8" main lines that outfall into the existing 21" Boxelder sanitary trunk line. Two connections to this existing mainline are proposed and the extents of each sanitary "basin" along with the proposed sanitary sewer layout of Phase D and approximate locations of future sanitary lines can be seen in the exhibit located in Appendix C. The sewer sizing and layout has been determined based on demand calculations and analysis that is discussed in section 4.0 of this report. %iiii.i.sul".. ENGINEERS Page 2 Montava Phase D Sanitary Sewer Analysis 4.0 Sanitary Sewer Analysis and Results 4.1 Sanitary Sewer Demand Calculations The previously mentioned criteria and assumptions were used to calculate the average day residential and non-residential sanitary flows from each lot, tract, and future phase. The average day effluent flow was applied to its associated upstream manhole and the cumulative base flow was determined through each stretch of pipe. A peaking factor was determined from each cumulative base flow value. Infiltration and inflows were determined based on the cumulative area flowing to each manhole. The peak effluent flow through each pipe was then determined by multiplying the cumulative base flow by the peaking factor and adding the cumulative infiltration and inflow. The peak effluent flow was converted from gallons per minute (gpm) to cubic feet per second (cfs). The peak flow was then input into FlowMaster (10.03.00.03) where the Manning Formula was utilized to determine velocities and flow depths within each pipe during peak events. All calculations were done in an Excel spreadsheet and the velocities and % Full (d/D) values were taken from FlowMaster and summarized within the Excel spreadsheet provided in Appendix D. 4.2 Sanitary Sewer Analysis and Results Based on the result, the peak flow scenario indicated no modeled pipes exceeded a d/D capacity of 80%. Four pipes slightly exceeded 50% d/D using the peak flow scenario. The total peak effluent discharge was also calculated and determined to be adequately handled by the existing 21" trunk line. 5.0 Conclusions and Recommendations The Montava Phase D sanitary sewer has been designed to meet the Boxelder Sanitation District Design Criteria and to adequately service the proposed and future Montava Subdivision. If there are any questions or additional information needed, please do not hesitate to contact us. 6.0 Appendices Appendix A - Existing Conditions Appendix B - Density Assumptions Appendix C - Proposed Sanitary Layout Appendix D - Sanitary Sewer Analysis Results %ii ilmi SULTING ENGINEERS Page 3 i i ♦ r i i i Z, \i i i \i i i TWI Ifl . i Facilities Pipe Diameter Pressure Mains Larimer Parcel C <all other values> 0 DRI • AEI O PRO Ep SgOiFe� 0 700 1,400 .) WWTP 6,8, 10 in CDOT Force Main 0 0 BSD MH By Sub-basin DRI/PRI • BSI O RAPS m Lift Station 12, 15, 16, 18 in Timnath Force Main 0 CIS OCI O CDOT O TMG <Title> Feet O E1 Points 24 in Walker Mfg.Force Main O BXI • PDI O PLT • WMPS Farnsworth Production Date: �27,30,42 in E1 Force Main • CSI GROUP UP 2/20/2018 Pipe labels are length,diameter,a type Jetter Sensitive Harmony Ridge FM Preliminary Pipe Montava Yield Estimate By Phase May 26,2021 ---------- -------------------- f ' FARM f PHASEA f � / f � 7 i PHASE B ` �`x f PHASE M max. f � 'PHASE C i - r� f � f f I \♦ a PHASE D _ PHASE L _ 1 f i PHASE E +�� PHASE F ' PHASE K Ji % f 1 11�� PHASE G ' ` I f .'� " t�' PHASE J � \\ PHASE H PHASE I i `------------ ------}- ----�'i-------------' -------------------- f I f f � f f \ 1 1 \ f f \ i PHASE N i PHASE 0 \\ f f e f f f f f f f f f f f Estimated Units By Type and Phase Unit Type Phase Total ID Name A B c D E F G H 1 J K L M N O # %SF %MF 50 du 29.do 31 du 18 du 41 du 169 du 6% 76 du 58 du 70 du 17 du 43 du 62 du 23 du 55 du 30 du 434 du 17% 66 du 58 du 40 du 65 du 24 du 42 du 26 du 51 du 64 du 48 du 484 du 19% 39%MF ......... .................... ........------........------- ._--- --- --- --- -.........--------- --- _._______-._-........------ .........------ ........------ ......'----"_'___________................................. 76 du 70 du 49 tlu 81 tlu 52 du 37 tlu 60 du 50 tlu 89 du 48 du 612 du 23% ....................................................................................................................................................................._------------------------------ 60du 47 du 102 du 204 tlu 71 du 56 du 31 du 90 tlu 68 du 89 tlu 32 du 66 du 916 du 35% 0 du 0% _:. ......___................................................................................................................................................................................................_____------------------ --------------- 36du 18 du 126 du 240 du 198 du 162 du 270 du 306 du 54 du 72 du 36 du 1,518 du 90% -du 0% 75 du 75 du 25 du 175 du 10% 268 du 311 du 154 du 444 du 560 du 321 du 340 du 376 du 421 du 301 du 303 du 281 du 228 du 4,308 du 41.87 ac 45.06 ac 16.42 ac 51.60 ac 35.67 ac 20.64 ac 38.34 ac 16.17 ac 28.89 ac 33.88 ac 39.76 ac 50.69 ac 23.66 ac 30.00 ac 45.30 ac 517.95 ac ....................................................................................................................................................................................................................................:................................ 7 du/ac 7 du/ae 10 du/ac 9 du/ac 16 du/ac 16 tlu/ac 9 du/ac 24 du/ac 15 du/ac 9 du/ac 8 du/ac 6 du/ac 10 tlu/m 11 du/ac 12 du/ac 16 du/ac 15 du/ac 27 du/ac 26 du/ac 15 du/ac 39 du/ac 25 du/ac 15 du/ac 13 du/ac 10 du/ac 17 du/ac PUD calculation method Minimum per PUD Estimated per PUD Estimated Non-residential By Phase Unit Type Phase Total Name A B c D E F G H I J K L M N O Area 39,787 sf 43,980 sf 21,027 sf 104,794 sf 3,600 sf 11,052 sf - 10,995 sf 21,027 sf 11,160 sf 57,834 sf .:_.._.................._.._.._.._.._............................................................................................................................................................................ ............................... .i 29,472 sf 29,320 sf 224,288 sf 210,000 sf 650,000 sf 1,143,080 sf U s1 0 si 3,800 61 0 0 80,311 of _, 0 si 84,295 sf 266,342 sf 11,160 sf 210,000 0650,000 s 1,305,708 sf Phase N and O Concept Layout I _ _ l i s$5 4 f -- - - 5 x o o I I � i i i Overall Program Distribution Program Distribution Program Size Notes 41.87 ac 45.06 ac 16A2 ac 51.60 ac ._-_-__35.67 ac________. Phase E 20.64 ac 38.34 ac Phase calculations are approximate, however they are reflected in the 16.17 ac PUD.Phase boundaries are 28.89 ac -generally drawn down road --------------------------centerlines or greenway corridors. 33.88 ac ....:...::..............................::..:.._. 39.76 ac _-._-._____..............--------_-------- 50.69 ac 23.66 ac 30.00 ac Phase 0 45.30 ac 517.95 ac 16.00 ac 108.00 ac Per agreement 124.00 ac 87.00 ac Agreement is between 80 and 100 189.00 ac Approximate 45.00 ac Approximate i z 0 — I— RICHARDS LAKE RD. - — — — — — — N o_ z it — — — — O S� - - - - — - - - - o \ LEI — v, I ` °- ` PHASE A � \ 268 DU o I o M m cn o FARM 0° I � DRAWN EKO � ` I CHECKED 0 DAP 0 PHASE B p 1 DESIGNED 7) 311 DU 0 � EKO Of Y Z FILENAME o Sanitary Sewer Master Plan July 202 —110000 I � � ,`n SS EX. SANITARY PHASE M PROP. 8" SANITARY f 1I 228 DU PROP. 12" SANITARY / 11,160 SF COMMERCIAL SCHOOL 0 / 1 PROP. 15" SANITARY / / � � � "` / PHASE C FUTURE SANITARY I 154 DU I I / FUTURE SANITARY WA / 3,600 SF COMMERCIAL I I FLOW DIRECTION WA '0Z Cn cn / `+ / / EXISTING SANITARY ! FLOW DIRECTION ° SS° L � / 0 PROPOSED MANHOLE SS SS SS SS SS SS ss ° I �I I / � �? PHASE L . I CONNECTION TO / MI I / 281 DU EXISTING TRUNKLINE — — ° - - - - - - - - - — _ - - - _SS1000, - - _ _ PHASE LINES CD — — " ..,)� " a+n EX. 21 �o SANITARY BASIN 1 210 0 SANITARY BASIN 2 j) TRUNKLINE A �,I PHASE D 2 J SANITARY BASIN 3 �A �2E I Q �+ W c I Z 20 I r a a 3F 2B 2b1 w o Q ?� M0 W U' / 20A Cl) 0 PHASE K I' — Cl)� v' mAcr"" '" 303 DU Z / i ,M EX. 1- IPAM biz � — — I BQXELDER I Z PHASE E TRUNKLINE Q \ � cn (NOT A PART) < Cn I I ' C / PHASE J 1 / 321PHASDU I /E F / (NOT A PART) — s ss ss I / / / M / U) / I � / C � / / � I NO E 3A / \ SS SSA / Npt 3A / PHASE H 1E / U� PHASE G / (NOT A PART) C/) (NOT A PART) � 1D� \< SS II 78 is ° I 'A PHASE I C o 421 DU '' 266 n 342 SF\ , SS COMMERCIAL EMPLOYMENT SS SS SS SS SS SS S - - - - TST, INC. MOUNTAIN VISTA DR. CONSULTING ENGINEERS 748 Whalers Way o Suite EX. 21" \ Colorado Collinsado 8055 a- BOXELDER = S Phone: 970.226.0557 Z TRUNKLINE \ JOB N0. w SS I 1230.0009.03 SCALE 1" = 300' F Z SS DATE JULY 9, 2024 I 300 0 300 600 SHEET ! I \ 1of1 scale 1"=300' feet MONTAVAPHASED SAN-SEWEBANALv51S Montava Phase D Sanitary Sewer Analysis along ln(p mml Peak Flow Flow loclry Full(-) Assumptions Le emr en sump- mtsloulg eauW ml We 1Q l8 .4 Fee14 �m0.116Nm m<.03 0.01 0.91 ].SO 013 em Acros PIts10U1 C e mlallDMce sflV ml N 10 DODO 6 0.94 6.85O.ib 0.32 9.95 0.02 1.13 9.ep PE= 26^Qlaalb.16 0 oeplu 0U= 1AA 0.006 LBB. 6:53 0.36 12a9. 0.031.410.00 P2VwpImlOav= 75 Tran 11 212 0 0.00 1M 5.53 - gpm Tmc111 3M 1L. 0 0.004 2d a- 5.04 b.69 14s. 45.5] 0.10 P AverageDally Dnmantl lSCM1O galltlaylatte rh.,A 12 21 0 D.DO 1L 1K 5,04 d5.57 1.. IDfit3mHon8lnRow gpmlame 143 0.00 WtureA 40.16 CommmcWVO0lcaDemenO gaVery/1000 0 t 1Bk 1K 8 0 5.]J 3.39 0.09. 20.30 321 -_ ]N 0 0 2.8> 29 11 11 11 8 0 d.54 0.17 2A3 38.08 ,- 14 3. 0600 1H. 8 0.004 0.00 4.54 M-0 ]6.66 0.17 2a.00 PM1aseL 30 O.DO 11-Ij1H. IG. & J2 11.25 3J.50 0.3. 11- 1 190 1.55 f 0 11 0 1 1G 2 1P 1E 0.69 aseM N 1a 0.." T24 2TJ.P 6s6.62 1.56 4- 56 IC 1B ]6 20015 0 0.00 21J.1 281 A8.80 1B 1A 6 0.0015 0 22>.]] 2.91 0.00 -.262 1.56 2.. 48.80 0.00 36.94 -To1N. 3.ef 9484 am MN i4MN ame AOAe tN[mtlrW BaeAow ativ Ba Peatlrg W 1n(mml. Peak Flow Peak Flow Veloclry %FWI(dq on r�u o �(nrl� fU/ltl unmfWl fQaN A4w(�ml u (AW4) mmupm iptel(-) o 4-) (wa) LeM 2HD. 2HC ]3 0.0032 509 01.06J- .. 28:03 30J.05 3.M 30.50 2NC 0t 36.50 2HB 2HA 0.0022 0 O.DO Bl.pe 0.00. 26A3 30J.05 0.80. 30.50 PM1aseL 2AB MA 0 0.06 3609 56J3 60.6s 0.36 4.6 e.AO' 2AA 2G 12 0.0022 201 O.OD 0.00 2.. 45A0 Z W 06 2. 9 5:09 21 2H. 8 0.004 0.78 2D36.84 0.09 11.E ffA 3H 0 405 0.01 LI 2G 8. 0.004 3 24J 0.19 0.93. 18.86 0.04 1.39 2G 0,35 33.03 0.95 48.30 2EB. 00002 6 ]203�130'63 002 1.13 9:80 u 0 0.03 00022 123.61 0:95 340> 438:20 0.4J 46.80. 2BB B 0.006 17 12.06� 0,35 146.J0 D.pb 2BA I6 0a5 39.OB 1.81 TmcFAA 2Bp 11.440.35 56.06 D.12' 222 z9a 2D o.opi65 o.po 19s. n.m p.v 2. 2D 8 4ae 269 0 148:49 4AA I.00s 0.63 224 6,15 0.U3 0.98 6:]0 48A 4AA J 1,09 0.2d 9:30 224 O.00 lab 11M 4B 0.24 4B 4A 0.00] 18 SA] 3103 20p 15.A1 4 0.63 J.6 0.24 LJO 2. 1- 0.00 30.80 LS6 281 5200 Tmal 90.00 630.]d OIkXe mm MN OlaON Bbpe conMOutlng ase Flo arlveH axl/ In In llpm) Flow PeaxPlow VeloNry %FWI(O/O) nblEutmn Unl IO/N1 ntb(oUl fWmlw ow(gpml ase !�) ml(goml totaMcn) 11Va1 D.90 6H 5G 0 0.004 0.63 121 5J,D2. O.1 121.. 35.J9 430.32 0.9047.10 SBB Is 2�97 0.39 3- 54.]2 5BA 0.004 32 106 25.40 5BA 8 0.004 2 0,31 0.39 3].3] 61- 0.15 2.05 28a0 SAB 2.84 0:39 38.16 0.12 6E 60 00022 15 2.74 8 8D SC 1.. 10 29 8 75 1.1. 2.]5 50 0.0022 0 130.dd 3.IJ - 39.34 1.08 2.7549.30 0.0022 5A 3G 0 0.004 Oi.Os 3.16 4B2d] I.OJ 49.50 3G 20D22 ]40.96 0:50 2.>6 49:00 0 O.Op5 40.97 53.11 D.12 2.D8 .1 3AA 1.08 53a0 2.00 22:2 3P IE 12 1,112 1O.JB 13.s9 1,15 1,11 411 1117 Ll 1,11 11A 30 0022 031 2.1e 2.7' 3C 30 33 0.0022 0 220 44.53 a1.e0 2.78 E. T4M2 14Ab9 3:f6 4f:9B 48468 1.11 1-1.UWIaIL i.a cxnixcena