HomeMy WebLinkAboutTHE MARK - FDP240013 - SUBMITTAL DOCUMENTS - ROUND 2 - Traffic Study THE MARK AT FORT COLLINS APARTMENTS
TRANSPORTATION IMPACT STUDY
FORT COLLINS, COLORADO
SEPTEMBER 2024
Prepared for:
Landmark Properties, Inc.
315 Oconee Street
Athens, GA 30601
Prepared by:
DELICH ASSOCIATES
.C ��#'� "+ "•�'`�
2272 Glen Haven Drive ,�, ., ,,.� �,� �>.,,
Loveland, CO 80538 � � 'e
Phone: 970-669-2061 ��;������� �'' , ,t
� �m„�a:' :�
�; �� ���
���.. ;'�
����� l 7 ZO����=
� : � �..�.,v�,��.*6�yQ�/ �eo��..:--: .�
.. __ � �����������'"-.A :�
� ;� r
Project#2433
DELICH The Mark at Fort Collins Apartments TIS, September 2024 ASSOCIATES
TABLE OF CONTENTS
I. INTRODUCTION ........................................................................................................ 1
II. EXISTING CONDITIONS .......................................................................................... 2
Land Use ......................................................................................................................... 2
Roads .............................................................................................................................. 2
Existing Traffic ................................................................................................................. 5
Existing Operation ........................................................................................................... 5
Pedestrians Facilities ...................................................................................................... 9
Bicycle Facilities .............................................................................................................. 9
Transit Facilities .............................................................................................................. 9
III. PROPOSED DEVELOPMENT ............................................................................... 10
Trip Generation ............................................................................................................. 10
Trip Distribution ............................................................................................................. 10
Background Traffic Projections ..................................................................................... 13
Trip Assignment/Total Traffic ........................................................................................ 13
Signal Warrants ............................................................................................................. 13
Geometry ...................................................................................................................... 13
Operation Analysis ........................................................................................................ 13
Pedestrian Level of Service ........................................................................................... 20
Bicycle Level of Service ................................................................................................ 25
Transit Level of Service ................................................................................................. 26
IV. CONCLUSIONS/RECOMMENDATIONS .............................................................. 27
LIST OF TABLES
1. Current Peak Hour Operation .................................................................................... 8
2. Trip Generation ....................................................................................................... 10
3. Short Range (2029) Background Peak Hour Operation .......................................... 21
4. Long Range (2045) Background Peak Hour Operation ........................................... 22
5. Short Range (2029) Total Peak Hour Operation ..................................................... 23
6. Long Range (2045) Total Peak Hour Operation ...................................................... 24
DELICH The Mark at Fort Collins Apartments TIS, September 2024 ASSOCIATES
LIST OF FIGURES
1. Site Location ............................................................................................................. 3
2. Existing Intersection Geometry ................................................................................. 4
3. Recent Peak Hour Traffic .......................................................................................... 6
4. Averaged/Balances Recent Peak Hour Traffic .......................................................... 7
5. Site Plan .................................................................................................................. 11
6. Trip Distribution ....................................................................................................... 12
7. Short Range (2029) Background Peak Hour Traffic ................................................ 14
8. Long Range (2045) Background Peak Hour Traffic ................................................. 15
9. Site Generated Peak Hour Traffic ........................................................................... 16
10. Short Range (2029) Total Peak Hour Traffic ........................................................... 17
11. Long Range (2045) Total Peak Hour Traffic ............................................................ 18
12. Short Range (2029) and Long Range (2045) Geometry ......................................... 19
APPENDICES
A. Base Assumptions form and related information
B. Recent Peak Hour Traffic
C. Current Peak Hour Operation/Level of Service Descriptions/Fort Collins LOS
Standards
D. Short Range (2029) Background Peak Hour Operation
E. Long Range (2045) Background Peak Hour Operation
F. Short Range (2029) Total Peak Hour Operation
G. Long Range (2045) Total Peak Hour Operation
H. Pedestrian/Bicycle Level of Service
DELICH The Mark at Fort Collins Apartments TIS, September 2024 ASSOCIATES Page 1
I. INTRODUCTION
This transportation impact study (TIS) addresses the capacity, geometric, and
control requirements at and near the proposed The Mark at Fort Collins Apartments
student housing development. The proposed The Mark at Fort Collins Apartments site is
located in the southwest quadrant of the Johnson/Spring intersection in Fort Collins,
Colorado.
During the course of the analysis, numerous contacts were made with the project
developer (Landmark Properties, Inc.), the project planning consultant (Ripley Design),
and the Fort Collins Traffic Engineering staff. This study generally conforms to the format
set forth in the Fort Collins transportation impact study guidelines contained in the “Larimer
County Urban Area Street Standards” (LCUASS). The base assumptions packet is
provided in Appendix A. The study involved the following steps:
• Collect physical, traffic, and development data;
• Perform trip generation, trip distribution, and trip assignment;
• Determine peak hour traffic volumes;
• Conduct capacity and operational level of service analyses on key intersections;
• Analyze signal warrants;
• Conduct level of service evaluation of pedestrian, bicycle, and transit modes of
transportation.
DELICH The Mark at Fort Collins Apartments TIS, September 2024 ASSOCIATES Page 2
II. EXISTING CONDITIONS
The location of The Mark at Fort Collins Apartments site is shown in Figure 1. It is
important that a thorough understanding of the existing conditions be presented.
Land Use
Land uses in the area are primarily commercial or residential. Land adjacent to the
site is flat (<2% grade) from a traffic operations perspective. This site is near the center of
Fort Collins. Colorado State University is north of the proposed The Mark at Fort Collins
Apartments site.
Roads
The primary streets near The Mark at Fort Collins Apartments site are College
Avenue, The Mark at Fort Collins, Spring Park Drive, Spring Court, and Arthur Drive.
Figure 2 shows a schematic of the existing geometry at the College/Spring Park-
Johnson and College/ Arthur-Retail Access intersections.
College Avenue (US287) is to the east of The Mark at Fort Collins Apartments
site. It is classified as a six-lane arterial street on the Fort Collins Master Street Plan.
Currently, College Avenue has a six-lane cross section in this area. At the College/
Spring Park-Johnson intersection, College Avenue has northbound and southbound left-
turn lanes and three through lanes in each direction. At the College/Arthur-Retail
Access intersection, College Avenue has northbound and southbound left-turn lanes
and three through lanes in each direction. The College/Spring Park-Johnson
intersection has signal control. The College/Arthur-Retail Access intersection has stop
sign control on Arthur Drive. The posted speed limit in this area of College Avenue is
40 mph.
The Mark at Fort Collins is to the north of (adjacent to) The Mark at Fort Collins
Apartments site. It is an east-west street designated as a local street on the Fort Collins
Master Street Plan. Currently, it has a two-lane cross section with parking on both sides
of the street. The Mark at Fort Collins is the west leg of the College/Spring Park-
Johnson intersection. At the College/Spring Park-Johnson intersection, The Mark at
Fort Collins has all eastbound movements combined into a single lane. The Mark at
Fort Collins is off set to the north of Spring Park Drive (~45 feet). There is no posted
speed limit on The Mark at Fort Collins.
Spring Park Drive is to the east of The Mark at Fort Collins Apartments site. It is
an east-west street designated as a collector street on the Fort Collins Master Street
Plan. Currently, it has a two-lane cross section in this area. Spring Park Drive is the
east leg of the College/Spring Park-Johnson intersection. At the College/Spring Park-
Johnson intersection, Spring Park Drive has a westbound left-turn lane and a
westbound through/right-turn lane. The posted speed limit on Spring Park Drive is 25
mph.
Mason Trail
Johnson
Arthur
Springpark
Stuart
Co
l
l
e
g
e
Sp
r
i
n
g
Prospect
Ba
y
Spring Creek Trail
SCALE: 1"=500'
SITE LOCATION Figure 1
DELICH
ASSOCIATES The Mark at Fort Collins Apartments TIS, September 2024
Page 3
EXISTING GEOMETRY Figure 2
The Mark at Fort Collins Apartments TIS, September 2024
Page 4
Johnson Drive Spring Park Drive
Arthur Drive
Co
l
l
e
g
e
A
v
e
n
u
e
Retail Access
- Denotes Lane
ST
O
P
ST
O
P
DELICH
ASSOCIATES
80
'
L
a
n
e
p
l
u
s
10
0
'
T
a
p
e
r
80
'
L
a
n
e
p
l
u
s
10
0
'
T
a
p
e
r
60
'
L
a
n
e
p
l
u
s
10
0
'
T
a
p
e
r
65
'
L
a
n
e
p
l
u
s
75
'
T
a
p
e
r
DELICH The Mark at Fort Collins Apartments TIS, September 2024 ASSOCIATES Page 5
Spring Court is to the east of (adjacent to) The Mark at Fort Collins Apartments
site. Spring Court is a north-south street designated as a local street on the Fort Collins
Master Street Plan. Currently, Spring Court has a two-lane cross section with parking
on both sides of the street. There is no posted speed limit on Spring Court.
Arthur Drive is an east-west street designated as a local street on the Fort Collins
Master Street Plan. Currently, Arthur Drive has a two-lane cross section. Parking is
prohibited on Arthur Drive. Arthur Drive is the west leg of the College/Arthur-Retail
Access intersection. The east leg is into a retail development. At the College/Arthur-
Retail Access intersection, Arthur Drive and the Retail Access have all movements
combined into single lanes. The posted speed limit in this area of Arthur Drive is 25
mph.
Existing Traffic
Figure 3 shows the recent morning and afternoon peak hour traffic counts at the
College/Spring Park-Johnson and College/Arthur-Retail Access intersections. Recent
count data at the College/Johnson-Spring Park and College/Arthur-Retail Access
intersections was obtained in August 2024. Raw count data is provided in Appendix B.
Since the peak hour counts were performed on different days, the traffic volumes
between the intersections were averaged/balanced and are shown in Figure 4.
Existing Operation
The College/Spring Park-Johnson and College/Arthur-Retail Access intersections
were evaluated using techniques provided in the Highway Capacity Manual, 6th Edition.
Using the peak hour traffic shown in Figure 4, the peak hour operation is shown in Table
1. The College/Spring Park-Johnson and College/Arthur-Retail Access intersections
meet the City of Fort Collins Motor Vehicle LOS Standard during the morning and
afternoon peak hours with existing signal control, geometry, and signal timing
Calculation forms are provided in Appendix C. A description of level of service for
signalized and unsignalized intersections from the Highway Capacity Manual, 6th Edition
and a table showing the Fort Collins Motor Vehicle LOS Standards (Intersections) are
also provided in Appendix C. Acceptable operation at signalized intersections during
the peak hours is defined as level of service D or better for the overall intersection, and
level of service E or better for any leg or movement. At arterial/arterial and
collector/collector stop sign controlled intersections, acceptable operation is considered
to be at level of service E, overall and level of service F, for any approach leg. At
arterial/collector, arterial/local, collector/ local, and local/local stop sign controlled
intersections, acceptable operation is considered to be at level of service D, overall and
level of service F, for any approach leg.
RECENT PEAK HOUR TRAFFIC Figure 3
The Mark at Fort Collins Apartments TIS, September 2024
Page 6
Johnson Drive Spring Park Drive
Arthur Drive
Co
l
l
e
g
e
A
v
e
n
u
e
Retail Access
DELICH
ASSOCIATES
AM/PM
3/7
0/1
5/3
15/51
0/2
43/434/
2
15
/
2
2
96
9
/
1
9
5
4
3/
1
11
1
9
/
1
5
0
4
17
/
3
1
8/
8
7/
5
1/1
0/0
1/14
0/0
0/0
0/111
/
1
0
1/
1
92
9
/
2
0
0
8
5/
4
12
0
3
/
1
4
4
7
0/
1
0/
6
4/
2
AVERAGED/BALANCED
RECENT PEAK HOUR TRAFFIC Figure 4
The Mark at Fort Collins Apartments TIS, September 2024
Page 7
Johnson Drive Spring Park Drive
Arthur Drive
Co
l
l
e
g
e
A
v
e
n
u
e
Retail Access
DELICH
ASSOCIATES
AM/PM
3/7
0/1
5/3
15/51
0/2
43/434/
2
15
/
2
2
94
5
/
1
9
6
4
3/
1
11
4
2
/
1
4
6
9
17
/
3
1
8/
8
7/
5
1/1
0/0
1/14
0/0
0/0
0/111
/
1
0
1/
1
95
3
/
2
0
0
3
5/
4
11
8
0
/
1
4
8
2
0/
1
0/
6
4/
2
DELICH The Mark at Fort Collins Apartments TIS, September 2024 ASSOCIATES Page 8
TABLE 1
Current Peak Hour Operation
Intersection Movement
College/Spring Park-Johnson
(signal)
College/Arthur-Retail Access
(stop sign)
DELICH The Mark at Fort Collins Apartments TIS, September 2024 ASSOCIATES Page 9
Pedestrian Facilities
There are sidewalks along College Avenue, Spring Park Drive, The Mark at Fort
Collins (except adjacent to The Mark at Fort Collins Apartments site), the east side of
Spring Court, and the north side of Arthur Drive. There is a ped/bike underpass of
College Avenue along the Spring Creek Trail. There is also a ped/bike underpass of the
Max Guideway and the railroad tracks that connects to the Mason Trail.
Bicycle Facilities
Bicycle lanes exist on Spring Park Drive. The Spring Creek Trail is to the north
of the site and Mason Trail is to the west of the site. Bike lanes are not required on
local streets.
Transit Facilities
This area of Fort Collins is served by The Max. There is a Max stop to the
southwest of The Mark at Fort Collins Apartments site.
DELICH The Mark at Fort Collins Apartments TIS, September 2024 ASSOCIATES Page 10
III. PROPOSED DEVELOPMENT
The Mark at Fort Collins Apartments is a student residential development with
397 beds. Figure 5 shows a site plan of The Mark at Fort Collins Apartments. The site
plan shows access to/from Spring Court. The short range analysis (Year 2029) includes
development of The Mark at Fort Collins Apartments site and an appropriate increase in
background traffic, due to normal growth, and other approved developments in the area.
The long range analysis (Year 2045) includes background traffic due to normal growth
and in general accordance with the Fort Collins Structure Plan.
Trip Generation
Trip generation is important in considering the impact of a development such as this
upon the existing and proposed street system. A compilation of trip generation information
contained in Trip Generation, 11th Edition, ITE was used to estimate trips that would be
generated by the proposed/expected use at a site. Table 2 shows the daily and peak hour
trip generation for The Mark at Fort Collins Apartments site. It is assumed that alternative
modes (pedestrian, bicycle, and transit) have been considered in the ITE rates for
student apartments. The trip generation of The Mark at Fort Collins Apartments
resulted in 1,020 daily trip ends, 28 morning peak hour trip ends, and 83 afternoon peak
hour trip ends.
TABLE 2
Trip Generation
Code Use Size Rate Trips Rate In Rate Out Rate In Rate Out
226 Apartment (Mid-Rise) Beds 2.57 1020 46% 13 54% 15 47% 39 53% 44
Trip Distribution
Directional distribution of the generated trips was determined for The Mark at Fort
Collins Apartments site. Figure 6 shows the vehicle trip distribution used for The Mark at
Fort Collins Apartments site. The trip distribution was agreed to by City of Fort Collins staff
in the scoping discussions.
SCALE: 1"=60'
SITE PLAN Figure 5
DELICH
ASSOCIATES The Mark at Fort Collins Apartments TIS, September 2024
Page 11
Johnson Drive
S
p
r
i
n
g
C
o
u
r
t
Mason Trail
Johnson
Arthur
Spring Park
Stuart
Co
l
l
e
g
e
Sp
r
i
n
g
30
%
70
%
SCALE: 1"=300'
TRIP DISTRIBUTION Figure 6
DELICH
ASSOCIATES The Mark at Fort Collins Apartments TIS, September 2024
Page 12
DELICH The Mark at Fort Collins Apartments TIS, September 2024 ASSOCIATES Page 13
Background Traffic Projections
Figures 7 and 8 show the respective short range (2029) and long range (2045)
background peak hour traffic projections at the College/Spring Park-Johnson and
College/Arthur-Retail Access intersections. Traffic at the key intersections was
increased at a rate of one percent per year for the short range (2029) and long range
(2045) background traffic forecasts.
Trip Assignment/Total Traffic
Trip assignment is how the generated and distributed trips are expected to be
loaded on the street system. The assigned trips are the resultant of the trip distribution
process. Using the trip distribution shown in Figure 6, Figure 9 shows the assignment
of the site generated peak hour vehicle traffic. The site generated vehicle traffic was
combined with the background traffic to determine the total forecasted vehicle traffic at
the key intersections. Figures 10 and 11 shows the respective short range (2029) and
long range (2045) total peak hour vehicle traffic at the key intersections.
Signal Warrants
As a matter of policy, traffic signals are not installed at any location unless warrants
are met according to the Manual on Uniform Traffic Control Devices (MUTCD). The
College/Spring Park-Johnson intersection is currently signalized. The stop sign
controlled intersection at the College/Arthur-Retail Access intersection is not expected to
meet peak hour signal warrants and does not meet signal spacing requirements.
Geometry
The short range (2029) and long range (2045) geometry is shown in Figure 12.
This is the existing geometry at the College/Spring Park-Johnson and College/Arthur-
Retail Access intersections.
Operation Analysis
Operation analyses were performed at the College/Spring Park-Johnson and
College/Arthur-Retail Access intersections. The operation analyses were conducted for
the short range future, reflecting a year 2029 condition and for the long range future,
reflecting a year 2045 condition. The long range (2045) operational analyses are used
for planning and informational purposes only.
SHORT RANGE (2029) BACKGROUND
PEAK HOUR TRAFFIC Figure 7
The Mark at Fort Collins Apartments TIS, September 2024
Page 14
Johnson Drive Spring Park Drive
Arthur Drive
Co
l
l
e
g
e
A
v
e
n
u
e
Retail Access
DELICH
ASSOCIATES
AM/PM
3/7
0/1
5/3
16/54
0/2
45/454/
2
16
/
2
3
99
3
/
2
0
6
4
3/
1
12
0
0
/
1
5
4
4
18
/
3
3
8/
8
7/
5
1/1
0/0
1/15
0/0
0/0
0/112
/
1
1
1/
1
10
0
2
/
2
1
0
5
5/
4
12
4
0
/
1
5
5
8
0/
1
0/
6
4/
2
LONG RANGE (2045) BACKGROUND
PEAK HOUR TRAFFIC Figure 8
The Mark at Fort Collins Apartments TIS, September 2024
Page 15
Johnson Drive Spring Park Drive
Arthur Drive
Co
l
l
e
g
e
A
v
e
n
u
e
Retail Access
DELICH
ASSOCIATES
AM/PM
4/9
0/1
6/4
18/63
0/2
53/535/
2
18
/
2
7
11
6
5
/
2
4
2
0
4/
1
14
0
7
/
1
8
1
0
21
/
3
8
10
/
1
0
9/
6
1/1
0/0
1/17
0/0
0/0
0/114
/
1
2
1/
1
11
7
4
/
2
4
6
8
6/
5
14
5
4
/
1
8
2
6
0/
1
0/
7
5/
2
SITE GENERATED
PEAK HOUR TRAFFIC Figure 9
The Mark at Fort Collins Apartments TIS, September 2024
Page 16
Johnson Drive Spring Park Drive
Arthur Drive
Co
l
l
e
g
e
A
v
e
n
u
e
Retail Access
DELICH
ASSOCIATES
AM/PM
3/
1
0
11/31
2/7
3/
8
6/
1
9
2/
7
3/
8
1/
2
2/6
3/
1
0
SHORT RANGE (2029) TOTAL
PEAK HOUR TRAFFIC Figure 10
The Mark at Fort Collins Apartments TIS, September 2024
Page 17
Johnson Drive Spring Park Drive
Arthur Drive
Co
l
l
e
g
e
A
v
e
n
u
e
Retail Access
DELICH
ASSOCIATES
AM/PM
14/38
0/1
7/10
16/54
0/2
45/454/
2
16
/
2
3
99
6
/
2
0
7
2
6/
1
1
12
0
0
/
1
5
4
4
18
/
3
3
8/
8
13
/
2
4
1/1
0/0
3/21
0/0
0/0
0/112
/
1
1
1/
1
10
0
4
/
2
1
1
2
6/
6
12
4
3
/
1
5
6
8
0/
1
0/
6
7/
1
0
LONG RANGE (2045) TOTAL
PEAK HOUR TRAFFIC Figure 11
The Mark at Fort Collins Apartments TIS, September 2024
Page 18
Johnson Drive Spring Park Drive
Arthur Drive
Co
l
l
e
g
e
A
v
e
n
u
e
Retail Access
DELICH
ASSOCIATES
AM/PM
15/40
0/1
8/11
18/63
0/2
53/535/
2
18
/
2
7
11
6
8
/
2
4
2
8
7/
1
1
14
0
7
/
1
8
1
0
21
/
3
8
10
/
1
0
15
/
2
5
1/1
0/0
3/23
0/0
0/0
0/114
/
1
2
1/
1
11
7
6
/
2
4
7
5
7/
7
14
5
7
/
1
8
3
6
0/
1
0/
7
8/
1
0
SHORT RANGE (2029) AND
LONG RANGE (2045) GEOMETRY Figure 12
The Mark at Fort Collins Apartments TIS, September 2024
Page 19
Johnson Drive Spring Park Drive
Arthur Drive
Co
l
l
e
g
e
A
v
e
n
u
e
Retail Access
- Denotes Lane
ST
O
P
ST
O
P
DELICH
ASSOCIATES
DELICH The Mark at Fort Collins Apartments TIS, September 2024 ASSOCIATES Page 20
Using the short range (2029) background peak hour traffic volumes, the
College/Spring Park-Johnson and College/Arthur-Retail Access intersections operate as
indicated in Table 3. Calculation forms for these analyses are provided in Appendix D.
The key intersections will meet the City of Fort Collins Motor Vehicle LOS Standard in
the morning and afternoon peak hours with the existing geometry.
Using the long range (2045) background peak hour traffic volumes, the
College/Spring Park-Johnson and College/Arthur-Retail Access intersections operate as
indicated in Table 4. Calculation forms for these analyses are provided in Appendix E.
In the long range (2045) future, the key intersections will meet the City of Fort Collins
Motor Vehicle LOS Standard in the morning and afternoon peak hour with the existing
geometry. At the College/Arthur-Retail Access intersection during the afternoon peak
hour, the calculated delay for the northbound left-turn lane and eastbound approach
was commensurate with level of service F. The calculated delay associated with level
of service F operation is provided in Table 4.
Using the short range (2029) total peak hour traffic volumes, the College/Spring
Park-Johnson and College/Arthur-Retail Access intersections operate as indicated in
Table 5. Calculation forms for these analyses are provided in Appendix F. The key
intersections will meet the City of Fort Collins Motor Vehicle LOS Standard in the
morning and afternoon peak hours with the existing geometry.
Using the long range (2045) total peak hour traffic volumes, the College/Spring
Park-Johnson and College/Arthur-Retail Access intersections operate as indicated in
Table 6. Calculation forms for these analyses are provided in Appendix G. In the long
range (2045) future, the key intersections will meet the City of Fort Collins Motor Vehicle
LOS standard in the morning and afternoon peak hours with the existing geometry. At
the College/Arthur-Retail Access intersection during the afternoon peak hour, the
calculated delay for the northbound left-turn lane and eastbound approach was
commensurate with level of service F. The calculated delay associated with level of
service F operation is provided in Table 6.
Pedestrian Level of Service
Appendix H shows a map of the area that is within 1320 feet of The Mark at Fort
Collins Apartments site. The Mark at Fort Collins Apartments site is located within an
area termed as “Transit Corridor,” which sets the level of service threshold at LOS B for
the Directness and Security categories and LOS C for the Continuity, Street Crossing,
and Visual Interest and Amenity categories. There are four destination areas within
1320 feet of the proposed The Mark at Fort Collins Apartments site: 1) the Spring Creek
and Mason trails; 2) the residential/commercial area to the north of the site; 3) the
commercial area to the south of the site; and 4) the offices to the southwest of the site.
This site is proposed to develop as student housing; therefore CSU (Area #5) was
added to the destination areas even though it is outside of the 1320 feet. The
pedestrian LOS Worksheet is provided in Appendix H. The following description
pertains to the existing conditions.
DELICH The Mark at Fort Collins Apartments TIS, September 2024 ASSOCIATES Page 21
TABLE 3
Short Range (2029) Background Peak Hour Operation
Intersection Movement
College/Spring Park-Johnson
(signal)
College/Arthur-Retail Access
(stop sign)
DELICH The Mark at Fort Collins Apartments TIS, September 2024 ASSOCIATES Page 22
TABLE 4
Long Range (2045) Background Peak Hour Operation
Intersection Movement
College/Spring Park-Johnson
(signal)
College/Arthur-Retail Access
(stop sign)
(80.2 secs)
DELICH The Mark at Fort Collins Apartments TIS, September 2024 ASSOCIATES Page 23
TABLE 5
Short Range (2029) Total Peak Hour Operation
Intersection Movement
College/Spring Park-Johnson
(signal)
College/Arthur-Retail Access
(stop sign)
DELICH The Mark at Fort Collins Apartments TIS, September 2024 ASSOCIATES Page 24
TABLE 6
Long Range (2045) Total Peak Hour Operation
Intersection Movement
College/Spring Park-Johnson
(signal)
College/Arthur-Retail Access
(stop sign)
DELICH The Mark at Fort Collins Apartments TIS, September 2024 ASSOCIATES Page 25
• Directness – The distance ratio to all pedestrian destinations is less than 1.2
(LOS A) using the existing sidewalk system, except for destination #3. One route
to destination #3 is the Mason Trail to the Max station overpass. This route will
have LOS D for directness. The other route is using the College Avenue sidewalk.
This route will have LOS A for directness, which is acceptable.
• Continuity – The sidewalk system to all destination areas has no breaks or
gaps. However, the sidewalks adjacent to College Avenue were built prior to
current standards and are directly adjacent to College Avenue with no
landscaped parkways. Therefore, the route is using the College Avenue sidewalk
to destination #3 will achieve LOS C, which is acceptable In Transit Corridors.
The route using the Mason Trail to the Max station overpass can achieve LOS A.
• Street Crossings – There are no street crossings for destinations #1, #3, #4,
and #5. The destinations #1, #4, and #5 have underpasses to avoid street
crossings. In order to get to destination #2, it requires a crossing of W. Stuart
Street within the multifamily residential uses. There is an existing painted
crosswalk at this street crossing of W. Stuart Street. The street crossings will be
acceptable at LOS A for all destination areas.
• Visual Interest and Amenity – The visual interest and amenity will be
acceptable at LOS A for all destination areas, except for destination #3 (College
Avenue route). This is part of a Transit Corridor, which generally is has
enhanced pedestrian features (large sidewalk widths, trails, landscaped parkway,
etc.). The sidewalks adjacent to College Avenue are narrow and are right next to
the vehicle travel lanes. Therefore, the route is using the College Avenue
sidewalk to destination #3 can only achieve LOS D.
• Security – The security will be acceptable at LOS A for all destination areas,
except for destination #3 (College Avenue route). This is part of a Transit
Corridor, which generally has enhanced pedestrian features and trails that avoid
vehicular traffic interaction. The sidewalks adjacent to College Avenue are
narrow and are right next to the vehicle travel lanes. Therefore, the route is using
the College Avenue sidewalk to destination #3 can only achieve LOS D.
The City of Fort Collins requested that a ramp be constructed over the Sherwood
Lateral Ditch in order to achieve acceptable pedestrian level of service. This ramp is
estimated to cost $1,000,000 to construct. The City and the developer have agreed that
25 percent of the construction costs will be paid with the development of The Mark at
Fort Collins Apartments. The City stated that upon construction of the ramp, a
temporary sidewalk will be provided for connection to the commercial area to the south.
The construction of this ramp will satisfy the pedestrian level of service criteria.
Bicycle Level of Service
Appendix H shows a map of the area that is within 1320 feet of The Mark at Fort
Collins Apartments site. Based upon Fort Collins bicycle LOS criteria, there are three
destination areas within 1320 feet of the proposed The Mark at Fort Collins Apartments
site: 1) the Spring Creek and Mason trails; 2) the residential/commercial area to the
DELICH The Mark at Fort Collins Apartments TIS, September 2024 ASSOCIATES Page 26
north of the site; and 3) the commercial area to the south of the site. This site is
proposed to develop as student housing, therefore CSU (Area #4) was added to the
destination areas even though it is outside of the 1320 feet. The bicycle LOS
Worksheet is provided in Appendix H. Acceptable bicycle level of service cannot be
achieved based on the requirement that the site must be directly connected to both
North-South and East-West on-street lanes. In this area College Avenue does not allow
bicycle traffic. However, this site is directly connected to both North-South (Mason) and
East-West (Spring Creek) trails. At this location these trails will act similarly to on-street
lanes. Bicycles can also use the ped/bike overpass to the Max station in order to get to
destination #3. In addition to this, bicycles can use the Spring Creek Trail to get to
Centre Avenue, which does have on-street bicycle lanes. The construction of the ramp
of the Sherwood Lateral Ditch will also satisfy the bicycle level of service criteria.
Therefore, it is concluded that level of service A connectivity can be achieved for The
Mark at Fort Collins Apartments to/from all destinations.
Transit Level of Service
This area of Fort Collins is served by The Max. There is a Max stop to the
southwest of The Mark at Fort Collins Apartments site.
DELICH The Mark at Fort Collins Apartments TIS, September 2024 ASSOCIATES Page 27
IV. CONCLUSIONS/RECOMMENDATIONS
This study assessed the impacts of The Mark at Fort Collins Apartments
development on the short range (2029) and long range (2045) street system in the vicinity
of the proposed development. As a result of this analysis, the following is concluded:
• The development of The Mark at Fort Collins Apartments site is feasible from a
traffic engineering standpoint. At full development, The Mark at Fort Collins
Apartments site will generate approximately 1,020 daily trip ends, 28 morning
peak hour trip ends, and 83 afternoon peak hour trip ends.
• Current operation at the College/Spring Park-Johnson and College/Arthur-Retail
Access intersections meet the City of Fort Collins Motor vehicle LOS Standard
during the morning and afternoon peak hours.
• In the short range (2029) future, given development of The Mark at Fort Collins
Apartments site and an increase in background traffic, the College/Spring Park-
Johnson and College/Arthur-Retail Access intersections will meet the City of Fort
Collins Motor Vehicle LOS Standard in the morning and afternoon peak hours.
• In the long range (2045) future, given development of The Mark at Fort Collins
Apartments site and an increase in background traffic, the key intersections will
meet the City of Fort Collins Motor Vehicle LOS Standard in the morning and
afternoon peak hours. The long range (2045) operational analyses are used for
planning and informational purposes only.
• The short range (2029) and long range (2045) geometry is shown in Figure 12.
This is the existing geometry at the College/Spring Park-Johnson and College/
Arthur-Retail Access intersections.
• With the construction of the ramp over the Sherwood Lateral Ditch, acceptable
pedestrian level of service is achieved.
DELICH The Mark at Fort Collins Apartments TIS, September 2024 ASSOCIATES Page 28
• Acceptable bicycle level of service cannot be achieved based on the requirement
that the site must be directly connected to both North-South and East-West on-
street lanes. In this area, College Avenue does not allow bicycle traffic.
However, this site is directly connected to both North-South (Mason) and East-
West (Spring Creek) trails. At this location these trails will act similarly to on-
street lanes. The construction of the ramp of the Sherwood Lateral Ditch will also
satisfy the bicycle level of service criteria. Therefore, it is concluded that level of
service A connectivity can be achieved for The Mark at Fort Collins Apartments
to/from all destinations.
• Acceptable level of service is achieved for transit based upon the measures in the
multi-modal transportation guidelines.
APPENDIX A
Chapter 4 — Attachments
Attachment A
_ Transportation impact Study Base Assumptions
Project Information
Project Name ��� /l�J�q�K a T � L G N�
Project Location s o�r►�a��' Q�A R ,�c o k N Son1 S r
TIS Assumphons
Type of Study Full: ��s Intermediate: �d
MTIS: �� Memo: N�
Study Area Boundaries North: � �N go ��� South: ,4 Q.�Kv�
East: CoG��'�E West: COLL�GE
Study Yeazs' Short Range: Zb� q Long Range: z O .4.j
Future Traffic Growth Rate / � �,e �N G6ur�e,ac. A 6A F ���
Study Intersections 1. All access drives 5.
2• Cocc.GGE �aW ,� 6.
3• Coc.L���' /�Rt�u�C �•
4. g,
Time Period for Study 7:00-9:00 PM: 4:00-6: Sat Noon: ��
Trip Generation Rates SL��' �r7 Q C a(�b
Trip Adjustment Factors Passby: �/A Captive Market: � �
/
Overall Trip Distribution SEE ATTACHED SKETCH
ModeSplitAssumptions ,��,G �toroK ��Idt�c.G
Design Vehicle Information �� --fi��C
Committed Roadway Improvements NDr �.�,kR� v fi ,d,Uf�
Other Traffic Studies �o,� A�A Q& o � p„��
Areas Requiring Special Study �. r,����. ��� C Q���r,V�r�
��X �YAriON To Sovrf�t,crESr
Date: �-�—�-���� Q U G'!J S 7 �, z���
' Traffic Engineer: �6 L. x C F( ���o C t A`r��
� Local Entity Engineer:
� � � � �3r� � z
� Larimer County Urban Area Street Standards-Repealed and Reenacbed Auguat 1,2021 PBge 435
Adopted by Larimer County,City of Loveland,City of FoR Collfns
e J�.€i.: �� . �� � '�'�' 'yi - £«i�.3 ��, � 1- �- �-"�_.
y �s.�+b � �� � �'4�'� _�� .'
�� ) Itll "�+.. �r � , .
c r_ "`"��ua�� � �+rlr .t � � oo � .
c
' " R�� ( r1j,1 ' ��� '�.. < 4 ��
�d i � :'� ��, 4 �fi'g .. r .
Y �. ;t ...� �p �'i
�
� � 4� �� � , it
� T ,�
�r' ���ii ` ��
�� � � �'�Jl a iy��,�, ��r�,�;.�j,
%' ��� � ;:�a � +�`.�' ��'
� T x �
� �. .
e� o a �� ��r, w�� � �`�ra. ,� ^` �• ,
.� '... �� �Y`� � �� . �%�n� � . . �� � 1i
.. � � .' ',�n �' �s � _ ..
�An,ao�= � . F� z� . .,_.. *� :�?�+��' � " .-._ 'r
,y.,,� r, u � �� _ a �-✓v— _. °�'^�'p'�ry°"A
�a, � i y ��� ,d "�'--"—t3,� � �/ ,� L ; , q
-' ' �� -
�� r � � � � � "�
�/� �
� ,,, � � � � ��� .. �„M � 2 '�� ay*� ? ��,e33aau �� e�
,E� �33i �, � ���`� � r+. c7 � � �'+�' `�-� ,
� �l fi ��� .. / • t � M9
� f��v..�� �i�-F,3 �.�. �S.Z9. �� , , .
'' ,� ` < Gi
yt
� �.r. � �n �I � � ) �� � 4 � �( a�l! a 3 � �
. _ ,�+ r � �._ . �` Q� �"a � ��'"a�,"- �'+4a +�,. e o a
� . � :. .. I i: � LY � . .�
� � � � �� a A a„�_ � fi'� �la � r a � raa�
"'+ � B Bfl�Wn ��}1 y � � o � 31
� � p�.F . [_, �I2 [a`�,. Je'�'T �� ay�l t� �� i� SM1 �� QF��"R
: q� aT ,: ,. ' - a� " I ; ) F� �
� �_. '�- � �'' ; ar, a � � }� �
� ' �� . �
, a� � � , � I
,a,� . � pj� �,�
� �1NN�::��5 i�i��� � � CSy � 6' l _,�.mLr/�3- ��c �✓"�y�� e �!"r� pN. Qdq
� �
� �._. . � . 'd:. . � .� T . -1 ��� - �__
� �C9a°�,�.°��3 / ��J�pa°,�
� � �
.� n �� �� Y ,� �` i � � I � ° o
�6: r ,� �F'� A �E �, ,s� i i `
; �t � 3� �' I� d' � , r .� o :-
I y^� �r* __� �
q� ai�� ��}/ i � ��l'F � .�.. i � ''�t � as �'�',' .rr�+i
I � , �
r ,! � �`�" � �� �a,� � ^^ � A �aa Y� „ �,"�� "
I r _� ��t.,�; t ���'i 's- � g g,� � � r e��'
p` �
Ik �y . ,¢ s , .� .:�` � � , 2tg(Cp;q��}� �`}-'t..k��i��) �' {I=#•
. �
i ' � . .,.. . r �. i � ' "F�i �� � — „9 � .
�� ,54 , � ( " ,,,, c �.T� � ' _-� E ..
� L,',o o �^ F'An
�gI� � �e l� Y �� �Y F q ye� ��, c n". � q� ��'"�'
t' �
�� � s �,�j �.. ��+1�y�"t �'',. �y d13. �I
I �' � �a t � #�6 �'�Mo p `4Y" '�� � 5 � � ^�r ' ' �
v
' r�� ' 3 ��'a ��'?� h� �� � � } �7 � �� 4 x I � ' �
i ,���'""" :� r, -`�. . � ' d � � �'
t � � ���a ti � �i � t � �. '4 °�. .B �� ��e, . o � �
�,, 1 F'4 �
I _-N '_i ������ �Y* �� �� ..9£ ',, ,�� � � ��'� �4 .� a �
� _ _ _ - - --..-_ - _ - --
- _--� ------
'i,`l .�`,�`�...
' $' ;'�--�.,
=1 ' ' �.�--_..,_
, � ; � �_ � �
I¢� � , r � '�`t� , — � ��_ --�e_
:
I �i� : � �f . 'a � ._ , i I - ol w� mi+ i ,� `
I t-a ��+ i •n
m
� ' � � .� �-,��.�� � � - i �-
3C) � e' = f r iin•� �� � �_ , ,�„`� i .� --_
—_ �
" �� i �. � �
I � %, �� � - 'i — � � � '� � �
� �'
��f ����4 II� � � __ i �,� i� � � Lg`�—�
% �,
� �— � ' -OOQ^ �o i
, n,'r �.
r l0'. � , . � I ^ I �;
: � �, � r J - t t a t
' � y . n - � ' �R a � �
,'
" r
, ' im ��� � " ' t' '
�
< i�. .� � � _ — .,,an " � I i�/
� a .: � � � � � � �'i �
��'.
; ,
_ - -
i�
� � n � � i � aa � � r � ��
� ,'� „� n-� n�.. �L �� � � e� ��� ��� d
� e �4� n vV 1— 2 �� ''A � �I
� 1 . . � � € ..n._ .
/ / " f,S ^ '[ _� °a i � il
' i r"--. o � _-I .- � .§� I �.
I / '� n - — � .� �" i � � �
f:l I ` e
� Y � � 5 }�� �� ���i' ,I
I � � F '+"=r � � � I
�. n 1 �; N i � � � � li
i�� � � e� � il e d �"� � —4 � ,[ tl i
'� Y a��,• � I ' t "�-_ � 3 — 9 i t. � ; �� � ��
t�� - � � � `� ;
— r _ c� `T.".� _", �` �. - ��Ai i ; i . II �
� ' _ �' _ r" '-yY(.1—i �— — T �. �
�
_
9 �
�
_. , � � ' E t .—� � � .
�— r � — j� . III . i
� � �� F . a �� I I ������
��i� _ � 73 ; � et � $< �`� * �� . � � 5 #S
� _ ��x� s ' ������ � is5
_ 9 �a € tp � � e' � �
€€c _ 3 s - � B ne�€az.a i g@ � . g,
aa& i � a k � �ya��'� ; � S � S
Lss€ a . ' ���� x ' e �s�€�& hg
� �' . ����a � ����z e �s�a ���d
t r. r € „ .��§§ � p $f sg'
e ��•
� x�,.Y �. 1€ � � 3 �S� ', s% FR � `��z� ���;§
� I'�� "s � ' z s�s ��� a s €� � ��'�� s�$
`s
I �fi'.��7a �� �3�'���6�x� � � £g�p� °�� d �� �p � `� �� � �g�z
'. � ��d�. �,���8 4C� %pa� 4 er 64� °"",e � a�:& � G �
5 €�s�g� 3'ass :� §��� p ¢�� �±� � 1� ;€ # € $ � � :.
r JOHMON pRNE APPRiMENiS �
N 3v i � ,,,1�i�
9 m OVEMLtSREPIAtl
O ' � lll�i�ll'.�
rt—
Base Assumptions Trip Generation
In the previous TIS, the FoR Collins trip generation data for apartments
(pertaining to off-campus student housing] was used. Since then, the Trie
Generation Manual. 11'" Edition, ITE, has the land use category of Off-Campus
Student Housing (Code 226). The trip generation variable is bedrooms. There
wiil be 397 beds. The assumption in this table is that there is ONE bed in each
bedroom. The TIS guidelines [LCUASS] say to use the ITE source.
TABLE 1
Trip Generetion
Code Use g�� A�TE AM Peak Hour PM Peak Hour
Rate Tfipa Rate Talal In Out Pab Total In Out
226 OH-CampusStudent 397 p57 1,020 0.07 28 13 15 021 83 39 44
Apartment(Mid-Rise) bedrooms 46% 54% 47% 53Yo
TRIP DISTRIBUTION
�� �
t�l
��
SPR�uG
Pa R�
Joµks�
�i'�'E
�erµ�R.
�p'�
G�M
APPENDIX B
DELICH ASSOCIATES 2272 GLEN HAVEN DRIVE
LOVELAND, CO 80538
Phone: (970) 669-2061
TABULAR SUMMARY OF VEHICLE COUNTS
Day: Thursday Jurisdiction: Fort Collins
R = right turn Intersection: College/Springpark-Johnson
S = straight
L = left turn
Time Northbound: College Southbound: College Total Eastbound: Johnson Westbound: Springpark Total Total
Begins UT L S R Total UT L S R Total north/south L S R Total L S R Total east/west All
7:00 0 0 143 3 146 1 1 92 0 94 0 0 0 0 1 0 6 7 7 247
7:15 2 1 168 3 174 1 0 140 0 141 0 0 0 0 2 0 5 7 7 322
7:30 0 2 203 2 207 2 2 189 1 194 0 0 1 1 1 1 1 3 4 405
7:45 0 0 264 2 266 0 2 226 1 229 0 1 0 1 8 0 11 19 20 515 #
8:00 1 1 285 2 289 2 4 208 5 219 2 0 3 5 3 0 6 9 14 522 #
8:15 2 0 257 5 264 1 5 220 0 226 0 0 1 1 5 0 13 18 19 509 #
8:30 3 0 290 7 300 1 4 230 1 236 0 0 0 0 4 0 10 14 14 550 #
8:45 2 2 287 3 294 0 2 311 1 314 1 0 1 2 3 0 14 17 19 627 #
8:00-9:00 8 3 1119 17 1147 4 15 969 7 995
PHF 0.67 0.38 0.96 0.61 0.96 0.5 0.75 0.78 0.35 0.79 0.88 0.38 n/a 0.42 0.4 0.75 n/a 0.77 0.81 0.87 0.88
4:00 4 1 379 11 395 5 8 497 2 512 0 0 3 3 8 0 10 18 21 928
4:15 3 1 342 6 352 0 9 470 0 479 1 0 4 5 11 0 17 28 33 864
4:30 1 1 382 6 390 2 6 470 3 481 3 1 1 5 11 1 14 26 31 902
4:45 1 0 366 7 374 0 7 490 1 498 0 0 1 1 13 0 9 22 23 895 #
5:00 2 0 379 8 389 0 3 523 0 526 2 0 0 2 17 1 12 30 32 947 #
5:15 4 0 377 10 391 0 6 471 1 478 2 0 1 3 10 0 8 18 21 890 #
5:30 4 0 367 9 380 2 6 418 1 427 5 0 0 5 7 0 5 12 17 824 #
5:45 2 2 355 9 368 4 8 369 1 382 2 0 2 4 5 0 5 10 14 764 #
4:30-5:30 8 1 1504 31 1544 2 22 1954 5 1983
PHF 0.5 0.25 0.98 0.78 0.99 0.25 0.79 0.93 0.42 0.94 0.96 0.58 0.25 0.75 0.55 0.75 0.5 0.77 0.8 0.84 0.96
DELICH ASSOCIATES 2272 GLEN HAVEN DRIVE
LOVELAND, CO 80538
Phone: (970) 669-2061
TABULAR SUMMARY OF VEHICLE COUNTS
Day: Tuesday Jurisdiction: Fort Collins
R = right turn Intersection: College/Arthur-Driveway
S = straight
L = left turn
Time Northbound: College Southbound: College Total Eastbound: Arthur Westbound: Driveway Total Total
Begins UT L S R Total UT L S R Total north/south L S R Total L S R Total east/west All
7:00 0 1 125 0 126 1 0 107 0 108 0 0 0 0 0 0 0 0 0 234
7:15 0 0 184 0 184 0 0 157 2 159 0 0 0 0 0 0 0 0 0 343
7:30 0 0 252 0 252 4 1 181 1 187 1 0 0 1 0 0 0 0 1 440
7:45 1 2 301 0 304 1 0 264 1 266 0 0 0 0 0 0 0 0 0 570 #
8:00 0 1 269 0 270 2 1 206 0 209 0 0 1 1 0 0 0 0 1 480 #
8:15 0 2 299 0 301 1 0 203 0 204 0 0 0 0 0 0 0 0 0 505 #
8:30 0 1 317 0 318 6 0 264 1 271 1 0 0 1 0 0 0 0 1 590 #
8:45 0 1 318 0 319 2 0 256 3 261 0 0 0 0 0 0 0 0 0 580 #
8:00-9:00 0 5 1203 0 1208 11 1 929 4 945
PHF n/a 0.63 0.95 n/a 0.95 0.46 0.25 0.88 0.33 0.87 0.91 0.25 n/a 0.25 0.5 n/a n/a n/a n/a 0.5 0.91
4:00 0 2 384 0 386 3 0 502 1 506 0 0 4 4 0 0 0 0 4 896
4:15 2 1 388 0 391 3 0 532 1 536 0 0 4 4 0 0 0 0 4 931
4:30 4 0 333 0 337 1 0 470 0 471 0 0 4 4 0 0 0 0 4 812
4:45 0 1 342 1 344 3 1 504 0 508 1 0 2 3 0 0 1 1 4 856 #
5:00 3 1 373 0 377 1 0 481 1 483 0 0 1 1 0 0 0 0 1 861 #
5:15 1 2 375 0 378 2 0 525 0 527 0 0 4 4 0 0 0 0 4 909 #
5:30 5 0 382 0 387 4 0 413 0 417 0 0 1 1 0 0 0 0 1 805 #
5:45 1 1 429 0 431 1 0 388 0 389 0 0 3 3 0 0 0 0 3 823 #
4:00-5:00 6 4 1447 1 1458 10 1 2008 2 2021
PHF 0.38 0.5 0.93 0.25 0.93 0.83 0.25 0.94 0.5 0.94 0.94 0.25 n/a 0.88 0.94 n/a n/a 0.25 0.25 1 0.94
APPENDIX C
HCM 6th Signalized Intersection Summary Recent AM
8: College (US 287) & Johnson/Spring Park
Scenario 1 City of Fort Collins Signal Timing 08/20/2024 Synchro 11 Light Report
recent am.syn
Movement EBL EBT EBR WBL WBT WBR NBU NBL NBT NBR SBU SBL
Lane Configurations
Traffic Volume (veh/h) 3 0 5 15 0 43 8 3 1142 17 4 15
Future Volume (veh/h) 3 0 5 15 0 43 8 3 1142 17 4 15
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1796 1870 1796 1870 1945 1796 1870 1870 1796 1870
Adj Flow Rate, veh/h 3 0 6 17 0 49 3 1298 19 17
Peak Hour Factor 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88
Percent Heavy Veh, %2 2 2 2 2 2 2 2 2 2
Cap, veh/h 10 0 20 90 0 83 482 4147 61 399
Arrive On Green 0.02 0.00 0.02 0.05 0.00 0.05 1.00 1.00 1.00 1.00
Sat Flow, veh/h 548 0 1097 1781 0 1648 521 5185 76 417
Grp Volume(v), veh/h 9 0 0 17 0 49 3 852 465 17
Grp Sat Flow(s),veh/h/ln 1645 0 0 1781 0 1648 521 1702 1857 417
Q Serve(g_s), s 0.6 0.0 0.0 1.0 0.0 3.2 0.0 0.0 0.0 0.0
Cycle Q Clear(g_c), s 0.6 0.0 0.0 1.0 0.0 3.2 0.0 0.0 0.0 0.0
Prop In Lane 0.33 0.67 1.00 1.00 1.00 0.04 1.00
Lane Grp Cap(c), veh/h 29 0 0 90 0 83 482 2723 1485 399
V/C Ratio(X) 0.31 0.00 0.00 0.19 0.00 0.59 0.01 0.31 0.31 0.04
Avail Cap(c_a), veh/h 150 0 0 162 0 150 482 2723 1485 399
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.33 1.33 1.33 2.00
Upstream Filter(I) 1.00 0.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00 0.97
Uniform Delay (d), s/veh 53.3 0.0 0.0 50.1 0.0 51.1 0.0 0.0 0.0 0.0
Incr Delay (d2), s/veh 5.8 0.0 0.0 1.0 0.0 6.5 0.0 0.3 0.6 0.2
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.3 0.0 0.0 0.5 0.0 1.5 0.0 0.1 0.2 0.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 59.1 0.0 0.0 51.1 0.0 57.6 0.0 0.3 0.6 0.2
LnGrp LOS E A A D A E A A A A
Approach Vol, veh/h 9 66 1320
Approach Delay, s/veh 59.1 55.9 0.4
Approach LOS E E A
Timer - Assigned Phs 2 4 6 8
Phs Duration (G+Y+Rc), s 92.5 7.0 92.5 10.5
Change Period (Y+Rc), s 5.5 6.0 5.5 6.0
Max Green Setting (Gmax), s 74.5 9.0 74.5 9.0
Max Q Clear Time (g_c+I1), s 2.0 2.6 2.0 5.2
Green Ext Time (p_c), s 4.7 0.0 5.8 0.0
Intersection Summary
HCM 6th Ctrl Delay 2.0
HCM 6th LOS A
Notes
User approved ignoring U-Turning movement.
HCM 6th Signalized Intersection Summary Recent AM
8: College (US 287) & Johnson/Spring Park
Scenario 1 City of Fort Collins Signal Timing 08/20/2024 Synchro 11 Light Report
recent am.syn
Movement SBT SBR
Lane Configurations
Traffic Volume (veh/h) 945 7
Future Volume (veh/h) 945 7
Initial Q (Qb), veh 0 0
Ped-Bike Adj(A_pbT) 1.00
Parking Bus, Adj 1.00 1.00
Work Zone On Approach No
Adj Sat Flow, veh/h/ln 1870 1796
Adj Flow Rate, veh/h 1074 8
Peak Hour Factor 0.88 0.88
Percent Heavy Veh, % 2 2
Cap, veh/h 4182 31
Arrive On Green 1.00 1.00
Sat Flow, veh/h 5228 39
Grp Volume(v), veh/h 699 383
Grp Sat Flow(s),veh/h/ln 1702 1863
Q Serve(g_s), s 0.0 0.0
Cycle Q Clear(g_c), s 0.0 0.0
Prop In Lane 0.02
Lane Grp Cap(c), veh/h 2723 1491
V/C Ratio(X) 0.26 0.26
Avail Cap(c_a), veh/h 2723 1491
HCM Platoon Ratio 2.00 2.00
Upstream Filter(I) 0.97 0.97
Uniform Delay (d), s/veh 0.0 0.0
Incr Delay (d2), s/veh 0.2 0.4
Initial Q Delay(d3),s/veh 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.1 0.2
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 0.2 0.4
LnGrp LOS A A
Approach Vol, veh/h 1099
Approach Delay, s/veh 0.3
Approach LOS A
Timer - Assigned Phs
Timing Report, Sorted By Phase Recent AM
8: College (US 287) & Johnson/Spring Park
Scenario 1 City of Fort Collins Signal Timing 08/20/2024 Synchro 11 Light Report
recent am.syn
Phase Number 2 4 6 8
Movement SBTL EBTL NBTL WBTL
Lead/Lag
Lead-Lag Optimize
Recall Mode C-Max None C-Max None
Maximum Split (s) 80 15 80 15
Maximum Split (%) 72.7% 13.6% 72.7% 13.6%
Minimum Split (s) 23.5 10 23.5 35
Yellow Time (s)4 3 4 3
All-Red Time (s) 1.5 3 1.5 3
Minimum Initial (s) 10 4 10 4
Vehicle Extension (s)3 3 3 3
Minimum Gap (s)3 3 3 3
Time Before Reduce (s)0 0 0 0
Time To Reduce (s)0 0 0 0
Walk Time (s)
Flash Dont Walk (s)
Dual Entry Yes Yes Yes Yes
Inhibit Max Yes Yes Yes Yes
Start Time (s) 39.5 9.5 39.5 24.5
End Time (s) 9.5 24.5 9.5 39.5
Yield/Force Off (s) 4 18.5 4 33.5
Yield/Force Off 170(s) 4 18.5 4 33.5
Local Start Time (s) 35.5 5.5 35.5 20.5
Local Yield (s) 0 14.5 0 29.5
Local Yield 170(s) 0 14.5 0 29.5
Intersection Summary
Cycle Length 110
Control Type Actuated-Coordinated
Natural Cycle 70
Offset: 4 (4%), Referenced to phase 2:SBTL and 6:NBTL, Start of Yellow
Splits and Phases: 8: College (US 287) & Johnson/Spring Park
Queues Recent AM
8: College (US 287) & Johnson/Spring Park
Scenario 1 City of Fort Collins Signal Timing 08/20/2024 Synchro 11 Light Report
recent am.syn
Lane Group EBT WBL WBT NBL NBT SBL SBT
Lane Group Flow (vph) 9 17 49 12 1317 22 1082
v/c Ratio 0.05 0.14 0.17 0.03 0.32 0.08 0.26
Control Delay 0.5 50.1 1.3 4.5 5.7 1.4 0.8
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 0.5 50.1 1.3 4.5 5.7 1.4 0.8
Queue Length 50th (ft) 0 12 0 3 159 0 5
Queue Length 95th (ft) 0 33 0 m6 274 4 30
Internal Link Dist (ft) 516 684 292 471
Turn Bay Length (ft) 275 90 75
Base Capacity (vph) 228 160 320 364 4179 278 4184
Starvation Cap Reductn 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0
Reduced v/c Ratio 0.04 0.11 0.15 0.03 0.32 0.08 0.26
Intersection Summary
m Volume for 95th percentile queue is metered by upstream signal.
HCM 6th Signalized Intersection Summary Recent PM
8: College (US 287) & Johnson/Spring Park
Scenario 1 City of Fort Collins Signal Timing 08/20/2024 Synchro 11 Light Report
recent pm.syn
Movement EBL EBT EBR WBL WBT WBR NBU NBL NBT NBR SBU SBL
Lane Configurations
Traffic Volume (veh/h) 7 1 3 51 2 43 8 1 1469 31 2 22
Future Volume (veh/h) 7 1 3 51 2 43 8 1 1469 31 2 22
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.99 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1796 1870 1796 1870 1945 1796 1870 1870 1796 1870
Adj Flow Rate, veh/h 7 1 3 53 2 45 1 1530 32 23
Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96
Percent Heavy Veh, %2 2 2 2 2 2 2 2 2 2
Cap, veh/h 20 3 9 95 4 84 224 4134 86 325
Arrive On Green 0.02 0.02 0.02 0.05 0.05 0.05 1.00 1.00 1.00 1.00
Sat Flow, veh/h 1101 157 472 1781 71 1589 205 5146 108 329
Grp Volume(v), veh/h 11 0 0 53 0 47 1 1012 550 23
Grp Sat Flow(s),veh/h/ln 1730 0 0 1781 0 1659 205 1702 1850 329
Q Serve(g_s), s 0.8 0.0 0.0 3.5 0.0 3.3 0.0 0.0 0.0 0.0
Cycle Q Clear(g_c), s 0.8 0.0 0.0 3.5 0.0 3.3 0.0 0.0 0.0 0.0
Prop In Lane 0.64 0.27 1.00 0.96 1.00 0.06 1.00
Lane Grp Cap(c), veh/h 32 0 0 95 0 88 224 2734 1486 325
V/C Ratio(X) 0.34 0.00 0.00 0.56 0.00 0.53 0.00 0.37 0.37 0.07
Avail Cap(c_a), veh/h 130 0 0 163 0 152 224 2734 1486 325
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 2.00 2.00
Upstream Filter(I) 1.00 0.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00 0.69
Uniform Delay (d), s/veh 58.2 0.0 0.0 55.4 0.0 55.4 0.0 0.0 0.0 0.0
Incr Delay (d2), s/veh 6.2 0.0 0.0 5.1 0.0 4.9 0.0 0.4 0.7 0.3
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.4 0.0 0.0 1.7 0.0 1.5 0.0 0.1 0.3 0.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 64.3 0.0 0.0 60.5 0.0 60.3 0.0 0.4 0.7 0.3
LnGrp LOS E A A E A E A A A A
Approach Vol, veh/h 11 100 1563
Approach Delay, s/veh 64.3 60.4 0.5
Approach LOS E E A
Timer - Assigned Phs 2 4 6 8
Phs Duration (G+Y+Rc), s 101.4 7.2 101.4 11.4
Change Period (Y+Rc), s 6.0 6.0 6.0 6.0
Max Green Setting (Gmax), s 84.0 8.0 84.0 10.0
Max Q Clear Time (g_c+I1), s 2.0 2.8 2.0 5.5
Green Ext Time (p_c), s 13.4 0.0 7.5 0.1
Intersection Summary
HCM 6th Ctrl Delay 2.3
HCM 6th LOS A
Notes
User approved ignoring U-Turning movement.
HCM 6th Signalized Intersection Summary Recent PM
8: College (US 287) & Johnson/Spring Park
Scenario 1 City of Fort Collins Signal Timing 08/20/2024 Synchro 11 Light Report
recent pm.syn
Movement SBT SBR
Lane Configurations
Traffic Volume (veh/h) 1964 5
Future Volume (veh/h) 1964 5
Initial Q (Qb), veh 0 0
Ped-Bike Adj(A_pbT) 0.99
Parking Bus, Adj 1.00 1.00
Work Zone On Approach No
Adj Sat Flow, veh/h/ln 1870 1796
Adj Flow Rate, veh/h 2046 5
Peak Hour Factor 0.96 0.96
Percent Heavy Veh, % 2 2
Cap, veh/h 4225 10
Arrive On Green 1.00 1.00
Sat Flow, veh/h 5259 13
Grp Volume(v), veh/h 1324 727
Grp Sat Flow(s),veh/h/ln 1702 1868
Q Serve(g_s), s 0.0 0.0
Cycle Q Clear(g_c), s 0.0 0.0
Prop In Lane 0.01
Lane Grp Cap(c), veh/h 2734 1500
V/C Ratio(X) 0.48 0.48
Avail Cap(c_a), veh/h 2734 1500
HCM Platoon Ratio 2.00 2.00
Upstream Filter(I) 0.69 0.69
Uniform Delay (d), s/veh 0.0 0.0
Incr Delay (d2), s/veh 0.4 0.8
Initial Q Delay(d3),s/veh 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.2 0.3
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 0.4 0.8
LnGrp LOS A A
Approach Vol, veh/h 2074
Approach Delay, s/veh 0.5
Approach LOS A
Timer - Assigned Phs
Timing Report, Sorted By Phase Recent PM
8: College (US 287) & Johnson/Spring Park
Scenario 1 City of Fort Collins Signal Timing 08/20/2024 Synchro 11 Light Report
recent pm.syn
Phase Number 2 4 6 8
Movement SBTL EBTL NBTL WBTL
Lead/Lag
Lead-Lag Optimize
Recall Mode C-Max None Max None
Maximum Split (s) 90 14 90 16
Maximum Split (%) 75.0% 11.7% 75.0% 13.3%
Minimum Split (s) 23.5 10 23.5 16
Yellow Time (s) 4.5 3 4.5 3
All-Red Time (s) 1.5 3 1.5 3
Minimum Initial (s) 10 4 10 4
Vehicle Extension (s)3 3 3 3
Minimum Gap (s)3 3 3 3
Time Before Reduce (s)0 0 0 0
Time To Reduce (s)0 0 0 0
Walk Time (s)
Flash Dont Walk (s)
Dual Entry Yes Yes Yes Yes
Inhibit Max Yes Yes Yes Yes
Start Time (s) 114 84 114 98
End Time (s) 84 98 84 114
Yield/Force Off (s) 78 92 78 108
Yield/Force Off 170(s) 78 92 78 108
Local Start Time (s) 36 6 36 20
Local Yield (s) 0 14 0 30
Local Yield 170(s) 0 14 0 30
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 60
Offset: 78 (65%), Referenced to phase 2:SBTL, Start of Yellow
Splits and Phases: 8: College (US 287) & Johnson/Spring Park
Queues Recent PM
8: College (US 287) & Johnson/Spring Park
Scenario 1 City of Fort Collins Signal Timing 08/20/2024 Synchro 11 Light Report
recent pm.syn
Lane Group EBT WBL WBT NBL NBT SBL SBT
Lane Group Flow (vph) 11 53 47 9 1562 25 2051
v/c Ratio 0.10 0.38 0.27 0.08 0.38 0.12 0.50
Control Delay 47.0 59.4 19.6 4.8 2.4 2.9 1.9
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 47.0 59.4 19.6 4.8 2.4 2.9 1.9
Queue Length 50th (ft) 6 39 1 1 41 2 62
Queue Length 95th (ft) 25 81 39 m3 102 m4 78
Internal Link Dist (ft) 413 682 293 471
Turn Bay Length (ft) 275 90 75
Base Capacity (vph) 133 164 193 112 4125 204 4137
Starvation Cap Reductn 0 0 0 0 0 0 352
Spillback Cap Reductn 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0
Reduced v/c Ratio 0.08 0.32 0.24 0.08 0.38 0.12 0.54
Intersection Summary
m Volume for 95th percentile queue is metered by upstream signal.
HCM 6th TWSC Recent AM
2: College (US 287) & Arthur/Retail Access
Scenario 1 City of Fort Collins Signal Timing 08/20/2024 Synchro 11 Light Report
recent am.syn
Intersection
Int Delay, s/veh 0.2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBU SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 1 0 1 0 0 0 5 1180 0 11 1 953 4
Future Vol, veh/h 1 0 1 0 0 0 5 1180 0 11 1 953 4
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - - None
Storage Length -- - - - - 80 - - - 80 - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - - 0 -
Grade, % - 0 - - 0 - - 0 - - - 0 -
Peak Hour Factor 91 91 91 91 91 91 91 91 91 91 91 91 91
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 1 0 1 0 0 0 5 1297 0 12 1 1047 4
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 1604 2382 526 1752 2384 649 1051 0 0 947 1297 0 0
Stage 1 1075 1075 - 1307 1307 -- - - - - - -
Stage 2 529 1307 - 445 1077 -- - - - - - -
Critical Hdwy 6.44 6.54 7.14 6.44 6.54 7.14 5.34 - - 5.64 5.34 - -
Critical Hdwy Stg 1 7.34 5.54 - 7.34 5.54 -- - - - - - -
Critical Hdwy Stg 2 6.74 5.54 - 6.74 5.54 -- - - - - - -
Follow-up Hdwy 3.82 4.02 3.92 3.82 4.02 3.92 3.12 - - 2.32 3.12 - -
Pot Cap-1 Maneuver 111 34 425 90 34 354 370 - - 470 281 - -
Stage 1 177 294 - 121 228 -- - - - - - -
Stage 2 457 228 - 514 293 -- - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 107 33 425 87 33 354 370 - - 445 445 - -
Mov Cap-2 Maneuver 107 33 - 87 33 -- - - - - - -
Stage 1 175 285 - 119 225 -- - - - - - -
Stage 2 451 225 - 498 285 -- - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 26.3 0 0.1 0.2
HCM LOS D A
Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR
Capacity (veh/h) 370 - - 171 - 445 - -
HCM Lane V/C Ratio 0.015 - - 0.013 - 0.03 - -
HCM Control Delay (s) 14.9 - - 26.3 0 13.3 - -
HCM Lane LOS B - - D A B - -
HCM 95th %tile Q(veh) 0 - - 0 - 0.1 - -
HCM 6th TWSC Recent PM
3: College (US 287) & Arthur/Retail Access
Scenario 1 City of Fort Collins Signal Timing 08/20/2024 Synchro 11 Light Report
recent pm.syn
Intersection
Int Delay, s/veh 0.3
Movement EBL EBT EBR WBL WBT WBR NBU NBL NBT NBR SBU SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 1 0 14 0 0 1 6 4 1482 1 10 1 2003 2
Future Vol, veh/h 1 0 14 0 0 1 6 4 1482 1 10 1 2003 2
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free Free Free
RT Channelized - - None - - None - - - None - - - None
Storage Length -- - - - - - 80 - - - 80 - -
Veh in Median Storage, # - 0 - - 0 - - - 0 - - - 0 -
Grade, % - 0 - - 0 - - - 0 - - - 0 -
Peak Hour Factor 94 94 94 94 94 94 94 94 94 94 94 94 94 94
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 1 0 15 0 0 1 6 4 1577 1 11 1 2131 2
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 2807 3754 1067 2474 3755 789 1557 2133 0 0 1152 1578 0 0
Stage 1 2156 2156 - 1598 1598 - - - - - - - - -
Stage 2 651 1598 - 876 2157 - - - - - - - - -
Critical Hdwy 6.44 6.54 7.14 6.44 6.54 7.14 5.64 5.34 - - 5.64 5.34 - -
Critical Hdwy Stg 1 7.34 5.54 - 7.34 5.54 - - - - - - - - -
Critical Hdwy Stg 2 6.74 5.54 - 6.74 5.54 - - - - - - - - -
Follow-up Hdwy 3.82 4.02 3.92 3.82 4.02 3.92 2.32 3.12 - - 2.32 3.12 - -
Pot Cap-1 Maneuver 20 4 187 32 4 286 214 107 - - 362 204 - -
Stage 1 30 86 - 75 164 - - - - - - - - -
Stage 2 386 164 - 281 86 - - - - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 18 4 187 27 4 286 148 148 - - 337 337 - -
Mov Cap-2 Maneuver 18 4 - 27 4 - - - - - - - - -
Stage 1 28 83 - 69 152 - - - - - - - - -
Stage 2 356 152 - 249 83 - - - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 41.3 17.6 0.2 0.1
HCM LOS E C
Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR
Capacity (veh/h) 148 - - 115 286 337 - -
HCM Lane V/C Ratio 0.072 - - 0.139 0.004 0.035 - -
HCM Control Delay (s) 31.2 - - 41.3 17.6 16.1 - -
HCM Lane LOS D - - E C C - -
HCM 95th %tile Q(veh) 0.2 - - 0.5 0 0.1 - -
UNSIGNALIZED INTERSECTIONS
Level-of-Service Average Total Delay
sec/veh
A < 10
B > 10 and < 15
C > 15 and < 25
D > 25 and < 35
E > 35 and < 50
F > 50
SIGNALIZED INTERSECTIONS
Level-of-Service Average Total Delay
sec/veh
A < 10
B > 10 and < 20
C > 20 and < 35
D > 35 and < 55
E > 55 and < 80
F > 80
Table 4-2
Fort Collins (GMA and City Limits)
Motor Vehicle LOS Standards (Intersections)
Overall Any
Approach Leg
Any
Movement
Signalized D1 E E2
Unsignalized E3 F4
Arterial/Arterial
Collector/Collector
Unsignalized 4
Arterial/Collector
Arterial/Local
Collector/Local
Local/Local
1 In mixed use district including downtown as defined by structure plan, overall LOS E is acceptable
2 Applicable with at least 5% of total entering volume
3 Use weighed average to identify overall delay
4 Mitigation may be required
5 Apply unsignalized delay value thresholds to determine LOS
APPENDIX D
HCM 6th Signalized Intersection Summary Short Bkgrd AM
8: College (US 287) & Johnson/Spring Park
Scenario 1 City of Fort Collins Signal Timing 08/20/2024 Synchro 11 Light Report
sb am.syn
Movement EBL EBT EBR WBL WBT WBR NBU NBL NBT NBR SBU SBL
Lane Configurations
Traffic Volume (veh/h) 3 0 5 16 0 45 8 3 1200 18 4 16
Future Volume (veh/h) 3 0 5 16 0 45 8 3 1200 18 4 16
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1796 1870 1796 1870 1945 1796 1870 1870 1796 1870
Adj Flow Rate, veh/h 3 0 6 18 0 51 3 1364 20 18
Peak Hour Factor 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88
Percent Heavy Veh, %2 2 2 2 2 2 2 2 2 2
Cap, veh/h 10 0 20 93 0 86 461 4139 61 378
Arrive On Green 0.02 0.00 0.02 0.05 0.00 0.05 1.00 1.00 1.00 1.00
Sat Flow, veh/h 548 0 1097 1781 0 1648 495 5185 76 391
Grp Volume(v), veh/h 9 0 0 18 0 51 3 896 488 18
Grp Sat Flow(s),veh/h/ln 1645 0 0 1781 0 1648 495 1702 1857 391
Q Serve(g_s), s 0.6 0.0 0.0 1.1 0.0 3.3 0.0 0.0 0.0 0.0
Cycle Q Clear(g_c), s 0.6 0.0 0.0 1.1 0.0 3.3 0.0 0.0 0.0 0.0
Prop In Lane 0.33 0.67 1.00 1.00 1.00 0.04 1.00
Lane Grp Cap(c), veh/h 29 0 0 93 0 86 461 2718 1482 378
V/C Ratio(X) 0.31 0.00 0.00 0.19 0.00 0.59 0.01 0.33 0.33 0.05
Avail Cap(c_a), veh/h 150 0 0 162 0 150 461 2718 1482 378
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.33 1.33 1.33 2.00
Upstream Filter(I) 1.00 0.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00 0.97
Uniform Delay (d), s/veh 53.3 0.0 0.0 49.9 0.0 51.0 0.0 0.0 0.0 0.0
Incr Delay (d2), s/veh 5.8 0.0 0.0 1.0 0.0 6.4 0.0 0.3 0.6 0.2
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.3 0.0 0.0 0.5 0.0 1.5 0.0 0.1 0.2 0.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 59.1 0.0 0.0 50.9 0.0 57.4 0.0 0.3 0.6 0.2
LnGrp LOS E A A D A E A A A A
Approach Vol, veh/h 9 69 1387
Approach Delay, s/veh 59.1 55.7 0.4
Approach LOS E E A
Timer - Assigned Phs 2 4 6 8
Phs Duration (G+Y+Rc), s 92.3 7.0 92.3 10.7
Change Period (Y+Rc), s 5.5 6.0 5.5 6.0
Max Green Setting (Gmax), s 74.5 9.0 74.5 9.0
Max Q Clear Time (g_c+I1), s 2.0 2.6 2.0 5.3
Green Ext Time (p_c), s 5.0 0.0 6.2 0.0
Intersection Summary
HCM 6th Ctrl Delay 2.0
HCM 6th LOS A
Notes
User approved ignoring U-Turning movement.
HCM 6th Signalized Intersection Summary Short Bkgrd AM
8: College (US 287) & Johnson/Spring Park
Scenario 1 City of Fort Collins Signal Timing 08/20/2024 Synchro 11 Light Report
sb am.syn
Movement SBT SBR
Lane Configurations
Traffic Volume (veh/h) 993 7
Future Volume (veh/h) 993 7
Initial Q (Qb), veh 0 0
Ped-Bike Adj(A_pbT) 1.00
Parking Bus, Adj 1.00 1.00
Work Zone On Approach No
Adj Sat Flow, veh/h/ln 1870 1796
Adj Flow Rate, veh/h 1128 8
Peak Hour Factor 0.88 0.88
Percent Heavy Veh, % 2 2
Cap, veh/h 4176 30
Arrive On Green 1.00 1.00
Sat Flow, veh/h 5231 37
Grp Volume(v), veh/h 734 402
Grp Sat Flow(s),veh/h/ln 1702 1864
Q Serve(g_s), s 0.0 0.0
Cycle Q Clear(g_c), s 0.0 0.0
Prop In Lane 0.02
Lane Grp Cap(c), veh/h 2718 1488
V/C Ratio(X) 0.27 0.27
Avail Cap(c_a), veh/h 2718 1488
HCM Platoon Ratio 2.00 2.00
Upstream Filter(I) 0.97 0.97
Uniform Delay (d), s/veh 0.0 0.0
Incr Delay (d2), s/veh 0.2 0.4
Initial Q Delay(d3),s/veh 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.1 0.2
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 0.2 0.4
LnGrp LOS A A
Approach Vol, veh/h 1154
Approach Delay, s/veh 0.3
Approach LOS A
Timer - Assigned Phs
Timing Report, Sorted By Phase Short Bkgrd AM
8: College (US 287) & Johnson/Spring Park
Scenario 1 City of Fort Collins Signal Timing 08/20/2024 Synchro 11 Light Report
sb am.syn
Phase Number 2 4 6 8
Movement SBTL EBTL NBTL WBTL
Lead/Lag
Lead-Lag Optimize
Recall Mode C-Max None C-Max None
Maximum Split (s) 80 15 80 15
Maximum Split (%) 72.7% 13.6% 72.7% 13.6%
Minimum Split (s) 23.5 10 23.5 35
Yellow Time (s)4 3 4 3
All-Red Time (s) 1.5 3 1.5 3
Minimum Initial (s) 10 4 10 4
Vehicle Extension (s)3 3 3 3
Minimum Gap (s)3 3 3 3
Time Before Reduce (s)0 0 0 0
Time To Reduce (s)0 0 0 0
Walk Time (s)
Flash Dont Walk (s)
Dual Entry Yes Yes Yes Yes
Inhibit Max Yes Yes Yes Yes
Start Time (s) 39.5 9.5 39.5 24.5
End Time (s) 9.5 24.5 9.5 39.5
Yield/Force Off (s) 4 18.5 4 33.5
Yield/Force Off 170(s) 4 18.5 4 33.5
Local Start Time (s) 35.5 5.5 35.5 20.5
Local Yield (s) 0 14.5 0 29.5
Local Yield 170(s) 0 14.5 0 29.5
Intersection Summary
Cycle Length 110
Control Type Actuated-Coordinated
Natural Cycle 70
Offset: 4 (4%), Referenced to phase 2:SBTL and 6:NBTL, Start of Yellow
Splits and Phases: 8: College (US 287) & Johnson/Spring Park
Queues Short Bkgrd AM
8: College (US 287) & Johnson/Spring Park
Scenario 1 City of Fort Collins Signal Timing 08/20/2024 Synchro 11 Light Report
sb am.syn
Lane Group EBT WBL WBT NBL NBT SBL SBT
Lane Group Flow (vph) 9 18 51 12 1384 23 1136
v/c Ratio 0.05 0.15 0.18 0.04 0.33 0.09 0.27
Control Delay 0.5 50.1 1.4 4.6 6.0 1.6 0.9
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 0.5 50.1 1.4 4.6 6.0 1.6 0.9
Queue Length 50th (ft) 0 12 0 3 170 0 7
Queue Length 95th (ft) 0 34 0 m6 319 4 34
Internal Link Dist (ft) 516 684 292 471
Turn Bay Length (ft) 275 90 75
Base Capacity (vph) 228 160 312 342 4177 257 4182
Starvation Cap Reductn 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0
Reduced v/c Ratio 0.04 0.11 0.16 0.04 0.33 0.09 0.27
Intersection Summary
m Volume for 95th percentile queue is metered by upstream signal.
HCM 6th Signalized Intersection Summary Short Bkgrd PM
8: College (US 287) & Johnson/Spring Park
Scenario 1 City of Fort Collins Signal Timing 08/21/2024 Synchro 11 Light Report
sb pm.syn
Movement EBL EBT EBR WBL WBT WBR NBU NBL NBT NBR SBU SBL
Lane Configurations
Traffic Volume (veh/h) 7 1 3 54 2 45 8 1 1544 33 2 23
Future Volume (veh/h) 7 1 3 54 2 45 8 1 1544 33 2 23
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.99 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1796 1870 1796 1870 1945 1796 1870 1870 1796 1870
Adj Flow Rate, veh/h 7 1 3 56 2 47 1 1608 34 24
Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96
Percent Heavy Veh, %2 2 2 2 2 2 2 2 2 2
Cap, veh/h 20 3 9 98 4 88 208 4123 87 304
Arrive On Green 0.02 0.02 0.02 0.06 0.06 0.06 1.00 1.00 1.00 1.00
Sat Flow, veh/h 1101 157 472 1781 68 1591 185 5145 109 305
Grp Volume(v), veh/h 11 0 0 56 0 49 1 1064 578 24
Grp Sat Flow(s),veh/h/ln 1730 0 0 1781 0 1659 185 1702 1850 305
Q Serve(g_s), s 0.8 0.0 0.0 3.7 0.0 3.5 0.0 0.0 0.0 0.0
Cycle Q Clear(g_c), s 0.8 0.0 0.0 3.7 0.0 3.5 0.0 0.0 0.0 0.0
Prop In Lane 0.64 0.27 1.00 0.96 1.00 0.06 1.00
Lane Grp Cap(c), veh/h 32 0 0 98 0 91 208 2728 1482 304
V/C Ratio(X) 0.34 0.00 0.00 0.57 0.00 0.54 0.00 0.39 0.39 0.08
Avail Cap(c_a), veh/h 130 0 0 163 0 152 208 2728 1482 304
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 2.00 2.00
Upstream Filter(I) 1.00 0.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00 0.69
Uniform Delay (d), s/veh 58.2 0.0 0.0 55.3 0.0 55.2 0.0 0.0 0.0 0.0
Incr Delay (d2), s/veh 6.2 0.0 0.0 5.2 0.0 4.8 0.0 0.4 0.8 0.3
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.4 0.0 0.0 1.8 0.0 1.6 0.0 0.2 0.3 0.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 64.3 0.0 0.0 60.5 0.0 60.0 0.0 0.4 0.8 0.3
LnGrp LOS E A A E A E A A A A
Approach Vol, veh/h 11 105 1643
Approach Delay, s/veh 64.3 60.3 0.5
Approach LOS E E A
Timer - Assigned Phs 2 4 6 8
Phs Duration (G+Y+Rc), s 101.2 7.2 101.2 11.6
Change Period (Y+Rc), s 6.0 6.0 6.0 6.0
Max Green Setting (Gmax), s 84.0 8.0 84.0 10.0
Max Q Clear Time (g_c+I1), s 2.0 2.8 2.0 5.7
Green Ext Time (p_c), s 15.0 0.0 8.2 0.1
Intersection Summary
HCM 6th Ctrl Delay 2.4
HCM 6th LOS A
Notes
User approved ignoring U-Turning movement.
HCM 6th Signalized Intersection Summary Short Bkgrd PM
8: College (US 287) & Johnson/Spring Park
Scenario 1 City of Fort Collins Signal Timing 08/21/2024 Synchro 11 Light Report
sb pm.syn
Movement SBT SBR
Lane Configurations
Traffic Volume (veh/h) 2064 5
Future Volume (veh/h) 2064 5
Initial Q (Qb), veh 0 0
Ped-Bike Adj(A_pbT) 0.99
Parking Bus, Adj 1.00 1.00
Work Zone On Approach No
Adj Sat Flow, veh/h/ln 1870 1796
Adj Flow Rate, veh/h 2150 5
Peak Hour Factor 0.96 0.96
Percent Heavy Veh, % 2 2
Cap, veh/h 4215 10
Arrive On Green 1.00 1.00
Sat Flow, veh/h 5260 12
Grp Volume(v), veh/h 1391 764
Grp Sat Flow(s),veh/h/ln 1702 1868
Q Serve(g_s), s 0.0 0.0
Cycle Q Clear(g_c), s 0.0 0.0
Prop In Lane 0.01
Lane Grp Cap(c), veh/h 2728 1497
V/C Ratio(X) 0.51 0.51
Avail Cap(c_a), veh/h 2728 1497
HCM Platoon Ratio 2.00 2.00
Upstream Filter(I) 0.69 0.69
Uniform Delay (d), s/veh 0.0 0.0
Incr Delay (d2), s/veh 0.5 0.9
Initial Q Delay(d3),s/veh 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.2 0.4
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 0.5 0.9
LnGrp LOS A A
Approach Vol, veh/h 2179
Approach Delay, s/veh 0.6
Approach LOS A
Timer - Assigned Phs
Timing Report, Sorted By Phase Short Bkgrd PM
8: College (US 287) & Johnson/Spring Park
Scenario 1 City of Fort Collins Signal Timing 08/21/2024 Synchro 11 Light Report
sb pm.syn
Phase Number 2 4 6 8
Movement SBTL EBTL NBTL WBTL
Lead/Lag
Lead-Lag Optimize
Recall Mode C-Max None Max None
Maximum Split (s) 90 14 90 16
Maximum Split (%) 75.0% 11.7% 75.0% 13.3%
Minimum Split (s) 23.5 10 23.5 16
Yellow Time (s) 4.5 3 4.5 3
All-Red Time (s) 1.5 3 1.5 3
Minimum Initial (s) 10 4 10 4
Vehicle Extension (s)3 3 3 3
Minimum Gap (s)3 3 3 3
Time Before Reduce (s)0 0 0 0
Time To Reduce (s)0 0 0 0
Walk Time (s)
Flash Dont Walk (s)
Dual Entry Yes Yes Yes Yes
Inhibit Max Yes Yes Yes Yes
Start Time (s) 114 84 114 98
End Time (s) 84 98 84 114
Yield/Force Off (s) 78 92 78 108
Yield/Force Off 170(s) 78 92 78 108
Local Start Time (s) 36 6 36 20
Local Yield (s) 0 14 0 30
Local Yield 170(s) 0 14 0 30
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 60
Offset: 78 (65%), Referenced to phase 2:SBTL, Start of Yellow
Splits and Phases: 8: College (US 287) & Johnson/Spring Park
Queues Short Bkgrd PM
8: College (US 287) & Johnson/Spring Park
Scenario 1 City of Fort Collins Signal Timing 08/21/2024 Synchro 11 Light Report
sb pm.syn
Lane Group EBT WBL WBT NBL NBT SBL SBT
Lane Group Flow (vph) 11 56 49 9 1642 26 2155
v/c Ratio 0.10 0.39 0.28 0.09 0.40 0.14 0.52
Control Delay 47.0 59.8 19.3 5.2 2.4 3.2 2.0
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 47.0 59.8 19.3 5.2 2.4 3.2 2.0
Queue Length 50th (ft) 6 42 1 1 43 2 67
Queue Length 95th (ft) 25 84 40 m3 107 m4 82
Internal Link Dist (ft) 413 682 293 471
Turn Bay Length (ft) 275 90 75
Base Capacity (vph) 133 165 196 97 4120 185 4132
Starvation Cap Reductn 0 0 0 0 0 0 256
Spillback Cap Reductn 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0
Reduced v/c Ratio 0.08 0.34 0.25 0.09 0.40 0.14 0.56
Intersection Summary
m Volume for 95th percentile queue is metered by upstream signal.
HCM 6th TWSC Short Bkgrd AM
2: College (US 287) & Arthur/Retail Access
Scenario 1 City of Fort Collins Signal Timing 08/20/2024 Synchro 11 Light Report
sb am.syn
Intersection
Int Delay, s/veh 0.2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBU SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 1 0 1 0 0 0 5 1240 0 12 1 1002 4
Future Vol, veh/h 1 0 1 0 0 0 5 1240 0 12 1 1002 4
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - - None
Storage Length -- - - - - 80 - - - 80 - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - - 0 -
Grade, % - 0 - - 0 - - 0 - - - 0 -
Peak Hour Factor 91 91 91 91 91 91 91 91 91 91 91 91 91
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 1 0 1 0 0 0 5 1363 0 13 1 1101 4
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 1686 2504 553 1841 2506 682 1105 0 0 995 1363 0 0
Stage 1 1131 1131 - 1373 1373 -- - - - - - -
Stage 2 555 1373 - 468 1133 -- - - - - - -
Critical Hdwy 6.44 6.54 7.14 6.44 6.54 7.14 5.34 - - 5.64 5.34 - -
Critical Hdwy Stg 1 7.34 5.54 - 7.34 5.54 -- - - - - - -
Critical Hdwy Stg 2 6.74 5.54 - 6.74 5.54 -- - - - - - -
Follow-up Hdwy 3.82 4.02 3.92 3.82 4.02 3.92 3.12 - - 2.32 3.12 - -
Pot Cap-1 Maneuver 99 28 408 80 28 336 348 - - 442 260 - -
Stage 1 161 277 - 109 212 -- - - - - - -
Stage 2 441 212 - 498 276 -- - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 95 27 408 77 27 336 348 - - 419 419 - -
Mov Cap-2 Maneuver 95 27 - 77 27 -- - - - - - -
Stage 1 159 268 - 107 209 -- - - - - - -
Stage 2 435 209 - 480 267 -- - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 28.7 0 0.1 0.2
HCM LOS D A
Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR
Capacity (veh/h) 348 - - 154 - 419 - -
HCM Lane V/C Ratio 0.016 - - 0.014 - 0.034 - -
HCM Control Delay (s) 15.5 - - 28.7 0 13.9 - -
HCM Lane LOS C - - D A B - -
HCM 95th %tile Q(veh) 0 - - 0 - 0.1 - -
HCM 6th TWSC Short Bkgrd PM
3: College (US 287) & Arthur/Retail Access
Scenario 1 City of Fort Collins Signal Timing 08/21/2024 Synchro 11 Light Report
sb pm.syn
Intersection
Int Delay, s/veh 0.4
Movement EBL EBT EBR WBL WBT WBR NBU NBL NBT NBR SBU SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 1 0 15 0 0 1 6 4 1558 1 11 1 2105 2
Future Vol, veh/h 1 0 15 0 0 1 6 4 1558 1 11 1 2105 2
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free Free Free
RT Channelized - - None - - None - - - None - - - None
Storage Length -- - - - - - 80 - - - 80 - -
Veh in Median Storage, # - 0 - - 0 - - - 0 - - - 0 -
Grade, % - 0 - - 0 - - - 0 - - - 0 -
Peak Hour Factor 94 94 94 94 94 94 94 94 94 94 94 94 94 94
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 1 0 16 0 0 1 6 4 1657 1 12 1 2239 2
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 2949 3944 1121 2600 3945 829 1636 2241 0 0 1211 1658 0 0
Stage 1 2266 2266 - 1678 1678 - - - - - - - - -
Stage 2 683 1678 - 922 2267 - - - - - - - - -
Critical Hdwy 6.44 6.54 7.14 6.44 6.54 7.14 5.64 5.34 - - 5.64 5.34 - -
Critical Hdwy Stg 1 7.34 5.54 - 7.34 5.54 - - - - - - - - -
Critical Hdwy Stg 2 6.74 5.54 - 6.74 5.54 - - - - - - - - -
Follow-up Hdwy 3.82 4.02 3.92 3.82 4.02 3.92 2.32 3.12 - - 2.32 3.12 - -
Pot Cap-1 Maneuver 16 3 172 27 3 269 194 94 - - 335 186 - -
Stage 1 25 75 - 66 150 - - - - - - - - -
Stage 2 369 150 - 263 75 - - - - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 14 3 172 22 3 269 131 131 - - 313 313 - -
Mov Cap-2 Maneuver 14 3 - 22 3 - - - - - - - - -
Stage 1 23 72 - 60 137 - - - - - - - - -
Stage 2 337 137 - 229 72 - - - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 47.7 18.4 0.2 0.1
HCM LOS E C
Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR
Capacity (veh/h) 131 - - 101 269 313 - -
HCM Lane V/C Ratio 0.081 - - 0.169 0.004 0.041 - -
HCM Control Delay (s) 34.9 - - 47.7 18.4 17 - -
HCM Lane LOS D - - E C C - -
HCM 95th %tile Q(veh) 0.3 - - 0.6 0 0.1 - -
APPENDIX E
HCM 6th Signalized Intersection Summary Long Bkgrd AM
8: College (US 287) & Johnson/Spring Park
Scenario 1 City of Fort Collins Signal Timing 08/21/2024 Synchro 11 Light Report
lb am.syn
Movement EBL EBT EBR WBL WBT WBR NBU NBL NBT NBR SBU SBL
Lane Configurations
Traffic Volume (veh/h) 4 0 6 18 0 53 10 4 1407 21 5 18
Future Volume (veh/h) 4 0 6 18 0 53 10 4 1407 21 5 18
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1796 1870 1796 1870 1945 1796 1870 1870 1796 1870
Adj Flow Rate, veh/h 4 0 7 20 0 59 4 1563 23 20
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
Percent Heavy Veh, %2 2 2 2 2 2 2 2 2 2
Cap, veh/h 12 0 20 103 0 95 399 4100 60 320
Arrive On Green 0.02 0.00 0.02 0.06 0.00 0.06 1.00 1.00 1.00 1.00
Sat Flow, veh/h 600 0 1051 1781 0 1648 422 5184 76 322
Grp Volume(v), veh/h 11 0 0 20 0 59 4 1026 560 20
Grp Sat Flow(s),veh/h/ln 1651 0 0 1781 0 1648 422 1702 1856 322
Q Serve(g_s), s 0.7 0.0 0.0 1.2 0.0 3.8 0.0 0.0 0.0 0.0
Cycle Q Clear(g_c), s 0.7 0.0 0.0 1.2 0.0 3.8 0.0 0.0 0.0 0.0
Prop In Lane 0.36 0.64 1.00 1.00 1.00 0.04 1.00
Lane Grp Cap(c), veh/h 32 0 0 103 0 95 399 2692 1468 320
V/C Ratio(X) 0.34 0.00 0.00 0.19 0.00 0.62 0.01 0.38 0.38 0.06
Avail Cap(c_a), veh/h 150 0 0 162 0 150 399 2692 1468 320
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.33 1.33 1.33 2.00
Upstream Filter(I) 1.00 0.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00 0.97
Uniform Delay (d), s/veh 53.2 0.0 0.0 49.4 0.0 50.6 0.0 0.0 0.0 0.0
Incr Delay (d2), s/veh 6.2 0.0 0.0 0.9 0.0 6.4 0.0 0.4 0.8 0.4
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.4 0.0 0.0 0.6 0.0 1.8 0.0 0.2 0.3 0.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 59.4 0.0 0.0 50.3 0.0 57.0 0.0 0.4 0.8 0.4
LnGrp LOS E A A D A E A A A A
Approach Vol, veh/h 11 79 1590
Approach Delay, s/veh 59.4 55.3 0.5
Approach LOS E E A
Timer - Assigned Phs 2 4 6 8
Phs Duration (G+Y+Rc), s 91.5 7.1 91.5 11.4
Change Period (Y+Rc), s 5.5 6.0 5.5 6.0
Max Green Setting (Gmax), s 74.5 9.0 74.5 9.0
Max Q Clear Time (g_c+I1), s 2.0 2.7 2.0 5.8
Green Ext Time (p_c), s 6.2 0.0 7.7 0.0
Intersection Summary
HCM 6th Ctrl Delay 2.1
HCM 6th LOS A
Notes
User approved ignoring U-Turning movement.
HCM 6th Signalized Intersection Summary Long Bkgrd AM
8: College (US 287) & Johnson/Spring Park
Scenario 1 City of Fort Collins Signal Timing 08/21/2024 Synchro 11 Light Report
lb am.syn
Movement SBT SBR
Lane Configurations
Traffic Volume (veh/h) 1165 9
Future Volume (veh/h) 1165 9
Initial Q (Qb), veh 0 0
Ped-Bike Adj(A_pbT) 1.00
Parking Bus, Adj 1.00 1.00
Work Zone On Approach No
Adj Sat Flow, veh/h/ln 1870 1796
Adj Flow Rate, veh/h 1294 10
Peak Hour Factor 0.90 0.90
Percent Heavy Veh, % 2 2
Cap, veh/h 4133 32
Arrive On Green 1.00 1.00
Sat Flow, veh/h 5227 40
Grp Volume(v), veh/h 843 461
Grp Sat Flow(s),veh/h/ln 1702 1863
Q Serve(g_s), s 0.0 0.0
Cycle Q Clear(g_c), s 0.0 0.0
Prop In Lane 0.02
Lane Grp Cap(c), veh/h 2692 1473
V/C Ratio(X) 0.31 0.31
Avail Cap(c_a), veh/h 2692 1473
HCM Platoon Ratio 2.00 2.00
Upstream Filter(I) 0.97 0.97
Uniform Delay (d), s/veh 0.0 0.0
Incr Delay (d2), s/veh 0.3 0.5
Initial Q Delay(d3),s/veh 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.1 0.2
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 0.3 0.5
LnGrp LOS A A
Approach Vol, veh/h 1324
Approach Delay, s/veh 0.4
Approach LOS A
Timer - Assigned Phs
Timing Report, Sorted By Phase Long Bkgrd AM
8: College (US 287) & Johnson/Spring Park
Scenario 1 City of Fort Collins Signal Timing 08/21/2024 Synchro 11 Light Report
lb am.syn
Phase Number 2 4 6 8
Movement SBTL EBTL NBTL WBTL
Lead/Lag
Lead-Lag Optimize
Recall Mode C-Max None C-Max None
Maximum Split (s) 80 15 80 15
Maximum Split (%) 72.7% 13.6% 72.7% 13.6%
Minimum Split (s) 23.5 10 23.5 35
Yellow Time (s)4 3 4 3
All-Red Time (s) 1.5 3 1.5 3
Minimum Initial (s) 10 4 10 4
Vehicle Extension (s)3 3 3 3
Minimum Gap (s)3 3 3 3
Time Before Reduce (s)0 0 0 0
Time To Reduce (s)0 0 0 0
Walk Time (s)
Flash Dont Walk (s)
Dual Entry Yes Yes Yes Yes
Inhibit Max Yes Yes Yes Yes
Start Time (s) 39.5 9.5 39.5 24.5
End Time (s) 9.5 24.5 9.5 39.5
Yield/Force Off (s) 4 18.5 4 33.5
Yield/Force Off 170(s) 4 18.5 4 33.5
Local Start Time (s) 35.5 5.5 35.5 20.5
Local Yield (s) 0 14.5 0 29.5
Local Yield 170(s) 0 14.5 0 29.5
Intersection Summary
Cycle Length 110
Control Type Actuated-Coordinated
Natural Cycle 75
Offset: 4 (4%), Referenced to phase 2:SBTL and 6:NBTL, Start of Yellow
Splits and Phases: 8: College (US 287) & Johnson/Spring Park
Queues Long Bkgrd AM
8: College (US 287) & Johnson/Spring Park
Scenario 1 City of Fort Collins Signal Timing 08/21/2024 Synchro 11 Light Report
lb am.syn
Lane Group EBT WBL WBT NBL NBT SBL SBT
Lane Group Flow (vph) 11 20 59 15 1586 26 1304
v/c Ratio 0.06 0.16 0.23 0.05 0.38 0.13 0.31
Control Delay 0.7 50.3 2.0 5.1 6.9 2.6 1.1
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 0.7 50.3 2.0 5.1 6.9 2.6 1.1
Queue Length 50th (ft) 0 14 0 4 207 1 12
Queue Length 95th (ft) 0 38 0 m8 417 6 49
Internal Link Dist (ft) 516 684 292 471
Turn Bay Length (ft) 275 90 75
Base Capacity (vph) 228 160 290 282 4171 202 4176
Starvation Cap Reductn 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0
Reduced v/c Ratio 0.05 0.13 0.20 0.05 0.38 0.13 0.31
Intersection Summary
m Volume for 95th percentile queue is metered by upstream signal.
HCM 6th Signalized Intersection Summary Long Bkgrd PM
8: College (US 287) & Johnson/Spring Park
Scenario 1 City of Fort Collins Signal Timing 08/21/2024 Synchro 11 Light Report
lb pm.syn
Movement EBL EBT EBR WBL WBT WBR NBU NBL NBT NBR SBU SBL
Lane Configurations
Traffic Volume (veh/h) 9 1 4 63 2 53 10 1 1810 38 2 27
Future Volume (veh/h) 9 1 4 63 2 53 10 1 1810 38 2 27
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.99 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1796 1870 1796 1870 1945 1796 1870 1870 1796 1870
Adj Flow Rate, veh/h 9 1 4 66 2 55 1 1885 40 28
Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96
Percent Heavy Veh, %2 2 2 2 2 2 2 2 2 2
Cap, veh/h 23 3 10 109 4 98 161 4080 87 244
Arrive On Green 0.02 0.02 0.02 0.06 0.06 0.06 1.00 1.00 1.00 1.00
Sat Flow, veh/h 1110 123 493 1781 58 1599 128 5145 109 232
Grp Volume(v), veh/h 14 0 0 66 0 57 1 1247 678 28
Grp Sat Flow(s),veh/h/ln 1726 0 0 1781 0 1657 128 1702 1850 232
Q Serve(g_s), s 1.0 0.0 0.0 4.3 0.0 4.0 0.0 0.0 0.0 0.0
Cycle Q Clear(g_c), s 1.0 0.0 0.0 4.3 0.0 4.0 0.0 0.0 0.0 0.0
Prop In Lane 0.64 0.29 1.00 0.96 1.00 0.06 1.00
Lane Grp Cap(c), veh/h 36 0 0 109 0 101 161 2700 1467 244
V/C Ratio(X) 0.39 0.00 0.00 0.61 0.00 0.56 0.01 0.46 0.46 0.11
Avail Cap(c_a), veh/h 129 0 0 163 0 152 161 2700 1467 244
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 2.00 2.00
Upstream Filter(I) 1.00 0.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00 0.69
Uniform Delay (d), s/veh 58.0 0.0 0.0 54.9 0.0 54.8 0.0 0.0 0.0 0.0
Incr Delay (d2), s/veh 6.8 0.0 0.0 5.3 0.0 4.8 0.1 0.6 1.1 0.7
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.5 0.0 0.0 2.1 0.0 1.8 0.0 0.2 0.4 0.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 64.8 0.0 0.0 60.3 0.0 59.6 0.1 0.6 1.1 0.7
LnGrp LOS E A A E A E A A A A
Approach Vol, veh/h 14 123 1926
Approach Delay, s/veh 64.8 60.0 0.7
Approach LOS E E A
Timer - Assigned Phs 2 4 6 8
Phs Duration (G+Y+Rc), s 100.2 7.5 100.2 12.3
Change Period (Y+Rc), s 6.0 6.0 6.0 6.0
Max Green Setting (Gmax), s 84.0 8.0 84.0 10.0
Max Q Clear Time (g_c+I1), s 2.0 3.0 2.0 6.3
Green Ext Time (p_c), s 22.6 0.0 11.0 0.1
Intersection Summary
HCM 6th Ctrl Delay 2.6
HCM 6th LOS A
Notes
User approved ignoring U-Turning movement.
HCM 6th Signalized Intersection Summary Long Bkgrd PM
8: College (US 287) & Johnson/Spring Park
Scenario 1 City of Fort Collins Signal Timing 08/21/2024 Synchro 11 Light Report
lb pm.syn
Movement SBT SBR
Lane Configurations
Traffic Volume (veh/h) 2420 6
Future Volume (veh/h) 2420 6
Initial Q (Qb), veh 0 0
Ped-Bike Adj(A_pbT) 0.99
Parking Bus, Adj 1.00 1.00
Work Zone On Approach No
Adj Sat Flow, veh/h/ln 1870 1796
Adj Flow Rate, veh/h 2521 6
Peak Hour Factor 0.96 0.96
Percent Heavy Veh, % 2 2
Cap, veh/h 4171 10
Arrive On Green 1.00 1.00
Sat Flow, veh/h 5260 13
Grp Volume(v), veh/h 1631 896
Grp Sat Flow(s),veh/h/ln 1702 1868
Q Serve(g_s), s 0.0 0.0
Cycle Q Clear(g_c), s 0.0 0.0
Prop In Lane 0.01
Lane Grp Cap(c), veh/h 2700 1482
V/C Ratio(X) 0.60 0.60
Avail Cap(c_a), veh/h 2700 1482
HCM Platoon Ratio 2.00 2.00
Upstream Filter(I) 0.69 0.69
Uniform Delay (d), s/veh 0.0 0.0
Incr Delay (d2), s/veh 0.7 1.3
Initial Q Delay(d3),s/veh 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.3 0.5
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 0.7 1.3
LnGrp LOS A A
Approach Vol, veh/h 2555
Approach Delay, s/veh 0.9
Approach LOS A
Timer - Assigned Phs
Timing Report, Sorted By Phase Long Bkgrd PM
8: College (US 287) & Johnson/Spring Park
Scenario 1 City of Fort Collins Signal Timing 08/21/2024 Synchro 11 Light Report
lb pm.syn
Phase Number 2 4 6 8
Movement SBTL EBTL NBTL WBTL
Lead/Lag
Lead-Lag Optimize
Recall Mode C-Max None Max None
Maximum Split (s) 90 14 90 16
Maximum Split (%) 75.0% 11.7% 75.0% 13.3%
Minimum Split (s) 23.5 10 23.5 16
Yellow Time (s) 4.5 3 4.5 3
All-Red Time (s) 1.5 3 1.5 3
Minimum Initial (s) 10 4 10 4
Vehicle Extension (s)3 3 3 3
Minimum Gap (s)3 3 3 3
Time Before Reduce (s)0 0 0 0
Time To Reduce (s)0 0 0 0
Walk Time (s)
Flash Dont Walk (s)
Dual Entry Yes Yes Yes Yes
Inhibit Max Yes Yes Yes Yes
Start Time (s) 114 84 114 98
End Time (s) 84 98 84 114
Yield/Force Off (s) 78 92 78 108
Yield/Force Off 170(s) 78 92 78 108
Local Start Time (s) 36 6 36 20
Local Yield (s) 0 14 0 30
Local Yield 170(s) 0 14 0 30
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 70
Offset: 78 (65%), Referenced to phase 2:SBTL, Start of Yellow
Splits and Phases: 8: College (US 287) & Johnson/Spring Park
Queues Long Bkgrd PM
8: College (US 287) & Johnson/Spring Park
Scenario 1 City of Fort Collins Signal Timing 08/21/2024 Synchro 11 Light Report
lb pm.syn
Lane Group EBT WBL WBT NBL NBT SBL SBT
Lane Group Flow (vph) 14 66 57 11 1925 30 2527
v/c Ratio 0.13 0.45 0.30 0.18 0.48 0.24 0.63
Control Delay 45.5 61.6 18.5 10.4 3.2 6.3 2.9
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 45.5 61.6 18.5 10.4 3.2 6.3 2.9
Queue Length 50th (ft) 7 49 1 1 51 2 90
Queue Length 95th (ft) 29 96 43 m4 128 m5 105
Internal Link Dist (ft) 413 682 293 471
Turn Bay Length (ft) 275 90 75
Base Capacity (vph) 133 165 203 61 4001 125 4013
Starvation Cap Reductn 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0
Reduced v/c Ratio 0.11 0.40 0.28 0.18 0.48 0.24 0.63
Intersection Summary
m Volume for 95th percentile queue is metered by upstream signal.
HCM 6th TWSC Long Bkgrd AM
2: College (US 287) & Arthur/Retail Access
Scenario 1 City of Fort Collins Signal Timing 08/21/2024 Synchro 11 Light Report
lb am.syn
Intersection
Int Delay, s/veh 0.2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBU SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 1 0 1 0 0 0 6 1454 0 14 1 1174 5
Future Vol, veh/h 1 0 1 0 0 0 6 1454 0 14 1 1174 5
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - - None
Storage Length -- - - - - 80 - - - 80 - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - - 0 -
Grade, % - 0 - - 0 - - 0 - - - 0 -
Peak Hour Factor 93 93 93 93 93 93 93 93 93 93 93 93 93
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 1 0 1 0 0 0 6 1563 0 15 1 1262 5
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 1934 2872 634 2112 2874 782 1267 0 0 1141 1563 0 0
Stage 1 1297 1297 - 1575 1575 -- - - - - - -
Stage 2 637 1575 - 537 1299 -- - - - - - -
Critical Hdwy 6.44 6.54 7.14 6.44 6.54 7.14 5.34 - - 5.64 5.34 - -
Critical Hdwy Stg 1 7.34 5.54 - 7.34 5.54 -- - - - - - -
Critical Hdwy Stg 2 6.74 5.54 - 6.74 5.54 -- - - - - - -
Follow-up Hdwy 3.82 4.02 3.92 3.82 4.02 3.92 3.12 - - 2.32 3.12 - -
Pot Cap-1 Maneuver 70 16 362 54 16 289 290 - - 367 207 - -
Stage 1 123 230 - 78 169 -- - - - - - -
Stage 2 393 169 - 452 230 -- - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 67 15 362 51 15 289 290 - - 349 349 - -
Mov Cap-2 Maneuver 67 15 - 51 15 -- - - - - - -
Stage 1 120 219 - 76 165 -- - - - - - -
Stage 2 385 165 - 430 219 -- - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 37.5 0 0.1 0.2
HCM LOS E A
Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR
Capacity (veh/h) 290 - - 113 - 349 - -
HCM Lane V/C Ratio 0.022 - - 0.019 - 0.046 - -
HCM Control Delay (s) 17.7 - - 37.5 0 15.8 - -
HCM Lane LOS C - - E A C - -
HCM 95th %tile Q(veh) 0.1 - - 0.1 - 0.1 - -
HCM 6th TWSC Long Bkgrd PM
3: College (US 287) & Arthur/Retail Access
Scenario 1 City of Fort Collins Signal Timing 08/21/2024 Synchro 11 Light Report
lb pm.syn
Intersection
Int Delay, s/veh 0.6
Movement EBL EBT EBR WBL WBT WBR NBU NBL NBT NBR SBU SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 1 0 17 0 0 1 7 5 1826 1 12 1 2468 2
Future Vol, veh/h 1 0 17 0 0 1 7 5 1826 1 12 1 2468 2
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free Free Free
RT Channelized - - None - - None - - - None - - - None
Storage Length -- - - - - - 80 - - - 80 - -
Veh in Median Storage, # - 0 - - 0 - - - 0 - - - 0 -
Grade, % - 0 - - 0 - - - 0 - - - 0 -
Peak Hour Factor 95 95 95 95 95 95 95 95 95 95 95 95 95 95
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 1 0 18 0 0 1 7 5 1922 1 13 1 2598 2
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 3420 4574 1300 3014 4575 962 1898 2600 0 0 1404 1923 0 0
Stage 1 2627 2627 - 1947 1947 - - - - - - - - -
Stage 2 793 1947 - 1067 2628 - - - - - - - - -
Critical Hdwy 6.44 6.54 7.14 6.44 6.54 7.14 5.64 5.34 - - 5.64 5.34 - -
Critical Hdwy Stg 1 7.34 5.54 - 7.34 5.54 - - - - - - - - -
Critical Hdwy Stg 2 6.74 5.54 - 6.74 5.54 - - - - - - - - -
Follow-up Hdwy 3.82 4.02 3.92 3.82 4.02 3.92 2.32 3.12 - - 2.32 3.12 - -
Pot Cap-1 Maneuver 8 1 130 14 1 220 137 61 - - 261 137 - -
Stage 1 13 49 - 42 110 - - - - - - - - -
Stage 2 316 110 - 214 49 - - - - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 7 1 130 10 1 220 85 85 - - 243 243 - -
Mov Cap-2 Maneuver 7 1 - 10 1 - - - - - - - - -
Stage 1 11 46 - 36 93 - - - - - - - - -
Stage 2 267 93 - 174 46 - - - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 80.2 21.4 0.4 0.1
HCM LOS F C
Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR
Capacity (veh/h) 85 - - 66 220 243 - -
HCM Lane V/C Ratio 0.149 - - 0.287 0.005 0.056 - -
HCM Control Delay (s) 54.5 - - 80.2 21.4 20.7 - -
HCM Lane LOS F - - F C C - -
HCM 95th %tile Q(veh) 0.5 - - 1 0 0.2 - -
APPENDIX F
HCM 6th Signalized Intersection Summary Short Total AM
8: College (US 287) & Johnson/Spring Park
Scenario 1 City of Fort Collins Signal Timing 08/21/2024 Synchro 11 Light Report
st am.syn
Movement EBL EBT EBR WBL WBT WBR NBU NBL NBT NBR SBU SBL
Lane Configurations
Traffic Volume (veh/h) 14 0 7 16 0 45 8 6 1200 18 4 16
Future Volume (veh/h) 14 0 7 16 0 45 8 6 1200 18 4 16
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1796 1870 1796 1870 1945 1796 1870 1870 1796 1870
Adj Flow Rate, veh/h 16 0 8 18 0 51 7 1364 20 18
Peak Hour Factor 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88
Percent Heavy Veh, %2 2 2 2 2 2 2 2 2 2
Cap, veh/h 32 0 16 93 0 86 452 4086 60 344
Arrive On Green 0.03 0.00 0.03 0.05 0.00 0.05 0.79 0.79 0.79 1.00
Sat Flow, veh/h 1140 0 570 1781 0 1648 490 5185 76 391
Grp Volume(v), veh/h 24 0 0 18 0 51 7 896 488 18
Grp Sat Flow(s),veh/h/ln 1711 0 0 1781 0 1648 490 1702 1857 391
Q Serve(g_s), s 1.5 0.0 0.0 1.1 0.0 3.3 0.3 8.3 8.3 0.5
Cycle Q Clear(g_c), s 1.5 0.0 0.0 1.1 0.0 3.3 0.3 8.3 8.3 8.8
Prop In Lane 0.67 0.33 1.00 1.00 1.00 0.04 1.00
Lane Grp Cap(c), veh/h 48 0 0 93 0 86 452 2683 1463 344
V/C Ratio(X) 0.50 0.00 0.00 0.19 0.00 0.59 0.02 0.33 0.33 0.05
Avail Cap(c_a), veh/h 156 0 0 162 0 150 452 2683 1463 344
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 2.00
Upstream Filter(I) 1.00 0.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00 0.97
Uniform Delay (d), s/veh 52.7 0.0 0.0 49.9 0.0 51.0 2.5 3.3 3.3 0.4
Incr Delay (d2), s/veh 7.9 0.0 0.0 1.0 0.0 6.4 0.1 0.3 0.6 0.3
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.8 0.0 0.0 0.5 0.0 1.5 0.0 2.0 2.3 0.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 60.6 0.0 0.0 50.9 0.0 57.4 2.6 3.7 4.0 0.7
LnGrp LOS E A A D A E A A A A
Approach Vol, veh/h 24 69 1391
Approach Delay, s/veh 60.6 55.7 3.8
Approach LOS E E A
Timer - Assigned Phs 2 4 6 8
Phs Duration (G+Y+Rc), s 91.2 8.1 91.2 10.7
Change Period (Y+Rc), s 5.5 6.0 5.5 6.0
Max Green Setting (Gmax), s 74.5 9.0 74.5 9.0
Max Q Clear Time (g_c+I1), s 10.8 3.5 10.3 5.3
Green Ext Time (p_c), s 5.1 0.0 6.3 0.0
Intersection Summary
HCM 6th Ctrl Delay 4.1
HCM 6th LOS A
Notes
User approved ignoring U-Turning movement.
HCM 6th Signalized Intersection Summary Short Total AM
8: College (US 287) & Johnson/Spring Park
Scenario 1 City of Fort Collins Signal Timing 08/21/2024 Synchro 11 Light Report
st am.syn
Movement SBT SBR
Lane Configurations
Traffic Volume (veh/h) 996 13
Future Volume (veh/h) 996 13
Initial Q (Qb), veh 0 0
Ped-Bike Adj(A_pbT) 1.00
Parking Bus, Adj 1.00 1.00
Work Zone On Approach No
Adj Sat Flow, veh/h/ln 1870 1796
Adj Flow Rate, veh/h 1132 15
Peak Hour Factor 0.88 0.88
Percent Heavy Veh, % 2 2
Cap, veh/h 4093 54
Arrive On Green 1.00 1.00
Sat Flow, veh/h 5193 69
Grp Volume(v), veh/h 742 405
Grp Sat Flow(s),veh/h/ln 1702 1858
Q Serve(g_s), s 0.0 0.0
Cycle Q Clear(g_c), s 0.0 0.0
Prop In Lane 0.04
Lane Grp Cap(c), veh/h 2683 1464
V/C Ratio(X) 0.28 0.28
Avail Cap(c_a), veh/h 2683 1464
HCM Platoon Ratio 2.00 2.00
Upstream Filter(I) 0.97 0.97
Uniform Delay (d), s/veh 0.0 0.0
Incr Delay (d2), s/veh 0.2 0.5
Initial Q Delay(d3),s/veh 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.1 0.2
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 0.2 0.5
LnGrp LOS A A
Approach Vol, veh/h 1165
Approach Delay, s/veh 0.3
Approach LOS A
Timer - Assigned Phs
Timing Report, Sorted By Phase Short Total AM
8: College (US 287) & Johnson/Spring Park
Scenario 1 City of Fort Collins Signal Timing 08/21/2024 Synchro 11 Light Report
st am.syn
Phase Number 2 4 6 8
Movement SBTL EBTL NBTL WBTL
Lead/Lag
Lead-Lag Optimize
Recall Mode C-Max None C-Max None
Maximum Split (s) 80 15 80 15
Maximum Split (%) 72.7% 13.6% 72.7% 13.6%
Minimum Split (s) 23.5 10 23.5 35
Yellow Time (s)4 3 4 3
All-Red Time (s) 1.5 3 1.5 3
Minimum Initial (s) 10 4 10 4
Vehicle Extension (s)3 3 3 3
Minimum Gap (s)3 3 3 3
Time Before Reduce (s)0 0 0 0
Time To Reduce (s)0 0 0 0
Walk Time (s)
Flash Dont Walk (s)
Dual Entry Yes Yes Yes Yes
Inhibit Max Yes Yes Yes Yes
Start Time (s) 39.5 9.5 39.5 24.5
End Time (s) 9.5 24.5 9.5 39.5
Yield/Force Off (s) 4 18.5 4 33.5
Yield/Force Off 170(s) 4 18.5 4 33.5
Local Start Time (s) 35.5 5.5 35.5 20.5
Local Yield (s) 0 14.5 0 29.5
Local Yield 170(s) 0 14.5 0 29.5
Intersection Summary
Cycle Length 110
Control Type Actuated-Coordinated
Natural Cycle 70
Offset: 4 (4%), Referenced to phase 2:SBTL and 6:NBTL, Start of Yellow
Splits and Phases: 8: College (US 287) & Johnson/Spring Park
Queues Short Total AM
8: College (US 287) & Johnson/Spring Park
Scenario 1 City of Fort Collins Signal Timing 08/21/2024 Synchro 11 Light Report
st am.syn
Lane Group EBT WBL WBT NBL NBT SBL SBT
Lane Group Flow (vph) 24 18 51 16 1384 23 1147
v/c Ratio 0.13 0.15 0.19 0.05 0.35 0.10 0.29
Control Delay 1.5 50.1 1.6 7.4 8.9 2.4 1.4
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 1.5 50.1 1.6 7.4 8.9 2.4 1.4
Queue Length 50th (ft) 0 12 0 5 222 2 34
Queue Length 95th (ft) 0 34 0 m8 317 4 35
Internal Link Dist (ft) 516 684 292 471
Turn Bay Length (ft) 275 90 75
Base Capacity (vph) 232 160 295 318 3972 242 3973
Starvation Cap Reductn 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0
Reduced v/c Ratio 0.10 0.11 0.17 0.05 0.35 0.10 0.29
Intersection Summary
m Volume for 95th percentile queue is metered by upstream signal.
HCM 6th Signalized Intersection Summary Short Total PM
8: College (US 287) & Johnson/Spring Park
Scenario 1 City of Fort Collins Signal Timing 08/21/2024 Synchro 11 Light Report
st pm.syn
Movement EBL EBT EBR WBL WBT WBR NBU NBL NBT NBR SBU SBL
Lane Configurations
Traffic Volume (veh/h) 38 1 10 54 2 45 8 11 1544 33 2 23
Future Volume (veh/h) 38 1 10 54 2 45 8 11 1544 33 2 23
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.99 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1796 1870 1796 1870 1945 1796 1870 1870 1796 1870
Adj Flow Rate, veh/h 40 1 10 56 2 47 11 1608 34 24
Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96
Percent Heavy Veh, %2 2 2 2 2 2 2 2 2 2
Cap, veh/h 62 2 16 98 4 88 199 3984 84 296
Arrive On Green 0.05 0.05 0.05 0.06 0.06 0.06 1.00 1.00 1.00 1.00
Sat Flow, veh/h 1365 34 341 1781 68 1591 180 5145 109 305
Grp Volume(v), veh/h 51 0 0 56 0 49 11 1064 578 24
Grp Sat Flow(s),veh/h/ln 1741 0 0 1781 0 1659 180 1702 1850 305
Q Serve(g_s), s 3.5 0.0 0.0 3.7 0.0 3.5 0.0 0.0 0.0 0.0
Cycle Q Clear(g_c), s 3.5 0.0 0.0 3.7 0.0 3.5 0.0 0.0 0.0 0.0
Prop In Lane 0.78 0.20 1.00 0.96 1.00 0.06 1.00
Lane Grp Cap(c), veh/h 79 0 0 98 0 91 199 2636 1432 296
V/C Ratio(X) 0.64 0.00 0.00 0.57 0.00 0.54 0.06 0.40 0.40 0.08
Avail Cap(c_a), veh/h 131 0 0 163 0 152 199 2636 1432 296
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 2.00 2.00
Upstream Filter(I) 1.00 0.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00 0.69
Uniform Delay (d), s/veh 56.3 0.0 0.0 55.3 0.0 55.2 0.0 0.0 0.0 0.0
Incr Delay (d2), s/veh 8.4 0.0 0.0 5.2 0.0 4.8 0.5 0.5 0.8 0.4
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 1.7 0.0 0.0 1.8 0.0 1.6 0.0 0.2 0.3 0.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 64.7 0.0 0.0 60.5 0.0 60.0 0.5 0.5 0.8 0.4
LnGrp LOS E A A E A E A A A A
Approach Vol, veh/h 51 105 1653
Approach Delay, s/veh 64.7 60.3 0.6
Approach LOS E E A
Timer - Assigned Phs 2 4 6 8
Phs Duration (G+Y+Rc), s 97.9 10.5 97.9 11.6
Change Period (Y+Rc), s 6.0 6.0 6.0 6.0
Max Green Setting (Gmax), s 84.0 8.0 84.0 10.0
Max Q Clear Time (g_c+I1), s 2.0 5.5 2.0 5.7
Green Ext Time (p_c), s 15.5 0.0 8.8 0.1
Intersection Summary
HCM 6th Ctrl Delay 3.0
HCM 6th LOS A
Notes
User approved ignoring U-Turning movement.
HCM 6th Signalized Intersection Summary Short Total PM
8: College (US 287) & Johnson/Spring Park
Scenario 1 City of Fort Collins Signal Timing 08/21/2024 Synchro 11 Light Report
st pm.syn
Movement SBT SBR
Lane Configurations
Traffic Volume (veh/h) 2072 24
Future Volume (veh/h) 2072 24
Initial Q (Qb), veh 0 0
Ped-Bike Adj(A_pbT) 0.99
Parking Bus, Adj 1.00 1.00
Work Zone On Approach No
Adj Sat Flow, veh/h/ln 1870 1796
Adj Flow Rate, veh/h 2158 25
Peak Hour Factor 0.96 0.96
Percent Heavy Veh, % 2 2
Cap, veh/h 4029 47
Arrive On Green 1.00 1.00
Sat Flow, veh/h 5203 60
Grp Volume(v), veh/h 1411 772
Grp Sat Flow(s),veh/h/ln 1702 1859
Q Serve(g_s), s 0.0 0.0
Cycle Q Clear(g_c), s 0.0 0.0
Prop In Lane 0.03
Lane Grp Cap(c), veh/h 2636 1440
V/C Ratio(X) 0.54 0.54
Avail Cap(c_a), veh/h 2636 1440
HCM Platoon Ratio 2.00 2.00
Upstream Filter(I) 0.69 0.69
Uniform Delay (d), s/veh 0.0 0.0
Incr Delay (d2), s/veh 0.5 1.0
Initial Q Delay(d3),s/veh 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.2 0.4
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 0.5 1.0
LnGrp LOS A A
Approach Vol, veh/h 2207
Approach Delay, s/veh 0.7
Approach LOS A
Timer - Assigned Phs
Timing Report, Sorted By Phase Short Total PM
8: College (US 287) & Johnson/Spring Park
Scenario 1 City of Fort Collins Signal Timing 08/21/2024 Synchro 11 Light Report
st pm.syn
Phase Number 2 4 6 8
Movement SBTL EBTL NBTL WBTL
Lead/Lag
Lead-Lag Optimize
Recall Mode C-Max None Max None
Maximum Split (s) 90 14 90 16
Maximum Split (%) 75.0% 11.7% 75.0% 13.3%
Minimum Split (s) 23.5 10 23.5 16
Yellow Time (s) 4.5 3 4.5 3
All-Red Time (s) 1.5 3 1.5 3
Minimum Initial (s) 10 4 10 4
Vehicle Extension (s)3 3 3 3
Minimum Gap (s)3 3 3 3
Time Before Reduce (s)0 0 0 0
Time To Reduce (s)0 0 0 0
Walk Time (s)
Flash Dont Walk (s)
Dual Entry Yes Yes Yes Yes
Inhibit Max Yes Yes Yes Yes
Start Time (s) 114 84 114 98
End Time (s) 84 98 84 114
Yield/Force Off (s) 78 92 78 108
Yield/Force Off 170(s) 78 92 78 108
Local Start Time (s) 36 6 36 20
Local Yield (s) 0 14 0 30
Local Yield 170(s) 0 14 0 30
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 60
Offset: 78 (65%), Referenced to phase 2:SBTL, Start of Yellow
Splits and Phases: 8: College (US 287) & Johnson/Spring Park
Queues Short Total PM
8: College (US 287) & Johnson/Spring Park
Scenario 1 City of Fort Collins Signal Timing 08/21/2024 Synchro 11 Light Report
st pm.syn
Lane Group EBT WBL WBT NBL NBT SBL SBT
Lane Group Flow (vph) 51 56 49 19 1642 26 2183
v/c Ratio 0.40 0.40 0.28 0.23 0.43 0.16 0.58
Control Delay 55.7 60.6 19.6 10.7 3.8 4.4 3.1
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 55.7 60.6 19.6 10.7 3.8 4.4 3.1
Queue Length 50th (ft) 32 42 1 2 82 3 78
Queue Length 95th (ft) 74 85 40 m6 107 m4 83
Internal Link Dist (ft) 413 682 293 471
Turn Bay Length (ft) 275 90 75
Base Capacity (vph) 138 162 193 82 3791 165 3794
Starvation Cap Reductn 0 0 0 0 0 0 187
Spillback Cap Reductn 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0
Reduced v/c Ratio 0.37 0.35 0.25 0.23 0.43 0.16 0.61
Intersection Summary
m Volume for 95th percentile queue is metered by upstream signal.
HCM 6th TWSC Short Total AM
2: College (US 287) & Arthur/Retail Access
Scenario 1 City of Fort Collins Signal Timing 08/21/2024 Synchro 11 Light Report
st am.syn
Intersection
Int Delay, s/veh 0.2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBU SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 1 0 3 0 0 0 6 1243 0 12 1 1004 7
Future Vol, veh/h 1 0 3 0 0 0 6 1243 0 12 1 1004 7
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - - None
Storage Length -- - - - - 80 - - - 80 - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - - 0 -
Grade, % - 0 - - 0 - - 0 - - - 0 -
Peak Hour Factor 91 91 91 91 91 91 91 91 91 91 91 91 91
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 1 0 3 0 0 0 7 1366 0 13 1 1103 8
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 1695 2515 556 1849 2519 683 1111 0 0 997 1366 0 0
Stage 1 1135 1135 - 1380 1380 -- - - - - - -
Stage 2 560 1380 - 469 1139 -- - - - - - -
Critical Hdwy 6.44 6.54 7.14 6.44 6.54 7.14 5.34 - - 5.64 5.34 - -
Critical Hdwy Stg 1 7.34 5.54 - 7.34 5.54 -- - - - - - -
Critical Hdwy Stg 2 6.74 5.54 - 6.74 5.54 -- - - - - - -
Follow-up Hdwy 3.82 4.02 3.92 3.82 4.02 3.92 3.12 - - 2.32 3.12 - -
Pot Cap-1 Maneuver 98 28 406 79 28 336 346 - - 441 260 - -
Stage 1 160 275 - 108 210 -- - - - - - -
Stage 2 438 210 - 497 274 -- - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 94 27 406 75 27 336 346 - - 419 419 - -
Mov Cap-2 Maneuver 94 27 - 75 27 -- - - - - - -
Stage 1 157 266 - 106 206 -- - - - - - -
Stage 2 429 206 - 476 265 -- - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 21.5 0 0.1 0.2
HCM LOS C A
Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR
Capacity (veh/h) 346 - - 222 - 419 - -
HCM Lane V/C Ratio 0.019 - - 0.02 - 0.034 - -
HCM Control Delay (s) 15.6 - - 21.5 0 13.9 - -
HCM Lane LOS C - - C A B - -
HCM 95th %tile Q(veh) 0.1 - - 0.1 - 0.1 - -
HCM 6th TWSC Short Total PM
3: College (US 287) & Arthur/Retail Access
Scenario 1 City of Fort Collins Signal Timing 08/21/2024 Synchro 11 Light Report
st pm.syn
Intersection
Int Delay, s/veh 0.5
Movement EBL EBT EBR WBL WBT WBR NBU NBL NBT NBR SBU SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 1 0 21 0 0 1 6 6 1568 1 11 1 2112 10
Future Vol, veh/h 1 0 21 0 0 1 6 6 1568 1 11 1 2112 10
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free Free Free
RT Channelized - - None - - None - - - None - - - None
Storage Length -- - - - - - 80 - - - 80 - -
Veh in Median Storage, # - 0 - - 0 - - - 0 - - - 0 -
Grade, % - 0 - - 0 - - - 0 - - - 0 -
Peak Hour Factor 94 94 94 94 94 94 94 94 94 94 94 94 94 94
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 1 0 22 0 0 1 6 6 1668 1 12 1 2247 11
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 2970 3972 1129 2618 3977 835 1648 2258 0 0 1218 1669 0 0
Stage 1 2279 2279 - 1693 1693 - - - - - - - - -
Stage 2 691 1693 - 925 2284 - - - - - - - - -
Critical Hdwy 6.44 6.54 7.14 6.44 6.54 7.14 5.64 5.34 - - 5.64 5.34 - -
Critical Hdwy Stg 1 7.34 5.54 - 7.34 5.54 - - - - - - - - -
Critical Hdwy Stg 2 6.74 5.54 - 6.74 5.54 - - - - - - - - -
Follow-up Hdwy 3.82 4.02 3.92 3.82 4.02 3.92 2.32 3.12 - - 2.32 3.12 - -
Pot Cap-1 Maneuver 15 3 170 26 3 267 191 92 - - 332 184 - -
Stage 1 24 74 - 64 147 - - - - - - - - -
Stage 2 365 147 - 262 74 - - - - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 13 3 170 20 3 267 119 119 - - 310 310 - -
Mov Cap-2 Maneuver 13 3 - 20 3 - - - - - - - - -
Stage 1 21 71 - 57 131 - - - - - - - - -
Stage 2 324 131 - 218 71 - - - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 46.4 18.5 0.3 0.1
HCM LOS E C
Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR
Capacity (veh/h) 119 - - 110 267 310 - -
HCM Lane V/C Ratio 0.107 - - 0.213 0.004 0.041 - -
HCM Control Delay (s) 39 - - 46.4 18.5 17.1 - -
HCM Lane LOS E - - E C C - -
HCM 95th %tile Q(veh) 0.4 - - 0.8 0 0.1 - -
APPENDIX G
HCM 6th Signalized Intersection Summary Long Total AM
8: College (US 287) & Johnson/Spring Park
Scenario 1 City of Fort Collins Signal Timing 08/21/2024 Synchro 11 Light Report
lt am.syn
Movement EBL EBT EBR WBL WBT WBR NBU NBL NBT NBR SBU SBL
Lane Configurations
Traffic Volume (veh/h) 15 0 8 18 0 53 10 7 1407 21 5 18
Future Volume (veh/h) 15 0 8 18 0 53 10 7 1407 21 5 18
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1796 1870 1796 1870 1945 1796 1870 1870 1796 1870
Adj Flow Rate, veh/h 17 0 9 20 0 59 8 1563 23 20
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
Percent Heavy Veh, %2 2 2 2 2 2 2 2 2 2
Cap, veh/h 32 0 17 103 0 95 392 4050 60 287
Arrive On Green 0.03 0.00 0.03 0.06 0.00 0.06 0.78 0.78 0.78 1.00
Sat Flow, veh/h 1117 0 591 1781 0 1648 418 5184 76 322
Grp Volume(v), veh/h 26 0 0 20 0 59 8 1026 560 20
Grp Sat Flow(s),veh/h/ln 1708 0 0 1781 0 1648 418 1702 1856 322
Q Serve(g_s), s 1.7 0.0 0.0 1.2 0.0 3.8 0.5 10.4 10.4 0.9
Cycle Q Clear(g_c), s 1.7 0.0 0.0 1.2 0.0 3.8 0.5 10.4 10.4 11.3
Prop In Lane 0.65 0.35 1.00 1.00 1.00 0.04 1.00
Lane Grp Cap(c), veh/h 50 0 0 103 0 95 392 2659 1450 287
V/C Ratio(X) 0.52 0.00 0.00 0.19 0.00 0.62 0.02 0.39 0.39 0.07
Avail Cap(c_a), veh/h 155 0 0 162 0 150 392 2659 1450 287
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 2.00
Upstream Filter(I) 1.00 0.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00 0.97
Uniform Delay (d), s/veh 52.7 0.0 0.0 49.4 0.0 50.6 2.7 3.8 3.8 0.7
Incr Delay (d2), s/veh 8.3 0.0 0.0 0.9 0.0 6.4 0.1 0.4 0.8 0.5
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.8 0.0 0.0 0.6 0.0 1.8 0.0 2.6 3.0 0.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 61.0 0.0 0.0 50.3 0.0 57.0 2.8 4.2 4.5 1.1
LnGrp LOS E A A D A E A A A A
Approach Vol, veh/h 26 79 1594
Approach Delay, s/veh 61.0 55.3 4.3
Approach LOS E E A
Timer - Assigned Phs 2 4 6 8
Phs Duration (G+Y+Rc), s 90.4 8.2 90.4 11.4
Change Period (Y+Rc), s 5.5 6.0 5.5 6.0
Max Green Setting (Gmax), s 74.5 9.0 74.5 9.0
Max Q Clear Time (g_c+I1), s 13.3 3.7 12.4 5.8
Green Ext Time (p_c), s 6.3 0.0 7.8 0.0
Intersection Summary
HCM 6th Ctrl Delay 4.4
HCM 6th LOS A
Notes
User approved ignoring U-Turning movement.
HCM 6th Signalized Intersection Summary Long Total AM
8: College (US 287) & Johnson/Spring Park
Scenario 1 City of Fort Collins Signal Timing 08/21/2024 Synchro 11 Light Report
lt am.syn
Movement SBT SBR
Lane Configurations
Traffic Volume (veh/h) 1168 15
Future Volume (veh/h) 1168 15
Initial Q (Qb), veh 0 0
Ped-Bike Adj(A_pbT) 1.00
Parking Bus, Adj 1.00 1.00
Work Zone On Approach No
Adj Sat Flow, veh/h/ln 1870 1796
Adj Flow Rate, veh/h 1298 17
Peak Hour Factor 0.90 0.90
Percent Heavy Veh, % 2 2
Cap, veh/h 4058 53
Arrive On Green 1.00 1.00
Sat Flow, veh/h 5194 68
Grp Volume(v), veh/h 851 464
Grp Sat Flow(s),veh/h/ln 1702 1858
Q Serve(g_s), s 0.0 0.0
Cycle Q Clear(g_c), s 0.0 0.0
Prop In Lane 0.04
Lane Grp Cap(c), veh/h 2659 1452
V/C Ratio(X) 0.32 0.32
Avail Cap(c_a), veh/h 2659 1452
HCM Platoon Ratio 2.00 2.00
Upstream Filter(I) 0.97 0.97
Uniform Delay (d), s/veh 0.0 0.0
Incr Delay (d2), s/veh 0.3 0.6
Initial Q Delay(d3),s/veh 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.1 0.2
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 0.3 0.6
LnGrp LOS A A
Approach Vol, veh/h 1335
Approach Delay, s/veh 0.4
Approach LOS A
Timer - Assigned Phs
Timing Report, Sorted By Phase Long Total AM
8: College (US 287) & Johnson/Spring Park
Scenario 1 City of Fort Collins Signal Timing 08/21/2024 Synchro 11 Light Report
lt am.syn
Phase Number 2 4 6 8
Movement SBTL EBTL NBTL WBTL
Lead/Lag
Lead-Lag Optimize
Recall Mode C-Max None C-Max None
Maximum Split (s) 80 15 80 15
Maximum Split (%) 72.7% 13.6% 72.7% 13.6%
Minimum Split (s) 23.5 10 23.5 35
Yellow Time (s)4 3 4 3
All-Red Time (s) 1.5 3 1.5 3
Minimum Initial (s) 10 4 10 4
Vehicle Extension (s)3 3 3 3
Minimum Gap (s)3 3 3 3
Time Before Reduce (s)0 0 0 0
Time To Reduce (s)0 0 0 0
Walk Time (s)
Flash Dont Walk (s)
Dual Entry Yes Yes Yes Yes
Inhibit Max Yes Yes Yes Yes
Start Time (s) 39.5 9.5 39.5 24.5
End Time (s) 9.5 24.5 9.5 39.5
Yield/Force Off (s) 4 18.5 4 33.5
Yield/Force Off 170(s) 4 18.5 4 33.5
Local Start Time (s) 35.5 5.5 35.5 20.5
Local Yield (s) 0 14.5 0 29.5
Local Yield 170(s) 0 14.5 0 29.5
Intersection Summary
Cycle Length 110
Control Type Actuated-Coordinated
Natural Cycle 75
Offset: 4 (4%), Referenced to phase 2:SBTL and 6:NBTL, Start of Yellow
Splits and Phases: 8: College (US 287) & Johnson/Spring Park
Queues Long Total AM
8: College (US 287) & Johnson/Spring Park
Scenario 1 City of Fort Collins Signal Timing 08/21/2024 Synchro 11 Light Report
lt am.syn
Lane Group EBT WBL WBT NBL NBT SBL SBT
Lane Group Flow (vph) 26 20 59 19 1586 26 1315
v/c Ratio 0.14 0.16 0.24 0.07 0.40 0.14 0.33
Control Delay 1.7 50.3 2.4 8.1 10.1 3.5 1.8
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 1.7 50.3 2.4 8.1 10.1 3.5 1.8
Queue Length 50th (ft) 0 14 0 7 271 2 45
Queue Length 95th (ft) 0 38 0 m11 417 6 50
Internal Link Dist (ft) 516 684 292 471
Turn Bay Length (ft) 275 90 75
Base Capacity (vph) 232 160 273 261 3966 190 3967
Starvation Cap Reductn 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0
Reduced v/c Ratio 0.11 0.13 0.22 0.07 0.40 0.14 0.33
Intersection Summary
m Volume for 95th percentile queue is metered by upstream signal.
HCM 6th Signalized Intersection Summary Long Total PM
8: College (US 287) & Johnson/Spring Park
Scenario 1 City of Fort Collins Signal Timing 08/21/2024 Synchro 11 Light Report
lt pm.syn
Movement EBL EBT EBR WBL WBT WBR NBU NBL NBT NBR SBU SBL
Lane Configurations
Traffic Volume (veh/h) 40 1 11 63 2 53 10 11 1810 38 2 27
Future Volume (veh/h) 40 1 11 63 2 53 10 11 1810 38 2 27
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.99 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1796 1870 1796 1870 1945 1796 1870 1870 1796 1870
Adj Flow Rate, veh/h 42 1 11 66 2 55 11 1885 40 28
Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96
Percent Heavy Veh, %2 2 2 2 2 2 2 2 2 2
Cap, veh/h 65 2 17 109 4 98 155 3941 84 237
Arrive On Green 0.05 0.05 0.05 0.06 0.06 0.06 1.00 1.00 1.00 1.00
Sat Flow, veh/h 1353 32 354 1781 58 1599 124 5145 109 232
Grp Volume(v), veh/h 54 0 0 66 0 57 11 1247 678 28
Grp Sat Flow(s),veh/h/ln 1739 0 0 1781 0 1657 124 1702 1850 232
Q Serve(g_s), s 3.7 0.0 0.0 4.3 0.0 4.0 0.0 0.0 0.0 0.0
Cycle Q Clear(g_c), s 3.7 0.0 0.0 4.3 0.0 4.0 0.0 0.0 0.0 0.0
Prop In Lane 0.78 0.20 1.00 0.96 1.00 0.06 1.00
Lane Grp Cap(c), veh/h 83 0 0 109 0 101 155 2608 1417 237
V/C Ratio(X) 0.65 0.00 0.00 0.61 0.00 0.56 0.07 0.48 0.48 0.12
Avail Cap(c_a), veh/h 130 0 0 163 0 152 155 2608 1417 237
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 2.00 2.00
Upstream Filter(I) 1.00 0.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00 0.69
Uniform Delay (d), s/veh 56.1 0.0 0.0 54.9 0.0 54.8 0.0 0.0 0.0 0.0
Incr Delay (d2), s/veh 8.2 0.0 0.0 5.3 0.0 4.8 0.9 0.6 1.2 0.7
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 1.8 0.0 0.0 2.1 0.0 1.8 0.0 0.2 0.5 0.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 64.4 0.0 0.0 60.3 0.0 59.6 0.9 0.6 1.2 0.7
LnGrp LOS E A A E A E A A A A
Approach Vol, veh/h 54 123 1936
Approach Delay, s/veh 64.4 60.0 0.8
Approach LOS E E A
Timer - Assigned Phs 2 4 6 8
Phs Duration (G+Y+Rc), s 96.9 10.7 96.9 12.3
Change Period (Y+Rc), s 6.0 6.0 6.0 6.0
Max Green Setting (Gmax), s 84.0 8.0 84.0 10.0
Max Q Clear Time (g_c+I1), s 2.0 5.7 2.0 6.3
Green Ext Time (p_c), s 23.3 0.0 12.2 0.1
Intersection Summary
HCM 6th Ctrl Delay 3.2
HCM 6th LOS A
Notes
User approved ignoring U-Turning movement.
HCM 6th Signalized Intersection Summary Long Total PM
8: College (US 287) & Johnson/Spring Park
Scenario 1 City of Fort Collins Signal Timing 08/21/2024 Synchro 11 Light Report
lt pm.syn
Movement SBT SBR
Lane Configurations
Traffic Volume (veh/h) 2428 25
Future Volume (veh/h) 2428 25
Initial Q (Qb), veh 0 0
Ped-Bike Adj(A_pbT) 0.99
Parking Bus, Adj 1.00 1.00
Work Zone On Approach No
Adj Sat Flow, veh/h/ln 1870 1796
Adj Flow Rate, veh/h 2529 26
Peak Hour Factor 0.96 0.96
Percent Heavy Veh, % 2 2
Cap, veh/h 3992 41
Arrive On Green 1.00 1.00
Sat Flow, veh/h 5211 53
Grp Volume(v), veh/h 1650 905
Grp Sat Flow(s),veh/h/ln 1702 1860
Q Serve(g_s), s 0.0 0.0
Cycle Q Clear(g_c), s 0.0 0.0
Prop In Lane 0.03
Lane Grp Cap(c), veh/h 2608 1425
V/C Ratio(X) 0.63 0.63
Avail Cap(c_a), veh/h 2608 1425
HCM Platoon Ratio 2.00 2.00
Upstream Filter(I) 0.69 0.69
Uniform Delay (d), s/veh 0.0 0.0
Incr Delay (d2), s/veh 0.8 1.5
Initial Q Delay(d3),s/veh 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.3 0.6
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 0.8 1.5
LnGrp LOS A A
Approach Vol, veh/h 2583
Approach Delay, s/veh 1.1
Approach LOS A
Timer - Assigned Phs
Timing Report, Sorted By Phase Long Total PM
8: College (US 287) & Johnson/Spring Park
Scenario 1 City of Fort Collins Signal Timing 08/21/2024 Synchro 11 Light Report
lt pm.syn
Phase Number 2 4 6 8
Movement SBTL EBTL NBTL WBTL
Lead/Lag
Lead-Lag Optimize
Recall Mode C-Max None Max None
Maximum Split (s) 90 14 90 16
Maximum Split (%) 75.0% 11.7% 75.0% 13.3%
Minimum Split (s) 23.5 10 23.5 16
Yellow Time (s) 4.5 3 4.5 3
All-Red Time (s) 1.5 3 1.5 3
Minimum Initial (s) 10 4 10 4
Vehicle Extension (s)3 3 3 3
Minimum Gap (s)3 3 3 3
Time Before Reduce (s)0 0 0 0
Time To Reduce (s)0 0 0 0
Walk Time (s)
Flash Dont Walk (s)
Dual Entry Yes Yes Yes Yes
Inhibit Max Yes Yes Yes Yes
Start Time (s) 114 84 114 98
End Time (s) 84 98 84 114
Yield/Force Off (s) 78 92 78 108
Yield/Force Off 170(s) 78 92 78 108
Local Start Time (s) 36 6 36 20
Local Yield (s) 0 14 0 30
Local Yield 170(s) 0 14 0 30
Intersection Summary
Cycle Length 120
Control Type Actuated-Coordinated
Natural Cycle 70
Offset: 78 (65%), Referenced to phase 2:SBTL, Start of Yellow
Splits and Phases: 8: College (US 287) & Johnson/Spring Park
Queues Long Total PM
8: College (US 287) & Johnson/Spring Park
Scenario 1 City of Fort Collins Signal Timing 08/21/2024 Synchro 11 Light Report
lt pm.syn
Lane Group EBT WBL WBT NBL NBT SBL SBT
Lane Group Flow (vph) 54 66 57 21 1925 30 2555
v/c Ratio 0.42 0.46 0.31 0.35 0.51 0.26 0.68
Control Delay 56.7 62.5 18.8 27.4 4.1 7.7 4.0
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 56.7 62.5 18.8 27.4 4.1 7.7 4.0
Queue Length 50th (ft) 34 49 1 3 97 3 103
Queue Length 95th (ft) 77 96 43 m13 128 m5 108
Internal Link Dist (ft) 413 682 293 471
Turn Bay Length (ft) 275 90 75
Base Capacity (vph) 138 162 200 60 3780 114 3784
Starvation Cap Reductn 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0
Reduced v/c Ratio 0.39 0.41 0.28 0.35 0.51 0.26 0.68
Intersection Summary
m Volume for 95th percentile queue is metered by upstream signal.
HCM 6th TWSC Long Total AM
2: College (US 287) & Arthur/Retail Access
Scenario 1 City of Fort Collins Signal Timing 08/21/2024 Synchro 11 Light Report
lt am.syn
Intersection
Int Delay, s/veh 0.2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBU SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 1 0 3 0 0 0 7 1457 0 14 1 1176 8
Future Vol, veh/h 1 0 3 0 0 0 7 1457 0 14 1 1176 8
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - - None
Storage Length -- - - - - 80 - - - 80 - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - - 0 -
Grade, % - 0 - - 0 - - 0 - - - 0 -
Peak Hour Factor 93 93 93 93 93 93 93 93 93 93 93 93 93
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 1 0 3 0 0 0 8 1567 0 15 1 1265 9
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 1945 2885 637 2121 2889 784 1274 0 0 1144 1567 0 0
Stage 1 1302 1302 - 1583 1583 -- - - - - - -
Stage 2 643 1583 - 538 1306 -- - - - - - -
Critical Hdwy 6.44 6.54 7.14 6.44 6.54 7.14 5.34 - - 5.64 5.34 - -
Critical Hdwy Stg 1 7.34 5.54 - 7.34 5.54 -- - - - - - -
Critical Hdwy Stg 2 6.74 5.54 - 6.74 5.54 -- - - - - - -
Follow-up Hdwy 3.82 4.02 3.92 3.82 4.02 3.92 3.12 - - 2.32 3.12 - -
Pot Cap-1 Maneuver 69 16 360 53 16 288 288 - - 365 206 - -
Stage 1 122 229 - 77 167 -- - - - - - -
Stage 2 390 167 - 452 228 -- - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 65 15 360 50 15 288 288 - - 347 347 - -
Mov Cap-2 Maneuver 65 15 - 50 15 -- - - - - - -
Stage 1 119 218 - 75 162 -- - - - - - -
Stage 2 379 162 - 427 218 -- - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 26.9 0 0.1 0.2
HCM LOS D A
Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR
Capacity (veh/h) 288 - - 169 - 347 - -
HCM Lane V/C Ratio 0.026 - - 0.025 - 0.046 - -
HCM Control Delay (s) 17.8 - - 26.9 0 15.9 - -
HCM Lane LOS C - - D A C - -
HCM 95th %tile Q(veh) 0.1 - - 0.1 - 0.1 - -
HCM 6th TWSC Long Total PM
3: College (US 287) & Arthur/Retail Access
Scenario 1 City of Fort Collins Signal Timing 08/21/2024 Synchro 11 Light Report
lt pm.syn
Intersection
Int Delay, s/veh 0.7
Movement EBL EBT EBR WBL WBT WBR NBU NBL NBT NBR SBU SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 1 0 23 0 0 1 7 7 1836 1 12 1 2475 10
Future Vol, veh/h 1 0 23 0 0 1 7 7 1836 1 12 1 2475 10
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free Free Free
RT Channelized - - None - - None - - - None - - - None
Storage Length -- - - - - - 80 - - - 80 - -
Veh in Median Storage, # - 0 - - 0 - - - 0 - - - 0 -
Grade, % - 0 - - 0 - - - 0 - - - 0 -
Peak Hour Factor 95 95 95 95 95 95 95 95 95 95 95 95 95 95
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 1 0 24 0 0 1 7 7 1933 1 13 1 2605 11
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 3440 4601 1308 3032 4606 967 1910 2616 0 0 1412 1934 0 0
Stage 1 2639 2639 - 1962 1962 - - - - - - - - -
Stage 2 801 1962 - 1070 2644 - - - - - - - - -
Critical Hdwy 6.44 6.54 7.14 6.44 6.54 7.14 5.64 5.34 - - 5.64 5.34 - -
Critical Hdwy Stg 1 7.34 5.54 - 7.34 5.54 - - - - - - - - -
Critical Hdwy Stg 2 6.74 5.54 - 6.74 5.54 - - - - - - - - -
Follow-up Hdwy 3.82 4.02 3.92 3.82 4.02 3.92 2.32 3.12 - - 2.32 3.12 - -
Pot Cap-1 Maneuver 8 1 129 14 1 218 135 60 - - 259 135 - -
Stage 1 13 48 - 41 108 - - - - - - - - -
Stage 2 312 108 - 213 48 - - - - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 6 1 129 9 1 218 78 78 - - 241 241 - -
Mov Cap-2 Maneuver 6 1 - 9 1 - - - - - - - - -
Stage 1 10 45 - 33 87 - - - - - - - - -
Stage 2 251 87 - 163 45 - - - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 83 21.6 0.5 0.1
HCM LOS F C
Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR
Capacity (veh/h) 78 - - 70 218 241 - -
HCM Lane V/C Ratio 0.189 - - 0.361 0.005 0.057 - -
HCM Control Delay (s) 61.7 - - 83 21.6 20.8 - -
HCM Lane LOS F - - F C C - -
HCM 95th %tile Q(veh) 0.6 - - 1.4 0 0.2 - -
APPENDIX H
Spring Creek Trail
Mason Trail
Johnson
Arthur
Springpark
Stuart
Co
l
l
e
g
e
Sp
r
i
n
g
Prospect
Ba
y
MAX
Station
SCALE: 1"=600'
PEDESTRIAN INFLUENCE AREA
DELICH
ASSOCIATES Johnson Drive Apartments TIS, August 2024
Pedestrian LOS Worksheet
Project Location Classification: Transit Corridor
Description of
Applicable Destination
Area Within 1320’
Destination
Area
Classification
Directness Continuity Street
Crossings
Visual
Interest &
Amenities
Security
Spring Creek/Mason
trails Recreational
Residential/Commercial
to the north
Residential/
Commercial
Commercial to the
south using the trail Commercial
Commercial to the
south using College
Ave
Commercial
Offices to the southwest Office
Buildings
CSU to the north Institutional
Spring Creek Trail
Mason Trail
Johnson
Arthur
Springpark
Stuart
Co
l
l
e
g
e
Sp
r
i
n
g
Prospect
Ba
y
MAX
Station
SCALE: 1"=600'
BICYCLE INFLUENCE AREA
DELICH
ASSOCIATES Johnson Drive Apartments TIS, August 2024
Bicycle LOS Worksheet
Minimum Actual Proposed
Base Connectivity: C D D
Specific connections to priority sites:
Description of
Applicable Destination
Area Within 1320’
Destination
Area
Classification
Spring Creek/Mason
trails Recreational B D D
Residential/Commercial
to the north
Residential/
Commercial B D D
Commercial to the
south Commercial B D D
CSU to the north Institutional B D D