Loading...
HomeMy WebLinkAboutTHE MARK - FDP240013 - SUBMITTAL DOCUMENTS - ROUND 2 - Fire Authority DocumentsFIRE PREVENTION AND COMMUNITY RISK REDUCTION 102 Remington St Fort Collins, CO 80524 (970) 416-2891 REQUEST FOR MODIFICATIONS OR ALTERNATE MATERIALS AND METHODS REVIEW Fire code Sections 104.8.2 – Technical Assistance 104.9 - Modifications and 104.10 - Alternate Materials and Methods SECTION 1 – APPLICANT Applicants are Project Designers and Owners. Please complete SECTION 1 and submit this form and all supporting documents (building plans, calculations, specifications, test reports, etc.) to the Fire Marshal's Office Fire Prevention for review of this document. _____ City: _______ Owner: _____________ Owner’s Address: _____________ Applicant’s Name: Applicant’s Contact Phone Number: ____________ ______ Type of Construction: ______ Occupancy: ____ Stories: Sprinklered: ☐ Yes ☐ No Referral for: ☐ Modifications ☐ Alternate Materials ☐ Alternate Methods of Construction or Protection Projection Description: Modification Request: Explain the practical difficulties involved in carrying out the provisions of the Code and proposed application OR Alternate Request: Explain the materials, designs, or methods of construction not specifically prescribed as the Code and proposed application. (Attach additional documents as necessary.) Fort Collins The Mark at Fort Collins, LLC 315 Oconee Street, Athens GA W. Christopher Hart (404)406-4868 61A, 5A R-2, A-3, S-2 Project Address: 255 Johnson Drive The reason for this alternate compliance is no fire vehicles can get the the south and west sides of the building. Open Parking, Office and Amenity Spaces at the 1st and 2nd Levels Multi-Family Apartments, Interior Amenity Spaces and Open Amenity Courtyards at 3rd Level Multi-Family Apartments and Interior Amenity Spaces at 4th Through 6th Levels 1st-2nd Levels: Type 1A Construction S-2 Occupancy 3rd-6th Levels: Type 5A Construction R-2 Occupancy A-3 Occupancy at 3rd Level Open Amenity Courtyard Applicant’s Email: Hamilton.Reynolds@LandmarkProperties.com Applicable Code References: (List all applicable Code Sections.) Justification: Demonstrate conformity and equivalence with that prescribed in the Code. Describe any proposed offsetting safety features. (Attach additional documents if necessary.) The fire code official has the authority to require the owner or owner’s authorized agent to provide a technical opinion safety report. The report is to be prepared by parties that have the technical ability to evaluate the design of the facility or the operational process in question. A registered design professional is commonly used for these services. It is critical that the preparer of the report have the proper background and experience for the project since the credibility of the report depends on these qualifications. THIS SECTION MUST BE COMPLETED AND SIGNED Requestor Name: Address: Signature: Property Owner Signature: W. Christopher Hart 315 Oconee Street Athens, GA 30601 Please refer to the attached 2021 IBC/2021 IFC Alternative Means of ComplianceMatrix dated August, 2024. Please refer to the attached 2021 IBC/2021 IFC Alternative Means of ComplianceMatrix dated August, 2024. Name: Address: Email: The Mark at Fort Collins, LLC 255 Johnson Drive Fort Collins, CO 80525 hamilton.reynolds@landmarkproperties.com Phone: (404)406-4868Phone: (404)406-4868 Email: hamilton.reynolds@landmarkproperties.com SECTION 2 – Staff Review Ensure the submittal package is complete and all pertinent information is included. Complete Section 2 and forward this form and all supporting documents to Assistant Fire Marshal or Fire Marshal. Reviewed by: __________________________________________ Date: _________________________ Comments: SECTION 3 – FINAL DETERMINATION This request is: ☐ Approved (provide Conditions of Approval if any.) Approved by: ________________________ ☐ Not Approved: (Provided comments, if any). Date: _______________________________ Comments: SECTION 4 – USE Contractors: Approvals must be incorporated into the plans by attachment to the plans. All approvals must be presented to Department Inspectors at the time of the project inspection. An approval of alternative materials and methods of construction (AMM) does not abrogate requirements or approval by other agencies having jurisdiction or responsibility. Approval, if granted, is specific to the project or process in question and shall not be construed as approval or acceptance of this application on future projects and is specific to the address under which the AMM was approved. AMM approvals shall only remain valid within the currently adopted Building and Fire Code cycle in which they were reviewed and approved. AMM approvals will expire upon adoption of subsequent editions of the Code. SAMPLE LETTER <Customer’s letterhead> Date Code Modifications Request Or Alternate Materials or Methods Review request 1601 Mac Davis Lane Lubbock, TX 79401 Re: <Project Name, Address, Code issue> At a minimum, provide the following information in your code modification request letter. ☐ Introduction: Identify the project and address that you are requesting consideration of a modification or an alternate method of construction or materials. ☐ Code Issue: Identify the specific code section for which the Code Modification Request and Alternative Methods and materials is proposed. ☐ Discussion/Justification: Provide rationale and supporting information such as technical data, engineering calculations, results of actual field tests, requirements or allowances in other model codes, etc. that provide the basis for PFA to accept the request. Proposed design documents (i.e., architectural or engineering plans) and supporting information listed above should be attached to the requests as needed to clarify proposed request. ☐ Conclusion: Provide a summary statement such as “In my/our professional opinion. The proposed code modification/alternate method of construction/materials meets the intent of the Codes and provides a level of safety equivalent to, or better than that requested by the Code.” Sincerely, ______________________________ ___________________________ Signature and Title Block of Applicant Signature of Owner (if applicable)