HomeMy WebLinkAboutHERITAGE CHRISTIAN ACADEMY - ODP - ODP240001 - SUBMITTAL DOCUMENTS - ROUND 1 - Project NarrativeProject Information and Design Narrative
Heritage Christian Academy Overall Development Plan
September 18, 2024
Heritage Christian Academy is beginning its path towards becoming a full two-track school. As
they grow to two tracks and double the size of the student body, Heritage Christian Academy
must expand its facilities.
To support the growth of the school, HCA has purchased approximately 13.6 acres of property
located adjacent to, and west of, the existing school site within the Industrial Business Park
International PUD, currently located in unincorporated Larimer County.
On March 8, 2024, a Conceptual Review meeting was held with the City of Fort Collins and
HCA was encouraged to begin with Annexation and Zoning of the property, followed by an
Overall Development Plan since the planned expansions are likely to be phased. Annexation
documents have been submitted to the City and are currently under review. This submittal of the
Overall Development Plan (ODP) follows the request for Annexation and anticipated
Employment (E) zoning of the property.
The project phasing may change based on how the project is funded, but at this time is
anticipated to begin with the lots south of Zurich Drive (approximately 10 acres) followed by the
property north of Zurich Drive (approximately 3 acres). Roads and utilities are already existing
within the ODP area, but required improvements will be determined and constructed as required
to support each phase in compliance with the Larimer County Urban Area Street Standards and
other applicable city codes.