Loading...
HomeMy WebLinkAboutUNION PARK - FDP240004 - SUBMITTAL DOCUMENTS - ROUND 3 - Utility PlansZI E G L E R R D E. HARMONY RD PADDINGTON RD CO R B E T T D R KI N G S L E Y D R SITE RE V I S I O N NO . BY DA T E HI G H L A N D DE V E L O P M E N T S E R V I C E S 63 5 5 F A I R G R O U N D S A V E N U E , S U I T E 2 0 0 | W I N D S O R , C O 8 0 5 5 0 PH O N E : 9 7 0 . 6 7 4 . 7 5 5 0 | E M A I L : I n f o @ H i g h l a n d - D S . c o m | w w w . H i g h l a n d - D S . c o m PREPARED BY OR UNDER THE DIRECT SUPERVISION OF: FOR AND ON BEHALF OF HIGHLAND DEVELOPMENT SERVICES REVIEW SET NOT FOR CONSTRUCTION OFSHEET DRAWN BY CHECKED BY DATE SCALE (H) HDS PROJECT # SCALE (V) UN I O N P A R K CO V E R S H E E T 9/9/24 N/A N/A ZMW JTC 21-1044-00 C0.00 1 60 CALL UTILITY NOTIFICATION CENTER OF COLORADO CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. before you dig.Call Know what's below. R TYPICAL 26' PITCHED STREET W/ PARKING NTS TYPICAL 36' CROWNED STREET SECTION NTS TYPICAL 36' CROWNED W/ MEDIAN & LEFT TURN NTS TYPICAL 26' VALLEY W/ OPTIONAL PARKING NTS TYPICAL 24' PITCHED W/ PARKING NTS TYPICAL 30' CROWNED STREET SECTION NTS FINAL CIVIL PLANS FOR UNION PARK A PARCEL OF LAND SITUATE IN THE SOUTHEAST QUARTER OF SECTION 32, TOWNSHIP 7 NORTH, RANGE 68 WEST OF THE 6TH P.M. CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO SEPTEMBER 2024 PROPOSED STREET LIGHT PROPOSED STORM SEWER EXISTING SANITARY SEWER MAIN PROPOSED TELEPHONE LINE EXISTING GAS EXISTING STORM SEWER EXISTING WATER MAIN EXISTING MANHOLE PROPOSED STORM INLET LEGEND PROPOSED CONCRETE PROPOSED MINOR CONTOUR PROPOSED SPOT ELEVATIONEXISTING SPOT ELEVATION PROPOSED MAJOR CONTOUR EXISTING MINOR CONTOUR EXISTING MAJOR CONTOUR EXISTING UTILITY POLE EXISTING GUY WIRE PROPOSED GAS PROPOSED ELECTRIC LINEEXISTING ELECTRIC LINE EXISTING TELEPHONE LINE PROPOSED FIRE HYDRANTEXISTING FIRE HYDRANT EXISTING WATER VALVE PROPOSED SANITARY SEWER MAIN PROPOSED WATER MAIN EXISTING CONCRETE EXISTING FLOWLINE, CURB & GUTTER PROPOSED FLOWLINE, CURB & GUTTER PROPOSED FENCE LIMITS OF CONSTRUCTION EXISTING OVERHEAD UTILITY EXISTING STORM SEWER INLET PROPOSED WATER VALVE PROPOSED MANHOLE PROPOSED UTILITY POLE EXISTING STREET LIGHT PROPOSED SWALE PROPOSED DIRECTION OF OVERLAND FLOW EXISTING FIBER OPTIC LINE PROPOSED HANDICAP RAMP EXISTING OVERHEAD ELECTRIC LINE EXISTING OVERHEAD TELEPHONE LINE PROPOSED OVERHEAD ELECTRIC LINE PROPOSED FIBER OPTIC LINE PROPOSED OVERHEAD TELEPHONE LINE EXISTING FENCE PROPOSED OVERHEAD UTILITY PROPOSED LIGHT POLES EXISTING CABLE TV LINE PROPOSED CABLE TV PROPOSED WATER SERVICE W/ CURB STOP AND METER PIT PROPOSED SANITARY SEWER SERVICE W/ CLEANOUT EXISTING ROW Vicinity Map Scale: 1" = 1000' PROJECT DATUM: NAVD88 CITY OF FORT COLLINS BENCHMARK #14-94 NORTHWEST CORNER OF HEWLETT PACKARD PROPERTY ON EAST SIDE ZIEGLER RD., ON THE NORTHWEST CORNER OF THE CONCRETE BASE OF A NATURAL GAS UNIT HOUSING. ELEV= 4927.83 CITY OF FORT COLLINS BENCHMARK #6-07 SOUTHEAST CORNER OF HARMONY RD. AND ZIEGLER RD. 50 FEET +/- SOUTH OF THE EDGE OF ASPHALT ON THE WALL OF A CONCRETE IRRIGATION DROP STRUCTURE. ELEV= 4931.08 PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) FOR THEIR VERTICAL DATUMS. IF NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQUATIONS SHOULD BE USED: NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) = 4927.83 (NAVD88 DATUM) - 3.19' NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) = 4931.08 (NAVD88 DATUM) - 3.19' ABBREVIATION LIST ABC AGGREGATE BASE COURSE AD ALGEBRAIC DIFFERENCE ADA AMERICANS WITH DISABILITIES ACT AE ACCESS EASEMENT ARCH ARCHITECT ARV AIR RELEASE VALVE ASPH ASPHALT BLDG BUILDING BE BUILDING ENVELOPE BFV BUTTERFLY VALVE BOV BLOW OFF VALVE BOS BOTTOM OF STEP BOW BACK OF WALK BVC BEGINNING VERTICAL CURVE BW BOTTOM OF WALL C&G CURB & GUTTER CATV CABLE TELEVISION CDOT COLORADO DEPARTMENT OF TRANSPORTATION CL CENTERLINE CMP CORRUGATED METAL PIPE CO CLEAN OUT COFC CITY OF FORT COLLINS COMM COMMUNICATION CON CONDENSATE CONC CONCRETE COORD COORDINATION CS CURB STOP DE DRAINAGE EASEMENT D&UE DRAINAGE & UTILITY EASEMENT D,U,AE DRAINAGE, UTILITY & ACCESS EASEMENT DEMO DEMOLITION DIA DIAMETER DIP DUCTILE IRON PIPE DU&AE(PU)DRAINAGE, UTLITY & PUBLIC ACCESS EASEMENT DU&AE(PR)DRAINAGE, UTILITY & PRIVATE ACCESS EASEMENT E EAST(ING) EAE EMERGENCY ACCESS EASEMENT EB EAST BOUND EEA EASEMENT EXCLUSION AREA EG EXISTING GROUND EL ELEVATION ELEC ELECTRIC EM ELECTRIC METER EOA EDGE OF ASPHALT EOC EDGE OF CONCRETE ESMT EASEMENT EST ESTIMATE(D) EX EXISTING EV ELECTRIC VEHICLE (CHARGING STATION) EVC END VERTICAL CURVE F FIRE LINE FCU FORT COLLINS UTILITIES FDC FIRE DEPARTMENT CONNECTION FES FLARED END SECTION FF FINISHED FLOOR FFE FINISHED FLOOR ELEVATION FG FINISHED GRADE FH FIRE HYDRANT FL FLOWLINE FO FIBER OPTIC G GAS GB GRADE BREAK GF GARAGE FLOOR GM GAS METER GND GROUND GV GATE VALVE HBP HOT BITUMINOUS PAVEMENT HORZ HORIZONTAL HDPE HIGH DENSITY POLYETHYLENE HP HIGH POINT HW HEADWALL IE IRRIGATION EASEMENT INV INVERT IRR IRRIGATION LA LANDSCAPE (PLAN/ACRH) LCUASS LARIMER COUNTY URBAN AREA STREET STANDARDS LF LINEAR FEET LP LOW POINT LT LEFT (TURN) MAX MAXIMUM ME MATCH EXISTING MEP MECHANICAL, ELECTRICAL, PLUMBING ENGINEER MH MANHOLE MIN MINIMUM N NORTH(ING) NA NOT APPLICABLE NB NORTH BOUND NHBZ NATURAL HABITAT BUFFER ZONE NTS NOT TO SCALE OC ON CENTER OHE OVERHEAD ELECTRIC OHT OVERHEAD TELEPHONE OHU OVERHEAD UTILITY PAE PUBLIC ACCESS EASEMENT PE PEDESTRIAN EASEMENT PERF PERFORATED PC POINT OF CURVATURE PCC PORTLAND CEMENT CONCRETE PCR POINT OF CURB RETURN PH POTHOLE PI POINT OF INTERSECTION PL PROPERTY LINE POC POINT OF CONNECTION PP POWER POLE PT POINT OF TANGENCY PVC POLYVINYL CHLORIDE R&R REMOVAL & REPLACEMENT RCP REINFORCED CONCRETE PIPE RD ROOF DRAIN RE REFERENCE RJ RESTRAINT JOINT ROW RIGHT-OF-WAY RT RIGHT (TURN) SCH SCHEDULE S SOUTH SB SOUTH BOUND SD STORM DRAIN PIPE SDMH STORM DRAIN MANHOLE SRVC SERVICE SS SANITARY SEWER SSCO SANITARY SEWER CLEAN-OUT SSMH SANITARY SEWER MANHOLE SSWR SANITARY SEWER STA STATION SWMP STORMWATER MANAGEMENT PLAN T TELEPHONE TB THRUST BLOCK TBC TOP BACK OF CURB TBV TO BE VACATED TBR TO BE REMOVED TELE TELEPHONE TEMP TEMPORARY TF TOP OF FOUNDATION TOS TOP OF STEP TS TOP OF SLAB TW TOP OF WALL TYP TYPICAL XFMR ELECTRICAL TRANSFORMER XS CROSS SECTION UD UNDERDRAIN UE UTILITY EASEMENT U&DE UTILITY & DRAINAGE EASEMENT UGE UNDERGROUND ELECTRIC UTIL UTILITY VCP VITRIFIED CLAY PIPE YD YARD DRAIN VIF VERIFY IN FIELD VERT VERTICAL VPC VERTICAL POINT OF CURVATURE VPI VERTICAL POINT OF INTERSECTION VPT VERTICAL POINT OF TANGENCY W WATERLINE OR WEST WB WEST BOUND WL WATERLINE WQCE WATER QUALITY CONTROL ELEVATION WSE WATER SURFACE ELEVATION DEVELOPER/APPLICANT Landmark Real Estate Holdings 6341 Fairgrounds Ave, Suite 100 Windsor, CO 80550 Ph. 970.460.0567 ENGINEER Highland Development Services 6355 Fairgrounds Ave, Ste 200 Windsor, CO 80550 Ph. 970.674.7550 LANDSCAPE ARCHITECT The Birdsall Group 444 Mountain Ave Berthoud CO, 80513 Ph. 970.532.5891 SURVEYOR Majestic Surveying 1111 Diamond Vally, Ste 104 Windsor, CO 80550 Ph. 970.833.5698 ARCHITECT NSPJ Architects 3515 W 75th St, Suite 201 Prairie Village, KS 66208 Ph. 913.831.1415 PROJECT CONTACTS: INDEX OF SHEETS Sheet No.Discipline No.Description of Sheets 1 C0.00 COVER SHEET 2 C0.01 GENERAL NOTES 3 - 4 C0.02 - C0.03 EXISTING CONDITIONS & DEMOLITION PLAN 5 C0.04 PHASING PLAN 6 - 9 C1.00 - C1.03 HORIZONTAL CONTROL PLAN 10 - 11 C2.00 - C2.01 GRADING & DRAINAGE PLAN 12 - 15 C2.02 - C2.05 EROSION & SEDIMENT CONTROL PLAN 16 - 23 C2.06 - C2.13 DETAILED GRADING PLANS 24 C3.00 OVERALL UTILITY PLAN 25 - 26 C3.01 - C3.02 UTILITY PLAN 27 - 34 C3.03 - C3.10 SANITARY SEWER PLAN & PROFILES 35 - 42 C3.11 - C3.18 STORM DRAIN PLAN & PROFILES 43 - 45 C4.00 - C4.02 STREET PLAN & PROFILES 46 - 60 C5.00 - C5.14 DETAILS I HEREBY AFFIRM THAT THESE FINAL CONSTRUCTION PLANS WERE PREPARED UNDER MY DIRECT SUPERVISION, IN ACCORDANCE WITH ALL APPLICABLE CITY OF FORT COLLINS AND STATE OF COLORADO STANDARDS AND STATUTES, RESPECTIVELY, AND THAT I AM FULLY RESPONSIBLE FOR THE ACCURACY OF ALL DESIGN, REVISIONS AND RECORD CONDITIONS THAT I HAVE NOTED ON THESE PLANS. INDEMNIFICATION STATEMENT: THESE PLANS HAVE BEEN REVIEWED BY THE LOCAL ENTITY FOR CONCEPT ONLY. THE REVIEW DOES NOT IMPLY RESPONSIBILITY BY THE REVIEWING DEPARTMENT, THE LOCAL ENTITY ENGINEER, OR THE LOCAL ENTITY FOR ACCURACY AND CORRECTNESS OF THE CALCULATIONS. FURTHERMORE, THE REVIEW DOES NOT IMPLY THAT QUANTITIES OF ITEMS ON THE PLANS ARE THE FINAL QUANTITIES REQUIRED. THE REVIEW SHALL NOT BE CONSTRUED IN ANY REASON AS ACCEPTANCE OF FINANCIAL RESPONSIBILITY BY THE LOCAL ENTITY FOR ADDITIONAL QUANTITIES OF ITEMS SHOWN THAT MAY BE REQUIRED DURING THE CONSTRUCTION PHASE. JASON T. CLAEYS P.E. NO. 42122 City of Fort Collins, Colorado UTILITY PLAN APPROVAL Traffic Operations, Park Planning and Development, Stormwater Utility, Water & Wastewater Utility, City Engineer, APPROVED: Environmental Planner, Approved Sheets Date APPROVED: Approved Sheets Date APPROVED: Approved Sheets Date APPROVED: Approved Sheets Date APPROVED: Approved Sheets Date APPROVED: Approved Sheets Date UTILITY CONTACTS: LIGHT & POWER Fort Collins Light & Power 700 Wood Street Fort Collins, Colorado 80522 Contact: Cody Snowden Ph. 970.416.2306 WATER, WASTEWATER & STORMWATER Fort Collins Utilities 700 Wood Street Fort Collins, Colorado 80522 Contact: Matt Simpson Ph. 970.416.2754 NATURAL GAS Xcel Energy 1901 E. Horsetooth Road Fort Collins, Colorado 80525 Contact: Stephanie Rich Ph. 970.225.7828 TELEPHONE SERVICE Century Link (Qwest) 3351 Eastbrook Drive Fort Collins, Colorado 80525 Contact: Bill Johnson Ph. 970.490.7501 CABLE SERVICE Comcast 1201 University Dr. Fort Collins, Colorado 80521 Contact: Marcus Petty Ph. 720.275.0572 Fort Collins Connexion 222 Laporte Ave. Fort Collins, Colorado 80521 Contact: Ph. 970.207.7870 PROPOSED ELECTRIC TRANSFORMER N W E S SOIL INFORMATION: "SOIL AND FOUNDATION INVESTIGATION, PROPOSED MULTI-FAMILY RESIDENTIAL BUILDING:, Prepared by: CTL | THOMPSON, DATED SEPTEMBER 20, 2022 CALL UTILITY NOTIFICATION CENTER OF COLORADO CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. before you dig.Call Know what's below. R LCUASS GENERAL NOTES 1.ALL MATERIALS, WORKMANSHIP, AND CONSTRUCTION OF PUBLIC IMPROVEMENTS SHALL MEET OR EXCEED THE STANDARDS AND SPECIFICATIONS SET FORTH IN THE LARIMER COUNTY URBAN AREA STREET STANDARDS AND APPLICABLE STATE AND FEDERAL REGULATIONS. WHERE THERE IS CONFLICT BETWEEN THESE PLANS AND THE SPECIFICATIONS, OR ANY APPLICABLE STANDARDS, THE MOST RESTRICTIVE STANDARD SHALL APPLY. ALL WORK SHALL BE INSPECTED AND APPROVED BY THE LOCAL ENTITY. 2.ALL REFERENCES TO ANY PUBLISHED STANDARDS SHALL REFER TO THE LATEST REVISION OF SAID STANDARD, UNLESS SPECIFICALLY STATED OTHERWISE. 3.THESE PUBLIC IMPROVEMENT CONSTRUCTION PLANS SHALL BE VALID FOR A PERIOD OF THREE YEARS FROM THE DATE OF APPROVAL BY THE LOCAL ENTITY ENGINEER. USE OF THESE PLANS AFTER THE EXPIRATION DATE WILL REQUIRE A NEW REVIEW AND APPROVAL PROCESS BY THE LOCAL ENTITY PRIOR TO COMMENCEMENT OF ANY WORK SHOWN IN THESE PLANS. 4.THE ENGINEER WHO HAS PREPARED THESE PLANS, BY EXECUTION AND/OR SEAL HEREOF, DOES HEREBY AFFIRM RESPONSIBILITY TO THE LOCAL ENTITY, AS BENEFICIARY OF SAID ENGINEER'S WORK, FOR ANY ERRORS AND OMISSIONS CONTAINED IN THESE PLANS, AND APPROVAL OF THESE PLANS BY THE LOCAL ENTITY ENGINEER SHALL NOT RELIEVE THE ENGINEER WHO HAS PREPARED THESE PLANS OF ALL SUCH RESPONSIBILITY. FURTHER, TO THE EXTENT PERMITTED BY LAW, THE ENGINEER HEREBY AGREES TO HOLD HARMLESS AND INDEMNIFY THE LOCAL ENTITY, AND ITS OFFICERS AND EMPLOYEES, FROM AND AGAINST ALL LIABILITIES, CLAIMS, AND DEMANDS WHICH MAY ARISE FROM ANY ERRORS AND OMISSIONS CONTAINED IN THESE PLANS. 5.ALL SANITARY SEWER, STORM SEWER, AND WATER LINE CONSTRUCTION, AS WELL AS POWER AND OTHER "DRY" UTILITY INSTALLATIONS, SHALL CONFORM TO THE LOCAL ENTITY STANDARDS AND SPECIFICATIONS CURRENT AT THE DATE OF APPROVAL OF THE PLANS BY THE LOCAL ENTITY ENGINEER. 6.THE TYPE, SIZE, LOCATION AND NUMBER OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER TO VERIFY THE EXISTENCE AND LOCATION OF ALL UNDERGROUND UTILITIES ALONG THE ROUTE OF THE WORK BEFORE COMMENCING NEW CONSTRUCTION. THE DEVELOPER SHALL BE RESPONSIBLE FOR UNKNOWN UNDERGROUND UTILITIES. 7.THE CONTRACTOR SHALL CONTACT THE UTILITY NOTIFICATION CENTER OF COLORADO (UNCC) AT 1-800-922-1987, AT LEAST 2 WORKING DAYS PRIOR TO BEGINNING EXCAVATION OR GRADING, TO HAVE ALL REGISTERED UTILITY LOCATIONS MARKED. OTHER UNREGISTERED UTILITY ENTITIES (I.E. DITCH / IRRIGATION COMPANY) ARE TO BE LOCATED BY CONTACTING THE RESPECTIVE REPRESENTATIVE. UTILITY SERVICE LATERALS ARE ALSO TO BE LOCATED PRIOR TO BEGINNING EXCAVATION OR GRADING. IT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER TO RELOCATE ALL EXISTING UTILITIES THAT CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THESE PLANS. 8.THE DEVELOPER SHALL BE RESPONSIBLE FOR PROTECTING ALL UTILITIES DURING CONSTRUCTION AND FOR COORDINATING WITH THE APPROPRIATE UTILITY COMPANY FOR ANY UTILITY CROSSINGS REQUIRED. 9.IF A CONFLICT EXISTS BETWEEN EXISTING AND PROPOSED UTILITIES AND/OR A DESIGN MODIFICATION IS REQUIRED, THE DEVELOPER SHALL COORDINATE WITH THE ENGINEER TO MODIFY THE DESIGN. DESIGN MODIFICATION(S) MUST BE APPROVED BY THE LOCAL ENTITY PRIOR TO BEGINNING CONSTRUCTION. 10.THE DEVELOPER SHALL COORDINATE AND COOPERATE WITH THE LOCAL ENTITY, AND ALL UTILITY COMPANIES INVOLVED, TO ASSURE THAT THE WORK IS ACCOMPLISHED IN A TIMELY FASHION AND WITH A MINIMUM DISRUPTION OF SERVICE. THE DEVELOPER SHALL BE RESPONSIBLE FOR CONTACTING, IN ADVANCE, ALL PARTIES AFFECTED BY ANY DISRUPTION OF ANY UTILITY SERVICE AS WELL AS THE UTILITY COMPANIES. 11.NO WORK MAY COMMENCE WITHIN ANY PUBLIC STORM WATER, SANITARY SEWER OR POTABLE WATER SYSTEM UNTIL THE DEVELOPER NOTIFIES THE UTILITY PROVIDER. NOTIFICATION SHALL BE A MINIMUM OF 2 WORKING DAYS PRIOR TO COMMENCEMENT OF ANY WORK. AT THE DISCRETION OF THE WATER UTILITY PROVIDER, A PRE-CONSTRUCTION MEETING MAY BE REQUIRED PRIOR TO COMMENCEMENT OF ANY WORK. 12.THE DEVELOPER SHALL SEQUENCE INSTALLATION OF UTILITIES IN SUCH A MANNER AS TO MINIMIZE POTENTIAL UTILITY CONFLICTS. IN GENERAL, STORM SEWER AND SANITARY SEWER SHOULD BE CONSTRUCTED PRIOR TO INSTALLATION OF THE WATER LINES AND DRY UTILITIES. 13.THE MINIMUM COVER OVER WATER LINES IS 4.5 FEET AND THE MAXIMUM COVER IS 5.5 FEET UNLESS OTHERWISE NOTED IN THE PLANS AND APPROVED BY THE WATER UTILITY. 14.A STATE CONSTRUCTION DEWATERING WASTEWATER DISCHARGE PERMIT IS REQUIRED IF DEWATERING IS REQUIRED IN ORDER TO INSTALL UTILITIES OR WATER IS DISCHARGED INTO A STORM SEWER, CHANNEL, IRRIGATION DITCH OR ANY WATERS OF THE UNITED STATES. 15.THE DEVELOPER SHALL COMPLY WITH ALL TERMS AND CONDITIONS OF THE COLORADO PERMIT FOR STORM WATER DISCHARGE (CONTACT COLORADO DEPARTMENT OF HEALTH, WATER QUALITY CONTROL DIVISION, (303) 692-3590), THE STORM WATER MANAGEMENT PLAN, AND THE EROSION CONTROL PLAN. 16.THE LOCAL ENTITY SHALL NOT BE RESPONSIBLE FOR THE MAINTENANCE OF STORM DRAINAGE FACILITIES LOCATED ON PRIVATE PROPERTY. MAINTENANCE OF ONSITE DRAINAGE FACILITIES SHALL BE THE RESPONSIBILITY OF THE PROPERTY OWNER(S). 17.PRIOR TO FINAL INSPECTION AND ACCEPTANCE BY THE LOCAL ENTITY, CERTIFICATION OF THE DRAINAGE FACILITIES, BY A REGISTERED ENGINEER, MUST BE SUBMITTED TO AND APPROVED BY THE STORMWATER UTILITY DEPARTMENT. CERTIFICATION SHALL BE SUBMITTED TO THE STORMWATER UTILITY DEPARTMENT AT LEAST TWO WEEKS PRIOR TO THE RELEASE OF A CERTIFICATE OF OCCUPANCY FOR SINGLE FAMILY UNITS. FOR COMMERCIAL PROPERTIES, CERTIFICATION SHALL BE SUBMITTED TO THE STORMWATER UTILITY DEPARTMENT AT LEAST TWO WEEKS PRIOR TO THE RELEASE OF ANY BUILDING PERMITS IN EXCESS OF THOSE ALLOWED PRIOR TO CERTIFICATION PER THE DEVELOPMENT AGREEMENT. 18.THE LOCAL ENTITY SHALL NOT BE RESPONSIBLE FOR ANY DAMAGES OR INJURIES SUSTAINED IN THIS DEVELOPMENT AS A RESULT OF GROUNDWATER SEEPAGE, WHETHER RESULTING FROM GROUNDWATER FLOODING, STRUCTURAL DAMAGE OR OTHER DAMAGE UNLESS SUCH DAMAGE OR INJURIES ARE SUSTAINED AS A RESULT OF THE LOCAL ENTITY FAILURE TO PROPERLY MAINTAIN ITS WATER, WASTEWATER, AND/OR STORM DRAINAGE FACILITIES IN THE DEVELOPMENT. 19.ALL RECOMMENDATIONS OF THE FINAL DRAINAGE AND EROSION CONTROL STUDY, FINAL DRAINAGE REPORT FOR UNION PARK BY HIGHLAND DEVELOPMENT SERVICES DATED JULY 17TH, 2024 SHALL BE FOLLOWED AND IMPLEMENTED. 20.TEMPORARY EROSION CONTROL DURING CONSTRUCTION SHALL BE PROVIDED AS SHOWN ON THE EROSION CONTROL PLAN. ALL EROSION CONTROL MEASURES SHALL BE MAINTAINED IN GOOD REPAIR BY THE DEVELOPER, UNTIL SUCH TIME AS THE ENTIRE DISTURBED AREAS IS STABILIZED WITH HARD SURFACE OR LANDSCAPING. 21.THE DEVELOPER SHALL BE RESPONSIBLE FOR INSURING THAT NO MUD OR DEBRIS SHALL BE TRACKED ONTO THE EXISTING PUBLIC STREET SYSTEM. MUD AND DEBRIS MUST BE REMOVED WITHIN 24 HOURS BY AN APPROPRIATE MECHANICAL METHOD (I.E. MACHINE BROOM SWEEP, LIGHT DUTY FRONT-END LOADER, ETC.) OR AS APPROVED BY THE LOCAL ENTITY STREET INSPECTOR. 22.NO WORK MAY COMMENCE WITHIN ANY IMPROVED OR UNIMPROVED PUBLIC RIGHT-OF-WAY UNTIL A RIGHT-OF-WAY PERMIT OR DEVELOPMENT CONSTRUCTION PERMIT IS OBTAINED, IF APPLICABLE. 23.THE DEVELOPER SHALL BE RESPONSIBLE FOR OBTAINING ALL NECESSARY PERMITS FOR ALL APPLICABLE AGENCIES PRIOR TO COMMENCEMENT OF CONSTRUCTION. THE DEVELOPER SHALL NOTIFY THE LOCAL ENTITY ENGINEERING INSPECTOR (FORT COLLINS - 221-6605) AND THE LOCAL ENTITY EROSION CONTROL INSPECTOR (FORT COLLINS - 221-6700) AT LEAST 2 WORKING DAYS PRIOR TO THE START OF ANY EARTH DISTURBING ACTIVITY, OR CONSTRUCTION ON ANY AND ALL PUBLIC IMPROVEMENTS. IF THE LOCAL ENTITY ENGINEER IS NOT AVAILABLE AFTER PROPER NOTICE OF CONSTRUCTION ACTIVITY HAS BEEN PROVIDED, THE DEVELOPER MAY COMMENCE WORK IN THE ENGINEER ABSENCE. HOWEVER, THE LOCAL ENTITY RESERVES THE RIGHT NOT TO ACCEPT THE IMPROVEMENT IF SUBSEQUENT TESTING REVEALS AN IMPROPER INSTALLATION. 24.THE DEVELOPER SHALL BE RESPONSIBLE FOR OBTAINING SOILS TESTS WITHIN THE PUBLIC RIGHT-OF-WAY AFTER RIGHT OF WAY GRADING AND ALL UTILITY TRENCH WORK IS COMPLETE AND PRIOR TO THE PLACEMENT OF CURB, GUTTER, SIDEWALK AND PAVEMENT. IF THE FINAL SOILS/PAVEMENT DESIGN REPORT DOES NOT CORRESPOND WITH THE RESULTS OF THE ORIGINAL GEOTECHNICAL REPORT, THE DEVELOPER SHALL BE RESPONSIBLE FOR A RE-DESIGN OF THE SUBJECT PAVEMENT SECTION OR, THE DEVELOPER MAY USE THE LOCAL ENTITY'S DEFAULT PAVEMENT THICKNESS SECTION(S). REGARDLESS OF THE OPTION USED, ALL FINAL SOILS/PAVEMENT DESIGN REPORTS SHALL BE PREPARED BY A LICENSED PROFESSIONAL ENGINEER. THE FINAL REPORT SHALL BE SUBMITTED TO THE INSPECTOR A MINIMUM OF 10 WORKING DAYS PRIOR TO PLACEMENT OF BASE AND ASPHALT. PLACEMENT OF CURB, GUTTER, SIDEWALK, BASE AND ASPHALT SHALL NOT OCCUR UNTIL THE LOCAL ENTITY ENGINEER APPROVES THE FINAL REPORT. 25.THE CONTRACTOR SHALL HIRE A LICENSED ENGINEER OR LAND SURVEYOR TO SURVEY THE CONSTRUCTED ELEVATIONS OF THE STREET SUBGRADE AND THE GUTTER FLOWLINE AT ALL INTERSECTIONS, INLETS, AND OTHER LOCATIONS REQUESTED BY THE LOCAL ENTITY INSPECTOR. THE ENGINEER OR SURVEYOR MUST CERTIFY IN A LETTER TO THE LOCAL ENTITY THAT THESE ELEVATIONS CONFORM TO THE APPROVED PLANS AND SPECIFICATIONS. ANY DEVIATIONS SHALL BE NOTED IN THE LETTER AND THEN RESOLVED WITH THE LOCAL ENTITY BEFORE INSTALLATION OF BASE COURSE OR ASPHALT WILL BE ALLOWED ON THE STREETS. 26.ALL UTILITY INSTALLATIONS WITHIN OR ACROSS THE ROADBED OF NEW RESIDENTIAL ROADS MUST BE COMPLETED PRIOR TO THE FINAL STAGES OF ROAD CONSTRUCTION. FOR THE PURPOSES OF THESE STANDARDS, ANY WORK EXCEPT C/G ABOVE THE SUBGRADE IS CONSIDERED FINAL STAGE WORK. ALL SERVICE LINES MUST BE STUBBED TO THE PROPERTY LINES AND MARKED SO AS TO REDUCE THE EXCAVATION NECESSARY FOR BUILDING CONNECTIONS. 27.PORTIONS OF LARIMER COUNTY ARE WITHIN OVERLAY DISTRICTS. THE LARIMER COUNTY FLOODPLAIN RESOLUTION SHOULD BE REFERRED TO FOR ADDITIONAL CRITERIA FOR ROADS WITHIN THESE DISTRICTS. 28.ALL ROAD CONSTRUCTION IN AREAS DESIGNATED AS WILD FIRE HAZARD AREAS SHALL BE DONE IN ACCORDANCE WITH THE CONSTRUCTION CRITERIA AS ESTABLISHED IN THE WILD FIRE HAZARD AREA MITIGATION REGULATIONS IN FORCE AT THE TIME OF FINAL PLAT APPROVAL. 29.PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION, THE CONTRACTOR SHALL CONTACT THE LOCAL ENTITY FORESTER TO SCHEDULE A SITE INSPECTION FOR ANY TREE REMOVAL REQUIRING A PERMIT. 30.THE DEVELOPER SHALL BE RESPONSIBLE FOR ALL ASPECTS OF SAFETY INCLUDING, BUT NOT LIMITED TO, EXCAVATION, TRENCHING, SHORING, TRAFFIC CONTROL, AND SECURITY. REFER TO OSHA PUBLICATION 2226, EXCAVATING AND TRENCHING. 31.THE DEVELOPER SHALL SUBMIT A CONSTRUCTION TRAFFIC CONTROL PLAN, IN ACCORDANCE WITH MUTCD, TO THE APPROPRIATE RIGHT-OF-WAY AUTHORITY. (LOCAL ENTITY, COUNTY OR STATE), FOR APPROVAL, PRIOR TO ANY CONSTRUCTION ACTIVITIES WITHIN, OR AFFECTING, THE RIGHT-OF-WAY. THE DEVELOPER SHALL BE RESPONSIBLE FOR PROVIDING ANY AND ALL TRAFFIC CONTROL DEVICES AS MAY BE REQUIRED BY THE CONSTRUCTION ACTIVITIES. 32.PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION THAT WILL AFFECT TRAFFIC SIGNS OF ANY TYPE, THE CONTRACTOR SHALL CONTACT LOCAL ENTITY TRAFFIC OPERATIONS DEPARTMENT, WHO WILL TEMPORARILY REMOVE OR RELOCATE THE SIGN AT NO COST TO THE CONTRACTOR; HOWEVER, IF THE CONTRACTOR MOVES THE TRAFFIC SIGN THEN THE CONTRACTOR WILL BE CHARGED FOR THE LABOR, MATERIALS AND EQUIPMENT TO REINSTALL THE SIGN AS NEEDED. 33.THE DEVELOPER IS RESPONSIBLE FOR ALL COSTS FOR THE INITIAL INSTALLATION OF TRAFFIC SIGNING AND STRIPING FOR THE DEVELOPMENT RELATED TO THE DEVELOPMENT'S LOCAL STREET OPERATIONS. IN ADDITION, THE DEVELOPER IS RESPONSIBLE FOR ALL COSTS FOR TRAFFIC SIGNING AND STRIPING RELATED TO DIRECTING TRAFFIC ACCESS TO AND FROM THE DEVELOPMENT. 34.THERE SHALL BE NO SITE CONSTRUCTION ACTIVITIES ON SATURDAYS, UNLESS SPECIFICALLY APPROVED BY THE LOCAL ENTITY ENGINEER, AND NO SITE CONSTRUCTION ACTIVITIES ON SUNDAYS OR HOLIDAYS, UNLESS THERE IS PRIOR WRITTEN APPROVAL BY THE LOCAL ENTITY. 35.THE DEVELOPER IS RESPONSIBLE FOR PROVIDING ALL LABOR AND MATERIALS NECESSARY FOR THE COMPLETION OF THE INTENDED IMPROVEMENTS, SHOWN ON THESE DRAWINGS, OR DESIGNATED TO BE PROVIDED, INSTALLED, OR CONSTRUCTED, UNLESS SPECIFICALLY NOTED OTHERWISE. 36.DIMENSIONS FOR LAYOUT AND CONSTRUCTION ARE NOT TO BE SCALED FROM ANY DRAWING. IF PERTINENT DIMENSIONS ARE NOT SHOWN, CONTACT THE DESIGNER FOR CLARIFICATION, AND ANNOTATE THE DIMENSION ON THE AS-BUILT RECORD DRAWINGS. 37.THE DEVELOPER SHALL HAVE, ONSITE AT ALL TIMES, ONE (1) SIGNED COPY OF THE APPROVED PLANS, ONE (1) COPY OF THE APPROPRIATE STANDARDS AND SPECIFICATIONS, AND A COPY OF ANY PERMITS AND EXTENSION AGREEMENTS NEEDED FOR THE JOB. 38.IF, DURING THE CONSTRUCTION PROCESS, CONDITIONS ARE ENCOUNTERED WHICH COULD INDICATE A SITUATION THAT IS NOT IDENTIFIED IN THE PLANS OR SPECIFICATIONS, THE DEVELOPER SHALL CONTACT THE DESIGNER AND THE LOCAL ENTITY ENGINEER IMMEDIATELY. 39.THE DEVELOPER SHALL BE RESPONSIBLE FOR RECORDING AS-BUILT INFORMATION ON A SET OF RECORD DRAWINGS KEPT ON THE CONSTRUCTION SITE, AND AVAILABLE TO THE LOCAL ENTITY'S INSPECTOR AT ALL TIMES. UPON COMPLETION OF THE WORK, THE CONTRACTOR(S) SHALL SUBMIT RECORD DRAWINGS TO THE LOCAL ENTITY ENGINEER. 40.PROJECT BENCHMARKS: PROJECT DATUM: NAVD88 CITY OF FORT COLLINS BENCHMARK #14-94 NORTHWEST CORNER OF HEWLETT PACKARD PROPERTY ON EAST SIDE ZIEGLER RD., ON THE NORTHWEST CORNER OF THE CONCRETE BASE OF A NATURAL GAS UNIT HOUSING ELEV= 4927.83 CITY OF FORT COLLINS BENCHMARK #6-07 SOUTHEAST CORNER OF HARMONY RD. AND ZIEGLER RD. 50 FEET ± SOUTH OF THE EDGE OF ASPHALT ON THE WALL OF A CONCRETE IRRIGATION DROP STRUCTURE ELEV= 4931.08 PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) FOR THEIR VERTICAL DATUMS. IF NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) IS REQUIRED FOR ANY PURPOSE,THE FOLLOWING EQUATIONS SHOULD BE USED: NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) = 4927.83 (NAVD88 DATUM) - 3.19 NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) = 4931.08 (NAVD88 DATUM) - 3.19 HORIZONTAL DATUM: COLORADO STATE PLAN COORDINATES NAD 83(2007) DATUM. HORIZONTAL CONTROL BASED VRS. 41.ALL STATIONING IS BASED ON FLOWLINE OF ROADWAYS UNLESS OTHERWISE NOTED. 42.DAMAGED CURB, GUTTER AND SIDEWALK EXISTING PRIOR TO CONSTRUCTION, AS WELL AS EXISTING FENCES, TREES, STREETS, SIDEWALKS, CURBS AND GUTTERS, LANDSCAPING, STRUCTURES, AND IMPROVEMENTS DESTROYED, DAMAGED OR REMOVED DUE TO CONSTRUCTION OF THIS PROJECT, SHALL BE REPLACED OR RESTORED IN LIKE KIND AT THE DEVELOPER'S EXPENSE, UNLESS OTHERWISE INDICATED ON THESE PLANS, PRIOR TO THE ACCEPTANCE OF COMPLETED IMPROVEMENTS AND/OR PRIOR TO THE ISSUANCE OF THE FIRST CERTIFICATE OF OCCUPANCY. 43.WHEN AN EXISTING ASPHALT STREET MUST BE CUT, THE STREET MUST BE RESTORED TO A CONDITION EQUAL TO OR BETTER THAN ITS ORIGINAL CONDITION. THE EXISTING STREET CONDITION SHALL BE DOCUMENTED BY THE LOCAL ENTITY CONSTRUCTION INSPECTOR BEFORE ANY CUTS ARE MADE. PATCHING SHALL BE DONE IN ACCORDANCE WITH THE LOCAL ENTITY STREET REPAIR STANDARDS. THE FINISHED PATCH SHALL BLEND IN SMOOTHLY INTO THE EXISTING SURFACE. ALL LARGE PATCHES SHALL BE PAVED WITH AN ASPHALT LAY-DOWN MACHINE. IN STREETS WHERE MORE THAN ONE CUT IS MADE, AN OVERLAY OF THE ENTIRE STREET WIDTH, INCLUDING THE PATCHED AREA, MAY BE REQUIRED. THE DETERMINATION OF NEED FOR A COMPLETE OVERLAY SHALL BE MADE BY THE LOCAL ENTITY ENGINEER AND/OR THE LOCAL ENTITY INSPECTOR AT THE TIME THE CUTS ARE MADE. 44.UPON COMPLETION OF CONSTRUCTION, THE SITE SHALL BE CLEANED AND RESTORED TO A CONDITION EQUAL TO, OR BETTER THAN, THAT WHICH EXISTED BEFORE CONSTRUCTION, OR TO THE GRADES AND CONDITION AS REQUIRED BY THESE PLANS. 45.STANDARD HANDICAP RAMPS ARE TO BE CONSTRUCTED AT ALL CURB RETURNS AND AT ALL "T" INTERSECTIONS. 46.AFTER ACCEPTANCE BY THE LOCAL ENTITY, PUBLIC IMPROVEMENTS DEPICTED IN THESE PLANS SHALL BE GUARANTEED TO BE FREE FROM MATERIAL AND WORKMANSHIP DEFECTS FOR A MINIMUM PERIOD OF TWO YEARS FROM THE DATE OF ACCEPTANCE. 47.THE LOCAL ENTITY SHALL NOT BE RESPONSIBLE FOR THE MAINTENANCE OF ROADWAY AND APPURTENANT IMPROVEMENTS, INCLUDING STORM DRAINAGE STRUCTURES AND PIPES, FOR THE FOLLOWING PRIVATE STREETS: ALL STREETS WITHIN PROJECT LIMITS ARE PRIVATE AND PRIVATELY MAINTAINED EXCLUDING ZIEGLER ROAD. 48.APPROVED VARIANCES ARE LISTED AS FOLLOWS: INTERSECTION SPACING ON ZIEGLER ROAD. CITY OF FORT COLLINS CONSTRUCTION NOTES A.STANDARD GRADING AND EROSION AND SEDIMENT CONTROL CONSTRUCTION PLAN NOTES GENERAL EROSION CONTROL REQUIREMENTS THESE NOTES ARE A SUMMARY FOR THE LEGAL REQUIREMENTS, THAT ARE SET FORTH IN THE FORT COLLINS STORMWATER CRITERIA MANUAL (FCSCM), AND THAT ANY CONFLICT IS RESOLVED BY THE MORE STRINGENT REQUIREMENT CONTROLLING. 1.THE PROPERTY OWNER, OWNER'S REPRESENTATIVE, DEVELOPER, DESIGN ENGINEER, GENERAL CONTRACTOR, SUB-CONTRACTORS, OR SIMILAR TITLE FOR THE DEVELOPING ENTITY (HERE AFTER REFERRED TO AS THE DEVELOPER) HAS PROVIDED THESE EROSION CONTROL MATERIALS IN ACCORDANCE WITH EROSION CONTROL CRITERIA SET FORTH IN THE MANUAL AS AN ATTEMPT TO IDENTIFY EROSION, SEDIMENT, AND OTHER POTENTIAL POLLUTANT SOURCES ASSOCIATED WITH THESE CONSTRUCTION ACTIVITIES AND PREVENTING THOSE POLLUTANTS FROM LEAVING THE PROJECT SITE AS AN ILLICIT DISCHARGE. FULL CITY REQUIREMENTS AND ARE OUTLINED AND CLARIFIED IN THE MANUAL UNDER CHAPTER 4: CONSTRUCTION CONTROL MEASURES AND SHOULD BE USED TO IDENTIFY AND DEFINE WHAT IS NEEDED ON A PROJECT. 2.THE DEVELOPER SHALL MAKE THEMSELVES THOROUGHLY FAMILIAR WITH THE PROVISIONS AND THE CONTENT OF THE SPECIFICATIONS LAID OUT IN THE MANUAL, THE DEVELOPMENT AGREEMENT, THE EROSION CONTROL MATERIALS COMPILED FOR THIS PROJECT, AND THE FOLLOWING NOTES AS ALL THESE MATERIALS ARE APPLICABLE TO THIS PROJECT. 3.THE DEVELOPER SHALL IMPLEMENT AND MAINTAIN CONTROL MEASURES FOR ALL POTENTIAL POLLUTANTS FROM THE START OF LAND DISTURBING ACTIVITIES UNTIL FINAL STABILIZATION OF THE CONSTRUCTION SITE. 4.THE CITY EROSION CONTROL INSPECTOR SHALL BE NOTIFIED AT LEAST TWENTY-FOUR (24) HOURS PRIOR TO THE DESIRED START OF ANY CONSTRUCTION ACTIVITIES ON THIS SITE TO ALLOW ADEQUATE TIME FOR ON-SITE CONFIRMATION (INITIAL INSPECTION WHICH CAN TAKE UP TO TWO BUSINESS DAYS AFTER RECEIVING THE REQUEST) THAT THE SITE IS IN FACT PROTECTED FROM SEDIMENT AND POLLUTANTS DISCHARGES OFF SITE. PLEASE CONTACT EROSION@FCGOV.COM EARLY TO SCHEDULE THOSE INITIAL EROSION CONTROL INSPECTIONS WELL IN ADVANCE SO THAT DEMOLITION, CLEARING, GRUBBING, TREE REMOVAL, AND SCRAPING MAY BEGIN WITHOUT DELAY. FAILURE TO RECEIVE AN ON-SITE CONFIRMATION BEFORE CONSTRUCTION ACTIVITIES COMMENCE IS AN AUTOMATIC “NOTICE OF VIOLATION” AND CAN RESULT IN FURTHER ENFORCEMENT ACTIONS. 5.THE DEVELOPER SHALL PROACTIVELY PROVIDE ALL APPROPRIATE CONTROL MEASURES TO PREVENT DAMAGE TO ADJACENT DOWNSTREAM AND LEEWARD PROPERTIES. THIS INCLUDES BUT IS NOT LIMITED TO: TREES, SHRUBS, LAWNS, WALKS, PAVEMENTS, ROADWAYS, STRUCTURES, CREEKS, WETLANDS, STREAMS, RIVERS, AND UTILITIES THAT ARE NOT DESIGNED FOR REMOVAL, RELOCATION, OR REPLACEMENT IN THE COURSE OF CONSTRUCTION. 6.AT ALL TIMES THE DEVELOPER SHALL BE RESPONSIBLE TO ENSURE ADEQUATE CONTROL MEASURES ARE DESIGNED, SELECTED, INSTALLED, MAINTAIN, REPAIRED, REPLACED, AND ULTIMATELY REMOVED IN ORDER TO PREVENT AND CONTROL EROSION SUSPENSION, SEDIMENT TRANSPORTATION, AND POLLUTANT DISCHARGE AS A RESULT OF CONSTRUCTION ACTIVITIES ASSOCIATED WITH THIS PROJECT. 7.ALL APPLICABLE CONTROL MEASURES BASED UPON THE SEQUENCING AND/OR PHASING OF THE PROJECT SHALL BE INSTALLED PRIOR TO THOSE CONSTRUCTION ACTIVITIES COMMENCING. 8.AS DYNAMIC CONDITIONS (DUE TO THE NATURE, TIMING, SEQUENCE, AND PHASING OF CONSTRUCTION) IN THE FIELD MAY WARRANT CONTROL MEASURES IN ADDITION, OR DIFFERENT, TO WHAT IS SHOWN ON THESE PLANS, THE DEVELOPER SHALL AT ALL TIMES BE RESPONSIBLE TO IMPLEMENT THE CONTROL MEASURES THAT ARE MOST EFFECTIVE WITH THE CURRENT STATE AND PROGRESS OF CONSTRUCTION. THE DEVELOPER SHALL IMPLEMENT WHATEVER MEASURES ARE DETERMINED NECESSARY, AND/OR AS DIRECTED BY THE CITY EROSION CONTROL INSPECTOR. THE DEVELOPER SHALL INSURE THAT ALL EROSION CONTROL PLANS (MAPS) OR SWMP DOCUMENTS ARE UPDATED TO REFLECT THE CURRENT SITE CONDITIONS, WITH UPDATES BEING INITIALED AND DATED. THESE SITE INSPECTIONS AND SITE CONDITION UPDATES SHALL BE MADE AVAILABLE UPON REQUEST BY THE CITY. 9.ALL LISTINGS, PROVISIONS, MATERIALS, PROCEDURES, ACTIVITIES, SITE WORK AND THE LIKE ARTICULATED IN THIS OR OTHER WRITTEN SITE-SPECIFIC DOCUMENTS (INCLUDING BUT NOT LIMITED TO THE EROSION CONTROL REPORTS, DEVELOPMENT AGREEMENTS, LANDSCAPE, AND DRAINAGE MATERIALS) SHALL MEET OR EXCEED THE MOST RESTRICTIVE LANGUAGE FOR CITY, COUNTY, STATE, AND FEDERAL REGULATIONS WITH REGARDS TO EROSION, SEDIMENT, POLLUTANT, AND OTHER POLLUTION SOURCE CONTROL MEASURES. THE DEVELOPER SHALL BE RESPONSIBLE TO COMPLY WITH ALL OF THESE AFOREMENTIONED LAWS AND REGULATIONS. 10.THE DEVELOPER SHALL ENSURE THAT ALL APPROPRIATE PERMITS (CDPS GENERAL PERMIT STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY, DEWATERING, CLEAN WATER ACT, ARMY CORPS OF ENGINEERS' 404 WETLANDS MITIGATION PERMIT, ETC.) HAVE BEEN ATTAINED PRIOR TO THE RELEVANT ACTIVITY HAS BEGUN. THESE PERMITS OR COPIES SHALL BE MADE AVAILABLE UPON REQUEST BY THE CITY. 11.THE DEVELOPER SHALL FURNISH ALL CONVENIENCES AND ASSISTANCES TO AID THE EROSION CONTROL INSPECTORS OF MATERIALS, WORKMANSHIP, RECORDS, AND SELF-INSPECTIONS, ETC. OF THE CONTROL MEASURES INVOLVED IN THE CONSTRUCTION ACTIVITIES. 12.THE DEVELOPER SHALL REQUEST CLARIFICATION OF ALL APPARENT SITE CONSTRUCTION ISSUES THAT MAY ARISE DUE TO INCONSISTENCIES IN CONSTRUCTION PLANS FOR THE SITE OR SITE CONDITIONS AROUND THE SELECTED CONTROL MEASURES BY CONTACTING THE EROSION CONTROL INSPECTOR. THE EROSION CONTROL INSPECTOR WILL NOT BE RESPONSIBLE FOR ANY EXPLANATIONS, INTERPRETATIONS, OR SUPPLEMENTARY DATA PROVIDED BY OTHERS. 13.ALL CONTROL MEASURES SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUAL. 14.THE CITY RESERVES THE RIGHT TO REQUIRE ADDITIONAL CONTROL MEASURES AS SITE CONDITIONS WARRANT, TO THE EXTENT AUTHORIZED BY RELEVANT LEGAL AUTHORITY. 15.AS WITH ANY CONSTRUCTION STANDARDS, OCCASIONS MAY ARISE WHERE THE MINIMUM EROSION CONTROL STANDARDS ARE EITHER INAPPROPRIATE OR CANNOT BE JUSTIFIED. IN THESE CASES, A VARIANCE TO THESE STANDARDS MAY BE APPLIED FOR PURSUANT TO THE TERMS, CONDITIONS, AND PROCEDURES OF THE MANUAL. 16.INSPECTION. THE CONTRACTOR SHALL INSPECT SITE POLLUTANT SOURCES AND IMPLEMENT CONTROL MEASURES AT A MINIMUM OF ONCE EVERY TWO WEEKS DURING CONSTRUCTION AND WITHIN 24 HOURS FOLLOWING A PRECIPITATION EVENT. DOCUMENTATION OF EACH INSPECTION SHALL BE RECORDED AND RETAINED BY THE CONTRACTOR. 17.ALL TEMPORARY CONTROL MEASURES SHALL BE CLEANED, REPAIRED, OR RECONSTRUCTED AS NECESSARY IN ORDER TO ASSURE CONTINUAL PERFORMANCE OF THEIR INTENDED FUNCTION. ALL RETAINED SEDIMENTS, PARTICULARLY THOSE ON PAVED ROADWAY SURFACES, SHALL BE REMOVED AND DISPOSED OF IN A MANNER AND LOCATION SO AS NOT TO CAUSE THEIR RELEASE INTO ANY DRAINAGE WAY. 18.ANY CONTROL MEASURE MAY BE SUBSTITUTED FOR ANOTHER STANDARD CONTROL MEASURE SO LONG AS THAT CONTROL MEASURE IS EQUAL TO, OR OF GREATER PROTECTION THAN THE ORIGINAL CONTROL MEASURE THAT WAS TO BE USED IN THAT LOCATION. (EX. SILT FENCE, FOR WATTLES, OR FOR COMPACT BERMS) WATTLE ALONE ON COMMERCIAL CONSTRUCTION SITES HAVE SHOWN TO BE AN INEFFECTIVE SUBSTITUTE FOR SILT FENCE OR COMPACT BERMS UNLESS IT IS ACCOMPANIED BY A CONSTRUCTION FENCE TO PREVENT VEHICLE TRAFFIC. 19.ANY IMPLEMENTATION OR REPLACEMENT OF EXISTING CONTROL MEASURES FOR A NON-STANDARD CONTROL, OR ALTERNATIVE CONTROL MEASURE, SHALL REQUIRE THE REVIEW AND ACCEPTANCE BY THE CITY EROSION CONTROL STAFF BEFORE THE MEASURE WILL BE ALLOWED TO BE USED ON THIS PROJECT. THESE CONTROL MEASURES' DETAILS SHALL BE SUBMITTED, REVIEWED AND ACCEPTED TO BE IN ACCORDANCE WITH THE EROSION CONTROL CRITERIA BASED UPON THE FUNCTIONALITY AND EFFECTIVENESS IN ACCORDANCE WITH SOUND ENGINEERING AND HYDROLOGICAL PRACTICES LAND DISTURBANCE, STOCKPILES, AND STORAGE OF SOILS 20.THERE SHALL BE NO EARTH-DISTURBING ACTIVITY OUTSIDE THE LIMITS DESIGNATED ON THE ACCEPTED PLANS. OFF ROAD STAGING AREAS OR STOCKPILES MUST BE PREAPPROVED BY THE CITY. DISTURBANCES BEYOND THESE LIMITS WILL BE RESTORED TO ORIGINAL CONDITION. 21.PRE-DISTURBANCE VEGETATION SHALL BE IDENTIFIED, PROTECTED, AND RETAINED WHEREVER POSSIBLE. REMOVAL OR DISTURBANCE OF EXISTING VEGETATION SHALL BE LIMITED TO THE AREA REQUIRED FOR IMMEDIATE CONSTRUCTION OPERATIONS, AND FOR THE SHORTEST PRACTICAL PERIOD OF TIME. THIS SHOULD INCLUDE SEQUENCING AND PHASING CONSTRUCTION ACTIVITIES IN A WAY SO THAT THE SOIL IS NOT EXPOSED FOR LONG PERIODS OF TIME BY SCHEDULE OR LIMIT GRADING TO SMALL AREAS. THIS SHOULD ALSO INCLUDE WHEN PRACTICAL ADVANCING THE SCHEDULE ON STABILIZATION ACTIVITIES SUCH THAT LANDSCAPING TAKES PLACE SHORTLY IF NOT IMMEDIATELY AFTER GRADING HAS OCCURRED. VEGETATION EFFORTS SHALL START AS SOON AS POSSIBLE TO RETURN THE SITE TO A STABILIZED CONDITION. SENSITIVE AREAS SHOULD AVOID CLEARING AND GRADING ACTIVITIES AS MUCH POSSIBLE. 22.ALL EXPOSED SOILS OR DISTURBED AREAS ARE CONSIDERED A POTENTIAL POLLUTANT AND SHALL HAVE CONTROL MEASURES IMPLEMENTED ON THE SITE TO PREVENT MATERIALS FROM LEAVING THE SITE. 23.ALL SOILS EXPOSED DURING LAND DISTURBING ACTIVITY (STRIPPING, GRADING, UTILITY INSTALLATIONS, STOCKPILING, FILLING, ETC.) SHALL BE KEPT IN A ROUGHENED CONDITION AT ALL TIMES BY EQUIPMENT TRACKING, SCARIFYING OR DISKING THE SURFACE ON A CONTOUR WITH A 2 TO 4 INCH MINIMUM VARIATION IN SOIL SURFACE UNTIL MULCH, VEGETATION, AND/OR OTHER PERMANENT EROSION CONTROL IS INSTALLED. 24.NO SOIL STOCKPILE SHALL EXCEED TEN (10) FEET IN HEIGHT. ALL SOIL STOCKPILES SHALL BE PROTECTED FROM SEDIMENT TRANSPORT THROUGH THE USE OF SURFACE ROUGHENING, WATERING, AND DOWN GRADIENT PERIMETER CONTROLS. ALL SOIL STOCKPILES SHALL BE PROTECTED FROM SEDIMENT TRANSPORT BY WIND IN ACCORDANCE WITH MUNICIPAL CODE §12-150. ALL STOCKPILES SHALL BE FLATTENED TO MEET GRADE OR REMOVED FROM SITE AS SOON AS PRACTICAL, AND NO LATER THAN THE COMPLETION OF CONSTRUCTION ACTIVITIES OR ABANDONMENT OF THE PROJECT. ALL OFF-SITE STOCKPILE STORAGE LOCATIONS IN CITY LIMITS SHALL HAVE A STOCKPILE PERMIT FROM THE CITY ENGINEERING DEPARTMENT PRIOR TO USING THE AREA TO STORE MATERIAL. IF FREQUENT ACCESS FROM HARDSCAPE TO THE STOCKPILE IS NEEDED A STRUCTURAL TRACKING CONTROL MEASURE SHALL BE IMPLEMENTED. 25.ALL REQUIRED CONTROL MEASURES SHALL BE INSTALLED PRIOR TO ANY LAND DISTURBING ACTIVITY (STOCKPILING, STRIPPING, GRADING, ETC.). ALL OF THE REQUIRED EROSION CONTROL MEASURES MUST BE INSTALLED AT THE APPROPRIATE TIME IN THE CONSTRUCTION SEQUENCE AS INDICATED IN THE APPROVED PROJECT SCHEDULE, CONSTRUCTION PLANS, AND EROSION CONTROL REPORT. 26.ALL INLETS, CURB-CUTS, CULVERTS, AND OTHER STORM SEWER INFRASTRUCTURE WHICH COULD BE POTENTIALLY IMPACTED BY CONSTRUCTION ACTIVITIES SHALL BE PROTECTED WITH CONTROL MEASURES. MATERIAL ACCUMULATED FROM THIS CONTROL MEASURE SHALL BE PROMPTLY REMOVED AND IN CASES WHERE THE PROTECTION HAS FAILED, THE PIPES SHALL BE THOROUGHLY CLEANED OUT. 27.ALL STREAMS, STREAM CORRIDORS, BUFFERS, WOODLANDS, WETLANDS, OR OTHER SENSITIVE AREAS SHALL BE PROTECTED FROM IMPACT BY ANY CONSTRUCTION ACTIVITY THROUGH THE USE OF CONTROL MEASURES. 28.ALL EXPOSED DIRT SHALL HAVE PERIMETER CONTROL. ANY PERIMETER CONTROLS THAT DRAIN OFF OR HAS THE ABILITY TO BE TRACKED ONTO THE NEARBY HARDSCAPE SHALL HAVE SOME FORM OF EFFECTIVE SEDIMENT CONTROL AS THE, OR AS PART OF THE, PERIMETER CONTROL. 29.ALL EXPOSED SLOPES SHOULD BE PROTECTED. ALL EXPOSED STEEP SLOPES (STEEPER THAN 3:1 H:V) SHALL BE PROTECTED FROM EROSION AND SEDIMENT TRANSPORT THROUGH USE OF CONTROL MEASURES. 30.NO SOILS SHALL REMAIN EXPOSED BY LAND DISTURBING ACTIVITY FOR MORE THAN THIRTY (30) DAYS AFTER ACTIVITY HAS CEASED BEFORE REQUIRED TEMPORARY SEEDING OR PERMANENT EROSION CONTROL (E.G. SEED/MULCH, LANDSCAPING, ETC.) IS INSTALLED. THIS IS NOT JUST LIMITED TO PROJECTS THAT ARE ABANDONED; THIS INCLUDES ANY PROJECT THAT IS TEMPORARILY HALTED AND NO IMMEDIATE ACTIVITY IS TO RESUME WITHIN THE NEXT THIRTY (30) DAYS, UNLESS OTHERWISE APPROVED BY THE CITY EROSION CONTROL INSPECTOR. DURING A SEASON WHEN SEEDING DOES NOT PRODUCE VEGETATIVE COVER, ANOTHER TEMPORARY EROSION CONTROL SHALL BE IMPLEMENTED WITH OR UNTIL TEMPORARY SEEDING OR PERMANENT EROSION CONTROL CAN BE PERFORMED. 31.ALL INDIVIDUAL LOTS SHALL HAVE EFFECTIVE SEDIMENT CONTROLS LOCATED ON THE STREET SIDE AND ANY DOWN GRADIENT SIDE. TYPICALLY MOST LOTS DRAIN TO THE FRONT YET ON THOSE CASES WHERE HOUSES ARE ALONG A POND OR DRAINAGE SWALE HAVE THE LOT DRAIN IN A DIFFERENT DIRECTION THAN THE STREET, THOSE INDIVIDUAL LOTS WILL NEED PROTECTION ON THAT DOWN GRADIENT SIDE TO PREVENT SEDIMENT FROM LEAVING THE LOT. SEE THE INDIVIDUAL LOT DETAILS FOR FURTHER CLARIFICATION. VEHICLE TRACKING 32.AT ALL POINTS WHERE VEHICLES EXIT OR LEAVE THE EXPOSED DIRT AREA ON TO A HARDSCAPE OR SEMI HARDSCAPE (CONCRETE, ASPHALT, ROAD BASE, ETC.) SHALL HAVE INSTALLED AT LEAST ONE STRUCTURAL TRACKING CONTROL MEASURE TO PREVENT VEHICLE TRACKING. ALL AREAS NOT PROTECTED BY AN ADEQUATE PERIMETER CONTROL SHALL BE CONSIDERED A POINT WHERE VEHICLES EXIT THE SITE. ACCESS POINTS SHOULD BE LIMITED TO AS FEW ENTRANCES AS POSSIBLE (ALL PERIMETER AREAS SHALL BE PROTECTED FROM TRACKING ACTIVITIES). 33.IN ALL AREAS THAT THE STRUCTURAL TRACKING CONTROL MEASURES FAIL TO PREVENT VEHICLE TRACKING, COLLECTION AND PROPER DISPOSAL OF THAT MATERIAL IS REQUIRED. ALL INLETS LOCATED NEAR ACCESS POINTS AND AFFECTED BY TRACKING ACTIVITIES SHALL BE PREVENTED FROM THE INTRODUCTION OF SEDIMENT INTO THE DRAINAGE SYSTEM. 34.CITY MUNICIPAL CODE §20-62, AMONG OTHER THINGS, PROHIBITS THE TRACKING, DROPPING, OR DEPOSITING OF SOILS OR ANY OTHER MATERIAL ONTO CITY STREETS BY OR FROM ANY SOURCE. CITY MUNICIPAL CODE, §26-498, AMONG OTHER THINGS, PROHIBITS THE DISCHARGE OF POLLUTANTS ON PUBLIC OR PRIVATE PROPERTY IF THERE IS A SIGNIFICANT POTENTIAL FOR MIGRATION OF SUCH POLLUTANT. THEREFORE, ALL TRACKED OR DEPOSITED MATERIALS (INTENTIONAL OR INADVERTENT) ARE NOT PERMITTED TO REMAIN ON THE STREET OR GUTTER AND SHALL BE REMOVED AND LEGALLY DISPOSED OF BY THE DEVELOPER IN A TIMELY AND IMMEDIATE MANNER. DIRT RAMPS INSTALLED IN THE CURB-LINES ARE NOT EXEMPT TO THESE SECTIONS OF CODE AND SHALL NOT BE PERMITTED IN THE STREET RIGHT OF WAY (PUBLIC OR PRIVATE). 35.IF REPEATED DEPOSIT OF MATERIAL OCCURS ON A SITE, ADDITIONAL STRUCTURAL TRACKING CONTROLS MAY BE REQUIRED OF THE DEVELOPER BY THE CITY EROSION CONTROL INSPECTOR. LOADING AND UNLOADING OPERATIONS 36.THE DEVELOPER SHALL APPLY CONTROL MEASURE TO LIMIT TRAFFIC (SITE WORKER OR PUBLIC) IMPACTS AND PROACTIVELY LOCATE MATERIAL DELIVERED TO THE SITE IN CLOSE PROXIMITY TO THE WORK AREA OR IMMEDIATELY INCORPORATED IN THE CONSTRUCTION TO LIMIT OPERATIONAL IMPACTS TO DISTURBED AREAS, VEHICLE TRACKING, AND SEDIMENT DEPOSITION THAT COULD IMPACT WATER QUALITY. OUTDOOR STORAGE OR CONSTRUCTION SITE MATERIALS, BUILDING MATERIALS, FERTILIZERS, AND CHEMICALS 37.ANY MATERIALS OF A NON-POLLUTING NATURE (STEEL, ROCK, BRICK, LUMBER, ETC.) SHALL BE INSPECTED FOR ANY RESIDUE COMING OFF THE MATERIAL DURING ROUTINE INSPECTION AND WILL GENERALLY BE LOCATED WHERE PRACTICAL AT LEAST FIFTY (50) FEET FROM ANY PERMANENT OR INTERIM DRAINAGE WAYS. 38.ANY HIGH ENVIRONMENTAL IMPACT POLLUTANT MATERIALS THAT HAVE A HIGH LIKELIHOOD TO RESULT IN DISCHARGE WHEN IN CONTACT WITH STORMWATER (LUBRICANTS, FUELS, PAINTS, SOLVENTS, DETERGENTS, FERTILIZERS, CHEMICAL SPRAYS, BAGS OF CEMENT MIX, ETC.) SHOULD NOT BE KEPT ON SITE WHERE PRACTICAL. WHEN NOT PRACTICAL, THEY SHOULD BE STORED INSIDE (VEHICLE, TRAILER, CONNEX, BUILDING, ETC.) AND OUT OF CONTACT WITH STORMWATER OR STORMWATER RUNOFF. WHERE NOT AVAILABLE, THEY SHALL BE STORED OUTSIDE IN A RAISED (HIGH SPOTS OR ON PALLETS), COVERED (PLASTIC OR TARPED), AND SEALED (LEAK PROOF CONTAINER) IN SECONDARY CONTAINMENT LOCATION. THE SECONDARY CONTAINMENT OR OTHER CONTROL MEASURE SHALL BE ADEQUATELY SIZED, LOCATED, WHERE PRACTICAL, AT LEAST FIFTY (50) FEET FROM ANY PERMANENT OR INTERIM STORMWATER STRUCTURES OR DRAINAGE WAYS AND SHALL BE MONITORED AS PART OF THE ROUTINE INSPECTIONS. VEHICLE AND EQUIPMENT MAINTENANCE AND FUELING 39.PARKING, REFUELING, AND MAINTENANCE OF VEHICLES AND EQUIPMENT SHOULD BE LIMITED IN ONE AREA OF THE SITE TO MINIMIZE POSSIBLE SPILLS AND FUEL STORAGE AREAS. THIS AREA SHALL BE LOCATED, WHERE PRACTICAL, AT LEAST FIFTY (50) FEET FROM ANY PERMANENT OR INTERIM STORMWATER STRUCTURES OR DRAINAGE WAYS AND SHALL BE MONITORED AS PART OF THE ROUTINE INSPECTIONS. ALL AREAS SHALL KEEP SPILL KITS AND SUPPLIES CLOSE. SIGNIFICANT DUST OR PARTICULATE GENERATING PROCESS 40.THE PROPERTY MUST BE ACTIVELY PREVENTING THE EMISSION OF FUGITIVE DUST AT ALL TIMES DURING CONSTRUCTION AND VEGETATION ACTIVITIES. ALL LAND DISTURBING ACTIVITIES THAT RESULT IN FUGITIVE DUST SHALL BE IN ACCORDANCE WITH MUNICIPAL CODE §12-150 TO REDUCE THE IMPACTS TO ADJACENT PROPERTIES AND COMMUNITY HEALTH. ALL REQUIRED PRACTICES SHALL BE IMPLEMENTED AND ADDITIONAL ONES SHALL BE FOLLOWED. THESE PRACTICES INCLUDE WATERING THE SITES AND DISCONTINUING CONSTRUCTION ACTIVITIES UNTIL THE WIND SUBSIDES AS DETERMINED BY ANY CITY INSPECTORS. CONCRETE TRUCK / EQUIPMENT WASHING, INCLUDING THE CONCRETE TRUCK CHUTE AND ASSOCIATED FIXTURES AND EQUIPMENT 41.ALL CONCRETE AND EQUIPMENT WASHING SHALL USE STRUCTURAL CONTROL MEASURES APPROPRIATE TO THE VOLUME OF WASH AND FREQUENCY OF USE. THESE CONTROL MEASURES SHALL BE LOCATED, WHERE PRACTICAL, AT LEAST FIFTY (50) FEET FROM ANY PERMANENT OR INTERIM STORMWATER STRUCTURES OR DRAINAGE WAYS AND SHALL BE MONITORED AS PART OF THE ROUTINE INSPECTIONS. THESE AREAS SHALL BE CLEARLY IDENTIFIED AND PROTECTED FROM ANY WASH FROM LEAVING THE CONTROL MEASURE. IF FREQUENT ACCESS FROM HARDSCAPE TO THE CONTROL MEASURE IS TO OCCUR, A STRUCTURAL TRACKING CONTROL MEASURE SHALL BE IMPLEMENTED. THESE CONTROL MEASURES SHALL BE FREQUENTLY CLEANED OUT. 42.THE DEVELOPER IS RESPONSIBLE FOR ENSURING WASHING ACTIVITY IS TAKING PLACE AT THE APPROPRIATE CONTROL MEASURE AND SITE WORKERS ARE NOT WASHING OR DUMPING WASH WATER ON TO THE DIRT OR OTHER UNCONTROLLED LOCATIONS. DEDICATED ASPHALT AND CONCRETE BATCH PLANTS 43.DEDICATED ASPHALT AND CONCRETE BATCH PLANTS ARE NOT ACCEPTABLE ON CONSTRUCTION SITES WITHIN THE CITY OF FORT COLLINS WITHOUT AN EXPRESSED WRITTEN REQUEST AND PLAN TO REDUCE POLLUTANTS ASSOCIATED WITH THAT TYPE OF ACTIVITY AND APPROVAL BY THE CITY OF FORT COLLINS SPECIFICALLY THE EROSION CONTROL INSPECTOR. THE DEVELOPER SHALL INFORM THE EROSION CONTROL INSPECTION STAFF OF ANY DEDICATED ASPHALT, OR CONCRETE BATCH PLANTS THAT IS TO BE USED ON SITE. CONCRETE SAW CUTTING MATERIALS 44.SAW CUTTING MATERIAL SHALL BE IN ACCORDANCE WITH MUNICIPAL CODE §12-150 FOR AIR EMISSIONS AND ALL WATER APPLICATIONS TO THE SAW CUTTING SHALL PREVENT MATERIAL FROM LEAVING THE IMMEDIATE SITE AND COLLECTED. THESE CUTTING LOCATIONS, ONCE DRIED, SHALL BE SWEPT AND SCRAPED OF ALL MATERIAL AND SHALL HAVE PROPER AND LEGAL DISPOSAL. WASTE MATERIALS STORAGE AND SANITARY FACILITIES 45.TRASH, DEBRIS, MATERIAL SALVAGE, AND/OR RECYCLING AREAS SHALL BE, WHERE PRACTICAL, AT LEAST FIFTY FEET FROM ANY PERMANENT OR INTERIM STORMWATER STRUCTURES OR DRAINAGE WAYS AND SHALL BE MONITORED AS PART OF THE ROUTINE INSPECTIONS. THESE FACILITIES SHOULD BE LOCATED OUT OF THE WIND AND COVERED AS ABLE. WHERE NOT ABLE TO COVER, LOCATING SAID AREAS ON THE SIDE OF OTHER STRUCTURES TO REDUCE EXPOSURE TO WINDS, AND FOLLOW MAXIMUM LOADING GUIDELINES AS MARKED ON THE CONTAINER. THE DEVELOPER IS REQUIRED TO PRACTICE GOOD HOUSEKEEPING TO KEEP THE CONSTRUCTION SITE FREE OF LITTER, CONSTRUCTION DEBRIS, AND LEAKING CONTAINERS. 46.SANITARY FACILITIES SHALL BE PREVENTED FROM TIPPING THROUGH THE USE OF ANCHORING TO THE GROUND OR LASHING TO A STABILIZED STRUCTURE. THESE FACILITIES SHALL ALSO BE LOCATED AS FAR AS PRACTICAL FROM AN INLET, CURB CUT, DRAINAGE SWALE OR OTHER DRAINAGE CONVEYANCES TO PREVENT MATERIAL TRANSPORT FROM LEAVING THE LOCAL AREA. THIS CONSISTS OF THE FACILITY BEING LOCATED, WHERE PRACTICAL, AT LEAST FIFTY (50) FEET FROM ANY PERMANENT OR INTERIM DRAINAGE WAYS. OTHER SITE OPERATIONS AND POTENTIAL SPILL AREAS 47.SPILLS: FOR THOSE MINOR SPILLS THAT; ARE LESS THAN THE STATE'S REPORTABLE QUANTITY FOR SPILLS, STAY WITHIN THE PERMITTED AREA, AND IN NO WAY THREATEN ANY STORMWATER CONVEYANCE, NOTIFY THE CITY OF FORT COLLINS UTILITIES BY EMAIL AT EROSION@FCGOV.COM OR PHONE (970) 817-4770. FOR ANY SIGNIFICANT, MAJOR, OR HAZARDOUS SPILLS, NOTIFY THE CITY OF FORT COLLINS UTILITIES BY PHONE ONLY AFTER EMERGENCY RESPONSE (911) HAS BEEN NOTIFIED AND IS ON ROUTE, COUNTY HEALTH DEPARTMENT (LCDHE) HAS BEEN NOTIFIED THROUGH LARIMER COUNTY SHERIFF DISPATCH (970) 416-1985, AND THE STATE SPILL HOTLINE INCIDENT REPORTING HAVE BEEN CONTACTED 1-877-518-5608. WRITTEN DOCUMENTATION SHALL BE PROVIDED TO THE CITY WITHIN 5 DAYS OF THE EVENT. ALL SPILLS SHALL BE CLEANED UP IMMEDIATELY. 48.SELECTION OF “PLASTIC WELDED” EROSION CONTROL BLANKETS SHALL NOT BE USED IN AREAS THAT WILDLIFE, SUCH AS SNAKES, ARE LIKELY TO BE LOCATED AS THESE HAVE PROVEN TO CAUSE ENTRAPMENT ISSUES. FINAL STABILIZATION AND PROJECT COMPLETION 49.ANY STORMWATER FACILITIES USED AS A TEMPORARY CONTROL MEASURE WILL BE RESTORED AND STORM SEWER LINES WILL BE CLEANED UPON COMPLETION OF THE PROJECT AND BEFORE TURNING THE MAINTENANCE OVER TO THE OWNER, HOMEOWNERS ASSOCIATION (HOA), OR OTHER PARTY RESPONSIBLE FOR LONG TERM MAINTENANCE OF THOSE FACILITY. 50.ALL FINAL STABILIZATION SPECIFICATIONS SHALL BE DONE IN ACCORDANCE WITH THE MANUAL, CHAPTER 4: CONSTRUCTION CONTROL MEASURES. 51.ALL DISTURBED AREAS DESIGNED TO BE VEGETATED SHALL BE AMENDED, SEEDED & MULCHED, OR LANDSCAPED AS SPECIFIED IN THE LANDSCAPE PLANS WITHIN 14 WORKING DAYS OF FINAL GRADING. 52.SOIL IN ALL VEGETATED (LANDSCAPED OR SEEDED) AREAS, INCLUDING PARKWAYS AND MEDIANS SHALL COMPLY WITH ALL REQUIREMENTS SET FORTH IN SECTIONS 12-130 THROUGH 12-132 OF THE CITY MUNICIPAL CODE, AS WELL AS SECTION 3.8.21 FOR THE CITY LAND USE CODE. 53.ALL SEEDING SHALL REFER TO LANDSCAPING PLANS FOR SPECIES MIXTURE AND APPLICATION RATES AND DEPTHS REQUIREMENTS. 54.ALL SEED SHALL BE DRILLED WHERE PRACTICAL TO A DEPTH BASED UPON THE SEED TYPE. BROADCAST SEEDING SHALL BE APPLIED AT DOUBLE THE RATE AS PRESCRIBED FOR DRILL SEEDING AND SHALL BE LIGHTLY HAND RAKED AFTER APPLICATION. HYDROSEEDING MAY BE SUBSTITUTED FOR DRILL SEEDING ON SLOPES STEEPER THAN 3(H):1(V) OR ON OTHER AREAS NOT PRACTICAL TO DRILL SEED AND CRIMP AND MULCH. ALL HYDROSEEDING MUST BE CONDUCTED AS TWO SEPARATE PROCESSES OF SEEDING AND TACKIFICATION. 55.ALL SEEDED AREAS MUST BE MULCHED WITHIN TWENTY-FOUR (24) AFTER PLANTING. ALL MULCH SHALL BE MECHANICALLY CRIMPED AND OR ADEQUATELY APPLIED TACKIFIER. THE USE OF CRIMPED MULCH OR TACKIFIER MAY REQUIRE MULTIPLE RE-APPLICATIONS IF NOT PROPERLY INSTALLED OR HAVE WEATHERED OR DEGRADED BEFORE VEGETATION HAS BEEN ESTABLISHED. AREAS OF EMBANKMENTS HAVING SLOPES GREATER THAN OR EQUAL TO 3H:1V SHALL BE STABILIZED WITH AN EROSION MAT OR APPROVED EQUAL TO ENSURE SEED WILL BE ABLE TO GERMINATE ON THE STEEP SLOPES. DURING A SEASON WHEN SEEDING DOES NOT PRODUCE VEGETATIVE COVER, ANOTHER TEMPORARY EROSION CONTROL SHALL BE IMPLEMENTED ALONG WITH, OR UNTIL, TEMPORARY SEEDING OR PERMANENT EROSION CONTROL CAN BE PERFORMED. 56.THE DEVELOPER SHALL WARRANTY AND MAINTAIN ALL VEGETATIVE MEASURES FOR TWO GROWING SEASONS AFTER INSTALLATION OR UNTIL SEVENTY PERCENT (70%) VEGETATIVE COVER HAS BEEN ESTABLISHED, WHICHEVER IS LONGER AND MEETS ALL THE CRITERIA OUTLINED IN THE FORT COLLINS STORMWATER CRITERIA MANUAL CHAPTER 4: CONSTRUCTION CONTROL MEASURES. 57.THE DEVELOPER SHALL MAINTAIN, MONITOR, REPAIR, AND REPLACE ANY AND ALL APPLICABLE CONTROL MEASURES UNTIL FINAL STABILIZATION HAS BEEN OBTAINED. ALL CONTROL MEASURES MUST REMAIN UNTIL SUCH TIME AS ALL UPSTREAM CONTRIBUTING POLLUTANT SOURCES HAVE BEEN VEGETATED OR REMOVED FROM THE SITE. WHEN ANY CONTROL MEASURE IS REMOVED, THE DEVELOPER SHALL BE RESPONSIBLE FOR THE CLEANUP AND REMOVAL OF ALL SEDIMENT AND DEBRIS FROM THAT CONTROL MEASURE. AT THE POINT AT WHICH THE SITE HAS BEEN DEEMED STABILIZED AND VERIFIED BY CITY EROSION CONTROL INSPECTOR, ALL TEMPORARY CONTROL MEASURES CAN THEN BE FULLY REMOVED. ALL MEASURES SHALL BE REMOVED WITHIN 30 DAYS AFTER FINAL STABILIZATION IS ACHIEVED. 58.THE RESPONSIBLE PARTY SHALL MAINTAIN AND KEEP CURRENT ALL PAYMENTS OR RELATED FORMS OF SECURITY FOR THE EROSION CONTROL ESCROW UNTIL 1) STABILIZATION HAS BEEN REACHED AND 2) ALL CONTROL MEASURES AND/OR BMPS HAVE SEDIMENT MATERIALS COLLECTED AND THE CONTROL MEASURE REMOVED FROM THE SITE. AT THAT TIME THE SITE WILL BE CONSIDERED COMPLETED AND ANY REMAINING EROSION CONTROL ESCROW SHALL BE RETURNED TO THE APPROPRIATE PARTIES. B.STREET IMPROVEMENT NOTES 1.ALL STREET CONSTRUCTION IS SUBJECT TO THE GENERAL NOTES ON THE COVER SHEET OF THESE PLANS AS WELL AS THE STREET IMPROVEMENTS NOTES LISTED HERE. 2.A PAVING SECTION DESIGN, SIGNED AND STAMPED BY A COLORADO LICENSED ENGINEER, MUST BE SUBMITTED TO THE LOCAL ENTITY ENGINEER FOR APPROVAL, PRIOR TO ANY STREET CONSTRUCTION ACTIVITY, (FULL DEPTH ASPHALT SECTIONS ARE NOT PERMITTED AT A DEPTH GREATER THAN 8 INCHES OF ASPHALT). THE JOB MIX SHALL BE SUBMITTED FOR APPROVAL PRIOR TO PLACEMENT OF ANY ASPHALT. 3.WHERE PROPOSED PAVING ADJOINS EXISTING ASPHALT, THE EXISTING ASPHALT SHALL BE SAW CUT, A MINIMUM DISTANCE OF 12 INCHES FROM THE EXISTING EDGE, TO CREATE A CLEAN CONSTRUCTION JOINT. THE DEVELOPER SHALL BE REQUIRED TO REMOVE EXISTING PAVEMENT TO A DISTANCE WHERE A CLEAN CONSTRUCTION JOINT CAN BE MADE. WHEEL CUTS SHALL NOT BE ALLOWED UNLESS APPROVED BY THE LOCAL ENTITY ENGINEER. 4.STREET SUBGRADES SHALL BE SCARIFIED THE TOP 12 INCHES AND RE-COMPACTED PRIOR TO SUBBASE INSTALLATION. NO BASE MATERIAL SHALL BE LAID UNTIL THE SUBGRADE HAS BEEN INSPECTED AND APPROVED BY THE LOCAL ENTITY ENGINEER. 5.FT. COLLINS ONLY. VALVE BOXES AND MANHOLES ARE TO BE BROUGHT UP TO GRADE AT THE TIME OF PAVEMENT PLACEMENT OR OVERLAY. VALVE BOX ADJUSTING RINGS ARE NOT ALLOWED. 6.WHEN AN EXISTING ASPHALT STREET MUST BE CUT, THE STREET MUST BE RESTORED TO A CONDITION EQUAL TO OR BETTER THAN ITS ORIGINAL CONDITION. THE EXISTING STREET CONDITION SHALL BE DOCUMENTED BY THE INSPECTOR BEFORE ANY CUTS ARE MADE. CUTTING AND PATCHING SHALL BE DONE IN CONFORMANCE WITH CHAPTER 25, RECONSTRUCTION AND REPAIR. THE FINISHED PATCH SHALL BLEND SMOOTHLY INTO THE EXISTING SURFACE. THE DETERMINATION OF NEED FOR A COMPLETE OVERLAY SHALL BE MADE BY THE LOCAL ENTITY ENGINEER. ALL OVERLAY WORK SHALL BE COORDINATED WITH ADJACENT LANDOWNERS SUCH THAT FUTURE PROJECTS DO NOT CUT THE NEW ASPHALT OVERLAY WORK. 7.ALL TRAFFIC CONTROL DEVICES SHALL BE IN CONFORMANCE WITH THESE PLANS OR AS OTHERWISE SPECIFIED IN M.U.T.C.D. (INCLUDING COLORADO SUPPLEMENT) AND AS PER THE RIGHT-OF-WAY WORK PERMIT TRAFFIC CONTROL PLAN. 8.THE DEVELOPER IS REQUIRED TO PERFORM A GUTTER WATER FLOW TEST IN THE PRESENCE OF THE LOCAL ENTITY INSPECTOR AND PRIOR TO INSTALLATION OF ASPHALT. GUTTERS THAT HOLD MORE THAN ¼ INCH DEEP OR 5 FEET LONGITUDINALLY, OF WATER, SHALL BE COMPLETELY REMOVED AND RECONSTRUCTED TO DRAIN PROPERLY. 9.PRIOR TO PLACEMENT OF H.B.P. OR CONCRETE WITHIN THE STREET AND AFTER MOISTURE/DENSITY TESTS HAVE BEEN TAKEN ON THE SUBGRADE MATERIAL (WHEN A FULL DEPTH SECTION IS PROPOSED) OR ON THE SUBGRADE AND BASE MATERIAL (WHEN A COMPOSITE SECTION IS PROPOSED), A MECHANICAL "PROOF ROLL" WILL BE REQUIRED. THE ENTIRE SUBGRADE AND/OR BASE MATERIAL SHALL BE ROLLED WITH A HEAVILY LOADED VEHICLE HAVING A TOTAL GVW OF NOT LESS THAN 50,000 LBS. AND A SINGLE AXLE WEIGHT OF AT LEAST 18,000 LBS. WITH PNEUMATIC TIRES INFLATED TO NOT LESS THAT 90 P.S.I.G. “PROOF ROLL” VEHICLES SHALL NOT TRAVEL AT SPEEDS GREATER THAN 3 M.P.H. ANY PORTION OF THE SUBGRADE OR BASE MATERIAL WHICH EXHIBITS EXCESSIVE PUMPING OR DEFORMATION, AS DETERMINED BY THE LOCAL ENTITY ENGINEER, SHALL BE REWORKED, REPLACED OR OTHERWISE MODIFIED TO FORM A SMOOTH, NON-YIELDING SURFACE. THE LOCAL ENTITY ENGINEER SHALL BE NOTIFIED AT LEAST 24 HOURS PRIOR TO THE “PROOF ROLL.” ALL “PROOF ROLLS” SHALL BE PREFORMED IN THE PRESENCE OF AN INSPECTOR. C.TRAFFIC SIGNING AND PAVEMENT MARKING CONSTRUCTION NOTES 1.ALL SIGNAGE AND MARKING IS SUBJECT TO THE GENERAL NOTES ON THE COVER SHEET OF THESE PLANS, AS WELL AS THE TRAFFIC SIGNING AND MARKING CONSTRUCTION NOTES LISTED HERE. 2.ALL SYMBOLS, INCLUDING ARROWS, ONLYS, CROSSWALKS, STOP BARS, ETC. SHALL BE PRE-FORMED THERMO-PLASTIC. 3.ALL SIGNAGE SHALL BE PER LOCAL ENTITY STANDARDS AND THESE PLANS OR AS OTHERWISE SPECIFIED IN MUTCD. 4.ALL LANE LINES FOR ASPHALT PAVEMENT SHALL RECEIVE TWO COATS OF LATEX PAINT WITH GLASS BEADS. 5.ALL LANE LINES SHALL BE LATEX PAINT. 6.PRIOR TO PERMANENT INSTALLATION OF TRAFFIC STRIPING AND SYMBOLS, THE DEVELOPER SHALL PLACE TEMPORARY TABS OR TAPE DEPICTING ALIGNMENT AND PLACEMENT OF THE SAME. THEIR PLACEMENT SHALL BE APPROVED BY THE LOCAL TRAFFIC ENGINEER PRIOR TO PERMANENT INSTALLATION OF STRIPING AND SYMBOLS. 7.PRE-FORMED THERMO-PLASTIC APPLICATIONS SHALL BE AS SPECIFIED IN THESE PLANS AND/OR THESE STANDARDS. 8.LATEX PAINT APPLICATIONS SHALL BE APPLIED AS SPECIFIED IN CDOT STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION. 9.ALL SURFACES SHALL BE THOROUGHLY CLEANED PRIOR TO INSTALLATION OF STRIPING OR MARKINGS. 10.ALL SIGN POSTS SHALL UTILIZE BREAK-AWAY ASSEMBLIES AND FASTENERS PER THE STANDARDS. 11.A FIELD INSPECTION OF LOCATION AND INSTALLATION OF ALL SIGNS SHALL BE PERFORMED BY THE LOCAL ENTITY ENGINEER. ALL DISCREPANCIES IDENTIFIED DURING THE FIELD INSPECTION MUST BE CORRECTED BEFORE THE 2-YEAR WARRANTY PERIOD WILL BEGIN. 12.THE DEVELOPER INSTALLING SIGNS SHALL BE RESPONSIBLE FOR LOCATING AND PROTECTING ALL UNDERGROUND UTILITIES. 13.SPECIAL CARE SHALL BE TAKEN IN SIGN LOCATION TO ENSURE AN UNOBSTRUCTED VIEW OF EACH SIGN. 14.SIGNAGE AND STRIPING HAS BEEN DETERMINED BY INFORMATION AVAILABLE AT THE TIME OF REVIEW. PRIOR TO INITIATION OF THE WARRANTY PERIOD, THE LOCAL ENTITY ENGINEER RESERVES THE RIGHT TO REQUIRE ADDITIONAL SIGNAGE AND/OR STRIPING IF THE LOCAL ENTITY ENGINEER DETERMINES THAT AN UNFORESEEN CONDITION WARRANTS SUCH SIGNAGE ACCORDING TO THE MUTCD OR THE CDOT M AND S STANDARDS. ALL SIGNAGE AND STRIPING SHALL FALL UNDER THE REQUIREMENTS OF THE 2-YEAR WARRANTY PERIOD FOR NEW CONSTRUCTION (EXCEPT FAIR WEAR ON TRAFFIC MARKINGS). 15.SLEEVES FOR SIGN POSTS SHALL BE REQUIRED FOR USE IN ISLANDS/MEDIANS. REFER TO CHAPTER 14, TRAFFIC CONTROL DEVICES, FOR ADDITIONAL DETAIL. 16.CONTRACTOR IS RESPONSIBLE FOR REMOVING ALL ANCHORS, POSTS, SIGNS, AND/OR DELINEATORS IN CONSTRUCTION AREA. CONTRACTOR MAY KEEP THE SIGNS, OR CALL THE CITY TRAFFIC DIVISION TO HAVE THEM REMOVED. 17.NO "RESET" ANCHORS, POSTS, SIGNS, AND/OR DELINEATORS WILL BE ACCEPTED. 18.ALL ANCHORS, POSTS, SIGNS, AND/OR DELINEATORS SHALL BE NEW AND BE CONSISTENT WITH THE LCUASS CRITERIA. D.STORM DRAINAGE NOTES 1.THE CITY OF FORT COLLINS SHALL NOT BE RESPONSIBLE FOR THE MAINTENANCE OF STORM DRAINAGE FACILITIES LOCATED ON PRIVATE PROPERTY. MAINTENANCE OF ONSITE DRAINAGE FACILITIES SHALL BE THE RESPONSIBILITY OF THE PROPERTY OWNER(S). 2.ALL RECOMMENDATIONS OF THE FINAL DRAINAGE AND EROSION CONTROL STUDY, FINAL DRAINAGE REPORT FOR HEARTSIDE HILL BY HIGHLAND DEVELOPMENT SERVICES, SHALL BE FOLLOWED AND IMPLEMENTED. 3.SEE CITY OF FORT COLLINS STORMWATER CRITERIA MANUAL - APPENDIX F CONSTRUCTION CONTROL MEASURES STANDARD NOTES AND STANDARD EROSION CONTROL NOTES. E. WATERLINE NOTE 1.THE MINIMUM COVER OVER WATER LINES IS 4.5 FEET AND THE MAXIMUM COVER IS 5.5 FEET UNLESS OTHERWISE NOTED IN THE PLANS AND APPROVED BY THE WATER UTILITY. F. WATERLINE & SEWER NOTES 1.ALL WATERLINE CONSTRUCTION SHALL CONFORM TO THE CITY OF FORT COLLINS UTILITIES STANDARDS AND SPECIFICATIONS CURRENT TO THE DATE OF CONSTRUCTION. 2.ALL SANITARY SEWER LINE CONSTRUCTION SHALL CONFORM TO THE CITY OF FORT COLLINS UTILITIES STANDARDS AND SPECIFICATIONS CURRENT TO THE DATE OF CONSTRUCTION. RE V I S I O N NO . BY DA T E HI G H L A N D DE V E L O P M E N T S E R V I C E S 63 5 5 F A I R G R O U N D S A V E N U E , S U I T E 2 0 0 | W I N D S O R , C O 8 0 5 5 0 PH O N E : 9 7 0 . 6 7 4 . 7 5 5 0 | E M A I L : I n f o @ H i g h l a n d - D S . c o m | w w w . H i g h l a n d - D S . c o m PREPARED BY OR UNDER THE DIRECT SUPERVISION OF: FOR AND ON BEHALF OF HIGHLAND DEVELOPMENT SERVICES REVIEW SET NOT FOR CONSTRUCTION OFSHEET DRAWN BY CHECKED BY DATE SCALE (H) HDS PROJECT # SCALE (V) UN I O N P A R K GE N E R A L N O T E S 9/9/24 N/A N/A ZMW JTC 21-1044-00 C0.01 2 60 TREE PROTECTION NOTES: 1.ALL EXISTING TREES WITHIN THE LIMITS OF THE DEVELOPMENT AND WITHIN ANY NATURAL AREA BUFFER ZONES SHALL REMAIN AND BE PROTECTED UNLESS NOTED ON THESE PLANS FOR REMOVAL. 2.WITHIN THE DRIP LINE OF ANY PROTECTED EXISTING TREE, THERE SHALL BE NO CUT OR FILL OVER A FOUR-INCH DEPTH UNLESS A QUALIFIED ARBORIST OR FORESTER HAS EVALUATED AND APPROVED THE DISTURBANCE. 3.ALL PROTECTED EXISTING TREES SHALL BE PRUNED TO THE CITY OF FORT COLLINS FORESTRY STANDARDS. TREE PRUNING AND REMOVAL SHALL BE PERFORMED BY A BUSINESS THAT HOLDS A CURRENT CITY OF FORT COLLINS ARBORIST LICENSE WHERE REQUIRED BY CODE. 4.PRIOR TO AND DURING CONSTRUCTION, BARRIERS SHALL BE ERECTED AROUND ALL PROTECTED EXISTING TREES WITH SUCH BARRIERS TO BE OF ORANGE FENCING A MINIMUM OF FOUR (4) FEET IN HEIGHT, SECURED WITH METAL T-POSTS, NO CLOSER THAN SIX (6) FEET FROM THE TRUNK OR ONE-HALF (½) OF THE DRIP LINE, WHICHEVER IS GREATER. THERE SHALL BE NO STORAGE OR MOVEMENT OF EQUIPMENT, MATERIAL, DEBRIS OR FILL WITHIN THE FENCED TREE PROTECTION ZONE. 5.DURING THE CONSTRUCTION STAGE OF DEVELOPMENT, THE APPLICANT SHALL PREVENT THE CLEANING OF EQUIPMENT OR MATERIAL OR THE STORAGE AND DISPOSAL OF WASTE MATERIAL SUCH AS PAINTS, OILS, SOLVENTS, ASPHALT, CONCRETE, MOTOR OIL OR ANY OTHER MATERIAL HARMFUL TO THE LIFE OF A TREE WITHIN THE DRIP LINE OF ANY PROTECTED TREE OR GROUP OF TREES. 6.NO DAMAGING ATTACHMENT, WIRES, SIGNS OR PERMITS MAY BE FASTENED TO ANY PROTECTED TREE. 7.LARGE PROPERTY AREAS CONTAINING PROTECTED TREES AND SEPARATED FROM CONSTRUCTION OR LAND CLEARING AREAS, ROAD RIGHTS-OF-WAY AND UTILITY EASEMENTS MAY BE "RIBBONED OFF," RATHER THAN ERECTING PROTECTIVE FENCING AROUND EACH TREE AS REQUIRED IN SUBSECTION (G)(3) ABOVE. THIS MAY BE ACCOMPLISHED BY PLACING METAL T-POST STAKES A MAXIMUM OF FIFTY (50) FEET APART AND TYING RIBBON OR ROPE FROM STAKE-TO-STAKE ALONG THE OUTSIDE PERIMETERS OF SUCH AREAS BEING CLEARED. 8.THE INSTALLATION OF UTILITIES, IRRIGATION LINES OR ANY UNDERGROUND FIXTURE REQUIRING EXCAVATION DEEPER THAN SIX (6) INCHES SHALL BE ACCOMPLISHED BY BORING UNDER THE ROOT SYSTEM OF PROTECTED EXISTING TREES AT A MINIMUM DEPTH OF TWENTY-FOUR (24) INCHES. THE AUGER DISTANCE IS ESTABLISHED FROM THE FACE OF THE TREE (OUTER BARK) AND IS SCALED FROM TREE DIAMETER AT BREAST HEIGHT AS DESCRIBED IN THE CHART BELOW: 9.NO TREES SHALL BE REMOVED DURING THE SONGBIRD NESTING SEASON (FEBRUARY 1 TO JULY 31) WITHOUT FIRST HAVING A PROFESSIONAL ECOLOGIST OR WILDLIFE BIOLOGIST COMPLETE A NESTING SURVEY TO IDENTIFY ANY ACTIVE NESTS EXISTING ON THE PROJECT SITE. THE SURVEY SHALL BE SENT TO THE CITY ENVIRONMENTAL PLANNER. IF ACTIVE NESTS ARE FOUND, THE CITY WILL COORDINATE WITH RELEVANT STATE AND FEDERAL REPRESENTATIVES TO DETERMINE WHETHER ADDITIONAL RESTRICTIONS ON TREE REMOVAL AND CONSTRUCTION APPLY. TREE DIAMETER AT BREAST HEIGHT (INCHES) AUGER DISTANCE FROM FACE OF TREE (FEET) 0 - 2 1 3 - 4 2 5 - 9 5 10 - 14 10 15 - 19 12 OVER 19 15 CO R B E T T D R I V E KINGSLEY COURT NEWBURY COURT HARRINGTON COURT MA T C H L I N E SE E S H E E T 4 LOT 12 FRONT RANGE VILLAGE FIRST REPLAT LO T 1 AFF I N I T Y S U B D I V I S I O N PARCEL 1 UNPLATTED TRACT A ENGLISH RANCH SOUTH P.U.D. THIRD FILING RE V I S I O N NO . BY DA T E HI G H L A N D DE V E L O P M E N T S E R V I C E S 63 5 5 F A I R G R O U N D S A V E N U E , S U I T E 2 0 0 | W I N D S O R , C O 8 0 5 5 0 PH O N E : 9 7 0 . 6 7 4 . 7 5 5 0 | E M A I L : I n f o @ H i g h l a n d - D S . c o m | w w w . H i g h l a n d - D S . c o m PREPARED BY OR UNDER THE DIRECT SUPERVISION OF: FOR AND ON BEHALF OF HIGHLAND DEVELOPMENT SERVICES REVIEW SET NOT FOR CONSTRUCTION OFSHEET DRAWN BY CHECKED BY DATE SCALE (H) HDS PROJECT # SCALE (V) UN I O N P A R K EX I S T I N G C O N D I T I O N S & D E M O L I T I O N P L A N 9/9/24 1" = 40' N/A ZMW JTC 21-1044-00 C0.02 3 60 0 SCALE: 1" = 40' 80402040 N W E S APPROX LIMITS OF SAWCUT LINE DEMO STRUCTURE/UTILITY/ LIGHT/ ETC DEMO ASPHALT / SITE FEATURES DEMO UTILITIES LEGEND NOTES: 1.ALL EXISTING UTILITY LOCATIONS SHOWN HAVE BEEN DETERMINED FROM A COMBINATION OF RECORD DRAWINGS, SURVEYED FIELD MARK-OUTS, AND PHYSICAL OBSERVATIONS. THERE MAY BE OTHER UTILITIES NOT SHOWN WHICH PRESENTLY EXIST IN THE AREA OF CONSTRUCTION. THEREFORE, THE CONTRACTOR SHALL VERIFY LOCATION AND DEPTH OF ALL EXISTING UTILITIES IN THE PROJECT VICINITY PRIOR TO BEGINNING WORK. THE CONTRACTOR SHALL COORDINATE AND PROVIDE PROTECTION OF CONFLICTING UTILITIES. NOTIFY OWNER/ENGINEER IF ANY CONFLICTS ARE ENCOUNTERED. THE OWNER AND/OR ENGINEER ASSUMES NO RESPONSIBILITY FOR THE ACCURACY OR COMPLETENESS SHOWN. 2.COORDINATE DEMOLITION REQUIREMENTS, LIMITS OF DEMOLITION, SALVAGE ITEMS, PROTECTION OF ITEMS TO REMAIN, TREES, FENCING, ETC. WITH OWNER, ARCHITECT, AND RELEVANT CONSTRUCTION AND/OR PHASING PLANS. ADDITIONAL DEMOLITION OF PAVING, TREES, UTILITIES, STRUCTURES, ETC. TO BE PERFORMED AS REQUIRED. 3.ALL EXISTING UTILITIES TO REMAIN SHALL BE ADJUSTED TO FINAL GRADE. 4.CONTRACTOR RESPONSIBLE FOR ALL SURFACE REPAIR/REPLACEMENT TO RESTORE SIDEWALKS, PAVEMENT, CURB/GUTTER AND SOD AREAS DISTURBED BY NEW WORK. REPAIR/REPLACEMENTS SHALL BE COMPLETED PER CITY OF FORT COLLINS STANDARDS AT CONTRACTOR EXPENSE. 5.EXISTING CONCRETE AND ASPHALT PAVING SHALL BE SAWCUT AND REMOVED PRIOR TO EXCAVATION. REMOVE CONCRETE TO THE NEAREST JOINT. 6.CONTRACTOR TO PROVIDE ALL NECESSARY EROSION CONTROL MEASURES DURING CONSTRUCTION. PLACE EROSION CONTROL PROTECTION AT ALL PROPOSED AND EXISTING INLETS DOWNSTREAM FROM CONSTRUCTION AREA. EROSION CONTROL PROTECTION SHALL REMAIN IN PLACE UNTIL CONSTRUCTION IS COMPLETE AND ALL DISTURBED GROUND IS ADEQUATELY VEGETATED. 7.LIMITS OF STREET CUTS, ASPHALT, AND CONCRETE REMOVALS ARE APPROXIMATE. LIMITS OF REMOVAL TO BE DETERMINED IN THE FIELD TO ADEQUATELY COMPLETE THE PROPOSED IMPROVEMENTS, WHILE MAINTAINING, IF NOT IMPROVING, EXISTING CONDITIONS. ADDITIONAL REMOVAL IDENTIFIED IN THE FIELD SHALL BE COMPLETED AT CONTRACTOR EXPENSE. ALL REPAIRS TO BE COMPLETED IN ACCORDANCE WITH CITY STREET REPAIRS STANDARDS. 8.ALL UTILITIES TO BE PROTECTED IN PLACE UNLESS OTHERWISE NOTED. 9.HDS CANNOT BE HELD LIABLE FOR INFORMATION PERFORMED AND/OR PROVIDED BY OTHERS. NO GUARANTEE IS PROVIDED OR ASSUMED REGARDING THE ACCURATENESS OF THE EXISTING INFORMATION PROVIDED BY OR IN REFERENCE TO OTHERS. VERIFY ALL EXISTING CONDITIONS AND INFORMATION PRIOR TO CONSTRUCTION. 10.POTHOLE INFORMATION PROVIDED BY: ACT UNDERGROUND, LLC DBA BADGER DAYLIGHTING ON 5-9-24 THRU 5-10-24. 11.GROUND SURVEY PROVIDED BY: MAJESTIC SURVEYING, LLC ON 5-15-24 & 5-29-24. 12.REFERENCE LANDSCAPE PLANS FOR TREE REMOVAL/RELOCATION AND ADDITIONAL SITE DEMOLITION. CALL UTILITY NOTIFICATION CENTER OF COLORADO CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. before you dig.Call Know what's below. R ZI E G L E R R O A D (R O W V A R I E S ) MA T C H L I N E SE E S H E E T 3 TRACT B ENGLISH RANCH SOUTH P.U.D.UNPLATTED PARCEL 3 PARCEL 2 LOT 10 FRONT RANGE VILLAGE FIRST REPLAT LOT 11 FRONT RANGE VILLAGE RE V I S I O N NO . BY DA T E HI G H L A N D DE V E L O P M E N T S E R V I C E S 63 5 5 F A I R G R O U N D S A V E N U E , S U I T E 2 0 0 | W I N D S O R , C O 8 0 5 5 0 PH O N E : 9 7 0 . 6 7 4 . 7 5 5 0 | E M A I L : I n f o @ H i g h l a n d - D S . c o m | w w w . H i g h l a n d - D S . c o m PREPARED BY OR UNDER THE DIRECT SUPERVISION OF: FOR AND ON BEHALF OF HIGHLAND DEVELOPMENT SERVICES REVIEW SET NOT FOR CONSTRUCTION OFSHEET DRAWN BY CHECKED BY DATE SCALE (H) HDS PROJECT # SCALE (V) UN I O N P A R K EX I S T I N G C O N D I T I O N S & D E M O L I T I O N P L A N 9/9/24 1" = 40' N/A ZMW JTC 21-1044-00 C0.03 4 60 0 SCALE: 1" = 40' 80402040 N W E S APPROX LIMITS OF SAWCUT LINE DEMO STRUCTURE/UTILITY/ LIGHT/ ETC DEMO ASPHALT / SITE FEATURES DEMO UTILITIES LEGEND NOTES: 1.ALL EXISTING UTILITY LOCATIONS SHOWN HAVE BEEN DETERMINED FROM A COMBINATION OF RECORD DRAWINGS, SURVEYED FIELD MARK-OUTS, AND PHYSICAL OBSERVATIONS. THERE MAY BE OTHER UTILITIES NOT SHOWN WHICH PRESENTLY EXIST IN THE AREA OF CONSTRUCTION. THEREFORE, THE CONTRACTOR SHALL VERIFY LOCATION AND DEPTH OF ALL EXISTING UTILITIES IN THE PROJECT VICINITY PRIOR TO BEGINNING WORK. THE CONTRACTOR SHALL COORDINATE AND PROVIDE PROTECTION OF CONFLICTING UTILITIES. NOTIFY OWNER/ENGINEER IF ANY CONFLICTS ARE ENCOUNTERED. THE OWNER AND/OR ENGINEER ASSUMES NO RESPONSIBILITY FOR THE ACCURACY OR COMPLETENESS SHOWN. 2.COORDINATE DEMOLITION REQUIREMENTS, LIMITS OF DEMOLITION, SALVAGE ITEMS, PROTECTION OF ITEMS TO REMAIN, TREES, FENCING, ETC. WITH OWNER, ARCHITECT, AND RELEVANT CONSTRUCTION AND/OR PHASING PLANS. ADDITIONAL DEMOLITION OF PAVING, TREES, UTILITIES, STRUCTURES, ETC. TO BE PERFORMED AS REQUIRED. 3.ALL EXISTING UTILITIES TO REMAIN SHALL BE ADJUSTED TO FINAL GRADE. 4.CONTRACTOR RESPONSIBLE FOR ALL SURFACE REPAIR/REPLACEMENT TO RESTORE SIDEWALKS, PAVEMENT, CURB/GUTTER AND SOD AREAS DISTURBED BY NEW WORK. REPAIR/REPLACEMENTS SHALL BE COMPLETED PER CITY OF FORT COLLINS STANDARDS AT CONTRACTOR EXPENSE. 5.EXISTING CONCRETE AND ASPHALT PAVING SHALL BE SAWCUT AND REMOVED PRIOR TO EXCAVATION. REMOVE CONCRETE TO THE NEAREST JOINT. 6.CONTRACTOR TO PROVIDE ALL NECESSARY EROSION CONTROL MEASURES DURING CONSTRUCTION. PLACE EROSION CONTROL PROTECTION AT ALL PROPOSED AND EXISTING INLETS DOWNSTREAM FROM CONSTRUCTION AREA. EROSION CONTROL PROTECTION SHALL REMAIN IN PLACE UNTIL CONSTRUCTION IS COMPLETE AND ALL DISTURBED GROUND IS ADEQUATELY VEGETATED. 7.LIMITS OF STREET CUTS, ASPHALT, AND CONCRETE REMOVALS ARE APPROXIMATE. LIMITS OF REMOVAL TO BE DETERMINED IN THE FIELD TO ADEQUATELY COMPLETE THE PROPOSED IMPROVEMENTS, WHILE MAINTAINING, IF NOT IMPROVING, EXISTING CONDITIONS. ADDITIONAL REMOVAL IDENTIFIED IN THE FIELD SHALL BE COMPLETED AT CONTRACTOR EXPENSE. ALL REPAIRS TO BE COMPLETED IN ACCORDANCE WITH CITY STREET REPAIRS STANDARDS. 8.ALL UTILITIES TO BE PROTECTED IN PLACE UNLESS OTHERWISE NOTED. 9.HDS CANNOT BE HELD LIABLE FOR INFORMATION PERFORMED AND/OR PROVIDED BY OTHERS. NO GUARANTEE IS PROVIDED OR ASSUMED REGARDING THE ACCURATENESS OF THE EXISTING INFORMATION PROVIDED BY OR IN REFERENCE TO OTHERS. VERIFY ALL EXISTING CONDITIONS AND INFORMATION PRIOR TO CONSTRUCTION. 10.POTHOLE INFORMATION PROVIDED BY: ACT UNDERGROUND, LLC DBA BADGER DAYLIGHTING ON 5-9-24 THRU 5-10-24. 11.GROUND SURVEY PROVIDED BY: MAJESTIC SURVEYING, LLC ON 5-15-24 & 5-29-24. 12.REFERENCE LANDSCAPE PLANS FOR TREE REMOVAL/RELOCATION AND ADDITIONAL SITE DEMOLITION. CALL UTILITY NOTIFICATION CENTER OF COLORADO CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. before you dig.Call Know what's below. R DS DSDS DS DS DS DS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DS DS DS DS DS DSDS DS DS DS DS DS DS DS DS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS UPUP DS DSDS DS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS UPUP DS DSDS DS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DS DSDSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DS DS DS DS DS DS DS DS DS DS DS UPUP DS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DS DS DSDSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DS DS DS DS DS DS DS DS DS DS DS UPUP DS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS UPUP DS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DS DS DS DSDS DS DS DS DS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DS DS DS DS C C C C C C C C C C C C C C C C C C C C D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D NDYLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYSD D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYSD NDYLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS DDONOTPOLLUTE RAINSTOWATERWAYS DUCTILEIRONNYLOPLAST NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE DDONOTPOLLUTE RAINSTOWATERWAYS DUCTILEIRONNYLOPLAST DDONOTPOLLUTE RAINSTOWATERWAYS DUCTILEIRONNYLOPLAST DDONOTPOLLUTE RAINSTOWATERWAYS DUCTILEIRONNYLOPLAST DDONOTPOLLUTE RAINSTOWATERWAYS DUCTILEIRONNYLOPLAST NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D NDYLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D NDYLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D ND YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D ND YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D NDYLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYSD NDYLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D NDYLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D NDYLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D NDYLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D NDYLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D ND YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D ND YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D NDYLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D NDYLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D ND YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D NDYLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D NDYLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D NDYLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D NDYLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D NDYLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D NDYLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D ND YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D NDYLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D NDYLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D NDYLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYSD N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D NDYLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYSD N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE DO NOT POLLUTEDRAINS TO WATERWAYS NYLOPLASTDUCTILE IRON D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE PADDIN G T O N R O A D CA R R I C K R O A D KINGSLEY COURT NEWBURG COURT HARRINGTON COURT CO R B E T T D R I V E LOT 12 FRONT RANGE VILLAGE FIRST REPLAT TRACT B ENGLISH RANCH SOUTH P.U.D. UNPLATTED LO T 1 AFF I N I T Y S U B D I V I S I O N LOT 10 FRONT RANGE VILLAGE FIRST REPLAT LOT 11 FRONT RANGE VILLAGE TRACT A ENGLISH RANCH SOUTH P.U.D. THIRD FILING POND 298C PHASE B PHASE D PHASE E PHASE C PHASE F POND 298C POND 298A POND 298B IN F A N T R Y T E R R A C E D R I V E FORTITUDE LANE UNION PARK AVENUE IN F A N T R Y T E R R A C E D R I V E FORT SUMTER WAY ED M O N D S R O A D FORT SUMTER WAY UNION PARK AVENUE FORTITUDE LANE ZI E G L E R R O A D (R O W V A R I E S ) GOLDEN GROVE DRIVE GOLDEN GROVE DRIVE UN I O N P A R K A V E N U E IR O N L A N E HERITAGE HILL PLACE CITADEL PLACE PHASE G PHASE A TERMINATE SSWR BETWEEN PHASES STUB SD W/ PHASE "A"TEMP FH TEMP FH TEMP FH TERMINATE SSWR BETWEEN PHASES TEMP FH TEMP FH CONSTRUCT FH W/ PHASE "A" CONSTRUCT SSWR W/ PHASE "A" STUB SD W/ PHASE "A" STUB SD W/ PHASE "A" TERMINATE SSWR BETWEEN PHASES CONSTRUCT FH W/ PHASE "A" CONSTRUCT SSWR W/ PHASE "E" TEMP FH TEMP FH TERMINATE SSWR BETWEEN PHASES TEMP FH CONSTRUCT SSWR W/ PHASE "A" TEMP FH TEMP FH CONSTRUCT SSWR W/ PHASE "A" RE V I S I O N NO . BY DA T E HI G H L A N D DE V E L O P M E N T S E R V I C E S 63 5 5 F A I R G R O U N D S A V E N U E , S U I T E 2 0 0 | W I N D S O R , C O 8 0 5 5 0 PH O N E : 9 7 0 . 6 7 4 . 7 5 5 0 | E M A I L : I n f o @ H i g h l a n d - D S . c o m | w w w . H i g h l a n d - D S . c o m PREPARED BY OR UNDER THE DIRECT SUPERVISION OF: FOR AND ON BEHALF OF HIGHLAND DEVELOPMENT SERVICES REVIEW SET NOT FOR CONSTRUCTION OFSHEET DRAWN BY CHECKED BY DATE SCALE (H) HDS PROJECT # SCALE (V) UN I O N P A R K PH A S I N G P L A N 9/9/24 1" = 60' N/A ZMW JTC 21-1044-00 C0.04 5 60 N W E S 0 SCALE: 1" = 60' 120603060 PHASE A PHASE B PHASE E ANTICIPATED CONSTRUCTION SEQUENCE PHASE C PHASE GPHASE D PHASE F DS DSDS DS DS DS DS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DS DS DS DS UPUP DS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DS DSDSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DS DS DS DS DS DS DS DS DS DS DS UPUP DS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS UP DS DS DS DS DS DS DS DS DS DS DSDS DS DS DS DS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DS DS DS DS C C C C C C C C C C C C C C C C C C C C MA T C H L I N E SE E S H E E T 7 POND 298A LOT 12 FRONT RANGE VILLAGE FIRST REPLAT LO T 1 AFF I N I T Y S U B D I V I S I O N UNPLATTED TRACT A ENGLISH RANCH SOUTH P.U.D. THIRD FILING LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 1 LOT 2 LOT 3 LOT 4 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5LOT 1 LOT 2 LOT 3 LOT 4LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 1 LOT 2 LOT 3 LOT 4 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5LOT 1 LOT 2 LOT 3 LOT 4LOT 5LOT 4LOT 3LOT 2LOT 1 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 1 LOT 2 LOT 3 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 BLOCK 1 BLOCK 2 BLOCK 3 BLOCK 4BLOCK 5BLOCK 6 BLOCK 7 BLOCK 8 BLOCK 9 BLOCK 10BLOCK 11BLOCK 12 BLOCK 13 BLOCK 18 BLOCK 19 BLOCK 24 BLDG A2 ESMT EXCLUSION BLDG A11 ESMT EXCLUSION BLDG A10 ESMT EXCLUSION BLDG A1 ESMT EXCLUSION BLDG A3 ESMT EXCLUSION BLDG A4 ESMT EXCLUSION EE G1 EE G2EE AG1 EE AG2 EE AG3 BLOCK 29 LOT R1 KINGSLEY COURT NEWBURG COURT HARRINGTON COURT CO R B E T T D R I V E ED M O N D S R O A D FORT SUMTER WAY FORTITUDE LANE GOLDEN GROVE DRIVE UN I O N P A R K A V E N U E BL U E C O A T D R I V E ED M O N D S R O A D UNION PARK AVENUE TRACT A D,U&AE(PU) TRACT N D,U&AE(PR) TRACT M D,U&AE(PR) TRACT O D,U&AE(PR) TRACT G D,U&AE(PU) TRACT B D,U&AE(PR) TR A C T C D, U & A E ( P U ) RE V I S I O N NO . BY DA T E HI G H L A N D DE V E L O P M E N T S E R V I C E S 63 5 5 F A I R G R O U N D S A V E N U E , S U I T E 2 0 0 | W I N D S O R , C O 8 0 5 5 0 PH O N E : 9 7 0 . 6 7 4 . 7 5 5 0 | E M A I L : I n f o @ H i g h l a n d - D S . c o m | w w w . H i g h l a n d - D S . c o m PREPARED BY OR UNDER THE DIRECT SUPERVISION OF: FOR AND ON BEHALF OF HIGHLAND DEVELOPMENT SERVICES REVIEW SET NOT FOR CONSTRUCTION OFSHEET DRAWN BY CHECKED BY DATE SCALE (H) HDS PROJECT # SCALE (V) UN I O N P A R K HO R I Z O N T A L C O N T R O L P L A N 9/9/24 1" = 40' N/A ZMW JTC 21-1044-00 C1.00 6 60 0 SCALE: 1" = 40' 80402040 N W E S CALL UTILITY NOTIFICATION CENTER OF COLORADO CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. before you dig.Call Know what's below. R NOTES: 1.ALL ROAD AND PARKING DIMENSIONS BASED ON FLOWLINE OR CURB. VERIFY BUILDING PLAN DIMENSIONS PRIOR TO CONSTRUCTION 2.ALL PARKING STALLS, HANDICAP PARKING STALLS AND ISLES, ARE 9' WIDE AND 17' DEEP UNLESS OTHERWISE NOTED. 3.ALL RETURN CURBS ARE 20' RADIUS UNLESS OTHERWISE NOTED. 4.ALL INTERSECTION RAMPS SHALL CONFORM TO ADA STANDARDS. 5.ALL WALKS ARE A MINIMUM 5' WIDE, WITH EXCEPTION TO ENTRY WALKS TO INDIVIDUAL BUILDINGS/UNITS, UNLESS OTHERWISE NOTED. 6.CONTRACTOR SHALL BE RESPONSIBLE FOR TRAFFIC CONTROL PLANS FOR STREET RIGHT-OF-WAY WORK. 7.TRAFFIC CONTROL, PERMITS, CONSTRUCTION AND FEES ASSOCIATED WITH THE RIGHT-OF-WAY WORK, ARE THE SOLE RESPONSIBILITY OF THE GENERAL CONTRACTOR. 8.ALL PAVEMENTS AND EARTHWORK SHALL CONFORM TO THE GEOTECHNICAL REPORT FOR THE SITE. 9.ALL WORK SHALL CONFORM TO LARIMER COUNTY URBAN AREA STREET STANDARDS. 10.COORDINATE LOCATION, HEIGHTS, ETC. OF WALLS, FENCES, AND SITE FEATURES WITH LANDSCAPE ARCHITECT. 11.RE: LA FOR CONCRETE SCORING PATTERNS. 12.ALL PROPOSED STREETS ARE PRIVATE DRIVES AND PRIVATELY MAINTAINED. SEE LEGEND ABOVE. 13.ALL SIGNING AND MARKING TO BE DONE IN ACCORDANCE WITH CITY OF FORT COLLINS AND/OR MUTCD STANDARDS. 14.ALL PAVEMENTS SHALL BE DESIGNED TO SUPPORT 80,000 LBS PER FIRE CODE. CONCRETE SIDEWALK CONCRETE PAVEMENT HEAVY DUTY ASPHALT PAVEMENT LIGHT DUTY ASPHALT PAVEMENT EV INSTALLED LEGEND EV READY EV CAPABLE P FIRE LANE RESERVED PARKING VAN ACCESSIBLE ENHANCED PEDESTRIAN CROSSING (RE:LA) R1-1 WITH PRIVATE DRIVE SIGNAGE EXAMPLE UNION PARK AVE 3000 PRIVATELY MAINTAINED DR 4000 PRIVATELY MAINTAINED JUNCTION STOP 4" MOUNTABLE CURB W/ 1' SPILL GUTTER 6" VERTICAL CURB W/ 1' SPILL GUTTER 6" VERTICAL CURB W/ 2' CATCH GUTTER 2.0' CURB TRANSITION 4.0' CONCRETE PAN 6.0' CONCRETE PAN TRASH ENCLOSURE (RE: ARCH) BIKE RACK (RE: LA) PARK AMENITY (RE: LA) 1.0' CONCRETE PAN CURB RAMP ADA RAMP 1.0' SIDEWALK CHASE 1.5' CONCRETE PAN 1.5' SIDEWALK CHASE 2.0' CONCRETE PAN 2.0' SIDEWALK CHASE 2.0' CONCRETE CHANNEL EV READY RIGHT TURN LANE BEGIN YIELD TO BIKES DS DSDS DS DS DS DS DS DS DS DS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS UPUP DS DSDS DS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DS DS DS DS DS DSDSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DS DS DS DS DS DS DS DS DS DS DS UPUP DS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS UPUP DS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS MA T C H L I N E SE E S H E E T 6 POND 298C POND 298C TRACT B ENGLISH RANCH SOUTH P.U.D.UNPLATTED LOT 10 FRONT RANGE VILLAGE FIRST REPLAT LOT 11 FRONT RANGE VILLAGE POND 298B LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 7 LOT 8 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 7 LOT 8 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6LOT 1 LOT 2 LOT 3 LOT 4 LOT 5LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 7 LOT 8 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 7 LOT 8 LOT 9 LOT 1 LOT 2 LOT 3 LOT 1 LOT 2 LOT 3 BLOCK 13 BLOCK 14 BLOCK 15 BLOCK 16BLOCK 17BLOCK 18 BLOCK 19 BLOCK 20 BLOCK 21 BLOCK 22BLOCK 23BLOCK 24 BL O C K 2 7 BL O C K 2 8 BLDG A9 ESMT EXCLUSION BLDG A8 ESMT EXCLUSION BLDG A7 ESMT EXCLUSION BLDG A4 ESMT EXCLUSION BLDG A5 ESMT EXCLUSION BLDG A6 ESMT EXCLUSION LOT C3 LOT C1 LOT C2 EE AG3 EE G3 EE AG4EE G4 EE AG5 EE G5 LOT MU1 LOT MU2 BLOCK 25 BLOCK 26 ZI E G L E R R O A D (R O W V A R I E S ) IN F A N T R Y T E R R A C E D R I V E UNION PARK AVENUE IN F A N T R Y T E R R A C E D R I V E FORT SUMTER WAY ZI E G L E R R O A D (R O W V A R I E S ) LO C O M O T I V E D R I V E IR O N L A N E CITADEL PLACE HERITAGE HILL PLACE GOLDEN GROVE DRIVE FORTITUDE LANE TRACT J D,U&AE(PR) TRACT D D,U&AE(PR) TRACT H D,U&AE(PR) TRACT I D,U&AE(PR) TRACT K D,U&AE(PR) TRACT F D,U&AE(PR) TRACT E D,U&AE(PR) TRACT L D,U&AE(PR) RE V I S I O N NO . BY DA T E HI G H L A N D DE V E L O P M E N T S E R V I C E S 63 5 5 F A I R G R O U N D S A V E N U E , S U I T E 2 0 0 | W I N D S O R , C O 8 0 5 5 0 PH O N E : 9 7 0 . 6 7 4 . 7 5 5 0 | E M A I L : I n f o @ H i g h l a n d - D S . c o m | w w w . H i g h l a n d - D S . c o m PREPARED BY OR UNDER THE DIRECT SUPERVISION OF: FOR AND ON BEHALF OF HIGHLAND DEVELOPMENT SERVICES REVIEW SET NOT FOR CONSTRUCTION OFSHEET DRAWN BY CHECKED BY DATE SCALE (H) HDS PROJECT # SCALE (V) UN I O N P A R K HO R I Z O N T A L C O N T R O L P L A N 9/9/24 1" = 40' N/A ZMW JTC 21-1044-00 C1.01 7 60 0 SCALE: 1" = 40' 80402040 N W E S CALL UTILITY NOTIFICATION CENTER OF COLORADO CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. before you dig.Call Know what's below. R NOTES: 1.ALL ROAD AND PARKING DIMENSIONS BASED ON FLOWLINE OR CURB. VERIFY BUILDING PLAN DIMENSIONS PRIOR TO CONSTRUCTION 2.ALL PARKING STALLS, HANDICAP PARKING STALLS AND ISLES, ARE 9' WIDE AND 17' DEEP UNLESS OTHERWISE NOTED. 3.ALL RETURN CURBS ARE 20' RADIUS UNLESS OTHERWISE NOTED. 4.ALL INTERSECTION RAMPS SHALL CONFORM TO ADA STANDARDS. 5.ALL WALKS ARE A MINIMUM 5' WIDE, WITH EXCEPTION TO ENTRY WALKS TO INDIVIDUAL BUILDINGS/UNITS, UNLESS OTHERWISE NOTED. 6.CONTRACTOR SHALL BE RESPONSIBLE FOR TRAFFIC CONTROL PLANS FOR STREET RIGHT-OF-WAY WORK. 7.TRAFFIC CONTROL, PERMITS, CONSTRUCTION AND FEES ASSOCIATED WITH THE RIGHT-OF-WAY WORK, ARE THE SOLE RESPONSIBILITY OF THE GENERAL CONTRACTOR. 8.ALL PAVEMENTS AND EARTHWORK SHALL CONFORM TO THE GEOTECHNICAL REPORT FOR THE SITE. 9.ALL WORK SHALL CONFORM TO LARIMER COUNTY URBAN AREA STREET STANDARDS. 10.COORDINATE LOCATION, HEIGHTS, ETC. OF WALLS, FENCES, AND SITE FEATURES WITH LANDSCAPE ARCHITECT. 11.RE: LA FOR CONCRETE SCORING PATTERNS. 12.ALL PROPOSED STREETS ARE PRIVATE DRIVES AND PRIVATELY MAINTAINED. SEE LEGEND ABOVE. 13.ALL SIGNING AND MARKING TO BE DONE IN ACCORDANCE WITH CITY OF FORT COLLINS AND/OR MUTCD STANDARDS. 14.ALL PAVEMENTS SHALL BE DESIGNED TO SUPPORT 80,000 LBS PER FIRE CODE. CONCRETE SIDEWALK CONCRETE PAVEMENT HEAVY DUTY ASPHALT PAVEMENT LIGHT DUTY ASPHALT PAVEMENT EV INSTALLED LEGEND EV READY EV CAPABLE P FIRE LANE RESERVED PARKING VAN ACCESSIBLE ENHANCED PEDESTRIAN CROSSING (RE:LA) R1-1 WITH PRIVATE DRIVE SIGNAGE EXAMPLE UNION PARK AVE 3000 PRIVATELY MAINTAINED DR 4000 PRIVATELY MAINTAINED JUNCTION STOP 4" MOUNTABLE CURB W/ 1' SPILL GUTTER 6" VERTICAL CURB W/ 1' SPILL GUTTER 6" VERTICAL CURB W/ 2' CATCH GUTTER 2.0' CURB TRANSITION 4.0' CONCRETE PAN 6.0' CONCRETE PAN TRASH ENCLOSURE (RE: ARCH) BIKE RACK (RE: LA) PARK AMENITY (RE: LA) 1.0' CONCRETE PAN CURB RAMP ADA RAMP 1.0' SIDEWALK CHASE 1.5' CONCRETE PAN 1.5' SIDEWALK CHASE 2.0' CONCRETE PAN 2.0' SIDEWALK CHASE 2.0' CONCRETE CHANNEL EV READY RIGHT TURN LANE BEGIN YIELD TO BIKES RE V I S I O N NO . BY DA T E HI G H L A N D DE V E L O P M E N T S E R V I C E S 63 5 5 F A I R G R O U N D S A V E N U E , S U I T E 2 0 0 | W I N D S O R , C O 8 0 5 5 0 PH O N E : 9 7 0 . 6 7 4 . 7 5 5 0 | E M A I L : I n f o @ H i g h l a n d - D S . c o m | w w w . H i g h l a n d - D S . c o m PREPARED BY OR UNDER THE DIRECT SUPERVISION OF: FOR AND ON BEHALF OF HIGHLAND DEVELOPMENT SERVICES REVIEW SET NOT FOR CONSTRUCTION OFSHEET DRAWN BY CHECKED BY DATE SCALE (H) HDS PROJECT # SCALE (V) UN I O N P A R K HO R I Z O N T A L C O N T R O L P L A N 9/9/24 1" = 40' N/A ZMW JTC 21-1044-00 C1.02 8 60 RE V I S I O N NO . BY DA T E HI G H L A N D DE V E L O P M E N T S E R V I C E S 63 5 5 F A I R G R O U N D S A V E N U E , S U I T E 2 0 0 | W I N D S O R , C O 8 0 5 5 0 PH O N E : 9 7 0 . 6 7 4 . 7 5 5 0 | E M A I L : I n f o @ H i g h l a n d - D S . c o m | w w w . H i g h l a n d - D S . c o m PREPARED BY OR UNDER THE DIRECT SUPERVISION OF: FOR AND ON BEHALF OF HIGHLAND DEVELOPMENT SERVICES REVIEW SET NOT FOR CONSTRUCTION OFSHEET DRAWN BY CHECKED BY DATE SCALE (H) HDS PROJECT # SCALE (V) UN I O N P A R K HO R I Z O N T A L C O N T R O L P L A N 9/9/24 1" = 40' N/A ZMW JTC 21-1044-00 C1.03 9 60 DS DSDS DS DS DS DS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DS DS DS DS UPUP DS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DS DSDSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DS DS DS DS DS DS DS DS DS DS DS UPUP DS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS UP DS DS DS DS DS DS DS DS DS DS DSDS DS DS DS DS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DS DS DS DS D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS DDONOTPOLLUTE RAINSTOWATERWAYS DUCTILEIRONNYLOPLAST NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYSD N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE DO NOT POLLUTEDRAINS TO WATERWAYS NYLOPLASTDUCTILE IRON D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE OFFSITE AFFINITY SPILL LOCATION LO T 1 AFF I N I T Y S U B D I V I S I O N MA T C H L I N E SE E S H E E T 11 BLOCK 1 BLOCK 2 BLOCK 3 BLOCK 4BLOCK 5BLOCK 6 BLOCK 7 BLOCK 8 BLOCK 9 BLOCK 10BLOCK 11BLOCK 12 BLOCK 13 BLOCK 18 BLOCK 19 BLOCK 24 BLDG A2 ESMT EXCLUSION BLDG A11 ESMT EXCLUSION BLDG A10 ESMT EXCLUSION BLDG A1 ESMT EXCLUSION BLDG A3 ESMT EXCLUSION BLDG A4 ESMT EXCLUSION EE G1 EE G2EE AG1 EE AG2 EE AG3 BLOCK 29 LOT R1 KINGSLEY COURT NEWBURG COURT HARRINGTON COURT CO R B E T T D R I V E ED M O N D S R O A D FORT SUMTER WAY FORTITUDE LANE GOLDEN GROVE DRIVE UN I O N P A R K A V E N U E BL U E C O A T D R I V E ED M O N D S R O A D LID B STORMTECH SC-800 (90 CHAMBERS) POND 298A AFFINITY OUTFALL ROUTED THROUGH POND & SITE TRACT A D,U&AE(PU) TRACT N D,U&AE(PR) TRACT M D,U&AE(PR) TRACT O D,U&AE(PR) TRACT G D,U&AE(PU) TRACT B D,U&AE(PR) TR A C T C D, U & A E ( P U ) RE V I S I O N NO . BY DA T E HI G H L A N D DE V E L O P M E N T S E R V I C E S 63 5 5 F A I R G R O U N D S A V E N U E , S U I T E 2 0 0 | W I N D S O R , C O 8 0 5 5 0 PH O N E : 9 7 0 . 6 7 4 . 7 5 5 0 | E M A I L : I n f o @ H i g h l a n d - D S . c o m | w w w . H i g h l a n d - D S . c o m PREPARED BY OR UNDER THE DIRECT SUPERVISION OF: FOR AND ON BEHALF OF HIGHLAND DEVELOPMENT SERVICES REVIEW SET NOT FOR CONSTRUCTION OFSHEET DRAWN BY CHECKED BY DATE SCALE (H) HDS PROJECT # SCALE (V) UN I O N P A R K GR A D I N G & D R A I N A G E P L A N 9/9/24 1" = 40' N/A JTC JTC 21-1044-00 C2.00 10 60 N W E S 0 SCALE: 1" = 40' 80402040 CALL UTILITY NOTIFICATION CENTER OF COLORADO CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. before you dig.Call Know what's below. R BASIN COEFFICIENT (100-YR) BASIN DESIGNATION BASIN AREA DESIGN POINT DRAINAGE FLOW ARROW DRAINAGE BASIN BOUNDARY DRAINAGE BASIN FLOW PATH LEGEND EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR DS DSDS DS DS DS DS DS DS DS DS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS UPUP DS DSDS DS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DS DS DS DS DS DSDSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DS DS DS DS DS DS DS DS DS DS DS UPUP DS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS UPUP DS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYSD N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE DDONOTPOLLUTE RAINSTOWATERWAYS DUCTILEIRON NYLOPLAST DDONOTPOLLUTE RAINSTOWATERWAYS DUCTILEIRONNYLOPLAST DDONOTPOLLUTE RAINSTOWATERWAYS DUCTILEIRONNYLOPLAST DDONOTPOLLUTE RAINSTOWATERWAYS DUCTILEIRONNYLOPLAST NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYSD N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYSD N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE DO NOT POLLUTEDRAINS TO WATERWAYS NYLOPLASTDUCTILE IRON INADVERTENT DETENTION SPILL LOCATION ZI E G L E R R O A D (R O W V A R I E S ) MA T C H L I N E SE E S H E E T 10 RAISED PLANTING AREA RAISED PLANTING AREA RAISED PLANTING AREA BLOCK 13 BLOCK 14 BLOCK 15 BLOCK 16BLOCK 17BLOCK 18 BLOCK 19 BLOCK 20 BLOCK 21 BLOCK 22BLOCK 23BLOCK 24 BL O C K 2 7 BL O C K 2 8 BLDG A9 ESMT EXCLUSION BLDG A8 ESMT EXCLUSION BLDG A7 ESMT EXCLUSION BLDG A4 ESMT EXCLUSION BLDG A5 ESMT EXCLUSION BLDG A6 ESMT EXCLUSION LOT C3 LOT C1 LOT C2 EE AG3 EE G3 EE AG4EE G4 EE AG5 EE G5 LOT MU1 LOT MU2 BLOCK 25 BLOCK 26 ZI E G L E R R O A D (R O W V A R I E S ) IN F A N T R Y T E R R A C E D R I V E UNION PARK AVENUE IN F A N T R Y T E R R A C E D R I V E FORT SUMTER WAY ZI E G L E R R O A D (R O W V A R I E S ) LO C O M O T I V E D R I V E IR O N L A N E CITADEL PLACE HERITAGE HILL PLACE LID D STORMTECH SC-310 (147 CHAMBERS) POND 298C POND 298C STORM OUTFALL 20.1 CFS LIMITED POND 298B LID C STORMTECH SC-800 (45 CHAMBERS) GOLDEN GROVE DRIVE FORTITUDE LANE TRACT J D,U&AE(PR) TRACT D D,U&AE(PR) TRACT H D,U&AE(PR) TRACT I D,U&AE(PR) TRACT K D,U&AE(PR) TRACT F D,U&AE(PR) TRACT E D,U&AE(PR) TRACT L D,U&AE(PR) RE V I S I O N NO . BY DA T E HI G H L A N D DE V E L O P M E N T S E R V I C E S 63 5 5 F A I R G R O U N D S A V E N U E , S U I T E 2 0 0 | W I N D S O R , C O 8 0 5 5 0 PH O N E : 9 7 0 . 6 7 4 . 7 5 5 0 | E M A I L : I n f o @ H i g h l a n d - D S . c o m | w w w . H i g h l a n d - D S . c o m PREPARED BY OR UNDER THE DIRECT SUPERVISION OF: FOR AND ON BEHALF OF HIGHLAND DEVELOPMENT SERVICES REVIEW SET NOT FOR CONSTRUCTION OFSHEET DRAWN BY CHECKED BY DATE SCALE (H) HDS PROJECT # SCALE (V) UN I O N P A R K GR A D I N G & D R A I N A G E P L A N 9/9/24 1" = 40' N/A JTC JTC 21-1044-00 C2.01 11 60 CALL UTILITY NOTIFICATION CENTER OF COLORADO CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. before you dig.Call Know what's below. R BASIN COEFFICIENT (100-YR) BASIN DESIGNATION BASIN AREA DESIGN POINT DRAINAGE FLOW ARROW DRAINAGE BASIN BOUNDARY DRAINAGE BASIN FLOW PATH LEGEND EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR N W E S 0 SCALE: 1" = 40' 80402040 APPROX LIMIT OF DISTURBANCE (TYP) RE V I S I O N NO . BY DA T E HI G H L A N D DE V E L O P M E N T S E R V I C E S 63 5 5 F A I R G R O U N D S A V E N U E , S U I T E 2 0 0 | W I N D S O R , C O 8 0 5 5 0 PH O N E : 9 7 0 . 6 7 4 . 7 5 5 0 | E M A I L : I n f o @ H i g h l a n d - D S . c o m | w w w . H i g h l a n d - D S . c o m PREPARED BY OR UNDER THE DIRECT SUPERVISION OF: FOR AND ON BEHALF OF HIGHLAND DEVELOPMENT SERVICES REVIEW SET NOT FOR CONSTRUCTION OFSHEET DRAWN BY CHECKED BY DATE SCALE (H) HDS PROJECT # SCALE (V) UN I O N P A R K ER O S I O N & S E D I M E N T C O N T R O L P L A N PH A S E 1 - G R A D I N G 9/9/24 1" = 60' N/A ZMW JTC 21-1044-00 C2.02 12 60 PHASE 1 - GRADING PHASE NOTES 1.THIS PLAN IS A LIVING DOCUMENT THAT MAY CHANGE AS WORK PROGRESSES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR UPDATING THESE EROSION CONTROL PLANS AS NEEDED DURING CONSTRUCTION ACTIVITIES TO REFLECT ACTUAL BMPS USED ONSITE, REASONS FOR CHANGES AND ANY DISTURBED AREAS. 2.DURING CONSTRUCTION, TEMPORARY EROSION CONTROL MEASURES SHALL BE IMPLEMENTED AS IMPROVEMENTS ARE INSTALLED, INCLUDING BUT NOT LIMITED TO INLET PROTECTION, SEDIMENT BASINS, BMP MAINTENANCE/PROTECTION AND TEMPORARY SEEDING. 3.THE CONTRACTOR MAY USE SUCH BMPS AS SILT FENCE OR COMPACTED EARTH BERM AS FORMAL CONSTRUCTION MARKER PERIMETER CONTROL AS APPROVED BY THE CITY OF FORT COLLINS EROSION CONTROL INSPECTOR. 4.ALL ONSITE AND OFFSITE DRAINAGE PATTERNS ARE TO BE VERIFIED IN THE FIELD. PROVIDE ALL NECESSARY BMPS TO PROTECT IMMEDIATE DOWNSTREAM INLETS, CULVERTS, DRAINAGE WAYS, ETC. 5.OFFSITE INLET PROTECTIONS SHALL BE COMPLETED BY CURB INLET OR DROP INLET PROTECTION WHETHER BY MEANS OF GRATE FILTERS IN CONJUNCTION WITH CURBSIDE CHECKDAM OR OTHER MEASURES AS APPROVED BY THE CITY OF FORT COLLINS EROSION CONTROL INSPECTOR. 6.ALL PERIMETER CONTROL BMPS SHALL INSTALLED IN PHASE 1. CONTRACTOR SHALL NOT PROCEED WITH CONSTRUCTION ACTIVITIES UNTIL ALL PHASE 1 BMPS ARE INSTALLED, INSPECTED, AND APPROVED BY THE CITY OF FORT COLLINS EROSION CONTROL INSPECTOR. 7.CONTRACTOR SHALL INSTALL AND MAINTAIN AT LEAST ONE VEHICLE TRACKING PAD AND MAY INSTALL ADDITIONAL VEHICLE TRACKING PADS TO ACCOMMODATE CONSTRUCTION PROCESSES IN ACCORDANCE WITH THE STORMWATER MANAGEMENT PLAN. ALL VEHICLE TRACKING PADS MUST BE PRE-APPROVED BY THE CITY OF FORT COLLINS EROSION CONTROL INSPECTOR. DRAINAGE FLOW ARROW LEGEND EX MAJOR CONTOUR EX MINOR CONTOUR PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR CONSTRUCTION ENTRANCE W/ VEHICLE TRACKING CONTROL CONCRETE WASHOUT AREA SILT FENCE INLET PROTECTION OUTLET STRUCTURE PROTECTION ROCK SOCKS SEDIMENT CONTROL LOGS TEMPORARY SEDIMENT BASIN SURFACE ROUGHENING STABILIZED STAGING AREA TURF REINFORCEMENT MAT PERMANENT RIPRAP APRON LIMITS OF DISTURBANCE (APPROX) CONSTRUCTION FENCE CULVERT PROTECTION 0 60' 120603060 SCALE: 1" = N W E S COFC STANDARD EROSION AND SEDIMENT CONTROL NOTES 1.THE CITY STORMWATER DEPARTMENT EROSION CONTROL INSPECTOR MUST BE NOTIFIED AT LEAST 24 HOURS PRIOR TO ANY CONSTRUCTION ON THIS SITE. 2.ALL REQUIRED BMPS MUST BE INSTALLED PRIOR TO ANY LAND DISTURBING ACTIVITY (STOCKPILING, STRIPPING, GRADING, ETC). ALL REQUIRED EROSION CONTROL MEASURES MUST BE INSTALLED AT THE APPROPRIATE TIME IN THE CONSTRUCTION SEQUENCE AS INDICATED IN THE APPROVED PROJECT SCHEDULE, CONSTRUCTION PLANS, AND EROSION CONTROL REPORT. 3.PRE-DISTURBANCE VEGETATION SHALL BE PROTECTED AND RETAINED WHEREVER POSSIBLE. REMOVAL OR DISTURBANCE OF EXISTING VEGETATION SHALL BE LIMITED TO THE AREA REQUIRED FOR IMMEDIATE CONSTRUCTION OPERATIONS, AND FOR THE SHORTEST PRACTICAL PERIOD OF TIME. 4.ALL SOILS EXPOSED DURING LAND DISTURBING ACTIVITY (STRIPPING, GRADING, UTILITY INSTALLATIONS, STOCKPILING, FILLING, ETC.) SHALL BE KEPT IN A ROUGHENED CONDITION BY RIPPING OR DISKING ALONG LAND CONTOURS UNTIL MULCH, VEGETATION, OR OTHER PERMANENT EROSION CONTROL IS INSTALLED. NO SOILS IN AREAS OUTSIDE PROJECT STREET RIGHTS OF WAY SHALL REMAIN EXPOSED BY LAND DISTURBING ACTIVITY FOR MORE THAN THIRTY (30) DAYS BEFORE REQUIRED TEMPORARY OR PERMANENT EROSION CONTROL (E.G. SEED/MULCH, LANDSCAPING, ETC.) IS INSTALLED, UNLESS OTHERWISE APPROVED BY THE STORMWATER DEPARTMENT. 5.THE PROPERTY MUST BE WATERED AND MAINTAINED AT ALL TIMES DURING CONSTRUCTION ACTIVITIES SO AS TO PREVENT WIND-CAUSED EROSION. ALL LAND DISTURBING ACTIVITIES SHALL BE IMMEDIATELY DISCONTINUED WHEN FUGITIVE DUST IMPACTS ADJACENT PROPERTIES, AS DETERMINED BY THE CITY ENGINEERING DEPARTMENT. 6.ALL TEMPORARY (STRUCTURAL) EROSION CONTROL MEASURES MUST BE INSPECTED AND REPAIRED OR RECONSTRUCTED AS NECESSARY AFTER EACH RUNOFF EVENT AND EVERY 14 DAYS IN ORDER TO ASSURE CONTINUED PERFORMANCE OF THEIR INTENDED FUNCTION. ALL RETAINED SEDIMENTS, PARTICULARLY THOSE ON PAVED ROADWAY SURFACES, SHALL BE REMOVED AND DISPOSED OF IN A MANNER AND LOCATION SO AS NOT TO CAUSE THEIR RELEASE INTO ANY DRAINAGEWAY. 7.NO SOIL STOCKPILE SHALL EXCEED TEN (10) FEET IN HEIGHT. ALL SOIL STOCKPILES SHALL BE PROTECTED FROM SEDIMENT TRANSPORT BY SURFACE ROUGHENING, WATERING, AND PERIMETER SILT FENCING. ANY SOIL STOCKPILE REMAINING AFTER 30 DAYS SHALL BE SEEDED AND MULCHED. 8.CITY ORDINANCE PROHIBITS THE TRACKING, DROPPING, OR DEPOSITING OF SOILS OR ANY OTHER MATERIAL ONTO CITY STREETS BY OR FROM ANY VEHICLE. ANY INADVERTENT DEPOSITED MATERIAL SHALL BE CLEANED IMMEDIATELY BY THE CONTRACTOR. EROSION CONTROL NOTES 1.CONTRACTOR TO PROVIDE AND MAINTAIN ALL NECESSARY EROSION CONTROL MEASURES PRIOR TO AND THROUGHOUT CONSTRUCTION. PLACE EROSION CONTROL PROTECTION AT ALL EXISTING INLETS DOWNSTREAM FROM THE CONSTRUCTION AREA. EROSION CONTROL PROTECTION SHALL REMAIN IN PLACE UNTIL CONSTRUCTION IS COMPLETE AND ALL DISTURBED GROUND IS ADEQUATELY VEGETATED WITH APPROVAL FOR REMOVAL. 2.THE EXTENT OF EROSION CONTROL PROTECTION SHALL BE OBSERVED AND ADJUSTED AS NEEDED DURING CONSTRUCTION BASED ON SITE CONDITIONS AND THE PERFORMANCE OF THE EROSION CONTROL MEASURES SHOWN, TO SUPPLY SUFFICIENT EROSION CONTROL AND PREVENT OFFSITE SEDIMENTATION. ADDITIONAL MEASURES AND MEANS NOT SHOWN SHALL ALSO BE IMPLEMENTED AS NEEDED. IT IS THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE APPROPRIATE BMPS DEPICTED AND/OR NOT DEPICTED ON THIS PLAN. 3.CONTRACTOR TO MINIMIZE DISTURBED AREA AT ALL TIMES AND LIMIT DISTURBANCE TO AREAS WITHIN EROSION CONTROL BOUNDARIES. ADJUST EROSION CONTROL BOUNDARIES AS NECESSARY TO ADEQUATELY COMPLETE PROPOSED WORK. AREAS SHALL NOT BE CLEARED UNTIL THEY ARE TO BE CONSTRUCTED UNLESS APPROVED BY THE BY THE CITY OF FORT COLLINS EROSION CONTROL INSPECTOR. 4.ALL DISTURBED AREAS SHALL BE PREPARED (SEEDED & MULCHED, SURFACE ROUGHENING, ETC.) TO MINIMIZE EROSION POTENTIAL AND SOIL MIGRATION. ANY DISTURBED LAND MUST RECEIVE SURFACE ROUGHENING, INCLUDING BUT NOT LIMITED TO SLOPED AREAS. 5.STORMWATER MANAGEMENT PLAN SHALL BE PREPARED AND SUBMITTED BY CONTRACTOR PRIOR TO CONSTRUCTION COMMENCEMENT. 6.SEE LANDSCAPE PLAN FOR REVEGETATION METHODS AND DETAILS. DURING CONSTRUCTION, ANY SOIL DISTURBED AND NOT UNDER ACTIVE CONSTRUCTION SHALL BE SEEDED AND MULCHED PER LCUASS STANDARDS. 7.AREAS THAT EXPERIENCE EROSION ISSUES FROM STEEP SLOPES OR WATER EROSION RESULTING IN SEED NOT BEING ABLE TO ESTABLISH DURING THE FIRST GROWING SEASON SHALL REQUIRE RESEEDING AND EROSION CONTROL BLANKETS TO STABILIZE THE SOIL. SEEDING, MULCHING AND CRIMPING APPROX LIMIT OF DISTURBANCE (TYP) RE V I S I O N NO . BY DA T E HI G H L A N D DE V E L O P M E N T S E R V I C E S 63 5 5 F A I R G R O U N D S A V E N U E , S U I T E 2 0 0 | W I N D S O R , C O 8 0 5 5 0 PH O N E : 9 7 0 . 6 7 4 . 7 5 5 0 | E M A I L : I n f o @ H i g h l a n d - D S . c o m | w w w . H i g h l a n d - D S . c o m PREPARED BY OR UNDER THE DIRECT SUPERVISION OF: FOR AND ON BEHALF OF HIGHLAND DEVELOPMENT SERVICES REVIEW SET NOT FOR CONSTRUCTION OFSHEET DRAWN BY CHECKED BY DATE SCALE (H) HDS PROJECT # SCALE (V) UN I O N P A R K ER O S I O N & S E D I M E N T C O N T R O L P L A N PH A S E 2 - I N F R A S T R U C T U R E 9/9/24 1" = 60' N/A ZMW JTC 21-1044-00 C2.03 13 60 PHASE 2 - INFRASTRUCTURE PHASE NOTES 1.CONTRACTOR SHALL GRADE AND INSTALL SEDIMENT BASINS BEFORE PROCEEDING WITH ANY PHASE 2 INFRASTRUCTURE CONSTRUCTION ACTIVITIES. 2.DURING CONSTRUCTION, TEMPORARY EROSION CONTROL MEASURES SHALL BE IMPLEMENTED AS IMPROVEMENTS ARE INSTALLED, INCLUDING BUT NOT LIMITED TO INLET PROTECTION, SEDIMENT BASINS, BMP MAINTENANCE/PROTECTION, TEMPORARY SEEDING AND MULCHING. 3.ONSITE & OFFSITE INLET PROTECTIONS SHALL BE COMPLETED PROTECTED BY CURB INLET OR DROP INLET PROTECTION WHETHER BY MEANS OF GRATE FILTERS IN CONJUNCTION WITH CURBSIDE CHECKDAM OR OTHER MEASURES AS APPROVED BY THE CITY OF FORT COLLINS EROSION CONTROL INSPECTOR. 4.INFILTRATION GALLERIES TO BE CONSTRUCTED CONCURRENT WITH STORM SYSTEM INFRASTRUCTURE. CONSTRUCT TEMPORARY SEDIMENT BASIN AROUND OUTLET STRUCTURE. SEDIMENT SHALL BE REMOVED FROM INFILTRATION GALLERY ONCE SITE IS STABILIZED. 5.RAIN GARDENS TO BE INSTALLED AT THE CONCLUSION OF CONSTRUCTION ACTIVITIES AND CONCURRENT WITH LANDSCAPE INSTALLATION. PLACE NECESSARY EROSION CONTROL PROTECTION TO MINIMIZE RISK OF NATIVE SOILS MIGRATING TO THE RAIN GARDEN GROWING MEDIA. THE RAIN GARDEN GRADING MAY BE UTILIZED AS A SEDIMENT TRAP PRIOR TO THE INSTALLATION OF THE DRAINAGE COURSE AND GROWING MEDIA. 6.CONTRACTOR SHALL INSTALL AND MAINTAIN AT LEAST ONE VEHICLE TRACKING PAD AND MAY INSTALL ADDITIONAL VEHICLE TRACKING PADS TO ACCOMMODATE CONSTRUCTION PROCESSES IN ACCORDANCE WITH THE STORMWATER MANAGEMENT PLAN. ALL VEHICLE TRACKING PADS MUST BE PRE-APPROVED BY THE BY THE CITY OF FORT COLLINS EROSION CONTROL INSPECTOR. DRAINAGE FLOW ARROW LEGEND EX MAJOR CONTOUR EX MINOR CONTOUR PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR CONSTRUCTION ENTRANCE W/ VEHICLE TRACKING CONTROL CONCRETE WASHOUT AREA SILT FENCE INLET PROTECTION OUTLET STRUCTURE PROTECTION ROCK SOCKS SEDIMENT CONTROL LOGS TEMPORARY SEDIMENT BASIN SURFACE ROUGHENING STABILIZED STAGING AREA TURF REINFORCEMENT MAT PERMANENT RIPRAP APRON LIMITS OF DISTURBANCE (APPROX) CONSTRUCTION FENCE CULVERT PROTECTION 0 60' 120603060 SCALE: 1" = N W E S COFC STANDARD EROSION AND SEDIMENT CONTROL NOTES 1.THE CITY STORMWATER DEPARTMENT EROSION CONTROL INSPECTOR MUST BE NOTIFIED AT LEAST 24 HOURS PRIOR TO ANY CONSTRUCTION ON THIS SITE. 2.ALL REQUIRED BMPS MUST BE INSTALLED PRIOR TO ANY LAND DISTURBING ACTIVITY (STOCKPILING, STRIPPING, GRADING, ETC). ALL REQUIRED EROSION CONTROL MEASURES MUST BE INSTALLED AT THE APPROPRIATE TIME IN THE CONSTRUCTION SEQUENCE AS INDICATED IN THE APPROVED PROJECT SCHEDULE, CONSTRUCTION PLANS, AND EROSION CONTROL REPORT. 3.PRE-DISTURBANCE VEGETATION SHALL BE PROTECTED AND RETAINED WHEREVER POSSIBLE. REMOVAL OR DISTURBANCE OF EXISTING VEGETATION SHALL BE LIMITED TO THE AREA REQUIRED FOR IMMEDIATE CONSTRUCTION OPERATIONS, AND FOR THE SHORTEST PRACTICAL PERIOD OF TIME. 4.ALL SOILS EXPOSED DURING LAND DISTURBING ACTIVITY (STRIPPING, GRADING, UTILITY INSTALLATIONS, STOCKPILING, FILLING, ETC.) SHALL BE KEPT IN A ROUGHENED CONDITION BY RIPPING OR DISKING ALONG LAND CONTOURS UNTIL MULCH, VEGETATION, OR OTHER PERMANENT EROSION CONTROL IS INSTALLED. NO SOILS IN AREAS OUTSIDE PROJECT STREET RIGHTS OF WAY SHALL REMAIN EXPOSED BY LAND DISTURBING ACTIVITY FOR MORE THAN THIRTY (30) DAYS BEFORE REQUIRED TEMPORARY OR PERMANENT EROSION CONTROL (E.G. SEED/MULCH, LANDSCAPING, ETC.) IS INSTALLED, UNLESS OTHERWISE APPROVED BY THE STORMWATER DEPARTMENT. 5.THE PROPERTY MUST BE WATERED AND MAINTAINED AT ALL TIMES DURING CONSTRUCTION ACTIVITIES SO AS TO PREVENT WIND-CAUSED EROSION. ALL LAND DISTURBING ACTIVITIES SHALL BE IMMEDIATELY DISCONTINUED WHEN FUGITIVE DUST IMPACTS ADJACENT PROPERTIES, AS DETERMINED BY THE CITY ENGINEERING DEPARTMENT. 6.ALL TEMPORARY (STRUCTURAL) EROSION CONTROL MEASURES MUST BE INSPECTED AND REPAIRED OR RECONSTRUCTED AS NECESSARY AFTER EACH RUNOFF EVENT AND EVERY 14 DAYS IN ORDER TO ASSURE CONTINUED PERFORMANCE OF THEIR INTENDED FUNCTION. ALL RETAINED SEDIMENTS, PARTICULARLY THOSE ON PAVED ROADWAY SURFACES, SHALL BE REMOVED AND DISPOSED OF IN A MANNER AND LOCATION SO AS NOT TO CAUSE THEIR RELEASE INTO ANY DRAINAGEWAY. 7.NO SOIL STOCKPILE SHALL EXCEED TEN (10) FEET IN HEIGHT. ALL SOIL STOCKPILES SHALL BE PROTECTED FROM SEDIMENT TRANSPORT BY SURFACE ROUGHENING, WATERING, AND PERIMETER SILT FENCING. ANY SOIL STOCKPILE REMAINING AFTER 30 DAYS SHALL BE SEEDED AND MULCHED. 8.CITY ORDINANCE PROHIBITS THE TRACKING, DROPPING, OR DEPOSITING OF SOILS OR ANY OTHER MATERIAL ONTO CITY STREETS BY OR FROM ANY VEHICLE. ANY INADVERTENT DEPOSITED MATERIAL SHALL BE CLEANED IMMEDIATELY BY THE CONTRACTOR. EROSION CONTROL NOTES 1.CONTRACTOR TO PROVIDE AND MAINTAIN ALL NECESSARY EROSION CONTROL MEASURES PRIOR TO AND THROUGHOUT CONSTRUCTION. PLACE EROSION CONTROL PROTECTION AT ALL EXISTING INLETS DOWNSTREAM FROM THE CONSTRUCTION AREA. EROSION CONTROL PROTECTION SHALL REMAIN IN PLACE UNTIL CONSTRUCTION IS COMPLETE AND ALL DISTURBED GROUND IS ADEQUATELY VEGETATED WITH APPROVAL FOR REMOVAL. 2.THE EXTENT OF EROSION CONTROL PROTECTION SHALL BE OBSERVED AND ADJUSTED AS NEEDED DURING CONSTRUCTION BASED ON SITE CONDITIONS AND THE PERFORMANCE OF THE EROSION CONTROL MEASURES SHOWN, TO SUPPLY SUFFICIENT EROSION CONTROL AND PREVENT OFFSITE SEDIMENTATION. ADDITIONAL MEASURES AND MEANS NOT SHOWN SHALL ALSO BE IMPLEMENTED AS NEEDED. IT IS THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE APPROPRIATE BMPS DEPICTED AND/OR NOT DEPICTED ON THIS PLAN. 3.CONTRACTOR TO MINIMIZE DISTURBED AREA AT ALL TIMES AND LIMIT DISTURBANCE TO AREAS WITHIN EROSION CONTROL BOUNDARIES. ADJUST EROSION CONTROL BOUNDARIES AS NECESSARY TO ADEQUATELY COMPLETE PROPOSED WORK. AREAS SHALL NOT BE CLEARED UNTIL THEY ARE TO BE CONSTRUCTED UNLESS APPROVED BY THE BY THE CITY OF FORT COLLINS EROSION CONTROL INSPECTOR. 4.ALL DISTURBED AREAS SHALL BE PREPARED (SEEDED & MULCHED, SURFACE ROUGHENING, ETC.) TO MINIMIZE EROSION POTENTIAL AND SOIL MIGRATION. ANY DISTURBED LAND MUST RECEIVE SURFACE ROUGHENING, INCLUDING BUT NOT LIMITED TO SLOPED AREAS. 5.STORMWATER MANAGEMENT PLAN SHALL BE PREPARED AND SUBMITTED BY CONTRACTOR PRIOR TO CONSTRUCTION COMMENCEMENT. 6.SEE LANDSCAPE PLAN FOR REVEGETATION METHODS AND DETAILS. DURING CONSTRUCTION, ANY SOIL DISTURBED AND NOT UNDER ACTIVE CONSTRUCTION SHALL BE SEEDED AND MULCHED PER LCUASS STANDARDS. 7.AREAS THAT EXPERIENCE EROSION ISSUES FROM STEEP SLOPES OR WATER EROSION RESULTING IN SEED NOT BEING ABLE TO ESTABLISH DURING THE FIRST GROWING SEASON SHALL REQUIRE RESEEDING AND EROSION CONTROL BLANKETS TO STABILIZE THE SOIL. SEEDING, MULCHING AND CRIMPING DS DSDS DS DS DS DS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DS DS DS DS DS DSDS DS DS DS DS DS DS DS DS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS UPUP DS DSDS DS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS UPUP DS DSDS DS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DS DSDSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DS DS DS DS DS DS DS DS DS DS DS UPUP DS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DS DS DSDSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DS DS DS DS DS DS DS DS DS DS DS UPUP DS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS UPUP DS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DS DS DS DSDS DS DS DS DS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DS DS DS DS D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D NDYLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYSD NDYLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS DDONOTPOLLUTE RAINSTOWATERWAYS DUCTILEIRONNYLOPLAST NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE DDONOTPOLLUTE RAINSTOWATERWAYS DUCTILEIRONNYLOPLAST DDONOTPOLLUTE RAINSTOWATERWAYS DUCTILEIRONNYLOPLAST DDONOTPOLLUTE RAINSTOWATERWAYS DUCTILEIRONNYLOPLAST DDONOTPOLLUTE RAINSTOWATERWAYS DUCTILEIRONNYLOPLAST NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D NDYLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D ND YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYSD N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D NDYLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D NDYLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D NDYLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D NDYLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D NDYLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D NDYLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D NDYLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D ND YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D NDYLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D NDYLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D ND YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D NDYLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D NDYLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D NDYLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D NDYLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D NDYLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D ND YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D NDYLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D NDYLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D ND YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D NDYLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D NDYLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYSD N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D NDYLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYSD N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE DO NOT POLLUTEDRAINS TO WATERWAYS NYLOPLASTDUCTILE IRON D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE APPROX LIMIT OF DISTURBANCE (TYP) RE V I S I O N NO . BY DA T E HI G H L A N D DE V E L O P M E N T S E R V I C E S 63 5 5 F A I R G R O U N D S A V E N U E , S U I T E 2 0 0 | W I N D S O R , C O 8 0 5 5 0 PH O N E : 9 7 0 . 6 7 4 . 7 5 5 0 | E M A I L : I n f o @ H i g h l a n d - D S . c o m | w w w . H i g h l a n d - D S . c o m PREPARED BY OR UNDER THE DIRECT SUPERVISION OF: FOR AND ON BEHALF OF HIGHLAND DEVELOPMENT SERVICES REVIEW SET NOT FOR CONSTRUCTION OFSHEET DRAWN BY CHECKED BY DATE SCALE (H) HDS PROJECT # SCALE (V) UN I O N P A R K ER O S I O N & S E D I M E N T C O N T R O L P L A N PH A S E 3 - V E R T I C A L C O N S T R U C T I O N 9/9/24 1" = 60' N/A ZMW JTC 21-1044-00 C2.04 14 60 DRAINAGE FLOW ARROW LEGEND EX MAJOR CONTOUR EX MINOR CONTOUR PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR CONSTRUCTION ENTRANCE W/ VEHICLE TRACKING CONTROL CONCRETE WASHOUT AREA SILT FENCE INLET PROTECTION OUTLET STRUCTURE PROTECTION ROCK SOCKS SEDIMENT CONTROL LOGS TEMPORARY SEDIMENT BASIN SURFACE ROUGHENING STABILIZED STAGING AREA TURF REINFORCEMENT MAT PERMANENT RIPRAP APRON LIMITS OF DISTURBANCE (APPROX) CONSTRUCTION FENCE CULVERT PROTECTION 0 60' 120603060 SCALE: 1" = N W E S COFC STANDARD EROSION AND SEDIMENT CONTROL NOTES 1.THE CITY STORMWATER DEPARTMENT EROSION CONTROL INSPECTOR MUST BE NOTIFIED AT LEAST 24 HOURS PRIOR TO ANY CONSTRUCTION ON THIS SITE. 2.ALL REQUIRED BMPS MUST BE INSTALLED PRIOR TO ANY LAND DISTURBING ACTIVITY (STOCKPILING, STRIPPING, GRADING, ETC). ALL REQUIRED EROSION CONTROL MEASURES MUST BE INSTALLED AT THE APPROPRIATE TIME IN THE CONSTRUCTION SEQUENCE AS INDICATED IN THE APPROVED PROJECT SCHEDULE, CONSTRUCTION PLANS, AND EROSION CONTROL REPORT. 3.PRE-DISTURBANCE VEGETATION SHALL BE PROTECTED AND RETAINED WHEREVER POSSIBLE. REMOVAL OR DISTURBANCE OF EXISTING VEGETATION SHALL BE LIMITED TO THE AREA REQUIRED FOR IMMEDIATE CONSTRUCTION OPERATIONS, AND FOR THE SHORTEST PRACTICAL PERIOD OF TIME. 4.ALL SOILS EXPOSED DURING LAND DISTURBING ACTIVITY (STRIPPING, GRADING, UTILITY INSTALLATIONS, STOCKPILING, FILLING, ETC.) SHALL BE KEPT IN A ROUGHENED CONDITION BY RIPPING OR DISKING ALONG LAND CONTOURS UNTIL MULCH, VEGETATION, OR OTHER PERMANENT EROSION CONTROL IS INSTALLED. NO SOILS IN AREAS OUTSIDE PROJECT STREET RIGHTS OF WAY SHALL REMAIN EXPOSED BY LAND DISTURBING ACTIVITY FOR MORE THAN THIRTY (30) DAYS BEFORE REQUIRED TEMPORARY OR PERMANENT EROSION CONTROL (E.G. SEED/MULCH, LANDSCAPING, ETC.) IS INSTALLED, UNLESS OTHERWISE APPROVED BY THE STORMWATER DEPARTMENT. 5.THE PROPERTY MUST BE WATERED AND MAINTAINED AT ALL TIMES DURING CONSTRUCTION ACTIVITIES SO AS TO PREVENT WIND-CAUSED EROSION. ALL LAND DISTURBING ACTIVITIES SHALL BE IMMEDIATELY DISCONTINUED WHEN FUGITIVE DUST IMPACTS ADJACENT PROPERTIES, AS DETERMINED BY THE CITY ENGINEERING DEPARTMENT. 6.ALL TEMPORARY (STRUCTURAL) EROSION CONTROL MEASURES MUST BE INSPECTED AND REPAIRED OR RECONSTRUCTED AS NECESSARY AFTER EACH RUNOFF EVENT AND EVERY 14 DAYS IN ORDER TO ASSURE CONTINUED PERFORMANCE OF THEIR INTENDED FUNCTION. ALL RETAINED SEDIMENTS, PARTICULARLY THOSE ON PAVED ROADWAY SURFACES, SHALL BE REMOVED AND DISPOSED OF IN A MANNER AND LOCATION SO AS NOT TO CAUSE THEIR RELEASE INTO ANY DRAINAGEWAY. 7.NO SOIL STOCKPILE SHALL EXCEED TEN (10) FEET IN HEIGHT. ALL SOIL STOCKPILES SHALL BE PROTECTED FROM SEDIMENT TRANSPORT BY SURFACE ROUGHENING, WATERING, AND PERIMETER SILT FENCING. ANY SOIL STOCKPILE REMAINING AFTER 30 DAYS SHALL BE SEEDED AND MULCHED. 8.CITY ORDINANCE PROHIBITS THE TRACKING, DROPPING, OR DEPOSITING OF SOILS OR ANY OTHER MATERIAL ONTO CITY STREETS BY OR FROM ANY VEHICLE. ANY INADVERTENT DEPOSITED MATERIAL SHALL BE CLEANED IMMEDIATELY BY THE CONTRACTOR. EROSION CONTROL NOTES 1.CONTRACTOR TO PROVIDE AND MAINTAIN ALL NECESSARY EROSION CONTROL MEASURES PRIOR TO AND THROUGHOUT CONSTRUCTION. PLACE EROSION CONTROL PROTECTION AT ALL EXISTING INLETS DOWNSTREAM FROM THE CONSTRUCTION AREA. EROSION CONTROL PROTECTION SHALL REMAIN IN PLACE UNTIL CONSTRUCTION IS COMPLETE AND ALL DISTURBED GROUND IS ADEQUATELY VEGETATED WITH APPROVAL FOR REMOVAL. 2.THE EXTENT OF EROSION CONTROL PROTECTION SHALL BE OBSERVED AND ADJUSTED AS NEEDED DURING CONSTRUCTION BASED ON SITE CONDITIONS AND THE PERFORMANCE OF THE EROSION CONTROL MEASURES SHOWN, TO SUPPLY SUFFICIENT EROSION CONTROL AND PREVENT OFFSITE SEDIMENTATION. ADDITIONAL MEASURES AND MEANS NOT SHOWN SHALL ALSO BE IMPLEMENTED AS NEEDED. IT IS THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE APPROPRIATE BMPS DEPICTED AND/OR NOT DEPICTED ON THIS PLAN. 3.CONTRACTOR TO MINIMIZE DISTURBED AREA AT ALL TIMES AND LIMIT DISTURBANCE TO AREAS WITHIN EROSION CONTROL BOUNDARIES. ADJUST EROSION CONTROL BOUNDARIES AS NECESSARY TO ADEQUATELY COMPLETE PROPOSED WORK. AREAS SHALL NOT BE CLEARED UNTIL THEY ARE TO BE CONSTRUCTED UNLESS APPROVED BY THE BY THE CITY OF FORT COLLINS EROSION CONTROL INSPECTOR. 4.ALL DISTURBED AREAS SHALL BE PREPARED (SEEDED & MULCHED, SURFACE ROUGHENING, ETC.) TO MINIMIZE EROSION POTENTIAL AND SOIL MIGRATION. ANY DISTURBED LAND MUST RECEIVE SURFACE ROUGHENING, INCLUDING BUT NOT LIMITED TO SLOPED AREAS. 5.STORMWATER MANAGEMENT PLAN SHALL BE PREPARED AND SUBMITTED BY CONTRACTOR PRIOR TO CONSTRUCTION COMMENCEMENT. 6.SEE LANDSCAPE PLAN FOR REVEGETATION METHODS AND DETAILS. DURING CONSTRUCTION, ANY SOIL DISTURBED AND NOT UNDER ACTIVE CONSTRUCTION SHALL BE SEEDED AND MULCHED PER LCUASS STANDARDS. 7.AREAS THAT EXPERIENCE EROSION ISSUES FROM STEEP SLOPES OR WATER EROSION RESULTING IN SEED NOT BEING ABLE TO ESTABLISH DURING THE FIRST GROWING SEASON SHALL REQUIRE RESEEDING AND EROSION CONTROL BLANKETS TO STABILIZE THE SOIL. PHASE 3 - VERTICAL CONSTRUCTION PHASE NOTES 1.DURING CONSTRUCTION, TEMPORARY EROSION CONTROL MEASURES SHALL BE IMPLEMENTED AS IMPROVEMENTS ARE INSTALLED, INCLUDING BUT NOT LIMITED TO INLET PROTECTION, SEDIMENT BASINS, PROTECTION, AND TEMPORARY SEEDING. 2.ANY COMMISSIONED STORM SEWER SYSTEM SHALL INLET AND OUTLET PROTECTION INSTALLED FOR ALL PHASE 3 OPERATIONS. 3.INLET PROTECTION SHALL BE COMPLETED BY CURB INLET OR DROP INLET PROTECTION WHETHER BY MEANS OF GRATE FILTERS IN CONJUNCTION WITH CURBSIDE CHECKDAM OR OTHER MEASURES AS APPROVED BY THE CITY OF FORT COLLINS EROSION CONTROL INSPECTOR. 4.CONTRACTOR MAY PLACE PERIMETER SEDIMENT CONTROL LOG IN PLACE OF PERMANENT SEEDING IN BLOCKS THAT ANTICIPATE CONSTRUCTION. 5.PERMANENT SEEDING MAY BE REPLACED WITH PERMANENT PROPOSED LANDSCAPING AS APPROVED BY THE CITY OF FORT COLLINS EROSION CONTROL INSPECTOR. SEEDING, MULCHING AND CRIMPING DS DSDS DS DS DS DS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DS DS DS DS DS DSDS DS DS DS DS DS DS DS DS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS UPUP DS DSDS DS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS UPUP DS DSDS DS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DS DSDSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DS DS DS DS DS DS DS DS DS DS DS UPUP DS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DS DS DSDSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DS DS DS DS DS DS DS DS DS DS DS UPUP DS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS UPUP DS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DS DS DS DSDS DS DS DS DS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DS DS DS DS D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D NDYLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYSD NDYLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS DDONOTPOLLUTE RAINSTOWATERWAYS DUCTILEIRONNYLOPLAST NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE DDONOTPOLLUTE RAINSTOWATERWAYS DUCTILEIRONNYLOPLAST DDONOTPOLLUTE RAINSTOWATERWAYS DUCTILEIRONNYLOPLAST DDONOTPOLLUTE RAINSTOWATERWAYS DUCTILEIRONNYLOPLAST DDONOTPOLLUTE RAINSTOWATERWAYS DUCTILEIRONNYLOPLAST NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D NDYLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D ND YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYSD N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D NDYLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D NDYLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D NDYLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D NDYLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D NDYLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D NDYLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D NDYLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D ND YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D NDYLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D NDYLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D ND YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D NDYLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D NDYLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D NDYLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D NDYLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D NDYLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D ND YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D NDYLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D NDYLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D ND YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D NDYLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D NDYLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYSD N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D NDYLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYSD N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE DO NOT POLLUTEDRAINS TO WATERWAYS NYLOPLASTDUCTILE IRON D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE APPROX LIMIT OF DISTURBANCE (TYP) RE V I S I O N NO . BY DA T E HI G H L A N D DE V E L O P M E N T S E R V I C E S 63 5 5 F A I R G R O U N D S A V E N U E , S U I T E 2 0 0 | W I N D S O R , C O 8 0 5 5 0 PH O N E : 9 7 0 . 6 7 4 . 7 5 5 0 | E M A I L : I n f o @ H i g h l a n d - D S . c o m | w w w . H i g h l a n d - D S . c o m PREPARED BY OR UNDER THE DIRECT SUPERVISION OF: FOR AND ON BEHALF OF HIGHLAND DEVELOPMENT SERVICES REVIEW SET NOT FOR CONSTRUCTION OFSHEET DRAWN BY CHECKED BY DATE SCALE (H) HDS PROJECT # SCALE (V) UN I O N P A R K ER O S I O N & S E D I M E N T C O N T R O L P L A N PH A S E 4 - P E R M A N E N T B M P & F I N A L S T A B I L I Z A T I O N 9/9/24 1" = 60' N/A ZMW JTC 21-1044-00 C2.05 15 60 PHASE 4 - PERMANENT BMP AND FINAL STABILIZATION NOTES 1.LOTS AND BLOCKS ANTICIPATING CONSTRUCTION MAY UTILIZE SLOPE PROTECTION IN LIEU OF TEMPORARY SEEDING AND MULCHING AS APPROVED BY THE CITY OF FORT COLLINS EROSION CONTROL INSPECTOR. 2.INLET PROTECTIONS SHALL BE COMPLETED BY CURB INLET OR DROP INLET PROTECTION WHETHER BY MEANS OF GRATE FILTERS IN CONJUNCTION WITH CURBSIDE CHECKDAM OR OTHER MEASURES AS APPROVED BY THE CITY OF FORT COLLINS EROSION CONTROL INSPECTOR. 3.CONTRACTOR SHALL REMOVE ALL TEMPORARY BMPS PRIOR TO FINAL DEMOBILIZATION OR AS DIRECTED BY THE CITY OF FORT COLLINS EROSION CONTROL INSPECTOR. 4.CONTRACTOR MAY PLACE PERIMETER SEDIMENT CONTROL LOG IN PLACE OF PERMANENT SEEDING IN BLOCKS THAT ANTICIPATE CONSTRUCTION. 5.PERMANENT SEEDING MAY BE REPLACED WITH PERMANENT PROPOSED LANDSCAPING AS APPROVED BY THE CITY OF FORT COLLINS EROSION CONTROL INSPECTOR. 6.CONTRACTOR TO INSTALL PROPOSED PERMANENT OUTLET PROTECTION WHEN FINALIZING STORM SEWER CONSTRUCTION WHICH MAY HAVE OCCURRED IN EARLIER PHASES. 7.CONTRACTOR TO CLEAN AND LEGALLY DISPOSE OF ALL SEDIMENT COLLECTED ONSITE DURING CONSTRUCTION PRIOR TO FINAL ACCEPTANCE. DRAINAGE FLOW ARROW LEGEND EX MAJOR CONTOUR EX MINOR CONTOUR PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR CONSTRUCTION ENTRANCE W/ VEHICLE TRACKING CONTROL CONCRETE WASHOUT AREA SILT FENCE INLET PROTECTION OUTLET STRUCTURE PROTECTION ROCK SOCKS SEDIMENT CONTROL LOGS TEMPORARY SEDIMENT BASIN SURFACE ROUGHENING STABILIZED STAGING AREA TURF REINFORCEMENT MAT PERMANENT RIPRAP APRON LIMITS OF DISTURBANCE (APPROX) CONSTRUCTION FENCE CULVERT PROTECTION 0 60' 120603060 SCALE: 1" = N W E S COFC STANDARD EROSION AND SEDIMENT CONTROL NOTES 1.THE CITY STORMWATER DEPARTMENT EROSION CONTROL INSPECTOR MUST BE NOTIFIED AT LEAST 24 HOURS PRIOR TO ANY CONSTRUCTION ON THIS SITE. 2.ALL REQUIRED BMPS MUST BE INSTALLED PRIOR TO ANY LAND DISTURBING ACTIVITY (STOCKPILING, STRIPPING, GRADING, ETC). ALL REQUIRED EROSION CONTROL MEASURES MUST BE INSTALLED AT THE APPROPRIATE TIME IN THE CONSTRUCTION SEQUENCE AS INDICATED IN THE APPROVED PROJECT SCHEDULE, CONSTRUCTION PLANS, AND EROSION CONTROL REPORT. 3.PRE-DISTURBANCE VEGETATION SHALL BE PROTECTED AND RETAINED WHEREVER POSSIBLE. REMOVAL OR DISTURBANCE OF EXISTING VEGETATION SHALL BE LIMITED TO THE AREA REQUIRED FOR IMMEDIATE CONSTRUCTION OPERATIONS, AND FOR THE SHORTEST PRACTICAL PERIOD OF TIME. 4.ALL SOILS EXPOSED DURING LAND DISTURBING ACTIVITY (STRIPPING, GRADING, UTILITY INSTALLATIONS, STOCKPILING, FILLING, ETC.) SHALL BE KEPT IN A ROUGHENED CONDITION BY RIPPING OR DISKING ALONG LAND CONTOURS UNTIL MULCH, VEGETATION, OR OTHER PERMANENT EROSION CONTROL IS INSTALLED. NO SOILS IN AREAS OUTSIDE PROJECT STREET RIGHTS OF WAY SHALL REMAIN EXPOSED BY LAND DISTURBING ACTIVITY FOR MORE THAN THIRTY (30) DAYS BEFORE REQUIRED TEMPORARY OR PERMANENT EROSION CONTROL (E.G. SEED/MULCH, LANDSCAPING, ETC.) IS INSTALLED, UNLESS OTHERWISE APPROVED BY THE STORMWATER DEPARTMENT. 5.THE PROPERTY MUST BE WATERED AND MAINTAINED AT ALL TIMES DURING CONSTRUCTION ACTIVITIES SO AS TO PREVENT WIND-CAUSED EROSION. ALL LAND DISTURBING ACTIVITIES SHALL BE IMMEDIATELY DISCONTINUED WHEN FUGITIVE DUST IMPACTS ADJACENT PROPERTIES, AS DETERMINED BY THE CITY ENGINEERING DEPARTMENT. 6.ALL TEMPORARY (STRUCTURAL) EROSION CONTROL MEASURES MUST BE INSPECTED AND REPAIRED OR RECONSTRUCTED AS NECESSARY AFTER EACH RUNOFF EVENT AND EVERY 14 DAYS IN ORDER TO ASSURE CONTINUED PERFORMANCE OF THEIR INTENDED FUNCTION. ALL RETAINED SEDIMENTS, PARTICULARLY THOSE ON PAVED ROADWAY SURFACES, SHALL BE REMOVED AND DISPOSED OF IN A MANNER AND LOCATION SO AS NOT TO CAUSE THEIR RELEASE INTO ANY DRAINAGEWAY. 7.NO SOIL STOCKPILE SHALL EXCEED TEN (10) FEET IN HEIGHT. ALL SOIL STOCKPILES SHALL BE PROTECTED FROM SEDIMENT TRANSPORT BY SURFACE ROUGHENING, WATERING, AND PERIMETER SILT FENCING. ANY SOIL STOCKPILE REMAINING AFTER 30 DAYS SHALL BE SEEDED AND MULCHED. 8.CITY ORDINANCE PROHIBITS THE TRACKING, DROPPING, OR DEPOSITING OF SOILS OR ANY OTHER MATERIAL ONTO CITY STREETS BY OR FROM ANY VEHICLE. ANY INADVERTENT DEPOSITED MATERIAL SHALL BE CLEANED IMMEDIATELY BY THE CONTRACTOR. EROSION CONTROL NOTES 1.CONTRACTOR TO PROVIDE AND MAINTAIN ALL NECESSARY EROSION CONTROL MEASURES PRIOR TO AND THROUGHOUT CONSTRUCTION. PLACE EROSION CONTROL PROTECTION AT ALL EXISTING INLETS DOWNSTREAM FROM THE CONSTRUCTION AREA. EROSION CONTROL PROTECTION SHALL REMAIN IN PLACE UNTIL CONSTRUCTION IS COMPLETE AND ALL DISTURBED GROUND IS ADEQUATELY VEGETATED WITH APPROVAL FOR REMOVAL. 2.THE EXTENT OF EROSION CONTROL PROTECTION SHALL BE OBSERVED AND ADJUSTED AS NEEDED DURING CONSTRUCTION BASED ON SITE CONDITIONS AND THE PERFORMANCE OF THE EROSION CONTROL MEASURES SHOWN, TO SUPPLY SUFFICIENT EROSION CONTROL AND PREVENT OFFSITE SEDIMENTATION. ADDITIONAL MEASURES AND MEANS NOT SHOWN SHALL ALSO BE IMPLEMENTED AS NEEDED. IT IS THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE APPROPRIATE BMPS DEPICTED AND/OR NOT DEPICTED ON THIS PLAN. 3.CONTRACTOR TO MINIMIZE DISTURBED AREA AT ALL TIMES AND LIMIT DISTURBANCE TO AREAS WITHIN EROSION CONTROL BOUNDARIES. ADJUST EROSION CONTROL BOUNDARIES AS NECESSARY TO ADEQUATELY COMPLETE PROPOSED WORK. AREAS SHALL NOT BE CLEARED UNTIL THEY ARE TO BE CONSTRUCTED UNLESS APPROVED BY THE BY THE CITY OF FORT COLLINS EROSION CONTROL INSPECTOR. 4.ALL DISTURBED AREAS SHALL BE PREPARED (SEEDED & MULCHED, SURFACE ROUGHENING, ETC.) TO MINIMIZE EROSION POTENTIAL AND SOIL MIGRATION. ANY DISTURBED LAND MUST RECEIVE SURFACE ROUGHENING, INCLUDING BUT NOT LIMITED TO SLOPED AREAS. 5.STORMWATER MANAGEMENT PLAN SHALL BE PREPARED AND SUBMITTED BY CONTRACTOR PRIOR TO CONSTRUCTION COMMENCEMENT. 6.SEE LANDSCAPE PLAN FOR REVEGETATION METHODS AND DETAILS. DURING CONSTRUCTION, ANY SOIL DISTURBED AND NOT UNDER ACTIVE CONSTRUCTION SHALL BE SEEDED AND MULCHED PER LCUASS STANDARDS. 7.AREAS THAT EXPERIENCE EROSION ISSUES FROM STEEP SLOPES OR WATER EROSION RESULTING IN SEED NOT BEING ABLE TO ESTABLISH DURING THE FIRST GROWING SEASON SHALL REQUIRE RESEEDING AND EROSION CONTROL BLANKETS TO STABILIZE THE SOIL. SEEDING, MULCHING AND CRIMPING D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE DUCTILEIRON NYLOPLAST TE NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE DUCTILEIRON NYLOPL D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE BLOCK 1 BLOCK 6 BLOCK 7 BLOCK 12 KINGSLEY COURT NEWBURG COURT LOT 2 MA T C H L I N E SE E S H E E T 17 MATCHLINE SEE SHEET 20 LOT 3 LOT 4 LOT 5LOT 1 LOT 1 LOT 1 LOT 1 LOT 2 LOT 2 LOT 2 LOT 3 LOT 3 LOT 3 LOT 4 LOT 4 LOT 4 LOT 5 LOT 5 LOT 5 TRACT A D,U&AE(PU) 1 2 3 4 5 RE V I S I O N NO . BY DA T E HI G H L A N D DE V E L O P M E N T S E R V I C E S 63 5 5 F A I R G R O U N D S A V E N U E , S U I T E 2 0 0 | W I N D S O R , C O 8 0 5 5 0 PH O N E : 9 7 0 . 6 7 4 . 7 5 5 0 | E M A I L : I n f o @ H i g h l a n d - D S . c o m | w w w . H i g h l a n d - D S . c o m PREPARED BY OR UNDER THE DIRECT SUPERVISION OF: FOR AND ON BEHALF OF HIGHLAND DEVELOPMENT SERVICES REVIEW SET NOT FOR CONSTRUCTION OFSHEET DRAWN BY CHECKED BY DATE SCALE (H) HDS PROJECT # SCALE (V) UN I O N P A R K DE T A I L E D G R A D I N G P L A N 9/9/24 1" = 20' N/A ZMW JTC 21-1044-00 C2.06 16 60 N W E S KEY MAP NTS ZI E G L E R R O A D CO R B E T T D R PADDINGTON RD UNION PARK AVEED M O N D S R D CALL UTILITY NOTIFICATION CENTER OF COLORADO CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. before you dig.Call Know what's below. R 0 SCALE: 1" = 20' 40201020 N W E S NOTES: 1.THE TOP OF FOUNDATION ELEVATIONS SHOWN ARE THE MINIMUM ELEVATIONS REQUIRED FOR PROTECTION FROM THE 100 YEAR STORM. THE LOWEST OPENING ELEVATIONS SHOWN ARE AT LEAST ONE FOOT ABOVE THE 100 YEAR STORM ELEVATION OF ADJACENT STREETS, CHANNELS, DITCHES, SWALES, OR OTHER DRAINAGE FACILITIES. MINIMUM FINISHED FLOOR ELEVATIONS ABOVE 100-YEAR WATER SURFACE IN STREETS, CHANNELS, DITCHES, SWALES, OR OTHER DRAINAGE FACILITIES, AS ILLUSTRATED BY A FINAL GRADING PLAN ARE TO BE SHOWN. 2.CONTRACTOR TO PROVIDE AND MAINTAIN ALL NECESSARY EROSION CONTROL MEASURES PRIOR TO AND THROUGHOUT CONSTRUCTION. 3.SPOT ELEVATIONS SHOWN ARE ON FLOWLINE OR BACK OF WALK UNLESS OTHERWISE LABELED. 4.THE FINISHED GRADE (FG) ADJACENT TO BUILDING FOUNDATION IS A MINIMUM OF 6" BELOW THE TOP OF FOUNDATION (TF). TF IS EQUAL TO THE BUILDING FINISHED FLOOR ELEVATION (FFE) AND/OR TOP OF SLAB (TS) ELEVATION. 5.WALKWAYS SLOPE 2.0% AWAY FROM BUILDINGS AND/OR TOWARD PARKING/DRIVE AREAS. WALK LABELS ARE SHOWN ON THE HIGH SIDE OF THE WALK. 6.ALL SUBGRADE TO BE PLACED/COMPACTED PER GEOTECHNICAL ENGINEER RECOMMENDATIONS. 7.ANY RETAINING WALL EXCEEDING 30" RETAINING HEIGHT ARE REQUIRED TO GET A SEPARATE PERMIT FROM THE CITY OF FT. COLLINS BUILDING DIVISION. 8.ADA RAMPS & CURB RAMPS SHALL NOT EXCEED 8.33% (12H:1V) SLOPE. CONTRACTOR SHALL VERIFY AS-BUILT CONDITIONS AND RAMP SLOPE IN THE FIELD PRIOR TO CONSTRUCTION. (RE:LA FOR HAND RAIL DETAIL) 9.DRIVEWAY SLOPES AND STAIR HEIGHTS & COUNTS SHOWN ARE ESTIMATED AND ARE TO BE VERIFIED BY THE CONTRACTOR IN THE FIELD. LEGEND EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR STEP NOTATION RISER HEIGHT (IN) NO. OF RISERS STEPPED FOOTING C2.06 SHEET 16 C2.07 SHEET 17 C2.08 SHEET 18 C2.09 SHEET 19 C2.10 SHEET 20 C2.11 SHEET 21 C2.12 SHEET 22 C2.13 SHEET 23 D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS DDONOT POLLUTE RAINSTOWATERWAYS DUCTILEIRON NYLOPLAST NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D N D YLOPLAST ONOT POLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOT POLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE DO NOT POLLUTEDRAINS TO WATERWAYS NYLOPLASTDUCTILE IRON D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE DSDSDS DSDSDS BLOCK 2 BLOCK 3 BLOCK 4BLOCK 5 BLOCK 8 BLOCK 9 BLOCK 10 BLOCK 11 BLOCK 13 BLOCK 24 HARRINGTON COURT FORTITUDE LANE GOLDEN GROVE DRIVE BL U E C O A T D R I V E ED M O N D S R O A D UNION PARK AVENUE MA T C H L I N E SE E S H E E T 16 MA T C H L I N E SE E S H E E T 18 MATCHLINE SEE SHEET 21 LOT 4 LOT 5 LOT 1 LOT 1 LOT 1 LOT 1 LOT 1 LOT 1 LOT 1 LOT 1 LOT 1 LOT 1 LOT 1 LOT 1 LOT 2 LOT 2 LOT 2 LOT 2LOT 2LOT 2 LOT 2 LOT 2 LOT 2 LOT 2LOT 2LOT 2 LOT 3 LOT 3 LOT 3 LOT 3LOT 3 LOT 3 LOT 3 LOT 3 LOT 3LOT 3LOT 3 LOT 4 LOT 4 LOT 4 LOT 4LOT 4LOT 4 LOT 4 LOT 4 LOT 4 LOT 4 LOT 4LOT 4LOT 4LOT 4 LOT 5 LOT 5LOT 5 LOT 5 LOT 5 LOT 5LOT 5 LOT 6 TRACT G D,U&AE(PU) TRACT B D,U&AE(PR) TRACT C D,U&AE(PU) RE V I S I O N NO . BY DA T E HI G H L A N D DE V E L O P M E N T S E R V I C E S 63 5 5 F A I R G R O U N D S A V E N U E , S U I T E 2 0 0 | W I N D S O R , C O 8 0 5 5 0 PH O N E : 9 7 0 . 6 7 4 . 7 5 5 0 | E M A I L : I n f o @ H i g h l a n d - D S . c o m | w w w . H i g h l a n d - D S . c o m PREPARED BY OR UNDER THE DIRECT SUPERVISION OF: FOR AND ON BEHALF OF HIGHLAND DEVELOPMENT SERVICES REVIEW SET NOT FOR CONSTRUCTION OFSHEET DRAWN BY CHECKED BY DATE SCALE (H) HDS PROJECT # SCALE (V) UN I O N P A R K DE T A I L E D G R A D I N G P L A N 9/9/24 1" = 20' N/A ZMW JTC 21-1044-00 C2.07 17 60 CALL UTILITY NOTIFICATION CENTER OF COLORADO CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. before you dig.Call Know what's below. R 0 SCALE: 1" = 20' 40201020 N W E S NOTES: 1.THE TOP OF FOUNDATION ELEVATIONS SHOWN ARE THE MINIMUM ELEVATIONS REQUIRED FOR PROTECTION FROM THE 100 YEAR STORM. THE LOWEST OPENING ELEVATIONS SHOWN ARE AT LEAST ONE FOOT ABOVE THE 100 YEAR STORM ELEVATION OF ADJACENT STREETS, CHANNELS, DITCHES, SWALES, OR OTHER DRAINAGE FACILITIES. MINIMUM FINISHED FLOOR ELEVATIONS ABOVE 100-YEAR WATER SURFACE IN STREETS, CHANNELS, DITCHES, SWALES, OR OTHER DRAINAGE FACILITIES, AS ILLUSTRATED BY A FINAL GRADING PLAN ARE TO BE SHOWN. 2.CONTRACTOR TO PROVIDE AND MAINTAIN ALL NECESSARY EROSION CONTROL MEASURES PRIOR TO AND THROUGHOUT CONSTRUCTION. 3.SPOT ELEVATIONS SHOWN ARE ON FLOWLINE OR BACK OF WALK UNLESS OTHERWISE LABELED. 4.THE FINISHED GRADE (FG) ADJACENT TO BUILDING FOUNDATION IS A MINIMUM OF 6" BELOW THE TOP OF FOUNDATION (TF). TF IS EQUAL TO THE BUILDING FINISHED FLOOR ELEVATION (FFE) AND/OR TOP OF SLAB (TS) ELEVATION. 5.WALKWAYS SLOPE 2.0% AWAY FROM BUILDINGS AND/OR TOWARD PARKING/DRIVE AREAS. WALK LABELS ARE SHOWN ON THE HIGH SIDE OF THE WALK. 6.ALL SUBGRADE TO BE PLACED/COMPACTED PER GEOTECHNICAL ENGINEER RECOMMENDATIONS. 7.ANY RETAINING WALL EXCEEDING 30" RETAINING HEIGHT ARE REQUIRED TO GET A SEPARATE PERMIT FROM THE CITY OF FT. COLLINS BUILDING DIVISION. 8.ADA RAMPS & CURB RAMPS SHALL NOT EXCEED 8.33% (12H:1V) SLOPE. CONTRACTOR SHALL VERIFY AS-BUILT CONDITIONS AND RAMP SLOPE IN THE FIELD PRIOR TO CONSTRUCTION. (RE:LA FOR HAND RAIL DETAIL) 9.DRIVEWAY SLOPES AND STAIR HEIGHTS & COUNTS SHOWN ARE ESTIMATED AND ARE TO BE VERIFIED BY THE CONTRACTOR IN THE FIELD. LEGEND EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR STEP NOTATION RISER HEIGHT (IN) NO. OF RISERS STEPPED FOOTING N W E S KEY MAP NTS ZI E G L E R R O A D CO R B E T T D R PADDINGTON RD UNION PARK AVEED M O N D S R D C2.06 SHEET 16 C2.07 SHEET 17 C2.08 SHEET 18 C2.09 SHEET 19 C2.10 SHEET 20 C2.11 SHEET 21 C2.12 SHEET 22 C2.13 SHEET 23 D N D YLOPLAST ONOT POLLUTE UCTILEIRON DRAINSTOWATERWAYS D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D N D YLOPLAST ONOT POLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINS TOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYSD D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE DSDSDSDS DSDSDS BLOCK 13 BLOCK 14 BLOCK 15 BLOCK 16BLOCK 17BLOCK 18 BLOCK 19 BLOCK 20 BLOCK 21 BLOCK 22 BLOCK 23BLOCK 24 UNION PARK AVENUE LO C O M O T I V E D R I V E GOLDEN GROVE DRIVE FORTITUDE LANE MA T C H L I N E SE E S H E E T 17 MA T C H L I N E SE E S H E E T 19 MATCHLINE SEE SHEET 22 LOT 6 LOT 7 LOT 8 LOT 9 LOT 1 LOT 1 LOT 1LOT 1 LOT 1LOT 1 LOT 1LOT 1 LOT 1 LOT 2 LOT 2 LOT 2LOT 2LOT 2 LOT 2 LOT 2 LOT 2 LOT 2LOT 2 LOT 6 LOT 6 LOT 3 LOT 3 LOT 3 LOT 3LOT 3LOT 3 LOT 3 LOT 3 LOT 3 LOT 3LOT 3LOT 3 LOT 4 LOT 4 LOT 4 LOT 4LOT 4LOT 4 LOT 4 LOT 4 LOT 4 LOT 4LOT 4LOT 4 LOT 5 LOT 5 LOT 5 LOT 5LOT 5LOT 5 LOT 5 LOT 5 LOT 5 LOT 5LOT 5LOT 5 LOT 6LOT 6 LOT 6 LOT 6 LOT 6LOT 6LOT 6 LOT 7 LOT 7LOT 7 LOT 8 LOT 8LOT 8 TRACT D D,U&AE(PR) RE V I S I O N NO . BY DA T E HI G H L A N D DE V E L O P M E N T S E R V I C E S 63 5 5 F A I R G R O U N D S A V E N U E , S U I T E 2 0 0 | W I N D S O R , C O 8 0 5 5 0 PH O N E : 9 7 0 . 6 7 4 . 7 5 5 0 | E M A I L : I n f o @ H i g h l a n d - D S . c o m | w w w . H i g h l a n d - D S . c o m PREPARED BY OR UNDER THE DIRECT SUPERVISION OF: FOR AND ON BEHALF OF HIGHLAND DEVELOPMENT SERVICES REVIEW SET NOT FOR CONSTRUCTION OFSHEET DRAWN BY CHECKED BY DATE SCALE (H) HDS PROJECT # SCALE (V) UN I O N P A R K DE T A I L E D G R A D I N G P L A N 9/9/24 1" = 20' N/A ZMW JTC 21-1044-00 C2.08 18 60 CALL UTILITY NOTIFICATION CENTER OF COLORADO CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. before you dig.Call Know what's below. R 0 SCALE: 1" = 20' 40201020 N W E S NOTES: 1.THE TOP OF FOUNDATION ELEVATIONS SHOWN ARE THE MINIMUM ELEVATIONS REQUIRED FOR PROTECTION FROM THE 100 YEAR STORM. THE LOWEST OPENING ELEVATIONS SHOWN ARE AT LEAST ONE FOOT ABOVE THE 100 YEAR STORM ELEVATION OF ADJACENT STREETS, CHANNELS, DITCHES, SWALES, OR OTHER DRAINAGE FACILITIES. MINIMUM FINISHED FLOOR ELEVATIONS ABOVE 100-YEAR WATER SURFACE IN STREETS, CHANNELS, DITCHES, SWALES, OR OTHER DRAINAGE FACILITIES, AS ILLUSTRATED BY A FINAL GRADING PLAN ARE TO BE SHOWN. 2.CONTRACTOR TO PROVIDE AND MAINTAIN ALL NECESSARY EROSION CONTROL MEASURES PRIOR TO AND THROUGHOUT CONSTRUCTION. 3.SPOT ELEVATIONS SHOWN ARE ON FLOWLINE OR BACK OF WALK UNLESS OTHERWISE LABELED. 4.THE FINISHED GRADE (FG) ADJACENT TO BUILDING FOUNDATION IS A MINIMUM OF 6" BELOW THE TOP OF FOUNDATION (TF). TF IS EQUAL TO THE BUILDING FINISHED FLOOR ELEVATION (FFE) AND/OR TOP OF SLAB (TS) ELEVATION. 5.WALKWAYS SLOPE 2.0% AWAY FROM BUILDINGS AND/OR TOWARD PARKING/DRIVE AREAS. WALK LABELS ARE SHOWN ON THE HIGH SIDE OF THE WALK. 6.ALL SUBGRADE TO BE PLACED/COMPACTED PER GEOTECHNICAL ENGINEER RECOMMENDATIONS. 7.ANY RETAINING WALL EXCEEDING 30" RETAINING HEIGHT ARE REQUIRED TO GET A SEPARATE PERMIT FROM THE CITY OF FT. COLLINS BUILDING DIVISION. 8.ADA RAMPS & CURB RAMPS SHALL NOT EXCEED 8.33% (12H:1V) SLOPE. CONTRACTOR SHALL VERIFY AS-BUILT CONDITIONS AND RAMP SLOPE IN THE FIELD PRIOR TO CONSTRUCTION. (RE:LA FOR HAND RAIL DETAIL) 9.DRIVEWAY SLOPES AND STAIR HEIGHTS & COUNTS SHOWN ARE ESTIMATED AND ARE TO BE VERIFIED BY THE CONTRACTOR IN THE FIELD. LEGEND EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR STEP NOTATION RISER HEIGHT (IN) NO. OF RISERS STEPPED FOOTING N W E S KEY MAP NTS ZI E G L E R R O A D CO R B E T T D R PADDINGTON RD UNION PARK AVEED M O N D S R D C2.06 SHEET 16 C2.07 SHEET 17 C2.08 SHEET 18 C2.09 SHEET 19 C2.10 SHEET 20 C2.11 SHEET 21 C2.12 SHEET 22 C2.13 SHEET 23 D N D YLOPLAST ONOT POLLUTE UCTILEIRON DRAINSTOWATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE DDO NOTPOLLUTE RAINSTOWATERWAYS DUCTILEIRON NYLOPLAST DDONOTPOLLUTE RAINSTOWATERWAYS DUCTILEIRON NYLOPLAST DDONOTPOLLUTE RAINSTOWATERWAYS DUCTILE IRON NYLOPLAST DDONOTPOLLUTE RAINSTOWATERWAYS DUCTILE IRON NYLOPLAST DS LOT C3 LOT C1 LOT C2 BLOCK 25 BLOCK 26 IN F A N T R Y T E R R A C E D R I V E BLDG MU1 BLDG MU2 MA T C H L I N E SE E S H E E T 18 MATCHLINE SEE SHEET 23 LOT 6 LOT 5 LOT 6 LOT 8 TRACT F D,U&AE(PR) TRACT E D,U&AE(PR) 1 2 3 4 5 RE V I S I O N NO . BY DA T E HI G H L A N D DE V E L O P M E N T S E R V I C E S 63 5 5 F A I R G R O U N D S A V E N U E , S U I T E 2 0 0 | W I N D S O R , C O 8 0 5 5 0 PH O N E : 9 7 0 . 6 7 4 . 7 5 5 0 | E M A I L : I n f o @ H i g h l a n d - D S . c o m | w w w . H i g h l a n d - D S . c o m PREPARED BY OR UNDER THE DIRECT SUPERVISION OF: FOR AND ON BEHALF OF HIGHLAND DEVELOPMENT SERVICES REVIEW SET NOT FOR CONSTRUCTION OFSHEET DRAWN BY CHECKED BY DATE SCALE (H) HDS PROJECT # SCALE (V) UN I O N P A R K DE T A I L E D G R A D I N G P L A N 9/9/24 1" = 20' N/A ZMW JTC 21-1044-00 C2.09 19 60 CALL UTILITY NOTIFICATION CENTER OF COLORADO CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. before you dig.Call Know what's below. R 0 SCALE: 1" = 20' 40201020 N W E S NOTES: 1.THE TOP OF FOUNDATION ELEVATIONS SHOWN ARE THE MINIMUM ELEVATIONS REQUIRED FOR PROTECTION FROM THE 100 YEAR STORM. THE LOWEST OPENING ELEVATIONS SHOWN ARE AT LEAST ONE FOOT ABOVE THE 100 YEAR STORM ELEVATION OF ADJACENT STREETS, CHANNELS, DITCHES, SWALES, OR OTHER DRAINAGE FACILITIES. MINIMUM FINISHED FLOOR ELEVATIONS ABOVE 100-YEAR WATER SURFACE IN STREETS, CHANNELS, DITCHES, SWALES, OR OTHER DRAINAGE FACILITIES, AS ILLUSTRATED BY A FINAL GRADING PLAN ARE TO BE SHOWN. 2.CONTRACTOR TO PROVIDE AND MAINTAIN ALL NECESSARY EROSION CONTROL MEASURES PRIOR TO AND THROUGHOUT CONSTRUCTION. 3.SPOT ELEVATIONS SHOWN ARE ON FLOWLINE OR BACK OF WALK UNLESS OTHERWISE LABELED. 4.THE FINISHED GRADE (FG) ADJACENT TO BUILDING FOUNDATION IS A MINIMUM OF 6" BELOW THE TOP OF FOUNDATION (TF). TF IS EQUAL TO THE BUILDING FINISHED FLOOR ELEVATION (FFE) AND/OR TOP OF SLAB (TS) ELEVATION. 5.WALKWAYS SLOPE 2.0% AWAY FROM BUILDINGS AND/OR TOWARD PARKING/DRIVE AREAS. WALK LABELS ARE SHOWN ON THE HIGH SIDE OF THE WALK. 6.ALL SUBGRADE TO BE PLACED/COMPACTED PER GEOTECHNICAL ENGINEER RECOMMENDATIONS. 7.ANY RETAINING WALL EXCEEDING 30" RETAINING HEIGHT ARE REQUIRED TO GET A SEPARATE PERMIT FROM THE CITY OF FT. COLLINS BUILDING DIVISION. 8.ADA RAMPS & CURB RAMPS SHALL NOT EXCEED 8.33% (12H:1V) SLOPE. CONTRACTOR SHALL VERIFY AS-BUILT CONDITIONS AND RAMP SLOPE IN THE FIELD PRIOR TO CONSTRUCTION. (RE:LA FOR HAND RAIL DETAIL) 9.DRIVEWAY SLOPES AND STAIR HEIGHTS & COUNTS SHOWN ARE ESTIMATED AND ARE TO BE VERIFIED BY THE CONTRACTOR IN THE FIELD. LEGEND EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR STEP NOTATION RISER HEIGHT (IN) NO. OF RISERS STEPPED FOOTING N W E S KEY MAP NTS ZI E G L E R R O A D CO R B E T T D R PADDINGTON RD UNION PARK AVEED M O N D S R D C2.06 SHEET 16 C2.07 SHEET 17 C2.08 SHEET 18 C2.09 SHEET 19 C2.10 SHEET 20 C2.11 SHEET 21 C2.12 SHEET 22 C2.13 SHEET 23 2' CONCRETE COMMERCIAL CHANNEL DETAIL NTS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS D N D YLOPLAST O NOT POLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOT POLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST O NOT POLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOT POLLUTE UCTILEIRON DRAINS TOWATERWAYS D N D YLOPLAST O NOT POLLUTE UCTILEIRON DRAINS TOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOT POLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST O NOT POLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOT POLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST O NOT POLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOT POLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST O NOT POLLUTE UCTILEIRON DRAINS TOWATERWAYS D N D YLOPLAST ONOT POLLUTE UCTILEIRON DRAINS TOWATERWAYS D N D YLOPLAST O NOT POLLUTE UCTILEIRON DRAINSTOWATERWAYSD N D YLOPLAST ONOT POLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE DS DSDS DS DS DS DS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DS DS DS DS UPUP DS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DS DS DS DS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DS DS DS DS C C C C C C C C C C C C C C C C BLDG A2 ESMT EXCLUSION BLDG A11 ESMT EXCLUSION BLDG A1 ESMT EXCLUSION EE G1EE AG1 CO R B E T T D R I V E UN I O N P A R K A V E N U E BLDG A2 BLDG A2 BLDG A1 BLDG A1 BLDG A1 BLDG A11 BLDG A2 MA T C H L I N E SE E S H E E T 21 MATCHLINE SEE SHEET 16 BLDG A2 BLDG A1 TRACT O D,U&AE(PR) RE V I S I O N NO . BY DA T E HI G H L A N D DE V E L O P M E N T S E R V I C E S 63 5 5 F A I R G R O U N D S A V E N U E , S U I T E 2 0 0 | W I N D S O R , C O 8 0 5 5 0 PH O N E : 9 7 0 . 6 7 4 . 7 5 5 0 | E M A I L : I n f o @ H i g h l a n d - D S . c o m | w w w . H i g h l a n d - D S . c o m PREPARED BY OR UNDER THE DIRECT SUPERVISION OF: FOR AND ON BEHALF OF HIGHLAND DEVELOPMENT SERVICES REVIEW SET NOT FOR CONSTRUCTION OFSHEET DRAWN BY CHECKED BY DATE SCALE (H) HDS PROJECT # SCALE (V) UN I O N P A R K DE T A I L E D G R A D I N G P L A N 9/9/24 1" = 20' N/A ZMW JTC 21-1044-00 C2.10 20 60 CALL UTILITY NOTIFICATION CENTER OF COLORADO CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. before you dig.Call Know what's below. R 0 SCALE: 1" = 20' 40201020 N W E S NOTES: 1.THE TOP OF FOUNDATION ELEVATIONS SHOWN ARE THE MINIMUM ELEVATIONS REQUIRED FOR PROTECTION FROM THE 100 YEAR STORM. THE LOWEST OPENING ELEVATIONS SHOWN ARE AT LEAST ONE FOOT ABOVE THE 100 YEAR STORM ELEVATION OF ADJACENT STREETS, CHANNELS, DITCHES, SWALES, OR OTHER DRAINAGE FACILITIES. MINIMUM FINISHED FLOOR ELEVATIONS ABOVE 100-YEAR WATER SURFACE IN STREETS, CHANNELS, DITCHES, SWALES, OR OTHER DRAINAGE FACILITIES, AS ILLUSTRATED BY A FINAL GRADING PLAN ARE TO BE SHOWN. 2.CONTRACTOR TO PROVIDE AND MAINTAIN ALL NECESSARY EROSION CONTROL MEASURES PRIOR TO AND THROUGHOUT CONSTRUCTION. 3.SPOT ELEVATIONS SHOWN ARE ON FLOWLINE OR BACK OF WALK UNLESS OTHERWISE LABELED. 4.THE FINISHED GRADE (FG) ADJACENT TO BUILDING FOUNDATION IS A MINIMUM OF 6" BELOW THE TOP OF FOUNDATION (TF). TF IS EQUAL TO THE BUILDING FINISHED FLOOR ELEVATION (FFE) AND/OR TOP OF SLAB (TS) ELEVATION. 5.WALKWAYS SLOPE 2.0% AWAY FROM BUILDINGS AND/OR TOWARD PARKING/DRIVE AREAS. WALK LABELS ARE SHOWN ON THE HIGH SIDE OF THE WALK. 6.ALL SUBGRADE TO BE PLACED/COMPACTED PER GEOTECHNICAL ENGINEER RECOMMENDATIONS. 7.ANY RETAINING WALL EXCEEDING 30" RETAINING HEIGHT ARE REQUIRED TO GET A SEPARATE PERMIT FROM THE CITY OF FT. COLLINS BUILDING DIVISION. 8.ADA RAMPS & CURB RAMPS SHALL NOT EXCEED 8.33% (12H:1V) SLOPE. CONTRACTOR SHALL VERIFY AS-BUILT CONDITIONS AND RAMP SLOPE IN THE FIELD PRIOR TO CONSTRUCTION. (RE:LA FOR HAND RAIL DETAIL) 9.DRIVEWAY SLOPES AND STAIR HEIGHTS & COUNTS SHOWN ARE ESTIMATED AND ARE TO BE VERIFIED BY THE CONTRACTOR IN THE FIELD. LEGEND EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR STEP NOTATION RISER HEIGHT (IN) NO. OF RISERS STEPPED FOOTING N W E S ZI E G L E R R O A D CO R B E T T D R PADDINGTON RD UNION PARK AVEED M O N D S R D C2.06 SHEET 16 C2.07 SHEET 17 C2.08 SHEET 18 C2.09 SHEET 19 C2.10 SHEET 20 C2.11 SHEET 21 C2.12 SHEET 22 C2.13 SHEET 23 NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D N D YLOPLAST O NOT POLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS DUCTILEIRON AINSTOWATERWAYS D N D YLOPLAST ONOT POLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOT POLLUTE UCTILEIRON DRAINS TOWATERWAYS D N D YLOPLAST O NOT POLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST O NOT POLLUTE UCTILEIRON DRAINS TOWATERWAYS D N D YLOPLAST ONOT POLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOT POLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOT POLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST O NOT POLLUTE UCTILE IRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST O NOT POLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE UP DS DS DS DS DS DSDSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DS DSDSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DS DS DS DS DS DS DS DS DS DS DS UPUP DS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS UP DS DS DS DS DS DS DS DS C C C C BLDG A10 ESMT EXCLUSION BLDG A3 ESMT EXCLUSION BLDG A4 ESMT EXCLUSION EE G2 EE AG2 EE AG3 BLOCK 29 LOT R1 ED M O N D S R O A D FORT SUMTER WAY BLDG A10 BLDG A3 BLDG A3 BLDG A3 BLDG A3 BLDG A4 BLDG A4 BLDG A4 BLDG A4 MA T C H L I N E SE E S H E E T 20 MA T C H L I N E SE E S H E E T 22 MATCHLINE SEE SHEET 17 TRACT N D,U&AE(PR) TRACT M D,U&AE(PR) TRACT G D,U&AE(PU) RE V I S I O N NO . BY DA T E HI G H L A N D DE V E L O P M E N T S E R V I C E S 63 5 5 F A I R G R O U N D S A V E N U E , S U I T E 2 0 0 | W I N D S O R , C O 8 0 5 5 0 PH O N E : 9 7 0 . 6 7 4 . 7 5 5 0 | E M A I L : I n f o @ H i g h l a n d - D S . c o m | w w w . H i g h l a n d - D S . c o m PREPARED BY OR UNDER THE DIRECT SUPERVISION OF: FOR AND ON BEHALF OF HIGHLAND DEVELOPMENT SERVICES REVIEW SET NOT FOR CONSTRUCTION OFSHEET DRAWN BY CHECKED BY DATE SCALE (H) HDS PROJECT # SCALE (V) UN I O N P A R K DE T A I L E D G R A D I N G P L A N 9/9/24 1" = 20' N/A ZMW JTC 21-1044-00 C2.11 21 60 CALL UTILITY NOTIFICATION CENTER OF COLORADO CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. before you dig.Call Know what's below. R 0 SCALE: 1" = 20' 40201020 N W E S NOTES: 1.THE TOP OF FOUNDATION ELEVATIONS SHOWN ARE THE MINIMUM ELEVATIONS REQUIRED FOR PROTECTION FROM THE 100 YEAR STORM. THE LOWEST OPENING ELEVATIONS SHOWN ARE AT LEAST ONE FOOT ABOVE THE 100 YEAR STORM ELEVATION OF ADJACENT STREETS, CHANNELS, DITCHES, SWALES, OR OTHER DRAINAGE FACILITIES. MINIMUM FINISHED FLOOR ELEVATIONS ABOVE 100-YEAR WATER SURFACE IN STREETS, CHANNELS, DITCHES, SWALES, OR OTHER DRAINAGE FACILITIES, AS ILLUSTRATED BY A FINAL GRADING PLAN ARE TO BE SHOWN. 2.CONTRACTOR TO PROVIDE AND MAINTAIN ALL NECESSARY EROSION CONTROL MEASURES PRIOR TO AND THROUGHOUT CONSTRUCTION. 3.SPOT ELEVATIONS SHOWN ARE ON FLOWLINE OR BACK OF WALK UNLESS OTHERWISE LABELED. 4.THE FINISHED GRADE (FG) ADJACENT TO BUILDING FOUNDATION IS A MINIMUM OF 6" BELOW THE TOP OF FOUNDATION (TF). TF IS EQUAL TO THE BUILDING FINISHED FLOOR ELEVATION (FFE) AND/OR TOP OF SLAB (TS) ELEVATION. 5.WALKWAYS SLOPE 2.0% AWAY FROM BUILDINGS AND/OR TOWARD PARKING/DRIVE AREAS. WALK LABELS ARE SHOWN ON THE HIGH SIDE OF THE WALK. 6.ALL SUBGRADE TO BE PLACED/COMPACTED PER GEOTECHNICAL ENGINEER RECOMMENDATIONS. 7.ANY RETAINING WALL EXCEEDING 30" RETAINING HEIGHT ARE REQUIRED TO GET A SEPARATE PERMIT FROM THE CITY OF FT. COLLINS BUILDING DIVISION. 8.ADA RAMPS & CURB RAMPS SHALL NOT EXCEED 8.33% (12H:1V) SLOPE. CONTRACTOR SHALL VERIFY AS-BUILT CONDITIONS AND RAMP SLOPE IN THE FIELD PRIOR TO CONSTRUCTION. (RE:LA FOR HAND RAIL DETAIL) 9.DRIVEWAY SLOPES AND STAIR HEIGHTS & COUNTS SHOWN ARE ESTIMATED AND ARE TO BE VERIFIED BY THE CONTRACTOR IN THE FIELD. LEGEND EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR STEP NOTATION RISER HEIGHT (IN) NO. OF RISERS STEPPED FOOTING N W E S KEY MAP NTS ZI E G L E R R O A D CO R B E T T D R PADDINGTON RD UNION PARK AVEED M O N D S R D C2.06 SHEET 16 C2.07 SHEET 17 C2.08 SHEET 18 C2.09 SHEET 19 C2.10 SHEET 20 C2.11 SHEET 21 C2.12 SHEET 22 C2.13 SHEET 23 NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINS TOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOT POLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOT POLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOT POLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST O NOT POLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOT POLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST O NOT POLLUTE UCTILEIRON DRAINS TOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST O NOT POLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOT POLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOT POLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOT POLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINS TOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYSD N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOT POLLUTE UCTILE IRON DRAINS TOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS DS DSDS DS DS DS DS DS DS DS DS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DS DS DS DS DS DSDSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DS DS DS DS DS DS DS DS DS DS DS UP DS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS UPUP DS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS BLDG A9 ESMT EXCLUSION BLDG A8 ESMT EXCLUSION EXCLUSION BLDG A5 ESMT EXCLUSION BLDG A6 ESMT EXCLUSION EE AG3 EE G3 EE AG4EE G4 FORT SUMTER WAY BLDG A10 BLDG A8 BLDG A4 BLDG A5 BLDG A5 BLDG A5 BLDG A6 BLDG A6 BLDG A5 BLDG A6 BLDG A6 MA T C H L I N E SE E S H E E T 21 MA T C H L I N E SE E S H E E T 23 MATCHLINE SEE SHEET 18 TRACT K D,U&AE(PR) TRACT L D,U&AE(PR) 1 2 3 4 5 RE V I S I O N NO . BY DA T E HI G H L A N D DE V E L O P M E N T S E R V I C E S 63 5 5 F A I R G R O U N D S A V E N U E , S U I T E 2 0 0 | W I N D S O R , C O 8 0 5 5 0 PH O N E : 9 7 0 . 6 7 4 . 7 5 5 0 | E M A I L : I n f o @ H i g h l a n d - D S . c o m | w w w . H i g h l a n d - D S . c o m PREPARED BY OR UNDER THE DIRECT SUPERVISION OF: FOR AND ON BEHALF OF HIGHLAND DEVELOPMENT SERVICES REVIEW SET NOT FOR CONSTRUCTION OFSHEET DRAWN BY CHECKED BY DATE SCALE (H) HDS PROJECT # SCALE (V) UN I O N P A R K DE T A I L E D G R A D I N G P L A N 9/9/24 1" = 20' N/A ZMW JTC 21-1044-00 C2.12 22 60 CALL UTILITY NOTIFICATION CENTER OF COLORADO CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. before you dig.Call Know what's below. R 0 SCALE: 1" = 20' 40201020 N W E S NOTES: 1.THE TOP OF FOUNDATION ELEVATIONS SHOWN ARE THE MINIMUM ELEVATIONS REQUIRED FOR PROTECTION FROM THE 100 YEAR STORM. THE LOWEST OPENING ELEVATIONS SHOWN ARE AT LEAST ONE FOOT ABOVE THE 100 YEAR STORM ELEVATION OF ADJACENT STREETS, CHANNELS, DITCHES, SWALES, OR OTHER DRAINAGE FACILITIES. MINIMUM FINISHED FLOOR ELEVATIONS ABOVE 100-YEAR WATER SURFACE IN STREETS, CHANNELS, DITCHES, SWALES, OR OTHER DRAINAGE FACILITIES, AS ILLUSTRATED BY A FINAL GRADING PLAN ARE TO BE SHOWN. 2.CONTRACTOR TO PROVIDE AND MAINTAIN ALL NECESSARY EROSION CONTROL MEASURES PRIOR TO AND THROUGHOUT CONSTRUCTION. 3.SPOT ELEVATIONS SHOWN ARE ON FLOWLINE OR BACK OF WALK UNLESS OTHERWISE LABELED. 4.THE FINISHED GRADE (FG) ADJACENT TO BUILDING FOUNDATION IS A MINIMUM OF 6" BELOW THE TOP OF FOUNDATION (TF). TF IS EQUAL TO THE BUILDING FINISHED FLOOR ELEVATION (FFE) AND/OR TOP OF SLAB (TS) ELEVATION. 5.WALKWAYS SLOPE 2.0% AWAY FROM BUILDINGS AND/OR TOWARD PARKING/DRIVE AREAS. WALK LABELS ARE SHOWN ON THE HIGH SIDE OF THE WALK. 6.ALL SUBGRADE TO BE PLACED/COMPACTED PER GEOTECHNICAL ENGINEER RECOMMENDATIONS. 7.ANY RETAINING WALL EXCEEDING 30" RETAINING HEIGHT ARE REQUIRED TO GET A SEPARATE PERMIT FROM THE CITY OF FT. COLLINS BUILDING DIVISION. 8.ADA RAMPS & CURB RAMPS SHALL NOT EXCEED 8.33% (12H:1V) SLOPE. CONTRACTOR SHALL VERIFY AS-BUILT CONDITIONS AND RAMP SLOPE IN THE FIELD PRIOR TO CONSTRUCTION. (RE:LA FOR HAND RAIL DETAIL) 9.DRIVEWAY SLOPES AND STAIR HEIGHTS & COUNTS SHOWN ARE ESTIMATED AND ARE TO BE VERIFIED BY THE CONTRACTOR IN THE FIELD. LEGEND EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR STEP NOTATION RISER HEIGHT (IN) NO. OF RISERS STEPPED FOOTING N W E S KEY MAP NTS ZI E G L E R R O A D CO R B E T T D R PADDINGTON RD UNION PARK AVEED M O N D S R D C2.06 SHEET 16 C2.07 SHEET 17 C2.08 SHEET 18 C2.09 SHEET 19 C2.10 SHEET 20 C2.11 SHEET 21 C2.12 SHEET 22 C2.13 SHEET 23 NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYSD N D YLOPLAST ONOT POLLUTE UCTILEIRON DRAINSTOWATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS D N D YLOPLAST ONOT POLLUTE UCTILEIRON DRAINS TOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST O NOT POLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST O NOT POLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOT POLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST O NOT POLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOT POLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOT POLLUTE UCTILE IRON DRAINSTOWATERWAYS D N D YLOPLAST O NOT POLLUTE UCTILEIRON DRAINS TOWATERWAYSD N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS UPUP DS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS UP DS DS DS DS BL O C K 2 7 BL O C K 2 8 BLDG A7 ESMT EXCLUSION EE AG5 EE G5 LOT MU1 LOT MU2 BLOCK 26 ZI E G L E R R O A D (R O W V A R I E S ) IN F A N T R Y T E R R A C E D R I V E ZI E G L E R R O A D (R O W V A R I E S ) IR O N L A N E CITADEL PLACE HERITAGE HILL PLACE BLDG A7 BLDG MU1 BLDG MU2 MA T C H L I N E SE E S H E E T 22 MATCHLINE SEE SHEET 19 LOT 1 LOT 2 LOT 3LOT 3 LOT 2 LOT 1 TRACT J D,U&AE(PR) TRACT H D,U&AE(PR) TRACT I D,U&AE(PR) 1 2 3 4 5 RE V I S I O N NO . BY DA T E HI G H L A N D DE V E L O P M E N T S E R V I C E S 63 5 5 F A I R G R O U N D S A V E N U E , S U I T E 2 0 0 | W I N D S O R , C O 8 0 5 5 0 PH O N E : 9 7 0 . 6 7 4 . 7 5 5 0 | E M A I L : I n f o @ H i g h l a n d - D S . c o m | w w w . H i g h l a n d - D S . c o m PREPARED BY OR UNDER THE DIRECT SUPERVISION OF: FOR AND ON BEHALF OF HIGHLAND DEVELOPMENT SERVICES REVIEW SET NOT FOR CONSTRUCTION OFSHEET DRAWN BY CHECKED BY DATE SCALE (H) HDS PROJECT # SCALE (V) UN I O N P A R K DE T A I L E D G R A D I N G P L A N 9/9/24 1" = 20' N/A ZMW JTC 21-1044-00 C2.13 23 60 CALL UTILITY NOTIFICATION CENTER OF COLORADO CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. before you dig.Call Know what's below. R 0 SCALE: 1" = 20' 40201020 N W E S NOTES: 1.THE TOP OF FOUNDATION ELEVATIONS SHOWN ARE THE MINIMUM ELEVATIONS REQUIRED FOR PROTECTION FROM THE 100 YEAR STORM. THE LOWEST OPENING ELEVATIONS SHOWN ARE AT LEAST ONE FOOT ABOVE THE 100 YEAR STORM ELEVATION OF ADJACENT STREETS, CHANNELS, DITCHES, SWALES, OR OTHER DRAINAGE FACILITIES. MINIMUM FINISHED FLOOR ELEVATIONS ABOVE 100-YEAR WATER SURFACE IN STREETS, CHANNELS, DITCHES, SWALES, OR OTHER DRAINAGE FACILITIES, AS ILLUSTRATED BY A FINAL GRADING PLAN ARE TO BE SHOWN. 2.CONTRACTOR TO PROVIDE AND MAINTAIN ALL NECESSARY EROSION CONTROL MEASURES PRIOR TO AND THROUGHOUT CONSTRUCTION. 3.SPOT ELEVATIONS SHOWN ARE ON FLOWLINE OR BACK OF WALK UNLESS OTHERWISE LABELED. 4.THE FINISHED GRADE (FG) ADJACENT TO BUILDING FOUNDATION IS A MINIMUM OF 6" BELOW THE TOP OF FOUNDATION (TF). TF IS EQUAL TO THE BUILDING FINISHED FLOOR ELEVATION (FFE) AND/OR TOP OF SLAB (TS) ELEVATION. 5.WALKWAYS SLOPE 2.0% AWAY FROM BUILDINGS AND/OR TOWARD PARKING/DRIVE AREAS. WALK LABELS ARE SHOWN ON THE HIGH SIDE OF THE WALK. 6.ALL SUBGRADE TO BE PLACED/COMPACTED PER GEOTECHNICAL ENGINEER RECOMMENDATIONS. 7.ANY RETAINING WALL EXCEEDING 30" RETAINING HEIGHT ARE REQUIRED TO GET A SEPARATE PERMIT FROM THE CITY OF FT. COLLINS BUILDING DIVISION. 8.ADA RAMPS & CURB RAMPS SHALL NOT EXCEED 8.33% (12H:1V) SLOPE. CONTRACTOR SHALL VERIFY AS-BUILT CONDITIONS AND RAMP SLOPE IN THE FIELD PRIOR TO CONSTRUCTION. (RE:LA FOR HAND RAIL DETAIL) 9.DRIVEWAY SLOPES AND STAIR HEIGHTS & COUNTS SHOWN ARE ESTIMATED AND ARE TO BE VERIFIED BY THE CONTRACTOR IN THE FIELD. LEGEND EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR STEP NOTATION RISER HEIGHT (IN) NO. OF RISERS STEPPED FOOTING N W E S KEY MAP NTS ZI E G L E R R O A D CO R B E T T D R PADDINGTON RD UNION PARK AVEED M O N D S R D C2.06 SHEET 16 C2.07 SHEET 17 C2.08 SHEET 18 C2.09 SHEET 19 C2.10 SHEET 20 C2.11 SHEET 21 C2.12 SHEET 22 C2.13 SHEET 23 DS DSDS DS DS DS DS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DS DS DS DS DS DSDS DS DS DS DS DS DS DS DS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS UPUP DS DSDS DS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS UPUP DS DSDS DS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DS DSDSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DS DS DS DS DS DS DS DS DS DS DS UPUP DS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DS DS DSDSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DS DS DS DS DS DS DS DS DS DS DS UPUP DS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS UPUP DS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DS DS DS DSDS DS DS DS DS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DS DS DS DS C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D NDYLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYSD NDYLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS DDONOTPOLLUTE RAINSTOWATERWAYS DUCTILEIRONNYLOPLAST NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE DDONOTPOLLUTE RAINSTOWATERWAYS DUCTILEIRONNYLOPLAST DDONOTPOLLUTE RAINSTOWATERWAYS DUCTILEIRONNYLOPLAST DDONOTPOLLUTE RAINSTOWATERWAYS DUCTILEIRONNYLOPLAST DDONOTPOLLUTE RAINSTOWATERWAYS DUCTILEIRONNYLOPLAST NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D NDYLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D ND YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D NDYLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D ND YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYSD N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D ND YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D NDYLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D NDYLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D NDYLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D NDYLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D ND YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D NDYLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D NDYLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D NDYLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D NDYLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D NDYLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D NDYLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D NDYLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D NDYLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D ND YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D NDYLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D ND YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D NDYLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D NDYLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D NDYLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D NDYLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D NDYLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D NDYLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYSD ND YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D NDYLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYSD ND YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE DO NOT POLLUTEDRAINS TO WATERWAYS NYLOPLASTDUCTILE IRON D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE LOT 12 FRONT RANGE VILLAGE FIRST REPLAT TRACT B ENGLISH RANCH SOUTH P.U.D. UNPLATTED LO T 1 AFF I N I T Y S U B D I V I S I O N LOT 10 FRONT RANGE VILLAGE FIRST REPLAT LOT 11 FRONT RANGE VILLAGE TRACT A ENGLISH RANCH SOUTH P.U.D. THIRD FILING AFFINITY OUTFALL ROUTED THROUGH POND & SITE POND 298C POND 298C POND 298A POND 298B BLOCK 1 BLOCK 2 BLOCK 3 BLOCK 4BLOCK 5BLOCK 6 BLOCK 7 BLOCK 8 BLOCK 9 BLOCK 10BLOCK 11BLOCK 12 BLOCK 13 BLOCK 14 BLOCK 15 BLOCK 16BLOCK 17BLOCK 18 BLOCK 19 BLOCK 20 BLOCK 21 BLOCK 22BLOCK 23BLOCK 24 BL O C K 2 7 BL O C K 2 8 BLDG A2 ESMT EXCLUSION BLDG A11 ESMT EXCLUSION BLDG A10 ESMT EXCLUSION BLDG A9 ESMT EXCLUSION BLDG A8 ESMT EXCLUSION BLDG A7 ESMT EXCLUSION BLDG A1 ESMT EXCLUSION BLDG A3 ESMT EXCLUSION BLDG A4 ESMT EXCLUSION BLDG A5 ESMT EXCLUSION BLDG A6 ESMT EXCLUSION EE G1 EE G2EE AG1 EE AG2 EE AG3 EE G3 EE AG4EE G4 EE AG5 EE G5 BLOCK 29 BLOCK 25 BLOCK 26 PADDIN G T O N R O A D CA R R I C K R O A D KINGSLEY COURT NEWBURG COURT HARRINGTON COURT CO R B E T T D R I V E ZI E G L E R R O A D (R O W V A R I E S ) IN F A N T R Y T E R R A C E D R I V E UNION PARK AVENUE IN F A N T R Y T E R R A C E D R I V E FORT SUMTER WAY ED M O N D S R O A D FORT SUMTER WAY FORTITUDE LANE ZI E G L E R R O A D (R O W V A R I E S ) GOLDEN GROVE DRIVE UN I O N P A R K A V E N U E BL U E C O A T D R I V E LO C O M O T I V E D R I V E IR O N L A N E CITADEL PLACE HERITAGE HILL PLACE ED M O N D S R O A D SSWR-08 (SEE SHEET 34) SSWR-07 (SEE SHEET 34) SSWR-06 (SEE SHEET 33)LID-D LID-C LID-B SD-05 (SEE SHEET 37) SD-17 (SEE SHEET 41) SD-19 (SEE SHEET 41) SD-12 (SEE SHEET 39) SD-03 (SEE SHEET 36) SD-08 (SEE SHEET 38) SD-07 (SEE SHEET 37) SD-09 (SEE SHEET 38) SD-02 (SEE SHEET 35) SD-01 (SEE SHEET 35) SD-06 (SEE SHEET 37) SD-10 (SEE SHEET 39) SD-11 (SEE SHEET 39) SD-13 (SEE SHEET 40) SD-14 (SEE SHEET 40) SD-15 (SEE SHEET 40) SD-16 (SEE SHEET 40) SD-18 (SEE SHEET 41) SD-20 (SEE SHEET 41) SD-21 (SEE SHEET 41) SD-04 (SEE SHEET 37) SD-22 (SEE SHEET 41) SSWR-10 (SEE SHEET 34) SSWR-04 (SEE SHEET 32) SSWR-03 (SEE SHEET 31) SSWR-09 (SEE SHEET 34) SSWR-05 (SEE SHEET 33)SSWR-02 (SEE SHEET 29) SSWR-02 (SEE SHEET 30) SSWR-01 (SEE SHEET 27 & 28) SSWR-02 (SEE SHEET 29) SSWR-02 (SEE SHEET 30) APPROX 12" WL LOCATION (CONTRACTOR TO VERIFY LOCATION & DEPTH PRIOR TO CONSTRUCTION) TRACT A D,U&AE(PU) TRACT N D,U&AE(PR) TRACT M D,U&AE(PR) TRACT O D,U&AE(PR) TRACT G D,U&AE(PU) TRACT B D,U&AE(PR) TRACT J D,U&AE(PR) TR A C T C D, U & A E ( P U ) TRACT D D,U&AE(PR) TRACT H D,U&AE(PR) TRACT I D,U&AE(PR) TRACT K D,U&AE(PR) TRACT F D,U&AE(PR) TRACT E D,U&AE(PR) TRACT L D,U&AE(PR) SD-08 (SEE SHEET 38) SD-08 (SEE SHEET 38) RE V I S I O N NO . BY DA T E HI G H L A N D DE V E L O P M E N T S E R V I C E S 63 5 5 F A I R G R O U N D S A V E N U E , S U I T E 2 0 0 | W I N D S O R , C O 8 0 5 5 0 PH O N E : 9 7 0 . 6 7 4 . 7 5 5 0 | E M A I L : I n f o @ H i g h l a n d - D S . c o m | w w w . H i g h l a n d - D S . c o m PREPARED BY OR UNDER THE DIRECT SUPERVISION OF: FOR AND ON BEHALF OF HIGHLAND DEVELOPMENT SERVICES REVIEW SET NOT FOR CONSTRUCTION OFSHEET DRAWN BY CHECKED BY DATE SCALE (H) HDS PROJECT # SCALE (V) UN I O N P A R K OV E R A L L U T I L I T Y P L A N 9/9/24 1" = 60' N/A ZMW JTC 21-1044-00 C3.00 24 60 N W E S 0 SCALE: 1" = 60' 120603060 DS DSDS DS DS DS DS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DS DS DS DS UPUP DS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DS DSDSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DS DS DS DS DS DS DS DS DS DS DS UPUP DS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS UP DS DS DS DS DS DS DS DS DS DS DSDS DS DS DS DS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DS DS DS DS C C C C C C C C C C C C C C C C C C C C D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS DDONOTPOLLUTE RAINSTOWATERWAYS DUCTILEIRONNYLOPLAST NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYSD N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE DO NOT POLLUTEDRAINS TO WATERWAYS NYLOPLASTDUCTILE IRON D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE MA T C H L I N E SE E S H E E T 26 LOT 12 FRONT RANGE VILLAGE FIRST REPLAT LO T 1 AFF I N I T Y S U B D I V I S I O N UNPLATTED TRACT A ENGLISH RANCH SOUTH P.U.D. THIRD FILING POND 298A LID B STORMTECH MC-800 (90 CHAMBERS) LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 1 LOT 2 LOT 3 LOT 4 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 1 LOT 2 LOT 3 LOT 4LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 1 LOT 2 LOT 3 LOT 4 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5LOT 1 LOT 2 LOT 3 LOT 4 LOT 5LOT 4LOT 3LOT 2LOT 1 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 1 LOT 2 LOT 3 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 BLOCK 1 BLOCK 2 BLOCK 3 BLOCK 4BLOCK 5BLOCK 6 BLOCK 7 BLOCK 8 BLOCK 9 BLOCK 10BLOCK 11 BLOCK 12 BLOCK 13 BLOCK 24 BLDG A2 ESMT EXCLUSION BLDG A11 ESMT EXCLUSION BLDG A10 ESMT EXCLUSION BLDG A1 ESMT EXCLUSION BLDG A3 ESMT EXCLUSION BLDG A4 ESMT EXCLUSION EE G1 EE G2EE AG1 EE AG2 EE AG3 BLOCK 29 LOT R1 KINGSLEY COURT NEWBURG COURT HARRINGTON COURT CO R B E T T D R I V E ED M O N D S R O A D FORT SUMTER WAY FORTITUDE LANE GOLDEN GROVE DRIVE UN I O N P A R K A V E N U E BL U E C O A T D R I V E ED M O N D S R O A D UNION PARK AVENUE WATER LOWERING 'F' (SEE SHEET 52) WATER LOWERING 'G' (SEE SHEET 52) WATER LOWERING 'H' (SEE SHEET 52) WL LOWERING 'H' (SEE SHEET 52) WL LOWERING 'M' (SEE SHEET 52) WL LOWERING 'I' (SEE SHEET 52) WL LOWERING 'L' (SEE SHEET 52) TRACT A D,U&AE(PU) TRACT N D,U&AE(PR) TRACT M D,U&AE(PR) TRACT O D,U&AE(PR) TRACT G D,U&AE(PU) TRACT B D,U&AE(PR) TR A C T C D, U & A E ( P U ) WATERLINE FITTING TABLE FITTING DESCRIPTION NORTHING EASTING RE V I S I O N NO . BY DA T E HI G H L A N D DE V E L O P M E N T S E R V I C E S 63 5 5 F A I R G R O U N D S A V E N U E , S U I T E 2 0 0 | W I N D S O R , C O 8 0 5 5 0 PH O N E : 9 7 0 . 6 7 4 . 7 5 5 0 | E M A I L : I n f o @ H i g h l a n d - D S . c o m | w w w . H i g h l a n d - D S . c o m PREPARED BY OR UNDER THE DIRECT SUPERVISION OF: FOR AND ON BEHALF OF HIGHLAND DEVELOPMENT SERVICES REVIEW SET NOT FOR CONSTRUCTION OFSHEET DRAWN BY CHECKED BY DATE SCALE (H) HDS PROJECT # SCALE (V) UN I O N P A R K UT I L I T Y P L A N 9/9/24 1" = 40' N/A ZMW/PHS JTC 21-1044-00 C3.01 25 60 N W E S0 SCALE: 1" = 40' 80402040 CALL UTILITY NOTIFICATION CENTER OF COLORADO CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. before you dig.Call Know what's below. R NOTES: 1.ALL EXISTING UTILITY LOCATIONS SHOWN HAVE BEEN PROVIDED BY OTHERS AND DETERMINED FROM A COMBINATION OF RECORD DRAWINGS, SURVEYED FIELD MARK-OUTS AND PHYSICAL OBSERVATIONS. THERE MAY BE UTILITIES NOT SHOWN ON THE DRAWINGS WHICH PRESENTLY EXIST IN THE AREA OF CONSTRUCTION. THEREFORE, THE CONTRACTOR SHALL VERIFY LOCATION AND DEPTH OF ALL EXISTING UTILITIES IN THE PROJECT VICINITY PRIOR TO BEGINNING WORK. THE CONTRACTOR SHALL BE FULLY AND SOLELY RESPONSIBLE FOR ANY AND ALL DAMAGES AND COSTS WHICH MIGHT OCCUR BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UTILITIES. THE CONTRACTOR SHALL NOTIFY ALL PUBLIC AND PRIVATE UTILITY COMPANIES AND DETERMINE THE LOCATION OF ALL EXISTING UTILITIES PRIOR TO PROCEEDING WITH GRADING AND CONSTRUCTION. ALL WORK PERFORMED IN THE AREA OF UTILITIES SHALL BE PERFORMED AND INSPECTED ACCORDING TO THE REQUIREMENTS OF THE UTILITY OWNER. LIKEWISE, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING AND MAPPING ANY EXISTING UTILITY (INCLUDING DEPTH) WHICH MAY CONFLICT WITH THE PROPOSED CONSTRUCTION, AND FOR RELOCATING ENCOUNTERED UTILITIES AS DIRECTED BY THE ENGINEER. CONTRACTOR SHALL CONTACT AND RECEIVE APPROVAL FROM OWNER/UTILITY OWNER BEFORE RELOCATING ANY ENCOUNTERED UTILITIES. CONTRACTOR RESPONSIBLE FOR SERVICE CONNECTIONS, AND RELOCATING AND RECONNECTING AFFECTED UTILITIES AS COORDINATED WITH UTILITY OWNER AND/OR ENGINEER, INCLUDING NON-MUNICIPAL UTILITIES (TELEPHONE, GAS, CABLE, ETC., WHICH SHALL BE COORDINATED WITH THE UTILITY OWNER). THE CONTRACTOR SHALL IMMEDIATELY CONTACT ENGINEER UPON DISCOVERY OF A UTILITY DISCREPANCY OR CONFLICT. AT LEAST 48 HOURS PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL NOTIFY THE UTILITY NOTIFICATION CENTER OF COLORADO (1-800-922-1987, WWW.UNCC.ORG). 2.IN ADDITION TO MEETING APPLICABLE LCUASS, STATE OR FEDERAL STANDARDS, ALL MATERIALS, WORKMANSHIP AND CONSTRUCTION OF PUBLIC WATER AND WASTEWATER SYSTEM IMPROVEMENTS SHALL MEET OR EXCEED THE STANDARDS SET FORTH IN THE CITY OF FORT COLLINS WATER AND WASTEWATER DEVELOPMENT STANDARDS. 3.IN CASES OF CONFLICT BETWEEN THESE SIGNED PLANS AND APPLICABLE STANDARDS, THE MOST RESTRICTIVE STANDARD SHALL APPLY. 4.ALL WATER MAINS AND FIRE LINES SHALL BE AWWA C900 PLASTIC PRESSURE PIPE (DR-18, PRESSURE CLASS 305). ALL PLASTIC PRESSURE PIPE SHALL HAVE TRACER WIRE PER STANDARDS. ALL FITTINGS ON THE PROPOSED FIRE LINES AND FIRE HYDRANT LATERALS SHALL BE FULLY RESTRAINED JOINTS PER CITY STANDARDS (MEGA-LUG OR APPROVED EQUAL). 5.ALL WATER SERVICES SHALL BE TYPE K SOFT COPPER. 6.ALL WATER MAINS AND SERVICES SHALL HAVE A MINIMUM COVER OF 4.5' AND A MAXIMUM OF 5.5', UNLESS OTHERWISE NOTED. 7.ALL SANITARY SEWER MAINS AND SERVICES SHALL BE SDR 35 PVC. ALL SANITARY SEWER & STORM SEWER CLEANOUTS LOCATED WITHIN THE PAVEMENT SHALL BE TRAFFIC RATED CLEANOUTS. 8.INVERT SHAPING ON SANITARY SEWER MANHOLES TO BE AT LEAST TO SPRING LINE. 9.SITE CONTRACTOR SHALL COORDINATE UTILITY CONNECTIONS AT THE BUILDING WITH BUILDING CONTRACTOR. 10.ALL PROPOSED STORM SEWER IMPROVEMENTS SHALL BE IN ACCORDANCE WITH THE CITY OF FORT COLLINS STANDARDS AND SPECIFICATIONS. 11.COORDINATE SITE LIGHTING AND ELECTRIC SERVICE ROUTING, DEMOLISHING, RELOCATING, AND MODIFICATIONS WITH THE ELECTRICAL ENGINEER, ARCHITECT, AND OWNER. 12.ALL MANHOLE RIM AND INLET GRATE ELEVATIONS SHOWN ARE APPROXIMATE. CONFIRM FINAL ELEVATIONS PRIOR TO INSTALLATION. 13.ELECTRIC SERVICE TO BE OWNED, MAINTAINED AND INSTALLED BY OWNER FROM THE UTILITY TRANSFORMER SECONDARY LUGS TO THE ELECTRIC METER. 14.ALL RESIDENTIAL LOT SERVICE LINES ARE 3/4" WITH INTERIOR WATER METERS UNLESS OTHERWISE NOTED. SEE DETAILS FOR DUAL WATER SERVICES. 15.ELECTRICAL LAYOUT AND DESIGN FOR EV CHARGERS TO BE PROVIDED BY OTHERS. EV INSTALLED EV READY EV CAPABLE EV READY LEGEND DS DSDS DS DS DS DS DS DS DS DS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS UPUP DS DSDS DS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DS DS DS DS DS DSDSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DS DS DS DS DS DS DS DS DS DS DS UPUP DS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS UPUP DS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYSD N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE DDONOTPOLLUTE RAINSTOWATERWAYS DUCTILEIRON NYLOPLAST DDONOTPOLLUTE RAINSTOWATERWAYS DUCTILEIRONNYLOPLAST DDONOTPOLLUTE RAINSTOWATERWAYS DUCTILEIRONNYLOPLAST DDONOTPOLLUTE RAINSTOWATERWAYS DUCTILEIRONNYLOPLAST NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYSD N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYSD N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE DO NOT POLLUTEDRAINS TO WATERWAYS NYLOPLASTDUCTILE IRON MA T C H L I N E SE E S H E E T 25 TRACT B ENGLISH RANCH SOUTH P.U.D.UNPLATTED LOT 10 FRONT RANGE VILLAGE FIRST REPLAT LOT 11 FRONT RANGE VILLAGE POND 298C POND 298CPOND 298B LID D STORMTECH MC-800 (69 CHAMBERS) LID C STORMTECH MC-310 (102 CHAMBERS) LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 7 LOT 8 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 7 LOT 8 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 7 LOT 8 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 7 LOT 8 LOT 9 LOT 1 LOT 2 LOT 3 LOT 1 LOT 2 LOT 3 BLOCK 13 BLOCK 14 BLOCK 15 BLOCK 16BLOCK 17 BLOCK 18 BLOCK 19 BLOCK 20 BLOCK 21 BLOCK 22BLOCK 23BLOCK 24 BL O C K 2 7 BL O C K 2 8 BLDG A9 ESMT EXCLUSION BLDG A8 ESMT EXCLUSION BLDG A7 ESMT EXCLUSION BLDG A4 ESMT EXCLUSION BLDG A5 ESMT EXCLUSION BLDG A6 ESMT EXCLUSION LOT C3 LOT C1 LOT C2 EE AG3 EE G3 EE AG4EE G4 EE AG5 EE G5 LOT MU1 LOT MU2 BLOCK 25 BLOCK 26 ZI E G L E R R O A D (R O W V A R I E S ) IN F A N T R Y T E R R A C E D R I V E UNION PARK AVENUE IN F A N T R Y T E R R A C E D R I V E FORT SUMTER WAY LO C O M O T I V E D R I V E IR O N L A N E CITADEL PLACE HERITAGE HILL PLACE WATER LOWERING 'C' (SEE SHEET 52) WATER LOWERING 'A' (SEE SHEET 52) WATER LOWERING "B' (SEE SHEET 52)WATER LOWERING 'D' (SEE SHEET 52) WL LOWERING 'E' (SEE SHEET 52 WL LOWERING 'J' (SEE SHEET 52) WL LOWERING 'K' (SEE SHEET 52) TRACT J D,U&AE(PR) TRACT D D,U&AE(PR) TRACT H D,U&AE(PR) TRACT I D,U&AE(PR) TRACT K D,U&AE(PR) TRACT F D,U&AE(PR) TRACT E D,U&AE(PR) TRACT L D,U&AE(PR) WATERLINE FITTING TABLE FITTING DESCRIPTION NORTHING EASTING RE V I S I O N NO . BY DA T E HI G H L A N D DE V E L O P M E N T S E R V I C E S 63 5 5 F A I R G R O U N D S A V E N U E , S U I T E 2 0 0 | W I N D S O R , C O 8 0 5 5 0 PH O N E : 9 7 0 . 6 7 4 . 7 5 5 0 | E M A I L : I n f o @ H i g h l a n d - D S . c o m | w w w . H i g h l a n d - D S . c o m PREPARED BY OR UNDER THE DIRECT SUPERVISION OF: FOR AND ON BEHALF OF HIGHLAND DEVELOPMENT SERVICES REVIEW SET NOT FOR CONSTRUCTION OFSHEET DRAWN BY CHECKED BY DATE SCALE (H) HDS PROJECT # SCALE (V) UN I O N P A R K UT I L I T Y P L A N 9/9/24 1" = 40' N/A ZMW/PHS JTC 21-1044-00 C3.02 26 60 CALL UTILITY NOTIFICATION CENTER OF COLORADO CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. before you dig.Call Know what's below. R N W E S0 SCALE: 1" = 40' 80402040 NOTES: 1.ALL EXISTING UTILITY LOCATIONS SHOWN HAVE BEEN PROVIDED BY OTHERS AND DETERMINED FROM A COMBINATION OF RECORD DRAWINGS, SURVEYED FIELD MARK-OUTS AND PHYSICAL OBSERVATIONS. THERE MAY BE UTILITIES NOT SHOWN ON THE DRAWINGS WHICH PRESENTLY EXIST IN THE AREA OF CONSTRUCTION. THEREFORE, THE CONTRACTOR SHALL VERIFY LOCATION AND DEPTH OF ALL EXISTING UTILITIES IN THE PROJECT VICINITY PRIOR TO BEGINNING WORK. THE CONTRACTOR SHALL BE FULLY AND SOLELY RESPONSIBLE FOR ANY AND ALL DAMAGES AND COSTS WHICH MIGHT OCCUR BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UTILITIES. THE CONTRACTOR SHALL NOTIFY ALL PUBLIC AND PRIVATE UTILITY COMPANIES AND DETERMINE THE LOCATION OF ALL EXISTING UTILITIES PRIOR TO PROCEEDING WITH GRADING AND CONSTRUCTION. ALL WORK PERFORMED IN THE AREA OF UTILITIES SHALL BE PERFORMED AND INSPECTED ACCORDING TO THE REQUIREMENTS OF THE UTILITY OWNER. LIKEWISE, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING AND MAPPING ANY EXISTING UTILITY (INCLUDING DEPTH) WHICH MAY CONFLICT WITH THE PROPOSED CONSTRUCTION, AND FOR RELOCATING ENCOUNTERED UTILITIES AS DIRECTED BY THE ENGINEER. CONTRACTOR SHALL CONTACT AND RECEIVE APPROVAL FROM OWNER/UTILITY OWNER BEFORE RELOCATING ANY ENCOUNTERED UTILITIES. CONTRACTOR RESPONSIBLE FOR SERVICE CONNECTIONS, AND RELOCATING AND RECONNECTING AFFECTED UTILITIES AS COORDINATED WITH UTILITY OWNER AND/OR ENGINEER, INCLUDING NON-MUNICIPAL UTILITIES (TELEPHONE, GAS, CABLE, ETC., WHICH SHALL BE COORDINATED WITH THE UTILITY OWNER). THE CONTRACTOR SHALL IMMEDIATELY CONTACT ENGINEER UPON DISCOVERY OF A UTILITY DISCREPANCY OR CONFLICT. AT LEAST 48 HOURS PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL NOTIFY THE UTILITY NOTIFICATION CENTER OF COLORADO (1-800-922-1987, WWW.UNCC.ORG). 2.IN ADDITION TO MEETING APPLICABLE LCUASS, STATE OR FEDERAL STANDARDS, ALL MATERIALS, WORKMANSHIP AND CONSTRUCTION OF PUBLIC WATER AND WASTEWATER SYSTEM IMPROVEMENTS SHALL MEET OR EXCEED THE STANDARDS SET FORTH IN THE CITY OF FORT COLLINS WATER AND WASTEWATER DEVELOPMENT STANDARDS. 3.IN CASES OF CONFLICT BETWEEN THESE SIGNED PLANS AND APPLICABLE STANDARDS, THE MOST RESTRICTIVE STANDARD SHALL APPLY. 4.ALL WATER MAINS AND FIRE LINES SHALL BE AWWA C900 PLASTIC PRESSURE PIPE (DR-18, PRESSURE CLASS 305). ALL PLASTIC PRESSURE PIPE SHALL HAVE TRACER WIRE PER STANDARDS. ALL FITTINGS ON THE PROPOSED FIRE LINES AND FIRE HYDRANT LATERALS SHALL BE FULLY RESTRAINED JOINTS PER CITY STANDARDS (MEGA-LUG OR APPROVED EQUAL). 5.ALL WATER SERVICES SHALL BE TYPE K SOFT COPPER. 6.ALL WATER MAINS AND SERVICES SHALL HAVE A MINIMUM COVER OF 4.5' AND A MAXIMUM OF 5.5', UNLESS OTHERWISE NOTED. 7.ALL SANITARY SEWER MAINS AND SERVICES SHALL BE SDR 35 PVC. ALL SANITARY SEWER & STORM SEWER CLEANOUTS LOCATED WITHIN THE PAVEMENT SHALL BE TRAFFIC RATED CLEANOUTS. 8.INVERT SHAPING ON SANITARY SEWER MANHOLES TO BE AT LEAST TO SPRING LINE. 9.SITE CONTRACTOR SHALL COORDINATE UTILITY CONNECTIONS AT THE BUILDING WITH BUILDING CONTRACTOR. 10.ALL PROPOSED STORM SEWER IMPROVEMENTS SHALL BE IN ACCORDANCE WITH THE CITY OF FORT COLLINS STANDARDS AND SPECIFICATIONS. 11.COORDINATE SITE LIGHTING AND ELECTRIC SERVICE ROUTING, DEMOLISHING, RELOCATING, AND MODIFICATIONS WITH THE ELECTRICAL ENGINEER, ARCHITECT, AND OWNER. 12.ALL MANHOLE RIM AND INLET GRATE ELEVATIONS SHOWN ARE APPROXIMATE. CONFIRM FINAL ELEVATIONS PRIOR TO INSTALLATION. 13.ELECTRIC SERVICE TO BE OWNED, MAINTAINED AND INSTALLED BY OWNER FROM THE UTILITY TRANSFORMER SECONDARY LUGS TO THE ELECTRIC METER. 14.ALL INDIVIDUAL LOT SERVICE LINES ARE 3/4" WITH INTERIOR WATER METERS UNLESS OTHERWISE NOTED. SEE DETAILS FOR DUAL WATER SERVICES. 15.ELECTRICAL LAYOUT AND DESIGN FOR EV CHARGERS TO BE PROVIDED BY OTHERS. EV INSTALLED EV READY EV CAPABLE EV READY LEGEND C DSDS DS DS DS DSDSDS DSDS DSDSDS DSDS DS DS DS DS MA T C H L I N E SE E S H E E T 28UNION PARK AVENUE TRACT G D,U&AE(PU) SSWR-01 PROFILE HORIZ. SCALE: 1"=40' 4915 4920 4925 4930 4935 4940 4945 4915 4920 4925 4930 4935 4940 4945 15+5016+0016+5017+0017+5018+0018+5019+0019+5020+0020+5021+0021+5022+0022+50 MA T C H L I N E ST A 1 5 + 5 0 MA T C H L I N E SE E S H E E T 28 RE V I S I O N NO . BY DA T E HI G H L A N D DE V E L O P M E N T S E R V I C E S 63 5 5 F A I R G R O U N D S A V E N U E , S U I T E 2 0 0 | W I N D S O R , C O 8 0 5 5 0 PH O N E : 9 7 0 . 6 7 4 . 7 5 5 0 | E M A I L : I n f o @ H i g h l a n d - D S . c o m | w w w . H i g h l a n d - D S . c o m PREPARED BY OR UNDER THE DIRECT SUPERVISION OF: FOR AND ON BEHALF OF HIGHLAND DEVELOPMENT SERVICES REVIEW SET NOT FOR CONSTRUCTION OFSHEET DRAWN BY CHECKED BY DATE SCALE (H) HDS PROJECT # SCALE (V) UN I O N P A R K SA N I T A R Y S E W E R P L A N & P R O F I L E S SS W R - 0 1 S T A 2 3 + 5 0 T O 1 5 + 5 0 9/9/24 1" = 40' 1" = 4' ZMW JTC 21-1044-00 C3.03 27 60 N W E S KEY MAP NTS ZI E G L E R R O A D CO R B E T T D R PADDINGTON RD UNION PARK AVEED M O N D S R D SSWR-01 N W E S NOTES: 1.ALL SANITARY SEWER MAINS AND SERVICES SHALL BE SDR 35 PVC. VERIFY BUILDING CONNECTION ELEVATION (RE: MEP). 2.ALL SANITARY SEWER & STORM SEWER CLEANOUTS LOCATED WITHIN THE PAVEMENT SHALL BE TRAFFIC RATED CLEANOUTS. 3.INVERT SHAPING ON SANITARY SEWER MANHOLES TO BE AT LEAST TO SPRING LINE. 4.ALL MANHOLE RIM ELEVATIONS SHOWN ARE APPROXIMATE. CONFIRM FINAL ELEVATIONS PRIOR TO INSTALLATION. 5.PIPE LENGTHS ARE PROVIDED FROM CENTER OF STRUCTURE TO CENTER OF STRUCTURE. 6.INSTALL CUT OFF WALLS 5' UPSTREAM OF ALL SSWR MANHOLES AND AT 400 LF INTERVALS ON SEWER MAINS CONSISTING OF COMPACTED CLAY MATERIAL EXTENDING 12" ABOVE THE TOP OF THE PIPE. 0 SCALE: 1" = 40' 80402040 HORIZONTAL VERTICAL SCALE: 1" =4' CALL UTILITY NOTIFICATION CENTER OF COLORADO CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. before you dig.Call Know what's below. R SSWR-02 (SEE SHEET 29-30) SSWR-10 (SEE SHEET 34) DSDSDS DSDS DS DS DS DS MA T C H L I N E SE E S H E E T 27 ZI E G L E R R O A D (R O W V A R I E S ) LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 BLOCK 22 LOT MU1 LOT MU2 BLOCK 26 SSWR-01 PROFILE HORIZ. SCALE: 1"=40' 4915 4920 4925 4930 4935 4940 4945 4915 4920 4925 4930 4935 4940 4945 9+5010+0010+5011+0011+5012+0012+5013+0013+5014+0014+5015+0015+5016+0016+50 MA T C H L I N E ST A 1 5 + 5 0 MA T C H L I N E SE E S H E E T 27 RE V I S I O N NO . BY DA T E HI G H L A N D DE V E L O P M E N T S E R V I C E S 63 5 5 F A I R G R O U N D S A V E N U E , S U I T E 2 0 0 | W I N D S O R , C O 8 0 5 5 0 PH O N E : 9 7 0 . 6 7 4 . 7 5 5 0 | E M A I L : I n f o @ H i g h l a n d - D S . c o m | w w w . H i g h l a n d - D S . c o m PREPARED BY OR UNDER THE DIRECT SUPERVISION OF: FOR AND ON BEHALF OF HIGHLAND DEVELOPMENT SERVICES REVIEW SET NOT FOR CONSTRUCTION OFSHEET DRAWN BY CHECKED BY DATE SCALE (H) HDS PROJECT # SCALE (V) UN I O N P A R K SA N I T A R Y S E W E R P L A N & P R O F I L E S SS W R - 0 1 S T A 1 5 + 5 0 T O 9 + 5 0 9/9/24 1" = 40' 1" = 4' ZMW JTC 21-1044-00 C3.04 28 60 N W E S KEY MAP NTS ZI E G L E R R O A D CO R B E T T D R PADDINGTON RD UNION PARK AVEED M O N D S R D SSWR-01 N W E S NOTES: 1.ALL SANITARY SEWER MAINS AND SERVICES SHALL BE SDR 35 PVC. VERIFY BUILDING CONNECTION ELEVATION (RE: MEP). 2.ALL SANITARY SEWER & STORM SEWER CLEANOUTS LOCATED WITHIN THE PAVEMENT SHALL BE TRAFFIC RATED CLEANOUTS. 3.INVERT SHAPING ON SANITARY SEWER MANHOLES TO BE AT LEAST TO SPRING LINE. 4.ALL MANHOLE RIM ELEVATIONS SHOWN ARE APPROXIMATE. CONFIRM FINAL ELEVATIONS PRIOR TO INSTALLATION. 5.PIPE LENGTHS ARE PROVIDED FROM CENTER OF STRUCTURE TO CENTER OF STRUCTURE. 6.INSTALL CUT OFF WALLS 5' UPSTREAM OF ALL SSWR MANHOLES AND AT 400 LF INTERVALS ON SEWER MAINS CONSISTING OF COMPACTED CLAY MATERIAL EXTENDING 12" ABOVE THE TOP OF THE PIPE. 0 SCALE: 1" = 40' 80402040 HORIZONTAL VERTICAL SCALE: 1" =4' CALL UTILITY NOTIFICATION CENTER OF COLORADO CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. before you dig.Call Know what's below. R SSWR-03 (SEE SHEET 31) SSWR-09 (SEE SHEET 34) SSWR-05 (SEE SHEET 33) C C C C C C C C C C C C C C C DS DS DS DS DS DS DS DS DS DS DS DSDS DS DS DS DS DS DS DS DS DS DS DS D DS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS N D YLOPLAST ONOTPOLLUTE LEIRON DRAINSTO D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE MA T C H L I N E SE E S H E E T 30 FORT SUMTER WAY UN I O N P A R K A V E N U E BLDG A2 ESMT EXCLUSION BLDG A11 ESMT EXCLUSION BLDG A10 ESMT EXCLUSION BLDG A3 ESMT EXCLUSION EE G1 EE G2EE AG1 EE AG2 BLOCK 29 LOT R1 TRACT M D,U&AE(PR) SSWR-02 PROFILE HORIZ. SCALE: 1"=40' 4920 4925 4930 4935 4940 4945 4950 4920 4925 4930 4935 4940 4945 4950 15+0015+5016+0016+5017+0017+5018+0018+5019+0019+5020+0020+5021+0021+5022+0022+5023+0023+50 MA T C H L I N E ST A 1 5 + 0 0 MA T C H L I N E SE E S H E E T 30 RE V I S I O N NO . BY DA T E HI G H L A N D DE V E L O P M E N T S E R V I C E S 63 5 5 F A I R G R O U N D S A V E N U E , S U I T E 2 0 0 | W I N D S O R , C O 8 0 5 5 0 PH O N E : 9 7 0 . 6 7 4 . 7 5 5 0 | E M A I L : I n f o @ H i g h l a n d - D S . c o m | w w w . H i g h l a n d - D S . c o m PREPARED BY OR UNDER THE DIRECT SUPERVISION OF: FOR AND ON BEHALF OF HIGHLAND DEVELOPMENT SERVICES REVIEW SET NOT FOR CONSTRUCTION OFSHEET DRAWN BY CHECKED BY DATE SCALE (H) HDS PROJECT # SCALE (V) UN I O N P A R K SA N I T A R Y S E W E R P L A N & P R O F I L E S SS W R - 0 2 S T A 2 3 + 5 0 T O 1 5 + 0 0 9/9/24 1" = 40' 1" = 4' ZMW JTC 21-1044-00 C3.05 29 60 N W E S KEY MAP NTS ZI E G L E R R O A D CO R B E T T D R PADDINGTON RD UNION PARK AVEED M O N D S R D SSWR-02 N W E S NOTES: 1.ALL SANITARY SEWER MAINS AND SERVICES SHALL BE SDR 35 PVC. VERIFY BUILDING CONNECTION ELEVATION (RE: MEP). 2.ALL SANITARY SEWER & STORM SEWER CLEANOUTS LOCATED WITHIN THE PAVEMENT SHALL BE TRAFFIC RATED CLEANOUTS. 3.INVERT SHAPING ON SANITARY SEWER MANHOLES TO BE AT LEAST TO SPRING LINE. 4.ALL MANHOLE RIM ELEVATIONS SHOWN ARE APPROXIMATE. CONFIRM FINAL ELEVATIONS PRIOR TO INSTALLATION. 5.PIPE LENGTHS ARE PROVIDED FROM CENTER OF STRUCTURE TO CENTER OF STRUCTURE. 6.INSTALL CUT OFF WALLS 5' UPSTREAM OF ALL SSWR MANHOLES AND AT 400 LF INTERVALS ON SEWER MAINS CONSISTING OF COMPACTED CLAY MATERIAL EXTENDING 12" ABOVE THE TOP OF THE PIPE. 0 SCALE: 1" = 40' 80402040 HORIZONTAL VERTICAL SCALE: 1" =4' CALL UTILITY NOTIFICATION CENTER OF COLORADO CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. before you dig.Call Know what's below. R CCCC DS DS DS DS DS DSDSDSD DS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DS DS DS DS DS DS DSDS DS DS DS DS DS DS NYLOPLAST D U C T I L E I R O N DO NOT POLLU T E D R A I N S T O W A T E R W A Y S NYLOPLA S T D U C T I L E I R O N DO NOT P O L L U T E D R A I N S T O W A T E R W A Y S D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRONDRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRONDRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRONDRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRONDRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRONDRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRONDRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRONDRAINSTOWATERWAYS EDMONDS ROAD BL D G A 3 ES M T EX C L U S I O N EE A G 2 MATCHLINE SEE SHEET 29 SSWR-02 PROFILE HORIZ. SCALE: 1"=40' 4920 4925 4930 4935 4940 4945 4950 4920 4925 4930 4935 4940 4945 4950 9+5010+0010+5011+0011+5012+0012+5013+0013+5014+0014+5015+00 MA T C H L I N E ST A 1 5 + 0 0 MA T C H L I N E SE E S H E E T 29 RE V I S I O N NO . BY DA T E HI G H L A N D DE V E L O P M E N T S E R V I C E S 63 5 5 F A I R G R O U N D S A V E N U E , S U I T E 2 0 0 | W I N D S O R , C O 8 0 5 5 0 PH O N E : 9 7 0 . 6 7 4 . 7 5 5 0 | E M A I L : I n f o @ H i g h l a n d - D S . c o m | w w w . H i g h l a n d - D S . c o m PREPARED BY OR UNDER THE DIRECT SUPERVISION OF: FOR AND ON BEHALF OF HIGHLAND DEVELOPMENT SERVICES REVIEW SET NOT FOR CONSTRUCTION OFSHEET DRAWN BY CHECKED BY DATE SCALE (H) HDS PROJECT # SCALE (V) UN I O N P A R K SA N I T A R Y S E W E R P L A N & P R O F I L E S SS W R - 0 2 S T A 1 5 + 0 0 T O 9 + 5 0 9/9/24 1" = 40' 1" = 4' ZMW JTC 21-1044-00 C3.06 30 60 N W E S KEY MAP NTS ZI E G L E R R O A D CO R B E T T D R PADDINGTON RD UNION PARK AVEED M O N D S R D SSWR-02 N W E S NOTES: 1.ALL SANITARY SEWER MAINS AND SERVICES SHALL BE SDR 35 PVC. VERIFY BUILDING CONNECTION ELEVATION (RE: MEP). 2.ALL SANITARY SEWER & STORM SEWER CLEANOUTS LOCATED WITHIN THE PAVEMENT SHALL BE TRAFFIC RATED CLEANOUTS. 3.INVERT SHAPING ON SANITARY SEWER MANHOLES TO BE AT LEAST TO SPRING LINE. 4.ALL MANHOLE RIM ELEVATIONS SHOWN ARE APPROXIMATE. CONFIRM FINAL ELEVATIONS PRIOR TO INSTALLATION. 5.PIPE LENGTHS ARE PROVIDED FROM CENTER OF STRUCTURE TO CENTER OF STRUCTURE. 6.INSTALL CUT OFF WALLS 5' UPSTREAM OF ALL SSWR MANHOLES AND AT 400 LF INTERVALS ON SEWER MAINS CONSISTING OF COMPACTED CLAY MATERIAL EXTENDING 12" ABOVE THE TOP OF THE PIPE. 0 SCALE: 1" = 40' 80402040 HORIZONTAL VERTICAL SCALE: 1" =4' CALL UTILITY NOTIFICATION CENTER OF COLORADO CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. before you dig.Call Know what's below. R SSWR-01 (SEE SHEET 27) SSWR-01 (SEE SHEET 27) NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS DDONOTPOLLUTE RAINSTOWATERWAYS DUCTILEIRON NYLOPLAST NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE DO NOT POLLUTEDRAINS TO WATERWAYS NYLOPLASTDUCTILE IRON D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE MA T C H L I N E SE E S H E E T 28 IN F A N T R Y T E R R A C E D R I V E FORTITUDE LANE UNION PARK AVENUE FORTITUDE LANE GOLDEN GROVE DRIVE GOLDEN GROVE DRIVE LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 1 LOT 2 LOT 3 LOT 4 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5LOT 1 LOT 2 LOT 3 LOT 4LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 1 LOT 2 LOT 3 LOT 4 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5LOT 1 LOT 2 LOT 3 LOT 4LOT 5LOT 4LOT 3LOT 2LOT 1 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 7 LOT 8 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 7 LOT 8 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6LOT 1 LOT 2 LOT 3 LOT 4 LOT 5LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 7 LOT 8 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 7 LOT 8 LOT 9 BLOCK 1 BLOCK 2 BLOCK 3 BLOCK 4BLOCK 5BLOCK 6 BLOCK 7 BLOCK 8 BLOCK 9 BLOCK 10BLOCK 11BLOCK 12 BLOCK 13 BLOCK 14 BLOCK 15 BLOCK 16BLOCK 17BLOCK 18 BLOCK 19 BLOCK 20 BLOCK 21 BLOCK 22BLOCK 23BLOCK 24 LOT C3 ED M O N D S R O A D BL U E C O A T DR I V E LO C O M O T I V E DR I V E IN F A N T R Y TE R R A C E D R I V E ED M O N D S RO A D UNION PA R K AVENUE MA T C H L I N E SE E B E L O W TRACT G TRACT B D,U&AE(PR) TR A C T C D, U & A E ( P U ) TRACT D D,U&AE(PR) SSWR-03 PROFILE HORIZ. SCALE: 1"=40' 4920 4925 4930 4935 4940 4920 4925 4930 4935 4940 14+0014+5015+0015+5016+0016+5017+0017+5018+0018+5019+0019+5020+0020+5021+0021+5022+0022+5023+0023+50 MA T C H L I N E SE E B E L O W MA T C H L I N E ST A 1 4 + 0 0 SSWR-03 PROFILE HORIZ. SCALE: 1"=40' 4920 4925 4930 4935 4940 4920 4925 4930 4935 4940 9+5010+0010+5011+0011+5012+0012+5013+0013+5014+00 MA T C H L I N E ST A 1 4 + 0 0 MA T C H L I N E SE E A B O V E SANITARY SERVICE STATIONING SSWR MAIN BLOCK-LOT SRVC SIZE STATION SANITARY SERVICE STATIONING SSWR MAIN BLOCK-LOT SRVC SIZE STATION SANITARY SERVICE STATIONING SSWR MAIN BLOCK-LOT SRVC SIZE STATION SANITARY SERVICE STATIONING SSWR MAIN BLOCK-LOT SRVC SIZE STATION RE V I S I O N NO . BY DA T E HI G H L A N D DE V E L O P M E N T S E R V I C E S 63 5 5 F A I R G R O U N D S A V E N U E , S U I T E 2 0 0 | W I N D S O R , C O 8 0 5 5 0 PH O N E : 9 7 0 . 6 7 4 . 7 5 5 0 | E M A I L : I n f o @ H i g h l a n d - D S . c o m | w w w . H i g h l a n d - D S . c o m PREPARED BY OR UNDER THE DIRECT SUPERVISION OF: FOR AND ON BEHALF OF HIGHLAND DEVELOPMENT SERVICES REVIEW SET NOT FOR CONSTRUCTION OFSHEET DRAWN BY CHECKED BY DATE SCALE (H) HDS PROJECT # SCALE (V) UN I O N P A R K SA N I T A R Y S E W E R P L A N & P R O F I L E S SS W R - 0 3 9/9/24 1" = 40' 1" = 4' ZMW JTC 21-1044-00 C3.07 31 60 N W E S KEY MAP NTS ZI E G L E R R O A D CO R B E T T D R PADDINGTON RD UNION PARK AVEED M O N D S R D SSWR-03 N W E S NOTES: 1.ALL SANITARY SEWER MAINS AND SERVICES SHALL BE SDR 35 PVC. VERIFY BUILDING CONNECTION ELEVATION (RE: MEP). 2.ALL SANITARY SEWER & STORM SEWER CLEANOUTS LOCATED WITHIN THE PAVEMENT SHALL BE TRAFFIC RATED CLEANOUTS. 3.INVERT SHAPING ON SANITARY SEWER MANHOLES TO BE AT LEAST TO SPRING LINE. 4.ALL MANHOLE RIM ELEVATIONS SHOWN ARE APPROXIMATE. CONFIRM FINAL ELEVATIONS PRIOR TO INSTALLATION. 5.PIPE LENGTHS ARE PROVIDED FROM CENTER OF STRUCTURE TO CENTER OF STRUCTURE. 6.INSTALL CUT OFF WALLS 5' UPSTREAM OF ALL SSWR MANHOLES AND AT 400 LF INTERVALS ON SEWER MAINS CONSISTING OF COMPACTED CLAY MATERIAL EXTENDING 12" ABOVE THE TOP OF THE PIPE. 0 SCALE: 1" = 40' 80402040 HORIZONTAL VERTICAL SCALE: 1" =4' CALL UTILITY NOTIFICATION CENTER OF COLORADO CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. before you dig.Call Know what's below. R SSWR-05 (SEE SHEET 33) SS W R - 0 4 (S E E S H E E T 32 ) SS W R - 0 1 (S E E S H E E T 28 ) SS W R - 0 1 (S E E S H E E T 28 ) NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS DDONOTPOLLUTE RAINSTOWATERWAYS DUCTILEIRON NYLOPLAST NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS FORTITUDE LANEFORTITUDE LANE LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 1 LOT 2 LOT 3 LOT 4 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5LOT 1 LOT 2 LOT 3 LOT 4LOT 5LOT 4LOT 3LOT 2LOT 1 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 7 LOT 8 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 7 LOT 8 LOT 9 BLOCK 7 BLOCK 8 BLOCK 9 BLOCK 10BLOCK 11BLOCK 12 BLOCK 19 BLOCK 20 BLOCK 21 BLOCK 22BLOCK 23BLOCK 24 BL U E C O A T DR I V E LO C O M O T I V E DR I V E ED M O N D S RO A D SSWR-04 PROFILE HORIZ. SCALE: 1"=40' 4915 4920 4925 4930 4935 4940 4945 4915 4920 4925 4930 4935 4940 4945 9+5010+0010+5011+0011+5012+0012+5013+0013+5014+0014+5015+0015+5016+0016+5017+0017+5018+0018+5019+0019+5020+0020+5021+00 SANITARY SERVICE STATIONING SSWR MAIN BLOCK-LOT SRVC SIZE STATION SANITARY SERVICE STATIONING SSWR MAIN BLOCK-LOT SRVC SIZE STATION SANITARY SERVICE STATIONING SSWR MAIN BLOCK-LOT SRVC SIZE STATION SANITARY SERVICE STATIONING SSWR MAIN BLOCK-LOT SRVC SIZE STATION SANITARY SERVICE STATIONING SSWR MAIN BLOCK-LOT SRVC SIZE STATION RE V I S I O N NO . BY DA T E HI G H L A N D DE V E L O P M E N T S E R V I C E S 63 5 5 F A I R G R O U N D S A V E N U E , S U I T E 2 0 0 | W I N D S O R , C O 8 0 5 5 0 PH O N E : 9 7 0 . 6 7 4 . 7 5 5 0 | E M A I L : I n f o @ H i g h l a n d - D S . c o m | w w w . H i g h l a n d - D S . c o m PREPARED BY OR UNDER THE DIRECT SUPERVISION OF: FOR AND ON BEHALF OF HIGHLAND DEVELOPMENT SERVICES REVIEW SET NOT FOR CONSTRUCTION OFSHEET DRAWN BY CHECKED BY DATE SCALE (H) HDS PROJECT # SCALE (V) UN I O N P A R K SA N I T A R Y S E W E R P L A N & P R O F I L E S SS W R - 0 4 9/9/24 1" = 40' 1" = 4' ZMW JTC 21-1044-00 C3.08 32 60 N W E S KEY MAP NTS ZI E G L E R R O A D CO R B E T T D R PADDINGTON RD UNION PARK AVEED M O N D S R D SSWR-04 N W E S NOTES: 1.ALL SANITARY SEWER MAINS AND SERVICES SHALL BE SDR 35 PVC. VERIFY BUILDING CONNECTION ELEVATION (RE: MEP). 2.ALL SANITARY SEWER & STORM SEWER CLEANOUTS LOCATED WITHIN THE PAVEMENT SHALL BE TRAFFIC RATED CLEANOUTS. 3.INVERT SHAPING ON SANITARY SEWER MANHOLES TO BE AT LEAST TO SPRING LINE. 4.ALL MANHOLE RIM ELEVATIONS SHOWN ARE APPROXIMATE. CONFIRM FINAL ELEVATIONS PRIOR TO INSTALLATION. 5.PIPE LENGTHS ARE PROVIDED FROM CENTER OF STRUCTURE TO CENTER OF STRUCTURE. 6.INSTALL CUT OFF WALLS 5' UPSTREAM OF ALL SSWR MANHOLES AND AT 400 LF INTERVALS ON SEWER MAINS CONSISTING OF COMPACTED CLAY MATERIAL EXTENDING 12" ABOVE THE TOP OF THE PIPE. 0 SCALE: 1" = 40' 80402040 HORIZONTAL VERTICAL SCALE: 1" =4' CALL UTILITY NOTIFICATION CENTER OF COLORADO CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. before you dig.Call Know what's below. R SSWR-03 (SEE SHEET 31) SSWR-03 (SEE SHEET 31) DSDS DS DS DS DS DS DS DSDSDS DS DS DS DS DS DS DS DS DS DSDS DS DS DS DS DS DS DS DS DSDS DS DSDS DS DS DS DS DSDS DS DS DS DS DS DSDS DS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYSD N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYSD N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS MA T C H L I N E SE E S H E E T 28UNION PARK AVENUE FORT SUMTER WAY BL O C K 2 7 BLDG A9 ESMT EXCLUSION BLDG A8 ESMT EXCLUSION BLDG A5 ESMT EXCLUSION BLDG A6 ESMT EXCLUSION EE G3 EE AG4EE G4 IN F A N T R Y TE R R A C E D R I V E TRACT G D,U&AE(PU) TRACT K D,U&AE(PR) TRACT L D,U&AE(PR) SSWR-05 PROFILE HORIZ. SCALE: 1"=40' 4915 4920 4925 4930 4935 4940 4945 4915 4920 4925 4930 4935 4940 4945 9+5010+0010+5011+0011+5012+0012+5013+0013+5014+0014+5015+0015+5016+0016+5017+0017+5018+0018+5019+00 DS DS DS DS DS DS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS LOT 1 LOT 1 CITADEL PLACE TRACT J D,U&AE(PR) TRACT I D,U&AE(PR) SSWR-06 PROFILE HORIZ. SCALE: 1"=40' 4920 4925 4930 4935 4940 4920 4925 4930 4935 4940 9+50 10+00 10+50 11+00 11+50 12+00 12+50 RE V I S I O N NO . BY DA T E HI G H L A N D DE V E L O P M E N T S E R V I C E S 63 5 5 F A I R G R O U N D S A V E N U E , S U I T E 2 0 0 | W I N D S O R , C O 8 0 5 5 0 PH O N E : 9 7 0 . 6 7 4 . 7 5 5 0 | E M A I L : I n f o @ H i g h l a n d - D S . c o m | w w w . H i g h l a n d - D S . c o m PREPARED BY OR UNDER THE DIRECT SUPERVISION OF: FOR AND ON BEHALF OF HIGHLAND DEVELOPMENT SERVICES REVIEW SET NOT FOR CONSTRUCTION OFSHEET DRAWN BY CHECKED BY DATE SCALE (H) HDS PROJECT # SCALE (V) UN I O N P A R K SA N I T A R Y S E W E R P L A N & P R O F I L E S SS W R - 0 5 & 0 6 9/9/24 1" = 40' 1" = 4' ZMW JTC 21-1044-00 C3.09 33 60 N W E S KEY MAP NTS ZI E G L E R R O A D CO R B E T T D R PADDINGTON RD UNION PARK AVEED M O N D S R D SSWR-05 SSWR-06 N W E S NOTES: 1.ALL SANITARY SEWER MAINS AND SERVICES SHALL BE SDR 35 PVC. VERIFY BUILDING CONNECTION ELEVATION (RE: MEP). 2.ALL SANITARY SEWER & STORM SEWER CLEANOUTS LOCATED WITHIN THE PAVEMENT SHALL BE TRAFFIC RATED CLEANOUTS. 3.INVERT SHAPING ON SANITARY SEWER MANHOLES TO BE AT LEAST TO SPRING LINE. 4.ALL MANHOLE RIM ELEVATIONS SHOWN ARE APPROXIMATE. CONFIRM FINAL ELEVATIONS PRIOR TO INSTALLATION. 5.PIPE LENGTHS ARE PROVIDED FROM CENTER OF STRUCTURE TO CENTER OF STRUCTURE. 6.INSTALL CUT OFF WALLS 5' UPSTREAM OF ALL SSWR MANHOLES AND AT 400 LF INTERVALS ON SEWER MAINS CONSISTING OF COMPACTED CLAY MATERIAL EXTENDING 12" ABOVE THE TOP OF THE PIPE. 0 SCALE: 1" = 40' 80402040 HORIZONTAL VERTICAL SCALE: 1" =4' CALL UTILITY NOTIFICATION CENTER OF COLORADO CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. before you dig.Call Know what's below. R SSWR-05 (SEE SHEET 33) SSWR-05 (SEE SHEET 33) SSWR-07 (SEE SHEET 34) SS W R - 0 1 (S E E S H E E T 28 ) SS W R - 0 6 (S E E T H I S S H E E T ) SS W R - 0 1 (S E E S H E E T 28 ) SSWR-03 (SEE SHEET 31) SS W R - 0 8 (S E E S H E E T 34 ) DS DS DS DS DS DS DS DS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYSD N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS EE AG5 FORT SUMTER WAY SSWR-08 PROFILE HORIZ. SCALE: 1"=40' 4920 4925 4930 4935 4940 4945 4920 4925 4930 4935 4940 4945 9+50 10+00 10+50 11+00 11+50 12+00 BLOCK 25 TRACT E D,U&AE(PR) SSWR-09 PROFILE HORIZ. SCALE: 1"=40' 4920 4925 4930 4935 4940 4920 4925 4930 4935 4940 9+50 10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 NYLOPLAS T D U C T I L E I R O N DO NOT POLL U T E D R A I N S T O W A T E R W A Y S LO T 1 LO T 2 LO T 3 LO T 1 LO T 2 LO T 3 BLOCK 28 CI T A D E L P L A C E IRON LANE TRACT J D,U&AE(PR) TRACT I D,U&AE(PR) SSWR-07 PROFILE HORIZ. SCALE: 1"=40' 4920 4925 4930 4935 4940 4920 4925 4930 4935 4940 9+5010+0010+5011+0011+50 DS DS DS DSDSDSD D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE SSWR-10 PROFILE HORIZ. SCALE: 1"=40' 4920 4925 4930 4935 4940 4945 4920 4925 4930 4935 4940 4945 9+5010+0010+5011+0011+5012+0012+5012+75 RE V I S I O N NO . BY DA T E HI G H L A N D DE V E L O P M E N T S E R V I C E S 63 5 5 F A I R G R O U N D S A V E N U E , S U I T E 2 0 0 | W I N D S O R , C O 8 0 5 5 0 PH O N E : 9 7 0 . 6 7 4 . 7 5 5 0 | E M A I L : I n f o @ H i g h l a n d - D S . c o m | w w w . H i g h l a n d - D S . c o m PREPARED BY OR UNDER THE DIRECT SUPERVISION OF: FOR AND ON BEHALF OF HIGHLAND DEVELOPMENT SERVICES REVIEW SET NOT FOR CONSTRUCTION OFSHEET DRAWN BY CHECKED BY DATE SCALE (H) HDS PROJECT # SCALE (V) UN I O N P A R K SA N I T A R Y S E W E R P L A N & P R O F I L E S SS W R - 0 7 , 0 8 , 0 9 , & 1 0 9/9/24 1" = 40' 1" = 4' ZMW JTC 21-1044-00 C3.10 34 60 N W E S KEY MAP NTS ZI E G L E R R O A D CO R B E T T D R PADDINGTON RD UNION PARK AVEED M O N D S R D SSWR-07 SSWR-08 SSWR-09 N W E S N W E S N W E S NOTES: 1.ALL SANITARY SEWER MAINS AND SERVICES SHALL BE SDR 35 PVC. VERIFY BUILDING CONNECTION ELEVATION (RE: MEP). 2.ALL SANITARY SEWER & STORM SEWER CLEANOUTS LOCATED WITHIN THE PAVEMENT SHALL BE TRAFFIC RATED CLEANOUTS. 3.INVERT SHAPING ON SANITARY SEWER MANHOLES TO BE AT LEAST TO SPRING LINE. 4.ALL MANHOLE RIM ELEVATIONS SHOWN ARE APPROXIMATE. CONFIRM FINAL ELEVATIONS PRIOR TO INSTALLATION. 5.PIPE LENGTHS ARE PROVIDED FROM CENTER OF STRUCTURE TO CENTER OF STRUCTURE. 6.INSTALL CUT OFF WALLS 5' UPSTREAM OF ALL SSWR MANHOLES AND AT 400 LF INTERVALS ON SEWER MAINS CONSISTING OF COMPACTED CLAY MATERIAL EXTENDING 12" ABOVE THE TOP OF THE PIPE. 0 SCALE: 1" = 40' 80402040 HORIZONTAL VERTICAL SCALE: 1" =4' CALL UTILITY NOTIFICATION CENTER OF COLORADO CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. before you dig.Call Know what's below. R SSWR-06 (SEE SHEET 33) SSWR-06 (SEE SHEET 33) SSWR-05 (SEE SHEET 33) SS W R - 0 5 (S E E S H E E T 33 ) SSWR-01 (SEE SHEET 28) SSWR-01 (SEE SHEET 28) SSWR-10 N W E S SSWR-01 (SEE SHEET 28) SSWR-01 (SEE SHEET 28) NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS LOT MU2 SD-02 (SEE SHEET 35) TRACT H D,U&AE(PR) TRACT I D,U&AE(PR) NYLOPLA S T D U C T I L E I R O N DO NOT P O L L U T E D R A I N S T O W A T E R W A Y S LOT MU2 SD-03 (SEE SHEET 36) TR A C T H D, U & A E ( P R ) TRACT I D,U&AE(PR) TRACT F D,U&AE(PR) SD-01 PROFILE HORIZ. SCALE: 1"=40' 4920 4925 4930 4935 4940 4920 4925 4930 4935 4940 9+009+5010+0010+5011+0011+50 SD-02 PROFILE HORIZ. SCALE: 1"=40' 4920 4925 4930 4935 4940 4920 4925 4930 4935 4940 9+00 9+50 10+00 10+50 11+00 11+50 WTR LOWERING 'B' (SEE SHEET 52) N W E S KEY MAP NTS ZI E G L E R R O A D CO R B E T T D R PADDINGTON RD UNION PARK AVEED M O N D S R D RE V I S I O N NO . BY DA T E HI G H L A N D DE V E L O P M E N T S E R V I C E S 63 5 5 F A I R G R O U N D S A V E N U E , S U I T E 2 0 0 | W I N D S O R , C O 8 0 5 5 0 PH O N E : 9 7 0 . 6 7 4 . 7 5 5 0 | E M A I L : I n f o @ H i g h l a n d - D S . c o m | w w w . H i g h l a n d - D S . c o m PREPARED BY OR UNDER THE DIRECT SUPERVISION OF: FOR AND ON BEHALF OF HIGHLAND DEVELOPMENT SERVICES REVIEW SET NOT FOR CONSTRUCTION OFSHEET DRAWN BY CHECKED BY DATE SCALE (H) HDS PROJECT # SCALE (V) UN I O N P A R K ST O R M D R A I N P L A N & P R O F I L E S SD - 0 1 & S D - 0 2 9/9/24 1" = 40' 1" = 4' ZMW JTC 21-1044-00 C3.11 35 60 N W E S N W E S SD-02 SD-01 NOTES: 1.ALL PROPOSED STORM SEWER IMPROVEMENTS SHALL BE IN ACCORDANCE WITH THE CITY OF FORT COLLINS STANDARDS AND SPECIFICATIONS. 2.STORM PIPES SHALL BE ADS HP STORM UNLESS OTHERWISE NOTED. 3.ALL MANHOLE RIM AND INLET GRATE ELEVATIONS SHOWN ARE APPROXIMATE. CONFIRM FINAL ELEVATIONS PRIOR TO INSTALLATION. 4.PIPE LENGTHS ARE PROVIDED FROM CENTER OF STRUCTURE TO CENTER OF STRUCTURE. LENGTH OF FLARED END SECTIONS ARE INCLUDED IN PIPE LENGTHS. 5.ALL STORM PIPES AND STRUCTURES ARE PRIVATELY OWNED AND MAINTAINED EXCEPT WHERE SPECIFICALLY IDENTIFIED AND LABELED ON THESE PLANS AS PUBLIC. 6.INSTALL CUT OFF WALLS 5' UPSTREAM OF ALL STORM MANHOLES AND INLETS CONSISTING OF COMPACTED CLAY MATERIAL EXTENDING BEYOND THE SPRINGLINE OF THE PIPE. CALL UTILITY NOTIFICATION CENTER OF COLORADO CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. before you dig.Call Know what's below. R 0 SCALE: 1" = 40' 80402040 HORIZONTAL VERTICAL SCALE: 1" =4' SD-01 SD-02 C NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS DDONOTPOLLUTE RAINSTOWATERWAYS DUCTILEIRON NYLOPLAST D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS SD-16 (SEE SHEET 40) LOT 1 LOT 2 LOT 3 LOT 4 LOT 5LOT 1 LOT 3 LOT 4 LOT 5 LOT 4LOT 3LOT 2LOT 1 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 BLOCK 10BLOCK 11BLOCK 12 BLOCK 24 UNION PARK AVENUE FORTITUDE LANE ED M O N D S R O A D LID-B (SEE SHEET 42) SD-16 (SEE SHEET 40) SD-13 (SEE SHEET 39) MA T C H L I N E SE E T H I S S H E E T TRACT G D,U&AE(PU) SD-07 (SEE SHEET 38) SD-02 (SEE SHEET 35) LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 7 LOT 8 LOT 9 BLOCK 22BLOCK 23BLOCK 24 LOT MU1 LOT MU2 BLOCK 26 LID-D (SEE SHEET 42) SD-08 (SEE SHEET 38) MA T C H L I N E SE E T H I S S H E E T 4920 4925 4930 4935 4940 4945 4920 4925 4930 4935 4940 4945 17+5018+0018+5019+0019+5020+0020+5021+0021+5022+0022+5023+0023+5024+0024+5024+75 MA T C H L I N E ST A 1 7 + 5 0 MA T C H L I N E SE E T H I S S H E E T DEFLECT PIPE TO ACHIEVE 18" MIN BELOW SD-16 (SEE SHEET 40) 4920 4925 4930 4935 4940 4920 4925 4930 4935 4940 9+5010+0010+5011+0011+5012+0012+5013+0013+5014+0014+5015+0015+5016+0016+5017+0017+50 MA T C H L I N E ST A 1 7 + 5 0 MA T C H L I N E SE E T H I S S H E E T *WTR LOWERING 'D' (SEE SHEET 52) *WTR LOWERING 'C' (SEE SHEET 52) N W E S KEY MAP NTS ZI E G L E R R O A D CO R B E T T D R PADDINGTON RD UNION PARK AVEED M O N D S R D RE V I S I O N NO . BY DA T E HI G H L A N D DE V E L O P M E N T S E R V I C E S 63 5 5 F A I R G R O U N D S A V E N U E , S U I T E 2 0 0 | W I N D S O R , C O 8 0 5 5 0 PH O N E : 9 7 0 . 6 7 4 . 7 5 5 0 | E M A I L : I n f o @ H i g h l a n d - D S . c o m | w w w . H i g h l a n d - D S . c o m PREPARED BY OR UNDER THE DIRECT SUPERVISION OF: FOR AND ON BEHALF OF HIGHLAND DEVELOPMENT SERVICES REVIEW SET NOT FOR CONSTRUCTION OFSHEET DRAWN BY CHECKED BY DATE SCALE (H) HDS PROJECT # SCALE (V) UN I O N P A R K ST O R M D R A I N P L A N & P R O F I L E S SD - 0 3 9/9/24 1" = 40' 1" = 4" ZMW JTC 21-1044-00 C3.12 36 60 SD-03 NOTES: 1.ALL PROPOSED STORM SEWER IMPROVEMENTS SHALL BE IN ACCORDANCE WITH THE CITY OF FORT COLLINS STANDARDS AND SPECIFICATIONS. 2.STORM PIPES SHALL BE ADS HP STORM UNLESS OTHERWISE NOTED. 3.ALL MANHOLE RIM AND INLET GRATE ELEVATIONS SHOWN ARE APPROXIMATE. CONFIRM FINAL ELEVATIONS PRIOR TO INSTALLATION. 4.PIPE LENGTHS ARE PROVIDED FROM CENTER OF STRUCTURE TO CENTER OF STRUCTURE. LENGTH OF FLARED END SECTIONS ARE INCLUDED IN PIPE LENGTHS. 5.ALL STORM PIPES AND STRUCTURES ARE PRIVATELY OWNED AND MAINTAINED EXCEPT WHERE SPECIFICALLY IDENTIFIED AND LABELED ON THESE PLANS AS PUBLIC. 6.INSTALL CUT OFF WALLS 5' UPSTREAM OF ALL STORM MANHOLES AND INLETS CONSISTING OF COMPACTED CLAY MATERIAL EXTENDING BEYOND THE SPRINGLINE OF THE PIPE. CALL UTILITY NOTIFICATION CENTER OF COLORADO CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. before you dig.Call Know what's below. R 0 SCALE: 1" = 40' 80402040 HORIZONTAL VERTICAL SCALE: 1" =4' SD-03 SD-03 PROFILE SD-03 SD-03 PROFILE N W E S DEFLECT PIPE NORTH TO ACHIEVE 18" MIN SEPARATION BELOW SD-16 (SEE SHEET 40) * STEEL CASING REQUIRED TO EXTEND 5' ON EACH SIDE OF PIPE FOR WATER LOWERING. UP UP D N D YLOPLASTONOTPOLLUTE UCTILEIRONDRAINSTOWATERWAYS TRACT K D,U&AE(PR) TRACT L D,U&AE(PR) KI N G S L E Y C O U R T SD-04 PROFILE HORIZ. SCALE: 1"=40' 4930 4935 4940 4945 4930 4935 4940 4945 9+009+5010+0010+5011+0011+50 SD-05 PROFILE HORIZ. SCALE: 1"=40' 4925 4930 4935 4940 4945 4925 4930 4935 4940 4945 9+5010+0010+5011+0011+5012+0012+5012+75 SD-06 PROFILE HORIZ. SCALE: 1"=40' 4925 4930 4935 4940 4945 4925 4930 4935 4940 4945 9+00 9+50 10+00 10+50 11+00 SD-07 (SEE THIS SHEET) LID-D (SEE SHEET 42) SD-07 PROFILE HORIZ. SCALE: 1"=40' 4920 4925 4930 4935 4940 4945 4920 4925 4930 4935 4940 4945 9+00 9+50 10+00 10+50 11+00 11+50 WTR LOWERING 'E' (SEE SHEET 52) LO T 1 LO T 4 LO T 5 LO T 6 BL O C K 2 3 SD-03 (SEE SHEET 36) LI D - D (S E E S H E E T 42 ) SD-03 (SEE SHEET 36) SD-06 (SEE SHEET 37) N W E S KEY MAP NTS ZI E G L E R R O A D CO R B E T T D R PADDINGTON RD UNION PARK AVEED M O N D S R D RE V I S I O N NO . BY DA T E HI G H L A N D DE V E L O P M E N T S E R V I C E S 63 5 5 F A I R G R O U N D S A V E N U E , S U I T E 2 0 0 | W I N D S O R , C O 8 0 5 5 0 PH O N E : 9 7 0 . 6 7 4 . 7 5 5 0 | E M A I L : I n f o @ H i g h l a n d - D S . c o m | w w w . H i g h l a n d - D S . c o m PREPARED BY OR UNDER THE DIRECT SUPERVISION OF: FOR AND ON BEHALF OF HIGHLAND DEVELOPMENT SERVICES REVIEW SET NOT FOR CONSTRUCTION OFSHEET DRAWN BY CHECKED BY DATE SCALE (H) HDS PROJECT # SCALE (V) UN I O N P A R K ST O R M D R A I N P L A N & P R O F I L E S SD - 0 4 , S D - 0 5 , S D - 0 6 , & S D - 0 7 9/9/24 1" = 40' 1" = 4' ZMW JTC 21-1044-00 C3.13 37 60 N W E S N W E S N W E S SD-04 SD-07 SD-05 SD-06 NOTES: 1.ALL PROPOSED STORM SEWER IMPROVEMENTS SHALL BE IN ACCORDANCE WITH THE CITY OF FORT COLLINS STANDARDS AND SPECIFICATIONS. 2.STORM PIPES SHALL BE ADS HP STORM UNLESS OTHERWISE NOTED. 3.ALL MANHOLE RIM AND INLET GRATE ELEVATIONS SHOWN ARE APPROXIMATE. CONFIRM FINAL ELEVATIONS PRIOR TO INSTALLATION. 4.PIPE LENGTHS ARE PROVIDED FROM CENTER OF STRUCTURE TO CENTER OF STRUCTURE. LENGTH OF FLARED END SECTIONS ARE INCLUDED IN PIPE LENGTHS. 5.ALL STORM PIPES AND STRUCTURES ARE PRIVATELY OWNED AND MAINTAINED EXCEPT WHERE SPECIFICALLY IDENTIFIED AND LABELED ON THESE PLANS AS PUBLIC. 6.INSTALL CUT OFF WALLS 5' UPSTREAM OF ALL STORM MANHOLES AND INLETS CONSISTING OF COMPACTED CLAY MATERIAL EXTENDING BEYOND THE SPRINGLINE OF THE PIPE. CALL UTILITY NOTIFICATION CENTER OF COLORADO CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. before you dig.Call Know what's below. R 0 SCALE: 1" = 40' 80402040 HORIZONTAL VERTICAL SCALE: 1" =4' SD-04 SD-06 SD-05 N W E S SD-07 NOTE: THE PERFORMANCE OF THE LID GALLERIES IS DEPENDENT ON THE ACCURACY OF THE INLET & OUTFALL PIPE ELEVATIONS AND REQUIRED TO BE INSTALLED PER PLAN. NOTE: THE PERFORMANCE OF THE LID GALLERIES IS DEPENDENT ON THE ACCURACY OF THE INLET & OUTFALL PIPE ELEVATIONS AND REQUIRED TO BE INSTALLED PER PLAN. SD-08 PROFILE HORIZ. SCALE: 1"=40' 4920 4925 4930 4935 4940 4945 4920 4925 4930 4935 4940 4945 9+5010+0010+5011+0011+5012+0012+5013+0013+5014+0014+5015+0015+5016+0016+5017+00 WTR LOWERING 'L' (SEE SHEET 52) WTR LOWERING 'J' (SEE SHEET 52) C D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE DDONOTPOLLUTE RAINSTOWATERWAYS DUCTILEIRONNYLOPLAST NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE DO NOT POLLUTEDRAINS TO WATERWAYS NYLOPLASTDUCTILE IRON D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE LOT 4 LOT 5 LOT 4 LOT 4 LOT 5 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 7 LOT 8 LOT 1 LOT 2 LOT 3 LOT 1LOT 1 LOT 2 LOT 3 LOT 4 LOT 6 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 7 LOT 8 LOT 1 LOT 1 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 7 LOT 8 LOT 9 BLOCK 13 BLOCK 14 BLOCK 18 BLOCK 19 BLOCK 24 UNION PARK AVENUE ED M O N D S R O A D MA T C H L I N E SE E T H I S S H E E T MA T C H L I N E SE E T H I S S H E E T LO C O M O T I V E D R I V E SD-10 (SEE SHEET 39) SD - 1 1 (S E E S H E E T 39 ) TR A C T C D, U & A E ( P U ) SD-09 PROFILE HORIZ. SCALE: 1"=40' 4925 4930 4935 4940 4945 4925 4930 4935 4940 4945 9+5010+0010+5011+0011+50 D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE LOT 1 LOT 2 LOT 1 LOT 2 LO C O M O T I V E DR I V E SD - 0 8 (S E E S H E E T 38 ) SD-08 (SEE SHEET 38) SD-10 (SEE SHEET 39) N W E S KEY MAP NTS ZI E G L E R R O A D CO R B E T T D R PADDINGTON RD UNION PARK AVEED M O N D S R D RE V I S I O N NO . BY DA T E HI G H L A N D DE V E L O P M E N T S E R V I C E S 63 5 5 F A I R G R O U N D S A V E N U E , S U I T E 2 0 0 | W I N D S O R , C O 8 0 5 5 0 PH O N E : 9 7 0 . 6 7 4 . 7 5 5 0 | E M A I L : I n f o @ H i g h l a n d - D S . c o m | w w w . H i g h l a n d - D S . c o m PREPARED BY OR UNDER THE DIRECT SUPERVISION OF: FOR AND ON BEHALF OF HIGHLAND DEVELOPMENT SERVICES REVIEW SET NOT FOR CONSTRUCTION OFSHEET DRAWN BY CHECKED BY DATE SCALE (H) HDS PROJECT # SCALE (V) UN I O N P A R K ST O R M D R A I N P L A N & P R O F I L E S SD - 0 8 , S D - 0 9 9/9/24 1" = 40' 1" = 4' ZMW JTC 21-1044-00 C3.14 38 60 N W E S SD-09SD-08 NOTES: 1.ALL PROPOSED STORM SEWER IMPROVEMENTS SHALL BE IN ACCORDANCE WITH THE CITY OF FORT COLLINS STANDARDS AND SPECIFICATIONS. 2.STORM PIPES SHALL BE ADS HP STORM UNLESS OTHERWISE NOTED. 3.ALL MANHOLE RIM AND INLET GRATE ELEVATIONS SHOWN ARE APPROXIMATE. CONFIRM FINAL ELEVATIONS PRIOR TO INSTALLATION. 4.PIPE LENGTHS ARE PROVIDED FROM CENTER OF STRUCTURE TO CENTER OF STRUCTURE. LENGTH OF FLARED END SECTIONS ARE INCLUDED IN PIPE LENGTHS. 5.ALL STORM PIPES AND STRUCTURES ARE PRIVATELY OWNED AND MAINTAINED EXCEPT WHERE SPECIFICALLY IDENTIFIED AND LABELED ON THESE PLANS AS PUBLIC. 6.INSTALL CUT OFF WALLS 5' UPSTREAM OF ALL STORM MANHOLES AND INLETS CONSISTING OF COMPACTED CLAY MATERIAL EXTENDING BEYOND THE SPRINGLINE OF THE PIPE. CALL UTILITY NOTIFICATION CENTER OF COLORADO CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. before you dig.Call Know what's below. R 0 SCALE: 1" = 40' 80402040 HORIZONTAL VERTICAL SCALE: 1" =4' SD-08 LID-C (SEE SHEET 42) SD - 0 3 (S E E S H E E T 36 ) SD - 0 3 (S E E S H E E T 36 ) N W E S SD-09 NOTE: THE PERFORMANCE OF THE LID GALLERIES IS DEPENDENT ON THE ACCURACY OF THE INLET & OUTFALL PIPE ELEVATIONS AND REQUIRED TO BE INSTALLED PER PLAN. SD-09 (SEE SHEET 38) SD-10 PROFILE HORIZ. SCALE: 1"=40' 4925 4930 4935 4940 4945 4925 4930 4935 4940 4945 9+50 10+00 10+50 11+00 11+50 12+00 12+50 WTR LOWERING 'K' (SEE SHEET 52) D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE NYLOPLAS T D U C T I L E I R O N DO NOT PO L L U T E D R A I N S T O W A T E R W A Y S D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE LO T 8 LO T 1 LO T 6 LOCOMOTIVE DRIVE SD - 0 8 (S E E S H E E T 38 ) SD-08 (SEE SHEET 38) SD-09 (SEE SHEET 38) D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE DO NOT POLLUTEDRAINS TO WATERWAYS NYLOPLASTDUCTILE IRON D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE SD-08 (SEE SHEET 38) LOT 3 LOT 4 LOT 1 LOT 1 SD-11 PROFILE HORIZ. SCALE: 1"=40' 4925 4930 4935 4940 4945 9+009+5010+0010+5011+0011+50 WTR LOWERING 'I' (SEE SHEET 52) UP UP D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE DONOTPOLLUTE D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRONDRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRONDRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRONDRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLAST ONOTPOLLUTE UCTILEIRONDRAINSTOWATERWAYS D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE SD-14 (SEE SHEET 40) 4 BL D G A 1 0 ES M T EX C L U S I O N BL O C K 2 9 LO T R 1 FO R T S U M T E R W A Y SD-03 (SEE SHEET 36) SD-03 (SEE SHEET 36) SD-13 (SEE SHEET 40) TR A C T N D, U & A E ( P R ) TRACT M D,U&AE(PR) SD-12 PROFILE HORIZ. SCALE: 1"=40' 4925 4930 4935 4940 4945 4950 4925 4930 4935 4940 4945 4950 9+5010+0010+5011+0011+5012+0012+5013+0013+5014+0014+5015+0015+5016+0016+25 WTR LOWERING 'F' (SEE SHEET 52) N W E S KEY MAP NTS ZI E G L E R R O A D CO R B E T T D R PADDINGTON RD UNION PARK AVEED M O N D S R D RE V I S I O N NO . BY DA T E HI G H L A N D DE V E L O P M E N T S E R V I C E S 63 5 5 F A I R G R O U N D S A V E N U E , S U I T E 2 0 0 | W I N D S O R , C O 8 0 5 5 0 PH O N E : 9 7 0 . 6 7 4 . 7 5 5 0 | E M A I L : I n f o @ H i g h l a n d - D S . c o m | w w w . H i g h l a n d - D S . c o m PREPARED BY OR UNDER THE DIRECT SUPERVISION OF: FOR AND ON BEHALF OF HIGHLAND DEVELOPMENT SERVICES REVIEW SET NOT FOR CONSTRUCTION OFSHEET DRAWN BY CHECKED BY DATE SCALE (H) HDS PROJECT # SCALE (V) UN I O N P A R K ST O R M D R A I N P L A N & P R O F I L E S SD - 1 0 , S D - 1 1 , & S D - 1 2 9/9/24 1" = 40' 1" = 4' ZMW JTC 21-1044-00 C3.15 39 60 N W E S N W E S N W E S SD-12 SD-11 SD-10 NOTES: 1.ALL PROPOSED STORM SEWER IMPROVEMENTS SHALL BE IN ACCORDANCE WITH THE CITY OF FORT COLLINS STANDARDS AND SPECIFICATIONS. 2.STORM PIPES SHALL BE ADS HP STORM UNLESS OTHERWISE NOTED. 3.ALL MANHOLE RIM AND INLET GRATE ELEVATIONS SHOWN ARE APPROXIMATE. CONFIRM FINAL ELEVATIONS PRIOR TO INSTALLATION. 4.PIPE LENGTHS ARE PROVIDED FROM CENTER OF STRUCTURE TO CENTER OF STRUCTURE. LENGTH OF FLARED END SECTIONS ARE INCLUDED IN PIPE LENGTHS. 5.ALL STORM PIPES AND STRUCTURES ARE PRIVATELY OWNED AND MAINTAINED EXCEPT WHERE SPECIFICALLY IDENTIFIED AND LABELED ON THESE PLANS AS PUBLIC. 6.INSTALL CUT OFF WALLS 5' UPSTREAM OF ALL STORM MANHOLES AND INLETS CONSISTING OF COMPACTED CLAY MATERIAL EXTENDING BEYOND THE SPRINGLINE OF THE PIPE. CALL UTILITY NOTIFICATION CENTER OF COLORADO CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. before you dig.Call Know what's below. R 0 SCALE: 1" = 40' 80402040 HORIZONTAL VERTICAL SCALE: 1" =4' SD-10 SD-11 SD-12 SD-08 (SEE SHEET 38) SD-13 PROFILE HORIZ. SCALE: 1"=40' 4925 4930 4935 4940 4945 4925 4930 4935 4940 4945 9+00 9+50 10+00 10+50 11+00 11+50 SD-15 (SEE THIS SHEET) SD-12 (SEE SHEET 39) SD-12 (SEE SHEET 39) D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE SD-12 (SEE SHEET 39) SD - 1 2 (S E E S H E E T 39 ) TRACT M D,U&AE(PR) SD-14 PROFILE HORIZ. SCALE: 1"=40' 4930 4935 4940 4945 4930 4935 4940 4945 9+00 9+50 10+00 10+50 11+00 SD-13 (SEE THIS SHEET) LO T 3 LO T 4 BL O C K 1 1 SD-15 PROFILE HORIZ. SCALE: 1"=40' 4925 4930 4935 4940 4945 4925 4930 4935 4940 4945 9+00 9+50 10+00 10+50 11+00 11+50 WTR LOWERING 'G' (SEE SHEET 52) D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE NYLOPLAST D U C T I L E I R O N DO NOT POLLU T E D R A I N S T O W A T E R W A Y S NYLOPLA S T D U C T I L E I R O N DO NOT PO L L U T E D R A I N S T O W A T E R W A Y S NYLOPLAST D U C T I L E I R O N DO NOT POLLU T E D R A I N S T O W A T E R W A Y S NYLOPLAST D U C T I L E I R O N DO NOT P O L L U T E D R A I N S T O W A T E R W A Y S NYLOPLAS T D U C T I L E I R O N DO NOT POL L U T E D R A I N S T O W A T E R W A Y S D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS D N D YLOPLASTONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYSSD-15 (SEE THIS SHEET) LO T 5 LO T 1 LO T 2 LO T 3 LO T 4 LO T 5 LO T 6 LO T 1 LO T 1 LO T 1 LO T 2 LO T 3 LO T 4 LO T 5 LO T 5 LO T 1 LO T 2 LO T 3 LO T 4 LO T 5 LO T 1 LO T 3 LO T 4 LO T 5 BL O C K 2 BL O C K 5 BL O C K 8 BL O C K 1 1 FO R T I T U D E L A N E GO L D E N G R O V E D R I V E BLUECOAT DRIVE SD-03 (SEE SHEET 36) TR A C T B D, U & A E ( P R ) SD-16 PROFILE HORIZ. SCALE: 1"=40' 4925 4930 4935 4940 4945 4925 4930 4935 4940 4945 9+50 10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 14+50 15+00 15+50 DEFLECT PIPE TO ACHIEVE 18" MIN ABOVE SD-03 (SEE SHEET 36) WTR LOWERING 'H' (SEE SHEET 52) WTR LOWERING 'M' (SEE SHEET 52) N W E S KEY MAP NTS ZI E G L E R R O A D CO R B E T T D R PADDINGTON RD UNION PARK AVEED M O N D S R D RE V I S I O N NO . BY DA T E HI G H L A N D DE V E L O P M E N T S E R V I C E S 63 5 5 F A I R G R O U N D S A V E N U E , S U I T E 2 0 0 | W I N D S O R , C O 8 0 5 5 0 PH O N E : 9 7 0 . 6 7 4 . 7 5 5 0 | E M A I L : I n f o @ H i g h l a n d - D S . c o m | w w w . H i g h l a n d - D S . c o m PREPARED BY OR UNDER THE DIRECT SUPERVISION OF: FOR AND ON BEHALF OF HIGHLAND DEVELOPMENT SERVICES REVIEW SET NOT FOR CONSTRUCTION OFSHEET DRAWN BY CHECKED BY DATE SCALE (H) HDS PROJECT # SCALE (V) UN I O N P A R K ST O R M D R A I N P L A N & P R O F I L E S SD - 1 3 , S D - 1 4 , S D - 1 5 , & S D - 1 6 9/9/24 1" = 40' 1" = 4' ZMW JTC 21-1044-00 C3.16 40 60 N W E S N W E S N W E S SD-16 SD-15 SD-13 SD-14 NOTES: 1.ALL PROPOSED STORM SEWER IMPROVEMENTS SHALL BE IN ACCORDANCE WITH THE CITY OF FORT COLLINS STANDARDS AND SPECIFICATIONS. 2.STORM PIPES SHALL BE ADS HP STORM UNLESS OTHERWISE NOTED. 3.ALL MANHOLE RIM AND INLET GRATE ELEVATIONS SHOWN ARE APPROXIMATE. CONFIRM FINAL ELEVATIONS PRIOR TO INSTALLATION. 4.PIPE LENGTHS ARE PROVIDED FROM CENTER OF STRUCTURE TO CENTER OF STRUCTURE. LENGTH OF FLARED END SECTIONS ARE INCLUDED IN PIPE LENGTHS. 5.ALL STORM PIPES AND STRUCTURES ARE PRIVATELY OWNED AND MAINTAINED EXCEPT WHERE SPECIFICALLY IDENTIFIED AND LABELED ON THESE PLANS AS PUBLIC. 6.INSTALL CUT OFF WALLS 5' UPSTREAM OF ALL STORM MANHOLES AND INLETS CONSISTING OF COMPACTED CLAY MATERIAL EXTENDING BEYOND THE SPRINGLINE OF THE PIPE. CALL UTILITY NOTIFICATION CENTER OF COLORADO CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. before you dig.Call Know what's below. R 0 SCALE: 1" = 40' 80402040 HORIZONTAL VERTICAL SCALE: 1" =4' SD-15 SD-13 SD-14 SD-16 SD-03 (SEE SHEET 36) SD-03 (SEE SHEET 36) SD-16 (SEE THIS SHEET) LID-B (SEE SHEET 42) NOTE: UTILIZE FLOWABLE FILL FOR BACK FILL WITHIN THE AREA OF CONGESTED PIPES/STRUCTURES, AND AREAS WITH LIMITED PIPE SEPARATIONS. NOTE: THE PERFORMANCE OF THE LID GALLERIES IS DEPENDENT ON THE ACCURACY OF THE INLET & OUTFALL PIPE ELEVATIONS AND REQUIRED TO BE INSTALLED PER PLAN. NOTE: WRAP STORM JOINTS 10' EACH SIDE OF CROSSING WITH 12' WIDE BUTYL ADHESIVE TAPE (EZ WRAP OR EQUIVALENT). NO CASING OR ENCASEMENT REQUIRED UNDER ADS HP STORM ONLY. SPECIFIC APPROVAL NEEDED UNDER RCP. SD-17 PROFILE HORIZ. SCALE: 1"=40' 4925 4930 4935 4940 4925 4930 4935 4940 9+5010+0010+5011+00 NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS EE G5 UP NYLOPLAST D U C T I L E I R O N DO NOT POL L U T E D R A I N S T O W A T E R W A Y S SD-19 (SEE THIS SHEET) SD-18 PROFILE HORIZ. SCALE: 1"=40' 4920 4925 4930 4935 4940 4920 4925 4930 4935 4940 9+009+5010+0010+5011+0011+50 SD-19 PROFILE HORIZ. SCALE: 1"=40' 4920 4925 4930 4935 4940 4920 4925 4930 4935 4940 9+009+5010+0010+5011+00 NYLOPLAST DUCT I L E I R O NDO NOT POLLUTE DRAINS T O W A T E R W A Y S SD-18 (SEE THIS SHEET) SD-20 PROFILE HORIZ. SCALE: 1"=40' 4920 4925 4930 4935 4940 4920 4925 4930 4935 4940 9+009+5010+0010+5011+00 NYLOPLAST DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS LOT 1 LOT MU2 TRACT I D,U&AE(PR) SD-21 PROFILE HORIZ. SCALE: 1"=40' 4920 4925 4930 4935 4940 4920 4925 4930 4935 4940 9+259+5010+0010+5011+0011+25 TRACT F D,U&AE(PR) SD-22 PROFILE 4920 4925 4930 4935 4920 4925 4930 4935 9+009+5010+0010+5011+00 RE V I S I O N NO . BY DA T E HI G H L A N D DE V E L O P M E N T S E R V I C E S 63 5 5 F A I R G R O U N D S A V E N U E , S U I T E 2 0 0 | W I N D S O R , C O 8 0 5 5 0 PH O N E : 9 7 0 . 6 7 4 . 7 5 5 0 | E M A I L : I n f o @ H i g h l a n d - D S . c o m | w w w . H i g h l a n d - D S . c o m PREPARED BY OR UNDER THE DIRECT SUPERVISION OF: FOR AND ON BEHALF OF HIGHLAND DEVELOPMENT SERVICES REVIEW SET NOT FOR CONSTRUCTION OFSHEET DRAWN BY CHECKED BY DATE SCALE (H) HDS PROJECT # SCALE (V) UN I O N P A R K ST O R M D R A I N P L A N & P R O F I L E S SD - 1 7 , S D - 1 8 , S D - 1 9 , S D - 2 0 , S D - 2 1 , & S D - 2 2 9/9/24 1" = 40' 1" = 4' ZMW JTC 21-1044-00 C3.17 41 60 N W E S N W E S N W ES N W E S N W E S CALL UTILITY NOTIFICATION CENTER OF COLORADO CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. before you dig.Call Know what's below. R 0 SCALE: 1" = 40' 80402040 HORIZONTAL VERTICAL SCALE: 1" =4' N W E S KEY MAP NTS ZI E G L E R R O A D CO R B E T T D R PADDINGTON RD UNION PARK AVEED M O N D S R D SD-17 SD-19 SD-20 SD-21 SD-18 NOTES: 1.ALL PROPOSED STORM SEWER IMPROVEMENTS SHALL BE IN ACCORDANCE WITH THE CITY OF FORT COLLINS STANDARDS AND SPECIFICATIONS. 2.STORM PIPES SHALL BE ADS HP STORM UNLESS OTHERWISE NOTED. 3.ALL MANHOLE RIM AND INLET GRATE ELEVATIONS SHOWN ARE APPROXIMATE. CONFIRM FINAL ELEVATIONS PRIOR TO INSTALLATION. 4.PIPE LENGTHS ARE PROVIDED FROM CENTER OF STRUCTURE TO CENTER OF STRUCTURE. LENGTH OF FLARED END SECTIONS ARE INCLUDED IN PIPE LENGTHS. 5.ALL STORM PIPES AND STRUCTURES ARE PRIVATELY OWNED AND MAINTAINED EXCEPT WHERE SPECIFICALLY IDENTIFIED AND LABELED ON THESE PLANS AS PUBLIC. 6.INSTALL CUT OFF WALLS 5' UPSTREAM OF ALL STORM MANHOLES AND INLETS CONSISTING OF COMPACTED CLAY MATERIAL EXTENDING BEYOND THE SPRINGLINE OF THE PIPE. SD-17 SD-19 SD-20 SD-21 SD-18 N W E S SD-22 SD-22 SD-22 (PUBLIC) SD-16 (SEE SHEET 40) LOT 1LOT 1 LOT 2 LOT 3 LOT 4LOT 5LOT 4LOT 3 BL U E C O A T D R I V E UNION PARK AVENUE SD - 0 3 (S E E S H E E T 36 ) SD - 0 3 (S E E S H E E T 36 ) SD-16 (SEE SHEET 40) LID-B STORMTECH SC-800 (90 CHAMBERS) SD-12 (SEE SHEET 39) SD-15 (SEE SHEET 40) SD-13 (SEE SHEET 40) TRACT N D,U&AE(PR) TRACT G D,U&AE(PU) DS DS DS DS DS DS DS SD-06 (SEE SHEET 37) UNION PARK AVENUE LID-D STORMTECH SC-310 (147 CHAMBERS) SD-05 (SEE SHEET 37) SD - 0 3 (S E E S H E E T 36 ) SD - 0 3 (S E E S H E E T 36 ) SD-07 (SEE SHEET 37) TRACT L D,U&AE(PR) D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYS NYLOPLAST DONOTPOLLUTE D N D YLOPLAST ONOTPOLLUTE UCTILEIRON DRAINSTOWATERWAYS BLOCK 20LO C O M O T I V E DR I V E LID-C STORMTECH SC-800 (45 CHAMBERS) SD - 0 8 (S E E S H E E T 38 ) SD-08 (SEE SHEET 38) TRACT D D,U&AE(PR) SD-09 (SEE SHEET 38) INFILTRATION GALLERY UNDERDRAIN DETAIL N W E S KEY MAP NTS ZI E G L E R R O A D CO R B E T T D R PADDINGTON RD UNION PARK AVEED M O N D S R D RE V I S I O N NO . BY DA T E HI G H L A N D DE V E L O P M E N T S E R V I C E S 63 5 5 F A I R G R O U N D S A V E N U E , S U I T E 2 0 0 | W I N D S O R , C O 8 0 5 5 0 PH O N E : 9 7 0 . 6 7 4 . 7 5 5 0 | E M A I L : I n f o @ H i g h l a n d - D S . c o m | w w w . H i g h l a n d - D S . c o m PREPARED BY OR UNDER THE DIRECT SUPERVISION OF: FOR AND ON BEHALF OF HIGHLAND DEVELOPMENT SERVICES REVIEW SET NOT FOR CONSTRUCTION OFSHEET DRAWN BY CHECKED BY DATE SCALE (H) HDS PROJECT # SCALE (V) UN I O N P A R K ST O R M D R A I N P L A N & P R O F I L E S IN F I L T R A T I O N G A L L E R Y 9/9/24 1" = 20' N/A ZMW JTC 21-1044-00 C3.18 42 60 LID-B LID-C LID-D LID-B LID-D LID-C N W E S 0 SCALE: 1" = 20' 40201020 CALL UTILITY NOTIFICATION CENTER OF COLORADO CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. before you dig.Call Know what's below. R UP DS DS DS DS NYLOPLA S T D U C T I L E I R O N DO NOT P O L L U T E D R A I N S T O W A T E R W A Y S NYLOPLAST D U C T I L E I R O N DO NOT P O L L U T E D R A I N S T O W A T E R W A Y S D DONOTPOLLUTE RAINSTOWATERWAYSDUCTILEIRONNYLOPLAST D DONOTPOLLUTE RAINSTOWATERWAYSDUCTILEIRONNYLOPLAST D DONOTPOLLUTE RAINSTOWATERWAYSDUCTILEIRONNYLOPLAST D DONOTPOLLUTE RAINSTOWATERWAYSDUCTILEIRONNYLOPLAST NYLOPLAST D U C T I L E I R O N DO NOT P O L L U T E D R A I N S T O W A T E R W A Y S LOT C2 ZIEGLER ROAD (ROW VARIES) UN I O N P A R K A V E N U E HI D D E N PO N D D R GR A N D TE T O N P L PA D D I N G T O N R D FR V S E R V I C E D R I V E TRACT H D,U&AE(PR) TRACT F D,U&AE(PR) RE V I S I O N NO . BY DA T E HI G H L A N D DE V E L O P M E N T S E R V I C E S 63 5 5 F A I R G R O U N D S A V E N U E , S U I T E 2 0 0 | W I N D S O R , C O 8 0 5 5 0 PH O N E : 9 7 0 . 6 7 4 . 7 5 5 0 | E M A I L : I n f o @ H i g h l a n d - D S . c o m | w w w . H i g h l a n d - D S . c o m PREPARED BY OR UNDER THE DIRECT SUPERVISION OF: FOR AND ON BEHALF OF HIGHLAND DEVELOPMENT SERVICES REVIEW SET NOT FOR CONSTRUCTION OFSHEET DRAWN BY CHECKED BY DATE SCALE (H) HDS PROJECT # SCALE (V) UN I O N P A R K ST R E E T P L A N & P R O F I L E S ZI E G L E R R O A D 9/9/24 1" = 40' 1" = 4' ZMW JTC 21-1044-00 C4.00 43 60 N W E S KEY MAP NTS ZI E G L E R R O A D CO R B E T T D R PADDINGTON RD UNION PARK AVEED M O N D S R D CONCRETE SIDEWALK HEAVY DUTY ASPHALT PAVEMENT LEGEND EXISTING SLOPE APPROX LIMITS OF SAWCUT TYPICAL MODIFIED STREET SECTION NTS PROPOSED SLOPE NOTES: 1.LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY CITY ENGINEER INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH CITY STREET REPAIR STANDARDS 2.ALL LONGITUDINAL PAVEMENT MARKINGS TO BE DONE IN LATEX PAVEMENT MARKING PAINT. ALL TRANSVERSE PAVEMENT MARKINGS AND SYMBOLS TO BE DONE IN PRE-FORMED THERMOPLASTIC. 3.DIMENSIONS SHOWN FOR STRIPING ARE FROM CENTER OF STRIPE TO CENTER OF STRIPE OR FROM CENTER OF STRIPE TO FLOWLINE OF CURB. 4.ALL SIGNING AND MARKING TO BE DONE IN ACCORDANCE WITH CITY OF FORT COLLINS AND/OR MUTCD STANDARDS. 5.THERMOPLASTIC ARROWS SHALL BE 12' ELONGATED FHWA. 6.THERMOPLASTIC BIKE STENCILS SHALL BE 6'-6" W/ 6' ARROW. 7.ALL SIGNS PLACED IN HARDSCAPE SHALL HAVE A SLEEVE INSTALLED. 8.RE-STRIPE AREAS OF PAVEMENT REPLACEMENT AS NECESSARY. CALL UTILITY NOTIFICATION CENTER OF COLORADO CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. before you dig.Call Know what's below. R STREET CROSS SECTIONS N W E S 0 SCALE: 1" = 40' 80402040 4925 4930 4935 4940 4925 4930 4935 4940 9+5010+0010+5011+0011+5012+0012+5013+0013+5014+0014+5015+0015+5016+0016+5017+0017+5018+0018+50 MA T C H L I N E SE E T H I S S H E E T MA T C H L I N E ST A 1 8 + 5 0 DS DS DSDS DS DS DS DS DS DS DSDS DS DS DS DSDS DS DS DSDSDS DS DS DS DS DSDS DS DS DS DS DS LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6LOT 3 LOT 4 LOT 5 LOT 6 LOT 7 LOT 8 LOT 9 BLOCK 22BLOCK 23BLOCK 24 LOT MU1 LOT MU2 BLOCK 26 UNION PARK AVENUE MA T C H L I N E SE E T H I S S H E E T TRACT H TRACT I D,U&AE(PR) TRACT L DS DSDS DS DS DS DS DS DS DS DS DSDS DS DS DS DS DS DS DS DS DSDSDS DS DS DS DS DS DSDS DSDSDS DS DS DS DS DSDS DS DS DS DS DS LOT 1 LOT 2 LOT 3 LOT 4 LOT 5LOT 1 LOT 2 LOT 3 LOT 4LOT 5LOT 4LOT 3LOT 2LOT 1 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 7 LOT 8 BLOCK 10BLOCK 11BLOCK 12 BLOCK 24 ED M O N D S R O A D UNION PARK AVENUE MA T C H L I N E SE E S H E E T 45 MA T C H L I N E SE E T H I S S H E E T TRACT N D,U&AE(PR) TRACT G D,U&AE(PU) 4930 4935 4940 4945 4930 4935 4940 4945 18+5019+0019+5020+0020+5021+0021+5022+0022+5023+0023+5024+0024+5025+0025+5026+0026+50 MA T C H L I N E SE E S H E E T 45 MA T C H L I N E SE E T H I S S H E E T MA T C H L I N E ST A 1 8 + 5 0 MA T C H L I N E ST A 2 6 + 5 0 LINE TABLE LINE LENGTH DIRECTION START (N,E) CURVE TABLE CURVE LENGTH RADIUS DELTA CHORD DIRECTION CHORD LENGTH START (N,E) RE V I S I O N NO . BY DA T E HI G H L A N D DE V E L O P M E N T S E R V I C E S 63 5 5 F A I R G R O U N D S A V E N U E , S U I T E 2 0 0 | W I N D S O R , C O 8 0 5 5 0 PH O N E : 9 7 0 . 6 7 4 . 7 5 5 0 | E M A I L : I n f o @ H i g h l a n d - D S . c o m | w w w . H i g h l a n d - D S . c o m PREPARED BY OR UNDER THE DIRECT SUPERVISION OF: FOR AND ON BEHALF OF HIGHLAND DEVELOPMENT SERVICES REVIEW SET NOT FOR CONSTRUCTION OFSHEET DRAWN BY CHECKED BY DATE SCALE (H) HDS PROJECT # SCALE (V) UN I O N P A R K ST R E E T P L A N & P R O F I L E S UN I O N P A R K A V E N U E 9/9/24 1" = 40' 1" = 4' ZMW JTC 21-1044-00 C4.01 44 60 CALL UTILITY NOTIFICATION CENTER OF COLORADO CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. before you dig.Call Know what's below. R N W E S KEY MAP NTS ZI E G L E R R O A D CO R B E T T D R PADDINGTON RD UNION PARK AVEED M O N D S R D UNION PARK AVENUE CL PROFILE UNION PARK AVENUE CL PROFILE 0 SCALE: 1" = 40' 80402040 HORIZONTAL VERTICAL SCALE: 1" =4' N W E S 4935 4940 4945 4950 4935 4940 4945 4950 26+5027+0027+5028+0028+5029+0029+5030+0030+5031+0031+5032+00 MA T C H L I N E SE E S H E E T 44 MA T C H L I N E ST A 2 6 + 5 0 DS DSDSDSDS DS DSDS DS DS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDSDSDS DS DSDS DS DS DS DS DS DS DS DS DS DS DS DSDS DS DS BLDG A1 ESMT EXCLUSION CORBETT DRIVE UNION PARK AVENUE MATC H L I N E SEE S H E E T 44 TRACT O D,U&AE(PR) DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS LO T 4 LO T 4 LO T 5 LO T 3 LO T 4 LO T 4 LO T 5 LO T 1 LO T 2 LO T 3 LO T 1 LO T 1 LO T 2 LO T 3 LO T 1 LO T 2 LO T 3 BL O C K 9 BL O C K 1 0 PA D D I N G T O N R O A D EDMONDS ROAD UN I O N P A R K A V E N U E TRACT C D,U&AE(PU) 4930 4935 4940 4945 4930 4935 4940 4945 13+50 14+00 14+50 15+00 15+50 16+00 16+50 17+00 17+50 18+00 18+50 19+00 19+50 20+00 20+50 PROPOSED IMPROVEMENTS FUTURE IMPROVEMENTS (BY OTHERS) RE V I S I O N NO . BY DA T E HI G H L A N D DE V E L O P M E N T S E R V I C E S 63 5 5 F A I R G R O U N D S A V E N U E , S U I T E 2 0 0 | W I N D S O R , C O 8 0 5 5 0 PH O N E : 9 7 0 . 6 7 4 . 7 5 5 0 | E M A I L : I n f o @ H i g h l a n d - D S . c o m | w w w . H i g h l a n d - D S . c o m PREPARED BY OR UNDER THE DIRECT SUPERVISION OF: FOR AND ON BEHALF OF HIGHLAND DEVELOPMENT SERVICES REVIEW SET NOT FOR CONSTRUCTION OFSHEET DRAWN BY CHECKED BY DATE SCALE (H) HDS PROJECT # SCALE (V) UN I O N P A R K ST R E E T P L A N & P R O F I L E S JU N C T I O N D R I V E & U N I O N P A R K A V E N U E 9/9/24 1" = 40' 1" = 4' ZMW JTC 21-1044-00 C4.02 45 60 N W E S KEY MAP NTS ZI E G L E R R O A D CO R B E T T D R PADDINGTON RD UNION PARK AVEED M O N D S R D EDMONDS ROAD UNION PARK AVENUE N W E S EDMONDS ROAD CL PROFILE UNION PARK AVENUE CL PROFILE 0 SCALE: 1" = 40' 80402040 HORIZONTAL VERTICAL SCALE: 1" =4' RE V I S I O N NO . BY DA T E HI G H L A N D DE V E L O P M E N T S E R V I C E S 63 5 5 F A I R G R O U N D S A V E N U E , S U I T E 2 0 0 | W I N D S O R , C O 8 0 5 5 0 PH O N E : 9 7 0 . 6 7 4 . 7 5 5 0 | E M A I L : I n f o @ H i g h l a n d - D S . c o m | w w w . H i g h l a n d - D S . c o m PREPARED BY OR UNDER THE DIRECT SUPERVISION OF: FOR AND ON BEHALF OF HIGHLAND DEVELOPMENT SERVICES REVIEW SET NOT FOR CONSTRUCTION OFSHEET DRAWN BY CHECKED BY DATE SCALE (H) HDS PROJECT # SCALE (V) UN I O N P A R K SI T E D E T A I L S 9/9/24 N/A N/A ZMW JTC 21-1044-00 C5.00 46 60 CURB RAMP DETAIL (W/ DETECTABLE WARNING PLATE)ASPHALT PATCH DETAIL (FOR PRIVATE STREETS ONLY) NTS CONTRACTION JOINT DETAIL EXPANSION JOINT DETAIL CURB AND GUTTER DETAIL (ON-SITE ONLY) CONCRETE PAN DETAIL RE V I S I O N NO . BY DA T E HI G H L A N D DE V E L O P M E N T S E R V I C E S 63 5 5 F A I R G R O U N D S A V E N U E , S U I T E 2 0 0 | W I N D S O R , C O 8 0 5 5 0 PH O N E : 9 7 0 . 6 7 4 . 7 5 5 0 | E M A I L : I n f o @ H i g h l a n d - D S . c o m | w w w . H i g h l a n d - D S . c o m PREPARED BY OR UNDER THE DIRECT SUPERVISION OF: FOR AND ON BEHALF OF HIGHLAND DEVELOPMENT SERVICES REVIEW SET NOT FOR CONSTRUCTION OFSHEET DRAWN BY CHECKED BY DATE SCALE (H) HDS PROJECT # SCALE (V) UN I O N P A R K SI T E D E T A I L S 9/9/24 N/A N/A ZMW JTC 21-1044-00 C5.01 47 60 SIGN DETAIL SIDEWALK CHASE DETAIL SOFT BOTTOM PAN 4" MOUNTABLE CURB AND 1' SPILL GUTTER 4" MOUNTABLE CURB AND 1' CATCH GUTTER 6" CURB AND 1' SPILL GUTTER 6" CURB AND 1' CATCH GUTTER RE V I S I O N NO . BY DA T E HI G H L A N D DE V E L O P M E N T S E R V I C E S 63 5 5 F A I R G R O U N D S A V E N U E , S U I T E 2 0 0 | W I N D S O R , C O 8 0 5 5 0 PH O N E : 9 7 0 . 6 7 4 . 7 5 5 0 | E M A I L : I n f o @ H i g h l a n d - D S . c o m | w w w . H i g h l a n d - D S . c o m PREPARED BY OR UNDER THE DIRECT SUPERVISION OF: FOR AND ON BEHALF OF HIGHLAND DEVELOPMENT SERVICES REVIEW SET NOT FOR CONSTRUCTION OFSHEET DRAWN BY CHECKED BY DATE SCALE (H) HDS PROJECT # SCALE (V) UN I O N P A R K SI T E D E T A I L S 9/9/24 N/A N/A ZMW JTC 21-1044-00 C5.02 48 60 RE V I S I O N NO . BY DA T E HI G H L A N D DE V E L O P M E N T S E R V I C E S 63 5 5 F A I R G R O U N D S A V E N U E , S U I T E 2 0 0 | W I N D S O R , C O 8 0 5 5 0 PH O N E : 9 7 0 . 6 7 4 . 7 5 5 0 | E M A I L : I n f o @ H i g h l a n d - D S . c o m | w w w . H i g h l a n d - D S . c o m PREPARED BY OR UNDER THE DIRECT SUPERVISION OF: FOR AND ON BEHALF OF HIGHLAND DEVELOPMENT SERVICES REVIEW SET NOT FOR CONSTRUCTION OFSHEET DRAWN BY CHECKED BY DATE SCALE (H) HDS PROJECT # SCALE (V) UN I O N P A R K ER O S I O N C O N T R O L D E T A I L S 9/9/24 N/A N/A ZMW JTC 21-1044-00 C5.03 49 60 RE V I S I O N NO . BY DA T E HI G H L A N D DE V E L O P M E N T S E R V I C E S 63 5 5 F A I R G R O U N D S A V E N U E , S U I T E 2 0 0 | W I N D S O R , C O 8 0 5 5 0 PH O N E : 9 7 0 . 6 7 4 . 7 5 5 0 | E M A I L : I n f o @ H i g h l a n d - D S . c o m | w w w . H i g h l a n d - D S . c o m PREPARED BY OR UNDER THE DIRECT SUPERVISION OF: FOR AND ON BEHALF OF HIGHLAND DEVELOPMENT SERVICES REVIEW SET NOT FOR CONSTRUCTION OFSHEET DRAWN BY CHECKED BY DATE SCALE (H) HDS PROJECT # SCALE (V) UN I O N P A R K ER O S I O N C O N T R O L D E T A I L S 9/9/24 N/A N/A ZMW JTC 21-1044-00 C5.04 50 60 RE V I S I O N NO . BY DA T E HI G H L A N D DE V E L O P M E N T S E R V I C E S 63 5 5 F A I R G R O U N D S A V E N U E , S U I T E 2 0 0 | W I N D S O R , C O 8 0 5 5 0 PH O N E : 9 7 0 . 6 7 4 . 7 5 5 0 | E M A I L : I n f o @ H i g h l a n d - D S . c o m | w w w . H i g h l a n d - D S . c o m PREPARED BY OR UNDER THE DIRECT SUPERVISION OF: FOR AND ON BEHALF OF HIGHLAND DEVELOPMENT SERVICES REVIEW SET NOT FOR CONSTRUCTION OFSHEET DRAWN BY CHECKED BY DATE SCALE (H) HDS PROJECT # SCALE (V) UN I O N P A R K UT I L I T Y D E T A I L S 9/9/24 N/A N/A ZMW JTC 21-1044-00 C5.05 51 60 RE V I S I O N NO . BY DA T E HI G H L A N D DE V E L O P M E N T S E R V I C E S 63 5 5 F A I R G R O U N D S A V E N U E , S U I T E 2 0 0 | W I N D S O R , C O 8 0 5 5 0 PH O N E : 9 7 0 . 6 7 4 . 7 5 5 0 | E M A I L : I n f o @ H i g h l a n d - D S . c o m | w w w . H i g h l a n d - D S . c o m PREPARED BY OR UNDER THE DIRECT SUPERVISION OF: FOR AND ON BEHALF OF HIGHLAND DEVELOPMENT SERVICES REVIEW SET NOT FOR CONSTRUCTION OFSHEET DRAWN BY CHECKED BY DATE SCALE (H) HDS PROJECT # SCALE (V) UN I O N P A R K UT I L I T Y D E T A I L S 9/9/24 N/A N/A ZMW JTC 21-1044-00 C5.06 52 60 RE V I S I O N NO . BY DA T E HI G H L A N D DE V E L O P M E N T S E R V I C E S 63 5 5 F A I R G R O U N D S A V E N U E , S U I T E 2 0 0 | W I N D S O R , C O 8 0 5 5 0 PH O N E : 9 7 0 . 6 7 4 . 7 5 5 0 | E M A I L : I n f o @ H i g h l a n d - D S . c o m | w w w . H i g h l a n d - D S . c o m PREPARED BY OR UNDER THE DIRECT SUPERVISION OF: FOR AND ON BEHALF OF HIGHLAND DEVELOPMENT SERVICES REVIEW SET NOT FOR CONSTRUCTION OFSHEET DRAWN BY CHECKED BY DATE SCALE (H) HDS PROJECT # SCALE (V) UN I O N P A R K UT I L I T Y D E T A I L S 9/9/24 N/A N/A ZMW JTC 21-1044-00 C5.07 53 60 SANITARY / STORM CLEANOUT DETAIL PLAN VIEW DUAL SANITARY SEWER SERVICE LINE DETAIL RE V I S I O N NO . BY DA T E HI G H L A N D DE V E L O P M E N T S E R V I C E S 63 5 5 F A I R G R O U N D S A V E N U E , S U I T E 2 0 0 | W I N D S O R , C O 8 0 5 5 0 PH O N E : 9 7 0 . 6 7 4 . 7 5 5 0 | E M A I L : I n f o @ H i g h l a n d - D S . c o m | w w w . H i g h l a n d - D S . c o m PREPARED BY OR UNDER THE DIRECT SUPERVISION OF: FOR AND ON BEHALF OF HIGHLAND DEVELOPMENT SERVICES REVIEW SET NOT FOR CONSTRUCTION OFSHEET DRAWN BY CHECKED BY DATE SCALE (H) HDS PROJECT # SCALE (V) UN I O N P A R K ST O R M D E T A I L S 9/9/24 N/A N/A ZMW JTC 21-1044-00 C5.08 54 60 STORM SEWER OUTLET ISOMETRIC VIEW SECTION B-B STORM SEWER HEADWALL RIPRAP DETAIL SECTION A-A STABILIZED BURIED RIPRAP ALL RIPRAP IS TO BE BURIED PER BURIED RIPRAP DETAIL RE V I S I O N NO . BY DA T E HI G H L A N D DE V E L O P M E N T S E R V I C E S 63 5 5 F A I R G R O U N D S A V E N U E , S U I T E 2 0 0 | W I N D S O R , C O 8 0 5 5 0 PH O N E : 9 7 0 . 6 7 4 . 7 5 5 0 | E M A I L : I n f o @ H i g h l a n d - D S . c o m | w w w . H i g h l a n d - D S . c o m PREPARED BY OR UNDER THE DIRECT SUPERVISION OF: FOR AND ON BEHALF OF HIGHLAND DEVELOPMENT SERVICES REVIEW SET NOT FOR CONSTRUCTION OFSHEET DRAWN BY CHECKED BY DATE SCALE (H) HDS PROJECT # SCALE (V) UN I O N P A R K ST O R M D E T A I L S 9/9/24 N/A N/A ZMW JTC 21-1044-00 C5.09 55 60 RE V I S I O N NO . BY DA T E HI G H L A N D DE V E L O P M E N T S E R V I C E S 63 5 5 F A I R G R O U N D S A V E N U E , S U I T E 2 0 0 | W I N D S O R , C O 8 0 5 5 0 PH O N E : 9 7 0 . 6 7 4 . 7 5 5 0 | E M A I L : I n f o @ H i g h l a n d - D S . c o m | w w w . H i g h l a n d - D S . c o m PREPARED BY OR UNDER THE DIRECT SUPERVISION OF: FOR AND ON BEHALF OF HIGHLAND DEVELOPMENT SERVICES REVIEW SET NOT FOR CONSTRUCTION OFSHEET DRAWN BY CHECKED BY DATE SCALE (H) HDS PROJECT # SCALE (V) UN I O N P A R K ST O R M D E T A I L S 9/9/24 N/A N/A ZMW JTC 21-1044-00 C5.10 56 60 RE V I S I O N NO . BY DA T E HI G H L A N D DE V E L O P M E N T S E R V I C E S 63 5 5 F A I R G R O U N D S A V E N U E , S U I T E 2 0 0 | W I N D S O R , C O 8 0 5 5 0 PH O N E : 9 7 0 . 6 7 4 . 7 5 5 0 | E M A I L : I n f o @ H i g h l a n d - D S . c o m | w w w . H i g h l a n d - D S . c o m PREPARED BY OR UNDER THE DIRECT SUPERVISION OF: FOR AND ON BEHALF OF HIGHLAND DEVELOPMENT SERVICES REVIEW SET NOT FOR CONSTRUCTION OFSHEET DRAWN BY CHECKED BY DATE SCALE (H) HDS PROJECT # SCALE (V) UN I O N P A R K ST O R M D E T A I L S 9/9/24 N/A N/A ZMW JTC 21-1044-00 C5.11 57 60 RE V I S I O N NO . BY DA T E HI G H L A N D DE V E L O P M E N T S E R V I C E S 63 5 5 F A I R G R O U N D S A V E N U E , S U I T E 2 0 0 | W I N D S O R , C O 8 0 5 5 0 PH O N E : 9 7 0 . 6 7 4 . 7 5 5 0 | E M A I L : I n f o @ H i g h l a n d - D S . c o m | w w w . H i g h l a n d - D S . c o m PREPARED BY OR UNDER THE DIRECT SUPERVISION OF: FOR AND ON BEHALF OF HIGHLAND DEVELOPMENT SERVICES REVIEW SET NOT FOR CONSTRUCTION OFSHEET DRAWN BY CHECKED BY DATE SCALE (H) HDS PROJECT # SCALE (V) UN I O N P A R K ST O R M D E T A I L S 9/9/24 N/A N/A ZMW JTC 21-1044-00 C5.12 58 60 RE V I S I O N NO . BY DA T E HI G H L A N D DE V E L O P M E N T S E R V I C E S 63 5 5 F A I R G R O U N D S A V E N U E , S U I T E 2 0 0 | W I N D S O R , C O 8 0 5 5 0 PH O N E : 9 7 0 . 6 7 4 . 7 5 5 0 | E M A I L : I n f o @ H i g h l a n d - D S . c o m | w w w . H i g h l a n d - D S . c o m PREPARED BY OR UNDER THE DIRECT SUPERVISION OF: FOR AND ON BEHALF OF HIGHLAND DEVELOPMENT SERVICES REVIEW SET NOT FOR CONSTRUCTION OFSHEET DRAWN BY CHECKED BY DATE SCALE (H) HDS PROJECT # SCALE (V) UN I O N P A R K ST O R M D E T A I L S 9/9/24 N/A N/A ZMW JTC 21-1044-00 C5.13 59 60 RE V I S I O N NO . BY DA T E HI G H L A N D DE V E L O P M E N T S E R V I C E S 63 5 5 F A I R G R O U N D S A V E N U E , S U I T E 2 0 0 | W I N D S O R , C O 8 0 5 5 0 PH O N E : 9 7 0 . 6 7 4 . 7 5 5 0 | E M A I L : I n f o @ H i g h l a n d - D S . c o m | w w w . H i g h l a n d - D S . c o m PREPARED BY OR UNDER THE DIRECT SUPERVISION OF: FOR AND ON BEHALF OF HIGHLAND DEVELOPMENT SERVICES REVIEW SET NOT FOR CONSTRUCTION OFSHEET DRAWN BY CHECKED BY DATE SCALE (H) HDS PROJECT # SCALE (V) UN I O N P A R K ST O R M D E T A I L S 9/9/24 N/A N/A ZMW JTC 21-1044-00 C5.14 60 60 100-YEAR ORIFICE PLATE SECTION DWQ Ls Ws Wo (12" MIN.) 100-YR ORIFICE, Do ELEV. A (POND INV.) ELEV. B ELEV. C SPILL ELEV. WQ HOLE DIA. # OF ROWS # OF COLUMNS POND 298A* 4926.50 4928.25 4929.25 4935.93 N/A 4' 4' 6" POND 298B**POND 298C N/A N/A N/A 7-5/8" DWQ Ls Ws Wo (12" MIN.) 100-YR ORIFICE, Do ELEV. A (POND INV.) ELEV. B ELEV. C SPILL ELEV. WQ HOLE DIM. # OF ROWS # OF COLUMNS 4927.80 4931.10 4931.10 4931.10 N/A 4' 4' 8" 5-1/2"Hx6"W 1 1 N/A DWQ Ls Ws Wo (12" MIN.) 100-YR ORIFICE, Do ELEV. A (POND INV.) ELEV. B (WQCV ELEV) ELEV. C SPILL ELEV. WQ HOLE DIA. # OF ROWS # OF COLUMNS 4922.35 4923.97 4924.97 4929.57 1.62 4' 4' 6" 1" 4 1 16-3/4" ** POND 298B HAS NO WATER QUALITY CAPTURE VOLUME. WQ FLOW CONTROL PLATE ACTS AS 100-YR ORIFICE PLACED BEHIND TRASH RACK WELL SCREEN, OPENING PLACED AT BOTTOM OF PLATE * POND 298A HAS NO WQ FLOW CONTROL PLATE OR WATER QUALITY CAPTURE VOLUME