Loading...
HomeMy WebLinkAboutBLOOM FILING SIX - PDP230017 - SUBMITTAL DOCUMENTS - ROUND 3 - Responses (3)3201 East Mulberry, Unit Q – P.O. Box 1518 • Fort Collins, Colorado 80522 Phone (970) 498-0604 •Fax (970) 498-0701 •www.boxeldersanitation.org June 12, 2024 Brandy Bethuram Harras Community Development and neighborhood Services City of Fort Collins 281 North College Avenue, PO Box 580 Fort Collins, CO 80522 RE: Case Number: PDP230017 Title: Bloom Filing Six Engineering/Survey: Planscapes Design Group Engineer Contact: Emily Tarantini Applicant: MIC TDC Mulberry St Fort Collins, LLC Parcel Number(s): 8709307009 Boxelder Sanitation District (BSD) has reviewed the proposed project identified as: Retail development consisting of 4 pads. The District hereby advises as follows:  There is no objection to this proposal.  Responses required to comments below.  The District will respond at the hearing date of ______________. Comments: 1) Standalone easement will be required for all sewers that are not located in the public R.O.W. and in alley tracts. The easements are necessary to address access and maintenance issues that are not included on the plat. Standard easement width for Boxelder is 30-feet. District Easement template is attached. 2) Boxelder Sanitation District Rules and Regulation have specific requirements for monitoring and treating industrial waste. If any use within the building uses falls into those regulations, it will be necessary to coordinate the requirements with Kevin Schmitz, District Pretreatment Coordinator. This could include the design for grease interceptor and monitoring manholes. Applicant shall provide information about the intended use of the facility and potential discharges that may require treatment/monitoring of industrial wastes. i2 Consultants/Dan Richardson; Boxelder 06/27/2024 10:50a. discussion regarding comments Not required as the line is private Comment acknowledged; individual users for each lot will provide their design and if pre-treatment is required 3) Applicant shall confirm feasibility of connecting to service line along East Mulberry (Hwy 14) Frontage Road. The line labeled as existing sanitary sewer on sheet C-6 is a service line that is not owned by the District. Coordination with the service line owner will be required. 4) The E One sewer system is facilitated by Ambiente H2O. It will be necessary to contact them for proper pump capacity verification. Correspondence with Ambiente H2O must be provided to the district before taps can be approved. 5) The District requires an agreement that describes that the lift station and force main are the responsibility of the property owner and not the District. The proposed agreement is attached. Please feel free to contact me if you have any questions. Sincerely, Daniel Richardson, PE District Engineer Bloom Filing Six owner is coordinating with the service line owner Comment acknowleged; owner is working with Ambiente H2O. Comment acknowleged; owner is reviewing agreement