From: Erin Bouchet <ebouchet@ctlthompson.com>
Sent: Monday, August 5, 2024 5:02 PM
To: Reese, Andy; Blaine Mathisen
Subject: RE: FCRM Groundwater
Categories: Filed by Newforma
Here is a table summarizing the groundwater measurements we have taken to-date.
Boring Depth to GW(during) Depth to GW Depth to GW Depth to GW Depth to GW Depth to GW
(3-21-2024) (3-29-2024) (4-23-2024) (5-28-2024) (6-21-2024) (7-24-2024)
P-1 6 5.5 5.5 5.5 5.5 6.5
P-2 5 8 8 8.5 8.5 9
Erin Bouchet, P.E., P.G.
Associate Engineer I Denver Engineering Manager
CTLIThompson, Inc.
1971 West 12th Avenue
Denver, Colorado 80204
Office: 303-825-0777
Direct: 303-628-5025
ebouchet&ctlthompson.com I www.ctlt.com
CTL THOMPSON
CTLITHOMPSON
April 19, 2024
1311 North College, LLC
262 East Mountain Avenue
Fort Collins, Colorado 80524
Attention: Colin Vito
Subject: Groundwater Investigation
Fort Collins Rescue Mission
1311 North College Avenue
Fort Collins, Colorado
Project No. FC10520.002-112-L1
We performed a Geotechnical Investigation for Fort Collins Rescue Mission
initially called Hibdon/Mason 24/7 Shelter and presented results in a report (Project
No. FC10,520-125-R1 , dated November 20, 2023). During the investigation, ground-
water was encountered at depths of 8 to 9.5 feet or approximate elevations 4970.5'
to 4973'. We indicated that groundwater may be encountered during sub-excavation
or deep utility installation. We were requested to drill additional borings to further
evaluate the groundwater levels near the proposed detention pond. This letter pre-
sents the results of our additional groundwater measurements. The scope was de-
scribed in a proposal DN 24-0094R dated March 1 , 2024.
Investigation
We drilled two borings on March 21 st 2024, to a depth of about 15 feet below
existing grade using a truck-mounted drill rig and 8-inch continuous flight hollow-
stem auger at the approximate locations shown on Fig. 1 . Machine-slotted PVC pipe
was installed in the lower 10 feet and the upper 5 feet is solid PVC riser pipe. An ad-
ditional 3.5 feet of riser pipe was installed above-grade with a stick-up well protector.
Silica sand was placed from a depth of 3 feet to 15 feet. A bentonite seal was con-
structed in the upper 3 feet of each monitoring well. Our field representative was pre-
sent to observe drilling, log the strata encountered, and log monitoring well construc-
tion. Monitoring well logs are presented in Appendix A.
Subsurface Conditions
Strata found in our exploratory borings consisted of about 7 to 9.5 feet of
sandy gravelly clay underlain by silty gravelly sand. We measured groundwater at
the time of drilling and once again, several days later on March 29, 2024. The
groundwater measurements are presented in the table below. Additional groundwa-
ter measurements will be obtained on a monthly basis through the fall of 2024 and
measurements will be transmitted in subsequent letters.
CTLIThompson, Inc.
Denver, Fort Collins, Colorado Springs, Glenwood Springs, Pueblo, Summit County—Colorado
Cheyenne, Wyoming and Bozeman, Montana
Monitoring Well March 21, 2024 March 29, 2024 GW Elev. (shallow-
Depth to GW During Depth to GW (ft) est measurement)
Drilling (ft) (ft)
P-1 6 5.5 4974
P-2 5 8 4971.5
We believe this investigation was conducted with that level of skill and care
ordinarily used by geotechnical engineers practicing under similar conditions. No
warranty, express or implied is made. If we can be of further service in discussing
the contents of this letter or in the analysis of the influence of subsoil conditions on
design of the structures, please call.
0 Up
CTL I THOMPSON, INC. O•�STINE'•'t'�,
� eo 0
z 0054368 0:
Abhinav Jakilati
Staff Engineer
Reviewed by: S
/ONAt-�
Erin Bouchet, P.E., P.G.
Associate Engineer) Denver Engineering Manager 4/zz/zoz4
Via e-mail:
Andy.Reese(a�kimley-horn.com
Blaine.Math isen(cD-epsgroupinc.com
1311 NORTH COLLEGE,LLC 2
FORT COLLINS RESCUE MISSION-1311 NORTH COLLEGE AVENUE
CTL I T PROJECT NO.FC10520.002-112-L1
W. WILLOX LN.
LEGEND:
P1 APPROXIMATE LOCATION OF SITE z
• EXPLORATORY BORING
0
r
0 100 200 r
m
0
m
SCALE: 1" = 200' HICKORY ST.
m
VICINITY MAP
NOT TO SCALE
r r • � i
irr�Y :
a 1�
P-1 _ . •I
sop z
r ArA
1.
�.e rIlkr ; S
-�` HICKORY sr.
Locations of
1311 NORTH COLLEGE, LLC Exploratory
FORT COLLINS RESCUE MISSION CTLIT Project No. FC10520.002-112-L1 Borings Fig. 1
APPENDIX A
MONITORING WELL LOGS
1311 NORTH COLLEGE,LLC
FORT COLLINS RESCUE MISSION-1311 NORTH COLLEGE AVENUE
CTL IT PROJECT NO.FC10520.002-112-L1
Monitoring Well CTUTHOMPSON, INC. (303)825-0777
Construction Summary 1971 WEST 12TH AVENUE DENVER,COLORADO 80204
Project No. FC10520.002-112 Well No. P-1
Project Name FORT COLLINS RESCUE MISSION Engineer TSK/DENVER
Drilling Contractor TERRACON Date Drilled 3/21/24
Drilling Method 8"HOLLOW STEM AUGER Ground Elevation 4979.81'
Ground Water Depth(ft) 6'
WELL CONSTRUCTION WELL DETAIL
DEPTH/HEIGHT FROM GROUND SURFACE
Cap Type J-PLUG DEPTH (FT)
Well Protector Type STICK UP 4' Top of Well Protector
Annular Sealant Type BENTONITE CHIPS 3.5, Top of Riser Pipe
Seal Material Type BENTONITE CHIPS 0' Ground Surface
Sand Pack Type SILICA 10/20
Riser Pipe Length(ft)and Type 5'PVC 40
Riser Pipe Diameter(in) 2^
Screen Length(ft)and Type 10'PVC 40
Screen Slot Size 0.0101,
Gallons Removed(purge) N/A
Other N/A
DEPTH
(FEET)
01 Top of Seal
3' Total Seal Interval
De th Soil
From To Type Soil Description 3 Top of Sand
0' 0' TS NATURAL GRASS
5' Top of Screen
0' 9.5' CL CLAY,SANDY,MOIST,DARK BROWN.
9.5' 15' SPG SAND,GRAVELLY,VERY MOIST, 12' Sand Pack
BROWN,DARK BROWN.
10, Total Screen Interval
15' Bottom of Screen
�f 15' Bottom of Borehole
REMARKS:
g" Borehole Diameter(in)
FIG.A-1
Monitoring Well CTUTHOMPSON, INC. (303)825-0777
Construction Summary 1971 WEST 12TH AVENUE DENVER,COLORADO 80204
Project No. FC10520.002-112 Well No. P-2
Project Name FORT COLLINS RESCUE MISSION Engineer TSK/DENVER
Drilling Contractor TERRACON Date Drilled 3/21/24
Drilling Method 8"HOLLOW STEM AUGER Ground Elevation 4979.46'
Ground Water Depth(ft) 5'
WELL CONSTRUCTION WELL DETAIL
DEPTH/HEIGHT FROM GROUND SURFACE
Cap Type J-PLUG DEPTH (FT)
Well Protector Type STICK UP 4' Top of Well Protector
Annular Sealant Type BENTONITE CHIPS 3.5, Top of Riser Pipe
Seal Material Type BENTONITE CHIPS 0' Ground Surface
Sand Pack Type SILICA 10/20
Riser Pipe Length(ft)and Type 5'PVC 40
Riser Pipe Diameter(in) 2^
Screen Length(ft)and Type 10'PVC 40
Screen Slot Size 0.0101,
Gallons Removed(purge) N/A
Other N/A
DEPTH
(FEET)
01 Top of Seal
3' Total Seal Interval
De th Soil
From To Type Soil Description 3 Top of Sand
0' 0' TS NATURAL GRASS
5' Top of Screen
0' 2.5' CL CLAY,SANDY,MOIST,DARK BROWN.
2.5' 7' CL/GC CLAYEY,GRAVELLY,SANDY 12' Sand Pack
7' 15' SP SAND,GRAVEL,VERY MOIST
10, Total Screen Interval
15, Bottom of Screen
�f 15' Bottom of Borehole
REMARKS:
g" Borehole Diameter(in)
FIG.A-2