July 03, 2024
Jamie Thorpe
Hartford Homes
4801 Goodman Street
Timnath, CO 80547
RE: Bloom Filing Seven, BDR240008, Round Number 1
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of Bloom Filing Seven. If you have questions about any
comments, you may contact the individual commenter or direct your questions through your
Development Review Coordinator, Brandy Bethurem Harras via phone at 970-416-2744 or
via email at bbethuremharras@fcgov.com.
Comment Summary:
Department: Development Review Coordinator
Contact: Brandy Bethurem Harras bbethuremharras@fcgov.com 970-416-2744
Topic: General
Comment Number: 1
07/02/2024: INFORMATION:
I will be your primary point of contact throughout the development review and
permitting process. If you have any questions, need additional meetings with the
project reviewers, or need assistance throughout the process, please let me
know and I can assist you and your team. Please include me in all email
correspondence with other reviewers and keep me informed of any phone
conversations. Thank you!
Response: Noted, Thank you.
Comment Number: 2
07/02/2024: SUBMITTAL:
As part of your submittal, a response to the comments provided in this letter and
a response to plan markups is required. The final letter is provided to you in
Microsoft Word format. Please use this letter to insert responses to each
comment for your submittal, using a different font color. Please use the markups
to insert responses to each comment on plans. Please do not flatten markup
2
responses.
Provide a detailed response for any comment asking a question or requiring an
action. Any comment requesting a response or requiring action by you with a
response of noted, acknowledged etc. will be considered not addressed. You
will need to provide references to specific project plans, pages, reports, or
explanations of why comments have not been addressed [when applicable].
Response: Responses provided. Thank you.
Comment Number: 3
07/02/2024: SUBMITTAL:
Correct file naming is required as part of a complete submittal. Please follow
the Electronic Submittal Requirements and File Naming Standards found here:
https://www.fcgov.com/developmentreview/files/electronic-submittal-requiremen
ts-and-file-naming-standards_v1_8-1-19.pdf?1703783275
File names should have the corresponding number, followed by the file type
prefix, project information, and round number. For example: 1_SITE
PLAN_Project Name_FDP_Rd1. A list of numbers and prefixes for each file
can be found at the link above.
Response: Files provided with naming as noted.
Comment Number: 4
07/02/2024: SUBMITTAL:
All plans should be saved as optimized/flattened PDFs to reduce file size and remove layers.
Per the Electronic Submittal Requirements AutoCAD SHX attributes need to be
removed from the PDF’s.
AutoCAD turns drawing text into comments that appear in the PDF plan set,
and these must be removed prior to submittal as they can cause issues with the PDF file.
The default setting is "1" ("on") in AutoCAD. To change the setting and remove
this feature, type "EPDFSHX" (version 2016.1) or “PDFSHX (version 2017 and
newer) in the command line and enter "0".
Read this article at Autodesk.com for more on this topic:
https://knowledge.autodesk.com/support/autocad/troubleshooting/caas/sfdcarti
cles/sfdcarticles/Drawing-text-appears-as-Comments-in-a-PDF-created-by-Aut oCAD.html
Response: Files flattened.
Comment Number: 5
07/02/2024: SUBMITTAL:
Resubmittals are accepted any day of the week, with Wednesday at noon being
the cut-off for routing the same week. When you are preparing to resubmit your
plans, please notify me with an expected submittal date with as much advanced
notice as possible.
Response: Noted, Thank you.
Comment Number: 6
07/02/2024: INFORMATION:
Please resubmit within 180 days, approximately 6 months, to avoid the expiration of your project.
Response: Submitted prior to 180 days.
3
Comment Number: 7
07/02/2024: INFORMATION:
ANY project that requires four or more rounds of review would be subject to an additional fee of $3,000.00.
Response: Noted, Thank you.
Comment Number: 8
07/02/2024: NOTICE:
A Development Review sign will be posted on the property. This sign will be
posted through the final decision and appeal process. A request for the removal
of signs will be made by your Development Review Coordinator at the appropriate time.
Response: Noted, Thank you.
Comment Number: 9
07/02/2024: FOR RECORDING - PLAT:
Could you please update the City signature blocks on the plat? Instead of using
"this _______ day of ______A.D., ____," could you opt for "on this day,
_____________" for the date? This alternative format facilitates smoother date
input with digital signatures.
Additionally, kindly ensure there is sufficient space between the signature line
and the title line to accommodate the digital signature.
Response: Updated the city signature block as directed
Comment Number: 10
07/02/2024: FOR FINAL APPROVAL:
The Director shall issue a written decision to approve, approve with conditions,
or deny the development application based on compliance with the standards
referenced in Step 8 of the Common Development Review Procedures.
The written decision shall be mailed to the applicant, to any person who
provided comments during the comment period and to the abutting property
owners and shall also be posted on the City's website.
Response: Noted, Thank you.
Comment Number: 11
07/02/2024: FOR FINAL APPROVAL:
If the project is approved by the Director, there is a two-week appeal period from the date
of the decision. The project is not able to be recorded until it is confirmed there are no appeals.
Response: Noted, Thank you.
Comment Number: 12
07/02/2024: FOR FINAL APPROVAL:
All "For Final Approval / For Approval" comments need to be addressed and
resolved prior to moving forward with the final documents and recording of this project.
I will provide a recording checklist and process information when we are closer to this step.
Response: Noted, Thank you.
Department: Planning Services
Contact: Kai Kleer kkleer@fcgov.com 970-416-4284
Topic: General
Comment Number: 1
07/03/2024: No comments.
Response: Noted, Thank you.
4
Department: Historic Preservation
Contact: Jim Bertolini jbertolini@fcgov.com 970-416-4250
Topic: General
Comment Number: 1
07/02/2024: INFORMATION - NO HISTORIC REVIEW REQUIRED:
This proposal does not require historic review because there are no designated
historic resources on the site and the nature of the project does not impact any
historic resources that may lie on the development site or within 200 feet of the site.
Response: Noted, Thank you.
Department: Engineering Development Review
Contact: Sophie Buckingham sbuckingham@fcgov.com
Topic: General
Comment Number: 1
07/01/2024: FOR APPROVAL:
On the plat, please clearly label the sight distance easement in the northeast
corner of Tract Z and the southeast corner of Tract CC. The sight distance easement needs to be
preserved with this replat.
Response: We created details on sheet 3 showing the sight distance easement on the current plat boundary
Comment Number: 2
07/01/2024: FOR APPROVAL:
The project narrative explains that the utility easement northeast of Aria and
Sykes is being modified because Xcel installed the gas line in a different place
than the developer had anticipated. Please provide an informal utility sheet,
as-built diagram, or survey exhibit showing the location of the Xcel line in
relation to the existing and proposed easement location.
Response: Exhibit provided.
Comment Number: 3
07/01/2024: FOR APPROVAL:
On the Bloom Filing Five plat, there were irrigation easements within Tracts P,
T, and X, now labeled as Tracts N, T, and Z, respectively, of Bloom Filing
Seven. Does the developer want to preserve these irrigation easements with the replat?
Response: We added the irrigation easements and annotated them from Bloom Filing Five.
Department: Traffic Operation
Contact: Steve Gilchrist sgilchrist@fcgov.com 970-224-6175
Topic: General
Comment Number: 1
06/21/2024: INFORMATION:
Based on the narrative that this is primarily a re-plat, this filing of Bloom will not
change or alter the anticipated trips or traffic that would require the submittal of
a Transportation Impact Study. TIS waived.
Response: Noted, Thank you.
5
Department: Technical Services
Contact: Jeff County jcounty@fcgov.com 970-221-6588
Topic: Plat
Comment Number: 1
07/03/2024: FOR FINAL APPROVAL:
Please make changes as marked. If changes are not made or you disagree
with comments, please provide written response of why corrections were not
made. Please provide any responses on redlined sheets and/or in response
letter. If you have any specific questions about the markups, please contact
John Von Nieda at 970-221-6565 or jvonnieda@fcgov.com
Response: We addressed all the redlines on the city comments pdf.
Department: PFA
Contact: Marcus Glasgow marcus.glasgow@poudre-fire.org 970-416-2869
Topic: General
Comment Number: 1
07/02/2024: FOR APPROVAL - EMERGENCY ACCESS:
All areas required to provide fire apparatus access shall be dedicated as Emergency Access
Easement (EAE). The provided plat only shows access easements in the alleys.
Response: Through extensive coordination with PFA during design, processing, platting, and approval of Filing 5, due to the
configuration of the majority of the proposed buildings being accessible to surrounding public roads, emergency access was not
required within internal alleys/drives.
Block 8 does include EAE at the internal alleys due to not having a public road on the west side. This was a requirement of PFA
and easements were included.
Additionally, the design and configuration of the alley tracts have remained unchanged since Filing 5 and are not a part of the
modifications being made with Filing Seven, therefore we are not adding the EAEs at this time.
Department: Erosion Control
Contact: Andrew Crecca acrecca@fcgov.com
Topic: Erosion Control
Comment Number: 1
06/17/2024: INFORMATION:
This replat of Bloom filing 5 poses no significant change and requires no
additional Erosion Control Submittals.
Response: Noted, Thank you.
Department: Stormwater Engineering
Contact: Wes Lamarque wlamarque@fcgov.com 970-416-2418
Topic: General
Comment Number: 2
07/02/2024: INFORMATION:
No Comments.
Response: Noted, Thank you.
6
Department: Water-Wastewater Engineering
Contact: Wes Lamarque wlamarque@fcgov.com 970-416-2418
Topic: General
Comment Number: 1
07/02/2024: INFORMATION:
No Comments.
Response: Noted, Thank you.
Department: Light And Power
Contact: Tyler Siegmund tsiegmund@fcgov.com 970-416-2772
Topic: General
Comment Number: 1
06/20/2024: INFORMATIONI:
It is the understanding of Light and Power that this BDR will not cause a change
to the electric capacity needs or the location of our facilities. If this incorrect
understanding or if plans change, please contact me directly. Thank you.
Response: Noted, Thank you.
Department: Environmental Planning
Contact: Scott Benton sbenton@fcgov.com (970)416-4290
Topic: General
Comment Number: 1
07/01/2024: INFORMATION:
No comments.
Response: Noted, Thank you.
Department: Park Planning
Contact: Missy Nelson mnelson@fcgov.com
Topic: General
Comment Number: 1
07/02/2024: INFORMATION:
No comments from Parks or Park Planning and Development, thank you.
Response: Noted, Thank you.
Department: Internal Services
Contact: Russell Hovland rhovland@fcgov.com 970-416-2341
Topic: Building Insp Plan Review
Comment Number: 1
06/24/2024: BUILDING PERMIT:
Per the adopted building code, garage unit buildings are a U occupancy and
are limited to 5500 square feet if non-fire-sprinkled and must provide 5ft min to
a property line and 10ft to other garage buildings or 15ft to other
commercial/MF buildings.
Response: Noted, Thank you.