Loading...
HomeMy WebLinkAboutSNOW RIDGE APARTMENTS - FDP240003 - SUBMITTAL DOCUMENTS - ROUND 2 - Utility PlansPROSPECT ROAD SH I E L D S S T R E E T LAKE STREET PITKIN STREET STUART STREET HOBBIT ST. HILL POND R D . Sheet SN O W R I D G E A P A R T M E N T S Th e s e d r a w i n g s a r e in s t r u m e n t s o f s e r v i c e pr o v i d e d b y N o r t h e r n En g i n e e r i n g S e r v i c e s , I n c . an d a r e n o t t o b e u s e d f o r an y t y p e o f c o n s t r u c t i o n un l e s s s i g n e d a n d s e a l e d b y a P r o f e s s i o n a l E n g i n e e r i n th e e m p l o y o f N o r t h e r n En g i n e e r i n g S e r v i c e s , I n c . N O T F O R C O N S T R U C T I O N R E V I E W S E T of 21 Original Field Survery: PLS Corporation Project No. 23005 Date: July 6, 2023 JUNE 2024 CONTACT INFORMATION PROJECT TEAM: VICINITY MAP NORTH Project Datum: NAVD88 Benchmark PAULUS On the East edge of a double manhole Type R Inlet, 15 feet South of a concrete multi-use trail tunnel, 7 feet West of top back of curb near the Southwest corner of Shields St. and Elizabeth St. Elevation: 5025.82 Benchmark CSU2 The mark is a standard brass Larimer County geodetic control disk set in 2002, in the campus of Colorado State University approx. 240.8 feet South from the center line of North Drive, 46.6 feet Northeast from the edge of CSU Lagoon, 33 feet Southwest from the center of the delivery road to the University Club and 1.1 feet Southwest from the edge of the sidewalk. Elevation: 5006.29 Please Note: This plan set is using NAVD88 for a vertical datum. Surrounding developments have used NGVD29 unadjusted (Prior City of Fort Collins datum) for their vertical datums. If NGVD29 unadjusted datum (Prior City of Fort Collins datum is required for any purpose the following equation should be used: NGVD29 = NAVD88 - 3.17' Basis of Bearings Bearings are based on the assumption that the east line of the southeast Quarter of Section 15, which bears N 00°29'45'' E, the Southeast Section Corner being monumented by a 3.25" aluminum cap on a #6 rebar in a monument box and the East Quarter Corner being monumented by a 3" aluminum cap on a #6 rebar in a monument box. PROJECT BENCHMARKS: SNOW RIDGE APARTMENTS PROJECT TEAM: Joel Weikert Ripley Design, Inc. 419 Canyon Ave. Suite 200 Fort Collins, CO 80521 (970) 224-5828 Matthew Deault MMD Built LLC 1425 Pikes Peak Ave Fort Collins, CO 80524 (303)931-9295 Northern Engineering Services, Inc. Amanda Poincelot 301 North Howes Street, Suite 100 Fort Collins, Colorado 80521 (970) 221-4158 PLANNER/ LANDSCAPE ARCHITECT OWNER/APPLICANT SITE ENGINEER GEOTECHNICAL ENGINEER Soilogic, Inc. Darrel DiCarlo, P.E. 3522 Draft Horse Court Loveland, CO 80538 (970)535-6144 SHEET INDEX A TRACT OF LAND LOCATED IN THE SOUTHEAST QUARTER OF SECTION 15, TOWNSHIP 7 NORTH, RANGE 69 WEST OF THE 6TH P.M., CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO (1509 SOUTH SHIELDS STREET) FIELD SURVEY BY: Northern Engineering Services, Inc. Bob Tessely, PLS 301 North Howes Street, Suite 100 Fort Collins, Colorado 80521 (970) 221-4158 SITE SURVEYOR FINAL UTILITY PLANS FOR Soilogic, Inc. Geotechnical Subsurface Exploration Report Larimer County, Colorado Project No.: 23-1207 Date: September 14, 2023 SUBSURFACE EXPLORATION BY: UTILITY CONTACT LIST: * E N G I N E E R N GI EHTRON R N E N G I N E E R N GI EHTRON R N 1 COVER SHEET 2 GENERAL & CONSTRUCTION NOTES 3 STANDARD EROSION CONTROL NOTES 4 EXISTING CONDITIONS & DEMOLITION PLAN GRADING SHEETS 5 OVERALL GRADING PLAN UTILITY SHEETS 6 OVERALL UTILITY PLAN STORM SHEETS 7 STORM DRAINS A & B PLAN & PROFILE EROSION CONTROL SHEETS 8 INITIAL EROSION CONTROL PLAN 9 INTERMEDIATE EROSION CONTROL PLAN 10 FINAL EROSION CONTROL PLAN 11 EROSION CONTROL DETAILS DRAINAGE SHEETS 12 HISTORIC DRAINAGE EXHIBIT 13 DEVELOPED DRAINAGE EXHIBIT DETAIL SHEETS 14 UTILITY DETAILS 15-17 DRAINAGE DETAILS 18-19 SITE DETAILS LIGHTING SHEETS 20 FORT COLLINS LIGHTING CODE 21 PHOTOMETRIC FIXTURE CUT-SHEETS PROJECT LOCATION UTILITY COMPANY * This list is provided as a courtesy reference only. Northern Engineering Services assumes no responsibility for the accuracy or completeness of this list. In no way shall this list relinquish the Contractor's responsibility for locating all utilities prior to commencing any construction activity. Please contact the Utility Notification Center of Colorado (UNCC) at 811 for additional information. PHONE NUMBER GAS-----------------Xcel Energy-----------------------------Cory Thelen (970) 225-7843 ELECTRIC--------City of Fort Collins Light & Power--Cody Snowdon (970) 416-2306 CABLE-------------Comcast----------------------------------Marcus Petty (720) 275-0572 TELECOM.--------Lumen-------------------------------Brad Craddock (970) 342-3431 WATER----------- City of Fort Collins Utilities---------- Jim McChesney (970) 556-8179 WASTEWATER--City of Fort Collins Utilities-----------Jim McChesney (970) 556-8179 STORMWATER-City of Fort Collins Utilities-----------Heidi Hansen (970) 221-6854 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R APPROVED: City Engineer:Approved Sheets Date Water & Wastewater Utility Approved Sheets Date Stormwater Utility Approved Sheets Date Park Planning and Development Approved Sheets Date Traffic Operations Approved Sheets Date Environmental Planner Approved Sheets Date City of Fort Collins, Colorado UTILITY PLAN APPROVAL APPROVED: APPROVED: APPROVED: APPROVED: APPROVED: I hereby affirm that these final construction plans were prepared under my direct supervision, in accordance with all applicable City of Fort Collins and State of Colorado standards and statutes, respectively; and that I am fully responsible for the accuracy of all design. revisions, and record conditions that I have noted on these plans. These plans have been reviewed by the City of Fort Collins for concept only. The review does not imply responsibility by the reviewing department, the City of Fort Collins Engineer, or the City of Fort Collins for accuracy and correctness of the calculations. Furthermore, the review does not imply that quantities of items on the plans are the final quantities required. The review shall not be construed for any reason as acceptance of financial responsibility by the City of Fort Collins for additional quantities of items shown that may be required during the construction phase. DISCLAIMER STATEMENT: CERTIFICATION STATEMENT: John Dengler John Dengler & Associates 5336 Highcastle Court Fort Collins, CO 80525 (970) 223-1512 ARCHITECT CS1 CO V E R S H E E T 1 Sheet SN O W R I D G E A P A R T M E N T S Th e s e d r a w i n g s a r e in s t r u m e n t s o f s e r v i c e pr o v i d e d b y N o r t h e r n En g i n e e r i n g S e r v i c e s , I n c . an d a r e n o t t o b e u s e d f o r an y t y p e o f c o n s t r u c t i o n un l e s s s i g n e d a n d s e a l e d b y a P r o f e s s i o n a l E n g i n e e r i n th e e m p l o y o f N o r t h e r n En g i n e e r i n g S e r v i c e s , I n c . N O T F O R C O N S T R U C T I O N R E V I E W S E T of 21 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R A. GENERAL NOTES 1.All materials, workmanship, and construction of public improvements shall meet or exceed the standards and specifications set forth in the Larimer County Urban Area Street Standards and applicable state and federal regulations. Where there is conflict between these plans and the specifications, or any applicable standards, the most restrictive standard shall apply. All work shall be inspected and approved by the City of Fort Collins. 2.All references to any published standards shall refer to the latest revision of said standard, unless specifically stated otherwise. 3.These public improvement construction plans shall be valid for a period of three years from the date of approval by the City of Fort Collins Engineer. Use of these plans after the expiration date will require a new review and approval process by the City of Fort Collins prior to commencement of any work shown in these plans. 4.The engineer who has prepared these plans, by execution and/or seal hereof, does hereby affirm responsibility to the City of Fort Collins, as beneficiary of said engineer's work, for any errors and omissions contained in these plans, and approval of these plans by the City of Fort Collins Engineer shall not relieve the engineer who has prepared these plans of all such responsibility. Further, to the extent permitted by law, the engineer hereby agrees to hold harmless and indemnify the City of Fort Collins, and its officers and employees, from and against all liabilities, claims, and demands which may arise from any errors and omissions contained in these plans. 5.All storm sewer construction, as well as power and other "dry" utility installations, shall conform to the City of Fort Collins standards and specifications current at the date of approval of the plans by the City of Fort Collins Engineer. 6.The type, size, location and number of all known underground utilities are approximate when shown on the drawings. It shall be the responsibility of the Developer to verify the existence and location of all underground utilities along the route of the work before commencing new construction. The Developer shall be responsible for unknown underground utilities. 7.The Developer shall contact the Utility Notification Center of Colorado (UNCC) at 1-800-922-1987, at least 2 working days prior to beginning excavation or grading, to have all registered utility locations marked. Other unregistered utility entities (i.e. ditch / irrigation company) are to be located by contacting the respective representative. Utility service laterals are also to be located prior to beginning excavation or grading. It shall be the responsibility of the Developer to relocate all existing utilities that conflict with the proposed improvements shown on these plans. 8.The Developer shall be responsible for protecting all utilities during construction and for coordinating with the appropriate utility company for any utility crossings required. 9.If a conflict exists between existing and proposed utilities and/or a design modification is required, the Developer shall coordinate with the engineer to modify the design. Design modification(s) must be approved by the City of Fort Collins prior to beginning construction. 10.The Developer shall coordinate and cooperate with the City of Fort Collins, and all utility companies involved, to assure that the work is accomplished in a timely fashion and with a minimum disruption of service. The Developer shall be responsible for contacting, in advance, all parties affected by any disruption of any utility service as well as the utility companies. 11.No work may commence within any public storm water, sanitary sewer or potable water system until the Developer notifies the utility provider. Notification shall be a minimum of 2 working days prior to commencement of any work. At the discretion of the water utility provider, a pre-construction meeting may be required prior to commencement of any work. 12.The Developer shall sequence installation of utilities in such a manner as to minimize potential utility conflicts. In general, storm sewer and sanitary sewer should be constructed prior to installation of the water lines and dry utilities. 13.The minimum cover over water lines is 4.5 feet and the maximum cover is 5.5 feet unless otherwise noted in the plans and approved by the Water Utility. 14.A State Construction Dewatering Wastewater Discharge Permit is required if dewatering is required in order to install utilities or if water is discharged into a storm sewer, channel, irrigation ditch or any waters of the United States. 15.The Developer shall comply with all terms and conditions of the Colorado Permit for Storm Water Discharge (Contact Colorado Department of Health, Water Quality Control Division, (303) 692-3590), the Storm Water Management Plan, and the Erosion Control Plan. 16.The City of Fort Collins shall not be responsible for the maintenance of storm drainage facilities located on private property. Maintenance of onsite drainage facilities shall be the responsibility of the property owner(s). 17.Prior to final inspection and acceptance by the City of Fort Collins, certification of the drainage facilities, by a registered engineer, must be submitted to and approved by the Stormwater Utility Department. Certification shall be submitted to the Stormwater Utility Department at least two weeks prior to the release of a certificate of occupancy for single family units. For commercial properties, certification shall be submitted to the Stormwater Utility Department at least two weeks prior to the release of any building permits in excess of those allowed prior to certification per the Development Agreement. 18.The City of Fort Collins shall not be responsible for any damages or injuries sustained in this Development as a result of groundwater seepage, whether resulting from groundwater flooding, structural damage or other damage unless such damage or injuries are sustained as a result of the City of Fort Collins failure to properly maintain its water, wastewater, and/or storm drainage facilities in the development. 19.All recommendations of the Final Drainage Report, dated April 3, 2023 by Northern Engineering shall be followed and implemented. 20.Temporary erosion control during construction shall be provided as shown on the Erosion Control Plan. All erosion control measures shall be maintained in good repair by the Developer, until such time as the entire disturbed areas is stabilized with hard surface or landscaping. 21.The Developer shall be responsible for insuring that no mud or debris shall be tracked onto the existing public street system. Mud and debris must be removed within 24 hours by an appropriate mechanical method (i.e. machine broom sweep, light duty front-end loader, etc.) or as approved by the the City of Fort Collins street inspector. 22.No work may commence within any improved or unimproved public Right-of-Way until a Right-of-Way Permit or Development Construction Permit is obtained, if applicable. 23.The Developer shall be responsible for obtaining all necessary permits for all applicable agencies prior to commencement of construction. The Developer shall notify the the City of Fort Collins Inspector (Fort Collins - 221-6605) and the City of Fort Collins Erosion Control Inspector (Fort Collins - 221-6700) at least 2 working days prior to the start of any earth disturbing activity, or construction on any and all public improvements. If the City of Fort Collins Engineer is not available after proper notice of construction activity has been provided, the Developer may commence work in the Engineer absence. However, the City of Fort Collins reserves the right not to accept the improvement if subsequent testing reveals an improper installation. 24.The Developer shall be responsible for obtaining soils tests within the Public Right-of-Way after right of way grading and all utility trench work is complete and prior to the placement of curb, gutter, sidewalk and pavement. If the final soils/pavement design report does not correspond with the results of the original geotechnical report, the Developer shall be responsible for a re-design of the subject pavement section or, the Developer may use the City of Fort Collins' default pavement thickness section(s). Regardless of the option used, all final soils/pavement design reports shall be prepared by a licensed Professional Engineer. The final report shall be submitted to the Inspector a minimum of 10 working days prior to placement of base and asphalt. Placement of curb, gutter, sidewalk, base and asphalt shall not occur until the City of Fort Collins Engineer approves the final report. 25.The contractor shall hire a licensed engineer or land surveyor to survey the constructed elevations of the street subgrade and the gutter flowline at all intersections, inlets, and other locations requested by the the City of Fort Collins inspector. The engineer or surveyor must certify in a letter to the City of Fort Collins that these elevations conform to the approved plans and specifications. Any deviations shall be noted in the letter and then resolved with the City of Fort Collins before installation of base course or asphalt will be allowed on the streets. 26.All utility installations within or across the roadbed of new residential roads must be completed prior to the final stages of road construction. For the purposes of these standards, any work except c/g above the subgrade is considered final stage work. All service lines must be stubbed to the property lines and marked so as to reduce the excavation necessary for building connections. 27.Portions of Larimer County are within overlay districts. The Larimer County Flood Plain Resolution should be referred to for additional criteria for roads within these districts. 28.All road construction in areas designated as Wild Fire Hazard Areas shall be done in accordance with the construction criteria as established in the Wild Fire Hazard Area Mitigation Regulations in force at the time of final plat approval. 29.Prior to the commencement of any construction, the contractor shall contact the Local Entity Forester to schedule a site inspection for any tree removal requiring a permit. 30.The Developer shall be responsible for all aspects of safety including, but not limited to, excavation, trenching, shoring, traffic control, and security. Refer to OSHA Publication 2226, Excavating and Trenching. 31.The Developer shall submit a Construction Traffic Control Plan, in accordance with MUTCD, to the appropriate Right-of-Way authority. (The City of Fort Collins, Larimer County, Colorado), for approval, prior to any construction activities within, or affecting, the Right-of-Way. The Developer shall be responsible for providing any and all traffic control devices as may be required by the construction activities. 32.Prior to the commencement of any construction that will affect traffic signs of any type, the contractor shall contact the City of Fort Collins Traffic Operations Department, who will temporarily remove or relocate the sign at no cost to the contractor, however, if the contractor moves the traffic sign then the contractor will be charged for the labor, materials and equipment to reinstall the sign as needed. 33.The Developer is responsible for all costs for the initial installation of traffic signing and striping for the Development related to the Development's local street operations. In addition, the Developer is responsible for all costs for traffic signing and striping related to directing traffic access to and from the Development. 34.There shall be no site construction activities on Saturdays, unless specifically approved by the City of Fort Collins Engineer, and no site construction activities on Sundays or holidays, unless there is prior written approval by City of Fort Collins. 35.The Developer is responsible for providing all labor and materials necessary for the completion of the intended improvements, shown on these drawings, or designated to be provided, installed, or constructed, unless specifically noted otherwise. 36.Dimensions for layout and construction are not to be scaled from any drawing. If pertinent dimensions are not shown, contact the Designer for clarification, and annotate the dimension on the as-built record drawings. 37.The Developer shall have, onsite at all times, one (1) signed copy of the approved plans, one (1) copy of the appropriate standards and specifications, and a copy of any permits and extension agreements needed for the job. 38.If, during the construction process, conditions are encountered which could indicate a situation that is not identified in the plans or specifications, the Developer shall contact the Designer and the City of Fort Collins Engineer immediately. 39.The Developer shall be responsible for recording as-built information on a set of record drawings kept on the construction site, and available to the Larimer County's Inspector at all times. Upon completion of the work, the contractor(s) shall submit record drawings to the City of Fort Collins Engineer. 40.The Designer shall provide, in this location on the plan, the location and description of the nearest survey benchmarks (2) for the project as well as the basis of bearings. The information shall be as follows: Project Datum: NAVD88 Benchmark PAULUS On the East edge of a double manhole Type R Inlet, 15 feet South of a concrete multi-use trail tunnel, 7 feet West of top back of curb near the Southwest corner of Shields St. and Elizabeth St. Elevation: 5025.82 Benchmark CSU2 The mark is a standard brass Larimer County geodetic control disk set in 2002, in the campus of Colorado State University approx. 240.8 feet South from the center line of North Drive, 46.6 feet Northeast from the edge of CSU Lagoon, 33 feet Southwest from the center of the delivery road to the University Club and 1.1 feet Southwest from the edge of the sidewalk. Elevation: 5006.29 Please Note: This plan set is using NAVD88 for a vertical datum. Surrounding developments have used NGVD29 unadjusted datum (Prior City of Fort Collins datum) for their vertical datums. If NGVD29 unadjusted datum (Prior City of Fort Collins datum) is required for any purpose, the following equation should be used: NGVD29 = NAVD88 - 3.17' Basis of Bearings Bearings are based on the assumption that the east line of the southeast Quarter of Section 15, which bears N 00°29'45'' E, the Southeast Section Corner being monumented by a 3.25" aluminum cap on a #6 rebar in a monument box and the East Quarter Corner being monumented by a 3" aluminum cap on a #6 rebar in a monument box. 41.All stationing is based on centerline of roadways unless otherwise noted. 42.Damaged curb, gutter and sidewalk existing prior to construction, as well as existing fences, trees, streets, sidewalks, curbs and gutters, landscaping, structures, and improvements destroyed, damaged or removed due to construction of this project, shall be replaced or restored in like kind at the Developer's expense, unless otherwise indicated on these plans, prior to the acceptance of completed improvements and/or prior to the issuance of the first Certificate of Occupancy. 43.When an existing asphalt street must be cut, the street must be restored to a condition equal to or better than its original condition. The existing street condition shall be documented by the City of Fort Collins Construction Inspector before any cuts are made. Patching shall be done in accordance with the City of Fort Collins Street Repair Standards. The finished patch shall blend in smoothly into the existing surface. All large patches shall be paved with an asphalt lay-down machine. In streets where more than one cut is made, an overlay of the entire street width, including the patched area, may be required. The determination of need for a complete overlay shall be made by the Larimer County Engineer and/or the City of Fort Collins Inspector at the time the cuts are made. 44.Upon completion of construction, the site shall be cleaned and restored to a condition equal to, or better than, that which existed before construction, or to the grades and condition as required by these plans. 45.Standard Handicap ramps are to be constructed at all curb returns and at all "T" intersections. 46.After acceptance by the City of Fort Collins, public improvements depicted in these plans shall be guaranteed to be free from material and workmanship defects for a minimum period of two years from the date of acceptance. 47.The City of Fort Collins shall not be responsible for the maintenance of roadway and appurtenant improvements, including storm drainage structures and pipes, for the following private streets: N.A. 48.Approved Variances are listed as follows: 1) N/A CONSTRUCTION NOTES A. Grading and Erosion Control Notes 1.The erosion control inspector must be notified at least twenty-four (24) hours prior to any construction on this site. 2.There shall be no earth-disturbing activity outside the limits designated on the accepted plans. 3.All required perimeter silt and construction fencing shall be installed prior to any land disturbing activity (stockpiling, stripping, grading, etc). All other required erosion control measures shall be installed at the appropriate time in the construction sequence as indicated in the approved project schedule, construction plans, and erosion control report. 4.At all times during construction, the Developer shall be responsible for preventing and controlling on-site erosion including keeping the property sufficiently watered so as to minimize wind blown sediment. The Developer shall also be responsible for installing and maintaining all erosion control facilities shown herein. 5.Pre-disturbance vegetation shall be protected and retained wherever possible. Removal or disturbance of existing vegetation shall be limited to the area(s) required for immediate construction operations, and for the shortest practical period of time. 6.All soils exposed during land disturbing activity (stripping, grading, utility installations, stockpiling, filling, etc.) shall be kept in a roughened condition by ripping or disking along land contours until mulch, vegetation, or other permanent erosion control BMPs are installed. No soils in areas outside project street rights-of-way shall remain exposed by land disturbing activity for more than thirty (30) days before required temporary or permanent erosion control (e.g. seed/mulch, landscaping, etc.) is installed, unless otherwise approved by the City/County. 7.In order to minimize erosion potential, all temporary (structural) erosion control measures shall: a.Be inspected at a minimum of once every two (2) weeks and after each significant storm event and repaired or reconstructed as necessary in order to ensure the continued performance of their intended function. b.Remain in place until such time as all the surrounding disturbed areas are sufficiently stabilized as determined by the erosion control inspector. c.Be removed after the site has been sufficiently stabilized as determined by the erosion control inspector. 8.When temporary erosion control measures are removed, the Developer shall be responsible for the clean up and removal of all sediment and debris from all drainage infrastructure and other public facilities. 9.The contractor shall immediately clean up any construction materials inadvertently deposited on existing streets, sidewalks, or other public rights of way, and make sure streets and walkways are cleaned at the end of each working day. 10.All retained sediments, particularly those on paved roadway surfaces, shall be removed and disposed of in a manner and location so as not to cause their release into any waters of the United States. 11.No soil stockpile shall exceed ten (10) feet in height. All soil stockpiles shall be protected from sediment transport by surface roughening, watering, and perimeter silt fencing. Any soil stockpile remaining after thirty (30) days shall be seeded and mulched. 12.The stormwater volume capacity of detention ponds will be restored and storm sewer lines will be cleaned upon completion of the project and before turning the maintenance over to the City/County or Homeowners Association (HOA). 13.City Ordinance and Colorado Discharge Permit System (CDPS) requirements make it unlawful to discharge or allow the discharge of any pollutant or contaminated water from construction sites. Pollutants include, but are not limited to discarded building materials, concrete truck washout, chemicals, oil and gas products, litter, and sanitary waste. The developer shall at all times take whatever measures are necessary to assure the proper containment and disposal of pollutants on the site in accordance with any and all applicable local, state, and federal regulations. 14.A designated area shall be provided on site for concrete truck chute washout. The area shall be constructed so as to contain washout material and located at least fifty (50) feet away from any waterway during construction. Upon completion of construction activities the concrete washout material will be removed and properly disposed of prior to the area being restored. 15.To ensure that sediment does not move off of individual lots one or more of the following sediment/erosion control BMPs shall be installed and maintained until the lots are sufficiently stabilized, as determined by the erosion control inspector. a.) Below all gutter downspout. b.) Out to drainage swales. c.) Along lot perimeter. d.) Other locations, if needed. 16.Conditions in the field may warrant erosion control measures in addition to what is shown on these plans. The Developer shall implement whatever measures are determined necessary, as directed by the City 17.A Vehicle Tracking Control Pad shall be installed whenever it is necessary for construction equipment including but not limited to personal vehicles existing roadways. No earthern materials, i.e., stone, dirt, etc., shall be placed in the curb & gutter or roadway as a ramp to access temporary stockpile(s), staging area(s), construction material(s), concrete washout areas(s) and/or building site(s). 18.For additional information see separate Stormwater Management Plan / Erosion Control Report for SNOW RIDGE APARTMENTS. B. Street Improvement Notes 1.All street construction is subject to the General Notes on the cover sheet of these plans as well as the Street Improvements Notes listed here. 2.A paving section design, signed and stamped by a Colorado licensed Engineer, must be submitted to the City of Fort Collins Engineer for approval, prior to any street construction activity, (full depth asphalt sections are not permitted at a depth greater than 8 inches of asphalt). The job mix shall be submitted for approval prior to placement of any asphalt. 3.Where proposed paving adjoins existing asphalt, the existing asphalt shall be saw cut, a minimum distance of 12 inches from the existing edge, to create a clean construction joint. The Developer shall be required to remove existing pavement to a distance where a clean construction joint can be made. Wheel cuts shall not be allowed unless approved by the City of Fort Collins Engineer in Fort Collins. 4.Street subgrades shall be scarified the top 12 inches and re-compacted prior to subbase installation. No base material shall be laid until the subgrade has been inspected and approved by the City of Fort Collins Engineer. 5.Valve boxes and manholes are to be brought up to grade at the time of pavement placement or overlay. Valve box adjusting rings are not allowed. 6.When an existing asphalt street must be cut, the street must be restored to a condition equal to or better than its original condition. The existing street condition shall be documented by the Inspector before any cuts are made. Cutting and patching shall be done in conformance with Chapter 25, Reconstruction and Repair. The finished patch shall blend smoothly into the existing surface. The determination of need for a complete overlay shall be made by the City of Fort Collins Engineer. All overlay work shall be coordinated with adjacent landowners such that future projects do not cut the new asphalt overlay work. 7.All traffic control devices shall be in conformance with these plans or as otherwise specified in M.U.T.C.D. (including Colorado supplement) and as per the Right-of-Way Work Permit traffic control plan. 8.The Developer is required to perform a gutter water flow test in the presence of the City of Fort Collins Inspector and prior to installation of asphalt. Gutters that hold more than 1/4 inch deep or 5 feet longitudinally, of water, shall be completely removed and reconstructed to drain properly. 9.Prior to placement of H.B.P. or concrete within the street and after moisture/density tests have been taken on the subgrade material (when a full depth section is proposed) or on the subgrade and base material (when a composite section is proposed), a mechanical "proof roll" will be required. The entire subgrade and/or base material shall be rolled with a heavily loaded vehicle having a total GVW of not less than 50,000 lbs. and a single axle weight of at least 18,000 lbs. with pneumatic tires inflated to not less that 90 p.s.i.g. "Proof roll" vehicles shall not travel at speeds greater than 3 m.p.h. Any portion of the subgrade or base material which exhibits excessive pumping or deformation, as determined by the City of Fort Collins Engineer, shall be reworked, replaced or otherwise modified to form a smooth, non-yielding surface. The City of Fort Collins Engineer shall be notified at least 24 hours prior to the "proof roll." All "proof rolls" shall be preformed in the presence of an Inspector. C. Traffic Signing and Pavement Marking Construction Notes 1.All signage and marking is subject to the General Notes on the cover sheet of these plans, as well as the Traffic Signing and Marking Construction Notes listed here. 2.All symbols, including arrows, ONLYS, crosswalks, stop bars, etc. shall be pre-formed thermo-plastic. 3.All signage shall be per the City of Fort Collins Standards and these plans or as otherwise specified in MUTCD. 4.All lane lines for asphalt pavement shall receive two coats of latex paint with glass beads. 5.All lane lines for concrete pavement should be epoxy paint. 6.Prior to permanent installation of traffic striping and symbols, the Developer shall place temporary tabs or tape depicting alignment and placement of the same. Their placement shall be approved by the City of Fort Collins Traffic Engineer prior to permanent installation of striping and symbols. 7.Pre-formed thermo-plastic applications shall be as specified in these Plans and/or these Standards. 8.Latex paint applications shall be applied as specified in CDOT Standard Specifications for Road and Bridge Construction. 9.All surfaces shall be thoroughly cleaned prior to installation of striping or markings. 10.All sign posts shall utilize break-away assemblies and fasteners per the Standards. 11.A field inspection of location and installation of all signs shall be performed by the City of Fort Collins Traffic Engineer. All discrepancies identified during the field inspection must be corrected before the 2-year warranty period will begin. 12.The Developer installing signs shall be responsible for locating and protecting all underground utilities. 13.Special care shall be taken in sign location to ensure an unobstructed view of each sign. 14.Signage and striping has been determined by information available at the time of review. Prior to initiation of the warranty period,the City of Fort Collins Traffic Engineer reserves the right to require additional signage and/or striping if the City of Fort Collins Traffic Engineer determines that an unforeseen condition warrants such signage according to the MUTCD or the CDOT M and S Standards. All signage and striping shall fall under the requirements of the 2-year warranty period for new construction (except fair wear on traffic markings). 15.Sleeves for sign posts shall be required for use in islands/medians. Refer to Chapter 14, Traffic Control Devices, for additional detail. 16.Contractor is responsible for removing all anchors, posts, signs and/or delineators in Construction area. Contractor may keep the signs, or call the City Traffic Division to have them removed. 17.No "Reset" anchors, posts, signs, and/or delineators will be accepted. 18.All anchors, posts, signs, and/or delineators shall be new and be consistent with the LCUASS criteria. D. Storm Drainage Notes 1.The City of Fort Collins shall not be responsible for the maintenance of storm drainage facilities located on private property. Maintenance of onsite drainage facilities shall be the responsibility of the property owner(s). 2.All recommendations of the Final Drainage Report, dated April 3, 2023 by Northern Engineering shall be followed and implemented. 3.Prior to final inspection and acceptance by the City of Fort Collins, certification of the drainage facilities, by a registered engineer, must by submitted to and approved by the Stormwater Utility Department. Certification shall be submitted to the Stormwater Utility Department at least two weeks prior to the release of a certificate of occupancy for single family units. For commercial properties, certification shall by submitted to the Stormwater Utility Department at least two weeks prior to the release of any building permits in excess of those allowed prior to certification per the Development Agreement. 4.See City of Fort Collins Stormwater Criteria Manual - Appendix F Construction Control Measures Standard Notes and Standard Erosion Control Notes. E. Utility Notes 1.All waterline and sanitary sewer construction shall conform to the City of Fort Collins Utility standards and specifications current to date of construction. 2.Water mains shall be poly-wrapped D.I.P, or PVC with tracer wire. 3.The minimum cover over water lines is 4.5 feet and the maximum cover is 5.5 feet unless otherwise noted in the plans and approved by the Water Utility. 4.HDPE pipe may be used for 1-1/2 and 2 inch water services. The pipe shall meet the standards of AWWA 901, NSF Standard 61 and ASTM. The HDPE pipe shall be SDR 9 having a pressure rating of 200 psi. Stiffeners shall be used at all fittings and connections. Tracer wire shall be installed with the HDPE service, and shall extend up the curb stop. The curb stop shall be covered with a metal valve box and "water" lid per City Water Detail 11A. INFILL AND REDEVELOPMENT NOTE A.Despite everyone's best efforts, it is impossible to fully display subsurface information prior to excavation. This is especially true in areas of infill and redevelopment. Unknown subsurface conditions can have cost and schedule implications. Prior to finalizing contract terms, it is strongly recommended that the Owner and General Contractor have a candid discussion to formulate a strategy for dealing with such circumstances when they arise. The process and procures should be in place prior to excavation. Allowances and contingencies can address the cost implications, but additional measures are required to deal with scheduling and factors impacting sequence of work. The Architect, Engineer(s), and Construction Surveyor should be made aware of the protocol for dealing with such unknown subsurface conditions prior to starting work. CS2 & C O N S T R U C T I O N N O T E S GE N E R A L 2 Sheet SN O W R I D G E A P A R T M E N T S Th e s e d r a w i n g s a r e in s t r u m e n t s o f s e r v i c e pr o v i d e d b y N o r t h e r n En g i n e e r i n g S e r v i c e s , I n c . an d a r e n o t t o b e u s e d f o r an y t y p e o f c o n s t r u c t i o n un l e s s s i g n e d a n d s e a l e d b y a P r o f e s s i o n a l E n g i n e e r i n th e e m p l o y o f N o r t h e r n En g i n e e r i n g S e r v i c e s , I n c . N O T F O R C O N S T R U C T I O N R E V I E W S E T of 21 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R GENERAL EROSION CONTROL REQUIREMENTS 1.The Property Owner, Owner's Representative, Developer, Design Engineer, General Contractor, Sub-contractors, or similar title for the developing entity (here after referred to as the Developer) has provided these Erosion Control Materials in accordance with Erosion Control Criteria set forth in the Manual as an attempt to identify erosion, sediment, and other potential pollutant sources associated with these Construction Activities and preventing those pollutants from leaving the project site as an illicit discharge. Full City requirements and are outlined and clarified in the Manual under Chapter 4: Construction Control Measures and should be used to identify and define what is needed on a project. 2.The Developer shall make themselves thoroughly familiar with the provisions and the content of the specifications laid out in the Manual, the Development Agreement, the Erosion Control Materials compiled for this project, and the following notes as all these materials are applicable to this project. 3.The Developer shall implement and maintain Control Measures for all potential pollutants from the start of land disturbing activities until final stabilization of the construction site. 4.The City Erosion Control Inspector shall be notified at least twenty-four (24) hours prior to the desired start of any construction activities on this site to allow adequate time for on-site confirmation (initial inspection which can take up to two business days after receiving the request) that the site is in fact protected from sediment and pollutants discharges off site. Please contact erosion@fcgov.com early to schedule those Initial Erosion Control Inspections well in advance so that demolition, clearing, grubbing, tree removal, and scraping may begin without delay. Failure to receive an on-site confirmation before construction activities commence is an automatic “Notice of Violation” and can result in further enforcement actions. 5.The Developer shall proactively provide all appropriate Control Measures to prevent damage to adjacent downstream and leeward properties. This includes but is not limited to: trees, shrubs, lawns, walks, pavements, roadways, structures, creeks, wetlands, streams, rivers, and utilities that are not designed for removal, relocation, or replacement in the course of construction. 6.At all times the Developer shall be responsible to ensure adequate Control Measures are designed, selected, installed, maintain, repaired, replaced, and ultimately removed in order to prevent and control erosion suspension, sediment transportation, and pollutant discharge as a result of construction activities associated with this project. 7.All applicable Control Measures based upon the sequencing and/or phasing of the project shall be installed prior to those construction activities commencing. 8.As dynamic conditions (due to the nature, timing, sequence, and phasing of construction) in the field may warrant Control Measures in addition, or different, to what is shown on these plans, the Developer shall at all times be responsible to implement the Control Measures that are most effective with the current state and progress of construction. The Developer shall implement whatever measures are determined necessary, and/or as directed by the City Erosion Control Inspector. The Developer shall insure that all Erosion Control Plans (Maps) or SWMP documents are updated to reflect the current site conditions, with updates being initialed and dated. These site inspections and site condition updates shall be made available upon request by the City. 9.All listings, provisions, materials, procedures, activities, site work and the like articulated in this or other written site-specific documents (Including but not limited to the erosion control reports, development agreements, landscape, and drainage materials) shall meet or exceed the most restrictive language for City, County, State, and Federal regulations with regards to erosion, sediment, pollutant, and other pollution source Control Measures. The Developer shall be responsible to comply with all of these aforementioned laws and regulations. 10.The Developer shall ensure that all appropriate permits (CDPS General Permit Stormwater Discharges Associated with Construction Activity, Dewatering, Clean Water Act, Army Corps of Engineers' 404 Wetlands Mitigation Permit, etc.) have been attained prior to the relevant activity has begun. These permits or copies shall be made available upon request by the City. 11.The Developer shall furnish all conveniences and assistances to aid the Erosion Control Inspectors of materials, workmanship, records, and self-inspections, etc. of the Control Measures involved in the construction activities. 12.The Developer shall request clarification of all apparent site construction issues that may arise due to inconsistencies in construction plans for the site or site conditions around the selected Control Measures by contacting the Erosion Control Inspector. The Erosion Control Inspector will not be responsible for any explanations, interpretations, or supplementary data provided by others. 13.All Control Measures shall be installed in accordance with the Manual. 14.The City reserves the right to require additional Control Measures as site conditions warrant, to the extent authorized by relevant legal authority. 15.As with any construction standards, occasions may arise where the minimum erosion control standards are either inappropriate or cannot be justified. In these cases, a variance to these standards may be applied for pursuant to the terms, conditions, and procedures of the Manual. 16.Inspection. The contractor shall inspect site pollutant sources and implement Control Measures at a minimum of once every two weeks during construction and within 24 hours following a precipitation event. Documentation of each inspection shall be recorded and retained by the contractor. 17.All temporary Control Measures shall be cleaned, repaired, or reconstructed as necessary in order to assure continual performance of their intended function. All retained sediments, particularly those on paved roadway surfaces, shall be removed and disposed of in a manner and location so as not to cause their release into any drainage way. 18.Any Control Measure may be substituted for another standard Control Measure so long as that Control Measure is equal to, or of greater protection than the original Control Measure that was to be used in that location. (ex. silt fence, for wattles, or for compact berms) Wattle alone on commercial construction sites have shown to be an ineffective substitute for silt fence or compact berms unless it is accompanied by a construction fence to prevent vehicle traffic. 19.Any implementation or replacement of existing Control Measures for a non-standard control, or alternative Control Measure, shall require the review and acceptance by the City erosion control staff before the measure will be allowed to be used on this project. These Control Measures' details shall be submitted, reviewed and accepted to be in accordance with the Erosion Control Criteria based upon the functionality and effectiveness in accordance with sound engineering and hydrological practices. LAND DISTURBANCE, STOCKPILES, AND STORAGE OF SOILS 20.There shall be no earth-disturbing activity outside the limits designated on the accepted plans. Off road staging areas or stockpiles must be preapproved by the City. Disturbances beyond these limits will be restored to original condition. 21.Pre-disturbance vegetation shall be identified, protected, and retained wherever possible. Removal or disturbance of existing vegetation shall be limited to the area required for immediate construction operations, and for the shortest practical period of time. This should include sequencing and phasing construction activities in a way so that the soil is not exposed for long periods of time by schedule or limit grading to small areas. This should also include when practical advancing the schedule on stabilization activities such that landscaping takes place shortly if not immediately after grading has occurred. Vegetation efforts shall start as soon as possible to return the site to a stabilized condition. Sensitive areas should avoid clearing and grading activities as much possible. 22.All exposed soils or disturbed areas are considered a potential pollutant and shall have Control Measures implemented on the site to prevent materials from leaving the site. 23.All soils exposed during land disturbing activity (stripping, grading, utility installations, stockpiling, filling, etc.) shall be kept in a roughened condition at all times by equipment tracking, scarifying or disking the surface on a contour with a 2 to 4 inch minimum variation in soil surface until mulch, vegetation, and/or other permanent erosion control is installed. 24.No soil stockpile shall exceed ten (10) feet in height. All soil stockpiles shall be protected from sediment transport through the use of surface roughening, watering, and down gradient perimeter controls. All soil stockpiles shall be protected from sediment transport by wind in accordance with Municipal Code §12-150. All stockpiles shall be flattened to meet grade or removed from site as soon as practical, and no later than the completion of construction activities or abandonment of the project. All off-site stockpile storage locations in City limits shall have a stockpile permit from the City Engineering Department prior to using the area to store material. If frequent access from hardscape to the stockpile is needed a structural tracking Control Measure shall be implemented. 25.All required Control Measures shall be installed prior to any land disturbing activity (stockpiling, stripping, grading, etc.). All of the required erosion Control Measures must be installed at the appropriate time in the construction sequence as indicated in the approved project schedule, construction plans, and erosion control report. 26.All inlets, curb-cuts, culverts, and other storm sewer infrastructure which could be potentially impacted by construction activities shall be protected with Control Measures. Material accumulated from this Control Measure shall be promptly removed and in cases where the protection has failed, the pipes shall be thoroughly cleaned out. 27.All streams, stream corridors, buffers, woodlands, wetlands, or other sensitive areas shall be protected from impact by any construction activity through the use of Control Measures. 28.All exposed dirt shall have perimeter control. Any perimeter controls that drain off or has the ability to be tracked onto the nearby hardscape shall have some form of effective sediment control as the, or as part of the, perimeter control. 29.All exposed slopes should be protected. All exposed steep slopes (Steeper than 3:1 H:V) shall be protected from erosion and sediment transport through use of Control Measures. 30.No soils shall remain exposed by land disturbing activity for more than thirty (30) days after activity has ceased before required temporary seeding or permanent erosion control (e.g. seed/mulch, landscaping, etc.) is installed. This is not just limited to projects that are abandoned; this includes any project that is temporarily halted and no immediate activity is to resume within the next thirty (30) days, unless otherwise approved by the City Erosion Control Inspector. During a season when seeding does not produce vegetative cover, another temporary erosion control shall be implemented with or until temporary seeding or permanent erosion control can be performed. 31.All individual lots shall have effective sediment controls located on the street side and any down gradient side. Typically most lots drain to the front yet on those cases where houses are along a pond or drainage swale have the lot drain in a different direction than the street, those individual lots will need protection on that down gradient side to prevent sediment from leaving the lot. See the Individual Lot Details for further clarification. VEHICLE TRACKING 32.At all points where vehicles exit or leave the exposed dirt area on to a hardscape or semi hardscape (concrete, asphalt, road base, etc.) shall have installed at least one structural tracking Control Measure to prevent vehicle tracking. All areas not protected by an adequate perimeter control shall be considered a point where vehicles exit the site. Access points should be limited to as few entrances as possible (All perimeter areas shall be protected from tracking activities). 33.In all areas that the structural tracking Control Measures fail to prevent vehicle tracking, collection and proper disposal of that material is required. All inlets located near access points and affected by tracking activities shall be prevented from the introduction of sediment into the drainage system. 34.City Municipal Code §20-62, among other things, prohibits the tracking, dropping, or depositing of soils or any other material onto city streets by or from any source. City Municipal Code, §26-498, among other things, prohibits the discharge of pollutants on public or private property if there is a significant potential for migration of such pollutant. Therefore, all tracked or deposited materials (intentional or inadvertent) are not permitted to remain on the street or gutter and shall be removed and legally disposed of by the Developer in a timely and immediate manner. Dirt ramps installed in the curb-lines are not exempt to these sections of code and shall not be permitted in the street right of way (public or private). 35.If repeated deposit of material occurs on a site, additional structural tracking controls may be required of the Developer by the City Erosion Control Inspector. LOADING AND UNLOADING OPERATIONS 36.The Developer shall apply Control Measure to limit traffic (site worker or public) impacts and proactively locate material delivered to the site in close proximity to the work area or immediately incorporated in the construction to limit operational impacts to disturbed areas, vehicle tracking, and sediment deposition that could impact water quality. OUTDOOR STORAGE OR CONSTRUCTION SITE MATERIALS, BUILDING MATERIALS, FERTILIZERS, AND CHEMICALS 37.Any materials of a non-polluting nature (steel, rock, brick, lumber, etc.) shall be inspected for any residue coming off the material during routine inspection and will generally be located where practical at least fifty (50) feet from any permanent or interim drainage ways. 38.Any high environmental impact pollutant materials that have a high likelihood to result in discharge when in contact with stormwater (lubricants, fuels, paints, solvents, detergents, fertilizers, chemical sprays, bags of cement mix, etc.) should not be kept on site where practical. When not practical, they should be stored inside (vehicle, trailer, connex, building, etc.) and out of contact with stormwater or stormwater runoff. Where not available, they shall be stored outside in a raised (high spots or on pallets), covered (plastic or tarped), and sealed (leak proof container) in secondary containment location. The secondary containment or other Control Measure shall be adequately sized, located, where practical, at least fifty (50) feet from any permanent or interim stormwater structures or drainage ways and shall be monitored as part of the routine inspections. VEHICLE AND EQUIPMENT MAINTENANCE AND FUELING 39.Parking, refueling, and maintenance of vehicles and equipment should be limited in one area of the site to minimize possible spills and fuel storage areas. This area shall be located, where practical, at least fifty (50) feet from any permanent or interim stormwater structures or drainage ways and shall be monitored as part of the routine inspections. All areas shall keep spill kits and supplies close. SIGNIFICANT DUST OR PARTICULATE GENERATING PROCESS 40.The property must be actively preventing the emission of fugitive dust at all times during construction and vegetation activities. All land disturbing activities that result in fugitive dust shall be in accordance with Municipal Code §12-150 to reduce the impacts to adjacent properties and community health. All required practices shall be implemented and additional ones shall be followed. These practices include watering the sites and discontinuing construction activities until the wind subsides as determined by any City Inspectors. CONCRETE TRUCK / EQUIPMENT WASHING, INCLUDING THE CONCRETE TRUCK CHUTE AND ASSOCIATED FIXTURES AND EQUIPMENT 41.All concrete and equipment washing shall use structural Control Measures appropriate to the volume of wash and frequency of use. These Control Measures shall be located, where practical, at least fifty (50) feet from any permanent or interim stormwater structures or drainage ways and shall be monitored as part of the routine inspections. These areas shall be clearly identified and protected from any wash from leaving the Control Measure. If frequent access from hardscape to the Control Measure is to occur, a structural tracking Control Measure shall be implemented. These Control Measures shall be frequently cleaned out. 42.The Developer is responsible for ensuring washing activity is taking place at the appropriate Control Measure and site workers are not washing or dumping wash water on to the dirt or other uncontrolled locations. DEDICATED ASPHALT AND CONCRETE BATCH PLANTS 43.Dedicated asphalt and concrete batch plants are not acceptable on construction sites within the City of Fort Collins without an expressed written request and plan to reduce pollutants associated with that type of activity and approval by the City of Fort Collins specifically the Erosion Control Inspector. The Developer shall inform the erosion control inspection staff of any dedicated asphalt, or concrete batch plants that is to be used on site. CONCRETE SAW CUTTING MATERIALS 44.Saw cutting material shall be in accordance with Municipal Code §12-150 for air emissions and all water applications to the saw cutting shall prevent material from leaving the immediate site and collected. These cutting locations, once dried, shall be swept and scraped of all material and shall have proper and legal disposal. WASTE MATERIALS STORAGE AND SANITARY FACILITIES 45.Trash, debris, material salvage, and/or recycling areas shall be, where practical, at least fifty (50) feet from any permanent or interim stormwater structures or drainage ways and shall be monitored as part of the routine inspections. These facilities should be located out of the wind and covered as able. Where not able to cover, locating said areas on the side of other structures to reduce exposure to winds, and follow maximum loading guidelines as marked on the container. The Developer is required to practice good housekeeping to keep the construction site free of litter, construction debris, and leaking containers. 46.Sanitary facilities shall be prevented from tipping through the use of anchoring to the ground or lashing to a stabilized structure. These facilities shall also be located as far as practical from an inlet, curb cut, drainage swale or other drainage conveyances to prevent material transport from leaving the local area. This consists of the facility being located, where practical, at least fifty (50) feet from any permanent or interim drainage ways. OTHER SITE OPERATIONS AND POTENTIAL SPILL AREAS 47.Spills: For those minor spills that; are less than the State's reportable quantity for spills, stay within the permitted area, and in no way threaten any stormwater conveyance, notify the City of Fort Collins Utilities by email at erosion@fcgov.com or phone (970) 817-4770. For any significant, major, or hazardous spills, notify the City of Fort Collins Utilities by phone only after Emergency Response (911) has been notified and is on route, County Health Department (LCDHE) has been notified through Larimer County Sheriff Dispatch (970) 416-1985, and the State Spill Hotline Incident Reporting have been contacted 1-877-518-5608. Written documentation shall be provided to the City within 5 days of the event. All spills shall be cleaned up immediately. 48.Selection of “plastic welded” erosion control blankets shall not be used in areas that wildlife, such as snakes, are likely to be located as these have proven to cause entrapment issues. FINAL STABILIZATION AND PROJECT COMPLETION 49.Any stormwater facilities used as a temporary Control Measure will be restored and storm sewer lines will be cleaned upon completion of the project and before turning the maintenance over to the Owner, Homeowners Association (HOA), or other party responsible for long term maintenance of those facility. 50.All final stabilization specifications shall be done in accordance with the Manual, Chapter 4: Construction Control Measures. 51.All disturbed areas designed to be vegetated shall be amended, seeded & mulched, or landscaped as specified in the landscape plans within 14 working days of final grading. 52.Soil in all vegetated (landscaped or seeded) areas, including parkways and medians shall comply with all requirements set forth in Sections 12-130 through 12-132 of the City Municipal Code, as well as Section 3.8.21 for the City Land Use Code. 53.All seeding shall refer to landscaping plans for species mixture and application rates and depths requirements. 54.All seed shall be drilled where practical to a depth based upon the seed type. Broadcast seeding shall be applied at double the rate as prescribed for drill seeding and shall be lightly hand raked after application. Hydroseeding may be substituted for drill seeding on slopes steeper than 3(H):1(V) or on other areas not practical to drill seed and crimp and mulch. All hydroseeding must be conducted as two separate processes of seeding and tackification. 55.All seeded areas must be mulched within twenty-four (24) after planting. All mulch shall be mechanically crimped and or adequately applied tackifier. The use of crimped mulch or tackifier may require multiple re-applications if not properly installed or have weathered or degraded before vegetation has been established. Areas of embankments having slopes greater than or equal to 3H:1V shall be stabilized with an erosion mat or approved equal to ensure seed will be able to germinate on the steep slopes. During a season when seeding does not produce vegetative cover, another temporary erosion control shall be implemented along with, or until, temporary seeding or permanent erosion control can be performed. 56.The Developer shall warranty and maintain all vegetative measures for two growing seasons after installation or until seventy percent (70%) vegetative cover has been established, whichever is longer and meets all the Criteria outlined in the Fort Collins Stormwater Criteria Manual Chapter 4: Construction Control Measures. 57.The Developer shall maintain, monitor, repair, and replace any and all applicable Control Measures until final stabilization has been obtained. All Control Measures must remain until such time as all upstream contributing pollutant sources have been vegetated or removed from the site. When any Control Measure is removed, the Developer shall be responsible for the cleanup and removal of all sediment and debris from that Control Measure. At the point at which the site has been deemed stabilized and verified by City Erosion Control Inspector, all temporary Control Measures can then be fully removed. All measures shall be removed within 30 days after final stabilization is achieved. 58.The responsible party shall maintain and keep current all payments or related forms of security for the Erosion Control Escrow until 1) stabilization has been reached and 2) all Control Measures and/or BMPs have sediment materials collected and the Control Measure removed from the site. At that time the site will be considered completed and any remaining Erosion Control Escrow shall be returned to the appropriate parties. EC1 ER O S I O N C O N T R O L N O T E S ST A N D A R D 3 HYD MBMBMB w FO FO FO OH U OH U OH U OH U OH U OH U OH U OH U XXXXXXXXXOHUOHUOHU G FO FO FO X X X X X X / / / / / / / / X X X X X X X X G G G G G G G E E E E E E E E E E G G G G / / / / / / / // / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / // / / / / / / / XXXX / / / / / / / / / / / / / / / // / / / / / / // / / / / / / / XXXXXXXXX X X X X 15 " S S 15 " S S 15 " S S 15 " S S 15 " S S 15 " S S 12 " W 12 " W 12 " W 12 " W 12 " W 12 " W ////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////// / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / /////////////////////////////////////////////////////////////////////////////////////////////////////////////// / / / / / / / / / / / / / / / / / / / / / / / / / / ////////////////////////////////////////////////////////////////////////////////////// BYRNE, MICHAEL F 1505 S SHIELDS ST RHT LLC 1515 S SHIELDS ST MILLER JERALD, BYRON/NORMA ROSARIO 1132 W PROSPECT RD EXISTING 10.87' CONCRETE DRIVE EXISTING 6.25' ATTACHED SIDEWALK SO U T H S H I E L D S S T R E E T APPROX. ±35.92' CL-ROW / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / ////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////// ////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////// ///// / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / //////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////// ±170 LF EXISTING FENCE TO BE REMOVED EXISTING ELECTRIC VAULT ±2,574 SF EXISTING ASPHALT DRIVEWAY TO BE REMOVED ± 276LF EXISTING FENCE TO BE REMOVEDEXISTING OVERHEAD UTILITY TO REMAIN EXISTING BUILDING TO REMAIN EXISTING UTILITY POLES TO REMAIN ±123 LF EXISTING GAS TO BE RELOCATED ±106 LF EXISTING ELECTRIC LINE TO BE RELOCATED EXISTING CLEANOUT TO BE REMOVED EXISTING FIBER OPTIC BOX ±180 LF EXISTING WATERLINE TO BE REMOVED ±126 SF EXISTING CONCRETE PAD TO REMOVED AND REPLACED EXISTING 5' GATE TO BE REMOVED EXISTING MAILBOXES TO BE RELOCATED EXISTING GAS VALVE TO BE REMOVED EXISTING OVERHEAD UTILITIES TO REMAIN ±408 SF EXISTING CONCRETE PAD TO BE REMOVED EXISTING ELECTRICAL BOX TO BE RELOCATED AS NECCESSARY EXISTING TELECOM VAULT EXISTING LIGHTPOLE ±528 SF EXISTING BUILDING TO BE REMOVED EXISTING TREES TO BE REMOVED EXISTING TREE TO BE REMOVED (TYP.) ±60 LF VERTICAL CURB & GUTTER & 6' ATTACHED SIDEWALK TO BE REMOVED ±31 LF EXISTING FENCE TO BE REMOVED PROPOSED SAWCUT LINE ±190 SF EXISTING ASPHALT TO BE REMOVED/REPLACED ±40 SF EXISTING CONCRETE PAVEMENT TO BE REMOVED/REPLACED ±10 LF VERTICAL CURB & GUTTER & 6' ATTACHED SIDEWALK TO BE REMOVED PROJECT BOUNDARY (TYP.) SECTION LINE EXISTING RIGHT-OF-WAY EDGE OF EXISTING CONCRETE PAVEMENT EXISTING VERTICAL CURB & GUTTER EXISTING TREE TO REMAIN ±427 SF EXISTING ASPHALT TO BE REMOVED/REPLACED ±192 SF EXISTING CONCRETE PAVEMENT TO BE REMOVED/REPLACED APPROXIMATE LOCATION EXISTING 15" VCP SANITARY SEWER (CITY OF FORT COLLINS) APPROXIMATE LOCATION EXISTING 12" DIP WATERLINE (CITY OF FORT COLLINS) LIMITS OF CONVENTIONAL TOPO (TYP.) OFFSITE CONTOURS PROVIDED FOR REFERENCE ONLY APPROXIMATE EXISTING CENTERLINE ± 86LF EXISTING FENCE TO BE REMOVED ± 169LF EXISTING FENCE TO BE REMOVED EXISTING WELL TO REMAIN ±191 LF APPROXIMATE EXISTING SANITARY SERVICE TO BE REMOVED ±1,220 SF EXISTING CONCRETE TO BE REMOVED //////////////////////////////////////////////////////////////////////////////////////////////// Sheet SN O W R I D G E A P A R T M E N T S Th e s e d r a w i n g s a r e in s t r u m e n t s o f s e r v i c e pr o v i d e d b y N o r t h e r n En g i n e e r i n g S e r v i c e s , I n c . an d a r e n o t t o b e u s e d f o r an y t y p e o f c o n s t r u c t i o n un l e s s s i g n e d a n d s e a l e d b y a P r o f e s s i o n a l E n g i n e e r i n th e e m p l o y o f N o r t h e r n En g i n e e r i n g S e r v i c e s , I n c . N O T F O R C O N S T R U C T I O N R E V I E W S E T of 21 EX1 DE M O L I T I O N P L A N EX I S T I N G C O N D I T I O N S & 4 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R NORTH ( IN FEET ) 1 inch = ft. Feet02020 20 40 60 Sheet SN O W R I D G E A P A R T M E N T S Th e s e d r a w i n g s a r e in s t r u m e n t s o f s e r v i c e pr o v i d e d b y N o r t h e r n En g i n e e r i n g S e r v i c e s , I n c . an d a r e n o t t o b e u s e d f o r an y t y p e o f c o n s t r u c t i o n un l e s s s i g n e d a n d s e a l e d b y a P r o f e s s i o n a l E n g i n e e r i n th e e m p l o y o f N o r t h e r n En g i n e e r i n g S e r v i c e s , I n c . N O T F O R C O N S T R U C T I O N R E V I E W S E T of 21 KEYMAP EXISTING ELECTRIC E LEGEND: G T EXISTING STORM SEWER EXISTING TELEPHONE EXISTING GAS EXISTING IRRIGATION BOX EXISTING GAS METER EXISTING TELEPHONE PEDESTAL EXISTING TREES (TO REMAIN) FIELD SURVEY BY: NOTES: EXISTING SANITARY SEWER SS EXISTING WATER W EXISTING FENCE X EXISTING WATER METER EXISTING FIRE HYDRANT EXISTING ELECTRIC VAULT PROJECT BOUNDARY EXISTING RIGHT-OF-WAY EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR VAULT ELEC CONTROL IRR EXISTING TREES (TO BE REMOVED) EXISTING CABLE CTV EXISTING FIBER OPTIC FO 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING DEMOLITION, REMOVAL, REPLACEMENT, AND DISPOSAL OF ALL FACILITIES AND MATERIAL. 3.CONTRACTOR IS ENCOURAGED TO PERFORM DEMOLITION IN A MANNER THAT MAXIMIZES SALVAGE, RE-USE, AND RECYCLING OF MATERIALS. THIS INCLUDES APPROPRIATE SORTING AND STORING. IN PARTICULAR, DEMOLISHED CONCRETE, ASPHALT, AND BASE COURSE SHOULD BE RECYCLED IF POSSIBLE. 4.ALL SYMBOLS ARE ONLY GRAPHICALLY REPRESENTED AND ARE NOT TO SCALE. 5.CONTACT THE PROJECT SURVEYOR FOR ANY INQUIRIES RELATED TO THE EXISTING SITE SURVEY. 6.ALL EXISTING WATER AND WASTEWATER SERVICES ARE TO BE ABANDONED AND CAPPED AT THE MAIN LINE. EXISTING OVERHEAD UTILITY OHE PLS CORPORATION ON FEBRUARY 8TH 2023 EXISTING PAVEMENT TO BE REMOVED EXISTING CONCRETE TO BE REMOVED EX1 H Y D X X X X X X X UD UD UD UD UD BYRNE, MICHAEL F 1505 S SHIELDS ST RHT LLC 1515 S SHIELDS ST MILLER JERALD, BYRON/NORMA ROSARIO 1132 W PROSPECT RD 1.3% 1.8% 2.0% 2.1% 1.3% 1.6% 2. 0 % 1. 3 % 2. 0 % 1 . 3 % 2.1% 2. 2 % 6. 0 % 3.9% 3.1 % 6:1 3 . 5 % 2. 2 % 7:14:1 10:16:1 9: 1 4: 1 5: 1 5. 1 % 5. 1 % 1.9% 1. 5 % 1.7% 5:1 8: 1 4 : 1 17 . 9 % 4: 1 2.6% 6:1 4:1 4: 1 4: 1 4: 1 4 : 1 4. 0 % 2. 1 % 2. 0 % 2 . 0 % 1 . 3 % 5.1% 2.0%2.2 % 4:1 3: 1 7.1% 5.0% 3.6 % 5.0%5.0%2.5% 0.5 % 0.5% 0.5% 0 . 5 % 0. 5 % 0.3% 0.5% 0.7%0.2%2.0%0.4% 1.5% 2. 0 % 2. 6 % 15.0 % 12.1 % PROPOSED EMERGENCY SPILLWAY LOCATION PROPOSED POND OUTLET STRUCTURE PROPOSED 12" PVC UNDERDRAIN @0.2% PROPOSED PERMEABLE INTERLOCKING PAVERS PROPOSED PERMEABLE INTERLOCKING PAVERS PROPOSED SIDEWALK CHASE PROPOSED SIDEWALK CHASE PROPOSED SIDEWALK CHASE PROPOSED 8' CONCRETE PAN PROPERTY BOUNDARY (TYP.) 20 ' F L - F L 55 . 5 ' F L - F L PROPOSED 2' CONCRETE PAN LIMITS OF CONVENTIONAL TOPO (TYP.) OFFSITE CONTOURS PROVIDED FOR REFERENCE ONLY PROPOSED UNDERDRAIN OUTFALL WITH UPTURNED ELBOW PROPOSED 2' U-CHANNEL 15' UTILITY EASEMENT PROPOSED 100-YR WSEL PROPOSED 100-YR WSEL 20 ' F L - F L EM E R G E N C Y AC C E S S EA S E M E N T EXISTING WELL PROPOSED CONCRETE PAD 12' PROPOSED FLUSH CURB 2. 0 % SO U T H S H I E L D S S T R E E T DETENTION POND 1 EXISTING FFE=39.51 FFE=39.37 FFE=39.37 (35.65) (37.3 2 ) (35.19) (36.0 0 ) (37 . 1 3 ) 37.49 37.25 37.26 37.99 37. 3 4 37.39 3 7 . 7 3 3 7 . 9 3 37 . 5 5 37.95 37.9 0 3 8 . 6 1 38.57 38.52 38.57 38.61 39.25 39.25 39.22 3 8 . 8 2 38 . 8 2 3 8 . 4 5 3 7 . 9 6 37 . 9 6 38 . 4 5 38. 5 4 38. 6 6 3 8 . 8 3 38.95 39.21 39.21 3 8 . 6 0 38.4 5 38.13 37.3 2 37.44 37 . 0 9 36 . 9 7 39.2 5 39.2 5 39 . 2 5 37 . 0 4 36 . 8 8 36 . 8 4 37 . 0 0 (37 . 1 4 ) (37 . 0 2 ) 35.9 1 3 5 . 4 8 36 . 8 4 36.7 3 3 5 . 9 6 3 5 . 9 1 3 5 . 8 6 35.90 3 5 . 8 5 35 . 8 3 3 5 . 7 8 3 5 . 8 0 3 5 . 7 4 3 5 . 7 2 3 5 . 6 8 35 . 9 7 36 . 1 1 36.17 36.303 6 . 3 6 36.43 36.5236.58 36.78 37. 2 8 37 . 5 5 37. 6 3 37 . 6 9 37 . 6 8 37 . 1 6 37.0 8 3 7 . 9 0 37.90 37.90 37.95 37.90 3 7 . 9 0 37.81 (34 . 9 5 ) (35 . 3 8 ) 37.41 37.4 1 (34 . 7 8 ) (35.3 6 ) 3 5 . 0 8 35. 5 1 36.16 (35.59) 6' 2.0% (37 . 0 0 ) (36 . 6 1 ) TIE INTO EXISTING SIDEWALK/DRIVEWAY TIE INTO EXISTING SIDEWALK/DRIVEWAY 2.0% 4.5% 2. 6 % 1. 8 % 2. 1 % STORM DRAIN LINE B SEE SHEET ST1 STORM DRAIN LINE A SEE SHEET ST1 20' DRAINAGE EASEMENT 51' DRAINAGE EASEMENT 46' DRAINAGE EASEMENT 7.4' DRAINAGE EASEMENT 15.5' DRAINAGE EASEMENT 22' DRAINAGE EASEMENT 10' UTILITY EASEMENT SIDEWALK VARIANCE SEE DETAIL SHEET D6 5.3% 38. 4 1 38. 5 3 8.8% 37.88 OH U OH U OH U OH U UD UD 19' 8' 8.5' 38.0 7 3 8 . 0 5 38.42 38.5 7 3 7 . 9 5 3 7 . 9 4 37 . 9 2 37 . 8 0 8' 2.1 % 1.1% 1.1%1.3% 1.8% 1.8% 6.2%8.3% VAN ACCESSIBLE HC PARKING STALL & AISLE EASEMENT Sheet SN O W R I D G E A P A R T M E N T S Th e s e d r a w i n g s a r e in s t r u m e n t s o f s e r v i c e pr o v i d e d b y N o r t h e r n En g i n e e r i n g S e r v i c e s , I n c . an d a r e n o t t o b e u s e d f o r an y t y p e o f c o n s t r u c t i o n un l e s s s i g n e d a n d s e a l e d b y a P r o f e s s i o n a l E n g i n e e r i n th e e m p l o y o f N o r t h e r n En g i n e e r i n g S e r v i c e s , I n c . N O T F O R C O N S T R U C T I O N R E V I E W S E T of 21 OG1 OV E R A L L G R A D I N G P L A N 5 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R NORTH ( IN FEET ) 1 inch = ft. Feet02020 20 40 60 KEYMAP PROPOSED CONTOUR PROPOSED STORM SEWER PROPOSED UNDERDRAIN UD PROPOSED SWALE EXISTING CONTOUR PROPOSED CURB & GUTTER PROPOSED PROPERTY BOUNDARY PROPOSED SPOT ELEVATION PROPOSED SLOPES 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS, UTILITY EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION. 3.ALL PROJECT DATA IS ON VERTICAL DATUM; NAVD88. SEE COVER SHEET FOR BENCHMARK REFERENCES. 4.ALL CURB SPOTS SHOWN ARE FLOWLINE ELEVATIONS. ALL OTHER SPOTS ARE FINISHED GRADE ELEVATIONS. 5.LOT GRADING IS DESIGNED FOR TYPICAL RECTANGULAR FOOTPRINT WITH DIMENSIONS AS SHOWN HEREON. SHOULD BUILDING FOOTPRINT CHANGE, GRADING SHALL BE ADJUSTED BY PLOT PLAN FOR THE SPECIFIC FOOTPRINT. ALL MINIMUM OPENINGS SHALL BE A MINIMUM OF 18" ABOVE FRONT LOT ELEVATIONS AND PLOT PLAN DESIGN SHALL MEET FHA GRADING GUIDELINES AND BUILDING CODE REQUIREMENTS. 6.ALL AREAS WITHIN THE EMERGENCY ACCESS EASEMENT ARE CAPABLE OF SUPPORTING 80,000 POUNDS. NOTES: PROPOSED DRAIN BASIN 2.0% (47.45 ) EXISTING SPOT ELEVATION EXISTING LOT LINE PROPOSED CONCRETE CROSS PAN (TYP.) 33.43 EXISTING RIGHT OF WAY LEGEND: PROPOSED GRADE BREAK OG1 ( IN FEET ) 1 inch = ft. Feet01010 10 H YD MBMBMB FO FO FO OHU OHU OH U OH U OH U OH U OH U OH U X OHU OHU OHU G FO FO FO X X X X X X G G G G G G G E E E E E 15 " S S 15 " S S 15 " S S 15 " S S 15 " S S 15 " S S 12 " W 12 " W 12 " W 12 " W 12 " W 12 " W EM GM UGEUGEUGEUGEUGEUGE G G G G G G S UD UD UD UD UD UGE WF SO U T H S H I E L D S S T R E E T EXISTING ELECTRIC VAULT EXISTING OVERHEAD UTILITY EXISTING UTILITY POLES PROPOSED GAS ±111 LF PROPOSED ELECTRIC SERVICE LINE EXISTING FIBER OPTIC BOX ±176 LF PROPOSED 2.5" DIP FIRE SERVICE EXISTING GAS VALVE EXISTING OVERHEAD UTILITIES EXISTING ELECTRICAL BOX EXISTING LIGHTPOLE EXISTING FENCE PROPOSED FENCE (TYP.) RE: LANDSCAPE PLANS 20' FL-FL EMERGENCY ACCESS EASEMENT EXISTING BUILDING 6' SIDEWALK 6' SIDEWALK 6' S I D E W A L K 6' SIDEWALK 6' SIDEWALK 3' S I D E W A L K 8.5' 19' TRASH ENCLOSURE PROPOSED FENCE (TYP.) RE: LANDSCAPE PLANS BYRNE, MICHAEL F 1505 S SHIELDS ST RHT LLC 1515 S SHIELDS ST MILLER JERALD, BYRON/NORMA ROSARIO 1132 W PROSPECT RD 6' 4' 5' 2.72' ±155 LF PROPOSED SANITARY 4" PVC SEWER SERVICE APPROXIMATE LOCATION EXISTING 15" VCP SANITARY SEWER (CITY OF FORT COLLINS) APPROXIMATE LOCATION EXISTING 12" DIP WATERLINE (CITY OF FORT COLLINS) CONNECT TO EXISTING 12" DIP WATERLINE CONNECT TO EXISTING 15" VCP SANITARY SEWER w/ RUBBERIZED TAPPING SLEEVE TEE SECTION LINE EXISTING RIGHT-OF-WAY APPROXIMATE EXISTING CENTERLINE APPROX. ±35.92' CL-ROW RECONSTRUCT EXISTING DRIVEWAY PER LCUASS DETAIL 706.2 APPROXIMATE LOCATION EXISTING FIRE HYDRANT PROSPECT ROAD PROPOSED POND OUTLET STRUCTUREPROPOSED PERMEABLE INTERLOCKING PAVERS 6' SIDEWALK 6' S I D E W A L K 51' ROW 10' UTILITY EASEMENT ±17 LF PROPOSED ELECTRIC SERVICE LINE 15' UTILITY EASEMENT EXISTING WELL TO BE RELOCATED 8.79' ADDITIONAL ROW (WIDTH VARIES) EXISTING TELECOM VAULT PROPOSED EV CHARGING STATION (DESIGNED BY OTHERS) PROPOSED PAD MOUNTED TRANSFORMER 6' 20' DRAINAGE EASEMENT 51' DRAINAGE EASEMENT 46' DRAINAGE EASEMENT 7.4' DRAINAGE EASEMENT 15.5' DRAINAGE EASEMENT 22' DRAINAGE EASEMENT 10' UTILITY EASEMENT STORM DRAIN LINE B SEE SHEET ST1 STORM DRAIN LINE A SEE SHEET ST1 PROPOSED SANITARY SEWER CLEANOUT PROPOSED SANITARY SEWER CLEANOUT 3 4" WATER METER AND CURB STOP ±168 LF PROPOSED 3/4" PVC DOMESTIC WATER SERVICE 6' SIDEWALK PROPOSED 90° BEND 19' 1 P ACCESS AISLE ACCESSIBLE PARKING 2 2 2 2 2 PROPOSED WELL RELOCATION WITH IRRIGATION STUB (SEE IRRIGATION PLANS) PROPOSED PUMP HOUSE SHED FOR IRRIGATION WELL (SEE IRRIGATION AND ARCHITECTURAL PLANS) CRUSHER FINES Sheet SN O W R I D G E A P A R T M E N T S Th e s e d r a w i n g s a r e in s t r u m e n t s o f s e r v i c e pr o v i d e d b y N o r t h e r n En g i n e e r i n g S e r v i c e s , I n c . an d a r e n o t t o b e u s e d f o r an y t y p e o f c o n s t r u c t i o n un l e s s s i g n e d a n d s e a l e d b y a P r o f e s s i o n a l E n g i n e e r i n th e e m p l o y o f N o r t h e r n En g i n e e r i n g S e r v i c e s , I n c . N O T F O R C O N S T R U C T I O N R E V I E W S E T of 21 OU1 OV E R A L L U T I L I T Y P L A N 6 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R NORTH ( IN FEET ) 1 inch = ft. Feet02020 20 40 60 NOTES: 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.ALL WATER CONSTRUCTION SHALL BE PER FORT COLLINS UTILITIES WATER AND WASTEWATER DESIGN CRITERIA MANUAL, LATEST EDITION, EXCEPT FOR THE STANDARDS RELATED TO THE WATER SERVICES, WHICH SHALL BE PER THE CITY OF FORT COLLINS STANDARDS, EXCEPT THAT NO MECHANICAL JOINT RESTRAINTS ARE REQUIRED BETWEEN FITTINGS UNLESS SPECIFICALLY SHOWN ON THE PLAN OR AS REQUIRED FOR ABNORMAL DEFLECTIONS. 3.ALL SEWER CONSTRUCTION SHALL BE PER THE CITY OF FORT COLLINS SANITARY SEWER DESIGN TECHNICAL CRITERIA MANUAL, LATEST EDITION. 4.ALL WATER FITTINGS AND VALVES ARE ONLY GRAPHICALLY REPRESENTED AND ARE NOT TO SCALE. 5.ALL WATERLINES SHALL HAVE A MINIMUM OF 4.5' AND MAXIMUM OF 5.5' WATER LINE COVER FROM FINISHED GRADE TO TOP OF PIPE. 6.UTILITY SERVICES ARE SHOWN IN A SCHEMATIC FASHION ONLY. EXACT LOCATIONS SHALL BE PER THE REQUIREMENTS OF THE RESPECTIVE UTILITY PROVIDERS, AND ARE SUBJECT TO CHANGE IN THE FIELD. 7.MAINTAIN 10' HORIZONTAL AND 18" VERTICAL MINIMUM SEPARATION BETWEEN ALL SANITARY SEWER MAINS, WATER MAINS & SERVICES. 8.REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS, UTILITY EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION. 9.LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY OF FORT COLLINS ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH THE CITY OF FORT COLLINS STREET REPAIR STANDARDS. 10.ALL MANHOLE RIM ELEVATIONS (EXISTING & PROPOSED) ARE TO BE ADJUSTED TO 14" BELOW FINISHED GRADE. IF NECESSARY, CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 11.ALL WATER SERVICES SHALL BE 3 4" UNLESS OTHERWISE NOTED. 12.ALL NEW WATER AND WASTEWATER SERVICE TAPS ARE TO BE AT LEAST 5' FROM THE EXISTING TAP TO BE ABANDONED. EXISTING LOT LINE EASEMENT LINE SPROPOSED SEWER SERVICE WPROPOSED WATER SERVICE EXISTING WATER MAIN PROPOSED WATER MAIN PROPOSED STORM SEWER LEGEND: G PROPOSED UNDERDRAIN EXISTING TELEPHONE EXISTING GAS EXISTING SANITARY SEWER PROPOSED STORM INLET PROPOSED CURB & GUTTER PROPOSED SANITARY SEWER PROPOSED FIRE HYDRANT EXISTING FIRE HYDRANT PROPOSED PROPERTY BOUNDARY EXISTING TELEPHONE PEDESTAL PROPOSED STREET LIGHT UD W SS PROPOSED LOT LINE EXISTING ROW EXISTING OVERHEAD UTILITY OHU EEXISTING ELECRIC EXISTING FENCE X EXISTING FIBER OPTIC FO PROPOSED FENCE PPARALLEL ACCESS RAMP RESERVED PARKING 1 SITE SIGN LEGEND: SIGNAGE NOTE: SIGN LOCATIONS SHOWN ARE APPROXIMATE. FINAL LOCATION MAY VARY. FIRE LANE NO PARKING 2 KEYMAP OU1 MBMBMB FO FO OH U OH U OH U OH U OH U OHU OHU FO FO X X X X G G G G E E E 15 " S S 15 " S S 15 " S S 15 " S S 12 " W 12 " W 12 " W 12 " W EM GM UGEUGEUGEUGE G G G G S UD UD UD WF PROPOSED EMERGENCY SPILLWAY LOCATION PROPOSED POND OUTLET STRUCTURE PROPOSED PERMEABLE INTERLOCKING PAVERS PROPOSED PERMEABLE INTERLOCKING PAVERS PROPOSED SIDEWALK CHASE PROPOSED SIDEWALK CHASE PROPOSED SIDEWALK CHASE PROPOSED 8' CONCRETE PAN 20 ' F L - F L 55 . 5 ' F L - F L PROPOSED 2' CONCRETE PAN LIMITS OF CONVENTIONAL TOPO (TYP.) OFFSITE CONTOURS PROVIDED FOR REFERENCE ONLY PROPOSED 2' U-CHANNEL 15' UTILITY EASEMENT PROPOSED 100-YR WSEL 20 ' F L - F L EM E R G E N C Y AC C E S S EA S E M E N T EXISTING WELL 20' DRAINAGE EASEMENT 51' DRAINAGE EASEMENT 46' DRAINAGE EASEMENT 7.4' DRAINAGE EASEMENT 15.5' DRAINAGE EASEMENT 22' DRAINAGE EASEMENT PROPOSED 100-YR WSEL PROPOSED 100-YR WSEL 10' UTILITY EASEMENT 12' PROPOSED FLUSH CURB SO U T H S H I E L D S S T R E E T STORM DRAIN LINE B SEE THIS SHEET RIGHT 3.31 LF 6" PVC @ 0.50% 21.12 LF 6" PVC @ 0.20% 70.99 LF 6" PVC @ 0.20% 25.22 LF 6" PVC @ 0.20% 25.58 LF 6" PVC PERFORATED UNDERDRAIN @ 0.20% 46.01 LF 6" PVC @ 0.20% 92.47 LF 6" PVC PERFORATED UNDERDRAIN @ 0.20% UD BASIN A5 STA 11+87.90 N: 124067.04 E: 189224.40 UNDERDRAIN OUTFALL A1 STA 10+03.31 N: 124084.34 E: 189397.79 UD BASIN A8 STA 12+84.70 N: 124118.21 E: 189178.80 BASIN A6 STA 12+33.90 N: 124067.41 E: 189178.39 UD BASIN A4 STA 10+95.42 N: 124066.28 E: 189316.87 UD BASIN A7 STA 12+59.12 N: 124092.63 E: 189178.60 BASIN A3 STA 10+24.43 N: 124065.71 E: 189387.86 HEADWALL A STA 10+00.00 N: 124087.65 E: 189397.82 5025 5030 5035 5040 5045 5050 5055 5025 5030 5035 5040 5045 5050 5055 9+7510+0011+0012+0013+0013+25 PROPOSED GROUND EXISTING GROUND 46.01 LF 6" PVC @ 0.20% 25.22 LF 6" PVC @ 0.20% 25.58 LF 6" PVC @ 0.20% PERFORATED UNDERDRAIN 92.47 LF 6" PVC @ 0.20% PERFORATED UNDERDRAIN 70.99 LF 6" PVC @ 0.20% 21.12 LF 6" PVC @ 0.20% 3.31 LF 6" PVC @ 0.50% HE A D W A L L A ST A 1 0 + 0 0 . 0 0 IN V . 5 0 3 6 . 1 0 ( S ) UN D E R D R A I N O U T F A L L A 1 ST A 1 0 + 0 3 . 3 1 RI M 5 0 3 7 . 6 ± IN V . I N 5 0 3 5 . 1 5 ( S W ) IN V . O U T 5 0 3 6 . 1 2 ( N ) BA S I N A 3 ST A 1 0 + 2 4 . 4 3 RI M 5 0 3 7 . 1 ± IN V . I N 5 0 3 5 . 1 9 ( W ) IN V . O U T 5 0 3 5 . 1 9 ( N E ) UD B A S I N A 4 ST A 1 0 + 9 5 . 4 2 RI M 5 0 3 7 . 5 ± IN V . I N 5 0 3 5 . 3 3 ( W ) IN V . O U T 5 0 3 5 . 3 3 ( E ) UD B A S I N A 5 ST A 1 1 + 8 7 . 9 0 RI M 5 0 3 7 . 7 ± IN V . I N 5 0 3 5 . 5 2 ( W ) IN V . O U T 5 0 3 5 . 5 2 ( E ) BA S I N A 6 ST A 1 2 + 3 3 . 9 0 RI M 5 0 3 7 . 5 ± IN V . I N 5 0 3 5 . 6 1 ( N ) IN V . O U T 5 0 3 5 . 6 1 ( E ) UD B A S I N A 7 ST A 1 2 + 5 9 . 1 2 RI M 5 0 3 7 . 4 ± IN V . I N 5 0 3 5 . 6 6 ( N ) IN V . O U T 5 0 3 5 . 6 6 ( S ) UD B A S I N A 8 ST A 1 2 + 8 4 . 7 0 RI M 5 0 3 7 . 3 ± IN V . O U T 5 0 3 5 . 7 1 ( S ) 1.5' MIN. UPTURNED ELBOW 6" FIRE STA.=10+13.15 TOP=5033.39 3 4" GAS STA.=10+19.92 TOP=5033.41 3 4" WATER STA.=10+07.51 TOP=5033.38 2.18' TRANSITION FROM SOLID TO PERFORATED PIPE TRANSITION FROM PERFORATED TO SOLID PIPE TRANSITION FROM PERFORATED TO SOLID PIPE MBMBMB FO FO OH U OH U OH U OH U OH U OHU OHU FO FO X X X X G G G G E E E 15 " S S 15 " S S 15 " S S 15 " S S 12 " W 12 " W 12 " W 12 " W EM GM UGEUGEUGEUGE G G G G S UD UD UD WF PROPOSED EMERGENCY SPILLWAY LOCATION PROPOSED POND OUTLET STRUCTURE PROPOSED PERMEABLE INTERLOCKING PAVERS PROPOSED PERMEABLE INTERLOCKING PAVERS PROPOSED SIDEWALK CHASE PROPOSED SIDEWALK CHASE PROPOSED SIDEWALK CHASE PROPOSED 8' CONCRETE PAN 20 ' F L - F L 55 . 5 ' F L - F L PROPOSED 2' CONCRETE PAN LIMITS OF CONVENTIONAL TOPO (TYP.) OFFSITE CONTOURS PROVIDED FOR REFERENCE ONLY PROPOSED 2' U-CHANNEL 15' UTILITY EASEMENT PROPOSED 100-YR WSEL 20 ' F L - F L EM E R G E N C Y AC C E S S EA S E M E N T EXISTING WELL 20' DRAINAGE EASEMENT 51' DRAINAGE EASEMENT 46' DRAINAGE EASEMENT 7.4' DRAINAGE EASEMENT 15.5' DRAINAGE EASEMENT 22' DRAINAGE EASEMENT PROPOSED 100-YR WSEL PROPOSED 100-YR WSEL 10' UTILITY EASEMENT 12' PROPOSED FLUSH CURB SO U T H S H I E L D S S T R E E T STORM DRAIN LINE A SEE THIS SHEET LEFT 8.69 LF 8" PVC @ 0.20% 11.85 LF 8" PVC @ 0.16% 68.00 LF 8" PVC @ 0.20% BASIN B3 STA 10+11.85 N: 124157.37 E: 189296.10 BASIN B2 STA 10+79.85 N: 124157.37 E: 189228.10 FES B1 STA 10+88.54 N: 124156.08 E: 189219.51 FES B4 STA 10+00.00 N: 124154.25 E: 189307.53 5025 5030 5035 5040 5045 5050 5055 5025 5030 5035 5040 5045 5050 5055 9+7510+0011+0011+25 PROPOSED GROUND EXISTING GROUND FE S B 1 ST A 1 0 + 8 8 . 5 4 IN V . 5 0 3 7 . 0 2 ( E ) FE S B 4 ST A 1 0 + 0 0 . 0 0 IN V . 5 0 3 6 . 8 4 ( W ) BA S I N B 3 ST A 1 0 + 1 1 . 8 5 RI M 5 0 3 8 . 5 ± IN V . I N 5 0 3 6 . 8 6 ( W ) IN V . O U T 5 0 3 6 . 8 6 ( E ) BA S I N B 3 ST A 1 0 + 1 1 . 8 5 RI M 5 0 3 8 . 5 ± IN V . I N 5 0 3 6 . 8 6 ( W ) IN V . O U T 5 0 3 6 . 8 6 ( E ) BA S I N B 2 ST A 1 0 + 7 9 . 8 5 RI M 5 0 3 8 . 5 ± IN V . I N 5 0 3 7 . 0 0 ( W ) IN V . O U T 5 0 3 7 . 0 0 ( E ) 8.69 LF 8" PVC @ 0.20% 11.85 LF 8" PVC @ 0.16% 100-YR HGL 68.00 LF 8" PVC @ 0.20% 1.68' Sheet SN O W R I D G E A P A R T M E N T S N O T F O R C O N S T R U C T I O N R E V I E W S E T of 21 NORTH ( IN FEET ) 1 inch = ft. Feet03030 30 60 90 KEYMAP STORM DRAIN A STORM DRAIN B PROFILE SCALE:PROFILE SCALE: CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R STRUCTURE ID STRUCTURE TYPE STRUCTURE SIZE HEADWALL A CONCRETE HEADWALL SEE DETAIL UNDERDRAIN OUTFALL A1 DRAIN BASIN 8" GRATE COVER BASIN A3 DRAIN BASIN 8" SOLID COVER UD BASIN A4 DRAIN BASIN 8" SOLID COVER UD BASIN A5 DRAIN BASIN 8" SOLID COVER BASIN A6 DRAIN BASIN 8" SOLID COVER UD BASIN A7 DRAIN BASIN 8" SOLID COVER UD BASIN A8 DRAIN BASIN 8" SOLID COVER FES B1 HDPE FES 8" FES BASIN B2 DRAIN BASIN 8" SOLID COVER BASIN B3 DRAIN BASIN 8" SOLID COVER FES B4 HDPE FES 8" FES ST1 PL A N & P R O F I L E ST O R M D R A I N S A & B 7 ST1 PL A N & P R O F I L E ST O R M D R A I N S A & B 7 EXISTING WATER MAIN PROPOSED WATER MAIN PROPOSED STORM SEWER LEGEND: NOTES: W EXISTING SANITARY SEWER SS PROPOSED STORM INLET PROPOSED CURB & GUTTER PROPOSED SANITARY SEWER PROPOSED FIRE HYDRANT EXISTING FIRE HYDRANT PROPOSED LOT LINE PROJECT BOUNDARY EXISTING RIGHT OF WAY EXISTING STORM SEWER EASEMENT LINE 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.MAINTAIN 10' HORIZONTAL AND 18" VERTICAL MINIMUM SEPARATION BETWEEN ALL STORM DRAINS, SANITARY SEWER MAINS, WATER MAINS, AND SERVICES. 3.PIPE LENGTHS ARE CALCULATED FROM THE CENTER OF MANHOLES AND STRUCTURES. SPECIFIED LENGTH OF PIPE INCLUDES THE LAYING LENGTH OF FLARED END SECTIONS. 4.ALL RCP SHALL BE CLASS III OR GREATER. PIPE MATERIAL, BEDDING, AND INSTALLATION WITHIN PUBLIC RIGHTS-OF-WAY SHALL BE GOVERNED BY (THE CITY OF FORT COLLINS). ALTERNATES (SUCH AS ADS N-12 OR HP SANITITE) OUTSIDE OF THE R.O.W. SHALL BE APPROVED IN ADVANCE BY THE ENGINEER. ALL JOINTS SHALL BE 'WATERTIGHT' USING APPROPRIATE GASKETS OR JOINT WRAPS (PER ASTM C443 FOR RCP AND PER ASTM F477 / D3212 FOR PLASTIC PIPE). 5.CONTRACTOR SHALL SHALL CONFIRM THAT MANHOLE DIAMETERS ARE SUFFICIENT FOR THEIR PROPOSED METHODS OF INSTALLATION (i.e., WITHIN PRE-CASTER'S TOLERANCES, ETC.). 6.ALL STORM DRAINS ARE PRIVATE. PROPOSED RIGHT OF WAY INLET SCHEDULE: STORM A STORM B MBMBMB FO FO FO XXXXXXXXX G FO FO FO X X X X X X / / / / / / / / X X X X X X X X G G G G G G G E E E E E / / / / / / / // / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / // / / / / / / / XXXX / / / / / / / / / / / / / / / // / / / / / / // / / / / / / / XXXXXXXXX X X X X H Y D LOD LOD LO D LODLOD LO D LOD LOD LOD LO D LODLOD LO D LO D LOD LO D LODLODLODLODLODLODLODLODLODLODLODLODLODLOD LO D LO D LO D LO D LO D LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LO D LOD LO D LODLO D SFSFSFSFSFSFSFSFSFSFSFSFSFSF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF ± 775 LF SILT FENCE SO U T H S H I E L D S S T R E E T LIMITS OF CONVENTIONAL TOPO (TYP.) OFFSITE CONTOURS PROVIDED FOR REFERENCE ONLY SO U T H S H I E L D S S T R E E T LIMITS OF CONVENTIONAL TOPO (TYP.) OFFSITE CONTOURS PROVIDED FOR REFERENCE ONLY Sheet SN O W R I D G E A P A R T M E N T S Th e s e d r a w i n g s a r e in s t r u m e n t s o f s e r v i c e pr o v i d e d b y N o r t h e r n En g i n e e r i n g S e r v i c e s , I n c . an d a r e n o t t o b e u s e d f o r an y t y p e o f c o n s t r u c t i o n un l e s s s i g n e d a n d s e a l e d b y a P r o f e s s i o n a l E n g i n e e r i n th e e m p l o y o f N o r t h e r n En g i n e e r i n g S e r v i c e s , I n c . N O T F O R C O N S T R U C T I O N R E V I E W S E T of 21 EC1 ER O S I O N C O N T R O L P L A N IN I T I A L 8 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R NORTH ( IN FEET ) 1 inch = ft. Feet02020 20 40 60 PROPOSED CONTOUR PROPOSED STORM SEWER PROPOSED SWALE EXISTING CONTOUR PROPOSED CURB & GUTTER PROPERTY BOUNDARY SILT FENCE ROCK SOCK RIPRAP 1.CONTRACTOR SHALL IMMEDIATELY STABILIZE ALL DISTURBED SLOPES BY CRIMP MULCHING OR SIMILAR METHODS. 2.SWMP ADMINISTRATOR: Contact ________________________________ Company ________________________________ Address ________________________________ Phone________________________________ 3.CONTRACTOR TO PROVIDE VEHICLE TRACKING CONTROL FOR CONCRETE WASHOUT AREA IF ACCESS IS OFF PAVEMENT. 4.NO MUD OR DEBRIS IS ALLOWED ON CITY STREETS. IF ANY DOES OCCUR, CONTRACTOR SHALL SWEEP AND CLEAN IMMEDIATELY. 5.REFER TO THE FINAL DRAINAGE REPORT, DATED APRIL 3, 2023 BY NORTHERN ENGINEERING FOR ADDITIONAL INFORMATION. 6.PAVER SYSTEM IS TO BE CONSTRUCTED AS PART OF THE LAST SEQUENCE OF CONSTRUCTION TO MINIMIZE POTENTIAL FOR SEDIMENTATION. 7.FINAL STABILIZATION TO BE DONE IN ACCORDANCE WITH THE FINAL LANDSCAPE PLAN. GENERAL NOTES: WATTLE DIKE CONCRETE WASH AREA SEDIMENT TRAP BALE INLET PROTECTION SLOPE DRAIN EROSION CONTROL FABRIC LEGEND: BALE OUTLET PROTECTION INLET PROTECTION VEHICLE TRACKING CONTROL PAD SF LIMIT OF DISTURBANCE LOD CITY OF FORT COLLINS UPLAND MIX SEED CALCULATIONS CHART TOTAL DISTURBED PROJECT AREA 0.72 ACRES TOTAL "ONSITE" AREA OF DISTURBANCE 0.67 ACRES TOTAL "OFFSITE" AREA OF DISTURBANCE 0.05 ACRES TOTAL STORAGE/STAGING AREA N/A ACRES TOTAL HAUL ROADS AREA N/A CONSTRUCTION VEHICLE TRAFFIC AREA N/A EST. PERCENT OF PROJECT AREA EXPOSED 100% EST. PERCENT VEGETATIVE COVER ~35%DENSITY EXISTING SOIL TYPE C APPROX. GROUNDWATER DEPTH 20 FEET NUMBER OF PHASES W/ PROJECT N/A TOTAL VOLUME OF IMPORTED (+) / EXPORTED (-) MATERIALS CUB. YD. TOTAL AREA OF STOCKPILING OF FILL OR BORROW AREAS OFF SITE SQ. FEET STEEPEST SLOPE 5:2 H:V DISTANCE FROM A RIPARIAN AREA OR SENSITIVE AREA N/A FEET MBMBMB FO FO FO OH U OH U OH U OH U OH U OH U OH U OH U X OHU OHU OHU G FO FO FO X X X X X X G G G G G G G E E E E E 15 " S S 15 " S S 15 " S S 15 " S S 15 " S S 15 " S S 12 " W 12 " W 12 " W 12 " W 12 " W 12 " W UD UD UD UD UD H Y D LOD LOD LO D LODLOD LO D LOD LOD LOD LO D LODLOD LO D LO D LOD LO D LODLODLODLODLODLODLODLODLODLODLODLODLODLOD LO D LO D LO D LO D LO D LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LO D LOD LO D LODLO D SFSFSFSFSFSFSFSFSFSFSFSFSFSF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SO U T H S H I E L D S S T R E E T DETENTION POND 1 ± 775 LF SILT FENCE ± 1,400 SF EROSION CONTROL FABRIC PROPOSED EMERGENCY SPILLWAY LOCATION PROPOSED POND OUTLET STRUCTURE PAVER 1 PROPOSED PERMEABLE INTERLOCKING PAVERS PAVER 2 PROPOSED PERMEABLE INTERLOCKING PAVERS PROPOSED SIDEWALK CHASE PROPOSED SIDEWALK CHASE PROPOSED SIDEWALK CHASE PROPOSED 8' CONCRETE PAN PROPERTY BOUNDARY (TYP.) PROPOSED 2' CONCRETE PAN LIMITS OF CONVENTIONAL TOPO (TYP.) OFFSITE CONTOURS PROVIDED FOR REFERENCE ONLY PROPOSED UNDERDRAIN OUTFALL WITH UPTURNED ELBOW PROPOSED 2' U-CHANNEL 100-YR WSEL100-YR WSEL STORM DRAIN LINE B SEE SHEET ### STORM DRAIN LINE A SEE SHEET ### Sheet SN O W R I D G E A P A R T M E N T S Th e s e d r a w i n g s a r e in s t r u m e n t s o f s e r v i c e pr o v i d e d b y N o r t h e r n En g i n e e r i n g S e r v i c e s , I n c . an d a r e n o t t o b e u s e d f o r an y t y p e o f c o n s t r u c t i o n un l e s s s i g n e d a n d s e a l e d b y a P r o f e s s i o n a l E n g i n e e r i n th e e m p l o y o f N o r t h e r n En g i n e e r i n g S e r v i c e s , I n c . N O T F O R C O N S T R U C T I O N R E V I E W S E T of 21 EC2 ER O S I O N C O N T R O L P L A N IN T E R M E D I A T E 9 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R NORTH ( IN FEET ) 1 inch = ft. Feet02020 20 40 60 PROPOSED CONTOUR PROPOSED STORM SEWER PROPOSED SWALE EXISTING CONTOUR PROPOSED CURB & GUTTER PROPERTY BOUNDARY SILT FENCE ROCK SOCK RIPRAP 1.CONTRACTOR SHALL IMMEDIATELY STABILIZE ALL DISTURBED SLOPES BY CRIMP MULCHING OR SIMILAR METHODS. 2.SWMP ADMINISTRATOR: Contact ________________________________ Company ________________________________ Address ________________________________ Phone________________________________ 3.CONTRACTOR TO PROVIDE VEHICLE TRACKING CONTROL FOR CONCRETE WASHOUT AREA IF ACCESS IS OFF PAVEMENT. 4.NO MUD OR DEBRIS IS ALLOWED ON CITY STREETS. IF ANY DOES OCCUR, CONTRACTOR SHALL SWEEP AND CLEAN IMMEDIATELY. 5.REFER TO THE FINAL DRAINAGE REPORT, DATED APRIL 3, 2023 BY NORTHERN ENGINEERING FOR ADDITIONAL INFORMATION. 6.PAVER SYSTEM IS TO BE CONSTRUCTED AS PART OF THE LAST SEQUENCE OF CONSTRUCTION TO MINIMIZE POTENTIAL FOR SEDIMENTATION. 7.FINAL STABILIZATION TO BE DONE IN ACCORDANCE WITH THE FINAL LANDSCAPE PLAN. GENERAL NOTES: WATTLE DIKE CONCRETE WASH AREA SEDIMENT TRAP BALE INLET PROTECTION SLOPE DRAIN EROSION CONTROL FABRIC LEGEND: BALE OUTLET PROTECTION INLET PROTECTION VEHICLE TRACKING CONTROL PAD SF LIMIT OF DISTURBANCE LOD CITY OF FORT COLLINS UPLAND MIX SEED CALCULATIONS CHART TOTAL DISTURBED PROJECT AREA 0.72 ACRES TOTAL "ONSITE" AREA OF DISTURBANCE 0.67 ACRES TOTAL "OFFSITE" AREA OF DISTURBANCE 0.05 ACRES TOTAL STORAGE/STAGING AREA N/A ACRES TOTAL HAUL ROADS AREA N/A CONSTRUCTION VEHICLE TRAFFIC AREA N/A EST. PERCENT OF PROJECT AREA EXPOSED 100% EST. PERCENT VEGETATIVE COVER ~35%DENSITY EXISTING SOIL TYPE C APPROX. GROUNDWATER DEPTH 20 FEET NUMBER OF PHASES W/ PROJECT N/A TOTAL VOLUME OF IMPORTED (+) / EXPORTED (-) MATERIALS CUB. YD. TOTAL AREA OF STOCKPILING OF FILL OR BORROW AREAS OFF SITE SQ. FEET STEEPEST SLOPE 5:2 H:V DISTANCE FROM A RIPARIAN AREA OR SENSITIVE AREA N/A FEET MBMBMB FO FO FO OH U OH U OH U OH U OH U OH U OH U OH U X OHU OHU OHU G FO FO FO X X X X X X G G G G G G G E E E E E 15 " S S 15 " S S 15 " S S 15 " S S 15 " S S 15 " S S 12 " W 12 " W 12 " W 12 " W 12 " W 12 " W UD UD UD UD UD HY D SO U T H S H I E L D S S T R E E T DETENTION POND 1 LOD LOD LODLODLOD LO D LO D LOD LOD LO D LODLOD LO D LO D LO D LO D LODLODLODLODLODLODLODLODLODLODLODLODLOD LO D LO D LO D LO D LO D LO D LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LO D LOD LO D LOD LO D PROPOSED EMERGENCY SPILLWAY LOCATION PROPOSED POND OUTLET STRUCTURE PAVER 1 PROPOSED PERMEABLE INTERLOCKING PAVERS PAVER 2 PROPOSED PERMEABLE INTERLOCKING PAVERS PROPOSED SIDEWALK CHASE PROPOSED SIDEWALK CHASE PROPOSED SIDEWALK CHASE PROPOSED 8' CONCRETE PAN PROPERTY BOUNDARY (TYP.) PROPOSED 2' CONCRETE PAN LIMITS OF CONVENTIONAL TOPO (TYP.) OFFSITE CONTOURS PROVIDED FOR REFERENCE ONLY PROPOSED UNDERDRAIN OUTFALL WITH UPTURNED ELBOW PROPOSED 2' U-CHANNEL 100-YR WSEL100-YR WSEL STORM DRAIN LINE B SEE SHEET ### STORM DRAIN LINE A SEE SHEET ### Sheet SN O W R I D G E A P A R T M E N T S Th e s e d r a w i n g s a r e in s t r u m e n t s o f s e r v i c e pr o v i d e d b y N o r t h e r n En g i n e e r i n g S e r v i c e s , I n c . an d a r e n o t t o b e u s e d f o r an y t y p e o f c o n s t r u c t i o n un l e s s s i g n e d a n d s e a l e d b y a P r o f e s s i o n a l E n g i n e e r i n th e e m p l o y o f N o r t h e r n En g i n e e r i n g S e r v i c e s , I n c . N O T F O R C O N S T R U C T I O N R E V I E W S E T of 21 EC3 ER O S I O N C O N T R O L P L A N FI N A L 10 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R NORTH ( IN FEET ) 1 inch = ft. Feet02020 20 40 60 PROPOSED CONTOUR PROPOSED STORM SEWER PROPOSED SWALE EXISTING CONTOUR PROPOSED CURB & GUTTER PROPERTY BOUNDARY SILT FENCE ROCK SOCK RIPRAP 1.CONTRACTOR SHALL IMMEDIATELY STABILIZE ALL DISTURBED SLOPES BY CRIMP MULCHING OR SIMILAR METHODS. 2.SWMP ADMINISTRATOR: Contact ________________________________ Company ________________________________ Address ________________________________ Phone________________________________ 3.CONTRACTOR TO PROVIDE VEHICLE TRACKING CONTROL FOR CONCRETE WASHOUT AREA IF ACCESS IS OFF PAVEMENT. 4.NO MUD OR DEBRIS IS ALLOWED ON CITY STREETS. IF ANY DOES OCCUR, CONTRACTOR SHALL SWEEP AND CLEAN IMMEDIATELY. 5.REFER TO THE FINAL DRAINAGE REPORT, DATED APRIL 3, 2023 BY NORTHERN ENGINEERING FOR ADDITIONAL INFORMATION. 6.PAVER SYSTEM IS TO BE CONSTRUCTED AS PART OF THE LAST SEQUENCE OF CONSTRUCTION TO MINIMIZE POTENTIAL FOR SEDIMENTATION. 7.FINAL STABILIZATION TO BE DONE IN ACCORDANCE WITH THE FINAL LANDSCAPE PLAN. GENERAL NOTES: WATTLE DIKE CONCRETE WASH AREA SEDIMENT TRAP BALE INLET PROTECTION SLOPE DRAIN EROSION CONTROL FABRIC LEGEND: BALE OUTLET PROTECTION INLET PROTECTION VEHICLE TRACKING CONTROL PAD SF LIMIT OF DISTURBANCE LOD CITY OF FORT COLLINS UPLAND MIX SEED CALCULATIONS CHART TOTAL DISTURBED PROJECT AREA 0.72 ACRES TOTAL "ONSITE" AREA OF DISTURBANCE 0.67 ACRES TOTAL "OFFSITE" AREA OF DISTURBANCE 0.05 ACRES TOTAL STORAGE/STAGING AREA N/A ACRES TOTAL HAUL ROADS AREA N/A CONSTRUCTION VEHICLE TRAFFIC AREA N/A EST. PERCENT OF PROJECT AREA EXPOSED 100% EST. PERCENT VEGETATIVE COVER ~35%DENSITY EXISTING SOIL TYPE C APPROX. GROUNDWATER DEPTH 20 FEET NUMBER OF PHASES W/ PROJECT N/A TOTAL VOLUME OF IMPORTED (+) / EXPORTED (-) MATERIALS CUB. YD. TOTAL AREA OF STOCKPILING OF FILL OR BORROW AREAS OFF SITE SQ. FEET STEEPEST SLOPE 5:2 H:V DISTANCE FROM A RIPARIAN AREA OR SENSITIVE AREA N/A FEET EC4 ER O S I O N C O N T R O L D E T A I L S 11 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R ROCK SOCK SECTION ROCK SOCK PLAN ROCK SOCK JOINTING GRADATION TABLE SIEVE SIZE MASS PERCENT PASSING SQUARE MESH SIEVES NO. 4 2"100 1-1/2"90-100 1"20-55 3/4"0-15 3/8"0-5 MATCHES SPECIFICATIONS FOR NO. 4 COARSE AGGREGATE FOR CONCRETE PER AASHTO M43. ALL ROCK SHALL BE FRACTURED FACE, ALL SIDES RS 001 CONCRETE WASHOUT AREA 002 ROCK SOCK 003 VEHICLE TRACKING PAD 004 SILT FENCE SF POSTS PREASSEMBLED SILT FENCE POSTS SHALL OVERLAP AT JOINTS SO THAT NO GAPS EXIST IN SILT FENCE. NOTE: THICKNESS OF GEOTEXTILE HAS BEEN EXAGGERATED.POST SHALL BE JOINED AS SHOWN, THEN ROTATED 180° IN DIRECTION SHOWN AND DRIVEN INTO THE GROUND. SILT FENCE JOINTS DRIVE POSTS VERTICALLY INTO THE GROUND TO A MINIMUM DEPTH OF 18". EXCAVATE A TRENCH APPROXIMATELY 4" WIDE AND 4" DEEP ALONG THE LINE OF POSTS AND UPSLOPE FROM THE BARRIER. ANCHOR TRENCH SHALL BE EXCAVATED BY HAND, WITH TRENCHER, OR WITH SILT FENCE INSTALLATION MACHINE. NO ROAD GRADERS, BACKHOES, ETC. SHALL BE USED. NOT LESS THAN THE BOTTOM 1' OF THE SILT FENCE FABRIC SHALL BE BURIED IN THE TRENCH. THE TRENCH SHALL BE COMPACTED BY HAND, WITH "JUMPING JACK" OR BY WHEEL ROLLING. COMPACTION SHALL BE SUCH THAT THE SILT FENCE RESISTS BEING PULLED OUT OF ANCHOR TRENCH BY HAND. SILT FENCE INDICATED IN THE PLANS SHALL BE INSTALLED PRIOR TO ANY LAND-DISTURBING ACTIVITIES. USE WOOD POSTS OR OTHER MATERIAL AS ACCEPTED BY THE CITY. INSTALLATION NOTES: 1. 2. 3. 4. 5. 6. 7. THE CONTRACTOR SHALL INSPECT SILT FENCE EVERY TWO WEEKS AND AFTER SIGNIFICANT STORM EVENTS AND MAKE REPAIRS OR CLEAN OUT UPSTREAM SEDIMENT AS NECESSARY. SEDIMENT ACCUMULATED UPSTREAM OF SILT FENCE SHALL BE REMOVED WHEN THE UPSTREAM SEDIMENT REACHES A DEPTH OF 6". SILT FENCE SHALL BE REMOVED WHEN THE UPSTREAM DISTURBED AREA IS STABILIZED AND GRASS COVER IS ACCEPTED BY THE CITY. IF ANY DISTURBED AREA EXISTS AFTER REMOVAL, IT SHALL BE SEEDED AND MULCHED OR OTHERWISE STABILIZED IN A MANNER ACCEPTED BY THE CITY. MAINTENANCE NOTES: 1. 2. 3. 4" MIN. 4" MIN. 1 12" x 1 12" WOODEN FENCE POSTS SF 005 SECTION G-G G PLAN G BOP BALE OUTLET PROTECTION Sheet SN O W R I D G E A P A R T M E N T S Th e s e d r a w i n g s a r e in s t r u m e n t s o f s e r v i c e pr o v i d e d b y N o r t h e r n En g i n e e r i n g S e r v i c e s , I n c . an d a r e n o t t o b e u s e d f o r an y t y p e o f c o n s t r u c t i o n un l e s s s i g n e d a n d s e a l e d b y a P r o f e s s i o n a l E n g i n e e r i n th e e m p l o y o f N o r t h e r n En g i n e e r i n g S e r v i c e s , I n c . N O T F O R C O N S T R U C T I O N R E V I E W S E T of 21 FL O W 3'-4' ADJACENT ROLLS SHALL TIGHTLY ABUT W1 NOTES: INSTALLATION: WHEN INSTALLING RUNNING LENGTHS OF WATTLES, BUTT THE SECOND WATTLE TIGHTLY AGAINST THE FIRST, DO NOT OVERLAP THE ENDS. STAKE THE WATTLES AT EACH END AND FOUR FOOT ON CENTER. FOR EXAMPLE: A 25 FOOT WATTLE USES 6 STAKES A 20 FOOT WATTLE USES 5 STAKES A 12 FOOT WATTLE USES 4 STAKES STAKES SHOULD BE DRIVEN THROUGH THE MIDDLE OF THE WATTLE. LEAVING 2 - 3 INCHES OF THE STAKE PROTRUDING ABOVE THE WATTLE. A HEAVY SEDIMENT LOAD WILL TEND TO PICK THE WATTLE UP AND COULD PULL IT OFF THE STAKES IF THEY ARE DRIVEN DOWN TOO LOW. IT MAY BE NECESSARY TO MAKE A HOLE IN THE WATTLE WITH A PICK END OF YOUR MADDOX IN ORDER TO GET THE STAKE THROUGH THE STRAW. WHEN STRAW WATTLES ARE USED FOR FLAT GROUND APPLICATIONS, DRIVE THE STAKES STRAIGHT DOWN; WHEN INSTALLING WATTLES ON SLOPES, DRIVE THE STAKES PERPENDICULAR TO THE SLOPE. DRIVE THE FIRST END STAKE OF THE SECOND WATTLE AT AN ANGLE TOWARD THE FIRST WATTLE IN ORDER TO HELP ABUT THEM TIGHTLY TOGETHER. IF YOU HAVE DIFFICULTY DRIVING THE STAKE INTO EXTREMELY HARD OR ROCKY SLOPES, A PILOT BAR MAY BE NEEDED TO BEGIN THE STAKE HOLE. 1"x 1" WOOD STAKES 18"-24" BAILING WIRE OR NYLON ROPE WATTLE "A"WATTLE "B" 1'2' TYP. 1'1' W2 NOTES: INSTALLATION: STAKES SHOULD BE DRIVEN ACROSS FROM EACH OTHER AND ON EACH SIDE OF THE WATTLE. LEAVING 4"-6" OF STAKE PROTRUDING ABOVE THE WATTLE. BAILING WIRE OR NYLON ROPE SHOULD BE TIED TO THE STAKES ACROSS THE WATTLE. STAKES SHOULD THEN BE DRIVEN UNTIL THE BAILING WIRE OR NYLON ROPE IS SUFFICIENTLY SNUG TO THE WATTLE. WHEN INSTALLING RUNNING LENGTHS OF WATTLES, TO PREVENT SHIFTING, BUTT THE SECOND WATTLE TIGHTLY AGAINST THE FIRST. DO NOT OVERLAP THE ENDS. STAKES SHOULD BE DRIVEN 1 FT. FROM END, ACROSS FROM AND ON EACH SIDE OF WATTLE LEAVING 4"-6" OF STAKE PROTRUDING ABOVE THE WATTLE. BAILING WIRE OR NYLON ROPE SHOULD BE TIED TO STAKES IN AN HOUR GLASS FORMATION (FRONT TO BACK OF WATTLE "A", ACROSS TO FRONT OF WATTLE "B", ACROSS TO BACK AND BACK TO FRONT OF WATTLE "A"). STAKES SHOULD THEN BE DRIVEN IN UNTIL BAILING WIRE OR NYLON ROPE IS SUFFICIENTLY SNUG TO THE WATTLE. SEDIMENT DEPOSITION ZONE STORM WATER LINE WEIGHTED WATTLE LIP OF GUTTER SIDEWALK EXISTING OR PROPOSED INLET TOP BACK CURB FLOW LINE SEDIMENT DEPOSITION ZONE STORM WATER LINE LIP OF GUTTER WEIGHTED WATTLE AT 45 DEG. TO CURB SIDEWALK TOP BACK CURB FLOW LINE SIDEWALK TOP BACK CURB FLOW LINE W4 NOTES: 1. NUMBER OF WATTLES AND SPACING SHOULD BE DETERMINED BY THE SLOPE AND SITE CONDITIONS. 2. TUBULAR MARKERS SHALL MEET THE REQUIREMENTS OF MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) 3. CITY RECOMMENDS INSTALLING AT LEAST 3 CHECKDAMS WHEN USING THIS SETUP. LIP OF GUTTER WEIGHTED WATTLE W1 & W2 INSTALLATION NOTES: 1. THE LOCATION AND LENGTH OF WATTLE IS DEPENDENT ON THE CONDITIONS OF EACH SITE. 2. WATTLES SHALL BE INSTALLED PRIOR TO ANY LAND-DISTURBING ACTIVITIES. 3. WATTLES SHALL CONSIST OF STRAW, COMPOST, EXCELSIOR, OR COCONUT FIBER. 4. NOT FOR USE IN CONCENTRATED FLOW AREAS. 5. THE WATTLES SHALL BE TRENCHED INTO THE GROUND A MINIMUM OF TWO (2) INCHES. 6. WATTLES SHALL BE INSTALLED PER MANUFACTURERS SPECIFICATIONS. 7. ON SLOPES, WATTLES SHOULD BE INSTALLED ON CONTOUR WITH A SLIGHT DOWNWARD ANGLE AT THE END OF THE ROW IN ORDER TO PREVENT PONDING AT THE MID SECTION. 8. RUNNING LENGTHS OF WATTLES SHOULD BE ABUTTED FIRMLY TO ENSURE NO LEAKAGE AT THE ABUTMENTS. 9. SPACING - DOWNSLOPE: VERTICAL SPACING FOR SLOPE INSTALLATIONS SHOULD BE DETERMINED BY SITE CONDITIONS. SLOPE GRADIENT AND SOIL TYPE ARE THE MAIN FACTORS. A GOOD RULE OF THUMB IS: 1:1 SLOPES = 10 FEET APART 2:1 SLOPES = 20 FEET APART 3:1 SLOPES = 30 FEET APART 4:1 SLOPES = 40 FEET APART, ETC. HOWEVER, ADJUSTMENTS MAY HAVE TO BE MADE FOR THE SOIL TYPE: FOR SOFT, LOAMY SOILS - ADJUST THE ROWS CLOSER TOGETHER; FOR HARD, ROCKY SOILS - ADJUST THE ROWS FURTHER APART. A SECONDARY WATTLE PLACED BEHIND THE ABUTMENT OF TWO WATTLES IS ENCOURAGED ON STEEP SLOPES OR WHERE JOINTS HAVE FAILED IN THE PAST. 10. STAKING: THE CITY RECOMMENDS USING WOOD STAKES TO SECURE THE WATTLES. 1/2" TO 5/8" REBAR IS ALSO ACCEPTABLE. BE SURE TO USE A STAKE THAT IS LONG ENOUGH TO PROTRUDE SEVERAL INCHES ABOVE THE WATTLE: 18" IS A GOOD LENGTH FOR HARD, ROCKY SOIL. FOR SOFT LOAMY SOIL USE A 24" STAKE. 4"-6" ABOVE WATTLE AFTER BAILING WIRE OR NYLON ROPE IS ATTACHED. STAKES NEED TO BE TAMPED UNTIL WIRE/ROPE IS SNUG WITH WATTLE. W3 NOTE: IF THE AREA BEHIND THE INLET IS NOT STABILIZED, A BMP SHOULD BE USED TO PREVENT SEDIMENT FROM ENTERING THE INLET 1"x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x4 MATERIAL FOR STAKES JOINT ANCHOR TRENCH, TYP. PERIMETER ANCHOR TRENCH, TYP. TOP OF CHANNEL BANK TYPE OF BLANKET AS INDICATED IN PLAN VIEW, IN ALL DISTURBED AREAS OF STREAMS AND DRAINAGE CHANNELS TO DEPTH "D" ABOVE CHANNEL INVERT. BLANKET SHALL GENERALLY BE ORIENTED PARALLEL TO FLOW DIRECTION. STAKING PATTERN SHALL MATCH BLANKET TYPE. UNDISTURBED SOIL TYPE OF BLANKET, INDICATED IN PLAN VIEW PER MANUFACTURER SPEC. OR TYPE 2 OR 3 STAKING (MATCH SPECIFIED BLANKET TYPE) SEE THE STAKING PATTERNS DETAIL ON NEXT SHEET PERIMETER ANCHOR TRENCH, TYP. JOINT ANCHOR TRENCH, TYP. COMPACTED SUBGRADE 1 >3 THE BLANKET SHALL BE EXTENDED TO THE TOP OF CHANNEL "D " 6 " TO P S O I L "M" OVERLAPPING JOINT, SEE DETAIL ON THIS SHEET STAGGER OVERLAPS PERIMETER ANCHOR TRENCH SEE DETAIL ON THIS SHEET PER MANUFACTURER SPEC. OR TYPE 1 STAKING SEE THE STAKING PATTERN DETAIL ON NEXT SHEET BLANKET SHALL BE 100% STRAW MIN. DIVERSION DITCH TYPICALLY AT TOP OF SLOPE 6 " TO P S O I L 6" MIN. (TYP.) 3" MIN. (TYP.) SINGLE EDGE EROSION CONTROL BLANKET (TYP.) COMPACTED BACKFILL (TYP.) STAKE (TYP.) TWO EDGES OF TWO ADJACENT ROLLS LOOP FROM MIDDLE OF ROLL FLOW 6" 3" MIN. 1 2 " MI N . STAKING PATTERNS SHALL BE IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATION. IF NO MANUFACTURER'S SPECIFICATION IS AVAILABLE USE THE ACCEPTABLE STAKING PATTERN (AS SHOWN ABOVE) PERIMETER ANCHOR TRENCH OR JOINT ANCHOR TRENCH, TYP. STRAW-COCONUT COCONUT OR EXCELSIOR STRAW ROLL WIDTH "W" (TYP.) 6' 3'1/2 "W" 1/2 "W" 1/2 "W" 1/2 "W" 1/2 "W" 4' 3' 2' EROSION CONTROL BLANKET TYPE TYPE STRAW* STRAW-COCONUT EXCELSIOR COCONUT CONTENT - 30% MIN. - STRAW CONTENT 100% - NETTING MIN. DOUBLE/NATURAL 100% - - EXCELSIOR CONTENT COCONUT --100% * FOR OUTSIDE OF STREAMS AND DRAINAGE CHANNELS DOUBLE/NATURAL DOUBLE/NATURAL DOUBLE/NATURAL MAX.70% EROSION CONTROL BLANKET006 VTC EF CWA H Y D MBMBMB FO FO FO OH U OH U OH U OH U OH U OH U OH U OH U X OHU OHU OHU G FO FO FO X X X X X X G G G G G G G E E E E E 15 " S S 15 " S S 15 " S S 15 " S S 15 " S S 15 " S S 12 " W 12 " W 12 " W 12 " W 12 " W 12 " W SO U T H S H I E L D S S T R E E T LIMITS OF CONVENTIONAL TOPO (TYP.) OFFSITE CONTOURS PROVIDED FOR REFERENCE ONLY a2 0.43 ac. A2 0.24 ac. A1 a1 Sheet SN O W R I D G E A P A R T M E N T S Th e s e d r a w i n g s a r e in s t r u m e n t s o f s e r v i c e pr o v i d e d b y N o r t h e r n En g i n e e r i n g S e r v i c e s , I n c . an d a r e n o t t o b e u s e d f o r an y t y p e o f c o n s t r u c t i o n un l e s s s i g n e d a n d s e a l e d b y a P r o f e s s i o n a l E n g i n e e r i n th e e m p l o y o f N o r t h e r n En g i n e e r i n g S e r v i c e s , I n c . N O T F O R C O N S T R U C T I O N R E V I E W S E T of 21 DR1 HI S T O R I C D R A I N A G E E X H I B I T 12 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R NORTH ( IN FEET ) 1 inch = ft. Feet02020 20 40 60 EXISTING CONTOUR PROPERTY BOUNDARY A DESIGN POINT FLOW ARROW DRAINAGE BASIN LABEL DRAINAGE BASIN BOUNDARY NOTES: 1.REFER TO THE FINAL DRAINAGE REPORT, DATED APRIL 3, 2023 FOR ADDITIONAL INFORMATION. A LEGEND: FOR DRAINAGE REVIEW ONLY NOT FOR CONSTRUCTION HISTORIC DRAINAGE SUMMARY Design Point Basin ID Total Area (acres) C2 C100 2-Yr Tc (min) 100-Yr Tc (min) Q2 (cfs) Q100 (cfs) HA1 ha1 0.241 0.50 0.62 5.80 5.80 0.33 1.49 HA2 ha2 0.428 0.23 0.28 10.09 10.09 0.21 0.98 total Total 0.669 0.32 0.41 6.98 6.98 0.56 2.53 MBMBMB FO FO FO OHU OH U OH U OH U OH U OH U OH U OH U X OHU OHU OHU G FO FO FO X X X X X X G G G G G G G E E E E E 15 " S S 15 " S S 15 " S S 15 " S S 15 " S S 15 " S S 12 " W 12 " W 12 " W 12 " W 12 " W 12 " W EM GM UGEUGEUGEUGEUGEUGE G G G G G G S UD UD UD UD UD UGE WF H Y D SO U T H S H I E L D S S T R E E T DETENTION POND 10.14 ac. A3 0.09 ac. OS2 0.04 ac. OS1 0.15 ac. A2 0.23 ac. A1 a3 a2 a1 PROPOSED EMERGENCY SPILLWAY LOCATION PROPOSED POND OUTLET STRUCTURE PAVER 1 PROPOSED PERMEABLE INTERLOCKING PAVERS PAVER 2 PROPOSED PERMEABLE INTERLOCKING PAVERS PROPOSED SIDEWALK CHASE PROPOSED SIDEWALK CHASE PROPOSED SIDEWALK CHASE PROPOSED 8' CONCRETE PAN PROPERTY BOUNDARY (TYP.) PROPOSED 2' CONCRETE PAN LIMITS OF CONVENTIONAL TOPO (TYP.) OFFSITE CONTOURS PROVIDED FOR REFERENCE ONLY PROPOSED UNDERDRAIN OUTFALL WITH UPTURNED ELBOW PROPOSED 2' U-CHANNEL 100-YR WSEL100-YR WSEL 20' DRAINAGE EASEMENT 51' DRAINAGE EASEMENT 46' DRAINAGE EASEMENT 7.4' DRAINAGE EASEMENT 15.5' DRAINAGE EASEMENT 22' DRAINAGE EASEMENT 10' UTILITY EASEMENT 10' UTILITY EASEMENT STORM DRAIN LINE B SEE SHEET ### STORM DRAIN LINE A SEE SHEET ### Sheet SN O W R I D G E A P A R T M E N T S Th e s e d r a w i n g s a r e in s t r u m e n t s o f s e r v i c e pr o v i d e d b y N o r t h e r n En g i n e e r i n g S e r v i c e s , I n c . an d a r e n o t t o b e u s e d f o r an y t y p e o f c o n s t r u c t i o n un l e s s s i g n e d a n d s e a l e d b y a P r o f e s s i o n a l E n g i n e e r i n th e e m p l o y o f N o r t h e r n En g i n e e r i n g S e r v i c e s , I n c . N O T F O R C O N S T R U C T I O N R E V I E W S E T of 21 DR2 DE V E L O P E D D R A I N A G E E X H I B I T 13 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R NORTH ( IN FEET ) 1 inch = ft. Feet02020 20 40 60 PROPOSED CONTOUR PROPOSED STORM SEWER PROPOSED SWALE EXISTING CONTOUR PROPOSED CURB & GUTTER PROPERTY BOUNDARY PROPOSED INLET A DESIGN POINT FLOW ARROW DRAINAGE BASIN LABEL DRAINAGE BASIN BOUNDARY PROPOSED SWALE SECTION 11 NOTES: 1.REFER TO THE FINAL DRAINAGE REPORT, DATED APRIL 3, 2023 FOR ADDITIONAL INFORMATION. A LEGEND: FOR DRAINAGE REVIEW ONLY NOT FOR CONSTRUCTION Detention Summary ID Tributary Area (ac) Weighted Percent Impervious Extended Detention WQV (ac-ft) LID WQV (ac-ft) 100-Year Detention Vol. (ac-ft) 100-Yr Total Pond Volume (ac-ft) 100-Yr Detention WSEL (ft) Final Release Rate (cfs) Pond 1 0.23 77%0.005 N/A 0.055 0.060 5,037.42 0.60 Paver 1 0.15 93%N/A 0.003 N/A N/A N/A N/A Paver 2 0.14 79%N/A 0.002 N/A N/A N/A N/A DEVELOPED DRAINAGE SUMMARY Design Point Basin ID Total Area (acres) C2 C100 2-Yr Tc (min) 100-Yr Tc (min) Q2 (cfs) Q100 (cfs) a1 A1 0.233 0.61 0.77 5.00 5.00 0.41 1.78 a2 A2 0.150 0.74 0.93 5.00 5.00 0.32 1.39 a3 A3 0.135 0.63 0.79 5.62 5.62 0.23 1.06 Offsite Basins os1 OS1 0.042 0.44 0.44 5.17 5.17 0.05 0.18 os2 OS2 0.095 0.20 0.20 5.57 5.57 0.05 0.18 Sheet SN O W R I D G E A P A R T M E N T S Th e s e d r a w i n g s a r e in s t r u m e n t s o f s e r v i c e pr o v i d e d b y N o r t h e r n En g i n e e r i n g S e r v i c e s , I n c . an d a r e n o t t o b e u s e d f o r an y t y p e o f c o n s t r u c t i o n un l e s s s i g n e d a n d s e a l e d b y a P r o f e s s i o n a l E n g i n e e r i n th e e m p l o y o f N o r t h e r n En g i n e e r i n g S e r v i c e s , I n c . N O T F O R C O N S T R U C T I O N R E V I E W S E T of 21 D1 DE T A I L S UT I L I T Y 14 100 SANITARY SEWER CONNECTION WITH TAPPING SLEEVE TEE FL O W METER APPROVED: DRAWN BY:DETAILS CONSTRUCTION DATE REVISED: DETAILWATER STANDARD EXTERIOR SETTING FOR 3/4" AND 1" WATER METERS 4/20/2022 SAA W-15 GENERAL NOTES: 1.DO NOT INSTALL IN ANY STREET, ALLEY, PARKING AREA, DRIVEWAY, DRAINAGE DITCH OR DETENTION BASIN. 2.NO LANDSCAPING (SHRUBS, BOULDERS, ETC.) OR STRUCTURES TO BE WITHIN 4 FEET OF METER BOX, OR NO TREES WITHIN 6 FEET OF METER BOX. 3.SLOPE GROUND SURROUNDING METER BOX AWAY FROM LID AT 2% GRADE FOR A MIN DISTANCE OF 4 FEET. 4.MAKE NO PLUMBING CONNECTIONS (TEES, COUPLINGS, ETC.) IN METER BOX. 5.ALL TEES AND CONNECTION FITTINGS TO BE A MINIMUM OF 2 FEET FROM METER BOX WALL ON OUTLET SIDE. 6.GRADE ACCEPTANCE AFTER METER BOX INSTALLATION REQUIRES THAT THE OWNER ADJUST METER BOX COVER TO 1/2 INCH ABOVE FINAL GRADE. 7.IF A PRESSURE REDUCING VALVE IS REQUIRED BY PLUMBING CODE, INSTALL VALVE INSIDE THE BUILDING, IMMEDIATELY FOLLOWING THE MAIN SHUT-OFF VALVE. 8.REFER TO QUICK REFERENCE FOR INSTALLATION OF EXTERIOR SETTING FOR 3/4 " AND 1" WATER METERS (QUICK REFERENCE 15) 6 INCH LAYER OF PEA GRAVEL (3/8") UNDER METER BOX LOCK TYPE INLET VALVE PLASTIC INNER LID CAST IRON RECESSED LID WITH WORM LOCK CURB STOP TYPE "K" COPPER PIPING COMPRESSION TYPE CONNECTION METER BOX (NO ALTERATIONS) CURB BOX CAST IRON FROST PROOF METER BOX COVER C.L. OF METER CONNECTION PIPE INLETS NEED TO BE EXPOSED TO ALLOW GEOTHERMAL HEATING OF BOX 4" X 6" SUPPORT BRICK INSTALL LID 1/2" ABOVE FINAL LANDSCAPED GRADE 10" 48" 64" NO FITTINGS FOR 2' MIN 15" RECOMMENDED 14" MIN. ALLOWED 18" MAX. ALLOWED COMPACTED GRANULAR MATERIAL CONFORMING TO CDDH #67 LOWER LIMIT OF TRENCH WALL SLOPING INITIAL LIFT * 12 IN. MIN. PIPE O.D. 4 IN. MIN. TRENCH WIDTH AS SPECIFIED IN SECTION 02221 COMPACTED GRANULAR MATERIAL CONFORMING TO CDDH #67 * BEDDING REQUIRMENTS WW-1 FLOW DIRECTION TRAFFIC RATED CLEANOUT WW-15 PLAN VIEW STANDARD TEE CONNECTION ELEVATION VIEW STANDARD SADDLE CONNECTION 45° 45° NOTES: 5' MIN. TAPPING SADDLE OR STANDARD TEE CONNECTION STREET SURFACE PROPERTY LINE STANDARD AIR TIGHT PLUG PER WATER & SEWER SPECIFICATIONS PIPE BEDDING MATERIAL PER WATER & SEWER BEDDING DETAILS. A STANDARD TEE MAY BE USED IF THE SANITARY SEWER IS BEING INSTALLED AT THE SAME TIME AS THE SERVICE LINE SANITARY SEWER MAIN STANDARD TEE (REFER TO SPECS) MARKER FOR SEWER SERVICE CONNECTION 2"x4" POST AT END OF SERVICE 24" MIN ABOVE SURFACE (SEE NOTE 7) 4" OR 6" SERVICE (MINIMUM GRADE 18"PER FOOT) FOR ACCEPTABLE BENDS (SEE NOTE 5) FOR ACCEPTABLE BENDS SEE NOTE 5 45° ANGLE ABOVE PIPE SPRINGLING (SEE NOTE 5)MINIMUM GRADE 1/8" PER FOOT MINIMUM GRADE 1/8" PER FOOT SEWER SADDLE CONNECTION PER (SADDLE PURCHASED THROUGH CITY) SEWER SADDLE CONNECTION (SADDLE PURCHASED THROUGH CITY) TRACER WIRE (SEE DETAIL UL-5) 45° ANGLE ABOVE PIPE SPRINGLING (SEE NOTE 5) DATE: JANUARY 2023 SCALE: N.T.S. SANITARY SEWER SERVICE CONNECTION DETAIL SS-5 Sheet SN O W R I D G E A P A R T M E N T S N O T F O R C O N S T R U C T I O N R E V I E W S E T of 21 D2 DE T A I L S DR A I N A G E 15 201 CONCRETE CHANNEL FOR STORM OUTLET FG 0.5' 2' 0.5' #4@6" O.C. #4L@12" O.C. 3" CL R . #4@12" O.C.#4L@12" O.C. BACK OF CURB EDGE OF STREET 58" GALV. STEEL PLATE 21 2 1 3"x2"x38" GALV. ANGLE SEE DETAIL 1 #4@12" O.C. #4@12" O.C. #4@12" O.C. 3"x2"x38" GALV. ANGLE 58" GALV. STEEL PLATE #3 REBAR ANCHOR 18 O.C. 38" BRASS SCREW 18 O.C. WITH COUNTERSUNK HEAD FLUSH WITH PLATE 6" 6" VARIES 2' 3' SECTION B-B DETAIL 1 SECTION A-A PLAN SECTION C-C SLOPE VARIES 0.5% SLOPE (MIN.) VARIES VARIES 2' DEPRESSED GUTTER VA R I E S EXPANSION MATERIAL 58" GALV.STEEL PLATE EDGE OF STREET 12" R 12" R 2' OPENING 3'-3"3'-3" 6" ( T Y P . ) BACK OF CURB 3" (TYP.) 3' (TYP.) SIDEWALK (TYP.) EXTEND WALK 6" ON BOTH SIDES OF WALK VA R I E S VA R I E S SL O P E CC BB A A 8'-6" EXPANSION MATERIAL 38" BRASS SCREW 18" O.C.WITH COUNTERSINK HEAD FLUSH WITH PLATE2' 6" Sheet SN O W R I D G E A P A R T M E N T S N O T F O R C O N S T R U C T I O N R E V I E W S E T of 21 D3 DE T A I L S DR A I N A G E 16 NOTES: 1.CONTRACTOR MUST FOLLOW THE INTERLOCKING CONCRETE PAVEMENT INSTITUTE (ICPI) ASSOCIATION AND BRICK INDUSTRY ASSOCIATION CONSTRUCTION SPECIFICATIONS FOR COMPLETE INSTALLATION INFORMATION. 2.IT IS RECOMMENDED THAT A CERTIFIED PERMEABLE PAVEMENT INSTALLER PERFORM THE INSTALLATION OF THE PAVERS. 3.SUBGRADE PREPARATION: 3.1.CONTRACTOR TO VERIFY THAT SUBGRADE PREPARATION, COMPACTION DENSITY AND ELEVATIONS CONFORM TO THE APPROVED DRAWINGS AND CONSTRUCTION SPECIFICATIONS. 3.2.MINIMUM ALLOWABLE SUBGRADE SLOPE IS 0.5%. 4.EDGE RESTRAINTS: 4.1.CONCRETE EDGE RESTRAINTS (CURB AND GUTTER OR APRON) SHALL BE INSTALLED AROUND THE PERIMETER OF THE PAVER AREA TO PROVIDE FOR PROPER EDGE RESTRAINT AND ALLOW FOR ADEQUATE SEPARATIONS BETWEEN PAVERS AND OTHER SURFACE TYPES. 4.2.A LINEAR-EDGE CONCRETE COLLAR TO BE POURED AROUND ALL PENETRATIONS (INCLUDING CLEANOUTS) THROUGH THE PAVER SECTION . 4.3. 5.GEOTEXTILE LINERS: 5.5.GEOTEXTILE LINERS (PERMEABLE OR IMPERMEABLE AS PER PLAN) SHALL BE INSTALLED ALONG PERIMETER OF CROSS-SECTION OF THE PAVER AREA. 5.3.GEOTEXTILE LINERS SHALL BE PLACED IN ACCORDANCE WITH MANUFACTURER'S STANDARDS AND RECOMMENDATIONS. ALL SEAMS AND OPENINGS IN THE LINER SHALL BE SEALED ACCORDING TO MANUFACTURER'S RECOMMENDATIONS AND SPECIFICATIONS. 5.4.WHERE USED, IMPERMEABLE GEOMEMBRANE SHEET / LINER SHALL BE 40 MIL THICK, HIGH-DENSITY POLYETHYLENE DESIGNED SPECIFICALLY FOR FLEXIBLE GEOMEMBRANE APPLICATIONS. ADJACENT STRIPS OF IMPERMEABLE LINER SHALL OVERLAP A MINIMUM OF 18", OR PER MANUFACTURER'S SPECIFICATION. 6.AGGREGATES: 6.1.ALL AGGREGATES SHALL BE ANGULAR, CRUSHED, WASHED GRANITE ROCK AND SHALL BE WASHED ROCK, CLEAN OF DEBRIS AND WITH NO MORE THAN 1% FINES. 6.2.SUB-BASECOURSE AGGREGATE SHALL BE GRADATION ASTM #2, #3, OR #4. ASTM #4 WILL NOT BE ALLOWED FOR USE WITH SUBSURFACE STORMWATER DETENTION SYSTEMS. 6.3.BASECOURSE AGGREGATE SHALL BE GRADATION ASTM #57 OR #67. 6.4.LEVELING COURSE SHALL BE GRADATION ASTM #8, #89 OR #9. 6.5.LEVELING COURSE SHALL BE INSTALLED ALL THE WAY TO THE FINISHED GRADE SURFACE OF THE PAVERS. 6.6.THE AGGREGATE SHALL BE PLACED IN 6-INCH (MAX.) LIFTS, COMPACTING EACH LIFT WITH A 10-TON, OR HEAVIER, VIBRATING STEEL DRUM ROLLER. MAKE AT LEAST FOUR PASSES WITH THE ROLLER, WITH THE INITIAL PASSES MADE WHILE VIBRATING THE ROLLER AND THE FINAL ONE TO TWO PASSES WITHOUT VIBRATION. 6.7.CONTRACTOR MAY BE REQUIRED TO PROVIDE COMPACTION TESTING. 7.UNDERDRAIN: 7.1.UNDERDRAIN PIPE TO BE PERFORATED OR SLOTTED. PERFORATIONS OR SLOTS TO BE NO WIDER THAN 3/8" TO ENSURE AGGREGATE DOES NOT FALL INTO OR CLOG THE OPENINGS. 7.2.DO NOT WRAP UNDERDRAIN WITH GEOTEXTILE OR SOCK. 8.CLEANOUTS: 8.1.PROVIDE CLEANOUTS (AS PER PLAN) TO ALLOW INSPECTION (BY CAMERA) OF THE UNDERDRAIN SYSTEM DURING AND AFTER CONSTRUCTION. 8.2.CLEANOUTS SHALL BE PROVIDED AT EACH BEND GREATER THAN OR EQUAL TO 90° AND EVERY 100' ALONG A STRAIGHT RUN. CLEANOUT SHALL BE INSTALLED PER THE APPROVED PLANS. 8.3.CLEANOUTS SHALL BE A SOLID WALL PVC STRUCTURE FOR ALL VERTICAL SECTIONS WITH FITTINGS TO CONNECT TO DISTRIBUTION AND UNDERDRAIN PIPING MATERIALS, AS REQUIRED. 8.4.PROVIDE OBSERVATION PORT AT DOWNSTREAM END OF EACH PERMEABLE PAVEMENT SECTION, CONNECTED TO UNDERDRAIN WHEN PRESENT. 8.5.THE CLEANOUT FRAME AND COVER SHALL BE DUCTILE IRON AND STAMPED "CLEANOUT." 9.PAVERS: 9.1.CONTRACTORS MUST INSTALL A PAVER PRODUCT THAT IS APPROVED BY THE ICPI. 9.2.FINISHED GRADE OF THE PAVER SURFACE TO BE EVENLY SLOPED AND FLUSH WITH THE ADJACENT EDGE RESTRAINTS. 9.3.ALL PENETRATIONS THROUGH THE PAVER SURFACE, INCLUDING CLEANOUT LIDS, SHALL BE INSTALLED WITH A CONCRETE COLLAR POURED AROUND THE PERIMETER. 10.POST-INSTALLATION: 10.1.LOOSE MATERIALS SHALL NOT BE STORED ON THE PERMEABLE PAVEMENT AREA. 10.2.THE CONTRACTOR SHALL, AT ALL TIMES DURING AND AFTER SYSTEM INSTALLATION, PREVENT SEDIMENT, DEBRIS AND DIRT FROM ANY SOURCE FROM ENTERING THE PERMEABLE PAVEMENT SYSTEM. UNDISTURBED SOIL SUBGRADE 4" MIN DIAMETER PERFORATED PVC UNDERDRAIN 10" MIN 4" TOPSOIL MAX 1 8" WIDTH HAND-TIGHT JOINTS FILLED WITH LEVELING COURSE MATERIAL TO SURFACE 2-3" DEPTH OF LEVELING COURSE PERMEABLE INTERLOCKING CONCRETE PAVERS EDGE RESTRAINT (CONCRETE APRON OPTION) EDGE RESTRAINT (CURB AND GUTTER OPTION) 2" MIN 6" 6" MIN CLEANOUTS WITH CONCRETE COLLAR (AS PER PLAN) PERFORATED UNDERDRAIN @ 0.50% MIN SLOPE GEOTEXTILE LINER (AS PER PLAN) 12" MIN CROSS-SECTION DETAIL 20" MIN 6" APPROVED: DRAWN BY:DETAILS CONSTRUCTIONDATE REVISED: DETAILSTORMWATER PERMEABLE INTERLOC.ING CONCRETE PAVERS DECEMBER 2018 HEM D-54 PREPARED SUBGRADE @ 0.50% MIN SLOPE 10" MIN DEPTH OF SUB-BASECOURSE 4" DEPTH OF BASECOURSE PAVER SURFACE @ 0.50% MIN OR 3.00% MAX SLOPE APPROVED: DRAWN BY:DETAILS CONSTRUCTIONDATE REVISED: DETAILSTORMWATER BIORETENTION  UPTURNED ELBOW OUTFALL D-53AJUNE 2023 SAA TYPICAL BIORETENTION OR SAND FILTER CROSS-SECTION UPTURNED ELBOW DAYLIGHT ELEVATION AND THE UNDERDRAIN MUST BE BELOW THE BIOSAND MEDIA OF THE LID FEATURE UNDERDRAIN @ 0.50% MIN SLOPE 1.CONTRACTOR SHALL INSTALL BIORETENTION BASINS ACCORDING TO THE APPROVED PLANS AND/OR CONSTRUCTION SPECIFICATIONS. 2.THIS DETAIL SHALL BE USED IN CONJUNCTION WITH DETAIL D-53 OR D-54. PLEASE REFER TO RAIN GARDEN/SAND FILTER DETAIL FOR THE BIOMEDIA STRUCTURE. 3.THIS OPTION IS ONLY FOR USE WITH SYSTEMS THAT DO NOT HAVE AN IMPERMEABLE LINER. NOTES: 30" MIN 12" MAX 18" MIN 4" 8" MIN CC A A B B 3'-6"Ls1' 6" Ws 6" 6" VA R I E S VA R I E S 6" Ws / 2 Ws / 2 SECTION C-C SECTION A-A SECTION B-B WELL SCREEN FLOW CONTROL PLATE 2' - 6 " 6" Wo Wo Wo Wp 4" (T Y P . ) 1' (M A X . ) PLAN 6" 3" CL R . D 1 GENERAL NOTES SECTION D-D WQ D D A A OPP. CLR. ABBREVIATIONS @ # Wp Wo TYP. DIA. O.C. MAX. MIN. LEGEND WQINV. ELEV. 6" 6" Ls Ws 6" 6" 301 WATER QUALITY OUTLET STRUCTURE Sheet SN O W R I D G E A P A R T M E N T S N O T F O R C O N S T R U C T I O N R E V I E W S E T of 21 D4 DE T A I L S DR A I N A G E 17 Sheet SN O W R I D G E A P A R T M E N T S Th e s e d r a w i n g s a r e in s t r u m e n t s o f s e r v i c e pr o v i d e d b y N o r t h e r n En g i n e e r i n g S e r v i c e s , I n c . an d a r e n o t t o b e u s e d f o r an y t y p e o f c o n s t r u c t i o n un l e s s s i g n e d a n d s e a l e d b y a P r o f e s s i o n a l E n g i n e e r i n th e e m p l o y o f N o r t h e r n En g i n e e r i n g S e r v i c e s , I n c . N O T F O R C O N S T R U C T I O N R E V I E W S E T of 21 D5 DE T A I L S SI T E 18 Serv i c e Service PLAN VIEW PROFILE E Service Property Line Line PropertyElectric Se w e r M a i n Wa t e r M a i n G E S W G TapWater Stop Box Ga s M a i n Stub-Out Sewer (min.) On C e n t e r l i n e Re a r o f Si d e w a l k Easement En v e l o p e Bu i l d i n g S e t b a c k Sewer Main Main Primary Gas Main Service Primary Water Electric Stop Box ** Sewer stub-out Sewer stub-out Secondary stub-out Secondary stub-out TELEPHONE CROSSING FROM REAR LOT LINE CABLE TV CROSSING FROM REAR LOT LINE NOTES: 1. No scale to the drawing above. All measurements shown are minimums. 2. Storm and sanitary sewers, manholes, water valves or telephone manholes are not allowed in the wheel path. 2' Roadway 13' 2' 7'10' 1' (Typ.) 10 ' 1' Lvld 4' FC Gas Main Service Stop Box Fl o w L i n e En v e l o p e Cl e a r a n c e t o Easement 9' - 15' Sewer Stub-OutTap Tap Tap Box Stop Water 10' St o r m D r a i n R. O . W . Ba c k o f W a l k 1' Lvld E Pr i m a r y El e c t r i c E Serv i c e (min.) 3' Min 4' FC E E STANDARD VEHICLE A B C D E F G 12202382380 15201717.4208.530 15201220.2208.545 202410.42119960 NA2491919990 ° ° ° ° ° Dimension in feet 2 **1 °90 °60 45 ° 30 ° °0 197.5 7.5 7.5 16.5 16.5 16 158 8 7.5 14.8 17 17.9 15 8 9.2 10.6 15 19 24 24 20 20 20 NA 20 15 15 12 Dimension in feetCOMPACT VEHICLE * Under special conditions, these dimensions could be varied with the Local Entity's approval. Stall length (only) can be reduced by 2' when overhanging is provided. For handicap spaces, width shall be 13' with ramp access to walks. 1 2 A - Angle of Parking B - Stall Width D - Stall Depth C - Stall Length E - Curb Length F - Two-Way Drive Width or Double Loaded Drive Width Single Loaded Drive Width G - One-Way Drive Width or B C E D G F A A B C D E F G** 6" 2"R.2" 6" 6" 12 " 1 1/2"R. 2'-6" 6" 4 1/2" 30" 9" R 0.5" 4.5" 18" 3.63" 21.75" R 0.13" 7" 2" 3.75" 12" ROLL-OVER VERTICAL (LOVELAND) Gutter edge may be tapered or battered. (Typical for all Curb & & Gutter Types) Lip FLBack of curb Right of W a y L i n e 1: 5 0 ( m a x . ) NOTE: 1. Concrete driveway shall be provided to the property line. 2. 0" Curb Height, See Section A-A 3. Full Curb and Gutter, See Standard Drawing 701. X W X 1: 1 2 ( m a x . ) SECTION A-A X = Curb Transition Length, Varies* W = Driveway Width (See Drawing Series 707) T = Concrete Thickness - 6" Residential, 8" Commercial. A A PERSPECTIVE Fl o w l i n e Ba c k o f W a l k N.T.S. Varies *Driveway Width Varies * W = Width Refer to Chapter 25 for minimum removal dimensions. Walk T ROW Varies AttachedSidewalk P r o p e r t y L i n e Retaining Curb (Optional), 1" p e r f t . 1/ 4 " p e r f t . See Drawing 1603 (TYP) 6" Attached Attached 1:12 (max.)1:12 (max.) * Ramp length not to exceed 15'-0", slope must be uniform. See Note 3 See Note 2 See Note 3 See Note 2 1" per ft.1:50 (max.) 1/4" per ft. 1:12 (max. ) 12" min - 2" max T 2" Expansion Joint if driveway continues as concrete PAVEMENT SECTIONS501 ATTACHED SIDEWALK DETAIL Slope sidewalk to curb 1/4" per foot. NOTE: Construct sidewalk with joints at 10' intervals R 1/8" WEAKENED PLANE JOINT EXPANSION JOINT R1/4" and aligned with scoring on curb. INSTALL IN LOCATIONS SPECIFIED IN CHAPTER 22 1/2" 1/4"1/4 SLAB THICKNESS 1/4" 1/2" Expansion Joint material DETACHED SIDEWALK DETAIL Variable Landscaping Slope sidewalk to curb 1/4" per foot. 2' min. Slope: Minumum 1 4"/ft Maximum 3"/ft ADA RAMP PROPOSED ACCESS TRANSITION EX. DRIVEWAY EX. RAMP FULL HEIGHT CURB FULL HEIGHT CURB FLOW LINE 2. 0 % NO PROPOSED CONSTRUCTION TIE INTO EXISTING8. 0 % 8. 8 % 2. 0 % 2. 0 % 2. 0 % 6.8% 2.7% 3.0% 1.8% 1.8% 2.6% 2.1% 2.1% 1.8% 1.8% Sheet SN O W R I D G E A P A R T M E N T S Th e s e d r a w i n g s a r e in s t r u m e n t s o f s e r v i c e pr o v i d e d b y N o r t h e r n En g i n e e r i n g S e r v i c e s , I n c . an d a r e n o t t o b e u s e d f o r an y t y p e o f c o n s t r u c t i o n un l e s s s i g n e d a n d s e a l e d b y a P r o f e s s i o n a l E n g i n e e r i n th e e m p l o y o f N o r t h e r n En g i n e e r i n g S e r v i c e s , I n c . N O T F O R C O N S T R U C T I O N R E V I E W S E T of 21 D6 DE T A I L S SI T E 19 702 18" FLUSH CURB VA N - AC C E S S I B L E PA R K I N G MI N . MI N . ON E I N E V E R Y EI G H T A C C E S S I B L E SP A C E S , B U T N O T LE S S T H A N O N E , SH A L L B E V A N AC C E S S I B L E . ON E S I G N PE R S P A C E RE Q U I R E D RE Q U I R E D PE R S P A C E ON E S I G N RE Q U I R E D PE R S P A C E ON E S I G N CA R A C C E S S I B L E VA N A C C E S S I B L E "U N I V E R S A L D E S I G N " CA R & V A N A C C E S S I B L E OR A " U N I V E R S A L " P A R K I N G S P A C E D E S I G N M A Y B E U S E D . TH I S D E S I G N I S U S E D T O A C C O M M O D A T E C A R & V A N AC C E S S I B L E P A R K I N G S P A C E S , W H I C H E L I M I N A T E S T H E NE E D F O R T W O S I G N T Y P E S . 8' 5' 8' 8' 8' 8' 11 ' 5' 11 ' 11 ' 5' RE S E R V E D RE S E R V E D PA R K I N G RE S E R V E D PA R K I N G R7 - 8 R7 - 8 R7 - 8 Driveway Driveway Sidewalk SECTION A-A Detached Sidewalk Attached Sidewalk AttachedDetached All Sidewalk Thickness Shall Be 6" minimum. Sidewalk NOTE: 1. Sidewalk grade shall remain consistent across driveway 2. For driveway design requirements, see CONST. DWG. Series 706 & 707 3. This detail applies to Residential & Commercial driveways. 6" 2'-0"6'-0" T.C.F.L.Lip 1/2" Expansion Joint Material 1/2" Expansion Joint Material 8" Commercial 6" Residential A A Sidewalk Min. Transition back of walk (typ.) Broom finishBroom finish SECTION A-A MID-BLOCK LOCATION Varies * 1:12 Slope (max.) 1:50 see note 2 Fl o w l i n e (max.) Slope 1:12 5' A Varies * Wood float finish thru ramp Slo p e 1:1 2 Slope 1:12 CORNER LOCATION ramp finish thru Wood float Broom finish A Varie s * (max . ) A A 5' (m a x ) (Radius varies) (typ.) back of walk Transition 2 Br o o m f i n i s h BA C K O F W A L K / L A N D I N G Retaining Curb (Optional) 12 " (m a x . ) (m i n . ) T Walk Curb Gutter NOTES: 1. T = Concrete thickness, 6" minimum for entire ramp area. 2. 1:50 Max unless a landing behind ramp (then ramp can be 1:12 with 1:20 on the detectable warning). 3. See CONST. DWG. 1606(a) and 1607 for Fort Collins. 4. Detectable Warning to extend the full width of the ramp. Material to be approved by Local Engineer. 5. 0" Curb height, See Section A-A. 6. Standard Curb and Gutter Section , See Standard Drawing 701. 2'-0" (min) 6" Walk Gutter Curb Va r i e s * Detectable Warning 1/4" per ft. 1" per ft.1" per ft. 1" p e r f t . 1" pe r f t . On a radius hold 6" at the corners of the truncated dome warning. 2" Retaining Curb (Optional) 6" * Curb to match slope of sidewalk, Ramp length not to exceed 15'-0" See Note 6 See Note 5 See Note 5 See Note 6 Detectable Warning, See Note 4 Detectable Warning, See Note 4 Retaining Curb (Optional) to retain ground behind the walk, if needed 10" 18" 4000 PSI CONCRETE 701 SHIELDS STREET SIDEWALK DETAIL DRAWING NUMBER: PROJECT NUMBER: SEAL: IN ASSOCIATION WITH: ADONAI PROFESSIONAL SERVICES, INC. THIS DRAWING MAY NOT BE PHOTOGRAPHED, SCANNED, TRACED OR COPIED IN ANY MANNER WITHOUT THE WRITTEN PERMISSION OF APS. COPYRIGHT: SHEET ISSUANCES DESCRIPTION DATE SNOW RIDGE APARTMENTS FORT COLLINS, COLORADO PHOTOMETRICS APS 236-23 PHOTOMETRICS 12-21-2023 1509 S SHIELDS PDP SUBMITTAL E0.0 FORT COLLINS LIGHTING CODE 20 of 21 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 1.5 0.7 0.0 0.0 0.0 0.3 0.2 0.0 0.0 0.0 0.0 0.1 1.7 2.0 0.0 0.0 0.0 4.7 0.2 0.0 0.0 0.0 0.1 0.6 0.5 0.1 0.1 0.1 0.8 0.9 0.2 0.0 0.0 0.0 0.0 0.1 0.2 0.3 0.2 0.2 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.1 0.4 0.6 0.5 0.5 0.4 0.2 0.0 0.0 0.0 0.0 0.0 0.1 0.6 1.1 1.0 1.0 0.6 0.2 0.0 0.0 0.0 0.0 0.0 0.1 0.6 1.4 1.4 1.2 0.6 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.6 1.3 2.3 0.0 0.0 0.0 0.1 0.7 1.6 1.4 0.0 0.0 0.0 0.0 0.5 0.9 0.2 0.0 0.0 0.0 0.0 0.3 0.6 0.0 0.0 0.5 2.5 0.0 0.0 0.0 0.0 0.2 0.3 0.1 0.1 0.2 0.3 0.0 0.0 0.0 0.0 0.1 0.0 2.4 2.9 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.4 2.9 0.1 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.4 1.1 0.3 0.2 0.0 0.0 0.0 0.0 0.1 0.1 0.2 1.8 0.1 2.8 0.0 0.0 0.0 0.0 0.1 0.3 0.3 0.5 0.0 0.0 0.0 0.0 0.2 0.5 0.6 0.1 0.8 0.0 0.0 0.0 0.0 0.2 0.8 2.0 0.9 0.0 0.0 0.0 0.0 0.0 0.3 1.5 1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.3 1.0 1.3 0.0 0.3 0.3 0.4 0.1 0.0 0.0 0.0 0.2 0.6 0.6 0.0 0.1 0.3 1.1 5.0 0.2 0.0 0.0 0.0 0.1 0.4 0.3 0.0 0.0 0.0 0.9 1.5 0.1 0.0 0.0 0.0 0.1 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 BB BB BB BB CC CC CC CC CC CC CC CC CC CC DD-2M DD-2M DD-FT DRAWING NUMBER: PROJECT NUMBER: SEAL: IN ASSOCIATION WITH: ADONAI PROFESSIONAL SERVICES, INC. THIS DRAWING MAY NOT BE PHOTOGRAPHED, SCANNED, TRACED OR COPIED IN ANY MANNER WITHOUT THE WRITTEN PERMISSION OF APS. COPYRIGHT: SHEET ISSUANCES DESCRIPTION DATE SNOW RIDGE APARTMENTS FORT COLLINS, COLORADO PHOTOMETRICS APS 236-23 PHOTOMETRICS 12-21-2023 1509 S SHIELDS PDP SUBMITTAL E1.0 PHOTOMETRIC FIXTURE CUT-SHEETS 2 3 4FIXTURE TYPE "BB"FIXTURE TYPE "CC" 1 PHOTOMETRIC SITE PLAN Allowed Lumens Description SF PER SF TOTAL LUMENS PARKING LOT 8,9697,175 WALK WAYS 4,5883,670 13,557TOTAL ALLOWED LUMENS UNDER ALLOWANCE BY 12 LUMENSCOMPLIES: PROVIDED LUMENS Description QTY LUMENS TOTAL LUMENS BB 1,194 4,7764 13,545TOTAL PROVIDED LUMENS LUMENS 1.25 1.25 CC 466 4,66010 DD 2M 1,3492 2,698 DD FT 1,4111 1,411 FIXTURE TYPE "DD" Statistics Description Symbol Avg Max Min Max/Min Avg/Min Calc Zone #1 0.3 fc 5.0 fc 0.0 fc N/A N/A Schedule Symbol Label Image QTY Manufacturer Catalog Description Number Lamps Lamp Output LLF Input Power Polar Plot BB 4 Lithonia Lighting DSXB LED 12C 350 30K ASY D-SERIES BOLLARD WITH 12 3000K LEDS OPERATED AT 350mA AND ASYMMETRIC DISTRIBUTION 1 1194 1 16 CC 10 WAC Lighting WS-W28514 A121914 1 466 1 9.6 DD- 2M 2 Lithonia Lighting DSXW1 LED 10C 350 30K T2M MVOLT DSXW1 LED WITH (1) 10 LED LIGHT ENGINES, TYPE T2M OPTIC, 3000K, @ 350mA. 1 1349 1 13.3 DD- FT 1 Lithonia Lighting DSXW1 LED 10C 350 30K TFTM MVOLT DSXW1 LED WITH (1) 10 LED LIGHT ENGINES, TYPE TFTM OPTIC, 3000K, @ 350mA. 1 1411 1 13.3 Luminaire Locations No.Label MH Tilt 6 BB 3.50 0.00 7 BB 3.50 0.00 8 BB 3.50 0.00 1 CC 6.50 0.00 2 CC 6.50 0.00 3 CC 6.50 0.00 4 CC 6.50 0.00 5 CC 6.50 0.00 6 CC 6.50 0.00 7 CC 6.50 0.00 8 CC 6.50 0.00 9 CC 6.50 0.00 10 CC 6.50 0.00 1 DD-2M 10.00 0.00 2 DD-2M 10.00 0.00 1 DD-FT 10.00 0.00 1 BB 3.50 0.00 BUG RATING: B1 - U0 - G1 BUG RATING: B0 - U0 - G1 BUG RATING: B0 - U0 - G1 NIGHT TIME FRIENDLY NIGHT TIME FRIENDLY NIGHT TIME FRIENDLY BUG RATING: NOT LISTED IDA DARK SKY COMPLIANT SEE POLAR PLOT APPEARS TO BE B0 - U0 - G0 COLOR TEMPERATURE FOR ALL EXTERIOR LIGHT FIXTURES SHALL BE 3,000 KELVIN LAMP COLOR 3,000 KELVIN 3,000 KELVIN 3,000 KELVIN 3,000 KELVIN 21 of 21