Loading...
HomeMy WebLinkAboutSCHOOLSIDE PARK - BDR240009 - SUBMITTAL DOCUMENTS - ROUND 1 - Geotechnical (Soils) Report (3)Geotechnical Investigation Report Timberline Road Improvements Project City of Fort Collins, Colorado RockSol Project No. 579.01 March 27, 2020 Prepared for: J-U-B Engineers, Inc. 4745 East Boardwalk Drive, #200 Fort Collins, Colorado 80525 Attention: Mr. Dan Tuttle, P.E. Project Manager Prepared by: RockSol Consulting Group, Inc. 12076 Grant Street Thornton, Colorado 80241 (303) 962-9300 DR A F T Geotechnical Investigation Report Timberline Road Improvements Project City of Fort Collins, Colorado RockSol Project No. 579.01 March 27, 2020 Prepared for: J-U-B Engineers, Inc. 4745 East Boardwalk Drive, #200 Fort Collins, Colorado 80525 Attention: Mr. Dan Tuttle, P.E. Project Manager Prepared by: RockSol Consulting Group, Inc. 12076 Grant Street Thornton, Colorado 80241 (303) 962-9300 ____________________ ________________________ Madison Philips, E.I.T. Donald G. Hunt, P.E. Civil Engineering Associate Senior Geotechnical Engineer ____________________ ________________________ Ryan Lepro Jacob Sphatt, E.I.T. Engineering Geologist Civil Engineering Associate DR A F T Geotechnical Investigation Report Timberline Road Improvements Project City of Fort Collins, Colorado RockSol Project No. 579.01 i March 27, 2020 Table of Contents 1.0 PROJECT OBJECTIVE AND DESCRIPTION ................................................................ 1 2.0 PROJECT SITE CONDITIONS....................................................................................... 2 3.0 GEOLOGICAL CONDITIONS ......................................................................................... 3 4.0 SUBSURFACE EXPLORATION ..................................................................................... 3 5.0 SURFACE AND SUBSURFACE CONDITIONS ............................................................. 5 5.1 Existing Asphalt Pavement Sections ..................................................................... 5 5.2 Fill Material ........................................................................................................... 6 5.3 Native Subgrade Soils .......................................................................................... 6 5.4 Sedimentary Bedrock ............................................................................................ 6 5.5 Groundwater ......................................................................................................... 6 6.0 LABORATORY TESTING ............................................................................................... 7 7.0 SUBGRADE CHARACTERIZATION .............................................................................. 7 7.1 Roadway Subgrade Soil Classification .................................................................. 8 7.2 Subgrade Support Test Results (R-Value) ............................................................ 8 7.3 Swell/Consolidation Potential of Roadway Subgrade Soils ................................... 8 7.4 Water Soluble Sulfate Content .............................................................................. 9 8.0 PAVEMENT DESIGN RECOMMENDATIONS ..............................................................10 8.1 Pavement Subgrade Characterization..................................................................10 8.2 Pavement Section Recommendations .................................................................11 8.3 Subgrade Preparation (Prior to Pavement Construction) .....................................11 9.0 EARTHWORK ...............................................................................................................12 9.1 Compaction Specifications ...................................................................................12 10.0 CONCRETE BOX CULVERT EXTENSION FOUNDATION RECOMMENDATIONS .....13 10.1 Shallow Footing Foundation Alternative with Ground Improvement ..................13 11.0 SEISMICITY DISCUSSION ...........................................................................................14 11.1 General ............................................................................................................14 11.2 Seismic Design Parameters .............................................................................15 12.0 OTHER DESIGN AND CONSTRUCTION CONSIDERATIONS.....................................16 13.0 LIMITATIONS ................................................................................................................16 ATTACHMENTS Figure 1: Borehole Location Plan Sheet Appendix A: Legend and Individual Borehole Logs Appendix B: Pavement Core Log Summary Appendix C: Summary of Laboratory Test Results Appendix D: Pavement Design Output Sheets DR A F T Geotechnical Investigation Report Timberline Road Improvements Project City of Fort Collins, Colorado RockSol Project No. 579.01 1 March 27, 2020 1.0 PROJECT OBJECTIVE AND DESCRIPTION This report documents the geotechnical engineering investigation performed by RockSol Consulting Group, Inc. (RockSol) for the Timberline Road Improvements Project in the City of Fort Collins, Colorado (see Image 1, Site Vicinity Map). Image 1 – Site Vicinity Map (Google Maps) The City of Fort Collins (City) is planning to make improvements to Timberline Road from Trilby Road to Stetson Creek Drive, and to extend the existing culvert structure at Mail Creek Ditch. The purpose of the improvements to Timberline Road is to widen Timberline Road from the existing two-lane roadway to the City’s standard four-lane arterial section with median islands, utility installations, sidewalks, bike facilities, landscaping and streetlights. The project will include coordination with the Hansen Farms housing development project located to the northwest of the intersection of Zephyr Road and Timberline Road. The objective of this project is to provide the City with preliminary engineering design (30% design – FIR level), defining project footprint, environmental review, traffic analysis, utility alignment/sizing and public outreach coordination. The geotechnical investigation was conducted by RockSol as a subconsultant to JUB Engineers for the City of Fort Collins. The scope of work for this geotechnical investigation included: • Preparing a drilling/sampling program to perform a subsurface investigation and implementing the program to collect soil samples for laboratory testing. • Performing laboratory tests and analyzing the data. Kechter Road E Harmony Road E Trilby Road Timberline Road Project Site Hansen Farms N DR A F T Geotechnical Investigation Report Timberline Road Improvements Project City of Fort Collins, Colorado RockSol Project No. 579.01 2 March 27, 2020 • Preparing a report that presents the field and laboratory data obtained, geological setting and conditions, geotechnical design parameters for the culvert structure extension and roadway pavement thickness recommendations. Surface and groundwater hydrology, hydraulic engineering, and environmental evaluation of site soils and groundwater for possible contaminant characterization were not included in RockSol’s geotechnical scope of work. 2.0 PROJECT SITE CONDITIONS Timberline Road is an important arterial roadway that connects residential areas to major amenities. A combination of residential, commercial, and undeveloped land surrounds the project limits including Bacon Elementary School on the northeast corner of Zephyr Road and Timberline Road. Timberline Road currently consist of two lanes, one in each direction, with a center turn lane for the majority of the project vicinity and northbound and southbound shoulders as well as bike lanes for a majority of the project site vicinity. Timberline Road at Stetson Creek Drive, Kechter Road, Zephyr Road, Fossil Creek Parkway and Trilby Road have been previously widened to accommodate turn lanes for the intersections. The existing lanes are approximately 12 feet wide and surfaced with asphalt pavement. Topography along the project limits of Timberline Road generally consists of nearly flat slopes with a general trend of decreasing elevation toward the east. Mail Creek Ditch crosses Timberline Road once within the project limits (see Image 2). The existing box culvert structure (Structure No. TMB-KTR) that takes Timberline Road traffic over the Mail Creek Ditch will be extended. The box culvert will be extended on both sides of Timberline Road to accommodate the new four-lane arterial section. In addition, safety improvements for the culvert extension including the installation of bridge rails, approach rails, rail transitions and rail ends to meet AASHTO guidelines were proposed following an inspection in March of 2018 by Michael Baker International. Image 2 –Timberline Road over Mail Creek Ditch Mail Creek Ditch Timberline Road N DR A F T Geotechnical Investigation Report Timberline Road Improvements Project City of Fort Collins, Colorado RockSol Project No. 579.01 3 March 27, 2020 3.0 GEOLOGICAL CONDITIONS Based on information presented in the United States Geological Survey (USGS) Geologic Map (See Image 3, Site Geology Map) of the Boulder-Fort Collins-Greeley Area, Colorado, by Roger B. Colton, dated 1978, Quaternary Eolium (Qe) is mapped at or near the surface of the project site limits, with Upper Cretaceous Upper (Pierre Shale) Shale Member (Kpu) mapped southwest of the southern end of the project site. Eolium generally consists of windblown clay, silt (loess) and sand, while the Upper Shale Member consists of gray concretionary silty shale. During RockSol’s drilling/sampling operations, sandy to clayey material was encountered in the upper 5 feet, with sandy clay to clayey sand with trace gravel and silt material encountered with depth. The material encountered was consistent with Eolium deposits. Bedrock was not encountered to the maximum depths drilled of 30 feet below existing grade. Image 3 – Site Geology Map (Boulder – Fort Collins – Greeley Area, Colorado 1978) 4.0 SUBSURFACE EXPLORATION For this investigation, RockSol completed a total of seventeen boreholes identified as B-1 and B- 2, and P-1 through P-15. B-1 and B-2 were drilled near each end of the existing concrete box culvert structure where Mail Creek Ditch crosses under Timberline Road. Borings P-1 through P- 15 were drilled along Timberline Road and at the cross streets of Trilby Road and Zephyr Road at spacings ranging from approximately 300 feet to 500 feet for the purposes of identifying existing pavement thickness and characterizing subgrade soils for new pavement design. In addition to the 15 pavement borings, RockSol obtained 4 pavement cores on Timberline Road, Fossil Creek Parkway, and Kechter Road. Pavement cores were obtained with a 4-inch diameter diamond tipped core barrel and were recovered then taken to RockSol’s office for photographic documentation. The locations of the geotechnical investigation boreholes and pavement cores Project Location Trilby Road Ti m b e r l i n e R o a d Mail Creek Ditch Harmony Road N DR A F T Geotechnical Investigation Report Timberline Road Improvements Project City of Fort Collins, Colorado RockSol Project No. 579.01 4 March 27, 2020 are summarized below in Table 4.1 and are shown in Figure 1 - Borehole Location Plan. The boreholes were drilled between January 22, 2020 and January 24, 2020. Table 4.1- Borehole and Pavement Core Location Summary Borehole/ Core ID Borehole/Core Location Lane Location B-1 SB Timberline Road, ~1,100 feet S of Kechter Road Right Shoulder B-2 NB Timberline Road, ~1,150 feet S of Kechter Road Right Lane P-1 NB Timberline Road, ~200 feet S of Trilby Road Left Turn Lane P-2 WB Trilby Road, ~130 feet E of Timberline Road Right Lane P-3 SB Timberline Road, ~460 feet N of Trilby Road Right Shoulder P-4 NB Timberline Road, ~75 feet N of Westchase Road Right Lane P-5 Timberline Road, ~200 feet S of Fossil Creek Pkwy Center Turn Lane P-6 NB Timberline Road, ~270 feet N of Fossil Creek Pkwy Right Shoulder P-7 Timberline Road, ~100 feet N of Rosen Drive Center Turn Lane P-8 WB Zephyr Road, ~250 feet E of Timberline Road Right Shoulder P-9 SB Timberline Road, ~40 feet N of Zephyr Road Right Shoulder/Bike Lane P-10 NB Timberline Road, ~500 feet N of Zephyr Road Right Shoulder P-11 NB Timberline Road, ~745 feet S of Kechter Road Right Lane P-12 SB Timberline Road, ~275 feet S of Kechter Road Right Shoulder P-13 NB Timberline Road, ~185 feet N of Kechter Road Right Off-Shoulder P-14 Timberline Road, ~800 feet N of Kechter Road Center Turn Lane P-15 SB Timberline Road, ~1300 feet N of Kechter Road Right Shoulder C-1 NB Timberline Road, ~225 feet S of Trilby Road Left Turn Lane C-2 EB Fossil Creek Pkwy, ~80 feet E of Timberline Road Right Lane C-3 WB Kechter Road, ~150 feet E of Timberline Road Left Turn Lane C-4 NB Timberline Road, ~230 feet N of Kechter Road Right Shoulder A truck mounted CME-45 drill rig was used for drilling and sampling. Culvert structure boreholes were advanced to depths of approximately 30 feet and pavement boreholes were advanced to depths of approximately 10 feet below existing grades using 4-inch and 6-inch outside diameter solid stem augers. The boreholes were logged in the field by a representative of RockSol with the depth to groundwater, if encountered, noted at the time of drilling. Each borehole was backfilled at the completion of drilling and groundwater level checks and patched with surface asphalt patch mix when drilled within existing pavement. Subsurface materials were sampled using modified California barrel and standard split spoon samplers. The modified California barrel sampler has an outside diameter of approximately 2.5 inches and an inside diameter of 2 inches. The standard split spoon sampler used had an outside diameter of 2 inches and an inside diameter of 1⅜-inches. Brass tube liners are used with the modified California barrel sampler to retain samples for density and swell testing. Sample retaining liners are not used with the standard split spoon sampler. DR A F T Geotechnical Investigation Report Timberline Road Improvements Project City of Fort Collins, Colorado RockSol Project No. 579.01 5 March 27, 2020 Standard Penetration Tests (SPT) and Penetration Tests (PT) were performed at selected intervals using an automatic hammer lift system. The standard split spoon sampling method is the SPT described by ASTM Method D-1586. PT were performed using the modified California barrel sampler. A standard hammer weighing 140 pounds falling 30 inches per ASTM D3550 was used for both the SPT and PT. The modified California Barrel sampling method is similar to the SPT test with the difference being the sampler dimensions and the number of 6-inch intervals driven with the hammer. It is RockSol’s experience that blow counts obtained with the modified California sampler tend to be slightly greater than a standard split spoon sampler. Penetration resistance values (blow counts) were recorded for each sampling event. Blow counts, when properly evaluated, indicate the relative density or consistency of the soils. Depths at which the samples were taken, the type of sampler used, and the blow counts that were obtained are shown on the Boring Logs (See Appendix A). 5.0 SURFACE AND SUBSURFACE CONDITIONS The surface and subsurface materials encountered by RockSol at our borehole locations included asphaltic pavement, fill material, and native soils. A brief description of the materials encountered is presented below. 5.1 Existing Asphalt Pavement Sections Asphalt pavement was encountered in Boreholes B-1, B-2, P-1 through P-12, P-14, and P-15 and Cores C-2 through C-4. Asphalt pavement ranged in thickness from 6.75 inches to 9.75 inches. A Pavement Core Log Summary was produced by RockSol to describe the location, thickness, layers, and general quality of pavement at each coring location (See Appendix B – Pavement Core Log Summary). Portland Cement Concrete Pavement (PCCP) was encountered at C-1 and measured 10.0 inches in thickness. Asphalt pavement was not encountered in Borehole P-13 because the boring was drilled off-shoulder. Aggregate base course (ABC) was noted below the pavement in Boreholes B-1, B-2, P-1 through P-12, P-14, and P-15 with observed thicknesses of 7 to 20 inches. A summary of existing pavement section thickness encountered at each borehole location is presented in Table 5.1. Pavement section thicknesses are also shown on the individual borehole logs in Appendix A. DR A F T Geotechnical Investigation Report Timberline Road Improvements Project City of Fort Collins, Colorado RockSol Project No. 579.01 6 March 27, 2020 Table 5.1 – Existing Pavement Sections Borehole/Core ID Pavement Type Pavement Thickness (in) ABC Thickness (in) B-1 Asphalt Pavement 7.5 12.0 B-2 Asphalt Pavement 8.0 12.0 P-1 Asphalt Pavement 7.5 20.0 P-2 Asphalt Pavement 8.0 12.0 P-3 Asphalt Pavement 7.5 10.0 P-4 Asphalt Pavement 7.0 10.0 P-5 Asphalt Pavement 7.75 10.0 P-6 Asphalt Pavement 8.0 10.0 P-7 Asphalt Pavement 7.5 10.0 P-8 Asphalt Pavement 7.5 8.5 P-9 Asphalt Pavement 7.75 10.0 P-10 Asphalt Pavement 8.0 8.0 P-11 Asphalt Pavement 8.0 10.0 P-12 Asphalt Pavement 8.25 13.0 P-13 Not Encountered NE NE P-14 Asphalt Pavement 7.5 7.0 P-15 Asphalt Pavement 7.5 12.0 C-1 Concrete Pavement 10.0 NM C-2 Asphalt Pavement 6.75 NM C-3 Asphalt Pavement 7.0 NM C-4 Asphalt Pavement 9.75 NM NE = Not Encountered; NM = Not Measured 5.2 Fill Material Fill material was encountered in most boreholes drilled within Timberline Road and generally extended to depths ranging from 2.5 feet to 6 feet below existing grades. Fill material consisted of medium stiff to very stiff sandy clay with gravel. The fill material appears to be associated with Timberline Road roadway construction. 5.3 Native Subgrade Soils The native soils encountered in these boreholes were generally comprised of soft to very stiff slightly silty to sandy clay with gravel in parts, and loose to medium dense clayey to silty sand with gravel in parts. The native soil encountered by RockSol is generally consistent with the eolium materials identified on the USGS Geological Map (See Image 2 – Site Geology Map) found in Section 3.0 of this report. 5.4 Sedimentary Bedrock Bedrock was not encountered at any borehole location to the maximum drilled depths of approximately 30 feet. 5.5 Groundwater Groundwater was encountered during drilling/sampling activities at borehole locations B-1 and B- 2 at approximate depths of 16 feet and 17 feet below existing grades (elevations of approximately 4,949 feet and 4,947 feet), respectfully, at the time of drilling operations. See Table 5.2, Approximate Groundwater Depths and Elevations for approximate depths to groundwater, where encountered. Due to the location of the boreholes, all boreholes were backfilled at the completion DR A F T Geotechnical Investigation Report Timberline Road Improvements Project City of Fort Collins, Colorado RockSol Project No. 579.01 7 March 27, 2020 of drilling/sampling operations, therefore long-term monitoring of groundwater elevations was not performed. Table 5.2 – Approximate Groundwater Depths and Elevations Borehole Ground Surface Elevation (Feet) Bottom of Borehole Elevation (Feet) Groundwater Depth (Feet) Groundwater Elevation (Feet) B-1 4,963.9 4,933.9 16 4,947.9 B-2 4,963.8 4,933.8 17 4,946.8 Groundwater elevations are subject to change depending on climatic conditions, water flows in Mail Creek Ditch, local irrigation practices, changes in local topography, and changes in surface storm water management. Groundwater elevations may lower during the Ditch “shutdown” period. Long-term monitoring of groundwater elevations is required to establish groundwater fluctuations. 6.0 LABORATORY TESTING Soil samples retrieved from the borehole locations were examined by the project geotechnical engineer in the RockSol laboratory. Selected samples were tested and classified per the Unified Soil Classification System (USCS). The following laboratory tests were performed in accordance with the American Society for Testing and Materials (ASTM), American Association of State Highway and Transportation Officials (AASHTO), and current local practices: • Natural Moisture Content (ASTM D-2216) • Percent Passing No. 200 Sieve (ASTM D-1140) • Liquid and Plastic Limits (ASTM D-4318) • Dry Density (ASTM D-2937) • Gradation (ASTM D 6913) • Water Soluble Sulfates (CDOT CP-L 2103) • Soil Classification (ASTM D-2487, ASTM D-2488, and AASHTO M145) • Swell Test (ASTM D-4546) • Resistance Value (AASHTO T-190) R-Values (Resistance Values) were tested by Cesare, Inc. All other laboratory tests were performed by RockSol. Laboratory test results are presented in Appendix C and are also summarized on the Borehole Logs presented in Appendix A. 7.0 SUBGRADE CHARACTERIZATION Laboratory test results were used to characterize the engineering properties of the subsurface material encountered. For soil classification, RockSol conducted sieve analyses and Atterberg Limits tests. RockSol assigned R-Value testing based on the results of the soil classifications. Swell tests were used to determine the swell or consolidation characteristics of the subsurface materials. Lab testing was also performed on selected samples to determine the water-soluble sulfate content of subsurface materials to assist with cement type recommendations. A summary of the physical and chemical test results is included in Appendix C. DR A F T Geotechnical Investigation Report Timberline Road Improvements Project City of Fort Collins, Colorado RockSol Project No. 579.01 8 March 27, 2020 7.1 Roadway Subgrade Soil Classification Subgrade bulk samples of existing roadway grades were obtained at various depths from each pavement borehole location and were tested for AASHTO soil classification. The subgrade soils tested varied between A-6 and A-7-6 AASHTO soil types. A summary of the subgrade soil classifications is presented in Table 7.1. Table 7.1 – Subgrade Soil Classifications Borehole Location Depth (feet) AASHTO Classification P-1 2.3 – 4 A-6 (7) P-2 1.7 – 4 A-6 (10) P-3 1.5 – 4 A-6 (4) P-4 1.5 – 7 A-7-6 (15) P-5 1.5 – 4 A-6 (5) P-6 1.6 – 4 A-6 (5) P-7 1.67 – 4 A-6 (13) P-8 1.3 – 7 A-6 (16) P-9 1.5 – 4 A-6 (6) P-10 1.3 – 4 A-6 (10) P-11 1.6 – 4 A-6 (5) P-12 1.75 – 4 A-6 (8) P-13 0.6 – 4 A-6 (5) P-14 1.16 – 7 A-6 (9) P-15 1.67 – 7 A-6 (4) 7.2 Subgrade Support Test Results (R-Value) To test the subgrade support characteristics, R-Value laboratory tests were performed on composite samples obtained from Boreholes P-7 and P-8, and P-9 and P-11. R-Value test results of 10 and 22 were obtained from the samples. A summary of the R-Value tests is presented in Table 7.2 below Table 7.2 - R-Value Summary Sample Type Borehole(s) at Sample Depths And AASHTO Classification R-Value Resilient Modulus (psi) Composite P-7 at 1.67’ to 4’----A-6 (13) P-8 at 1.3’ to 4’----A-6 (16) 10 6,482 Composite P-9 at 1.5’ to 4’----A-6 (6) P-11 at 1.6’ to 4’----A-6 (5) 22 8,053 For pavement design purposes, Larimer County Urban Street Standards (LUCASS) requires correlation of R-Value to Resilient Modulus (Mr) for input into the pavement design equation. For this report, RockSol used the CDOT correlation equation as stated in the 2020 CDOT M-E Pavement Design Manual for conversion of R-value to Resilient Modulus. 7.3 Swell/Consolidation Potential of Roadway Subgrade Soils Based on swell test results and plasticity index (PI) testing, the subgrade soils encountered within the upper 4 feet of the pavement surface of Timberline Road exhibit low to moderate swell potential and low consolidation potential (0.0 to 2.0 percent swell under 150 pounds per square foot (psf) surcharge pressure. DR A F T Geotechnical Investigation Report Timberline Road Improvements Project City of Fort Collins, Colorado RockSol Project No. 579.01 9 March 27, 2020 Tests performed on samples obtained from Boreholes B-1 and B-2 at the Mail Creek Ditch structure exhibited 0.1 to 0.7 percent consolidation under 500 pounds per square foot (psf) surcharge pressure). Based on the swell/consolidation test results and subgrade soil classifications obtained, special mitigation methods for expansive soil are not deemed necessary for the proposed culvert structure extension. However, moisture conditioning of exposed subgrade material should be controlled during new roadway construction (See Section 8.3). Based on consolidation and penetration data obtained from the boreholes drilled, special mitigation for the design and construction of the proposed culvert structure extension is recommended (See Section 10). Mitigation may consist of over excavation and replacement with coarse, granular material with geosynthetic fabrics or geogrids to help stabilize the foundation soils. 7.4 Water Soluble Sulfate Content Cementitious material requirements for concrete in contact with site soils or groundwater is typically based on the percentage of water-soluble sulfate. Mix design requirements for concrete exposed to water soluble sulfates in soils or water is considered by CDOT as shown in Table 7.4a and in the CDOT Standard Specifications for Road and Bridge Construction, dated 2019. Water Soluble Sulfate Testing Results are summarized in Table 7.4b. Table 7.4a – Requirements to Protect Against Damage to Concrete by Sulfate Attack from External Sources of Sulfate Severity of sulfate exposure Water-soluble sulfate (SO4), in dry soil, percent Sulfate (SO4), in water, ppm Water cementitious ratio, maximum Cementitious material requirements Class 0 0.00 to 0.10 0 to 150 0.45 Class 0 Class 1 0.11 to 0.20 151 to 1,500 0.45 Class 1 Class 2 0.21 to 2.0 1,501 to 10,000 0.45 Class 2 Class 3 2.01 or greater 10,001 or greater 0.40 Class 3 Table 7.4b – Water Soluble Sulfate Testing Summary Borehole Sample Depth (feet) Water-soluble sulfate (SO4 in dry soil, percent Cementitious material requirements B-1 4 0.00 Class 0 B-1 9 0.00 Class 0 B-2 4 0.00 Class 0 B-2 14 0.00 Class 0 P-1 2.3 – 4 0.23 Class 2 P-2 1.7 – 4 0.02 Class 0 P-3 1.5 – 4 0.06 Class 0 P-4 1.5 – 7 1.10 Class 2 P-5 1.5 – 4 0.44 Class 2 P-6 1.6 – 4 0.51 Class 2 P-7 1.67 – 4 0.01 Class 0 P-8 1.3 – 7 0.00 Class 2 P-9 1.5 – 4 0.00 Class 2 P-10 1.3 – 4 0.04 Class 1 P-11 1.6 – 4 0.22 Class 2 P-12 1.75 – 4 0.13 Class 1 P-13 0.6 – 4 0.20 Class 2 P-14 1.16 – 7 0.10 Class 0 P-15 1.67 – 7 0.03 Class 0 DR A F T Geotechnical Investigation Report Timberline Road Improvements Project City of Fort Collins, Colorado RockSol Project No. 579.01 10 March 27, 2020 The concentration of water-soluble sulfates measured in soil samples obtained from RockSol’s exploratory boreholes ranged from 0.00 percent to 1.10 percent by weight. Based on the results of the water-soluble sulfate testing, concrete in contact with subgrade materials may be constructed with cement meeting the requirements for CDOT Exposure Class 2. Concrete constructed with ASTM C150 Type II, III, or V cement is appropriate for Class 2 requirements. 8.0 PAVEMENT DESIGN RECOMMENDATIONS New pavement is planned for the widening of Timberline Road from Trilby Road to Stetson Creek Drive. Pavement thickness evaluation for development of flexible and rigid pavement design recommendations within the City of Fort Collins right of way was performed in accordance with Chapter 10 – Pavement Design and Report, Larimer County Urban Area Street Standards (April 1, 2007) and AASHTO Guide for the Design of Pavements (1993 with the 1998 update for rigid pavement). RockSol understands that for arterial and collector level intersections, 20-year design traffic loading needs to be combined for the shared use areas and a separate design analysis is required. RockSol obtained functional classifications of roads within the project limits using Larimer County’s Road Information Locator and determined the Traffic Loading ESAL’s for a 20- year design life from Table 10-1 in Chapter 10 - Pavement Design and Report, Larimer County Urban Area Street Standards (April 1, 2007). See Table 8 below for 20-year design traffic loading and separate design analysis requirements. As noted in Section 7.2, correlation of subgrade soil R-Value to Resilient Modulus for this report was performed using the latest correlation used by CDOT. Table 8 – Road Classification and Design Analysis Requirements Road Classification 20-Year Design ESAL Separate Design Analysis Required at Intersection with Timberline Road? (Yes/No) Timberline Road Four Lane Arterial 1,460,000 Not Applicable Trilby Road Two Lane Arterial 730,000 Yes Westchase Road Two Lane Residential 36,500 No Fossil Creek Parkway Two Lane Residential 36,500 No Rosen Drive Two Lane Residential 36,500 No Zephyr Road Commercial Collector 730,000 Yes Kechter Road Two Lane Arterial 730,000 Yes Traffic loading of 1,460,000 ESAL’s for a 20-year design life were used for Timberline Road. For the intersections of Trilby Road, Zephyr Road, and Kechter Road with Timberline Road a combined traffic loading of 2,190,000 ESAL’s for a 20-year design life were used. Separate design analysis for the intersections of Westchase Road, Fossil Creek Parkway, and Rosen Drive with Timberline Road were not deemed necessary by RockSol based on their residential classifications. RockSol understands that new and reconstructed Arterial/Arterial intersections are to be constructed with rigid pavement in accordance with Chapter 8 – Intersections, Larimer County Urban Area Street Standards (April 1, 2007). 8.1 Pavement Subgrade Characterization Subgrade bulk samples within the upper four feet of existing roadway grades were obtained at each borehole location and were tested for AASHTO soil classification. The subgrade soils tested classified as A-6 and A-7-6 AASHTO soil types (See Sections 7.1 and 7.2). DR A F T Geotechnical Investigation Report Timberline Road Improvements Project City of Fort Collins, Colorado RockSol Project No. 579.01 11 March 27, 2020 Based on R-Value testing, subgrade resilient modulus value of 6,482 psi (R-Value 10) is considered appropriate for new pavement constructed on the existing site soils. 8.2 Pavement Section Recommendations A summary of the recommended pavement section thicknesses for pavement placed on the existing site soils or imported soils that have a minimum R-Value of 10 is presented in Table 8.2a and Table 8.2b and the pavement design output sheets are included in Appendix D. Table 8.2a – Pavement Section Thickness Recommendations (20 Year Design Life at 1,460,000 ESAL’s) (Mainline) R-Value = 10 HMA Over ABC HMA 7.0 inches ABC 8.0 inches R-Value = 10 PCCP Over ABC PCCP 8.0 inches ABC 6.0 inches HMA = Hot Mix Asphalt; ABC = Aggregate Base Course; PCCP = Portland Cement Concrete Pavement Table 8.2b – Pavement Section Thickness Recommendations (20 Year Design Life at 2,190,000 ESAL’s)(Intersections) R-Value = 10 HMA Over ABC HMA 7.5 inches ABC 8.0 inches R-Value = 10 PCCP Over ABC PCCP 8.0 inches ABC 6.0 inches HMA = Hot Mix Asphalt; ABC = Aggregate Base Course; PCCP = Portland Cement Concrete Pavement HMA pavement shall consist of CDOT-approved mix designs. The top lift (2 inches) of new HMA should consist of SX(100) PG-64-28 materials. Underlying HMA should consist of S(100) PG 64- 28 materials. ABC should consist of material meeting CDOT Class 5 or 6 Aggregate Base Course per CDOT 703.03. Concrete mix designs shall consist of CDOT-approved mixes for pavements. 8.3 Subgrade Preparation (Prior to Pavement Construction) Prior to construction of new pavements on subgrade soils, the underlying subgrade should be properly prepared by removal of all organic matter (topsoil), debris, loose material, and any deleterious material identified by the Project Engineer followed by scarification, moisture conditioning and recompaction. The minimum depth of scarification, moisture conditioning and re-compaction in all cases shall be 6 inches. Cobbles greater than 6 inches in diameter, if encountered, should be removed from the scarification zone. Prior to pavement section construction, subgrade proof rolling with pneumatic tire equipment shall be performed using a minimum axle load of 18 kips per axle after specified subgrade compaction has been obtained. Areas found to be weak and those areas which exhibit soft spots, non-uniform deflection or excessive deflection as determined by the project engineer shall be ripped, scarified, wetted or dried if necessary, and re-compacted to the requirements for density and moisture. Complete coverage of the proof roller will be required. The use of flyash to assist with subgrade stabilization is acceptable if the contractor proposes to use it. All pavement subgrade preparation, including final proof-rolling, pavement materials, and pavement construction shall conform to the current Larimer County Urban Area Street Standards (Chapter 22 – Materials and Construction Specifications). At a minimum, roadway subgrade moisture conditioning and compaction should meet the compaction specifications outlined in Table 8.3. DR A F T Geotechnical Investigation Report Timberline Road Improvements Project City of Fort Collins, Colorado RockSol Project No. 579.01 12 March 27, 2020 Table 8.3 –Roadway Subgrade Compaction Specifications AASHTO Classification Minimum Relative Compaction (Percentage of MDD), % Moisture Content (Deviation from OMC) A-1, A-2-4, A-2-5, A-3 95% of AASHTO T99 -3 to +3 A-2-6, A-2-7 95% of AASHTO T99 -2 to +2 A-4, A-5, A-6 and A-7 95% of AASHTO T99 -2 to +2 MDD = Maximum Dry Density; OMC = Optimum Moisture Content Based on the results of our field and laboratory tests, A-6 and A-7-6 soils are anticipated to be encountered at existing pavement subgrade elevations within the project limits. 9.0 EARTHWORK To accommodate widening of Timberline Road, new embankment may be required along the roadway alignment. At some locations minor cuts may be required. Materials used to construct embankments, roadway side slopes, structure backfill, and aggregate base course materials should meet the material and moisture density control requirements specified in Chapter 22 of the Larimer County Urban Area Street Standards (current edition). At a minimum, the ground surface underlying all embankment fills should be carefully prepared by removing all organic matter (topsoil), scarification to a minimum depth of 12 inches and recompacting to the requirements for maximum dry density and moisture content listed in Table 9 of this report prior to fill placement. Where fill material is to be placed on existing slopes steeper than 4 (H):1 (V), benching must be performed to tie the new fill into the existing slope. Benching into the existing slopes shall allow sufficient bench width to accommodate placing and compaction equipment to operate in a horizontal orientation. Broken concrete, broken asphalt, or other solid materials more than 6 inches in greatest dimension shall not be placed within embankment areas supporting the roadway shoulders and pavement structure. Claystone materials shall not be used for construction of new embankment. Imported fill material used for embankment constructed shall be compatible with designed side slopes. Material excavated from utility trenches may be used for backfill provided it does not contain unsuitable material or particles larger than 3 inches. Unsuitable material includes, but is limited to, topsoil, vegetation, brush, sod, trash, and other deleterious substances. 9.1 Compaction Specifications Embankment material, structure backfill, and utility trench backfill shall be thoroughly compacted to the moisture and density specifications required for the material tested, in accordance with moisture conditioning and compaction specifications outlined in Chapter 22 of the Larimer County Urban Area Street Standards (current edition). At a minimum, roadway subgrade moisture conditioning and compaction should meet the compaction specifications outlined in Table 9. DR A F T Geotechnical Investigation Report Timberline Road Improvements Project City of Fort Collins, Colorado RockSol Project No. 579.01 13 March 27, 2020 Table 9 – Compaction Specifications AASHTO Classification Minimum Relative Compaction (Percentage of MDD), % Moisture Content (Deviation from OMC) A-1, A-2-4, A-2-5, A-3 95% of AASHTO T99 -3 to +3 A-2-6, A-2-7 95% of AASHTO T99 -2 to +2 A-4, A-5, A-6 and A-7 95% of AASHTO T99 -2 to +2 MDD = Maximum Dry Density; OMC = Optimum Moisture Content To reduce the risk of excessive compaction induced lateral earth pressures on the proposed concrete box culvert structure and associated wing walls, if proposed, thin lifts (6 to 8 inches maximum) and small manually operated equipment should be used within proximity of the inside wall face. Compaction equipment or methods that produce horizontal or vertical earth pressures, which may cause excessive displacement or overturning, or may damage structures, shall not be used. 10.0 CONCRETE BOX CULVERT EXTENSION FOUNDATION RECOMMENDATIONS Shallow foundation design is feasible for the proposed Concrete Box Culvert (CBC) structure over Mail Creek Ditch. However, due to the presence of soft to very soft subsurface soil conditions, ground improvement is recommended for a shallow footing foundation or a 4-sided CBC system. Ground improvement will likely require excavations extend below groundwater elevations, therefore dewatering and control of groundwater should be anticipated. RockSol assumes construction of the CBC extension structures will occur during the seasonal “shutdown” period of the Mail Creek Ditch. A discussion of ground improvement mitigation for a shallow foundation system is presented below. 10.1 Shallow Footing Foundation Alternative with Ground Improvement Boreholes B-1 and B-2 were advanced at the approximate location of existing CBC structure TMB-KTR (see Borehole Location Plan Figure 1). RockSol considers a design groundwater elevation of 4,947 feet appropriate for this location. Depending on the time of construction relative to the time of Ditch “shutdown” the groundwater elevation may be encountered at a slightly lower elevation. Based on conditions encountered in RockSol Boreholes B-1 and B-2, ground improvement is recommended to achieve a service bearing resistance greater than 1,000 psf for a shallow concrete foundation (spread footing or a 4-sided CBC) system. At a minimum, RockSol recommends ground improvement consisting of overexcavation of subgrade soils to a minimum depth of 2.5 feet below the bottom of the concrete footing or CBC bottom slab and replacement with 6-inches of CDOT Class 1 Structural Fill and at least 2-feet of a crushed aggregate material meeting CDOT No. 57 Concrete Aggregate which is fully wrapped with a CDOT approved Class 1 stabilization/separator geotextile. The crushed aggregate shall extend horizontally beyond the limits of the footing by a length equal to the vertical depth of the aggregate material. Placement of the aggregate material should be in horizonal lifts with a maximum lift thickness of 8 inches. Compaction of each lift with vibratory methods is recommended. RockSol recommends placement of at least 6-inches of granular material, such DR A F T Geotechnical Investigation Report Timberline Road Improvements Project City of Fort Collins, Colorado RockSol Project No. 579.01 14 March 27, 2020 as CDOT Class 1 Structural Fill between the top of the geotextile wrapped granular material and the bottom of the foundation. With two feet (vertically) of aggregate materials, RockSol considers a service bearing resistance of 1.5 ksf appropriate. If greater service bearing resistance is required, additional thickness of replaced subgrade soil is required. Bearing resistances, based on replacement thicknesses of aggregate is presented in Table 10.1. Table 10.1 - Bearing Resistances for Shallow Foundations After Ground Improvement (without geogrid included) Overexcavation And Replacement Thickness (No. 57 Material) Strength Limit State (LRFD) Service Limit State (LRFD) Ultimate (Nominal) Resistance (ksf) Factored Resistance (ksf) Service Bearing Resistance (LRFD) (ksf) 2 feet 4.6 2.1 1.5 3 feet 5.9 2.6 2.0 4 feet 7.7 3.4 2.5 A resistance factor of 0.45 is used to determine the factored bearing resistance for LRFD strength limit state evaluation. Service limit state, service bearing resistance is estimated to correspond to a total settlement of less than 1-inch. RockSol assumes a minimum foundation width of 6 feet. Inclusion of geogrids within the replacement granular material will provide additional service bearing resistance. For preliminary design considerations, an additional 0.5 ksf of service bearing resistance may be achieved for each layer of geogrid included within the granular material when placed at 12-inch intervals. At 12-inch intervals, one geogrid layer can be provided in the 2-foot replacement layer; two geogrid layers can be provided in the 3-foot replacement layer; and three layers can be provided in the 4-foot replacement layer. A representative of the geotechnical engineer should observe all footing excavations prior to placement of the geotextile and aggregate material. If unstable subgrade conditions are encountered at the bottom of the subexcavation, additional excavation to allow placement of a coarse stabilization material layer is recommended. For evaluation of sliding resistance (AASHTO LRFD Bridge Design specifications (Eighth Edition) Section 10.6.3.4), CDOT Class 1 Structural Fill is presented in Table 10.2. Table 10.2 – Sliding Resistance Parameters – Shallow Foundations Foundation Bearing Material Total Unit Weight (pcf) Angle of Internal Friction (degrees) Undrained Shear Strength (Cohesion) (psf) CDOT Class 1 Structural Fill 125 32 0 For a concrete footing cast in-place against a minimum of 6 inches in thickness of Class 1 Structural Fill, a nominal coefficient of friction of 0.67 and a resistance factor of 0.80 is recommended. 11.0 SEISMICITY DISCUSSION 11.1 General Boreholes B-1 and B-2 terminated approximately 30 feet below the top of the existing pavement on Timberline Road at the Mail Creek Ditch crossing. Based on the subsurface conditions encountered, including blow counts and laboratory testing, it is our opinion that the subject bridge sites meet criteria DR A F T Geotechnical Investigation Report Timberline Road Improvements Project City of Fort Collins, Colorado RockSol Project No. 579.01 15 March 27, 2020 for Seismic Site Class D, as defined by AASHTO LRFD Table 3.10.3.1-1. Shear wave velocity testing was not performed by RockSol. Soil conditions necessary for Site Class E and F were not encountered in RockSol’s boreholes. For final design, RockSol recommends performing shear wave velocity testing or performing penetration tests to a depth of 100 feet if determination of Seismic Site Class C conditions is necessary. Seismic design parameters for Seismic Site Class D are discussed below. 11.2 Seismic Design Parameters Seismic design parameters were obtained from the 2017 AASHTO Guide Specifications for LRFD Seismic Bridge Design. Interpolated values for Peak Ground Acceleration Coefficient (PGA), Spectral Response Acceleration Parameter for Short Period (Ss), and Spectral Response Acceleration Parameter at 1-s Period (S1) were obtained using Figures 3.10.2.1-1, 3.10.2.1-2 and 3.10.2.1-3 of the 2017 AASHTO Guide Specifications for LRFD Seismic Bridge Design for the project site. The seismic acceleration coefficients obtained from the Design Maps are presented in Table 11.1.1. Table 11.1.1 – Seismic Acceleration Coefficients Timberline Road Over Mail Creek Ditch Crossing (Latitude°/Longitude°) Peak Ground Acceleration (PGA) Spectral Acceleration Coefficient - Ss (Period 0.2 sec) Spectral Acceleration Coefficient - S1 (Period 1.0 sec) (40.506°/-105.039°) 0.060 0.125 0.033 The acceleration coefficients are then used to obtain Site Factors Fpga, Fa, and Fv based on the defined Site Class as shown in Tables 3.10.3.2-1, 3.10.3.2-2 and 3.10.3.2-3 of the 2017 AASHTO Guide Specifications for LRFD Seismic Bridge Design. A summary of the Site Factor values obtained are shown in Table 11.1.2. Table 11.1.2 – Seismic Site Factor Values Timberline Road Over Mail Creek Ditch Crossing (Latitude°/Longitude°) Fpga (at zero-period on acceleration spectrum) Fa (for short period range of acceleration spectrum) Fv (for long period range of acceleration spectrum) (40.506°/-105.039°) 1.60 1.60 2.40 Values for S1 and Fv are presented in Tables 11.1.1 and 11.1.2, shown above. The seismic design category was determined with the 2017 AASHTO Guide Specifications for LRFD Seismic Bridge Design Table 3.10.6-1. Table 11.1.3 summarizes the Seismic Design Category determination and horizontal response spectral Acceleration Coefficients (SDS and SD1) obtained for the proposed structure. Seismic Performance Zone determination is based on the value of the horizontal response spectral Acceleration Coefficient, SD1, as determined by Eq. 3.10.4.2-6 and SDS, as determined by Eq. 3.10.4.2-3 of the 2017 AASHTO Guide Specifications for LRFD Seismic Bridge Design. Table 11.1.3 – Seismic Performance Zone Timberline Road Over Mail Creek Ditch Crossing (Latitude°/Longitude°) Acceleration Coefficient (SD1) Seismic Zone (1) and Seismic Design Category Acceleration Coefficient, SDS (40.506°/-105.039°) 0.0792 1 and B 0.200 Note 1: Seismic Zone 1 is assigned when SD1 ≤ 0.15. Seismic Design Category B is assigned when 0.067 ≤ SD1 < 0.133 for Risk Category I or II or III. DR A F T Geotechnical Investigation Report Timberline Road Improvements Project City of Fort Collins, Colorado RockSol Project No. 579.01 16 March 27, 2020 12.0 OTHER DESIGN AND CONSTRUCTION CONSIDERATIONS Proper construction practices, in accordance with Larimer County Urban Area Street Standards (current edition), should be followed during site preparation, earthwork, excavations, and embankment and retaining wall construction for the suitable long-term performance of the proposed improvements. Excavation support should be provided to maintain onsite safety and the stability of excavations and slopes. Excavations shall be constructed in accordance with local, state and federal regulations including OSHA guidelines. The contractor must provide a competent person to determine compliance with OSHA excavation requirements. For preliminary planning, existing fill material and native soils may be considered as OSHA Type C soils. Surface drainage patterns may be altered during construction and local landscape irrigation (if any) must be controlled to prevent excessive moisture infiltration into the subgrade soils during and after construction. Environmentally contaminated material, if encountered, should be characterized and removed under the direction of the project environmental consultant. Design and construction plans should be reviewed, and onsite construction should be observed by the professional engineers. 13.0 LIMITATIONS This geotechnical investigation was conducted in general accordance with the scope of work. The geotechnical practices are similar to that used in the Colorado Front Range area with similar soil conditions and our understanding of the proposed work. This report has been prepared for use by J-U-B Engineers, Inc. and the City of Fort Collins for the project described in this report. The report is based on our exploratory boreholes and does not consider variations in the subsurface conditions that may exist between boreholes. Additional investigation is required to address such variation. If during construction activities, materials or water conditions appear to be different from those described herein, RockSol should be advised at once so that a re-evaluation of the recommendations presented in this report can be made. RockSol is not responsible for liability associated with interpretation of subsurface data by others. DR A F T N 0 100 200 SCALE IN FEET MA T C H L I N E A MA T C H L I N E A MA T C H L I N E B N 0 100 200 SCALE IN FEET N 0 100 200 SCALE IN FEET MA T C H L I N E B LEGEND SO U T H E N D O F P R O J E C T NO R T H E N D O F P R O J E C T DR A F T Geotechnical Investigation Report Timberline Road Improvements Project City of Fort Collins, Colorado RockSol Project No. 579.01 March 27, 2020 APPENDIX A LEGEND AND INDIVIDUAL BOREHOLE LOGS DR A F T CLIENT J-U-B Engineers, Inc. PROJECT NUMBER 579.01 PROJECT NAME Timberline Road Improvements PROJECT LOCATION Fort Collins, CO LITHOLOGY LEGEND Asphalt Pavement Fill - Aggregate Base Course Fill - CLAY, sandy TOPSOIL Native - SAND, silty Native - SAND, gravelly Native - SAND, clayey Native - CLAY, sandy SAMPLE TYPE Auger Cuttings MODIFIED CALIFORNIA SAMPLER 2.5" O.D. AND 2" I.D. WITH BRASS LINERS INCLUDED SPLIT SPOON SAMPLER 2" O.D. AND 1 3/8" I.D. NO LINERS Fines Content indicates amount of material, by weight, passing the US No 200 Sieve (%) 15/12 Indicates 15 blows of a 140 pound hammer falling 30 inches was required to drive the sampler 12 inches. 50/11 Indicates 50 blows of a 140 pound hammer falling 30 inches was required to drive the sampler 11 inches. 5,5,5 Indicates 5 blows, 5 blows, 5 blows of a 140 pound hammer falling 30 inches was required to drive the sampler 18 inches. PR O J E C T L E G E N D 5 7 9 . 0 1 _ T I M B E R L I N E R O A D I M P R O V E M E N T S . G P J 3 / 3 0 / 2 0 GROUND WATER LEVEL AT TIME OF DRILLING DR A F T BULK MC MC MC MC MC MC MC 9/12 5/12 6/12 3/12 12/12 11/12 8/12 -0.1 -0.4 0.00 0.00 115.9 97.2 105.2 117.7 117.6 108.5 106.7 17.6 23.1 21.6 17.2 14.6 20.9 21.8 39 31 15 12 24 19 Asphalt pavement, approximately 7.5" thick Aggregate base course, approximately 1' thick (Fill) CLAY, sandy, trace gravel in parts, moist, tan to brown, stiff (Native) CLAY, sandy, moist, light brown, medium stiff (Native) SAND, clayey, moist, brown to reddish brown, loose (Native) SAND, with gravel, moist, brown to reddish brown, medium dense (Native) SAND, clayey, very moist to wet, gray with yellow, medium dense (Native) SAND, clayey, very moist, gray with yellow, loose 53.3 30.4 45.2 45.2 DRILLING CONTRACTOR Old Dirt Drilling COMPLETED 1/22/20 NOTES Right shoulder, 1 ft W of white edge line for bike lane LOGGED BY M. Philips GROUND WATER LEVELS: DRILLING CONTRACTOR Old Dirt Drilling DATE STARTED 1/22/20 COMPLETED 1/22/20 NOTES Right shoulder, 1 ft W of white edge line for bike lane LOGGED BY M. Philips DATE STARTED 1/22/20 HOLE SIZE 4.0" WATER DEPTH 16.0 ft on 1/22/20 DRILLING METHOD Solid Stem Auger NORTH 101501.6 EAST 205224.7 GROUND ELEVATION 4963.9 ft BORING LOCATION:SB Timberline Rd, ~1,100 ft S of Kechter Rd ATTERBERG LIMITS SA M P L E T Y P E NU M B E R BL O W CO U N T S (N V A L U E ) SW E L L PO T E N T I A L ( % ) SU L F A T E ( % ) DR Y U N I T W T . (p c f ) MO I S T U R E CO N T E N T ( % ) DE P T H (f t ) 0 5 10 15 20 25 30 LI Q U I D LI M I T PL A S T I C LI M I T PL A S T I C I T Y IN D E X GR A P H I C LO G EL E V A T I O N (f t ) 4964 4959 4954 4949 4944 4939 4934 MATERIAL DESCRIPTION FI N E S C O N T E N T (% ) PAGE 1 OF 1 BORING : B-1 CLIENT J-U-B Engineers, Inc.PROJECT NAME Timberline Road Improvements ROCKSOL PROJECT NUMBER 579.01 CLIENT PROJECT NUMBER Fort Collins, CO LO G - C L I E N T S T A N D A R D 5 7 9 . 0 1 _ T I M B E R L I N E R O A D I M P R O V E M E N T S . G P J 3 / 3 0 / 2 0 Bottom of hole at 30.0 feet. DR A F T -0.3 -0.7 0.00 0.00 99.5 95.8 104.4 105.7 109.1 103.4 37 24 15 15 22 9 5/12 5/12 2/12 7/12 11/12 12/12 Asphalt pavement, approximately 8" thick Aggregate base course, approximately 1' thick (Native) CLAY, sandy, moist, brown, medium stiff (Native) CLAY, sandy, moist, brown, medium stiff (Native) SAND, clayey, grading to sandy CLAY in parts, moist to wet, light brown with red and gray, loose to medium dense BULK MC MC MC MC MC MC 24.2 25.3 22.7 21.6 20.6 23.3 76.0 43.8 58.1 DRILLING CONTRACTOR Old Dirt Drilling COMPLETED 1/23/20 NOTES Right lane, 1 ft W of white edge line LOGGED BY M. Philips GROUND WATER LEVELS: DATE STARTED 1/23/20 COMPLETED 1/23/20 NOTES Right lane, 1 ft W of white edge line HOLE SIZE 4.0" WATER DEPTH 17.0 ft on 1/23/20 DRILLING METHOD Solid Stem Auger NORTH 101451.0 EAST 205255.5 GROUND ELEVATION 4963.8 ft BORING LOCATION:NB Timberline Rd, ~1,150 ft S of Kechter Rd GROUND ELEVATION 4963.8 ft STATION NO. HAMMER TYPE Automatic ATTERBERG LIMITS SW E L L PO T E N T I A L ( % ) SU L F A T E ( % ) DR Y U N I T W T . (p c f ) LI Q U I D LI M I T PL A S T I C LI M I T PL A S T I C I T Y IN D E X GR A P H I C LO G DE P T H (f t ) 0 5 10 15 20 25 30 BL O W CO U N T S MATERIAL DESCRIPTION SA M P L E T Y P E MO I S T U R E CO N T E N T ( % ) FI N E S C O N T E N T (% ) EL E V A T I O N (f t ) 4963.8 4958.8 4953.8 4948.8 4943.8 4938.8 4933.8 PAGE 1 OF 1 BORING : B-2 CLIENT J-U-B Engineers, Inc. PROJECT NUMBER 579.01 PROJECT NAME Timberline Road Improvements PROJECT LOCATION Fort Collins, CO LO G - S T A N D A R D 5 7 9 . 0 1 _ T I M B E R L I N E R O A D I M P R O V E M E N T S . G P J 3 / 2 4 / 2 0 Bottom of hole at 30.0 feet. DR A F T 2.0 0.23 107.9 101.9 30 14 16 6/7/8 22/12 6/12 Asphalt pavement, approximately 7.5" thick (ABC) SAND, slightly silty to gravelly, slightly moist to moist, brown, medium dense, approximately 20.5" thick BULK SS MC MC 16.1 19.6 21.4 61.7 55.4 DRILLING CONTRACTOR Old Dirt Drilling COMPLETED 1/24/20 NOTES Left turn lane ~6 ft E of double yellow LOGGED BY M. Philips/S. Scott GROUND WATER LEVELS: DATE STARTED 1/24/20 COMPLETED 1/24/20 NOTES Left turn lane ~6 ft E of double yellow HOLE SIZE 4.0" WATER DEPTH None Encountered on 1/24/20 DRILLING METHOD Solid Stem Auger NORTH 97154.3 EAST 205242.3 GROUND ELEVATION 4925.4 ft BORING LOCATION:NB Timberline Rd ~200' S of Trilby Rd GROUND ELEVATION 4925.4 ft STATION NO. HAMMER TYPE Automatic ATTERBERG LIMITS SW E L L PO T E N T I A L ( % ) SU L F A T E ( % ) DR Y U N I T W T . (p c f ) LI Q U I D LI M I T PL A S T I C LI M I T PL A S T I C I T Y IN D E X GR A P H I C LO G DE P T H (f t ) 0.0 2.5 5.0 7.5 10.0 BL O W CO U N T S MATERIAL DESCRIPTION SA M P L E T Y P E MO I S T U R E CO N T E N T ( % ) FI N E S C O N T E N T (% ) EL E V A T I O N (f t ) 4925.4 4922.9 4920.4 4917.9 4915.4 PAGE 1 OF 1 BORING : P-1 CLIENT J-U-B Engineers, Inc. PROJECT NUMBER 579.01 PROJECT NAME Timberline Road Improvements PROJECT LOCATION Fort Collins, CO LO G - S T A N D A R D 5 7 9 . 0 1 _ T I M B E R L I N E R O A D I M P R O V E M E N T S . G P J 3 / 2 4 / 2 0 Bottom of hole at 10.0 feet. (Native) CLAY, sandy with gravel in parts, slightly moist to moist, very stiff to medium stiff, minor calcareous Approximate Bulk Depth 2.3-4 Liquid Limit= 30 Plastic Limit= 14 Plasticity Index= 16 Fines Content= 61.7 Sulfate= 0.23 DR A F T 0.5 0.02 109.3 101.7 33 16 17 4/5/5 9/12 6/12 Asphalt pavement, approximately 8" thick (ABC) SAND, slightly silty to gravelly, slightly moist, brown, medium dense, approximately 1' thick (Fill) CLAY, sandy with gravel in parts, slightly moist to moist, brown to gray, stiff Bottom of hole at 10.0 feet. BULK SS MC MC 19.0 21.0 23.7 73.3 71.2 DRILLING CONTRACTOR Old Dirt Drilling COMPLETED 1/23/20 NOTES Right lane ~7 ft S of curb LOGGED BY M. Philips GROUND WATER LEVELS: DATE STARTED 1/23/20 COMPLETED 1/23/20 NOTES Right lane ~7 ft S of curb HOLE SIZE 4.0" WATER DEPTH None Encountered on 1/23/20 DRILLING METHOD Solid Stem Auger NORTH 97398.8 EAST 205435.6 GROUND ELEVATION 4924.6 ft BORING LOCATION:WB Tribly Rd ~130' E of Timberline Rd GROUND ELEVATION 4924.6 ft STATION NO. HAMMER TYPE Automatic ATTERBERG LIMITS SW E L L PO T E N T I A L ( % ) SU L F A T E ( % ) DR Y U N I T W T . (p c f ) LI Q U I D LI M I T PL A S T I C LI M I T PL A S T I C I T Y IN D E X GR A P H I C LO G DE P T H (f t ) 0.0 2.5 5.0 7.5 10.0 BL O W CO U N T S MATERIAL DESCRIPTION SA M P L E T Y P E MO I S T U R E CO N T E N T ( % ) FI N E S C O N T E N T (% ) EL E V A T I O N (f t ) 4924.6 4922.1 4919.6 4917.1 4914.6 PAGE 1 OF 1 BORING : P-2 CLIENT J-U-B Engineers, Inc. PROJECT NUMBER 579.01 PROJECT NAME Timberline Road Improvements PROJECT LOCATION Fort Collins, CO LO G - S T A N D A R D 5 7 9 . 0 1 _ T I M B E R L I N E R O A D I M P R O V E M E N T S . G P J 3 / 2 4 / 2 0 (Native) CLAY, sandy, moist, gray, stiff to medium stiff Approximate Bulk Depth 1.67-4 Liquid Limit= 33 Plastic Limit= 16 Plasticity Index= 17 Fines Content= 73.3 Sulfate= 0.02 DR A F T BULK SS MC MC 3/2/3 7/12 5/12 0.6 0.06 97.4 97.3 19.4 26.9 22.9 28 14 14 Asphalt pavement, approximately 7.5" thick (ABC) SAND, slightly silty to gravelly, slightly moist to moist, brown, medium dense, approximately 10" thick (Fill) CLAY, sandy, slightly moist to moist, brown to light brown, medium stiff Bottom of hole at 10.0 feet. 55.0 54.4 DRILLING CONTRACTOR Old Dirt Drilling COMPLETED 1/23/20 NOTES Right shoulder, ~3 ft W of white edge line LOGGED BY M. Philips GROUND WATER LEVELS: DRILLING CONTRACTOR Old Dirt Drilling DATE STARTED 1/23/20 COMPLETED 1/23/20 NOTES Right shoulder, ~3 ft W of white edge line LOGGED BY M. Philips DATE STARTED 1/23/20 HOLE SIZE 4.0" WATER DEPTH None Encountered on 1/23/20 DRILLING METHOD Solid Stem Auger NORTH 97859.5 EAST 205224.3 GROUND ELEVATION 4930.2 ft BORING LOCATION:SB Timberline Rd, ~460' N of Trilby Rd ATTERBERG LIMITS SA M P L E T Y P E NU M B E R BL O W CO U N T S (N V A L U E ) SW E L L PO T E N T I A L ( % ) SU L F A T E ( % ) DR Y U N I T W T . (p c f ) MO I S T U R E CO N T E N T ( % ) DE P T H (f t ) 0.0 2.5 5.0 7.5 10.0 LI Q U I D LI M I T PL A S T I C LI M I T PL A S T I C I T Y IN D E X GR A P H I C LO G EL E V A T I O N (f t ) 4930.2 4927.7 4925.2 4922.7 4920.2 MATERIAL DESCRIPTION FI N E S C O N T E N T (% ) PAGE 1 OF 1 BORING : P-3 CLIENT J-U-B Engineers, Inc.PROJECT NAME Timberline Road Improvements ROCKSOL PROJECT NUMBER 579.01 CLIENT PROJECT NUMBER Fort Collins, CO LO G - C L I E N T S T A N D A R D 5 7 9 . 0 1 _ T I M B E R L I N E R O A D I M P R O V E M E N T S . G P J 3 / 2 5 / 2 0 (Native) CLAY, sandy, moist, brown to gray, medium stiff, slightly calcareous with iron staining Approximate Bulk Depth 1.5-4 Liquid Limit= 28 Plastic Limit= 14 Plasticity Index= 14 Fines Content= 55.0 Sulfate= 0.06 DR A F T 0.0 1.10 104.4 93.4 41 16 25 5/6/7 10/12 5/12 Asphalt pavement, approximately 7" thick (ABC) SAND, slighty silty to gravelly, moist, brown, medium dense, approximately 10" thick (Fill) CLAY, sandy, slightly moist to moist, brown with black, stiff to very stiff (Native) CLAY, sandy, brown, moist, medium stiff Bottom of hole at 10.0 feet. BULK SS MC MC 19.3 22.4 26.2 68.6 DRILLING CONTRACTOR Old Dirt Drilling COMPLETED 1/24/20 NOTES Right lane ~6 in W of white edge line LOGGED BY M. Philips/S. Scott GROUND WATER LEVELS: DATE STARTED 1/24/20 COMPLETED 1/24/20 NOTES Right lane ~6 in W of white edge line HOLE SIZE 4.0" WATER DEPTH None Encountered on 1/24/20 DRILLING METHOD Solid Stem Auger NORTH 98393.8 EAST 205277.1 GROUND ELEVATION 4935.8 ft BORING LOCATION:NB Timberline Rd, ~75' N of Westchase Rd GROUND ELEVATION 4935.8 ft STATION NO. HAMMER TYPE Automatic ATTERBERG LIMITS SW E L L PO T E N T I A L ( % ) SU L F A T E ( % ) DR Y U N I T W T . (p c f ) LI Q U I D LI M I T PL A S T I C LI M I T PL A S T I C I T Y IN D E X GR A P H I C LO G DE P T H (f t ) 0.0 2.5 5.0 7.5 10.0 BL O W CO U N T S MATERIAL DESCRIPTION SA M P L E T Y P E MO I S T U R E CO N T E N T ( % ) FI N E S C O N T E N T (% ) EL E V A T I O N (f t ) 4935.8 4933.3 4930.8 4928.3 4925.8 PAGE 1 OF 1 BORING : P-4 CLIENT J-U-B Engineers, Inc. PROJECT NUMBER 579.01 PROJECT NAME Timberline Road Improvements PROJECT LOCATION Fort Collins, CO LO G - S T A N D A R D 5 7 9 . 0 1 _ T I M B E R L I N E R O A D I M P R O V E M E N T S . G P J 3 / 2 4 / 2 0 (Native) CLAY, sandy, moist, gray to black to light brown, stiff to medium stiff, trace organics, calcareous Approximate Bulk Depth 1.5-7 Liquid Limit= 41 Plastic Limit= 16 Plasticity Index= 25 Fines Content= 68.6 Sulfate= 1.10DR A F T 0.3 0.44 110.9 100.7 36 20 16 15/13/14 11/12 6/12 Asphalt pavement, approximately 7.75" thick (ABC) SAND, slightly silty to gravelly, moist, brown, medium dense, approximatley 10" thick (Fill) CLAY, sandy with gravel in parts, slightly moist to moist, light brown, very stiff (Native) CLAY, sandy with trace gravel, moist to very moist, light brown, medium stiff Bottom of hole at 10.0 feet. BULK SS MC MC 17.6 19.2 22.4 52.4 DRILLING CONTRACTOR Old Dirt Drilling COMPLETED 1/24/20 NOTES 6 ft W of NB yellow line LOGGED BY M. Philips/S. Scott GROUND WATER LEVELS: DATE STARTED 1/24/20 COMPLETED 1/24/20 NOTES 6 ft W of NB yellow line HOLE SIZE 4.0" WATER DEPTH None Encountered on 1/24/20 DRILLING METHOD Solid Stem Auger NORTH 98867.3 EAST 205258.9 GROUND ELEVATION 4942.0 ft BORING LOCATION:Center lane Timberline Rd, ~200' S of Fossil Creek Pkwy GROUND ELEVATION 4942.0 ft STATION NO. HAMMER TYPE Automatic ATTERBERG LIMITS SW E L L PO T E N T I A L ( % ) SU L F A T E ( % ) DR Y U N I T W T . (p c f ) LI Q U I D LI M I T PL A S T I C LI M I T PL A S T I C I T Y IN D E X GR A P H I C LO G DE P T H (f t ) 0.0 2.5 5.0 7.5 10.0 BL O W CO U N T S MATERIAL DESCRIPTION SA M P L E T Y P E MO I S T U R E CO N T E N T ( % ) FI N E S C O N T E N T (% ) EL E V A T I O N (f t ) 4942.0 4939.5 4937.0 4934.5 4932.0 PAGE 1 OF 1 BORING : P-5 CLIENT J-U-B Engineers, Inc. PROJECT NUMBER 579.01 PROJECT NAME Timberline Road Improvements PROJECT LOCATION Fort Collins, CO LO G - S T A N D A R D 5 7 9 . 0 1 _ T I M B E R L I N E R O A D I M P R O V E M E N T S . G P J 3 / 2 4 / 2 0 (Native) CLAY, sandy with trace gravel, moist, light brown, stiff Approximate Bulk Depth 1.5-4 Liquid Limit= 36 Plastic Limit= 20 Plasticity Index= 16 Fines Content= 52.6 Sulfate= 0.44 DR A F T BULK SS MC MC 6/6/7 22/12 5/12 0.2 0.51 120.7 103.4 18.7 4.3 20.9 35 20 15 Asphalt pavement, approximately 8" thick (ABC) SAND, slightly silty to gravelly, moist, brown, medium dense, approximately 10" thick (Native) CLAY, sandy to silty with gravel, moist, light brown, medium stiff, slightly calcareous, minor organics Bottom of hole at 10.0 feet. 51.1 DRILLING CONTRACTOR Old Dirt Drilling COMPLETED 1/24/20 NOTES Right shoulder/Bike lane, ~4 in E of white edge line LOGGED BY M. Philips/S. Scott GROUND WATER LEVELS: DRILLING CONTRACTOR Old Dirt Drilling DATE STARTED 1/24/20 COMPLETED 1/24/20 NOTES Right shoulder/Bike lane, ~4 in E of white edge line LOGGED BY M. Philips/S. Scott DATE STARTED 1/24/20 HOLE SIZE 4.0" WATER DEPTH None Encountered on 1/24/20 DRILLING METHOD Solid Stem Auger NORTH 99366.3 EAST 205280.9 GROUND ELEVATION 4949.1 ft BORING LOCATION:NB Timberline Rd, ~270' N of Fossil Creek Pkwy ATTERBERG LIMITS SA M P L E T Y P E NU M B E R BL O W CO U N T S (N V A L U E ) SW E L L PO T E N T I A L ( % ) SU L F A T E ( % ) DR Y U N I T W T . (p c f ) MO I S T U R E CO N T E N T ( % ) DE P T H (f t ) 0.0 2.5 5.0 7.5 10.0 LI Q U I D LI M I T PL A S T I C LI M I T PL A S T I C I T Y IN D E X GR A P H I C LO G EL E V A T I O N (f t ) 4949.1 4946.6 4944.1 4941.6 4939.1 MATERIAL DESCRIPTION FI N E S C O N T E N T (% ) PAGE 1 OF 1 BORING : P-6 CLIENT J-U-B Engineers, Inc.PROJECT NAME Timberline Road Improvements ROCKSOL PROJECT NUMBER 579.01 CLIENT PROJECT NUMBER Fort Collins, CO LO G - C L I E N T S T A N D A R D 5 7 9 . 0 1 _ T I M B E R L I N E R O A D I M P R O V E M E N T S . G P J 3 / 2 5 / 2 0 (Fill) CLAY, sandy with gravel, moist, brown to dark brown to black, stiff to very stiff Approximate Bulk Depth 1.5-4 Liquid Limit= 35 Plastic Limit= 20 Plasticity Index= 15 Fines Content= 51.1 Sulfate= 0.51 DR A F T 1.0 0.01 106.1 108.3 34 10 24 4/5/5 7/12 9/12 Asphalt pavement, approximately 7.5" thick (ABC) SAND, slightly silty to gravelly, slightl moist to moist, brown, medium dense, approximately 10" thick (Native) SAND, silty to clayey, moist, tan, loose Bottom of hole at 10.0 feet. BULK SS MC MC 17.2 19.8 18.5 68.7 62.7 DRILLING CONTRACTOR Old Dirt Drilling COMPLETED 1/22/20 NOTES ~5 ft W of NB yellow line LOGGED BY M. Philips GROUND WATER LEVELS: DATE STARTED 1/22/20 COMPLETED 1/22/20 NOTES ~5 ft W of NB yellow line HOLE SIZE 4.0" WATER DEPTH None Encountered on 1/22/20 DRILLING METHOD Solid Stem Auger NORTH 99932.1 EAST 205261.8 GROUND ELEVATION 4961.6 ft BORING LOCATION:Center turn lane Timberline Rd, ~100' N of Rosen Dr. GROUND ELEVATION 4961.6 ft STATION NO. HAMMER TYPE Automatic ATTERBERG LIMITS SW E L L PO T E N T I A L ( % ) SU L F A T E ( % ) DR Y U N I T W T . (p c f ) LI Q U I D LI M I T PL A S T I C LI M I T PL A S T I C I T Y IN D E X GR A P H I C LO G DE P T H (f t ) 0.0 2.5 5.0 7.5 10.0 BL O W CO U N T S MATERIAL DESCRIPTION SA M P L E T Y P E MO I S T U R E CO N T E N T ( % ) FI N E S C O N T E N T (% ) EL E V A T I O N (f t ) 4961.6 4959.1 4956.6 4954.1 4951.6 PAGE 1 OF 1 BORING : P-7 CLIENT J-U-B Engineers, Inc. PROJECT NUMBER 579.01 PROJECT NAME Timberline Road Improvements PROJECT LOCATION Fort Collins, CO LO G - S T A N D A R D 5 7 9 . 0 1 _ T I M B E R L I N E R O A D I M P R O V E M E N T S . G P J 3 / 2 4 / 2 0 (Native) CLAY, sandy, moist, grayish brown, medium stiff Approximate Bulk Depth 1.67-4 Liquid Limit= 34 Plastic Limit= 10 Plasticity Index= 24 Fines Content= 68.7 Sulfate= 0.01 DR A F T 0.6 0.00 107.6 99.5 39 14 25 3/3/5 13/12 4/12 Asphalt pavement, approximately 7.5" thick (ABC) SAND, slightly silty to gravelly, slightly moist to moist, brown, medium dense, approximately 8.5" thick (Fill) CLAY, sandy, slightly moist to moist, brown, medium stiff to stiff (Native) CLAY, sandy, very moist, light brown, soft to medium stiff BULK SS MC MC 23.1 18.8 23.2 71.7 DRILLING CONTRACTOR Old Dirt Drilling COMPLETED 1/24/20 NOTES Right shoulder, ~1 ft N of bike lane white edge line LOGGED BY M. Philips/S. Scott GROUND WATER LEVELS: DATE STARTED 1/24/20 COMPLETED 1/24/20 NOTES Right shoulder, ~1 ft N of bike lane white edge line HOLE SIZE 4.0" WATER DEPTH None Encountered on 1/24/20 DRILLING METHOD Solid Stem Auger NORTH 100376.3 EAST 205536.7 GROUND ELEVATION 4957.5 ft BORING LOCATION:WB Zephyr Rd, ~250' E of Timberline Rd GROUND ELEVATION 4957.5 ft STATION NO. HAMMER TYPE Automatic ATTERBERG LIMITS SW E L L PO T E N T I A L ( % ) SU L F A T E ( % ) DR Y U N I T W T . (p c f ) LI Q U I D LI M I T PL A S T I C LI M I T PL A S T I C I T Y IN D E X GR A P H I C LO G DE P T H (f t ) 0.0 2.5 5.0 7.5 10.0 BL O W CO U N T S MATERIAL DESCRIPTION SA M P L E T Y P E MO I S T U R E CO N T E N T ( % ) FI N E S C O N T E N T (% ) EL E V A T I O N (f t ) 4957.5 4955.0 4952.5 4950.0 4947.5 PAGE 1 OF 1 BORING : P-8 CLIENT J-U-B Engineers, Inc. PROJECT NUMBER 579.01 PROJECT NAME Timberline Road Improvements PROJECT LOCATION Fort Collins, CO LO G - S T A N D A R D 5 7 9 . 0 1 _ T I M B E R L I N E R O A D I M P R O V E M E N T S . G P J 3 / 2 4 / 2 0 Bottom of hole at 10.0 feet. (Native) CLAY, sandy with trace gravel, moist, light brown, stiff, iron staining at 4' Approximate Bulk Depth 1.3-7 Liquid Limit= 39 Plastic Limit= 14 Plasticity Index= 25 Fines Content= 71.7 Sulfate= 0.00 DR A F T BULK SS MC MC 2/3/4 17/12 7/12 2.0 0.00 113.8 105.7 15.3 17.6 20.3 31 14 17 Asphalt pavement, approximately 7.75" inches thick (ABC) SAND, slightly silty to gravelly, slightly moist, brown, medium dense, approximately 10" thick (Fill) CLAY, sandy with gravel in parts, slightly moist to moist, brown, medium stiff Bottom of hole at 10.0 feet. 56.9 46.6 DRILLING CONTRACTOR Old Dirt Drilling COMPLETED 1/23/20 NOTES In bike lane, ~2 ft E of left bike lane white edge line LOGGED BY M. Philips GROUND WATER LEVELS: DRILLING CONTRACTOR Old Dirt Drilling DATE STARTED 1/23/20 COMPLETED 1/23/20 NOTES In bike lane, ~2 ft E of left bike lane white edge line LOGGED BY M. Philips DATE STARTED 1/23/20 HOLE SIZE 4.0" WATER DEPTH None Encountered on 1/23/20 DRILLING METHOD Solid Stem Auger NORTH 100405.5 EAST 205229.9 GROUND ELEVATION 4962.2 ft BORING LOCATION:SB Timberline Rd, ~40' N of Zephyr Rd ATTERBERG LIMITS SA M P L E T Y P E NU M B E R BL O W CO U N T S (N V A L U E ) SW E L L PO T E N T I A L ( % ) SU L F A T E ( % ) DR Y U N I T W T . (p c f ) MO I S T U R E CO N T E N T ( % ) DE P T H (f t ) 0.0 2.5 5.0 7.5 10.0 LI Q U I D LI M I T PL A S T I C LI M I T PL A S T I C I T Y IN D E X GR A P H I C LO G EL E V A T I O N (f t ) 4962.2 4959.7 4957.2 4954.7 4952.2 MATERIAL DESCRIPTION FI N E S C O N T E N T (% ) PAGE 1 OF 1 BORING : P-9 CLIENT J-U-B Engineers, Inc.PROJECT NAME Timberline Road Improvements ROCKSOL PROJECT NUMBER 579.01 CLIENT PROJECT NUMBER Fort Collins, CO LO G - C L I E N T S T A N D A R D 5 7 9 . 0 1 _ T I M B E R L I N E R O A D I M P R O V E M E N T S . G P J 3 / 2 5 / 2 0 (Native) CLAY, sandy, grading to clayey SAND in parts, slightly moist to moist, brown, very stiff to medium stiff, minor calcareous Approximate Bulk Depth 1.5-4 Liquid Limit= 31 Plastic Limit= 14 Plasticity Index= 17 Fines Content= 56.9 Sulfate= 0.00DR A F T BULK SS MC MC 2/3/3 8/12 6/12 1.2 0.04 102.3 104.6 28.0 21.4 22.5 38 18 20 Asphalt pavement, approximately 8" thick (ABC) SAND, slightly silty to gravelly, moist, brown, medium dense, approximately 8" thick (Fill) CLAY, minor gravel in parts, moist, brown with black in parts, medium stiff 64.5 74.8 DRILLING CONTRACTOR Old Dirt Drilling COMPLETED 1/24/20 NOTES Right shoulder, ~4 ft E of white edge line LOGGED BY M. Philips/S. Scott GROUND WATER LEVELS: DRILLING CONTRACTOR Old Dirt Drilling DATE STARTED 1/24/20 COMPLETED 1/24/20 NOTES Right shoulder, ~4 ft E of white edge line LOGGED BY M. Philips/S. Scott DATE STARTED 1/24/20 HOLE SIZE 4.0" WATER DEPTH None Encountered on 1/24/20 DRILLING METHOD Solid Stem Auger NORTH 100881.4 EAST 205271.6 GROUND ELEVATION 4960.3 ft BORING LOCATION:NB Timberline Rd, ~500' N of Zephyr Rd ATTERBERG LIMITS SA M P L E T Y P E NU M B E R BL O W CO U N T S (N V A L U E ) SW E L L PO T E N T I A L ( % ) SU L F A T E ( % ) DR Y U N I T W T . (p c f ) MO I S T U R E CO N T E N T ( % ) DE P T H (f t ) 0.0 2.5 5.0 7.5 10.0 LI Q U I D LI M I T PL A S T I C LI M I T PL A S T I C I T Y IN D E X GR A P H I C LO G EL E V A T I O N (f t ) 4960.3 4957.8 4955.3 4952.8 4950.3 MATERIAL DESCRIPTION FI N E S C O N T E N T (% ) PAGE 1 OF 1 BORING : P-10 CLIENT J-U-B Engineers, Inc.PROJECT NAME Timberline Road Improvements ROCKSOL PROJECT NUMBER 579.01 CLIENT PROJECT NUMBER Fort Collins, CO LO G - C L I E N T S T A N D A R D 5 7 9 . 0 1 _ T I M B E R L I N E R O A D I M P R O V E M E N T S . G P J 3 / 2 5 / 2 0 Bottom of hole at 10.0 feet. (Native) CLAY, sandy to slightly silty, moist to very moist, light brown, medium stiff to stiff, minor calcareous Approximate Bulk Depth 1.3-4 Liquid Limit= 38 Plastic Limit= 18 Plasticity Index= 20 Fines Content= 64.5 Sulfate= 0.04 DR A F T BULK SS MC MC 6/6/7 5/12 2/12 0.9 0.22 100.6 92.3 15.4 21.8 21.8 30 17 13 Asphalt pavement, approximately 8" thick (ABC) SAND, slilghtly silty to gravelly, slightly moist to moist, brown, medium dense, approximately 10" thick (Fill) CLAY, sandy, moist, light brown, stiff, calcarerous (Native) CLAY, sandy, trace gravel in parts, slightly moist to moist, light brown to reddish brown, soft Bottom of hole at 10.0 feet. 61.8 DRILLING CONTRACTOR Old Dirt Drilling COMPLETED 1/23/20 NOTES Right lane, ~4 inches W of white edge line LOGGED BY M. Philips GROUND WATER LEVELS: DRILLING CONTRACTOR Old Dirt Drilling DATE STARTED 1/23/20 COMPLETED 1/23/20 NOTES Right lane, ~4 inches W of white edge line LOGGED BY M. Philips DATE STARTED 1/23/20 HOLE SIZE 4.0" WATER DEPTH None Encountered on 1/23/20 DRILLING METHOD Solid Stem Auger NORTH 101870.8 EAST 205255.3 GROUND ELEVATION 4961.1 ft BORING LOCATION:NB Timberline Rd, ~745' S of Kechter Rd ATTERBERG LIMITS SA M P L E T Y P E NU M B E R BL O W CO U N T S (N V A L U E ) SW E L L PO T E N T I A L ( % ) SU L F A T E ( % ) DR Y U N I T W T . (p c f ) MO I S T U R E CO N T E N T ( % ) DE P T H (f t ) 0.0 2.5 5.0 7.5 10.0 LI Q U I D LI M I T PL A S T I C LI M I T PL A S T I C I T Y IN D E X GR A P H I C LO G EL E V A T I O N (f t ) 4961.1 4958.6 4956.1 4953.6 4951.1 MATERIAL DESCRIPTION FI N E S C O N T E N T (% ) PAGE 1 OF 1 BORING : P-11 CLIENT J-U-B Engineers, Inc.PROJECT NAME Timberline Road Improvements ROCKSOL PROJECT NUMBER 579.01 CLIENT PROJECT NUMBER Fort Collins, CO LO G - C L I E N T S T A N D A R D 5 7 9 . 0 1 _ T I M B E R L I N E R O A D I M P R O V E M E N T S . G P J 3 / 2 5 / 2 0 (Native) CLAY, sandy, trace gravel in parts, slightly moist to moist, light brown to reddish brown, medium stiff, lightly calcareous Approximate Bulk Depth 1.5-4 Liquid Limit= 30 Plastic Limit= 17 Plasticity Index= 13 Fines Content= 61.8 Sulfate= 0.22DR A F T BULK SS MC MC 6/5/5 9/12 5/12 1.2 0.13 102.0 92.8 21.9 23.9 18.6 36 18 18 Asphalt pavement, approximately 8.25" thick (ABC) SAND, slightly silty to gravelly, slightly moist to moist, brown, medium dense, approximately 13" thick (Fill) CLAY, slightly moist, dark gray to black, stiff (Native) CLAY, sandy with trace gravel, moist, light brown, calcareous, medium stiff 58.2 55.2 DRILLING CONTRACTOR Old Dirt Drilling COMPLETED 1/23/20 NOTES Right shoulder, ~1 ft W of white edge line LOGGED BY M. Philips GROUND WATER LEVELS: DRILLING CONTRACTOR Old Dirt Drilling DATE STARTED 1/23/20 COMPLETED 1/23/20 NOTES Right shoulder, ~1 ft W of white edge line LOGGED BY M. Philips DATE STARTED 1/23/20 HOLE SIZE 4.0" WATER DEPTH None Encountered on 1/23/20 DRILLING METHOD Solid Stem Auger NORTH 102342.7 EAST 205221.3 GROUND ELEVATION 4958.4 ft BORING LOCATION:SB Timberline Rd, ~275' S of Kechter Rd ATTERBERG LIMITS SA M P L E T Y P E NU M B E R BL O W CO U N T S (N V A L U E ) SW E L L PO T E N T I A L ( % ) SU L F A T E ( % ) DR Y U N I T W T . (p c f ) MO I S T U R E CO N T E N T ( % ) DE P T H (f t ) 0.0 2.5 5.0 7.5 10.0 LI Q U I D LI M I T PL A S T I C LI M I T PL A S T I C I T Y IN D E X GR A P H I C LO G EL E V A T I O N (f t ) 4958.4 4955.9 4953.4 4950.9 4948.4 MATERIAL DESCRIPTION FI N E S C O N T E N T (% ) PAGE 1 OF 1 BORING : P-12 CLIENT J-U-B Engineers, Inc.PROJECT NAME Timberline Road Improvements ROCKSOL PROJECT NUMBER 579.01 CLIENT PROJECT NUMBER Fort Collins, CO LO G - C L I E N T S T A N D A R D 5 7 9 . 0 1 _ T I M B E R L I N E R O A D I M P R O V E M E N T S . G P J 3 / 2 5 / 2 0 Bottom of hole at 10.0 feet. (Native) CLAY, sandy with trace gravel, moist, brown to black, stiff, iron staining Approximate Bulk Depth 1.75-4 Liquid Limit= 36 Plastic Limit= 18 Plasticity Index= 18 Fines Content= 58.2 Sulfate= 0.13DR A F T BULK SS MC MC 12/28/24 9/12 4/12 0.5 0.20 110.5 101.6 11.7 17.9 18.9 32 19 13 Gravel, sandy, landscape area, approximately 6" thick (Native) CLAY, sandy with gravel in parts, moist, light brown, medium stiff (Native) CLAY, sandy with gravel in parts, moist, light brown, soft to medium stiff Bottom of hole at 10.0 feet. 55.8 DRILLING CONTRACTOR Old Dirt Drilling COMPLETED 1/22/20 NOTES Off-shoulder, ~15 ft E of white edge line LOGGED BY M. Philips GROUND WATER LEVELS: DRILLING CONTRACTOR Old Dirt Drilling DATE STARTED 1/22/20 COMPLETED 1/22/20 NOTES Off-shoulder, ~15 ft E of white edge line LOGGED BY M. Philips DATE STARTED 1/22/20 HOLE SIZE 4.0" WATER DEPTH None Encountered on 1/22/20 DRILLING METHOD Solid Stem Auger NORTH 102845.3 EAST 205271.6 GROUND ELEVATION 4956.5 ft BORING LOCATION:NB Timberline, ~185' N of Kechter Rd ATTERBERG LIMITS SA M P L E T Y P E NU M B E R BL O W CO U N T S (N V A L U E ) SW E L L PO T E N T I A L ( % ) SU L F A T E ( % ) DR Y U N I T W T . (p c f ) MO I S T U R E CO N T E N T ( % ) DE P T H (f t ) 0.0 2.5 5.0 7.5 10.0 LI Q U I D LI M I T PL A S T I C LI M I T PL A S T I C I T Y IN D E X GR A P H I C LO G EL E V A T I O N (f t ) 4956.5 4954.0 4951.5 4949.0 4946.5 MATERIAL DESCRIPTION FI N E S C O N T E N T (% ) PAGE 1 OF 1 BORING : P-13 CLIENT J-U-B Engineers, Inc.PROJECT NAME Timberline Road Improvements ROCKSOL PROJECT NUMBER 579.01 CLIENT PROJECT NUMBER Fort Collins, CO LO G - C L I E N T S T A N D A R D 5 7 9 . 0 1 _ T I M B E R L I N E R O A D I M P R O V E M E N T S . G P J 3 / 2 5 / 2 0 (Fill) CLAY, sandy with gravel, moist, brown to light brown, hard to stiff Approximate Bulk Depth 0.5-4 Liquid Limit= 32 Plastic Limit= 19 Plasticity Index= 13 Fines Content= 55.8 Sulfate= 0.20 DR A F T BULK SS MC MC 5/6/7 10/12 17/12 0.4 0.10 105.5 119.4 18.3 19.4 14.3 34 15 19 Asphalt pavement, approximately 7.5" thick (ABC) SAND, slightly silty to gravelly, slightly moist to moist, brown, medium dense, approximately 7" thick (Native) SAND, clayey, moist, light brown, medium dense 64.2 DRILLING CONTRACTOR Old Dirt Drilling COMPLETED 1/22/20 NOTES 6 ft W of NB yellow line (center turn lane) LOGGED BY M. Philips GROUND WATER LEVELS: DRILLING CONTRACTOR Old Dirt Drilling DATE STARTED 1/22/20 COMPLETED 1/22/20 NOTES 6 ft W of NB yellow line (center turn lane) LOGGED BY M. Philips DATE STARTED 1/22/20 HOLE SIZE 4.0" WATER DEPTH None Encountered on 1/22/20 DRILLING METHOD Solid Stem Auger NORTH 103391.5 EAST 205248.3 GROUND ELEVATION 4954.3 ft BORING LOCATION:Center lane Timberline Rd, ~800 ft N of Kechter Rd ATTERBERG LIMITS SA M P L E T Y P E NU M B E R BL O W CO U N T S (N V A L U E ) SW E L L PO T E N T I A L ( % ) SU L F A T E ( % ) DR Y U N I T W T . (p c f ) MO I S T U R E CO N T E N T ( % ) DE P T H (f t ) 0.0 2.5 5.0 7.5 10.0 LI Q U I D LI M I T PL A S T I C LI M I T PL A S T I C I T Y IN D E X GR A P H I C LO G EL E V A T I O N (f t ) 4954.3 4951.8 4949.3 4946.8 4944.3 MATERIAL DESCRIPTION FI N E S C O N T E N T (% ) PAGE 1 OF 1 BORING : P-14 CLIENT J-U-B Engineers, Inc.PROJECT NAME Timberline Road Improvements ROCKSOL PROJECT NUMBER 579.01 CLIENT PROJECT NUMBER Fort Collins, CO LO G - C L I E N T S T A N D A R D 5 7 9 . 0 1 _ T I M B E R L I N E R O A D I M P R O V E M E N T S . G P J 3 / 2 5 / 2 0 Bottom of hole at 10.0 feet. (Native) CLAY, sandy, moist, light brown, stiff Approximate Bulk Depth 1.16-7 Liquid Limit= 34 Plastic Limit= 15 Plasticity Index= 19 Fines Content= 64.2 Sulfate= 0.10 DR A F T BULK SS MC MC 12/10/9 12/12 15/12 0.3 0.03 100.9 106.2 13.2 23.8 22.5 30 15 15 Asphalt pavement, approximately 7.5" thick (ABC) SAND, slightly silty to gravelly, slightly moist to moist, brown, medium dense, approximately 12" thick (Native) CLAY, sandy, moist, brown, very stiff Bottom of hole at 10.0 feet. 52.1 DRILLING CONTRACTOR Old Dirt Drilling COMPLETED 1/22/20 NOTES Right shoulder, ~1.5 ft W of white edge line LOGGED BY M. Philips GROUND WATER LEVELS: DRILLING CONTRACTOR Old Dirt Drilling DATE STARTED 1/22/20 COMPLETED 1/22/20 NOTES Right shoulder, ~1.5 ft W of white edge line LOGGED BY M. Philips DATE STARTED 1/22/20 HOLE SIZE 4.0" WATER DEPTH None Encountered on 1/22/20 DRILLING METHOD Solid Stem Auger NORTH 103882.6 EAST 205225.8 GROUND ELEVATION 4944.9 ft BORING LOCATION:SB Timberline Rd, ~1300 ft N of Kechter Rd ATTERBERG LIMITS SA M P L E T Y P E NU M B E R BL O W CO U N T S (N V A L U E ) SW E L L PO T E N T I A L ( % ) SU L F A T E ( % ) DR Y U N I T W T . (p c f ) MO I S T U R E CO N T E N T ( % ) DE P T H (f t ) 0.0 2.5 5.0 7.5 10.0 LI Q U I D LI M I T PL A S T I C LI M I T PL A S T I C I T Y IN D E X GR A P H I C LO G EL E V A T I O N (f t ) 4944.9 4942.4 4939.9 4937.4 4934.9 MATERIAL DESCRIPTION FI N E S C O N T E N T (% ) PAGE 1 OF 1 BORING : P-15 CLIENT J-U-B Engineers, Inc.PROJECT NAME Timberline Road Improvements ROCKSOL PROJECT NUMBER 579.01 CLIENT PROJECT NUMBER Fort Collins, CO LO G - C L I E N T S T A N D A R D 5 7 9 . 0 1 _ T I M B E R L I N E R O A D I M P R O V E M E N T S . G P J 3 / 2 5 / 2 0 (Native) CLAY, sandy, moist, light brown to grayish brown, stiff to very stiff, calcareous Approximate Bulk Depth 1.67-7 Liquid Limit= 30 Plastic Limit= 15 Plasticity Index= 15 Fines Content= 52.1 Sulfate= 0.03DR A F T Geotechnical Investigation Report Timberline Road Improvements Project City of Fort Collins, Colorado RockSol Project No. 579.01 March 27, 2020 APPENDIX B PAVEMENT CORE LOG SUMMARY DR A F T Geotechnical Investigation Report Timberline Road Improvements Project City of Fort Collins, Colorado RockSol Project No. 579.01 March 27, 2020 CORE ID: C-1 General Location: Timberline Rd, ~200 ft S of Trilby Rd Lane Location: Northbound Left Turn Lane Description: Thickness of Asphalt Pavement: NP Thickness of Concrete Pavement: 10.00 inches Thickness of Aggregate Base Course: NP Condition of Asphalt: N/A Condition of Concrete: Good Diameter of Core: 4 inches Aggregate Base Course (ABC) Present: Yes No Approximate Layer Thicknesses: One Layer: 10.00” – Concrete Date Core Obtained: 1-24-2020 Notes: DR A F T Geotechnical Investigation Report Timberline Road Improvements Project City of Fort Collins, Colorado RockSol Project No. 579.01 March 27, 2020 CORE ID: C-2 General Location: Fossil Creek Pkwy, ~80 ft E of Timberline Rd Lane Location: Eastbound Right Lane Description: Thickness of Asphalt Pavement: 6.75 inches Thickness of Concrete Pavement: NP Thickness of Aggregate Base Course: NP Condition of Asphalt: Good Condition of Concrete: N/A Diameter of Core: 4 inches Aggregate Base Course (ABC) Present: Yes No Approximate Layer Thicknesses*: Top Layer: 2.25” – Asphalt Lift Middle Layer: 2.00” – Asphalt Lift Bottom Layer: 2.50” – Asphalt Lift *Asphalt Layers not well defined Date Core Obtained: 1-24-2020 Notes: DR A F T Geotechnical Investigation Report Timberline Road Improvements Project City of Fort Collins, Colorado RockSol Project No. 579.01 March 27, 2020 CORE ID: C-3 General Location: Kechter Rd, ~150 ft E of Timberline Rd Lane Location: Westbound Left Turn Lane Description: Thickness of Asphalt Pavement: 7.00 inches Thickness of Concrete Pavement: NP Thickness of Aggregate Base Course: NP Condition of Asphalt: Good Condition of Concrete: N/A Diameter of Core: 4 inches Aggregate Base Course (ABC) Present: Yes No Approximate Layer Thicknesses*: Top Layer: 2.75” – Asphalt Lift Middle Layer: ~2.00” – Asphalt Lift Bottom Layer: ~2.25” – Asphalt Lift *Asphalt Layers not well defined Date Core Obtained: 1-24-2020 Notes: DR A F T Geotechnical Investigation Report Timberline Road Improvements Project City of Fort Collins, Colorado RockSol Project No. 579.01 March 27, 2020 CORE ID: C-4 General Location: Timberline Rd, ~230 ft N of Kechter Rd Lane Location: Northbound Right Shoulder Description: Thickness of Asphalt Pavement: 9.75 inches Thickness of Concrete Pavement: NP Thickness of Aggregate Base Course: NP Condition of Asphalt: Good Condition of Concrete: N/A Diameter of Core: 4 inches Aggregate Base Course (ABC) Present: Yes No Approximate Layer Thicknesses*: Top Layer: 3.00” – Asphalt Lift 2nd Layer: 3.75” – Asphalt Lift Bottom Layer: 3.00” – Asphalt Lift *Asphalt Layers not well defined Date Core Obtained: 1-24-2020 Notes: Bottom ~0.5 inches partially recovered DR A F T Geotechnical Investigation Report Timberline Road Improvements Project City of Fort Collins, Colorado RockSol Project No. 579.01 March 27, 2020 APPENDIX C SUMMARY OF LABORATORY TEST RESULTS DR A F T B-1 1.667-9 B-1 2 17.6 115.9 B-1 4 -0.1 23.1 97.2 0.00 B-1 9 39 15 24 -0.4 53 CL A-6 (9) 21.6 105.2 0.00 B-1 14 30 17.2 117.7 B-1 19 14.6 117.6 B-1 24 31 12 19 45 SC A-6 (4) 20.9 108.5 B-1 29 45 21.8 106.7 B-2 2-10 B-2 4 -0.3 76 24.2 99.5 0.00 B-2 9 37 15 22 -0.7 25.3 95.8 B-2 14 44 22.7 104.4 0.00 B-2 17 B-2 19 21.6 105.7 B-2 24 24 15 9 58 CL A-4 (2) 20.6 109.1 B-2 29 23.3 103.4 P-1 2.3-4 30 14 16 62 CL A-6 (7)0.23 P-1 2.33 55 16.1 P-1 4 2.0 19.6 107.9 P-1 9 21.4 101.9 P-2 1.67 71 19.0 P-2 1.7-4 33 16 17 73 CL A-6 (10)0.02 P-2 4 0.5 21.0 109.3 P-2 9 23.7 101.7 P-3 1.45 54 19.4 P-3 1.5-4 28 14 14 55 CL A-6 (4)0.06 P-3 4 0.6 26.9 97.4 P-3 9 22.9 97.3 P-4 1.45 19.3 P-4 1.5-7 41 16 25 69 CL A-7-6 (15)1.10 Swell Potential (%) Water Content (%) pH S/MMDD S=Standard M=ModifiedBoreholeLiquid Limit Plastic Limit OMC Plasticity Index %<#200 Sieve Classification Sulfate (%) Proctor USCS Chlorides (%) Resistivity (ohm-cm) Depth (ft) SUMMARY OF PHYSICAL & CHEMICAL TEST RESULTS PAGE 1 OF 3 Dry Density (pcf)AASHTO Unconfined Compressive Strength (psi) CLIENT J-U-B Engineers, Inc. PROJECT NUMBER 579.01 PROJECT NAME Timberline Road Improvements PROJECT LOCATION Fort Collins, CO SU M M A R Y - S T A N D A R D L A N D S C A P E C D O T S P A C I N G 5 7 9 . 0 1 _ T I M B E R L I N E R O A D I M P R O V E M E N T S . G P J 3 / 3 0 / 2 0 DR A F T P-4 4 0.0 22.4 104.4 P-4 9 26.2 93.4 P-5 1.45 17.6 P-5 1.5-4 36 20 16 52 CL A-6 (5)0.44 P-5 4 0.3 19.2 110.9 P-5 9 22.4 100.7 P-6 1.5 18.7 P-6 1.6-4 35 20 15 51 CL A-6 (5)0.51 P-6 4 0.2 4.3 120.7 P-6 9 20.9 103.4 P-7 1.45 63 17.2 P-7 1.67-4 34 10 24 69 CL A-6 (13)0.01 P-7 4 1.0 19.8 106.1 P-7 9 18.5 108.3 P-8 1.3-7 39 14 25 72 CL A-6 (16)0.00 P-8 1.33 23.1 P-8 4 0.6 18.8 107.6 P-8 9 23.2 99.5 P-9 1.48 47 15.3 P-9 1.5-4 31 14 17 57 CL A-6 (6)0.00 P-9 4 2.0 17.6 113.8 P-9 9 20.3 105.7 P-10 1.3-4 38 18 20 64 CL A-6 (10)0.04 P-10 1.33 75 28.0 P-10 4 1.2 21.4 102.3 P-10 9 22.5 104.6 P-11 1.5 15.4 P-11 1.6-4 30 17 13 62 CL A-6 (5)0.22 P-11 4 0.9 21.8 100.6 P-11 9 21.8 92.3 Swell Potential (%) Water Content (%) pH S/MMDD S=Standard M=ModifiedBoreholeLiquid Limit Plastic Limit OMC Plasticity Index %<#200 Sieve Classification Sulfate (%) Proctor USCS Chlorides (%) Resistivity (ohm-cm) Depth (ft) SUMMARY OF PHYSICAL & CHEMICAL TEST RESULTS PAGE 2 OF 3 Dry Density (pcf)AASHTO Unconfined Compressive Strength (psi) CLIENT J-U-B Engineers, Inc. PROJECT NUMBER 579.01 PROJECT NAME Timberline Road Improvements PROJECT LOCATION Fort Collins, CO SU M M A R Y - S T A N D A R D L A N D S C A P E C D O T S P A C I N G 5 7 9 . 0 1 _ T I M B E R L I N E R O A D I M P R O V E M E N T S . G P J 3 / 3 0 / 2 0 DR A F T P-12 1.75-4 36 18 18 58 CL A-6 (8)0.13 P-12 1.77 55 21.9 P-12 4 1.2 23.9 102.0 P-12 9 18.6 92.8 P-13 0.5 11.7 P-13 0.6-4 32 19 13 56 CL A-6 (5)0.20 P-13 4 0.5 17.9 110.5 P-13 9 18.9 101.6 P-14 1.16-7 34 15 19 64 CL A-6 (9)0.10 P-14 1.21 18.3 P-14 4 0.4 19.4 105.5 P-14 9 14.3 119.4 P-15 1.625 13.2 P-15 1.67-7 30 15 15 52 CL A-6 (4)0.03 P-15 4 0.3 23.8 100.9 P-15 9 22.5 106.2 Swell Potential (%) Water Content (%) pH S/MMDD S=Standard M=ModifiedBoreholeLiquid Limit Plastic Limit OMC Plasticity Index %<#200 Sieve Classification Sulfate (%) Proctor USCS Chlorides (%) Resistivity (ohm-cm) Depth (ft) SUMMARY OF PHYSICAL & CHEMICAL TEST RESULTS PAGE 3 OF 3 Dry Density (pcf)AASHTO Unconfined Compressive Strength (psi) CLIENT J-U-B Engineers, Inc. PROJECT NUMBER 579.01 PROJECT NAME Timberline Road Improvements PROJECT LOCATION Fort Collins, CO SU M M A R Y - S T A N D A R D L A N D S C A P E C D O T S P A C I N G 5 7 9 . 0 1 _ T I M B E R L I N E R O A D I M P R O V E M E N T S . G P J 3 / 3 0 / 2 0 DR A F T 0 10 20 30 40 50 60 0 20 40 60 80 100 Fines Classification 39 31 37 24 30 33 28 41 36 35 34 39 31 38 30 36 32 34 30 15 12 15 15 14 16 14 16 20 20 10 14 14 18 17 18 19 15 15 53.3 45.2 58.1 61.7 73.3 55.0 68.6 52.4 51.1 68.7 71.7 56.9 64.5 61.8 58.2 55.8 64.2 52.1 B-1 B-1 B-2 B-2 P-1 P-2 P-3 P-4 P-5 P-6 P-7 P-8 P-9 P-10 P-11 P-12 P-13 P-14 P-15 ML CL MH CH Specimen Identification CL-ML P L A S T I C I T Y I N D E X LIQUID LIMIT LL PL PI 24 19 22 9 16 17 14 25 16 15 24 25 17 20 13 18 13 19 15 ATTERBERG LIMITS RESULTS AASHTO T89 Method A/T90 9.0 24.0 9.0 24.0 2.3-4.0 1.7-4.0 1.5-4.0 1.5-7.0 1.5-4.0 1.6-4.0 1.7-4.0 1.3-7.0 1.5-4.0 1.3-4.0 1.6-4.0 1.8-4.0 0.6-4.0 1.2-7.0 1.7-7.0 SANDY LEAN CLAY (CL) (A-6) CLAYEY SAND (SC) (A-6) CLAY, sandy SANDY LEAN CLAY (CL) (A-4) SANDY LEAN CLAY (CL) (A-6) (Fill) CLAY, sandy w gravel in parts (A-6) (Fill) CLAY, sandy (A-6) SANDY LEAN CLAY (CL) (A-7-6) SANDY LEAN CLAY (CL) (A-6) SANDY LEAN CLAY (CL) (A-6) CLAY, very sandy (A-6) LEAN CLAY with SAND (CL) (A-6) (Fill) CLAY, sandy with gravel in parts (A-6) (ABC) SAND, slightly silty to gravelly (A-6) SANDY LEAN CLAY (CL) (A-6) (Fill) CLAY (A-6) SANDY LEAN CLAY (CL) (A-6) SANDY LEAN CLAY (CL) (A-6) SANDY LEAN CLAY (CL) (A-6) CLIENT J-U-B Engineers, Inc. PROJECT NUMBER 579.01 PROJECT NAME Timberline Road Improvements PROJECT LOCATION Fort Collins, CO AT T E R B E R G L I M I T S - S T A N D A R D 5 7 9 . 0 1 _ T I M B E R L I N E R O A D I M P R O V E M E N T S . G P J R O C K S O L T E M P L A T E . G D T 3 / 3 0 / 2 0 DR A F T 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 0.0010.010.1110100 finemedium %Silt %Clay SANDY LEAN CLAY (CL) (A-6) SAND, clayey CLAYEY SAND (SC) (A-6) SAND, clayey CLAY, sandy 9.0 14.0 24.0 29.0 4.0 ClassificationSpecimen Identification Specimen Identification 15 12 8 143/4 3/8 D100 D60 D30 %Coarse Sand %Fine Sand 1403420 406 603 100 %Gravel B-1 B-1 B-1 B-1 B-2 24 16 301 2006 10 501/2 HYDROMETERU.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS PL 24 19 GRAIN SIZE DISTRIBUTION SAND GRAIN SIZE IN MILLIMETERS coarse D10 fine 0.075 0.075 0.075 0.075 0.075 1.5 53.3 30.4 45.2 45.2 76.0 PI Cc 9.0 14.0 24.0 29.0 4.0 COBBLES GRAVEL PE R C E N T F I N E R B Y W E I G H T 39 31 CuLL B-1 B-1 B-1 B-1 B-2 coarse SILT OR CLAY CLIENT J-U-B Engineers, Inc.PROJECT NAME Timberline Road Improvements PROJECT LOCATION Fort Collins, COPROJECT NUMBER 579.01 GR A D A T I O N - S T A N D A R D 5 7 9 . 0 1 _ T I M B E R L I N E R O A D I M P R O V E M E N T S . G P J R O C K S O L T E M P L A T E . G D T 3 / 3 0 / 2 0 Rocksol Consulting Group DR A F T 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 0.0010.010.1110100 finemedium %Silt %Clay SAND, clayey SANDY LEAN CLAY (CL) (A-4) SANDY LEAN CLAY (CL) (A-6) (ABC) SAND, slightly silty to gravelly (Fill) CLAY, sandy w gravel in parts 14.0 24.0 2.3-4.0 2.3 1.7 ClassificationSpecimen Identification Specimen Identification 15 14 8 143/4 3/8 D100 D60 D30 %Coarse Sand %Fine Sand 30.8 1403420 406 603 100 %Gravel B-2 B-2 P-1 P-1 P-2 24 16 301 2006 10 501/2 HYDROMETERU.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS PL 9 16 GRAIN SIZE DISTRIBUTION SAND GRAIN SIZE IN MILLIMETERS coarse D10 fine 0.075 0.075 19 0.075 0.075 1.5 43.8 58.1 61.7 55.4 71.2 PI Cc 14.0 24.0 2.3-4.0 2.3 1.7 COBBLES GRAVEL PE R C E N T F I N E R B Y W E I G H T 24 30 CuLL B-2 B-2 P-1 P-1 P-2 coarse SILT OR CLAY 3.4 4.1 CLIENT J-U-B Engineers, Inc.PROJECT NAME Timberline Road Improvements PROJECT LOCATION Fort Collins, COPROJECT NUMBER 579.01 GR A D A T I O N - S T A N D A R D 5 7 9 . 0 1 _ T I M B E R L I N E R O A D I M P R O V E M E N T S . G P J R O C K S O L T E M P L A T E . G D T 3 / 3 0 / 2 0 Rocksol Consulting Group DR A F T 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 0.0010.010.1110100 finemedium %Silt %Clay (Fill) CLAY, sandy w gravel in parts (A-6) (Fill) CLAY, sandy (Fill) CLAY, sandy (A-6) SANDY LEAN CLAY (CL) (A-7-6) SANDY LEAN CLAY (CL) (A-6) 1.7-4.0 1.5 1.5-4.0 1.5-7.0 1.5-4.0 ClassificationSpecimen Identification Specimen Identification 16 14 16 20 8 143/4 3/8 D100 D60 D30 %Coarse Sand %Fine Sand 18.9 31.7 22.9 31.9 1403420 406 603 100 %Gravel P-2 P-3 P-3 P-4 P-5 24 16 301 2006 10 501/2 HYDROMETERU.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS PL 17 14 25 16 GRAIN SIZE DISTRIBUTION SAND GRAIN SIZE IN MILLIMETERS coarse D10 fine 25 0.075 19 12.5 19 0.089 0.097 1.5 73.3 54.4 55.0 68.6 52.4 PI Cc 1.7-4.0 1.5 1.5-4.0 1.5-7.0 1.5-4.0 COBBLES GRAVEL PE R C E N T F I N E R B Y W E I G H T 33 28 41 36 CuLL P-2 P-3 P-3 P-4 P-5 coarse SILT OR CLAY 4.3 6.2 2.5 6.3 3.4 7.0 6.0 9.3 CLIENT J-U-B Engineers, Inc.PROJECT NAME Timberline Road Improvements PROJECT LOCATION Fort Collins, COPROJECT NUMBER 579.01 GR A D A T I O N - S T A N D A R D 5 7 9 . 0 1 _ T I M B E R L I N E R O A D I M P R O V E M E N T S . G P J R O C K S O L T E M P L A T E . G D T 3 / 3 0 / 2 0 Rocksol Consulting Group DR A F T 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 0.0010.010.1110100 finemedium %Silt %Clay SANDY LEAN CLAY (CL) (A-6) CLAY, very sandy CLAY, very sandy (A-6) LEAN CLAY with SAND (CL) (A-6) (Fill) CLAY, sandy with gravel in parts 1.6-4.0 1.5 1.7-4.0 1.3-7.0 1.5 ClassificationSpecimen Identification Specimen Identification 20 10 14 8 143/4 3/8 D100 D60 D30 %Coarse Sand %Fine Sand 19.8 22.9 23.2 1403420 406 603 100 %Gravel P-6 P-7 P-7 P-8 P-9 24 16 301 2006 10 501/2 HYDROMETERU.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS PL 15 24 25 GRAIN SIZE DISTRIBUTION SAND GRAIN SIZE IN MILLIMETERS coarse D10 fine 19 0.075 19 12.5 0.075 0.12 1.5 51.1 62.7 68.7 71.7 46.6 PI Cc 1.6-4.0 1.5 1.7-4.0 1.3-7.0 1.5 COBBLES GRAVEL PE R C E N T F I N E R B Y W E I G H T 35 34 39 CuLL P-6 P-7 P-7 P-8 P-9 coarse SILT OR CLAY 17.3 4.2 2.0 11.8 4.2 3.0 CLIENT J-U-B Engineers, Inc.PROJECT NAME Timberline Road Improvements PROJECT LOCATION Fort Collins, COPROJECT NUMBER 579.01 GR A D A T I O N - S T A N D A R D 5 7 9 . 0 1 _ T I M B E R L I N E R O A D I M P R O V E M E N T S . G P J R O C K S O L T E M P L A T E . G D T 3 / 3 0 / 2 0 Rocksol Consulting Group DR A F T 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 0.0010.010.1110100 finemedium %Silt %Clay (Fill) CLAY, sandy with gravel in parts (A-6) (ABC) SAND, slightly silty to gravelly (A-6) (ABC) SAND, slightly silty to gravelly SANDY LEAN CLAY (CL) (A-6) (Fill) CLAY (A-6) 1.5-4.0 1.3-4.0 1.3 1.6-4.0 1.8-4.0 ClassificationSpecimen Identification Specimen Identification 14 18 17 18 8 143/4 3/8 D100 D60 D30 %Coarse Sand %Fine Sand 29.8 23.3 22.0 27.3 1403420 406 603 100 %Gravel P-9 P-10 P-10 P-11 P-12 24 16 301 2006 10 501/2 HYDROMETERU.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS PL 17 20 13 18 GRAIN SIZE DISTRIBUTION SAND GRAIN SIZE IN MILLIMETERS coarse D10 fine 19 19 0.075 19 19 0.083 0.081 1.5 56.9 64.5 74.8 61.8 58.2 PI Cc 1.5-4.0 1.3-4.0 1.3 1.6-4.0 1.8-4.0 COBBLES GRAVEL PE R C E N T F I N E R B Y W E I G H T 31 38 30 36 CuLL P-9 P-10 P-10 P-11 P-12 coarse SILT OR CLAY 7.2 5.3 6.6 5.9 6.1 7.0 9.6 8.6 CLIENT J-U-B Engineers, Inc.PROJECT NAME Timberline Road Improvements PROJECT LOCATION Fort Collins, COPROJECT NUMBER 579.01 GR A D A T I O N - S T A N D A R D 5 7 9 . 0 1 _ T I M B E R L I N E R O A D I M P R O V E M E N T S . G P J R O C K S O L T E M P L A T E . G D T 3 / 3 0 / 2 0 Rocksol Consulting Group DR A F T 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 0.0010.010.1110100 finemedium %Silt %Clay (Fill) CLAY SANDY LEAN CLAY (CL) (A-6) SANDY LEAN CLAY (CL) (A-6) SANDY LEAN CLAY (CL) (A-6) 1.8 0.6-4.0 1.2-7.0 1.7-7.0 ClassificationSpecimen Identification Specimen Identification 19 15 15 8 143/4 3/8 D100 D60 D30 %Coarse Sand %Fine Sand 14.8 21.5 24.7 1403420 406 603 100 %Gravel P-12 P-13 P-14 P-15 24 16 301 2006 10 501/2 HYDROMETERU.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS PL 13 19 15 GRAIN SIZE DISTRIBUTION SAND GRAIN SIZE IN MILLIMETERS coarse D10 fine 0.075 25 19 25 0.108 0.118 1.5 55.2 55.8 64.2 52.1 PI Cc 1.8 0.6-4.0 1.2-7.0 1.7-7.0 COBBLES GRAVEL PE R C E N T F I N E R B Y W E I G H T 32 34 30 CuLL P-12 P-13 P-14 P-15 coarse SILT OR CLAY 21.7 4.0 8.7 7.7 10.3 14.5 CLIENT J-U-B Engineers, Inc.PROJECT NAME Timberline Road Improvements PROJECT LOCATION Fort Collins, COPROJECT NUMBER 579.01 GR A D A T I O N - S T A N D A R D 5 7 9 . 0 1 _ T I M B E R L I N E R O A D I M P R O V E M E N T S . G P J R O C K S O L T E M P L A T E . G D T 3 / 3 0 / 2 0 Rocksol Consulting Group DR A F T -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 0.01 0.1 1 10 ST R A I N , % STRESS, ksf 23.197.2 SWELL - CONSOLIDATION TEST -0.1 Specimen Identification Classification MC%(pcf)Swell/Consol. (%) CLAY, sandy4B-1 CLIENT J-U-B Engineers, Inc. PROJECT NUMBER 579.01 PROJECT NAME Timberline Road Improvements PROJECT LOCATION Fort Collins, CO SW E L L - S T A N D A R D 5 7 9 . 0 1 _ T I M B E R L I N E R O A D I M P R O V E M E N T S . G P J R O C K S O L T E M P L A T E . G D T 3 / 3 0 / 2 0 DR A F T -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 0.01 0.1 1 10 ST R A I N , % STRESS, ksf 21.6105.2 SWELL - CONSOLIDATION TEST -0.4 Specimen Identification Classification MC%(pcf)Swell/Consol. (%) SANDY LEAN CLAY (CL)9B-1 CLIENT J-U-B Engineers, Inc. PROJECT NUMBER 579.01 PROJECT NAME Timberline Road Improvements PROJECT LOCATION Fort Collins, CO SW E L L - S T A N D A R D 5 7 9 . 0 1 _ T I M B E R L I N E R O A D I M P R O V E M E N T S . G P J R O C K S O L T E M P L A T E . G D T 3 / 3 0 / 2 0 DR A F T -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 0.01 0.1 1 10 ST R A I N , % STRESS, ksf 24.299.5 SWELL - CONSOLIDATION TEST -0.3 Specimen Identification Classification MC%(pcf)Swell/Consol. (%) CLAY, sandy4B-2 CLIENT J-U-B Engineers, Inc. PROJECT NUMBER 579.01 PROJECT NAME Timberline Road Improvements PROJECT LOCATION Fort Collins, CO SW E L L - S T A N D A R D 5 7 9 . 0 1 _ T I M B E R L I N E R O A D I M P R O V E M E N T S . G P J R O C K S O L T E M P L A T E . G D T 3 / 3 0 / 2 0 DR A F T -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 0.01 0.1 1 10 ST R A I N , % STRESS, ksf 25.395.8 SWELL - CONSOLIDATION TEST -0.7 Specimen Identification Classification MC%(pcf)Swell/Consol. (%) CLAY, sandy9B-2 CLIENT J-U-B Engineers, Inc. PROJECT NUMBER 579.01 PROJECT NAME Timberline Road Improvements PROJECT LOCATION Fort Collins, CO SW E L L - S T A N D A R D 5 7 9 . 0 1 _ T I M B E R L I N E R O A D I M P R O V E M E N T S . G P J R O C K S O L T E M P L A T E . G D T 3 / 3 0 / 2 0 DR A F T -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 0.01 0.1 1 10 ST R A I N , % STRESS, ksf 19.6107.9 SWELL - CONSOLIDATION TEST 2.0 Specimen Identification Classification MC%(pcf)Swell/Consol. (%) CLAY, slightly silty to sandy w gravel in parts4P-1 CLIENT J-U-B Engineers, Inc. PROJECT NUMBER 579.01 PROJECT NAME Timberline Road Improvements PROJECT LOCATION Fort Collins, CO SW E L L - S T A N D A R D 5 7 9 . 0 1 _ T I M B E R L I N E R O A D I M P R O V E M E N T S . G P J R O C K S O L T E M P L A T E . G D T 3 / 3 0 / 2 0 DR A F T -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 0.01 0.1 1 10 ST R A I N , % STRESS, ksf 21.0109.3 SWELL - CONSOLIDATION TEST 0.5 Specimen Identification Classification MC%(pcf)Swell/Consol. (%) CLAY, sandy to slightly silty4P-2 CLIENT J-U-B Engineers, Inc. PROJECT NUMBER 579.01 PROJECT NAME Timberline Road Improvements PROJECT LOCATION Fort Collins, CO SW E L L - S T A N D A R D 5 7 9 . 0 1 _ T I M B E R L I N E R O A D I M P R O V E M E N T S . G P J R O C K S O L T E M P L A T E . G D T 3 / 3 0 / 2 0 DR A F T -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 0.01 0.1 1 10 ST R A I N , % STRESS, ksf 26.997.4 SWELL - CONSOLIDATION TEST 0.6 Specimen Identification Classification MC%(pcf)Swell/Consol. (%) CLAY, sandy to slightly silty4P-3 CLIENT J-U-B Engineers, Inc. PROJECT NUMBER 579.01 PROJECT NAME Timberline Road Improvements PROJECT LOCATION Fort Collins, CO SW E L L - S T A N D A R D 5 7 9 . 0 1 _ T I M B E R L I N E R O A D I M P R O V E M E N T S . G P J R O C K S O L T E M P L A T E . G D T 3 / 3 0 / 2 0 DR A F T -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 0.01 0.1 1 10 ST R A I N , % STRESS, ksf 22.4104.4 SWELL - CONSOLIDATION TEST 0.0 Specimen Identification Classification MC%(pcf)Swell/Consol. (%) CLAY, slightly silty to sandy4P-4 CLIENT J-U-B Engineers, Inc. PROJECT NUMBER 579.01 PROJECT NAME Timberline Road Improvements PROJECT LOCATION Fort Collins, CO SW E L L - S T A N D A R D 5 7 9 . 0 1 _ T I M B E R L I N E R O A D I M P R O V E M E N T S . G P J R O C K S O L T E M P L A T E . G D T 3 / 3 0 / 2 0 DR A F T -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 0.01 0.1 1 10 ST R A I N , % STRESS, ksf 19.2110.9 SWELL - CONSOLIDATION TEST 0.3 Specimen Identification Classification MC%(pcf)Swell/Consol. (%) CLAY, sandy with minor gravel to silty4P-5 CLIENT J-U-B Engineers, Inc. PROJECT NUMBER 579.01 PROJECT NAME Timberline Road Improvements PROJECT LOCATION Fort Collins, CO SW E L L - S T A N D A R D 5 7 9 . 0 1 _ T I M B E R L I N E R O A D I M P R O V E M E N T S . G P J R O C K S O L T E M P L A T E . G D T 3 / 3 0 / 2 0 DR A F T -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 0.01 0.1 1 10 ST R A I N , % STRESS, ksf 4.3120.7 SWELL - CONSOLIDATION TEST 0.2 Specimen Identification Classification MC%(pcf)Swell/Consol. (%) (Fill) CLAY, sandy to sandy with gravel4P-6 CLIENT J-U-B Engineers, Inc. PROJECT NUMBER 579.01 PROJECT NAME Timberline Road Improvements PROJECT LOCATION Fort Collins, CO SW E L L - S T A N D A R D 5 7 9 . 0 1 _ T I M B E R L I N E R O A D I M P R O V E M E N T S . G P J R O C K S O L T E M P L A T E . G D T 3 / 3 0 / 2 0 DR A F T -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 0.01 0.1 1 10 ST R A I N , % STRESS, ksf 19.8106.1 SWELL - CONSOLIDATION TEST 1.0 Specimen Identification Classification MC%(pcf)Swell/Consol. (%) CLAY, very sandy4P-7 CLIENT J-U-B Engineers, Inc. PROJECT NUMBER 579.01 PROJECT NAME Timberline Road Improvements PROJECT LOCATION Fort Collins, CO SW E L L - S T A N D A R D 5 7 9 . 0 1 _ T I M B E R L I N E R O A D I M P R O V E M E N T S . G P J R O C K S O L T E M P L A T E . G D T 3 / 3 0 / 2 0 DR A F T -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 0.01 0.1 1 10 ST R A I N , % STRESS, ksf 18.8107.6 SWELL - CONSOLIDATION TEST 0.6 Specimen Identification Classification MC%(pcf)Swell/Consol. (%) CLAY, sandy with minor gravel to silty4P-8 CLIENT J-U-B Engineers, Inc. PROJECT NUMBER 579.01 PROJECT NAME Timberline Road Improvements PROJECT LOCATION Fort Collins, CO SW E L L - S T A N D A R D 5 7 9 . 0 1 _ T I M B E R L I N E R O A D I M P R O V E M E N T S . G P J R O C K S O L T E M P L A T E . G D T 3 / 3 0 / 2 0 DR A F T -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 0.01 0.1 1 10 ST R A I N , % STRESS, ksf 17.6113.8 SWELL - CONSOLIDATION TEST 2.0 Specimen Identification Classification MC%(pcf)Swell/Consol. (%) CLAY, slightly silty to sandy4P-9 CLIENT J-U-B Engineers, Inc. PROJECT NUMBER 579.01 PROJECT NAME Timberline Road Improvements PROJECT LOCATION Fort Collins, CO SW E L L - S T A N D A R D 5 7 9 . 0 1 _ T I M B E R L I N E R O A D I M P R O V E M E N T S . G P J R O C K S O L T E M P L A T E . G D T 3 / 3 0 / 2 0 DR A F T -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 0.01 0.1 1 10 ST R A I N , % STRESS, ksf 21.4102.3 SWELL - CONSOLIDATION TEST 1.2 Specimen Identification Classification MC%(pcf)Swell/Consol. (%) CLAY, sandy to slightly silty4P-10 CLIENT J-U-B Engineers, Inc. PROJECT NUMBER 579.01 PROJECT NAME Timberline Road Improvements PROJECT LOCATION Fort Collins, CO SW E L L - S T A N D A R D 5 7 9 . 0 1 _ T I M B E R L I N E R O A D I M P R O V E M E N T S . G P J R O C K S O L T E M P L A T E . G D T 3 / 3 0 / 2 0 DR A F T -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 0.01 0.1 1 10 ST R A I N , % STRESS, ksf 21.8100.6 SWELL - CONSOLIDATION TEST 0.9 Specimen Identification Classification MC%(pcf)Swell/Consol. (%) CLAY, slightly silty to sandy, gravel in parts4P-11 CLIENT J-U-B Engineers, Inc. PROJECT NUMBER 579.01 PROJECT NAME Timberline Road Improvements PROJECT LOCATION Fort Collins, CO SW E L L - S T A N D A R D 5 7 9 . 0 1 _ T I M B E R L I N E R O A D I M P R O V E M E N T S . G P J R O C K S O L T E M P L A T E . G D T 3 / 3 0 / 2 0 DR A F T -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 0.01 0.1 1 10 ST R A I N , % STRESS, ksf 23.9102.0 SWELL - CONSOLIDATION TEST 1.2 Specimen Identification Classification MC%(pcf)Swell/Consol. (%) CLAY, sandy with trace gravel4P-12 CLIENT J-U-B Engineers, Inc. PROJECT NUMBER 579.01 PROJECT NAME Timberline Road Improvements PROJECT LOCATION Fort Collins, CO SW E L L - S T A N D A R D 5 7 9 . 0 1 _ T I M B E R L I N E R O A D I M P R O V E M E N T S . G P J R O C K S O L T E M P L A T E . G D T 3 / 3 0 / 2 0 DR A F T -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 0.01 0.1 1 10 ST R A I N , % STRESS, ksf 17.9110.5 SWELL - CONSOLIDATION TEST 0.5 Specimen Identification Classification MC%(pcf)Swell/Consol. (%) (Fill) CLAY, sandy with gravel to very sandy4P-13 CLIENT J-U-B Engineers, Inc. PROJECT NUMBER 579.01 PROJECT NAME Timberline Road Improvements PROJECT LOCATION Fort Collins, CO SW E L L - S T A N D A R D 5 7 9 . 0 1 _ T I M B E R L I N E R O A D I M P R O V E M E N T S . G P J R O C K S O L T E M P L A T E . G D T 3 / 3 0 / 2 0 DR A F T -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 0.01 0.1 1 10 ST R A I N , % STRESS, ksf 19.4105.5 SWELL - CONSOLIDATION TEST 0.4 Specimen Identification Classification MC%(pcf)Swell/Consol. (%) SAND, clayey to silty4P-14 CLIENT J-U-B Engineers, Inc. PROJECT NUMBER 579.01 PROJECT NAME Timberline Road Improvements PROJECT LOCATION Fort Collins, CO SW E L L - S T A N D A R D 5 7 9 . 0 1 _ T I M B E R L I N E R O A D I M P R O V E M E N T S . G P J R O C K S O L T E M P L A T E . G D T 3 / 3 0 / 2 0 DR A F T -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 0.01 0.1 1 10 ST R A I N , % STRESS, ksf 23.8100.9 SWELL - CONSOLIDATION TEST 0.3 Specimen Identification Classification MC%(pcf)Swell/Consol. (%) CLAY, sandy4P-15 CLIENT J-U-B Engineers, Inc. PROJECT NUMBER 579.01 PROJECT NAME Timberline Road Improvements PROJECT LOCATION Fort Collins, CO SW E L L - S T A N D A R D 5 7 9 . 0 1 _ T I M B E R L I N E R O A D I M P R O V E M E N T S . G P J R O C K S O L T E M P L A T E . G D T 3 / 3 0 / 2 0 DR A F T Geotechnical Investigation Report Timberline Road Improvements Project City of Fort Collins, Colorado RockSol Project No. 579.01 March 27, 2020 APPENDIX D PAVEMENT DESIGN OUTPUT SHEETS DR A F T THIS SHEET USES THE "NEW" CDOT R‐VALUE TO RESILIENT MODULUS EQUATION Timberline Road Improvements Project ESAL's =the number of Equivalent 18‐kip axle loads for the appropriate design period Mr = subgrade Resilient Modulus in pounds per square inch (psi)  R‐Value =  10 Mr = 6,482 psi For Post‐2015 CDOT Correlation 1,460,000 = Design Life ESALs SN = 3.748 = Required SN when B equals (or slightly exceeds) A Log₁₀ESAL =A = 6.16435 6,482 psi = Thickness Equation= B = 6.16437 with no drainage reduction  0.77310145 A When A = B, ESAL's and SN agree, then calculate thickness 4.75 B Take Calculated Thickness and round appropriately for design thickness 3244.07276 C 0.73723041 D ‐0.17678838 E 0.44 0.200000 F 0.11 4.75 G 6.33214025 H 8.52 ‐0.56408 I 8.0 6.52 Use 7 inches Design Mr = If Mr is based on R‐Value ===> Structural Coefficient of HMA = Structural Coefficient of ABC = Design Serviceability Loss (ΔPSI)= 2.0 Calculated thickness, inches = Initial Serviceability  Index= 4.5 FULL DEPTH HMA Final Serviceability Index = 2.5 Overall Standard Deviation, So = 0.44 Composite HMA over ABC Reliability, R (percent) = 90 (using specified layer of ABC) Standard Normal Deviate (ZR) = ‐1.282 Inches of ABC = (Use Table 1.4 from CDOT Pavement Design Manual) Calculated Inches of HMA = DR A F T THIS SHEET USES THE "NEW" CDOT R‐VALUE TO RESILIENT MODULUS EQUATION Timberline Road Improvements Project ESAL's =the number of Equivalent 18‐kip axle loads for the appropriate design period Mr = subgrade Resilient Modulus in pounds per square inch (psi)  R‐Value =  10 Mr = 6,482 psi For Post‐2015 CDOT Correlation 2,190,000 = Design Life ESALs SN = 3.983 = Required SN when B equals (or slightly exceeds) A Log₁₀ESAL =A = 6.34044 6,482 psi = Thickness Equation= B = 6.34079 with no drainage reduction  0.77310145 A When A = B, ESAL's and SN agree, then calculate thickness 4.98 B Take Calculated Thickness and round appropriately for design thickness 4168.47983 C 0.66244579 D ‐0.19674631 E 0.44 0.200000 F 0.11 4.98 G 6.5285147 H 9.05 ‐0.56408 I 8.0 7.05 Use 7.5 inches Design Mr = If Mr is based on R‐Value ===> Structural Coefficient of HMA = Structural Coefficient of ABC = Design Serviceability Loss (ΔPSI)= 2.0 Calculated thickness, inches = Initial Serviceability  Index= 4.5 FULL DEPTH HMA Final Serviceability Index = 2.5 Overall Standard Deviation, So = 0.44 Composite HMA over ABC Reliability, R (percent) = 90 (using specified layer of ABC) Standard Normal Deviate (ZR) = ‐1.282 Inches of ABC = (Use Table 1.4 from CDOT Pavement Design Manual) Calculated Inches of HMA = DR A F T Rigid Pavement Design - Based on AASHTO Supplemental Guide Reference: LTPP DATA ANALYSIS - Phase I: Validation of Guidelines for k-Value Selection and Concrete Pavement Performance Prediction I. General Agency:RockSol Consulting Group, Inc. Street Address:12076 Grant Street City:Thornton State:Colorado Project Number:ID:Wadsworth Blvd N. of 6th Ave - R-Value 5 Description:Timberline Road Improvements Location: II. Design Serviceability Initial Serviceability, P1:4.5 Joint Spacing: Terminal Serviceability, P2:2.5 15.0 ft PCC Properties 28-day Mean Modulus of Rupture, (S'c)':650 psi JPCP Elastic Modulus of Slab, Ec:3,400,000 psi Poisson's Ratio for Concrete, m:0.15 Effective Joint Spacing:180 in Base Properties Elastic Modulus of Base, Eb:18,000 psi Design Thickness of Base, Hb:6.0 in Slab-Base Friction Factor, f:1.0 Reliability and Standard Deviation Reliability Level (R):90.0 %Edge Support Factor:0.94 Overall Standard Deviation, S0:0.34 Climatic Properties Slab Thickness used for Mean Annual Wind Speed, WIND:9.0 mph Sensitivity Analysis:7.33 in Mean Annual Air Temperature, TEMP:51.0 oF Mean Annual Precipitation, PRECIP:13.4 in Subgrade k-Value 50 psi/in Design ESALs 1.4 million Calculated Slab Thickness for Above Inputs:7.33 in Pavement Type, Joint Spacing (L) JPCP JRCP CRCP Edge Support Conventional 12-ft wide traffic lane Conventional 12-ft wide traffic lane + tied PCC 2-ft widened slab w/conventional 12-ft traffic lane Sensitivity Analysis Modulus of Rupture Elastic Modulus (Slab) Elastic Modulus (Base)Base Thickness k-Value Joint Spacing Reliability Standard Deviation DR A F T Rigid Pavement Design - Based on AASHTO Supplemental Guide Reference: LTPP DATA ANALYSIS - Phase I: Validation of Guidelines for k-Value Selection and Concrete Pavement Performance Prediction I. General Agency:RockSol Consulting Group, Inc. Street Address:12076 Grant Street City:Thornton State:Colorado Project Number:ID:Wadsworth Blvd N. of 6th Ave - R-Value 5 Description:Timberline Road Improvements Location: II. Design Serviceability Initial Serviceability, P1:4.5 Joint Spacing: Terminal Serviceability, P2:2.5 15.0 ft PCC Properties 28-day Mean Modulus of Rupture, (S'c)':650 psi JPCP Elastic Modulus of Slab, Ec:3,400,000 psi Poisson's Ratio for Concrete, m:0.15 Effective Joint Spacing:180 in Base Properties Elastic Modulus of Base, Eb:18,000 psi Design Thickness of Base, Hb:6.0 in Slab-Base Friction Factor, f:1.0 Reliability and Standard Deviation Reliability Level (R):90.0 %Edge Support Factor:0.94 Overall Standard Deviation, S0:0.34 Climatic Properties Slab Thickness used for Mean Annual Wind Speed, WIND:9.0 mph Sensitivity Analysis:7.82 in Mean Annual Air Temperature, TEMP:51.0 oF Mean Annual Precipitation, PRECIP:13.4 in Subgrade k-Value 50 psi/in Design ESALs 2.2 million Calculated Slab Thickness for Above Inputs:7.82 in Pavement Type, Joint Spacing (L) JPCP JRCP CRCP Edge Support Conventional 12-ft wide traffic lane Conventional 12-ft wide traffic lane + tied PCC 2-ft widened slab w/conventional 12-ft traffic lane Sensitivity Analysis Modulus of Rupture Elastic Modulus (Slab) Elastic Modulus (Base)Base Thickness k-Value Joint Spacing Reliability Standard Deviation DR A F T