HomeMy WebLinkAboutBLOOM FILING SEVEN - BDR240008 - SUBMITTAL DOCUMENTS - ROUND 1 - Supporting Documentation (14)__,Y� i � ��i�Lili i.,�
�'l�rj���� � ,A�p�������il��y
To fulfill the water adequacy requirements of the City of Fort Coilins (�UC Divisi�� �. i�), every development or redevelopment that requires new,
expanded, or increased water use must provide information related to the ensuring the proposed water supply is adequate for long-term satisfaction
of potable and non-potable water demands of the development, based upon FCMC §26-148 to -150. The Applicant is responsible for familiarity with
applicable code and requirements.
The checklists and requirements below summarize the code; more detail regarding contents of documents and needed information may be found
within the F�r� Collins Lared k�s� ��d� �LU�i and f�unac�p�l ��d�.
Pr�lect �nf��������
Project Name:
Project Type:
� Waiver =
Address �r Parcel #
81oom Filing 7
� Standard Basic Development Review
Project # :
� Deferral -
� Change -
Date of Prior Determination
Wafier Prmvider
Please SUBMIT a SEPARA TE Water Adequacy Determination Application for each water provider fhaf senrices th� develo�ment
Established Providers: East Larimer County Water District Other:
, a; ����s� i�u��i�� u�r�i��t ���ivrma�ion for Vtiiater Pravi�er
Manager:
Email:
,�I�►�a��al�t ���"�iif���t6�ti
Public Water Service Permit #:
Phone:
By submitting these materials and my signature affixed below, I acknowledge my awareness of Land Use Code Division 5.17 regulating the
Determination of Water Adequacy and submit my Request for Review to the City of Fort Collins. I agree to reimburse the City for all costs associated
with reviewing the attached application and associated materials, including costs associated with hiring consultants, not to exceed costs directly-
attributable to the review [LUC §5.17.5.8(1) and 5.17.6.B(1)]. I also acknowledge that this Determination may contain conditions, shall be final, and
becomes a material part of all future associated development applications.
Applicant Name (printed�: Patrick McMeekin
Email:
rdco.com
Phone: 970-674-1109
Date: S - Z �t - Z
Revised 05/i C12024 281 N College Av�, Fort Coliins„ CO 80525 97�221.6689 dreoord@fcgay.corm Request for F�ctension 1 �2
��rx+�.c�����s
Required Submittal Materials
� Overal� Map of Development area to be served.
� Deferral request (For simple projects; materials due at Construction or Building Permit stage);
OR This development (Bloom Filing 7
ODetailed information related to the water demand of the project. only consists of a plat and therefore
has no associated water demand.
For areas served by Fort Collins Utilities, City approval of Final Plans acts as acknowledgment of
willingness and ability to serve.
For areas served by ELCO and FCLWD:
�✓ Please provide "Will Serve" Letter from a Colorado Licensed PE or Water Supply Expert from the Water
Supply Entity which:
❑ Describes the development area(s) to be served;
❑ States the ability to provide an adequate water supply;
❑ States the entities commitment, and any conditions, to provide adequate supply and service; and
❑ Identifies the length of time for which the letter is valid.
Non-Potable Water Suppliers for Permanent Irrigation Systems
N/A � Summary document linking the �nformation provided to the standard of review as indicated in the land
use code.
N/A � Provide a report from a Professional Engineer, licensed in Colorado, providing the Water Supply
Description, to include at minimum:
❑ Estimated demand analysis of project through build-out, including impact of phasing.
❑ Physical Source of Water Provider's water supply, and water quality test results.
❑�escription of all elements of the ProjecYs Water Portfolio, cur�ently-owned or planned.
❑ Description and Estimate of Total Project Portfolio Yield under various hydrologic conditions.
Historical temporal availability of proposed supplies, ann�al volumetric yield, and frequen4 and flow rate of
deliveries.
Decreed place of use
Augmentation requirements
❑ Water demand management measures that may be implemented to account for hydrologic variability.
❑ Description of all water conseroation measures to be applied; and how enforced and effectuated.
N/A � Financial documents reflecting entity's ability to create and maintain supply in perpetuity,
N/A � Statemen# describing how the entity ensures water conservation measures tha# meet or exceed City
requirements.
N/A ❑�pproval documentation from other regulatory agencies, as well as any established potable water supply
entity whose service area contains the proposed non-potable system.
Upon review of submlttal materlals, the Dlrector may requlre addltional informatlon be provided;
all such information shall be provided prior to final approval of any cfevelopment or permit.
Revised 06/16(2024 281 R9 College Ave, Fort Colliros, CO 80626 970.221.888J, planning�,mfcgov.covn 1Nater Adequacy DeterminaGon 2�2