HomeMy WebLinkAboutBLOOM FILING SEVEN - BDR240008 - SUBMITTAL DOCUMENTS - ROUND 1 - Submittal Checklist�i�yaf
Fort Colli ns
Submittal Instructions
Development Application
Complete Submittal Checklist
• A City Development Review Coordinator will be assigned to all projects - Your Development Review
Coordinator is available to assist you with the review process. If you do not have a review coordinator
assigned to your project, please contact us at 970-221-6689 or DRCoord(a�fcqov.com for assistance.
• Advanced notice of Submittal and resubmittals is appreciated - A completed copy of this checklist, all
submittal materials and fee payments are due at the time of project submittal. Please contact your
Development Review Coordinator at 970-221-6689 or DRCoord(c�.fcgov.com for more submittal details
including turnaround times and next steps.
• Only complete submittals are accepted - The submittal may be returned to the applicant if any required
materials or application fees are missing or insufficient. Submittals received Monday morning through
Wednesday noon will be routed for review the same week and submittals received after Wednesday
noon will be held and routed the following week.
• This checklist shall be used in tandem with the Submittal Requirements Document. The applicant must
complete this checklist and acknowledgement of the Submittal Requirements Document.
• The applicant shall be the designated contact person who will receive correspondence from city staff
and referral agencies.
Additional Resources
• Development Review Guide and Flowchart:
https://www.fcqov.com/drq/
• Development Review Applications and Submittal Requirements Main Page:
https://www.fcqov.com/developmentreview/applications.php
• City Land Use Code:
https://www.fcqov.com/planninq-development-services/luc
• City Utilities:
Development Forms, Guidelines & Regulations
• City Engineering main page:
https://www.fcgov.com/engineerinq/
• The City's Comprehensive Plans:
Citv Plan and Transportation Master Plan
• Online City Map Resources:
https://www.fcgov.com/gis/maps.php
• Larimer County Urban Area Street Standards:
https://www.larimer.org/engineering/standards-and-guides/urban-area-street-standards
Development Review Center � 281 N College Ave � Fort Collins CO 80522 � 970.221.6689 � DRCoord(a�fcqov.com
Complete Submittal Checklist:
Final Development Plan (FDP) • Basic Development Review (BDR)
Project Name: Bloom Filing Seven
Applicant Name: Mulberry W, LLC / By Hartford Homes, LLC its manager.
Project Type: BDR
� New Submittal
Project Number (if assigned):
!� Revision Review Round: Submittal Date:
Project Review Meeting Date:
Development Review Coordinator: Brandy Bethurem Harras, BBethuremHarras@fcgov.com
This checklist is for the Final Review phase for all development projects (see Step 7 of the process
flowchart). This includes final detail required for Project Development Plans (PDP). The checklist shall also
be used for Basic Development Reviews (BDR) or plan amendments including Major Amendments (MJA)
and Minor Amendments (MA) as determined bv staff.
All checklist items are required unless city staff indicates an item is (W)aived, (D)eferred, (N/A) Not
Applicable or already (R)eceived. If the staff code is blank, then the item is required.
This checklist must be reviewed, completed and accepted by staff prior to project routing. Additional
information may be requested from the applicant during the review process, if necessary, to address
specific issues that arise. Please note that all application materials, once submitted, become a matter of
public record.
Checklist, Submittal Forms and Fees:
Staff Applicant Item Description Submittal Requirement
Code Validation Resources
��Q��REo � One copy of this checklist, completed and signed by applicant
Development Review
Coordination
REQUIRED � One signed copy of Development Application Form
Payment for the above application form DRCoord(c�fcqov.com
970-221-6689
Pavments can be made bv check, tlebit /cretlit card or eCheck.
Check: Make payable to City of Fort Collins.
REQUIRED ❑ Mail to the Development Review Center, 281 N College Ave, Fort Collins,
CO 80524, OR place in the blue drop box locatetl at the west side of the building.
Card or eCheck: Woultl be processetl at fcqov.com/CitizenAccess.
• Debit/Credit card payments include a convenience fee of 2% +$0.25 added to all
payments under $2,500.00, and 2.75% added to all payments over $2,500.00.
• ECheck payments include a convenience fee of $0.50 atldetl to all payments
between $0.00 - $99,999.99.
If choosing to pay online, your Development Review Coordinator will provide you with the
ro ect information when the fees are available to be aid.
5/16/2024 2 FDP/BDR Developmef�t AppJicatron Submittal Checklist
Electronic Copies*
All copies must be provided per City file naming standards and submitted electronically. All copies must be
prepared per city PDF formatting standards.
See: Submittal Requirements Section M— File Naming Standards & PDF formatting standards
" Paper copies of plans and reports are not required during development review. See Submittal Requirements,
Section D for drawing format guidelines. All plan elements shall be clearly drawn and labelled. A scale bar must
be provided on all scaled drawings. Paper copies of plan sheets may be requested complete a timely review,
including instances when the drawing scale is not accurately depicted.
�.I �« ��__,. ����
Staff Applicant Item Description Submittal Requirement
Code Validation Resources
A comment response letter from the projecYs Conceptual Section C
Review or Preliminary Development Review staff meeting;
NA � for 1 st round FDP include response from the last round Development Review
PDP; or for resubmittals include a comment response letter Coordination
from the prior round of review. To receive a final copy of
the staff comment letter, contact your Development Review DRCoord@fcgov.com
Coordinator
970-221-6689
REQUIRED � Project Information and Design Narrative
' . i � ' . . • -
Staff Applicant Item Description Submittal Requirement
Code Validation Resources
NA � Title Block information on all plan sheets
NA � Cover Page, including: Section D
� � Title Block
� _i Land Use Table Section E Requirements
NA ❑ _� Sheet Index
❑ I Section D
Signature Blocks
Site Plan Notes Standard Notes
NA � (also available in Word
format at the Submittal
Requirements web page)
Nq � Site Location Map
Section D
NA � Legal Description
5/16/2024 3 FDP/BDR Development Application Submittal Checklist
NA � Final Site Plan Sheet(s) (and related hardscape design Section F
detail sheets, See Section I for Requirements)
NA � Final Architectural Elevation Sheet(s), Materials and other Section G
Detail Sheets (color elevations recommended)
Section H and I
Final Landscape Plan Sheet(s) Standard Notes
NA � Standard city landscape notes, and related planting detail (also available in Word
sheets (See Section I for planting detail requirements) format at the Submittal
Requirements web page)
Section H
NA � Preliminary Irrigation Plan
Water Conservation
NA � Final Lighting Plan, Photometric Plan and Lighting Detail
Sheets
Section I
NA � Final Trash and Recycling Enclosure Details (include these
details with the site plan sheets or elevation sheets)
NA ❑ Confirmation that all Sheets provided incorporate City Section D
drafting and format standards
NA � Staff Comments:
5i16/2024 4 �l�F'/�L�R D�vefo�ir��n,t A�,�licatior, ���bmiital Che��klist
.
i i •. ! �� . �
Staff Applicant Item Description Submittal Requirement
Code Validation Resources
A final subdivision plat of the site. This plat must conform to
the subdivision requirements of the City. The subdivision
❑ plat shall contain proper designations for public streets, Section J
easements, flood plains, floodways with base flood
elevations if required and all other public rights-of-way.
Approval by the Director for Type I Administrative Review, LUC Division 5.4
and approval by the Planning and Zoning Board for Type II Engineering Standards
Review by the Planning and Zoning Board, of the final plan
and subdivision plat, and complete execution, together with
all necessary certifications, shall be required before filing of
the subdivision plat or issuance of building permits. City Contact(s):
• Technical Services —
Jeff County,
Each residential lot on the subdivision plat shall identify if JCounty�a fgov.com
the garage door(s) is recessed behind the front face of the . Surveying —
building, located on one of the other sides of the building, John Von Nieda
detached from the building or located to the front of the front JVonNieda(a�fcqov.com
face of the building.
Please note that, with the Recording submittal, the subdivision
REQUIRED plat is required to be provided in CAD format at time of
recordation. The CAD file for plat must be set up to be in
conformance with GIS's Subdivision Plat Digital Submittal
Standards. Refer to the Recording Submittal Checklist which
will be provided by your Development Review Coordinator.
� Monument Records
This plat does not include section corners and
therefore no monument records rovided.
❑ Closure Report
Included in submittal.
5/16/2024 5 FDP/BDR Development Application Submittal Checklist
4) Final Utility Plans (Civil Construction Plans):
Staff Applicant Item Description Submittal Requirement
Code Validation Resources
NA � Cover Sheet Utilitv Plans Checklist.pdf
City Contact: Engineering
Nq � Standard Notes Sheet Development Review
EngDevRev@fcgov.com
970-221-6605
NA � Existing Conditions and/or Demolition Plan
NA � Overall Grading Plan
NA � Detailed Grading Plan Sheets
NA � Overall Utility Plan Sheet
Nq � Detailed Utility Plan Sheets
NA � Sanitary Sewer Plan and Profile Sheets
NA � Storm Sewer Plan and Profile Sheets
NA � Water Plan and Profile Sheets
NA � Street Plan and Profile Sheets
NA � Street Cross-sections
NA � City of Fort Collins Standard Construction Details
5/16/2024 6 FDP/BDR Development Application Submittal Checklist
5) Final Drainage and Erosion Control Report:
Staff Applicant Item Description
Code Validation
Final Drainage and Erosion Control Report may include
the following:
Items from the PDP Checklist:
_ Detention Requirements and Calculations
i Offsite Flows
�-� Floodplain Zone -- Contact Floodplain
Administration staff at 970-416-2632 forquestions
�-� Hydraulic Calculations
i-i Detention Basin Calculations
- Standard Water Quality and LID Calculations
I I Include Drainage Plan or Exhibit in the report
�
�
Additional Final Items:
I_i Hydraulic Calculations
[ � Four Step Process
-i SDI Data Spreadsheet (if required)
i i Erosion Control Materials
Note: All items shown above are components that may
be necessary with a drainage report analysis. Not all
components may be necessary. The drainage report
analysis must be prepared by a professional engineer.
Submittal Requirement
Resources
Stormwater Criteria Manual
Resource Page
Stormwater Criteria Manual
Appendices:
A. Required Submittal
Content
B. Stormwater Facilities
Landscape Standards
C. LID Implementation
D. Erosion Control
Guidance
E. Erosion Control
Construction Measures
Fact Sheets
F. Erosion Control
Construction Measures
Standard Notes
City Utilities:
Development Forms,
Guidelines & Requlations
For Stormwater or
Floodplain questions,
contact:
waterutilitiesenq c(D.
fcgov.com
970-221-6689
Erosion Control Information:
www.fcgov.com/erosion
5/16/2024 7 FDP/BDR Development Application Submittal Checklist
6) Final Reports and Supporting Document�:
Staff Applicant Item Description Submittal Requirement
Code Validation Resources
Building Services: Please Note: Buildinq
Permits will not be reviewed
REQUIRED PRIOR TO FDP SUBMITTAL until Development Plan
Building Services Presubmittal Meeting: review process is completed
Confirmation of completed Pre-Submittal Code Feasibility and recorded.
Meeting Meeting with Building Services.
Date: Building Codes and
New Commercial Projects require a pre-submittal meeting for Standards
NA building code feasibility. This typically takes place when
drawings are 50% complete and in the mid phases of the
(mm/dd/yy) Development Review Process, and prior to Building Permit Building Permit Fees
Submittal.
Applicants are encouraged to review building requirements as
early as possible in the process. For questions or to schedule
this meeting contact your Development Review Coordinator.
Planning Services:
NA � - Perspective views of the Building Exterior
(Incorporated into the building elevation sheets) Section G
NA � Electronic Building Material Sample Board
(Physical board maybe required upon request)
_ Neighborhood Context Plan
NA ❑ (Overall site plan diagram indicating surrounding Section C
neighborhood features, to be incorporated into Site
Plan sheets or cover page)
�: � Land Use Code Modification and Alternative Compliance LUC Division 6.8
p ❑ Requests; staff review, and approval required prior to City Contact: Planning
Development Review Completion Services
(If Modifications are proposed) planninq(a�fcqov.com
970-416-4311
_ Parking Alternative Compliance Studies LUC Section 5.9.1(K)
City Contact: Planning
NA � Guidelines for these studies are held by the Director Services
Parking Impact Study Guidetines planning�a fcgov.com
(If Alternative Compliance is proposed) 970-416-4311
Certification of Mineral Estate
REQUIRED � Certification of Notice to Mineral Owner(s) Owner Notification
*If provided with PDP p/ease submit same copy C.R.S.A § 24-65.5-103
LUC Section 5.17
FCMC $26-148 to -150
REQUIRED � C Water Adequacy Determination & Demand City Contact: Planning
Summary Worksheet Services
planninq(cr�.fcqov.com
970-416-4311
5/16/2024 8 FDP/BDR Development Application Submittal Checklist
Staff Applicant Item Description Submittal Requirement
Code Validation ResourCes
Development Review Engineering:
Soils Report
NA � Larimer County Urban Area
In conformance with the Larimer County Urban Area Street Standards
Street Standards
NA � _ Subsurface Hydrologic Study
� �- Development Agreement Information Form Engineering Main Page
City Contact: Engineering
NA i: l Recorded Statement of Authority (§38-30-172, C.R.S.) for Development Review
❑ Developer and/or Owner [whoever will be signing the EngDevRev(a�fcqov.com
Development Agreement] 970-221-6605
NA � Final legal descriptions for accompanying deeds of Easement and Riqht-of-Wav
dedication by separate document Dedication Process
NA � � Final legal descriptions for accompanying easement Vacation of Easements
vacation request by separate document Process
NA � -I Closure Report for any Easements and/or Right of
Ways submitted for review.
NA � � Approved and Signed Engineering or Utility Variance Larimer Countv Urban Area
Requests Street Standards
Traffic Operations:
Traffic Operations
-i Transportation Impact Study (TIS) OR waiver Resource Paqe
NA � indicated from Traffic Operations staff
City Contact:
(Waiver indication to be provided with initial submittal) Traffic Operations
970-221-6630
City Utilities: Development
NA � Utilities — Environmental Engineering: Forms, Guidelines &
` Erosion Control Cost Estimate Requlations
Nq � Utilities — Electric Systems Engineering: City Utilities: Development
Forms, Guidelines &
Electric Utility Service G-'I �=oi'� Regulations
NA � Utilities — Water Development Fees: City Utilities: Water
� Water Fee Form development fees paqe
5/16/2024 9 FDP/BDR Development Application Submittal Checklist
Staff Applicant Item Description Submittal Requirement
Code Validation ResourCes
Environmental Planning: section �
� Ecological Characterization Study (ECS) Section H
LUC Section 5.6.1
Nq � If an ECS is required, this must be submitted at least
ten days prior to the development review application. A City Contact:
copy shall also be submitted at the time of the Environmental Planning
application with this checklist. 970-416-4311
Phase 1 Environmental Site Assessment
(�JA � Has there been previous uses on the site that could To be provided by qualified
cause contamination of some sort? i.e., mechanic third-party consultant
shops, quick lube shops, chemical storage/processing,
manufacturing, gas stations or anything with fuel
storage (above or below ground), dry cleaners, etc.
City Forestry:
Existing Tree Inventory Plan
NA � Prior to the review submittal, the applicant must
schedule an on- site meeting with City Forestry to
obtain tree inventory information for all existing trees
within the development area. The meeting is also See Submittal Requirements
intended to discuss any proposed tree removal. Sections H and L for more
information regarding
documentation of existing and
PLEASE NOTE THAT EXISTING TREES SHOULD proposed trees on landscape
NOT BE REMOVED OR DAMAGED PRIOR TO plans
SUBMITTAL, REVIEW AND APPROVAL OF THE
PROPOSED DEVELOPMENT. City Contact:
City Forestry
— Existing Tree Removal Feasibility Request forestry�a fcgov.com
NA � 970.221.6660
Provide a letter to City Forestry outlining the justification
for the removal of any existing trees, if proposed. City Forestry Resources:
www.fcgov.com/forestry
Land Use Code Section:
— Existing Tree Mitigation Plan 5.10.1 LF) Tree Preservation
and Mitiqation
At your site meeting, City Forestry will determine the
Replacement
NA � characteristics and mitigation requirements for all
existing trees within the project's proposed Limits of
Disturbance.
(If tree removal is proposed).
5/16/2024 10 FDP/BDR Development Application Submittal Checklist
Applicant Acknowledgement:
I have reviewed the Development Application Submittal Requirements, Sections A— M. All documents submitted
are complete and the Development Application Submittal Requirements have been incorporated into the plans
(See Development Application Submittal Requirements for detailed description of requirements). All documents
submitted have been compared and consistent design information is shown on all plan sheets and reports.
I understand that submittal requirements not sufficiently addressed or deferred may result in added review time.
Applicant Signature: ` --- � � —�-- Date: 05/31/2024
Phone: 970-217-7147 Emai�: swestlind@hartfordco.com
(See i:���oreVc�����r�� i���V�c��ro� �a��a�it��V &��c��as��r����a� for detailed description of requirements)
5/16/2024 11 FDP/BDR Development Application Submittal Checklist