Loading...
HomeMy WebLinkAboutPROSPECT SPORTS CLUB - FDP240002 - SUBMITTAL DOCUMENTS - ROUND 2 - ECS ReportProject:Disturbed Acres:2.14 EROSION CONTROL BMPs Units Estimated Quantity Unit Price Total Price L.F.545 $1.75 $953.75 each 6 $75.00 $450.00 each 1 $500.00 $500.00 each 1 $750.00 $750.00 L.F.$1.50 $0.00 L.F.$1.50 $0.00 each 2 $90.00 $180.00 Erosion Control Blanket (ECB)SF $1.00 $0.00 Turf Reinforcement Mat (TRM)SF $2.00 $0.00 acre $500.00 $0.00 SY 100 $10.00 $1,000.00 hour 20 $125.00 $2,500.00 Sub-Total:$6,333.75 1.5 x Sub-Total:$9,500.63 Amount of security:$9,500.63 Total Acres x Price/acre:$4,280.00 $2,000.00 Sub-Total:$4,280.00 1.5 x Sub-Total:$6,420.00 Amount to Re-seed:$6,420.00 Minimum escrow amount:$3,000.00 Erosion Control Escrow:$9,500.63 Final Escrow Amount Surface Roughening (SR) Reseeding Amount Sweeping (Sediment Removal Only) Rock Sock (RS) Erosion and Sediment Control Escrow/Security Calculation for The City of Fort Collins BMP Amount Silt Fence (SF) Vehicle Tracking Control (VTC) Sediment Control Logs (SCL) “The amount of the security must be based on one and one-half times the estimate of the cost to install the approved measures, or one and one-half times the cost to re-vegetate the disturbed land to dry land grasses based upon unit cost determined by the City's Annual Revegetation and Stabilization Bid, whichever is greater. In no instance, will the amount of security be less than one thousand five hundred dollars ($1,500) for residential development or three thousand dollars ($3,000) for commercial development” Culvert Inlet Protection (IP) Concrete Washout (CW) Prospect Sports Club Construction Fencing (CF) Miniumum Escrow Amount Unit Price of Seeding per acre: Stabilized Staging Area (SSA) 5/15/2024 11:38 AM C:\United Civil Dropbox\Projects\U22014 - Prospect Park East\Specs and Estimates\Estimates\Prospect Sports_Erosion-Escrow-Estimate