PROSPECT SPORTS CLUB - FDP240002 - SUBMITTAL DOCUMENTS - ROUND 2 - Responses (4)
PROJECT SITE SH A R P P O I N T D R . E. PROSPECT ROAD MIDPOINT DRIVE TI M B E R L I N E R O A D 4/ 2 / 2 0 2 4 2: 2 6 : 1 1 P M C: \ U N I T E D C I V I L D R O P B O X \ P R O J E C T S \ U 2 2 0 1 4 - P R O S P E C T P A R K E A S T \ C A D D \ C P \ C 0 . 0 0 - C O V E R . D W G C0 . 0 0 - C O V E R -- - - -- - - APPLICANT/OWNER MAX WEST INC 1500 BUCKEYE STREET FORT COLLINS, CO 80525 PHONE:970-218-9453 CONTACT: JONATHAN O'NEIL CIVIL ENGINEER UNITED CIVIL DESIGN GROUP, LLC 19 OLD TOWN SQUARE #238 FORT COLLINS, CO 80524 PHONE: 970-530-4044 CONTACT: KEVIN BRAZELTON SURVEYOR MAJESTIC SURVEYING 1111 DIAMOND VALLEY DRIVE #104 WINDSOR, CO 80550 PHONE: 970-833-5698 CONTACT: STEVE PARKS CIVIL CONSTRUCTION PLANS FOR CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what's below. before you dig.Call R PROSPECT SPORTS CLUB LOTS 5, PROSPECT PARK EAST P.U.D. SITUATE IN THE NORTHWEST QUARTER OF SECTION 20, TOWNSHIP 7 NORTH, RANGE 69 WEST OF THE 6TH P.M., CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO PROJECT VERTICAL DATUM: NAVD 88 BENCHMARK: CITY OF FORT COLLINS VERTICAL BENCHMARK "FOREMAN" LOCATED ON THE NORTH SIDE OF PROSPECT RD. 0.1 MILES EAST OF SHARP POINT DRIVE,AT THE BACK OF WALK AT THE BASE OF THE PARAPET WALL TO THE BRIDGE OVER THE POUDRE RIVER,15 FT EAST OF THE WEST END OF THE PARAPET WALL. ELEVATION: 4910.33 PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) FOR THEIR VERTICAL DATUMS. IF NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQUATION SHOULD BE USED: NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) = NAVD88 - 3.19' BASIS OF BEARINGS: THE NORTH LINE OF THE NORTHWEST QUARTER OF SECTION 20, T7N, R68W OF THE 6TH PM AS BEARING N89°42'52"W. NOTE: 1.ALL PROJECT CONTROL LISTED HEREON IS PROVIDED AS A COURTESY. IT IS THE RESPONSIBILITY OF THE RECIPIENT TO VERIFY THE ACCURACY OF THE COORDINATES AND ELEVATIONS SHOWN PRIOR TO USING THEM FOR ANY PURPOSES. VICINITY MAP 1"=500' PROJECT TEAM PROJECT COORDINATES SHEET INDEX PAGE #SHEET #SHEET NAME 1 C0.00 COVER SHEET 2-3 C0.01-C0.02 GENERAL NOTES 4 C1.00 EXISTING CONDITIONS & REMOVALS PLAN 5 C2.00 HORIZONTAL CONTROL PLAN 6 C2.10 PAVEMENT, SIGNING & STRIPING PLAN 7 C3.00 UTILITY PLAN 8 - 9 C3.10-C3.11 STORM SEWER PLAN & PROFILES 10 C4.00 OVERALL GRADING & EROSION CONTROL PLAN 11 - 12 C4.10 - C4.11 DETAILED GRADING PLANS 13 C5.00 DRAINAGE PLAN 14 - 21 C6.00-C6.07 CONSTRUCTION DETAILS UTILITY PROVIDERS LANDSCAPE ARCHITECT RB+B ARCHITECTS 315 EAST MOUNTAIN AVE, SUITE 100 FORT COLLINS, CO 80524 PHONE:970-484-0117 CONTACT: AMANDA HANSEN UTILITY PROVIDER CONTACT PHONE WATER/WASTEWATER CITY OF FORT COLLINS UTILITIES DAN MOGEN (970) 305-5989 STORMWATER CITY OF FORT COLLINS UTILITIES DAN MOGEN (970) 305-5989 POWER CITY OF FORT COLLINS LIGHT & POWER TYLER SIEGMUND (970) 221-6710 NATURAL GAS XCEL ENERGY STEPHANIE RICH (970) 225-7828 TELECOM CENTURYLINK ROBERT RULI (970) 490-7503 CABLE COMCAST DON KAPPERMAN (970) 567-0245 Note: All utility providers listed hereon is provided as a courtesy. It is the responsibility of the recipient to verify the accuracy and completeness of the information shown. City of Fort Collins, CO UTILITY PLAN APPROVAL APPROVED: CITY ENGINEER,APPROVED SHEETS DATE APPROVED: WATER & WASTEWATER UTILITY,APPROVED SHEETS DATE APPROVED: STORMWATER UTILITY,APPROVED SHEETS DATE APPROVED: PARK PLANNING & DEVELOPMENT,APPROVED SHEETS DATE APPROVED: TRAFFIC OPERATIONS,APPROVED SHEETS DATE APPROVED: ENVIRONMENTAL PLANNER,APPROVED SHEETS DATE I HEREBY AFFIRM THAT THESE FINAL CONSTRUCTION PLANS WERE PREPARED UNDER MY DIRECT SUPERVISION, IN ACCORDANCE WITH ALL APPLICABLE CITY OF FORT COLLINS AND STATE OF COLORADO STANDARDS AND STATUTES, RESPECTIVELY; AND THAT I AM FULLY RESPONSIBLE FOR THE ACCURACY OF ALL DESIGN, REVISIONS, AND RECORD CONDITIONS THAT I HAVE NOTED ON THESE PLANS. KEVIN BRAZELTON, PE #38837 DATE CERTIFICATION STATEMENT THESE PLANS HAVE BEEN REVIEWED BY THE LOCAL ENTITY FOR CONCEPT ONLY. THE REVIEW DOES NOT IMPLY RESPONSIBILITY BY THE REVIEWING DEPARTMENT, THE LOCAL ENTITY ENGINEER, OR THE LOCAL ENTITY FOR ACCURACY AND CORRECTNESS OF THE CALCULATIONS. FURTHERMORE, THE REVIEW DOES NOT IMPLY THAT QUANTITIES OF ITEMS ON THE PLANS ARE THE FINAL QUANTITIES REQUIRED. THE REVIEW SHALL NOT BE CONSTRUED IN ANY REASON AS ACCEPTANCE OF FINANCIAL RESPONSIBILITY BY THE LOCAL ENTITY FOR ADDITIONAL QUANTITIES OF ITEMS SHOWN THAT MAY BE REQUIRED DURING THE CONSTRUCTION PHASE. DISCLAIMER STATEMENTA A 1 2 3 4 5 1 2 3 4 5 PR O J E C T I N F O R M A T I O N SH E E T I N F O R M A T I O N PR O J E C T P H A S E AR C H I T E C T SE A L ISSUE DATE: PROJECT #: CO N S U L T A N T B C D A B C D T - 970.484.0117 F - 970.484.0264 315 East Mountain Ave Suite 100 Fort Collins, CO 80524-2913 © 2015 www.rbbarchitects.com ARCHITECTS REVISIONS: 2204 PR O S P E C T S P O R T S CL U B MA X W E S T I N C . FI N A L DE V E L O P M E N T PL A N 4/2/2024 16 0 0 E A S T P R O S P E C T R O A D FO R T C O L L I N S , C O 8 0 5 2 5 DESCRIPTION DATE CIVIL ENGINEERING & CONSULTING UNITED CIVIL Design Group 19 OLD TOWN SQUARE #238 FORT COLLINS, CO 80524 (970) 530-4044 www.unitedcivil.com PR O J . M G R : DR A W I N G N A M E : PA T H : DE S I G N E R : DA T E : TI M E : COVER SHEET C0.00 APRIL 2024 Fort Collins Utilities Redlines Water, Wastewater & Stormwater Thank you for the opportunity to review the se plans. I encourage you to contact me to discuss questions & revisions prior to resubmittal. dmogen@fcgov.com or 970-305-5989 Reviewed by: Date : Dan Mogen 04/26/2024 4/ 2 / 2 0 2 4 2: 2 6 : 1 1 P M C: \ U N I T E D C I V I L D R O P B O X \ P R O J E C T S \ U 2 2 0 1 4 - P R O S P E C T P A R K E A S T \ C A D D \ C P \ C 0 . 0 0 - C O V E R . D W G C0 . 0 0 - C O V E R -- - - -- - - A A 1 2 3 4 5 1 2 3 4 5 PR O J E C T I N F O R M A T I O N SH E E T I N F O R M A T I O N PR O J E C T P H A S E AR C H I T E C T SE A L ISSUE DATE: PROJECT #: CO N S U L T A N T B C D A B C D T - 970.484.0117 F - 970.484.0264 315 East Mountain Ave Suite 100 Fort Collins, CO 80524-2913 © 2015 www.rbbarchitects.com ARCHITECTS REVISIONS: 2204 PR O S P E C T S P O R T S CL U B MA X W E S T I N C . FI N A L DE V E L O P M E N T PL A N 4/2/2024 16 0 0 E A S T P R O S P E C T R O A D FO R T C O L L I N S , C O 8 0 5 2 5 DESCRIPTION DATE CIVIL ENGINEERING & CONSULTING UNITED CIVIL Design Group 19 OLD TOWN SQUARE #238 FORT COLLINS, CO 80524 (970) 530-4044 www.unitedcivil.com PR O J . M G R : DR A W I N G N A M E : PA T H : DE S I G N E R : DA T E : TI M E : GENERAL NOTES C0.01 LARIMER COUNTY URBAN AREA STREET STANDARDS - REPEALED AND REENACTED AUGUST 1, 2021 GENERAL NOTES 1.ALL MATERIALS, WORKMANSHIP, AND CONSTRUCTION OF PUBLIC IMPROVEMENTS SHALL MEET OR EXCEED THE STANDARDS AND SPECIFICATIONS SET FORTH IN THE LARIMER COUNTY URBAN AREA STREET STANDARDS AND APPLICABLE STATE AND FEDERAL REGULATIONS. WHERE THERE IS CONFLICT BETWEEN THESE PLANS AND THE SPECIFICATIONS, OR ANY APPLICABLE STANDARDS, THE MOST RESTRICTIVE STANDARD SHALL APPLY. ALL WORK SHALL BE INSPECTED AND APPROVED BY THE LOCAL ENTITY. 2.ALL REFERENCES TO ANY PUBLISHED STANDARDS SHALL REFER TO THE LATEST REVISION OF SAID STANDARD, UNLESS SPECIFICALLY STATED OTHERWISE. 3.THESE PUBLIC IMPROVEMENT CONSTRUCTION PLANS SHALL BE VALID FOR A PERIOD OF THREE YEARS FROM THE DATE OF APPROVAL BY THE LOCAL ENTITY ENGINEER. USE OF THESE PLANS AFTER THE EXPIRATION DATE WILL REQUIRE A NEW REVIEW AND APPROVAL PROCESS BY THE LOCAL ENTITY PRIOR TO COMMENCEMENT OF ANY WORK SHOWN IN THESE PLANS. 4.THE ENGINEER WHO HAS PREPARED THESE PLANS, BY EXECUTION AND/OR SEAL HEREOF, DOES HEREBY AFFIRM RESPONSIBILITY TO THE LOCAL ENTITY, AS BENEFICIARY OF SAID ENGINEER'S WORK, FOR ANY ERRORS AND OMISSIONS CONTAINED IN THESE PLANS, AND APPROVAL OF THESE PLANS BY THE LOCAL ENTITY ENGINEER SHALL NOT RELIEVE THE ENGINEER WHO HAS PREPARED THESE PLANS OF ALL SUCH RESPONSIBILITY. FURTHER, TO THE EXTENT PERMITTED BY LAW, THE ENGINEER HEREBY AGREES TO HOLD HARMLESS AND INDEMNIFY THE LOCAL ENTITY, AND ITS OFFICERS AND EMPLOYEES, FROM AND AGAINST ALL LIABILITIES, CLAIMS, AND DEMANDS WHICH MAY ARISE FROM ANY ERRORS AND OMISSIONS CONTAINED IN THESE PLANS. 5.ALL SANITARY SEWER, STORM SEWER, AND WATER LINE CONSTRUCTION, AS WELL AS POWER AND OTHER "DRY" UTILITY INSTALLATIONS, SHALL CONFORM TO THE LOCAL ENTITY STANDARDS AND SPECIFICATIONS CURRENT AT THE DATE OF APPROVAL OF THE PLANS BY THE LOCAL ENTITY ENGINEER. 6.THE TYPE, SIZE, LOCATION AND NUMBER OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER TO VERIFY THE EXISTENCE AND LOCATION OF ALL UNDERGROUND UTILITIES ALONG THE ROUTE OF THE WORK BEFORE COMMENCING NEW CONSTRUCTION. THE DEVELOPER SHALL BE RESPONSIBLE FOR UNKNOWN UNDERGROUND UTILITIES. 7.THE DEVELOPER SHALL CONTACT THE UTILITY NOTIFICATION CENTER OF COLORADO (UNCC) AT 1-800-922-1987, AT LEAST 2 WORKING DAYS PRIOR TO BEGINNING EXCAVATION OR GRADING, TO HAVE ALL REGISTERED UTILITY LOCATIONS MARKED. OTHER UNREGISTERED UTILITY ENTITIES (I.E. DITCH / IRRIGATION COMPANY) ARE TO BE LOCATED BY CONTACTING THE RESPECTIVE REPRESENTATIVE. UTILITY SERVICE LATERALS ARE ALSO TO BE LOCATED PRIOR TO BEGINNING EXCAVATION OR GRADING. IT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER TO RELOCATE ALL EXISTING UTILITIES THAT CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THESE PLANS. 8.THE DEVELOPER SHALL BE RESPONSIBLE FOR PROTECTING ALL UTILITIES DURING CONSTRUCTION AND FOR COORDINATING WITH THE APPROPRIATE UTILITY COMPANY FOR ANY UTILITY CROSSINGS REQUIRED. 9.IF A CONFLICT EXISTS BETWEEN EXISTING AND PROPOSED UTILITIES AND/OR A DESIGN MODIFICATION IS REQUIRED, THE DEVELOPER SHALL COORDINATE WITH THE ENGINEER TO MODIFY THE DESIGN. DESIGN MODIFICATION(S) MUST BE APPROVED BY THE LOCAL ENTITY PRIOR TO BEGINNING CONSTRUCTION. 10.THE DEVELOPER SHALL COORDINATE AND COOPERATE WITH THE LOCAL ENTITY, AND ALL UTILITY COMPANIES INVOLVED, TO ASSURE THAT THE WORK IS ACCOMPLISHED IN A TIMELY FASHION AND WITH A MINIMUM DISRUPTION OF SERVICE. THE DEVELOPER SHALL BE RESPONSIBLE FOR CONTACTING, IN ADVANCE, ALL PARTIES AFFECTED BY ANY DISRUPTION OF ANY UTILITY SERVICE AS WELL AS THE UTILITY COMPANIES. 11.NO WORK MAY COMMENCE WITHIN ANY PUBLIC STORM WATER, SANITARY SEWER OR POTABLE WATER SYSTEM UNTIL THE DEVELOPER NOTIFIES THE UTILITY PROVIDER. NOTIFICATION SHALL BE A MINIMUM OF 2 WORKING DAYS PRIOR TO COMMENCEMENT OF ANY WORK. AT THE DISCRETION OF THE WATER UTILITY PROVIDER, A PRE-CONSTRUCTION MEETING MAY BE REQUIRED PRIOR TO COMMENCEMENT OF ANY WORK. 12.THE DEVELOPER SHALL SEQUENCE INSTALLATION OF UTILITIES IN SUCH A MANNER AS TO MINIMIZE POTENTIAL UTILITY CONFLICTS. IN GENERAL, STORM SEWER AND SANITARY SEWER SHOULD BE CONSTRUCTED PRIOR TO INSTALLATION OF THE WATER LINES AND DRY UTILITIES. 13.THE MINIMUM COVER OVER WATER LINES IS4.5 FEET AND THE MAXIMUM IS 5.5 FEE UNLESS OTHERWISE NOTED IN THE PLANS AND APPROVED BY THE WATER UTILITY. 14.A STATE CONSTRUCTION DEWATERING WASTEWATER DISCHARGE PERMIT IS REQUIRED IF DEWATERING IS REQUIRED IN ORDER TO INSTALL UTILITIES OR WATER IS DISCHARGED INTO A STORM SEWER, CHANNEL, IRRIGATION DITCH OR ANY WATERS OF THE UNITED STATES. 15.THE DEVELOPER SHALL COMPLY WITH ALL TERMS AND CONDITIONS OF THE COLORADO PERMIT FOR STORM WATER DISCHARGE (CONTACT COLORADO DEPARTMENT OF HEALTH, WATER QUALITY CONTROL DIVISION, (303) 692-3590), THE STORM WATER MANAGEMENT PLAN, AND THE EROSION CONTROL PLAN. 16.THE LOCAL ENTITY SHALL NOT BE RESPONSIBLE FOR THE MAINTENANCE OF STORM DRAINAGE FACILITIES LOCATED ON PRIVATE PROPERTY. MAINTENANCE OF ONSITE DRAINAGE FACILITIES SHALL BE THE RESPONSIBILITY OF THE PROPERTY OWNER(S). 17.CERTIFICATION OF GRADING AND DRAINAGE FACILITIES MUST BE COMPLETED BY A REGISTERED ENGINEER AND SUBMITTED TO THE STORMWATER UTILITY DEPARTMENT AT LEAST TWO WEEKS PRIOR TO STORMWATER UTILITY DEPARTMENT ACCEPTANCE, OR OTHERWISE IN ACCORDANCE WITH THE DEVELOPMENT AGREEMENT. 18.THE LOCAL ENTITY INCLUDING BUT NOT LIMITED TO CITY OF FORT COLLINS, SOUTH FORT COLLINS SANITATION DISTRICT AND FORT COLLINS-LOVELAND WATER DISTRICT SHALL NOT BE RESPONSIBLE FOR ANY DAMAGES OR INJURIES SUSTAINED IN THIS DEVELOPMENT AS A RESULT OF GROUNDWATER SEEPAGE, WHETHER RESULTING FROM GROUNDWATER FLOODING, STRUCTURAL DAMAGE OR OTHER DAMAGE UNLESS SUCH DAMAGE OR INJURIES ARE SUSTAINED AS A RESULT OF THE LOCAL ENTITY FAILURE TO PROPERLY MAINTAIN ITS WATER, WASTEWATER, AND/OR STORM DRAINAGE FACILITIES IN THE DEVELOPMENT. 19.ALL RECOMMENDATIONS OF THE PRELIMINARY DRAINAGE AND EROSION CONTROL STUDY ENTITLED "PROSPECT SPORTS CLUB" PREPARED BY UNITED CIVIL DESIGN GROUP LLC, AND DATED DECEMBER 20, 2023, SHALL BE FOLLOWED AND IMPLEMENTED. 20.TEMPORARY EROSION CONTROL DURING CONSTRUCTION SHALL BE PROVIDED AS SHOWN ON THE EROSION CONTROL PLAN. ALL EROSION CONTROL MEASURES SHALL BE MAINTAINED IN GOOD REPAIR BY THE DEVELOPER, UNTIL SUCH TIME AS THE ENTIRE DISTURBED AREAS IS STABILIZED WITH HARD SURFACE OR LANDSCAPING. 21.THE DEVELOPER SHALL BE RESPONSIBLE FOR INSURING THAT NO MUD OR DEBRIS SHALL BE TRACKED ONTO THE EXISTING PUBLIC STREET SYSTEM. MUD AND DEBRIS MUST BE REMOVED WITHIN 24 HOURS BY AN APPROPRIATE MECHANICAL METHOD (I.E. MACHINE BROOM SWEEP, LIGHT DUTY FRONT-END LOADER, ETC.) OR AS APPROVED BY THE LOCAL ENTITY STREET INSPECTOR. 22.NO WORK MAY COMMENCE WITHIN ANY IMPROVED OR UNIMPROVED PUBLIC RIGHT-OF-WAY UNTIL A RIGHT-OF-WAY PERMIT OR DEVELOPMENT CONSTRUCTION PERMIT IS OBTAINED, IF APPLICABLE. 23.THE DEVELOPER SHALL BE RESPONSIBLE FOR OBTAINING ALL NECESSARY PERMITS FOR ALL APPLICABLE AGENCIES PRIOR TO COMMENCEMENT OF CONSTRUCTION. THE DEVELOPER SHALL NOTIFY THE LOCAL ENTITY ENGINEERING INSPECTOR (FORT COLLINS - 221-6605) AND THE LOCAL ENTITY EROSION CONTROL INSPECTOR (FORT COLLINS - 221-6700) AT LEAST 2 WORKING DAYS PRIOR TO THE START OF ANY EARTH DISTURBING ACTIVITY, OR CONSTRUCTION ON ANY AND ALL PUBLIC IMPROVEMENTS. IF THE LOCAL ENTITY ENGINEER IS NOT AVAILABLE AFTER PROPER NOTICE OF CONSTRUCTION ACTIVITY HAS BEEN PROVIDED, THE DEVELOPER MAY COMMENCE WORK IN THE ENGINEERS ABSENCE. HOWEVER, THE LOCAL ENTITY RESERVES THE RIGHT NOT TO ACCEPT THE IMPROVEMENT IF SUBSEQUENT TESTING REVEALS AN IMPROPER INSTALLATION. 24.THE DEVELOPER SHALL BE RESPONSIBLE FOR OBTAINING SOILS TESTS WITHIN THE PUBLIC RIGHT-OF-WAY AFTER RIGHT-OF-WAY GRADING AND ALL UTILITY TRENCH WORK IS COMPLETE AND PRIOR TO THE PLACEMENT OF CURB, GUTTER, SIDEWALK AND PAVEMENT. IF THE FINAL SOILS/PAVEMENT DESIGN REPORT DOES NOT CORRESPOND WITH THE RESULTS OF THE ORIGINAL GEOTECHNICAL REPORT, THE DEVELOPER SHALL BE RESPONSIBLE FOR A RE-DESIGN OF THE SUBJECT PAVEMENT SECTION OR, THE DEVELOPER MAY USE THE LOCAL ENTITY'S DEFAULT PAVEMENT THICKNESS SECTION(S). REGARDLESS OF THE OPTION USED, ALL FINAL SOILS/PAVEMENT DESIGN REPORTS SHALL BE PREPARED BY A LICENSED PROFESSIONAL ENGINEER. THE FINAL REPORT SHALL BE SUBMITTED TO THE INSPECTOR A MINIMUM OF 10 WORKING DAYS PRIOR TO PLACEMENT OF BASE AND ASPHALT. PLACEMENT OF CURB, GUTTER, SIDEWALK, BASE AND ASPHALT SHALL NOT OCCUR UNTIL THE LOCAL ENTITY ENGINEER APPROVES THE FINAL REPORT. 25.THE CONTRACTOR SHALL HIRE A LICENSED ENGINEER OR LAND SURVEYOR TO SURVEY THE CONSTRUCTED ELEVATIONS OF THE STREET SUBGRADE AND THE GUTTER FLOWLINE AT ALL INTERSECTIONS, INLETS, AND OTHER LOCATIONS REQUESTED BY THE LOCAL ENTITY INSPECTOR. THE ENGINEER OR SURVEYOR MUST CERTIFY IN A LETTER TO THE LOCAL ENTITY THAT THESE ELEVATIONS CONFORM TO THE APPROVED PLANS AND SPECIFICATIONS. ANY DEVIATIONS SHALL BE NOTED IN THE LETTER AND THEN RESOLVED WITH THE LOCAL ENTITY BEFORE INSTALLATION OF BASE COURSE OR ASPHALT WILL BE ALLOWED ON THE STREETS. 26.ALL UTILITY INSTALLATIONS WITHIN OR ACROSS THE ROADBED OF NEW RESIDENTIAL ROADS MUST BE COMPLETED PRIOR TO THE FINAL STAGES OF ROAD CONSTRUCTION. FOR THE PURPOSES OF THESE STANDARDS, ANY WORK EXCEPT C/G ABOVE THE SUBGRADE IS CONSIDERED FINAL STAGE WORK. ALL SERVICE LINES MUST BE STUBBED TO THE PROPERTY LINES AND MARKED SO AS TO REDUCE THE EXCAVATION NECESSARY FOR BUILDING CONNECTIONS. 27.PORTIONS OF LARIMER COUNTY ARE WITHIN OVERLAY DISTRICTS. THE LARIMER COUNTY FLOODPLAIN RESOLUTION SHOULD BE REFERRED TO FOR ADDITIONAL CRITERIA FOR ROADS WITHIN THESE DISTRICTS. 28.ALL ROAD CONSTRUCTION IN AREAS DESIGNATED AS WILD FIRE HAZARD AREAS SHALL BE DONE IN ACCORDANCE WITH THE CONSTRUCTION CRITERIA AS ESTABLISHED IN THE WILD FIRE HAZARD AREA MITIGATION REGULATIONS IN FORCE AT THE TIME OF FINAL PLAT APPROVAL. 29.PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION, THE CONTRACTOR SHALL CONTACT THE LOCAL ENTITY FORESTER TO SCHEDULE A SITE INSPECTION FOR ANY TREE REMOVAL REQUIRING A PERMIT. 30.THE DEVELOPER SHALL BE RESPONSIBLE FOR ALL ASPECTS OF SAFETY INCLUDING, BUT NOT LIMITED TO, EXCAVATION, TRENCHING, SHORING, TRAFFIC CONTROL, AND SECURITY. REFER TO OSHA PUBLICATION 2226, EXCAVATING AND TRENCHING. 31.THE DEVELOPER SHALL SUBMIT A CONSTRUCTION TRAFFIC CONTROL PLAN, IN ACCORDANCE WITH MUTCD, TO THE APPROPRIATE RIGHT-OF-WAY AUTHORITY. (LOCAL ENTITY, COUNTY OR STATE), FOR APPROVAL, PRIOR TO ANY CONSTRUCTION ACTIVITIES WITHIN, OR AFFECTING, THE RIGHT-OF-WAY. THE DEVELOPER SHALL BE RESPONSIBLE FOR PROVIDING ANY AND ALL TRAFFIC CONTROL DEVICES AS MAY BE REQUIRED BY THE CONSTRUCTION ACTIVITIES. 32.PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION THAT WILL AFFECT TRAFFIC SIGNS OF ANY TYPE, THE CONTRACTOR SHALL CONTACT LOCAL ENTITY TRAFFIC OPERATIONS DEPARTMENT, WHO WILL TEMPORARILY REMOVE OR RELOCATE THE SIGN AT NO COST TO THE CONTRACTOR; HOWEVER, IF THE CONTRACTOR MOVES THE TRAFFIC SIGN THEN THE CONTRACTOR WILL BE CHARGED FOR THE LABOR, MATERIALS AND EQUIPMENT TO REINSTALL THE SIGN AS NEEDED. 33.THE DEVELOPER IS RESPONSIBLE FOR ALL COSTS FOR THE INITIAL INSTALLATION OF TRAFFIC SIGNING AND STRIPING FOR THE DEVELOPMENT RELATED TO THE DEVELOPMENT'S LOCAL STREET OPERATIONS. IN ADDITION, THE DEVELOPER IS RESPONSIBLE FOR ALL COSTS FOR TRAFFIC SIGNING AND STRIPING RELATED TO DIRECTING TRAFFIC ACCESS TO AND FROM THE DEVELOPMENT. 34.THERE SHALL BE NO SITE CONSTRUCTION ACTIVITIES ON SATURDAYS, UNLESS SPECIFICALLY APPROVED BY THE LOCAL ENTITY ENGINEER, AND NO SITE CONSTRUCTION ACTIVITIES ON SUNDAYS OR HOLIDAYS, UNLESS THERE IS PRIOR WRITTEN APPROVAL BY THE LOCAL ENTITY. 35.THE DEVELOPER IS RESPONSIBLE FOR PROVIDING ALL LABOR AND MATERIALS NECESSARY FOR THE COMPLETION OF THE INTENDED IMPROVEMENTS, SHOWN ON THESE DRAWINGS, OR DESIGNATED TO BE PROVIDED, INSTALLED, OR CONSTRUCTED, UNLESS SPECIFICALLY NOTED OTHERWISE. 36.DIMENSIONS FOR LAYOUT AND CONSTRUCTION ARE NOT TO BE SCALED FROM ANY DRAWING. IF PERTINENT DIMENSIONS ARE NOT SHOWN, CONTACT THE DESIGNER FOR CLARIFICATION, AND ANNOTATE THE DIMENSION ON THE AS-BUILT RECORD DRAWINGS. 37.THE DEVELOPER SHALL HAVE, ONSITE AT ALL TIMES, ONE (1) SIGNED COPY OF THE APPROVED PLANS, ONE (1) COPY OF THE APPROPRIATE STANDARDS AND SPECIFICATIONS, AND A COPY OF ANY PERMITS AND EXTENSION AGREEMENTS NEEDED FOR THE JOB. 38.IF, DURING THE CONSTRUCTION PROCESS, CONDITIONS ARE ENCOUNTERED WHICH COULD INDICATE A SITUATION THAT IS NOT IDENTIFIED IN THE PLANS OR SPECIFICATIONS, THE DEVELOPER SHALL CONTACT THE DESIGNER AND THE LOCAL ENTITY ENGINEER IMMEDIATELY. 39.THE DEVELOPER SHALL BE RESPONSIBLE FOR RECORDING AS-BUILT INFORMATION ON A SET OF RECORD DRAWINGS KEPT ON THE CONSTRUCTION SITE, AND AVAILABLE TO THE LOCAL ENTITY'S INSPECTOR AT ALL TIMES. UPON COMPLETION OF THE WORK, THE CONTRACTOR(S) SHALL SUBMIT RECORD DRAWINGS TO THE LOCAL ENTITY ENGINEER. 40.THE DESIGNER SHALL PROVIDE, IN THIS LOCATION ON THE PLAN, THE LOCATION AND DESCRIPTION OF THE NEAREST SURVEY BENCHMARKS (2) FOR THE PROJECT AS WELL AS THE BASIS OF BEARINGS. THE INFORMATION SHALL BE AS FOLLOWS: PROJECT VERTICAL DATUM: NAVD 88 BENCHMARK: CITY OF FORT COLLINS VERTICAL BENCHMARK "FOREMAN" LOCATED ON THE NORTH SIDE OF PROSPECT RD. 0.1 MILES EAST OF SHARP POINT DRIVE,AT THE BACK OF WALK AT THE BASE OF THE PARAPET WALL TO THE BRIDGE OVER THE POUDRE RIVER,15 FT EAST OF THE WEST END OF THE PARAPET WALL. ELEVATION: 4910.33 PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) FOR THEIR VERTICAL DATUMS. IF NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQUATION SHOULD BE USED: NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) = NAVD88 - 3.19' 41.ALL STATIONING IS BASED ON CENTERLINE OF ROADWAYS UNLESS OTHERWISE NOTED. GENERAL NOTES (CONTINUED) 42.DAMAGED CURB, GUTTER AND SIDEWALK EXISTING PRIOR TO CONSTRUCTION, AS WELL AS EXISTING FENCES, TREES, STREETS, SIDEWALKS, CURBS AND GUTTERS, LANDSCAPING, STRUCTURES, AND IMPROVEMENTS DESTROYED, DAMAGED OR REMOVED DUE TO CONSTRUCTION OF THIS PROJECT, SHALL BE REPLACED OR RESTORED IN LIKE KIND AT THE DEVELOPER'S EXPENSE, UNLESS OTHERWISE INDICATED ON THESE PLANS, PRIOR TO THE ACCEPTANCE OF COMPLETED IMPROVEMENTS AND/OR PRIOR TO THE ISSUANCE OF THE FIRST CERTIFICATE OF OCCUPANCY. 43.WHEN AN EXISTING ASPHALT STREET MUST BE CUT, THE STREET MUST BE RESTORED TO A CONDITION EQUAL TO OR BETTER THAN ITS ORIGINAL CONDITION. THE EXISTING STREET CONDITION SHALL BE DOCUMENTED BY THE LOCAL ENTITY CONSTRUCTION INSPECTOR BEFORE ANY CUTS ARE MADE. PATCHING SHALL BE DONE IN ACCORDANCE WITH THE LOCAL ENTITY STREET REPAIR STANDARDS. THE FINISHED PATCH SHALL BLEND IN SMOOTHLY INTO THE EXISTING SURFACE. ALL LARGE PATCHES SHALL BE PAVED WITH AN ASPHALT LAY-DOWN MACHINE. IN STREETS WHERE MORE THAN ONE CUT IS MADE, AN OVERLAY OF THE ENTIRE STREET WIDTH, INCLUDING THE PATCHED AREA, MAY BE REQUIRED. THE DETERMINATION OF NEED FOR A COMPLETE OVERLAY SHALL BE MADE BY THE LOCAL ENTITY ENGINEER AND/OR THE LOCAL ENTITY INSPECTOR AT THE TIME THE CUTS ARE MADE. 44.UPON COMPLETION OF CONSTRUCTION, THE SITE SHALL BE CLEANED AND RESTORED TO A CONDITION EQUAL TO, OR BETTER THAN, THAT WHICH EXISTED BEFORE CONSTRUCTION, OR TO THE GRADES AND CONDITION AS REQUIRED BY THESE PLANS. 45.STANDARD HANDICAP RAMPS ARE TO BE CONSTRUCTED AT ALL CURB RETURNS AND AT ALL "T" INTERSECTIONS. 46.AFTER ACCEPTANCE BY THE LOCAL ENTITY, PUBLIC IMPROVEMENTS DEPICTED IN THESE PLANS SHALL BE GUARANTEED TO BE FREE FROM MATERIAL AND WORKMANSHIP DEFECTS FOR A MINIMUM PERIOD OF TWO YEARS FROM THE DATE OF ACCEPTANCE. 47.THE LOCAL ENTITY SHALL NOT BE RESPONSIBLE FOR THE MAINTENANCE OF ROADWAY AND APPURTENANT IMPROVEMENTS, INCLUDING STORM DRAINAGE STRUCTURES AND PIPES, FOR THE FOLLOWING PRIVATE STREETS: NONE. 48.APPROVED VARIANCES ARE LISTED AS FOLLOWS: 1)STORMWATER VARIANCE (PENDING) STREET IMPROVEMENTS NOTES 1.ALL STREET CONSTRUCTION IS SUBJECT TO THE GENERAL NOTES ON THE COVER SHEET OF THESE PLANS AS WELL AS THE STREET IMPROVEMENTS NOTES LISTED HERE. 2.A PAVING SECTION DESIGN, SIGNED AND STAMPED BY A COLORADO LICENSED ENGINEER, MUST BE SUBMITTED TO THE LOCAL ENTITY ENGINEER FOR APPROVAL, PRIOR TO ANY STREET CONSTRUCTION ACTIVITY, (FULL DEPTH ASPHALT SECTIONS ARE NOT PERMITTED AT A DEPTH GREATER THAN 8 INCHES OF ASPHALT). THE JOB MIX SHALL BE SUBMITTED FOR APPROVAL PRIOR TO PLACEMENT OF ANY ASPHALT. 3.WHERE PROPOSED PAVING ADJOINS EXISTING ASPHALT, THE EXISTING ASPHALT SHALL BE SAW CUT, A MINIMUM DISTANCE OF 12 INCHES FROM THE EXISTING EDGE, TO CREATE A CLEAN CONSTRUCTION JOINT. THE DEVELOPER SHALL BE REQUIRED TO REMOVE EXISTING PAVEMENT TO A DISTANCE WHERE A CLEAN CONSTRUCTION JOINT CAN BE MADE. WHEEL CUTS SHALL NOT BE ALLOWED UNLESS APPROVED BY THE LOCAL ENTITY ENGINEER IN FORT COLLINS. 4.STREET SUBGRADES SHALL BE SCARIFIED THE TOP 12 INCHES AND RE-COMPACTED PRIOR TO SUBBASE INSTALLATION. NO BASE MATERIAL SHALL BE LAID UNTIL THE SUBGRADE HAS BEEN INSPECTED AND APPROVED BY THE LOCAL ENTITY ENGINEER. 5.VALVE BOXES AND MANHOLES ARE TO BE BROUGHT UP TO GRADE AT THE TIME OF PAVEMENT PLACEMENT OR OVERLAY. VALVE BOX ADJUSTING RINGS ARE NOT ALLOWED. 6.WHEN AN EXISTING ASPHALT STREET MUST BE CUT, THE STREET MUST BE RESTORED TO A CONDITION EQUAL TO OR BETTER THAN ITS ORIGINAL CONDITION. THE EXISTING STREET CONDITION SHALL BE DOCUMENTED BY THE INSPECTOR BEFORE ANY CUTS ARE MADE. CUTTING AND PATCHING SHALL BE DONE IN CONFORMANCE WITH CHAPTER 25, RECONSTRUCTION AND REPAIR. THE FINISHED PATCH SHALL BLEND SMOOTHLY INTO THE EXISTING SURFACE. THE DETERMINATION OF NEED FOR A COMPLETE OVERLAY SHALL BE MADE BY THE LOCAL ENTITY ENGINEER. ALL OVERLAY WORK SHALL BE COORDINATED WITH ADJACENT LANDOWNERS SUCH THAT FUTURE PROJECTS DO NOT CUT THE NEW ASPHALT OVERLAY WORK. 7.ALL TRAFFIC CONTROL DEVICES SHALL BE IN CONFORMANCE WITH THESE PLANS OR AS OTHERWISE SPECIFIED IN MUTCD (INCLUDING COLORADO SUPPLEMENT) AND AS PER THE RIGHT-OF-WAY WORK PERMIT TRAFFIC CONTROL PLAN. 8.THE DEVELOPER IS REQUIRED TO PERFORM A GUTTER WATER FLOW TEST IN THE PRESENCE OF THE LOCAL ENTITY INSPECTOR AND PRIOR TO INSTALLATION OF ASPHALT. GUTTERS THAT HOLD MORE THAN INCH DEEP OR 5 FEET LONGITUDINALLY, OF WATER, SHALL BE COMPLETELY REMOVED AND RECONSTRUCTED TO DRAIN PROPERLY. 9.PRIOR TO PLACEMENT OF H.B.P. OR CONCRETE WITHIN THE STREET AND AFTER MOISTURE/DENSITY TESTS HAVE BEEN TAKEN ON THE SUBGRADE MATERIAL (WHEN A FULL DEPTH SECTION IS PROPOSED) OR ON THE SUBGRADE AND BASE MATERIAL (WHEN A COMPOSITE SECTION IS PROPOSED), A MECHANICAL "PROOF ROLL" WILL BE REQUIRED. THE ENTIRE SUBGRADE AND/OR BASE MATERIAL SHALL BE ROLLED WITH A HEAVILY LOADED VEHICLE HAVING A TOTAL GVW OF NOT LESS THAN 50,000 LBS. AND A SINGLE AXLE WEIGHT OF AT LEAST 18,000 LBS. WITH PNEUMATIC TIRES INFLATED TO NOT LESS THAN 90 P.S.I.G. "PROOF ROLL" VEHICLES SHALL NOT TRAVEL AT SPEEDS GREATER THAN 3 M.P.H. ANY PORTION OF THE SUBGRADE OR BASE MATERIAL WHICH EXHIBITS EXCESSIVE PUMPING OR DEFORMATION, AS DETERMINED BY THE LOCAL ENTITY ENGINEER, SHALL BE REWORKED, REPLACED OR OTHERWISE MODIFIED TO FORM A SMOOTH, NON-YIELDING SURFACE. THE LOCAL ENTITY ENGINEER SHALL BE NOTIFIED AT LEAST 24 HOURS PRIOR TO THE "PROOF ROLL." ALL "PROOF ROLLS" SHALL BE PERFORMED IN THE PRESENCE OF AN INSPECTOR. STORM DRAINAGE NOTES 1.THE CITY OF FORT COLLINS SHALL NOT BE RESPONSIBLE FOR THE MAINTENANCE OF STORM DRAINAGE FACILITIES LOCATED ON PRIVATE PROPERTY. MAINTENANCE OF ONSITE DRAINAGE FACILITIES SHALL BE THE RESPONSIBILITY OF THE PROPERTY OWNER(S). 2.ALL RECOMMENDATIONS OF THE PRELIMINARY DRAINAGE AND EROSION CONTROL STUDY ENTITLED "PROSPECT SPORTS CLUB" PREPARED BY UNITED CIVIL DESIGN GROUP, LLC, AND DATED DECEMBER 20, 2023, SHALL BE FOLLOWED AND IMPLEMENTED. 3.CERTIFICATION OF GRADING AND DRAINAGE FACILITIES MUST BE COMPLETED BY A REGISTERED ENGINEER AND SUBMITTED TO THE STORMWATER UTILITY DEPARTMENT AT LEAST TWO WEEKS PRIOR TO STORMWATER UTILITY DEPARTMENT ACCEPTANCE, OR OTHERWISE IN ACCORDANCE WITH THE DEVELOPMENT AGREEMENT. 4.SEE CITY OF FORT COLLINS STORMWATER CRITERIA MANUAL - APPENDIX F CONSTRUCTION CONTROL MEASURES STANDARD NOTES AND STANDARD EROSION CONTROL NOTES. TRAFFIC SIGNING AND PAVEMENT MARKING CONSTRUCTION NOTES 1.ALL SIGNAGE AND MARKING IS SUBJECT TO THE GENERAL NOTES ON THE COVER SHEET OF THESE PLANS, AS WELL AS THE TRAFFIC SIGNING AND MARKING CONSTRUCTION NOTES LISTED HERE. 2.ALL SYMBOLS, INCLUDING ARROWS, ONLYS, CROSSWALKS, STOP BARS, ETC. SHALL BE PRE-FORMED THERMO-PLASTIC. 3.ALL SIGNAGE SHALL BE PER LOCAL ENTITY STANDARDS AND THESE PLANS OR AS OTHERWISE SPECIFIED IN MUTCD. 4.ALL LANE LINES FOR ASPHALT PAVEMENT SHALL RECEIVE TWO COATS OF LATEX PAINT WITH GLASS BEADS. 5.ALL LANE LINES SHALL BE LATEX PAINT. 6.PRIOR TO PERMANENT INSTALLATION OF TRAFFIC STRIPING AND SYMBOLS, THE DEVELOPER SHALL PLACE TEMPORARY TABS OR TAPE DEPICTING ALIGNMENT AND PLACEMENT OF THE SAME. THEIR PLACEMENT SHALL BE APPROVED BY THE LOCAL ENTITY ENGINEER PRIOR TO PERMANENT INSTALLATION OF STRIPING AND SYMBOLS. 7.PRE-FORMED THERMO-PLASTIC APPLICATIONS SHALL BE AS SPECIFIED IN THESE PLANS AND/OR THESE STANDARDS. 8.LATEX APPLICATIONS SHALL BE APPLIED AS SPECIFIED IN CDOT STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION. 9.ALL SURFACES SHALL BE THOROUGHLY CLEANED PRIOR TO INSTALLATION OF STRIPING OR MARKINGS. 10.ALL SIGN POSTS SHALL UTILIZE BREAK-AWAY ASSEMBLIES AND FASTENERS PER THE STANDARDS. 11.A FIELD INSPECTION OF LOCATION AND INSTALLATION OF ALL SIGNS SHALL BE PERFORMED BY THE LOCAL ENTITY ENGINEER. ALL DISCREPANCIES IDENTIFIED DURING THE FIELD INSPECTION MUST BE CORRECTED BEFORE THE 2-YEAR WARRANTY PERIOD WILL BEGIN. 12.THE DEVELOPER INSTALLING SIGNS SHALL BE RESPONSIBLE FOR LOCATING AND PROTECTING ALL UNDERGROUND UTILITIES. 13.SPECIAL CARE SHALL BE TAKEN IN SIGN LOCATION TO ENSURE AN UNOBSTRUCTED VIEW OF EACH SIGN. 14.SIGNAGE AND STRIPING HAS BEEN DETERMINED BY INFORMATION AVAILABLE AT THE TIME OF REVIEW. PRIOR TO INITIATION OF THE WARRANTY PERIOD, THE CITY OF FORT COLLINS TRAFFIC ENGINEER RESERVES THE RIGHT TO REQUIRE ADDITIONAL SIGNAGE AND/OR STRIPING IF THE CITY OF FORT COLLINS TRAFFIC ENGINEER DETERMINES THAT AN UNFORESEEN CONDITION WARRANTS SUCH SIGNAGE ACCORDING TO THE MUTCD OR THE CDOT M AND S STANDARDS. ALL SIGNAGE AND STRIPING SHALL FALL UNDER THE REQUIREMENTS OF THE TWO YEAR WARRANTY PERIOD FOR NEW CONSTRUCTION (EXCEPT FAIR WEAR ON TRAFFIC MARKINGS). 15.SLEEVES FOR SIGN POSTS SHALL BE REQUIRED FOR USE IN ISLANDS/MEDIANS. REFER TO CHAPTER 14, TRAFFIC CONTROL DEVICES, FOR ADDITIONAL DETAIL. 16.CONTRACTOR IS RESPONSIBLE FOR REMOVING ALL ANCHORS, POSTS, SIGNS AND/OR DELINEATORS IN CONSTRUCTION AREA. CONTRACTOR MAY KEEP THE SIGNS, OR CALL THE CITY TRAFFIC DIVISION TO HAVE THEM REMOVED. 17.NO "RESET" ANCHORS, POSTS, SIGNS, AND/OR DELINEATORS WILL BE ACCEPTED. 18.ALL ANCHORS, POSTS, SINGS, AND/OR DELINEATORS SHALL BE NEW AND BE CONSISTENT WITH THE LCUASS CRITERIA. FORT COLLINS TREE PROTECTION NOTES 1.ALL EXISTING TREES WITHIN THE LIMITS OF THE DEVELOPMENT AND WITHIN ANY NATURAL AREA BUFFER ZONES SHALL REMAIN AND BE PROTECTED UNLESS NOTED ON THESE PLANS FOR REMOVAL. 2.WITHIN THE DRIP LINE OF ANY PROTECTED EXISTING TREE, THERE SHALL BE NO CUT OR FILL OVER A FOUR-INCH DEPTH UNLESS A QUALIFIED ARBORIST OR FORESTER HAS EVALUATED AND APPROVED THE DISTURBANCE. 3.ALL PROTECTED EXISTING TREES SHALL BE PRUNED TO THE CITY OF FORT COLLINS FORESTRY STANDARDS. TREE PRUNING AND REMOVAL SHALL BE PERFORMED BY A BUSINESS THAT HOLDS A CURRENT CITY OF FORT COLLINS ARBORIST LICENSE WHERE REQUIRED BY CODE. 4.PRIOR TO AND DURING CONSTRUCTION, BARRIERS SHALL BE ERECTED AROUND ALL PROTECTED EXISTING TREES WITH SUCH BARRIERS TO BE OF ORANGE FENCING A MINIMUM OF FOUR (4) FEET IN HEIGHT, SECURED WITH METAL T-POSTS, NO CLOSER THAN SIX (6) FEET FROM THE TRUNK OR ONE-HALF (½) OF THE DRIP LINE, WHICHEVER IS GREATER. THERE SHALL BE NO STORAGE OR MOVEMENT OF EQUIPMENT, MATERIAL, DEBRIS OR FILL WITHIN THE FENCED TREE PROTECTION ZONE. 5.DURING THE CONSTRUCTION STAGE OF DEVELOPMENT, THE APPLICANT SHALL PREVENT THE CLEANING OF EQUIPMENT OR MATERIAL OR THE STORAGE AND DISPOSAL OF WASTE MATERIAL SUCH AS PAINTS, OILS, SOLVENTS, ASPHALT, CONCRETE, MOTOR OIL OR ANY OTHER MATERIAL HARMFUL TO THE LIFE OF A TREE WITHIN THE DRIP LINE OF ANY PROTECTED TREE OR GROUP OF TREES. 6.NO DAMAGING ATTACHMENT, WIRES, SIGNS OR PERMITS MAY BE FASTENED TO ANY PROTECTED TREE. 7.LARGE PROPERTY AREAS CONTAINING PROTECTED TREES AND SEPARATED FROM CONSTRUCTION OR LAND CLEARING AREAS, ROAD RIGHTS-OF-WAY AND UTILITY EASEMENTS MAY BE "RIBBONED OFF," RATHER THAN ERECTING PROTECTIVE FENCING AROUND EACH TREE AS REQUIRED IN SUBSECTION (G)(3) ABOVE. THIS MAY BE ACCOMPLISHED BY PLACING METAL T-POST STAKES A MAXIMUM OF FIFTY (50) FEET APART AND TYING RIBBON OR ROPE FROM STAKE-TO-STAKE ALONG THE OUTSIDE PERIMETERS OF SUCH AREAS BEING CLEARED. 8.THE INSTALLATION OF UTILITIES, IRRIGATION LINES OR ANY UNDERGROUND FIXTURE REQUIRING EXCAVATION DEEPER THAN SIX (6) INCHES SHALL BE ACCOMPLISHED BY BORING UNDER THE ROOT SYSTEM OF PROTECTED EXISTING TREES AT A MINIMUM DEPTH OF TWENTY-FOUR (24) INCHES. THE AUGER DISTANCE IS ESTABLISHED FROM THE FACE OF THE TREE (OUTER BARK) AND IS SCALED FROM TREE DIAMETER AT BREAST HEIGHT AS DESCRIBED IN THE CHART BELOW: 9.NO TREES SHALL BE REMOVED DURING THE SONGBIRD NESTING SEASON (FEBRUARY 1 TO JULY 31) WITHOUT FIRST HAVING A PROFESSIONAL ECOLOGIST OR WILDLIFE BIOLOGIST COMPLETE A NESTING SURVEY TO IDENTIFY ANY ACTIVE NESTS EXISTING ON THE PROJECT SITE. THE SURVEY SHALL BE SENT TO THE CITY ENVIRONMENTAL PLANNER. IF ACTIVE NESTS ARE FOUND, THE CITY WILL COORDINATE WITH RELEVANT STATE AND FEDERAL REPRESENTATIVES TO DETERMINE WHETHER ADDITIONAL RESTRICTIONS ON TREE REMOVAL AND CONSTRUCTION APPLY. STANDARD GRADING AND EROSION AND SEDIMENT CONTROL NOTES 1.THE EROSION CONTROL INSPECTOR MUST BE NOTIFIED AT LEAST TWENTY-FOUR (24) HOURS PRIOR TO ANY CONSTRUCTION ON THIS SITE. 2.THERE SHALL BE NO EARTH-DISTURBING ACTIVITY OUTSIDE THE LIMITS DESIGNATED ON THE ACCEPTED PLANS. 3.ALL REQUIRED PERIMETER SILT AND CONSTRUCTION FENCING SHALL BE INSTALLED PRIOR TO ANY LAND DISTURBING ACTIVITY (STOCKPILING, STRIPPING, GRADING, ETC). ALL OTHER REQUIRED EROSION CONTROL MEASURES SHALL BE INSTALLED AT THE APPROPRIATE TIME IN THE CONSTRUCTION SEQUENCE AS INDICATED IN THE APPROVED PROJECT SCHEDULE, CONSTRUCTION PLANS, AND EROSION CONTROL REPORT. 4.AT ALL TIMES DURING CONSTRUCTION, THE DEVELOPER SHALL BE RESPONSIBLE FOR PREVENTING AND CONTROLLING ON-SITE EROSION INCLUDING KEEPING THE PROPERTY SUFFICIENTLY WATERED SO AS TO MINIMIZE WIND BLOWN SEDIMENT. THE DEVELOPER SHALL ALSO BE RESPONSIBLE FOR INSTALLING AND MAINTAINING ALL EROSION CONTROL FACILITIES SHOWN HEREIN. 5.PRE-DISTURBANCE VEGETATION SHALL BE PROTECTED AND RETAINED WHEREVER POSSIBLE. REMOVAL OR DISTURBANCE OF EXISTING VEGETATION SHALL BE LIMITED TO THE AREA(S) REQUIRED FOR IMMEDIATE CONSTRUCTION OPERATIONS, AND FOR THE SHORTEST PRACTICAL PERIOD OF TIME. 6.ALL SOILS EXPOSED DURING LAND DISTURBING ACTIVITY (STRIPPING, GRADING, UTILITY INSTALLATIONS, STOCKPILING, FILLING, ETC.) SHALL BE KEPT IN A ROUGHENED CONDITION BY RIPPING OR DISKING ALONG LAND CONTOURS UNTIL MULCH, VEGETATION, OR OTHER PERMANENT EROSION CONTROL BMPS ARE INSTALLED. NO SOILS IN AREAS OUTSIDE PROJECT STREET RIGHTS_OF-WAY SHALL REMAIN EXPOSED BY LAND DISTURBING ACTIVITY FOR MORE THAN THIRTY (30) DAYS BEFORE REQUIRED TEMPORARY OR PERMANENT EROSION CONTROL (E.G. SEED/MULCH, LANDSCAPING, ETC.) IS INSTALLED, UNLESS OTHERWISE APPROVED BY THE CITY OF LOVELAND. 7.IN ORDER TO MINIMIZE EROSION POTENTIAL, ALL TEMPORARY (STRUCTURAL) EROSION CONTROL MEASURES SHALL: A.BE INSPECTED AT A MINIMUM OF ONCE EVERY TWO (2) WEEKS AND AFTER EACH SIGNIFICANT STORM EVENT AND REPAIRED OR RECONSTRUCTED AS NECESSARY IN ORDER TO ENSURE THE CONTINUED PERFORMANCE OF THEIR INTENDED FUNCTION. B.REMAIN IN PLACE UNTIL SUCH TIME AS ALL THE SURROUNDING DISTURBED AREAS ARE SUFFICIENTLY STABILIZED AS DETERMINED BY THE EROSION CONTROL INSPECTOR. C.BE REMOVED AFTER THE SITE HAS BEEN SUFFICIENTLY STABILIZED AS DETERMINED BY THE EROSION CONTROL INSPECTOR. 8.WHEN TEMPORARY EROSION CONTROL MEASURES ARE REMOVED, THE DEVELOPER SHALL BE RESPONSIBLE FOR THE CLEAN UP AND REMOVAL OF ALL SEDIMENT AND DEBRIS FROM ALL DRAINAGE INFRASTRUCTURE AND OTHER PUBLIC FACILITIES. 9.THE CONTRACTOR SHALL IMMEDIATELY CLEAN UP ANY CONSTRUCTION MATERIALS INADVERTENTLY DEPOSITED ON EXISTING STREETS, SIDEWALKS, OR OTHER PUBLIC RIGHTS OF WAY, AND MAKE SURE STREETS AND WALKWAYS ARE CLEANED AT THE END OF EACH WORKING DAY. 10.ALL RETAINED SEDIMENTS, PARTICULARLY THOSE ON PAVED ROADWAY SURFACES, SHALL BE REMOVED AND DISPOSED OF IN A MANNER AND LOCATION SO AS NOT TO CAUSE THEIR RELEASE INTO ANY WATERS OF THE UNITED STATES. 11.NO SOIL STOCKPILE SHALL EXCEED TEN (10) FEET IN HEIGHT. ALL SOIL STOCKPILES SHALL BE PROTECTED FROM SEDIMENT TRANSPORT BY SURFACE ROUGHENING, WATERING, AND PERIMETER SILT FENCING. ANY SOIL STOCKPILE REMAINING AFTER THIRTY (30) DAYS SHALL BE SEEDED AND MULCHED. 12.THE STORMWATER VOLUME CAPACITY OF DETENTION PONDS WILL BE RESTORED AND STORM SEWER LINES WILL BE CLEANED UPON COMPLETION OF THE PROJECT AND BEFORE TURNING THE MAINTENANCE OVER TO THE CITY OF LOVELAND OR HOMEOWNERS ASSOCIATION (HOA). 13.CITY ORDINANCE AND COLORADO DISCHARGE PERMIT SYSTEM (CDPS) REQUIREMENTS MAKE IT UNLAWFUL TO DISCHARGE OR ALLOW THE DISCHARGE OF ANY POLLUTANT OR CONTAMINATED WATER FROM CONSTRUCTION SITES. POLLUTANTS INCLUDE, BUT ARE NOT LIMITED TO DISCARDED BUILDING MATERIALS, CONCRETE TRUCK WASHOUT, CHEMICALS, OIL AND GAS PRODUCTS, LITTER, AND SANITARY WASTE. THE DEVELOPER SHALL AT ALL TIMES TAKE WHATEVER MEASURES ARE NECESSARY TO ASSURE THE PROPER CONTAINMENT AND DISPOSAL OF POLLUTANTS ON THE SITE IN ACCORDANCE WITH ANY AND ALL APPLICABLE LOCAL, STATE, AND FEDERAL REGULATIONS. 14.A DESIGNATED AREA SHALL BE PROVIDED ON SITE FOR CONCRETE TRUCK CHUTE WASHOUT. THE AREA SHALL BE CONSTRUCTED SO AS TO CONTAIN WASHOUT MATERIAL AND LOCATED AT LEAST FIFTY (50) FEET AWAY FROM ANY WATERWAY DURING CONSTRUCTION. UPON COMPLETION OF CONSTRUCTION ACTIVITIES THE CONCRETE WASHOUT MATERIAL WILL BE REMOVED AND PROPERLY DISPOSED OF PRIOR TO THE AREA BEING RESTORED. 15.TO ENSURE THAT SEDIMENT DOES NOT MOVE OFF OF INDIVIDUAL LOTS ONE OR MORE OF THE FOLLOWING SEDIMENT/EROSION CONTROL BMPS SHALL BE INSTALLED AND MAINTAINED UNTIL THE LOTS ARE SUFFICIENTLY STABILIZED, AS DETERMINED BY THE EROSION CONTROL INSPECTOR, (LOVELAND GMA & CITY LIMITS ONLY). A.BELOW ALL GUTTER DOWNSPOUTS. B.OUT TO DRAINAGE SWALES. C.ALONG LOT PERIMETER. D.OTHER LOCATIONS, IF NEEDED. 16.CONDITIONS IN THE FIELD MAY WARRANT EROSION CONTROL MEASURES IN ADDITION TO WHAT IS SHOWN ON THESE PLANS. THE DEVELOPER SHALL IMPLEMENT WHATEVER MEASURES ARE DETERMINED NECESSARY, AS DIRECTED BY THE CITY OF LOVELAND. 17.A VEHICLE TRACKING CONTROL PAD SHALL BE INSTALLED WHENEVER IT IS NECESSARY FOR CONSTRUCTION EQUIPMENT INCLUDING BUT NOT LIMITED TO PERSONAL VEHICLES EXITING EXISTING ROADWAYS. NO EARTHEN MATERIALS, I.E., STONE, DIRT, ETC., SHALL BE PLACED IN THE CURB & GUTTER OR ROADWAY AS A RAMP TO ACCESS TEMPORARY STOCKPILE(S), STAGING AREA(S), CONSTRUCTION MATERIAL(S), CONCRETE WASHOUT AREA(S) AND/OR BUILDING SITE(S). SIGNS Reminder to check and update with final edition date Reminder to check and update with final edition date UCDG Response:This has been updated with the final edition and correct date. UCDG Response:This has been updated. LOT 6 PROSPECT PARK EAST P.U.D. LOT 4 PROSPECT PARK EAST P.U.D. TRACT "A" PROSPECT PARK EAST P.U.D. LOT 5 PROSPECT PARK EAST P.U.D. 2601 E. PROSPECT ROAD OWNER: MAX WEST INC. REMOVE EXISTING CURB PROTECT EXISTING TREE (TYP.) (SEE NOTE 6) PROTECT EXISTING TREE (TYP.) (SEE NOTE 6) PROTECT EXISTING TREE (TYP.) (SEE NOTE 6) E. PROSPECT R O A D SH A R P P O I N T D R . EXISTING BUILDING EXISTING SIDEWALK TO REMAIN REMOVE EXISTING TREE (TYP.) (SEE NOTE 5) EXISTING CURB EXISTING CURB & GUTTER EXISTING SIDEWALK TO REMAIN EXISTING SIDEWALK EXISTING STRIPING LOT LINE LOT LINE LOT LINE LOT LINE EXISTING LAKE/POND EXISTING ELECTRIC EXISTING HYDRANT EXISTING HYDRANT EXISTING HYDRANT 8' UTILITY EASEMENT 25' PEDESTRIAN & ACCESS EASEMENT BOOK: 2296 PAGE: 2456 15' UTILITY EASEMENT BOOK: 2296 PAGE: 2456 50' PEDESTRIAN & ACCESS EASEMENT BOOK: 2296 PAGE: 2456 15' UTILITY EASEMENT BOOK: 2296 PAGE: 2456 ACCESS EASEMENT REC. NO. 20150005330 CITY OF FORT COLLINS FIBER CITY OF FORT COLLINS ELECTRIC CITY OF FORT COLLINS ELECTRIC CITY OF FORT COLLINS ELECTRIC CITY OF FORT COLLINS FIBER CITY OF FORT COLLINS FIBER 20' UTILITY & DRAINAGE EASEMENT BOOK: 2296, PAGE: 2456 COMCAST TELE XCEL GAS ADVANCED ENERGY MONUMENT SIGN TO BE REMOVED EXISTING CONCRETE PAD TO BE REMOVED EXISTING ASPHALT EXISTING GRAVEL EXISTING CURB CUT PROTECT EXISTING FENCED IN ELECTRICAL TRANSFORMER REMOVE EXISTING TREE (TYP.) (SEE NOTE 5) EXISTING 6" WATER EXISTING 8" SANITARY SEWER EXISTING FENCING GRAVEL ACCESS ROAD EXISTING 42" SANITARY SEWER EXISTING 12" WATER EXISTING SIGNS TO REMAIN PROTECT EXISTING TREES (TYP.) (SEE NOTE 6) EXISTING 6" WATER SMH29 RIM-4900.83 INV N=4889.17 (42" RCP) INV NE=4894.12 (6" PVC) INV SE=4894.23 (6" PVC) INV S=4889.16 (42" RCP) SMH30 RIM-4903.89 INV N=4893.25 (8" PVC) INV E=4893.44 (8" PVC) INV S=4893.24 (8" PVC) SMH 10 4900.22=RIM (COULD NOT BE OPENED) EXISTING PRIMARY ELECTRIC LINE TO REMAIN 54' ROW 100' ROW POUDRE RIVER 100-YR FLOODPLAIN POUDRE RIVER 100-YR FLOODWAY POUDRE RIVER 500-YR FLOODPLAIN LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE TOP OF BANK EDGE OF POND PROTECT EXISTING ELECTRIC EQUIPMENT SECTION LINE EXISTING SIDEWALK TO REMAIN 15' UTILITY EASEMENT BOOK: 2296 PAGE: 2456 REMOVE SECTION OF EXISTING SIDEWALK FOR UTILITY INSTALLATION ABANDON EXISTING SANITARY SERVICE STUB FOR LOT 5 PER CITY STANDARDS FLOODPLAIN BFE 100-YEAR FLOOD ELEVATION - 4904 (NAVD 88) REMOVE & REPLACE EXISTING ASPHALT REMOVE EXISTING SIDEWALK REMOVE EXISTING CURB & GUTTER REMOVE EXISTING CURB & GUTTER REMOVE & REPLACE EXISTING ASPHALT REMOVE EXISTING SIDEWALK SAWCUT EXISTING PAVEMENT SAWCUT EXISTING PAVEMENT FLOODPLAIN BFE 100-YEAR FLOOD E L E V A T I O N - 4,900.0 (NAVD 88) FLOODPLAIN BFE 100-YEAR FLOOD ELEVATI O N - 4901.0 (NAVD 88) FLOODPLAIN C R O S S - S E C T I O N # 208567 100-YR FLOOD E L E V . 4 , 9 0 0 . 0 ( N A V D 8 8 ) REMOVE EXISTING TREE (TYP.) (SEE NOTE 5) PROTECT EXISTING TREES (TYP.) (SEE NOTE 6) PROTECT EXISTING TREE (TYP.) (SEE NOTE 6) PROTECT EXISTING TREE (TYP.) (SEE NOTE 6) REMOVE AND RESET EXISTING FENCE AT BACK OF WALK REMOVE EXISTING TREE (TYP.) (SEE NOTE 5) REMOVE WATERLINE FOR LOWERING LEGEND LOT LINE / PROPERTY BOUNDARY RIGHT OF WAY EASEMENT CENTERLINE EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR LIMITS OF DISTURBANCE REMOVE EXISTING CURB SAWCUT LINE REMOVE EXISTING UTILITY LINE REMOVE EXISTING TREE NOTES 1.EXISTING UNDERGROUND AND OVERHEAD PUBLIC AND PRIVATE UTILITIES AS SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. EXISTING UTILITY MAINS AND SERVICES MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THESE DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATIONS. 2.THE CONTRACTOR SHALL PROTECT ALL EXISTING FEATURES THAT ARE NOT TO BE REMOVED ADJACENT TO THE CONSTRUCTION AREA INCLUDING, BUT NOT LIMITED TO, PAVEMENT, PRIVATE FENCES, ABOVE GROUND OR UNDERGROUND UTILITIES, STRUCTURES, AND UNDERGROUND FOUNDATIONS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE THAT SHOULD OCCUR TO ANY ON-SITE, OFF-SITE, PUBLIC OR PRIVATE FACILITY OR FEATURE AS A RESULT OF THE CONSTRUCTION PROCESS FOR THIS PROJECT. 3.CURB, GUTTER AND SIDEWALK SHALL BE REMOVED TO THE NEAREST JOINT. 4.CONTRACTOR SHALL COORDINATE ALL CONSTRUCTION ITEMS IMPACTING ADJACENT PROPERTIES WITH THE PROPERTY OWNERS PRIOR TO BEGINNING ANY CONSTRUCTION ACTIVITIES. 5.COORDINATE THE REMOVAL AND/OR SALVAGING OF ALL EXISTING TREES AND OTHER PLANTINGS SHOWN ON THIS DEMOLITION PLAN WITH THE LANDSCAPE DRAWINGS. TREE REMOVAL SHALL BE BY A BUSINESS HOLDING A CURRENT CITY OF FORT COLLINS ARBORIST LICENSE AND ON THE CITY BID LIST. A FREE PERMIT MUST BE OBTAINED FROM THE CITY FORESTER BEFORE TREES ARE REMOVED. 6.REFER TO SHEET C0.01 FOR CITY OF FORT COLLINS TREE PROTECTION NOTES. REFER TO LANDSCAPE PLANS FOR THE TREE MITIGATION TABLE AND TREE PROTECTION DETAILS. 7.CONTRACTOR SHALL COORDINATE ALL UTILITY DEMOLITION AND/OR RELOCATION ITEMS WITH THE APPROPRIATE UTILITY PROVIDER PRIOR TO BEGINNING ANY ONSITE DEMOLITION. 8.CONTRACTOR SHALL LOCATE (HORIZONTAL AND VERTICAL) EXISTING UTILITIES ALONG SHARP POINT DRIVE PRIOR TO CONSTRUCTION. 1.PORTIONS OF THIS PROPERTY ARE LOCATED IN THE FEMA REGULATED, 100-YEAR AND 500-YEAR POUDRE RIVER FLOODPLAIN. ANY DEVELOPMENT WITHIN THE FLOODPLAIN MUST COMPLY WITH THE SAFETY REGULATIONS OF CHAPTER 10 OF CITY MUNICIPAL CODE. 2.ANY CONSTRUCTION ACTIVITIES IN THE FLOOD FRINGE (E.G. BUILDING OF STRUCTURES, EV CHARGING STATIONS, GRADING, FILL, DETENTION PONDS, BIKE PATHS, PARKING LOTS, UTILITY WORK, FLOOD CONTROL CHANNELS, SIDEWALK OR CURB & GUTTER INSTALLATION / REPLACEMENT, LANDSCAPING, ETC.) MUST BE PRECEDED BY AN APPROVED FLOODPLAIN USE PERMIT, THE APPROPRIATE PERMIT APPLICATION FEES, AND APPROVED PLANS. 3.AN APPROVED FEMA ELEVATION CERTIFICATE COMPLETED BY A LICENSED SURVEYOR OR CIVIL ENGINEER AND A FLOODPROOFING CERTIFICATE SHOWING THAT THE BUILDING IS CONSTRUCTED/FLOODPROOFED TO THE REQUIRED ELEVATION IS REQUIRED POST-CONSTRUCTION PRIOR TO A CERTIFICATE OF OCCUPANCY (CO) BEING ISSUED. PLEASE NOTE: IF ANY PART OF THE BUILDING IS WITHIN THE FLOODPLAIN BOUNDARY, THEN THE ENTIRE STRUCTURE IS CONSIDERED IN THE FLOODPLAIN AND THE ENTIRE BUILDING ENVELOPE MUST MEET THE REQUIREMENTS OF ELEVATING OR FLOODPROOFING TO THE RFPE. 4.OUTSIDE STORAGE OF EQUIPMENT OR FLOATABLE MATERIALS WHETHER PERMANENT OR TEMPORARY IS PROHIBITED IN THE 100-YEAR FLOODPLAIN. ALL FLOATABLE MATERIALS, MUST BE STORED INSIDE A BUILDING, BE ANCHORED PER AN APPROVED ENGINEERED DESIGN, OR BE LOCATED OUTSIDE OF THE 100-YEAR FLOODPLAIN. NO OVERNIGHT PARKING OF VEHICLES IS ALLOWED. 5.AT-RISK POPULATIONS, ESSENTIAL SERVICES, HAZARDOUS MATERIALS, AND GOVERNMENT SERVICES CRITICAL FACILITIES ARE PROHIBITED IN THE 100-YEAR FLOODPLAIN. AT-RISK POPULATION FACILITIES INCLUDE AFTER SCHOOL PROGRAMS/DAY CAMPS FOR K-12, ETC). 6.CONSTRUCTION OF NEW STRUCTURES, HARD SURFACE PATHS, WALKWAYS, DRIVEWAYS, WALLS, AND PARKING AREAS IS PROHIBITED IN THE FLOODWAY UNLESS NO-RISE CONDITIONS ARE MET, PER SECTION 10-45 OF CITY CODE. ANY CONSTRUCTION ACTIVITIES IN THE REGULATORY FLOODWAY MUST ALSO INCLUDE A NO-RISE CERTIFICATION PREPARED BY A PROFESSIONAL ENGINEER LICENSED IN COLORADO. FLOODPLAIN NOTES REMOVE EXISTING ASPHALT REMOVE EXISTING CONCRETE 0 30'60' SCALE: 1" = 30' 15' NO R T H 4/ 2 / 2 0 2 4 2: 2 6 : 2 3 P M C: \ U N I T E D C I V I L D R O P B O X \ P R O J E C T S \ U 2 2 0 1 4 - P R O S P E C T P A R K E A S T \ C A D D \ C P \ C 1 . 0 0 - E X I S T I N G C O N D I T I O N S & R E M O V A L S P L A N . D W G C1 . 0 0 - E X I S T I N G C O N D I T I O N S & R E M O V A L S P L A N -- - - -- - - A A 1 2 3 4 5 1 2 3 4 5 PR O J E C T I N F O R M A T I O N SH E E T I N F O R M A T I O N PR O J E C T P H A S E AR C H I T E C T SE A L ISSUE DATE: PROJECT #: CO N S U L T A N T B C D A B C D T - 970.484.0117 F - 970.484.0264 315 East Mountain Ave Suite 100 Fort Collins, CO 80524-2913 © 2015 www.rbbarchitects.com ARCHITECTS REVISIONS: 2204 PR O S P E C T S P O R T S CL U B MA X W E S T I N C . FI N A L DE V E L O P M E N T PL A N 4/2/2024 16 0 0 E A S T P R O S P E C T R O A D FO R T C O L L I N S , C O 8 0 5 2 5 DESCRIPTION DATE CIVIL ENGINEERING & CONSULTING UNITED CIVIL Design Group 19 OLD TOWN SQUARE #238 FORT COLLINS, CO 80524 (970) 530-4044 www.unitedcivil.com PR O J . M G R : DR A W I N G N A M E : PA T H : DE S I G N E R : DA T E : TI M E : C1.00 EXISTING CONDITIONS & REMOVALS PLAN asphalt removal likely longer for lowering to restrain new valves - can calculate length, EBAA Iron's restraint length calculator is usually used if other calcs not provided. UCDG Response:Limits of asphalt removal have been revised to reflect joint restraint beyond waterline lowering. E. PROSPECT R O A D SH A R P P O I N T D R . EXISTING BUILDING PROPOSED BUILDING 5' SIDEWALK PROPERTY CORNER N:1450148.56 E:3130937.10 TRASH ENCLOSURE (SEE ARCHITECTURAL PLANS) LOT 6 PROSPECT PARK EAST P.U.D. LOT 4 PROSPECT PARK EAST P.U.D. TRACT "A" PROSPECT PARK EAST P.U.D. LOT 5 PROSPECT PARK EAST P.U.D. PROPERTY BOUNDARY (TYP.) 54' R.O.W. 18" SPILL C&G 26' 18" SPILL C&G 5' SIDEWALK 6.5' SIDEWALK 5' SIDEWALK 6" CURB PROPERTY CORNER N:1450102.13 E:3131430.63 PROPERTY CORNER N:1450087.23 E:3131444.23 PROPERTY CORNER N:1449890.85 E:3131444.75 PROPERTY CORNER N:1449939.30 E:3130929.85 BUILDING OVERHANG 8' UTILITY EASEMENT 25' PEDESTRIAN & ACCESS EASEMENT BOOK: 2296 PAGE: 2456 15' UTILITY EASEMENT BOOK: 2296 PAGE: 2456 50' PEDESTRIAN & ACCESS EASEMENT BOOK: 2296 PAGE: 2456 15' UTILITY EASEMENT BOOK: 2296 PAGE: 2456 ACCESS EASEMENT REC. NO. 20150005330 20.52'26' 26' 51' 15.5' 5' SIDEWALK EDGE OF PAVEMENT TOP OF BANK EDGE OF POND 4' SIDEWALK 25' EMERGENCY ACCESS EASEMENT FLOODPLAIN CRO S S S E C T I O N " B I " 2.5' CURB & GUTTER 2.5' CURB & GUTTER 11' SIDEWALK EDGE OF PAVEMENT FLOODPLAIN BFE ADDITIONAL UTILITY EASEMENT WIDTH VARIES 10' DRAINAGE & TEMPORARY CONSTRUCTION EASEMENT POUDRE RIVER 100-YR FLOODWAY POUDRE RIVER 500-YR FLOODPLAIN FLOODPLAIN BFE 100-YEAR FLOOD ELEVATI O N - 4901 (NAVD 88) POUDRE RIVER 100-YR FLOODPLAIN 100' ROW 26' EMERGENCY ACCESS EASEMENT C1 C2 C3 C4 C5 C6C7 C8 C9 C10 C11 C12 C13 C14 C15 C16 C17 C18 L1 L2 L3 L4 L5 L6 L7 L8 L9 L10 L1 1 L12 L1 3 L1 4 L1 5 L1 6 L17 L1 8 L1 9 L20 24' EMERGENCY ACCESS EASEMENT 25' CURB CUT DRAINAGE SWALE DRAINAGE SWALE DRAINAGE SWALE DRAINAGE SWALE NORTH BIORETENTION POND SOUTH BIORETENTION POND 2.5' CURB & GUTTERPROPOSED WALK MATCH EXISTING SIDEWALK WIDTH EDGE OF PAVEMENT TRANSFORMER PAD DRAINAGE SWALE 5' SIDEWALK WITH (6) 6" RISERS 18" CATCH C&G W/ MULTIPLE CURB CUTS PROPOSED LIGHTING (TYP.)FUTURE EV CHARGER (TYP.) PROPOSED LIGHTING (TYP.) BLDG. GRID INT. (SEE NOTE 2) N:1449931.84 E:3131213.27 BLDG. GRID INT. (SEE NOTE 2) N:1450055.22 E:3131418.61 SIDEWALK CHASE 12" SIDEWALK CHASE N 1 10 A 18" CATCH C&G 18" CATCH C&G 18" CATCH C&G 18" FLUSH C&G 18" FLUSH C&G TRANSITION FROM FULL HEIGHT C&G AT PARKING TO FLUSH C&G AT BACK OF WALK TRANSITION FROM FULL HEIGHT C&G TO FLUSH C&G TC TC TC TC PROPOSED DRAINAGE EASEMENT PROPOSED DRAINAGE EASEMENT S0 1 ° 5 9 ' 0 8 " W 2 0 9 . 3 9 ' S84° 37' 31"E 51 7 . 1 8 ' N0 0 ° 0 9 ' 1 2 " W 1 9 6 . 3 8 ' L=22.12' R=15.00' ∆=84.49° N84° 37' 31"W 4 9 5 . 7 1 ' 8' UTILITY EASEMENT 8' UTILITY EASEMENT FOREBAY STRUCTURE (SEE SHEET C6.06) PROPOSED LIGHTING (TYP.) Line Table LINE L1 L2 L3 L4 L5 L6 L7 L8 L9 L10 LENGTH 39.32' 6.40' 9.52' 0.76' 14.00' 87.00' 14.00' 59.09' 101.00' 14.00' BEARING S04°23'44.12"W S66°23'15.57"W N50°22'29.50"E S84°37'30.50"E S05°22'29.50"W S84°37'30.50"E N05°22'29.50"E S84°37'30.50"E N05°22'29.43"E N84°37'30.50"W Line Table LINE L11 L12 L13 L14 L15 L16 L17 L18 L19 L20 LENGTH 14.00' 99.00' 13.97' 38.01' 14.00' 14.00' 81.00' 14.00' 14.00' 81.00' BEARING N05°22'29.50"E N84°37'30.50"W S05°22'29.50"W N04°23'44.12"E N05°22'29.50"E N05°22'29.50"E S84°37'30.50"E S05°22'29.50"W S05°22'29.50"W N84°37'30.50"W Curve Table CURVE C1 C2 C3 C4 C5 C6 C7 C8 C9 C10 DELTA 83°17'31" 61°42'19" 41°48'36" 42°05'49" 90°52'59" 45°00'00" 90°00'00" 90°00'00" 90°00'00" 93°05'08" RADIUS 25.00' 25.00' 50.00' 10.00' 58.00' 3.00' 3.00' 3.00' 3.00' 3.00' LENGTH 36.34' 26.92' 36.49' 7.35' 92.00' 2.36' 4.71' 4.71' 4.71' 4.87' BEARING S37°15'02"E S35°14'53"W S45°11'45"W S45°20'21"W S32°32'00"E N72°52'29"E S39°37'31"E N50°22'29"E N39°37'31"W S51°55'03"W CHORD 33.23' 25.64' 35.68' 7.18' 82.65' 2.30' 4.24' 4.24' 4.24' 4.36' Curve Table CURVE C11 C12 C13 C14 C15 C16 C17 C18 DELTA 85°56'07" 97°00'51" 90°03'02" 179°49'27" 90°20'07" 90°00'00" 180°00'00" 90°00'00" RADIUS 25.00' 10.00' 3.00' 25.00' 3.00' 3.00' 25.00' 3.00' LENGTH 37.50' 16.93' 4.72' 78.46' 4.73' 4.71' 78.54' 4.71' BEARING N38°34'19"W N52°53'44"E N39°39'01"W S05°23'31"W N50°32'33"E S39°37'31"E N05°22'29"E S50°22'29"W CHORD 34.08' 14.98' 4.24' 50.00' 4.26' 4.24' 50.00' 4.24' 4/ 2 / 2 0 2 4 2: 2 6 : 2 6 P M C: \ U N I T E D C I V I L D R O P B O X \ P R O J E C T S \ U 2 2 0 1 4 - P R O S P E C T P A R K E A S T \ C A D D \ C P \ C 2 . 0 0 - H O R I Z O N T A L C O N T R O L P L A N . D W G C2 . 0 0 - H O R I Z O N T A L C O N T R O L P L A N -- - - -- - - LEGEND PROPOSED BUILDING CATCH CURB & GUTTER SIDEWALK / TRAIL PROPERTY LINE RIGHT OF WAY SECTION LINE GENERAL NOTES 1.CONTRACTOR SHALL COORDINATE ALL CONSTRUCTION ITEMS IMPACTING ADJACENT PROPERTIES WITH THE PROPERTY OWNERS PRIOR TO BEGINNING ANY CONSTRUCTION ACTIVITIES. 2.FOR BUILDING LAYOUT REFERENCE ARCHITECTURAL PLANS. LAYOUT AND DIMENSION INFORMATION SHOWN REPRESENTS OUTSIDE FACE OF WALL AS PROVIDED BY THE ARCHITECT AND IS SHOWN FOR INFORMATION ONLY. REFER TO THE ARCHITECTURAL PLANS FOR COMPLETE GRID LINE INFORMATION. 3.CONTRACTOR SHALL REFER TO, AND COORDINATE WITH, THE APPROVED LANDSCAPE PLANS FOR ALL LANDSCAPE AND SITE FEATURES SUCH AS SEAT WALLS, FURNITURE, PLAZA LAYOUT, SEEDING/SOD, LANDSCAPE ROCK AND MULCH, ETC. 4.ALL DIMENSIONS AND LINE AND CURVE INFORMATION ARE MEASURED TO CURB FLOW LINE OR EDGE OF PAVEMENT UNLESS OTHERWISE NOTED. 5.SEE SOILS REPORT FOR PAVEMENT AND SUBGRADE PREPARATION, DESIGN AND RECOMMENDATIONS. 6.PUBLIC CONCRETE SIDEWALKS SHALL BE 6-INCH MINIMUM THICKNESS. PRIVATE ONSITE CONCRETE SIDEWALKS SHALL BE 4-INCH MINIMUM THICKNESS UNLESS OTHERWISE NOTED. 7.ONSITE PAVING AREAS (EXCLUDING SIDEWALKS) NOT DESIGNATED AS "HEAVY DUTY" SHALL CONSIST OF "LIGHT DUTY OR PARKING" PAVEMENT. SEE THE GEOTECHNICAL REPORT AND PAVEMENT SECTION DETAILS FOR MORE INFORMATION. 8.FIRE ACCESS LANES DESIGNATED BY EMERGENCY ACCESS EASEMENTS (EAE) SHALL BE PROVIDED USING PAVEMENT SECTIONS CAPABLE OF SUPPORTING A 40-TON VEHICLE UNLESS OTHERWISE NOTED. SEE PAVEMENT SECTION DETAILS. UTILITY EASEMENT ACCESS EASEMENT ASPHALT PAVEMENT CONCRETE PAVEMENT PERMEABLE PAVERS 1.THE FIRST FLOOR OF THE PROPOSED COMMERCIAL BUILDING IS BEING ELEVATED A MINIMUM OF 24-INCHES ABOVE THE BASE FLOOD ELEVATION OR FLOOD PROOFED. REFER TO ARCHITECTURAL PLANS FOR FLOOD PROOFING DETAILS AND SPECIFICATIONS. ALL FLOOD PROOFING MEASURES SHALL ADHERE TO SECTION 10-38 OF CITY CODE AND THE REQUIREMENTS SET FORTH WITHIN THE CITY'S "FLOODPROOFING GUIDELINES". A FLOOD PROOFING CERTIFICATE WILL BE REQUIRED PRIOR TO THE ISSUANCE OF A CERTIFICATE OF OCCUPANCY. 2.ALL SPOT ELEVATIONS AND BASE FLOOD ELEVATIONS AS SHOWN ON THIS DRAWING ARE PER VERTICAL CONTROL DATUM NAVD 88. 3.PORTIONS OF THIS PROPERTY ARE LOCATED IN THE FEMA REGULATED, 100-YEAR AND 500-YEAR POUDRE RIVER FLOODPLAIN. ANY DEVELOPMENT WITHIN THE FLOODPLAIN MUST COMPLY WITH THE SAFETY REGULATIONS OF CHAPTER 10 OF CITY MUNICIPAL CODE. 4.ANY CONSTRUCTION ACTIVITIES IN THE FLOOD FRINGE (E.G. BUILDING OF STRUCTURES, EV CHARGING STATIONS, GRADING, FILL, DETENTION PONDS, BIKE PATHS, PARKING LOTS, UTILITY WORK, FLOOD CONTROL CHANNELS, SIDEWALK OR CURB & GUTTER INSTALLATION/REPLACEMENT, LANDSCAPING, ETC.) MUST BE PRECEDED BY AN APPROVED FLOODPLAIN USE PERMIT, THE APPROPRIATE PERMIT APPLICATION FEES, AND APPROVED PLANS. 5.AN APPROVED FEMA ELEVATION CERTIFICATE COMPLETED BY A LICENSED SURVEYOR OR CIVIL ENGINEER AND A FLOODPROOFING CERTIFICATE SHOWING THAT THE BUILDING IS CONSTRUCTED/FLOODPROOFED TO THE REQUIRED ELEVATION IS REQUIRED POST-CONSTRUCTION PRIOR TO A CERTIFICATE OF OCCUPANCY (CO) BEING ISSUED. PLEASE NOTE: IF ANY PART OF THE BUILDING IS WITHIN THE FLOODPLAIN BOUNDARY, THEN THE ENTIRE STRUCTURE IS CONSIDERED IN THE FLOODPLAIN AND THE ENTIRE BUILDING ENVELOPE MUST MEET THE REQUIREMENTS OF ELEVATING OR FLOODPROOFING TO THE RFPE. 6.OUTSIDE STORAGE OF EQUIPMENT OR FLOATABLE MATERIALS WHETHER PERMANENT OR TEMPORARY IS PROHIBITED IN THE 100-YEAR FLOODPLAIN. ALL FLOATABLE MATERIALS, MUST BE STORED INSIDE A BUILDING, BE ANCHORED PER AN APPROVED ENGINEERED DESIGN, OR BE LOCATED OUTSIDE OF THE 100-YEAR FLOODPLAIN. NO OVERNIGHT PARKING OF VEHICLES IS ALLOWED. 7.AT-RISK POPULATIONS, ESSENTIAL SERVICES, HAZARDOUS MATERIALS, AND GOVERNMENT SERVICES CRITICAL FACILITIES ARE PROHIBITED IN THE 100-YEAR FLOODPLAIN. AT-RISK POPULATION FACILITIES INCLUDE AFTER SCHOOL PROGRAMS/DAY CAMPS FOR K-12, ETC). 8.CONSTRUCTION OF NEW STRUCTURES, HARD SURFACE PATHS, WALKWAYS, DRIVEWAYS, WALLS, AND PARKING AREAS IS PROHIBITED IN THE FLOODWAY UNLESS NO-RISE CONDITIONS ARE MET, PER SECTION 10-45 OF CITY CODE. ANY CONSTRUCTION ACTIVITIES IN THE REGULATORY FLOODWAY MUST ALSO INCLUDE A NO-RISE CERTIFICATION PREPARED BY A PROFESSIONAL ENGINEER LICENSED IN COLORADO. FLOODPLAIN NOTES SPILL CURB & GUTTER TRANSITION FROM CATCH TO SPILL CURB & GUTTERTC A A 1 2 3 4 5 1 2 3 4 5 PR O J E C T I N F O R M A T I O N SH E E T I N F O R M A T I O N PR O J E C T P H A S E AR C H I T E C T SE A L ISSUE DATE: PROJECT #: CO N S U L T A N T B C D A B C D T - 970.484.0117 F - 970.484.0264 315 East Mountain Ave Suite 100 Fort Collins, CO 80524-2913 © 2015 www.rbbarchitects.com ARCHITECTS REVISIONS: 2204 PR O S P E C T S P O R T S CL U B MA X W E S T I N C . FI N A L DE V E L O P M E N T PL A N 4/2/2024 16 0 0 E A S T P R O S P E C T R O A D FO R T C O L L I N S , C O 8 0 5 2 5 DESCRIPTION DATE CIVIL ENGINEERING & CONSULTING UNITED CIVIL Design Group 19 OLD TOWN SQUARE #238 FORT COLLINS, CO 80524 (970) 530-4044 www.unitedcivil.com PR O J . M G R : DR A W I N G N A M E : PA T H : DE S I G N E R : DA T E : TI M E : C2.00 HORIZONTAL CONTROL PLAN 0 30'60' SCALE: 1" = 30' 15' NO R T H Proposed Existing? Need Rec No or Book/Page if so Proposed UCDG Response:These call outs have been updated. UCDG Response:This call out has been updated. UCDG Response:This is existing and book/page information has been added. 'FIRE LANE' SIGNAGE 'FIRE LANE' SIGNAGE ADA 'RESERVED PARKING' SIGN EDGE OF PAVEMENT CONCRETE PAVEMENT ASPHALT PAVEMENT ASPHALT PAVEMENT 8 11 9 17' (TYP.) 80 LF OF 4" SOLID WHITE STRIPING DIAGONAL WHITE STRIPING 2' O.C. (TYP.) 9' (TYP.) 17' (TYP.) 17' (TYP.) 17' (TYP.) 9' (TYP.) 9' (TYP.) SITE LIGHTING (TYP.) 9 9 CONCRETE WALK TRASH ENCLOSURE (SEE ARCHITECTURAL PLANS) ADA PARKING STALL W/ SIGNAGE AND PARKING BLOCK DRAINAGE SWALE EV CHARGER STALLS W/ SIGNAGE (SEE DETAILS) FUTURE EV CHARGER (TYP.) 4" SOLID WHITE STRIPING (TYP.) 4" SOLID WHITE STRIPING (TYP.) 4" SOLID WHITE STRIPING (TYP.) 4" SOLID WHITE STRIPING (TYP.) DIAGONAL WHITE STRIPING 2' O.C. (TYP.) ADA PARKING STALL W/ SIGNAGE AND PARKING BLOCK 4" SOLID WHITE STRIPING (TYP.) SITE LIGHTING (TYP.) EXISTING PARKING AND STRIPING 'FIRE LANE' SIGNAGE 'FIRE LANE' SIGNAGE 'FIRE LANE' SIGNAGE ELECTRIC VEHICLE PARKING SIGN (SEE DETAILS) 12" CURB CUT 12" CURB CUT 12" CURB CUT 12" CURB CUT 12" CURB CUT 12" CURB CUT 18" SPILL C&G 18" SPILL C&G 18" CATCH C&G 18" CATCH C&G 18" CATCH C&G 18" FLUSH C&G 18" FLUSH C&G TRANSITION FROM FULL HEIGHT C&G AT PARKING TO FLUSH C&G AT BACK OF WALK TRANSITION FROM FULL HEIGHT C&G TO FLUSH C&G TC TC TRANSITION FROM SPILL TO CATCH C&G IN 5 FEET TC TC TRANSITION FROM SPILL TO CATCH C&G IN 5 FEET TRANSITION FROM SPILL TO CATCH C&G IN 5 FEET 26' EMERGENCY ACCESS EASEMENT 25' EMERGENCY ACCESS EASEMENT 8' UTILITY EASEMENT 8' UTILITY EASEMENT 0 10'20' SCALE: 1" = 10' 5' NO R T H 4/ 2 / 2 0 2 4 2: 2 6 : 3 3 P M C: \ U N I T E D C I V I L D R O P B O X \ P R O J E C T S \ U 2 2 0 1 4 - P R O S P E C T P A R K E A S T \ C A D D \ C P \ C 2 . 0 1 - P A V E M E N T S I G N I N G A N D S T R I P I N G P L A N . D W G C2 . 0 1 - P A V E M E N T S I G N I N G A N D S T R I P I N G P L A N -- - - -- - - A A 1 2 3 4 5 1 2 3 4 5 PR O J E C T I N F O R M A T I O N SH E E T I N F O R M A T I O N PR O J E C T P H A S E AR C H I T E C T SE A L ISSUE DATE: PROJECT #: CO N S U L T A N T B C D A B C D T - 970.484.0117 F - 970.484.0264 315 East Mountain Ave Suite 100 Fort Collins, CO 80524-2913 © 2015 www.rbbarchitects.com ARCHITECTS REVISIONS: 2204 PR O S P E C T S P O R T S CL U B MA X W E S T I N C . FI N A L DE V E L O P M E N T PL A N 4/2/2024 16 0 0 E A S T P R O S P E C T R O A D FO R T C O L L I N S , C O 8 0 5 2 5 DESCRIPTION DATE CIVIL ENGINEERING & CONSULTING UNITED CIVIL Design Group 19 OLD TOWN SQUARE #238 FORT COLLINS, CO 80524 (970) 530-4044 www.unitedcivil.com PR O J . M G R : DR A W I N G N A M E : PA T H : DE S I G N E R : DA T E : TI M E : PAVEMENT, SIGNING, AND STRIPING PLAN C2.10 INFLOW CURB & GUTTER OUTFLOW CURB & GUTTER SIGN PARKING STALL STRIPING HANDICAP PARKING STALL ASPHALT PAVEMENT CONCRETE PAVEMENT LIGHT POLE HEAVY DUTY ASPHALT PAVEMENT EXISTING CONCRETE PAVEMENT 1.ALL SYMBOLS, INCLUDING CROSSWALKS, STOP BARS, TURN ARROWS, ETC. SHALL BE PRE-FORMED THERMO-PLASTIC. PRE-FORMED THERMO-PLASTIC APPLICATIONS SHALL BE AS SPECIFIED IN THESE PLANS AND/OR CITY OF FORT COLLINS STANDARDS AND SPECIFICATIONS. 2.ALL SIGNAGE SHALL BE PER CITY OF FORT COLLINS STANDARDS AND THESE PLANS OR AS OTHERWISE SPECIFIED IN MUTCD. 3.EPOXY APPLICATIONS SHALL BE APPLIED AS SPECIFIED IN CDOT STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION. 4.ALL SURFACES SHALL BE THOROUGHLY CLEANED PRIOR TO INSTALLATION OF STRIPING OR MARKINGS. 5.THE DEVELOPER INSTALLING SIGNS SHALL BE RESPONSIBLE FOR LOCATING AND PROTECTING ALL UNDERGROUND UTILITIES. 6.SPECIAL CARE SHALL BE TAKEN IN SIGN LOCATION TO ENSURE AN UNOBSTRUCTED VIEW OF EACH SIGN. SIGNING & STRIPING NOTES LEGEND HEAVY DUTY CONCRETE PAVEMENT TRANSITION FROM CATCH TO SPILL CURB & GUTTERTC UCDG Response:Signs have been moved to back of walk. E. PROSPECT R O A D SH A R P P O I N T D R . EXISTING BUILDING PROPOSED BUILDING LOT 6 PROSPECT PARK EAST P.U.D. LOT 4 PROSPECT PARK EAST P.U.D. LOT 5 PROSPECT PARK EAST P.U.D. 50' PEDESTIRAN & ACCESS EASEMENT 15' UTILITY EASEMENT EXISTING ELECTRIC (CITY OF FORT COLLINS ) EXISTING ELECTRIC (CITY OF FORT COLLINS ) EXISTING GAS (XCEL) EXISTING 42" SANITARY (CITY OF FORT COLLINS) 15' UTILITY EASEMENT 15' UTILITY EASEMENT EXISTING 8" WATER EXISTING ELECTRIC (CITY OF FORT COLLINS ) SMH 29 4900.83=RIM 4894.16=8" PVC INV. (SE) 4894.15=4" PVC INV. (NE) 4889.55=42" RCP INV. (S) 4889.11=42" RCP INV. (N) SMH 30 4903.89=RIM 4893.43=8" PVC INV. (E) 4893.24=42" PVC INV. (S) 4893.23=8" PVC INV. (N) EX MH RIM: 4900.22 (COULD NOT OPEN) 25' PEDESTRIAN & ACCESS EASEMENT 8' UTILITY EASEMENT ACCESS EASEMENT (WIDTH VARIES) PROPOSED 1-1/2" WATER SERVICE UPSIZE TO 2" 5' DOWNSTREAM OF THE METER PROPOSED 6" FIRE SERVICE FULLY RESTRAINED FROM TEE TO BUILDING PROPOSED TRANSFORMER FIRE RISER ROOM EXISTING CTV LINE (COMCAST) OUTFALL RIPRAP STORM OUTFALL CURB INLET STORM LINE A (SEE SHEET C3.10) EXISTING HYDRANT EXISTING HYDRANT EXISTING HYDRANT EXISTING STREET LIGHT EXISTING STREET LIGHT EXISTING STREET LIGHT EXISTING STREET LIGHT EXISTING STREET LIGHT PROPOSED LIGHTING (TYP.) EXISTING ELECTRICAL EQUIPMENT TO REMAIN EXISTING ELECTRICAL EQUIPMENT TO REMAIN TOP OF BANK EDGE OF POND 3/4" IRRIGATION TAP W/ 6 LF 1" COPPER SERVICE LINE TO METER (SEE IRRIGATION PLANS FOR CONTINUATION OF IRRIGATION LINES) 3/4" IRRIGATION METER FIRE DEPARTMENT CONNECTION EV CHARGER (TYP.) FLOODPLAIN BFE 100-YEAR FLOOD E L E V A T I O N - 4,900.0 (NAVD 88) FLOODPLAIN BFE 100-YEAR FLOOD ELEVATION - 4904 (NAVD 88) FLOODPLAIN BFE 100-YEAR FLOOD ELEVATI O N - 4901 (NAVD 88) FLOODPLAIN C R O S S - S E C T I O N # 208567 PROPOSED GAS SERVICE (SEE NOTES 14 AND 17) ELECTRICAL EQUIPMENT AND METER CURB INLET PROPOSED ADDITIONAL UTILITY EASEMENT (WIDTH VARIES) 10' DRAINAGE & TEMPORARY CONSTRUCTION EASEMENT POUDRE RIVER 100-YR FLOODWAY 100-YR FLOOD E L E V . 4 , 9 0 0 . 0 ( N A V D 8 8 ) POUDRE RIVER 100-YR FLOODPLAIN POUDRE RIVER 500-YR FLOODPLAIN TRASH ENCLOSURE STORM LINE B2 (SEE SHEET C3.11) STORM LINE B (SEE SHEET C3.10) NORTH BIORETENTION POND SOUTH BIORETENTION POND FUTURE EV CHARGER (TYP.) FUTURE EV CHARGER (TYP.) PROPOSED LIGHTING (TYP.) SANITARY SERVICE BUILDING CONNECTION INV.=4900.50 178.1 LF 4" PVC @ 2.00% 4'' 45° BEND INV.=4896.94 43.9 LF 4" PVC @ 2.00% 4'' 45° BEND INV.=4896.06 74.4 LF 4" PVC @ 2.00% CONNECT TO EXISTING 42'' SEWER INV.=4890.36 (42" MAIN) INV.=4892.99 (4" SERVICE) 3.7 LF 4" PVC @ 42.26% 4'' 45° VERTICAL BEND INV.=4894.57 STORM LINE C (SEE SHEET C3.11) BIORETENTION UNDERDRAIN SYSTEM PERIMETER DRAIN STUB (SEE PLUMBING PLANS FOR PERIMETER DRAIN CONTINUATION) WATERLINE LOWERING (SEE SHEET C6.03 FOR DETAIL) 12" GATE VALVE 12" GATE VALVE INSULATE PORTION OF SANITARY SERVICE W/ LESS THAN 4' OF COVER (SEE NOTE 11 AND DETAIL ON SHEET C6.02) EXISTING PRIMARY LINE FOR LOT 6 TO REMAIN PROPOSED PRIMARY LINE FOR LOT 5 (SEE NOTES 14 AND 15) PORTION OF PRIMARY TO BE BORED UNDER EXISTING TREES (SEE NOTE 15) BIORETENTION UNDERDRAIN SYSTEM CLEAN OUT ON SANITARY SERVICE FOREBAY (SEE SHEET C6.06 FOR DETAIL) 8' UTILITY EASEMENT 8' UTILITY EASEMENT 1-1/2" DOMESTIC SERVICE TAP W/ 39 LF 1-1/2" COPPER DOMESTIC SERVICE LINE TO METER N:1450031.45 E:3131462.10 CONNECT TO EXISTING 8" WATER 8" X 6" WET-TAP 6" GATE VALVE (W) N:1450036.45 E:3131462.10 1-1/2" WATER METER N:1450031.45 E:3131431.80 STORM LINE D (SEE SHEET C3.11) 6" 45° BEND N:1450052.39 E:3131420.58 6" 45° BEND N:1450036.45 E:3131436.53 EXISTING WATER CROSSING TOP OF SANITARY SERVICE ELEV. = 4895.23 APPROX BOTTOM OF WATER ELEV. = 4896.7± MAINTAIN MINIMUM 18" OF SEPARATION 48"Ø MH W/ SUMP PUMP FOR BUILDING PERIMETER DRAIN (SEE NOTES 18-19) RIM = 4902.0± INV. IN = 4895.5± INV. OUT = 4899.00 SUMP ELEV. = 4893.00 PIPE END AND HEADWALL INV. = 4898.50 PROPOSED LIGHTING (TYP.) 0 30'60' SCALE: 1" = 30' 15' NO R T H 4/ 2 / 2 0 2 4 2: 2 6 : 4 1 P M C: \ U N I T E D C I V I L D R O P B O X \ P R O J E C T S \ U 2 2 0 1 4 - P R O S P E C T P A R K E A S T \ C A D D \ C P \ C 3 . 0 0 - U T I L I T Y P L A N . D W G C3 . 0 0 - U T I L I T Y P L A N -- - - -- - - LEGEND 1.THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING THE FIELD CONDITIONS ARE AS SHOWN IN THE DRAWINGS. IF THE CONTRACTOR FINDS DISCREPANCIES THE CONTRACTOR SHALL CONTACT THE ENGINEER. 2.EXISTING UNDERGROUND AND OVERHEAD PUBLIC AND PRIVATE UTILITIES AS SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. EXISTING UTILITY MAINS AND SERVICES MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THESE DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATIONS. 3.THE PROPOSED CONSTRUCTION WILL BE IN CLOSE PROXIMITY TO SEVERAL UNDERGROUND UTILITIES. THE CONTRACTOR SHALL COORDINATE WITH ALL UTILITY PROVIDERS PRIOR TO AND DURING CONSTRUCTION TO MINIMIZE SERVICE INTERRUPTIONS TO SURROUNDING BUILDINGS OR PROPERTIES. 4.THE PLUMBING CONTRACTOR SHALL TERMINATE UTILITY LATERALS 5' OUTSIDE OF BUILDING UNLESS NOTED OTHERWISE. EXACT LOCATIONS (HORIZONTAL AND VERTICAL) OF ALL UTILITY CONNECTIONS INTO THE PROPOSED BUILDING SHALL BE COORDINATED WITH APPROVED ARCHITECTURAL DRAWINGS. 5.REFER TO APPROVED SITE ELECTRICAL PLANS FOR ALL CONDUITS AND POWER LINE ROUTING FOR SITE LIGHTING. 6.WATER AND SEWER SERVICE PROVIDED BY THE CITY OF FORT COLLINS. ALL WATER AND SEWER CONSTRUCTION SHALL BE PER CITY STANDARD CONSTRUCTION SPECIFICATIONS, LATEST EDITION. 7.MINIMUM DEPTH OF COVER OVER WATER MAINS SHALL BE 4.5'. MAXIMUM COVER SHALL BE 5.5'. 8.MAINTAIN 10' HORIZONTAL AND 18" VERTICAL MINIMUM SEPARATION BETWEEN ALL SANITARY SEWER & WATER MAINS & SERVICES. 9.ALL WATER FITTINGS AND VALVES ARE ONLY GRAPHICALLY REPRESENTED AND ARE NOT TO SCALE. 10.SANITARY SEWER SERVICES SHALL BE SDR-35 PVC. 11.INSULATION BOARD SHALL BE USED WHERE SANITARY SEWER SERVICE OR MAIN COVER IS LESS THAN 4-FEET. CONTRACTOR IS TO VERIFY COVER OVER INSTALLED SEWER. 12.FIRE SERVICES SHALL BE AWWA C-900 PVC. WATER SERVICES UP TO 1-1/2" SHALL BE TYPE K COPPER. 13.CONTRACTOR SHALL COORDINATE ALL UTILITY DEMOLITION AND/OR RELOCATION ITEMS WITH THE APPROPRIATE UTILITY PROVIDER PRIOR TO BEGINNING ANY ONSITE DEMOLITION. 14.THE LOCATION OF PROPOSED DRY UTILITIES AS SHOWN ON THIS DRAWING ARE SHOWN FOR HORIZONTAL ALIGNMENTS ONLY AND ARE APPROXIMATE. FINAL DESIGNS OF DRY UTILITIES WILL BE PERFORMED BY THE APPROPRIATE UTILITY COMPANY. 15.ELECTRIC SERVICE TO BE PROVIDED BY THE CITY OF FORT COLLINS. THE CITY SHALL INSTALL THE TRANSFORMERS AND PRIMARY LINES FROM THE CONNECTION POINT AT THE EXISTING MAIN TO THE TRANSFORMER. THE COST OF THE PRIMARY LINE, TRANSFORMERS, AND INSTALLATION OF THE SECONDARY LINE FROM THE TRANSFORMER TO THE BUILDING SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. 16.ELECTRIC TRANSFORMER PAD SIZES ARE APPROXIMATE. COORDINATE FINAL LOCATION AND SIZE OF TRANSFORMER AND LOCATION OF SECONDARY LINE WITH APPROVED ARCHITECTURAL PLANS. 17.GAS SERVICE TO BE PROVIDED BY XCEL ENERGY. XCEL SHALL INSTALL ALL GAS SERVICES AND METERS. THE COST OF ALL THE MAIN AND SERVICE INSTALLATION SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. 18.CONTRACTOR SHALL REFER TO MECHANICAL PLANS FOR ALL INTERNAL PUMP EQUIPMENT AND PERIMETER DRAIN PIPING. 19.CONTRACTOR SHALL CONNECT TO AND EXTEND THE DISCHARGE PIPING FROM THE PUMP STATION USING THE SAME SIZE AND PIPE MATERIALS SHOWN ON THE MECHANICAL PLANS FROM THE MANHOLE TO THE HEADWALL LOCATION. CABLE TV LINE ELECTRIC LINE OVERHEAD ELECTRIC LINE FIBER OPTIC LINE GAS LINE IRRIGATION LINE SANITARY SERVICE FLARED END SECTION STORM INLET STORM MANHOLE STORM PIPE RIP RAP TELEPHONE LINE OVERHEAD TELEPHONE LINE FIRE HYDRANT RESTRAINED FIRELINE WATER SERVICE WATER METER DRY UTILITY CONDUIT GATE VALVE FIBER, GAS, ELEC., TELE PEDESTAL NOTES A A 1 2 3 4 5 1 2 3 4 5 PR O J E C T I N F O R M A T I O N SH E E T I N F O R M A T I O N PR O J E C T P H A S E AR C H I T E C T SE A L ISSUE DATE: PROJECT #: CO N S U L T A N T B C D A B C D T - 970.484.0117 F - 970.484.0264 315 East Mountain Ave Suite 100 Fort Collins, CO 80524-2913 © 2015 www.rbbarchitects.com ARCHITECTS REVISIONS: 2204 PR O S P E C T S P O R T S CL U B MA X W E S T I N C . FI N A L DE V E L O P M E N T PL A N 4/2/2024 16 0 0 E A S T P R O S P E C T R O A D FO R T C O L L I N S , C O 8 0 5 2 5 DESCRIPTION DATE CIVIL ENGINEERING & CONSULTING UNITED CIVIL Design Group 19 OLD TOWN SQUARE #238 FORT COLLINS, CO 80524 (970) 530-4044 www.unitedcivil.com PR O J . M G R : DR A W I N G N A M E : PA T H : DE S I G N E R : DA T E : TI M E : UTILITY PLAN C3.00 increase pipe size is allowed downstream of the meter. UCDG Response:This call out has been revised. E. PROSPECT R O A D SH A R P P O I N T D R . EXISTING BUILDING PROPOSED BUILDING FFE = 4903.50 (NORTH) FFE = 4899.00 (GYM / SOUTH) LOT 6 PROSPECT PARK EAST P.U.D. LOT 4 PROSPECT PARK EAST P.U.D. LOT 5 PROSPECT PARK EAST P.U.D. EXISTING LAKE/POND STORM SEWER (SEE SHEET C3.10) STORM SEWER (SEE SHEET C3.11) POUDRE RIVER 100-YR FLOODWAY POUDRE RIVER 500-YR FLOODPLAIN LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE EDGE OF POND FLOODPLAIN BFE 100-YEAR FLOOD ELEVATION - 4904 (NAVD 88) FLOODPLAIN BFE 100-YEAR FLOOD E L E V A T I O N - 4,900.0 (NAVD 88) FLOODPLAIN BFE 100-YEAR FLOOD ELEVATI O N - 4901 (NAVD 88) FLOODPLAIN C R O S S - S E C T I O N # 208567 100-YR FLOOD E L E V . 4 , 9 0 0 . 0 ( N A V D 8 8 ) POUDRE RIVER 100-YR FLOODPLAIN NORTH BIORETENTION POND SOUTH BIORETENTION POND STORM SEWER (SEE SHEET C3.10) FOREBAY STRUCTURE (SEE SHEET C6.06) 0 30'60' SCALE: 1" = 30' 15' NO R T H 4/ 2 / 2 0 2 4 2: 2 7 : 1 1 P M C: \ U N I T E D C I V I L D R O P B O X \ P R O J E C T S \ U 2 2 0 1 4 - P R O S P E C T P A R K E A S T \ C A D D \ C P \ C 4 . 0 0 - G R A D I N G & E R O S I O N C O N T R O L P L A N . D W G C4 . 0 0 - G R A D I N G & E R O S I O N C O N T R O L P L A N -- - - -- - - SWALE FLOWLINE INLET PROTECTION ROCK SOCK RIPRAP CONCRETE WASHOUT AREA SILT FENCE STABILIZED STAGING AREA VEHICLE TRACKING CONTROL SURFACE SLOPE DIRECTION GRADE BREAK PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR LEGEND EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR 1.THE CONTRACTOR SHALL VERIFY EXISTING CONDITIONS AS SHOWN ON THESE DRAWINGS. THE CONTRACTOR SHALL CONTACT THE ENGINEER IMMEDIATELY SHOULD ANY DISCREPANCIES BETWEEN THESE PLANS AND ACTUAL FIELD CONDITIONS EXIST. 2.EXISTING UNDERGROUND AND OVERHEAD PUBLIC AND PRIVATE UTILITIES AS SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. EXISTING UTILITY MAINS AND SERVICES MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THESE DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATION. 3.SEE SOILS REPORT FOR PAVEMENT AND FOUNDATION PREPARATION, DESIGN AND RECOMMENDATIONS. 4.ALL DISTURBED AREAS NOT PAVED SHALL BE REVEGETATED PER THE LANDSCAPE PLANS. 5.THE CONTRACTOR SHALL PROTECT ALL EXISTING FEATURES THAT ARE NOT TO BE REMOVED ADJACENT TO THE CONSTRUCTION AREA INCLUDING, BUT NOT LIMITED TO, PAVEMENT, PRIVATE FENCES, ABOVE GROUND OR UNDERGROUND UTILITIES, STRUCTURES, AND UNDERGROUND FOUNDATIONS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE THAT SHOULD OCCUR TO ANY ON-SITE, OFF-SITE, PUBLIC OR PRIVATE FACILITY OR FEATURE AS A RESULT OF THE CONSTRUCTION PROCESS FOR THIS PROJECT. 6.THE CONTRACTOR SHALL COORDINATE ALL CONSTRUCTION ITEMS IMPACTING ADJACENT PROPERTIES WITH THE PROPERTY OWNERS PRIOR TO BEGINNING ANY CONSTRUCTION ACTIVITIES. 7.EROSION CONTROL PRACTICES, SITE PROTECTION, AND REVEGETATION METHODS SHALL FOLLOW TOWN REGULATIONS. 8.IN ADDITION TO THE EROSION CONTROL MEASURES SHOWN ON THIS DRAWING, THE CONTRACTOR SHALL COMPLETE, COORDINATE WITH, AND UPDATE AS REQUIRED, THE STORMWATER MANAGEMENT PLAN (SWMP) FOR THIS PROJECT. 9.ANY AREAS USED FOR STOCKPILING AND/OR STAGING SHOULD ALSO HAVE SEDIMENT AND EROSION CONTROL MEASURES AS NECESSARY. THESE AREAS SHOULD BE LOCATED AT LEAST 100' AWAY FROM DRAINAGE WAYS. THE SWMP SHOULD BE UPDATED TO SHOW THESE AREAS AND SEDIMENT AND EROSION CONTROL ITEMS. THE ITEMS MAY INCLUDE BUT ARE NOT LIMITED TO VEHICLE TRACKING CONTROL, SILT FENCE, CONSTRUCTION FENCE, CONCRETE WASHOUT, AND SEDIMENT TRAP. 10.STREET SWEEPING SHALL BE PERFORMED AS NEEDED AND/OR AT THE DIRECTION OF THE CITY ENGINEERING INSPECTOR. NOTES A A 1 2 3 4 5 1 2 3 4 5 PR O J E C T I N F O R M A T I O N SH E E T I N F O R M A T I O N PR O J E C T P H A S E AR C H I T E C T SE A L ISSUE DATE: PROJECT #: CO N S U L T A N T B C D A B C D T - 970.484.0117 F - 970.484.0264 315 East Mountain Ave Suite 100 Fort Collins, CO 80524-2913 © 2015 www.rbbarchitects.com ARCHITECTS REVISIONS: 2204 PR O S P E C T S P O R T S CL U B MA X W E S T I N C . FI N A L DE V E L O P M E N T PL A N 4/2/2024 16 0 0 E A S T P R O S P E C T R O A D FO R T C O L L I N S , C O 8 0 5 2 5 DESCRIPTION DATE CIVIL ENGINEERING & CONSULTING UNITED CIVIL Design Group 19 OLD TOWN SQUARE #238 FORT COLLINS, CO 80524 (970) 530-4044 www.unitedcivil.com PR O J . M G R : DR A W I N G N A M E : PA T H : DE S I G N E R : DA T E : TI M E : C4.00 OVERALL GRADING & EROSION CONTROL PLAN PROJECT:PROSPECT SPORTS CLUB BEST MANAGEMENT PRACTICE ITEM: PRESERVE EXISTING VEGETATION SILT FENCE VEHICLE TRACKING CONTROL STAGING AREAS (if applicable) CONSTRUCTION FENCE (if applicable) ROCK SOCKS CONCRETE WASHOUT AREA (if applicable) TEMPORARY SEEDING INLET PROTECTION (EXIST. & PROP.) 1.COLUMNS SHOWN BELOW FOR TEMPORARY EROSION CONTROL ITEMS REPRESENT PHASE OF CONSTRUCTION INCREMENTS, NOT SPECIFIC TIME DURATIONS. 2.CONTRACTOR IS RESPONSIBLE FOR REGULAR MAINTENANCE OF ALL BMPs. MOBILIZATIONDEMOLITION UTILITY INSTALLATION BUILDING CONSTRUCTION SITE GRADING & PAVING FINAL LANDSCAPING& STABILIZATIONPHASE OF CONSTRUCTION EROSION CONTROL SEQUENCING EROSION CONTROL CALCULATIONS TOTAL AREA OF DISTURBANCE 2.14 ACRES TOTAL "ONSITE" AREA OF DISTURBANCE 2.05 ACRES TOTAL "OFFSITE" AREA OF DISTURBANCE 0.09 ACRES TOTAL STORAGE/STAGING AREA 0.05 ACRES TOTAL HAUL ROADS AREA N/A CONSTRUCTION VEHICLE TRAFFIC AREA N/A APPROX. % OF PROJECT DISTURBED AT ANY TIME 100% ESTIMATED PRE-EXISTING % VEGETATIVE COVER 80% EXISTING SOIL TYPE TYPE C/D AQUEPTS, LOVELAND CLAY LOAM, AND RIVERWASH MATERIAL DEPTH TO GROUNDWATER 3 FEET NUMBER OF PROJECT PHASES 1 TOTAL VOLUME OF MATERIAL IMPORT/EXPORT 2,050 CY TOTAL AREA OF OFFSITE STOCKPILING OF FILL/BORROW 0 STEEPEST SLOPE (H:V)3:1 DISTANCE FROM A RIPARIAN OR SENSITIVE AREA N/A EROSION CONTROL NOTES 1.TOTAL DISTURBED AREA = 93,131 SF (2.14 ACRES). 2.PERMANENT SITE STABILIZATION SHALL BE DONE IN ACCORDANCE WITH THE APPROVED LANDSCAPE PLAN FOR THIS DEVELOPMENT. 3.REFER TO SHEET C0.02 FOR STANDARD EROSION AND SEDIMENT CONTROL CONSTRUCTION PLAN NOTES. 4.EROSION CONTROL PRACTICES, SITE PROTECTION, AND REVEGETATION METHODS SHALL FOLLOW CITY REGULATIONS. 5.CONTRACTOR TO TERRACE SLOPES USING A "TRACKED" VEHICLE, RUN PERPENDICULAR TO SLOPE TO INHIBIT RILL/GULLEY EROSION. CONTRACTOR MAY USE OTHER WINDROW-TYPE METHODS AS APPROVED BY ENGINEER. TYPICAL ALL SLOPES, REPEAT AS NECESSARY UNTIL LANDSCAPING IS INSTALLED. 6.ANY AREAS USED FOR STOCKPILING AND/OR STAGING SHOULD ALSO HAVE SEDIMENT AND EROSION CONTROL MEASURES AS NECESSARY. THESE AREAS SHOULD BE LOCATED AT LEAST 100' AWAY FROM DRAINAGE WAYS. THE ITEMS MAY INCLUDE BUT ARE NOT LIMITED TO VEHICLE TRACKING CONTROL, SILT FENCE, CONSTRUCTION FENCE, CONCRETE WASHOUT, AND SEDIMENT TRAP. 7.SOIL AMENDMENTS SHALL BE INCORPORATED IN ALL LANDSCAPE AREAS TO A DEPTH OF 6" AT A RATE OF 3 CUBIC YARDS PER 1000 SQUARE FEET OF AREA -OR- 4" OF LOOSE TOPSOIL IMPORTED ONTO THE SITE OVER 4" OF LOOSENED SUBGRADE SOILS. REFER TO CITY OF FORT COLLINS CODE SECTIONS 12-130 THROUGH 12-132. 8.TEMPORARY SEEDING SHALL BE UTILIZED IN THE EVENT THAT A GRADED AREA IS EXPOSED LONGER THAN 30 DAYS. THE SITE SHALL BE SEEDED WITH THE APPROPRIATE SEED MIX AND INSTALLATION METHOD AS SPECIFIED ON THE APPROVED LANDSACPE PLANS. 9.TEMPORARY EROSION CONTROL BLANKET SHALL BE INSTALLED AROUND ALL POND FOREBAYS AND FLARED END SECTIONS. 10.A COMMERCIAL FERTILIZER WITH THE FOLLOWING SPECS SHALL BE USED: 11.ALL LID AND INFILTRATION PRACTICES SHALL BE BUILT AS PART OF THE FINAL CONSTRUCTION SEQUENCE TO MINIMIZE THE POTENTIAL FOR THESE TO BE CLOGGED WITH SEDIMENT DUE TO CONSTRUCTION ACTIVITIES ON THE SITE. INGREDIENT % AVAILABLE BY WEIGHT APPLICATION RATE IN LBS/ACRE NITROGEN 13 65 POTASSIUM 16 80 POTASSIUM M 120 Silt Fence needs to be added in plan beyond the "SF" symbol UCDG Response:Silt fence has been added back to this area. E. PROSPECT R O A D EXISTING BUILDING PROPOSED BUILDING FFE = 4903.50 (NORTH) FFE = 4899.00 (GYM / SOUTH) LOT 6 PROSPECT PARK EAST P.U.D. LOT 4 PROSPECT PARK EAST P.U.D. LOT 5 PROSPECT PARK EAST P.U.D. ADA PARKING SLOPES NOT TO EXCEED 2% IN ANY DIRECTION STORM SEWER (SEE SHEET C3.11) POUDRE RIVER 500-YR FLOODPLAIN LIMITS OF DISTURBANCE POUDRE RIVER 100-YR FLOODPLAIN 98.12 0. 6 0 9 9 . 9 0 0. 3 9 1.22 3. 0 0 3. 1 0 1. 0 0 0.83 0. 7 2 0.5 8 2.97 2. 8 4 2.7996.9497.57 3.50 3. 3 1 3. 5 0 3.49 3.4 2 3.14 3. 3 8 2.68 2.23 0. 4 6 2.90 0.32 2.69 3. 4 2 3.23 3. 3 3 3. 5 0 2.182.15 2.27 3. 0 02.392.202.552.3399 . 5 5 1. 4 6 0. 8 31.972.043.133. 0 0 NORTH BIORETENTION POND 96 . 0 0 97.08 2. 8 6 2.91 3. 1 6 1.5% 1.5% 1.5% 1.0% STORM SEWER (SEE SHEET C3.10) 1.61 0.6 5 0.65 0.6 5 0. 6 5 0. 6 5 3.00 3.042 . 2 02.612.943.231 . 2 61.833.7% 4. 8 % 4 . 0 % 8. 0 : 1 4. 7 % 7 . 8 % 5. 6 : 1 7.6:1 4. 0 : 1 3.7 : 1 7. 6 : 1 10 . 8 : 1 5. 3 : 1 8. 8 % 3. 9 : 1 6. 5 : 1 1.9% 1.8% 1.7% 1.5% 1. 5 % 2 . 1 % 3.0 % 2. 1 % 1 . 6 % 1 . 8 % 1.4 %2.4 % 2.0% 2.3% 2. 1 % 2 . 3 % 2 . 1 % 2 . 4 % 2. 4 % 2.2% 2. 4 % 3.8 % 2 . 5 % 2 . 2 % 3. 2 % 2 . 7 % 2. 9 % 2. 6 % 2 . 9 % 2. 6 % 4 . 5 % 5. 2 % 5. 1 : 1 5. 1 : 1 4.9 : 1 4.7:1 3.3:1 3. 9 : 1 3. 5 : 1 5. 1 : 1 4. 0 : 1 4. 0 : 1 5. 8 : 1 4. 3 : 1 4. 1 : 1 6 . 1 % 5 . 6 : 1 3 . 8 : 1 8. 5 : 1 3. 9 : 1 3.9:1 2. 0 % 0.0% 1. 6 % 3.00 3.39 0.53 99.71 97.81 1.57 1. 4 7 1. 0 9 1.16 1.85 1. 3 7 2.16 1.69 1. 7 6 2. 2 6 1.8 8 1.48 99.55 0.67 CURB CUT CURB CUT CURB CUT DRAINAGE SWALE DRAINAGE SWALE DRAINAGE SWALE DRAINAGE SWALE DRAINAGE SWALE GRADE BREAK BERMED TOP OF POND ELEV. = 4898.00 2' 2. 7 2 2. 7 5 DRAINAGE SWALE 0.49 2. 0 % 2.3% 1. 5 % 2.10 2 . 3 4 2 . 5 4 2.89 2.97 1. 5 % 1. 5 % 1.070.8% 3. 0 0 EXPOSED EDGE OF SIDEWALK (SEE DETAILS) SEE GRADING DETAIL A (SHEET C4.10) 1. 5 % 18" SPILL C&G 18" SPILL C&G 18" CATCH C&G 18" CATCH C&G 18" CATCH C&G 18" CATCH C&G 1. 0 6 GRADE BREAK CURB CUT 18" FLUSH C&G TRANSITION FROM FULL HEIGHT C&G TO FLUSH C&G 18" FLUSH C>RANSITION FROM FULL HEIGHT C&G TO FLUSH C&G TC TC TC TC 0. 8 6 1. 0 3 3.43 SW 2.9 2 3. 4 2 3.43 SW 12" SIDEWALK CHASE 12" SIDEWALK CHASE 98. 9 2 98.92 99. 0 0 2.78 21.4% 2 6 . 1 % 33.0 % 3.3 % 1. 5 % 2.19 EXPOSED EDGE OF SIDEWALK (SEE DETAILS) 98.92 99.20 99.78 99.78 0.37 0.37 0.95 0.95 1.53 1.53 2.12 2.12 2.70 14.0% 16 . 0 % 1.3 % 2.19 1.61 1.61 1.03 1.03 0.44 0.44 99.86 99.86 99.28 ONE 7" RISER ONE 7" RISER ONE 7" RISER ONE 7" RISER ONE 7" RISER ONE 7" RISER 4' LANDING (TYP.) 0 20'40' SCALE: 1" = 20' 10' NO R T H 4/ 2 / 2 0 2 4 2: 2 7 : 2 5 P M C: \ U N I T E D C I V I L D R O P B O X \ P R O J E C T S \ U 2 2 0 1 4 - P R O S P E C T P A R K E A S T \ C A D D \ C P \ C 4 . 1 0 - D E T A I L E D G R A D I N G P L A N S . D W G C4 . 1 0 - D E T A I L E D G R A D I N G P L A N S -- - - -- - - A A 1 2 3 4 5 1 2 3 4 5 PR O J E C T I N F O R M A T I O N SH E E T I N F O R M A T I O N PR O J E C T P H A S E AR C H I T E C T SE A L ISSUE DATE: PROJECT #: CO N S U L T A N T B C D A B C D T - 970.484.0117 F - 970.484.0264 315 East Mountain Ave Suite 100 Fort Collins, CO 80524-2913 © 2015 www.rbbarchitects.com ARCHITECTS REVISIONS: 2204 PR O S P E C T S P O R T S CL U B MA X W E S T I N C . FI N A L DE V E L O P M E N T PL A N 4/2/2024 16 0 0 E A S T P R O S P E C T R O A D FO R T C O L L I N S , C O 8 0 5 2 5 DESCRIPTION DATE CIVIL ENGINEERING & CONSULTING UNITED CIVIL Design Group 19 OLD TOWN SQUARE #238 FORT COLLINS, CO 80524 (970) 530-4044 www.unitedcivil.com PR O J . M G R : DR A W I N G N A M E : PA T H : DE S I G N E R : DA T E : TI M E : C4.10 DETAILED GRADING PLAN SWALE FLOWLINE 9 0 . 3 03.13EXISTING SPOT ELEVATION 10.0%4.0:1 (10.0%)(4.0:1) PROPOSED SLOPE EXISTING SLOPE GRADE BREAK PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR LEGEND PROPOSED SPOT ELEVATIONS FFE = FINISHED FLOOR ELEVATION FG = FINISHED GRADE AT EXTERIOR WALL EOP = EDGE OF PAVEMENT LP = LOW POINT HP = HIGH POINT TOW = TOP OF WALL BOW = BOTTOM OF WALL EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR 1.THE CONTRACTOR SHALL VERIFY EXISTING CONDITIONS AS SHOWN ON THESE DRAWINGS. THE CONTRACTOR SHALL CONTACT THE ENGINEER IMMEDIATELY SHOULD ANY DISCREPANCIES BETWEEN THESE PLANS AND ACTUAL FIELD CONDITIONS EXIST. 2.EXISTING UNDERGROUND AND OVERHEAD PUBLIC AND PRIVATE UTILITIES AS SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. EXISTING UTILITY MAINS AND SERVICES MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THESE DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATION. 3.SEE SOILS REPORT FOR PAVEMENT AND FOUNDATION PREPARATION, DESIGN AND RECOMMENDATIONS. 4.ALL DISTURBED AREAS NOT PAVED SHALL BE REVEGETATED PER THE LANDSCAPE PLANS. 5.THE CONTRACTOR SHALL PROTECT ALL EXISTING FEATURES THAT ARE NOT TO BE REMOVED ADJACENT TO THE CONSTRUCTION AREA INCLUDING, BUT NOT LIMITED TO, PAVEMENT, PRIVATE FENCES, ABOVE GROUND OR UNDERGROUND UTILITIES, STRUCTURES, AND UNDERGROUND FOUNDATIONS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE THAT SHOULD OCCUR TO ANY ON-SITE, OFF-SITE, PUBLIC OR PRIVATE FACILITY OR FEATURE AS A RESULT OF THE CONSTRUCTION PROCESS FOR THIS PROJECT. 6.THE CONTRACTOR SHALL COORDINATE ALL CONSTRUCTION ITEMS IMPACTING ADJACENT PROPERTIES WITH THE PROPERTY OWNERS PRIOR TO BEGINNING ANY CONSTRUCTION ACTIVITIES. 7.EROSION CONTROL PRACTICES, SITE PROTECTION, AND REVEGETATION METHODS SHALL FOLLOW TOWN REGULATIONS. 8.IN ADDITION TO THE EROSION CONTROL MEASURES SHOWN ON THIS DRAWING, THE CONTRACTOR SHALL COMPLETE, COORDINATE WITH, AND UPDATE AS REQUIRED, THE STORMWATER MANAGEMENT PLAN (SWMP) FOR THIS PROJECT. 9.ANY AREAS USED FOR STOCKPILING AND/OR STAGING SHOULD ALSO HAVE SEDIMENT AND EROSION CONTROL MEASURES AS NECESSARY. THESE AREAS SHOULD BE LOCATED AT LEAST 100' AWAY FROM DRAINAGE WAYS. THE SWMP SHOULD BE UPDATED TO SHOW THESE AREAS AND SEDIMENT AND EROSION CONTROL ITEMS. THE ITEMS MAY INCLUDE BUT ARE NOT LIMITED TO VEHICLE TRACKING CONTROL, SILT FENCE, CONSTRUCTION FENCE, CONCRETE WASHOUT, AND SEDIMENT TRAP. 10.STREET SWEEPING SHALL BE PERFORMED AS NEEDED AND/OR AT THE DIRECTION OF THE CITY ENGINEERING INSPECTOR. NOTES CATCH CURB & GUTTER PROPOSED BUILDING PROPERTY LINE SIDEWALK / TRAIL SPILL CURB & GUTTER TRANSITION FROM CATCH TO SPILL CURB & GUTTERTC GRADING DETAIL A SCALE: 1" = 10' INFORMATION: Comments were made to the Landscape Plan for this area to require rock or non-floating mulch as to prevent organic mulch from entering the stormwater conveyance. Can we add a note indicating acceptable non floating mulch that can handle flows from the north. I'm not sure this warrants a forebay, but maybe turf reinforcement? similar thoughts in this area, more runoff reaching this area but not sure if forebay/EC is warranted. UCDG Response:Note 11 has been added to the detailed grading plans discussing this issue and referring to the landscape plans for exact locations and specs of this mulch. UCDG Response:This has been coordinated offline and no forebay or TRM has been added but a cobble pad has been added to the outlet of this pipe.This cobble will match the cobble shown in the swales on the landscape plan. UCDG Response:This has been coordinated offline and no forebay or TRM has been added but cobble has been added to this swale prior to entering the bioretention pond.This cobble will match the cobble shown in the swales on the landscape plan. 4/ 2 / 2 0 2 4 2: 2 7 : 5 2 P M C: \ U N I T E D C I V I L D R O P B O X \ P R O J E C T S \ U 2 2 0 1 4 - P R O S P E C T P A R K E A S T \ C A D D \ C P \ C 6 . 0 0 C O N S T R U C T I O N D E T A I L S . D W G C6 . 0 0 C O N S T R U C T I O N D E T A I L S -- - - -- - - A A 1 2 3 4 5 1 2 3 4 5 PR O J E C T I N F O R M A T I O N SH E E T I N F O R M A T I O N PR O J E C T P H A S E AR C H I T E C T SE A L ISSUE DATE: PROJECT #: CO N S U L T A N T B C D A B C D T - 970.484.0117 F - 970.484.0264 315 East Mountain Ave Suite 100 Fort Collins, CO 80524-2913 © 2015 www.rbbarchitects.com ARCHITECTS REVISIONS: 2204 PR O S P E C T S P O R T S CL U B MA X W E S T I N C . FI N A L DE V E L O P M E N T PL A N 4/2/2024 16 0 0 E A S T P R O S P E C T R O A D FO R T C O L L I N S , C O 8 0 5 2 5 DESCRIPTION DATE CIVIL ENGINEERING & CONSULTING UNITED CIVIL Design Group 19 OLD TOWN SQUARE #238 FORT COLLINS, CO 80524 (970) 530-4044 www.unitedcivil.com PR O J . M G R : DR A W I N G N A M E : PA T H : DE S I G N E R : DA T E : TI M E : C6.03 CONSTRUCTION DETAILS *THIS DETAIL HAS BEEN MODIFIED PER DISCUSSION WITH THE CITY APPROVED: DRAWN BY:DETAILS CONSTRUCTIONDATE REVISED: DETAILWATER STANDARD SETTING FOR 1-1/2" AND 2" WATER METERS W-16A PLAN VIEW APPROVED: DRAWN BY:DETAILS CONSTRUCTIONDATE REVISED: DETAILWATER STANDARD SETTING FOR 1-1/2" AND 2" WATER METERS (PLAN VIEW) W-16B Please plan and profile this lowering UCDG Response:The waterline lowering has been profiled on sheet C3.00.