Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutBLOOM FILING SIX - PDP230017 - SUBMITTAL DOCUMENTS - ROUND 2 - Drainage Related DocumentDRAINAGE & EROSION CONTROL REPORT
Bloom Filing Six
City of Fort Collins, CO
Prepared for:
TDC DEVELOPMENT
Dean Barber
Dbarber@TDC-DEV.com
Prepared by:
16911 Potts Place
Mead, CO 80542
Phone: 970.217.9148
Project Number: 1061-3
May 14, 2024
16911 Potts Place, Mead, CO
970.217.9148
troy@i2-consultants.com
May 15, 2024
Mr. Wes Lamarque, PE
Development Review Engineer
City of Fort Collins Utilities
222 Laporte Avenue
Fort Collins, CO 80524
RE: Drainage and Erosion Control Report for Bloom Filing Six Fort Collins, CO
Dear Mr. Lamarque:
We are pleased to present this Drainage and Erosion Control Report for Bloom Filing Six
for your review and approval. This report has been prepared in general accordance with
the Fort Collins Stormwater Criteria Manual, September 2018 as well as the approved
Final Drainage Report, Bloom Filing 1, dated November 14, 2022, prepared by Galloway &
Company, Inc.
We look forward to your favorable review of this project and report. Please do not hesitate
to contact our office if you have any questions.
Sincerely,
i2 Consultants, Inc.
Troy W. Campbell, PE
Senior Project Engineer
ENGINEER’S CERTIFICATION
I hereby certify that this report for the drainage design of Bloom Filing Six was prepared by me (or
under my direct supervision) in accordance with the provisions of the Fort Collins Storm Drainage
Criteria Manual for the owners thereof.
__________________________________________
Registered Professional Engineer
State of Colorado No. 41159
(Seal)
Drainage and Erosion Control Report
Bloom Filing Six, Fort Collins, CO
May 15, 2024 Page 2
i2 Consultants, Inc.
Drainage and Erosion Control Report
Bloom Filing Six
Located within the Southwest Quarter of Section 9,
Township 7 North, Range 68 West of the 6th P.M.
City of Fort Collins, County of Larimer, State of Colorado
TABLE OF CONTENTS Page
I. GENERAL LOCATION AND DESCRIPTION 3
A. Site Location
B. Description of Property
II. DRAINAGE BASINS AND SUB-BASINS 4
A. Major Basin
B. Sub-basin and Site Drainage
III. DRAINAGE DESIGN CRITERIA 4
A. Regulations
B. Development Criteria Reference and Constraints
C. Hydrological Criteria
D. Hydraulic Criteria
IV. DRAINAGE FACILITY DESIGN 5
A. General Concept
B. Specific Details
V. SEDIMENT, EROSION CONTROL AND STORMWATER QUALITY 8
A. Temporary Sediment and Erosion Control
B. Permanent Water Quality BMPs
VI. CONCLUSIONS 9
A. Compliance with Standards
B. Drainage Concept
VII. REFERENCES 10
VIII. APPENDICIES 11
Drainage and Erosion Control Report
Bloom Filing Six, Fort Collins, CO
May 15, 2024 Page 3
i2 Consultants, Inc.
I. GENERAL LOCATION AND DESCRIPTION
A. Site Location:
The proposed development is located in the southwest quarter of Section 9,
Township 7 North, Range 68 West, of the 6th Principal Meridian, City of Fort Collins,
County of Larimer, State of Colorado. Furthermore, the project is north of Mulberry
Street (and the Frontage Road) and east of Delozier Drive.
The legal description of the property will be Bloom Filing Six.
The subject site is currently vacant and has been overlot graded generally
according to the Bloom Filing One construction improvements.
B. Description of Property:
The subject development consists of roughly 5.5 acres. The site is currently
undeveloped and the proposed project will consist of roadway connection, utility
installation and detention pond regrading. The subject property is being subdivided
and this report presents basins for future development.
The site currently is vacant but has been overlot graded with the Bloom Filing One
improvements. The site is bound by the Lake Canal on the north, Mulberry Street
Frontage Road on the south and existing subdivisions on the west and east.
The subject site generally slopes from south to north at varying slopes from 0% to
3%. The site has been graded so that the property is out of the 100-year floodplain.
The existing runoff from the subject property drains to the north via sheet flow to the
existing detention pond along the northern portion of the site. An outlet structure
was not installed for the detention pond during the grading for the pond.
The subject site is shown as Basin FUT-I in the approved Final Drainage Report,
Bloom Filing 1, dated November 14, 20222, prepared by Galloway & Company, Inc.
This basin was not included in the hydrology calculations in the report.
According to the Natural Resources Conversation Service (NRCS) Web Soil
Survey, the native soils in this area are Ascalon sandy loam, 0 to 3 percent slopes
(Map Unit Symbol #7), which is a Type B soil and Garrett loam, 0 to 1 percent
slopes (Map Unit Symbol #40), which is a Type B soil and Nunn clay loam, wet, 1 to
3 percent slopes (Map Unit Symbol #76), which is a Type C soil. Please refer to the
NRCS soils information in the Appendix.
Existing drainage facilities near or adjacent to the site include an existing roadside
swale along the north side of the Frontage Road as well as the existing detention in
the northern portion of the site.
Drainage and Erosion Control Report
Bloom Filing Six, Fort Collins, CO
May 15, 2024 Page 4
i2 Consultants, Inc.
II. DRAINAGE BASINS AND SUB-BASINS
A. Major Basin:
This site is located within the Boxelder Creek & Cooper Slough Basin as shown on
the City of Fort Collins Master Drainage Plan. This basin historically generally flows
from northwest to southeast.
The Lake Canal runs west to east along the northern portion of the subject site.
The site is shown on FEMA panel 08069C0984H, effective 05/02/2012. The subject
site is located with Zone X and AE on the current FEMA panel. A LOMR for the
subject site has been prepared and submitted to FEMA for the subject site in order
to revise the floodplain boundary.
B. Sub-basin and Site Drainage:
The proposed site generally directs runoff north to the detention pond. Each lot that
will be developed shall prepare a site-specific drainage report to meet the
requirements of the City of Fort Collins and this drainage report. A portion of the
subject site will drain from north to south to the existing Frontage Road, due to
existing grades and site constraints imposed on the site by the site being raised out
of the floodplain. The surrounding property to the east, as well as the Frontage
Road are still in the floodplain.
The subject site is shown as Basin FUT-I in the approved Final Drainage Report,
Bloom Filing 1, dated November 14, 20222, prepared by Galloway & Company, Inc.
This basin was not included in the hydrology calculations in the report.
There is no offsite runoff that reaches the subject property due to the recent grading
associated with the Bloom Filing One improvements.
The drainage patterns proposed with the subject improvements are generally
consistent with the drainage patterns proposed with the approved Bloom Filing One
report.
III. DRAINAGE DESIGN CRITERIA
A. Regulations:
This report has been prepared in general accordance with the Fort Collins
Stormwater Criteria Manual, September 2018 and the Urban Storm Drainage
Criteria Manual (USDCM).
Drainage and Erosion Control Report
Bloom Filing Six, Fort Collins, CO
May 15, 2024 Page 5
i2 Consultants, Inc.
B. Development Criteria Reference and Constraints:
The subject site has been included in the following previous reports:
• Final Drainage Report, Bloom Filing 1, dated November 14, 20222, prepared
by Galloway & Company, Inc.
The site is shown as Basin FUT-I, however hydrologic calculations are not
included within the report.
Th report for the subject site has been prepared in general accordance with the
appropriate City and USDCM criteria and previous reports.
C. Hydrological Criteria:
Fort Collins Stormwater Criteria Manual, September 2018, as well as the USDCM.
There are no deviations from the criteria in this report.
The design storms for this project are the 2-year and the 100-year recurrence
intervals. Runoff is calculated using the Rational Method since all basins are
smaller than 5 acres. The Rational Method calculations are computed by the
following:
Q = ciA where: Q = Runoff in cubic feet per second
c = Calculated runoff coefficient for design event
i = Storm intensity in inches/hour
A = Basin area in acres
Hydrological calculations have been prepared in accordance with the Fort Collins
Stormwater Criteria Manual, September 2018 as well as the USDCM.
D. Hydraulic Criteria:
Rational calculations were prepared using methodology outlined in the Fort Collins
Stormwater Criteria Manual, September 2018.
Hydraulic capacities were calculated using Hydraflow Express Extension for
Autodesk Civil 3D, Version 2021.
IV. DRAINAGE FACILITY DESIGN
A. General Concept:
The drainage patterns associated with the proposed improvements are generally
consistent with the existing drainage patterns. Subsequent onsite development
shall prepare a site specific drainage report to meet the requirements of the City of
Fort Collins and this drainage report.
Drainage and Erosion Control Report
Bloom Filing Six, Fort Collins, CO
May 15, 2024 Page 6
i2 Consultants, Inc.
Site runoff shall be directed to the detention pond in the northern portion of the site.
The estimated runoff for the site was determined using the Rational Method, as
detailed above. The proposed improvements have been divided into six (6)
drainage basins. The basins have been created to direct runoff to existing and
proposed facilities and are based on expected future lot development.
The detention pond regraded with this development should accommodate
developed future onsite flows. This report includes assumptions about future
development that shall be verified at the time of each specific development.
Additional stormwater attenuation may be required, if future development exceeds
the assumptions in this report.
B. Specific Details:
Basin A
Basin A (1.66 acres) is in the western portion of the site and this basin is assumed
to contain future commercial development. Assumed imperviousness for this basin
is 80%, which corresponds with “Commercial” Land Use as shown in Table 4.1-2 of
the City of Fort Collins Criteria. Runoff will generally flow from southwest to
northeast. Runoff is expected to flow to Design Point 1 and be conveyed to the
proposed detention pond through the northern portion of the basin.
Basin B
Basin B (0.30 acres) is in the northern central portion of the site and this basin is
assumed to contain future commercial development. Assumed imperviousness for
this basin is 80%, which corresponds with “Commercial” Land Use as shown in
Table 4.1-2 of the City of Fort Collins Criteria. Runoff will generally flow from
southwest to northeast. Runoff is expected to flow to Design Point 2 and be
conveyed to the proposed detention pond through the northern portion of the basin.
Basin C
Basin C (1.10 acres) is in the center of the site and this basin contains the proposed
shared roadway and is the remainder is assumed to contain future commercial
development. Assumed imperviousness for this basin is 80%, which corresponds
with “Commercial” Land Use as shown in Table 4.1-2 of the City of Fort Collins
Criteria. Runoff will generally flow from southwest to northeast. Runoff is expected
to flow to Design Point 3 and be conveyed to the proposed detention pond through
Basin B.
Basin D
Basin D (1.10 acres) is in the southeastern portion of the site and this basin is
assumed to contain future commercial development. Assumed imperviousness for
this basin is 80%, which corresponds with “Commercial” Land Use as shown in
Table 4.1-2 of the City of Fort Collins Criteria. Runoff will generally flow from
Drainage and Erosion Control Report
Bloom Filing Six, Fort Collins, CO
May 15, 2024 Page 7
i2 Consultants, Inc.
southwest to northeast. Runoff is expected to flow to Design Point 4 and be
conveyed to the proposed detention pond through the northern portion of Basin D.
Basin E
Basin E (1.33 acres) is along the northern portion of the subject site and contains
the detention pond. The portion of the detention which is along the channel is not
expected to have significant grading changes with this development. The detention
pond outlet will generally be in the center portion of the pond and will convey
detained runoff to Lake Canal.
Basin F
Basin F (0.07) acres is in the southern-middle portion of the site and will contain
roadway, sidewalk, and landscaping. This basin will flow from north to south the
Frontage Road. Due to existing site elevations and constraints, this basin cannot
flow to the site detention area.
The subject site is shown as Basin FUT-I in the approved Final Drainage Report,
Bloom Filing 1, dated November 14, 20222, prepared by Galloway & Company, Inc.
This basin was not included in the hydrology calculations in the report. There is an
outlet structure design, however the hydrologic and hydraulic calculations are not
included in the report.
The composite imperviousness calculated for this development (including all
basins) is 58%, with a “C” value of 0.65.
The required 100-year volume is 1.3 ac-ft and the provided volume is 1.3 ac-ft at a
release rate of 0.65 cfs. The release rate is based on the existing 2-year runoff
from the site. The detention volume is for the difference between the 100-year
developed runoff and the existing 2-year runoff. The 100-year water surface
elevation will be 4929.50.
The detention pond will contain water quality capture volume (WQCV). The WQCV
required is 0.15 ac-ft and this will be provided at roughly 4927.0.
The pond will have an emergency overflow spillway for a plugged outlet condition or
for a storm event greater than the 100-year event. The emergency overflow
spillway has been designed to be 40’ long and have a water depth of +/-6”. The
runoff through the spillway was calculated by assuming a plugged outlet and
determining the runoff at the time the pond is full. The spillway crest elevation is
4930.50, peak elevation through the spillway will be 4931.00. Furthermore, the top
of the proposed detention pond will be 4931.00.
The detention pond will release via 12” RCP into Lake Canal. The elevation for the
outlet pipe is based on the existing ditch cross-section and decreed flow of 158 cfs
in the ditch.
Drainage and Erosion Control Report
Bloom Filing Six, Fort Collins, CO
May 15, 2024 Page 8
i2 Consultants, Inc.
V. SEDIMENT, EROSION CONTROL AND STORMWATER QUALITY
A. Temporary Sediment and Erosion Control:
Several sediment and erosion control measures will be incorporated into the initial
phase of construction. The initial sediment and erosion control measures to be
installed shall include silt fence, as well as a vehicle tracking control at the
construction entrance and sediment control log within the existing swale on the
north side of the Frontage Road.
Furthermore, additional measures for sediment and erosion control shall consist of
providing an area designated for a concrete washout area. A stabilized staging
area is proposed to the west of the access road for the subject site. The initial
measures for sediment and erosion control shall be maintained and updated as
necessary during the interim and final stages of the project.
Additionally, any area that has been disturbed by construction activities and left
exposed for more than fourteen (14) days, shall receive drilled seeding and straw
mulch at 2 tons/acre, until permanent landscaping or ground cover has been
provided.
Four Step Process to Minimize Adverse Impacts of Urbanization
Employing runoff reduction practices: Water Quality will be utilized with this
development. Future developments will include landscaping as part of the
project and also utilizing LID measures.
Implementing best management practices (BMPs): Water Quality will be
provided in the detention pond and will be controlled by the water quality
plate for the outlet structure.
Stabilizing Streams: The runoff from the subject site drains to a detention
facility. The runoff release from the overall development will be controlled
by the outlet structure for the pond, prior to release into Lake Canal.
Implementing site specific and other source control BMPs: A stabilized
staging area will be provided to the west of the access road. Appropriate
erosion and pollution control shall be installed around the staging area.
Each individual lot shall be required to implement site specific and source
control BMPs.
Drainage and Erosion Control Report
Bloom Filing Six, Fort Collins, CO
May 15, 2024 Page 9
i2 Consultants, Inc.
B. Permanent Water Quality BMPs
Permanent Water Quality will be provided in the onsite detention pond. Please refer
to the discussion above regarding volume and elevations.
Required Treatment Area
The proposed development utilizes water quality practices to the extent practical for
the project. LID is provided with this project prior to runoff reaching the proposed
detention pond. The LID volume is intended to account for the future site
development. Each individual development shall provide additional LID measures
to treat new or modified impervious areas per City of Fort Collins criteria if the
specific site development LID requirement is above the proposed LID measures to
be constructed with Bloom Filing Six.
Portions of new and modified impervious areas are not able to be treated to the
existing conditions surrounding the subject site. Proposed and modified sidewalk
and modified parking areas drain away from the subject site to existing
conveyances and therefore are not able to be treated.
Please refer to the LID Exhibit provided in the Appendix for additional information.
VI. CONCLUSIONS
A. Compliance with Standards:
The drainage design is in general compliance with the Fort Collins Stormwater
Criteria Manual, September 2018 as well as the Urban Storm Drainage Criteria
Manual (USDCM). Furthermore, the design is in general conformance with the
approved Final Drainage Report, Bloom Filing 1, dated November 14, 20222,
prepared by Galloway & Company, Inc.
There are new and modified impervious areas, such as sidewalks and access that
are not able to be treated, per City criteria, since these areas drain away from the
subject site to existing conveyances and there is not existing infrastructure to
support treatment.
B. Drainage Concept:
The runoff from this site will be conveyed by existing and proposed storm drainage
improvements, including proposed curb, gutter and swales. The drainage design
for this project should not negatively impact improvements downstream or the
existing storm system.
Drainage and Erosion Control Report
Bloom Filing Six, Fort Collins, CO
May 15, 2024 Page 10
i2 Consultants, Inc.
Permanent water quality for the site will be provided through the detention pond to
slow runoff and provide a filter for runoff prior to leaving the subject site.
VII.REFERENCES
1. Fort Collins Stormwater Criteria Manual, dated September 2018.
2. Urban Drainage and Flood Control District, Drainage Criteria Manual Volumes 1,
Revised August 2018, Volume 2, Revised September 2017 and the Volume 3, dated
November 2010 and Updated October 2019.
3. Final Drainage Report, Bloom Filing 1, dated November 14, 20222, prepared by
Galloway & Company, Inc.
Drainage and Erosion Control Report
Bloom Filing Six, Fort Collins, CO
May 15, 2024 Page 11
i2 Consultants, Inc.
VIII.APPENDICIES
Vicinity Map
FEMA & Existing Geotechnical Information
Hydrologic Calculations
Hydraulic Calculations
Excerpts from Previous Reports
Charts and Figures
Vicinity Map
© 2023 Microsoft Corporation © 2023 TomTom
TRACT II, BLOOM FILING ONE
FORT COLLINS, CO
VICINITY MAP
JLB
C:
\
U
s
e
r
s
\
t
r
o
y
\
D
r
o
p
b
o
x
\
I
2
\
P
r
o
j
e
c
t
s
\
1
0
6
1
-
3
B
l
o
o
m
\
D
W
G
\
S
h
e
e
t
s
\
B
l
o
o
m
_
C
V
.
d
w
g
,
1
2
/
1
9
/
2
0
2
3
1
:
4
5
:
3
9
P
M
,
D
W
G
T
o
P
D
F
.
p
c
3
A-1
i2 Consultants, Inc.
FEMA & Existing Geotechnical Information
National Flood Hazard Layer FIRMette
0 500 1,000 1,500 2,000250
Feet
Ü
SEE FIS REPORT FOR DETAILED LEGEND AND INDEX MAP FOR FIRM PANEL LAYOUT
SPECIAL FLOOD
HAZARD AREAS
Without Base Flood Elevation (BFE)
Zone A, V, A99
With BFE or DepthZone AE, AO, AH, VE, AR
Regulatory Floodway
0.2% Annual Chance Flood Hazard, Areas
of 1% annual chance flood with average
depth less than one foot or with drainage
areas of less than one square mileZone X
Future Conditions 1% Annual
Chance Flood HazardZone X
Area with Reduced Flood Risk due to
Levee. See Notes.Zone X
Area with Flood Risk due to LeveeZone D
NO SCREEN Area of Minimal Flood Hazard Zone X
Area of Undetermined Flood HazardZone D
Channel, Culvert, or Storm Sewer
Levee, Dike, or Floodwall
Cross Sections with 1% Annual Chance
17.5 Water Surface Elevation
Coastal Transect
Coastal Transect Baseline
Profile Baseline
Hydrographic Feature
Base Flood Elevation Line (BFE)
Effective LOMRs
Limit of Study
Jurisdiction Boundary
Digital Data Available
No Digital Data Available
Unmapped
This map complies with FEMA's standards for the use of
digital flood maps if it is not void as described below.
The basemap shown complies with FEMA's basemap
accuracy standards
The flood hazard information is derived directly from the
authoritative NFHL web services provided by FEMA. This map
was exported on 12/13/2023 at 9:33 PM and does not
reflect changes or amendments subsequent to this date and
time. The NFHL and effective information may change or
become superseded by new data over time.
This map image is void if the one or more of the following map
elements do not appear: basemap imagery, flood zone labels,
legend, scale bar, map creation date, community identifiers,
FIRM panel number, and FIRM effective date. Map images for
unmapped and unmodernized areas cannot be used for
regulatory purposes.
Legend
OTHER AREAS OF
FLOOD HAZARD
OTHER AREAS
GENERAL
STRUCTURES
OTHER
FEATURES
MAP PANELS
8
B 20.2
The pin displayed on the map is an approximate
point selected by the user and does not represent
an authoritative property location.
1:6,000
105°1'28"W 40°35'10"N
105°0'51"W 40°34'43"N
Basemap Imagery Source: USGS National Map 2023
B-1
Soil Map—Larimer County Area, Colorado
(Tract II, Bloom Filing One)
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
12/13/2023
Page 1 of 3
44
9
2
2
7
0
44
9
2
3
1
0
44
9
2
3
5
0
44
9
2
3
9
0
44
9
2
4
3
0
44
9
2
4
7
0
44
9
2
5
1
0
44
9
2
5
5
0
44
9
2
5
9
0
44
9
2
2
7
0
44
9
2
3
1
0
44
9
2
3
5
0
44
9
2
3
9
0
44
9
2
4
3
0
44
9
2
4
7
0
44
9
2
5
1
0
44
9
2
5
5
0
44
9
2
5
9
0
498250 498290 498330 498370 498410 498450 498490
498250 498290 498330 498370 498410 498450 498490
40° 35' 2'' N
10
5
°
1
'
1
4
'
'
W
40° 35' 2'' N
10
5
°
1
'
4
'
'
W
40° 34' 52'' N
10
5
°
1
'
1
4
'
'
W
40° 34' 52'' N
10
5
°
1
'
4
'
'
W
N
Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 13N WGS84
0 50 100 200 300
Feet
0 20 40 80 120
Meters
Map Scale: 1:1,570 if printed on A portrait (8.5" x 11") sheet.
Soil Map may not be valid at this scale.
B-2
MAP LEGEND MAP INFORMATION
Area of Interest (AOI)
Area of Interest (AOI)
Soils
Soil Map Unit Polygons
Soil Map Unit Lines
Soil Map Unit Points
Special Point Features
Blowout
Borrow Pit
Clay Spot
Closed Depression
Gravel Pit
Gravelly Spot
Landfill
Lava Flow
Marsh or swamp
Mine or Quarry
Miscellaneous Water
Perennial Water
Rock Outcrop
Saline Spot
Sandy Spot
Severely Eroded Spot
Sinkhole
Slide or Slip
Sodic Spot
Spoil Area
Stony Spot
Very Stony Spot
Wet Spot
Other
Special Line Features
Water Features
Streams and Canals
Transportation
Rails
Interstate Highways
US Routes
Major Roads
Local Roads
Background
Aerial Photography
The soil surveys that comprise your AOI were mapped at
1:24,000.
Warning: Soil Map may not be valid at this scale.
Enlargement of maps beyond the scale of mapping can cause
misunderstanding of the detail of mapping and accuracy of soil
line placement. The maps do not show the small areas of
contrasting soils that could have been shown at a more detailed
scale.
Please rely on the bar scale on each map sheet for map
measurements.
Source of Map: Natural Resources Conservation Service
Web Soil Survey URL:
Coordinate System: Web Mercator (EPSG:3857)
Maps from the Web Soil Survey are based on the Web Mercator
projection, which preserves direction and shape but distorts
distance and area. A projection that preserves area, such as the
Albers equal-area conic projection, should be used if more
accurate calculations of distance or area are required.
This product is generated from the USDA-NRCS certified data as
of the version date(s) listed below.
Soil Survey Area: Larimer County Area, Colorado
Survey Area Data: Version 18, Aug 24, 2023
Soil map units are labeled (as space allows) for map scales
1:50,000 or larger.
Date(s) aerial images were photographed: Jul 2, 2021—Aug 25,
2021
The orthophoto or other base map on which the soil lines were
compiled and digitized probably differs from the background
imagery displayed on these maps. As a result, some minor
shifting of map unit boundaries may be evident.
Soil Map—Larimer County Area, Colorado
(Tract II, Bloom Filing One)
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
12/13/2023
Page 2 of 3
B-3
Map Unit Legend
Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI
7 Ascalon sandy loam, 0 to 3
percent slopes
3.6 51.3%
40 Garrett loam, 0 to 1 percent
slopes
3.1 44.8%
76 Nunn clay loam, wet, 1 to 3
percent slopes
0.3 3.9%
Totals for Area of Interest 7.0 100.0%
Soil Map—Larimer County Area, Colorado Tract II, Bloom Filing One
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
12/13/2023
Page 3 of 3
B-4
Hydrologic Soil Group—Larimer County Area, Colorado
(Tract II, Bloom Filing One)
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
12/13/2023
Page 1 of 4
44
9
2
2
7
0
44
9
2
3
1
0
44
9
2
3
5
0
44
9
2
3
9
0
44
9
2
4
3
0
44
9
2
4
7
0
44
9
2
5
1
0
44
9
2
5
5
0
44
9
2
5
9
0
44
9
2
2
7
0
44
9
2
3
1
0
44
9
2
3
5
0
44
9
2
3
9
0
44
9
2
4
3
0
44
9
2
4
7
0
44
9
2
5
1
0
44
9
2
5
5
0
44
9
2
5
9
0
498250 498290 498330 498370 498410 498450 498490
498250 498290 498330 498370 498410 498450 498490
40° 35' 2'' N
10
5
°
1
'
1
4
'
'
W
40° 35' 2'' N
10
5
°
1
'
4
'
'
W
40° 34' 52'' N
10
5
°
1
'
1
4
'
'
W
40° 34' 52'' N
10
5
°
1
'
4
'
'
W
N
Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 13N WGS84
0 50 100 200 300
Feet
0 20 40 80 120
Meters
Map Scale: 1:1,570 if printed on A portrait (8.5" x 11") sheet.
Soil Map may not be valid at this scale.
B-5
MAP LEGEND MAP INFORMATION
Area of Interest (AOI)
Area of Interest (AOI)
Soils
Soil Rating Polygons
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Soil Rating Lines
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Soil Rating Points
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Water Features
Streams and Canals
Transportation
Rails
Interstate Highways
US Routes
Major Roads
Local Roads
Background
Aerial Photography
The soil surveys that comprise your AOI were mapped at
1:24,000.
Warning: Soil Map may not be valid at this scale.
Enlargement of maps beyond the scale of mapping can cause
misunderstanding of the detail of mapping and accuracy of soil
line placement. The maps do not show the small areas of
contrasting soils that could have been shown at a more detailed
scale.
Please rely on the bar scale on each map sheet for map
measurements.
Source of Map: Natural Resources Conservation Service
Web Soil Survey URL:
Coordinate System: Web Mercator (EPSG:3857)
Maps from the Web Soil Survey are based on the Web Mercator
projection, which preserves direction and shape but distorts
distance and area. A projection that preserves area, such as the
Albers equal-area conic projection, should be used if more
accurate calculations of distance or area are required.
This product is generated from the USDA-NRCS certified data as
of the version date(s) listed below.
Soil Survey Area: Larimer County Area, Colorado
Survey Area Data: Version 18, Aug 24, 2023
Soil map units are labeled (as space allows) for map scales
1:50,000 or larger.
Date(s) aerial images were photographed: Jul 2, 2021—Aug 25,
2021
The orthophoto or other base map on which the soil lines were
compiled and digitized probably differs from the background
imagery displayed on these maps. As a result, some minor
shifting of map unit boundaries may be evident.
Hydrologic Soil Group—Larimer County Area, Colorado
(Tract II, Bloom Filing One)
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
12/13/2023
Page 2 of 4
B-6
Hydrologic Soil Group
Map unit symbol Map unit name Rating Acres in AOI Percent of AOI
7 Ascalon sandy loam, 0
to 3 percent slopes
B 3.6 51.3%
40 Garrett loam, 0 to 1
percent slopes
B 3.1 44.8%
76 Nunn clay loam, wet, 1
to 3 percent slopes
C 0.3 3.9%
Totals for Area of Interest 7.0 100.0%
Description
Hydrologic soil groups are based on estimates of runoff potential. Soils are
assigned to one of four groups according to the rate of water infiltration when the
soils are not protected by vegetation, are thoroughly wet, and receive
precipitation from long-duration storms.
The soils in the United States are assigned to four groups (A, B, C, and D) and
three dual classes (A/D, B/D, and C/D). The groups are defined as follows:
Group A. Soils having a high infiltration rate (low runoff potential) when
thoroughly wet. These consist mainly of deep, well drained to excessively
drained sands or gravelly sands. These soils have a high rate of water
transmission.
Group B. Soils having a moderate infiltration rate when thoroughly wet. These
consist chiefly of moderately deep or deep, moderately well drained or well
drained soils that have moderately fine texture to moderately coarse texture.
These soils have a moderate rate of water transmission.
Group C. Soils having a slow infiltration rate when thoroughly wet. These consist
chiefly of soils having a layer that impedes the downward movement of water or
soils of moderately fine texture or fine texture. These soils have a slow rate of
water transmission.
Group D. Soils having a very slow infiltration rate (high runoff potential) when
thoroughly wet. These consist chiefly of clays that have a high shrink-swell
potential, soils that have a high water table, soils that have a claypan or clay
layer at or near the surface, and soils that are shallow over nearly impervious
material. These soils have a very slow rate of water transmission.
If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is
for drained areas and the second is for undrained areas. Only the soils that in
their natural condition are in group D are assigned to dual classes.
Hydrologic Soil Group—Larimer County Area, Colorado Tract II, Bloom Filing One
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
12/13/2023
Page 3 of 4
B-7
Rating Options
Aggregation Method: Dominant Condition
Component Percent Cutoff: None Specified
Tie-break Rule: Higher
Hydrologic Soil Group—Larimer County Area, Colorado Tract II, Bloom Filing One
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
12/13/2023
Page 4 of 4
B-8
i2 Consultants, Inc.
Hydrologic Calculations
Runoff Coeffecients
Sub-Basins
C-1
Project: Tract II Bloom Filing One
i2
Location:Consultants, Inc.
Fort Collins, CO 16911 Potts Place, Mead, CO
Project Number:1061-3 970.217.9148
Date: 5/15/2024
troy@i2-consultants.com
All calculations presented are based upon the criteria set forth in the
City of Fort Collins Storm Drainage Design Criteria
9/1/2018
Basin A (Lot 1)
(ac) (sq.ft) (%)
Design Point Surface Improvement Area Area C I Comments
1 % of site area
Lawns, Sandy soil (flat <2%) 0.00 0.0 0.15 2.00 0.0%
Curb & gutter and walks 0.00 0.0 0.95 100.00 0.0%
Paved Parking & Drives 0.00 0.0 0.95 100.00 0.0%
Commercial Area 1.66 72326.0 0.85 80.00 100.0%
Avg. 0.85 80.00 100.0%
Total Area 1.66 0.85 80.00
Basin B (Lot 2)
(ac) (sq.ft) (%)
Design Point Surface Improvement Area Area C I Comments
2 % of site area
Lawns, Sandy soil (flat <2%) 0.00 0.0 0.15 2.00 0.0%
Curb & gutter and walks 0.00 0.0 0.95 100.00 0.0%
Paved Parking & Drives 0.00 0.0 0.95 100.00 0.0%
Commercial Area 0.30 12940.0 0.85 80.00 100.0%
Avg. 0.85 80.00 100.0%
Total Area 0.30 0.85 80.00
Basin C (Lot 3 & Tract)
(ac) (sq.ft) (%)
Design Point Surface Improvement Area Area C I Comments
3 % of site area
Lawns, Sandy soil (flat <2%) 0.00 0.0 0.15 2.00 0.0%
Curb & gutter and walks 0.00 0.0 0.95 100.00 0.0%
Paved Parking & Drives 0.00 0.0 0.95 100.00 0.0%
Commercial Area 0.79 34337.0 0.85 80.00 100.0%
Avg. 0.85 80.00 100.0%
Total Area 0.79 0.85 80.00
Basin D (Lot 4)
(ac) (sq.ft) (%)
Design Point Surface Improvement Area Area C I Comments
4 % of site area
Lawns, Sandy soil (flat <2%) 0.00 0.0 0.15 2.00 0.0%
Curb & gutter and walks 0.00 0.0 0.95 100.00 0.0%
Paved Parking & Drives 0.00 0.0 0.95 100.00 0.0%
Commercial Area 1.10 47719.0 0.85 80.00 100.0%
Avg. 0.85 80.00 100.0%
Total Area 1.10 0.85 80.00
Bloom_Imperv.xlsx\Sub-Basins 5/15/2024
Runoff Coeffecients
Sub-Basins
C-2
Basin E (Pond)
(ac) (sq.ft) (%)
Design Point Surface Improvement Area Area C I Comments
5 % of site area
Lawns, Sandy soil (flat <2%) 1.55 67518.0 0.15 2.00 100.1%
Curb & gutter and walks 0.00 0.0 0.95 100.00 0.0%
Paved Parking & Drives 0.00 0.0 0.95 100.00 0.0%
Commercial Area 0.00 0.0 0.85 80.00 0.0%
Avg. 0.15 2.00 100.1%
Total Area 1.55 0.15 2.00
Basin F (Off-Site)
(ac) (sq.ft) (%)
Design Point Surface Improvement Area Area C I Comments
6 % of site area
Lawns, Sandy soil (flat <2%) 0.00 0.0 0.15 2.00 0.0%
Curb & gutter and walks 0.00 0.0 0.95 100.00 0.0%
Paved Parking & Drives 0.07 3054.0 0.95 100.00 100.0%
Commercial Area 0.00 0.0 0.85 80.00 0.0%
Avg. 0.95 100.00 100.0%
Total Area 0.07 0.95 100.00
Overall Site
(ac) (sq.ft) (%)
Design Point publish Area Area C I Comments
5 % of site area
Lawns, Sandy soil (flat <2%) 1.55 67518.0 0.15 2.00 28.4%
Curb & gutter and walks 0.00 0.0 0.95 100.00 0.0%
Paved Parking & Drives 0.00 0.0 0.95 100.00 0.0%
Commercial Area 3.91 170376.0 0.85 80.00 71.6%
Avg. 0.65 57.86 100.0%
Total Area 5.46 237,894.00 0.65 57.86
Bloom_Imperv.xlsx\Sub-Basins 5/15/2024
C-3
PROJECT:Tract II Bloom Filing One
CALCULATED BY:i2 Consultants, Inc.DATE:5/15/2024
Cf = 1.00
FINAL REMARKS
tc
BASIN DP AREA C
C*Cf Length Slope
ti Length Slope R V
tt tc Total L tc
ID Ac Ft % min Ft (ft/ft) Ft fps min min ft min min
(0) (1) (2) (3) (4) (5) (6) (7) (8) (8a) (9) (10) (11) (12) (13) (14)
1 A 1 1.66 0.85 0.85 25 2.0 1.9 450 0.010 1.0 1.5 5.0 6.9 475 12.6 6.9 Use Tc = 6.9 mins
2 B 2 0.30 0.85 0.85 25 2.0 1.9 160 0.01 1.0 1.5 1.8 3.6 185 11.0 5.0 Use Tc = 5 mins
3 C 3 0.79 0.85 0.85 25 2.0 1.9 220 0.01 1.0 1.5 2.4 4.3 245 11.4 5.0 Use Tc = 5 mins
4 D 4 1.10 0.85 0.85 25 2.0 1.9 290 0.01 1.0 1.5 3.2 5.1 315 11.8 5.1 Use Tc = 5.1 mins
5 E 5 1.55 0.15 0.15 12 2.0 4.9 55 2.000 1.0 0.7 1.3 2.6 67 10.4 5.0 Use Tc = 5 mins
6 ALL 5 0.00 0.85 0.85 25 2.0 1.9 450 0.01 1.0 1.5 5.0 6.9 475 12.6 6.9 Use Tc = 6.9 mins
7 EX 5 0.00 0.10 0.10 300 1.0 32.4 50 0.01 1.0 1.5 0.6 32.9 350 11.9 11.9 Use Tc = 11.9 mins
Equations:
Urbanized
Tov tt =L tc =(L/180)+10
60V V=CvSw0.5
(1)(2) or Fig. 3-3 (3)
Velocity
V (1.4/n)*(R^2/3))*0.5)
S in ft/ft, R = Area/Wetted Perimeter in ft, n = Roughness Coeff.
S ^1/3
Rural/Non-urban
(URBANIZED)
RURAL OR NON URBANIZED
TIME OF CONCENTRATION - 2-YEAR
1.87(1.1-CC f )*D^1/2
DATA
SUB-BASIN INITIAL/OVERLAND
TIME (Tov)
TRAVEL TIME
(tt)
tc CHECK
C-4
PROJECT:Tract II Bloom Filing One
CALCULATED BY:i2 Consultants, Inc.DATE:5/15/2024
Cf = 1.25
FINAL REMARKS
tc
BASIN DP AREA C
C*Cf Length Slope
ti Length Slope R V
tt tc Total L tc
ID Ac Ft % min Ft % Ft fps min min ft min min
(0) (1) (2) (3) (4) (5) (6) (7) (8) (8a) (9) (10) (11) (12) (13) (14)
1 A 1 1.66 0.85 1.00 25 2.0 0.7 450 2.00 1.0 1.5 5.0 5.7 475 12.6 5.7 Use Tc = 5.7 mins
2 B 2 0.30 0.85 1.00 25 2.0 0.7 160 2.00 1.0 1.5 1.8 2.5 185 11.0 5.0 Use Tc = 5 mins
3 C 3 0.79 0.85 1.00 25 2.0 0.7 220 2.00 1.0 1.5 2.4 3.2 245 11.4 5.0 Use Tc = 5 mins
4 D 4 1.10 0.85 1.00 25 2.0 0.7 290 2.00 1.0 1.5 3.2 4.0 315 11.8 5.0 Use Tc = 5 mins
5 E 5 1.55 0.15 0.19 12 2.0 4.7 55 2.00 1.0 0.7 1.3 1.8 67 10.4 5.0 Use Tc = 5 mins
6 ALL 5 0.00 0.85 1.00 25 2.0 0.7 450 2.00 0.0 1.5 0.0 0.7 475 12.6 5.0 Use Tc = 5 mins
7 EX 5 0.00 0.10 0.13 300 1.0 31.6 50 0.10 1.0 1.5 0.6 32.1 350 11.9 11.9 Use Tc = 11.9 mins
Equations:
Urbanized
Tov tt =L tc =(L/180)+10
60V V=CvSw0.5
(1)(2) or Fig. 3-3 (3)
Velocity
V (1.4/n)*(R^2/3))*0.5)
S in ft/ft, R = Area/Wetted Perimeter in ft, n = Roughness Coeff.
RURAL OR NON URBANIZED
TIME OF CONCENTRATION - 100-YEAR
1.87(1.1-CC f )*D^1/2
DATA
SUB-BASIN INITIAL/OVERLAND
TIME (Tov)
TRAVEL TIME
(tt)
tc CHECK
S ^1/3
Rural/Non-urban
(URBANIZED)
Rational Method
Direct Runoff - 2-YR
C-5
Project: Tract II, Bloom Filing One
i2
Consultants, Inc.
Location:16911 Potts Place, Mead, CO
Fort Collins, Colorado 970.217.9148
Project Number:1061-3 troy@i2-consultants.com
Date: 5/15/2024
Rational Method:Q = CfCIA Q: Q: Runoff in cfs (peak)
C: C: Runoff Coefficient
Cf: Cf: Frequency Adjustment Factor
I: I: Rainfall Intensity (in/hr) for design event
A: A: Basin Area (acres)
2-YEAR
Design Point Basin ID Area C
CfC tc I Q2
1 A 1.66 0.85 0.85 6.9 2.52 3.56 2.1 cfs/acre
2 B 0.30 0.85 0.85 5.0 2.85 0.72 2.4 cfs/acre
3 C 0.79 0.85 0.85 5.0 2.85 1.91 2.4 cfs/acre
4 D 1.10 0.85 0.85 5.1 2.85 2.65 2.4 cfs/acre
5 E 1.55 0.15 0.15 5.0 2.85 0.66 0.4 cfs/acre
5 ALL 5.46 0.65 0.65 6.9 2.85 10.12 1.9 cfs/acre
5 EX 5.46 0.10 0.10 11.9 2.05 1.12 0.21 cfs/acre
C:\Users\troy\Dropbox\I2\Projects\1061-3 Bloom\Documents\Drainage\Bloom_rational.xlsx 5/15/2024
Rational Method
Direct Runoff - 100-YR
C-6
Project: Tract II, Bloom Filing One
i2
Consultants, Inc.
Location:16911 Potts Place, Mead, CO
Fort Collins, Colorado 970.217.9148
Project Number:1061-3 troy@i2-consultants.com
Date: 5/15/2024
Rational Method:Q = CfCIA Q: Q: Runoff in cfs (peak)
C: C: Runoff Coefficient
Cf: Cf: Frequency Adjustment Factor
I: I: Rainfall Intensity (in/hr) for design event
A: A: Basin Area (acres)
100-YEAR
Design Point Basin ID Area C
CfC tc I Q100
1 A 1.66 0.85 1.00 6.9 8.80 14.61 8.8 cfs/acre
2 B 0.30 0.85 1.00 5.0 9.95 2.96 10.0 cfs/acre
3 C 0.79 0.85 1.00 5.0 9.95 7.84 10.0 cfs/acre
4 D 1.10 0.85 1.00 5.1 9.95 10.90 10.0 cfs/acre
5 E 1.55 0.15 0.19 5.0 9.95 2.89 1.9 cfs/acre
5 ALL 5.46 0.65 0.81 6.9 8.80 39.05 7.2 cfs/acre
5 EX 5.46 0.10 0.10 11.90 7.16 3.91 0.7 cfs/acre
C:\Users\troy\Dropbox\I2\Projects\1061-3 Bloom\Documents\Drainage\Bloom_rational.xlsx 5/15/2024
i2 Consultants, Inc.
Hydraulic Calculations
100 Year Volume 12/19/2023
E-1
Project: Tract II Bloom Filing One
Location:
Fort Collins, Colorado
Project Number:1061-3
Date: Dec-23
ft3 acre-ft.
'C' value 0.68 57,182.4 1.31
'C' * 1.25 0.85
Area 5.5 acres
Release Rate 0.66 cfs (Area X 0.12 cfs/ac.)
DETENTION POND SIZING (100-Year)
TIME TIME INTENSITY Q 100 Runoff Release Required Required
cum 100 year Volume Cum total Detention Detention
(mins) (secs) (in/hr) (cfs) (ft^3) (ft^3) (ft^3) (ac-ft)
0 0 0 0.00 0 0.0 0.0 0.0000
5 300 9.950 46.52 13954.88 198.0 13756.9 0.3158
10 600 7.720 36.09 21654.6 396.0 21258.6 0.4880
15 900 6.520 30.48 27432.9 594.0 26838.9 0.6161
20 1200 5.600 26.18 31416 792.0 30624.0 0.7030
25 1500 4.980 23.28 34922.25 990.0 33932.3 0.7790
30 1800 4.520 21.13 38035.8 1188.0 36847.8 0.8459
35 2100 4.080 19.07 40055.4 1386.0 38669.4 0.8877
40 2400 3.740 17.48 41962.8 1584.0 40378.8 0.9270
45 2700 3.460 16.18 43673.85 1782.0 41891.9 0.9617
50 3000 3.230 15.10 45300.75 1980.0 43320.8 0.9945
55 3300 3.030 14.17 46745.33 2178.0 44567.3 1.0231
60 3600 2.860 13.37 48133.8 2376.0 45757.8 1.0505
65 3900 2.720 12.72 49592.4 2574.0 47018.4 1.0794
70 4200 2.590 12.11 50854.65 2772.0 48082.7 1.1038
75 4500 2.480 11.59 52173 2970.0 49203.0 1.1295
80 4800 2.380 11.13 53407.2 3168.0 50239.2 1.1533
85 5100 2.290 10.71 54599.33 3366.0 51233.3 1.1762
90 5400 2.210 10.33 55791.45 3564.0 52227.5 1.1990
95 5700 2.130 9.96 56759.18 3762.0 52997.2 1.2166
100 6000 2.060 9.63 57783 3960.0 53823.0 1.2356
105 6300 2.000 9.35 58905 4158.0 54747.0 1.2568
110 6600 1.940 9.07 59858.7 4356.0 55502.7 1.2742
115 6900 1.890 8.84 60966.68 4554.0 56412.7 1.2951
120 7200 1.840 8.60 61934.4 4752.0 57182.4 1.3127 100-Year Volume
125 7500 1.790 8.37 62761.88 4950.0 57811.9 1.3272
130 7800 1.750 8.18 63813.75 5148.0 58665.8 1.3468
135 8100 1.710 7.99 64753.43 5346.0 59407.4 1.3638
140 8400 1.670 7.81 65580.9 5544.0 60036.9 1.3783
145 8700 1.630 7.62 66296.18 5742.0 60554.2 1.3901
150 9000 1.600 7.48 67320 5940.0 61380.0 1.4091
155 9300 1.570 7.34 68259.68 6138.0 62121.7 1.4261
160 9600 1.540 7.20 69115.2 6336.0 62779.2 1.4412
165 9900 1.510 7.06 69886.58 6534.0 63352.6 1.4544
170 10200 1.480 6.92 70573.8 6732.0 63841.8 1.4656
175 10500 1.450 6.78 71176.88 6930.0 64246.9 1.4749
180 10800 1.420 6.64 71695.8 7128.0 64567.8 1.4823
185 11100 1.400 6.55 72649.5 7326.0 65323.5 1.4996
190 11400 1.380 6.45 73547.1 7524.0 66023.1 1.5157
195 11700 1.360 6.36 74388.6 7722.0 66666.6 1.5305
200 12000 1.340 6.26 75174 7920.0 67254.0 1.5439
205 12300 1.320 6.17 75903.3 8118.0 67785.3 1.5561
210 12600 1.300 6.08 76576.5 8316.0 68260.5 1.5670
215 12900 1.280 5.98 77193.6 8514.0 68679.6 1.5767
220 13200 1.260 5.89 77754.6 8712.0 69042.6 1.5850
225 13500 1.240 5.80 78259.5 8910.0 69349.5 1.5920
230 13800 1.220 5.70 78708.3 9108.0 69600.3 1.5978
235 14100 1.210 5.66 79760.18 9306.0 70454.2 1.6174
240 14400 1.200 5.61 80784 9504.0 71280.0 1.6364
Required detention
Page 1
D-1
Project:
Basin ID:
WQCV Design Volume (Input):
Catchment Imperviousness, Ia =61.0 percent
Catchment Area, A = 5.50 acres Diameter of holes, D = 0.794 inches
Depth at WQCV outlet above lowest perforation, H = 1 feet Number of holes per row, N = 1
Vertical distance between rows, h = 4.00 inches OR
Number of rows, NL = 2.00
Orifice discharge coefficient, Co =0.65 Height of slot, H = inches
Time to Drain the Pond = 40 hours
Watershed Design Information (Input):1
Percent Soil Type A = %
Percent Soil Type B = 100 %
Percent Soil Type C/D = %
Outlet Design Information (Output):
Water Quality Capture Volume, WQCV = 0.275 watershed inches
Water Quality Capture Volume (WQCV) = 0.126 acre-feet 0.00
Design Volume (WQCV / 12 * Area * 1.2) Vol = 0.151 acre-feet
Outlet area per row, Ao = 0.49 square inches
Total opening area at each row based on user-input above, Ao = 0.50 square inches
Total opening area at each row based on user-input above, Ao = 0.003 square feet
3
Row 1 Row 2 Row 3 Row 4 Row 5 Row 6 Row 7 Row 8 Row 9 Row 10 Row 11 Row 12 Row 13 Row 14 Row 15 Row 16 Row 17 Row 18 Row 19 Row 20 Row 21 Row 22 Row 23 Row 23
4925.50 4925.83 Flow
4925.50 0.0000 0.0000 0.00
4925.75 0.0090 0.0000 0.01
4926.00 0.0127 0.0074 0.02
4926.25 0.0155 0.0116 0.03
4926.50 0.0179 0.0147 0.03
4926.75 0.0201 0.0172 0.04
4927.00 0.0220 0.0194 0.04
4927.25 0.0237 0.0214 0.05
4927.50 0.0254 0.0232 0.05
4927.75 0.0269 0.0249 0.05
4928.00 0.0284 0.0264 0.05
4928.25 0.0297 0.0279 0.06
4928.50 0.0311 0.0293 0.06
4928.75 0.0323 0.0306 0.06
4929.00 0.0336 0.0319 0.07
4929.25 0.0347 0.0332 0.07
4929.50 0.0359 0.0344 0.07
4929.75 0.0370 0.0355 0.07
4930.00 0.0380 0.0366 0.07
4930.25 0.0391 0.0377 0.08
4930.50 0.0401 0.0388 0.08
4930.75 0.0411 0.0398 0.08
4931.00 0.0421 0.0408 0.08
#N/A #N/A #N/A
#N/A #N/A #N/A
#N/A #N/A #N/A
#N/A #N/A #N/A
#N/A #N/A #N/A
#N/A #N/A #N/A
#N/A #N/A #N/A
#N/A #N/A #N/A
#N/A #N/A #N/A
#N/A #N/A #N/A
#N/A #N/A #N/A
#N/A #N/A #N/A
#N/A #N/A #N/A
#N/A #N/A #N/A
#N/A #N/A #N/A
#N/A #N/A #N/A
#N/A #N/A #N/A
#N/A #N/A #N/A
#N/A #N/A #N/A
#N/A #N/A #N/A
#N/A #N/A #N/A
Override
Area
Row 1
Override
Area
Row 2
Override
Area
Row 3
Override
Area
Row 4
Override
Area
Row 5
Override
Area
Row 6
Override
Area
Row 7
Override
Area
Row 8
Override
Area
Row 9
Override
Area
Row 10
Override
Area
Row 11
Override
Area
Row 12
Override
Area
Row 13
Override
Area
Row 14
Override
Area
Row 15
Override
Area
Row 16
Override
Area
Row 17
Override
Area
Row 18
Override
Area
Row 19
Override
Area
Row 20
Override
Area
Row 21
Override
Area
Row 22
Override
Area
Row 23
Override
Area
Row 24
Central Elevations of Rows of Holes in feet
Collection Capacity for Each Row of Holes in cfs
STAGE-DISCHARGE SIZING OF THE WATER QUALITY CAPTURE VOLUME (WQCV) OUTLET
Tract II Bloom Filing One
Site
Bloom WQ UD-Detention_2.35.xls, WQCV 12/19/2023, 2:08 PM
D-2
Worksheet Protected
Project:
Basin ID:
STAGE-DISCHARGE SIZING OF THE WATER QUALITY CAPTURE VOLUME (WQCV) OUTLET
Tract II Bloom Filing One
Site
4925.00
4926.00
4927.00
4928.00
4929.00
4930.00
4931.00
4932.00
0.00 0.01 0.02 0.03 0.04 0.05 0.06 0.07 0.08 0.09
St
a
g
e
(
f
e
e
t
,
e
l
e
v
.
)
Discharge (cfs)
STAGE-DISCHARGE CURVE FOR THE WQCV OUTLET STRUCTURE
Bloom WQ UD-Detention_2.35.xls, WQCV 12/19/2023, 2:08 PM
D-3
Project:
Basin ID:
Design Information (Input):
Width of Basin Bottom, W = ft Right Triangle OR…
Length of Basin Bottom, L = ft Isosceles Triangle OR…
Dam Side-slope (H:V), Zd =ft/ft Rectangle OR…
Circle / Ellipse OR…
Irregular (Use Overide values in cells G32:G52)
MINOR MAJOR
Storage Requirement from Sheet 'Modified FAA': 0.41 1.40 acre-ft.
Stage-Storage Relationship:Storage Requirement from Sheet 'Hydrograph': acre-ft.
Storage Requirement from Sheet 'Full-Spectrum': acre-ft.
Labels Water Side Basin Basin Surface Surface Volume Surface Volume Target Volumes
for WQCV, Minor, Surface Slope Width at Length at Area at Area at Below Area at Below for WQCV, Minor,
& Major Storage Elevation (H:V) Stage Stage Stage Stage Stage Stage Stage & Major Storage
Stages ft ft/ft ft ft ft2 ft2 User ft3 acres acre-ft Volumes
(input) (input)Below El.(output) (output) (output)Overide (output) (output) (output) (for goal seek)
4925.50 (input)0 0.000 0.000
4926.00 0.00 0.00 2,740 685 0.063 0.016
4926.50 0.00 0.00 7,225 3,176 0.166 0.073
4927.00 0.00 0.00 10,000 7,483 0.230 0.172 WQCV
4927.50 0.00 0.00 15,000 13,733 0.344 0.315
4928.00 0.00 0.00 19,000 22,233 0.436 0.510
4928.50 0.00 0.00 25,000 33,233 0.574 0.763
4929.00 0.00 0.00 26,000 45,983 0.597 1.056
4929.50 0.00 0.00 27,000 59,233 0.620 1.360 100-WSEL
4930.00 0.00 0.00 30,000 73,483 0.689 1.687
4930.50 0.00 0.00 33,000 89,233 0.758 2.048
4931.00 0.00 0.00 35,000 106,233 0.803 2.439
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
STAGE-STORAGE SIZING FOR DETENTION BASINS
Tract Ii Bloom Filing One
Check Basin Shape
Site
Bloom WQ UD-Detention_2.35.xls, Basin 12/19/2023, 2:10 PM
D-4
Project:
Basin ID:
STAGE-STORAGE SIZING FOR DETENTION BASINS
0.00
1000.00
2000.00
3000.00
4000.00
5000.00
6000.00
0.00 0.50 1.00 1.50 2.00 2.50 3.00
St
a
g
e
(
f
t
.
e
l
e
v
.
)
Storage (acre-feet)
STAGE-STORAGE CURVE FOR THE POND
Bloom WQ UD-Detention_2.35.xls, Basin 12/19/2023, 2:10 PM
D-5
Project:
Basin ID:
X
1
#1 Vertical #2 Vertical
Sizing the Restrictor Plate for Circular Vertical Orifices or Pipes (Input)Orifice Orifice
Water Surface Elevation at Design Depth Elev: WS = 4,930.00 feet
Pipe/Vertical Orifice Entrance Invert Elevation Elev: Invert = 4,925.50 feet
Required Peak Flow through Orifice at Design Depth Q = 0.66 cfs
Pipe/Vertical Orifice Diameter (inches) Dia = 12.0 inches
Orifice Coefficient Co =0.65
Full-flow Capacity (Calculated)
Full-flow area Af = 0.79 sq ft
Half Central Angle in Radians Theta = 3.14 rad
Full-flow capacity Qf = 8.2 cfs
Percent of Design Flow = 1241%
Calculation of Orifice Flow Condition
Half Central Angle (0<Theta<3.1416) Theta = 0.74 rad
Flow area Ao =0.06 sq ft
Top width of Orifice (inches)To =8.08 inches
Height from Invert of Orifice to Bottom of Plate (feet)Yo =0.13 feet
Elevation of Bottom of Plate Elev Plate Bottom Edge = 4,925.63 feet
Resultant Peak Flow Through Orifice at Design Depth Qo =0.7 cfs
Width of Equivalent Rectangular Vertical Orifice Equivalent Width = 0.46 feet
Tract II Bloom Filing One
Site
RESTRICTOR PLATE SIZING FOR CIRCULAR VERTICAL ORIFICES
Bloom WQ UD-Detention_2.35.xls, Restrictor Plate 12/19/2023, 2:08 PM
D-6
Project:
Basin ID:
Design Information (Input):#1 Horiz. #2 Horiz. #1 Vert. #2 Vert.
Circular Opening: Diameter in Inches Dia. = 12.00 inches
OR
Rectangular Opening: Width in Feet W = 2.00 ft.
Length (Height for Vertical) L or H = 2.00 ft.
Percentage of Open Area After Trash Rack Reduction % open = 70 12 %
Orifice Coefficient Co = 0.65 0.65
Weir Coefficient Cw = 2.65
Orifice Elevation (Bottom for Vertical) Eo = 4926.50 4,925.57 ft.
Calculation of Collection Capacity:
OPTIONAL: User-Overide Net Opening Area Ao = sq. ft.
Perimeter as Weir Length Lw = 6.80 ft.
OPTIONAL: User-Overide Weir Length Lw =ft.
Top Elevation of Vertical Orifice Opening, Top =4926.57 ft.
Center Elevation of Vertical Orifice Opening, Cen =4926.07 ft.
Horizontal Orifices Vertical Orifices
Labels Water WQCV #1 Horiz. #1 Horiz. #2 Horiz. #2 Horiz. #1 Vert. #2 Vert.Total Target Volumes
for WQCV, Minor,Surface Plate/Riser Weir Orifice Weir Orifice Collection Collection Collection for WQCV, Minor,
& Major Storage Elevation Flow Flow Flow Flow Flow Capacity Capacity Capacity & Major Storage
W.S. Elevations ft cfs cfs cfs cfs cfs cfs cfs cfs Volumes
(input)(linked) (User-linked) (output) (output) (output) (output) (output) (output)(output)(link for goal seek)
4925.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4926.00 0.01 0.00 0.00 0.00 0.00 0.10 0.00 0.01
4926.50 0.02 0.00 0.00 0.00 0.00 0.31 0.00 0.02
4927.00 0.03 6.37 10.33 0.00 0.00 0.47 0.00 0.47
4927.50 0.03 18.02 14.61 0.00 0.00 0.59 0.00 0.59
4928.00 0.04 33.10 17.89 0.00 0.00 0.68 0.00 0.68
4928.50 0.04 50.97 20.66 0.00 0.00 0.77 0.00 0.77
4929.00 0.05 71.23 23.09 0.00 0.00 0.84 0.00 0.84
4929.50 0.05 93.63 25.30 0.00 0.00 0.91 0.00 0.91
4930.00 0.05 117.99 27.32 0.00 0.00 0.97 0.00 0.97
4930.50 0.05 144.16 29.21 0.00 0.00 1.03 0.00 1.03
4931.00 0.06 172.02 30.98 0.00 0.00 1.09 0.00 1.09
0.06 #N/A #N/A #N/A #N/A #N/A 0.00 #N/A
0.06 #N/A #N/A #N/A #N/A #N/A 0.00 #N/A
0.07 #N/A #N/A #N/A #N/A #N/A 0.00 #N/A
0.07 #N/A #N/A #N/A #N/A #N/A 0.00 #N/A
0.07 #N/A #N/A #N/A #N/A #N/A 0.00 #N/A
0.07 #N/A #N/A #N/A #N/A #N/A 0.00 #N/A
0.07 #N/A #N/A #N/A #N/A #N/A 0.00 #N/A
0.08 #N/A #N/A #N/A #N/A #N/A 0.00 #N/A
0.08 #N/A #N/A #N/A #N/A #N/A 0.00 #N/A
0.08 #N/A #N/A #N/A #N/A #N/A 0.00 #N/A
0.08 #N/A #N/A #N/A #N/A #N/A 0.00 #N/A
#N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A
#N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A
#N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A
#N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A
#N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A
#N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A
#N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A
#N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A
#N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A
#N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A
#N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A
#N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A
#N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A
#N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A
#N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A
#N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A
#N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A
#N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A
#N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A
#N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A
#N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A
Routing 3: Single Stage - Water flows through WQCV plate and #1 horizontal opening into #1 vertical opening. This flow will be applied to
culvert sheet (#2 vertical & horizontal openings is not used).
STAGE-DISCHARGE SIZING OF THE WEIRS AND ORIFICES (INLET CONTROL)
Tract II Bloom Filing One
Site
Current Routing Order is #3
W.S. EL. WQ
W.S. EL. Minor
W.S. EL. Major
WQ
H1
H2
V1 V2
Routing Order #1 (Standard)
V1
W.S. EL. WQ
W.S. EL. Design Storm
WQ
H1
Routing Order #3 (Single Stage)Routing Order #4
V2
V1
H1
WQ
W.S. EL. Major
W.S. EL. Minor
W.S. EL. WQ
W.S. EL. Emergency Spillway
Emergency Overflow into Pipe- H2
V2
H1
WQ
W.S. EL. Major
W.S. EL. Minor
W.S. EL. WQ V1
Routing Order #2
Bloom WQ UD-Detention_2.35.xls, Outlet 12/19/2023, 2:09 PM
D-7
Project:
Basin ID:
Tract II Bloom Filing One
Site
STAGE-DISCHARGE SIZING OF THE WEIRS AND ORIFICES (INLET CONTROL)
0
1000
2000
3000
4000
5000
6000
0 0.2 0.4 0.6 0.8 1 1.2
St
a
g
e
(
f
e
e
t
,
e
l
e
v
.
)
Discharge (cfs)
STAGE-DISCHARGE CURVE FOR THE OUTLET STRUCTURE
Bloom WQ UD-Detention_2.35.xls, Outlet 12/19/2023, 2:09 PM
D-8
Project:
Basin ID:
Status:Sheet Contains Warnings. See Culvert_ErrorList Range
Design Information (Input):
Circular Culvert: Barrel Diameter in Inches D = 12 in.
Circular Culvert: Inlet Edge Type (choose from pull-down list) Grooved End with Headwall
OR:
Box Culvert: Barrel Height (Rise) in Feet Height (Rise) = ft.
Box Culvert: Barrel Width (Span) in Feet Width (Span) = ft.
Box Culvert: Inlet Edge Type (choose from pull-down list)Square Edge w/ 90-15 deg. Flared Wingwall
Number of Barrels No = 1
Inlet Elevation at Culvert Invert Ielev =4925.50 ft. elev.
Outlet Elevation at Culvert Invert Oelev =4925.00 ft. elev.
Culvert Length in Feet L = 60.0 ft.
Manning's Roughness n = 0.0120
Bend Loss Coefficient Kb =0.00
Exit Loss Coefficient Kx =1.00
Design Information (calculated):
Entrance Loss Coefficient Ke =
Friction Loss Coefficient Kf =
Sum of All Loss Coefficients Ks =
Orifice Inlet Condition Coefficient Cd =
Minimum Energy Condition Coefficient KElow =
Calculations of Culvert Capacity (output):
Water Surface Tailwater Culvert Culvert Flowrate Controlling Inlet
Elevation Surface Inlet-Control Outlet-Control Into Culvert Culvert Equation
From Sheet Elevation Flowrate Flowrate From Sheet Flowrate Used
"Basin"ft cfs cfs "Outlet"cfs
(ft., linked)(input if known)(output) (output) (cfs, linked) (output) (output)
4925.50 4925.50 0.00
4926.00 4925.50 0.01
4926.50 4925.50 0.02
4927.00 4925.50 0.47
4927.50 4925.50 0.59
4928.00 4925.50 0.68
4928.50 4925.50 0.77
4929.00 0.84
4929.50 0.91
4930.00 0.97
4930.50 1.03
4931.00 1.09
0.00 #N/A
0.00 #N/A
0.00 #N/A
0.00 #N/A
0.00 #N/A
0.00 #N/A
0.00 #N/A
0.00 #N/A
0.00 #N/A
0.00 #N/A
0.00 #N/A
0.00 #N/A
0.00 #N/A
0.00 #N/A
0.00 #N/A
0.00 #N/A
0.00 #N/A
0.00 #N/A
0.00 #N/A
0.00 #N/A
0.00 #N/A
0.00 #N/A
0.00 #N/A
0.00 #N/A
0.00 #N/A
0.00 #N/A
0.00 #N/A
0.00 #N/A
0.00 #N/A
0.00 #N/A
0.00 #N/A
0.00 #N/A
STAGE-DISCHARGE SIZING OF THE OUTLET CULVERT (INLET vs. OUTLET CONTROL WITH TAILWATER EFFECTS)
Tract II Bloom Filing One
Site
Bloom WQ UD-Detention_2.35.xls, Culvert 12/19/2023, 2:09 PM
D-9
Project:
Basin ID:
STAGE-DISCHARGE SIZING OF THE OUTLET CULVERT (INLET vs. OUTLET CONTROL WITH TAILWATER EFFECTS)
Tract II Bloom Filing One
Site
0.00
1000.00
2000.00
3000.00
4000.00
5000.00
6000.00
0.00 10.00 20.00 30.00 40.00 50.00
St
a
g
e
(
f
e
e
t
,
e
l
e
v
.
)
Discharge (cfs)
STAGE-DISCHARGE CURVE FOR THE FINAL OUTLET PIPE CULVERT
Bloom WQ UD-Detention_2.35.xls, Culvert 12/19/2023, 2:09 PM
D-10
Project:
Basin ID:
75.96
4.00000
Design Information (input):
Bottom Length of Weir L = 40.00 feet
Angle of Side Slope Weir Angle = 75.96 degrees
Elev. for Weir Crest EL. Crest = 4,930.00 feet
Coef. for Rectangular Weir Cw = 0.60
Coef. for Trapezoidal Weir Ct = 3.00
Calculation of Spillway Capacity (output):
Water Rect. Triangle Total Total
Surface Weir Weir Spillway Pond
Elevation Flowrate Flowrate Release Release
ft. cfs cfs cfs cfs
(linked) (output) (output) (output) (output)
4925.50 0.00 0.00 0.00 0.00
4926.00 0.00 0.00 0.00 0.00
4926.50 0.00 0.00 0.00 0.00
4927.00 0.00 0.00 0.00 0.00
4927.50 0.00 0.00 0.00 0.00
4928.00 0.00 0.00 0.00 0.00
4928.50 0.00 0.00 0.00 0.00
4929.00 0.00 0.00 0.00 0.00
4929.50 0.00 0.00 0.00 0.00
4930.00 0.00 0.00 0.00 0.00
4930.50 8.49 2.12 10.61 10.61
4931.00 24.00 12.00 36.00 36.00
#N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A
STAGE-DISCHARGE SIZING OF THE SPILLWAY
Tract II Bloom Filing One
Site
Bloom WQ UD-Detention_2.35.xls, Spillway 12/19/2023, 2:10 PM
D-11
Project:
Basin ID:
STAGE-DISCHARGE SIZING OF THE SPILLWAY
Tract II Bloom Filing One
Site
0 0.5 1 1.5 2 2.5 3
4740.3
4790.3
4840.3
4890.3
4940.3
4990.3
0 5 10 15 20 25 30 35 40
Storage (Acre-Feet)
St
a
g
e
(
f
e
e
t
,
e
l
e
v
.
)
Pond Discharge (cfs)
STAGE-STORAGE-DISCHARGE CURVES FOR THE POND
TOTAL DISCHARGE SPILLWAY DISCHARGE POND STORAGE
Bloom WQ UD-Detention_2.35.xls, Spillway 12/19/2023, 2:10 PM
D-12
Channel Report
Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Tuesday, Dec 19 2023
Lake Canal Cross-Section
Trapezoidal
Bottom Width (ft) = 8.00
Side Slopes (z:1) = 1.50, 1.50
Total Depth (ft) = 10.00
Invert Elev (ft) = 4922.00
Slope (%) = 0.10
N-Value = 0.015
Calculations
Compute by: Known Q
Known Q (cfs) = 158.00
Highlighted
Depth (ft) = 2.75
Q (cfs) = 158.00
Area (sqft) = 33.34
Velocity (ft/s) = 4.74
Wetted Perim (ft) = 17.92
Crit Depth, Yc (ft) = 2.02
Top Width (ft) = 16.25
EGL (ft) = 3.10
0 5 10 15 20 25 30 35 40 45 50
Elev (ft)Depth (ft)Section
4920.00 -2.00
4922.00 0.00
4924.00 2.00
4926.00 4.00
4928.00 6.00
4930.00 8.00
4932.00 10.00
4934.00 12.00
Reach (ft)
D-13
Sheet 1 of 2
Designer:
Company:
Date:
Project:
Location:
1. Basin Storage Volume
A) Effective Imperviousness of Tributary Area, Ia Ia =80.0 %
(100% if all paved and roofed areas upstream of rain garden)
B) Tributary Area's Imperviousness Ratio (i = Ia/100)i = 0.800
C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV = 0.26 watershed inches
(WQCV= 0.8 * (0.91* i3 - 1.19 * i2 + 0.78 * i)
D) Contributing Watershed Area (including rain garden area) Area = 125,453 sq ft
E) Water Quality Capture Volume (WQCV) Design Volume VWQCV =cu ft
Vol = (WQCV / 12) * Area
F) For Watersheds Outside of the Denver Region, Depth of d6 =0.82 in
Average Runoff Producing Storm
G) For Watersheds Outside of the Denver Region, VWQCV OTHER =5,236 cu ft
Water Quality Capture Volume (WQCV) Design Volume
H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER =cu ft
(Only if a different WQCV Design Volume is desired)
2. Basin Geometry
A) WQCV Depth (12-inch maximum)DWQCV =12 in
B) Rain Garden Side Slopes (Z = 4 min., horiz. dist per unit vertical) Z = 4.00 ft / ft
(Use "0" if rain garden has vertical walls)
C) Mimimum Flat Surface Area AMin =2007 sq ft
D) Actual Flat Surface Area AActual =5630 sq ft
E) Area at Design Depth (Top Surface Area)ATop =9102 sq ft
F) Rain Garden Total Volume VT=7,366 cu ft
(VT= ((ATop + AActual) / 2) * Depth)
3. Growing Media
4. Underdrain System
A) Are underdrains provided?1
B) Underdrain system orifice diameter for 12 hour drain time
i) Distance From Lowest Elevation of the Storage y =2.5 ft
Volume to the Center of the Orifice
ii) Volume to Drain in 12 Hours Vol12 =5,236 cu ft
iii) Orifice Diameter, 3/8" Minimum DO =1 5/8 in
Design Procedure Form: Rain Garden (RG)
EM
i2 Consultants, Inc.
May 15, 2024
Bloom Filing 6
Fort Collins, CO
UD-BMP (Version 3.07, March 2018)
Choose One
Choose One
18" Rain Garden Growing Media
Other (Explain):
YES
NO
Bloom_UD-BMP_v3.07.xlsm, RG 5/15/2024, 8:13 AM
Sheet 2 of 2
Designer:
Company:
Date:
Project:
Location:
5. Impermeable Geomembrane Liner and Geotextile Separator Fabric
A) Is an impermeable liner provided due to proximity
of structures or groundwater contamination?
6. Inlet / Outlet Control
A) Inlet Control
7. Vegetation
8. Irrigation
A) Will the rain garden be irrigated?
Notes:
Design Procedure Form: Rain Garden (RG)
EM
i2 Consultants, Inc.
May 15, 2024
Bloom Filing 6
Fort Collins, CO
Choose One
Choose One
Choose One
Sheet Flow- No Energy Dissipation Required
Concentrated Flow- Energy Dissipation Provided
Plantings
Seed (Plan for frequent weed control)
Sand Grown or Other High Infiltration Sod
Choose One
YES
NO
YES
NO
Bloom_UD-BMP_v3.07.xlsm, RG 5/15/2024, 8:13 AM
i2 Consultants, Inc.
Excerpts from Previous Reports
Bloom Filing 1
Final Drainage Report
Galloway & Company, Inc. Page 1 of 29
PREPARED FOR:
Hartford Homes, LLC
4801 Goodman St.
Timnath, CO 80547
PREPARED BY:
Galloway & Company, Inc.
5265 Ronald Reagan Blvd., Suite 210
Johnstown, CO 80534
Contact: James Prelog, PE
DATE:
March 30, 2022
Revised June 1, 2022
Revised July 13, 2022
Revised August 16, 2022
Revised November 14, 2022 - Record
BLOOM FILING 1
Fort Collins, CO
FINAL DRAINAGE REPORT
City of Fort Collins Approved Plans
Approved by:
Date:
o
e8
oo
'
sN
m
o
o
l
a
o
=
I
I
I
I
I
I
I
I
I
I
I
I
I
I
3
r,
o
ag
o
s
y
a2
g
w.
o
ao
=
w
p
ti
,
o
do
o
Lj
j
ot
i
oy
wo
s
B
I
I
I
I
I
o
d'y
_
3N
O
NI
l
I
W0
0
1
9
U
w
SN
b
'
ld
1N
3
W
d
O
l
3
A
3
4
l
H
N
l
a
i
i
i
i
i
i
i
i
i
i
i
i
i
i
2
B
s
R
ff
v.
y
w
'
;
a
s
i
I
I
g
_
Eo
1
a$
a
e
i
$
I
m
a
,
I
NE
a
<
o
a
i
s
ws
w
'
=
a
o
Q
as
o
=
e
o=
o"
LL
w
o
B
6
s
aw
`
.
ss
i
I"
3
a`
a_
o
s
_
g
E
r=
n
0
3$
3g
a
g:
a
w
3`
s
a
0
8
w`
.
.
.
E
LL
g
y
C3
'
U
g'
'
ga
y
g
;
Y
.
,
,
_
ed
a
-
`
3
'
'
3'
=
`
so
°
i
g
s
Q%
"
s
a
E
_
as
`
'
o
g
6
a
e
a
;
,
u
o
s-
.
ss
=
a
a
gc
g
e
_
ff
'
=
a
LL
=
-
wg
'
p
e
`
s
o
a
s
s
a
E
S
Q
sa
_
ee
_
ff
s
a$
;
r
.
,
,
l
l'
Ol
13
3
H
S
33
S
-
3N
I
l
H
1H
W
r,
.
.
_
.
.
_
.
_
.
.
.
.
\
.
.
_
.
.
_
.
,
\
_
.
o
o
.
s'
;
,
'
'
i
U`
/
,
RI
I
1
/
I
I
fw
/
.
I
I
I
i
.
I
ai
"
2
I
I
s
r
-
@L
NR
Y
_
W
I
.
.
,
1
I'
/
w€
I
a
i
I
i
1
p
a
I
.
,
I
r<
1
3
PR
I
te
x
i
y=
.
a.
:
_
'
sa
-
-
_
_
_
'
r
I
I
I
-
_
_
_
.
.
.
_
_
i
i
a
I
i
I
C
i
ii
I
-
'
I
I
I
M
;
$
'
i'
j
I
i
r
,
o
x
o
f!
m
P
j
o
w'
V
I'
'
I
I
w
n
I
@
I
k
I
I
I
2N
w:
L=i
I
I
I
I
w
w
I
N
I
,
I
I
Z
I
I
Ii
e
f
i
I
j
,
I
i
I
i
/
,
M
i
I
r,
I
r
r-
-
-
-
-
-
-
-
II
I
I
o
e8
oo
'
sN
m
o
o
l
a
o
=
I
I
I
I
I
I
I
I
I
I
I
I
I
I
3
r,
o
ag
s
y
a2
g
w.
o
ao
=
w
p
ti
,
o
do
o
Lj
j
ot
i
oy
wo
s
B
I
I
I
I
I
o
d'y
_
3N
O
NI
l
I
W0
0
1
9
U
w
SN
b
'
ld
1N
3
W
d
O
l
3
A
3
4
l
H
N
l
a
i
i
i
i
i
i
i
i
i
i
i
i
i
i
w
s_
a
a
e
I
8$
g
'
Eo
1
a
e
i
$
I
m
a
,
I
NE
a
o
a
i
s
ws
w
'
=
a
o
Q
as
o
=
e
o=
o"
LL
w
o
B
6
s
aw
`
.
ss
i
I"
3
a`
a_
o
s
_
g
o
ga
g'
:
a
w
a`
s
a
=
o
a
w-
w"
gw
_
e=
i>
ga
y
-
y;
Y
„
V
-
e
a
'
'
=
3
'
0'
-
3€
ip
o
g
o
°
i
g
s
Q%
"
s
a
E
:
ag
.
`
-
_
_
e
'
o
g
6
a
e
a
;
,
u
o
s-
.
ss
=
a
a
gc
g
e
_
ff
'
=
a
LL
=
-
wg
'
'
pm
o=
s
s
a8
a
3
a
a
s$
_
ee
s
g$
r
.
,
.
.
.
6'
06
13
3
H
S
33
S
-
3N
I
l
H
1d
W
i
k\
`
I
:
.
,
.
}
il
I'
I1
1
3
I
I
i
I
i
I
w
1
i
rt,
I
I
II
I
o
I
i
i
j
I,
I
1;
L.
H
E
I
r 1-
-
I
h
J
,
I
9
l
'
i
a
i
i
!
ii
o
i
U
wW.
i,
i
w,
i
,
Z
i
I
1-
a
,
,
/
i"
@
II
I
o
r
o
I
I
I
I
I
j
j
II
I
I
I
I
I
I
jI
I
i2 Consultants, Inc.
Charts and Figures
FORT COLLINS STORMWATER CRITERIA MANUAL Hydrology Standards (Ch. 5)
3.0 Rational Method
3.2 Runoff Coefficients
Page 5
Table 3.2-2. Surface Type - Runoff Coefficients
Surface Type Runoff Coefficients
Hardscape or Hard Surface
Asphalt, Concrete 0.95
Rooftop 0.95
Recycled Asphalt 0.80
Gravel 0.50
Pavers 0.50
Landscape or Pervious Surface
Lawns, Sandy Soil, Flat Slope < 2% 0.10
Lawns, Sandy Soil, Avg Slope 2-7% 0.15
Lawns, Sandy Soil, Steep Slope >7% 0.20
Lawns, Clayey Soil, Flat Slope < 2% 0.20
Lawns, Clayey Soil, Avg Slope 2-7% 0.25
Lawns, Clayey Soil, Steep Slope >7% 0.35
3.2.1 Composite Runoff Coefficients
Drainage sub-basins are frequently composed of land that has multiple surface types or zoning
classifications. In such cases a composite runoff coefficient must be calculated for any given drainage
sub-basin.
The composite runoff coefficient is obtained using the following formula:
( )
t
n
i
ii
A
xAC
C
∑
==1 Equation 5-2
Where: C = Composite Runoff Coefficient
Ci = Runoff Coefficient for Specific Area (Ai), dimensionless
Ai = Area of Surface with Runoff Coefficient of Ci, acres or square feet
n = Number of different surfaces to be considered
At = Total Area over which C is applicable, acres or square feet
3.2.2 Runoff Coefficient Frequency Adjustment Factor
The runoff coefficients provided in Table 3.2-1 and Table 3.2-2 are appropriate for use with the 2-year
storm event. For any analysis of storms with higher intensities, an adjustment of the runoff coefficient is
required due to the lessening amount of infiltration, depression retention, evapotranspiration and other
losses that have a proportionally smaller effect on high-intensity storm runoff. This adjustment is
F-1
FORT COLLINS STORMWATER CRITERIA MANUAL Hydrology Standards (Ch. 5)
3.0 Rational Method
3.3 Time of Concentration
Page 6
applied to the composite runoff coefficient. These frequency adjustment factors, Cf, are found in Table
3.2-3.
Table 3.2-3. Frequency Adjustment Factors
Storm Return Period
(years)
Frequency Adjustment
Factor (Cf)
2, 5, 10 1.00
25 1.10
50 1.20
100 1.25
3.3 Time of Concentration
3.3.1 Overall Equation
The next step to approximate runoff using the Rational Method is to estimate the Time of
Concentration, Tc, or the time for water to flow from the most remote part of the drainage sub-basin to
the design point under consideration.
The Time of Concentration is represented by the following equation:
𝐓𝐓𝐜𝐜=𝐓𝐓𝐢𝐢+𝐓𝐓𝐭𝐭 Equation 5-3
Where: Tc = Total Time of Concentration, minutes
Ti = Initial or Overland Flow Time of Concentration, minutes
Tt = Channelized Flow in Swale, Gutter or Pipe, minutes
3.3.2 Overland Flow Time
Overland flow, Ti, can be determined by the following equation:
𝐓𝐓𝐢𝐢=𝟏𝟏.𝟖𝟖𝟖𝟖(𝟏𝟏.𝟏𝟏−𝐂𝐂𝐂𝐂𝐂𝐂𝐟𝐟)√𝐋𝐋√𝐒𝐒𝟑𝟑 Equation 3.3-2
Where: C = Runoff Coefficient, dimensionless
Cf = Frequency Adjustment Factor, dimensionless
L = Length of Overland Flow, feet
S = Slope, percent
CXCF
PRODUCT OF CXCF
CANNOT EXCEED THE
VALUE OF 1
OVERLAND FLOW LENGTH
L=200’ MAX IN DEVELOPED AREAS
L=500’ MAX IN UNDEVELOPED
AREAS
F-2
FORT COLLINS STORMWATER CRITERIA MANUAL Hydrology Standards (Ch. 5)
3.0 Rational Method
3.4 Intensity-Duration-Frequency Curves for Rational Method
Page 8
Table 3.4-1. IDF Table for Rational Method
Duration
(min)
Intensity
2-year
(in/hr)
Intensity
10-year
(in/hr)
Intensity
100-year
(in/hr)
Duration
(min)
Intensity
2-year
(in/hr)
Intensity
10-year
(in/hr)
Intensity
100-year
(in/hr)
5 2.85 4.87 9.95
39 1.09 1.86 3.8
6 2.67 4.56 9.31
40 1.07 1.83 3.74
7 2.52 4.31 8.80
41 1.05 1.80 3.68
8 2.40 4.10 8.38
42 1.04 1.77 3.62
9 2.30 3.93 8.03
43 1.02 1.74 3.56
10 2.21 3.78 7.72
44 1.01 1.72 3.51
11 2.13 3.63 7.42
45 0.99 1.69 3.46
12 2.05 3.50 7.16
46 0.98 1.67 3.41
13 1.98 3.39 6.92
47 0.96 1.64 3.36
14 1.92 3.29 6.71
48 0.95 1.62 3.31
15 1.87 3.19 6.52
49 0.94 1.6 3.27
16 1.81 3.08 6.30
50 0.92 1.58 3.23
17 1.75 2.99 6.10
51 0.91 1.56 3.18
18 1.70 2.90 5.92
52 0.9 1.54 3.14
19 1.65 2.82 5.75
53 0.89 1.52 3.10
20 1.61 2.74 5.60
54 0.88 1.50 3.07
21 1.56 2.67 5.46
55 0.87 1.48 3.03
22 1.53 2.61 5.32
56 0.86 1.47 2.99
23 1.49 2.55 5.20
57 0.85 1.45 2.96
24 1.46 2.49 5.09
58 0.84 1.43 2.92
25 1.43 2.44 4.98
59 0.83 1.42 2.89
26 1.4 2.39 4.87
60 0.82 1.4 2.86
27 1.37 2.34 4.78
65 0.78 1.32 2.71
28 1.34 2.29 4.69
70 0.73 1.25 2.59
29 1.32 2.25 4.60
75 0.70 1.19 2.48
30 1.30 2.21 4.52
80 0.66 1.14 2.38
31 1.27 2.16 4.42
85 0.64 1.09 2.29
32 1.24 2.12 4.33
90 0.61 1.05 2.21
33 1.22 2.08 4.24
95 0.58 1.01 2.13
34 1.19 2.04 4.16
100 0.56 0.97 2.06
35 1.17 2.00 4.08
105 0.54 0.94 2.00
36 1.15 1.96 4.01
110 0.52 0.91 1.94
37 1.16 1.93 3.93
115 0.51 0.88 1.88
38 1.11 1.89 3.87
120 0.49 0.86 1.84
F-3
FORT COLLINS STORMWATER CRITERIA MANUAL Hydrology Standards (Ch. 5)
3.0 Rational Method
3.4 Intensity-Duration-Frequency Curves for Rational Method
Page 9
Figure 3.4-1. Rainfall IDF Curve – Fort Collins
F-4
FORT COLLINS STORMWATER CRITERIA MANUAL Hydrology Standards (Ch. 5)
4.0 SWMM
4.1 Input Parameters
Page 11
Table 4.1-2. Land Use - Percent Impervious
Land Use
Percent Impervious
(%)
Residential
Urban Estate 30
Low Density 50
Medium Density 70
High Density 90
Commercial
Commercial 80
Industrial 90
Undeveloped
Open Lands, Transition 20
Greenbelts, Agriculture 2
Offsite Flow Analysis (when
Land Use not defined) 45
Reference: For further guidance regarding zoning classifications, refer to the Land Use
Code, Article 4.
For Final Plan (FP) submittals, impervious values must be based on the proposed land surface types.
Refer to Table 4.1-3 for recommended percent impervious values.
Table 4.1-3. Surface Type – Percent Impervious
Surface Type
Percent Impervious
(%)
Hardscape or Hard Surface
Asphalt, Concrete 100
Rooftop 90
Recycled Asphalt 80
Gravel 40
Pavers 40
Landscape or Pervious Surface
Playgrounds 25
Lawns, Sandy soil 2
Lawns, Clayey soil 2
F-5
Project:Disturbed Acres:2.00
EROSION CONTROL BMPs Units
Estimated
Quantity
Unit
Price
Total
Price
L.F.1150 $5.00 $5,750.00
L.F.100 $5.00 $500.00
EA 1 $1,000.00 $1,000.00
EA 1 $200.00 $200.00
EA 1 $1,500.00 $1,500.00
L.F.50 $5.00 $250.00
Sub-Total:$9,200.00
1.5 x Sub-Total:$13,800.00
Amount of security:$13,800.00
Total Acres x Price/acre:$4,000.00
$2,000.00 Sub-Total: $4,000.00
1.5 x Sub-Total:$6,000.00
Amount to Re-seed:$6,000.00
Minimum escrow amount:$3,000.00
Erosion Control Escrow:$13,800.00
Erosion and Sediment Control Escrow/Security Calculation
for The City of Fort Collins
BMP Amount
Sediment Control Log (SCL)
Vehicle Tracking Control Mat (VTC)
Rock Sock (RS)
Reseeding Amount
Silt Fence (SF)
Miniumum Escrow Amount
Tract II, Bloom Filing One
Unit Price of Seeding per acre:
“The amount of the security must be based on one and one-half times the estimate of the cost to install the approved measures, or one and one-half times
the cost to re-vegetate the disturbed land to dry land grasses based upon unit cost determined by the City's Annual Revegetation and Stabilization Bid,
whichever is greater. In no instance, will the amount of security be less than one thousand five hundred dollars ($1,500) for residential development or three
thousand dollars ($3,000) for commercial development”
Inlet Protection (IP)
Concrete Washout (CWA)
Final Escrow Amount
12/19/2023 1:20 PM C:\Users\troy\Dropbox\I2\Projects\1061-3 Bloom\Documents\Drainage\Bloom_EC_Escrow.xls
F-6
PARCEL NO. 8708400064
OWNER: WILLIAM HOUSE ET AL
PARCEL NO. 8708400057
OWNER: WILLIAM HOUSE ET AL
LOT 1 AMENDED PLAT
L 1-8, TRACT B & DOZIER DR
PARCEL NO. 8708400034
OWNER: WILLIAM HOUSE ET AL
PARCEL NO. 8709000008
OWNER: LUDIQUE CHAT, LLC
P
A
R
C
E
L
N
O
.
8
7
0
9
0
0
0
9
4
0
O
W
N
E
R
:
L
A
K
E
C
A
N
A
L
IR
R
I
G
A
T
I
O
N
C
O
M
P
A
N
Y
PARCEL NO. 8709307007
OWNER: MULBERRY SF LLC
L
A
K
E
C
A
N
A
L
DE
L
O
Z
I
E
R
D
R
PROPOSED
DETENTION
POND
EAST MULBERRY (HWY 14) FRONTAGE ROAD
PROPOSED
DETENTION
POND
BLOOM FILING SIX
LOT 1
LOT 2
LOT 4
LOT 3
PROPOSED RAIN GARDEN
PROPOSED RAIN GARDEN
SHEET
OF SHEETS
B
L
O
O
M
F
I
L
I
N
G
S
I
X
C
I
T
Y
O
F
F
O
R
T
C
O
L
L
I
N
S
,
C
O
U
N
T
Y
O
F
L
A
R
I
M
E
R
,
S
T
A
T
E
O
F
C
O
L
O
R
A
D
O
17
U
T
I
L
I
T
Y
P
L
A
N
S
Know what's below.
before you dig.Call
R
PRELIMINARY
NOT FOR CONSTRUCTION
05/15/2024
LI
D
E
X
H
I
B
I
T
LID-1
i2
LEGEND OF SYMBOLS
– ’.
SURVEY NOTES
PARCEL NO. 8708400064
OWNER: WILLIAM HOUSE ET AL
PARCEL NO. 8708400057
OWNER: WILLIAM HOUSE ET AL
LOT 1 AMENDED PLAT
L 1-8, TRACT B & DOZIER DR
PARCEL NO. 8708400034
OWNER: WILLIAM HOUSE ET AL
PARCEL NO. 8709000008
OWNER: LUDIQUE CHAT, LLC
P
A
R
C
E
L
N
O
.
8
7
0
9
0
0
0
9
4
0
O
W
N
E
R
:
L
A
K
E
C
A
N
A
L
IR
R
I
G
A
T
I
O
N
C
O
M
P
A
N
Y
PARCEL NO. 8709307007
OWNER: MULBERRY SF LLC
L
A
K
E
C
A
N
A
L
DE
L
O
Z
I
E
R
D
R
PROPOSED
DETENTION
POND
EAST MULBERRY (HWY 14) FRONTAGE ROAD
PROPOSED
DETENTION
POND
BLOOM FILING FIVE
LOT 1
LOT 3
LOT 2
OUTLOT A
PROPOSED RAIN GARDEN
PROPOSED RAIN GARDEN
PROPOSED RAIN GARDEN
LOT 4
SHEET
OF SHEETS
B
L
O
O
M
F
I
L
I
N
G
S
I
X
C
I
T
Y
O
F
F
O
R
T
C
O
L
L
I
N
S
,
C
O
U
N
T
Y
O
F
L
A
R
I
M
E
R
,
S
T
A
T
E
O
F
C
O
L
O
R
A
D
O
17
U
T
I
L
I
T
Y
P
L
A
N
S
Know what's below.
before you dig.Call
R
PRELIMINARY
NOT FOR CONSTRUCTION
05/15/2024
OV
E
R
A
L
L
D
R
A
I
N
A
G
E
P
L
A
N
C-10
10
i2
LEGEND OF SYMBOLS
BASIN RUNOFF SUMMARY
DETENTION SUMMARY
– ’.
SURVEY NOTES
C:
\
U
s
e
r
s
\
t
r
o
y
\
D
r
o
p
b
o
x
\
I
2
\
P
r
o
j
e
c
t
s
\
1
0
6
1
-
3
B
l
o
o
m
\
D
W
G
\
S
h
e
e
t
s
\
B
l
o
o
m
_
D
R
.
D
W
G
,
5
/
1
5
/
2
0
2
4
7
:
2
4
:
4
9
A
M
,
_
A
u
t
o
C
A
D
P
D
F
(
G
e
n
e
r
a
l
D
o
c
u
m
e
n
t
a
t
i
o
n
)
.
p
c
3
PARCEL NO. 8708400064
OWNER: WILLIAM HOUSE ET AL
PARCEL NO. 8708400057
OWNER: WILLIAM HOUSE ET AL
LOT 1 AMENDED PLAT
L 1-8, TRACT B & DOZIER DR
PARCEL NO. 8708400034
OWNER: WILLIAM HOUSE ET AL
PARCEL NO. 8709000008
OWNER: LUDIQUE CHAT, LLC
P
A
R
C
E
L
N
O
.
8
7
0
9
0
0
0
9
4
0
O
W
N
E
R
:
L
A
K
E
C
A
N
A
L
IR
R
I
G
A
T
I
O
N
C
O
M
P
A
N
Y
PARCEL NO. 8709307007
OWNER: MULBERRY SF LLC
L
A
K
E
C
A
N
A
L
DE
L
O
Z
I
E
R
D
R
EAST MULBERRY (HWY 14) FRONTAGE ROAD
PROPOSED
DETENTION
POND
PROPOSED
DETENTION
POND
INTERIM
INTERIM
INITIAL
INITIAL
INTERIM
INTERIM
INTERIMINTERIM
INTERIM
INTERIM
INTERIM
INITIAL
INITIAL
INITIAL
INITIAL
INITIAL
INITIAL
INITIAL
INTERIM
INTERIM
INTERIM
BLOOM FILING SIX
LOT 3
LOT 2
OUTLOT A
LOT 1
LOT 4
INTERIM
INTERIMINTERIM
INTERIM
INTERIM
INTERIM
INTERIM
SHEET
OF SHEETS
B
L
O
O
M
F
I
L
I
N
G
S
I
X
C
I
T
Y
O
F
F
O
R
T
C
O
L
L
I
N
S
,
C
O
U
N
T
Y
O
F
L
A
R
I
M
E
R
,
S
T
A
T
E
O
F
C
O
L
O
R
A
D
O
17
U
T
I
L
I
T
Y
P
L
A
N
S
Know what's below.
before you dig.Call
R
PRELIMINARY
NOT FOR CONSTRUCTION
05/15/2024
SE
D
I
M
E
N
T
&
E
R
O
S
I
O
N
C
O
N
T
R
O
L
P
L
A
N
C-11
11
i2
LEGEND OF SYMBOLS
TENTATIVE CONSTRUCTION SCHEDULE
NOTES
EROSON CONTROL TABLE
– ’.
SURVEY NOTES
INITIAL/INTERIM/FINAL
C:
\
U
s
e
r
s
\
t
r
o
y
\
D
r
o
p
b
o
x
\
I
2
\
P
r
o
j
e
c
t
s
\
1
0
6
1
-
3
B
l
o
o
m
\
D
W
G
\
S
h
e
e
t
s
\
B
l
o
o
m
_
E
C
.
D
W
G
,
5
/
1
5
/
2
0
2
4
7
:
2
5
:
0
1
A
M
,
_
A
u
t
o
C
A
D
P
D
F
(
G
e
n
e
r
a
l
D
o
c
u
m
e
n
t
a
t
i
o
n
)
.
p
c
3
DE
T
A
I
L
S
H
E
E
T
1
C-12
12
SHEET
OF SHEETS
B
L
O
O
M
F
I
L
I
N
G
S
I
X
C
I
T
Y
O
F
F
O
R
T
C
O
L
L
I
N
S
,
C
O
U
N
T
Y
O
F
L
A
R
I
M
E
R
,
S
T
A
T
E
O
F
C
O
L
O
R
A
D
O
17
U
T
I
L
I
T
Y
P
L
A
N
S
Know what's below.
before you dig.Call
R
PRELIMINARY
NOT FOR CONSTRUCTION
05/15/2024
C:
\
U
s
e
r
s
\
t
r
o
y
\
D
r
o
p
b
o
x
\
I
2
\
P
r
o
j
e
c
t
s
\
1
0
6
1
-
3
B
l
o
o
m
\
D
W
G
\
S
h
e
e
t
s
\
B
l
o
o
m
_
D
T
.
d
w
g
,
5
/
1
5
/
2
0
2
4
7
:
2
5
:
1
2
A
M
,
_
A
u
t
o
C
A
D
P
D
F
(
G
e
n
e
r
a
l
D
o
c
u
m
e
n
t
a
t
i
o
n
)
.
p
c
3
DE
T
A
I
L
S
H
E
E
T
2
C-13
13
SHEET
OF SHEETS
B
L
O
O
M
F
I
L
I
N
G
S
I
X
C
I
T
Y
O
F
F
O
R
T
C
O
L
L
I
N
S
,
C
O
U
N
T
Y
O
F
L
A
R
I
M
E
R
,
S
T
A
T
E
O
F
C
O
L
O
R
A
D
O
17
U
T
I
L
I
T
Y
P
L
A
N
S
Know what's below.
before you dig.Call
R
PRELIMINARY
NOT FOR CONSTRUCTION
05/15/2024
C:
\
U
s
e
r
s
\
t
r
o
y
\
D
r
o
p
b
o
x
\
I
2
\
P
r
o
j
e
c
t
s
\
1
0
6
1
-
3
B
l
o
o
m
\
D
W
G
\
S
h
e
e
t
s
\
B
l
o
o
m
_
D
T
.
d
w
g
,
5
/
1
5
/
2
0
2
4
7
:
2
5
:
2
1
A
M
,
_
A
u
t
o
C
A
D
P
D
F
(
G
e
n
e
r
a
l
D
o
c
u
m
e
n
t
a
t
i
o
n
)
.
p
c
3
DE
T
A
I
L
S
H
E
E
T
3
C-14
14
SHEET
OF SHEETS
B
L
O
O
M
F
I
L
I
N
G
S
I
X
C
I
T
Y
O
F
F
O
R
T
C
O
L
L
I
N
S
,
C
O
U
N
T
Y
O
F
L
A
R
I
M
E
R
,
S
T
A
T
E
O
F
C
O
L
O
R
A
D
O
17
U
T
I
L
I
T
Y
P
L
A
N
S
Know what's below.
before you dig.Call
R
PRELIMINARY
NOT FOR CONSTRUCTION
05/15/2024
C:
\
U
s
e
r
s
\
t
r
o
y
\
D
r
o
p
b
o
x
\
I
2
\
P
r
o
j
e
c
t
s
\
1
0
6
1
-
3
B
l
o
o
m
\
D
W
G
\
S
h
e
e
t
s
\
B
l
o
o
m
_
D
T
.
d
w
g
,
5
/
1
5
/
2
0
2
4
7
:
2
5
:
3
1
A
M
,
_
A
u
t
o
C
A
D
P
D
F
(
G
e
n
e
r
a
l
D
o
c
u
m
e
n
t
a
t
i
o
n
)
.
p
c
3