HomeMy WebLinkAboutBLOOM FILING SIX - PDP230017 - SUBMITTAL DOCUMENTS - ROUND 2 - Responses3201 East Mulberry, Unit Q – P.O. Box 1518 • Fort Collins, Colorado 80522
Phone (970) 498-0604 •Fax (970) 498-0701 •www.boxeldersanitation.org
January 16, 2024
Brandy Bethuram Harras
Community Development and neighborhood Services
City of Fort Collins
281 North College Avenue, PO Box 580
Fort Collins, CO 80522
RE: Case Number: PDP230017
Title: Bloom Tract II
Engineering/Survey: Planscapes Design Group
Engineer Contact: Emily Tarantini
Applicant: MIC TDC Mulberry St Fort Collins, LLC
Parcel Number(s): 8709307009
Boxelder Sanitation District (BSD) has reviewed the proposed project identified as:
Retail development consisting of 4 pads.
The District hereby advises as follows:
There is no objection to this proposal.
Responses required to comments below.
The District will respond at the hearing date of ______________.
Comments:
1) Standalone easement will be required for all sewers that are not located in the
public R.O.W. and in alley tracts. The easements are necessary to address access
and maintenance issues that are not included on the plat. Standard easement width
for Boxelder is 30-feet. District Easement template is attached.
2) Add distances from curb to sanitary sewer lines on the utility plan.
3) Boxelder Sanitation District Rules and Regulation have specific requirements for
monitoring and treating industrial waste. If any use within the building uses falls into
those regulations, it will be necessary to coordinate the requirements with Kevin
Schmitz, District Pretreatment Coordinator. This could include the design for
grease interceptor and monitoring manholes. Applicant shall provide information
about the intended use of the facility and potential discharges that may require
treatment/monitoring of industrial wastes.
Please feel free to contact me if you have any questions.
Sincerely,
Daniel Richardson, PE
District Engineer