Loading...
HomeMy WebLinkAboutSIT AND STAY DOG BAR - FDP230005 - SUBMITTAL DOCUMENTS - ROUND 3 - ECS ReportProject: Disturbed Acres:2.19 Seeded Acres:0.24 EROSION CONTROL BMPs Units Estimated Quantity Unit Price Total Price L.F.1100 $1.40 $1,540.00 E.A.1 $2,600.00 $2,600.00 L.F.45 $1.50 $67.50 L.F.150 $8.00 $1,200.00 L.F.345 $6.75 $2,328.75 L.F.700 $3.50 $2,450.00 E.A.9 $225.00 $2,025.00 E.A.1 $2,500.00 $2,500.00 E.A.1 $2,500.00 $2,500.00 Sub-Total:$17,211.25 1.5 x Sub-Total:$25,816.88 Amount of security:$25,816.88 Total Acres x Price/acre:$588.78 $2,500.00 Sub-Total: $588.78 1.5 x Sub-Total:$883.18 Amount to Re-seed:$883.18 Minimum escrow amount:$3,000.00 Erosion Control Escrow:$25,816.88 Erosion and Sediment Control Escrow/Security Calculation for The City of Fort Collins BMP Amount Silt Fence (SF) Rock Sock (RS) Erosion Control Log Wheel Rolled Berm Inlet Protection Sediment Trap Vehicle Tracking Pad Reseeding Amount Miniumum Escrow Amount Sit and Stay Dog Park Fort Collins Unit Price of Seeding per acre: “The amount of the security must be based on one and one-half times the estimate of the cost to install the approved measures, or one and one-half times the cost to re-vegetate the disturbed land to dry land grasses based upon unit cost determined by the City's Annual Revegetation and Stabilization Bid, whichever is greater. In no instance, will the amount of security be less than one thousand five hundred dollars ($1,500) for residential development or three thousand dollars ($3,000) for commercial development” Concrete Washout (CW) Construction Fence (CF) Final Escrow Amount 4/30/2024 3:04 PM F:\2021\04501-05000\021-04575\40-Design\Reports\GNCV\Drainage\_Examples\Example_Escrow