HomeMy WebLinkAboutSIT AND STAY DOG BAR - FDP230005 - SUBMITTAL DOCUMENTS - ROUND 3 - ECS ReportProject: Disturbed Acres:2.19
Seeded Acres:0.24
EROSION CONTROL BMPs Units
Estimated
Quantity
Unit
Price
Total
Price
L.F.1100 $1.40 $1,540.00
E.A.1 $2,600.00 $2,600.00
L.F.45 $1.50 $67.50
L.F.150 $8.00 $1,200.00
L.F.345 $6.75 $2,328.75
L.F.700 $3.50 $2,450.00
E.A.9 $225.00 $2,025.00
E.A.1 $2,500.00 $2,500.00
E.A.1 $2,500.00 $2,500.00
Sub-Total:$17,211.25
1.5 x Sub-Total:$25,816.88
Amount of security:$25,816.88
Total Acres x Price/acre:$588.78
$2,500.00 Sub-Total: $588.78
1.5 x Sub-Total:$883.18
Amount to Re-seed:$883.18
Minimum escrow amount:$3,000.00
Erosion Control Escrow:$25,816.88
Erosion and Sediment Control Escrow/Security Calculation
for The City of Fort Collins
BMP Amount
Silt Fence (SF)
Rock Sock (RS)
Erosion Control Log
Wheel Rolled Berm
Inlet Protection
Sediment Trap
Vehicle Tracking Pad
Reseeding Amount
Miniumum Escrow Amount
Sit and Stay Dog Park Fort Collins
Unit Price of Seeding per acre:
“The amount of the security must be based on one and one-half times the estimate of the cost to install the approved measures, or one and one-half times
the cost to re-vegetate the disturbed land to dry land grasses based upon unit cost determined by the City's Annual Revegetation and Stabilization Bid,
whichever is greater. In no instance, will the amount of security be less than one thousand five hundred dollars ($1,500) for residential development or three
thousand dollars ($3,000) for commercial development”
Concrete Washout (CW)
Construction Fence (CF)
Final Escrow Amount
4/30/2024 3:04 PM F:\2021\04501-05000\021-04575\40-Design\Reports\GNCV\Drainage\_Examples\Example_Escrow