Loading...
HomeMy WebLinkAboutHEARTSIDE HILL ACCESSORY BUILDING AND CHILD CARE CENTER - FDP240007 - SUBMITTAL DOCUMENTS - ROUND 1 - ECS Report5/1/2024 Project:Disturbed Acres:0.72 EROSION CONTROL BMPs Units Estimated Quantity Unit Price Total Price L.F. 800 $2.50 $2,000.00 each 4 $150.00 $600.00 C.Y. 12 $100.00 $1,200.00 each 1 $500.00 $500.00 each 2 $300.00 $600.00 A.C 0.41 $2,000.00 $820.00 Sub-Total: $5,720.00 1.5 x Sub-Total: $8,580.00 Amount of security: $8,580.00 AC 0.72 $2,000.00 $1,440.00 Sub-Total: $1,440.00 1.5 x Sub-Total: $2,160.00 Amount to Re-seed: $2,160.00 Minimum escrow amount: $3,000.00 Erosion Control Escrow:$8,580.00 Erosion and Sediment Control Escrow/Security Calculation for The City of Fort Collins BMP Amount Silt Fence Inlet Protection Reseeding Amount Miniumum Escrow Amount Heartside Hill - Accessory Building & Child Care Center Seeding “The amount of the security must be based on one and one-half times the estimate of the cost to install the approved measures, or one and one-half times the cost to re-vegetate the disturbed land to dry land grasses based upon unit cost determined by the City's Annual Revegetation and Stabilization Bid, whichever is greater. In no instance, will the amount of security be less than one thousand five hundred dollars ($1,500) for residential development or three thousand dollars ($3,000) for commercial development” Rock Sock Vehicle Tracking Control Pad Final Escrow Amount (Maximum between BMP, Reseeding and Minimum Escrow) Seeding & Mulching Riprap 5/1/2024 12:04 PM G:\Projects\21-1045-02 HH Community Bldg\03 Design Documents\Cost Estimates\HH-CC Erosion Control Escrow.xls